25/08/15 09:24:10	SIG	M62/2122K1	OFF	M62 J25 - J30	
25/08/15 09:24:10	SIG	M62/2122K2	OFF	M62 J25 - J30	
26/08/15 16:38:57	SIG	M62/2117B2	50R	M62 J25 - J30	
27/08/15 11:26:27	SIG	M62/1987A2	40R	M62 J25 - J30	
27/08/15 13:31:12	SIG	M62/1974M1	OFF	M62 J25 - J30	
27/08/15 13:31:12	SIG	M62/1974M2	OFF	M62 J25 - J30	
27/08/15 13:34:12	SIG	M62/1974B1	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1968B1	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1968B2	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1968B3	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1968L1	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1974B2	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1974B3	OFF	M62 J25 - J30	
27/08/15 13:34:13	SIG	M62/1974B4	OFF	M62 J25 - J30	
27/08/15 16:40:52	SIG	M62/1960B1	OFF	M62 J25 - J30	
27/08/15 16:40:52	SIG	M62/1960B2	OFF	M62 J25 - J30	
27/08/15 16:40:52	SIG	M62/1960B3	OFF	M62 J25 - J30	
27/08/15 16:40:52	SIG	M62/1960L1	OFF	M62 J25 - J30	
27/08/15 16:40:52	SIG	M62/1960L2	OFF	M62 J25 - J30	
28/08/15 18:08:24	SIG	M62/2197A1	OFF	M62 J25 - J30	
28/08/15 18:08:24	SIG	M62/2197A2	OFF	M62 J25 - J30	
28/08/15 18:08:24	SIG	M62/2197A3	OFF	M62 J25 - J30	
28/08/15 23:04:43	SIG	M62/2166K1	OFF	M62 J25 - J30	
28/08/15 23:04:43	SIG	M62/2166K2	OFF	M62 J25 - J30	
28/08/15 23:39:27	SIG	M621/1002A1	OFF	M62 J25 - J30	
28/08/15 23:39:27	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/08/15 08:15:31	SIG	M62/2135A1	OFF	M62 J25 - J30	
29/08/15 08:15:31	SIG	M62/2135A2	OFF	M62 J25 - J30	
29/08/15 08:15:31	SIG	M62/2135A3	OFF	M62 J25 - J30	
29/08/15 08:15:31	SIG	M62/2135A4	OFF	M62 J25 - J30	
29/08/15 08:16:37	SIG	M62/2155A1	OFF	M62 J25 - J30	
29/08/15 08:16:37	SIG	M62/2155A2	OFF	M62 J25 - J30	
29/08/15 08:16:37	SIG	M62/2155J1	OFF	M62 J25 - J30	
29/08/15 08:16:37	SIG	M62/2155K1	OFF	M62 J25 - J30	
29/08/15 08:16:37	SIG	M62/2157J1	OFF	M62 J25 - J30	
29/08/15 08:16:37	SIG	M62/2157J2	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2144A1	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2144A2	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2144J1	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2144K1	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2151A1	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2151A2	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2151J1	OFF	M62 J25 - J30	
29/08/15 08:18:32	SIG	M62/2151K1	OFF	M62 J25 - J30	
29/08/15 13:14:36	SIG	M62/2124A1	BLNK	M62 J25 - J30	
29/08/15 13:14:36	SIG	M62/2124A2	OFF	M62 J25 - J30	
29/08/15 13:14:36	SIG	M62/2124A3	OFF	M62 J25 - J30	
29/08/15 13:14:36	SIG	M62/2124A4	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2097A1	BLNK	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2097A2	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2097A3	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2097A4	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2106A1	BLNK	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2106A2	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2106A4	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2114A1	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2114A2	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2114A3	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2117A1	BLNK	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2117A2	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2117A3	OFF	M62 J25 - J30	
29/08/15 13:53:12	SIG	M62/2117A4	OFF	M62 J25 - J30	
30/08/15 18:58:24	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/08/15 18:58:24	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/08/15 18:58:24	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/08/15 18:58:24	SIG	M62/1981B4	OFF	M62 J25 - J30	
31/08/15 03:15:53	SIG	M62/2073K1	OFF	M62 J25 - J30	
31/08/15 03:15:53	SIG	M62/2073K2	OFF	M62 J25 - J30	
31/08/15 03:18:54	SIG	M62/2074A2	OFF	M62 J25 - J30	
31/08/15 03:18:54	SIG	M62/2074A3	OFF	M62 J25 - J30	
31/08/15 03:18:54	SIG	M62/2074A4	OFF	M62 J25 - J30	
31/08/15 03:18:55	SIG	M62/2074A1	BLNK	M62 J25 - J30	
31/08/15 08:57:30	SIG	M62/2004B1	BLNK	M62 J25 - J30	
31/08/15 08:57:30	SIG	M62/2004B2	OFF	M62 J25 - J30	
31/08/15 08:57:30	SIG	M62/2004B3	OFF	M62 J25 - J30	
31/08/15 08:57:30	SIG	M62/2004B4	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1955K1	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1955K2	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1956A1	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1956A2	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1956A3	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1979K1	OFF	M62 J25 - J30	
31/08/15 13:37:45	SIG	M62/1979K2	OFF	M62 J25 - J30	
31/08/15 13:40:35	SIG	M62/2004A1	OFF	M62 J25 - J30	
31/08/15 13:40:35	SIG	M62/2004A2	OFF	M62 J25 - J30	
31/08/15 13:40:35	SIG	M62/2004A3	OFF	M62 J25 - J30	
31/08/15 13:40:36	SIG	M62/1999A1	OFF	M62 J25 - J30	
31/08/15 13:40:36	SIG	M62/1999A2	OFF	M62 J25 - J30	
31/08/15 13:40:36	SIG	M62/1999A3	OFF	M62 J25 - J30	
31/08/15 13:40:36	SIG	M62/1999J1	OFF	M62 J25 - J30	
31/08/15 13:40:36	SIG	M62/1999J2	OFF	M62 J25 - J30	
31/08/15 13:40:46	SIG	M62/1960A1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1960A2	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1960A3	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1960K1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1960K2	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1968A1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1968A2	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1968A3	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1968A4	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1974A1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1974A2	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1974A3	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1974A4	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1981A1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1981A2	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1981A3	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1981A4	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1987A1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1987A3	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1987J1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1992A1	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1992A2	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1992A3	OFF	M62 J25 - J30	
31/08/15 13:40:56	SIG	M62/1992J1	OFF	M62 J25 - J30	
31/08/15 14:57:45	SIG	M606/2003B1	OFF	M62 J25 - J30	
31/08/15 14:57:45	SIG	M606/2003B2	OFF	M62 J25 - J30	
31/08/15 14:57:45	SIG	M62/2005M1	OFF	M62 J25 - J30	
31/08/15 14:57:45	SIG	M62/2005M2	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1987B1	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1987B2	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1987B3	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1987B4	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1992B1	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1992B2	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1992B3	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1992B4	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1999B2	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1999B3	OFF	M62 J25 - J30	
31/08/15 15:00:46	SIG	M62/1999B4	OFF	M62 J25 - J30	
31/08/15 15:00:47	SIG	M62/1999B1	BLNK	M62 J25 - J30	
31/08/15 15:13:37	SIG	M62/2170L1	OFF	M62 J25 - J30	
31/08/15 15:13:37	SIG	M62/2170L2	OFF	M62 J25 - J30	
31/08/15 15:21:37	SIG	M62/2159M1	OFF	M62 J25 - J30	
31/08/15 15:21:37	SIG	M62/2159M2	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2132B1	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2132B2	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2132B3	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2137B1	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2137B2	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2137B3	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2137B4	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2147B1	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2147B2	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2147B3	OFF	M62 J25 - J30	
31/08/15 15:24:38	SIG	M62/2147B4	OFF	M62 J25 - J30	
31/08/15 15:26:38	SIG	M62/2125B1	OFF	M62 J25 - J30	
31/08/15 15:26:38	SIG	M62/2125B2	OFF	M62 J25 - J30	
31/08/15 15:26:38	SIG	M62/2125B3	OFF	M62 J25 - J30	
31/08/15 15:29:38	SIG	M62/2125L1	OFF	M62 J25 - J30	
31/08/15 15:29:38	SIG	M62/2125L2	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2088B1	BLNK	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2088B2	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2088B3	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2088B4	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2097B1	BLNK	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2097B2	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2097B3	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2097B4	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2106B1	BLNK	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2106B2	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2106B3	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2106B4	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2113B1	BLNK	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2113B2	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2113B3	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2113B4	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2117B1	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2117B3	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2120M1	OFF	M62 J25 - J30	
31/08/15 16:50:43	SIG	M62/2120M2	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2074B1	BLNK	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2074B2	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2074B3	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2074B4	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2081B1	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2081B2	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2081B3	OFF	M62 J25 - J30	
31/08/15 16:50:44	SIG	M62/2081L1	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2008K1	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2008K2	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2012A1	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2012A2	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2012A3	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2018A1	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2018A2	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2018A3	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2018A4	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2025A1	BLNK	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2025A2	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2025A3	OFF	M62 J25 - J30	
31/08/15 16:59:51	SIG	M62/2025A4	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2033A1	BLNK	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2033A2	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2033A3	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2033A4	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2041A1	BLNK	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2041A2	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2041A3	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2041A4	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2050A1	BLNK	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2050A2	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2050A3	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2050A4	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2057A1	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2057A2	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2057A3	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2057J1	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2065A1	BLNK	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2065A2	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2065A3	OFF	M62 J25 - J30	
31/08/15 16:59:52	SIG	M62/2065A4	OFF	M62 J25 - J30	
31/08/15 17:54:57	SIG	M62/2069M1	OFF	M62 J25 - J30	
31/08/15 17:54:57	SIG	M62/2069M2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2025B1	BLNK	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2025B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2025B3	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2025B4	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2033B1	BLNK	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2033B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2033B4	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2041B1	BLNK	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2041B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2041B3	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2041B4	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2050B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2050B3	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2050B4	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2057B1	BLNK	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2057B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2057B3	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2057B4	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2065B1	BLNK	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2065B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2065B3	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2065B4	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M62/2065M1	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M621/1002B1	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M621/1002B2	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M621/1010B1	OFF	M62 J25 - J30	
31/08/15 17:54:58	SIG	M621/1010B2	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2012B1	BLNK	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2012B2	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2012B3	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2012B4	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2018B1	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2018B2	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2018B3	OFF	M62 J25 - J30	
31/08/15 17:54:59	SIG	M62/2018L1	OFF	M62 J25 - J30	
31/08/15 20:01:07	SIG	M62/2159B1	OFF	M62 J25 - J30	
31/08/15 20:01:07	SIG	M62/2159B2	OFF	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2079A1	BLNK	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2079A2	OFF	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2079A3	OFF	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2079A4	OFF	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2088A1	BLNK	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2088A2	OFF	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2088A3	OFF	M62 J25 - J30	
31/08/15 20:19:35	SIG	M62/2088A4	OFF	M62 J25 - J30	
31/08/15 20:32:43	SIG	M62/2203B1	OFF	M62 J25 - J30	
31/08/15 20:32:43	SIG	M62/2203B2	OFF	M62 J25 - J30	
31/08/15 20:32:43	SIG	M62/2203B3	OFF	M62 J25 - J30	
31/08/15 20:38:43	SIG	M62/2170B1	OFF	M62 J25 - J30	
31/08/15 20:38:43	SIG	M62/2170B2	OFF	M62 J25 - J30	
31/08/15 20:39:43	SIG	M62/2197B1	OFF	M62 J25 - J30	
31/08/15 20:39:43	SIG	M62/2197B2	OFF	M62 J25 - J30	
31/08/15 20:39:43	SIG	M62/2197B3	OFF	M62 J25 - J30	
31/08/15 20:39:43	SIG	M62/2199M1	OFF	M62 J25 - J30	
31/08/15 20:39:43	SIG	M62/2199M2	OFF	M62 J25 - J30	
31/08/15 20:42:43	SIG	M62/2194B1	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2177B1	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2177B2	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2177L1	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2177L2	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2183B1	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2183L1	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2183L2	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2189B1	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2189B2	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2189B3	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2189B4	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2194B2	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2194B3	OFF	M62 J25 - J30	
31/08/15 20:42:44	SIG	M62/2194B4	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2157A1	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2157A2	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2157K1	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2170A1	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2170A2	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2170K1	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2170K2	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2177A1	BLNK	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2177A2	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2177A3	OFF	M62 J25 - J30	
31/08/15 22:47:46	SIG	M62/2177A4	OFF	M62 J25 - J30	
31/08/15 22:50:46	SIG	M62/2183A2	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2163A1	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2163A2	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2183A3	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2183A4	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2189A2	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2189A3	OFF	M62 J25 - J30	
31/08/15 22:50:47	SIG	M62/2189A4	OFF	M62 J25 - J30	
31/08/15 22:50:48	SIG	M62/2183A1	BLNK	M62 J25 - J30	
31/08/15 22:50:48	SIG	M62/2189A1	BLNK	M62 J25 - J30	
31/08/15 22:50:48	SIG	M62/2189A1	BLNK	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2008K1	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2008K2	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2012A1	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2012A2	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2012A3	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2018A1	HSD	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2025A1	REDX	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2033A1	REDX	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2041A1	REDX	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2041A2	NR	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2041A3	NR	M62 J25 - J30	
01/09/15 06:32:54	SIG	M62/2041A4	NR	M62 J25 - J30	
01/09/15 06:36:54	SIG	M62/2004A1	60R	M62 J25 - J30	
01/09/15 06:36:54	SIG	M62/2004A2	60R	M62 J25 - J30	
01/09/15 06:36:54	SIG	M62/2004A3	60R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 06:38:54	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2008K1	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2008K2	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2012A1	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2012A2	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2012A3	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2018A2	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2018A3	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2018A4	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2025A2	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2025A3	50R	M62 J25 - J30	
01/09/15 06:38:54	SIG	M62/2025A4	50R	M62 J25 - J30	
01/09/15 06:38:55	SIG	M62/2033A2	50R	M62 J25 - J30	
01/09/15 06:38:55	SIG	M62/2033A3	50R	M62 J25 - J30	
01/09/15 06:38:55	SIG	M62/2033A4	50R	M62 J25 - J30	
01/09/15 06:39:00	SIG	M62/2033A2	40R	M62 J25 - J30	
01/09/15 06:39:00	SIG	M62/2033A3	40R	M62 J25 - J30	
01/09/15 06:39:00	SIG	M62/2033A4	40R	M62 J25 - J30	
01/09/15 06:39:53	SIG	M62/2025A2	40R	M62 J25 - J30	
01/09/15 06:39:53	SIG	M62/2025A3	40R	M62 J25 - J30	
01/09/15 06:39:53	SIG	M62/2025A4	40R	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2041A2	60R	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2041A3	60R	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2041A4	60R	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2050A1	REDX	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2050A2	NR	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2050A3	NR	M62 J25 - J30	
01/09/15 06:39:54	SIG	M62/2050A4	NR	M62 J25 - J30	
01/09/15 06:40:33	SIG	M62/2018A2	40R	M62 J25 - J30	
01/09/15 06:40:33	SIG	M62/2018A3	40R	M62 J25 - J30	
01/09/15 06:40:33	SIG	M62/2018A4	40R	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2050A2	60R	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2050A3	60R	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2050A4	60R	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2057A1	NR	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2057A2	NR	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2057A3	NR	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2057J1	NR	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2065A1	REDX	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2065A2	NR	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2065A3	NR	M62 J25 - J30	
01/09/15 06:40:41	SIG	M62/2065A4	NR	M62 J25 - J30	
01/09/15 06:40:42	SIG	M62/2057A1	60R	M62 J25 - J30	
01/09/15 06:40:42	SIG	M62/2057A2	60R	M62 J25 - J30	
01/09/15 06:40:42	SIG	M62/2057A3	60R	M62 J25 - J30	
01/09/15 06:40:42	SIG	M62/2057J1	60R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2004A1	50R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2004A2	50R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2004A3	50R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2008K1	40R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2008K2	40R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2012A1	40R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2012A2	40R	M62 J25 - J30	
01/09/15 06:41:16	SIG	M62/2012A3	40R	M62 J25 - J30	
01/09/15 06:41:54	SIG	M62/1999A1	60R	M62 J25 - J30	
01/09/15 06:41:54	SIG	M62/1999A2	60R	M62 J25 - J30	
01/09/15 06:41:54	SIG	M62/1999A3	60R	M62 J25 - J30	
01/09/15 06:41:54	SIG	M62/1999J1	50R	M62 J25 - J30	
01/09/15 06:41:54	SIG	M62/1999J2	50R	M62 J25 - J30	
01/09/15 06:42:04	SIG	M62/2050A1	60R	M62 J25 - J30	
01/09/15 06:42:28	SIG	M62/2041A1	60R	M62 J25 - J30	
01/09/15 06:42:53	SIG	M62/2033A1	40R	M62 J25 - J30	
01/09/15 06:42:57	SIG	M62/2018A1	50R	M62 J25 - J30	
01/09/15 06:42:57	SIG	M62/2025A1	40R	M62 J25 - J30	
01/09/15 06:43:02	SIG	M62/2018A1	40R	M62 J25 - J30	
01/09/15 06:43:02	SIG	M62/2025A1	40R	M62 J25 - J30	
01/09/15 06:43:25	SIG	M62/2004A1	40R	M62 J25 - J30	
01/09/15 06:43:25	SIG	M62/2004A2	40R	M62 J25 - J30	
01/09/15 06:43:25	SIG	M62/2004A3	40R	M62 J25 - J30	
01/09/15 06:43:26	SIG	M62/1999A1	50R	M62 J25 - J30	
01/09/15 06:43:26	SIG	M62/1999A2	50R	M62 J25 - J30	
01/09/15 06:43:26	SIG	M62/1999A3	50R	M62 J25 - J30	
01/09/15 06:43:52	SIG	M62/2033A1	60R	M62 J25 - J30	
01/09/15 06:43:52	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 06:43:52	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 06:43:52	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 06:44:33	SIG	M62/2025A1	60R	M62 J25 - J30	
01/09/15 06:44:33	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 06:44:33	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 06:44:33	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 06:45:16	SIG	M62/2018A1	60R	M62 J25 - J30	
01/09/15 06:45:16	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 06:45:16	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 06:45:16	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 06:46:54	SIG	M62/1992A1	60R	M62 J25 - J30	
01/09/15 06:46:54	SIG	M62/1992A2	60R	M62 J25 - J30	
01/09/15 06:46:54	SIG	M62/1992A3	60R	M62 J25 - J30	
01/09/15 06:46:54	SIG	M62/1992J1	60R	M62 J25 - J30	
01/09/15 06:47:18	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 06:47:18	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1979K1	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1979K2	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1981A1	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1981A2	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1981A3	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1981A4	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1987A1	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1987A3	60R	M62 J25 - J30	
01/09/15 06:49:04	SIG	M62/1987J1	60R	M62 J25 - J30	
01/09/15 06:49:55	SIG	M62/2065M1	NR	M62 J25 - J30	
01/09/15 06:49:55	SIG	M62/2069M1	60R	M62 J25 - J30	
01/09/15 06:49:55	SIG	M62/2069M2	60R	M62 J25 - J30	
01/09/15 06:49:55	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 06:49:55	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2057B1	REDX	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2065B1	REDX	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 06:49:56	SIG	M621/1002B1	HSD	M62 J25 - J30	
01/09/15 06:49:56	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2012B1	REDX	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2012B2	NR	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2012B3	NR	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2012B4	NR	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 06:49:57	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 06:51:45	SIG	M62/2025B1	60R	M62 J25 - J30	
01/09/15 06:51:54	SIG	M62/1974A1	60R	M62 J25 - J30	
01/09/15 06:51:54	SIG	M62/1974A2	60R	M62 J25 - J30	
01/09/15 06:51:54	SIG	M62/1974A3	60R	M62 J25 - J30	
01/09/15 06:51:54	SIG	M62/1974A4	60R	M62 J25 - J30	
01/09/15 06:52:10	SIG	M62/2033B1	60R	M62 J25 - J30	
01/09/15 06:52:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 06:52:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 06:52:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 06:52:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 06:52:29	SIG	M62/2041B1	60R	M62 J25 - J30	
01/09/15 06:52:55	SIG	M62/2057B1	60R	M62 J25 - J30	
01/09/15 06:52:55	SIG	M621/1002B1	60R	M62 J25 - J30	
01/09/15 06:52:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
01/09/15 06:52:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
01/09/15 06:54:59	SIG	M62/2008K1	50R	M62 J25 - J30	
01/09/15 06:54:59	SIG	M62/2008K2	50R	M62 J25 - J30	
01/09/15 06:54:59	SIG	M62/2012A1	50R	M62 J25 - J30	
01/09/15 06:54:59	SIG	M62/2012A2	50R	M62 J25 - J30	
01/09/15 06:54:59	SIG	M62/2012A3	50R	M62 J25 - J30	
01/09/15 06:55:35	SIG	M62/2113B1	REDX	M62 J25 - J30	
01/09/15 06:55:35	SIG	M62/2113B2	NR	M62 J25 - J30	
01/09/15 06:55:35	SIG	M62/2113B3	NR	M62 J25 - J30	
01/09/15 06:55:35	SIG	M62/2113B4	NR	M62 J25 - J30	
01/09/15 06:55:35	SIG	M62/2120M1	60R	M62 J25 - J30	
01/09/15 06:55:35	SIG	M62/2120M2	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2074B1	REDX	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2074B2	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2074B3	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2074B4	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2081B1	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2081B2	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2081B3	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2081L1	NR	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2088B1	REDX	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2097B1	REDX	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2097B2	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2097B4	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2106B1	REDX	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2106B2	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2106B3	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2106B4	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2113B2	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2113B3	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2113B4	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2117B1	60R	M62 J25 - J30	
01/09/15 06:55:45	SIG	M62/2117B3	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2074B2	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2074B3	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2074B4	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2081B1	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2081B2	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2081B3	60R	M62 J25 - J30	
01/09/15 06:55:46	SIG	M62/2081L1	60R	M62 J25 - J30	
01/09/15 06:56:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 06:56:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 06:56:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 06:56:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 06:56:53	SIG	M62/2088B1	60R	M62 J25 - J30	
01/09/15 06:57:12	SIG	M62/2097B1	60R	M62 J25 - J30	
01/09/15 06:57:37	SIG	M62/1999A1	60R	M62 J25 - J30	
01/09/15 06:57:37	SIG	M62/1999A2	60R	M62 J25 - J30	
01/09/15 06:57:37	SIG	M62/1999A3	60R	M62 J25 - J30	
01/09/15 06:57:37	SIG	M62/2004A1	50R	M62 J25 - J30	
01/09/15 06:57:37	SIG	M62/2004A2	50R	M62 J25 - J30	
01/09/15 06:57:37	SIG	M62/2004A3	50R	M62 J25 - J30	
01/09/15 06:58:30	SIG	M62/2106B1	60R	M62 J25 - J30	
01/09/15 06:58:34	SIG	M62/2113B1	60R	M62 J25 - J30	
01/09/15 06:59:16	SIG	M62/2159B1	NR	M62 J25 - J30	
01/09/15 06:59:16	SIG	M62/2159B2	NR	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 06:59:17	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2170B1	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2170B2	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2177B1	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2177B2	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2177L1	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2177L2	40R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2183B1	50R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2183L1	50R	M62 J25 - J30	
01/09/15 06:59:22	SIG	M62/2183L2	50R	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2065A2	60R	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2065A3	60R	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2065A4	60R	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2073K1	60R	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2073K2	60R	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2079A1	REDX	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2079A2	NR	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2079A3	NR	M62 J25 - J30	
01/09/15 07:00:49	SIG	M62/2079A4	NR	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2074A1	REDX	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2074A2	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2074A3	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2074A4	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2079A2	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2079A3	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2079A4	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2088A1	REDX	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2088A2	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2088A3	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2088A4	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2097A1	REDX	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2097A2	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2097A3	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2097A4	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2106A1	REDX	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2106A2	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2106A3	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2106A4	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2114A1	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2114A2	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2114A3	60R	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2117A1	REDX	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2117A2	NR	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2117A3	NR	M62 J25 - J30	
01/09/15 07:00:50	SIG	M62/2117A4	NR	M62 J25 - J30	
01/09/15 07:01:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:01:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:01:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:01:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:01:54	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 07:01:54	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2004A1	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2004A2	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2004A3	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2008K1	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2008K2	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2012A1	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2012A2	60R	M62 J25 - J30	
01/09/15 07:01:54	SIG	M62/2012A3	60R	M62 J25 - J30	
01/09/15 07:02:10	SIG	M62/2106A1	60R	M62 J25 - J30	
01/09/15 07:03:11	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:03:12	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:03:13	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:03:13	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:03:37	SIG	M62/2183B1	40R	M62 J25 - J30	
01/09/15 07:03:37	SIG	M62/2183L1	40R	M62 J25 - J30	
01/09/15 07:03:37	SIG	M62/2183L2	40R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2183B1	40R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2183L1	40R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2183L2	40R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 07:03:43	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 07:04:45	SIG	M62/2097A1	60R	M62 J25 - J30	
01/09/15 07:04:54	SIG	M62/2194B1	60R	M62 J25 - J30	
01/09/15 07:04:54	SIG	M62/2194B2	60R	M62 J25 - J30	
01/09/15 07:04:54	SIG	M62/2194B3	60R	M62 J25 - J30	
01/09/15 07:04:54	SIG	M62/2194B4	60R	M62 J25 - J30	
01/09/15 07:04:55	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 07:04:55	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 07:05:06	SIG	M62/2088A1	60R	M62 J25 - J30	
01/09/15 07:05:09	SIG	M62/2079A1	60R	M62 J25 - J30	
01/09/15 07:05:54	SIG	M62/2197B1	60R	M62 J25 - J30	
01/09/15 07:05:54	SIG	M62/2197B2	60R	M62 J25 - J30	
01/09/15 07:05:54	SIG	M62/2197B3	60R	M62 J25 - J30	
01/09/15 07:05:54	SIG	M62/2199M1	60R	M62 J25 - J30	
01/09/15 07:05:54	SIG	M62/2199M2	60R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2189B1	40R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2189B2	40R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2189B3	40R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2189B4	40R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2194B1	50R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2194B2	50R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2194B3	50R	M62 J25 - J30	
01/09/15 07:06:31	SIG	M62/2194B4	50R	M62 J25 - J30	
01/09/15 07:06:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:06:45	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:06:51	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:07:54	SIG	M62/2203B1	60R	M62 J25 - J30	
01/09/15 07:07:54	SIG	M62/2203B2	60R	M62 J25 - J30	
01/09/15 07:07:54	SIG	M62/2203B3	60R	M62 J25 - J30	
01/09/15 07:09:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:09:51	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:09:57	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2194B1	40R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2194B2	40R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2194B3	40R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2194B4	40R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 07:10:54	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 07:12:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:12:58	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:13:03	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:16:03	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:16:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:16:08	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2194B1	50R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2194B2	50R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2194B3	50R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2194B4	50R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2197B1	60R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2197B2	60R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2197B3	60R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2199M1	60R	M62 J25 - J30	
01/09/15 07:17:40	SIG	M62/2199M2	60R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2194B1	40R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2194B2	40R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2194B3	40R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2194B4	40R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 07:17:41	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 07:17:54	SIG	M62/1974A1	OFF	M62 J25 - J30	
01/09/15 07:17:54	SIG	M62/1974A2	OFF	M62 J25 - J30	
01/09/15 07:17:54	SIG	M62/1974A3	OFF	M62 J25 - J30	
01/09/15 07:17:54	SIG	M62/1974A4	OFF	M62 J25 - J30	
01/09/15 07:19:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:19:09	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:19:14	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2197B1	40R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2197B2	40R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2197B3	40R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2199M1	40R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2199M2	40R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2203B1	50R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2203B2	50R	M62 J25 - J30	
01/09/15 07:20:03	SIG	M62/2203B3	50R	M62 J25 - J30	
01/09/15 07:20:31	SIG	M62/2203B1	40R	M62 J25 - J30	
01/09/15 07:20:31	SIG	M62/2203B2	40R	M62 J25 - J30	
01/09/15 07:20:31	SIG	M62/2203B3	40R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2018A1	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2018A2	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2018A3	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2018A4	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2025A1	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2025A2	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2025A3	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2025A4	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2033A1	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2033A2	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2033A3	50R	M62 J25 - J30	
01/09/15 07:20:55	SIG	M62/2033A4	50R	M62 J25 - J30	
01/09/15 07:21:55	SIG	M62/2041A1	50R	M62 J25 - J30	
01/09/15 07:21:55	SIG	M62/2041A2	50R	M62 J25 - J30	
01/09/15 07:21:55	SIG	M62/2041A3	50R	M62 J25 - J30	
01/09/15 07:21:55	SIG	M62/2041A4	50R	M62 J25 - J30	
01/09/15 07:22:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:22:15	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:22:20	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:23:12	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 07:23:13	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 07:24:05	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 07:24:05	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 07:24:05	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 07:24:05	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2194B1	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2194B2	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2194B3	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2194B4	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 07:24:51	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 07:24:57	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 07:24:57	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 07:24:57	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 07:24:57	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 07:25:02	SIG	M62/2170B1	40R	M62 J25 - J30	
01/09/15 07:25:02	SIG	M62/2170B2	40R	M62 J25 - J30	
01/09/15 07:25:02	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 07:25:02	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 07:25:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:25:21	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:25:26	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:25:52	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 07:25:52	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 07:25:52	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 07:25:52	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 07:26:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 07:26:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 07:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:26:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 07:26:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 07:26:30	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:27:12	SIG	M62/2203B1	60R	M62 J25 - J30	
01/09/15 07:27:12	SIG	M62/2203B2	60R	M62 J25 - J30	
01/09/15 07:27:12	SIG	M62/2203B3	60R	M62 J25 - J30	
01/09/15 07:28:27	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:28:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:28:32	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:28:37	SIG	M62/2189B1	40R	M62 J25 - J30	
01/09/15 07:28:37	SIG	M62/2189B2	40R	M62 J25 - J30	
01/09/15 07:28:37	SIG	M62/2189B3	40R	M62 J25 - J30	
01/09/15 07:28:37	SIG	M62/2189B4	40R	M62 J25 - J30	
01/09/15 07:31:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:31:40	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:31:46	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2155A1	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2155A2	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2155J1	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2155K1	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2157A1	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2157A2	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2157J1	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2157J2	50R	M62 J25 - J30	
01/09/15 07:32:08	SIG	M62/2157K1	50R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2151A1	50R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2151A2	50R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2151J1	50R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2151K1	50R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2155A1	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2155A2	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2155J1	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2155K1	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2157A1	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2157A2	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2157J1	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2157J2	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2157K1	40R	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2163A1	NR	M62 J25 - J30	
01/09/15 07:32:14	SIG	M62/2163A2	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1979K1	OFF	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1979K2	OFF	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1981A1	OFF	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1981A2	OFF	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1981A3	OFF	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1981A4	OFF	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1987A1	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1987A3	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1987J1	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1992A1	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1992A2	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1992A3	NR	M62 J25 - J30	
01/09/15 07:34:05	SIG	M62/1992J1	NR	M62 J25 - J30	
01/09/15 07:34:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:34:41	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:34:46	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2151A1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2151A2	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2151J1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2151K1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2155A1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2155A2	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2155J1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2155K1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2157A1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2157A2	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2157J1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2157J2	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2157K1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2163A1	OFF	M62 J25 - J30	
01/09/15 07:36:22	SIG	M62/2163A2	OFF	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2155A1	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2155A2	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2155J1	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2155K1	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2157A1	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2157A2	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2157J1	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2157J2	50R	M62 J25 - J30	
01/09/15 07:36:27	SIG	M62/2157K1	50R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2151A1	50R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2151A2	50R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2151J1	50R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2151K1	50R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2155A1	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2155A2	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2155J1	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2155K1	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2157A1	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2157A2	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2157J1	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2157J2	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2157K1	40R	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2163A1	NR	M62 J25 - J30	
01/09/15 07:36:33	SIG	M62/2163A2	NR	M62 J25 - J30	
01/09/15 07:37:05	SIG	M62/1987J1	OFF	M62 J25 - J30	
01/09/15 07:37:15	SIG	M62/1987A1	OFF	M62 J25 - J30	
01/09/15 07:37:15	SIG	M62/1987A3	OFF	M62 J25 - J30	
01/09/15 07:37:15	SIG	M62/1992A1	OFF	M62 J25 - J30	
01/09/15 07:37:15	SIG	M62/1992A2	OFF	M62 J25 - J30	
01/09/15 07:37:15	SIG	M62/1992A3	OFF	M62 J25 - J30	
01/09/15 07:37:15	SIG	M62/1992J1	OFF	M62 J25 - J30	
01/09/15 07:37:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:37:45	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:37:50	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2151A1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2151A2	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2151J1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2151K1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2155A1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2155A2	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2155J1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2155K1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2157A2	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2157J1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2157J2	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2157K1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2163A1	OFF	M62 J25 - J30	
01/09/15 07:40:28	SIG	M62/2163A2	OFF	M62 J25 - J30	
01/09/15 07:40:50	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:40:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2135A1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2135A2	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2135A3	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2135A4	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2144A1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2144A2	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2144J1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2144K1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2151A1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2151A2	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2151J1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2151K1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2155A1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2155A2	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2155J1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2155K1	60R	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2157A1	NR	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2157A2	NR	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2157J1	NR	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2157J2	NR	M62 J25 - J30	
01/09/15 07:40:55	SIG	M62/2157K1	NR	M62 J25 - J30	
01/09/15 07:40:56	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2155A1	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2155A2	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2155J1	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2155K1	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2157A1	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2157A2	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2157J1	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2157J2	50R	M62 J25 - J30	
01/09/15 07:42:33	SIG	M62/2157K1	50R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2151A1	50R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2151A2	50R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2151J1	50R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2151K1	50R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2155A1	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2155A2	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2155J1	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2155K1	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2157A1	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2157A2	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2157J1	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2157J2	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2157K1	40R	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2163A1	NR	M62 J25 - J30	
01/09/15 07:42:39	SIG	M62/2163A2	NR	M62 J25 - J30	
01/09/15 07:43:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:43:56	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:44:02	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:44:55	SIG	M62/2018A1	60R	M62 J25 - J30	
01/09/15 07:44:55	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 07:44:55	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 07:44:55	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 07:45:24	SIG	M62/2194B1	40R	M62 J25 - J30	
01/09/15 07:45:24	SIG	M62/2194B2	40R	M62 J25 - J30	
01/09/15 07:45:24	SIG	M62/2194B3	40R	M62 J25 - J30	
01/09/15 07:45:24	SIG	M62/2194B4	40R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2025A1	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2033A1	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2041A1	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2041A2	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2041A3	60R	M62 J25 - J30	
01/09/15 07:45:55	SIG	M62/2041A4	60R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2177B1	60R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2177B2	60R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2177L1	60R	M62 J25 - J30	
01/09/15 07:46:03	SIG	M62/2177L2	60R	M62 J25 - J30	
01/09/15 07:46:45	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 07:46:45	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 07:46:45	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 07:46:45	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2177B1	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2177B2	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2177L1	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2177L2	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2197B1	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2197B2	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2197B3	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2199M1	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2199M2	40R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2203B1	50R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2203B2	50R	M62 J25 - J30	
01/09/15 07:46:51	SIG	M62/2203B3	50R	M62 J25 - J30	
01/09/15 07:47:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:47:02	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:47:08	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:47:26	SIG	M62/2203B1	40R	M62 J25 - J30	
01/09/15 07:47:26	SIG	M62/2203B2	40R	M62 J25 - J30	
01/09/15 07:47:26	SIG	M62/2203B3	40R	M62 J25 - J30	
01/09/15 07:48:48	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 07:48:49	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 07:50:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:50:08	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:50:14	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2194B1	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2194B2	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2194B3	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2194B4	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 07:51:27	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2194B1	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2194B2	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2194B3	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2194B4	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2197B1	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2197B2	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2197B3	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2199M1	40R	M62 J25 - J30	
01/09/15 07:51:45	SIG	M62/2199M2	40R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2151A1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2151A2	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2151J1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2151K1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2155A1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2155A2	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2155J1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2155K1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2157A1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2157A2	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2157J1	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2157J2	60R	M62 J25 - J30	
01/09/15 07:51:53	SIG	M62/2157K1	60R	M62 J25 - J30	
01/09/15 07:52:35	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 07:52:35	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 07:52:35	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 07:52:35	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 07:52:41	SIG	M62/2170B1	40R	M62 J25 - J30	
01/09/15 07:52:41	SIG	M62/2170B2	40R	M62 J25 - J30	
01/09/15 07:52:41	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 07:52:41	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2203B1	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2203B2	50R	M62 J25 - J30	
01/09/15 07:53:04	SIG	M62/2203B3	50R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2197B1	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2197B2	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2197B3	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2199M1	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2199M2	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2203B1	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2203B2	40R	M62 J25 - J30	
01/09/15 07:53:12	SIG	M62/2203B3	40R	M62 J25 - J30	
01/09/15 07:53:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2155A1	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2155A2	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2155J1	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2155K1	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2157A1	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2157A2	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2157J1	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2157J2	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2157K1	50R	M62 J25 - J30	
01/09/15 07:53:15	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2151A1	50R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2151A2	50R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2151J1	50R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2151K1	50R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2155A1	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2155A2	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2155J1	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2155K1	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2157A1	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2157A2	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2157J1	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2157J2	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2157K1	40R	M62 J25 - J30	
01/09/15 07:53:20	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:55:12	SIG	M62/2033A1	50R	M62 J25 - J30	
01/09/15 07:55:12	SIG	M62/2033A2	50R	M62 J25 - J30	
01/09/15 07:55:12	SIG	M62/2033A3	50R	M62 J25 - J30	
01/09/15 07:55:12	SIG	M62/2033A4	50R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2025A1	50R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2025A2	50R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2025A3	50R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2025A4	50R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2033A1	40R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2033A2	40R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2033A3	40R	M62 J25 - J30	
01/09/15 07:55:17	SIG	M62/2033A4	40R	M62 J25 - J30	
01/09/15 07:56:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:56:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 07:56:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 07:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:56:20	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:56:25	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 07:56:30	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2194B1	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2194B2	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2194B3	50R	M62 J25 - J30	
01/09/15 07:57:12	SIG	M62/2194B4	50R	M62 J25 - J30	
01/09/15 07:58:01	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 07:58:02	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2203B1	60R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2203B2	60R	M62 J25 - J30	
01/09/15 07:58:09	SIG	M62/2203B3	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2025A1	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2033A1	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 07:59:11	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 07:59:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 07:59:26	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 07:59:31	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:00:39	SIG	M62/2189B1	40R	M62 J25 - J30	
01/09/15 08:00:39	SIG	M62/2189B2	40R	M62 J25 - J30	
01/09/15 08:00:39	SIG	M62/2189B3	40R	M62 J25 - J30	
01/09/15 08:00:39	SIG	M62/2189B4	40R	M62 J25 - J30	
01/09/15 08:01:48	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 08:01:48	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 08:01:48	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 08:01:48	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 08:02:12	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 08:02:13	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:02:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:02:40	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:02:45	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:03:57	SIG	M62/2177B1	60R	M62 J25 - J30	
01/09/15 08:03:57	SIG	M62/2177B2	60R	M62 J25 - J30	
01/09/15 08:03:57	SIG	M62/2177L1	60R	M62 J25 - J30	
01/09/15 08:03:57	SIG	M62/2177L2	60R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2050A1	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2050A2	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2050A3	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2050A4	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2057A1	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2057A2	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2057A3	50R	M62 J25 - J30	
01/09/15 08:05:37	SIG	M62/2057J1	50R	M62 J25 - J30	
01/09/15 08:05:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:05:40	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2050A1	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2050A2	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2050A3	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2050A4	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2057A1	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2057A2	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2057A3	40R	M62 J25 - J30	
01/09/15 08:05:42	SIG	M62/2057J1	40R	M62 J25 - J30	
01/09/15 08:05:45	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:06:02	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 08:06:02	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 08:06:02	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 08:06:02	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 08:06:18	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 08:06:18	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 08:06:18	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 08:06:18	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 08:06:23	SIG	M62/2177B1	40R	M62 J25 - J30	
01/09/15 08:06:23	SIG	M62/2177B2	40R	M62 J25 - J30	
01/09/15 08:06:23	SIG	M62/2177L1	40R	M62 J25 - J30	
01/09/15 08:06:23	SIG	M62/2177L2	40R	M62 J25 - J30	
01/09/15 08:08:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:08:44	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:08:50	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:09:17	SIG	M62/2189B1	40R	M62 J25 - J30	
01/09/15 08:09:17	SIG	M62/2189B2	40R	M62 J25 - J30	
01/09/15 08:09:17	SIG	M62/2189B3	40R	M62 J25 - J30	
01/09/15 08:09:17	SIG	M62/2189B4	40R	M62 J25 - J30	
01/09/15 08:09:26	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 08:09:26	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 08:09:26	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 08:09:26	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 08:09:31	SIG	M62/2170B1	40R	M62 J25 - J30	
01/09/15 08:09:31	SIG	M62/2170B2	40R	M62 J25 - J30	
01/09/15 08:09:31	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 08:09:31	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2050A1	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2050A2	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2050A3	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2050A4	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2057A1	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2057A2	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2057A3	60R	M62 J25 - J30	
01/09/15 08:09:37	SIG	M62/2057J1	60R	M62 J25 - J30	
01/09/15 08:11:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:11:51	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:11:56	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:13:16	SIG	M62/2033A1	50R	M62 J25 - J30	
01/09/15 08:13:16	SIG	M62/2033A2	50R	M62 J25 - J30	
01/09/15 08:13:16	SIG	M62/2033A3	50R	M62 J25 - J30	
01/09/15 08:13:16	SIG	M62/2033A4	50R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2025A1	50R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2025A2	50R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2025A3	50R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2025A4	50R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2033A1	40R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2033A2	40R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2033A3	40R	M62 J25 - J30	
01/09/15 08:13:21	SIG	M62/2033A4	40R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1955K1	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1955K2	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1956A1	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1956A2	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1956A3	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1960A1	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1960A2	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1960A3	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1960K1	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1960K2	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1968A1	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1968A2	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1968A3	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1968A4	60R	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1974A1	NR	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1974A2	NR	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1974A3	NR	M62 J25 - J30	
01/09/15 08:13:56	SIG	M62/1974A4	NR	M62 J25 - J30	
01/09/15 08:14:10	SIG	M62/2041A1	50R	M62 J25 - J30	
01/09/15 08:14:10	SIG	M62/2041A2	50R	M62 J25 - J30	
01/09/15 08:14:10	SIG	M62/2041A3	50R	M62 J25 - J30	
01/09/15 08:14:10	SIG	M62/2041A4	50R	M62 J25 - J30	
01/09/15 08:14:16	SIG	M62/2041A1	40R	M62 J25 - J30	
01/09/15 08:14:16	SIG	M62/2041A2	40R	M62 J25 - J30	
01/09/15 08:14:16	SIG	M62/2041A3	40R	M62 J25 - J30	
01/09/15 08:14:16	SIG	M62/2041A4	40R	M62 J25 - J30	
01/09/15 08:14:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:14:56	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:15:01	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:15:02	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 08:15:02	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 08:15:02	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 08:15:02	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 08:15:27	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 08:15:28	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2151A1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2151A2	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2151J1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2151K1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2155A1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2155A2	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2155J1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2155K1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2157A1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2157A2	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2157J1	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2157J2	60R	M62 J25 - J30	
01/09/15 08:16:07	SIG	M62/2157K1	60R	M62 J25 - J30	
01/09/15 08:18:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:18:03	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:18:08	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:19:04	SIG	M62/2041A1	60R	M62 J25 - J30	
01/09/15 08:19:04	SIG	M62/2041A2	60R	M62 J25 - J30	
01/09/15 08:19:04	SIG	M62/2041A3	60R	M62 J25 - J30	
01/09/15 08:19:04	SIG	M62/2041A4	60R	M62 J25 - J30	
01/09/15 08:20:45	SIG	M62/2189B1	40R	M62 J25 - J30	
01/09/15 08:20:45	SIG	M62/2189B2	40R	M62 J25 - J30	
01/09/15 08:20:45	SIG	M62/2189B3	40R	M62 J25 - J30	
01/09/15 08:20:45	SIG	M62/2189B4	40R	M62 J25 - J30	
01/09/15 08:21:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:21:08	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:21:13	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2008K1	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2008K2	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2012A1	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2012A2	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2012A3	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2018A1	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2018A2	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2018A3	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2018A4	50R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2025A2	40R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2025A3	40R	M62 J25 - J30	
01/09/15 08:21:23	SIG	M62/2025A4	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 08:21:29	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2004A1	50R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2004A2	50R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2004A3	50R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2008K1	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2008K2	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2012A1	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2012A2	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2012A3	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2018A1	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2018A2	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2018A3	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2018A4	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2025A1	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2025A2	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2025A3	40R	M62 J25 - J30	
01/09/15 08:21:29	SIG	M62/2025A4	40R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2025A1	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2033A1	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 08:21:50	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2157A1	NR	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2157A2	NR	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2157J1	NR	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2157J2	NR	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2157K1	NR	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2163A1	OFF	M62 J25 - J30	
01/09/15 08:21:56	SIG	M62/2163A2	OFF	M62 J25 - J30	
01/09/15 08:22:57	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 08:22:57	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 08:22:57	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 08:22:57	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 08:24:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:24:14	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:24:19	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:24:27	SIG	M62/2177B1	60R	M62 J25 - J30	
01/09/15 08:24:27	SIG	M62/2177B2	60R	M62 J25 - J30	
01/09/15 08:24:27	SIG	M62/2177L1	60R	M62 J25 - J30	
01/09/15 08:24:27	SIG	M62/2177L2	60R	M62 J25 - J30	
01/09/15 08:24:40	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 08:24:41	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2025A1	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2025A2	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2025A3	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2025A4	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2033A1	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2033A2	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2033A3	50R	M62 J25 - J30	
01/09/15 08:25:06	SIG	M62/2033A4	50R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2025A1	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2025A2	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2025A3	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2025A4	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2033A1	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2033A2	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2033A3	40R	M62 J25 - J30	
01/09/15 08:25:12	SIG	M62/2033A4	40R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 08:25:17	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 08:25:23	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2004A1	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2004A2	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2004A3	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2008K1	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2008K2	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2012A1	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2012A2	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2012A3	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2018A1	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2025A1	50R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2025A2	50R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2025A3	50R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2025A4	50R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2170B1	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2170B2	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2177B1	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2177B2	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2177L1	40R	M62 J25 - J30	
01/09/15 08:25:23	SIG	M62/2177L2	40R	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2135A1	OFF	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2135A2	OFF	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2135A3	OFF	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2135A4	OFF	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2144A1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2144A2	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2144J1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2144K1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2151A1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2151A2	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2151J1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2151K1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2155A1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2155A2	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2155J1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2155K1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2157A1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2157A2	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2157J1	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2157J2	NR	M62 J25 - J30	
01/09/15 08:25:56	SIG	M62/2157K1	NR	M62 J25 - J30	
01/09/15 08:26:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 08:26:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 08:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 08:26:30	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 08:27:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:27:20	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:27:26	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:27:46	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:27:46	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2018A1	50R	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2018A2	50R	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2018A3	50R	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2018A4	50R	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2025A2	40R	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2025A3	40R	M62 J25 - J30	
01/09/15 08:27:51	SIG	M62/2025A4	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 08:27:57	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2008K1	50R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2008K2	50R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2012A1	50R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2012A2	50R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2012A3	50R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2018A1	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2018A2	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2018A3	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2018A4	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2025A1	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2025A2	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2025A3	40R	M62 J25 - J30	
01/09/15 08:27:57	SIG	M62/2025A4	40R	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2144A1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2144A2	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2144J1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2144K1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2151A1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2151A2	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2151J1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2151K1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2155A1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2155A2	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2155J1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2155K1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2157A2	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2157J1	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2157J2	OFF	M62 J25 - J30	
01/09/15 08:28:56	SIG	M62/2157K1	OFF	M62 J25 - J30	
01/09/15 08:29:05	SIG	M62/2033A1	60R	M62 J25 - J30	
01/09/15 08:29:05	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 08:29:05	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 08:29:05	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2155A1	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2155A2	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2155J1	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2155K1	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2157A1	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2157A2	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2157J1	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2157J2	50R	M62 J25 - J30	
01/09/15 08:29:17	SIG	M62/2157K1	50R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2151A1	50R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2151A2	50R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2151J1	50R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2151K1	50R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2155A1	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2155A2	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2155J1	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2155K1	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2157A1	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2157A2	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2157J1	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2157J2	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2157K1	40R	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2163A1	NR	M62 J25 - J30	
01/09/15 08:29:23	SIG	M62/2163A2	NR	M62 J25 - J30	
01/09/15 08:30:26	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:30:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:30:32	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:30:39	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 08:30:39	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 08:30:39	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 08:30:39	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 08:30:50	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 08:30:51	SIG	M62/2025A1	50R	M62 J25 - J30	
01/09/15 08:30:57	SIG	M62/2025A1	40R	M62 J25 - J30	
01/09/15 08:31:41	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 08:31:41	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 08:31:41	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 08:31:41	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 08:31:51	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2008K1	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2008K2	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2012A1	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2012A2	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2012A3	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2018A1	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2025A1	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 08:31:51	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1955K1	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1955K2	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1956A1	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1956A2	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1956A3	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1960A1	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1960A2	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1960A3	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1960K1	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1960K2	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1968A1	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1968A2	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1968A3	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1968A4	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1974A1	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1974A2	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1974A3	OFF	M62 J25 - J30	
01/09/15 08:31:56	SIG	M62/1974A4	OFF	M62 J25 - J30	
01/09/15 08:33:31	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 08:33:31	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 08:33:31	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 08:33:31	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 08:33:36	SIG	M62/2170B1	40R	M62 J25 - J30	
01/09/15 08:33:36	SIG	M62/2170B2	40R	M62 J25 - J30	
01/09/15 08:33:36	SIG	M62/2170L1	40R	M62 J25 - J30	
01/09/15 08:33:36	SIG	M62/2170L2	40R	M62 J25 - J30	
01/09/15 08:33:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:33:39	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:33:45	SIG	M62/2183B2	40R	M62 J25 - J30	
01/09/15 08:34:51	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 08:34:52	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 08:34:56	SIG	M62/2183B1	50R	M62 J25 - J30	
01/09/15 08:34:56	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 08:34:56	SIG	M62/2183L1	50R	M62 J25 - J30	
01/09/15 08:34:56	SIG	M62/2183L2	50R	M62 J25 - J30	
01/09/15 08:34:57	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:34:57	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2135A1	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2135A2	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2135A3	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2135A4	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2144A1	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2144A2	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2144J1	60R	M62 J25 - J30	
01/09/15 08:35:56	SIG	M62/2144K1	60R	M62 J25 - J30	
01/09/15 08:36:56	SIG	M62/2197B1	60R	M62 J25 - J30	
01/09/15 08:36:56	SIG	M62/2197B2	60R	M62 J25 - J30	
01/09/15 08:36:56	SIG	M62/2197B3	60R	M62 J25 - J30	
01/09/15 08:36:56	SIG	M62/2199M1	60R	M62 J25 - J30	
01/09/15 08:36:56	SIG	M62/2199M2	60R	M62 J25 - J30	
01/09/15 08:37:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:37:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:37:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:37:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2189B1	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2189B2	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2189B3	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2189B4	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2194B1	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2194B2	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2194B3	60R	M62 J25 - J30	
01/09/15 08:37:56	SIG	M62/2194B4	60R	M62 J25 - J30	
01/09/15 08:37:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:37:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2177B1	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2177B2	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2177L1	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2177L2	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2183B1	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2183B2	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2183L1	60R	M62 J25 - J30	
01/09/15 08:39:16	SIG	M62/2183L2	60R	M62 J25 - J30	
01/09/15 08:41:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:41:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:41:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:41:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2144A1	50R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2144A2	50R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2144J1	50R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2144K1	50R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2151A1	40R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2151A2	40R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2151J1	40R	M62 J25 - J30	
01/09/15 08:44:46	SIG	M62/2151K1	40R	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/1999A1	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/1999A2	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/1999A3	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/1999J1	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/1999J2	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/2004A1	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/2004A2	OFF	M62 J25 - J30	
01/09/15 08:45:56	SIG	M62/2004A3	OFF	M62 J25 - J30	
01/09/15 08:47:56	SIG	M62/2122K1	60R	M62 J25 - J30	
01/09/15 08:47:56	SIG	M62/2122K2	60R	M62 J25 - J30	
01/09/15 08:47:56	SIG	M62/2124A1	REDX	M62 J25 - J30	
01/09/15 08:47:56	SIG	M62/2124A2	60R	M62 J25 - J30	
01/09/15 08:47:56	SIG	M62/2124A3	60R	M62 J25 - J30	
01/09/15 08:47:56	SIG	M62/2124A4	60R	M62 J25 - J30	
01/09/15 08:47:57	SIG	M62/2117A2	60R	M62 J25 - J30	
01/09/15 08:47:57	SIG	M62/2117A3	60R	M62 J25 - J30	
01/09/15 08:47:57	SIG	M62/2117A4	60R	M62 J25 - J30	
01/09/15 08:48:06	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 08:48:07	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 08:48:08	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 08:48:08	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2144A1	60R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2144A2	60R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2144J1	60R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2144K1	60R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2151A1	50R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2151A2	50R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2151J1	50R	M62 J25 - J30	
01/09/15 08:48:46	SIG	M62/2151K1	50R	M62 J25 - J30	
01/09/15 08:52:56	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 08:52:56	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 08:52:56	SIG	M62/2170L1	OFF	M62 J25 - J30	
01/09/15 08:52:56	SIG	M62/2170L2	OFF	M62 J25 - J30	
01/09/15 08:52:57	SIG	M62/2159B1	NR	M62 J25 - J30	
01/09/15 08:52:57	SIG	M62/2159B2	NR	M62 J25 - J30	
01/09/15 08:54:56	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2159B1	OFF	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2159B2	OFF	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2177B1	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2177B2	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2177L1	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2177L2	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2183B1	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2183B2	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2183L1	NR	M62 J25 - J30	
01/09/15 08:55:57	SIG	M62/2183L2	NR	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 08:56:20	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 08:56:30	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2151A1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2151A2	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2151J1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2151K1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2155A1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2155A2	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2155J1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2155K1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2157A1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2157A2	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2157J1	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2157J2	60R	M62 J25 - J30	
01/09/15 08:58:51	SIG	M62/2157K1	60R	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2183B1	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2183B2	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2183L1	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2183L2	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2189B1	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2189B2	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2189B3	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2189B4	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2194B1	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2194B2	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2194B3	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2194B4	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2199M1	OFF	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2199M2	OFF	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2203B1	OFF	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2203B2	OFF	M62 J25 - J30	
01/09/15 08:58:56	SIG	M62/2203B3	OFF	M62 J25 - J30	
01/09/15 08:58:57	SIG	M62/2170B1	OFF	M62 J25 - J30	
01/09/15 08:58:57	SIG	M62/2170B2	OFF	M62 J25 - J30	
01/09/15 08:58:57	SIG	M62/2177B1	OFF	M62 J25 - J30	
01/09/15 08:58:57	SIG	M62/2177B2	OFF	M62 J25 - J30	
01/09/15 08:58:57	SIG	M62/2177L1	OFF	M62 J25 - J30	
01/09/15 08:58:57	SIG	M62/2177L2	OFF	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2117A2	NR	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2117A3	NR	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2117A4	NR	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2122K1	OFF	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2122K2	OFF	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2124A2	NR	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2124A3	NR	M62 J25 - J30	
01/09/15 09:01:56	SIG	M62/2124A4	NR	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2183B1	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2183L1	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2183L2	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2189B1	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2189B2	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2189B3	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2189B4	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2194B1	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2194B2	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2194B3	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2194B4	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2197B1	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2197B2	OFF	M62 J25 - J30	
01/09/15 09:01:57	SIG	M62/2197B3	OFF	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2157A1	NR	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2157A2	NR	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2157J1	NR	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2157J2	NR	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2157K1	NR	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2163A1	OFF	M62 J25 - J30	
01/09/15 09:03:57	SIG	M62/2163A2	OFF	M62 J25 - J30	
01/09/15 09:04:57	SIG	M62/2124A1	BLNK	M62 J25 - J30	
01/09/15 09:04:57	SIG	M62/2124A2	OFF	M62 J25 - J30	
01/09/15 09:04:57	SIG	M62/2124A3	OFF	M62 J25 - J30	
01/09/15 09:04:57	SIG	M62/2124A4	OFF	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2135A1	OFF	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2135A2	OFF	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2135A3	OFF	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2135A4	OFF	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2144A1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2144A2	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2144J1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2144K1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2151A1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2151A2	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2151J1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2151K1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2155A1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2155A2	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2155J1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2155K1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2157A1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2157A2	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2157J1	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2157J2	NR	M62 J25 - J30	
01/09/15 09:07:56	SIG	M62/2157K1	NR	M62 J25 - J30	
01/09/15 09:10:57	SIG	M62/2144J1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2144A1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2144A2	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2144K1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2151A1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2151A2	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2151J1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2151K1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2155A1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2155A2	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2155J1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2155K1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2157A2	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2157J1	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2157J2	OFF	M62 J25 - J30	
01/09/15 09:10:58	SIG	M62/2157K1	OFF	M62 J25 - J30	
01/09/15 09:25:12	SIG	M62/2057B1	HSD	M62 J25 - J30	
01/09/15 09:26:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 09:26:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 09:26:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:26:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 09:26:30	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 09:27:11	SIG	M62/2041B1	HSD	M62 J25 - J30	
01/09/15 09:27:11	SIG	M62/2057B1	REDX	M62 J25 - J30	
01/09/15 09:27:11	SIG	M621/1002B1	HSD	M62 J25 - J30	
01/09/15 09:27:11	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 09:27:11	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 09:28:11	SIG	M62/2033B1	HSD	M62 J25 - J30	
01/09/15 09:29:11	SIG	M62/2025B1	HSD	M62 J25 - J30	
01/09/15 09:29:11	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 09:30:03	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 09:30:48	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 09:30:48	SIG	M62/2113B1	HSD	M62 J25 - J30	
01/09/15 09:31:17	SIG	M62/2065B2	NR	M62 J25 - J30	
01/09/15 09:31:17	SIG	M62/2065B3	NR	M62 J25 - J30	
01/09/15 09:31:17	SIG	M62/2065B4	NR	M62 J25 - J30	
01/09/15 09:31:17	SIG	M62/2074B2	NR	M62 J25 - J30	
01/09/15 09:31:17	SIG	M62/2074B3	NR	M62 J25 - J30	
01/09/15 09:31:17	SIG	M62/2074B4	NR	M62 J25 - J30	
01/09/15 09:31:18	SIG	M62/2057B2	NR	M62 J25 - J30	
01/09/15 09:31:18	SIG	M62/2057B3	NR	M62 J25 - J30	
01/09/15 09:31:18	SIG	M62/2057B4	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2018B1	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2018B2	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2018B3	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2018L1	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2033B2	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2033B3	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2033B4	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2050B2	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2050B3	NR	M62 J25 - J30	
01/09/15 09:31:19	SIG	M62/2050B4	NR	M62 J25 - J30	
01/09/15 09:31:41	SIG	M62/2106B1	HSD	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2050B2	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2050B3	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2050B4	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2057B1	BLNK	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2057B2	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2057B3	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2057B4	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2065B2	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2065B3	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2065B4	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2065M1	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2069M1	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M62/2069M2	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M621/1002B1	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M621/1002B2	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M621/1010B1	OFF	M62 J25 - J30	
01/09/15 09:32:18	SIG	M621/1010B2	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2012B1	BLNK	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2012B2	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2012B3	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2012B4	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2018B1	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2018B2	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2018B3	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2018L1	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2033B2	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2033B4	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2041B2	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2041B3	OFF	M62 J25 - J30	
01/09/15 09:32:19	SIG	M62/2041B4	OFF	M62 J25 - J30	
01/09/15 09:32:50	SIG	M62/2097B1	HSD	M62 J25 - J30	
01/09/15 09:32:50	SIG	M62/2113B1	REDX	M62 J25 - J30	
01/09/15 09:33:57	SIG	M62/2088B1	HSD	M62 J25 - J30	
01/09/15 09:33:58	SIG	M62/2106B1	REDX	M62 J25 - J30	
01/09/15 09:35:05	SIG	M62/2097B1	REDX	M62 J25 - J30	
01/09/15 09:35:21	SIG	M62/2079A1	HSD	M62 J25 - J30	
01/09/15 09:36:14	SIG	M62/2088B1	REDX	M62 J25 - J30	
01/09/15 09:36:29	SIG	M62/2088A1	HSD	M62 J25 - J30	
01/09/15 09:37:07	SIG	M62/2117B1	NR	M62 J25 - J30	
01/09/15 09:37:07	SIG	M62/2117B3	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2081B1	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2081B2	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2081B3	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2081L1	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2088B2	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2088B3	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2088B4	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2097B2	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2097B4	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2106B2	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2106B3	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2106B4	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2113B2	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2113B3	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2113B4	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2120M1	NR	M62 J25 - J30	
01/09/15 09:37:23	SIG	M62/2120M2	NR	M62 J25 - J30	
01/09/15 09:37:37	SIG	M62/2079A1	REDX	M62 J25 - J30	
01/09/15 09:37:37	SIG	M62/2097A1	HSD	M62 J25 - J30	
01/09/15 09:38:07	SIG	M62/2120M1	OFF	M62 J25 - J30	
01/09/15 09:38:07	SIG	M62/2120M2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2074B1	BLNK	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2074B2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2074B3	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2074B4	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2081B1	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2081B2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2081B3	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2081L1	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2088B1	BLNK	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2088B2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2088B3	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2088B4	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2097B1	BLNK	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2097B2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2097B4	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2106B1	BLNK	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2106B2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2106B3	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2106B4	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2113B1	BLNK	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2113B2	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2113B3	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2113B4	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
01/09/15 09:38:23	SIG	M62/2117B3	OFF	M62 J25 - J30	
01/09/15 09:38:45	SIG	M62/2088A1	REDX	M62 J25 - J30	
01/09/15 09:38:45	SIG	M62/2106A1	HSD	M62 J25 - J30	
01/09/15 09:39:53	SIG	M62/2097A1	REDX	M62 J25 - J30	
01/09/15 09:41:01	SIG	M62/2106A1	REDX	M62 J25 - J30	
01/09/15 09:42:01	SIG	M62/2065A2	NR	M62 J25 - J30	
01/09/15 09:42:01	SIG	M62/2065A3	NR	M62 J25 - J30	
01/09/15 09:42:01	SIG	M62/2065A4	NR	M62 J25 - J30	
01/09/15 09:42:01	SIG	M62/2074A2	NR	M62 J25 - J30	
01/09/15 09:42:01	SIG	M62/2074A3	NR	M62 J25 - J30	
01/09/15 09:42:01	SIG	M62/2074A4	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2073K1	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2073K2	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2079A2	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2079A3	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2079A4	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2088A2	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2088A3	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2088A4	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2097A2	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2097A3	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2097A4	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2106A2	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2106A3	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2106A4	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2114A1	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2114A2	NR	M62 J25 - J30	
01/09/15 09:42:02	SIG	M62/2114A3	NR	M62 J25 - J30	
01/09/15 09:43:01	SIG	M62/2073K1	OFF	M62 J25 - J30	
01/09/15 09:43:01	SIG	M62/2073K2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2074A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2074A4	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2079A1	BLNK	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2079A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2079A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2079A4	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2088A1	BLNK	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2088A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2088A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2088A4	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2097A1	BLNK	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2097A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2097A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2097A4	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2106A1	BLNK	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2106A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2106A4	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2114A1	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2114A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2114A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2117A1	BLNK	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2117A2	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2117A3	OFF	M62 J25 - J30	
01/09/15 09:43:02	SIG	M62/2117A4	OFF	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 09:45:55	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2194B1	NR	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2194B2	NR	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2194B3	NR	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2194B4	NR	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2197B1	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2197B2	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2197B3	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2199M1	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2199M2	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2203B1	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2203B2	60R	M62 J25 - J30	
01/09/15 09:45:57	SIG	M62/2203B3	60R	M62 J25 - J30	
01/09/15 09:46:04	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 09:46:04	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 09:46:04	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 09:46:04	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 09:48:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:48:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:48:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:48:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2194B1	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2194B2	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2194B3	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2194B4	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2199M1	OFF	M62 J25 - J30	
01/09/15 09:53:57	SIG	M62/2199M2	OFF	M62 J25 - J30	
01/09/15 09:54:57	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 09:54:57	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2057B1	REDX	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2065B1	REDX	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 09:54:58	SIG	M621/1002B1	HSD	M62 J25 - J30	
01/09/15 09:54:58	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 09:55:57	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 09:55:57	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 09:55:57	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 09:55:57	SIG	M62/2203B1	OFF	M62 J25 - J30	
01/09/15 09:55:57	SIG	M62/2203B2	OFF	M62 J25 - J30	
01/09/15 09:55:57	SIG	M62/2203B3	OFF	M62 J25 - J30	
01/09/15 09:56:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 09:56:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 09:56:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 09:56:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 09:56:22	SIG	M62/2025A1	HSD	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2074B1	REDX	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2074B2	60R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2074B3	60R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M62/2074B4	60R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 09:56:48	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M62/2065B2	40R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M62/2065B3	40R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M62/2065B4	40R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M62/2065M1	40R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 09:56:53	SIG	M621/1002B2	40R	M62 J25 - J30	
01/09/15 09:56:57	SIG	M62/2194B1	OFF	M62 J25 - J30	
01/09/15 09:56:58	SIG	M62/2194B2	OFF	M62 J25 - J30	
01/09/15 09:56:58	SIG	M62/2194B3	OFF	M62 J25 - J30	
01/09/15 09:56:58	SIG	M62/2194B4	OFF	M62 J25 - J30	
01/09/15 09:57:22	SIG	M62/2033A1	HSD	M62 J25 - J30	
01/09/15 09:58:22	SIG	M62/2018A1	HSD	M62 J25 - J30	
01/09/15 09:58:22	SIG	M62/2025A1	REDX	M62 J25 - J30	
01/09/15 09:58:22	SIG	M62/2041A1	HSD	M62 J25 - J30	
01/09/15 09:58:58	SIG	M62/2197B1	OFF	M62 J25 - J30	
01/09/15 09:58:58	SIG	M62/2197B2	OFF	M62 J25 - J30	
01/09/15 09:58:58	SIG	M62/2197B3	OFF	M62 J25 - J30	
01/09/15 09:59:29	SIG	M62/2033A1	REDX	M62 J25 - J30	
01/09/15 09:59:29	SIG	M62/2050A1	HSD	M62 J25 - J30	
01/09/15 10:00:21	SIG	M62/2041A1	REDX	M62 J25 - J30	
01/09/15 10:01:21	SIG	M62/2050A1	REDX	M62 J25 - J30	
01/09/15 10:02:10	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M62/2069M1	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M62/2069M2	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 10:02:10	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2025A2	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2025A3	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2025A4	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2033A2	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2033A3	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2033A4	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2041A2	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2041A3	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2041A4	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2050A2	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2050A3	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2050A4	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2057A1	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2057A2	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2057A3	NR	M62 J25 - J30	
01/09/15 10:02:22	SIG	M62/2057J1	NR	M62 J25 - J30	
01/09/15 10:03:05	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 10:03:05	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 10:03:05	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 10:03:05	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 10:03:05	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 10:03:05	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2008K1	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2008K2	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2012A1	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2012A2	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2012A3	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2018A1	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2018A2	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2018A3	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2018A4	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2025A1	BLNK	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2025A2	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2025A3	OFF	M62 J25 - J30	
01/09/15 10:03:22	SIG	M62/2025A4	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2033A1	BLNK	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2033A2	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2033A3	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2033A4	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2041A1	BLNK	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2041A2	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2041A3	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2041A4	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2050A1	BLNK	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2050A2	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2050A3	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2050A4	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2057A1	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2057A2	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2057A3	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2057J1	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2065A1	BLNK	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2065A2	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2065A3	OFF	M62 J25 - J30	
01/09/15 10:03:23	SIG	M62/2065A4	OFF	M62 J25 - J30	
01/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:06:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:07:49	SIG	M606/2003B1	50R	M62 J25 - J30	
01/09/15 10:07:49	SIG	M606/2003B2	50R	M62 J25 - J30	
01/09/15 10:07:49	SIG	M62/2005M1	50R	M62 J25 - J30	
01/09/15 10:07:49	SIG	M62/2005M2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1960B1	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1960B2	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1960B3	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1960L1	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1960L2	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968A1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968A2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968A3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968A4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968B1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968B2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968B3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1968L1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974A1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974A2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974A3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974A4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974B1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974B2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974B3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974B4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974M1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1974M2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1979K1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1979K2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981A1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981A2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981A3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981A4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981B1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981B2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981B3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1981B4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987A1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987A3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987B1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987B2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987B3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987B4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1987J1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992A1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992A2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992A3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992B1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992B2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992B3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992B4	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1992J1	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999A1	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999A2	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999A3	NR	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999B1	REDX	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999B2	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999B3	50R	M62 J25 - J30	
01/09/15 10:07:58	SIG	M62/1999B4	50R	M62 J25 - J30	
01/09/15 10:08:13	SIG	M62/1999J1	50R	M62 J25 - J30	
01/09/15 10:08:13	SIG	M62/1999J2	50R	M62 J25 - J30	
01/09/15 10:08:19	SIG	M62/1999J1	40R	M62 J25 - J30	
01/09/15 10:08:19	SIG	M62/1999J2	40R	M62 J25 - J30	
01/09/15 10:11:28	SIG	M62/1979K1	40R	M62 J25 - J30	
01/09/15 10:11:28	SIG	M62/1979K2	40R	M62 J25 - J30	
01/09/15 10:11:28	SIG	M62/1981A1	40R	M62 J25 - J30	
01/09/15 10:11:28	SIG	M62/1981A2	40R	M62 J25 - J30	
01/09/15 10:11:28	SIG	M62/1981A3	40R	M62 J25 - J30	
01/09/15 10:11:28	SIG	M62/1981A4	40R	M62 J25 - J30	
01/09/15 10:15:21	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 10:15:21	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 10:15:21	SIG	M62/2005M1	OFF	M62 J25 - J30	
01/09/15 10:15:21	SIG	M62/2005M2	OFF	M62 J25 - J30	
01/09/15 10:15:28	SIG	M62/1979K1	50R	M62 J25 - J30	
01/09/15 10:15:28	SIG	M62/1979K2	50R	M62 J25 - J30	
01/09/15 10:15:28	SIG	M62/1981A1	50R	M62 J25 - J30	
01/09/15 10:15:28	SIG	M62/1981A2	50R	M62 J25 - J30	
01/09/15 10:15:28	SIG	M62/1981A3	50R	M62 J25 - J30	
01/09/15 10:15:28	SIG	M62/1981A4	50R	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1960B1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1960B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1960B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1960L1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1960L2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968A1	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968A2	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968A3	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968A4	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968B1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1968L1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974A1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974A2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974A3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974A4	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974B1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974B4	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974M1	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1974M2	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1979K1	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1979K2	OFF	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981A1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981A2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981A3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981A4	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981B1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1981B4	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987A1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987A3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987B1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987B4	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1987J1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1992B1	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1992B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1992B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1992B4	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1999B2	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1999B3	NR	M62 J25 - J30	
01/09/15 10:15:38	SIG	M62/1999B4	NR	M62 J25 - J30	
01/09/15 10:15:49	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 10:15:49	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 10:15:49	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 10:15:49	SIG	M62/2050B2	50R	M62 J25 - J30	
01/09/15 10:15:49	SIG	M62/2050B3	50R	M62 J25 - J30	
01/09/15 10:15:49	SIG	M62/2050B4	50R	M62 J25 - J30	
01/09/15 10:15:54	SIG	M62/2041B2	40R	M62 J25 - J30	
01/09/15 10:15:54	SIG	M62/2041B3	40R	M62 J25 - J30	
01/09/15 10:15:54	SIG	M62/2041B4	40R	M62 J25 - J30	
01/09/15 10:15:54	SIG	M62/2050B2	40R	M62 J25 - J30	
01/09/15 10:15:54	SIG	M62/2050B3	40R	M62 J25 - J30	
01/09/15 10:15:54	SIG	M62/2050B4	40R	M62 J25 - J30	
01/09/15 10:15:59	SIG	M62/2041B4	30R	M62 J25 - J30	
01/09/15 10:15:59	SIG	M62/2050B4	30R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2041B2	40R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2041B3	40R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2041B4	20R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2050B2	40R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2050B3	40R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2050B4	20R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2057B4	LDL	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2065B4	LDL	M62 J25 - J30	
01/09/15 10:16:05	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 10:16:05	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 10:16:10	SIG	M62/2041B4	STOP	M62 J25 - J30	
01/09/15 10:16:10	SIG	M62/2050B4	STOP	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2041B4	40R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2050B4	40R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 10:16:59	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 10:18:39	SIG	M62/1987J1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1960B1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1960B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1960B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1960L1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1960L2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1968B1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1968B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1968B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1968L1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974A1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974A2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974A3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974A4	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974B1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1974B4	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981A1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981A2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981A3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981A4	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981B1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1981B4	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1987A1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1987A3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1987B1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1987B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1987B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1987B4	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1992B1	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1992B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1992B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1992B4	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1999B2	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1999B3	OFF	M62 J25 - J30	
01/09/15 10:18:49	SIG	M62/1999B4	OFF	M62 J25 - J30	
01/09/15 10:18:50	SIG	M62/1999B1	BLNK	M62 J25 - J30	
01/09/15 10:18:50	SIG	M62/1999B1	BLNK	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1992A1	OFF	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1992A2	OFF	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1992A3	OFF	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1992J1	OFF	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1999A1	NR	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1999A2	NR	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1999A3	NR	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1999J1	OFF	M62 J25 - J30	
01/09/15 10:19:47	SIG	M62/1999J2	OFF	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2057B2	40R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2057B3	40R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2057B4	40R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 10:22:16	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 10:22:47	SIG	M62/1999A1	OFF	M62 J25 - J30	
01/09/15 10:22:48	SIG	M62/1999A2	OFF	M62 J25 - J30	
01/09/15 10:22:48	SIG	M62/1999A3	OFF	M62 J25 - J30	
01/09/15 10:24:16	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 10:24:16	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 10:24:16	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 10:24:37	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 10:24:37	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M62/2065B2	40R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M62/2065B3	40R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M62/2065B4	40R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M62/2065M1	40R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 10:24:38	SIG	M621/1002B2	40R	M62 J25 - J30	
01/09/15 10:26:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:26:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:26:46	SIG	M62/2069M1	40R	M62 J25 - J30	
01/09/15 10:26:46	SIG	M62/2069M2	40R	M62 J25 - J30	
01/09/15 10:26:46	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 10:26:46	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 10:26:46	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 10:26:46	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 10:26:46	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2074B2	40R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2074B3	40R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2074B4	40R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 10:26:51	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 10:27:02	SIG	M62/2050B2	50R	M62 J25 - J30	
01/09/15 10:27:02	SIG	M62/2050B3	50R	M62 J25 - J30	
01/09/15 10:27:02	SIG	M62/2050B4	50R	M62 J25 - J30	
01/09/15 10:29:58	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 10:29:58	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 10:29:58	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 10:30:10	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 10:30:10	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 10:30:10	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 10:32:31	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 10:32:31	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 10:32:31	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 10:32:31	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 10:32:31	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 10:32:31	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 10:32:37	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 10:32:37	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 10:32:37	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 10:32:37	SIG	M62/2041B2	40R	M62 J25 - J30	
01/09/15 10:32:37	SIG	M62/2041B3	40R	M62 J25 - J30	
01/09/15 10:32:37	SIG	M62/2041B4	40R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2088B1	REDX	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2088B2	50R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2088B3	50R	M62 J25 - J30	
01/09/15 10:33:25	SIG	M62/2088B4	50R	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2097B1	REDX	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2097B2	60R	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2097B3	60R	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2097B3	OFF	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2097B4	60R	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2106B1	REDX	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2106B2	60R	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2106B3	60R	M62 J25 - J30	
01/09/15 10:34:08	SIG	M62/2106B4	60R	M62 J25 - J30	
01/09/15 10:34:22	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 10:34:22	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 10:34:22	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 10:34:22	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 10:35:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:35:41	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 10:35:46	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 10:36:32	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 10:36:32	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 10:36:32	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 10:36:32	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 10:36:32	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 10:36:32	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 10:36:58	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 10:36:58	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 10:36:58	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2081B1	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2081B2	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2081B3	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2081L1	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 10:37:24	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 10:38:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:38:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:38:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:38:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:41:47	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 10:41:47	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 10:41:47	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 10:41:47	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 10:41:47	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M62/2069M1	60R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M62/2069M2	60R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M62/2074B2	60R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M62/2074B3	60R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M62/2074B4	60R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 10:42:58	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 10:45:58	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2088B2	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2088B3	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2088B4	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2097B2	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2097B3	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2097B4	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2106B2	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2106B3	NR	M62 J25 - J30	
01/09/15 10:48:58	SIG	M62/2106B4	NR	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2125B1	NR	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2125B2	NR	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2125B3	NR	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2125L1	NR	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2125L2	NR	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2132B1	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2132B2	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2132B3	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2137B1	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2137B2	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2137B3	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2137B4	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2147B1	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2147B2	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2147B3	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2147B4	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2159B1	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2159B2	60R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2159M1	50R	M62 J25 - J30	
01/09/15 10:49:58	SIG	M62/2159M2	50R	M62 J25 - J30	
01/09/15 10:51:58	SIG	M62/2097B2	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2088B2	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2088B3	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2088B4	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2097B3	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2097B4	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2106B2	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2106B3	OFF	M62 J25 - J30	
01/09/15 10:51:59	SIG	M62/2106B4	OFF	M62 J25 - J30	
01/09/15 10:52:00	SIG	M62/2088B1	BLNK	M62 J25 - J30	
01/09/15 10:52:00	SIG	M62/2088B1	BLNK	M62 J25 - J30	
01/09/15 10:52:00	SIG	M62/2097B1	BLNK	M62 J25 - J30	
01/09/15 10:52:00	SIG	M62/2106B1	BLNK	M62 J25 - J30	
01/09/15 10:52:00	SIG	M62/2106B1	BLNK	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2033B2	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2033B3	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2033B4	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 10:52:58	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 10:54:58	SIG	M62/2081B1	OFF	M62 J25 - J30	
01/09/15 10:54:58	SIG	M62/2081B2	OFF	M62 J25 - J30	
01/09/15 10:54:58	SIG	M62/2081B3	OFF	M62 J25 - J30	
01/09/15 10:54:58	SIG	M62/2081L1	OFF	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2033B2	OFF	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 10:55:59	SIG	M62/2033B4	OFF	M62 J25 - J30	
01/09/15 10:56:00	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2125B1	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2125B2	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2125B3	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2125L1	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2125L2	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2132B1	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2132B2	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2132B3	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2137B1	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2137B2	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2137B3	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2137B4	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2147B1	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2147B2	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2147B3	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2147B4	NR	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2159B1	OFF	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2159B2	OFF	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2159M1	OFF	M62 J25 - J30	
01/09/15 10:56:59	SIG	M62/2159M2	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2050B2	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2050B3	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2050B4	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2057B1	BLNK	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2057B2	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2057B3	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2057B4	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2065B2	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2065B3	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2065B4	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2065M1	NR	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2069M1	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2069M2	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2074B1	BLNK	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2074B2	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2074B3	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M62/2074B4	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M621/1002B1	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M621/1002B2	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M621/1010B1	OFF	M62 J25 - J30	
01/09/15 10:57:59	SIG	M621/1010B2	OFF	M62 J25 - J30	
01/09/15 10:59:59	SIG	M62/2137B1	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2125B1	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2125B2	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2125B3	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2125L1	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2125L2	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2132B1	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2132B2	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2132B3	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2137B2	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2137B3	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2137B4	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2147B1	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2147B2	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2147B3	OFF	M62 J25 - J30	
01/09/15 11:00:00	SIG	M62/2147B4	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2041B2	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2041B3	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2041B4	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2050B2	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2050B3	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2050B4	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2065B2	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2065B3	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2065B4	OFF	M62 J25 - J30	
01/09/15 11:00:59	SIG	M62/2065M1	OFF	M62 J25 - J30	
01/09/15 11:01:00	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 11:01:00	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 11:01:00	SIG	M62/2065B1	BLNK	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2147B1	NR	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2147B2	NR	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2147B3	NR	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2147B4	NR	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2159B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2159B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2159M1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2159M2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2170B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2170B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2183B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2183B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2183L1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2183L2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2194B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2194B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2194B3	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2194B4	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2203B1	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2203B2	50R	M62 J25 - J30	
01/09/15 14:28:40	SIG	M62/2203B3	50R	M62 J25 - J30	
01/09/15 14:31:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:31:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:31:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:31:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:42:46	SIG	M606/2003B1	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M606/2003B2	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1987B1	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1987B2	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1987B3	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1987B4	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1992B1	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1992B2	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1992B3	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/1992B4	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/2005M1	50R	M62 J25 - J30	
01/09/15 14:42:46	SIG	M62/2005M2	50R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1981B1	NR	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1981B2	NR	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1981B3	NR	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1981B4	NR	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1987B1	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1987B2	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1987B3	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1987B4	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1992B1	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1992B2	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1992B3	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1992B4	40R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1999B1	REDX	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1999B2	50R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1999B3	50R	M62 J25 - J30	
01/09/15 14:42:51	SIG	M62/1999B4	50R	M62 J25 - J30	
01/09/15 14:45:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2147B1	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2147B2	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2147B3	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2147B4	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2159B1	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2159B2	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2159M1	OFF	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2159M2	OFF	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 14:46:00	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 14:46:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:47:07	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 14:47:07	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 14:47:07	SIG	M62/2005M1	OFF	M62 J25 - J30	
01/09/15 14:47:07	SIG	M62/2005M2	OFF	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1981B1	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1981B2	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1981B3	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1981B4	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1987B1	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1987B2	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1987B3	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1987B4	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1992B1	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1992B2	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1992B3	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1992B4	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1999B2	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1999B3	NR	M62 J25 - J30	
01/09/15 14:47:08	SIG	M62/1999B4	NR	M62 J25 - J30	
01/09/15 14:49:01	SIG	M62/2147B1	OFF	M62 J25 - J30	
01/09/15 14:49:01	SIG	M62/2147B2	OFF	M62 J25 - J30	
01/09/15 14:49:01	SIG	M62/2147B3	OFF	M62 J25 - J30	
01/09/15 14:49:01	SIG	M62/2147B4	OFF	M62 J25 - J30	
01/09/15 14:49:01	SIG	M62/2159B1	OFF	M62 J25 - J30	
01/09/15 14:49:01	SIG	M62/2159B2	OFF	M62 J25 - J30	
01/09/15 14:50:08	SIG	M62/1999B2	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1981B1	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1981B2	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1981B3	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1981B4	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1987B1	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1987B2	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1987B3	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1987B4	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1992B1	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1992B2	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1992B3	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1992B4	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1999B1	BLNK	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1999B3	OFF	M62 J25 - J30	
01/09/15 14:50:09	SIG	M62/1999B4	OFF	M62 J25 - J30	
01/09/15 14:52:06	SIG	M62/2189B1	40R	M62 J25 - J30	
01/09/15 14:52:06	SIG	M62/2189B2	40R	M62 J25 - J30	
01/09/15 14:52:06	SIG	M62/2189B3	40R	M62 J25 - J30	
01/09/15 14:52:06	SIG	M62/2189B4	40R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2177B1	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2177B2	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2177L1	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2177L2	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2183B1	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2183B2	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2183L1	60R	M62 J25 - J30	
01/09/15 14:52:24	SIG	M62/2183L2	60R	M62 J25 - J30	
01/09/15 14:53:29	SIG	M62/2197B1	60R	M62 J25 - J30	
01/09/15 14:53:29	SIG	M62/2197B2	60R	M62 J25 - J30	
01/09/15 14:53:29	SIG	M62/2197B3	60R	M62 J25 - J30	
01/09/15 14:53:29	SIG	M62/2199M1	60R	M62 J25 - J30	
01/09/15 14:53:29	SIG	M62/2199M2	60R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2194B1	40R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2194B2	40R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2194B3	40R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2194B4	40R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2197B1	50R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2197B2	50R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2197B3	50R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2199M1	50R	M62 J25 - J30	
01/09/15 14:54:05	SIG	M62/2199M2	50R	M62 J25 - J30	
01/09/15 14:55:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:55:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:55:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:55:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2189B1	50R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2189B2	50R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2189B3	50R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2189B4	50R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2194B1	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2194B2	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2194B3	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2194B4	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2197B1	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2197B2	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2197B3	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2199M1	60R	M62 J25 - J30	
01/09/15 14:58:04	SIG	M62/2199M2	60R	M62 J25 - J30	
01/09/15 15:23:04	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 15:23:04	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 15:23:04	SIG	M62/2177B1	NR	M62 J25 - J30	
01/09/15 15:23:04	SIG	M62/2177B2	NR	M62 J25 - J30	
01/09/15 15:23:04	SIG	M62/2177L1	NR	M62 J25 - J30	
01/09/15 15:23:04	SIG	M62/2177L2	NR	M62 J25 - J30	
01/09/15 15:24:34	SIG	M62/2183L1	OFF	M62 J25 - J30	
01/09/15 15:24:35	SIG	M62/2183L1	60R	M62 J25 - J30	
01/09/15 15:25:46	SIG	M62/2183L1	60R	M62 J25 - J30	
01/09/15 15:25:46	SIG	M62/2183L1	OFF	M62 J25 - J30	
01/09/15 15:26:04	SIG	M62/2170B1	OFF	M62 J25 - J30	
01/09/15 15:26:04	SIG	M62/2170B2	OFF	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2177B1	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2177B2	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2177L1	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2177L2	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2183B1	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2183B2	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2183L1	NR	M62 J25 - J30	
01/09/15 15:32:03	SIG	M62/2183L2	NR	M62 J25 - J30	
01/09/15 15:35:04	SIG	M62/2177B1	OFF	M62 J25 - J30	
01/09/15 15:35:04	SIG	M62/2177B2	OFF	M62 J25 - J30	
01/09/15 15:35:04	SIG	M62/2177L1	OFF	M62 J25 - J30	
01/09/15 15:35:04	SIG	M62/2177L2	OFF	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2050B2	NR	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2050B3	NR	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2050B4	NR	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2057B1	REDX	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2065B1	REDX	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2069M1	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2069M2	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2074B1	REDX	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2074B2	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2074B3	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M62/2074B4	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M621/1002B1	HSD	M62 J25 - J30	
01/09/15 15:37:04	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 15:37:04	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2012B1	REDX	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2012B2	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2012B3	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2012B4	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2018B1	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2018B2	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2018B3	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2018L1	NR	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 15:38:04	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 15:40:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 15:41:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 15:41:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 15:41:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 15:48:04	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 15:48:04	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 15:48:04	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 15:48:04	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 15:48:04	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 15:48:04	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 15:48:04	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M62/2065B2	40R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M62/2065B3	40R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M62/2065B4	40R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M62/2065M1	40R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 15:48:10	SIG	M621/1002B2	40R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M62/2069M1	40R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M62/2069M2	40R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 15:49:20	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2074B2	40R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2074B3	40R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2074B4	40R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 15:49:26	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2012B1	BLNK	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2012B2	OFF	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2012B3	OFF	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2012B4	OFF	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2018B1	OFF	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2018B2	OFF	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2018B3	OFF	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2018L1	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2033B2	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2033B3	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2033B4	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 15:50:04	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/1999A1	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/1999A2	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/1999A3	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/1999J1	50R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/1999J2	50R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2004A1	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2004A2	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2004A3	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2008K1	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2008K2	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2012A1	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2012A2	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2012A3	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2018A1	HSD	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2025A1	REDX	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2025A2	NR	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2025A3	NR	M62 J25 - J30	
01/09/15 15:52:04	SIG	M62/2025A4	NR	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2018L1	OFF	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2033B2	OFF	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 15:53:04	SIG	M62/2033B4	OFF	M62 J25 - J30	
01/09/15 15:53:05	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 15:53:05	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 15:53:05	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 15:53:05	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2025A2	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2025A3	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2025A4	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2033A1	REDX	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2033A2	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2033A3	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2033A4	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2041A1	REDX	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2041A2	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2041A3	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2041A4	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2050A1	REDX	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2050A2	NR	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2050A3	NR	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2050A4	NR	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2088B1	REDX	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2097B1	REDX	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2097B2	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2097B3	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2097B4	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2106B1	REDX	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2106B2	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2106B3	60R	M62 J25 - J30	
01/09/15 15:57:04	SIG	M62/2106B4	60R	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2033B2	NR	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2033B3	NR	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2033B4	NR	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 15:57:27	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2012B1	REDX	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2012B2	NR	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2012B3	NR	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2012B4	NR	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 15:57:28	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 16:00:18	SIG	M62/2025B1	60R	M62 J25 - J30	
01/09/15 16:00:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:00:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:00:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:00:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:00:44	SIG	M62/2033B1	60R	M62 J25 - J30	
01/09/15 16:01:08	SIG	M62/2041B1	60R	M62 J25 - J30	
01/09/15 16:01:33	SIG	M621/1002B1	50R	M62 J25 - J30	
01/09/15 16:01:38	SIG	M62/2057B1	60R	M62 J25 - J30	
01/09/15 16:01:38	SIG	M621/1002B1	40R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2088B2	50R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2088B3	50R	M62 J25 - J30	
01/09/15 16:02:28	SIG	M62/2088B4	50R	M62 J25 - J30	
01/09/15 16:02:52	SIG	M62/2183L1	OFF	M62 J25 - J30	
01/09/15 16:02:53	SIG	M62/2183L1	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2050A2	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2050A3	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2050A4	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057A1	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057A1	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057A2	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057A2	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057A3	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057A3	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057J1	60R	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2057J1	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2065A1	REDX	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2065A2	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2065A3	NR	M62 J25 - J30	
01/09/15 16:06:50	SIG	M62/2065A4	NR	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/1999A1	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/1999A2	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/1999A3	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/1999J1	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/1999J2	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/2004A1	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/2004A2	OFF	M62 J25 - J30	
01/09/15 16:07:04	SIG	M62/2004A3	OFF	M62 J25 - J30	
01/09/15 16:07:05	SIG	M62/2113B1	REDX	M62 J25 - J30	
01/09/15 16:07:05	SIG	M62/2113B2	60R	M62 J25 - J30	
01/09/15 16:07:05	SIG	M62/2113B3	60R	M62 J25 - J30	
01/09/15 16:07:05	SIG	M62/2113B4	60R	M62 J25 - J30	
01/09/15 16:08:04	SIG	M62/2097B2	50R	M62 J25 - J30	
01/09/15 16:08:04	SIG	M62/2097B3	50R	M62 J25 - J30	
01/09/15 16:08:04	SIG	M62/2097B4	50R	M62 J25 - J30	
01/09/15 16:08:16	SIG	M62/2050A1	60R	M62 J25 - J30	
01/09/15 16:08:41	SIG	M62/2041A1	60R	M62 J25 - J30	
01/09/15 16:09:08	SIG	M62/2033A1	60R	M62 J25 - J30	
01/09/15 16:09:15	SIG	M62/2018A1	60R	M62 J25 - J30	
01/09/15 16:09:15	SIG	M62/2025A1	60R	M62 J25 - J30	
01/09/15 16:09:33	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 16:09:33	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 16:09:33	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 16:09:33	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 16:11:25	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 16:11:26	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 16:17:04	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 16:18:04	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 16:18:04	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 16:18:04	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 16:18:04	SIG	M62/2097B2	60R	M62 J25 - J30	
01/09/15 16:18:04	SIG	M62/2097B3	60R	M62 J25 - J30	
01/09/15 16:18:04	SIG	M62/2097B4	60R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2025B1	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 16:19:49	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2025B1	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2033B1	50R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:19:55	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2088B2	50R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2088B3	50R	M62 J25 - J30	
01/09/15 16:20:50	SIG	M62/2088B4	50R	M62 J25 - J30	
01/09/15 16:21:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:21:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:21:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:21:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:22:59	SIG	M62/2088B2	40R	M62 J25 - J30	
01/09/15 16:22:59	SIG	M62/2088B3	40R	M62 J25 - J30	
01/09/15 16:22:59	SIG	M62/2088B4	40R	M62 J25 - J30	
01/09/15 16:24:27	SIG	M62/2033B1	40R	M62 J25 - J30	
01/09/15 16:24:27	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 16:24:27	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2033B1	40R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2041B1	50R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 16:24:33	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 16:24:51	SIG	M62/2189B1	60R	M62 J25 - J30	
01/09/15 16:24:51	SIG	M62/2189B2	60R	M62 J25 - J30	
01/09/15 16:24:51	SIG	M62/2189B3	60R	M62 J25 - J30	
01/09/15 16:24:51	SIG	M62/2189B4	60R	M62 J25 - J30	
01/09/15 16:25:55	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 16:25:55	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 16:25:55	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 16:25:55	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 16:26:20	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 16:26:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 16:26:58	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 16:27:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:27:02	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:27:08	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:28:05	SIG	M62/2117B1	60R	M62 J25 - J30	
01/09/15 16:28:05	SIG	M62/2117B3	60R	M62 J25 - J30	
01/09/15 16:28:05	SIG	M62/2120M1	60R	M62 J25 - J30	
01/09/15 16:28:05	SIG	M62/2120M2	60R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2025B1	60R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2088B2	50R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2088B3	50R	M62 J25 - J30	
01/09/15 16:28:39	SIG	M62/2088B4	50R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2033B1	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2041B1	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 16:29:34	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2025B1	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 16:30:37	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2025B1	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2033B1	50R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:30:43	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 16:32:05	SIG	M62/2097B2	50R	M62 J25 - J30	
01/09/15 16:32:05	SIG	M62/2097B3	50R	M62 J25 - J30	
01/09/15 16:32:05	SIG	M62/2097B4	50R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2033B1	40R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2041B1	50R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 16:32:51	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 16:32:59	SIG	M62/2088B2	40R	M62 J25 - J30	
01/09/15 16:32:59	SIG	M62/2088B3	40R	M62 J25 - J30	
01/09/15 16:32:59	SIG	M62/2088B4	40R	M62 J25 - J30	
01/09/15 16:34:01	SIG	M62/2088B1	40R	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2183B1	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2183B2	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2183L2	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2189B1	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2189B2	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2189B3	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2189B4	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2194B1	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2194B2	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2194B3	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2194B4	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2199M1	OFF	M62 J25 - J30	
01/09/15 16:34:14	SIG	M62/2199M2	OFF	M62 J25 - J30	
01/09/15 16:34:24	SIG	M62/2097B1	50R	M62 J25 - J30	
01/09/15 16:34:38	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 16:34:38	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 16:34:38	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 16:34:38	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 16:35:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:35:13	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:35:13	SIG	M62/2106B1	60R	M62 J25 - J30	
01/09/15 16:35:17	SIG	M62/2113B1	60R	M62 J25 - J30	
01/09/15 16:35:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:37:15	SIG	M62/2194B1	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2183B1	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2183L2	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2189B1	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2189B2	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2189B3	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2189B4	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2194B2	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2194B3	OFF	M62 J25 - J30	
01/09/15 16:37:32	SIG	M62/2194B4	OFF	M62 J25 - J30	
01/09/15 16:38:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:38:16	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:38:21	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:38:28	SIG	M62/2088B1	50R	M62 J25 - J30	
01/09/15 16:38:28	SIG	M62/2088B2	50R	M62 J25 - J30	
01/09/15 16:38:28	SIG	M62/2088B3	50R	M62 J25 - J30	
01/09/15 16:38:28	SIG	M62/2088B4	50R	M62 J25 - J30	
01/09/15 16:38:31	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 16:38:31	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 16:38:31	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 16:38:31	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 16:38:56	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 16:38:56	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 16:38:56	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 16:38:56	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 16:39:59	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 16:39:59	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 16:39:59	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 16:39:59	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 16:40:05	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 16:40:05	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 16:40:05	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 16:40:05	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 16:41:19	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:41:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:41:25	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2033B1	50R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2041B1	60R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 16:41:26	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2033B1	40R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2041B1	50R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 16:43:21	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 16:45:48	SIG	M62/2170K1	60R	M62 J25 - J30	
01/09/15 16:45:48	SIG	M62/2170K2	60R	M62 J25 - J30	
01/09/15 16:45:48	SIG	M62/2177A1	REDX	M62 J25 - J30	
01/09/15 16:45:48	SIG	M62/2177A2	NR	M62 J25 - J30	
01/09/15 16:45:48	SIG	M62/2177A3	NR	M62 J25 - J30	
01/09/15 16:45:48	SIG	M62/2177A4	NR	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2170A1	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2170A2	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2177A2	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2177A3	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2177A4	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2183A1	REDX	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2183A2	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2183A3	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2183A4	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2189A1	REDX	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2189A2	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2189A3	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2189A4	60R	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2197A1	NR	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2197A2	NR	M62 J25 - J30	
01/09/15 16:45:49	SIG	M62/2197A3	NR	M62 J25 - J30	
01/09/15 16:45:52	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 16:45:52	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 16:45:52	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 16:45:52	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 16:46:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:46:26	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:46:31	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:46:45	SIG	M62/2189A1	60R	M62 J25 - J30	
01/09/15 16:46:51	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 16:46:51	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 16:46:51	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 16:46:51	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 16:47:02	SIG	M62/2183A1	60R	M62 J25 - J30	
01/09/15 16:47:06	SIG	M62/2177A1	60R	M62 J25 - J30	
01/09/15 16:49:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:49:30	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:49:35	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:50:32	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 16:50:32	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 16:50:32	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 16:50:32	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 16:50:51	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 16:50:51	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 16:50:51	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 16:50:51	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 16:51:02	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 16:51:02	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 16:51:02	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 16:51:02	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 16:51:07	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 16:51:07	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 16:51:07	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 16:51:07	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 16:52:34	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:52:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:52:36	SIG	M62/2073K1	60R	M62 J25 - J30	
01/09/15 16:52:36	SIG	M62/2073K2	60R	M62 J25 - J30	
01/09/15 16:52:36	SIG	M62/2079A1	REDX	M62 J25 - J30	
01/09/15 16:52:36	SIG	M62/2079A2	NR	M62 J25 - J30	
01/09/15 16:52:36	SIG	M62/2079A3	NR	M62 J25 - J30	
01/09/15 16:52:36	SIG	M62/2079A4	NR	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2074A1	REDX	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2074A2	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2074A3	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2074A4	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2079A2	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2079A3	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2079A4	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2088A1	REDX	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2088A2	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2088A3	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2088A4	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2097A1	REDX	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2097A2	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2097A3	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2097A4	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A1	REDX	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A2	NR	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A2	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A3	NR	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A3	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A4	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2106A4	NR	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2114A1	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2114A2	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2114A3	60R	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2117A1	REDX	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2117A2	NR	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2117A3	NR	M62 J25 - J30	
01/09/15 16:52:37	SIG	M62/2117A4	NR	M62 J25 - J30	
01/09/15 16:52:39	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:52:40	SIG	M62/2065A2	60R	M62 J25 - J30	
01/09/15 16:52:40	SIG	M62/2065A3	60R	M62 J25 - J30	
01/09/15 16:52:40	SIG	M62/2065A4	60R	M62 J25 - J30	
01/09/15 16:53:26	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 16:53:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 16:53:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 16:53:28	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 16:54:05	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 16:54:48	SIG	M62/2106A1	60R	M62 J25 - J30	
01/09/15 16:55:14	SIG	M62/2097A1	60R	M62 J25 - J30	
01/09/15 16:55:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:55:38	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:55:42	SIG	M62/2088A1	60R	M62 J25 - J30	
01/09/15 16:55:44	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 16:55:49	SIG	M62/2079A1	60R	M62 J25 - J30	
01/09/15 16:56:20	SIG	M62/2025A1	???	M62 J25 - J30	
01/09/15 16:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 16:56:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 16:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2088B1	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2097B1	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2097B2	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2097B3	60R	M62 J25 - J30	
01/09/15 16:58:05	SIG	M62/2097B4	60R	M62 J25 - J30	
01/09/15 16:58:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 16:58:42	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 16:58:48	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:01:27	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:01:27	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:01:27	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:01:27	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:01:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:01:46	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:01:52	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:02:09	SIG	M62/2041B1	40R	M62 J25 - J30	
01/09/15 17:02:09	SIG	M62/2041B2	40R	M62 J25 - J30	
01/09/15 17:02:09	SIG	M62/2041B3	40R	M62 J25 - J30	
01/09/15 17:02:09	SIG	M62/2041B4	40R	M62 J25 - J30	
01/09/15 17:04:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:04:50	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:04:56	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:06:09	SIG	M62/2041B1	50R	M62 J25 - J30	
01/09/15 17:06:09	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 17:06:09	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 17:06:09	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 17:07:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:07:54	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:07:59	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:08:10	SIG	M62/2025B1	60R	M62 J25 - J30	
01/09/15 17:08:10	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 17:08:10	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 17:08:10	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 17:09:00	SIG	M62/2041B1	40R	M62 J25 - J30	
01/09/15 17:09:00	SIG	M62/2041B2	40R	M62 J25 - J30	
01/09/15 17:09:00	SIG	M62/2041B3	40R	M62 J25 - J30	
01/09/15 17:09:00	SIG	M62/2041B4	40R	M62 J25 - J30	
01/09/15 17:10:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:10:58	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:11:04	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:12:05	SIG	M62/2025A1	OFF	M62 J25 - J30	
01/09/15 17:12:11	SIG	M62/2025B1	50R	M62 J25 - J30	
01/09/15 17:12:11	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 17:12:11	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 17:12:11	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 17:12:16	SIG	M62/2025B1	40R	M62 J25 - J30	
01/09/15 17:12:16	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 17:12:16	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 17:12:16	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 17:13:00	SIG	M62/2041B1	50R	M62 J25 - J30	
01/09/15 17:13:00	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 17:13:00	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 17:13:00	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 17:13:21	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 17:13:21	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 17:13:21	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 17:13:21	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 17:13:27	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 17:13:27	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 17:13:27	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 17:13:27	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 17:14:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:14:02	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:14:08	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2081B1	40R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2081B2	40R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2081B3	40R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2081L1	40R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2088B1	50R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2088B2	50R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2088B3	50R	M62 J25 - J30	
01/09/15 17:14:58	SIG	M62/2088B4	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M621/1002B1	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 17:15:33	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M62/2065B2	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M62/2065B3	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M62/2065B4	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M62/2065M1	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M62/2069M1	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M62/2069M2	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M621/1002B1	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M621/1002B2	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 17:15:47	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 17:17:13	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:17:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:17:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2088B1	60R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2088B2	60R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2088B3	60R	M62 J25 - J30	
01/09/15 17:18:57	SIG	M62/2088B4	60R	M62 J25 - J30	
01/09/15 17:19:54	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:19:54	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:19:54	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:19:54	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:20:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:20:13	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:20:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:20:26	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 17:20:26	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 17:20:26	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 17:20:26	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 17:20:31	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 17:20:31	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 17:20:31	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 17:20:31	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 17:20:34	SIG	M62/2041B1	40R	M62 J25 - J30	
01/09/15 17:20:34	SIG	M62/2041B2	40R	M62 J25 - J30	
01/09/15 17:20:34	SIG	M62/2041B3	40R	M62 J25 - J30	
01/09/15 17:20:34	SIG	M62/2041B4	40R	M62 J25 - J30	
01/09/15 17:23:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:23:14	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:23:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:25:55	SIG	M62/1968B1	50R	M62 J25 - J30	
01/09/15 17:25:55	SIG	M62/1968B2	50R	M62 J25 - J30	
01/09/15 17:25:55	SIG	M62/1968B3	50R	M62 J25 - J30	
01/09/15 17:25:55	SIG	M62/1968L1	50R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1960B1	60R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1960B2	60R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1960B3	60R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1960L1	NR	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1960L2	NR	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1968B1	40R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1968B2	40R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1968B3	40R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1968L1	40R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1974B1	50R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1974B2	50R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1974B3	50R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1974B4	50R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1974M1	50R	M62 J25 - J30	
01/09/15 17:26:01	SIG	M62/1974M2	50R	M62 J25 - J30	
01/09/15 17:26:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:26:18	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:26:19	SIG	M62/2132B1	50R	M62 J25 - J30	
01/09/15 17:26:19	SIG	M62/2132B2	50R	M62 J25 - J30	
01/09/15 17:26:19	SIG	M62/2132B3	50R	M62 J25 - J30	
01/09/15 17:26:20	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 17:26:20	SIG	M62/2132B1	50R	M62 J25 - J30	
01/09/15 17:26:20	SIG	M62/2132B2	50R	M62 J25 - J30	
01/09/15 17:26:20	SIG	M62/2132B3	50R	M62 J25 - J30	
01/09/15 17:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2125B1	60R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2125B2	60R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2125B3	60R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2125L1	NR	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2125L2	NR	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2132B1	40R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2132B2	40R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2132B3	40R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2137B1	50R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2137B2	50R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2137B3	50R	M62 J25 - J30	
01/09/15 17:26:25	SIG	M62/2137B4	50R	M62 J25 - J30	
01/09/15 17:26:26	SIG	M62/2125L1	NR	M62 J25 - J30	
01/09/15 17:26:26	SIG	M62/2125L2	NR	M62 J25 - J30	
01/09/15 17:28:03	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:28:03	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:28:03	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:28:03	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:29:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:29:21	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:29:27	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:29:28	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 17:29:28	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 17:29:28	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 17:29:28	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 17:29:33	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 17:29:33	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 17:29:33	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 17:29:33	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2081B1	60R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2081B2	60R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2081B3	60R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M62/2081L1	60R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 17:30:12	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2069M1	40R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2069M2	40R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2074B2	40R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2074B3	40R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2074B4	40R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 17:30:34	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2050B2	50R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2050B3	50R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2050B4	50R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2057B1	50R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 17:31:21	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2050B2	40R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2050B3	40R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2050B4	40R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2057B1	40R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2057B2	40R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2057B3	40R	M62 J25 - J30	
01/09/15 17:31:27	SIG	M62/2057B4	40R	M62 J25 - J30	
01/09/15 17:32:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:32:26	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:32:31	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1974B1	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1974B2	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1974B3	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1974B4	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1974M1	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1974M2	40R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1981B1	50R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1981B2	50R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1981B3	50R	M62 J25 - J30	
01/09/15 17:33:42	SIG	M62/1981B4	50R	M62 J25 - J30	
01/09/15 17:33:57	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:33:57	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:33:57	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:33:57	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/1987B1	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/1987B2	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/1987B3	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/1987B4	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2147B1	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2147B2	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2147B3	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2147B4	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2159B1	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2159B2	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2159M1	60R	M62 J25 - J30	
01/09/15 17:34:06	SIG	M62/2159M2	60R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2081B1	60R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2081B2	60R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2081B3	60R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M62/2081L1	60R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 17:34:33	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 17:34:38	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 17:34:38	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 17:34:38	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 17:34:38	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2057B1	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M621/1002B1	50R	M62 J25 - J30	
01/09/15 17:34:39	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2132B1	60R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2132B2	60R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2132B3	60R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2137B1	60R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2137B2	60R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2137B3	60R	M62 J25 - J30	
01/09/15 17:35:03	SIG	M62/2137B4	60R	M62 J25 - J30	
01/09/15 17:35:06	SIG	M62/2170B1	60R	M62 J25 - J30	
01/09/15 17:35:06	SIG	M62/2170B2	60R	M62 J25 - J30	
01/09/15 17:35:06	SIG	M62/2170L1	50R	M62 J25 - J30	
01/09/15 17:35:06	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 17:35:29	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:35:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:35:35	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2057B1	60R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 17:36:12	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M606/2003B1	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M606/2003B2	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1992B1	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1992B2	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1992B3	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1992B4	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1999B1	REDX	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1999B2	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1999B3	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/1999B4	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2004B1	REDX	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2004B2	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2004B3	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2004B4	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2005M1	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2005M2	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2012B2	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2012B3	60R	M62 J25 - J30	
01/09/15 17:37:06	SIG	M62/2012B4	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1968B1	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1968B2	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1968B3	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1968L1	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1974B1	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1974B2	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1974B3	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1974B4	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1974M1	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1974M2	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1981B1	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1981B2	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1981B3	60R	M62 J25 - J30	
01/09/15 17:37:43	SIG	M62/1981B4	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2050B2	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2050B3	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2050B4	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2057B1	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2069M1	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2069M2	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2074B2	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2074B3	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M62/2074B4	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 17:38:06	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 17:38:33	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:38:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:38:39	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:38:49	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:38:49	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:38:49	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:38:49	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:39:06	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 17:39:06	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 17:39:06	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 17:39:06	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 17:39:06	SIG	M621/1002B1	60R	M62 J25 - J30	
01/09/15 17:39:06	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 17:40:27	SIG	M62/2170L1	LDR	M62 J25 - J30	
01/09/15 17:40:27	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 17:40:27	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 17:40:27	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 17:40:27	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 17:41:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:41:38	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:41:43	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:43:55	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 17:43:55	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 17:43:55	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 17:43:55	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 17:44:00	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 17:44:00	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 17:44:00	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 17:44:00	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 17:44:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:44:42	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:44:47	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2125B1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2125B2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2125B3	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2125L1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2125L2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2132B1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2132B2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2132B3	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2137B1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2137B2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2137B3	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2137B4	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2147B1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2147B2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2147B3	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2147B4	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2159B1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2159B2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2159M1	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2159M2	OFF	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 17:46:06	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 17:47:10	SIG	M62/1960L1	60R	M62 J25 - J30	
01/09/15 17:47:10	SIG	M62/1960L2	60R	M62 J25 - J30	
01/09/15 17:47:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:47:46	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:47:52	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:47:55	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:47:55	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:47:55	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:47:55	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:49:12	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 17:49:12	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 17:49:12	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 17:49:12	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 17:49:18	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 17:49:18	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 17:49:18	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 17:49:18	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 17:49:40	SIG	M62/2050B2	40R	M62 J25 - J30	
01/09/15 17:49:40	SIG	M62/2050B3	40R	M62 J25 - J30	
01/09/15 17:49:40	SIG	M62/2050B4	40R	M62 J25 - J30	
01/09/15 17:50:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:50:50	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:50:55	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:51:10	SIG	M62/1960L1	NR	M62 J25 - J30	
01/09/15 17:51:10	SIG	M62/1960L2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 17:52:06	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1960B1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1960B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1960B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1960L1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1960L2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1968B1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1968B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1968B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1968L1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1974B1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1974B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1974B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1974B4	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1974M1	OFF	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1974M2	OFF	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1981B1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1981B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1981B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1981B4	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1987B1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1987B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1987B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1987B4	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1992B1	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1992B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1992B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1992B4	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1999B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1999B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/1999B4	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2004B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2004B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2004B4	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2005M1	OFF	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2005M2	OFF	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2012B2	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2012B3	NR	M62 J25 - J30	
01/09/15 17:52:06	SIG	M62/2012B4	NR	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2057B1	40R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2057B2	40R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2057B3	40R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2057B4	40R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M621/1002B1	50R	M62 J25 - J30	
01/09/15 17:52:17	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 17:53:53	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:53:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:53:58	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M62/2065B2	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M62/2065B3	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M62/2065B4	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M62/2065M1	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M621/1002B1	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M621/1002B2	40R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 17:54:15	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 17:54:48	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 17:54:48	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 17:54:48	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 17:54:48	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 17:54:57	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 17:54:57	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 17:54:57	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 17:54:57	SIG	M62/2203B1	OFF	M62 J25 - J30	
01/09/15 17:54:57	SIG	M62/2203B2	OFF	M62 J25 - J30	
01/09/15 17:54:57	SIG	M62/2203B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1960B1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1960B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1960B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1960L1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1960L2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1968B1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1968B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1968B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1968L1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1974B1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1974B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1974B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1974B4	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1981B1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1981B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1981B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1981B4	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1987B1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1987B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1987B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1987B4	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1992B1	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1992B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1992B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1992B4	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1999B1	BLNK	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1999B2	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1999B3	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/1999B4	OFF	M62 J25 - J30	
01/09/15 17:55:07	SIG	M62/2004B2	OFF	M62 J25 - J30	
01/09/15 17:55:08	SIG	M62/2004B1	BLNK	M62 J25 - J30	
01/09/15 17:55:08	SIG	M62/2004B1	BLNK	M62 J25 - J30	
01/09/15 17:55:08	SIG	M62/2004B3	OFF	M62 J25 - J30	
01/09/15 17:55:08	SIG	M62/2004B4	OFF	M62 J25 - J30	
01/09/15 17:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 17:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 17:56:45	SIG	M62/2041B1	30R	M62 J25 - J30	
01/09/15 17:56:50	SIG	M62/2041B1	20R	M62 J25 - J30	
01/09/15 17:56:50	SIG	M62/2057B1	LDR	M62 J25 - J30	
01/09/15 17:56:55	SIG	M62/2041B1	STOP	M62 J25 - J30	
01/09/15 17:56:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 17:56:58	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 17:57:03	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M62/2069M1	40R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M62/2069M2	40R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 17:57:46	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2074B2	40R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2074B3	40R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2074B4	40R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2081B1	50R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2081B2	50R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2081B3	50R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M62/2081L1	50R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M621/1010B1	40R	M62 J25 - J30	
01/09/15 17:57:52	SIG	M621/1010B2	40R	M62 J25 - J30	
01/09/15 17:57:58	SIG	M62/2197B1	OFF	M62 J25 - J30	
01/09/15 17:57:58	SIG	M62/2197B2	OFF	M62 J25 - J30	
01/09/15 17:57:58	SIG	M62/2197B3	OFF	M62 J25 - J30	
01/09/15 18:00:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:00:02	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:00:07	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:01:35	SIG	M62/2041B1	40R	M62 J25 - J30	
01/09/15 18:01:35	SIG	M62/2057B1	50R	M62 J25 - J30	
01/09/15 18:01:40	SIG	M62/2041B1	40R	M62 J25 - J30	
01/09/15 18:01:40	SIG	M62/2057B1	40R	M62 J25 - J30	
01/09/15 18:03:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:03:14	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:03:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2041B1	50R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2050B2	50R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2050B3	50R	M62 J25 - J30	
01/09/15 18:03:20	SIG	M62/2050B4	50R	M62 J25 - J30	
01/09/15 18:04:47	SIG	M62/2057B1	50R	M62 J25 - J30	
01/09/15 18:04:47	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 18:04:47	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 18:04:47	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 18:06:13	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:06:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:06:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:07:35	SIG	M62/2057B1	40R	M62 J25 - J30	
01/09/15 18:07:35	SIG	M62/2057B2	40R	M62 J25 - J30	
01/09/15 18:07:35	SIG	M62/2057B3	40R	M62 J25 - J30	
01/09/15 18:07:35	SIG	M62/2057B4	40R	M62 J25 - J30	
01/09/15 18:09:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:09:13	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:09:19	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:09:32	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 18:09:32	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 18:09:32	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 18:09:32	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 18:09:37	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 18:09:37	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 18:09:37	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 18:09:37	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 18:11:36	SIG	M62/2057B1	50R	M62 J25 - J30	
01/09/15 18:11:36	SIG	M62/2057B2	50R	M62 J25 - J30	
01/09/15 18:11:36	SIG	M62/2057B3	50R	M62 J25 - J30	
01/09/15 18:11:36	SIG	M62/2057B4	50R	M62 J25 - J30	
01/09/15 18:12:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:12:17	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:12:23	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:15:07	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 18:15:07	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 18:15:07	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 18:15:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:15:21	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:15:27	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2065B2	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2065B3	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2065B4	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2069M1	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2069M2	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2074B2	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2074B3	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2074B4	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2081B1	60R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2081B2	60R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2081B3	60R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M62/2081L1	60R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M621/1010B1	50R	M62 J25 - J30	
01/09/15 18:17:03	SIG	M621/1010B2	50R	M62 J25 - J30	
01/09/15 18:17:48	SIG	M62/2065M1	50R	M62 J25 - J30	
01/09/15 18:17:48	SIG	M621/1002B1	50R	M62 J25 - J30	
01/09/15 18:17:48	SIG	M621/1002B2	50R	M62 J25 - J30	
01/09/15 18:18:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:18:25	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:18:30	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:21:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:21:29	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:21:34	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M62/2069M1	60R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M62/2069M2	60R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M62/2074B2	60R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M62/2074B3	60R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M62/2074B4	60R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 18:23:07	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 18:23:37	SIG	M62/2079A1	HSD	M62 J25 - J30	
01/09/15 18:24:07	SIG	M62/2057B1	60R	M62 J25 - J30	
01/09/15 18:24:07	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 18:24:07	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 18:24:07	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 18:24:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:24:33	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:24:38	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:24:45	SIG	M62/2088A1	HSD	M62 J25 - J30	
01/09/15 18:25:07	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 18:25:07	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 18:25:07	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 18:25:07	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 18:25:07	SIG	M621/1002B1	60R	M62 J25 - J30	
01/09/15 18:25:07	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 18:25:42	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 18:25:42	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 18:25:42	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 18:25:42	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 18:25:52	SIG	M62/2097A1	HSD	M62 J25 - J30	
01/09/15 18:25:53	SIG	M62/2079A1	REDX	M62 J25 - J30	
01/09/15 18:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 18:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 18:27:00	SIG	M62/2106A1	HSD	M62 J25 - J30	
01/09/15 18:27:01	SIG	M62/2088A1	REDX	M62 J25 - J30	
01/09/15 18:27:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:27:37	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:27:42	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:28:09	SIG	M62/2097A1	REDX	M62 J25 - J30	
01/09/15 18:28:22	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 18:28:22	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 18:28:22	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 18:28:22	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 18:28:27	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 18:28:27	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 18:28:27	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 18:28:27	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 18:29:17	SIG	M62/2106A1	REDX	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2065A2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2065A3	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2065A4	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2073K1	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2073K2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2074A2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2074A3	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2074A4	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2079A2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2079A3	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2079A4	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2088A2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2088A3	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2088A4	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2097A2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2097A3	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2097A4	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2106A2	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2106A3	NR	M62 J25 - J30	
01/09/15 18:30:17	SIG	M62/2106A4	NR	M62 J25 - J30	
01/09/15 18:30:18	SIG	M62/2114A1	NR	M62 J25 - J30	
01/09/15 18:30:18	SIG	M62/2114A2	NR	M62 J25 - J30	
01/09/15 18:30:18	SIG	M62/2114A3	NR	M62 J25 - J30	
01/09/15 18:30:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:30:40	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:30:46	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 18:31:17	SIG	M62/2073K1	OFF	M62 J25 - J30	
01/09/15 18:31:17	SIG	M62/2073K2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2074A1	BLNK	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2074A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2074A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2074A4	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2079A1	BLNK	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2079A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2079A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2079A4	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2088A1	BLNK	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2088A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2088A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2088A4	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2097A1	BLNK	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2097A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2097A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2097A4	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2106A1	BLNK	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2106A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2106A4	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2114A1	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2114A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2114A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2117A1	BLNK	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2117A2	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2117A3	OFF	M62 J25 - J30	
01/09/15 18:31:18	SIG	M62/2117A4	OFF	M62 J25 - J30	
01/09/15 18:32:23	SIG	M62/2018B1	60R	M62 J25 - J30	
01/09/15 18:32:23	SIG	M62/2018B2	60R	M62 J25 - J30	
01/09/15 18:32:23	SIG	M62/2018B3	60R	M62 J25 - J30	
01/09/15 18:32:23	SIG	M62/2018L1	60R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2033B1	50R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2041B1	60R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 18:32:32	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2025B1	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2033B1	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 18:33:15	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 18:35:07	SIG	M62/2025B1	50R	M62 J25 - J30	
01/09/15 18:35:07	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 18:35:07	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 18:35:07	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2025B1	40R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2033B1	50R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 18:35:12	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 18:37:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:37:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:37:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:37:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2025B1	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2025B2	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2025B3	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2025B4	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2033B1	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 18:39:07	SIG	M621/1010B1	OFF	M62 J25 - J30	
01/09/15 18:39:07	SIG	M621/1010B2	OFF	M62 J25 - J30	
01/09/15 18:41:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:41:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:41:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:41:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:45:17	SIG	M62/2177A1	HSD	M62 J25 - J30	
01/09/15 18:46:02	SIG	M62/2183A1	HSD	M62 J25 - J30	
01/09/15 18:46:47	SIG	M62/2177A1	REDX	M62 J25 - J30	
01/09/15 18:46:47	SIG	M62/2189A1	HSD	M62 J25 - J30	
01/09/15 18:47:47	SIG	M62/2183A1	REDX	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2170A1	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2170A2	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2170K1	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2170K2	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2177A2	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2177A3	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2177A4	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2183A2	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2183A3	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2183A4	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2189A1	REDX	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2189A2	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2189A3	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2189A4	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2197A1	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2197A2	NR	M62 J25 - J30	
01/09/15 18:48:47	SIG	M62/2197A3	NR	M62 J25 - J30	
01/09/15 18:49:47	SIG	M62/2170K1	OFF	M62 J25 - J30	
01/09/15 18:49:47	SIG	M62/2170K2	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2170A1	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2170A2	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2177A1	BLNK	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2177A2	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2177A3	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2177A4	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2183A1	BLNK	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2183A2	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2183A3	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2183A4	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2189A1	BLNK	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2189A2	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2189A3	OFF	M62 J25 - J30	
01/09/15 18:49:48	SIG	M62/2189A4	OFF	M62 J25 - J30	
01/09/15 18:51:48	SIG	M62/2197A1	OFF	M62 J25 - J30	
01/09/15 18:51:48	SIG	M62/2197A2	OFF	M62 J25 - J30	
01/09/15 18:51:48	SIG	M62/2197A3	OFF	M62 J25 - J30	
01/09/15 18:52:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 18:53:12	SIG	M62/2113B1	HSD	M62 J25 - J30	
01/09/15 18:54:05	SIG	M62/2106B1	HSD	M62 J25 - J30	
01/09/15 18:55:13	SIG	M62/2097B1	HSD	M62 J25 - J30	
01/09/15 18:55:13	SIG	M62/2113B1	REDX	M62 J25 - J30	
01/09/15 18:56:21	SIG	M62/2088B1	HSD	M62 J25 - J30	
01/09/15 18:56:21	SIG	M62/2106B1	REDX	M62 J25 - J30	
01/09/15 18:57:29	SIG	M62/2097B1	REDX	M62 J25 - J30	
01/09/15 18:58:37	SIG	M62/2088B1	REDX	M62 J25 - J30	
01/09/15 18:59:30	SIG	M62/2117B1	NR	M62 J25 - J30	
01/09/15 18:59:30	SIG	M62/2117B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2074B2	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2074B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2074B4	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2081B1	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2081B2	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2081B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2081L1	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2088B2	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2088B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2088B4	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2097B2	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2097B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2097B4	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2106B2	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2106B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2106B4	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2113B2	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2113B3	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2113B4	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2120M1	NR	M62 J25 - J30	
01/09/15 18:59:31	SIG	M62/2120M2	NR	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2074B1	BLNK	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2074B2	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2074B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2074B4	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2081B1	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2081B2	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2081B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2081L1	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2088B1	BLNK	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2088B2	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2088B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2088B4	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2097B1	BLNK	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2097B2	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2097B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2097B4	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2106B1	BLNK	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2106B2	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2106B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2106B4	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2113B1	BLNK	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2113B2	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2113B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2113B4	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2117B3	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2120M1	OFF	M62 J25 - J30	
01/09/15 19:00:31	SIG	M62/2120M2	OFF	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2170L1	OFF	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2170L2	OFF	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2177B1	OFF	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2177B2	OFF	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2177L1	OFF	M62 J25 - J30	
01/09/15 19:00:59	SIG	M62/2177L2	OFF	M62 J25 - J30	
01/09/15 19:03:59	SIG	M62/2170B1	OFF	M62 J25 - J30	
01/09/15 19:03:59	SIG	M62/2170B2	OFF	M62 J25 - J30	
01/09/15 19:07:25	SIG	M62/2025A1	HSD	M62 J25 - J30	
01/09/15 19:08:25	SIG	M62/2033A1	HSD	M62 J25 - J30	
01/09/15 19:09:25	SIG	M62/2018A1	HSD	M62 J25 - J30	
01/09/15 19:09:25	SIG	M62/2025A1	REDX	M62 J25 - J30	
01/09/15 19:09:25	SIG	M62/2041A1	HSD	M62 J25 - J30	
01/09/15 19:10:32	SIG	M62/2033A1	REDX	M62 J25 - J30	
01/09/15 19:10:32	SIG	M62/2050A1	HSD	M62 J25 - J30	
01/09/15 19:11:24	SIG	M62/2041A1	REDX	M62 J25 - J30	
01/09/15 19:12:24	SIG	M62/2050A1	REDX	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2025A2	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2025A3	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2025A4	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2033A2	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2033A3	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2033A4	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2041A2	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2041A3	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2041A4	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2050A2	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2050A3	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2050A4	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2057A1	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2057A2	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2057A3	NR	M62 J25 - J30	
01/09/15 19:13:25	SIG	M62/2057J1	NR	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2008K1	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2008K2	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2012A1	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2012A2	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2012A3	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2018A1	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2018A2	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2018A3	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2018A4	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2025A1	BLNK	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2025A2	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2025A3	OFF	M62 J25 - J30	
01/09/15 19:14:25	SIG	M62/2025A4	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2033A1	BLNK	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2033A2	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2033A3	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2033A4	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2041A1	BLNK	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2041A2	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2041A3	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2041A4	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2050A1	BLNK	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2050A2	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2050A3	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2050A4	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2057A1	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2057A2	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2057A3	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2057J1	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2065A1	BLNK	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2065A2	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2065A3	OFF	M62 J25 - J30	
01/09/15 19:14:26	SIG	M62/2065A4	OFF	M62 J25 - J30	
01/09/15 19:18:57	SIG	M62/2057B1	HSD	M62 J25 - J30	
01/09/15 19:20:56	SIG	M62/2041B1	HSD	M62 J25 - J30	
01/09/15 19:20:56	SIG	M62/2057B1	REDX	M62 J25 - J30	
01/09/15 19:20:56	SIG	M621/1002B1	HSD	M62 J25 - J30	
01/09/15 19:20:56	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 19:20:56	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 19:21:56	SIG	M62/2033B1	HSD	M62 J25 - J30	
01/09/15 19:22:56	SIG	M62/2025B1	HSD	M62 J25 - J30	
01/09/15 19:22:56	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 19:23:48	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 19:24:32	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 19:25:02	SIG	M62/2065B2	NR	M62 J25 - J30	
01/09/15 19:25:02	SIG	M62/2065B3	NR	M62 J25 - J30	
01/09/15 19:25:02	SIG	M62/2065B4	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2018B1	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2018B2	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2018B3	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2018L1	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2033B2	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2033B3	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2033B4	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2050B2	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2050B3	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2050B4	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2057B2	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2057B3	NR	M62 J25 - J30	
01/09/15 19:25:03	SIG	M62/2057B4	NR	M62 J25 - J30	
01/09/15 19:26:02	SIG	M62/2069M1	OFF	M62 J25 - J30	
01/09/15 19:26:02	SIG	M62/2069M2	OFF	M62 J25 - J30	
01/09/15 19:26:02	SIG	M621/1010B1	OFF	M62 J25 - J30	
01/09/15 19:26:02	SIG	M621/1010B2	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2033B2	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2033B4	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2041B2	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2041B3	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2041B4	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2050B2	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2050B3	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2050B4	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2057B1	BLNK	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2057B2	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2057B3	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2057B4	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2065B1	BLNK	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2065B2	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2065B3	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2065B4	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M62/2065M1	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M621/1002B1	OFF	M62 J25 - J30	
01/09/15 19:26:03	SIG	M621/1002B2	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2012B1	BLNK	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2012B2	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2012B3	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2012B4	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2018B1	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2018B2	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2018B3	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2018L1	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 19:26:04	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 19:33:21	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 19:33:21	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2033B2	60R	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2033B3	60R	M62 J25 - J30	
01/09/15 19:40:19	SIG	M62/2033B4	60R	M62 J25 - J30	
01/09/15 19:43:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 19:43:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 19:43:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 19:43:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 19:49:20	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 19:49:20	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 19:49:20	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 19:49:20	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 19:49:20	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 19:49:20	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 19:52:22	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 19:52:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 19:53:00	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 19:53:00	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 19:53:00	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2012B1	REDX	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2012B2	NR	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2012B3	NR	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2012B4	NR	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2025B1	STOP	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 19:53:05	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 19:53:10	SIG	M62/2025B1	STOP	M62 J25 - J30	
01/09/15 19:53:35	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 19:53:35	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2033B1	STOP	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2033B2	40R	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2033B4	40R	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2041B2	50R	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2041B3	50R	M62 J25 - J30	
01/09/15 19:53:41	SIG	M62/2041B4	50R	M62 J25 - J30	
01/09/15 19:53:46	SIG	M62/2033B1	STOP	M62 J25 - J30	
01/09/15 19:56:28	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 19:56:29	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 19:56:34	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2057B1	REDX	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2057B2	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2057B3	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2057B4	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M62/2065M1	60R	M62 J25 - J30	
01/09/15 19:59:08	SIG	M621/1002B1	HSD	M62 J25 - J30	
01/09/15 19:59:08	SIG	M621/1002B2	60R	M62 J25 - J30	
01/09/15 19:59:09	SIG	M621/1010B1	60R	M62 J25 - J30	
01/09/15 19:59:09	SIG	M621/1010B2	60R	M62 J25 - J30	
01/09/15 19:59:32	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 19:59:32	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 19:59:38	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:02:09	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 20:02:09	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 20:02:09	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 20:02:09	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 20:02:35	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:02:36	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:02:41	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:05:39	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:05:40	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:05:45	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:06:10	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 20:06:10	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 20:08:43	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:08:44	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:08:49	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:09:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 20:09:11	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 20:11:09	SIG	M62/2065B1	REDX	M62 J25 - J30	
01/09/15 20:11:09	SIG	M62/2065B2	60R	M62 J25 - J30	
01/09/15 20:11:09	SIG	M62/2065B3	60R	M62 J25 - J30	
01/09/15 20:11:09	SIG	M62/2065B4	60R	M62 J25 - J30	
01/09/15 20:11:47	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:11:48	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:11:53	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:14:51	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:14:52	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:14:57	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:17:36	SIG	M62/2163A1	50R	M62 J25 - J30	
01/09/15 20:17:36	SIG	M62/2163A2	50R	M62 J25 - J30	
01/09/15 20:17:36	SIG	M62/2166K1	50R	M62 J25 - J30	
01/09/15 20:17:36	SIG	M62/2166K2	50R	M62 J25 - J30	
01/09/15 20:17:36	SIG	M62/2170K1	50R	M62 J25 - J30	
01/09/15 20:17:36	SIG	M62/2170K2	50R	M62 J25 - J30	
01/09/15 20:17:41	SIG	M62/2166K1	40R	M62 J25 - J30	
01/09/15 20:17:41	SIG	M62/2166K2	40R	M62 J25 - J30	
01/09/15 20:17:41	SIG	M62/2170K1	40R	M62 J25 - J30	
01/09/15 20:17:41	SIG	M62/2170K2	40R	M62 J25 - J30	
01/09/15 20:17:46	SIG	M62/2170K1	30R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2166K1	40R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2166K2	40R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2170A1	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2170A2	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2170K1	20R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2170K2	40R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2177A1	REDX	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2177A2	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2177A3	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2177A4	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2183A1	REDX	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2183A2	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2183A3	50R	M62 J25 - J30	
01/09/15 20:17:51	SIG	M62/2183A4	50R	M62 J25 - J30	
01/09/15 20:17:55	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:17:55	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:17:56	SIG	M62/2170K1	STOP	M62 J25 - J30	
01/09/15 20:18:01	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:20:58	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:20:59	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:21:04	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:22:55	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 20:22:55	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 20:22:55	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 20:22:55	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 20:24:02	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:24:03	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:24:08	SIG	M62/2033B3	40R	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2170L1	LDR	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2170L2	50R	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2177B1	50R	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2177B2	50R	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2177L1	50R	M62 J25 - J30	
01/09/15 20:26:34	SIG	M62/2177L2	50R	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 20:26:53	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 20:29:13	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 20:29:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 20:34:09	SIG	M62/2065B2	NR	M62 J25 - J30	
01/09/15 20:34:09	SIG	M62/2065B3	NR	M62 J25 - J30	
01/09/15 20:34:09	SIG	M62/2065B4	NR	M62 J25 - J30	
01/09/15 20:37:09	SIG	M62/2065B2	OFF	M62 J25 - J30	
01/09/15 20:37:10	SIG	M62/2065B1	BLNK	M62 J25 - J30	
01/09/15 20:37:10	SIG	M62/2065B3	OFF	M62 J25 - J30	
01/09/15 20:37:10	SIG	M62/2065B4	OFF	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 20:41:41	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2018B1	40R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2018B2	40R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2018B3	40R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2018L1	40R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 20:44:05	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2018B1	50R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2018B2	50R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2018B3	50R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2018L1	50R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 20:48:05	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2163A1	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2163A2	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2166K1	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2166K2	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2170A1	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2170A2	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2170K1	60R	M62 J25 - J30	
01/09/15 20:56:28	SIG	M62/2170K2	60R	M62 J25 - J30	
01/09/15 20:57:03	SIG	M62/2170K1	50R	M62 J25 - J30	
01/09/15 20:57:03	SIG	M62/2170K2	50R	M62 J25 - J30	
01/09/15 20:57:03	SIG	M62/2183A2	40R	M62 J25 - J30	
01/09/15 20:57:03	SIG	M62/2183A3	40R	M62 J25 - J30	
01/09/15 20:57:03	SIG	M62/2183A4	40R	M62 J25 - J30	
01/09/15 20:57:08	SIG	M62/2170K1	40R	M62 J25 - J30	
01/09/15 20:57:08	SIG	M62/2170K2	40R	M62 J25 - J30	
01/09/15 20:57:08	SIG	M62/2183A3	30R	M62 J25 - J30	
01/09/15 20:57:08	SIG	M62/2183A4	30R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2166K1	50R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2166K2	50R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2170A1	50R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2170A2	LDL	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2170K1	30R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2170K2	30R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2177A3	LDL	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2177A4	LDL	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2183A2	40R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2183A3	20R	M62 J25 - J30	
01/09/15 20:57:14	SIG	M62/2183A4	20R	M62 J25 - J30	
01/09/15 20:57:19	SIG	M62/2183A3	STOP	M62 J25 - J30	
01/09/15 20:57:19	SIG	M62/2183A4	STOP	M62 J25 - J30	
01/09/15 20:59:10	SIG	M62/2157A1	60R	M62 J25 - J30	
01/09/15 20:59:10	SIG	M62/2157A2	60R	M62 J25 - J30	
01/09/15 20:59:10	SIG	M62/2157J1	60R	M62 J25 - J30	
01/09/15 20:59:10	SIG	M62/2157J2	60R	M62 J25 - J30	
01/09/15 20:59:10	SIG	M62/2157K1	60R	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2170B1	NR	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2170B2	NR	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2170L1	OFF	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2170L2	OFF	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2177B1	OFF	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2177B2	OFF	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2177L1	OFF	M62 J25 - J30	
01/09/15 21:21:23	SIG	M62/2177L2	OFF	M62 J25 - J30	
01/09/15 21:24:23	SIG	M62/2170B1	OFF	M62 J25 - J30	
01/09/15 21:24:24	SIG	M62/2170B2	OFF	M62 J25 - J30	
01/09/15 21:49:49	SIG	M62/1960K1	50R	M62 J25 - J30	
01/09/15 21:49:49	SIG	M62/1960K2	50R	M62 J25 - J30	
01/09/15 21:49:49	SIG	M62/1968A1	50R	M62 J25 - J30	
01/09/15 21:49:49	SIG	M62/1968A2	50R	M62 J25 - J30	
01/09/15 21:49:49	SIG	M62/1968A3	50R	M62 J25 - J30	
01/09/15 21:49:49	SIG	M62/1968A4	50R	M62 J25 - J30	
01/09/15 21:49:55	SIG	M62/1960K1	40R	M62 J25 - J30	
01/09/15 21:49:55	SIG	M62/1960K2	40R	M62 J25 - J30	
01/09/15 21:49:55	SIG	M62/1968A1	40R	M62 J25 - J30	
01/09/15 21:49:55	SIG	M62/1968A2	40R	M62 J25 - J30	
01/09/15 21:49:55	SIG	M62/1968A3	40R	M62 J25 - J30	
01/09/15 21:49:55	SIG	M62/1968A4	40R	M62 J25 - J30	
01/09/15 21:50:00	SIG	M62/1960K1	30R	M62 J25 - J30	
01/09/15 21:50:00	SIG	M62/1960K2	30R	M62 J25 - J30	
01/09/15 21:50:00	SIG	M62/1968A1	30R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1955K1	TI	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1955K2	TI	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1960A1	50R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1960A2	50R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1960A3	50R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1960K1	20R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1960K2	30R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1968A1	20R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1968A2	40R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1968A3	40R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1968A4	40R	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1974A1	NR	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1974A2	NR	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1974A3	NR	M62 J25 - J30	
01/09/15 21:50:05	SIG	M62/1974A4	NR	M62 J25 - J30	
01/09/15 21:50:10	SIG	M62/1960K1	STOP	M62 J25 - J30	
01/09/15 21:50:10	SIG	M62/1968A1	STOP	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1955K1	OFF	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1955K2	OFF	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1960A1	OFF	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1960A2	OFF	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1960A3	OFF	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1960K1	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1960K2	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1968A1	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1968A2	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1968A3	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1968A4	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1974A1	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1974A2	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1974A3	NR	M62 J25 - J30	
01/09/15 21:52:00	SIG	M62/1974A4	NR	M62 J25 - J30	
01/09/15 21:53:10	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 21:53:10	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 21:53:10	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 21:53:10	SIG	M62/2203B1	50R	M62 J25 - J30	
01/09/15 21:53:10	SIG	M62/2203B2	50R	M62 J25 - J30	
01/09/15 21:53:10	SIG	M62/2203B3	50R	M62 J25 - J30	
01/09/15 21:55:00	SIG	M62/1960K1	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1960K2	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1968A1	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1968A2	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1968A3	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1968A4	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1974A1	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1974A2	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1974A3	OFF	M62 J25 - J30	
01/09/15 21:55:01	SIG	M62/1974A4	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2012B1	BLNK	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2012B2	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2012B3	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2012B4	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2018B1	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2018B2	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2018B3	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2018L1	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2033B2	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2033B4	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2050B2	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2050B3	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2050B4	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2057B1	BLNK	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2057B2	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2057B3	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2057B4	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M62/2065M1	NR	M62 J25 - J30	
01/09/15 22:02:11	SIG	M621/1002B1	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M621/1002B2	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M621/1010B1	OFF	M62 J25 - J30	
01/09/15 22:02:11	SIG	M621/1010B2	OFF	M62 J25 - J30	
01/09/15 22:05:11	SIG	M62/2065M1	OFF	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2041B2	OFF	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2041B3	OFF	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2041B4	OFF	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2050B2	OFF	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2050B3	OFF	M62 J25 - J30	
01/09/15 22:05:12	SIG	M62/2050B4	OFF	M62 J25 - J30	
01/09/15 22:05:13	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 22:39:11	SIG	M62/2197B1	NR	M62 J25 - J30	
01/09/15 22:39:11	SIG	M62/2197B2	NR	M62 J25 - J30	
01/09/15 22:39:11	SIG	M62/2197B3	NR	M62 J25 - J30	
01/09/15 22:39:11	SIG	M62/2203B1	OFF	M62 J25 - J30	
01/09/15 22:39:11	SIG	M62/2203B2	OFF	M62 J25 - J30	
01/09/15 22:39:11	SIG	M62/2203B3	OFF	M62 J25 - J30	
01/09/15 22:42:12	SIG	M62/2197B1	OFF	M62 J25 - J30	
01/09/15 22:42:12	SIG	M62/2197B2	OFF	M62 J25 - J30	
01/09/15 22:42:12	SIG	M62/2197B3	OFF	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2166K1	60R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2166K2	60R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2170A1	60R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2170A2	60R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2170K1	60R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2170K2	60R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2177A3	50R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2177A4	50R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2183A2	50R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2183A3	50R	M62 J25 - J30	
01/09/15 22:48:55	SIG	M62/2183A4	50R	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2157A1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2157A2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2157J1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2157J2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2157K1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2163A1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2163A2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2166K1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2166K2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2170A1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2170A2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2170K1	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2170K2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2177A1	BLNK	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2177A2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2177A3	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2177A4	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2183A1	BLNK	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2183A2	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2183A3	OFF	M62 J25 - J30	
01/09/15 22:49:12	SIG	M62/2183A4	OFF	M62 J25 - J30	
01/09/15 22:55:47	SIG	M62/2008K1	50R	M62 J25 - J30	
01/09/15 22:55:47	SIG	M62/2008K2	50R	M62 J25 - J30	
01/09/15 22:55:52	SIG	M62/2008K1	40R	M62 J25 - J30	
01/09/15 22:55:52	SIG	M62/2008K2	40R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M606/2003B1	NR	M62 J25 - J30	
01/09/15 22:55:57	SIG	M606/2003B2	NR	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2008K1	30R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2008K2	30R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2012A1	60R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2012A2	60R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2012A3	60R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2018A1	HSD	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2018A2	60R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2018A3	60R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2018A4	60R	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2025A1	REDX	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2025A2	NR	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2025A3	NR	M62 J25 - J30	
01/09/15 22:55:57	SIG	M62/2025A4	NR	M62 J25 - J30	
01/09/15 23:06:53	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 23:06:53	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 23:06:53	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2012B1	REDX	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2012B2	NR	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2012B3	NR	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2012B4	NR	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2025B1	STOP	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2025B2	40R	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2025B3	40R	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2025B4	40R	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2033B1	REDX	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2033B2	50R	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2033B3	50R	M62 J25 - J30	
01/09/15 23:06:58	SIG	M62/2033B4	50R	M62 J25 - J30	
01/09/15 23:07:03	SIG	M62/2025B1	STOP	M62 J25 - J30	
01/09/15 23:09:27	SIG	M62/2033B3	???	M62 J25 - J30	
01/09/15 23:09:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2008K1	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2008K2	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2012A1	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2012A2	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2012A3	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2018A1	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2018A2	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2018A3	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2018A4	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2025A1	BLNK	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2025A2	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2025A3	OFF	M62 J25 - J30	
01/09/15 23:18:03	SIG	M62/2025A4	OFF	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2041B1	REDX	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2041B2	60R	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2041B3	60R	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2041B4	60R	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2050B2	60R	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2050B3	60R	M62 J25 - J30	
01/09/15 23:19:12	SIG	M62/2050B4	60R	M62 J25 - J30	
01/09/15 23:24:36	SIG	M606/2003B1	OFF	M62 J25 - J30	
01/09/15 23:24:36	SIG	M606/2003B2	OFF	M62 J25 - J30	
01/09/15 23:35:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
01/09/15 23:35:57	SIG	M62/2025B2	50R	M62 J25 - J30	
01/09/15 23:35:57	SIG	M62/2025B3	50R	M62 J25 - J30	
01/09/15 23:35:57	SIG	M62/2025B4	50R	M62 J25 - J30	
01/09/15 23:36:21	SIG	M62/2018B1	NR	M62 J25 - J30	
01/09/15 23:36:21	SIG	M62/2018B2	NR	M62 J25 - J30	
01/09/15 23:36:21	SIG	M62/2018B3	NR	M62 J25 - J30	
01/09/15 23:36:28	SIG	M62/2018L1	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2012B1	BLNK	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2012B2	OFF	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2012B3	OFF	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2012B4	OFF	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2018B1	OFF	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2018B2	OFF	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2018B3	OFF	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2018L1	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2025B2	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2025B3	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2025B4	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2033B2	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2033B3	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2033B4	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2041B2	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2041B3	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2041B4	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2050B2	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2050B3	NR	M62 J25 - J30	
01/09/15 23:54:13	SIG	M62/2050B4	NR	M62 J25 - J30	
01/09/15 23:57:13	SIG	M62/2033B2	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2018L1	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2025B1	BLNK	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2025B2	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2025B3	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2025B4	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2033B1	BLNK	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2041B1	BLNK	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2041B3	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2041B4	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2050B2	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2050B3	OFF	M62 J25 - J30	
01/09/15 23:57:14	SIG	M62/2050B4	OFF	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2163A1	60R	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2163A2	60R	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2170K1	50R	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2170K2	50R	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2183A2	50R	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2183A3	50R	M62 J25 - J30	
02/09/15 03:42:29	SIG	M62/2183A4	50R	M62 J25 - J30	
02/09/15 03:42:34	SIG	M62/2170K1	40R	M62 J25 - J30	
02/09/15 03:42:34	SIG	M62/2170K2	40R	M62 J25 - J30	
02/09/15 03:42:34	SIG	M62/2183A2	40R	M62 J25 - J30	
02/09/15 03:42:34	SIG	M62/2183A3	40R	M62 J25 - J30	
02/09/15 03:42:34	SIG	M62/2183A4	40R	M62 J25 - J30	
02/09/15 03:42:39	SIG	M62/2170A2	LDL	M62 J25 - J30	
02/09/15 03:42:40	SIG	M62/2170K1	30R	M62 J25 - J30	
02/09/15 03:42:40	SIG	M62/2170K2	30R	M62 J25 - J30	
02/09/15 03:42:40	SIG	M62/2183A3	30R	M62 J25 - J30	
02/09/15 03:42:40	SIG	M62/2183A4	30R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2166K1	50R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2166K2	50R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2170A1	50R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2170A2	LDL	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2170K1	30R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2170K2	30R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2177A2	50R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2177A3	LDL	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2177A4	LDL	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2183A2	40R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2183A3	20R	M62 J25 - J30	
02/09/15 03:42:45	SIG	M62/2183A4	20R	M62 J25 - J30	
02/09/15 03:42:50	SIG	M62/2183A3	STOP	M62 J25 - J30	
02/09/15 03:42:50	SIG	M62/2183A4	STOP	M62 J25 - J30	
02/09/15 04:26:55	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 04:26:55	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 04:26:55	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 04:26:55	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 04:26:55	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 04:27:00	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 04:27:00	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 04:27:00	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 04:27:00	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 04:27:00	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 04:27:06	SIG	M62/2170L1	30R	M62 J25 - J30	
02/09/15 04:27:06	SIG	M62/2177B1	30R	M62 J25 - J30	
02/09/15 04:27:06	SIG	M62/2177L1	30R	M62 J25 - J30	
02/09/15 04:27:06	SIG	M62/2177L2	30R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2170B1	NR	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2170B2	NR	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2170L1	20R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2177B1	30R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2177L1	30R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2177L2	30R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 04:27:11	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 04:27:16	SIG	M62/2170L1	STOP	M62 J25 - J30	
02/09/15 04:29:23	SIG	M62/2183B2	???	M62 J25 - J30	
02/09/15 04:29:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2012B1	REDX	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2065B1	REDX	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 04:37:31	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 04:37:31	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 04:40:17	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 04:40:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2012B1	BLNK	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2012B2	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2012B3	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2012B4	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2018B1	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2018B2	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2018B3	OFF	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2018L1	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2025B2	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2025B3	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2025B4	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2033B2	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2033B3	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2033B4	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 04:40:35	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2170B1	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2170B2	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2170L1	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2170L2	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2177B1	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2177B2	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2177L1	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2177L2	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2183B1	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2183L1	OFF	M62 J25 - J30	
02/09/15 04:40:57	SIG	M62/2183L2	OFF	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2074B1	REDX	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 04:42:45	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 04:42:50	SIG	M62/2050B2	30R	M62 J25 - J30	
02/09/15 04:42:55	SIG	M62/2050B2	20R	M62 J25 - J30	
02/09/15 04:42:55	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 04:42:55	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 04:42:55	SIG	M62/2057B2	LDR	M62 J25 - J30	
02/09/15 04:42:55	SIG	M62/2065B2	LDR	M62 J25 - J30	
02/09/15 04:43:00	SIG	M62/2050B2	STOP	M62 J25 - J30	
02/09/15 04:43:35	SIG	M62/2033B2	OFF	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2018L1	OFF	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2025B2	OFF	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2025B3	OFF	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2025B4	OFF	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2033B1	BLNK	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 04:43:36	SIG	M62/2033B4	OFF	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2163A1	50R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2163A2	50R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2170A1	40R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2170A2	50R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2177A2	40R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2177A3	50R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2177A4	50R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2183A3	40R	M62 J25 - J30	
02/09/15 04:50:13	SIG	M62/2183A4	40R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2163A1	40R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2163A2	40R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2170A1	30R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2170A2	40R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2177A3	40R	M62 J25 - J30	
02/09/15 04:50:18	SIG	M62/2177A4	40R	M62 J25 - J30	
02/09/15 04:50:23	SIG	M62/2163A1	30R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2170A1	20R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2170A2	40R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2177A1	STOP	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2177A2	40R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2177A3	40R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2177A4	40R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2183A1	STOP	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2183A3	40R	M62 J25 - J30	
02/09/15 04:50:24	SIG	M62/2183A4	40R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2151A1	60R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2151A2	60R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2151J1	60R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2151K1	60R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2155A1	LDR	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2155A2	50R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2155J1	50R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2155K1	50R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2157A1	LDR	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2157A2	50R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2157J1	NR	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2157J2	NR	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2157K1	50R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2163A1	20R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2163A2	40R	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2177A1	STOP	M62 J25 - J30	
02/09/15 04:50:29	SIG	M62/2183A1	STOP	M62 J25 - J30	
02/09/15 04:50:34	SIG	M62/2163A1	STOP	M62 J25 - J30	
02/09/15 04:50:34	SIG	M62/2170A1	STOP	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2151A1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2151A2	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2151J1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2151K1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2155A1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2155A2	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2155J1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2155K1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2157A1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2157A2	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2157J1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2157J2	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2157K1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2163A1	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2163A2	OFF	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2170A1	50R	M62 J25 - J30	
02/09/15 04:50:49	SIG	M62/2170A2	50R	M62 J25 - J30	
02/09/15 04:51:01	SIG	M62/2163A1	50R	M62 J25 - J30	
02/09/15 04:51:01	SIG	M62/2163A2	50R	M62 J25 - J30	
02/09/15 05:01:30	SIG	M62/2166K1	40R	M62 J25 - J30	
02/09/15 05:01:30	SIG	M62/2166K2	40R	M62 J25 - J30	
02/09/15 05:01:30	SIG	M62/2170K1	20R	M62 J25 - J30	
02/09/15 05:01:35	SIG	M62/2170K1	STOP	M62 J25 - J30	
02/09/15 05:07:18	SIG	M62/2157A1	60R	M62 J25 - J30	
02/09/15 05:07:18	SIG	M62/2157A2	60R	M62 J25 - J30	
02/09/15 05:07:18	SIG	M62/2157J1	60R	M62 J25 - J30	
02/09/15 05:07:18	SIG	M62/2157J2	60R	M62 J25 - J30	
02/09/15 05:07:18	SIG	M62/2157K1	60R	M62 J25 - J30	
02/09/15 05:11:41	SIG	M62/2163A1	60R	M62 J25 - J30	
02/09/15 05:11:41	SIG	M62/2163A2	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2166K1	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2166K2	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2170A1	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2170A2	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2170K1	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2170K2	60R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2177A2	50R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2177A3	50R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2177A4	50R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2183A2	50R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2183A3	50R	M62 J25 - J30	
02/09/15 05:11:42	SIG	M62/2183A4	50R	M62 J25 - J30	
02/09/15 05:12:14	SIG	M62/2189A1	REDX	M62 J25 - J30	
02/09/15 05:12:14	SIG	M62/2189A2	NR	M62 J25 - J30	
02/09/15 05:12:14	SIG	M62/2189A3	NR	M62 J25 - J30	
02/09/15 05:12:14	SIG	M62/2189A4	NR	M62 J25 - J30	
02/09/15 05:20:10	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 05:20:10	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 05:20:10	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 05:20:10	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 05:20:10	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 05:20:43	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 05:20:43	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 05:20:43	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 05:20:49	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 05:20:49	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 05:20:49	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 05:25:15	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 05:25:15	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 05:25:15	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 05:25:15	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 05:25:15	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 06:13:59	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 06:13:59	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 06:13:59	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 06:13:59	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 06:13:59	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 06:13:59	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2050B2	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2050B3	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2050B4	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2057B1	BLNK	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2057B2	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2057B3	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2057B4	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2065B2	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2065B3	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2065B4	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2065M1	NR	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2069M1	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2069M2	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2074B1	BLNK	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2074B2	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2074B3	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M62/2074B4	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M621/1002B1	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M621/1002B2	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 06:23:20	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 06:26:20	SIG	M62/2065B2	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2041B2	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2041B3	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2041B4	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2050B2	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2050B3	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2050B4	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2065B1	BLNK	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2065B3	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2065B4	OFF	M62 J25 - J30	
02/09/15 06:26:21	SIG	M62/2065M1	OFF	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2012B1	REDX	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2018B1	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2018B2	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2018B3	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2018L1	NR	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 06:40:04	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2004A1	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2004A2	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2004A3	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2008K1	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2008K2	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2012A1	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2012A2	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2012A3	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2018A2	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2018A3	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2018A4	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2025A1	REDX	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2025A2	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2025A3	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2025A4	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2033A1	REDX	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2033A2	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2033A3	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2033A4	60R	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2041A1	REDX	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2041A2	NR	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2041A3	NR	M62 J25 - J30	
02/09/15 06:41:21	SIG	M62/2041A4	NR	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2041A2	60R	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2041A3	60R	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2041A4	60R	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2050A1	REDX	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2050A2	NR	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2050A3	NR	M62 J25 - J30	
02/09/15 06:41:32	SIG	M62/2050A4	NR	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2050A2	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2050A3	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2050A4	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2057A1	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2057A2	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2057A3	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2057J1	60R	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2065A1	REDX	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2065A2	NR	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2065A3	NR	M62 J25 - J30	
02/09/15 06:41:33	SIG	M62/2065A4	NR	M62 J25 - J30	
02/09/15 06:42:47	SIG	M62/2050A1	60R	M62 J25 - J30	
02/09/15 06:43:12	SIG	M62/2041A1	60R	M62 J25 - J30	
02/09/15 06:43:41	SIG	M62/2033A1	60R	M62 J25 - J30	
02/09/15 06:43:47	SIG	M62/2018A1	60R	M62 J25 - J30	
02/09/15 06:43:47	SIG	M62/2025A1	60R	M62 J25 - J30	
02/09/15 06:46:20	SIG	M62/2004A1	OFF	M62 J25 - J30	
02/09/15 06:46:20	SIG	M62/2004A2	OFF	M62 J25 - J30	
02/09/15 06:46:20	SIG	M62/2004A3	OFF	M62 J25 - J30	
02/09/15 06:46:22	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 06:46:23	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 06:47:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2012B1	BLNK	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2012B2	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2012B3	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2012B4	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2018B1	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2018B2	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2018B3	OFF	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2018L1	NR	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2025B2	NR	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2025B3	NR	M62 J25 - J30	
02/09/15 06:49:17	SIG	M62/2025B4	NR	M62 J25 - J30	
02/09/15 06:52:17	SIG	M62/2018L1	OFF	M62 J25 - J30	
02/09/15 06:52:17	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 06:52:17	SIG	M62/2025B2	OFF	M62 J25 - J30	
02/09/15 06:52:17	SIG	M62/2025B3	OFF	M62 J25 - J30	
02/09/15 06:52:17	SIG	M62/2025B4	OFF	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2065A2	60R	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2065A3	60R	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2065A4	60R	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2073K1	60R	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2073K2	60R	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2079A1	REDX	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2079A2	NR	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2079A3	NR	M62 J25 - J30	
02/09/15 06:54:15	SIG	M62/2079A4	NR	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2074A1	REDX	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2074A2	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2074A3	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2074A4	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2079A2	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2079A3	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2079A4	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2088A1	REDX	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2088A2	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2088A3	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2088A4	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2097A1	REDX	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2097A2	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2097A3	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2097A4	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2106A1	REDX	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2106A2	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2106A3	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2106A4	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2114A1	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2114A2	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2114A3	60R	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2117A1	REDX	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2117A2	NR	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2117A3	NR	M62 J25 - J30	
02/09/15 06:54:16	SIG	M62/2117A4	NR	M62 J25 - J30	
02/09/15 06:54:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 06:54:28	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 06:54:29	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 06:54:29	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 06:55:45	SIG	M62/2106A1	60R	M62 J25 - J30	
02/09/15 06:56:09	SIG	M62/2097A1	60R	M62 J25 - J30	
02/09/15 06:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 06:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 06:56:36	SIG	M62/2088A1	60R	M62 J25 - J30	
02/09/15 06:56:40	SIG	M62/2079A1	60R	M62 J25 - J30	
02/09/15 07:03:19	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 07:03:19	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 07:03:19	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 07:03:19	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2170B1	NR	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2170B2	NR	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2170L1	NR	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2170L2	NR	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 07:03:25	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2183B1	40R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2183L1	40R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2183L2	40R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2189B1	50R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2189B2	50R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2189B3	50R	M62 J25 - J30	
02/09/15 07:04:19	SIG	M62/2189B4	50R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/1999A1	60R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/1999A2	60R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/1999A3	60R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/1999J1	50R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/1999J2	50R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/2004A1	60R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/2004A2	60R	M62 J25 - J30	
02/09/15 07:04:21	SIG	M62/2004A3	60R	M62 J25 - J30	
02/09/15 07:04:50	SIG	M62/2159B1	NR	M62 J25 - J30	
02/09/15 07:04:50	SIG	M62/2159B2	NR	M62 J25 - J30	
02/09/15 07:04:50	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 07:04:50	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 07:04:50	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 07:04:50	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 07:04:55	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 07:04:55	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 07:04:55	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 07:04:55	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 07:06:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:06:47	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:06:52	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:07:02	SIG	M62/2113B1	REDX	M62 J25 - J30	
02/09/15 07:07:02	SIG	M62/2113B2	NR	M62 J25 - J30	
02/09/15 07:07:02	SIG	M62/2113B3	NR	M62 J25 - J30	
02/09/15 07:07:02	SIG	M62/2113B4	NR	M62 J25 - J30	
02/09/15 07:07:02	SIG	M62/2120M1	60R	M62 J25 - J30	
02/09/15 07:07:02	SIG	M62/2120M2	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2074B1	REDX	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2074B2	NR	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2074B3	NR	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2074B4	NR	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2081B2	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2081B3	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2097B1	REDX	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2097B2	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2097B4	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2106B1	REDX	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2106B2	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2106B3	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2106B4	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2113B2	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2113B3	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2113B4	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2117B1	60R	M62 J25 - J30	
02/09/15 07:07:13	SIG	M62/2117B3	60R	M62 J25 - J30	
02/09/15 07:07:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 07:08:20	SIG	M62/2088B1	60R	M62 J25 - J30	
02/09/15 07:08:42	SIG	M62/2097B1	60R	M62 J25 - J30	
02/09/15 07:09:13	SIG	M62/2106B1	60R	M62 J25 - J30	
02/09/15 07:09:18	SIG	M62/2113B1	60R	M62 J25 - J30	
02/09/15 07:09:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2194B1	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2194B2	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2194B3	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2194B4	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2197B1	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2197B2	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2197B3	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2199M1	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2199M2	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2203B1	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2203B2	60R	M62 J25 - J30	
02/09/15 07:09:21	SIG	M62/2203B3	60R	M62 J25 - J30	
02/09/15 07:09:51	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:09:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2189B1	40R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2189B2	40R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2189B3	40R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2189B4	40R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2194B1	50R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 07:09:57	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 07:13:01	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:13:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:13:07	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:13:50	SIG	M62/2159B1	NR	M62 J25 - J30	
02/09/15 07:13:50	SIG	M62/2159B2	NR	M62 J25 - J30	
02/09/15 07:13:50	SIG	M62/2170B1	NR	M62 J25 - J30	
02/09/15 07:13:50	SIG	M62/2170B2	NR	M62 J25 - J30	
02/09/15 07:13:50	SIG	M62/2170L1	NR	M62 J25 - J30	
02/09/15 07:13:50	SIG	M62/2170L2	NR	M62 J25 - J30	
02/09/15 07:14:21	SIG	M62/2159B1	NR	M62 J25 - J30	
02/09/15 07:14:21	SIG	M62/2159B2	NR	M62 J25 - J30	
02/09/15 07:14:21	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 07:14:21	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 07:14:21	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 07:14:21	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/1999A1	50R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/1999A2	50R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/1999A3	50R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/2004A1	50R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/2004A2	50R	M62 J25 - J30	
02/09/15 07:14:37	SIG	M62/2004A3	50R	M62 J25 - J30	
02/09/15 07:14:42	SIG	M62/2004A1	40R	M62 J25 - J30	
02/09/15 07:14:42	SIG	M62/2004A2	40R	M62 J25 - J30	
02/09/15 07:14:42	SIG	M62/2004A3	40R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:14:43	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:16:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:16:03	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:16:08	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:18:01	SIG	M62/2008K1	50R	M62 J25 - J30	
02/09/15 07:18:01	SIG	M62/2008K2	50R	M62 J25 - J30	
02/09/15 07:18:01	SIG	M62/2012A1	50R	M62 J25 - J30	
02/09/15 07:18:01	SIG	M62/2012A2	50R	M62 J25 - J30	
02/09/15 07:18:01	SIG	M62/2012A3	50R	M62 J25 - J30	
02/09/15 07:18:07	SIG	M606/2003B1	NR	M62 J25 - J30	
02/09/15 07:18:07	SIG	M606/2003B2	NR	M62 J25 - J30	
02/09/15 07:18:07	SIG	M62/2008K1	40R	M62 J25 - J30	
02/09/15 07:18:07	SIG	M62/2008K2	40R	M62 J25 - J30	
02/09/15 07:18:07	SIG	M62/2012A1	40R	M62 J25 - J30	
02/09/15 07:18:07	SIG	M62/2012A2	40R	M62 J25 - J30	
02/09/15 07:18:07	SIG	M62/2012A3	40R	M62 J25 - J30	
02/09/15 07:18:16	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 07:18:16	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 07:18:16	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 07:18:16	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 07:18:21	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 07:18:21	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 07:18:21	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 07:18:21	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1979K1	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1979K2	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1981A1	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1981A2	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1981A3	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1981A4	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1987A1	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1987A3	60R	M62 J25 - J30	
02/09/15 07:18:31	SIG	M62/1987J1	60R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1992A1	60R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1992A2	60R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1992A3	60R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1992J1	60R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1999A1	50R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1999A2	50R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1999A3	50R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1999J1	50R	M62 J25 - J30	
02/09/15 07:18:38	SIG	M62/1999J2	50R	M62 J25 - J30	
02/09/15 07:19:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:19:08	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:19:13	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2050B2	NR	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2050B3	NR	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2050B4	NR	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2065B1	REDX	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 07:19:21	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 07:19:21	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2033B2	NR	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2033B3	NR	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2033B4	NR	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 07:20:21	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2025B2	NR	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2025B3	NR	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2025B4	NR	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2033B2	60R	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2033B3	60R	M62 J25 - J30	
02/09/15 07:21:21	SIG	M62/2033B4	60R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 07:21:45	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2012B1	REDX	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2025B2	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2025B3	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2025B4	40R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:21:50	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:22:06	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1992A1	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1992A2	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1992A3	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1992J1	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:22:11	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:22:12	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:22:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:22:17	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:22:18	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 07:22:18	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 07:22:18	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 07:22:18	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/1974A1	60R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/1974A2	60R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/1974A3	60R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/1974A4	60R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 07:22:21	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1987A1	40R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1987A3	40R	M62 J25 - J30	
02/09/15 07:23:34	SIG	M62/1987J1	40R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M606/2003B1	NR	M62 J25 - J30	
02/09/15 07:23:43	SIG	M606/2003B2	NR	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2004A1	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2004A2	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2004A3	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2008K1	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2008K2	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2012A1	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2012A2	60R	M62 J25 - J30	
02/09/15 07:23:43	SIG	M62/2012A3	60R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 07:24:21	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 07:24:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:24:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:24:42	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 07:24:42	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 07:24:42	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 07:24:42	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 07:24:48	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 07:24:48	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 07:24:48	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 07:24:48	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 07:25:17	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:25:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:25:23	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:25:23	SIG	M62/2197B1	50R	M62 J25 - J30	
02/09/15 07:25:23	SIG	M62/2197B2	50R	M62 J25 - J30	
02/09/15 07:25:23	SIG	M62/2197B3	50R	M62 J25 - J30	
02/09/15 07:25:23	SIG	M62/2199M1	50R	M62 J25 - J30	
02/09/15 07:25:23	SIG	M62/2199M2	50R	M62 J25 - J30	
02/09/15 07:25:30	SIG	M62/2194B1	40R	M62 J25 - J30	
02/09/15 07:25:30	SIG	M62/2194B2	40R	M62 J25 - J30	
02/09/15 07:25:30	SIG	M62/2194B3	40R	M62 J25 - J30	
02/09/15 07:25:30	SIG	M62/2194B4	40R	M62 J25 - J30	
02/09/15 07:25:56	SIG	M62/1999A1	60R	M62 J25 - J30	
02/09/15 07:25:56	SIG	M62/1999A2	60R	M62 J25 - J30	
02/09/15 07:25:56	SIG	M62/1999A3	60R	M62 J25 - J30	
02/09/15 07:25:56	SIG	M62/1999J1	50R	M62 J25 - J30	
02/09/15 07:25:56	SIG	M62/1999J2	50R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1974A1	50R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1974A2	50R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1974A3	50R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1974A4	50R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1979K1	40R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1979K2	40R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1981A1	40R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1981A2	40R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1981A3	40R	M62 J25 - J30	
02/09/15 07:26:13	SIG	M62/1981A4	40R	M62 J25 - J30	
02/09/15 07:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 07:26:21	SIG	M62/1968A1	60R	M62 J25 - J30	
02/09/15 07:26:21	SIG	M62/1968A2	60R	M62 J25 - J30	
02/09/15 07:26:21	SIG	M62/1968A3	60R	M62 J25 - J30	
02/09/15 07:26:21	SIG	M62/1968A4	60R	M62 J25 - J30	
02/09/15 07:26:30	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 07:26:33	SIG	M62/2189A2	60R	M62 J25 - J30	
02/09/15 07:26:33	SIG	M62/2189A3	60R	M62 J25 - J30	
02/09/15 07:26:33	SIG	M62/2189A4	60R	M62 J25 - J30	
02/09/15 07:26:33	SIG	M62/2197A1	NR	M62 J25 - J30	
02/09/15 07:26:33	SIG	M62/2197A2	NR	M62 J25 - J30	
02/09/15 07:26:33	SIG	M62/2197A3	NR	M62 J25 - J30	
02/09/15 07:26:44	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 07:26:44	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1968A1	50R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1968A2	50R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1968A3	50R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1968A4	50R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1974A1	40R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1974A2	40R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1974A3	40R	M62 J25 - J30	
02/09/15 07:27:10	SIG	M62/1974A4	40R	M62 J25 - J30	
02/09/15 07:27:21	SIG	M62/1960A1	60R	M62 J25 - J30	
02/09/15 07:27:21	SIG	M62/1960A2	60R	M62 J25 - J30	
02/09/15 07:27:21	SIG	M62/1960A3	60R	M62 J25 - J30	
02/09/15 07:27:21	SIG	M62/1960K1	60R	M62 J25 - J30	
02/09/15 07:27:21	SIG	M62/1960K2	60R	M62 J25 - J30	
02/09/15 07:27:23	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 07:27:23	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 07:27:24	SIG	M62/1992A1	60R	M62 J25 - J30	
02/09/15 07:27:24	SIG	M62/1992A2	60R	M62 J25 - J30	
02/09/15 07:27:24	SIG	M62/1992A3	60R	M62 J25 - J30	
02/09/15 07:27:24	SIG	M62/1992J1	60R	M62 J25 - J30	
02/09/15 07:27:29	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 07:27:29	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:27:29	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 07:27:30	SIG	M62/2189A1	60R	M62 J25 - J30	
02/09/15 07:27:51	SIG	M62/2183A1	50R	M62 J25 - J30	
02/09/15 07:27:55	SIG	M62/2177A1	50R	M62 J25 - J30	
02/09/15 07:28:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:28:22	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:28:27	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:28:58	SIG	M62/1987A1	60R	M62 J25 - J30	
02/09/15 07:28:58	SIG	M62/1987A3	60R	M62 J25 - J30	
02/09/15 07:28:58	SIG	M62/1987J1	60R	M62 J25 - J30	
02/09/15 07:28:59	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 07:28:59	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 07:28:59	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 07:28:59	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/1955K1	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/1955K2	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/1956A1	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/1956A2	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/1956A3	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 07:29:21	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1960A1	50R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1960A2	50R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1960A3	50R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1960K1	50R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1960K2	50R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1968A1	40R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1968A2	40R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1968A3	40R	M62 J25 - J30	
02/09/15 07:29:26	SIG	M62/1968A4	40R	M62 J25 - J30	
02/09/15 07:29:30	SIG	M62/2194B1	50R	M62 J25 - J30	
02/09/15 07:29:30	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 07:29:30	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 07:29:30	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 07:29:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:29:43	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:29:48	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:30:27	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 07:30:27	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 07:30:27	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 07:30:27	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 07:30:29	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 07:30:29	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 07:30:29	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 07:30:29	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 07:30:34	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 07:30:34	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 07:30:34	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 07:30:34	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 07:30:44	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 07:30:44	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 07:30:45	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 07:30:46	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 07:31:11	SIG	M62/1979K1	60R	M62 J25 - J30	
02/09/15 07:31:11	SIG	M62/1979K2	60R	M62 J25 - J30	
02/09/15 07:31:11	SIG	M62/1981A1	60R	M62 J25 - J30	
02/09/15 07:31:11	SIG	M62/1981A2	60R	M62 J25 - J30	
02/09/15 07:31:11	SIG	M62/1981A3	60R	M62 J25 - J30	
02/09/15 07:31:11	SIG	M62/1981A4	60R	M62 J25 - J30	
02/09/15 07:31:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:31:28	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:31:33	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:32:07	SIG	M62/2025B1	40R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1955K1	50R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1955K2	50R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1956A1	50R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1956A2	50R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1956A3	50R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1960A1	40R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1960A2	40R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1960A3	40R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1960K1	40R	M62 J25 - J30	
02/09/15 07:32:17	SIG	M62/1960K2	40R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 07:32:21	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 07:32:25	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 07:32:25	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:32:25	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 07:32:25	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 07:32:25	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 07:32:25	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 07:32:35	SIG	M62/2033B1	50R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2033B1	40R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 07:32:54	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2033B1	40R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2041B2	40R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2041B3	40R	M62 J25 - J30	
02/09/15 07:32:59	SIG	M62/2041B4	40R	M62 J25 - J30	
02/09/15 07:33:01	SIG	M62/2041B1	40R	M62 J25 - J30	
02/09/15 07:33:22	SIG	M62/2057B1	60R	M62 J25 - J30	
02/09/15 07:33:22	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 07:33:22	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 07:33:22	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 07:33:22	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 07:33:22	SIG	M621/1002B1	60R	M62 J25 - J30	
02/09/15 07:33:25	SIG	M62/1974A1	60R	M62 J25 - J30	
02/09/15 07:33:25	SIG	M62/1974A2	60R	M62 J25 - J30	
02/09/15 07:33:25	SIG	M62/1974A3	60R	M62 J25 - J30	
02/09/15 07:33:25	SIG	M62/1974A4	60R	M62 J25 - J30	
02/09/15 07:33:28	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 07:33:28	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 07:33:28	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 07:33:28	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 07:33:33	SIG	M62/2033A1	50R	M62 J25 - J30	
02/09/15 07:33:33	SIG	M62/2033A2	50R	M62 J25 - J30	
02/09/15 07:33:33	SIG	M62/2033A3	50R	M62 J25 - J30	
02/09/15 07:33:33	SIG	M62/2033A4	50R	M62 J25 - J30	
02/09/15 07:33:34	SIG	M62/2194B1	40R	M62 J25 - J30	
02/09/15 07:33:34	SIG	M62/2194B2	40R	M62 J25 - J30	
02/09/15 07:33:34	SIG	M62/2194B3	40R	M62 J25 - J30	
02/09/15 07:33:34	SIG	M62/2194B4	40R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2025A2	50R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2025A3	50R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2025A4	50R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2033A1	40R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2033A2	40R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2033A3	40R	M62 J25 - J30	
02/09/15 07:33:39	SIG	M62/2033A4	40R	M62 J25 - J30	
02/09/15 07:33:45	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 07:33:45	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 07:33:45	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 07:33:45	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 07:33:46	SIG	M62/1955K1	40R	M62 J25 - J30	
02/09/15 07:33:46	SIG	M62/1955K2	40R	M62 J25 - J30	
02/09/15 07:33:46	SIG	M62/1956A1	40R	M62 J25 - J30	
02/09/15 07:33:46	SIG	M62/1956A2	40R	M62 J25 - J30	
02/09/15 07:33:46	SIG	M62/1956A3	40R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2018A1	50R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2018A2	50R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2018A3	50R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2018A4	50R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2025A2	40R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2025A3	40R	M62 J25 - J30	
02/09/15 07:34:21	SIG	M62/2025A4	40R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M606/2003B1	NR	M62 J25 - J30	
02/09/15 07:34:22	SIG	M606/2003B2	NR	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2008K1	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2008K2	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2012A1	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2012A2	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2012A3	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2018A1	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2018A2	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2018A3	50R	M62 J25 - J30	
02/09/15 07:34:22	SIG	M62/2018A4	50R	M62 J25 - J30	
02/09/15 07:34:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:34:35	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:34:40	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:35:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:35:51	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2197B1	40R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2197B2	40R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2197B3	40R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2199M1	40R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2199M2	40R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2203B1	50R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2203B2	50R	M62 J25 - J30	
02/09/15 07:35:53	SIG	M62/2203B3	50R	M62 J25 - J30	
02/09/15 07:35:56	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:36:15	SIG	M62/1968A1	60R	M62 J25 - J30	
02/09/15 07:36:15	SIG	M62/1968A2	60R	M62 J25 - J30	
02/09/15 07:36:15	SIG	M62/1968A3	60R	M62 J25 - J30	
02/09/15 07:36:15	SIG	M62/1968A4	60R	M62 J25 - J30	
02/09/15 07:36:36	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 07:36:36	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:36:42	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:36:55	SIG	M62/2018A1	40R	M62 J25 - J30	
02/09/15 07:36:55	SIG	M62/2018A2	40R	M62 J25 - J30	
02/09/15 07:36:55	SIG	M62/2018A3	40R	M62 J25 - J30	
02/09/15 07:36:55	SIG	M62/2018A4	40R	M62 J25 - J30	
02/09/15 07:36:59	SIG	M62/2203B1	40R	M62 J25 - J30	
02/09/15 07:36:59	SIG	M62/2203B2	40R	M62 J25 - J30	
02/09/15 07:36:59	SIG	M62/2203B3	40R	M62 J25 - J30	
02/09/15 07:37:22	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 07:37:22	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 07:37:22	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 07:37:22	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 07:37:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:37:40	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1955K1	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1955K2	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1960A1	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1960A2	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1960A3	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1960K1	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/1960K2	60R	M62 J25 - J30	
02/09/15 07:37:46	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:37:52	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 07:37:52	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 07:37:52	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 07:37:52	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 07:37:57	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 07:37:57	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 07:37:57	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 07:37:57	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2004A1	50R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2004A2	50R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2004A3	50R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2008K1	40R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2008K2	40R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2012A1	40R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2012A2	40R	M62 J25 - J30	
02/09/15 07:38:01	SIG	M62/2012A3	40R	M62 J25 - J30	
02/09/15 07:38:20	SIG	M62/2033A1	60R	M62 J25 - J30	
02/09/15 07:38:20	SIG	M62/2033A2	60R	M62 J25 - J30	
02/09/15 07:38:20	SIG	M62/2033A3	60R	M62 J25 - J30	
02/09/15 07:38:20	SIG	M62/2033A4	60R	M62 J25 - J30	
02/09/15 07:38:32	SIG	M62/1999A1	50R	M62 J25 - J30	
02/09/15 07:38:32	SIG	M62/1999A2	50R	M62 J25 - J30	
02/09/15 07:38:32	SIG	M62/1999A3	50R	M62 J25 - J30	
02/09/15 07:38:32	SIG	M62/2004A1	40R	M62 J25 - J30	
02/09/15 07:38:32	SIG	M62/2004A2	40R	M62 J25 - J30	
02/09/15 07:38:32	SIG	M62/2004A3	40R	M62 J25 - J30	
02/09/15 07:38:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:38:55	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:39:00	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:39:06	SIG	M62/1956A1	60R	M62 J25 - J30	
02/09/15 07:39:06	SIG	M62/1956A2	60R	M62 J25 - J30	
02/09/15 07:39:06	SIG	M62/1956A3	60R	M62 J25 - J30	
02/09/15 07:39:40	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 07:39:41	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:39:46	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2033A1	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2033A2	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2033A3	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2033A4	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2041A1	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2041A2	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2041A3	50R	M62 J25 - J30	
02/09/15 07:40:25	SIG	M62/2041A4	50R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2033A1	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2033A2	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2033A3	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2033A4	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2041A1	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2041A2	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2041A3	40R	M62 J25 - J30	
02/09/15 07:40:30	SIG	M62/2041A4	40R	M62 J25 - J30	
02/09/15 07:40:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:40:45	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:40:50	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:40:53	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2194B1	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2197B1	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2197B2	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2197B3	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2199M1	50R	M62 J25 - J30	
02/09/15 07:40:59	SIG	M62/2199M2	50R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2018A1	60R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2018A2	60R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2018A3	60R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2018A4	60R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2025A2	50R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2025A3	50R	M62 J25 - J30	
02/09/15 07:41:13	SIG	M62/2025A4	50R	M62 J25 - J30	
02/09/15 07:41:33	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 07:41:33	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 07:41:33	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 07:41:33	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 07:41:52	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 07:41:52	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 07:41:52	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 07:41:52	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 07:41:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:41:59	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:42:04	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:42:07	SIG	M62/2041B1	50R	M62 J25 - J30	
02/09/15 07:42:07	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 07:42:07	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 07:42:07	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 07:42:09	SIG	M62/2041B1	40R	M62 J25 - J30	
02/09/15 07:42:09	SIG	M62/2041B2	40R	M62 J25 - J30	
02/09/15 07:42:09	SIG	M62/2041B3	40R	M62 J25 - J30	
02/09/15 07:42:09	SIG	M62/2041B4	40R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2018A1	50R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2018A2	50R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2018A3	50R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2018A4	50R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2025A2	40R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2025A3	40R	M62 J25 - J30	
02/09/15 07:42:22	SIG	M62/2025A4	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2018A1	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2018A2	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2018A3	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2018A4	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2025A2	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2025A3	40R	M62 J25 - J30	
02/09/15 07:42:28	SIG	M62/2025A4	40R	M62 J25 - J30	
02/09/15 07:43:11	SIG	M62/2203B1	60R	M62 J25 - J30	
02/09/15 07:43:11	SIG	M62/2203B2	60R	M62 J25 - J30	
02/09/15 07:43:11	SIG	M62/2203B3	60R	M62 J25 - J30	
02/09/15 07:43:40	SIG	M62/2183B1	60R	M62 J25 - J30	
02/09/15 07:43:40	SIG	M62/2183B2	60R	M62 J25 - J30	
02/09/15 07:43:40	SIG	M62/2183L1	60R	M62 J25 - J30	
02/09/15 07:43:40	SIG	M62/2183L2	60R	M62 J25 - J30	
02/09/15 07:43:47	SIG	M62/2025B1	60R	M62 J25 - J30	
02/09/15 07:43:47	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 07:43:47	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 07:43:47	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1992A1	40R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1992A2	40R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1992A3	40R	M62 J25 - J30	
02/09/15 07:44:04	SIG	M62/1992J1	40R	M62 J25 - J30	
02/09/15 07:44:24	SIG	M62/2041A1	60R	M62 J25 - J30	
02/09/15 07:44:24	SIG	M62/2041A2	60R	M62 J25 - J30	
02/09/15 07:44:24	SIG	M62/2041A3	60R	M62 J25 - J30	
02/09/15 07:44:24	SIG	M62/2041A4	60R	M62 J25 - J30	
02/09/15 07:44:47	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 07:44:48	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:44:53	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2025B1	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 07:44:54	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2025B1	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2025B2	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2025B3	40R	M62 J25 - J30	
02/09/15 07:45:00	SIG	M62/2025B4	40R	M62 J25 - J30	
02/09/15 07:45:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:45:03	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:45:07	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 07:45:07	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:45:07	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 07:45:07	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 07:45:08	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:45:12	SIG	M62/2183B1	40R	M62 J25 - J30	
02/09/15 07:45:12	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:45:12	SIG	M62/2183L1	40R	M62 J25 - J30	
02/09/15 07:45:12	SIG	M62/2183L2	40R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1987A1	40R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1987A3	40R	M62 J25 - J30	
02/09/15 07:45:53	SIG	M62/1987J1	40R	M62 J25 - J30	
02/09/15 07:46:09	SIG	M62/2041B1	50R	M62 J25 - J30	
02/09/15 07:46:09	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 07:46:09	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 07:46:09	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 07:46:21	SIG	M62/2033A1	60R	M62 J25 - J30	
02/09/15 07:46:21	SIG	M62/2033A2	60R	M62 J25 - J30	
02/09/15 07:46:21	SIG	M62/2033A3	60R	M62 J25 - J30	
02/09/15 07:46:21	SIG	M62/2033A4	60R	M62 J25 - J30	
02/09/15 07:46:22	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 07:46:22	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 07:46:22	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 07:46:22	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 07:46:27	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 07:46:27	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 07:46:27	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 07:46:27	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1974A1	50R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1974A2	50R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1974A3	50R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1974A4	50R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1979K1	40R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1979K2	40R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1981A1	40R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1981A2	40R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1981A3	40R	M62 J25 - J30	
02/09/15 07:47:23	SIG	M62/1981A4	40R	M62 J25 - J30	
02/09/15 07:47:52	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 07:47:53	SIG	M62/1999J1	50R	M62 J25 - J30	
02/09/15 07:47:53	SIG	M62/1999J2	50R	M62 J25 - J30	
02/09/15 07:47:53	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:47:58	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:48:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:48:01	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:48:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:48:06	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:48:07	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:48:12	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1968A1	50R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1968A2	50R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1968A3	50R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1968A4	50R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1974A1	40R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1974A2	40R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1974A3	40R	M62 J25 - J30	
02/09/15 07:48:23	SIG	M62/1974A4	40R	M62 J25 - J30	
02/09/15 07:48:24	SIG	M62/2025A1	60R	M62 J25 - J30	
02/09/15 07:48:24	SIG	M62/2025A2	60R	M62 J25 - J30	
02/09/15 07:48:24	SIG	M62/2025A3	60R	M62 J25 - J30	
02/09/15 07:48:24	SIG	M62/2025A4	60R	M62 J25 - J30	
02/09/15 07:49:21	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 07:49:21	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1992A1	60R	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1992A2	60R	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1992A3	60R	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1992J1	60R	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1999A1	50R	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1999A2	50R	M62 J25 - J30	
02/09/15 07:49:35	SIG	M62/1999A3	50R	M62 J25 - J30	
02/09/15 07:49:40	SIG	M62/2018A1	60R	M62 J25 - J30	
02/09/15 07:49:40	SIG	M62/2018A2	60R	M62 J25 - J30	
02/09/15 07:49:40	SIG	M62/2018A3	60R	M62 J25 - J30	
02/09/15 07:49:40	SIG	M62/2018A4	60R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:49:46	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1992A1	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1992A2	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1992A3	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1992J1	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 07:49:52	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 07:50:23	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 07:50:23	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 07:50:23	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 07:50:23	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 07:50:25	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 07:50:25	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 07:50:25	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 07:50:25	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1987A1	60R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1987A3	60R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1987J1	60R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 07:50:26	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 07:50:53	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 07:50:57	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 07:50:58	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 07:51:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:51:02	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:51:08	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:51:11	SIG	M62/2194B1	40R	M62 J25 - J30	
02/09/15 07:51:11	SIG	M62/2194B2	40R	M62 J25 - J30	
02/09/15 07:51:11	SIG	M62/2194B3	40R	M62 J25 - J30	
02/09/15 07:51:11	SIG	M62/2194B4	40R	M62 J25 - J30	
02/09/15 07:51:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:51:17	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:51:22	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:51:59	SIG	M62/2008K1	50R	M62 J25 - J30	
02/09/15 07:51:59	SIG	M62/2008K2	50R	M62 J25 - J30	
02/09/15 07:51:59	SIG	M62/2012A1	50R	M62 J25 - J30	
02/09/15 07:51:59	SIG	M62/2012A2	50R	M62 J25 - J30	
02/09/15 07:51:59	SIG	M62/2012A3	50R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1960A1	50R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1960A2	50R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1960A3	50R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1960K1	50R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1960K2	50R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1968A1	40R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1968A2	40R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1968A3	40R	M62 J25 - J30	
02/09/15 07:52:05	SIG	M62/1968A4	40R	M62 J25 - J30	
02/09/15 07:52:22	SIG	M62/2008K1	40R	M62 J25 - J30	
02/09/15 07:52:22	SIG	M62/2008K2	40R	M62 J25 - J30	
02/09/15 07:52:22	SIG	M62/2012A1	40R	M62 J25 - J30	
02/09/15 07:52:22	SIG	M62/2012A2	40R	M62 J25 - J30	
02/09/15 07:52:22	SIG	M62/2012A3	40R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1987A2	50R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1992A1	40R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1992A2	40R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1992A3	40R	M62 J25 - J30	
02/09/15 07:52:33	SIG	M62/1992J1	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1987A1	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1987A3	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1987J1	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1992A1	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1992A2	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1992A3	40R	M62 J25 - J30	
02/09/15 07:52:53	SIG	M62/1992J1	40R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1979K1	60R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1979K2	60R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1981A1	60R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1981A2	60R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1981A3	60R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1981A4	60R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 07:53:03	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1987A1	40R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1987A2	40R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1987A3	40R	M62 J25 - J30	
02/09/15 07:53:25	SIG	M62/1987J1	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1979K1	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1979K2	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1981A1	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1981A2	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1981A3	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1981A4	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1987A1	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1987A3	40R	M62 J25 - J30	
02/09/15 07:53:31	SIG	M62/1987J1	40R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2197B1	40R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2197B2	40R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2197B3	40R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2199M1	40R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2199M2	40R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2203B1	50R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2203B2	50R	M62 J25 - J30	
02/09/15 07:53:42	SIG	M62/2203B3	50R	M62 J25 - J30	
02/09/15 07:54:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:54:08	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:54:13	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:54:16	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:54:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:54:22	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:54:53	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 07:54:53	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 07:54:53	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 07:54:53	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 07:55:36	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 07:55:36	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 07:55:36	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 07:55:36	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 07:55:46	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 07:55:51	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1960A1	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1960A2	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1960A3	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1960K1	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1960K2	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1968A1	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1968A2	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1968A3	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1968A4	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1974A1	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1974A2	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1974A3	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1974A4	60R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 07:56:04	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1974A1	50R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1974A2	50R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1974A3	50R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1974A4	50R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1979K1	40R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1979K2	40R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1981A1	40R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1981A2	40R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1981A3	40R	M62 J25 - J30	
02/09/15 07:56:08	SIG	M62/1981A4	40R	M62 J25 - J30	
02/09/15 07:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 07:56:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2004A1	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2004A2	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2004A3	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2008K1	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2008K2	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2012A1	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2012A2	50R	M62 J25 - J30	
02/09/15 07:56:22	SIG	M62/2012A3	50R	M62 J25 - J30	
02/09/15 07:56:24	SIG	M62/1999A1	50R	M62 J25 - J30	
02/09/15 07:56:24	SIG	M62/1999A2	50R	M62 J25 - J30	
02/09/15 07:56:24	SIG	M62/1999A3	50R	M62 J25 - J30	
02/09/15 07:56:24	SIG	M62/1999J1	50R	M62 J25 - J30	
02/09/15 07:56:24	SIG	M62/1999J2	50R	M62 J25 - J30	
02/09/15 07:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 07:56:31	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 07:56:42	SIG	M62/2041A1	50R	M62 J25 - J30	
02/09/15 07:56:42	SIG	M62/2041A2	50R	M62 J25 - J30	
02/09/15 07:56:42	SIG	M62/2041A3	50R	M62 J25 - J30	
02/09/15 07:56:42	SIG	M62/2041A4	50R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2033A1	50R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2033A2	50R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2033A3	50R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2033A4	50R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2041A1	40R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2041A2	40R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2041A3	40R	M62 J25 - J30	
02/09/15 07:56:47	SIG	M62/2041A4	40R	M62 J25 - J30	
02/09/15 07:56:49	SIG	M62/2025B1	60R	M62 J25 - J30	
02/09/15 07:56:49	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 07:56:49	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 07:56:49	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 07:57:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 07:57:12	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 07:57:17	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 07:57:18	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 07:57:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 07:57:24	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2025A2	50R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2025A3	50R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2025A4	50R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2033A1	40R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2033A2	40R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2033A3	40R	M62 J25 - J30	
02/09/15 07:57:36	SIG	M62/2033A4	40R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1968A1	50R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1968A2	50R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1968A3	50R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1968A4	50R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1974A1	40R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1974A2	40R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1974A3	40R	M62 J25 - J30	
02/09/15 07:57:40	SIG	M62/1974A4	40R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2189B1	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2189B2	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2189B3	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2189B4	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2194B1	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2197B1	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2197B2	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2197B3	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2199M1	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2199M2	50R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2203B1	60R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2203B2	60R	M62 J25 - J30	
02/09/15 07:57:42	SIG	M62/2203B3	60R	M62 J25 - J30	
02/09/15 07:57:53	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 07:57:53	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 07:57:53	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 07:57:53	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2033B1	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2033B2	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2033B3	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2033B4	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2041B1	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 07:58:01	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 07:59:09	SIG	M62/2189B1	40R	M62 J25 - J30	
02/09/15 07:59:09	SIG	M62/2189B2	40R	M62 J25 - J30	
02/09/15 07:59:09	SIG	M62/2189B3	40R	M62 J25 - J30	
02/09/15 07:59:09	SIG	M62/2189B4	40R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2018A1	50R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2018A2	50R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2018A3	50R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2018A4	50R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2025A2	40R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2025A3	40R	M62 J25 - J30	
02/09/15 07:59:55	SIG	M62/2025A4	40R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1960A1	50R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1960A2	50R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1960A3	50R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1960K1	50R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1960K2	50R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1968A1	40R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1968A2	40R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1968A3	40R	M62 J25 - J30	
02/09/15 07:59:56	SIG	M62/1968A4	40R	M62 J25 - J30	
02/09/15 08:00:16	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:00:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:00:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 08:00:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 08:00:22	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:00:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 08:00:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 08:00:57	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 08:00:57	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 08:00:57	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 08:01:03	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 08:01:03	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 08:01:03	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 08:01:03	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 08:01:36	SIG	M62/2041A1	60R	M62 J25 - J30	
02/09/15 08:01:36	SIG	M62/2041A2	60R	M62 J25 - J30	
02/09/15 08:01:36	SIG	M62/2041A3	60R	M62 J25 - J30	
02/09/15 08:01:36	SIG	M62/2041A4	60R	M62 J25 - J30	
02/09/15 08:02:18	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 08:02:18	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 08:02:21	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 08:02:21	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 08:02:21	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 08:02:21	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 08:02:21	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 08:02:21	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2004A1	60R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2004A2	60R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2004A3	60R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2018A1	40R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2018A2	40R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2018A3	40R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2018A4	40R	M62 J25 - J30	
02/09/15 08:02:24	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 08:03:20	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 08:03:20	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 08:03:20	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 08:03:20	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 08:03:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:03:22	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:03:27	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2004A1	50R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2004A2	50R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2004A3	50R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2008K1	40R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2008K2	40R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2012A1	40R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2012A2	40R	M62 J25 - J30	
02/09/15 08:03:31	SIG	M62/2012A3	40R	M62 J25 - J30	
02/09/15 08:03:55	SIG	M62/2033A1	60R	M62 J25 - J30	
02/09/15 08:03:55	SIG	M62/2033A2	60R	M62 J25 - J30	
02/09/15 08:03:55	SIG	M62/2033A3	60R	M62 J25 - J30	
02/09/15 08:03:55	SIG	M62/2033A4	60R	M62 J25 - J30	
02/09/15 08:03:56	SIG	M62/1974A1	50R	M62 J25 - J30	
02/09/15 08:03:56	SIG	M62/1974A2	50R	M62 J25 - J30	
02/09/15 08:03:56	SIG	M62/1974A3	50R	M62 J25 - J30	
02/09/15 08:03:56	SIG	M62/1974A4	50R	M62 J25 - J30	
02/09/15 08:04:30	SIG	M62/2194B1	40R	M62 J25 - J30	
02/09/15 08:04:30	SIG	M62/2194B2	40R	M62 J25 - J30	
02/09/15 08:04:30	SIG	M62/2194B3	40R	M62 J25 - J30	
02/09/15 08:04:30	SIG	M62/2194B4	40R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1955K1	50R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1955K2	50R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1956A1	50R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1956A2	50R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1956A3	50R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1960A1	40R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1960A2	40R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1960A3	40R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1960K1	40R	M62 J25 - J30	
02/09/15 08:04:37	SIG	M62/1960K2	40R	M62 J25 - J30	
02/09/15 08:04:46	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 08:04:46	SIG	M62/2097B3	OFF	M62 J25 - J30	
02/09/15 08:04:46	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 08:04:53	SIG	M62/2004A1	40R	M62 J25 - J30	
02/09/15 08:04:53	SIG	M62/2004A2	40R	M62 J25 - J30	
02/09/15 08:04:53	SIG	M62/2004A3	40R	M62 J25 - J30	
02/09/15 08:05:17	SIG	M62/2183B1	60R	M62 J25 - J30	
02/09/15 08:05:17	SIG	M62/2183B2	60R	M62 J25 - J30	
02/09/15 08:05:17	SIG	M62/2183L1	60R	M62 J25 - J30	
02/09/15 08:05:17	SIG	M62/2183L2	60R	M62 J25 - J30	
02/09/15 08:05:21	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 08:05:22	SIG	M62/2025A1	50R	M62 J25 - J30	
02/09/15 08:05:27	SIG	M62/2025A1	40R	M62 J25 - J30	
02/09/15 08:05:36	SIG	M62/1968A1	50R	M62 J25 - J30	
02/09/15 08:05:36	SIG	M62/1968A2	50R	M62 J25 - J30	
02/09/15 08:05:36	SIG	M62/1968A3	50R	M62 J25 - J30	
02/09/15 08:05:36	SIG	M62/1968A4	50R	M62 J25 - J30	
02/09/15 08:06:18	SIG	M62/2025A1	60R	M62 J25 - J30	
02/09/15 08:06:18	SIG	M62/2025A2	60R	M62 J25 - J30	
02/09/15 08:06:18	SIG	M62/2025A3	60R	M62 J25 - J30	
02/09/15 08:06:18	SIG	M62/2025A4	60R	M62 J25 - J30	
02/09/15 08:06:22	SIG	M62/1992A1	60R	M62 J25 - J30	
02/09/15 08:06:22	SIG	M62/1992A2	60R	M62 J25 - J30	
02/09/15 08:06:22	SIG	M62/1992A3	60R	M62 J25 - J30	
02/09/15 08:06:22	SIG	M62/1992J1	60R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1999A1	40R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1999A2	40R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1999A3	40R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1999J1	40R	M62 J25 - J30	
02/09/15 08:06:41	SIG	M62/1999J2	40R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 08:06:52	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2183B1	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2183L1	40R	M62 J25 - J30	
02/09/15 08:06:58	SIG	M62/2183L2	40R	M62 J25 - J30	
02/09/15 08:07:31	SIG	M62/2018A1	60R	M62 J25 - J30	
02/09/15 08:07:31	SIG	M62/2018A2	60R	M62 J25 - J30	
02/09/15 08:07:31	SIG	M62/2018A3	60R	M62 J25 - J30	
02/09/15 08:07:31	SIG	M62/2018A4	60R	M62 J25 - J30	
02/09/15 08:07:32	SIG	M62/1987A1	60R	M62 J25 - J30	
02/09/15 08:07:32	SIG	M62/1987A3	60R	M62 J25 - J30	
02/09/15 08:07:32	SIG	M62/1987J1	60R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2197B1	40R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2197B2	40R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2197B3	40R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2199M1	40R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2199M2	40R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2203B1	50R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2203B2	50R	M62 J25 - J30	
02/09/15 08:08:10	SIG	M62/2203B3	50R	M62 J25 - J30	
02/09/15 08:08:22	SIG	M62/1979K1	60R	M62 J25 - J30	
02/09/15 08:08:22	SIG	M62/1979K2	60R	M62 J25 - J30	
02/09/15 08:08:22	SIG	M62/1981A1	60R	M62 J25 - J30	
02/09/15 08:08:22	SIG	M62/1981A2	60R	M62 J25 - J30	
02/09/15 08:08:22	SIG	M62/1981A3	60R	M62 J25 - J30	
02/09/15 08:08:22	SIG	M62/1981A4	60R	M62 J25 - J30	
02/09/15 08:08:26	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 08:08:26	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1955K1	60R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1955K2	60R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1956A1	60R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1956A2	60R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1956A3	60R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1960A1	50R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1960A2	50R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1960A3	50R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1960K1	50R	M62 J25 - J30	
02/09/15 08:08:38	SIG	M62/1960K2	50R	M62 J25 - J30	
02/09/15 08:09:07	SIG	M62/2203B1	40R	M62 J25 - J30	
02/09/15 08:09:07	SIG	M62/2203B2	40R	M62 J25 - J30	
02/09/15 08:09:07	SIG	M62/2203B3	40R	M62 J25 - J30	
02/09/15 08:09:33	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:09:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:09:39	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:09:47	SIG	M62/2008K1	50R	M62 J25 - J30	
02/09/15 08:09:47	SIG	M62/2008K2	50R	M62 J25 - J30	
02/09/15 08:09:47	SIG	M62/2012A1	50R	M62 J25 - J30	
02/09/15 08:09:47	SIG	M62/2012A2	50R	M62 J25 - J30	
02/09/15 08:09:47	SIG	M62/2012A3	50R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1992A1	40R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1992A2	40R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1992A3	40R	M62 J25 - J30	
02/09/15 08:10:02	SIG	M62/1992J1	40R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1960A1	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1960A2	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1960A3	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1960K1	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1960K2	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1968A1	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1968A2	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1968A3	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1968A4	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1974A1	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1974A2	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1974A3	60R	M62 J25 - J30	
02/09/15 08:10:23	SIG	M62/1974A4	60R	M62 J25 - J30	
02/09/15 08:10:52	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 08:10:52	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 08:10:52	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 08:10:52	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 08:11:30	SIG	M62/2004A1	50R	M62 J25 - J30	
02/09/15 08:11:30	SIG	M62/2004A2	50R	M62 J25 - J30	
02/09/15 08:11:30	SIG	M62/2004A3	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1987A1	40R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1987A3	40R	M62 J25 - J30	
02/09/15 08:11:52	SIG	M62/1987J1	40R	M62 J25 - J30	
02/09/15 08:12:38	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:12:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:12:44	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:13:19	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 08:13:19	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 08:13:19	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 08:13:19	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2194B1	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2197B1	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2197B2	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2197B3	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2199M1	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2199M2	50R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2203B1	60R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2203B2	60R	M62 J25 - J30	
02/09/15 08:13:28	SIG	M62/2203B3	60R	M62 J25 - J30	
02/09/15 08:13:57	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 08:13:57	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 08:13:57	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 08:13:57	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 08:14:02	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 08:14:02	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 08:14:02	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 08:14:02	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 08:14:14	SIG	M62/1999A1	50R	M62 J25 - J30	
02/09/15 08:14:14	SIG	M62/1999A2	50R	M62 J25 - J30	
02/09/15 08:14:14	SIG	M62/1999A3	50R	M62 J25 - J30	
02/09/15 08:14:14	SIG	M62/1999J1	50R	M62 J25 - J30	
02/09/15 08:14:14	SIG	M62/1999J2	50R	M62 J25 - J30	
02/09/15 08:14:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 08:14:28	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 08:14:28	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 08:14:28	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 08:14:28	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 08:14:34	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 08:14:34	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 08:14:34	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 08:14:34	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 08:15:42	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 08:15:42	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 08:15:42	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 08:15:42	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 08:15:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:15:43	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:15:49	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:16:22	SIG	M606/2003B1	NR	M62 J25 - J30	
02/09/15 08:16:22	SIG	M606/2003B2	NR	M62 J25 - J30	
02/09/15 08:16:22	SIG	M62/2008K1	60R	M62 J25 - J30	
02/09/15 08:16:22	SIG	M62/2008K2	60R	M62 J25 - J30	
02/09/15 08:16:22	SIG	M62/2012A1	60R	M62 J25 - J30	
02/09/15 08:16:22	SIG	M62/2012A2	60R	M62 J25 - J30	
02/09/15 08:16:22	SIG	M62/2012A3	60R	M62 J25 - J30	
02/09/15 08:17:22	SIG	M62/2004A1	60R	M62 J25 - J30	
02/09/15 08:17:22	SIG	M62/2004A2	60R	M62 J25 - J30	
02/09/15 08:17:22	SIG	M62/2004A3	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1979K1	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1979K2	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1981A1	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1981A2	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1981A3	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1981A4	60R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 08:17:30	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 08:18:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:18:48	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:18:54	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:19:22	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 08:19:23	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1987A1	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1987A3	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1987J1	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1992A1	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1992A2	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1992A3	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1992J1	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1999A1	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1999A2	60R	M62 J25 - J30	
02/09/15 08:21:32	SIG	M62/1999A3	60R	M62 J25 - J30	
02/09/15 08:21:51	SIG	M62/2194B1	40R	M62 J25 - J30	
02/09/15 08:21:51	SIG	M62/2194B2	40R	M62 J25 - J30	
02/09/15 08:21:51	SIG	M62/2194B3	40R	M62 J25 - J30	
02/09/15 08:21:51	SIG	M62/2194B4	40R	M62 J25 - J30	
02/09/15 08:21:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:22:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:22:42	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 08:22:42	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 08:22:42	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 08:22:42	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2197B1	40R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2197B2	40R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2197B3	40R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2199M1	40R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2199M2	40R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2203B1	50R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2203B2	50R	M62 J25 - J30	
02/09/15 08:24:04	SIG	M62/2203B3	50R	M62 J25 - J30	
02/09/15 08:24:44	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 08:24:44	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 08:24:44	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 08:24:44	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 08:25:11	SIG	M62/2203B1	40R	M62 J25 - J30	
02/09/15 08:25:11	SIG	M62/2203B2	40R	M62 J25 - J30	
02/09/15 08:25:11	SIG	M62/2203B3	40R	M62 J25 - J30	
02/09/15 08:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 08:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 08:26:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 08:26:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 08:26:32	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 08:26:32	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 08:26:32	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 08:26:32	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 08:26:38	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 08:26:38	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 08:26:38	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 08:26:38	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2197B1	50R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2197B2	50R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2197B3	50R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2199M1	50R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2199M2	50R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2203B1	60R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2203B2	60R	M62 J25 - J30	
02/09/15 08:29:11	SIG	M62/2203B3	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2183B1	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2183B2	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2183L1	60R	M62 J25 - J30	
02/09/15 08:30:38	SIG	M62/2183L2	60R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2170B1	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2170B2	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2170L1	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 08:31:42	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2170B1	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2170B2	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2170L1	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2170L2	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2177B1	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2177B2	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2177L1	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2177L2	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2183B1	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2183L1	40R	M62 J25 - J30	
02/09/15 08:31:47	SIG	M62/2183L2	40R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2189B1	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2189B2	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2189B3	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2189B4	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2194B1	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 08:31:52	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 08:34:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:34:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:34:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:34:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:35:38	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 08:35:38	SIG	M62/2183L1	OFF	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2189B1	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2189B2	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2189B3	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2189B4	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2194B1	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2194B2	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2194B3	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2194B4	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2197B1	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2197B2	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2197B3	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2199M1	60R	M62 J25 - J30	
02/09/15 08:36:23	SIG	M62/2199M2	60R	M62 J25 - J30	
02/09/15 08:36:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:36:37	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 08:36:37	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 08:36:37	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 08:36:37	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2177B1	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2177B2	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2177L1	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2177L2	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2183B1	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2183B2	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2183L1	60R	M62 J25 - J30	
02/09/15 08:39:44	SIG	M62/2183L2	60R	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1955K1	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1955K2	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1956A1	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1956A2	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1956A3	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1960A1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1960A2	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1960A3	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1960K1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1960K2	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1968A1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1968A2	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1968A3	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1968A4	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1974A1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1974A2	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1974A3	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1974A4	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1979K1	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1979K2	OFF	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1981A1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1981A2	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1981A3	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1981A4	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1987A1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1987A3	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1987J1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1992A1	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1992A2	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1992A3	NR	M62 J25 - J30	
02/09/15 08:41:32	SIG	M62/1992J1	NR	M62 J25 - J30	
02/09/15 08:42:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:42:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:42:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:42:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 08:44:32	SIG	M62/1960A1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1960A2	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1960A3	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1960K1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1960K2	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1968A1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1968A2	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1968A3	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1968A4	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1974A1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1974A2	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1974A3	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1974A4	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1981A1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1981A2	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1981A3	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1981A4	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1987A1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1987A3	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1987J1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1992A1	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1992A2	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1992A3	OFF	M62 J25 - J30	
02/09/15 08:44:50	SIG	M62/1992J1	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/1999A1	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/1999A2	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/1999A3	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/1999J1	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/1999J2	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/2004A1	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/2004A2	OFF	M62 J25 - J30	
02/09/15 08:50:23	SIG	M62/2004A3	OFF	M62 J25 - J30	
02/09/15 08:53:22	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2197B1	NR	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2197B2	NR	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2197B3	NR	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2199M1	OFF	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2199M2	OFF	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2203B1	OFF	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2203B2	OFF	M62 J25 - J30	
02/09/15 08:55:23	SIG	M62/2203B3	OFF	M62 J25 - J30	
02/09/15 08:56:19	SIG	M62/2177A1	HSD	M62 J25 - J30	
02/09/15 08:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 08:56:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 08:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 08:56:21	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 08:56:23	SIG	M62/2159B1	NR	M62 J25 - J30	
02/09/15 08:56:23	SIG	M62/2159B2	NR	M62 J25 - J30	
02/09/15 08:56:23	SIG	M62/2170B1	NR	M62 J25 - J30	
02/09/15 08:56:23	SIG	M62/2170B2	NR	M62 J25 - J30	
02/09/15 08:56:23	SIG	M62/2170L1	NR	M62 J25 - J30	
02/09/15 08:56:23	SIG	M62/2170L2	NR	M62 J25 - J30	
02/09/15 08:57:04	SIG	M62/2183A1	HSD	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2170B1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2170B2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2170L1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2170L2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2177B1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2177B2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2177L1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2177L2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2183B1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2183B2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2183L1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2183L2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2189B1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2189B2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2189B3	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2189B4	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2194B1	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2194B2	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2194B3	NR	M62 J25 - J30	
02/09/15 08:57:23	SIG	M62/2194B4	NR	M62 J25 - J30	
02/09/15 08:57:49	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 08:57:49	SIG	M62/2189A1	HSD	M62 J25 - J30	
02/09/15 08:58:23	SIG	M62/2197B1	OFF	M62 J25 - J30	
02/09/15 08:58:24	SIG	M62/2197B2	OFF	M62 J25 - J30	
02/09/15 08:58:24	SIG	M62/2197B3	OFF	M62 J25 - J30	
02/09/15 08:58:49	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 08:59:23	SIG	M62/2159B1	OFF	M62 J25 - J30	
02/09/15 08:59:24	SIG	M62/2159B2	OFF	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2189A1	REDX	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2189A2	NR	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2189A3	NR	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2189A4	NR	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2197A1	NR	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2197A2	NR	M62 J25 - J30	
02/09/15 08:59:49	SIG	M62/2197A3	NR	M62 J25 - J30	
02/09/15 09:00:23	SIG	M62/2194B1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2170B1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2170B2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2170L1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2170L2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2177B1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2177B2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2177L1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2177L2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2183B1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2183L1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2183L2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2189B1	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2189B2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2189B3	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2189B4	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2194B2	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2194B3	OFF	M62 J25 - J30	
02/09/15 09:00:24	SIG	M62/2194B4	OFF	M62 J25 - J30	
02/09/15 09:02:50	SIG	M62/2197A1	OFF	M62 J25 - J30	
02/09/15 09:02:50	SIG	M62/2197A2	OFF	M62 J25 - J30	
02/09/15 09:02:50	SIG	M62/2197A3	OFF	M62 J25 - J30	
02/09/15 09:15:03	SIG	M62/2113B1	HSD	M62 J25 - J30	
02/09/15 09:15:56	SIG	M62/2106B1	HSD	M62 J25 - J30	
02/09/15 09:17:04	SIG	M62/2097B1	HSD	M62 J25 - J30	
02/09/15 09:17:05	SIG	M62/2113B1	REDX	M62 J25 - J30	
02/09/15 09:18:12	SIG	M62/2088B1	HSD	M62 J25 - J30	
02/09/15 09:18:13	SIG	M62/2106B1	REDX	M62 J25 - J30	
02/09/15 09:19:20	SIG	M62/2097B1	REDX	M62 J25 - J30	
02/09/15 09:20:28	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 09:21:22	SIG	M62/2117B1	NR	M62 J25 - J30	
02/09/15 09:21:22	SIG	M62/2117B3	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2074B2	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2074B3	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2074B4	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2081B1	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2081B2	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2081B3	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2081L1	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2088B2	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2088B3	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2088B4	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2097B2	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2097B4	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2106B2	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2106B3	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2106B4	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2113B2	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2113B3	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2113B4	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2120M1	NR	M62 J25 - J30	
02/09/15 09:21:32	SIG	M62/2120M2	NR	M62 J25 - J30	
02/09/15 09:22:22	SIG	M62/2120M1	OFF	M62 J25 - J30	
02/09/15 09:22:22	SIG	M62/2120M2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2074B1	BLNK	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2074B2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2074B3	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2074B4	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2081B1	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2081B2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2081B3	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2081L1	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2088B1	BLNK	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2088B2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2088B3	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2088B4	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2097B1	BLNK	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2097B2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2097B4	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2106B1	BLNK	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2106B2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2106B4	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2113B1	BLNK	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2113B2	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2113B3	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2113B4	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2117B1	OFF	M62 J25 - J30	
02/09/15 09:22:32	SIG	M62/2117B3	OFF	M62 J25 - J30	
02/09/15 09:24:55	SIG	M62/2079A1	HSD	M62 J25 - J30	
02/09/15 09:26:03	SIG	M62/2088A1	HSD	M62 J25 - J30	
02/09/15 09:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 09:26:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 09:26:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 09:27:11	SIG	M62/2079A1	REDX	M62 J25 - J30	
02/09/15 09:27:11	SIG	M62/2097A1	HSD	M62 J25 - J30	
02/09/15 09:28:19	SIG	M62/2088A1	REDX	M62 J25 - J30	
02/09/15 09:28:19	SIG	M62/2106A1	HSD	M62 J25 - J30	
02/09/15 09:29:27	SIG	M62/2097A1	REDX	M62 J25 - J30	
02/09/15 09:30:35	SIG	M62/2106A1	REDX	M62 J25 - J30	
02/09/15 09:31:35	SIG	M62/2065A2	NR	M62 J25 - J30	
02/09/15 09:31:35	SIG	M62/2065A3	NR	M62 J25 - J30	
02/09/15 09:31:35	SIG	M62/2065A4	NR	M62 J25 - J30	
02/09/15 09:31:35	SIG	M62/2074A2	NR	M62 J25 - J30	
02/09/15 09:31:35	SIG	M62/2074A3	NR	M62 J25 - J30	
02/09/15 09:31:35	SIG	M62/2074A4	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2073K1	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2073K2	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2079A2	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2079A3	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2079A4	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2088A2	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2088A3	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2088A4	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2097A2	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2097A3	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2097A4	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2106A2	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2106A3	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2106A4	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2114A1	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2114A2	NR	M62 J25 - J30	
02/09/15 09:31:36	SIG	M62/2114A3	NR	M62 J25 - J30	
02/09/15 09:32:35	SIG	M62/2073K1	OFF	M62 J25 - J30	
02/09/15 09:32:35	SIG	M62/2073K2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2074A1	BLNK	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2074A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2074A4	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2079A1	BLNK	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2079A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2079A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2079A4	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2088A1	BLNK	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2088A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2088A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2088A4	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2097A1	BLNK	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2097A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2097A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2097A4	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2106A1	BLNK	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2106A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2106A4	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2114A1	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2114A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2114A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2117A1	BLNK	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2117A2	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2117A3	OFF	M62 J25 - J30	
02/09/15 09:32:36	SIG	M62/2117A4	OFF	M62 J25 - J30	
02/09/15 10:17:05	SIG	M62/2057B1	HSD	M62 J25 - J30	
02/09/15 10:19:04	SIG	M62/2041B1	HSD	M62 J25 - J30	
02/09/15 10:19:04	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 10:19:04	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 10:19:04	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 10:19:04	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 10:20:04	SIG	M62/2033B1	HSD	M62 J25 - J30	
02/09/15 10:21:04	SIG	M62/2025B1	HSD	M62 J25 - J30	
02/09/15 10:21:05	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 10:21:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 10:22:41	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2033B2	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2033B3	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2033B4	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2050B2	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2050B3	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2050B4	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2057B2	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2057B3	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2057B4	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2065B2	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2065B3	NR	M62 J25 - J30	
02/09/15 10:23:11	SIG	M62/2065B4	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2018B1	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2018B2	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2018B3	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2018L1	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2025B2	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2025B3	NR	M62 J25 - J30	
02/09/15 10:23:12	SIG	M62/2025B4	NR	M62 J25 - J30	
02/09/15 10:24:11	SIG	M62/2069M1	OFF	M62 J25 - J30	
02/09/15 10:24:11	SIG	M62/2069M2	OFF	M62 J25 - J30	
02/09/15 10:24:11	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 10:24:11	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2012B1	BLNK	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2012B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2012B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2012B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2018B1	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2018B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2018B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2018L1	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2025B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2025B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2025B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2033B1	BLNK	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2033B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2033B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2041B1	BLNK	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2041B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2041B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2041B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2050B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2050B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2050B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2057B1	BLNK	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2057B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2057B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2057B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2065B1	BLNK	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2065B2	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2065B3	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2065B4	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M62/2065M1	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M621/1002B1	OFF	M62 J25 - J30	
02/09/15 10:24:12	SIG	M621/1002B2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2157A2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2157J1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2157J2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2157K1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2163A1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2163A2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2166K1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2166K2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2170A1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2170A2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2170K1	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2170K2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2177A1	BLNK	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2177A2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2177A3	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2177A4	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2183A1	BLNK	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2183A2	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2183A3	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2183A4	OFF	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2189A2	NR	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2189A3	NR	M62 J25 - J30	
02/09/15 10:36:25	SIG	M62/2189A4	NR	M62 J25 - J30	
02/09/15 10:39:25	SIG	M62/2189A2	OFF	M62 J25 - J30	
02/09/15 10:39:25	SIG	M62/2189A3	OFF	M62 J25 - J30	
02/09/15 10:39:25	SIG	M62/2189A4	OFF	M62 J25 - J30	
02/09/15 10:39:26	SIG	M62/2189A1	BLNK	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2163A1	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2163A2	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2166K1	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2166K2	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2170A1	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2170A2	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2170K1	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2170K2	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2177A2	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2177A3	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2177A4	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2183A2	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2183A3	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2183A4	60R	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2189A1	REDX	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2189A2	NR	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2189A3	NR	M62 J25 - J30	
02/09/15 10:40:25	SIG	M62/2189A4	NR	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2163A1	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2163A2	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2166K1	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2166K2	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2170A1	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2170A2	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2170K1	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2170K2	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2177A1	BLNK	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2177A2	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2177A3	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2177A4	OFF	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2183A2	NR	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2183A3	NR	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2183A4	NR	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2189A2	NR	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2189A3	NR	M62 J25 - J30	
02/09/15 10:44:25	SIG	M62/2189A4	NR	M62 J25 - J30	
02/09/15 10:47:25	SIG	M62/2183A2	OFF	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2183A1	BLNK	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2183A3	OFF	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2183A4	OFF	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2189A1	BLNK	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2189A2	OFF	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2189A3	OFF	M62 J25 - J30	
02/09/15 10:47:26	SIG	M62/2189A4	OFF	M62 J25 - J30	
02/09/15 10:47:27	SIG	M62/2189A1	BLNK	M62 J25 - J30	
02/09/15 11:52:58	SIG	M62/2050A1	OFF	M62 J25 - J30	
02/09/15 11:52:59	SIG	M62/2050A1	60R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2041A1	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2041A2	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2041A3	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2041A4	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2050A1	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2050A2	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2050A3	50R	M62 J25 - J30	
02/09/15 13:27:53	SIG	M62/2050A4	50R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2041A1	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2041A2	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2041A3	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2041A4	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2050A1	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2050A2	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2050A3	40R	M62 J25 - J30	
02/09/15 13:27:59	SIG	M62/2050A4	40R	M62 J25 - J30	
02/09/15 13:28:04	SIG	M62/2041A1	30R	M62 J25 - J30	
02/09/15 13:28:04	SIG	M62/2050A1	30R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2025A1	LDR	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2025A2	50R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2025A3	50R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2025A4	50R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2033A1	LDR	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2033A2	50R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2033A3	50R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2033A4	50R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2041A1	20R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2041A2	40R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2041A3	40R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2041A4	40R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2050A1	20R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2050A2	40R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2050A3	40R	M62 J25 - J30	
02/09/15 13:28:09	SIG	M62/2050A4	40R	M62 J25 - J30	
02/09/15 13:28:14	SIG	M62/2041A1	STOP	M62 J25 - J30	
02/09/15 13:28:14	SIG	M62/2050A1	STOP	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2025A1	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2025A2	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2025A3	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2025A4	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2033A1	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2033A2	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2033A3	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2033A4	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2041A1	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2041A2	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2041A3	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2041A4	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2050A1	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2050A2	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2050A3	60R	M62 J25 - J30	
02/09/15 13:31:24	SIG	M62/2050A4	60R	M62 J25 - J30	
02/09/15 13:33:40	SIG	M62/2025A1	???	M62 J25 - J30	
02/09/15 13:33:41	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 13:44:28	SIG	M62/2025A1	OFF	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2088B2	NR	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2088B3	NR	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2088B4	NR	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2097B1	REDX	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2097B2	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2097B4	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2106B1	REDX	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2106B2	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2106B3	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2106B4	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2113B1	REDX	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2113B2	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2113B3	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2113B4	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2117B1	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2117B3	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2120M1	60R	M62 J25 - J30	
02/09/15 14:10:38	SIG	M62/2120M2	60R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2074B1	REDX	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2074B2	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2074B3	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2074B4	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2081B1	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2081B2	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2081B3	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2081L1	NR	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2097B2	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2097B4	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2106B2	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2106B3	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2106B4	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2113B2	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2113B3	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2113B4	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2117B1	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2117B3	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2120M1	50R	M62 J25 - J30	
02/09/15 14:11:34	SIG	M62/2120M2	50R	M62 J25 - J30	
02/09/15 14:23:29	SIG	M62/2125B1	60R	M62 J25 - J30	
02/09/15 14:23:29	SIG	M62/2125B2	60R	M62 J25 - J30	
02/09/15 14:23:29	SIG	M62/2125B3	60R	M62 J25 - J30	
02/09/15 14:23:29	SIG	M62/2125L1	60R	M62 J25 - J30	
02/09/15 14:23:29	SIG	M62/2125L2	60R	M62 J25 - J30	
02/09/15 14:28:03	SIG	M62/2097B3	OFF	M62 J25 - J30	
02/09/15 14:28:04	SIG	M62/2097B3	50R	M62 J25 - J30	
02/09/15 14:28:04	SIG	M62/2097B3	50R	M62 J25 - J30	
02/09/15 14:29:48	SIG	M62/2065M1	NR	M62 J25 - J30	
02/09/15 14:29:48	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 14:29:48	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 14:29:48	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 14:29:48	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2065B1	REDX	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 14:29:49	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 14:29:49	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2012B1	REDX	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2033B2	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2033B3	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2033B4	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 14:29:50	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 14:31:16	SIG	M62/2025B1	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2081B2	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2081B3	60R	M62 J25 - J30	
02/09/15 14:31:29	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 14:31:45	SIG	M62/2033B1	60R	M62 J25 - J30	
02/09/15 14:32:08	SIG	M62/2041B1	60R	M62 J25 - J30	
02/09/15 14:32:21	SIG	M62/2097B2	40R	M62 J25 - J30	
02/09/15 14:32:21	SIG	M62/2097B3	40R	M62 J25 - J30	
02/09/15 14:32:21	SIG	M62/2097B4	40R	M62 J25 - J30	
02/09/15 14:32:21	SIG	M62/2106B2	40R	M62 J25 - J30	
02/09/15 14:32:21	SIG	M62/2106B3	40R	M62 J25 - J30	
02/09/15 14:32:21	SIG	M62/2106B4	40R	M62 J25 - J30	
02/09/15 14:32:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 14:32:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 14:32:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 14:32:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 14:32:54	SIG	M62/2057B1	60R	M62 J25 - J30	
02/09/15 14:32:54	SIG	M621/1002B1	60R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2183L1	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2189B1	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2189B2	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2189B3	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2189B4	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2199M1	50R	M62 J25 - J30	
02/09/15 14:34:11	SIG	M62/2199M2	50R	M62 J25 - J30	
02/09/15 14:34:14	SIG	M62/2113B2	40R	M62 J25 - J30	
02/09/15 14:34:14	SIG	M62/2113B3	40R	M62 J25 - J30	
02/09/15 14:34:14	SIG	M62/2113B4	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2183B1	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2183L1	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2183L2	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2189B1	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2189B2	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2189B3	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2189B4	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2199M1	40R	M62 J25 - J30	
02/09/15 14:34:16	SIG	M62/2199M2	40R	M62 J25 - J30	
02/09/15 14:34:22	SIG	M62/2183L1	30R	M62 J25 - J30	
02/09/15 14:34:22	SIG	M62/2189B1	30R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2177B1	NR	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2177B2	NR	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2177L1	NR	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2177L2	NR	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2183B1	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2183B2	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2183L1	20R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2183L2	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2189B1	20R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2189B2	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2189B3	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2189B4	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2194B1	LDR	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2194B2	50R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2194B3	50R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2194B4	50R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2197B1	50R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2197B2	50R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2197B3	50R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2199M1	40R	M62 J25 - J30	
02/09/15 14:34:27	SIG	M62/2199M2	40R	M62 J25 - J30	
02/09/15 14:34:32	SIG	M62/2183L1	STOP	M62 J25 - J30	
02/09/15 14:34:32	SIG	M62/2189B1	STOP	M62 J25 - J30	
02/09/15 14:35:25	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 14:35:25	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 14:35:25	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2177B1	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2177B2	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2177L1	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2177L2	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2183B1	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2183B2	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2183L1	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2183L2	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2189B1	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2189B2	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2189B3	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2189B4	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2194B1	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2194B2	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2194B3	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2194B4	NR	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2197B1	OFF	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2197B2	OFF	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2197B3	OFF	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2199M1	OFF	M62 J25 - J30	
02/09/15 14:35:33	SIG	M62/2199M2	OFF	M62 J25 - J30	
02/09/15 14:35:34	SIG	M606/2003B1	50R	M62 J25 - J30	
02/09/15 14:35:34	SIG	M606/2003B2	50R	M62 J25 - J30	
02/09/15 14:35:34	SIG	M62/2005M1	50R	M62 J25 - J30	
02/09/15 14:35:34	SIG	M62/2005M2	50R	M62 J25 - J30	
02/09/15 14:35:35	SIG	M62/1992B1	NR	M62 J25 - J30	
02/09/15 14:35:35	SIG	M62/1992B2	NR	M62 J25 - J30	
02/09/15 14:35:35	SIG	M62/1992B3	NR	M62 J25 - J30	
02/09/15 14:35:35	SIG	M62/1992B4	NR	M62 J25 - J30	
02/09/15 14:35:40	SIG	M606/2003B1	40R	M62 J25 - J30	
02/09/15 14:35:40	SIG	M606/2003B2	40R	M62 J25 - J30	
02/09/15 14:35:40	SIG	M62/2005M1	40R	M62 J25 - J30	
02/09/15 14:35:40	SIG	M62/2005M2	40R	M62 J25 - J30	
02/09/15 14:35:45	SIG	M606/2003B1	30R	M62 J25 - J30	
02/09/15 14:35:50	SIG	M606/2003B1	20R	M62 J25 - J30	
02/09/15 14:35:50	SIG	M606/2003B2	40R	M62 J25 - J30	
02/09/15 14:35:50	SIG	M62/2005M1	40R	M62 J25 - J30	
02/09/15 14:35:50	SIG	M62/2005M2	40R	M62 J25 - J30	
02/09/15 14:35:55	SIG	M606/2003B1	STOP	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2117B1	40R	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2117B3	40R	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2120M1	40R	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2120M2	40R	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2125B1	50R	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2125B2	50R	M62 J25 - J30	
02/09/15 14:35:57	SIG	M62/2125B3	50R	M62 J25 - J30	
02/09/15 14:36:22	SIG	M62/2097B2	60R	M62 J25 - J30	
02/09/15 14:36:22	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 14:36:22	SIG	M62/2097B4	60R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/1999B2	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/1999B3	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/1999B4	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2004B1	REDX	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2004B2	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2004B3	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2004B4	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2012B2	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2012B3	50R	M62 J25 - J30	
02/09/15 14:37:24	SIG	M62/2012B4	50R	M62 J25 - J30	
02/09/15 14:37:29	SIG	M62/1999B1	STOP	M62 J25 - J30	
02/09/15 14:37:29	SIG	M62/1999B2	40R	M62 J25 - J30	
02/09/15 14:37:29	SIG	M62/1999B3	40R	M62 J25 - J30	
02/09/15 14:37:29	SIG	M62/1999B4	40R	M62 J25 - J30	
02/09/15 14:37:34	SIG	M62/1999B1	STOP	M62 J25 - J30	
02/09/15 14:38:10	SIG	M62/2125B1	40R	M62 J25 - J30	
02/09/15 14:38:10	SIG	M62/2125B2	40R	M62 J25 - J30	
02/09/15 14:38:10	SIG	M62/2125B3	40R	M62 J25 - J30	
02/09/15 14:38:10	SIG	M62/2125L1	50R	M62 J25 - J30	
02/09/15 14:38:10	SIG	M62/2125L2	50R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2125B1	40R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2125B2	40R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2125B3	40R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2125L1	40R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2125L2	40R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2132B1	50R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2132B2	50R	M62 J25 - J30	
02/09/15 14:38:15	SIG	M62/2132B3	50R	M62 J25 - J30	
02/09/15 14:38:33	SIG	M62/2194B1	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2177B1	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2177B2	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2177L1	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2177L2	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2183B1	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2183L1	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2183L2	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2189B1	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2189B2	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2189B3	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2189B4	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2194B2	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2194B3	OFF	M62 J25 - J30	
02/09/15 14:38:34	SIG	M62/2194B4	OFF	M62 J25 - J30	
02/09/15 14:38:54	SIG	M62/2106B2	50R	M62 J25 - J30	
02/09/15 14:38:54	SIG	M62/2106B3	50R	M62 J25 - J30	
02/09/15 14:38:54	SIG	M62/2106B4	50R	M62 J25 - J30	
02/09/15 14:40:54	SIG	M62/2113B2	50R	M62 J25 - J30	
02/09/15 14:40:54	SIG	M62/2113B3	50R	M62 J25 - J30	
02/09/15 14:40:54	SIG	M62/2113B4	50R	M62 J25 - J30	
02/09/15 14:41:27	SIG	M62/2005M1	TI	M62 J25 - J30	
02/09/15 14:41:27	SIG	M62/2005M2	TI	M62 J25 - J30	
02/09/15 14:41:29	SIG	M62/2137B1	60R	M62 J25 - J30	
02/09/15 14:41:29	SIG	M62/2137B2	60R	M62 J25 - J30	
02/09/15 14:41:29	SIG	M62/2137B3	60R	M62 J25 - J30	
02/09/15 14:41:29	SIG	M62/2137B4	60R	M62 J25 - J30	
02/09/15 14:43:24	SIG	M62/2117B1	50R	M62 J25 - J30	
02/09/15 14:43:24	SIG	M62/2117B3	50R	M62 J25 - J30	
02/09/15 14:43:24	SIG	M62/2120M1	50R	M62 J25 - J30	
02/09/15 14:43:24	SIG	M62/2120M2	50R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2147B1	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2147B2	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2147B3	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2147B4	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2159B1	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2159B2	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2159M1	60R	M62 J25 - J30	
02/09/15 14:43:29	SIG	M62/2159M2	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2125B1	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2125B2	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2125B3	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2125L1	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2125L2	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2132B1	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2132B2	60R	M62 J25 - J30	
02/09/15 14:45:50	SIG	M62/2132B3	60R	M62 J25 - J30	
02/09/15 14:48:29	SIG	M62/2012B2	60R	M62 J25 - J30	
02/09/15 14:48:29	SIG	M62/2012B3	60R	M62 J25 - J30	
02/09/15 14:48:29	SIG	M62/2012B4	60R	M62 J25 - J30	
02/09/15 14:48:47	SIG	M62/2137B2	OFF	M62 J25 - J30	
02/09/15 14:48:48	SIG	M62/2137B2	60R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2113B2	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2113B3	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2113B4	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2117B1	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2117B3	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2120M1	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2120M2	40R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2125B1	50R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2125B2	50R	M62 J25 - J30	
02/09/15 14:49:21	SIG	M62/2125B3	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2113B2	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2113B3	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2113B4	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2117B1	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2117B3	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2120M1	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2120M2	50R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2125B1	60R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2125B2	60R	M62 J25 - J30	
02/09/15 14:53:21	SIG	M62/2125B3	60R	M62 J25 - J30	
02/09/15 14:54:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2106B2	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2106B3	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2106B4	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2113B2	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2113B3	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2113B4	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2117B1	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2117B3	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2120M1	60R	M62 J25 - J30	
02/09/15 14:55:30	SIG	M62/2120M2	60R	M62 J25 - J30	
02/09/15 14:56:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2069M1	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2069M2	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2074B2	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2074B3	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M62/2074B4	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M621/1002B1	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M621/1010B1	50R	M62 J25 - J30	
02/09/15 15:01:31	SIG	M621/1010B2	50R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2065B2	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2065B3	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2065B4	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2065M1	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2069M1	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2069M2	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2074B2	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2074B3	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2074B4	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M621/1002B1	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M621/1002B2	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M621/1010B1	40R	M62 J25 - J30	
02/09/15 15:01:37	SIG	M621/1010B2	40R	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/1999B1	REDX	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/1999B2	60R	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/1999B3	60R	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/1999B4	60R	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/2004B2	60R	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/2004B3	60R	M62 J25 - J30	
02/09/15 15:01:38	SIG	M62/2004B4	60R	M62 J25 - J30	
02/09/15 15:01:51	SIG	M606/2003B1	60R	M62 J25 - J30	
02/09/15 15:01:51	SIG	M606/2003B2	60R	M62 J25 - J30	
02/09/15 15:02:00	SIG	M62/2005M1	60R	M62 J25 - J30	
02/09/15 15:02:00	SIG	M62/2005M2	60R	M62 J25 - J30	
02/09/15 15:06:17	SIG	M621/1002A1	50R	M62 J25 - J30	
02/09/15 15:06:17	SIG	M621/1002A2	50R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2081B1	40R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2081B2	40R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2081B3	40R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2081L1	40R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 15:06:26	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M621/1002B1	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 15:07:57	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M62/2069M1	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M62/2069M2	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M621/1002B1	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M621/1010B1	50R	M62 J25 - J30	
02/09/15 15:09:07	SIG	M621/1010B2	50R	M62 J25 - J30	
02/09/15 15:09:12	SIG	M621/1010B1	40R	M62 J25 - J30	
02/09/15 15:09:12	SIG	M621/1010B2	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M62/2065B2	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M62/2065B3	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M62/2065B4	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M62/2065M1	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M62/2069M1	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M62/2069M2	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M621/1002B1	40R	M62 J25 - J30	
02/09/15 15:09:13	SIG	M621/1002B2	40R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 15:10:26	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M621/1002B1	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 15:13:07	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2132B1	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2132B2	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2132B3	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2137B1	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2137B2	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2137B3	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2137B4	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2147B1	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2147B2	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2147B3	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2147B4	NR	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2159B1	OFF	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2159B2	OFF	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2159M1	OFF	M62 J25 - J30	
02/09/15 15:13:30	SIG	M62/2159M2	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1992B1	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1992B2	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1992B3	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1992B4	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1999B1	BLNK	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1999B2	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1999B3	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/1999B4	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2004B1	BLNK	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2004B2	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2004B3	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2004B4	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2005M1	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2005M2	OFF	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 15:14:30	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 15:15:18	SIG	M621/1002A1	OFF	M62 J25 - J30	
02/09/15 15:15:18	SIG	M621/1002A2	OFF	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2074B2	50R	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2074B3	50R	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2074B4	50R	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2081B2	60R	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2081B3	60R	M62 J25 - J30	
02/09/15 15:15:32	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2132B1	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2132B2	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2132B3	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2137B1	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2137B2	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2137B3	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2137B4	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2147B1	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2147B2	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2147B3	OFF	M62 J25 - J30	
02/09/15 15:16:30	SIG	M62/2147B4	OFF	M62 J25 - J30	
02/09/15 15:18:30	SIG	M62/2125B1	OFF	M62 J25 - J30	
02/09/15 15:18:30	SIG	M62/2125B2	OFF	M62 J25 - J30	
02/09/15 15:18:30	SIG	M62/2125B3	OFF	M62 J25 - J30	
02/09/15 15:18:30	SIG	M62/2125L1	NR	M62 J25 - J30	
02/09/15 15:18:30	SIG	M62/2125L2	NR	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2117B3	OFF	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2120M1	OFF	M62 J25 - J30	
02/09/15 15:20:30	SIG	M62/2120M2	OFF	M62 J25 - J30	
02/09/15 15:21:30	SIG	M62/2125L1	OFF	M62 J25 - J30	
02/09/15 15:21:30	SIG	M62/2125L2	OFF	M62 J25 - J30	
02/09/15 15:22:30	SIG	M62/2113B1	BLNK	M62 J25 - J30	
02/09/15 15:22:30	SIG	M62/2113B2	OFF	M62 J25 - J30	
02/09/15 15:22:30	SIG	M62/2113B3	OFF	M62 J25 - J30	
02/09/15 15:22:30	SIG	M62/2113B4	OFF	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2088B2	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2088B3	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2088B4	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2097B2	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2097B3	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2097B4	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2106B2	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2106B3	NR	M62 J25 - J30	
02/09/15 15:26:30	SIG	M62/2106B4	NR	M62 J25 - J30	
02/09/15 15:29:30	SIG	M62/2097B2	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2088B1	BLNK	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2088B2	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2088B3	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2088B4	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2097B1	BLNK	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2097B3	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2097B4	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2106B1	BLNK	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2106B1	BLNK	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2106B2	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 15:29:31	SIG	M62/2106B4	OFF	M62 J25 - J30	
02/09/15 15:35:30	SIG	M62/2081B1	OFF	M62 J25 - J30	
02/09/15 15:35:30	SIG	M62/2081B2	OFF	M62 J25 - J30	
02/09/15 15:35:30	SIG	M62/2081B3	OFF	M62 J25 - J30	
02/09/15 15:35:30	SIG	M62/2081L1	OFF	M62 J25 - J30	
02/09/15 16:14:20	SIG	M62/2113B1	REDX	M62 J25 - J30	
02/09/15 16:14:20	SIG	M62/2113B2	NR	M62 J25 - J30	
02/09/15 16:14:20	SIG	M62/2113B3	NR	M62 J25 - J30	
02/09/15 16:14:20	SIG	M62/2113B4	NR	M62 J25 - J30	
02/09/15 16:14:20	SIG	M62/2120M1	60R	M62 J25 - J30	
02/09/15 16:14:20	SIG	M62/2120M2	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2081B2	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2081B3	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2097B1	REDX	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2097B2	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2097B4	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2106B1	REDX	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2106B2	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2106B3	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2106B4	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2113B2	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2113B3	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2113B4	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2117B1	60R	M62 J25 - J30	
02/09/15 16:14:31	SIG	M62/2117B3	60R	M62 J25 - J30	
02/09/15 16:16:48	SIG	M62/2088B1	60R	M62 J25 - J30	
02/09/15 16:17:11	SIG	M62/2097B1	60R	M62 J25 - J30	
02/09/15 16:17:45	SIG	M62/2106B1	60R	M62 J25 - J30	
02/09/15 16:17:49	SIG	M62/2113B1	60R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2025B1	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 16:22:55	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2025B1	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2025B2	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2025B3	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2025B4	40R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2033B1	50R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:23:01	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2033B1	40R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2041B1	50R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 16:24:36	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 16:26:29	SIG	M62/2041B1	40R	M62 J25 - J30	
02/09/15 16:26:29	SIG	M62/2041B2	40R	M62 J25 - J30	
02/09/15 16:26:29	SIG	M62/2041B3	40R	M62 J25 - J30	
02/09/15 16:26:29	SIG	M62/2041B4	40R	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2065A2	60R	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2065A3	60R	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2065A4	60R	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2073K1	60R	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2073K2	60R	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2079A1	REDX	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2079A2	NR	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2079A3	NR	M62 J25 - J30	
02/09/15 16:26:43	SIG	M62/2079A4	NR	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2074A1	REDX	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2074A2	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2074A3	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2074A4	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2079A2	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2079A3	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2079A4	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2088A1	REDX	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2088A2	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2088A3	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2088A4	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2097A1	REDX	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2097A2	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2097A3	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2097A4	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2106A1	REDX	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2106A2	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2106A3	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2106A4	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2114A1	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2114A2	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2114A3	60R	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2117A1	REDX	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2117A2	NR	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2117A3	NR	M62 J25 - J30	
02/09/15 16:26:44	SIG	M62/2117A4	NR	M62 J25 - J30	
02/09/15 16:26:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:26:52	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:26:56	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 16:26:57	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:26:57	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 16:26:58	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 16:26:58	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 16:28:29	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 16:28:29	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 16:28:29	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 16:28:29	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 16:29:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:29:56	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:30:01	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:31:31	SIG	M62/2025B1	60R	M62 J25 - J30	
02/09/15 16:31:31	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 16:31:31	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 16:31:31	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 16:32:09	SIG	M62/2106A1	60R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2025B1	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 16:32:21	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2025B1	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2025B2	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2025B3	40R	M62 J25 - J30	
02/09/15 16:32:26	SIG	M62/2025B4	40R	M62 J25 - J30	
02/09/15 16:32:33	SIG	M62/2097A1	60R	M62 J25 - J30	
02/09/15 16:32:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:32:59	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:32:59	SIG	M62/2088A1	60R	M62 J25 - J30	
02/09/15 16:33:04	SIG	M62/2079A1	60R	M62 J25 - J30	
02/09/15 16:33:05	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:36:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:36:03	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:36:09	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:37:19	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 16:37:19	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 16:37:19	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 16:37:19	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 16:38:43	SIG	M62/2170K1	60R	M62 J25 - J30	
02/09/15 16:38:43	SIG	M62/2170K2	60R	M62 J25 - J30	
02/09/15 16:38:43	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 16:38:43	SIG	M62/2177A2	NR	M62 J25 - J30	
02/09/15 16:38:43	SIG	M62/2177A3	NR	M62 J25 - J30	
02/09/15 16:38:43	SIG	M62/2177A4	NR	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2170A1	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2170A2	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2177A2	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2177A3	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2177A4	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2183A2	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2183A3	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2183A4	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2189A1	REDX	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2189A2	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2189A3	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2189A4	60R	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2197A1	NR	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2197A2	NR	M62 J25 - J30	
02/09/15 16:38:44	SIG	M62/2197A3	NR	M62 J25 - J30	
02/09/15 16:39:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:39:08	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:39:13	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:39:49	SIG	M62/2189A1	60R	M62 J25 - J30	
02/09/15 16:40:05	SIG	M62/2183A1	60R	M62 J25 - J30	
02/09/15 16:40:09	SIG	M62/2177A1	60R	M62 J25 - J30	
02/09/15 16:40:10	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 16:40:10	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 16:40:10	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 16:40:15	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 16:42:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:42:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:42:24	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:42:44	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 16:42:44	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 16:42:44	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 16:42:44	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 16:42:50	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 16:42:50	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 16:42:50	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 16:42:50	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 16:45:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:45:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2057B1	60R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 16:45:24	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 16:46:44	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 16:46:44	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 16:46:44	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 16:46:44	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 16:47:43	SIG	M621/1010B1	50R	M62 J25 - J30	
02/09/15 16:47:43	SIG	M621/1010B2	50R	M62 J25 - J30	
02/09/15 16:47:44	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 16:47:44	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 16:47:44	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 16:47:44	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 16:47:44	SIG	M621/1002B1	50R	M62 J25 - J30	
02/09/15 16:47:44	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M62/2065B2	40R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M62/2065B3	40R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M62/2065B4	40R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M62/2065M1	40R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M62/2069M1	50R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M62/2069M2	50R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M621/1002B1	40R	M62 J25 - J30	
02/09/15 16:47:49	SIG	M621/1002B2	40R	M62 J25 - J30	
02/09/15 16:48:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:48:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:48:25	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:48:43	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 16:48:43	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 16:48:43	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 16:48:43	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 16:48:48	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 16:48:48	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 16:48:48	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 16:48:48	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 16:49:10	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 16:49:10	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 16:49:10	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 16:49:15	SIG	M62/2069M1	40R	M62 J25 - J30	
02/09/15 16:49:15	SIG	M62/2069M2	40R	M62 J25 - J30	
02/09/15 16:49:16	SIG	M62/2074B2	50R	M62 J25 - J30	
02/09/15 16:49:16	SIG	M62/2074B3	50R	M62 J25 - J30	
02/09/15 16:49:16	SIG	M62/2074B4	50R	M62 J25 - J30	
02/09/15 16:49:16	SIG	M621/1010B1	40R	M62 J25 - J30	
02/09/15 16:49:16	SIG	M621/1010B2	40R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2074B2	40R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2074B3	40R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2074B4	40R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M621/1010B1	40R	M62 J25 - J30	
02/09/15 16:49:21	SIG	M621/1010B2	40R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 16:50:31	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 16:51:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:51:23	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:51:29	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:52:16	SIG	M62/2041B1	50R	M62 J25 - J30	
02/09/15 16:52:16	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 16:52:16	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 16:52:16	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 16:52:22	SIG	M62/2041B1	40R	M62 J25 - J30	
02/09/15 16:52:22	SIG	M62/2041B2	40R	M62 J25 - J30	
02/09/15 16:52:22	SIG	M62/2041B3	40R	M62 J25 - J30	
02/09/15 16:52:22	SIG	M62/2041B4	40R	M62 J25 - J30	
02/09/15 16:52:59	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 16:52:59	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 16:52:59	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 16:52:59	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 16:54:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:54:27	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:54:33	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 16:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 16:57:30	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 16:57:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 16:57:36	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2057B1	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2057B2	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 16:59:28	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 17:00:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:00:35	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:00:41	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:03:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:03:39	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:03:44	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 17:03:44	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 17:03:44	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 17:03:44	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 17:03:44	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:03:50	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 17:03:50	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 17:03:50	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 17:03:50	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2081B1	40R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2081B2	40R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2081B3	40R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2081L1	40R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2088B1	50R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 17:06:27	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 17:06:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:06:43	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:06:48	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 17:07:32	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2057B1	40R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2057B2	40R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 17:09:45	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 17:09:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:09:46	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:09:52	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2088B1	60R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 17:10:27	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 17:10:31	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 17:10:31	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 17:10:31	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 17:10:31	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 17:12:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:12:50	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:12:55	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 17:13:45	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 17:14:22	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 17:14:22	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 17:14:22	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 17:14:22	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 17:14:28	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 17:14:28	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 17:14:28	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 17:14:28	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2057B1	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2057B2	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 17:14:45	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2081B1	40R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2081B2	40R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2081B3	40R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2081L1	40R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2088B1	50R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 17:15:23	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 17:15:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:15:54	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:16:00	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:16:32	SIG	M62/2097B1	50R	M62 J25 - J30	
02/09/15 17:16:32	SIG	M62/2097B2	50R	M62 J25 - J30	
02/09/15 17:16:32	SIG	M62/2097B3	50R	M62 J25 - J30	
02/09/15 17:16:32	SIG	M62/2097B4	50R	M62 J25 - J30	
02/09/15 17:17:53	SIG	M62/2088B1	40R	M62 J25 - J30	
02/09/15 17:17:53	SIG	M62/2088B2	40R	M62 J25 - J30	
02/09/15 17:17:53	SIG	M62/2088B3	40R	M62 J25 - J30	
02/09/15 17:17:53	SIG	M62/2088B4	40R	M62 J25 - J30	
02/09/15 17:18:28	SIG	M62/1968B1	50R	M62 J25 - J30	
02/09/15 17:18:28	SIG	M62/1968B2	50R	M62 J25 - J30	
02/09/15 17:18:28	SIG	M62/1968B3	50R	M62 J25 - J30	
02/09/15 17:18:28	SIG	M62/1968L1	50R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1960B1	60R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1960B2	60R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1960B3	60R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1960L1	NR	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1960L2	NR	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1968B1	40R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1968B2	40R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1968B3	40R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1968L1	40R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1974B1	50R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1974B2	50R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1974B3	50R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1974B4	50R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1974M1	50R	M62 J25 - J30	
02/09/15 17:18:33	SIG	M62/1974M2	50R	M62 J25 - J30	
02/09/15 17:18:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:18:58	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:19:03	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:19:42	SIG	M62/2132B1	50R	M62 J25 - J30	
02/09/15 17:19:42	SIG	M62/2132B2	50R	M62 J25 - J30	
02/09/15 17:19:42	SIG	M62/2132B3	50R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2125B1	60R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2125B2	60R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2125B3	60R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2125L1	NR	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2125L2	NR	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2132B1	40R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2132B2	40R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2132B3	40R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2137B1	50R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2137B2	50R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2137B3	50R	M62 J25 - J30	
02/09/15 17:19:47	SIG	M62/2137B4	50R	M62 J25 - J30	
02/09/15 17:21:53	SIG	M62/2088B1	50R	M62 J25 - J30	
02/09/15 17:21:53	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 17:21:53	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 17:21:53	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 17:22:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:22:02	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:22:07	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:23:45	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 17:23:45	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 17:23:45	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 17:23:45	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1974B1	40R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1974B2	40R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1974B3	40R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1974B4	40R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1974M1	40R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1974M2	40R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1981B1	50R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1981B2	50R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1981B3	50R	M62 J25 - J30	
02/09/15 17:24:36	SIG	M62/1981B4	50R	M62 J25 - J30	
02/09/15 17:25:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:25:06	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:25:12	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:25:32	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 17:25:32	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 17:25:32	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 17:25:32	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 17:25:38	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 17:25:38	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 17:25:38	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 17:25:38	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 17:25:45	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 17:25:45	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 17:25:45	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 17:25:45	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 17:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 17:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2147B1	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2147B2	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2147B3	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2147B4	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2159B1	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2159B2	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2159M1	60R	M62 J25 - J30	
02/09/15 17:26:32	SIG	M62/2159M2	60R	M62 J25 - J30	
02/09/15 17:26:33	SIG	M62/2170B1	60R	M62 J25 - J30	
02/09/15 17:26:33	SIG	M62/2170B2	60R	M62 J25 - J30	
02/09/15 17:26:33	SIG	M62/2170L1	60R	M62 J25 - J30	
02/09/15 17:26:33	SIG	M62/2170L2	60R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 17:26:40	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 17:27:28	SIG	M62/2081B1	40R	M62 J25 - J30	
02/09/15 17:27:28	SIG	M62/2081B2	40R	M62 J25 - J30	
02/09/15 17:27:28	SIG	M62/2081B3	40R	M62 J25 - J30	
02/09/15 17:27:28	SIG	M62/2081L1	40R	M62 J25 - J30	
02/09/15 17:27:32	SIG	M62/1987B1	60R	M62 J25 - J30	
02/09/15 17:27:32	SIG	M62/1987B2	60R	M62 J25 - J30	
02/09/15 17:27:32	SIG	M62/1987B3	60R	M62 J25 - J30	
02/09/15 17:27:32	SIG	M62/1987B4	60R	M62 J25 - J30	
02/09/15 17:28:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:28:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:28:24	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M606/2003B1	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M606/2003B2	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1992B1	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1992B2	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1992B3	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1992B4	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1999B1	REDX	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1999B2	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1999B3	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/1999B4	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2004B1	REDX	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2004B2	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2004B3	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2004B4	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2005M1	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2005M2	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2012B2	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2012B3	60R	M62 J25 - J30	
02/09/15 17:28:32	SIG	M62/2012B4	60R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1974B1	50R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1974B2	50R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1974B3	50R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1974B4	50R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1974M1	50R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1974M2	50R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1981B1	60R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1981B2	60R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1981B3	60R	M62 J25 - J30	
02/09/15 17:28:36	SIG	M62/1981B4	60R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1974B1	40R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1974B2	40R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1974B3	40R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1974B4	40R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1974M1	40R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1974M2	40R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1981B1	50R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1981B2	50R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1981B3	50R	M62 J25 - J30	
02/09/15 17:30:34	SIG	M62/1981B4	50R	M62 J25 - J30	
02/09/15 17:30:55	SIG	M62/2088B1	40R	M62 J25 - J30	
02/09/15 17:30:55	SIG	M62/2088B2	40R	M62 J25 - J30	
02/09/15 17:30:55	SIG	M62/2088B3	40R	M62 J25 - J30	
02/09/15 17:30:55	SIG	M62/2088B4	40R	M62 J25 - J30	
02/09/15 17:31:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:31:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:31:25	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:32:54	SIG	M62/2137B1	40R	M62 J25 - J30	
02/09/15 17:32:54	SIG	M62/2137B2	40R	M62 J25 - J30	
02/09/15 17:32:54	SIG	M62/2137B3	40R	M62 J25 - J30	
02/09/15 17:32:54	SIG	M62/2137B4	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2057B1	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2057B2	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 17:33:33	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 17:34:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:34:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:34:24	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2088B1	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 17:34:55	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 17:36:54	SIG	M62/2137B1	50R	M62 J25 - J30	
02/09/15 17:36:54	SIG	M62/2137B2	50R	M62 J25 - J30	
02/09/15 17:36:54	SIG	M62/2137B3	50R	M62 J25 - J30	
02/09/15 17:36:54	SIG	M62/2137B4	50R	M62 J25 - J30	
02/09/15 17:37:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:37:21	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:37:27	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:38:51	SIG	M62/2137B1	40R	M62 J25 - J30	
02/09/15 17:38:51	SIG	M62/2137B2	40R	M62 J25 - J30	
02/09/15 17:38:51	SIG	M62/2137B3	40R	M62 J25 - J30	
02/09/15 17:38:51	SIG	M62/2137B4	40R	M62 J25 - J30	
02/09/15 17:40:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:40:25	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2041B1	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 17:40:31	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 17:42:21	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 17:42:21	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 17:42:21	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 17:42:21	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 17:42:31	SIG	M62/2041B1	40R	M62 J25 - J30	
02/09/15 17:42:31	SIG	M62/2041B2	40R	M62 J25 - J30	
02/09/15 17:42:31	SIG	M62/2041B3	40R	M62 J25 - J30	
02/09/15 17:42:31	SIG	M62/2041B4	40R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1974B1	50R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1974B2	50R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1974B3	50R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1974B4	50R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1974M1	50R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1974M2	50R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1981B1	60R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1981B2	60R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1981B3	60R	M62 J25 - J30	
02/09/15 17:42:41	SIG	M62/1981B4	60R	M62 J25 - J30	
02/09/15 17:42:51	SIG	M62/2137B1	50R	M62 J25 - J30	
02/09/15 17:42:51	SIG	M62/2137B2	50R	M62 J25 - J30	
02/09/15 17:42:51	SIG	M62/2137B3	50R	M62 J25 - J30	
02/09/15 17:42:51	SIG	M62/2137B4	50R	M62 J25 - J30	
02/09/15 17:43:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:43:29	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 17:43:35	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 17:44:24	SIG	M62/2081B1	40R	M62 J25 - J30	
02/09/15 17:44:24	SIG	M62/2081B2	40R	M62 J25 - J30	
02/09/15 17:44:24	SIG	M62/2081B3	40R	M62 J25 - J30	
02/09/15 17:44:24	SIG	M62/2081L1	40R	M62 J25 - J30	
02/09/15 17:45:39	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 17:45:39	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 17:45:39	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 17:45:39	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1974B1	40R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1974B2	40R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1974B3	40R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1974B4	40R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1974M1	40R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1974M2	40R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1981B1	50R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1981B2	50R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1981B3	50R	M62 J25 - J30	
02/09/15 17:46:27	SIG	M62/1981B4	50R	M62 J25 - J30	
02/09/15 17:46:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:46:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 17:48:24	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 17:48:24	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 17:48:24	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 17:48:24	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2057B1	40R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2057B2	40R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 17:51:04	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1974B1	50R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1974B2	50R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1974B3	50R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1974B4	50R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1974M1	50R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1974M2	50R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1981B1	60R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1981B2	60R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1981B3	60R	M62 J25 - J30	
02/09/15 17:51:21	SIG	M62/1981B4	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1968B1	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1968B2	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1968B3	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1968L1	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1974B1	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1974B2	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1974B3	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1974B4	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1974M1	60R	M62 J25 - J30	
02/09/15 17:51:27	SIG	M62/1974M2	60R	M62 J25 - J30	
02/09/15 17:52:02	SIG	M621/1002A1	50R	M62 J25 - J30	
02/09/15 17:52:02	SIG	M621/1002A2	50R	M62 J25 - J30	
02/09/15 17:53:17	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 17:53:17	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 17:53:17	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 17:53:17	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 17:53:23	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 17:53:23	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 17:53:23	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 17:53:23	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2132B1	60R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2132B2	60R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2132B3	60R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2137B1	60R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2137B2	60R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2137B3	60R	M62 J25 - J30	
02/09/15 17:54:16	SIG	M62/2137B4	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2088B1	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2097B1	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2097B2	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2097B3	60R	M62 J25 - J30	
02/09/15 17:54:33	SIG	M62/2097B4	60R	M62 J25 - J30	
02/09/15 17:56:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 17:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 17:58:33	SIG	M62/2132B1	50R	M62 J25 - J30	
02/09/15 17:58:33	SIG	M62/2132B2	50R	M62 J25 - J30	
02/09/15 17:58:33	SIG	M62/2132B3	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2057B1	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2132B1	40R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2132B2	40R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2132B3	40R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2137B1	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2137B2	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2137B3	50R	M62 J25 - J30	
02/09/15 17:58:38	SIG	M62/2137B4	50R	M62 J25 - J30	
02/09/15 17:59:32	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 17:59:32	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 17:59:32	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 17:59:32	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 18:00:26	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 18:00:26	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 18:00:26	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 18:00:26	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 18:00:31	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 18:00:31	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 18:00:31	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 18:00:31	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2069M1	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2069M2	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2074B2	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2074B3	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2074B4	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2081B2	60R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2081B3	60R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M621/1010B1	50R	M62 J25 - J30	
02/09/15 18:01:25	SIG	M621/1010B2	50R	M62 J25 - J30	
02/09/15 18:02:13	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 18:02:13	SIG	M621/1002B1	50R	M62 J25 - J30	
02/09/15 18:02:13	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2132B1	60R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2132B2	60R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2132B3	60R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2137B1	60R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2137B2	60R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2137B3	60R	M62 J25 - J30	
02/09/15 18:02:31	SIG	M62/2137B4	60R	M62 J25 - J30	
02/09/15 18:04:25	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 18:04:25	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 18:04:25	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 18:04:25	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 18:05:33	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 18:05:33	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1960B1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1960B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1960B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1960L1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1960L2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1968B1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1968B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1968B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1968L1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1974B1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1974B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1974B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1974B4	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1974M1	OFF	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1974M2	OFF	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1981B1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1981B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1981B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1981B4	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1987B1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1987B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1987B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1987B4	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1992B1	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1992B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1992B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1992B4	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1999B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1999B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/1999B4	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2004B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2004B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2004B4	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2005M1	OFF	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2005M2	OFF	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 18:05:33	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 18:05:38	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 18:05:38	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 18:05:38	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 18:05:38	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 18:05:44	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 18:05:44	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 18:05:44	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 18:05:44	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 18:06:44	SIG	M62/2050B2	40R	M62 J25 - J30	
02/09/15 18:06:44	SIG	M62/2050B3	40R	M62 J25 - J30	
02/09/15 18:06:44	SIG	M62/2050B4	40R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 18:07:33	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 18:08:33	SIG	M62/2004B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1960B1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1960B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1960B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1960L1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1960L2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1968B1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1968B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1968B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1968L1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1974B1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1974B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1974B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1974B4	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1981B1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1981B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1981B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1981B4	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1987B1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1987B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1987B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1987B4	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1992B1	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1992B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1992B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1992B4	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1999B1	BLNK	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1999B2	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1999B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/1999B4	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/2004B1	BLNK	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/2004B3	OFF	M62 J25 - J30	
02/09/15 18:08:34	SIG	M62/2004B4	OFF	M62 J25 - J30	
02/09/15 18:08:35	SIG	M62/1999B1	BLNK	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2065B2	60R	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2065B3	60R	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2065B4	60R	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2170B1	OFF	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2170B2	OFF	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2170L1	OFF	M62 J25 - J30	
02/09/15 18:11:33	SIG	M62/2170L2	OFF	M62 J25 - J30	
02/09/15 18:11:33	SIG	M621/1002B1	60R	M62 J25 - J30	
02/09/15 18:11:33	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 18:11:56	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 18:11:56	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 18:11:56	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2125B1	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2125B2	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2125B3	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2125L1	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2125L2	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2132B1	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2132B2	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2132B3	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2137B1	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2137B2	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2137B3	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2137B4	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2147B1	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2147B2	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2147B3	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2147B4	NR	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2159B1	OFF	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2159B2	OFF	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2159M1	OFF	M62 J25 - J30	
02/09/15 18:12:33	SIG	M62/2159M2	OFF	M62 J25 - J30	
02/09/15 18:12:36	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 18:12:36	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 18:12:36	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 18:12:36	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 18:14:30	SIG	M62/2041B1	50R	M62 J25 - J30	
02/09/15 18:14:30	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 18:14:30	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 18:14:30	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 18:15:15	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 18:15:15	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 18:15:15	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 18:15:15	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 18:15:21	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 18:15:21	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 18:15:21	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 18:15:21	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 18:15:33	SIG	M62/2137B1	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2125B1	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2125B2	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2125B3	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2125L1	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2125L2	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2132B1	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2132B2	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2132B3	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2137B2	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2137B3	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2137B4	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2147B1	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2147B2	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2147B3	OFF	M62 J25 - J30	
02/09/15 18:15:34	SIG	M62/2147B4	OFF	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2073K1	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2073K2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2074A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2074A4	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2079A1	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2079A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2079A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2079A4	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2088A1	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2088A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2088A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2088A4	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2097A1	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2097A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2097A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2097A4	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2106A1	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2106A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2106A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2106A4	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2114A1	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2114A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2114A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2117A2	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2117A3	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2117A4	50R	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2124A1	REDX	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2124A2	NR	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2124A3	NR	M62 J25 - J30	
02/09/15 18:17:19	SIG	M62/2124A4	NR	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2073K1	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2073K2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2074A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2074A4	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2079A1	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2079A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2079A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2079A4	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2088A1	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2088A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2088A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2088A4	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2097A1	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2097A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2097A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2097A4	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2106A1	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2106A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2106A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2106A4	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2114A1	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2114A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2114A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2117A2	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2117A3	40R	M62 J25 - J30	
02/09/15 18:17:25	SIG	M62/2117A4	40R	M62 J25 - J30	
02/09/15 18:17:30	SIG	M62/2079A1	30R	M62 J25 - J30	
02/09/15 18:17:30	SIG	M62/2088A1	30R	M62 J25 - J30	
02/09/15 18:17:30	SIG	M62/2097A1	30R	M62 J25 - J30	
02/09/15 18:17:30	SIG	M62/2106A1	30R	M62 J25 - J30	
02/09/15 18:17:30	SIG	M62/2114A1	30R	M62 J25 - J30	
02/09/15 18:17:35	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2073K1	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2073K2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2074A1	STOP	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2074A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2074A4	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2079A1	20R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2079A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2079A3	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2079A4	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2088A1	20R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2088A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2088A3	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2088A4	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2097A1	20R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2097A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2097A3	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2097A4	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2106A1	20R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2106A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2106A3	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2106A4	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2114A1	20R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2114A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2114A3	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2117A1	STOP	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2117A2	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2117A3	40R	M62 J25 - J30	
02/09/15 18:17:36	SIG	M62/2117A4	40R	M62 J25 - J30	
02/09/15 18:17:42	SIG	M62/2074A1	STOP	M62 J25 - J30	
02/09/15 18:17:42	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:17:47	SIG	M62/2088A1	STOP	M62 J25 - J30	
02/09/15 18:17:47	SIG	M62/2097A1	STOP	M62 J25 - J30	
02/09/15 18:17:47	SIG	M62/2106A1	STOP	M62 J25 - J30	
02/09/15 18:17:47	SIG	M62/2114A1	STOP	M62 J25 - J30	
02/09/15 18:17:47	SIG	M62/2117A1	STOP	M62 J25 - J30	
02/09/15 18:17:53	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:17:53	SIG	M62/2079A1	STOP	M62 J25 - J30	
02/09/15 18:17:54	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:17:59	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:18:09	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:18:10	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:18:16	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:18:26	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:18:26	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:18:31	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:20:33	SIG	M62/2057B1	60R	M62 J25 - J30	
02/09/15 18:20:33	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 18:20:33	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 18:20:33	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 18:20:53	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:20:54	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:20:59	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:21:09	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:21:10	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:21:15	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:21:25	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:21:26	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 18:21:31	SIG	M62/2074A3	40R	M62 J25 - J30	
02/09/15 18:21:45	SIG	M62/2018B1	60R	M62 J25 - J30	
02/09/15 18:21:45	SIG	M62/2018B2	60R	M62 J25 - J30	
02/09/15 18:21:45	SIG	M62/2018B3	60R	M62 J25 - J30	
02/09/15 18:21:45	SIG	M62/2018L1	60R	M62 J25 - J30	
02/09/15 18:22:16	SIG	M62/2124A2	NR	M62 J25 - J30	
02/09/15 18:22:16	SIG	M62/2124A3	NR	M62 J25 - J30	
02/09/15 18:22:16	SIG	M62/2124A4	NR	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2073K1	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2073K2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2074A1	REDX	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2074A2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2074A3	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2074A4	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2079A1	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2079A2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2079A3	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2079A4	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2088A1	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2088A2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2088A3	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2088A4	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2097A1	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2097A2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2097A3	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2097A4	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2106A1	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2106A2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2106A3	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2106A4	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2114A1	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2114A2	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2114A3	60R	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2117A1	REDX	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2117A2	NR	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2117A3	NR	M62 J25 - J30	
02/09/15 18:22:17	SIG	M62/2117A4	NR	M62 J25 - J30	
02/09/15 18:22:26	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:22:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:22:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:22:28	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2025B1	60R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2033B1	50R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 18:25:02	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 18:25:14	SIG	M62/2025B1	50R	M62 J25 - J30	
02/09/15 18:25:14	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 18:25:14	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 18:25:14	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 18:25:16	SIG	M62/2124A2	OFF	M62 J25 - J30	
02/09/15 18:25:17	SIG	M62/2124A1	BLNK	M62 J25 - J30	
02/09/15 18:25:17	SIG	M62/2124A3	OFF	M62 J25 - J30	
02/09/15 18:25:17	SIG	M62/2124A4	OFF	M62 J25 - J30	
02/09/15 18:25:19	SIG	M62/2025B1	40R	M62 J25 - J30	
02/09/15 18:25:19	SIG	M62/2025B2	40R	M62 J25 - J30	
02/09/15 18:25:19	SIG	M62/2025B3	40R	M62 J25 - J30	
02/09/15 18:25:19	SIG	M62/2025B4	40R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2041B1	60R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 18:25:33	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 18:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:26:58	SIG	M62/2079A1	HSD	M62 J25 - J30	
02/09/15 18:27:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:27:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:27:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:27:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:28:06	SIG	M62/2088A1	HSD	M62 J25 - J30	
02/09/15 18:29:14	SIG	M62/2079A1	REDX	M62 J25 - J30	
02/09/15 18:29:14	SIG	M62/2097A1	HSD	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2025B1	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2025B2	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2025B3	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2025B4	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2033B1	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2033B2	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2033B3	60R	M62 J25 - J30	
02/09/15 18:29:15	SIG	M62/2033B4	60R	M62 J25 - J30	
02/09/15 18:30:22	SIG	M62/2088A1	REDX	M62 J25 - J30	
02/09/15 18:30:22	SIG	M62/2106A1	HSD	M62 J25 - J30	
02/09/15 18:31:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:31:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:31:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:31:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:31:30	SIG	M62/2097A1	REDX	M62 J25 - J30	
02/09/15 18:32:38	SIG	M62/2106A1	REDX	M62 J25 - J30	
02/09/15 18:33:38	SIG	M62/2065A2	NR	M62 J25 - J30	
02/09/15 18:33:38	SIG	M62/2065A3	NR	M62 J25 - J30	
02/09/15 18:33:38	SIG	M62/2065A4	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2073K1	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2073K2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2074A2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2074A3	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2074A4	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2079A2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2079A3	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2079A4	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2088A2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2088A3	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2088A4	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2097A2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2097A3	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2097A4	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2106A2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2106A3	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2106A4	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2114A1	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2114A2	NR	M62 J25 - J30	
02/09/15 18:33:39	SIG	M62/2114A3	NR	M62 J25 - J30	
02/09/15 18:34:33	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 18:34:33	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 18:34:38	SIG	M62/2073K1	OFF	M62 J25 - J30	
02/09/15 18:34:38	SIG	M62/2073K2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2074A1	BLNK	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2074A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2074A4	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2079A1	BLNK	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2079A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2079A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2079A4	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2088A1	BLNK	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2088A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2088A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2088A4	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2097A1	BLNK	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2097A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2097A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2097A4	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2106A1	BLNK	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2106A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2106A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2106A4	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2114A1	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2114A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2114A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2117A1	BLNK	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2117A2	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2117A3	OFF	M62 J25 - J30	
02/09/15 18:34:39	SIG	M62/2117A4	OFF	M62 J25 - J30	
02/09/15 18:39:02	SIG	M62/2113B1	HSD	M62 J25 - J30	
02/09/15 18:39:56	SIG	M62/2106B1	HSD	M62 J25 - J30	
02/09/15 18:41:03	SIG	M62/2097B1	HSD	M62 J25 - J30	
02/09/15 18:41:04	SIG	M62/2113B1	REDX	M62 J25 - J30	
02/09/15 18:42:08	SIG	M621/1002A1	OFF	M62 J25 - J30	
02/09/15 18:42:08	SIG	M621/1002A2	OFF	M62 J25 - J30	
02/09/15 18:42:12	SIG	M62/2088B1	HSD	M62 J25 - J30	
02/09/15 18:42:12	SIG	M62/2106B1	REDX	M62 J25 - J30	
02/09/15 18:43:20	SIG	M62/2097B1	REDX	M62 J25 - J30	
02/09/15 18:44:28	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 18:44:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2097B2	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2097B3	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2097B4	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2106B2	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2106B3	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2106B4	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2113B2	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2113B3	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2113B4	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2117B1	NR	M62 J25 - J30	
02/09/15 18:45:21	SIG	M62/2117B3	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2074B2	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2074B3	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2074B4	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2081B1	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2081B2	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2081B3	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2081L1	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2088B2	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2088B3	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2088B4	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2120M1	NR	M62 J25 - J30	
02/09/15 18:45:22	SIG	M62/2120M2	NR	M62 J25 - J30	
02/09/15 18:46:21	SIG	M62/2120M1	OFF	M62 J25 - J30	
02/09/15 18:46:21	SIG	M62/2120M2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2074B1	BLNK	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2074B2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2074B3	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2074B4	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2081B1	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2081B2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2081B3	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2081L1	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2088B1	BLNK	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2088B2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2088B3	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2088B4	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2097B1	BLNK	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2097B2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2097B3	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2097B4	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2106B1	BLNK	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2106B2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2106B4	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2113B1	BLNK	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2113B2	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2113B3	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2113B4	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
02/09/15 18:46:22	SIG	M62/2117B3	OFF	M62 J25 - J30	
02/09/15 18:48:36	SIG	M62/2177A1	HSD	M62 J25 - J30	
02/09/15 18:49:21	SIG	M62/2183A1	HSD	M62 J25 - J30	
02/09/15 18:50:06	SIG	M62/2189A1	HSD	M62 J25 - J30	
02/09/15 18:50:07	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 18:51:06	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 18:52:06	SIG	M62/2189A1	REDX	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2170A1	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2170A2	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2170K1	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2170K2	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2177A2	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2177A3	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2177A4	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2183A2	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2183A3	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2183A4	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2189A2	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2189A3	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2189A4	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2197A1	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2197A2	NR	M62 J25 - J30	
02/09/15 18:52:07	SIG	M62/2197A3	NR	M62 J25 - J30	
02/09/15 18:53:06	SIG	M62/2170K1	OFF	M62 J25 - J30	
02/09/15 18:53:06	SIG	M62/2170K2	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2170A1	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2170A2	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2177A1	BLNK	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2177A2	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2177A3	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2177A4	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2183A1	BLNK	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2183A2	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2183A3	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2183A4	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2189A1	BLNK	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2189A2	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2189A3	OFF	M62 J25 - J30	
02/09/15 18:53:07	SIG	M62/2189A4	OFF	M62 J25 - J30	
02/09/15 18:55:07	SIG	M62/2197A1	OFF	M62 J25 - J30	
02/09/15 18:55:08	SIG	M62/2197A2	OFF	M62 J25 - J30	
02/09/15 18:55:08	SIG	M62/2197A3	OFF	M62 J25 - J30	
02/09/15 19:03:52	SIG	M62/2025A1	HSD	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1956A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1956A2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1956A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1960A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1960A2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1960A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1960K1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1960K2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1968A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1968A2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1968A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1968A4	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1974A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1974A2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1974A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1974A4	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1979K1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1979K2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1981A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1981A2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1981A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1981A4	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1987A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1987A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1987J1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1992A1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1992A2	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1992A3	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1992J1	50R	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1999A1	NR	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1999A2	NR	M62 J25 - J30	
02/09/15 19:04:37	SIG	M62/1999A3	NR	M62 J25 - J30	
02/09/15 19:04:52	SIG	M62/2033A1	HSD	M62 J25 - J30	
02/09/15 19:05:52	SIG	M62/2041A1	HSD	M62 J25 - J30	
02/09/15 19:05:53	SIG	M62/2018A1	HSD	M62 J25 - J30	
02/09/15 19:05:53	SIG	M62/2025A1	REDX	M62 J25 - J30	
02/09/15 19:06:59	SIG	M62/2050A1	HSD	M62 J25 - J30	
02/09/15 19:07:00	SIG	M62/2033A1	REDX	M62 J25 - J30	
02/09/15 19:07:52	SIG	M62/2041A1	REDX	M62 J25 - J30	
02/09/15 19:08:52	SIG	M62/2050A1	REDX	M62 J25 - J30	
02/09/15 19:09:52	SIG	M62/2025A2	NR	M62 J25 - J30	
02/09/15 19:09:52	SIG	M62/2025A3	NR	M62 J25 - J30	
02/09/15 19:09:52	SIG	M62/2025A4	NR	M62 J25 - J30	
02/09/15 19:09:52	SIG	M62/2033A2	NR	M62 J25 - J30	
02/09/15 19:09:52	SIG	M62/2033A3	NR	M62 J25 - J30	
02/09/15 19:09:52	SIG	M62/2033A4	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2041A2	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2041A3	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2041A4	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2050A2	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2050A3	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2050A4	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2057A1	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2057A2	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2057A3	NR	M62 J25 - J30	
02/09/15 19:09:53	SIG	M62/2057J1	NR	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2008K1	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2008K2	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2012A1	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2012A2	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2012A3	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2018A1	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2018A2	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2018A3	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2018A4	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2025A1	BLNK	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2025A2	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2025A3	OFF	M62 J25 - J30	
02/09/15 19:10:52	SIG	M62/2025A4	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2033A1	BLNK	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2033A2	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2033A3	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2033A4	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2041A1	BLNK	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2041A2	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2041A3	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2041A4	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2050A1	BLNK	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2050A2	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2050A3	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2050A4	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2057A1	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2057A2	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2057A3	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2057J1	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2065A1	BLNK	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2065A2	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2065A3	OFF	M62 J25 - J30	
02/09/15 19:10:53	SIG	M62/2065A4	OFF	M62 J25 - J30	
02/09/15 19:14:21	SIG	M62/2057B1	HSD	M62 J25 - J30	
02/09/15 19:16:20	SIG	M62/2041B1	HSD	M62 J25 - J30	
02/09/15 19:16:21	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 19:16:21	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 19:16:21	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 19:16:21	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 19:17:20	SIG	M62/2033B1	HSD	M62 J25 - J30	
02/09/15 19:18:20	SIG	M62/2025B1	HSD	M62 J25 - J30	
02/09/15 19:18:21	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 19:19:12	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 19:19:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 19:20:12	SIG	M606/2003B1	NR	M62 J25 - J30	
02/09/15 19:20:12	SIG	M606/2003B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2025B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2025B3	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2025B4	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2033B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2033B3	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2033B4	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2050B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2050B3	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2050B4	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2057B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2057B3	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2057B4	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2065B2	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2065B3	NR	M62 J25 - J30	
02/09/15 19:20:27	SIG	M62/2065B4	NR	M62 J25 - J30	
02/09/15 19:20:28	SIG	M62/2018B1	NR	M62 J25 - J30	
02/09/15 19:20:28	SIG	M62/2018B2	NR	M62 J25 - J30	
02/09/15 19:20:28	SIG	M62/2018B3	NR	M62 J25 - J30	
02/09/15 19:20:28	SIG	M62/2018L1	NR	M62 J25 - J30	
02/09/15 19:21:27	SIG	M62/2069M1	OFF	M62 J25 - J30	
02/09/15 19:21:27	SIG	M62/2069M2	OFF	M62 J25 - J30	
02/09/15 19:21:27	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 19:21:27	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2025B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2025B3	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2025B4	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2033B1	BLNK	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2033B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2033B4	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2041B1	BLNK	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2041B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2041B3	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2041B4	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2050B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2050B3	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2050B4	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2057B1	BLNK	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2057B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2057B3	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2057B4	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2065B1	BLNK	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2065B2	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2065B3	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2065B4	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M62/2065M1	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M621/1002B1	OFF	M62 J25 - J30	
02/09/15 19:21:28	SIG	M621/1002B2	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2012B1	BLNK	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2012B2	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2012B3	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2012B4	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2018B1	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2018B2	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2018B3	OFF	M62 J25 - J30	
02/09/15 19:21:29	SIG	M62/2018L1	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1956A1	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1956A2	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1960A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1960A2	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1960A3	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1960K1	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1960K2	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1968A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1968A2	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1968A3	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1968A4	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1974A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1974A2	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1974A3	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1974A4	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1979K1	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1979K2	OFF	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1981A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1981A2	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1981A3	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1981A4	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1987A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1987A3	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1987J1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1992A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1992A2	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1992A3	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1992J1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1999A1	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1999A2	NR	M62 J25 - J30	
02/09/15 19:25:53	SIG	M62/1999A3	NR	M62 J25 - J30	
02/09/15 19:28:53	SIG	M62/1960A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1960A2	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1960A3	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1968A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1968A2	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1968A3	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1968A4	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1974A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1974A2	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1974A3	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1974A4	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1981A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1981A2	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1981A3	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1981A4	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1987A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1987A3	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1987J1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1992A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1992A2	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1992A3	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1992J1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1999A1	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1999A2	OFF	M62 J25 - J30	
02/09/15 19:29:07	SIG	M62/1999A3	OFF	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2012B1	REDX	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 19:40:43	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 19:42:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 19:42:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 19:43:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 19:43:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 19:59:46	SIG	M62/2166K1	60R	M62 J25 - J30	
02/09/15 19:59:46	SIG	M62/2166K2	60R	M62 J25 - J30	
02/09/15 19:59:46	SIG	M62/2170K1	50R	M62 J25 - J30	
02/09/15 19:59:46	SIG	M62/2170K2	LDL	M62 J25 - J30	
02/09/15 20:00:01	SIG	M62/2166K1	OFF	M62 J25 - J30	
02/09/15 20:00:01	SIG	M62/2166K2	OFF	M62 J25 - J30	
02/09/15 20:00:01	SIG	M62/2170K1	OFF	M62 J25 - J30	
02/09/15 20:00:01	SIG	M62/2170K2	OFF	M62 J25 - J30	
02/09/15 20:00:10	SIG	M62/2166K1	50R	M62 J25 - J30	
02/09/15 20:00:10	SIG	M62/2166K2	50R	M62 J25 - J30	
02/09/15 20:00:10	SIG	M62/2170K1	50R	M62 J25 - J30	
02/09/15 20:00:10	SIG	M62/2170K2	50R	M62 J25 - J30	
02/09/15 20:00:16	SIG	M62/2166K1	40R	M62 J25 - J30	
02/09/15 20:00:16	SIG	M62/2166K2	40R	M62 J25 - J30	
02/09/15 20:00:16	SIG	M62/2170K1	40R	M62 J25 - J30	
02/09/15 20:00:16	SIG	M62/2170K2	40R	M62 J25 - J30	
02/09/15 20:00:21	SIG	M62/2170K1	30R	M62 J25 - J30	
02/09/15 20:00:26	SIG	M62/2166K1	40R	M62 J25 - J30	
02/09/15 20:00:26	SIG	M62/2166K2	40R	M62 J25 - J30	
02/09/15 20:00:26	SIG	M62/2170K1	20R	M62 J25 - J30	
02/09/15 20:00:26	SIG	M62/2170K2	40R	M62 J25 - J30	
02/09/15 20:00:31	SIG	M62/2170K1	STOP	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2177A1	REDX	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2177A2	50R	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2177A3	50R	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2177A4	50R	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2183A1	REDX	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2183A2	50R	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2183A3	50R	M62 J25 - J30	
02/09/15 20:00:39	SIG	M62/2183A4	50R	M62 J25 - J30	
02/09/15 20:00:56	SIG	M62/2170A1	50R	M62 J25 - J30	
02/09/15 20:00:56	SIG	M62/2170A2	50R	M62 J25 - J30	
02/09/15 20:10:35	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 20:10:35	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 20:10:35	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 20:10:35	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 20:10:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 20:11:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 20:11:21	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 20:11:21	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 20:11:21	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2018B1	40R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2018B2	40R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2018B3	40R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2018L1	40R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2025B2	40R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2025B3	40R	M62 J25 - J30	
02/09/15 20:12:03	SIG	M62/2025B4	40R	M62 J25 - J30	
02/09/15 20:13:30	SIG	M62/2170L1	LDR	M62 J25 - J30	
02/09/15 20:13:30	SIG	M62/2170L2	50R	M62 J25 - J30	
02/09/15 20:13:30	SIG	M62/2177B1	50R	M62 J25 - J30	
02/09/15 20:13:30	SIG	M62/2177B2	50R	M62 J25 - J30	
02/09/15 20:13:30	SIG	M62/2177L1	50R	M62 J25 - J30	
02/09/15 20:13:30	SIG	M62/2177L2	50R	M62 J25 - J30	
02/09/15 20:13:35	SIG	M62/2050B2	60R	M62 J25 - J30	
02/09/15 20:13:35	SIG	M62/2050B3	60R	M62 J25 - J30	
02/09/15 20:13:35	SIG	M62/2050B4	60R	M62 J25 - J30	
02/09/15 20:14:15	SIG	M62/2183B1	50R	M62 J25 - J30	
02/09/15 20:14:15	SIG	M62/2183B2	50R	M62 J25 - J30	
02/09/15 20:14:15	SIG	M62/2183L2	50R	M62 J25 - J30	
02/09/15 20:16:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 20:16:13	SIG	M62/2183B2	???	M62 J25 - J30	
02/09/15 20:16:44	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 20:16:44	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 20:16:49	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 20:16:49	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:16:49	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 20:16:49	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 20:16:49	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 20:16:49	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 20:17:35	SIG	M62/2057B2	60R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M62/2057B3	60R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M62/2057B4	60R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 20:17:35	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 20:17:35	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 20:17:55	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 20:17:55	SIG	M62/2050B3	50R	M62 J25 - J30	
02/09/15 20:17:55	SIG	M62/2050B4	50R	M62 J25 - J30	
02/09/15 20:17:55	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 20:17:55	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 20:17:55	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 20:19:45	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:19:46	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:19:51	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2065B1	REDX	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2074B1	REDX	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2074B2	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2074B3	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M62/2074B4	50R	M62 J25 - J30	
02/09/15 20:21:27	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 20:22:49	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:22:50	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:22:55	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:25:53	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:25:54	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:25:59	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:27:03	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 20:27:03	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 20:28:58	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:28:58	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:29:04	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:32:01	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:32:02	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:32:07	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:33:09	SIG	M621/1002A1	50R	M62 J25 - J30	
02/09/15 20:33:09	SIG	M621/1002A2	50R	M62 J25 - J30	
02/09/15 20:35:03	SIG	M62/2057A1	50R	M62 J25 - J30	
02/09/15 20:35:03	SIG	M62/2057A2	50R	M62 J25 - J30	
02/09/15 20:35:03	SIG	M62/2057J1	50R	M62 J25 - J30	
02/09/15 20:35:03	SIG	M621/1002A1	40R	M62 J25 - J30	
02/09/15 20:35:03	SIG	M621/1002A2	40R	M62 J25 - J30	
02/09/15 20:35:05	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:35:08	SIG	M62/2057A1	40R	M62 J25 - J30	
02/09/15 20:35:08	SIG	M62/2057A2	40R	M62 J25 - J30	
02/09/15 20:35:08	SIG	M62/2057J1	40R	M62 J25 - J30	
02/09/15 20:35:08	SIG	M621/1002A2	30R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2050A1	REDX	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2050A2	50R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2050A3	50R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2050A4	50R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2057A1	30R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2057A2	30R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2057A3	50R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2057J1	30R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2065A1	REDX	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2065A2	NR	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2065A3	NR	M62 J25 - J30	
02/09/15 20:35:13	SIG	M62/2065A4	NR	M62 J25 - J30	
02/09/15 20:35:13	SIG	M621/1002A1	40R	M62 J25 - J30	
02/09/15 20:35:13	SIG	M621/1002A2	20R	M62 J25 - J30	
02/09/15 20:35:14	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:35:19	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:35:25	SIG	M621/1002A2	STOP	M62 J25 - J30	
02/09/15 20:35:35	SIG	M62/2163A1	60R	M62 J25 - J30	
02/09/15 20:35:35	SIG	M62/2163A2	60R	M62 J25 - J30	
02/09/15 20:36:41	SIG	M62/2074B1	BLNK	M62 J25 - J30	
02/09/15 20:36:41	SIG	M62/2074B2	OFF	M62 J25 - J30	
02/09/15 20:36:41	SIG	M62/2074B3	OFF	M62 J25 - J30	
02/09/15 20:36:41	SIG	M62/2074B4	OFF	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2057B2	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2065B2	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2065B3	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2065B4	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2065M1	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2074B1	REDX	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2074B2	LDR	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2074B3	50R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2074B4	50R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2081B1	LDR	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2088B2	60R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2088B3	60R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M62/2088B4	60R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M621/1002B2	40R	M62 J25 - J30	
02/09/15 20:37:01	SIG	M621/1010B1	LDR	M62 J25 - J30	
02/09/15 20:37:01	SIG	M621/1010B2	50R	M62 J25 - J30	
02/09/15 20:37:06	SIG	M62/2057B2	30R	M62 J25 - J30	
02/09/15 20:37:06	SIG	M62/2065B2	30R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2057B1	STOP	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2057B2	20R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2057B3	40R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2057B4	40R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2065B1	STOP	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2065B2	20R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2065B3	40R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2065B4	40R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2065M1	40R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2069M1	50R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M62/2069M2	50R	M62 J25 - J30	
02/09/15 20:37:11	SIG	M621/1002B1	LDR	M62 J25 - J30	
02/09/15 20:37:11	SIG	M621/1002B2	40R	M62 J25 - J30	
02/09/15 20:37:17	SIG	M62/2065B1	STOP	M62 J25 - J30	
02/09/15 20:37:17	SIG	M62/2065B2	STOP	M62 J25 - J30	
02/09/15 20:37:22	SIG	M62/2057B1	STOP	M62 J25 - J30	
02/09/15 20:37:22	SIG	M62/2057B2	STOP	M62 J25 - J30	
02/09/15 20:37:49	SIG	M62/2166K1	60R	M62 J25 - J30	
02/09/15 20:37:49	SIG	M62/2166K2	60R	M62 J25 - J30	
02/09/15 20:37:49	SIG	M62/2170K1	50R	M62 J25 - J30	
02/09/15 20:37:49	SIG	M62/2170K2	50R	M62 J25 - J30	
02/09/15 20:38:09	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:38:09	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:38:09	SIG	M62/2170A1	60R	M62 J25 - J30	
02/09/15 20:38:09	SIG	M62/2170A2	60R	M62 J25 - J30	
02/09/15 20:38:09	SIG	M62/2170K1	60R	M62 J25 - J30	
02/09/15 20:38:09	SIG	M62/2170K2	60R	M62 J25 - J30	
02/09/15 20:38:15	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:38:30	SIG	M62/2170K1	50R	M62 J25 - J30	
02/09/15 20:38:30	SIG	M62/2170K2	50R	M62 J25 - J30	
02/09/15 20:38:30	SIG	M62/2183A2	40R	M62 J25 - J30	
02/09/15 20:38:30	SIG	M62/2183A3	40R	M62 J25 - J30	
02/09/15 20:38:30	SIG	M62/2183A4	40R	M62 J25 - J30	
02/09/15 20:38:35	SIG	M62/2170K1	40R	M62 J25 - J30	
02/09/15 20:38:35	SIG	M62/2170K2	40R	M62 J25 - J30	
02/09/15 20:38:35	SIG	M62/2183A3	30R	M62 J25 - J30	
02/09/15 20:38:35	SIG	M62/2183A4	30R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2166K1	50R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2166K2	50R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2170A1	50R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2170A2	LDL	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2170K1	30R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2170K2	30R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2177A3	LDL	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2177A4	LDL	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2183A2	40R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2183A3	20R	M62 J25 - J30	
02/09/15 20:38:41	SIG	M62/2183A4	20R	M62 J25 - J30	
02/09/15 20:38:46	SIG	M62/2183A3	STOP	M62 J25 - J30	
02/09/15 20:38:46	SIG	M62/2183A4	STOP	M62 J25 - J30	
02/09/15 20:41:19	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:41:20	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:41:25	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:42:36	SIG	M62/2157A1	60R	M62 J25 - J30	
02/09/15 20:42:36	SIG	M62/2157A2	60R	M62 J25 - J30	
02/09/15 20:42:36	SIG	M62/2157J1	60R	M62 J25 - J30	
02/09/15 20:42:36	SIG	M62/2157J2	60R	M62 J25 - J30	
02/09/15 20:42:36	SIG	M62/2157K1	60R	M62 J25 - J30	
02/09/15 20:43:19	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 20:43:19	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:43:19	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 20:45:01	SIG	M62/2033B2	40R	M62 J25 - J30	
02/09/15 20:45:01	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:45:01	SIG	M62/2033B4	40R	M62 J25 - J30	
02/09/15 20:45:03	SIG	M62/2050B2	LDR	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2033A1	REDX	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2033A2	60R	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2033A3	60R	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2033A4	60R	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2041A1	REDX	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2041A2	60R	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2041A3	60R	M62 J25 - J30	
02/09/15 20:45:36	SIG	M62/2041A4	60R	M62 J25 - J30	
02/09/15 20:45:47	SIG	M606/2003B1	LDR	M62 J25 - J30	
02/09/15 20:45:47	SIG	M606/2003B2	50R	M62 J25 - J30	
02/09/15 20:45:47	SIG	M62/2005M1	TI	M62 J25 - J30	
02/09/15 20:45:47	SIG	M62/2005M2	TI	M62 J25 - J30	
02/09/15 20:45:48	SIG	M62/1992B1	50R	M62 J25 - J30	
02/09/15 20:45:48	SIG	M62/1992B2	50R	M62 J25 - J30	
02/09/15 20:45:48	SIG	M62/1992B3	50R	M62 J25 - J30	
02/09/15 20:45:48	SIG	M62/1992B4	50R	M62 J25 - J30	
02/09/15 20:45:53	SIG	M62/1992B1	40R	M62 J25 - J30	
02/09/15 20:45:53	SIG	M62/1992B2	40R	M62 J25 - J30	
02/09/15 20:45:53	SIG	M62/1992B3	40R	M62 J25 - J30	
02/09/15 20:45:53	SIG	M62/1992B4	40R	M62 J25 - J30	
02/09/15 20:45:59	SIG	M62/1992B1	30R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1987B1	NR	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1987B2	NR	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1987B3	NR	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1987B4	NR	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1992B1	20R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1992B2	40R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1992B3	40R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1992B4	40R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1999B1	REDX	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1999B2	50R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1999B3	50R	M62 J25 - J30	
02/09/15 20:46:04	SIG	M62/1999B4	50R	M62 J25 - J30	
02/09/15 20:46:09	SIG	M62/1992B1	STOP	M62 J25 - J30	
02/09/15 20:47:20	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:47:21	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:47:26	SIG	M62/2033B3	40R	M62 J25 - J30	
02/09/15 20:49:01	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 20:49:01	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 20:49:01	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1981B1	NR	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1981B2	NR	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1981B3	NR	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1981B4	NR	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1987B1	LDR	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1987B2	50R	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1987B3	50R	M62 J25 - J30	
02/09/15 20:50:03	SIG	M62/1987B4	50R	M62 J25 - J30	
02/09/15 20:51:25	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 20:51:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2004B1	REDX	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2004B2	60R	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2004B3	60R	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2004B4	60R	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2012B2	60R	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2012B3	60R	M62 J25 - J30	
02/09/15 20:52:36	SIG	M62/2012B4	60R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2018B1	50R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2018B2	50R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2018B3	50R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2018L1	50R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 20:53:04	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M606/2003B1	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M606/2003B2	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1981B1	OFF	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1981B2	OFF	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1981B3	OFF	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1981B4	OFF	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1987B1	NR	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1987B2	NR	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1987B3	NR	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1987B4	NR	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1992B1	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1992B2	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1992B3	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1992B4	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1999B2	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1999B3	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/1999B4	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/2005M1	60R	M62 J25 - J30	
02/09/15 20:53:13	SIG	M62/2005M2	60R	M62 J25 - J30	
02/09/15 20:55:36	SIG	M62/2041B2	60R	M62 J25 - J30	
02/09/15 20:55:36	SIG	M62/2041B3	60R	M62 J25 - J30	
02/09/15 20:55:36	SIG	M62/2041B4	60R	M62 J25 - J30	
02/09/15 20:57:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 20:59:24	SIG	M62/2170L1	OFF	M62 J25 - J30	
02/09/15 20:59:24	SIG	M62/2170L2	OFF	M62 J25 - J30	
02/09/15 20:59:24	SIG	M62/2177B1	OFF	M62 J25 - J30	
02/09/15 20:59:24	SIG	M62/2177B2	OFF	M62 J25 - J30	
02/09/15 20:59:24	SIG	M62/2177L1	OFF	M62 J25 - J30	
02/09/15 20:59:24	SIG	M62/2177L2	OFF	M62 J25 - J30	
02/09/15 20:59:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 20:59:55	SIG	M62/2183B1	OFF	M62 J25 - J30	
02/09/15 20:59:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
02/09/15 20:59:55	SIG	M62/2183L2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1987B1	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1987B2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1987B3	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1987B4	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1992B1	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1992B2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1992B3	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1992B4	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1999B1	BLNK	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1999B2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1999B3	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/1999B4	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2004B1	BLNK	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2004B2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2004B3	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2004B4	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2005M1	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2005M2	OFF	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 21:01:36	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2050B2	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2057B1	REDX	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2057B2	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2057B3	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2057B4	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2065B1	REDX	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2081B1	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2081B2	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2081B3	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2081L1	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2088B1	BLNK	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2088B2	OFF	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2088B3	OFF	M62 J25 - J30	
02/09/15 21:02:09	SIG	M62/2088B4	OFF	M62 J25 - J30	
02/09/15 21:02:09	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 21:02:09	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 21:02:09	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M62/2050A2	60R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M62/2050A3	60R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M62/2050A4	60R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M62/2057A1	50R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M62/2057A2	50R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M62/2057J1	50R	M62 J25 - J30	
02/09/15 21:52:10	SIG	M621/1002A1	OFF	M62 J25 - J30	
02/09/15 21:52:10	SIG	M621/1002A2	OFF	M62 J25 - J30	
02/09/15 21:53:08	SIG	M606/2003B1	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M606/2003B2	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1987B1	NR	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1987B2	NR	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1987B3	NR	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1987B4	NR	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1992B1	LDR	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1992B2	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1992B3	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1992B4	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1999B1	REDX	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1999B2	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1999B3	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/1999B4	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/2005M1	50R	M62 J25 - J30	
02/09/15 21:53:08	SIG	M62/2005M2	50R	M62 J25 - J30	
02/09/15 21:57:15	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 21:57:15	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1987B1	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1987B2	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1987B3	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1987B4	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1992B1	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1992B2	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1992B3	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1992B4	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1999B2	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1999B3	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/1999B4	NR	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/2005M1	OFF	M62 J25 - J30	
02/09/15 21:57:15	SIG	M62/2005M2	OFF	M62 J25 - J30	
02/09/15 22:00:15	SIG	M62/1999B2	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1987B1	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1987B2	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1987B3	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1987B4	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1992B1	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1992B2	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1992B3	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1992B4	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1999B1	BLNK	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1999B3	OFF	M62 J25 - J30	
02/09/15 22:00:16	SIG	M62/1999B4	OFF	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2166K1	60R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2166K2	60R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2170A1	60R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2170A2	60R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2170K1	60R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2170K2	60R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2177A3	50R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2177A4	50R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2183A2	50R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2183A3	50R	M62 J25 - J30	
02/09/15 22:01:30	SIG	M62/2183A4	50R	M62 J25 - J30	
02/09/15 22:07:37	SIG	M62/2081B1	OFF	M62 J25 - J30	
02/09/15 22:07:37	SIG	M62/2081B2	OFF	M62 J25 - J30	
02/09/15 22:07:37	SIG	M62/2081B3	OFF	M62 J25 - J30	
02/09/15 22:07:37	SIG	M62/2081L1	OFF	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2081B1	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2081B2	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2081B3	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2081L1	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2088B1	REDX	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2088B2	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2088B3	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2088B4	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2097B1	REDX	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2097B2	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2097B3	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2097B4	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2106B1	REDX	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2106B2	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2106B3	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2106B4	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2113B1	REDX	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2113B2	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2113B3	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2113B4	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2117B1	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2117B3	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2120M1	50R	M62 J25 - J30	
02/09/15 22:30:06	SIG	M62/2120M2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2065A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2065A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2065A4	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2073K1	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2073K2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2074A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2074A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2074A4	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2079A1	REDX	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2079A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2079A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2079A4	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2088A1	REDX	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2088A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2088A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2088A4	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2097A1	REDX	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2097A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2097A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2097A4	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2106A1	REDX	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2106A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2106A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2106A4	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2114A1	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2114A2	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2114A3	50R	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2117A1	REDX	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2117A2	NR	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2117A3	NR	M62 J25 - J30	
02/09/15 22:31:03	SIG	M62/2117A4	NR	M62 J25 - J30	
02/09/15 22:31:13	SIG	M62/2074A3	???	M62 J25 - J30	
02/09/15 22:31:14	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 22:37:38	SIG	M62/2157A1	OFF	M62 J25 - J30	
02/09/15 22:37:38	SIG	M62/2157A2	OFF	M62 J25 - J30	
02/09/15 22:37:38	SIG	M62/2157J1	OFF	M62 J25 - J30	
02/09/15 22:37:38	SIG	M62/2157J2	OFF	M62 J25 - J30	
02/09/15 22:37:38	SIG	M62/2157K1	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2163A1	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2163A2	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2166K1	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2166K2	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2170A1	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2170A2	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2170K1	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2170K2	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2177A1	BLNK	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2177A2	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2177A3	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2177A4	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2183A1	BLNK	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2183A2	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2183A3	OFF	M62 J25 - J30	
02/09/15 22:38:38	SIG	M62/2183A4	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2065A2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2065A3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2065A4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2073K1	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2073K2	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2074A2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2074A3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2074A4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2079A1	BLNK	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2079A2	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2079A3	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2079A4	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2081B1	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2081B2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2081B3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2081L1	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2088A2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2088A3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2088A4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2088B2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2088B3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2088B4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2097A2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2097A3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2097A4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2097B2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2097B3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2097B4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2106A2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2106A3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2106A4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2106B2	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2106B3	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2106B4	NR	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2113B1	BLNK	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2113B2	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2113B3	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2113B4	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2114A1	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2114A2	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2114A3	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2117A1	BLNK	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2117A2	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2117A3	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2117A4	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2117B3	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2120M1	OFF	M62 J25 - J30	
02/09/15 22:40:59	SIG	M62/2120M2	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2033A2	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2033A3	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2033A4	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2041A2	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2041A3	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2041A4	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2050A2	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2050A3	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2050A4	NR	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2057A1	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2057A2	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2057A3	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2057J1	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065A1	BLNK	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065A2	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065A3	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065A4	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065B1	BLNK	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065B2	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065B3	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065B4	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2065M1	60R	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2069M1	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2069M2	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2074B1	BLNK	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2074B2	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2074B3	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M62/2074B4	OFF	M62 J25 - J30	
02/09/15 22:42:38	SIG	M621/1002B2	60R	M62 J25 - J30	
02/09/15 22:43:49	SIG	M606/2003B1	NR	M62 J25 - J30	
02/09/15 22:43:49	SIG	M606/2003B2	NR	M62 J25 - J30	
02/09/15 22:43:59	SIG	M62/2106A2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2074A1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2074A2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2074A3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2074A4	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2081B1	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2081B2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2081B3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2081L1	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088A1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088A2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088A3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088A4	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088B1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088B2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088B3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2088B4	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097A1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097A2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097A3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097A4	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097B1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097B2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097B3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2097B4	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106A1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106A4	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106B1	BLNK	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106B2	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106B3	OFF	M62 J25 - J30	
02/09/15 22:44:00	SIG	M62/2106B4	OFF	M62 J25 - J30	
02/09/15 22:44:01	SIG	M62/2074A1	BLNK	M62 J25 - J30	
02/09/15 22:44:01	SIG	M62/2088A1	BLNK	M62 J25 - J30	
02/09/15 22:44:01	SIG	M62/2088B1	BLNK	M62 J25 - J30	
02/09/15 22:44:01	SIG	M62/2106B1	BLNK	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2012B1	BLNK	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2012B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2012B3	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2012B4	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2018B1	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2018B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2018B3	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2018L1	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2025B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2025B3	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2025B4	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2033B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2033B4	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2050B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2050B3	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2050B4	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2057B1	BLNK	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2057B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2057B3	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2057B4	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M62/2065M1	NR	M62 J25 - J30	
02/09/15 22:45:38	SIG	M621/1002B1	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M621/1002B2	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 22:45:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2033A1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2033A1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2033A2	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2033A3	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2033A4	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2033B1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2041A1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2041A1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2041A2	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2041A3	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2041A4	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2050A1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2050A1	BLNK	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2050A2	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2050A3	OFF	M62 J25 - J30	
02/09/15 22:45:39	SIG	M62/2050A4	OFF	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2065B1	REDX	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2065B2	50R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2065B3	50R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2065B4	50R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2065M1	50R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2069M1	60R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2069M2	60R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2074B1	REDX	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2074B2	60R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2074B3	60R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M62/2074B4	60R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M621/1002B1	HSD	M62 J25 - J30	
02/09/15 22:46:38	SIG	M621/1002B2	50R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M621/1010B1	60R	M62 J25 - J30	
02/09/15 22:46:38	SIG	M621/1010B2	60R	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2065B2	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2065B3	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2065B4	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2065M1	NR	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2069M1	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2069M2	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2074B1	BLNK	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2074B2	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2074B3	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M62/2074B4	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M621/1002B1	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M621/1002B2	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
02/09/15 22:50:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
02/09/15 22:50:39	SIG	M62/2065B1	BLNK	M62 J25 - J30	
02/09/15 22:53:39	SIG	M62/2065M1	OFF	M62 J25 - J30	
02/09/15 22:53:56	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 22:53:56	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 22:53:56	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 22:56:57	SIG	M62/2041B1	BLNK	M62 J25 - J30	
02/09/15 22:56:57	SIG	M62/2041B2	OFF	M62 J25 - J30	
02/09/15 22:56:57	SIG	M62/2041B3	OFF	M62 J25 - J30	
02/09/15 22:56:57	SIG	M62/2041B4	OFF	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2012B1	REDX	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2012B2	NR	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2012B3	NR	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2012B4	NR	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2025B1	REDX	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2025B2	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2025B3	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2025B4	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2033B1	REDX	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2033B2	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2033B3	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2033B4	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2041B2	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2041B3	50R	M62 J25 - J30	
02/09/15 23:21:15	SIG	M62/2041B4	50R	M62 J25 - J30	
02/09/15 23:23:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 23:23:31	SIG	M62/2033B3	???	M62 J25 - J30	
02/09/15 23:29:16	SIG	M606/2003B1	OFF	M62 J25 - J30	
02/09/15 23:29:16	SIG	M606/2003B2	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2012B1	BLNK	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2012B2	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2012B3	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2012B4	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2025B2	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2025B3	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2025B4	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2033B2	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2033B4	OFF	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2041B2	NR	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2041B3	NR	M62 J25 - J30	
02/09/15 23:52:29	SIG	M62/2041B4	NR	M62 J25 - J30	
02/09/15 23:52:30	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 23:52:30	SIG	M62/2025B1	BLNK	M62 J25 - J30	
02/09/15 23:52:30	SIG	M62/2033B1	BLNK	M62 J25 - J30	
02/09/15 23:52:30	SIG	M62/2033B1	BLNK	M62 J25 - J30	
02/09/15 23:55:29	SIG	M62/2041B2	OFF	M62 J25 - J30	
02/09/15 23:55:30	SIG	M62/2041B1	BLNK	M62 J25 - J30	
02/09/15 23:55:30	SIG	M62/2041B3	OFF	M62 J25 - J30	
02/09/15 23:55:30	SIG	M62/2041B4	OFF	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2170L1	LDR	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 00:08:05	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 00:10:33	SIG	M62/2183B2	???	M62 J25 - J30	
03/09/15 00:10:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 00:40:22	SIG	M62/2170L1	OFF	M62 J25 - J30	
03/09/15 00:40:22	SIG	M62/2170L2	OFF	M62 J25 - J30	
03/09/15 00:40:22	SIG	M62/2177B1	OFF	M62 J25 - J30	
03/09/15 00:40:22	SIG	M62/2177B2	OFF	M62 J25 - J30	
03/09/15 00:40:22	SIG	M62/2177L1	OFF	M62 J25 - J30	
03/09/15 00:40:22	SIG	M62/2177L2	OFF	M62 J25 - J30	
03/09/15 00:40:37	SIG	M62/2183B1	OFF	M62 J25 - J30	
03/09/15 00:40:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 00:40:37	SIG	M62/2183L1	OFF	M62 J25 - J30	
03/09/15 00:40:37	SIG	M62/2183L2	OFF	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2057A1	50R	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2057A2	50R	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2057A3	50R	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2057J1	50R	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2065A1	REDX	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2065A2	NR	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2065A3	NR	M62 J25 - J30	
03/09/15 02:24:10	SIG	M62/2065A4	NR	M62 J25 - J30	
03/09/15 02:24:10	SIG	M621/1002A1	50R	M62 J25 - J30	
03/09/15 02:24:10	SIG	M621/1002A2	LDL	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2057A1	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2057A2	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2057A3	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2057J1	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2065A1	BLNK	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2065A2	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2065A3	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M62/2065A4	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M621/1002A1	OFF	M62 J25 - J30	
03/09/15 02:24:39	SIG	M621/1002A2	OFF	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2057A1	50R	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2057A2	50R	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2057A3	50R	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2057J1	50R	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2065A1	REDX	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2065A2	NR	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2065A3	NR	M62 J25 - J30	
03/09/15 02:25:01	SIG	M62/2065A4	NR	M62 J25 - J30	
03/09/15 02:25:01	SIG	M621/1002A1	50R	M62 J25 - J30	
03/09/15 02:25:01	SIG	M621/1002A2	LDL	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2074B1	REDX	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2074B2	LDR	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2081B1	60R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2081B2	60R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2081B3	60R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M62/2081L1	60R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 03:17:16	SIG	M621/1010B1	LDR	M62 J25 - J30	
03/09/15 03:17:16	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 03:17:21	SIG	M62/2057B2	40R	M62 J25 - J30	
03/09/15 03:17:21	SIG	M62/2057B3	40R	M62 J25 - J30	
03/09/15 03:17:21	SIG	M62/2057B4	40R	M62 J25 - J30	
03/09/15 03:17:21	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 03:17:21	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 03:17:27	SIG	M62/2057B2	30R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2057B1	STOP	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2057B2	20R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2057B3	40R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2057B4	40R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2065B1	REDX	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2065B2	LDR	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 03:17:32	SIG	M621/1002B1	LDR	M62 J25 - J30	
03/09/15 03:17:32	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 03:17:37	SIG	M62/2057B1	STOP	M62 J25 - J30	
03/09/15 03:17:37	SIG	M62/2057B2	STOP	M62 J25 - J30	
03/09/15 03:17:45	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 03:17:45	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 03:17:45	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 03:17:45	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2065B1	STOP	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2065B2	STOP	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2065B3	40R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2065B4	40R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2081B1	LDR	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2088B1	REDX	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 03:20:05	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 03:20:10	SIG	M62/2065B1	STOP	M62 J25 - J30	
03/09/15 03:20:10	SIG	M62/2065B2	STOP	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2074B1	BLNK	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2074B2	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2074B3	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2074B4	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2081B1	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2081B2	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2081B3	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2081L1	NR	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2088B2	NR	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2088B3	NR	M62 J25 - J30	
03/09/15 03:29:51	SIG	M62/2088B4	NR	M62 J25 - J30	
03/09/15 03:29:51	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 03:29:51	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2057B1	BLNK	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2057B2	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2057B3	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2057B4	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2065B1	BLNK	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2065B2	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2065B3	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2065B4	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2065M1	NR	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2069M1	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M62/2069M2	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M621/1002B1	OFF	M62 J25 - J30	
03/09/15 03:29:52	SIG	M621/1002B2	OFF	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2057B1	REDX	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2065B1	REDX	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2074B1	REDX	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2074B2	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 03:30:21	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 03:30:21	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 03:32:52	SIG	M62/2081L1	OFF	M62 J25 - J30	
03/09/15 03:32:52	SIG	M62/2088B1	BLNK	M62 J25 - J30	
03/09/15 03:32:52	SIG	M62/2088B2	OFF	M62 J25 - J30	
03/09/15 03:32:52	SIG	M62/2088B3	OFF	M62 J25 - J30	
03/09/15 03:32:52	SIG	M62/2088B4	OFF	M62 J25 - J30	
03/09/15 03:32:53	SIG	M62/2088B1	BLNK	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2057A1	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2057A2	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2057A3	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2057J1	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2065A1	BLNK	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2065A2	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2065A3	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M62/2065A4	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M621/1002A1	OFF	M62 J25 - J30	
03/09/15 03:49:33	SIG	M621/1002A2	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2057B1	BLNK	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2057B2	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2057B3	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2057B4	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2065B1	BLNK	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2065B2	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2065B3	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2065B4	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2065M1	NR	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2074B1	BLNK	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2074B2	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2074B3	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M62/2074B4	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M621/1002B1	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M621/1002B2	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 03:56:30	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 03:59:30	SIG	M62/2065M1	OFF	M62 J25 - J30	
03/09/15 03:59:31	SIG	M62/2041B1	BLNK	M62 J25 - J30	
03/09/15 03:59:31	SIG	M62/2041B2	OFF	M62 J25 - J30	
03/09/15 03:59:31	SIG	M62/2041B3	OFF	M62 J25 - J30	
03/09/15 03:59:31	SIG	M62/2041B4	OFF	M62 J25 - J30	
03/09/15 03:59:32	SIG	M62/2041B1	BLNK	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2170K1	50R	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2170K2	50R	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2183A2	50R	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2183A3	50R	M62 J25 - J30	
03/09/15 04:15:23	SIG	M62/2183A4	50R	M62 J25 - J30	
03/09/15 04:15:28	SIG	M62/2170K1	40R	M62 J25 - J30	
03/09/15 04:15:28	SIG	M62/2170K2	40R	M62 J25 - J30	
03/09/15 04:15:28	SIG	M62/2183A2	40R	M62 J25 - J30	
03/09/15 04:15:28	SIG	M62/2183A3	40R	M62 J25 - J30	
03/09/15 04:15:28	SIG	M62/2183A4	40R	M62 J25 - J30	
03/09/15 04:15:34	SIG	M62/2170K1	30R	M62 J25 - J30	
03/09/15 04:15:34	SIG	M62/2170K2	30R	M62 J25 - J30	
03/09/15 04:15:34	SIG	M62/2183A3	30R	M62 J25 - J30	
03/09/15 04:15:34	SIG	M62/2183A4	30R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2166K1	50R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2166K2	50R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2170A1	50R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2170A2	LDL	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2170K1	30R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2170K2	30R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2177A2	50R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2177A3	LDL	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2177A4	LDL	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2183A2	40R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2183A3	20R	M62 J25 - J30	
03/09/15 04:15:39	SIG	M62/2183A4	20R	M62 J25 - J30	
03/09/15 04:15:44	SIG	M62/2183A3	STOP	M62 J25 - J30	
03/09/15 04:15:44	SIG	M62/2183A4	STOP	M62 J25 - J30	
03/09/15 04:34:00	SIG	M62/2163A1	50R	M62 J25 - J30	
03/09/15 04:34:00	SIG	M62/2163A2	50R	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2166K1	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2166K2	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2170A1	NR	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2170A2	NR	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2170K1	NR	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2170K2	NR	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2177A2	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2177A3	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2177A4	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2183A1	BLNK	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2183A2	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2183A3	OFF	M62 J25 - J30	
03/09/15 05:06:08	SIG	M62/2183A4	OFF	M62 J25 - J30	
03/09/15 05:06:59	SIG	M62/2166K1	50R	M62 J25 - J30	
03/09/15 05:06:59	SIG	M62/2166K2	50R	M62 J25 - J30	
03/09/15 05:06:59	SIG	M62/2170K1	50R	M62 J25 - J30	
03/09/15 05:06:59	SIG	M62/2170K2	50R	M62 J25 - J30	
03/09/15 05:07:04	SIG	M62/2166K1	40R	M62 J25 - J30	
03/09/15 05:07:04	SIG	M62/2166K2	40R	M62 J25 - J30	
03/09/15 05:07:04	SIG	M62/2170K1	40R	M62 J25 - J30	
03/09/15 05:07:04	SIG	M62/2170K2	40R	M62 J25 - J30	
03/09/15 05:07:09	SIG	M62/2170K1	30R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2166K1	40R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2166K2	40R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2170A1	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2170A2	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2170K1	20R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2170K2	40R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2177A2	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2177A3	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2177A4	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2183A2	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2183A3	50R	M62 J25 - J30	
03/09/15 05:07:15	SIG	M62/2183A4	50R	M62 J25 - J30	
03/09/15 05:07:20	SIG	M62/2170K1	STOP	M62 J25 - J30	
03/09/15 05:15:45	SIG	M62/2157A1	60R	M62 J25 - J30	
03/09/15 05:15:45	SIG	M62/2157A2	60R	M62 J25 - J30	
03/09/15 05:15:45	SIG	M62/2157J1	60R	M62 J25 - J30	
03/09/15 05:15:45	SIG	M62/2157J2	60R	M62 J25 - J30	
03/09/15 05:15:45	SIG	M62/2157K1	60R	M62 J25 - J30	
03/09/15 05:32:06	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 05:32:06	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 05:32:07	SIG	M62/2170A1	60R	M62 J25 - J30	
03/09/15 05:32:07	SIG	M62/2170A2	60R	M62 J25 - J30	
03/09/15 05:32:20	SIG	M62/2166K1	60R	M62 J25 - J30	
03/09/15 05:32:20	SIG	M62/2166K2	60R	M62 J25 - J30	
03/09/15 05:32:20	SIG	M62/2170K1	60R	M62 J25 - J30	
03/09/15 05:32:20	SIG	M62/2170K2	60R	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2157A2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2157J1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2157J2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2157K1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2163A1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2163A2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2166K1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2166K2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2170A1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2170A2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2170K1	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2170K2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2177A2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2177A3	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2177A4	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2183A1	BLNK	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2183A2	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2183A3	OFF	M62 J25 - J30	
03/09/15 05:32:45	SIG	M62/2183A4	OFF	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2008K1	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2008K2	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2012A1	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2012A2	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2012A3	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2018A1	HSD	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2018A2	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2018A3	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2018A4	60R	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2025A1	REDX	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2025A2	NR	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2025A3	NR	M62 J25 - J30	
03/09/15 06:35:04	SIG	M62/2025A4	NR	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2012A1	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2018A1	HSD	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2025A2	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2025A3	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2025A4	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2033A1	REDX	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2033A2	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2033A3	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2033A4	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2041A1	REDX	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2041A2	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2041A3	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2041A4	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2050A1	REDX	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2050A2	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2050A3	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2050A4	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2057A1	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2057A2	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2057A3	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2057J1	60R	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2065A1	REDX	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2065A2	NR	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2065A3	NR	M62 J25 - J30	
03/09/15 06:35:05	SIG	M62/2065A4	NR	M62 J25 - J30	
03/09/15 06:36:08	SIG	M62/2050A1	60R	M62 J25 - J30	
03/09/15 06:36:29	SIG	M62/2041A1	60R	M62 J25 - J30	
03/09/15 06:36:50	SIG	M62/2033A1	60R	M62 J25 - J30	
03/09/15 06:36:54	SIG	M62/2018A1	60R	M62 J25 - J30	
03/09/15 06:36:54	SIG	M62/2025A1	60R	M62 J25 - J30	
03/09/15 06:39:45	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 06:39:46	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 06:43:33	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 06:57:47	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2065A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2065A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2065A4	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2073K1	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2073K2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2074A1	REDX	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2074A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2074A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2074A4	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A1	REDX	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A2	NR	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A3	NR	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A4	NR	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2079A4	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2088A1	REDX	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2088A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2088A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2088A4	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2097A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2097A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2097A4	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2106A1	REDX	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2106A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2106A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2106A4	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2114A1	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2114A2	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2114A3	60R	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 07:00:47	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 07:00:58	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:00:58	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:00:59	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:01:00	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:01:57	SIG	M62/2106A1	60R	M62 J25 - J30	
03/09/15 07:03:00	SIG	M62/2097A1	60R	M62 J25 - J30	
03/09/15 07:03:18	SIG	M62/2088A1	60R	M62 J25 - J30	
03/09/15 07:03:22	SIG	M62/2079A1	60R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2159B1	NR	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2159B2	NR	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 07:03:34	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2177B1	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2177B2	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2177L1	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2177L2	40R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:03:40	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 07:05:14	SIG	M62/2065M1	NR	M62 J25 - J30	
03/09/15 07:05:14	SIG	M62/2069M1	60R	M62 J25 - J30	
03/09/15 07:05:14	SIG	M62/2069M2	60R	M62 J25 - J30	
03/09/15 07:05:14	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 07:05:14	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2012B1	REDX	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2012B2	NR	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2012B3	NR	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2012B4	NR	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2025B1	REDX	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2033B1	REDX	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2050B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2050B2	NR	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2050B3	NR	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2050B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2050B4	NR	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2050B4	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2057B1	REDX	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2057B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2057B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2057B4	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2065B1	REDX	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2065B2	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2065B3	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2065B4	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2065M1	60R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 07:05:15	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 07:05:15	SIG	M621/1002B2	60R	M62 J25 - J30	
03/09/15 07:05:47	SIG	M62/2004A1	60R	M62 J25 - J30	
03/09/15 07:05:47	SIG	M62/2004A2	60R	M62 J25 - J30	
03/09/15 07:05:47	SIG	M62/2004A3	60R	M62 J25 - J30	
03/09/15 07:06:41	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 07:07:18	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 07:07:38	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 07:07:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:07:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:07:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:07:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:08:03	SIG	M62/2057B1	60R	M62 J25 - J30	
03/09/15 07:08:03	SIG	M621/1002B1	60R	M62 J25 - J30	
03/09/15 07:08:03	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 07:08:03	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 07:08:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:08:11	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:08:16	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2197B1	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2197B2	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2197B3	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2199M1	60R	M62 J25 - J30	
03/09/15 07:09:47	SIG	M62/2199M2	60R	M62 J25 - J30	
03/09/15 07:11:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:11:22	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:11:27	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:11:47	SIG	M62/2203B1	60R	M62 J25 - J30	
03/09/15 07:11:47	SIG	M62/2203B2	60R	M62 J25 - J30	
03/09/15 07:11:47	SIG	M62/2203B3	60R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2189B1	60R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2189B2	60R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2189B3	60R	M62 J25 - J30	
03/09/15 07:12:30	SIG	M62/2189B4	60R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2018A1	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2018A2	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2018A3	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2018A4	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2025A1	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2025A2	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2025A3	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2025A4	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2033A1	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2033A2	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2033A3	50R	M62 J25 - J30	
03/09/15 07:13:48	SIG	M62/2033A4	50R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 07:14:21	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 07:14:47	SIG	M62/2041A1	50R	M62 J25 - J30	
03/09/15 07:14:47	SIG	M62/2041A2	50R	M62 J25 - J30	
03/09/15 07:14:47	SIG	M62/2041A3	50R	M62 J25 - J30	
03/09/15 07:14:47	SIG	M62/2041A4	50R	M62 J25 - J30	
03/09/15 07:16:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:16:28	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:16:33	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:16:42	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 07:16:42	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 07:18:39	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 07:18:39	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 07:18:39	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 07:18:39	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 07:18:41	SIG	M62/2170K1	60R	M62 J25 - J30	
03/09/15 07:18:41	SIG	M62/2170K2	60R	M62 J25 - J30	
03/09/15 07:18:41	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 07:18:41	SIG	M62/2177A2	NR	M62 J25 - J30	
03/09/15 07:18:41	SIG	M62/2177A3	NR	M62 J25 - J30	
03/09/15 07:18:41	SIG	M62/2177A4	NR	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2170A1	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2170A2	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2177A2	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2177A3	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2177A4	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2183A2	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2183A3	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2183A4	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2189A1	REDX	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2189A2	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2189A3	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2189A4	60R	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2197A1	NR	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2197A2	NR	M62 J25 - J30	
03/09/15 07:18:42	SIG	M62/2197A3	NR	M62 J25 - J30	
03/09/15 07:19:33	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:19:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:19:38	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:19:42	SIG	M62/2189A1	60R	M62 J25 - J30	
03/09/15 07:19:47	SIG	M606/2003B1	NR	M62 J25 - J30	
03/09/15 07:19:47	SIG	M606/2003B2	NR	M62 J25 - J30	
03/09/15 07:19:47	SIG	M62/2008K1	50R	M62 J25 - J30	
03/09/15 07:19:47	SIG	M62/2008K2	50R	M62 J25 - J30	
03/09/15 07:19:47	SIG	M62/2012A1	50R	M62 J25 - J30	
03/09/15 07:19:47	SIG	M62/2012A2	50R	M62 J25 - J30	
03/09/15 07:19:47	SIG	M62/2012A3	50R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2189B1	40R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2189B2	40R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2189B3	40R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2189B4	40R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2194B1	50R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2194B2	50R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2194B3	50R	M62 J25 - J30	
03/09/15 07:19:50	SIG	M62/2194B4	50R	M62 J25 - J30	
03/09/15 07:20:03	SIG	M62/2183A1	60R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2155A1	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2155A2	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2155J1	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2155K1	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2157A1	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2157A2	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2157J1	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2157J2	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2157K1	50R	M62 J25 - J30	
03/09/15 07:20:07	SIG	M62/2177A1	60R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2155A1	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2155A2	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2155J1	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2155K1	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2157A1	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2157A2	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2157J1	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2157J2	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2157K1	40R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 07:20:12	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 07:20:27	SIG	M62/2177B1	60R	M62 J25 - J30	
03/09/15 07:20:27	SIG	M62/2177B2	60R	M62 J25 - J30	
03/09/15 07:20:27	SIG	M62/2177L1	60R	M62 J25 - J30	
03/09/15 07:20:27	SIG	M62/2177L2	60R	M62 J25 - J30	
03/09/15 07:22:39	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:22:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:22:45	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:23:20	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 07:23:20	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 07:23:20	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 07:23:20	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 07:23:26	SIG	M62/2177B1	40R	M62 J25 - J30	
03/09/15 07:23:26	SIG	M62/2177B2	40R	M62 J25 - J30	
03/09/15 07:23:26	SIG	M62/2177L1	40R	M62 J25 - J30	
03/09/15 07:23:26	SIG	M62/2177L2	40R	M62 J25 - J30	
03/09/15 07:23:28	SIG	M62/2113B1	REDX	M62 J25 - J30	
03/09/15 07:23:28	SIG	M62/2113B2	NR	M62 J25 - J30	
03/09/15 07:23:28	SIG	M62/2113B3	NR	M62 J25 - J30	
03/09/15 07:23:28	SIG	M62/2113B4	NR	M62 J25 - J30	
03/09/15 07:23:28	SIG	M62/2120M1	60R	M62 J25 - J30	
03/09/15 07:23:28	SIG	M62/2120M2	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2088B1	REDX	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2097B1	REDX	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2097B2	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2097B3	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2097B4	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2106B1	REDX	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2106B2	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2106B3	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2106B4	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2113B2	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2113B3	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2113B4	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2117B1	60R	M62 J25 - J30	
03/09/15 07:23:29	SIG	M62/2117B3	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2074B1	REDX	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2074B2	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2074B3	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2074B4	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2081B1	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2081B2	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2081B3	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2081L1	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 07:23:30	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2151A1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2151A2	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2151J1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2151K1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2155A1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2155A2	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2155J1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2155K1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2157A1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2157A2	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2157J1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2157J2	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2157K1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2163A1	OFF	M62 J25 - J30	
03/09/15 07:24:08	SIG	M62/2163A2	OFF	M62 J25 - J30	
03/09/15 07:24:33	SIG	M62/2088B1	60R	M62 J25 - J30	
03/09/15 07:24:51	SIG	M62/2097B1	60R	M62 J25 - J30	
03/09/15 07:25:15	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 07:25:15	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 07:25:15	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:25:15	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:25:17	SIG	M62/2106B1	60R	M62 J25 - J30	
03/09/15 07:25:21	SIG	M62/2113B1	60R	M62 J25 - J30	
03/09/15 07:25:21	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 07:25:21	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 07:25:21	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:25:21	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:25:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:25:45	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:25:47	SIG	M62/2050A1	50R	M62 J25 - J30	
03/09/15 07:25:47	SIG	M62/2050A2	50R	M62 J25 - J30	
03/09/15 07:25:47	SIG	M62/2050A3	50R	M62 J25 - J30	
03/09/15 07:25:47	SIG	M62/2050A4	50R	M62 J25 - J30	
03/09/15 07:25:50	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2189B1	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2189B2	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2189B3	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2189B4	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 07:25:51	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 07:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 07:27:09	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 07:27:48	SIG	M62/1999A1	60R	M62 J25 - J30	
03/09/15 07:27:48	SIG	M62/1999A2	60R	M62 J25 - J30	
03/09/15 07:27:48	SIG	M62/1999A3	60R	M62 J25 - J30	
03/09/15 07:27:48	SIG	M62/1999J1	50R	M62 J25 - J30	
03/09/15 07:27:48	SIG	M62/1999J2	50R	M62 J25 - J30	
03/09/15 07:29:48	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 07:29:48	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 07:29:48	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 07:29:48	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 07:29:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:29:53	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:29:58	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2189B1	40R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2189B2	40R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2189B3	40R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2189B4	40R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2194B1	50R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2194B2	50R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2194B3	50R	M62 J25 - J30	
03/09/15 07:30:56	SIG	M62/2194B4	50R	M62 J25 - J30	
03/09/15 07:31:47	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 07:31:47	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 07:31:47	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:31:47	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:31:52	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 07:31:52	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 07:31:52	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:31:52	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2155A1	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2155A2	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2155J1	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2155K1	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2157A1	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2157A2	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2157J1	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2157J2	50R	M62 J25 - J30	
03/09/15 07:32:16	SIG	M62/2157K1	50R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2155A1	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2155A2	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2155J1	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2155K1	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2157A1	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2157A2	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2157J1	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2157J2	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2157K1	40R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 07:32:22	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 07:32:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:32:59	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:33:04	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 07:34:54	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2189B1	40R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2189B2	40R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2189B3	40R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2189B4	40R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2194B1	50R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2194B2	50R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2194B3	50R	M62 J25 - J30	
03/09/15 07:35:28	SIG	M62/2194B4	50R	M62 J25 - J30	
03/09/15 07:36:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:36:05	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:36:10	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2151A1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2151A2	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2151J1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2151K1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2155A1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2155A2	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2155J1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2155K1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2157A1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2157A2	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2157J1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2157J2	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2157K1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2163A1	OFF	M62 J25 - J30	
03/09/15 07:39:03	SIG	M62/2163A2	OFF	M62 J25 - J30	
03/09/15 07:39:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:39:11	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:39:16	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2155A1	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2155A2	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2155J1	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2155K1	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2157A1	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2157A2	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2157J1	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2157J2	50R	M62 J25 - J30	
03/09/15 07:39:26	SIG	M62/2157K1	50R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 07:39:29	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2155A1	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2155A2	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2155J1	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2155K1	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2157A1	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2157A2	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2157J1	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2157J2	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2157K1	40R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 07:39:32	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2135A1	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2135A2	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2135A3	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2135A4	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2144A1	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2144A2	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2144J1	60R	M62 J25 - J30	
03/09/15 07:39:48	SIG	M62/2144K1	60R	M62 J25 - J30	
03/09/15 07:40:14	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 07:40:14	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 07:40:14	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 07:40:14	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 07:41:17	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 07:41:17	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 07:41:17	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 07:41:17	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 07:41:23	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 07:42:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:42:21	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:42:26	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M606/2003B1	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M606/2003B2	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/1999A1	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/1999A2	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/1999A3	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/1999J1	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/1999J2	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2004A1	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2004A2	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2004A3	OFF	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2008K1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2008K2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2012A1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2012A2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2012A3	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2018A1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2018A2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2018A3	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2018A4	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2025A1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2025A2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2025A3	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2025A4	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2033A1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2033A2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2033A3	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2033A4	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2041A1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2041A2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2041A3	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2041A4	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2050A1	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2050A2	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2050A3	60R	M62 J25 - J30	
03/09/15 07:42:48	SIG	M62/2050A4	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2151A1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2151A2	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2151J1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2151K1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2155A1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2155A2	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2155J1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2155K1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2157A1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2157A2	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2157J1	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2157J2	60R	M62 J25 - J30	
03/09/15 07:43:27	SIG	M62/2157K1	60R	M62 J25 - J30	
03/09/15 07:43:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:43:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:43:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:43:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:44:07	SIG	M62/2018B1	50R	M62 J25 - J30	
03/09/15 07:44:07	SIG	M62/2018B2	50R	M62 J25 - J30	
03/09/15 07:44:07	SIG	M62/2018B3	50R	M62 J25 - J30	
03/09/15 07:44:07	SIG	M62/2018L1	50R	M62 J25 - J30	
03/09/15 07:44:12	SIG	M62/2018B1	40R	M62 J25 - J30	
03/09/15 07:44:12	SIG	M62/2018B2	40R	M62 J25 - J30	
03/09/15 07:44:12	SIG	M62/2018B3	40R	M62 J25 - J30	
03/09/15 07:44:12	SIG	M62/2018L1	40R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2189B1	40R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2189B2	40R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2189B3	40R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2189B4	40R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2194B1	50R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2194B2	50R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2194B3	50R	M62 J25 - J30	
03/09/15 07:44:37	SIG	M62/2194B4	50R	M62 J25 - J30	
03/09/15 07:44:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:44:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:44:48	SIG	M62/2041B1	50R	M62 J25 - J30	
03/09/15 07:44:48	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 07:44:48	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 07:44:48	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 07:44:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:45:01	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 07:45:01	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 07:45:01	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:45:01	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:45:06	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 07:45:06	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 07:45:06	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:45:06	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:45:23	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:45:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:45:24	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 07:45:24	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 07:45:29	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:46:02	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 07:46:02	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 07:46:02	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 07:46:07	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 07:46:07	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 07:46:07	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 07:46:07	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/1999A1	60R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/1999A2	60R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/1999A3	60R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/1999J1	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/1999J2	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2004A1	60R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2004A2	60R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2004A3	60R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2018A1	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2018A2	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2018A3	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2018A4	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2025A1	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2025A2	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2025A3	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2025A4	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2033A1	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2033A2	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2033A3	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2033A4	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2041A1	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2041A2	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2041A3	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2041A4	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2050A1	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2050A2	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2050A3	50R	M62 J25 - J30	
03/09/15 07:46:48	SIG	M62/2050A4	50R	M62 J25 - J30	
03/09/15 07:48:07	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 07:48:07	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 07:48:07	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 07:48:07	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 07:48:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:48:29	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:48:34	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2189B1	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2189B2	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2189B3	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2189B4	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 07:48:36	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 07:48:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:48:41	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 07:48:46	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 07:49:01	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 07:49:01	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 07:49:01	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 07:49:01	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 07:49:29	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 07:49:30	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2155A1	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2155A2	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2155J1	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2155K1	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2157A1	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2157A2	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2157J1	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2157J2	50R	M62 J25 - J30	
03/09/15 07:49:50	SIG	M62/2157K1	50R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2155A1	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2155A2	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2155J1	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2155K1	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2157A1	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2157A2	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2157J1	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2157J2	40R	M62 J25 - J30	
03/09/15 07:49:55	SIG	M62/2157K1	40R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 07:50:02	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2177B1	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2177B2	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2177L1	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2177L2	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2183B1	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2183B2	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2183L1	60R	M62 J25 - J30	
03/09/15 07:50:37	SIG	M62/2183L2	60R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:51:15	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2177B1	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2177B2	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2177L1	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2177L2	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 07:51:20	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 07:51:48	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2018A1	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2018A2	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2018A3	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2018A4	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2025A1	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2025A2	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2025A3	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2025A4	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2033A1	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2033A2	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2033A3	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2033A4	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2041A1	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2041A2	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2041A3	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2041A4	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2050A1	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2050A2	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2050A3	60R	M62 J25 - J30	
03/09/15 07:52:48	SIG	M62/2050A4	60R	M62 J25 - J30	
03/09/15 07:53:38	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:53:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 07:53:44	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 07:54:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:54:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:54:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:54:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 07:55:37	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 07:55:38	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2189B1	60R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2189B2	60R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2189B3	60R	M62 J25 - J30	
03/09/15 07:56:13	SIG	M62/2189B4	60R	M62 J25 - J30	
03/09/15 07:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:56:32	SIG	M62/2074A3	60R	M62 J25 - J30	
03/09/15 07:56:42	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:56:42	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:56:43	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:56:43	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2177B1	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2177B2	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2177L1	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2177L2	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2183B1	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2183B2	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2183L1	60R	M62 J25 - J30	
03/09/15 07:57:37	SIG	M62/2183L2	60R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 07:58:13	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2177B1	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2177B2	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2177L1	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2177L2	40R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 07:58:18	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 08:00:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:00:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:00:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:00:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2177B1	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2177B2	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2177L1	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2177L2	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2183B1	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2183B2	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2183L1	60R	M62 J25 - J30	
03/09/15 08:02:13	SIG	M62/2183L2	60R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2144A1	50R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2144A2	50R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2144J1	50R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2144K1	50R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2151A1	40R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2151A2	40R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2151J1	40R	M62 J25 - J30	
03/09/15 08:02:17	SIG	M62/2151K1	40R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2117A2	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2117A3	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2117A4	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2122K1	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2122K2	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2124A1	REDX	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2124A2	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2124A3	60R	M62 J25 - J30	
03/09/15 08:04:48	SIG	M62/2124A4	60R	M62 J25 - J30	
03/09/15 08:05:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:05:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:05:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:05:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2144A1	60R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2144A2	60R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2144J1	60R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2144K1	60R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 08:06:31	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2144A1	50R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2144A2	50R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2144J1	50R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2144K1	50R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2151A1	40R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2151A2	40R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2151J1	40R	M62 J25 - J30	
03/09/15 08:06:53	SIG	M62/2151K1	40R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 08:07:10	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2177B1	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2177B2	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2177L1	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2177L2	40R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 08:07:15	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 08:07:34	SIG	M62/2124A3	OFF	M62 J25 - J30	
03/09/15 08:07:35	SIG	M62/2124A3	OFF	M62 J25 - J30	
03/09/15 08:07:35	SIG	M62/2124A3	OFF	M62 J25 - J30	
03/09/15 08:07:36	SIG	M62/2124A3	OFF	M62 J25 - J30	
03/09/15 08:07:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 08:10:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:10:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:10:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:10:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/1999A1	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/1999A2	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/1999A3	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/1999J1	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/1999J2	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/2004A1	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/2004A2	OFF	M62 J25 - J30	
03/09/15 08:10:48	SIG	M62/2004A3	OFF	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2144A1	60R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2144A2	60R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2144J1	60R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2144K1	60R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 08:10:52	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 08:11:10	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 08:11:10	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 08:11:10	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 08:11:10	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 08:11:19	SIG	M62/2057A1	50R	M62 J25 - J30	
03/09/15 08:11:19	SIG	M62/2057A2	50R	M62 J25 - J30	
03/09/15 08:11:19	SIG	M62/2057A3	50R	M62 J25 - J30	
03/09/15 08:11:19	SIG	M62/2057J1	50R	M62 J25 - J30	
03/09/15 08:11:19	SIG	M621/1002A1	50R	M62 J25 - J30	
03/09/15 08:11:19	SIG	M621/1002A2	50R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2050A1	50R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2050A2	50R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2050A3	50R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2050A4	50R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2057A1	40R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2057A2	40R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2057A3	40R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M62/2057J1	40R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M621/1002A1	40R	M62 J25 - J30	
03/09/15 08:11:25	SIG	M621/1002A2	40R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2144A1	50R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2144A2	50R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2144J1	50R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2144K1	50R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2151A1	40R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2151A2	40R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2151J1	40R	M62 J25 - J30	
03/09/15 08:13:23	SIG	M62/2151K1	40R	M62 J25 - J30	
03/09/15 08:14:29	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 08:14:29	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 08:14:29	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 08:14:29	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 08:14:34	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 08:14:34	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 08:14:34	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 08:14:34	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2050A1	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2050A2	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2050A3	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2050A4	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2057A1	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2057A2	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2057A3	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M62/2057J1	60R	M62 J25 - J30	
03/09/15 08:15:19	SIG	M621/1002A1	OFF	M62 J25 - J30	
03/09/15 08:15:19	SIG	M621/1002A2	OFF	M62 J25 - J30	
03/09/15 08:19:14	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 08:19:14	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 08:19:14	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 08:19:14	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2177B1	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2177B2	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2177L1	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2177L2	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2183B1	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2183B2	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2183L1	60R	M62 J25 - J30	
03/09/15 08:21:48	SIG	M62/2183L2	60R	M62 J25 - J30	
03/09/15 08:22:15	SIG	M62/2144A1	40R	M62 J25 - J30	
03/09/15 08:22:15	SIG	M62/2144A2	40R	M62 J25 - J30	
03/09/15 08:22:15	SIG	M62/2144J1	40R	M62 J25 - J30	
03/09/15 08:22:15	SIG	M62/2144K1	40R	M62 J25 - J30	
03/09/15 08:24:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:24:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:24:41	SIG	M62/2135A1	50R	M62 J25 - J30	
03/09/15 08:24:41	SIG	M62/2135A2	50R	M62 J25 - J30	
03/09/15 08:24:41	SIG	M62/2135A3	50R	M62 J25 - J30	
03/09/15 08:24:41	SIG	M62/2135A4	50R	M62 J25 - J30	
03/09/15 08:24:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:24:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:24:46	SIG	M62/2135A1	40R	M62 J25 - J30	
03/09/15 08:24:46	SIG	M62/2135A2	40R	M62 J25 - J30	
03/09/15 08:24:46	SIG	M62/2135A3	40R	M62 J25 - J30	
03/09/15 08:24:46	SIG	M62/2135A4	40R	M62 J25 - J30	
03/09/15 08:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 08:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 08:27:15	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2177B1	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2177B2	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2177L1	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2177L2	40R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 08:27:21	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2135A1	60R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2135A2	60R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2135A3	60R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2135A4	60R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2144A1	50R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2144A2	50R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2144J1	50R	M62 J25 - J30	
03/09/15 08:28:41	SIG	M62/2144K1	50R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 08:29:45	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 08:30:48	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2144A1	60R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2144A2	60R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2144J1	60R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2144K1	60R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 08:31:16	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 08:31:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:31:54	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:31:59	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2189B1	60R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2189B2	60R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2189B3	60R	M62 J25 - J30	
03/09/15 08:33:44	SIG	M62/2189B4	60R	M62 J25 - J30	
03/09/15 08:36:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:36:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:36:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:36:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:37:03	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 08:37:03	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 08:37:03	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2183B1	40R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2183L1	40R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2183L2	40R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 08:37:08	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 08:40:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:40:20	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:40:25	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2144A1	50R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2144A2	50R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2144J1	50R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2144K1	50R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2151A1	40R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2151A2	40R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2151J1	40R	M62 J25 - J30	
03/09/15 08:42:41	SIG	M62/2151K1	40R	M62 J25 - J30	
03/09/15 08:43:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:43:19	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:43:25	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:46:15	SIG	M62/2144A1	40R	M62 J25 - J30	
03/09/15 08:46:15	SIG	M62/2144A2	40R	M62 J25 - J30	
03/09/15 08:46:15	SIG	M62/2144J1	40R	M62 J25 - J30	
03/09/15 08:46:15	SIG	M62/2144K1	40R	M62 J25 - J30	
03/09/15 08:46:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:46:21	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:46:27	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2189B1	40R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2189B2	40R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2189B3	40R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2189B4	40R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2194B1	50R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2194B2	50R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2194B3	50R	M62 J25 - J30	
03/09/15 08:47:11	SIG	M62/2194B4	50R	M62 J25 - J30	
03/09/15 08:49:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:49:26	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:49:32	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:52:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:52:32	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:52:37	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:53:08	SIG	M62/2135A1	50R	M62 J25 - J30	
03/09/15 08:53:08	SIG	M62/2135A2	50R	M62 J25 - J30	
03/09/15 08:53:08	SIG	M62/2135A3	50R	M62 J25 - J30	
03/09/15 08:53:08	SIG	M62/2135A4	50R	M62 J25 - J30	
03/09/15 08:53:14	SIG	M62/2135A1	40R	M62 J25 - J30	
03/09/15 08:53:14	SIG	M62/2135A2	40R	M62 J25 - J30	
03/09/15 08:53:14	SIG	M62/2135A3	40R	M62 J25 - J30	
03/09/15 08:53:14	SIG	M62/2135A4	40R	M62 J25 - J30	
03/09/15 08:55:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:55:38	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:55:43	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 08:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 08:57:05	SIG	M62/2177A1	HSD	M62 J25 - J30	
03/09/15 08:57:08	SIG	M62/2135A1	60R	M62 J25 - J30	
03/09/15 08:57:08	SIG	M62/2135A2	60R	M62 J25 - J30	
03/09/15 08:57:08	SIG	M62/2135A3	60R	M62 J25 - J30	
03/09/15 08:57:08	SIG	M62/2135A4	60R	M62 J25 - J30	
03/09/15 08:57:50	SIG	M62/2183A1	HSD	M62 J25 - J30	
03/09/15 08:58:35	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 08:58:35	SIG	M62/2189A1	HSD	M62 J25 - J30	
03/09/15 08:58:43	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 08:58:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 08:58:49	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 08:59:35	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 09:00:35	SIG	M62/2163A1	NR	M62 J25 - J30	
03/09/15 09:00:35	SIG	M62/2163A2	NR	M62 J25 - J30	
03/09/15 09:00:35	SIG	M62/2189A1	REDX	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2170A1	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2170A2	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2170K1	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2170K2	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2177A2	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2177A3	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2177A4	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2183A2	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2183A3	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2183A4	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2189A2	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2189A3	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2189A4	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2197A1	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2197A2	NR	M62 J25 - J30	
03/09/15 09:00:36	SIG	M62/2197A3	NR	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2189B1	50R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2189B2	50R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2189B3	50R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2189B4	50R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 09:01:25	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 09:01:35	SIG	M62/2170K1	OFF	M62 J25 - J30	
03/09/15 09:01:35	SIG	M62/2170K2	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2170A1	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2170A2	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2177A2	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2177A3	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2177A4	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2183A1	BLNK	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2183A2	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2183A3	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2183A4	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2189A1	BLNK	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2189A2	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2189A3	OFF	M62 J25 - J30	
03/09/15 09:01:36	SIG	M62/2189A4	OFF	M62 J25 - J30	
03/09/15 09:01:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:01:50	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 09:01:55	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 09:03:36	SIG	M62/2197A1	OFF	M62 J25 - J30	
03/09/15 09:03:36	SIG	M62/2197A2	OFF	M62 J25 - J30	
03/09/15 09:03:36	SIG	M62/2197A3	OFF	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2189B1	40R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2189B2	40R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2189B3	40R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2189B4	40R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2194B1	50R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2194B2	50R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2194B3	50R	M62 J25 - J30	
03/09/15 09:03:42	SIG	M62/2194B4	50R	M62 J25 - J30	
03/09/15 09:04:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:04:56	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 09:05:01	SIG	M62/2183B2	40R	M62 J25 - J30	
03/09/15 09:05:49	SIG	M62/2144A1	50R	M62 J25 - J30	
03/09/15 09:05:49	SIG	M62/2144A2	50R	M62 J25 - J30	
03/09/15 09:05:49	SIG	M62/2144J1	50R	M62 J25 - J30	
03/09/15 09:05:49	SIG	M62/2144K1	50R	M62 J25 - J30	
03/09/15 09:06:07	SIG	M62/2144A1	40R	M62 J25 - J30	
03/09/15 09:06:07	SIG	M62/2144A2	40R	M62 J25 - J30	
03/09/15 09:06:07	SIG	M62/2144J1	40R	M62 J25 - J30	
03/09/15 09:06:07	SIG	M62/2144K1	40R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2183B1	50R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2183B2	50R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2183L1	50R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2183L2	50R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2189B1	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2189B2	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2189B3	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2189B4	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2194B1	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2194B2	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2194B3	60R	M62 J25 - J30	
03/09/15 09:07:45	SIG	M62/2194B4	60R	M62 J25 - J30	
03/09/15 09:09:45	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 09:09:45	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 09:09:45	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 09:09:45	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 09:10:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:10:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:10:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2144A1	60R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2144A2	60R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2144J1	60R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2144K1	60R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2151A1	50R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2151A2	50R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2151J1	50R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2151K1	50R	M62 J25 - J30	
03/09/15 09:10:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:10:18	SIG	M62/2170B1	50R	M62 J25 - J30	
03/09/15 09:10:18	SIG	M62/2170B2	50R	M62 J25 - J30	
03/09/15 09:10:18	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 09:10:18	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 09:10:23	SIG	M62/2170B1	40R	M62 J25 - J30	
03/09/15 09:10:23	SIG	M62/2170B2	40R	M62 J25 - J30	
03/09/15 09:10:23	SIG	M62/2170L1	40R	M62 J25 - J30	
03/09/15 09:10:23	SIG	M62/2170L2	40R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2177B1	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2177B2	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2177L1	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2177L2	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2183B1	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2183B2	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2183L1	60R	M62 J25 - J30	
03/09/15 09:15:25	SIG	M62/2183L2	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2151A1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2151A2	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2151J1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2151K1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2155A1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2155A2	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2155J1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2155K1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2157A1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2157A2	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2157J1	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2157J2	60R	M62 J25 - J30	
03/09/15 09:16:35	SIG	M62/2157K1	60R	M62 J25 - J30	
03/09/15 09:18:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:18:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:18:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:18:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2157A1	NR	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2157A2	NR	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2157J1	NR	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2157J2	NR	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2157K1	NR	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2163A1	OFF	M62 J25 - J30	
03/09/15 09:22:50	SIG	M62/2163A2	OFF	M62 J25 - J30	
03/09/15 09:23:49	SIG	M62/2122K1	OFF	M62 J25 - J30	
03/09/15 09:23:49	SIG	M62/2122K2	OFF	M62 J25 - J30	
03/09/15 09:23:49	SIG	M62/2124A2	NR	M62 J25 - J30	
03/09/15 09:23:49	SIG	M62/2124A3	NR	M62 J25 - J30	
03/09/15 09:23:49	SIG	M62/2124A4	NR	M62 J25 - J30	
03/09/15 09:23:50	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 09:23:50	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 09:23:50	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 09:24:50	SIG	M62/2203B1	OFF	M62 J25 - J30	
03/09/15 09:24:50	SIG	M62/2203B2	OFF	M62 J25 - J30	
03/09/15 09:24:50	SIG	M62/2203B3	OFF	M62 J25 - J30	
03/09/15 09:25:50	SIG	M62/2197B1	OFF	M62 J25 - J30	
03/09/15 09:25:50	SIG	M62/2197B2	OFF	M62 J25 - J30	
03/09/15 09:25:50	SIG	M62/2197B3	OFF	M62 J25 - J30	
03/09/15 09:25:50	SIG	M62/2199M1	OFF	M62 J25 - J30	
03/09/15 09:25:50	SIG	M62/2199M2	OFF	M62 J25 - J30	
03/09/15 09:26:20	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 09:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2124A1	BLNK	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2124A2	OFF	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2124A3	OFF	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2124A4	OFF	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2135A1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2135A2	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2135A3	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2135A4	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2144A1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2144A2	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2144J1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2144K1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2151A1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2151A2	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2151J1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2151K1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2155A1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2155A2	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2155J1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2155K1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2157A1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2157A2	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2157J1	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2157J2	NR	M62 J25 - J30	
03/09/15 09:26:50	SIG	M62/2157K1	NR	M62 J25 - J30	
03/09/15 09:27:50	SIG	M62/2159B1	NR	M62 J25 - J30	
03/09/15 09:27:50	SIG	M62/2159B2	NR	M62 J25 - J30	
03/09/15 09:27:50	SIG	M62/2170B1	NR	M62 J25 - J30	
03/09/15 09:27:50	SIG	M62/2170B2	NR	M62 J25 - J30	
03/09/15 09:27:50	SIG	M62/2170L1	OFF	M62 J25 - J30	
03/09/15 09:27:50	SIG	M62/2170L2	OFF	M62 J25 - J30	
03/09/15 09:29:50	SIG	M62/2144J1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2135A1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2135A2	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2135A3	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2135A4	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2144A1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2144A2	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2144K1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2151A1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2151A2	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2151J1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2151K1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2155A1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2155A2	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2155J1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2155K1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2157A2	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2157J1	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2157J2	OFF	M62 J25 - J30	
03/09/15 09:29:51	SIG	M62/2157K1	OFF	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2159B1	OFF	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2159B2	OFF	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2170B1	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2170B2	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2177B1	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2177B2	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2177L1	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2177L2	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2183B1	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2183B2	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2183L1	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2183L2	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2189B1	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2189B2	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2189B3	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2189B4	NR	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2194B1	OFF	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2194B2	OFF	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2194B3	OFF	M62 J25 - J30	
03/09/15 09:30:50	SIG	M62/2194B4	OFF	M62 J25 - J30	
03/09/15 09:33:50	SIG	M62/2189B1	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2170B1	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2170B2	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2177B1	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2177B2	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2177L1	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2177L2	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2183B1	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2183L1	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2183L2	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2189B2	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2189B3	OFF	M62 J25 - J30	
03/09/15 09:33:51	SIG	M62/2189B4	OFF	M62 J25 - J30	
03/09/15 09:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 09:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 09:58:19	SIG	M62/2113B1	HSD	M62 J25 - J30	
03/09/15 09:59:13	SIG	M62/2106B1	HSD	M62 J25 - J30	
03/09/15 10:00:21	SIG	M62/2097B1	HSD	M62 J25 - J30	
03/09/15 10:00:21	SIG	M62/2113B1	REDX	M62 J25 - J30	
03/09/15 10:01:29	SIG	M62/2088B1	HSD	M62 J25 - J30	
03/09/15 10:01:29	SIG	M62/2106B1	REDX	M62 J25 - J30	
03/09/15 10:02:37	SIG	M62/2097B1	REDX	M62 J25 - J30	
03/09/15 10:03:45	SIG	M62/2088B1	REDX	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2088B2	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2088B3	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2088B4	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2097B2	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2097B3	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2097B4	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2106B2	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2106B3	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2106B4	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2113B2	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2113B3	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2113B4	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2117B1	NR	M62 J25 - J30	
03/09/15 10:04:38	SIG	M62/2117B3	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2074B2	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2074B3	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2074B4	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2081B1	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2081B2	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2081B3	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2081L1	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2120M1	NR	M62 J25 - J30	
03/09/15 10:04:39	SIG	M62/2120M2	NR	M62 J25 - J30	
03/09/15 10:05:38	SIG	M62/2120M1	OFF	M62 J25 - J30	
03/09/15 10:05:38	SIG	M62/2120M2	OFF	M62 J25 - J30	
03/09/15 10:05:39	SIG	M62/2113B1	BLNK	M62 J25 - J30	
03/09/15 10:05:39	SIG	M62/2113B2	OFF	M62 J25 - J30	
03/09/15 10:05:39	SIG	M62/2113B3	OFF	M62 J25 - J30	
03/09/15 10:05:39	SIG	M62/2113B4	OFF	M62 J25 - J30	
03/09/15 10:05:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
03/09/15 10:05:39	SIG	M62/2117B3	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2074B1	BLNK	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2074B2	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2074B3	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2074B4	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2081B1	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2081B2	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2081B3	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2081L1	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2088B1	BLNK	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2088B2	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2088B3	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2088B4	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2097B1	BLNK	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2097B2	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2097B3	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2097B4	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2106B1	BLNK	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2106B2	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2106B3	OFF	M62 J25 - J30	
03/09/15 10:05:40	SIG	M62/2106B4	OFF	M62 J25 - J30	
03/09/15 10:21:38	SIG	M62/2079A1	HSD	M62 J25 - J30	
03/09/15 10:22:46	SIG	M62/2088A1	HSD	M62 J25 - J30	
03/09/15 10:23:54	SIG	M62/2079A1	REDX	M62 J25 - J30	
03/09/15 10:23:54	SIG	M62/2097A1	HSD	M62 J25 - J30	
03/09/15 10:25:02	SIG	M62/2088A1	REDX	M62 J25 - J30	
03/09/15 10:25:02	SIG	M62/2106A1	HSD	M62 J25 - J30	
03/09/15 10:26:10	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 10:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:26:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:26:32	SIG	M62/2074A3	60R	M62 J25 - J30	
03/09/15 10:26:42	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:26:42	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:26:43	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:26:43	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:27:18	SIG	M62/2106A1	REDX	M62 J25 - J30	
03/09/15 10:28:18	SIG	M62/2065A2	NR	M62 J25 - J30	
03/09/15 10:28:18	SIG	M62/2065A3	NR	M62 J25 - J30	
03/09/15 10:28:18	SIG	M62/2065A4	NR	M62 J25 - J30	
03/09/15 10:28:18	SIG	M62/2074A2	NR	M62 J25 - J30	
03/09/15 10:28:18	SIG	M62/2074A3	NR	M62 J25 - J30	
03/09/15 10:28:18	SIG	M62/2074A4	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2073K1	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2073K2	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2079A2	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2079A3	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2079A4	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2088A2	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2088A3	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2088A4	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2097A2	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2097A3	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2097A4	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2106A2	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2106A3	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2106A4	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 10:28:19	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 10:29:18	SIG	M62/2073K1	OFF	M62 J25 - J30	
03/09/15 10:29:18	SIG	M62/2073K2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2074A1	BLNK	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2074A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2074A4	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2079A1	BLNK	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2079A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2079A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2079A4	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2088A1	BLNK	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2088A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2088A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2088A4	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2097A1	BLNK	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2097A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2097A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2097A4	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2106A1	BLNK	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2106A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2106A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2106A4	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 10:29:19	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 10:42:10	SIG	M62/2057B1	HSD	M62 J25 - J30	
03/09/15 10:44:09	SIG	M62/2041B1	HSD	M62 J25 - J30	
03/09/15 10:44:09	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 10:44:09	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 10:44:10	SIG	M62/2057B1	REDX	M62 J25 - J30	
03/09/15 10:44:10	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 10:45:09	SIG	M62/2033B1	HSD	M62 J25 - J30	
03/09/15 10:46:09	SIG	M62/2025B1	HSD	M62 J25 - J30	
03/09/15 10:46:09	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 10:47:01	SIG	M62/2033B1	REDX	M62 J25 - J30	
03/09/15 10:47:45	SIG	M62/2025B1	REDX	M62 J25 - J30	
03/09/15 10:48:15	SIG	M62/2065B2	NR	M62 J25 - J30	
03/09/15 10:48:15	SIG	M62/2065B3	NR	M62 J25 - J30	
03/09/15 10:48:15	SIG	M62/2065B4	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2018B1	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2018B2	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2018B3	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2018L1	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2025B2	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2025B3	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2025B4	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2033B2	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2033B3	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2033B4	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2050B2	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2050B3	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2050B4	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2057B2	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2057B3	NR	M62 J25 - J30	
03/09/15 10:48:16	SIG	M62/2057B4	NR	M62 J25 - J30	
03/09/15 10:49:15	SIG	M62/2069M1	OFF	M62 J25 - J30	
03/09/15 10:49:15	SIG	M62/2069M2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2012B1	BLNK	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2012B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2012B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2012B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2018B1	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2018B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2018B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2018L1	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2025B1	BLNK	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2025B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2025B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2025B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2033B1	BLNK	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2033B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2033B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2041B1	BLNK	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2041B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2041B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2041B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2050B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2050B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2050B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2057B1	BLNK	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2057B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2057B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2057B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2065B1	BLNK	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2065B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2065B3	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2065B4	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M62/2065M1	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M621/1002B1	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M621/1002B2	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 10:49:16	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 10:54:00	SIG	M62/2177A1	OFF	M62 J25 - J30	
03/09/15 10:54:01	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2018A1	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2018A2	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2018A3	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2018A4	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2025A1	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2025A2	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2025A3	50R	M62 J25 - J30	
03/09/15 11:46:01	SIG	M62/2025A4	50R	M62 J25 - J30	
03/09/15 11:48:27	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 11:48:27	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2018A1	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2018A2	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2018A3	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2018A4	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2025A2	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2025A3	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2025A4	40R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2033A1	50R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2033A2	50R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2033A3	50R	M62 J25 - J30	
03/09/15 11:56:02	SIG	M62/2033A4	50R	M62 J25 - J30	
03/09/15 11:56:08	SIG	M62/2018A1	30R	M62 J25 - J30	
03/09/15 11:56:08	SIG	M62/2025A1	40R	M62 J25 - J30	
03/09/15 11:56:08	SIG	M62/2033A1	40R	M62 J25 - J30	
03/09/15 11:56:08	SIG	M62/2033A2	40R	M62 J25 - J30	
03/09/15 11:56:08	SIG	M62/2033A3	40R	M62 J25 - J30	
03/09/15 11:56:08	SIG	M62/2033A4	40R	M62 J25 - J30	
03/09/15 11:56:13	SIG	M62/2018A1	20R	M62 J25 - J30	
03/09/15 11:56:13	SIG	M62/2025A1	30R	M62 J25 - J30	
03/09/15 11:56:13	SIG	M62/2033A1	30R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M606/2003B1	NR	M62 J25 - J30	
03/09/15 11:56:18	SIG	M606/2003B2	NR	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2008K1	50R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2008K2	50R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2012A1	50R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2012A2	50R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2012A3	50R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2018A1	20R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2018A2	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2018A3	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2018A4	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2025A1	20R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2025A2	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2025A3	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2025A4	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2033A1	20R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2033A2	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2033A3	40R	M62 J25 - J30	
03/09/15 11:56:18	SIG	M62/2033A4	40R	M62 J25 - J30	
03/09/15 11:56:24	SIG	M62/2018A1	STOP	M62 J25 - J30	
03/09/15 11:56:24	SIG	M62/2025A1	STOP	M62 J25 - J30	
03/09/15 11:56:24	SIG	M62/2033A1	STOP	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/1999A1	60R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/1999A2	60R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/1999A3	60R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/1999J1	50R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/1999J2	50R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/2004A1	60R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/2004A2	60R	M62 J25 - J30	
03/09/15 11:57:52	SIG	M62/2004A3	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M606/2003B1	NR	M62 J25 - J30	
03/09/15 12:01:08	SIG	M606/2003B2	NR	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2008K1	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2008K2	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2012A1	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2012A2	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2012A3	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2018A1	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2018A2	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2018A3	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2018A4	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2025A1	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2025A2	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2025A3	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2025A4	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2033A1	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2033A2	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2033A3	60R	M62 J25 - J30	
03/09/15 12:01:08	SIG	M62/2033A4	60R	M62 J25 - J30	
03/09/15 12:03:53	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 12:03:54	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 12:04:08	SIG	M606/2003B1	OFF	M62 J25 - J30	
03/09/15 12:04:09	SIG	M606/2003B2	OFF	M62 J25 - J30	
03/09/15 12:06:52	SIG	M62/2004A1	OFF	M62 J25 - J30	
03/09/15 12:06:52	SIG	M62/2004A2	OFF	M62 J25 - J30	
03/09/15 12:06:52	SIG	M62/2004A3	OFF	M62 J25 - J30	
03/09/15 12:06:52	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 12:06:53	SIG	M62/1999A1	OFF	M62 J25 - J30	
03/09/15 12:06:53	SIG	M62/1999A2	OFF	M62 J25 - J30	
03/09/15 12:06:53	SIG	M62/1999A3	OFF	M62 J25 - J30	
03/09/15 12:06:53	SIG	M62/1999J1	OFF	M62 J25 - J30	
03/09/15 12:06:53	SIG	M62/1999J2	OFF	M62 J25 - J30	
03/09/15 12:10:21	SIG	M62/2170K1	60R	M62 J25 - J30	
03/09/15 12:10:21	SIG	M62/2170K2	60R	M62 J25 - J30	
03/09/15 12:10:21	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 12:10:21	SIG	M62/2177A2	NR	M62 J25 - J30	
03/09/15 12:10:21	SIG	M62/2177A3	NR	M62 J25 - J30	
03/09/15 12:10:21	SIG	M62/2177A4	NR	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2170A1	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2170A2	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2177A2	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2177A3	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2177A4	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2183A2	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2183A3	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2183A4	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2189A1	REDX	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2189A2	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2189A3	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2189A4	60R	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2197A1	NR	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2197A2	NR	M62 J25 - J30	
03/09/15 12:10:22	SIG	M62/2197A3	NR	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2170A1	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2170A2	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2170K1	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2170K2	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2177A2	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2177A3	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2177A4	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2183A1	BLNK	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2183A2	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2183A3	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2183A4	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2189A1	BLNK	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2189A2	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2189A3	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2189A4	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2197A1	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2197A2	OFF	M62 J25 - J30	
03/09/15 12:11:17	SIG	M62/2197A3	OFF	M62 J25 - J30	
03/09/15 12:31:18	SIG	M62/2025A1	HSD	M62 J25 - J30	
03/09/15 12:32:19	SIG	M62/2033A1	HSD	M62 J25 - J30	
03/09/15 12:33:18	SIG	M62/2041A1	HSD	M62 J25 - J30	
03/09/15 12:33:19	SIG	M62/2018A1	HSD	M62 J25 - J30	
03/09/15 12:33:19	SIG	M62/2025A1	REDX	M62 J25 - J30	
03/09/15 12:34:26	SIG	M62/2033A1	REDX	M62 J25 - J30	
03/09/15 12:34:26	SIG	M62/2050A1	HSD	M62 J25 - J30	
03/09/15 12:35:18	SIG	M62/2041A1	REDX	M62 J25 - J30	
03/09/15 12:36:18	SIG	M62/2050A1	REDX	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2025A2	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2025A3	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2025A4	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2033A2	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2033A3	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2033A4	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2041A2	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2041A3	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2041A4	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2050A2	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2050A3	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2050A4	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2057A1	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2057A2	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2057A3	NR	M62 J25 - J30	
03/09/15 12:37:18	SIG	M62/2057J1	NR	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2008K1	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2008K2	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2012A1	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2012A2	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2012A3	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2018A1	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2018A2	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2018A3	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2018A4	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2025A1	BLNK	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2025A2	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2025A3	OFF	M62 J25 - J30	
03/09/15 12:38:18	SIG	M62/2025A4	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2033A1	BLNK	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2033A2	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2033A3	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2033A4	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2041A1	BLNK	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2041A2	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2041A3	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2041A4	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2050A2	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2050A3	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2050A4	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2057A1	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2057A2	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2057A3	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2057J1	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2065A1	BLNK	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2065A2	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2065A3	OFF	M62 J25 - J30	
03/09/15 12:38:19	SIG	M62/2065A4	OFF	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2050B2	50R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2050B3	50R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2050B4	50R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2057B1	REDX	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M62/2065M1	60R	M62 J25 - J30	
03/09/15 14:06:27	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 14:06:27	SIG	M621/1002B2	60R	M62 J25 - J30	
03/09/15 14:06:28	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 14:06:28	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2065B1	REDX	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2065B2	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2065B3	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2065B4	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2069M1	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2069M2	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2074B1	REDX	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2074B2	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2074B3	60R	M62 J25 - J30	
03/09/15 14:15:55	SIG	M62/2074B4	60R	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2025B1	REDX	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2025B2	NR	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2025B3	NR	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2025B4	NR	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2033B1	REDX	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 14:16:25	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 14:17:34	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 14:17:34	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 14:17:34	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 14:17:34	SIG	M62/2041B2	40R	M62 J25 - J30	
03/09/15 14:17:34	SIG	M62/2041B3	40R	M62 J25 - J30	
03/09/15 14:17:34	SIG	M62/2041B4	40R	M62 J25 - J30	
03/09/15 14:20:12	SIG	M62/2050B2	40R	M62 J25 - J30	
03/09/15 14:20:12	SIG	M62/2050B3	40R	M62 J25 - J30	
03/09/15 14:20:12	SIG	M62/2050B4	40R	M62 J25 - J30	
03/09/15 14:20:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:20:31	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 14:20:36	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 14:21:35	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 14:21:35	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 14:21:35	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 14:21:35	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 14:21:35	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 14:21:35	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2057B2	40R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2057B3	40R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2057B4	40R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 14:21:42	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M62/2065B2	40R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M62/2065B3	40R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M62/2065B4	40R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M621/1010B1	50R	M62 J25 - J30	
03/09/15 14:23:31	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 14:24:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:24:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:24:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:24:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:25:56	SIG	M62/2050B2	50R	M62 J25 - J30	
03/09/15 14:25:56	SIG	M62/2050B3	50R	M62 J25 - J30	
03/09/15 14:25:56	SIG	M62/2050B4	50R	M62 J25 - J30	
03/09/15 14:27:15	SIG	M62/2069M1	40R	M62 J25 - J30	
03/09/15 14:27:15	SIG	M62/2069M2	40R	M62 J25 - J30	
03/09/15 14:27:16	SIG	M62/2074B2	50R	M62 J25 - J30	
03/09/15 14:27:16	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 14:27:16	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 14:27:16	SIG	M621/1010B1	40R	M62 J25 - J30	
03/09/15 14:27:16	SIG	M621/1010B2	40R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2074B2	40R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2074B3	40R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2074B4	40R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2081B1	50R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M621/1010B1	40R	M62 J25 - J30	
03/09/15 14:27:21	SIG	M621/1010B2	40R	M62 J25 - J30	
03/09/15 14:28:51	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 14:28:51	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 14:28:51	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2050B2	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2050B3	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2050B4	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2057B2	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2057B3	60R	M62 J25 - J30	
03/09/15 14:32:05	SIG	M62/2057B4	60R	M62 J25 - J30	
03/09/15 14:35:29	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 14:35:29	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 14:35:29	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 14:37:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:37:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2088B1	REDX	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2097B1	REDX	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2097B2	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2097B3	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2097B4	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2106B1	REDX	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2106B2	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2106B3	60R	M62 J25 - J30	
03/09/15 14:37:56	SIG	M62/2106B4	60R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2081B1	40R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2081B2	40R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2081B3	40R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2081L1	40R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 14:46:13	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 14:47:56	SIG	M62/2113B1	REDX	M62 J25 - J30	
03/09/15 14:47:56	SIG	M62/2113B2	60R	M62 J25 - J30	
03/09/15 14:47:56	SIG	M62/2113B3	60R	M62 J25 - J30	
03/09/15 14:47:56	SIG	M62/2113B4	60R	M62 J25 - J30	
03/09/15 14:48:06	SIG	M62/2088B2	40R	M62 J25 - J30	
03/09/15 14:48:06	SIG	M62/2088B3	40R	M62 J25 - J30	
03/09/15 14:48:06	SIG	M62/2088B4	40R	M62 J25 - J30	
03/09/15 14:48:55	SIG	M62/2097B2	50R	M62 J25 - J30	
03/09/15 14:48:55	SIG	M62/2097B3	50R	M62 J25 - J30	
03/09/15 14:48:55	SIG	M62/2097B4	50R	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2025B2	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2025B3	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2025B4	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2033B2	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2033B3	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2033B4	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 14:51:55	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2081B1	50R	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 14:52:06	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 14:53:56	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 14:53:56	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 14:53:56	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2025B1	BLNK	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2025B2	OFF	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2025B3	OFF	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2025B4	OFF	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2033B1	BLNK	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2033B2	OFF	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 14:54:56	SIG	M62/2033B4	OFF	M62 J25 - J30	
03/09/15 14:54:57	SIG	M62/2025B1	BLNK	M62 J25 - J30	
03/09/15 14:55:28	SIG	M62/2081B1	40R	M62 J25 - J30	
03/09/15 14:55:28	SIG	M62/2081B2	40R	M62 J25 - J30	
03/09/15 14:55:28	SIG	M62/2081B3	40R	M62 J25 - J30	
03/09/15 14:55:28	SIG	M62/2081L1	40R	M62 J25 - J30	
03/09/15 15:01:53	SIG	M62/2088B2	40R	M62 J25 - J30	
03/09/15 15:01:53	SIG	M62/2088B3	40R	M62 J25 - J30	
03/09/15 15:01:53	SIG	M62/2088B4	40R	M62 J25 - J30	
03/09/15 15:03:56	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 15:03:56	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 15:03:56	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 15:05:56	SIG	M62/2117B1	60R	M62 J25 - J30	
03/09/15 15:05:56	SIG	M62/2117B3	60R	M62 J25 - J30	
03/09/15 15:05:56	SIG	M62/2120M1	60R	M62 J25 - J30	
03/09/15 15:05:56	SIG	M62/2120M2	60R	M62 J25 - J30	
03/09/15 15:06:24	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 15:06:24	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 15:06:24	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2012B1	REDX	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2012B2	NR	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2012B3	NR	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2012B4	NR	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2025B1	REDX	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B1	REDX	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B2	NR	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B3	NR	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2033B4	NR	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 15:06:30	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 15:08:00	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 15:08:00	SIG	M62/2088B2	40R	M62 J25 - J30	
03/09/15 15:08:00	SIG	M62/2088B3	40R	M62 J25 - J30	
03/09/15 15:08:00	SIG	M62/2088B4	40R	M62 J25 - J30	
03/09/15 15:08:24	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 15:08:43	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 15:09:05	SIG	M621/1002B1	50R	M62 J25 - J30	
03/09/15 15:09:10	SIG	M62/2057B1	50R	M62 J25 - J30	
03/09/15 15:09:10	SIG	M621/1002B1	40R	M62 J25 - J30	
03/09/15 15:09:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 15:09:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 15:09:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 15:09:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 15:13:56	SIG	M62/2125B1	60R	M62 J25 - J30	
03/09/15 15:13:56	SIG	M62/2125B2	60R	M62 J25 - J30	
03/09/15 15:13:56	SIG	M62/2125B3	60R	M62 J25 - J30	
03/09/15 15:13:56	SIG	M62/2125L1	60R	M62 J25 - J30	
03/09/15 15:13:56	SIG	M62/2125L2	60R	M62 J25 - J30	
03/09/15 15:15:25	SIG	M62/2097B2	40R	M62 J25 - J30	
03/09/15 15:15:25	SIG	M62/2097B3	40R	M62 J25 - J30	
03/09/15 15:15:25	SIG	M62/2097B4	40R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M621/1002B1	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M621/1010B1	50R	M62 J25 - J30	
03/09/15 15:17:54	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 15:17:55	SIG	M621/1010B1	40R	M62 J25 - J30	
03/09/15 15:17:55	SIG	M621/1010B2	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M62/2065B2	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M62/2065B3	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M62/2065B4	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M62/2069M1	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M62/2069M2	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M621/1002B1	40R	M62 J25 - J30	
03/09/15 15:17:56	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2081B1	50R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 15:19:25	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 15:19:27	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 15:19:27	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 15:19:27	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 15:19:27	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 15:19:27	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 15:19:27	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2113B2	40R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2113B3	40R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2113B4	40R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2117B1	50R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2117B3	50R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2120M1	50R	M62 J25 - J30	
03/09/15 15:19:33	SIG	M62/2120M2	50R	M62 J25 - J30	
03/09/15 15:19:56	SIG	M62/2057B1	60R	M62 J25 - J30	
03/09/15 15:19:56	SIG	M62/2057B2	60R	M62 J25 - J30	
03/09/15 15:19:56	SIG	M62/2057B3	60R	M62 J25 - J30	
03/09/15 15:19:56	SIG	M62/2057B4	60R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2081B1	40R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2081B2	40R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2081B3	40R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2081L1	40R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2088B2	40R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2088B3	40R	M62 J25 - J30	
03/09/15 15:20:13	SIG	M62/2088B4	40R	M62 J25 - J30	
03/09/15 15:21:01	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 15:21:01	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 15:21:01	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 15:21:01	SIG	M62/2097B2	50R	M62 J25 - J30	
03/09/15 15:21:01	SIG	M62/2097B3	50R	M62 J25 - J30	
03/09/15 15:21:01	SIG	M62/2097B4	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M621/1002B1	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M621/1010B1	50R	M62 J25 - J30	
03/09/15 15:21:56	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2113B2	60R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2113B3	60R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2113B4	60R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2117B1	60R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2117B3	60R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2120M1	60R	M62 J25 - J30	
03/09/15 15:23:27	SIG	M62/2120M2	60R	M62 J25 - J30	
03/09/15 15:23:57	SIG	M62/2074B2	50R	M62 J25 - J30	
03/09/15 15:23:57	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 15:23:57	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 15:24:13	SIG	M62/2081B1	50R	M62 J25 - J30	
03/09/15 15:24:13	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 15:24:13	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 15:24:13	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 15:26:56	SIG	M62/2106B2	60R	M62 J25 - J30	
03/09/15 15:26:56	SIG	M62/2106B3	60R	M62 J25 - J30	
03/09/15 15:26:56	SIG	M62/2106B4	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2008K1	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2008K2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2012A1	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2012A1	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2012A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2012A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2018A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2018A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2018A4	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A1	REDX	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A2	NR	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A3	NR	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A4	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2025A4	NR	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2033A1	REDX	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2033A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2033A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2033A4	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2041A1	REDX	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2041A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2041A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2041A4	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2050A1	REDX	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2050A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2050A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2050A4	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2057A1	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2057A2	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2057A3	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2057J1	60R	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2065A1	REDX	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2065A2	NR	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2065A3	NR	M62 J25 - J30	
03/09/15 15:28:21	SIG	M62/2065A4	NR	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2081B1	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2081B2	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2081B3	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2081L1	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2097B2	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2097B3	60R	M62 J25 - J30	
03/09/15 15:28:56	SIG	M62/2097B4	60R	M62 J25 - J30	
03/09/15 15:29:43	SIG	M62/2050A1	60R	M62 J25 - J30	
03/09/15 15:30:03	SIG	M62/2041A1	60R	M62 J25 - J30	
03/09/15 15:30:24	SIG	M62/2033A1	60R	M62 J25 - J30	
03/09/15 15:30:27	SIG	M62/2018A1	60R	M62 J25 - J30	
03/09/15 15:30:27	SIG	M62/2025A1	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M62/2069M1	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M62/2069M2	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M62/2074B2	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M62/2074B3	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M62/2074B4	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 15:32:56	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 15:33:13	SIG	M62/2025A1	???	M62 J25 - J30	
03/09/15 15:33:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
03/09/15 15:33:56	SIG	M62/2065B2	60R	M62 J25 - J30	
03/09/15 15:33:56	SIG	M62/2065B3	60R	M62 J25 - J30	
03/09/15 15:33:56	SIG	M62/2065B4	60R	M62 J25 - J30	
03/09/15 15:33:56	SIG	M62/2065M1	60R	M62 J25 - J30	
03/09/15 15:33:56	SIG	M621/1002B1	60R	M62 J25 - J30	
03/09/15 15:33:56	SIG	M621/1002B2	60R	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2113B1	BLNK	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2113B2	OFF	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2113B3	OFF	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2113B4	OFF	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2117B3	OFF	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2120M1	OFF	M62 J25 - J30	
03/09/15 15:40:56	SIG	M62/2120M2	OFF	M62 J25 - J30	
03/09/15 15:40:57	SIG	M62/2125B1	OFF	M62 J25 - J30	
03/09/15 15:40:57	SIG	M62/2125B2	OFF	M62 J25 - J30	
03/09/15 15:40:57	SIG	M62/2125B3	OFF	M62 J25 - J30	
03/09/15 15:40:57	SIG	M62/2125L1	NR	M62 J25 - J30	
03/09/15 15:40:57	SIG	M62/2125L2	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2088B2	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2088B3	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2088B4	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2097B2	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2097B3	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2097B4	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2106B2	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2106B3	NR	M62 J25 - J30	
03/09/15 15:42:56	SIG	M62/2106B4	NR	M62 J25 - J30	
03/09/15 15:43:57	SIG	M62/2125L1	OFF	M62 J25 - J30	
03/09/15 15:43:57	SIG	M62/2125L2	OFF	M62 J25 - J30	
03/09/15 15:45:56	SIG	M62/2097B2	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2088B1	BLNK	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2088B2	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2088B3	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2088B4	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2097B1	BLNK	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2097B3	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2097B4	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2106B1	BLNK	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2106B1	BLNK	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2106B2	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2106B3	OFF	M62 J25 - J30	
03/09/15 15:45:57	SIG	M62/2106B4	OFF	M62 J25 - J30	
03/09/15 15:46:57	SIG	M62/2081B1	OFF	M62 J25 - J30	
03/09/15 15:46:57	SIG	M62/2081B2	OFF	M62 J25 - J30	
03/09/15 15:46:57	SIG	M62/2081B3	OFF	M62 J25 - J30	
03/09/15 15:46:57	SIG	M62/2081L1	OFF	M62 J25 - J30	
03/09/15 16:02:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2018B1	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2018B2	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2018B3	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2018L1	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2041B1	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 16:06:23	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2018B1	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2018B2	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2018B3	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2018L1	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 16:08:20	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 16:08:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:08:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:08:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:08:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:11:10	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 16:11:10	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 16:11:10	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 16:11:16	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 16:11:16	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 16:11:16	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:11:16	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 16:13:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:13:54	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:14:00	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:14:55	SIG	M62/2041B1	40R	M62 J25 - J30	
03/09/15 16:14:55	SIG	M62/2041B2	40R	M62 J25 - J30	
03/09/15 16:14:55	SIG	M62/2041B3	40R	M62 J25 - J30	
03/09/15 16:14:55	SIG	M62/2041B4	40R	M62 J25 - J30	
03/09/15 16:16:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:16:58	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:17:03	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2050B2	50R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2050B3	50R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2050B4	50R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2081B1	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2081B2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2081B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2081L1	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2088B1	REDX	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2097B1	REDX	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2097B2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2097B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2097B4	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2106B1	REDX	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2106B2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2106B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2106B4	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2113B1	REDX	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2113B2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2113B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2113B4	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2117B1	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2117B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2120M1	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2120M2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2125B1	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2125B2	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2125B3	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2125L1	60R	M62 J25 - J30	
03/09/15 16:18:57	SIG	M62/2125L2	60R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2050B2	40R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2050B3	40R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2050B4	40R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2057B1	50R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 16:19:32	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 16:20:02	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:20:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:20:08	SIG	M62/1956A1	NR	M62 J25 - J30	
03/09/15 16:20:08	SIG	M62/1956A2	NR	M62 J25 - J30	
03/09/15 16:20:08	SIG	M62/1956A3	NR	M62 J25 - J30	
03/09/15 16:20:08	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:20:35	SIG	M62/2018B1	50R	M62 J25 - J30	
03/09/15 16:20:35	SIG	M62/2018B2	50R	M62 J25 - J30	
03/09/15 16:20:35	SIG	M62/2018B3	50R	M62 J25 - J30	
03/09/15 16:20:35	SIG	M62/2018L1	50R	M62 J25 - J30	
03/09/15 16:20:57	SIG	M62/2132B1	60R	M62 J25 - J30	
03/09/15 16:20:57	SIG	M62/2132B2	60R	M62 J25 - J30	
03/09/15 16:20:57	SIG	M62/2132B3	60R	M62 J25 - J30	
03/09/15 16:21:02	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 16:21:02	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 16:21:02	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 16:21:02	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 16:21:30	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 16:21:30	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 16:21:30	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 16:21:30	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 16:21:30	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 16:21:30	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2113B2	40R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2113B3	40R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2113B4	40R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2117B1	50R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2117B3	50R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2120M1	50R	M62 J25 - J30	
03/09/15 16:21:36	SIG	M62/2120M2	50R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2057B1	40R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2057B2	40R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2057B3	40R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2057B4	40R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M621/1002B1	50R	M62 J25 - J30	
03/09/15 16:22:10	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 16:23:05	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:23:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:23:11	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2117B1	40R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2117B3	40R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2120M1	40R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2120M2	40R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2125B1	50R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2125B2	50R	M62 J25 - J30	
03/09/15 16:23:30	SIG	M62/2125B3	50R	M62 J25 - J30	
03/09/15 16:23:31	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 16:23:31	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 16:23:31	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:23:31	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M62/2065B2	40R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M62/2065B3	40R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M62/2065B4	40R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M621/1002B1	40R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M621/1010B1	50R	M62 J25 - J30	
03/09/15 16:23:41	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 16:23:58	SIG	M62/2125B1	40R	M62 J25 - J30	
03/09/15 16:23:58	SIG	M62/2125B2	40R	M62 J25 - J30	
03/09/15 16:23:58	SIG	M62/2125B3	40R	M62 J25 - J30	
03/09/15 16:23:58	SIG	M62/2125L1	50R	M62 J25 - J30	
03/09/15 16:23:58	SIG	M62/2125L2	50R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2125B1	40R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2125B2	40R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2125B3	40R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2125L1	40R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2125L2	40R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 16:24:03	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 16:24:57	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 16:24:57	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 16:24:57	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 16:24:57	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M62/2069M1	40R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M62/2069M2	40R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M62/2074B2	50R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M621/1010B1	40R	M62 J25 - J30	
03/09/15 16:25:17	SIG	M621/1010B2	40R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2074B2	40R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2074B3	40R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2074B4	40R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2081B1	50R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M621/1010B1	40R	M62 J25 - J30	
03/09/15 16:25:22	SIG	M621/1010B2	40R	M62 J25 - J30	
03/09/15 16:25:31	SIG	M62/2106B2	60R	M62 J25 - J30	
03/09/15 16:25:31	SIG	M62/2106B3	60R	M62 J25 - J30	
03/09/15 16:25:31	SIG	M62/2106B4	60R	M62 J25 - J30	
03/09/15 16:25:55	SIG	M62/1956A1	50R	M62 J25 - J30	
03/09/15 16:25:55	SIG	M62/1956A2	50R	M62 J25 - J30	
03/09/15 16:25:55	SIG	M62/1956A3	50R	M62 J25 - J30	
03/09/15 16:26:01	SIG	M62/1956A1	40R	M62 J25 - J30	
03/09/15 16:26:01	SIG	M62/1956A2	40R	M62 J25 - J30	
03/09/15 16:26:01	SIG	M62/1956A3	40R	M62 J25 - J30	
03/09/15 16:26:01	SIG	M62/1960A1	NR	M62 J25 - J30	
03/09/15 16:26:01	SIG	M62/1960A2	NR	M62 J25 - J30	
03/09/15 16:26:01	SIG	M62/1960A3	NR	M62 J25 - J30	
03/09/15 16:26:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:26:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:26:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:26:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:26:12	SIG	M62/2113B2	60R	M62 J25 - J30	
03/09/15 16:26:12	SIG	M62/2113B3	60R	M62 J25 - J30	
03/09/15 16:26:12	SIG	M62/2113B4	60R	M62 J25 - J30	
03/09/15 16:26:15	SIG	M62/2041B1	50R	M62 J25 - J30	
03/09/15 16:26:15	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 16:26:15	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 16:26:15	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 16:27:17	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 16:27:17	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 16:27:17	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 16:27:17	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2117B1	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2117B3	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2120M1	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2120M2	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2137B1	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2137B2	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2137B3	60R	M62 J25 - J30	
03/09/15 16:27:57	SIG	M62/2137B4	60R	M62 J25 - J30	
03/09/15 16:28:20	SIG	M62/2050B2	50R	M62 J25 - J30	
03/09/15 16:28:20	SIG	M62/2050B3	50R	M62 J25 - J30	
03/09/15 16:28:20	SIG	M62/2050B4	50R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2132B1	40R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2132B2	40R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2132B3	40R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 16:28:24	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 16:28:35	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 16:28:35	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 16:28:35	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 16:28:41	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 16:28:41	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 16:28:41	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:28:41	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2081B1	40R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2081B2	40R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2081B3	40R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2081L1	40R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 16:28:53	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2147B1	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2147B2	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2147B3	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2147B4	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2159B1	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2159B2	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2159M1	60R	M62 J25 - J30	
03/09/15 16:28:57	SIG	M62/2159M2	60R	M62 J25 - J30	
03/09/15 16:30:56	SIG	M62/2088B2	40R	M62 J25 - J30	
03/09/15 16:30:56	SIG	M62/2088B3	40R	M62 J25 - J30	
03/09/15 16:30:56	SIG	M62/2088B4	40R	M62 J25 - J30	
03/09/15 16:31:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:31:24	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:31:26	SIG	M62/2125B1	60R	M62 J25 - J30	
03/09/15 16:31:26	SIG	M62/2125B2	60R	M62 J25 - J30	
03/09/15 16:31:26	SIG	M62/2125B3	60R	M62 J25 - J30	
03/09/15 16:31:26	SIG	M62/2125L1	60R	M62 J25 - J30	
03/09/15 16:31:26	SIG	M62/2125L2	60R	M62 J25 - J30	
03/09/15 16:31:29	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 16:31:40	SIG	M62/2057B1	50R	M62 J25 - J30	
03/09/15 16:31:40	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 16:31:40	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 16:31:40	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 16:31:50	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 16:31:50	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 16:31:50	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 16:31:50	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 16:31:57	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 16:31:57	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 16:31:57	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 16:31:57	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2018B1	50R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2018B2	50R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2018B3	50R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2018L1	50R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 16:32:02	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2018B1	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2018B2	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2018B3	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2018L1	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 16:32:07	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2132B1	60R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2132B2	60R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2132B3	60R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2137B1	60R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2137B2	60R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2137B3	60R	M62 J25 - J30	
03/09/15 16:32:24	SIG	M62/2137B4	60R	M62 J25 - J30	
03/09/15 16:32:37	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 16:32:37	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 16:32:37	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 16:32:37	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 16:33:07	SIG	M62/2097B2	50R	M62 J25 - J30	
03/09/15 16:33:07	SIG	M62/2097B3	50R	M62 J25 - J30	
03/09/15 16:33:07	SIG	M62/2097B4	50R	M62 J25 - J30	
03/09/15 16:33:12	SIG	M62/2097B2	40R	M62 J25 - J30	
03/09/15 16:33:12	SIG	M62/2097B3	40R	M62 J25 - J30	
03/09/15 16:33:12	SIG	M62/2097B4	40R	M62 J25 - J30	
03/09/15 16:33:54	SIG	M62/2170K1	60R	M62 J25 - J30	
03/09/15 16:33:54	SIG	M62/2170K2	60R	M62 J25 - J30	
03/09/15 16:33:54	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 16:33:54	SIG	M62/2177A2	NR	M62 J25 - J30	
03/09/15 16:33:54	SIG	M62/2177A3	NR	M62 J25 - J30	
03/09/15 16:33:54	SIG	M62/2177A4	NR	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2170A1	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2170A2	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2177A2	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2177A3	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2177A4	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2183A2	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2183A3	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2183A4	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2189A1	REDX	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2189A2	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2189A3	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2189A4	60R	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2197A1	NR	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2197A2	NR	M62 J25 - J30	
03/09/15 16:33:55	SIG	M62/2197A3	NR	M62 J25 - J30	
03/09/15 16:34:47	SIG	M62/2189A1	60R	M62 J25 - J30	
03/09/15 16:35:03	SIG	M62/2183A1	60R	M62 J25 - J30	
03/09/15 16:35:06	SIG	M62/2177A1	60R	M62 J25 - J30	
03/09/15 16:35:21	SIG	M62/2125B1	50R	M62 J25 - J30	
03/09/15 16:35:21	SIG	M62/2125B2	50R	M62 J25 - J30	
03/09/15 16:35:21	SIG	M62/2125B3	50R	M62 J25 - J30	
03/09/15 16:35:22	SIG	M62/2117B1	50R	M62 J25 - J30	
03/09/15 16:35:22	SIG	M62/2117B2	50R	M62 J25 - J30	
03/09/15 16:35:22	SIG	M62/2117B3	50R	M62 J25 - J30	
03/09/15 16:35:22	SIG	M62/2120M1	50R	M62 J25 - J30	
03/09/15 16:35:22	SIG	M62/2120M2	50R	M62 J25 - J30	
03/09/15 16:35:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:35:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:35:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:35:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:35:27	SIG	M62/2117B1	40R	M62 J25 - J30	
03/09/15 16:35:27	SIG	M62/2117B3	40R	M62 J25 - J30	
03/09/15 16:35:27	SIG	M62/2120M1	40R	M62 J25 - J30	
03/09/15 16:35:27	SIG	M62/2120M2	40R	M62 J25 - J30	
03/09/15 16:35:33	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 16:35:33	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 16:35:33	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 16:35:33	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 16:35:33	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 16:35:33	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 16:35:38	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 16:35:38	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 16:35:38	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 16:35:38	SIG	M62/2113B2	40R	M62 J25 - J30	
03/09/15 16:35:38	SIG	M62/2113B3	40R	M62 J25 - J30	
03/09/15 16:35:38	SIG	M62/2113B4	40R	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2065A2	60R	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2065A3	60R	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2065A4	60R	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2073K1	60R	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2073K2	60R	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2079A1	REDX	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2079A2	NR	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2079A3	NR	M62 J25 - J30	
03/09/15 16:35:39	SIG	M62/2079A4	NR	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2074A1	REDX	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2074A2	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2074A3	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2074A4	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2079A2	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2079A3	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2079A4	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2088A1	REDX	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2088A2	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2088A3	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2088A4	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2097A2	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2097A3	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2097A4	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2106A1	REDX	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2106A2	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2106A3	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2106A4	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2114A1	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2114A2	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2114A3	60R	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 16:35:40	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 16:35:41	SIG	M62/2114A1	60R	M62 J25 - J30	
03/09/15 16:35:41	SIG	M62/2114A2	60R	M62 J25 - J30	
03/09/15 16:35:41	SIG	M62/2114A3	60R	M62 J25 - J30	
03/09/15 16:35:54	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 16:35:54	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 16:35:55	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 16:35:55	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 16:36:03	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 16:36:03	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 16:36:03	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 16:36:03	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 16:36:44	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 16:36:44	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 16:36:44	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 16:36:44	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2004B1	REDX	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2004B2	NR	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2004B3	NR	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2004B4	NR	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2012B2	50R	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2012B3	50R	M62 J25 - J30	
03/09/15 16:37:01	SIG	M62/2012B4	50R	M62 J25 - J30	
03/09/15 16:38:07	SIG	M62/2106A1	60R	M62 J25 - J30	
03/09/15 16:38:23	SIG	M62/1956A1	60R	M62 J25 - J30	
03/09/15 16:38:23	SIG	M62/1956A2	60R	M62 J25 - J30	
03/09/15 16:38:23	SIG	M62/1956A3	60R	M62 J25 - J30	
03/09/15 16:38:27	SIG	M62/2097A1	60R	M62 J25 - J30	
03/09/15 16:38:48	SIG	M62/2088A1	60R	M62 J25 - J30	
03/09/15 16:38:52	SIG	M62/2079A1	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2050B2	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2050B3	60R	M62 J25 - J30	
03/09/15 16:38:58	SIG	M62/2050B4	60R	M62 J25 - J30	
03/09/15 16:39:47	SIG	M62/2125B1	40R	M62 J25 - J30	
03/09/15 16:39:47	SIG	M62/2125B2	40R	M62 J25 - J30	
03/09/15 16:39:47	SIG	M62/2125B3	40R	M62 J25 - J30	
03/09/15 16:39:47	SIG	M62/2125L1	50R	M62 J25 - J30	
03/09/15 16:39:47	SIG	M62/2125L2	50R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2125B1	40R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2125B2	40R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2125B3	40R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2125L1	40R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2125L2	40R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 16:39:53	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 16:40:39	SIG	M62/2088B1	40R	M62 J25 - J30	
03/09/15 16:40:57	SIG	M62/2097B1	40R	M62 J25 - J30	
03/09/15 16:41:21	SIG	M62/2106B1	40R	M62 J25 - J30	
03/09/15 16:41:26	SIG	M62/2113B1	40R	M62 J25 - J30	
03/09/15 16:41:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:41:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:41:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:41:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 16:41:54	SIG	M62/1956A1	50R	M62 J25 - J30	
03/09/15 16:41:54	SIG	M62/1956A2	50R	M62 J25 - J30	
03/09/15 16:41:54	SIG	M62/1956A3	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2088B1	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2097B1	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2097B2	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2097B3	50R	M62 J25 - J30	
03/09/15 16:43:33	SIG	M62/2097B4	50R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2132B1	40R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2132B2	40R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2132B3	40R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 16:43:40	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2088B1	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2088B2	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2088B3	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2088B4	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2097B1	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2097B2	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2097B3	40R	M62 J25 - J30	
03/09/15 16:44:50	SIG	M62/2097B4	40R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2113B1	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2117B1	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2117B3	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2120M1	50R	M62 J25 - J30	
03/09/15 16:46:32	SIG	M62/2120M2	50R	M62 J25 - J30	
03/09/15 16:46:37	SIG	M62/2137B1	40R	M62 J25 - J30	
03/09/15 16:46:37	SIG	M62/2137B2	40R	M62 J25 - J30	
03/09/15 16:46:37	SIG	M62/2137B3	40R	M62 J25 - J30	
03/09/15 16:46:37	SIG	M62/2137B4	40R	M62 J25 - J30	
03/09/15 16:47:07	SIG	M62/2106B1	50R	M62 J25 - J30	
03/09/15 16:47:07	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 16:47:07	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 16:47:07	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 16:47:14	SIG	M62/2125B1	50R	M62 J25 - J30	
03/09/15 16:47:14	SIG	M62/2125B2	50R	M62 J25 - J30	
03/09/15 16:47:14	SIG	M62/2125B3	50R	M62 J25 - J30	
03/09/15 16:47:14	SIG	M62/2125L1	50R	M62 J25 - J30	
03/09/15 16:47:14	SIG	M62/2125L2	50R	M62 J25 - J30	
03/09/15 16:48:24	SIG	M62/2147B1	50R	M62 J25 - J30	
03/09/15 16:48:24	SIG	M62/2147B2	50R	M62 J25 - J30	
03/09/15 16:48:24	SIG	M62/2147B3	50R	M62 J25 - J30	
03/09/15 16:48:24	SIG	M62/2147B4	50R	M62 J25 - J30	
03/09/15 16:48:29	SIG	M62/2147B1	40R	M62 J25 - J30	
03/09/15 16:48:29	SIG	M62/2147B2	40R	M62 J25 - J30	
03/09/15 16:48:29	SIG	M62/2147B3	40R	M62 J25 - J30	
03/09/15 16:48:29	SIG	M62/2147B4	40R	M62 J25 - J30	
03/09/15 16:48:33	SIG	M62/2106B1	40R	M62 J25 - J30	
03/09/15 16:48:33	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 16:48:33	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 16:48:33	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 16:50:22	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 16:50:22	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 16:50:22	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 16:52:03	SIG	M62/2159B1	50R	M62 J25 - J30	
03/09/15 16:52:03	SIG	M62/2159B2	50R	M62 J25 - J30	
03/09/15 16:52:03	SIG	M62/2159M1	50R	M62 J25 - J30	
03/09/15 16:52:03	SIG	M62/2159M2	50R	M62 J25 - J30	
03/09/15 16:52:09	SIG	M62/2159B1	40R	M62 J25 - J30	
03/09/15 16:52:09	SIG	M62/2159B2	40R	M62 J25 - J30	
03/09/15 16:52:09	SIG	M62/2159M1	40R	M62 J25 - J30	
03/09/15 16:52:09	SIG	M62/2159M2	40R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2132B1	60R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2132B2	60R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2132B3	60R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2137B1	60R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2137B2	60R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2137B3	60R	M62 J25 - J30	
03/09/15 16:52:24	SIG	M62/2137B4	60R	M62 J25 - J30	
03/09/15 16:52:58	SIG	M62/2125B1	60R	M62 J25 - J30	
03/09/15 16:52:58	SIG	M62/2125B2	60R	M62 J25 - J30	
03/09/15 16:52:58	SIG	M62/2125B3	60R	M62 J25 - J30	
03/09/15 16:52:58	SIG	M62/2125L1	60R	M62 J25 - J30	
03/09/15 16:52:58	SIG	M62/2125L2	60R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 16:53:34	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2125B1	50R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2125B2	50R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2125B3	50R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2132B1	40R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2132B2	40R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2132B3	40R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2137B1	40R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2137B2	40R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2137B3	40R	M62 J25 - J30	
03/09/15 16:53:39	SIG	M62/2137B4	40R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2147B1	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2147B2	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2147B3	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2147B4	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2159B1	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2159B2	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2159M1	60R	M62 J25 - J30	
03/09/15 16:56:04	SIG	M62/2159M2	60R	M62 J25 - J30	
03/09/15 16:56:16	SIG	M62/1956A1	60R	M62 J25 - J30	
03/09/15 16:56:16	SIG	M62/1956A2	60R	M62 J25 - J30	
03/09/15 16:56:16	SIG	M62/1956A3	60R	M62 J25 - J30	
03/09/15 16:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 16:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 16:57:30	SIG	M62/2113B1	40R	M62 J25 - J30	
03/09/15 16:57:30	SIG	M62/2113B2	40R	M62 J25 - J30	
03/09/15 16:57:30	SIG	M62/2113B3	40R	M62 J25 - J30	
03/09/15 16:57:30	SIG	M62/2113B4	40R	M62 J25 - J30	
03/09/15 16:58:58	SIG	M62/1956A1	OFF	M62 J25 - J30	
03/09/15 16:58:58	SIG	M62/1956A2	OFF	M62 J25 - J30	
03/09/15 16:58:58	SIG	M62/1956A3	OFF	M62 J25 - J30	
03/09/15 16:58:58	SIG	M62/1960A1	OFF	M62 J25 - J30	
03/09/15 16:58:58	SIG	M62/1960A2	OFF	M62 J25 - J30	
03/09/15 16:58:58	SIG	M62/1960A3	OFF	M62 J25 - J30	
03/09/15 16:59:58	SIG	M62/2057B1	60R	M62 J25 - J30	
03/09/15 16:59:58	SIG	M62/2057B2	60R	M62 J25 - J30	
03/09/15 16:59:58	SIG	M62/2057B3	60R	M62 J25 - J30	
03/09/15 16:59:58	SIG	M62/2057B4	60R	M62 J25 - J30	
03/09/15 17:01:29	SIG	M62/2113B1	50R	M62 J25 - J30	
03/09/15 17:01:29	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 17:01:29	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 17:01:29	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 17:02:50	SIG	M62/2113B1	40R	M62 J25 - J30	
03/09/15 17:02:50	SIG	M62/2113B2	40R	M62 J25 - J30	
03/09/15 17:02:50	SIG	M62/2113B3	40R	M62 J25 - J30	
03/09/15 17:02:50	SIG	M62/2113B4	40R	M62 J25 - J30	
03/09/15 17:03:59	SIG	M62/2137B1	40R	M62 J25 - J30	
03/09/15 17:03:59	SIG	M62/2137B2	40R	M62 J25 - J30	
03/09/15 17:03:59	SIG	M62/2137B3	40R	M62 J25 - J30	
03/09/15 17:03:59	SIG	M62/2137B4	40R	M62 J25 - J30	
03/09/15 17:04:58	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 17:04:58	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 17:04:58	SIG	M62/2166K1	60R	M62 J25 - J30	
03/09/15 17:04:58	SIG	M62/2166K2	60R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2018B1	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2018B2	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2018B3	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2018L1	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 17:05:03	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2018B1	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2018B2	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2018B3	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2018L1	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 17:05:08	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 17:08:00	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 17:08:00	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 17:08:00	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 17:08:00	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 17:08:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:08:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:08:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:08:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 17:09:03	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 17:12:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:12:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:12:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:12:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:13:58	SIG	M62/2163A1	OFF	M62 J25 - J30	
03/09/15 17:13:58	SIG	M62/2163A2	OFF	M62 J25 - J30	
03/09/15 17:13:58	SIG	M62/2166K1	OFF	M62 J25 - J30	
03/09/15 17:13:58	SIG	M62/2166K2	OFF	M62 J25 - J30	
03/09/15 17:14:01	SIG	M62/2137B1	40R	M62 J25 - J30	
03/09/15 17:14:01	SIG	M62/2137B2	40R	M62 J25 - J30	
03/09/15 17:14:01	SIG	M62/2137B3	40R	M62 J25 - J30	
03/09/15 17:14:01	SIG	M62/2137B4	40R	M62 J25 - J30	
03/09/15 17:16:40	SIG	M62/2147B1	50R	M62 J25 - J30	
03/09/15 17:16:40	SIG	M62/2147B2	50R	M62 J25 - J30	
03/09/15 17:16:40	SIG	M62/2147B3	50R	M62 J25 - J30	
03/09/15 17:16:40	SIG	M62/2147B4	50R	M62 J25 - J30	
03/09/15 17:16:45	SIG	M62/2147B1	40R	M62 J25 - J30	
03/09/15 17:16:45	SIG	M62/2147B2	40R	M62 J25 - J30	
03/09/15 17:16:45	SIG	M62/2147B3	40R	M62 J25 - J30	
03/09/15 17:16:45	SIG	M62/2147B4	40R	M62 J25 - J30	
03/09/15 17:17:32	SIG	M62/1968B1	50R	M62 J25 - J30	
03/09/15 17:17:32	SIG	M62/1968B2	50R	M62 J25 - J30	
03/09/15 17:17:32	SIG	M62/1968B3	50R	M62 J25 - J30	
03/09/15 17:17:32	SIG	M62/1968L1	50R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1960B1	60R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1960B2	60R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1960B3	60R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1960L1	NR	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1960L2	NR	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1968B1	40R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1968B2	40R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1968B3	40R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1968L1	40R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1974B1	50R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1974B2	50R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1974B3	50R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1974B4	50R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1974M1	50R	M62 J25 - J30	
03/09/15 17:17:37	SIG	M62/1974M2	50R	M62 J25 - J30	
03/09/15 17:20:40	SIG	M62/2147B1	60R	M62 J25 - J30	
03/09/15 17:20:40	SIG	M62/2147B2	60R	M62 J25 - J30	
03/09/15 17:20:40	SIG	M62/2147B3	60R	M62 J25 - J30	
03/09/15 17:20:40	SIG	M62/2147B4	60R	M62 J25 - J30	
03/09/15 17:20:42	SIG	M62/2147B1	50R	M62 J25 - J30	
03/09/15 17:20:42	SIG	M62/2147B2	50R	M62 J25 - J30	
03/09/15 17:20:42	SIG	M62/2147B3	50R	M62 J25 - J30	
03/09/15 17:20:42	SIG	M62/2147B4	50R	M62 J25 - J30	
03/09/15 17:20:48	SIG	M62/2147B1	40R	M62 J25 - J30	
03/09/15 17:20:48	SIG	M62/2147B2	40R	M62 J25 - J30	
03/09/15 17:20:48	SIG	M62/2147B3	40R	M62 J25 - J30	
03/09/15 17:20:48	SIG	M62/2147B4	40R	M62 J25 - J30	
03/09/15 17:21:38	SIG	M62/2113B1	50R	M62 J25 - J30	
03/09/15 17:21:38	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 17:21:38	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 17:21:38	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 17:24:28	SIG	M62/2113B1	40R	M62 J25 - J30	
03/09/15 17:24:28	SIG	M62/2113B2	40R	M62 J25 - J30	
03/09/15 17:24:28	SIG	M62/2113B3	40R	M62 J25 - J30	
03/09/15 17:24:28	SIG	M62/2113B4	40R	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1960B1	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1960B2	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1960B3	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1960L1	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1960L2	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1968B1	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1968B2	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1968B3	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1968L1	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1974B1	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1974B2	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1974B3	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1974B4	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1974M1	OFF	M62 J25 - J30	
03/09/15 17:24:59	SIG	M62/1974M2	OFF	M62 J25 - J30	
03/09/15 17:25:58	SIG	M62/2159B1	50R	M62 J25 - J30	
03/09/15 17:25:58	SIG	M62/2159B2	50R	M62 J25 - J30	
03/09/15 17:25:58	SIG	M62/2159M1	50R	M62 J25 - J30	
03/09/15 17:25:58	SIG	M62/2159M2	50R	M62 J25 - J30	
03/09/15 17:26:05	SIG	M62/1968B1	50R	M62 J25 - J30	
03/09/15 17:26:05	SIG	M62/1968B2	50R	M62 J25 - J30	
03/09/15 17:26:05	SIG	M62/1968B3	50R	M62 J25 - J30	
03/09/15 17:26:05	SIG	M62/1968L1	50R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1960B1	60R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1960B2	60R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1960B3	60R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1960L1	NR	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1960L2	NR	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1968B1	40R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1968B2	40R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1968B3	40R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1968L1	40R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1974B1	50R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1974B2	50R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1974B3	50R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1974B4	50R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1974M1	50R	M62 J25 - J30	
03/09/15 17:26:11	SIG	M62/1974M2	50R	M62 J25 - J30	
03/09/15 17:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 17:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 17:28:28	SIG	M62/2113B1	50R	M62 J25 - J30	
03/09/15 17:28:28	SIG	M62/2113B2	50R	M62 J25 - J30	
03/09/15 17:28:28	SIG	M62/2113B3	50R	M62 J25 - J30	
03/09/15 17:28:28	SIG	M62/2113B4	50R	M62 J25 - J30	
03/09/15 17:29:22	SIG	M62/2106B1	50R	M62 J25 - J30	
03/09/15 17:29:22	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 17:29:22	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 17:29:22	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1981B1	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1981B2	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1981B3	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1981B4	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1987B1	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1987B2	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1987B3	60R	M62 J25 - J30	
03/09/15 17:29:58	SIG	M62/1987B4	60R	M62 J25 - J30	
03/09/15 17:30:09	SIG	M62/2106B1	40R	M62 J25 - J30	
03/09/15 17:30:09	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 17:30:09	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 17:30:09	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1968B1	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1968B2	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1968B3	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1968L1	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1974B1	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1974B2	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1974B3	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1974B4	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1974M1	60R	M62 J25 - J30	
03/09/15 17:31:25	SIG	M62/1974M2	60R	M62 J25 - J30	
03/09/15 17:32:14	SIG	M62/1968B1	50R	M62 J25 - J30	
03/09/15 17:32:14	SIG	M62/1968B2	50R	M62 J25 - J30	
03/09/15 17:32:14	SIG	M62/1968B3	50R	M62 J25 - J30	
03/09/15 17:32:14	SIG	M62/1968L1	50R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1968B1	40R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1968B2	40R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1968B3	40R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1968L1	40R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1974B1	50R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1974B2	50R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1974B3	50R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1974B4	50R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1974M1	50R	M62 J25 - J30	
03/09/15 17:32:20	SIG	M62/1974M2	50R	M62 J25 - J30	
03/09/15 17:34:08	SIG	M62/2106B1	50R	M62 J25 - J30	
03/09/15 17:34:08	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 17:34:08	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 17:34:08	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 17:37:15	SIG	M62/2106B1	40R	M62 J25 - J30	
03/09/15 17:37:15	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 17:37:15	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 17:37:15	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M606/2003B1	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M606/2003B2	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1992B1	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1992B2	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1992B3	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1992B4	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1999B1	REDX	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1999B2	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1999B3	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/1999B4	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/2004B2	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/2004B3	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/2004B4	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/2005M1	60R	M62 J25 - J30	
03/09/15 17:38:59	SIG	M62/2005M2	60R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1974B1	40R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1974B2	40R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1974B3	40R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1974B4	40R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1974M1	40R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1974M2	40R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1981B1	50R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1981B2	50R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1981B3	50R	M62 J25 - J30	
03/09/15 17:40:33	SIG	M62/1981B4	50R	M62 J25 - J30	
03/09/15 17:41:16	SIG	M62/2106B1	50R	M62 J25 - J30	
03/09/15 17:41:16	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 17:41:16	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 17:41:16	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 17:42:58	SIG	M62/2106B1	40R	M62 J25 - J30	
03/09/15 17:42:58	SIG	M62/2106B2	40R	M62 J25 - J30	
03/09/15 17:42:58	SIG	M62/2106B3	40R	M62 J25 - J30	
03/09/15 17:42:58	SIG	M62/2106B4	40R	M62 J25 - J30	
03/09/15 17:46:07	SIG	M62/1968B1	60R	M62 J25 - J30	
03/09/15 17:46:07	SIG	M62/1968B2	60R	M62 J25 - J30	
03/09/15 17:46:07	SIG	M62/1968B3	60R	M62 J25 - J30	
03/09/15 17:46:07	SIG	M62/1968L1	60R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2097B1	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2097B2	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2097B3	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2097B4	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2106B1	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2106B2	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2106B3	50R	M62 J25 - J30	
03/09/15 17:46:59	SIG	M62/2106B4	50R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2117B1	60R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2117B3	60R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2120M1	60R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2120M2	60R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2125B1	60R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2125B2	60R	M62 J25 - J30	
03/09/15 17:47:59	SIG	M62/2125B3	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1974B1	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1974B2	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1974B3	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1974B4	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1974M1	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1974M2	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1981B1	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1981B2	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1981B3	60R	M62 J25 - J30	
03/09/15 17:48:43	SIG	M62/1981B4	60R	M62 J25 - J30	
03/09/15 17:49:55	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 17:49:55	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 17:49:55	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 17:49:55	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 17:50:01	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 17:52:44	SIG	M62/1968B1	50R	M62 J25 - J30	
03/09/15 17:52:44	SIG	M62/1968B2	50R	M62 J25 - J30	
03/09/15 17:52:44	SIG	M62/1968B3	50R	M62 J25 - J30	
03/09/15 17:52:44	SIG	M62/1968L1	50R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1968B1	40R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1968B2	40R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1968B3	40R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1968L1	40R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1974B1	50R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1974B2	50R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1974B3	50R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1974B4	50R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1974M1	50R	M62 J25 - J30	
03/09/15 17:52:49	SIG	M62/1974M2	50R	M62 J25 - J30	
03/09/15 17:53:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:53:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:53:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:53:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 17:53:55	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 17:53:59	SIG	M62/2113B1	60R	M62 J25 - J30	
03/09/15 17:53:59	SIG	M62/2113B2	60R	M62 J25 - J30	
03/09/15 17:53:59	SIG	M62/2113B3	60R	M62 J25 - J30	
03/09/15 17:53:59	SIG	M62/2113B4	60R	M62 J25 - J30	
03/09/15 17:55:53	SIG	M62/2147B1	50R	M62 J25 - J30	
03/09/15 17:55:53	SIG	M62/2147B2	50R	M62 J25 - J30	
03/09/15 17:55:53	SIG	M62/2147B3	50R	M62 J25 - J30	
03/09/15 17:55:53	SIG	M62/2147B4	50R	M62 J25 - J30	
03/09/15 17:56:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:56:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:56:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:56:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 17:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 17:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1968B1	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1968B2	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1968B3	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1968L1	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1974B1	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1974B2	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1974B3	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1974B4	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1974M1	60R	M62 J25 - J30	
03/09/15 17:57:11	SIG	M62/1974M2	60R	M62 J25 - J30	
03/09/15 17:57:49	SIG	M62/2088B1	50R	M62 J25 - J30	
03/09/15 17:57:49	SIG	M62/2088B2	50R	M62 J25 - J30	
03/09/15 17:57:49	SIG	M62/2088B3	50R	M62 J25 - J30	
03/09/15 17:57:49	SIG	M62/2088B4	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2018B1	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2018B2	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2018B3	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2018L1	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 17:58:02	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2018B1	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2018B2	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2018B3	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2018L1	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 17:58:07	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 17:59:28	SIG	M62/2004A1	50R	M62 J25 - J30	
03/09/15 17:59:28	SIG	M62/2004A2	50R	M62 J25 - J30	
03/09/15 17:59:28	SIG	M62/2004A3	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1987A1	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1987A3	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1987J1	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1992A1	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1992A2	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1992A3	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1992J1	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1999A1	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1999A2	50R	M62 J25 - J30	
03/09/15 17:59:38	SIG	M62/1999A3	50R	M62 J25 - J30	
03/09/15 18:00:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:00:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:00:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:00:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2018B1	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2018B2	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2018B3	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2018L1	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 18:02:01	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 18:02:02	SIG	M62/2081B1	50R	M62 J25 - J30	
03/09/15 18:02:02	SIG	M62/2081B2	50R	M62 J25 - J30	
03/09/15 18:02:02	SIG	M62/2081B3	50R	M62 J25 - J30	
03/09/15 18:02:02	SIG	M62/2081L1	50R	M62 J25 - J30	
03/09/15 18:03:24	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 18:03:24	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 18:03:24	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 18:03:24	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 18:04:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:04:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:04:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:04:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:05:59	SIG	M62/2106B1	60R	M62 J25 - J30	
03/09/15 18:05:59	SIG	M62/2106B2	60R	M62 J25 - J30	
03/09/15 18:05:59	SIG	M62/2106B3	60R	M62 J25 - J30	
03/09/15 18:05:59	SIG	M62/2106B4	60R	M62 J25 - J30	
03/09/15 18:06:07	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 18:06:07	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 18:06:07	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 18:06:07	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:06:12	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2147B1	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2147B2	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2147B3	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2147B4	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2159B1	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2159B2	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2159M1	60R	M62 J25 - J30	
03/09/15 18:07:00	SIG	M62/2159M2	60R	M62 J25 - J30	
03/09/15 18:08:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:08:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:08:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:08:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M606/2003B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M606/2003B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1960B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1960B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1960B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1960L1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1960L2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1968B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1968B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1968B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1968L1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1974B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1974B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1974B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1974B4	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1974M1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1974M2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1981B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1981B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1981B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1981B4	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1987B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1987B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1987B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1987B4	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1992B1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1992B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1992B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1992B4	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1999B1	BLNK	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1999B2	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1999B3	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/1999B4	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/2004B2	NR	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/2004B3	NR	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/2004B4	NR	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/2005M1	OFF	M62 J25 - J30	
03/09/15 18:09:59	SIG	M62/2005M2	OFF	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 18:10:07	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2132B1	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2132B2	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2132B3	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2137B1	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2137B2	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2137B3	60R	M62 J25 - J30	
03/09/15 18:11:02	SIG	M62/2137B4	60R	M62 J25 - J30	
03/09/15 18:11:47	SIG	M62/2004A1	OFF	M62 J25 - J30	
03/09/15 18:11:47	SIG	M62/2004A2	OFF	M62 J25 - J30	
03/09/15 18:11:47	SIG	M62/2004A3	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1987A1	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1987A3	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1987J1	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1992A1	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1992A2	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1992A3	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1992J1	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1999A1	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1999A2	OFF	M62 J25 - J30	
03/09/15 18:11:57	SIG	M62/1999A3	OFF	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2088B1	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2088B2	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2088B3	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2088B4	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2097B1	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2097B2	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2097B3	60R	M62 J25 - J30	
03/09/15 18:11:59	SIG	M62/2097B4	60R	M62 J25 - J30	
03/09/15 18:12:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:12:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:12:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:12:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:12:44	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 18:12:44	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 18:12:44	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 18:12:44	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:12:49	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 18:15:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:15:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:15:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:15:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:17:20	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 18:17:20	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 18:17:20	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2041B1	50R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 18:17:26	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 18:17:31	SIG	M62/1968B1	50R	M62 J25 - J30	
03/09/15 18:17:31	SIG	M62/1968B2	50R	M62 J25 - J30	
03/09/15 18:17:31	SIG	M62/1968B3	50R	M62 J25 - J30	
03/09/15 18:17:31	SIG	M62/1968L1	50R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1960B1	60R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1960B2	60R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1960B3	60R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1960L1	NR	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1960L2	NR	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1968B1	40R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1968B2	40R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1968B3	40R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1968L1	40R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1974B1	50R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1974B2	50R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1974B3	50R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1974B4	50R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1974M1	50R	M62 J25 - J30	
03/09/15 18:17:37	SIG	M62/1974M2	50R	M62 J25 - J30	
03/09/15 18:18:00	SIG	M62/2125L1	NR	M62 J25 - J30	
03/09/15 18:18:00	SIG	M62/2125L2	NR	M62 J25 - J30	
03/09/15 18:18:35	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M621/1002B1	50R	M62 J25 - J30	
03/09/15 18:18:35	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2074B2	50R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2081B1	60R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2081B2	60R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2081B3	60R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M62/2081L1	60R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M621/1010B1	50R	M62 J25 - J30	
03/09/15 18:18:36	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 18:19:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:19:36	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:19:41	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:22:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:22:40	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:22:45	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 18:23:28	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2041B1	50R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 18:23:32	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M62/2065B2	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M62/2065B3	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M62/2065B4	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M62/2065M1	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M62/2069M1	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M62/2069M2	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M621/1002B1	60R	M62 J25 - J30	
03/09/15 18:24:59	SIG	M621/1002B2	60R	M62 J25 - J30	
03/09/15 18:25:00	SIG	M62/2074B2	60R	M62 J25 - J30	
03/09/15 18:25:00	SIG	M62/2074B3	60R	M62 J25 - J30	
03/09/15 18:25:00	SIG	M62/2074B4	60R	M62 J25 - J30	
03/09/15 18:25:00	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 18:25:00	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1960B1	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1960B2	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1960B3	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1960L1	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1960L2	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1968B1	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1968B2	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1968B3	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1968L1	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1974B1	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1974B2	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1974B3	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1974B4	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1974M1	OFF	M62 J25 - J30	
03/09/15 18:25:07	SIG	M62/1974M2	OFF	M62 J25 - J30	
03/09/15 18:25:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:25:44	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:25:49	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2147B1	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2147B2	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2147B3	50R	M62 J25 - J30	
03/09/15 18:25:59	SIG	M62/2147B4	50R	M62 J25 - J30	
03/09/15 18:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 18:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 18:26:50	SIG	M62/1968B1	50R	M62 J25 - J30	
03/09/15 18:26:50	SIG	M62/1968B2	50R	M62 J25 - J30	
03/09/15 18:26:50	SIG	M62/1968B3	50R	M62 J25 - J30	
03/09/15 18:26:50	SIG	M62/1968L1	50R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1960B1	60R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1960B2	60R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1960B3	60R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1960L1	NR	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1960L2	NR	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1968B1	40R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1968B2	40R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1968B3	40R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1968L1	40R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1974B1	50R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1974B2	50R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1974B3	50R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1974B4	50R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1974M1	50R	M62 J25 - J30	
03/09/15 18:26:56	SIG	M62/1974M2	50R	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2159B1	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2159B2	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2159M1	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2159M2	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2170B1	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2170B2	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2170L1	OFF	M62 J25 - J30	
03/09/15 18:27:00	SIG	M62/2170L2	OFF	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 18:27:32	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2033B1	40R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2033B2	40R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2033B4	40R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2041B1	50R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2041B2	50R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2041B3	50R	M62 J25 - J30	
03/09/15 18:27:44	SIG	M62/2041B4	50R	M62 J25 - J30	
03/09/15 18:29:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:29:49	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:29:54	SIG	M62/2033B3	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2132B1	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2132B2	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2132B3	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2137B1	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2137B2	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2137B3	40R	M62 J25 - J30	
03/09/15 18:30:13	SIG	M62/2137B4	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2132B1	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2132B2	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2132B3	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2137B1	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2137B2	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2137B3	40R	M62 J25 - J30	
03/09/15 18:30:23	SIG	M62/2137B4	40R	M62 J25 - J30	
03/09/15 18:30:30	SIG	M62/2147B1	60R	M62 J25 - J30	
03/09/15 18:30:30	SIG	M62/2147B2	60R	M62 J25 - J30	
03/09/15 18:30:30	SIG	M62/2147B3	60R	M62 J25 - J30	
03/09/15 18:30:30	SIG	M62/2147B4	60R	M62 J25 - J30	
03/09/15 18:31:03	SIG	M62/1960B1	NR	M62 J25 - J30	
03/09/15 18:31:03	SIG	M62/1960B2	NR	M62 J25 - J30	
03/09/15 18:31:03	SIG	M62/1960B3	NR	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2041B1	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2041B2	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2041B3	60R	M62 J25 - J30	
03/09/15 18:31:43	SIG	M62/2041B4	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1981B1	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1981B2	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1981B3	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1981B4	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1987B1	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1987B2	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1987B3	60R	M62 J25 - J30	
03/09/15 18:32:00	SIG	M62/1987B4	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2159B1	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2159B2	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2159M1	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2159M2	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2170B1	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2170B2	60R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2170L1	50R	M62 J25 - J30	
03/09/15 18:33:00	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 18:33:07	SIG	M62/1960B1	60R	M62 J25 - J30	
03/09/15 18:33:07	SIG	M62/1960B2	60R	M62 J25 - J30	
03/09/15 18:33:07	SIG	M62/1960B3	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1968B1	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1968B2	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1968B3	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1968L1	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1974B1	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1974B2	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1974B3	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1974B4	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1974M1	60R	M62 J25 - J30	
03/09/15 18:33:47	SIG	M62/1974M2	60R	M62 J25 - J30	
03/09/15 18:33:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:33:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:33:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:33:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:34:16	SIG	M62/2025B1	50R	M62 J25 - J30	
03/09/15 18:34:16	SIG	M62/2025B2	50R	M62 J25 - J30	
03/09/15 18:34:16	SIG	M62/2025B3	50R	M62 J25 - J30	
03/09/15 18:34:16	SIG	M62/2025B4	50R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2025B1	40R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2025B2	40R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2025B3	40R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2025B4	40R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2033B1	50R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2033B2	50R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2033B3	50R	M62 J25 - J30	
03/09/15 18:34:22	SIG	M62/2033B4	50R	M62 J25 - J30	
03/09/15 18:36:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:36:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:36:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:36:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:37:07	SIG	M62/1960B1	NR	M62 J25 - J30	
03/09/15 18:37:07	SIG	M62/1960B2	NR	M62 J25 - J30	
03/09/15 18:37:07	SIG	M62/1960B3	NR	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2025B1	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2025B2	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2025B3	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2025B4	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2033B1	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2033B2	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2033B3	60R	M62 J25 - J30	
03/09/15 18:38:17	SIG	M62/2033B4	60R	M62 J25 - J30	
03/09/15 18:39:00	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 18:39:00	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 18:39:45	SIG	M62/2079A1	HSD	M62 J25 - J30	
03/09/15 18:39:51	SIG	M62/1960B1	60R	M62 J25 - J30	
03/09/15 18:39:51	SIG	M62/1960B2	60R	M62 J25 - J30	
03/09/15 18:39:51	SIG	M62/1960B3	60R	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1960B1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1960B2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1960B3	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1960L1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1960L2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1968B1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1968B2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1968B3	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1968L1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1974B1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1974B2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1974B3	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1974B4	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1974M1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1974M2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1981B1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1981B2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1981B3	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1981B4	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1987B1	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1987B2	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1987B3	OFF	M62 J25 - J30	
03/09/15 18:40:00	SIG	M62/1987B4	OFF	M62 J25 - J30	
03/09/15 18:40:53	SIG	M62/2088A1	HSD	M62 J25 - J30	
03/09/15 18:41:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:41:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:41:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:41:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:42:01	SIG	M62/2079A1	REDX	M62 J25 - J30	
03/09/15 18:42:01	SIG	M62/2097A1	HSD	M62 J25 - J30	
03/09/15 18:43:08	SIG	M62/2106A1	HSD	M62 J25 - J30	
03/09/15 18:43:09	SIG	M62/2088A1	REDX	M62 J25 - J30	
03/09/15 18:44:17	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 18:45:25	SIG	M62/2106A1	REDX	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2132B1	50R	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2132B2	50R	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2132B3	50R	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2137B1	50R	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2137B2	50R	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2137B3	50R	M62 J25 - J30	
03/09/15 18:45:58	SIG	M62/2137B4	50R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2132B1	60R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2132B2	60R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2132B3	60R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2137B1	60R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2137B2	60R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2137B3	60R	M62 J25 - J30	
03/09/15 18:46:16	SIG	M62/2137B4	60R	M62 J25 - J30	
03/09/15 18:46:25	SIG	M62/2065A2	NR	M62 J25 - J30	
03/09/15 18:46:25	SIG	M62/2065A3	NR	M62 J25 - J30	
03/09/15 18:46:25	SIG	M62/2065A4	NR	M62 J25 - J30	
03/09/15 18:46:25	SIG	M62/2074A2	NR	M62 J25 - J30	
03/09/15 18:46:25	SIG	M62/2074A3	NR	M62 J25 - J30	
03/09/15 18:46:25	SIG	M62/2074A4	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2073K1	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2073K2	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2079A2	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2079A3	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2079A4	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2088A2	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2088A3	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2088A4	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2097A2	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2097A3	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2097A4	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2106A2	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2106A3	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2106A4	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 18:46:26	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2073K1	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2073K2	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2074A1	BLNK	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2074A2	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2074A4	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2079A1	BLNK	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2079A2	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2079A3	OFF	M62 J25 - J30	
03/09/15 18:47:25	SIG	M62/2079A4	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2088A1	BLNK	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2088A2	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2088A3	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2088A4	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2097A1	BLNK	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2097A2	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2097A3	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2097A4	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2106A1	BLNK	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2106A2	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2106A3	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2106A4	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 18:47:26	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 18:48:42	SIG	M62/2177A1	HSD	M62 J25 - J30	
03/09/15 18:49:27	SIG	M62/2183A1	HSD	M62 J25 - J30	
03/09/15 18:50:12	SIG	M62/2189A1	HSD	M62 J25 - J30	
03/09/15 18:50:13	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 18:51:12	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 18:52:12	SIG	M62/2189A1	REDX	M62 J25 - J30	
03/09/15 18:52:13	SIG	M62/2170A1	NR	M62 J25 - J30	
03/09/15 18:52:13	SIG	M62/2170A2	NR	M62 J25 - J30	
03/09/15 18:52:13	SIG	M62/2170K1	NR	M62 J25 - J30	
03/09/15 18:52:13	SIG	M62/2170K2	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2177A2	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2177A3	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2177A4	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2183A2	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2183A3	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2183A4	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2189A2	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2189A3	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2189A4	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2197A1	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2197A2	NR	M62 J25 - J30	
03/09/15 18:52:14	SIG	M62/2197A3	NR	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2170A1	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2170A2	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2170K1	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2170K2	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2177A2	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2177A3	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2177A4	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2183A1	BLNK	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2183A2	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2183A3	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2183A4	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2189A1	BLNK	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2189A2	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2189A3	OFF	M62 J25 - J30	
03/09/15 18:53:13	SIG	M62/2189A4	OFF	M62 J25 - J30	
03/09/15 18:53:56	SIG	M62/2113B1	HSD	M62 J25 - J30	
03/09/15 18:54:48	SIG	M62/2106B1	HSD	M62 J25 - J30	
03/09/15 18:55:14	SIG	M62/2197A1	OFF	M62 J25 - J30	
03/09/15 18:55:14	SIG	M62/2197A2	OFF	M62 J25 - J30	
03/09/15 18:55:14	SIG	M62/2197A3	OFF	M62 J25 - J30	
03/09/15 18:55:57	SIG	M62/2097B1	HSD	M62 J25 - J30	
03/09/15 18:55:57	SIG	M62/2113B1	REDX	M62 J25 - J30	
03/09/15 18:56:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2125B1	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2125B2	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2125B3	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2125L1	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2125L2	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2132B1	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2132B2	NR	M62 J25 - J30	
03/09/15 18:57:00	SIG	M62/2132B3	NR	M62 J25 - J30	
03/09/15 18:57:04	SIG	M62/2088B1	HSD	M62 J25 - J30	
03/09/15 18:57:05	SIG	M62/2106B1	REDX	M62 J25 - J30	
03/09/15 18:58:13	SIG	M62/2097B1	REDX	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2132B1	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2132B2	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2132B3	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2137B1	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2137B2	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2137B3	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2137B4	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2147B1	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2147B2	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2147B3	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2147B4	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2159B1	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2159B2	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2159M1	OFF	M62 J25 - J30	
03/09/15 18:59:00	SIG	M62/2159M2	OFF	M62 J25 - J30	
03/09/15 18:59:01	SIG	M62/2170B1	OFF	M62 J25 - J30	
03/09/15 18:59:01	SIG	M62/2170B2	OFF	M62 J25 - J30	
03/09/15 18:59:01	SIG	M62/2170L1	OFF	M62 J25 - J30	
03/09/15 18:59:01	SIG	M62/2170L2	OFF	M62 J25 - J30	
03/09/15 18:59:21	SIG	M62/2088B1	REDX	M62 J25 - J30	
03/09/15 19:00:00	SIG	M62/2125B1	OFF	M62 J25 - J30	
03/09/15 19:00:01	SIG	M62/2125B2	OFF	M62 J25 - J30	
03/09/15 19:00:01	SIG	M62/2125B3	OFF	M62 J25 - J30	
03/09/15 19:00:01	SIG	M62/2125L1	OFF	M62 J25 - J30	
03/09/15 19:00:01	SIG	M62/2125L2	OFF	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2088B2	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2088B3	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2088B4	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2097B2	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2097B3	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2097B4	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2106B2	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2106B3	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2106B4	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2113B2	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2113B3	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2113B4	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2117B1	NR	M62 J25 - J30	
03/09/15 19:00:14	SIG	M62/2117B3	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2074B2	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2074B3	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2074B4	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2081B1	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2081B2	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2081B3	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2081L1	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2120M1	NR	M62 J25 - J30	
03/09/15 19:00:15	SIG	M62/2120M2	NR	M62 J25 - J30	
03/09/15 19:01:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
03/09/15 19:01:14	SIG	M62/2117B3	OFF	M62 J25 - J30	
03/09/15 19:01:14	SIG	M62/2120M1	OFF	M62 J25 - J30	
03/09/15 19:01:14	SIG	M62/2120M2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2074B1	BLNK	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2074B2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2074B3	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2074B4	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2081B1	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2081B2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2081B3	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2081L1	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2088B1	BLNK	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2088B2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2088B3	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2088B4	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2097B1	BLNK	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2097B2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2097B3	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2097B4	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2106B1	BLNK	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2106B2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2106B3	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2106B4	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2113B1	BLNK	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2113B2	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2113B3	OFF	M62 J25 - J30	
03/09/15 19:01:15	SIG	M62/2113B4	OFF	M62 J25 - J30	
03/09/15 19:03:15	SIG	M62/2025A1	HSD	M62 J25 - J30	
03/09/15 19:04:15	SIG	M62/2033A1	HSD	M62 J25 - J30	
03/09/15 19:05:15	SIG	M62/2041A1	HSD	M62 J25 - J30	
03/09/15 19:05:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
03/09/15 19:05:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
03/09/15 19:06:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
03/09/15 19:06:23	SIG	M62/2050A1	HSD	M62 J25 - J30	
03/09/15 19:07:15	SIG	M62/2041A1	REDX	M62 J25 - J30	
03/09/15 19:08:15	SIG	M62/2050A1	REDX	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2025A2	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2025A3	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2025A4	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2033A2	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2033A3	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2033A4	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2041A2	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2041A3	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2041A4	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2050A2	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2050A3	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2050A4	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2057A1	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2057A2	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2057A3	NR	M62 J25 - J30	
03/09/15 19:09:16	SIG	M62/2057J1	NR	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2008K1	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2008K2	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2012A1	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2012A2	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2012A3	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2018A1	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2018A2	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2018A3	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2018A4	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2025A1	BLNK	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2025A2	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2025A3	OFF	M62 J25 - J30	
03/09/15 19:10:15	SIG	M62/2025A4	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2033A1	BLNK	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2033A2	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2033A3	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2033A4	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2041A1	BLNK	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2041A2	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2041A3	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2041A4	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2050A1	BLNK	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2050A2	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2050A3	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2050A4	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2057A1	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2057A2	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2057A3	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2057J1	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2065A1	BLNK	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2065A2	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2065A3	OFF	M62 J25 - J30	
03/09/15 19:10:16	SIG	M62/2065A4	OFF	M62 J25 - J30	
03/09/15 19:13:59	SIG	M62/2057B1	HSD	M62 J25 - J30	
03/09/15 19:15:58	SIG	M62/2041B1	HSD	M62 J25 - J30	
03/09/15 19:15:58	SIG	M62/2057B1	REDX	M62 J25 - J30	
03/09/15 19:15:58	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 19:15:58	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 19:15:58	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 19:16:58	SIG	M62/2033B1	HSD	M62 J25 - J30	
03/09/15 19:17:37	SIG	M62/2004B2	NR	M62 J25 - J30	
03/09/15 19:17:37	SIG	M62/2004B3	NR	M62 J25 - J30	
03/09/15 19:17:37	SIG	M62/2004B4	NR	M62 J25 - J30	
03/09/15 19:17:37	SIG	M62/2012B2	NR	M62 J25 - J30	
03/09/15 19:17:37	SIG	M62/2012B3	NR	M62 J25 - J30	
03/09/15 19:17:37	SIG	M62/2012B4	NR	M62 J25 - J30	
03/09/15 19:17:58	SIG	M62/2025B1	HSD	M62 J25 - J30	
03/09/15 19:17:58	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 19:18:50	SIG	M62/2033B1	REDX	M62 J25 - J30	
03/09/15 19:19:34	SIG	M62/2025B1	REDX	M62 J25 - J30	
03/09/15 19:20:04	SIG	M62/2065B2	NR	M62 J25 - J30	
03/09/15 19:20:04	SIG	M62/2065B3	NR	M62 J25 - J30	
03/09/15 19:20:04	SIG	M62/2065B4	NR	M62 J25 - J30	
03/09/15 19:20:05	SIG	M62/2050B2	NR	M62 J25 - J30	
03/09/15 19:20:05	SIG	M62/2050B3	NR	M62 J25 - J30	
03/09/15 19:20:05	SIG	M62/2050B4	NR	M62 J25 - J30	
03/09/15 19:20:05	SIG	M62/2057B2	NR	M62 J25 - J30	
03/09/15 19:20:05	SIG	M62/2057B3	NR	M62 J25 - J30	
03/09/15 19:20:05	SIG	M62/2057B4	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2018B1	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2018B2	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2018B3	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2018L1	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2025B2	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2025B3	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2025B4	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2033B2	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2033B3	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2033B4	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 19:20:06	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 19:20:37	SIG	M62/2004B2	OFF	M62 J25 - J30	
03/09/15 19:20:38	SIG	M62/2004B1	BLNK	M62 J25 - J30	
03/09/15 19:20:38	SIG	M62/2004B3	OFF	M62 J25 - J30	
03/09/15 19:20:38	SIG	M62/2004B4	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2050B2	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2050B3	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2050B4	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2057B1	BLNK	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2057B2	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2057B3	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2057B4	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2065B1	BLNK	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2065B2	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2065B3	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2065B4	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2065M1	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2069M1	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M62/2069M2	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M621/1002B1	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M621/1002B2	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 19:21:05	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2012B1	BLNK	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2012B2	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2012B3	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2012B4	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2018B1	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2018B2	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2018B3	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2018L1	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2025B1	BLNK	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2025B2	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2025B3	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2025B4	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2033B1	BLNK	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2033B2	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2033B4	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2041B1	BLNK	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2041B2	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2041B3	OFF	M62 J25 - J30	
03/09/15 19:21:06	SIG	M62/2041B4	OFF	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2079A1	REDX	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2079A2	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2079A3	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2079A4	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2088A1	REDX	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2088A2	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2088A3	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2088A4	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2097A2	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2097A3	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2097A4	50R	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 19:38:27	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2177A1	REDX	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2177A2	50R	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2177A3	50R	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2177A4	50R	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2183A1	REDX	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2183A2	50R	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2183A3	50R	M62 J25 - J30	
03/09/15 19:59:36	SIG	M62/2183A4	50R	M62 J25 - J30	
03/09/15 20:00:25	SIG	M62/2097A2	40R	M62 J25 - J30	
03/09/15 20:00:25	SIG	M62/2097A3	40R	M62 J25 - J30	
03/09/15 20:00:25	SIG	M62/2097A4	40R	M62 J25 - J30	
03/09/15 20:00:30	SIG	M62/2097A2	30R	M62 J25 - J30	
03/09/15 20:00:34	SIG	M62/2074A3	???	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2073K1	60R	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2073K2	60R	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2074A1	REDX	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2074A2	60R	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2074A4	60R	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2079A2	LDR	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2088A2	LDR	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2097A1	STOP	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2097A2	20R	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2097A3	40R	M62 J25 - J30	
03/09/15 20:00:35	SIG	M62/2097A4	40R	M62 J25 - J30	
03/09/15 20:00:36	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 20:00:41	SIG	M62/2097A1	STOP	M62 J25 - J30	
03/09/15 20:00:41	SIG	M62/2097A2	STOP	M62 J25 - J30	
03/09/15 20:05:01	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 20:06:03	SIG	M62/2166K1	50R	M62 J25 - J30	
03/09/15 20:06:03	SIG	M62/2166K2	50R	M62 J25 - J30	
03/09/15 20:06:03	SIG	M62/2170K1	50R	M62 J25 - J30	
03/09/15 20:06:03	SIG	M62/2170K2	50R	M62 J25 - J30	
03/09/15 20:06:09	SIG	M62/2166K1	40R	M62 J25 - J30	
03/09/15 20:06:09	SIG	M62/2166K2	40R	M62 J25 - J30	
03/09/15 20:06:09	SIG	M62/2170K1	40R	M62 J25 - J30	
03/09/15 20:06:09	SIG	M62/2170K2	40R	M62 J25 - J30	
03/09/15 20:06:14	SIG	M62/2170K1	30R	M62 J25 - J30	
03/09/15 20:06:19	SIG	M62/2166K1	40R	M62 J25 - J30	
03/09/15 20:06:19	SIG	M62/2166K2	40R	M62 J25 - J30	
03/09/15 20:06:19	SIG	M62/2170K1	20R	M62 J25 - J30	
03/09/15 20:06:19	SIG	M62/2170K2	40R	M62 J25 - J30	
03/09/15 20:06:25	SIG	M62/2170K1	STOP	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2079A2	60R	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2079A3	60R	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2079A4	60R	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2088A2	50R	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2097A2	50R	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2097A3	50R	M62 J25 - J30	
03/09/15 20:13:08	SIG	M62/2097A4	50R	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 20:13:28	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 20:14:15	SIG	M62/2057B1	REDX	M62 J25 - J30	
03/09/15 20:14:15	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 20:14:15	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 20:14:15	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 20:14:15	SIG	M62/2065M1	60R	M62 J25 - J30	
03/09/15 20:14:15	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 20:14:15	SIG	M621/1002B2	60R	M62 J25 - J30	
03/09/15 20:14:15	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 20:14:15	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 20:15:12	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 20:15:12	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 20:15:12	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 20:15:12	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2170B1	NR	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2170B2	NR	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2170L1	LDR	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2170L2	50R	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2177B1	50R	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2177B2	50R	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2177L1	50R	M62 J25 - J30	
03/09/15 20:19:33	SIG	M62/2177L2	50R	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2041B1	BLNK	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2041B2	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2041B3	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2041B4	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2057B1	BLNK	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2057B2	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2057B3	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2057B4	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M62/2065M1	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M621/1002B1	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M621/1002B2	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 20:21:20	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2057B2	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2057B3	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2057B4	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2074B1	REDX	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2074B2	LDR	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2074B3	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2074B4	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2081B1	60R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2081B2	60R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2081B3	60R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M62/2081L1	60R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 20:21:58	SIG	M621/1010B1	LDR	M62 J25 - J30	
03/09/15 20:21:58	SIG	M621/1010B2	50R	M62 J25 - J30	
03/09/15 20:22:04	SIG	M62/2057B2	40R	M62 J25 - J30	
03/09/15 20:22:04	SIG	M62/2057B3	40R	M62 J25 - J30	
03/09/15 20:22:04	SIG	M62/2057B4	40R	M62 J25 - J30	
03/09/15 20:22:04	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 20:22:04	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 20:22:05	SIG	M62/2163A1	60R	M62 J25 - J30	
03/09/15 20:22:05	SIG	M62/2163A2	60R	M62 J25 - J30	
03/09/15 20:22:05	SIG	M62/2170K2	30R	M62 J25 - J30	
03/09/15 20:22:05	SIG	M62/2183A2	40R	M62 J25 - J30	
03/09/15 20:22:05	SIG	M62/2183A3	40R	M62 J25 - J30	
03/09/15 20:22:05	SIG	M62/2183A4	40R	M62 J25 - J30	
03/09/15 20:22:09	SIG	M62/2057B2	30R	M62 J25 - J30	
03/09/15 20:22:10	SIG	M62/2183A3	30R	M62 J25 - J30	
03/09/15 20:22:10	SIG	M62/2183A4	30R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2057B1	STOP	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2057B2	20R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2057B3	40R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2057B4	40R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2065B1	REDX	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2065B2	LDR	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2065B3	50R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2065B4	50R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2065M1	40R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2069M1	50R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M62/2069M2	50R	M62 J25 - J30	
03/09/15 20:22:14	SIG	M621/1002B1	LDR	M62 J25 - J30	
03/09/15 20:22:14	SIG	M621/1002B2	40R	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2170A1	50R	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2170A2	LDL	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2170K2	30R	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2177A3	LDL	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2177A4	LDL	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2183A2	40R	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2183A3	20R	M62 J25 - J30	
03/09/15 20:22:15	SIG	M62/2183A4	20R	M62 J25 - J30	
03/09/15 20:22:19	SIG	M62/2057B1	STOP	M62 J25 - J30	
03/09/15 20:22:19	SIG	M62/2057B2	STOP	M62 J25 - J30	
03/09/15 20:22:21	SIG	M62/2183A3	STOP	M62 J25 - J30	
03/09/15 20:22:21	SIG	M62/2183A4	STOP	M62 J25 - J30	
03/09/15 20:22:31	SIG	M62/2166K1	50R	M62 J25 - J30	
03/09/15 20:22:31	SIG	M62/2166K2	50R	M62 J25 - J30	
03/09/15 20:22:31	SIG	M62/2170K1	30R	M62 J25 - J30	
03/09/15 20:22:58	SIG	M62/2041B1	REDX	M62 J25 - J30	
03/09/15 20:22:58	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 20:22:58	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 20:22:58	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 20:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 20:26:21	SIG	M62/2074A3	???	M62 J25 - J30	
03/09/15 20:27:02	SIG	M62/2157A1	60R	M62 J25 - J30	
03/09/15 20:27:02	SIG	M62/2157A2	60R	M62 J25 - J30	
03/09/15 20:27:02	SIG	M62/2157J1	60R	M62 J25 - J30	
03/09/15 20:27:02	SIG	M62/2157J2	60R	M62 J25 - J30	
03/09/15 20:27:02	SIG	M62/2157K1	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2057B2	OFF	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2057B3	OFF	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2057B4	OFF	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2065B2	50R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2065M1	50R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2069M1	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2069M2	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2074B2	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2074B3	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2074B4	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2081B1	OFF	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2081B2	OFF	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2081B3	OFF	M62 J25 - J30	
03/09/15 20:48:00	SIG	M62/2081L1	NR	M62 J25 - J30	
03/09/15 20:48:00	SIG	M621/1002B1	HSD	M62 J25 - J30	
03/09/15 20:48:00	SIG	M621/1002B2	50R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M621/1010B1	60R	M62 J25 - J30	
03/09/15 20:48:00	SIG	M621/1010B2	60R	M62 J25 - J30	
03/09/15 20:48:15	SIG	M62/2041B2	NR	M62 J25 - J30	
03/09/15 20:48:15	SIG	M62/2041B3	NR	M62 J25 - J30	
03/09/15 20:48:15	SIG	M62/2041B4	NR	M62 J25 - J30	
03/09/15 20:51:00	SIG	M62/2081L1	OFF	M62 J25 - J30	
03/09/15 20:51:15	SIG	M62/2041B2	OFF	M62 J25 - J30	
03/09/15 20:51:16	SIG	M62/2041B1	BLNK	M62 J25 - J30	
03/09/15 20:51:16	SIG	M62/2041B3	OFF	M62 J25 - J30	
03/09/15 20:51:16	SIG	M62/2041B4	OFF	M62 J25 - J30	
03/09/15 20:55:09	SIG	M62/2106A1	OFF	M62 J25 - J30	
03/09/15 20:55:10	SIG	M62/2106A1	BLNK	M62 J25 - J30	
03/09/15 20:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 20:56:21	SIG	M62/2074A3	???	M62 J25 - J30	
03/09/15 20:59:02	SIG	M62/2106A2	50R	M62 J25 - J30	
03/09/15 20:59:02	SIG	M62/2106A3	50R	M62 J25 - J30	
03/09/15 20:59:02	SIG	M62/2106A4	50R	M62 J25 - J30	
03/09/15 20:59:08	SIG	M62/2106A2	40R	M62 J25 - J30	
03/09/15 20:59:08	SIG	M62/2106A3	40R	M62 J25 - J30	
03/09/15 20:59:08	SIG	M62/2106A4	40R	M62 J25 - J30	
03/09/15 20:59:13	SIG	M62/2106A2	30R	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2088A2	LDR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2097A2	LDR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2106A1	STOP	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2106A2	20R	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2106A3	40R	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2106A4	40R	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 20:59:18	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 20:59:24	SIG	M62/2106A1	STOP	M62 J25 - J30	
03/09/15 20:59:24	SIG	M62/2106A2	STOP	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2088A2	50R	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2097A2	50R	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2106A2	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2106A4	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 20:59:35	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 21:06:03	SIG	M62/2106A2	50R	M62 J25 - J30	
03/09/15 21:06:03	SIG	M62/2106A3	50R	M62 J25 - J30	
03/09/15 21:06:03	SIG	M62/2106A4	50R	M62 J25 - J30	
03/09/15 21:06:08	SIG	M62/2106A2	40R	M62 J25 - J30	
03/09/15 21:06:08	SIG	M62/2106A3	40R	M62 J25 - J30	
03/09/15 21:06:08	SIG	M62/2106A4	40R	M62 J25 - J30	
03/09/15 21:06:14	SIG	M62/2106A2	30R	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2088A2	LDR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2097A2	LDR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2106A2	20R	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2106A3	40R	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2106A4	40R	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 21:06:19	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 21:06:24	SIG	M62/2106A2	STOP	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2088A2	50R	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2097A2	50R	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2106A2	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2106A3	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2106A4	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 21:06:29	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2170B1	NR	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2170B2	NR	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2170L1	OFF	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2170L2	OFF	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2177B1	OFF	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2177B2	OFF	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2177L1	OFF	M62 J25 - J30	
03/09/15 21:06:36	SIG	M62/2177L2	OFF	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2106A1	REDX	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2106A2	50R	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2106A3	50R	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2106A4	50R	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 21:07:06	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2106A2	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2106A3	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2106A4	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 21:07:15	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 21:09:36	SIG	M62/2170B1	OFF	M62 J25 - J30	
03/09/15 21:09:36	SIG	M62/2170B2	OFF	M62 J25 - J30	
03/09/15 21:15:34	SIG	M62/2097A2	40R	M62 J25 - J30	
03/09/15 21:15:34	SIG	M62/2097A3	40R	M62 J25 - J30	
03/09/15 21:15:34	SIG	M62/2097A4	40R	M62 J25 - J30	
03/09/15 21:15:39	SIG	M62/2097A2	30R	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2079A2	LDR	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2079A3	50R	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2079A4	50R	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2088A2	LDR	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2097A1	STOP	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2097A2	20R	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2097A3	40R	M62 J25 - J30	
03/09/15 21:15:44	SIG	M62/2097A4	40R	M62 J25 - J30	
03/09/15 21:15:50	SIG	M62/2097A1	STOP	M62 J25 - J30	
03/09/15 21:15:50	SIG	M62/2097A2	STOP	M62 J25 - J30	
03/09/15 21:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 21:26:21	SIG	M62/2074A3	???	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2079A2	60R	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2079A3	60R	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2079A4	60R	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2088A2	50R	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2097A1	REDX	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2097A2	50R	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2097A3	50R	M62 J25 - J30	
03/09/15 21:27:45	SIG	M62/2097A4	50R	M62 J25 - J30	
03/09/15 21:28:09	SIG	M62/2079A2	50R	M62 J25 - J30	
03/09/15 21:28:09	SIG	M62/2079A3	50R	M62 J25 - J30	
03/09/15 21:28:09	SIG	M62/2079A4	50R	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2114A1	NR	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2114A2	NR	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2114A3	NR	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2117A1	REDX	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2117A2	NR	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2117A3	NR	M62 J25 - J30	
03/09/15 21:28:30	SIG	M62/2117A4	NR	M62 J25 - J30	
03/09/15 21:52:17	SIG	M62/2079A2	60R	M62 J25 - J30	
03/09/15 21:52:17	SIG	M62/2079A3	60R	M62 J25 - J30	
03/09/15 21:52:17	SIG	M62/2079A4	60R	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2114A1	OFF	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2114A2	OFF	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2114A3	OFF	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2117A1	BLNK	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2117A2	OFF	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2117A3	OFF	M62 J25 - J30	
03/09/15 21:52:29	SIG	M62/2117A4	OFF	M62 J25 - J30	
03/09/15 21:53:01	SIG	M62/2106A2	NR	M62 J25 - J30	
03/09/15 21:53:01	SIG	M62/2106A3	NR	M62 J25 - J30	
03/09/15 21:53:01	SIG	M62/2106A4	NR	M62 J25 - J30	
03/09/15 21:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 21:56:21	SIG	M62/2074A3	???	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2166K1	60R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2166K2	60R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2170A1	60R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2170A2	60R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2170K1	60R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2170K2	60R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2177A3	50R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2177A4	50R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2183A2	50R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2183A3	50R	M62 J25 - J30	
03/09/15 21:57:50	SIG	M62/2183A4	50R	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2057B1	BLNK	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2065B1	BLNK	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2065B2	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2065B3	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2065B4	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2065M1	NR	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2069M1	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2069M2	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2074B1	BLNK	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2074B2	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2074B3	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M62/2074B4	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M621/1002B1	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M621/1002B2	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M621/1010B1	OFF	M62 J25 - J30	
03/09/15 21:58:03	SIG	M621/1010B2	OFF	M62 J25 - J30	
03/09/15 22:01:04	SIG	M62/2065M1	OFF	M62 J25 - J30	
03/09/15 22:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 22:26:21	SIG	M62/2074A3	???	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2073K1	OFF	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2073K2	OFF	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2074A2	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2074A3	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2074A4	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2079A1	BLNK	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2079A2	OFF	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2079A3	OFF	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2079A4	OFF	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2088A2	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2088A3	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2088A4	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2097A2	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2097A3	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2097A4	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2106A2	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2106A3	NR	M62 J25 - J30	
03/09/15 22:46:04	SIG	M62/2106A4	NR	M62 J25 - J30	
03/09/15 22:49:04	SIG	M62/2074A2	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2074A1	BLNK	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2074A3	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2074A4	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2088A1	BLNK	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2088A2	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2088A3	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2088A4	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2097A1	BLNK	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2097A2	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2097A3	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2097A4	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2106A1	BLNK	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2106A2	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2106A3	OFF	M62 J25 - J30	
03/09/15 22:49:05	SIG	M62/2106A4	OFF	M62 J25 - J30	
03/09/15 22:49:06	SIG	M62/2088A1	BLNK	M62 J25 - J30	
03/09/15 22:49:06	SIG	M62/2097A1	BLNK	M62 J25 - J30	
03/09/15 22:49:06	SIG	M62/2106A1	BLNK	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2157A1	OFF	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2157A2	OFF	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2157J1	OFF	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2157J2	OFF	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2157K1	OFF	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2163A1	OFF	M62 J25 - J30	
03/09/15 23:00:04	SIG	M62/2163A2	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2166K1	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2166K2	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2170A1	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2170A2	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2170K1	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2170K2	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2177A1	BLNK	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2177A2	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2177A3	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2177A4	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2183A1	BLNK	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2183A2	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2183A3	OFF	M62 J25 - J30	
03/09/15 23:00:05	SIG	M62/2183A4	OFF	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1960A1	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1960A2	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1960A3	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1960K1	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1960K2	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1968A1	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1968A2	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1968A3	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1968A4	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1974A1	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1974A2	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1974A3	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1974A4	50R	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1981A1	NR	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1981A2	NR	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1981A3	NR	M62 J25 - J30	
04/09/15 00:23:23	SIG	M62/1981A4	NR	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1960B1	NR	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1960B2	NR	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1960B3	NR	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1960L1	NR	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1960L2	NR	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1968B1	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1968B2	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1968B3	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1968L1	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1974B1	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1974B2	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1974B3	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1974B4	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1974M1	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1974M2	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1981B1	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1981B2	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1981B3	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1981B4	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1987B1	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1987B2	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1987B3	50R	M62 J25 - J30	
04/09/15 00:23:48	SIG	M62/1987B4	50R	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1960B1	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1960B2	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1960B3	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1960L1	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1960L2	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1968B1	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1968B2	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1968B3	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1968L1	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1974B1	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1974B2	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1974B3	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1974B4	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1974M1	OFF	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1974M2	OFF	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1981B1	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1981B2	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1981B3	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1981B4	NR	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1987B1	OFF	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1987B2	OFF	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1987B3	OFF	M62 J25 - J30	
04/09/15 00:31:18	SIG	M62/1987B4	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1960B1	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1960B2	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1960B3	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1960L1	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1960L2	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1968B1	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1968B2	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1968B3	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1968L1	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1974B1	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1974B2	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1974B3	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1974B4	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1981B1	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1981B2	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1981B3	OFF	M62 J25 - J30	
04/09/15 00:34:19	SIG	M62/1981B4	OFF	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1960A1	OFF	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1960A2	OFF	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1960A3	OFF	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1960K1	OFF	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1960K2	OFF	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1968A1	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1968A2	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1968A3	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1968A4	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1974A1	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1974A2	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1974A3	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1974A4	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1981A1	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1981A2	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1981A3	NR	M62 J25 - J30	
04/09/15 00:47:08	SIG	M62/1981A4	NR	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1968A1	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1968A2	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1968A3	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1968A4	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1974A1	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1974A2	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1974A3	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1974A4	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1981A1	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1981A2	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1981A3	OFF	M62 J25 - J30	
04/09/15 00:50:09	SIG	M62/1981A4	OFF	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1956A1	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1956A2	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1956A3	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1960A1	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1960A2	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1960A3	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1960K1	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1960K2	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1968A1	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1968A2	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1968A3	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1968A4	50R	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1974A1	NR	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1974A2	NR	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1974A3	NR	M62 J25 - J30	
04/09/15 00:59:55	SIG	M62/1974A4	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1968A1	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1968A2	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1968A3	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1968A4	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1974A1	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1974A2	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1974A3	NR	M62 J25 - J30	
04/09/15 01:17:40	SIG	M62/1974A4	NR	M62 J25 - J30	
04/09/15 01:20:41	SIG	M62/1974A1	OFF	M62 J25 - J30	
04/09/15 01:20:41	SIG	M62/1974A2	OFF	M62 J25 - J30	
04/09/15 01:20:41	SIG	M62/1974A3	OFF	M62 J25 - J30	
04/09/15 01:20:41	SIG	M62/1974A4	OFF	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1960A1	NR	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1960A2	NR	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1960A3	NR	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1960K1	OFF	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1960K2	OFF	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1968A1	NR	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1968A2	NR	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1968A3	NR	M62 J25 - J30	
04/09/15 01:27:27	SIG	M62/1968A4	NR	M62 J25 - J30	
04/09/15 01:30:27	SIG	M62/1968A1	OFF	M62 J25 - J30	
04/09/15 01:30:27	SIG	M62/1968A2	OFF	M62 J25 - J30	
04/09/15 01:30:27	SIG	M62/1968A3	OFF	M62 J25 - J30	
04/09/15 01:30:27	SIG	M62/1968A4	OFF	M62 J25 - J30	
04/09/15 01:41:55	SIG	M62/1956A1	NR	M62 J25 - J30	
04/09/15 01:41:55	SIG	M62/1956A2	NR	M62 J25 - J30	
04/09/15 01:41:55	SIG	M62/1956A3	NR	M62 J25 - J30	
04/09/15 01:41:55	SIG	M62/1960A1	NR	M62 J25 - J30	
04/09/15 01:41:55	SIG	M62/1960A2	NR	M62 J25 - J30	
04/09/15 01:41:55	SIG	M62/1960A3	NR	M62 J25 - J30	
04/09/15 01:44:55	SIG	M62/1956A1	OFF	M62 J25 - J30	
04/09/15 01:44:56	SIG	M62/1956A2	OFF	M62 J25 - J30	
04/09/15 01:44:56	SIG	M62/1956A3	OFF	M62 J25 - J30	
04/09/15 01:44:56	SIG	M62/1960A1	OFF	M62 J25 - J30	
04/09/15 01:44:56	SIG	M62/1960A2	OFF	M62 J25 - J30	
04/09/15 01:44:56	SIG	M62/1960A3	OFF	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2074B1	REDX	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2074B2	LDR	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2074B3	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2074B4	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 03:07:33	SIG	M621/1010B1	LDR	M62 J25 - J30	
04/09/15 03:07:33	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 03:07:38	SIG	M62/2057B2	40R	M62 J25 - J30	
04/09/15 03:07:38	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 03:07:38	SIG	M62/2057B4	40R	M62 J25 - J30	
04/09/15 03:07:38	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 03:07:38	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 03:07:43	SIG	M62/2057B2	30R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2057B1	STOP	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2057B2	20R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2057B4	40R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2065B1	REDX	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2065B2	LDR	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 03:07:49	SIG	M621/1002B1	LDR	M62 J25 - J30	
04/09/15 03:07:49	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 03:07:54	SIG	M62/2057B1	STOP	M62 J25 - J30	
04/09/15 03:07:54	SIG	M62/2057B2	STOP	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2163A1	60R	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2163A2	60R	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2170K1	50R	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2170K2	50R	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2183A2	50R	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2183A3	50R	M62 J25 - J30	
04/09/15 03:22:09	SIG	M62/2183A4	50R	M62 J25 - J30	
04/09/15 03:22:14	SIG	M62/2170K1	40R	M62 J25 - J30	
04/09/15 03:22:14	SIG	M62/2170K2	40R	M62 J25 - J30	
04/09/15 03:22:14	SIG	M62/2183A2	40R	M62 J25 - J30	
04/09/15 03:22:14	SIG	M62/2183A3	40R	M62 J25 - J30	
04/09/15 03:22:14	SIG	M62/2183A4	40R	M62 J25 - J30	
04/09/15 03:22:19	SIG	M62/2170K1	30R	M62 J25 - J30	
04/09/15 03:22:19	SIG	M62/2170K2	30R	M62 J25 - J30	
04/09/15 03:22:19	SIG	M62/2183A3	30R	M62 J25 - J30	
04/09/15 03:22:19	SIG	M62/2183A4	30R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2166K1	50R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2166K2	50R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2170A1	50R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2170A2	LDL	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2170K1	30R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2170K2	30R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2177A1	REDX	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2177A2	50R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2177A3	LDL	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2177A4	LDL	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2183A1	REDX	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2183A2	40R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2183A3	20R	M62 J25 - J30	
04/09/15 03:22:25	SIG	M62/2183A4	20R	M62 J25 - J30	
04/09/15 03:22:30	SIG	M62/2183A3	STOP	M62 J25 - J30	
04/09/15 03:22:30	SIG	M62/2183A4	STOP	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2065B1	BLNK	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2065B3	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2065B4	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2065M1	NR	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2069M1	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2069M2	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2074B1	BLNK	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2074B2	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2074B3	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2074B4	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2081B1	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2081B2	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2081B3	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M62/2081L1	NR	M62 J25 - J30	
04/09/15 03:27:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
04/09/15 03:27:17	SIG	M621/1010B1	NR	M62 J25 - J30	
04/09/15 03:27:17	SIG	M621/1010B2	NR	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 03:28:24	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 03:28:24	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 03:28:24	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 03:28:24	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 03:28:24	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 03:30:18	SIG	M62/2081L1	OFF	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2170L1	LDR	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 03:51:03	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2057B1	BLNK	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2057B2	OFF	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2057B3	OFF	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2057B4	OFF	M62 J25 - J30	
04/09/15 04:01:47	SIG	M62/2065M1	NR	M62 J25 - J30	
04/09/15 04:01:47	SIG	M621/1002B1	OFF	M62 J25 - J30	
04/09/15 04:01:47	SIG	M621/1002B2	OFF	M62 J25 - J30	
04/09/15 04:01:47	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 04:01:47	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 04:04:47	SIG	M62/2065M1	OFF	M62 J25 - J30	
04/09/15 04:04:48	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 04:04:48	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 04:04:48	SIG	M62/2041B2	OFF	M62 J25 - J30	
04/09/15 04:04:48	SIG	M62/2041B3	OFF	M62 J25 - J30	
04/09/15 04:04:48	SIG	M62/2041B4	OFF	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 04:24:29	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 04:27:30	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 04:27:30	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 04:38:07	SIG	M62/2163A1	OFF	M62 J25 - J30	
04/09/15 04:38:07	SIG	M62/2163A2	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2166K1	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2166K2	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2170A1	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2170A2	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2170K1	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2170K2	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2177A1	BLNK	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2177A2	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2177A3	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2177A4	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2183A2	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2183A3	OFF	M62 J25 - J30	
04/09/15 04:38:08	SIG	M62/2183A4	OFF	M62 J25 - J30	
04/09/15 04:38:56	SIG	M62/2163A1	50R	M62 J25 - J30	
04/09/15 04:38:56	SIG	M62/2163A2	50R	M62 J25 - J30	
04/09/15 04:38:56	SIG	M62/2166K1	50R	M62 J25 - J30	
04/09/15 04:38:56	SIG	M62/2166K2	50R	M62 J25 - J30	
04/09/15 04:38:56	SIG	M62/2170K1	50R	M62 J25 - J30	
04/09/15 04:38:56	SIG	M62/2170K2	50R	M62 J25 - J30	
04/09/15 04:39:01	SIG	M62/2166K1	40R	M62 J25 - J30	
04/09/15 04:39:01	SIG	M62/2166K2	40R	M62 J25 - J30	
04/09/15 04:39:01	SIG	M62/2170K1	40R	M62 J25 - J30	
04/09/15 04:39:01	SIG	M62/2170K2	40R	M62 J25 - J30	
04/09/15 04:39:06	SIG	M62/2170K1	30R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2166K1	40R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2166K2	40R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2170A1	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2170A2	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2170K1	20R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2170K2	40R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2177A1	REDX	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2177A2	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2177A3	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2177A4	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2183A1	REDX	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2183A2	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2183A3	50R	M62 J25 - J30	
04/09/15 04:39:11	SIG	M62/2183A4	50R	M62 J25 - J30	
04/09/15 04:39:17	SIG	M62/2170K1	STOP	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2163A1	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2163A2	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2166K1	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2166K2	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2170A1	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2170A2	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2170K1	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2170K2	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2177A1	BLNK	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2177A2	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2177A3	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2177A4	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2183A2	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2183A3	OFF	M62 J25 - J30	
04/09/15 05:09:03	SIG	M62/2183A4	OFF	M62 J25 - J30	
04/09/15 05:09:04	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2157A1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2157A2	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2157J1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2157J2	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2157K1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2163A1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2163A2	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2166K1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2166K2	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2170A1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2170A2	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2170K1	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2170K2	60R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2177A1	REDX	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2177A2	50R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2177A3	50R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2177A4	50R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2183A1	REDX	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2183A2	50R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2183A3	50R	M62 J25 - J30	
04/09/15 05:09:11	SIG	M62/2183A4	50R	M62 J25 - J30	
04/09/15 05:14:14	SIG	M62/2189A1	REDX	M62 J25 - J30	
04/09/15 05:14:14	SIG	M62/2189A2	NR	M62 J25 - J30	
04/09/15 05:14:14	SIG	M62/2189A3	NR	M62 J25 - J30	
04/09/15 05:14:14	SIG	M62/2189A4	NR	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2157A1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2157A2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2157J1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2157J2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2157K1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2163A1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2163A2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2166K1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2166K2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2170A1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2170A2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2170K1	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2170K2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2177A1	BLNK	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2177A2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2177A3	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2177A4	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2183A2	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2183A3	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2183A4	OFF	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2189A2	NR	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2189A3	NR	M62 J25 - J30	
04/09/15 05:36:12	SIG	M62/2189A4	NR	M62 J25 - J30	
04/09/15 05:39:12	SIG	M62/2189A2	OFF	M62 J25 - J30	
04/09/15 05:39:13	SIG	M62/2189A1	BLNK	M62 J25 - J30	
04/09/15 05:39:13	SIG	M62/2189A3	OFF	M62 J25 - J30	
04/09/15 05:39:13	SIG	M62/2189A4	OFF	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2008K1	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2008K2	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2012A1	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2012A2	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2012A3	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2018A1	HSD	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2018A2	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2018A3	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2018A4	60R	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2025A1	REDX	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2025A2	NR	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2025A3	NR	M62 J25 - J30	
04/09/15 06:40:46	SIG	M62/2025A4	NR	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2012A1	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2018A1	HSD	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2025A2	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2025A3	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2025A4	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2033A1	REDX	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2033A2	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2033A3	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2033A4	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2041A1	REDX	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2041A2	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2041A3	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2041A4	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2050A1	REDX	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2050A2	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2050A3	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2050A4	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057A1	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057A1	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057A2	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057A2	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057A3	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057A3	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057J1	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2057J1	60R	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2065A1	REDX	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2065A2	NR	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2065A3	NR	M62 J25 - J30	
04/09/15 06:40:47	SIG	M62/2065A4	NR	M62 J25 - J30	
04/09/15 06:42:08	SIG	M62/2050A1	60R	M62 J25 - J30	
04/09/15 06:42:35	SIG	M62/2041A1	60R	M62 J25 - J30	
04/09/15 06:43:03	SIG	M62/2033A1	60R	M62 J25 - J30	
04/09/15 06:43:08	SIG	M62/2018A1	60R	M62 J25 - J30	
04/09/15 06:43:08	SIG	M62/2025A1	60R	M62 J25 - J30	
04/09/15 06:45:14	SIG	M62/2025A1	???	M62 J25 - J30	
04/09/15 06:45:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
04/09/15 06:46:36	SIG	M62/2065M1	NR	M62 J25 - J30	
04/09/15 06:46:36	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 06:46:36	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 06:46:36	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 06:46:36	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2025B1	REDX	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2025B2	NR	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2025B3	NR	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2025B4	NR	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2033B1	REDX	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2033B2	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2033B3	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2033B4	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2041B2	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2041B3	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2041B4	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2050B2	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2050B3	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2050B4	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2057B2	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2057B3	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2057B4	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2065B1	REDX	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 06:46:37	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 06:46:37	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2012B1	REDX	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2012B2	NR	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2012B3	NR	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2012B4	NR	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 06:46:38	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2170B1	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2170B2	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 06:48:12	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2170B1	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2170B2	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 06:48:18	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 06:48:41	SIG	M62/2033B1	60R	M62 J25 - J30	
04/09/15 06:48:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 06:48:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 06:48:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 06:48:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 06:49:06	SIG	M62/2041B1	60R	M62 J25 - J30	
04/09/15 06:49:30	SIG	M62/2057B1	60R	M62 J25 - J30	
04/09/15 06:49:30	SIG	M621/1002B1	60R	M62 J25 - J30	
04/09/15 06:49:30	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 06:49:30	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 06:51:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 06:51:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 06:51:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 06:51:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2177B1	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2177B2	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2177L1	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2177L2	NR	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2183B1	OFF	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2183L1	OFF	M62 J25 - J30	
04/09/15 06:52:12	SIG	M62/2183L2	OFF	M62 J25 - J30	
04/09/15 06:55:12	SIG	M62/2159B1	OFF	M62 J25 - J30	
04/09/15 06:55:12	SIG	M62/2159B2	OFF	M62 J25 - J30	
04/09/15 06:55:13	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 06:55:13	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 06:55:13	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 06:55:13	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 06:55:13	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 06:55:13	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 07:01:24	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 07:01:24	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2170B1	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2170B2	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 07:01:25	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2170B1	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2170B2	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:01:30	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 07:03:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:03:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:03:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:03:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2177B1	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2177B2	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2177L1	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2177L2	NR	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2183B1	OFF	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2183L1	OFF	M62 J25 - J30	
04/09/15 07:05:24	SIG	M62/2183L2	OFF	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2177B1	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2177B2	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2177L1	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2177L2	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2183B1	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2183B2	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2183L1	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2183L2	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2189B1	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2189B2	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2189B3	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2189B4	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2194B1	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2194B2	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2194B3	60R	M62 J25 - J30	
04/09/15 07:06:14	SIG	M62/2194B4	60R	M62 J25 - J30	
04/09/15 07:07:05	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:07:05	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:07:05	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:07:05	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2183B1	40R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2183L1	40R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2183L2	40R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2189B1	50R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2189B2	50R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2189B3	50R	M62 J25 - J30	
04/09/15 07:07:10	SIG	M62/2189B4	50R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2189B1	40R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2189B2	40R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2189B3	40R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2189B4	40R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2194B1	50R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2194B2	50R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2194B3	50R	M62 J25 - J30	
04/09/15 07:07:33	SIG	M62/2194B4	50R	M62 J25 - J30	
04/09/15 07:08:24	SIG	M62/2159B1	OFF	M62 J25 - J30	
04/09/15 07:08:25	SIG	M62/2159B2	OFF	M62 J25 - J30	
04/09/15 07:09:09	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 07:09:09	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2170B1	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2170B2	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 07:09:10	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2170B1	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2170B2	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 07:09:15	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 07:09:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:09:53	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:09:58	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:11:13	SIG	M62/2197B1	60R	M62 J25 - J30	
04/09/15 07:11:13	SIG	M62/2197B2	60R	M62 J25 - J30	
04/09/15 07:11:13	SIG	M62/2197B3	60R	M62 J25 - J30	
04/09/15 07:11:13	SIG	M62/2199M1	60R	M62 J25 - J30	
04/09/15 07:11:13	SIG	M62/2199M2	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2189B1	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2189B2	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2189B3	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2189B4	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2194B1	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2194B2	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2194B3	60R	M62 J25 - J30	
04/09/15 07:11:33	SIG	M62/2194B4	60R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2183B1	40R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2183L1	40R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2183L2	40R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2189B1	50R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2189B2	50R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2189B3	50R	M62 J25 - J30	
04/09/15 07:11:40	SIG	M62/2189B4	50R	M62 J25 - J30	
04/09/15 07:12:13	SIG	M62/2203B1	60R	M62 J25 - J30	
04/09/15 07:12:13	SIG	M62/2203B2	60R	M62 J25 - J30	
04/09/15 07:12:13	SIG	M62/2203B3	60R	M62 J25 - J30	
04/09/15 07:14:01	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:14:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:14:07	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2189B1	40R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2189B2	40R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2189B3	40R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2189B4	40R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2194B1	50R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2194B2	50R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2194B3	50R	M62 J25 - J30	
04/09/15 07:14:13	SIG	M62/2194B4	50R	M62 J25 - J30	
04/09/15 07:16:03	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 07:16:03	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 07:16:04	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 07:16:04	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 07:16:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 07:16:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 07:16:13	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 07:16:13	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2170B1	60R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2170B2	60R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2177B1	60R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2177B2	60R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2177L1	60R	M62 J25 - J30	
04/09/15 07:16:14	SIG	M62/2177L2	60R	M62 J25 - J30	
04/09/15 07:16:56	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 07:16:56	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 07:16:56	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 07:16:56	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 07:17:01	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 07:17:01	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 07:17:01	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 07:17:01	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 07:17:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:17:07	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:17:13	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2189B1	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2189B2	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2189B3	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2189B4	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2194B1	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2194B2	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2194B3	60R	M62 J25 - J30	
04/09/15 07:18:14	SIG	M62/2194B4	60R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2183B1	40R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2183L1	40R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2183L2	40R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2189B1	50R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2189B2	50R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2189B3	50R	M62 J25 - J30	
04/09/15 07:19:32	SIG	M62/2189B4	50R	M62 J25 - J30	
04/09/15 07:22:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:22:17	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:22:22	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:23:57	SIG	M62/2177B1	60R	M62 J25 - J30	
04/09/15 07:23:57	SIG	M62/2177B2	60R	M62 J25 - J30	
04/09/15 07:23:57	SIG	M62/2177L1	60R	M62 J25 - J30	
04/09/15 07:23:57	SIG	M62/2177L2	60R	M62 J25 - J30	
04/09/15 07:24:14	SIG	M62/2004A1	60R	M62 J25 - J30	
04/09/15 07:24:14	SIG	M62/2004A2	60R	M62 J25 - J30	
04/09/15 07:24:14	SIG	M62/2004A3	60R	M62 J25 - J30	
04/09/15 07:24:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
04/09/15 07:25:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:25:23	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2183B1	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2183B2	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2183B2	40R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2183L1	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2183L2	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2189B1	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2189B2	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2189B3	60R	M62 J25 - J30	
04/09/15 07:25:29	SIG	M62/2189B4	60R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2170B1	50R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2170B2	50R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 07:26:06	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2170B1	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2170B2	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:26:12	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 07:28:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:28:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:28:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:28:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2065A2	60R	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2065A3	60R	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2065A4	60R	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2073K1	60R	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2073K2	60R	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2079A1	REDX	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2079A2	NR	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2079A3	NR	M62 J25 - J30	
04/09/15 07:29:20	SIG	M62/2079A4	NR	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2074A1	REDX	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2074A2	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2074A3	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2074A4	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2079A2	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2079A3	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2079A4	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2088A1	REDX	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2088A2	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2088A3	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2088A4	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2097A1	REDX	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2097A2	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2097A3	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2097A4	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2106A1	REDX	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2106A2	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2106A3	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2106A4	60R	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2114A1	NR	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2114A2	NR	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2114A3	NR	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2117A1	REDX	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2117A2	NR	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2117A3	NR	M62 J25 - J30	
04/09/15 07:29:21	SIG	M62/2117A4	NR	M62 J25 - J30	
04/09/15 07:29:22	SIG	M62/2114A1	60R	M62 J25 - J30	
04/09/15 07:29:22	SIG	M62/2114A2	60R	M62 J25 - J30	
04/09/15 07:29:22	SIG	M62/2114A3	60R	M62 J25 - J30	
04/09/15 07:29:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 07:29:32	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 07:29:32	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 07:29:33	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 07:30:46	SIG	M62/2106A1	60R	M62 J25 - J30	
04/09/15 07:31:11	SIG	M62/2097A1	60R	M62 J25 - J30	
04/09/15 07:31:39	SIG	M62/2088A1	60R	M62 J25 - J30	
04/09/15 07:31:43	SIG	M62/2079A1	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2170B1	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2170B2	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2177B1	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2177B2	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2177L1	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2177L2	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2183B1	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2183B2	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2183L1	60R	M62 J25 - J30	
04/09/15 07:33:20	SIG	M62/2183L2	60R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2170B1	50R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2170B2	50R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 07:33:37	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2170B1	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2170B2	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:33:42	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 07:35:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:35:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:35:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:35:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:37:37	SIG	M62/2170B1	60R	M62 J25 - J30	
04/09/15 07:37:37	SIG	M62/2170B2	60R	M62 J25 - J30	
04/09/15 07:37:37	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 07:37:37	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2177B1	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2177B2	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2177L1	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2177L2	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2183B1	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2183B2	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2183L1	60R	M62 J25 - J30	
04/09/15 07:40:16	SIG	M62/2183L2	60R	M62 J25 - J30	
04/09/15 07:42:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:42:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:42:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:43:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2004A1	OFF	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2004A2	OFF	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2004A3	OFF	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 07:50:14	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 07:52:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
04/09/15 07:53:14	SIG	M62/2159B1	OFF	M62 J25 - J30	
04/09/15 07:53:14	SIG	M62/2159B2	OFF	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2177B1	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2177B2	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2177L1	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2177L2	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2183B1	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2183B2	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2183L1	NR	M62 J25 - J30	
04/09/15 07:55:14	SIG	M62/2183L2	NR	M62 J25 - J30	
04/09/15 07:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 07:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 07:58:14	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 07:58:15	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 07:58:15	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 07:58:15	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 07:58:15	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 07:58:15	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 07:59:26	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 07:59:26	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 07:59:26	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 07:59:26	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 07:59:32	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 08:01:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:01:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:01:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:01:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2177B1	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2177B2	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2177L1	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2177L2	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2183B1	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2183B2	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2183L1	NR	M62 J25 - J30	
04/09/15 08:03:27	SIG	M62/2183L2	NR	M62 J25 - J30	
04/09/15 08:06:27	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 08:06:28	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 08:06:28	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 08:06:28	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 08:06:28	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 08:06:28	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2183B1	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2183B2	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2183L1	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2183L2	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2189B1	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2189B2	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2189B3	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2189B4	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2194B1	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2194B2	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2194B3	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2194B4	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2197B1	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2197B2	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2197B3	NR	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2199M1	OFF	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2199M2	OFF	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2203B1	OFF	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2203B2	OFF	M62 J25 - J30	
04/09/15 08:08:14	SIG	M62/2203B3	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2183B1	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2183L1	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2183L2	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2189B1	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2189B2	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2189B3	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2189B4	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2194B1	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2194B2	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2194B3	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2194B4	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2197B1	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2197B2	OFF	M62 J25 - J30	
04/09/15 08:11:15	SIG	M62/2197B3	OFF	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2170B1	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2170B2	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 08:19:15	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2170B1	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2170B2	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2170L1	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2170L2	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2177B1	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2177B2	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2177L1	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2177L2	40R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 08:19:21	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 08:22:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:22:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:22:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:22:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:23:14	SIG	M62/2159B1	NR	M62 J25 - J30	
04/09/15 08:23:14	SIG	M62/2159B2	NR	M62 J25 - J30	
04/09/15 08:23:15	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 08:23:15	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 08:23:15	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 08:23:15	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2177B1	NR	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2177B2	NR	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2177L1	NR	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2177L2	NR	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2183B1	OFF	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2183L1	OFF	M62 J25 - J30	
04/09/15 08:23:32	SIG	M62/2183L2	OFF	M62 J25 - J30	
04/09/15 08:26:07	SIG	M606/2003B1	NR	M62 J25 - J30	
04/09/15 08:26:07	SIG	M606/2003B2	NR	M62 J25 - J30	
04/09/15 08:26:07	SIG	M62/2008K1	50R	M62 J25 - J30	
04/09/15 08:26:07	SIG	M62/2008K2	50R	M62 J25 - J30	
04/09/15 08:26:15	SIG	M62/2159B1	OFF	M62 J25 - J30	
04/09/15 08:26:15	SIG	M62/2159B2	OFF	M62 J25 - J30	
04/09/15 08:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 08:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 08:26:33	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 08:26:33	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 08:26:33	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 08:26:33	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 08:26:33	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 08:26:33	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 08:39:57	SIG	M62/2008K1	40R	M62 J25 - J30	
04/09/15 08:39:57	SIG	M62/2008K2	40R	M62 J25 - J30	
04/09/15 08:40:02	SIG	M62/2008K1	30R	M62 J25 - J30	
04/09/15 08:40:02	SIG	M62/2008K2	30R	M62 J25 - J30	
04/09/15 08:49:58	SIG	M606/2003B1	OFF	M62 J25 - J30	
04/09/15 08:49:58	SIG	M606/2003B2	OFF	M62 J25 - J30	
04/09/15 08:49:58	SIG	M62/2008K1	60R	M62 J25 - J30	
04/09/15 08:49:58	SIG	M62/2008K2	60R	M62 J25 - J30	
04/09/15 08:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 08:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 08:57:58	SIG	M62/2079A1	HSD	M62 J25 - J30	
04/09/15 08:59:06	SIG	M62/2088A1	HSD	M62 J25 - J30	
04/09/15 09:00:14	SIG	M62/2079A1	REDX	M62 J25 - J30	
04/09/15 09:00:14	SIG	M62/2097A1	HSD	M62 J25 - J30	
04/09/15 09:01:22	SIG	M62/2088A1	REDX	M62 J25 - J30	
04/09/15 09:01:22	SIG	M62/2106A1	HSD	M62 J25 - J30	
04/09/15 09:02:30	SIG	M62/2097A1	REDX	M62 J25 - J30	
04/09/15 09:03:38	SIG	M62/2106A1	REDX	M62 J25 - J30	
04/09/15 09:04:38	SIG	M62/2065A2	NR	M62 J25 - J30	
04/09/15 09:04:38	SIG	M62/2065A3	NR	M62 J25 - J30	
04/09/15 09:04:38	SIG	M62/2065A4	NR	M62 J25 - J30	
04/09/15 09:04:38	SIG	M62/2074A2	NR	M62 J25 - J30	
04/09/15 09:04:38	SIG	M62/2074A3	NR	M62 J25 - J30	
04/09/15 09:04:38	SIG	M62/2074A4	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2073K1	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2073K2	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2079A2	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2079A3	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2079A4	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2088A2	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2088A3	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2088A4	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2097A2	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2097A3	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2097A4	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2106A2	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2106A3	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2106A4	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2114A1	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2114A2	NR	M62 J25 - J30	
04/09/15 09:04:39	SIG	M62/2114A3	NR	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2073K1	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2073K2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2074A1	BLNK	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2074A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2074A4	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2079A1	BLNK	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2079A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2079A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2079A4	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2088A1	BLNK	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2088A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2088A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2088A4	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2097A1	BLNK	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2097A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2097A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2097A4	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2106A1	BLNK	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2106A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2106A4	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2114A1	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2114A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2114A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2117A1	BLNK	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2117A2	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2117A3	OFF	M62 J25 - J30	
04/09/15 09:05:39	SIG	M62/2117A4	OFF	M62 J25 - J30	
04/09/15 09:16:43	SIG	M62/2057B1	HSD	M62 J25 - J30	
04/09/15 09:18:42	SIG	M62/2041B1	HSD	M62 J25 - J30	
04/09/15 09:18:43	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 09:18:43	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 09:18:43	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 09:18:43	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 09:19:42	SIG	M62/2033B1	HSD	M62 J25 - J30	
04/09/15 09:20:43	SIG	M62/2025B1	HSD	M62 J25 - J30	
04/09/15 09:20:43	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 09:21:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
04/09/15 09:22:19	SIG	M62/2025B1	REDX	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2050B2	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2050B3	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2050B4	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2057B2	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2057B3	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2057B4	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2065B2	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2065B3	NR	M62 J25 - J30	
04/09/15 09:22:49	SIG	M62/2065B4	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2018B1	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2018B2	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2018B3	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2018L1	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2025B2	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2025B3	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2025B4	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2033B2	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2033B3	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2033B4	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 09:22:50	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 09:23:49	SIG	M62/2069M1	OFF	M62 J25 - J30	
04/09/15 09:23:49	SIG	M62/2069M2	OFF	M62 J25 - J30	
04/09/15 09:23:49	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 09:23:49	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2012B1	BLNK	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2012B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2012B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2012B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2018B1	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2018B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2018B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2018L1	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2025B1	BLNK	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2025B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2025B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2025B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2033B1	BLNK	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2033B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2033B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2041B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2041B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2041B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2050B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2050B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2050B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2057B1	BLNK	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2057B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2057B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2057B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2065B1	BLNK	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2065B2	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2065B3	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2065B4	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M62/2065M1	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M621/1002B1	OFF	M62 J25 - J30	
04/09/15 09:23:50	SIG	M621/1002B2	OFF	M62 J25 - J30	
04/09/15 11:23:28	SIG	M62/2012A1	OFF	M62 J25 - J30	
04/09/15 11:23:28	SIG	M62/2012A1	OFF	M62 J25 - J30	
04/09/15 11:23:29	SIG	M62/2012A1	OFF	M62 J25 - J30	
04/09/15 11:23:29	SIG	M62/2012A1	OFF	M62 J25 - J30	
04/09/15 11:23:39	SIG	M62/2012A1	OFF	M62 J25 - J30	
04/09/15 11:23:39	SIG	M62/2012A1	60R	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2074B1	REDX	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2074B2	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2074B3	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2074B4	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2081B1	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2081B2	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2081B3	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2081L1	NR	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2088B1	REDX	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2088B2	60R	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2088B3	60R	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2088B4	60R	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2097B1	REDX	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2097B2	60R	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2097B3	60R	M62 J25 - J30	
04/09/15 11:52:58	SIG	M62/2097B4	60R	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2074B1	BLNK	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2074B2	OFF	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2074B3	OFF	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2074B4	OFF	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2081B1	OFF	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2081B2	OFF	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2081B3	OFF	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2081L1	NR	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2088B2	NR	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2088B3	NR	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2088B4	NR	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2097B2	NR	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2097B3	NR	M62 J25 - J30	
04/09/15 12:05:20	SIG	M62/2097B4	NR	M62 J25 - J30	
04/09/15 12:07:09	SIG	M62/2065M1	NR	M62 J25 - J30	
04/09/15 12:07:09	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 12:07:09	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 12:07:09	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 12:07:09	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2057B2	NR	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2057B3	NR	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2057B4	NR	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2065B1	REDX	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 12:07:10	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 12:07:10	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 12:07:10	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2012B1	REDX	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2012B2	NR	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2012B3	NR	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2012B4	NR	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2033B1	REDX	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2033B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2033B3	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2033B4	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2041B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2041B3	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2041B4	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2050B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2050B3	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2050B4	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2057B2	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2057B3	60R	M62 J25 - J30	
04/09/15 12:07:11	SIG	M62/2057B4	60R	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2081L1	OFF	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2088B2	OFF	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2088B3	OFF	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2088B4	OFF	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2097B2	OFF	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2097B3	OFF	M62 J25 - J30	
04/09/15 12:08:20	SIG	M62/2097B4	OFF	M62 J25 - J30	
04/09/15 12:08:21	SIG	M62/2088B1	BLNK	M62 J25 - J30	
04/09/15 12:08:21	SIG	M62/2088B1	BLNK	M62 J25 - J30	
04/09/15 12:08:21	SIG	M62/2097B1	BLNK	M62 J25 - J30	
04/09/15 12:08:21	SIG	M62/2097B1	BLNK	M62 J25 - J30	
04/09/15 12:08:34	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 12:09:06	SIG	M62/2033B1	60R	M62 J25 - J30	
04/09/15 12:09:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 12:09:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 12:09:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 12:09:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 12:09:27	SIG	M62/2041B1	60R	M62 J25 - J30	
04/09/15 12:09:47	SIG	M62/2057B1	60R	M62 J25 - J30	
04/09/15 12:09:47	SIG	M621/1002B1	60R	M62 J25 - J30	
04/09/15 12:09:47	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 12:09:47	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 13:31:10	SIG	M62/2122K1	IT	M62 J25 - J30	
04/09/15 13:31:10	SIG	M62/2122K2	IT	M62 J25 - J30	
04/09/15 13:31:10	SIG	M62/2135A1	NR	M62 J25 - J30	
04/09/15 13:31:10	SIG	M62/2135A2	NR	M62 J25 - J30	
04/09/15 13:31:10	SIG	M62/2135A3	NR	M62 J25 - J30	
04/09/15 13:31:10	SIG	M62/2135A4	NR	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2065A2	60R	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2065A3	60R	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2065A4	60R	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2073K1	60R	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2073K2	60R	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2079A1	REDX	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2079A2	NR	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2079A3	NR	M62 J25 - J30	
04/09/15 13:35:12	SIG	M62/2079A4	NR	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2074A1	REDX	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2074A2	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2074A3	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2074A4	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2079A2	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2079A3	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2079A4	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2088A1	REDX	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2088A2	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2088A3	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2088A4	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2097A1	REDX	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2097A2	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2097A3	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2097A4	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A1	REDX	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A2	NR	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A2	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A3	NR	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A3	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A4	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2106A4	NR	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2114A1	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2114A2	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2114A3	60R	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2117A1	REDX	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2117A2	NR	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2117A3	NR	M62 J25 - J30	
04/09/15 13:35:13	SIG	M62/2117A4	NR	M62 J25 - J30	
04/09/15 13:35:25	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 13:35:26	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 13:35:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 13:35:28	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 13:36:33	SIG	M62/2106A1	60R	M62 J25 - J30	
04/09/15 13:36:56	SIG	M62/2097A1	60R	M62 J25 - J30	
04/09/15 13:37:19	SIG	M62/2088A1	60R	M62 J25 - J30	
04/09/15 13:37:23	SIG	M62/2079A1	60R	M62 J25 - J30	
04/09/15 13:39:23	SIG	M62/2122K1	TT	M62 J25 - J30	
04/09/15 13:39:23	SIG	M62/2122K2	TT	M62 J25 - J30	
04/09/15 13:39:23	SIG	M62/2135A1	NR	M62 J25 - J30	
04/09/15 13:39:23	SIG	M62/2135A2	NR	M62 J25 - J30	
04/09/15 13:39:23	SIG	M62/2135A3	NR	M62 J25 - J30	
04/09/15 13:39:23	SIG	M62/2135A4	NR	M62 J25 - J30	
04/09/15 13:39:28	SIG	M62/2122K1	TT	M62 J25 - J30	
04/09/15 13:39:28	SIG	M62/2122K2	TT	M62 J25 - J30	
04/09/15 13:42:23	SIG	M62/2135A1	OFF	M62 J25 - J30	
04/09/15 13:42:23	SIG	M62/2135A2	OFF	M62 J25 - J30	
04/09/15 13:42:23	SIG	M62/2135A3	OFF	M62 J25 - J30	
04/09/15 13:42:23	SIG	M62/2135A4	OFF	M62 J25 - J30	
04/09/15 13:49:55	SIG	M62/2113B1	REDX	M62 J25 - J30	
04/09/15 13:49:55	SIG	M62/2113B2	NR	M62 J25 - J30	
04/09/15 13:49:55	SIG	M62/2113B3	NR	M62 J25 - J30	
04/09/15 13:49:55	SIG	M62/2113B4	NR	M62 J25 - J30	
04/09/15 13:49:55	SIG	M62/2120M1	60R	M62 J25 - J30	
04/09/15 13:49:55	SIG	M62/2120M2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2074B1	REDX	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2088B1	REDX	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2088B2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2088B3	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2088B4	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2097B1	REDX	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2097B2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2097B4	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2106B1	REDX	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2106B2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2106B3	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2106B4	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2113B2	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2113B3	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2113B4	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2117B1	60R	M62 J25 - J30	
04/09/15 13:50:14	SIG	M62/2117B3	60R	M62 J25 - J30	
04/09/15 13:51:13	SIG	M62/2122K1	OFF	M62 J25 - J30	
04/09/15 13:51:13	SIG	M62/2122K2	OFF	M62 J25 - J30	
04/09/15 13:51:19	SIG	M62/2088B1	60R	M62 J25 - J30	
04/09/15 13:51:39	SIG	M62/2097B1	60R	M62 J25 - J30	
04/09/15 13:52:07	SIG	M62/2106B1	60R	M62 J25 - J30	
04/09/15 13:52:11	SIG	M62/2113B1	60R	M62 J25 - J30	
04/09/15 13:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 13:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 14:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 14:26:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 14:38:24	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 14:38:24	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 14:38:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 14:38:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 14:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 14:56:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 14:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 14:56:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 14:58:22	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 14:58:22	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 15:14:37	SIG	M62/2170K1	60R	M62 J25 - J30	
04/09/15 15:14:37	SIG	M62/2170K2	60R	M62 J25 - J30	
04/09/15 15:14:37	SIG	M62/2177A1	REDX	M62 J25 - J30	
04/09/15 15:14:37	SIG	M62/2177A2	NR	M62 J25 - J30	
04/09/15 15:14:37	SIG	M62/2177A3	NR	M62 J25 - J30	
04/09/15 15:14:37	SIG	M62/2177A4	NR	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2170A1	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2170A2	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2177A2	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2177A3	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2177A4	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2183A1	REDX	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2183A2	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2183A3	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2183A4	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2189A1	REDX	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2189A2	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2189A3	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2189A4	60R	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2197A1	NR	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2197A2	NR	M62 J25 - J30	
04/09/15 15:14:38	SIG	M62/2197A3	NR	M62 J25 - J30	
04/09/15 15:15:34	SIG	M62/2189A1	60R	M62 J25 - J30	
04/09/15 15:15:51	SIG	M62/2183A1	60R	M62 J25 - J30	
04/09/15 15:15:55	SIG	M62/2177A1	60R	M62 J25 - J30	
04/09/15 15:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 15:26:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 15:26:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 15:26:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 15:49:35	SIG	M62/2050A1	60R	M62 J25 - J30	
04/09/15 15:49:35	SIG	M62/2050A1	OFF	M62 J25 - J30	
04/09/15 15:53:41	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M621/1002B1	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 15:53:41	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M621/1002B1	40R	M62 J25 - J30	
04/09/15 15:53:46	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 15:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 15:56:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 15:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 15:56:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 15:57:40	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M621/1002B1	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 15:57:40	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 16:12:56	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2033B1	50R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2033B2	50R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:13:02	SIG	M62/2033B4	50R	M62 J25 - J30	
04/09/15 16:15:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:15:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:15:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:15:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:15:40	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 16:15:40	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 16:15:40	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2041B1	50R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2041B2	50R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2041B3	50R	M62 J25 - J30	
04/09/15 16:15:45	SIG	M62/2041B4	50R	M62 J25 - J30	
04/09/15 16:17:23	SIG	M62/2025A1	OFF	M62 J25 - J30	
04/09/15 16:17:40	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 16:17:40	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 16:17:40	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 16:17:40	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 16:18:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:18:19	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:18:25	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:19:01	SIG	M62/2041B1	40R	M62 J25 - J30	
04/09/15 16:19:01	SIG	M62/2041B2	40R	M62 J25 - J30	
04/09/15 16:19:01	SIG	M62/2041B3	40R	M62 J25 - J30	
04/09/15 16:19:01	SIG	M62/2041B4	40R	M62 J25 - J30	
04/09/15 16:19:44	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 16:19:44	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 16:19:44	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 16:19:44	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 16:21:29	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:21:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:21:35	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 16:22:19	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 16:22:25	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2033B1	50R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2033B2	50R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2033B4	50R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2041B1	60R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2041B2	60R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2041B3	60R	M62 J25 - J30	
04/09/15 16:23:01	SIG	M62/2041B4	60R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2041B1	50R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2041B2	50R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2041B3	50R	M62 J25 - J30	
04/09/15 16:23:56	SIG	M62/2041B4	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2057B1	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M621/1002B1	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 16:25:06	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2057B1	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2057B2	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2057B4	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M621/1002B1	40R	M62 J25 - J30	
04/09/15 16:25:12	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 16:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 16:26:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2041B1	40R	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2041B2	40R	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2041B3	40R	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2041B4	40R	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 16:26:29	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 16:26:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 16:26:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2041B1	40R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2041B2	40R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2041B3	40R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2041B4	40R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 16:26:35	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 16:26:41	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:26:52	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 16:26:52	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 16:26:52	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 16:26:52	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 16:27:25	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 16:27:25	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 16:27:25	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 16:27:25	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 16:27:31	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 16:27:31	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 16:27:31	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 16:27:31	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M62/2069M1	40R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M62/2069M2	40R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M62/2074B2	50R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M62/2074B3	50R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M62/2074B4	50R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M621/1010B1	40R	M62 J25 - J30	
04/09/15 16:27:54	SIG	M621/1010B2	40R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2074B2	40R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2074B3	40R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2074B4	40R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2081B1	50R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2081B2	50R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2081B3	50R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M62/2081L1	50R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M621/1010B1	40R	M62 J25 - J30	
04/09/15 16:28:00	SIG	M621/1010B2	40R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2050B2	60R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2050B3	60R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2050B4	60R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2057B1	60R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2057B2	60R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2057B3	60R	M62 J25 - J30	
04/09/15 16:29:07	SIG	M62/2057B4	60R	M62 J25 - J30	
04/09/15 16:29:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:29:33	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:29:38	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M621/1002B1	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 16:32:10	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 16:32:25	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 16:32:25	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 16:32:25	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 16:32:25	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 16:32:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:32:37	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:32:42	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 16:33:39	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 16:34:52	SIG	M62/2033B1	30R	M62 J25 - J30	
04/09/15 16:34:57	SIG	M62/2033B1	20R	M62 J25 - J30	
04/09/15 16:34:57	SIG	M62/2041B1	LDR	M62 J25 - J30	
04/09/15 16:34:57	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 16:34:57	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 16:34:57	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 16:35:03	SIG	M62/2033B1	STOP	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2057B1	50R	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 16:35:07	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 16:35:25	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 16:35:25	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 16:35:25	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 16:35:25	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 16:35:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:35:40	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:35:46	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2057B1	40R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2057B2	40R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2057B4	40R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M621/1002B1	50R	M62 J25 - J30	
04/09/15 16:36:30	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2074B2	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2074B3	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M62/2074B4	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M621/1002B1	40R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 16:36:37	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2069M1	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2069M2	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2074B2	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2074B3	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2074B4	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2081B1	50R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2081B2	50R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2081B3	50R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M62/2081L1	50R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M621/1002B1	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M621/1010B1	40R	M62 J25 - J30	
04/09/15 16:36:42	SIG	M621/1010B2	40R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 16:36:44	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 16:36:49	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M606/2003B1	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M606/2003B2	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2004B1	REDX	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2004B2	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2004B3	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2004B4	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2005M1	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2005M2	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2012B2	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2012B3	50R	M62 J25 - J30	
04/09/15 16:38:42	SIG	M62/2012B4	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1960B1	NR	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1960B2	NR	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1960B3	NR	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1960L1	NR	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1960L2	NR	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1968B1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1968B2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1968B3	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1968L1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1974B1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1974B2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1974B3	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1974B4	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1974M1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1974M2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1981B1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1981B2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1981B3	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1981B4	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1987B1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1987B2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1987B3	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1987B4	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1992B1	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1992B2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1992B3	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1992B4	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1999B1	REDX	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1999B2	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1999B3	50R	M62 J25 - J30	
04/09/15 16:38:43	SIG	M62/1999B4	50R	M62 J25 - J30	
04/09/15 16:38:44	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:38:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:38:50	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1956A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1956A2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1956A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1960A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1960A2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1960A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1960K1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1960K2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1968A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1968A2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1968A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1968A4	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1974A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1974A2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1974A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1974A4	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1979K1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1979K2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1981A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1981A2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1981A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1981A4	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1987A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1987A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1987J1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1992A1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1992A2	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1992A3	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1992J1	50R	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1999A1	NR	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1999A2	NR	M62 J25 - J30	
04/09/15 16:39:25	SIG	M62/1999A3	NR	M62 J25 - J30	
04/09/15 16:40:23	SIG	M62/2025A1	OFF	M62 J25 - J30	
04/09/15 16:40:43	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 16:40:43	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 16:40:43	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 16:40:43	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 16:41:37	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 16:41:37	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 16:41:37	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 16:41:37	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 16:41:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:41:47	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:41:53	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:42:09	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 16:42:09	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 16:42:09	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 16:42:09	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 16:42:14	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 16:42:14	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 16:42:14	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 16:42:14	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2081B1	40R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2081B2	40R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2081B3	40R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2081L1	40R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2088B1	50R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2088B2	50R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2088B3	50R	M62 J25 - J30	
04/09/15 16:43:40	SIG	M62/2088B4	50R	M62 J25 - J30	
04/09/15 16:44:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:44:51	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:44:57	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:46:10	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 16:46:10	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 16:46:10	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 16:46:10	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 16:46:26	SIG	M62/2088B1	40R	M62 J25 - J30	
04/09/15 16:46:26	SIG	M62/2088B2	40R	M62 J25 - J30	
04/09/15 16:46:26	SIG	M62/2088B3	40R	M62 J25 - J30	
04/09/15 16:46:26	SIG	M62/2088B4	40R	M62 J25 - J30	
04/09/15 16:47:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:47:54	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:48:00	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:49:28	SIG	M62/2041B2	50R	M62 J25 - J30	
04/09/15 16:49:28	SIG	M62/2041B3	50R	M62 J25 - J30	
04/09/15 16:49:28	SIG	M62/2041B4	50R	M62 J25 - J30	
04/09/15 16:49:34	SIG	M62/2097B1	50R	M62 J25 - J30	
04/09/15 16:49:34	SIG	M62/2097B2	50R	M62 J25 - J30	
04/09/15 16:49:34	SIG	M62/2097B4	50R	M62 J25 - J30	
04/09/15 16:50:23	SIG	M606/2003B1	OFF	M62 J25 - J30	
04/09/15 16:50:23	SIG	M606/2003B2	OFF	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1960B1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1960B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1960B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1960L1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1960L2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1968B1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1968B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1968B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1968L1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1974B1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1974B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1974B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1974B4	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1974M1	OFF	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1974M2	OFF	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1981B1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1981B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1981B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1981B4	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1987B1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1987B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1987B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1987B4	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1992B1	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1992B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1992B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1992B4	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1999B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1999B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/1999B4	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2004B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2004B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2004B4	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2005M1	OFF	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2005M2	OFF	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2012B2	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2012B3	NR	M62 J25 - J30	
04/09/15 16:50:23	SIG	M62/2012B4	NR	M62 J25 - J30	
04/09/15 16:50:47	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 16:50:47	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 16:50:47	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1956A1	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1956A2	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1960A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1960A2	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1960A3	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1960K1	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1960K2	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1968A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1968A2	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1968A3	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1968A4	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1974A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1974A2	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1974A3	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1974A4	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1979K1	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1979K2	OFF	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1981A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1981A2	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1981A3	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1981A4	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1987A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1987A3	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1987J1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1992A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1992A2	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1992A3	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1992J1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1999A1	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1999A2	NR	M62 J25 - J30	
04/09/15 16:50:53	SIG	M62/1999A3	NR	M62 J25 - J30	
04/09/15 16:50:58	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:50:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:51:04	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 16:51:05	SIG	M62/2041B2	40R	M62 J25 - J30	
04/09/15 16:51:05	SIG	M62/2041B3	40R	M62 J25 - J30	
04/09/15 16:51:05	SIG	M62/2041B4	40R	M62 J25 - J30	
04/09/15 16:51:05	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 16:51:05	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 16:51:05	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 16:51:48	SIG	M62/2097B1	40R	M62 J25 - J30	
04/09/15 16:51:48	SIG	M62/2097B2	40R	M62 J25 - J30	
04/09/15 16:51:48	SIG	M62/2097B4	40R	M62 J25 - J30	
04/09/15 16:52:24	SIG	M62/2106B1	50R	M62 J25 - J30	
04/09/15 16:52:24	SIG	M62/2106B2	50R	M62 J25 - J30	
04/09/15 16:52:24	SIG	M62/2106B3	50R	M62 J25 - J30	
04/09/15 16:52:24	SIG	M62/2106B4	50R	M62 J25 - J30	
04/09/15 16:53:03	SIG	M62/2041B1	50R	M62 J25 - J30	
04/09/15 16:53:08	SIG	M62/2033B1	50R	M62 J25 - J30	
04/09/15 16:53:08	SIG	M62/2033B2	50R	M62 J25 - J30	
04/09/15 16:53:08	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 16:53:08	SIG	M62/2033B4	50R	M62 J25 - J30	
04/09/15 16:53:08	SIG	M62/2041B1	40R	M62 J25 - J30	
04/09/15 16:53:23	SIG	M62/1999B2	OFF	M62 J25 - J30	
04/09/15 16:53:23	SIG	M62/2004B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1960B1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1960B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1960B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1960L1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1960L2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1968B1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1968B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1968B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1968L1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1974B1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1974B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1974B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1974B4	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1981B1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1981B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1981B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1981B4	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1987B1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1987B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1987B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1987B4	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1992B1	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1992B2	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1992B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1992B4	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1999B1	BLNK	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1999B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/1999B4	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/2004B1	BLNK	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/2004B3	OFF	M62 J25 - J30	
04/09/15 16:53:24	SIG	M62/2004B4	OFF	M62 J25 - J30	
04/09/15 16:53:53	SIG	M62/1960A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1960A2	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1960A3	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1968A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1968A2	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1968A3	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1968A4	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1974A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1974A2	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1974A3	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1974A4	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1981A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1981A2	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1981A3	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1981A4	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1987A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1987A3	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1987J1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1992A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1992A2	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1992A3	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1992J1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1999A1	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1999A2	OFF	M62 J25 - J30	
04/09/15 16:54:08	SIG	M62/1999A3	OFF	M62 J25 - J30	
04/09/15 16:55:04	SIG	M62/2041B1	50R	M62 J25 - J30	
04/09/15 16:55:04	SIG	M62/2041B2	50R	M62 J25 - J30	
04/09/15 16:55:04	SIG	M62/2041B3	50R	M62 J25 - J30	
04/09/15 16:55:04	SIG	M62/2041B4	50R	M62 J25 - J30	
04/09/15 16:56:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:56:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:56:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:56:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 16:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 16:56:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 16:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 16:56:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 16:57:24	SIG	M62/2125B1	60R	M62 J25 - J30	
04/09/15 16:57:24	SIG	M62/2125B2	60R	M62 J25 - J30	
04/09/15 16:57:24	SIG	M62/2125B3	60R	M62 J25 - J30	
04/09/15 16:57:24	SIG	M62/2125L1	60R	M62 J25 - J30	
04/09/15 16:57:24	SIG	M62/2125L2	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2033B1	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2033B2	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2033B3	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2033B4	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2041B1	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2041B2	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2041B3	60R	M62 J25 - J30	
04/09/15 16:59:25	SIG	M62/2041B4	60R	M62 J25 - J30	
04/09/15 16:59:51	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 16:59:51	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 16:59:51	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2106B1	40R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2106B2	40R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2106B3	40R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2106B4	40R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2113B1	50R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2113B2	50R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2113B3	50R	M62 J25 - J30	
04/09/15 17:01:43	SIG	M62/2113B4	50R	M62 J25 - J30	
04/09/15 17:02:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:02:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:02:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:02:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:02:38	SIG	M62/2057B1	50R	M62 J25 - J30	
04/09/15 17:02:38	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 17:02:38	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 17:02:38	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 17:06:24	SIG	M62/2050B2	60R	M62 J25 - J30	
04/09/15 17:06:24	SIG	M62/2050B3	60R	M62 J25 - J30	
04/09/15 17:06:24	SIG	M62/2050B4	60R	M62 J25 - J30	
04/09/15 17:07:45	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 17:07:45	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 17:07:45	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 17:08:16	SIG	M62/2106B1	50R	M62 J25 - J30	
04/09/15 17:08:16	SIG	M62/2106B2	50R	M62 J25 - J30	
04/09/15 17:08:16	SIG	M62/2106B3	50R	M62 J25 - J30	
04/09/15 17:08:16	SIG	M62/2106B4	50R	M62 J25 - J30	
04/09/15 17:08:20	SIG	M62/2106B1	40R	M62 J25 - J30	
04/09/15 17:08:20	SIG	M62/2106B2	40R	M62 J25 - J30	
04/09/15 17:08:20	SIG	M62/2106B3	40R	M62 J25 - J30	
04/09/15 17:08:20	SIG	M62/2106B4	40R	M62 J25 - J30	
04/09/15 17:08:48	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 17:08:48	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 17:08:48	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 17:14:24	SIG	M62/2117B1	50R	M62 J25 - J30	
04/09/15 17:14:24	SIG	M62/2117B3	50R	M62 J25 - J30	
04/09/15 17:14:24	SIG	M62/2120M1	50R	M62 J25 - J30	
04/09/15 17:14:24	SIG	M62/2120M2	50R	M62 J25 - J30	
04/09/15 17:19:59	SIG	M62/2106B1	50R	M62 J25 - J30	
04/09/15 17:19:59	SIG	M62/2106B2	50R	M62 J25 - J30	
04/09/15 17:19:59	SIG	M62/2106B3	50R	M62 J25 - J30	
04/09/15 17:19:59	SIG	M62/2106B4	50R	M62 J25 - J30	
04/09/15 17:20:50	SIG	M62/2106B1	40R	M62 J25 - J30	
04/09/15 17:20:50	SIG	M62/2106B2	40R	M62 J25 - J30	
04/09/15 17:20:50	SIG	M62/2106B3	40R	M62 J25 - J30	
04/09/15 17:20:50	SIG	M62/2106B4	40R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 17:22:38	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2033B1	50R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2033B2	50R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 17:22:44	SIG	M62/2033B4	50R	M62 J25 - J30	
04/09/15 17:24:50	SIG	M62/2106B1	50R	M62 J25 - J30	
04/09/15 17:24:50	SIG	M62/2106B2	50R	M62 J25 - J30	
04/09/15 17:24:50	SIG	M62/2106B3	50R	M62 J25 - J30	
04/09/15 17:24:50	SIG	M62/2106B4	50R	M62 J25 - J30	
04/09/15 17:25:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:25:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:25:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:25:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:26:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 17:26:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 17:26:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 17:26:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 17:26:38	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 17:26:38	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 17:26:38	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 17:26:38	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 17:27:25	SIG	M62/2117B1	60R	M62 J25 - J30	
04/09/15 17:27:25	SIG	M62/2117B3	60R	M62 J25 - J30	
04/09/15 17:27:25	SIG	M62/2120M1	60R	M62 J25 - J30	
04/09/15 17:27:25	SIG	M62/2120M2	60R	M62 J25 - J30	
04/09/15 17:28:42	SIG	M62/2097B1	50R	M62 J25 - J30	
04/09/15 17:28:42	SIG	M62/2097B2	50R	M62 J25 - J30	
04/09/15 17:28:42	SIG	M62/2097B4	50R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2033B1	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2033B2	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2033B3	60R	M62 J25 - J30	
04/09/15 17:29:01	SIG	M62/2033B4	60R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 17:29:27	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2033B1	50R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2033B2	50R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 17:29:33	SIG	M62/2033B4	50R	M62 J25 - J30	
04/09/15 17:31:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:31:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:31:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:31:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:33:25	SIG	M62/2113B1	60R	M62 J25 - J30	
04/09/15 17:33:25	SIG	M62/2113B2	60R	M62 J25 - J30	
04/09/15 17:33:25	SIG	M62/2113B3	60R	M62 J25 - J30	
04/09/15 17:33:25	SIG	M62/2113B4	60R	M62 J25 - J30	
04/09/15 17:33:28	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 17:33:28	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 17:33:28	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 17:33:28	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 17:34:00	SIG	M62/2088B1	50R	M62 J25 - J30	
04/09/15 17:34:00	SIG	M62/2088B2	50R	M62 J25 - J30	
04/09/15 17:34:00	SIG	M62/2088B3	50R	M62 J25 - J30	
04/09/15 17:34:00	SIG	M62/2088B4	50R	M62 J25 - J30	
04/09/15 17:34:59	SIG	M62/2088B1	40R	M62 J25 - J30	
04/09/15 17:34:59	SIG	M62/2088B2	40R	M62 J25 - J30	
04/09/15 17:34:59	SIG	M62/2088B3	40R	M62 J25 - J30	
04/09/15 17:34:59	SIG	M62/2088B4	40R	M62 J25 - J30	
04/09/15 17:35:01	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 17:35:01	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 17:35:01	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 17:35:01	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 17:35:07	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 17:35:07	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 17:35:07	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 17:35:07	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M621/1002B1	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 17:36:27	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M62/2069M1	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M62/2069M2	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M621/1002B1	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M621/1010B1	40R	M62 J25 - J30	
04/09/15 17:36:41	SIG	M621/1010B2	40R	M62 J25 - J30	
04/09/15 17:37:10	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 17:37:10	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 17:37:10	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2041B1	50R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2041B2	50R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2041B3	50R	M62 J25 - J30	
04/09/15 17:37:16	SIG	M62/2041B4	50R	M62 J25 - J30	
04/09/15 17:39:02	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 17:39:02	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 17:39:02	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 17:39:02	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 17:40:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:40:02	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 17:40:07	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 17:40:40	SIG	M62/2088B1	50R	M62 J25 - J30	
04/09/15 17:40:40	SIG	M62/2088B2	50R	M62 J25 - J30	
04/09/15 17:40:40	SIG	M62/2088B3	50R	M62 J25 - J30	
04/09/15 17:40:40	SIG	M62/2088B4	50R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2033B1	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2033B2	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2033B3	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2033B4	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2041B1	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2041B2	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2041B3	60R	M62 J25 - J30	
04/09/15 17:41:11	SIG	M62/2041B4	60R	M62 J25 - J30	
04/09/15 17:42:06	SIG	M62/2081B1	50R	M62 J25 - J30	
04/09/15 17:42:06	SIG	M62/2081B2	50R	M62 J25 - J30	
04/09/15 17:42:06	SIG	M62/2081B3	50R	M62 J25 - J30	
04/09/15 17:42:06	SIG	M62/2081L1	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M606/2003B1	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M606/2003B2	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1992B1	NR	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1992B2	NR	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1992B3	NR	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1992B4	NR	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1999B1	REDX	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1999B2	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1999B3	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/1999B4	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2004B1	REDX	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2004B2	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2004B3	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2004B4	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2005M1	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2005M2	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2012B2	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2012B3	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2012B4	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 17:43:58	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 17:44:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:44:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:44:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:44:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2025B1	50R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2025B2	50R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2025B3	50R	M62 J25 - J30	
04/09/15 17:44:26	SIG	M62/2025B4	50R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2018B1	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2018B2	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2018B3	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2018L1	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2025B1	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2025B2	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2025B3	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2025B4	40R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2033B1	50R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2033B2	50R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 17:44:32	SIG	M62/2033B4	50R	M62 J25 - J30	
04/09/15 17:45:25	SIG	M62/2106B1	60R	M62 J25 - J30	
04/09/15 17:45:25	SIG	M62/2106B2	60R	M62 J25 - J30	
04/09/15 17:45:25	SIG	M62/2106B3	60R	M62 J25 - J30	
04/09/15 17:45:25	SIG	M62/2106B4	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2088B1	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2088B2	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2088B3	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2088B4	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2097B1	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2097B2	60R	M62 J25 - J30	
04/09/15 17:46:35	SIG	M62/2097B4	60R	M62 J25 - J30	
04/09/15 17:47:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:47:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:47:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:47:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2074B2	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2074B3	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2074B4	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M621/1002B1	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 17:47:49	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 17:48:47	SIG	M62/2018B1	50R	M62 J25 - J30	
04/09/15 17:48:47	SIG	M62/2018B2	50R	M62 J25 - J30	
04/09/15 17:48:47	SIG	M62/2018B3	50R	M62 J25 - J30	
04/09/15 17:48:47	SIG	M62/2018L1	50R	M62 J25 - J30	
04/09/15 17:50:25	SIG	M62/2057B1	60R	M62 J25 - J30	
04/09/15 17:50:25	SIG	M62/2057B2	60R	M62 J25 - J30	
04/09/15 17:50:25	SIG	M62/2057B3	60R	M62 J25 - J30	
04/09/15 17:50:25	SIG	M62/2057B4	60R	M62 J25 - J30	
04/09/15 17:50:30	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 17:50:30	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 17:50:30	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2033B1	40R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2033B2	40R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2033B4	40R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2041B1	50R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2041B2	50R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2041B3	50R	M62 J25 - J30	
04/09/15 17:50:35	SIG	M62/2041B4	50R	M62 J25 - J30	
04/09/15 17:52:25	SIG	M62/2125B1	OFF	M62 J25 - J30	
04/09/15 17:52:25	SIG	M62/2125B2	OFF	M62 J25 - J30	
04/09/15 17:52:25	SIG	M62/2125B3	OFF	M62 J25 - J30	
04/09/15 17:52:25	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 17:52:25	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 17:53:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:53:19	SIG	M62/2033B3	50R	M62 J25 - J30	
04/09/15 17:53:24	SIG	M62/2033B3	40R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M621/1002B1	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 17:54:25	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2025B1	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2025B2	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2025B3	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2025B4	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2033B1	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2033B2	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2033B3	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2033B4	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2041B1	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2041B2	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2041B3	60R	M62 J25 - J30	
04/09/15 17:54:30	SIG	M62/2041B4	60R	M62 J25 - J30	
04/09/15 17:55:25	SIG	M62/2125L1	OFF	M62 J25 - J30	
04/09/15 17:55:26	SIG	M62/2125L2	OFF	M62 J25 - J30	
04/09/15 17:56:21	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 17:56:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 17:56:31	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 17:56:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 17:57:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:57:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:57:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 17:57:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 18:05:29	SIG	M62/2079A1	HSD	M62 J25 - J30	
04/09/15 18:06:28	SIG	M606/2003B1	OFF	M62 J25 - J30	
04/09/15 18:06:28	SIG	M606/2003B2	OFF	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1992B1	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1992B2	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1992B3	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1992B4	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1999B2	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1999B3	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/1999B4	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2004B2	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2004B3	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2004B4	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2005M1	OFF	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2005M2	OFF	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2012B2	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2012B3	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2012B4	NR	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2018B1	60R	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2018B2	60R	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2018B3	60R	M62 J25 - J30	
04/09/15 18:06:28	SIG	M62/2018L1	60R	M62 J25 - J30	
04/09/15 18:06:38	SIG	M62/2088A1	HSD	M62 J25 - J30	
04/09/15 18:07:46	SIG	M62/2079A1	REDX	M62 J25 - J30	
04/09/15 18:07:46	SIG	M62/2097A1	HSD	M62 J25 - J30	
04/09/15 18:08:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 18:08:54	SIG	M62/2088A1	REDX	M62 J25 - J30	
04/09/15 18:08:54	SIG	M62/2106A1	HSD	M62 J25 - J30	
04/09/15 18:09:28	SIG	M62/1999B2	OFF	M62 J25 - J30	
04/09/15 18:09:28	SIG	M62/2004B1	BLNK	M62 J25 - J30	
04/09/15 18:09:28	SIG	M62/2004B2	OFF	M62 J25 - J30	
04/09/15 18:09:28	SIG	M62/2004B3	OFF	M62 J25 - J30	
04/09/15 18:09:28	SIG	M62/2004B4	OFF	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1992B1	OFF	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1992B2	OFF	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1992B3	OFF	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1992B4	OFF	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1999B1	BLNK	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1999B3	OFF	M62 J25 - J30	
04/09/15 18:09:29	SIG	M62/1999B4	OFF	M62 J25 - J30	
04/09/15 18:10:02	SIG	M62/2097A1	REDX	M62 J25 - J30	
04/09/15 18:11:10	SIG	M62/2106A1	REDX	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2065A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2065A3	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2065A4	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2073K1	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2073K2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2074A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2074A3	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2074A4	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2079A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2079A3	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2079A4	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2088A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2088A3	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2088A4	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2097A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2097A3	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2097A4	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2106A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2106A3	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2106A4	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2114A1	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2114A2	NR	M62 J25 - J30	
04/09/15 18:12:10	SIG	M62/2114A3	NR	M62 J25 - J30	
04/09/15 18:12:25	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 18:12:25	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 18:13:10	SIG	M62/2073K1	OFF	M62 J25 - J30	
04/09/15 18:13:10	SIG	M62/2073K2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2074A1	BLNK	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2074A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2074A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2074A4	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2079A1	BLNK	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2079A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2079A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2079A4	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2088A1	BLNK	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2088A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2088A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2088A4	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2097A1	BLNK	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2097A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2097A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2097A4	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2106A1	BLNK	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2106A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2106A4	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2114A1	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2114A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2114A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2117A1	BLNK	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2117A2	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2117A3	OFF	M62 J25 - J30	
04/09/15 18:13:11	SIG	M62/2117A4	OFF	M62 J25 - J30	
04/09/15 18:14:13	SIG	M62/2113B1	HSD	M62 J25 - J30	
04/09/15 18:15:07	SIG	M62/2106B1	HSD	M62 J25 - J30	
04/09/15 18:16:15	SIG	M62/2097B1	HSD	M62 J25 - J30	
04/09/15 18:16:15	SIG	M62/2113B1	REDX	M62 J25 - J30	
04/09/15 18:17:23	SIG	M62/2088B1	HSD	M62 J25 - J30	
04/09/15 18:17:23	SIG	M62/2106B1	REDX	M62 J25 - J30	
04/09/15 18:18:31	SIG	M62/2097B1	REDX	M62 J25 - J30	
04/09/15 18:19:39	SIG	M62/2088B1	REDX	M62 J25 - J30	
04/09/15 18:20:32	SIG	M62/2117B1	NR	M62 J25 - J30	
04/09/15 18:20:32	SIG	M62/2117B3	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2074B2	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2074B3	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2074B4	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2081B1	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2081B2	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2081B3	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2081L1	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2088B2	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2088B3	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2088B4	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2097B2	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2097B4	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2106B2	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2106B3	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2106B4	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2113B2	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2113B3	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2113B4	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2120M1	NR	M62 J25 - J30	
04/09/15 18:20:42	SIG	M62/2120M2	NR	M62 J25 - J30	
04/09/15 18:21:32	SIG	M62/2120M1	OFF	M62 J25 - J30	
04/09/15 18:21:32	SIG	M62/2120M2	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2097B1	BLNK	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2097B2	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2097B4	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2106B1	BLNK	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2106B2	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2106B3	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2106B4	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2113B1	BLNK	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2113B2	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2113B3	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2113B4	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
04/09/15 18:21:42	SIG	M62/2117B3	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2074B1	BLNK	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2074B2	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2074B3	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2074B4	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2081B1	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2081B2	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2081B3	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2081L1	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2088B1	BLNK	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2088B2	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2088B3	OFF	M62 J25 - J30	
04/09/15 18:21:43	SIG	M62/2088B4	OFF	M62 J25 - J30	
04/09/15 18:23:42	SIG	M62/2177A1	HSD	M62 J25 - J30	
04/09/15 18:24:27	SIG	M62/2183A1	HSD	M62 J25 - J30	
04/09/15 18:25:12	SIG	M62/2189A1	HSD	M62 J25 - J30	
04/09/15 18:25:13	SIG	M62/2177A1	REDX	M62 J25 - J30	
04/09/15 18:26:13	SIG	M62/2183A1	REDX	M62 J25 - J30	
04/09/15 18:27:12	SIG	M62/2189A1	REDX	M62 J25 - J30	
04/09/15 18:27:13	SIG	M62/2170A1	NR	M62 J25 - J30	
04/09/15 18:27:13	SIG	M62/2170A2	NR	M62 J25 - J30	
04/09/15 18:27:13	SIG	M62/2170K1	NR	M62 J25 - J30	
04/09/15 18:27:13	SIG	M62/2170K2	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2177A2	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2177A3	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2177A4	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2183A2	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2183A3	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2183A4	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2189A2	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2189A3	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2189A4	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2197A1	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2197A2	NR	M62 J25 - J30	
04/09/15 18:27:14	SIG	M62/2197A3	NR	M62 J25 - J30	
04/09/15 18:28:13	SIG	M62/2170K1	OFF	M62 J25 - J30	
04/09/15 18:28:13	SIG	M62/2170K2	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2170A1	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2170A2	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2177A1	BLNK	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2177A2	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2177A3	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2177A4	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2183A2	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2183A3	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2183A4	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2189A1	BLNK	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2189A2	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2189A3	OFF	M62 J25 - J30	
04/09/15 18:28:14	SIG	M62/2189A4	OFF	M62 J25 - J30	
04/09/15 18:30:14	SIG	M62/2197A1	OFF	M62 J25 - J30	
04/09/15 18:30:14	SIG	M62/2197A2	OFF	M62 J25 - J30	
04/09/15 18:30:14	SIG	M62/2197A3	OFF	M62 J25 - J30	
04/09/15 18:37:37	SIG	M62/2057B1	HSD	M62 J25 - J30	
04/09/15 18:39:36	SIG	M62/2041B1	HSD	M62 J25 - J30	
04/09/15 18:39:36	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 18:39:36	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 18:39:36	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 18:39:36	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 18:40:36	SIG	M62/2033B1	HSD	M62 J25 - J30	
04/09/15 18:41:36	SIG	M62/2025B1	HSD	M62 J25 - J30	
04/09/15 18:41:37	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 18:42:28	SIG	M62/2033B1	REDX	M62 J25 - J30	
04/09/15 18:43:12	SIG	M62/2025B1	REDX	M62 J25 - J30	
04/09/15 18:43:42	SIG	M62/2065B2	NR	M62 J25 - J30	
04/09/15 18:43:42	SIG	M62/2065B3	NR	M62 J25 - J30	
04/09/15 18:43:42	SIG	M62/2065B4	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2018B1	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2018B2	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2018B3	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2018L1	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2025B2	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2025B3	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2025B4	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2033B2	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2033B3	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2033B4	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2050B2	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2050B3	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2050B4	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2057B2	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2057B3	NR	M62 J25 - J30	
04/09/15 18:43:43	SIG	M62/2057B4	NR	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2033B1	BLNK	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2033B2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2033B4	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2041B2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2041B3	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2041B4	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2050B2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2050B3	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2050B4	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2057B1	BLNK	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2057B2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2057B3	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2057B4	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2065B1	BLNK	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2065B2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2065B3	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2065B4	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2065M1	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2069M1	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M62/2069M2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M621/1002B1	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M621/1002B2	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 18:44:43	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2012B1	BLNK	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2012B2	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2012B3	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2012B4	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2018B1	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2018B2	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2018B3	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2018L1	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2025B1	BLNK	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2025B2	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2025B3	OFF	M62 J25 - J30	
04/09/15 18:44:44	SIG	M62/2025B4	OFF	M62 J25 - J30	
04/09/15 18:51:43	SIG	M62/2025A1	HSD	M62 J25 - J30	
04/09/15 18:52:42	SIG	M62/2033A1	HSD	M62 J25 - J30	
04/09/15 18:53:42	SIG	M62/2041A1	HSD	M62 J25 - J30	
04/09/15 18:53:43	SIG	M62/2018A1	HSD	M62 J25 - J30	
04/09/15 18:53:43	SIG	M62/2025A1	REDX	M62 J25 - J30	
04/09/15 18:54:49	SIG	M62/2050A1	HSD	M62 J25 - J30	
04/09/15 18:54:50	SIG	M62/2033A1	REDX	M62 J25 - J30	
04/09/15 18:55:41	SIG	M62/2041A1	REDX	M62 J25 - J30	
04/09/15 18:56:41	SIG	M62/2050A1	REDX	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2025A2	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2025A3	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2025A4	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2033A2	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2033A3	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2033A4	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2041A2	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2041A3	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2041A4	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2050A2	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2050A3	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2050A4	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2057A1	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2057A2	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2057A3	NR	M62 J25 - J30	
04/09/15 18:57:42	SIG	M62/2057J1	NR	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2008K1	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2008K2	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2012A1	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2012A2	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2012A3	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2018A1	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2018A2	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2018A3	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2018A4	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2025A1	BLNK	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2025A2	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2025A3	OFF	M62 J25 - J30	
04/09/15 18:58:42	SIG	M62/2025A4	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2033A1	BLNK	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2033A2	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2033A3	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2033A4	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2041A1	BLNK	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2041A2	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2041A3	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2041A4	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2050A1	BLNK	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2050A2	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2050A3	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2050A4	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2057A1	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2057A2	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2057A3	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2057J1	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2065A1	BLNK	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2065A2	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2065A3	OFF	M62 J25 - J30	
04/09/15 18:58:43	SIG	M62/2065A4	OFF	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2074B1	REDX	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 19:46:42	SIG	M621/1010B1	LDR	M62 J25 - J30	
04/09/15 19:46:42	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2057B1	STOP	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2057B2	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2057B4	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2065B1	STOP	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 19:46:48	SIG	M621/1002B1	LDR	M62 J25 - J30	
04/09/15 19:46:48	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 19:46:53	SIG	M62/2065B1	STOP	M62 J25 - J30	
04/09/15 19:47:03	SIG	M62/2057B1	STOP	M62 J25 - J30	
04/09/15 19:58:35	SIG	M606/2003B1	NR	M62 J25 - J30	
04/09/15 19:58:35	SIG	M606/2003B2	NR	M62 J25 - J30	
04/09/15 20:02:04	SIG	M62/2189A3	50R	M62 J25 - J30	
04/09/15 20:02:04	SIG	M62/2189A4	50R	M62 J25 - J30	
04/09/15 20:02:04	SIG	M62/2197A1	50R	M62 J25 - J30	
04/09/15 20:02:04	SIG	M62/2197A2	50R	M62 J25 - J30	
04/09/15 20:02:04	SIG	M62/2197A3	50R	M62 J25 - J30	
04/09/15 20:02:10	SIG	M62/2189A3	40R	M62 J25 - J30	
04/09/15 20:02:10	SIG	M62/2189A4	40R	M62 J25 - J30	
04/09/15 20:02:10	SIG	M62/2197A1	40R	M62 J25 - J30	
04/09/15 20:02:10	SIG	M62/2197A2	40R	M62 J25 - J30	
04/09/15 20:02:10	SIG	M62/2197A3	40R	M62 J25 - J30	
04/09/15 20:02:15	SIG	M62/2197A1	30R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2177A1	REDX	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2177A2	60R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2177A3	60R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2177A4	60R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2183A1	REDX	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2183A2	LDR	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2183A3	50R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2183A4	50R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2189A1	STOP	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2189A2	LDR	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2189A3	40R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2189A4	40R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2197A1	20R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2197A2	40R	M62 J25 - J30	
04/09/15 20:02:20	SIG	M62/2197A3	40R	M62 J25 - J30	
04/09/15 20:02:26	SIG	M62/2189A1	STOP	M62 J25 - J30	
04/09/15 20:02:26	SIG	M62/2197A1	STOP	M62 J25 - J30	
04/09/15 20:02:27	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 20:02:27	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 20:02:27	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 20:02:27	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 20:11:19	SIG	M606/2003B1	NR	M62 J25 - J30	
04/09/15 20:11:19	SIG	M606/2003B2	NR	M62 J25 - J30	
04/09/15 20:12:28	SIG	M62/2170A1	60R	M62 J25 - J30	
04/09/15 20:12:28	SIG	M62/2170A2	60R	M62 J25 - J30	
04/09/15 20:12:28	SIG	M62/2170K1	60R	M62 J25 - J30	
04/09/15 20:12:28	SIG	M62/2170K2	60R	M62 J25 - J30	
04/09/15 20:12:55	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 20:12:55	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 20:12:55	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 20:12:55	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2170L1	LDR	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 20:13:55	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 20:14:19	SIG	M606/2003B1	OFF	M62 J25 - J30	
04/09/15 20:14:19	SIG	M606/2003B2	OFF	M62 J25 - J30	
04/09/15 20:15:44	SIG	M62/2183B2	???	M62 J25 - J30	
04/09/15 20:15:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2057A1	50R	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2057A2	50R	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2057A3	50R	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2057J1	50R	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2065A1	REDX	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2065A2	NR	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2065A3	NR	M62 J25 - J30	
04/09/15 20:19:11	SIG	M62/2065A4	NR	M62 J25 - J30	
04/09/15 20:19:11	SIG	M621/1002A1	50R	M62 J25 - J30	
04/09/15 20:19:11	SIG	M621/1002A2	LDL	M62 J25 - J30	
04/09/15 20:31:28	SIG	M62/2163A1	60R	M62 J25 - J30	
04/09/15 20:31:28	SIG	M62/2163A2	60R	M62 J25 - J30	
04/09/15 20:31:28	SIG	M62/2166K1	60R	M62 J25 - J30	
04/09/15 20:31:28	SIG	M62/2166K2	60R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2097A1	REDX	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2097A2	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2097A3	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2097A4	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2106A1	REDX	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2106A2	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2106A3	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2106A4	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2114A1	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2114A2	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2114A3	50R	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2117A1	REDX	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2117A2	NR	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2117A3	NR	M62 J25 - J30	
04/09/15 20:33:27	SIG	M62/2117A4	NR	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2183A2	60R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2183A3	60R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2183A4	60R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2189A1	REDX	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2189A2	50R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2189A3	50R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2189A4	50R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2197A1	50R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2197A2	50R	M62 J25 - J30	
04/09/15 20:34:08	SIG	M62/2197A3	50R	M62 J25 - J30	
04/09/15 20:35:29	SIG	M62/2197A1	40R	M62 J25 - J30	
04/09/15 20:35:29	SIG	M62/2197A2	40R	M62 J25 - J30	
04/09/15 20:35:29	SIG	M62/2197A3	40R	M62 J25 - J30	
04/09/15 20:35:34	SIG	M62/2197A2	30R	M62 J25 - J30	
04/09/15 20:35:34	SIG	M62/2197A3	30R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2170K1	50R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2170K2	50R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2177A2	50R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2177A3	50R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2177A4	LDL	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2183A2	50R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2183A3	LDL	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2183A4	LDL	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2189A3	LDL	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2189A4	LDL	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2197A1	40R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2197A2	20R	M62 J25 - J30	
04/09/15 20:35:39	SIG	M62/2197A3	20R	M62 J25 - J30	
04/09/15 20:35:45	SIG	M62/2197A2	STOP	M62 J25 - J30	
04/09/15 20:35:45	SIG	M62/2197A3	STOP	M62 J25 - J30	
04/09/15 20:35:57	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 20:35:57	SIG	M62/2106A3	???	M62 J25 - J30	
04/09/15 20:36:33	SIG	M62/2106A2	40R	M62 J25 - J30	
04/09/15 20:36:33	SIG	M62/2106A4	40R	M62 J25 - J30	
04/09/15 20:36:33	SIG	M62/2114A1	40R	M62 J25 - J30	
04/09/15 20:36:33	SIG	M62/2114A2	40R	M62 J25 - J30	
04/09/15 20:36:33	SIG	M62/2114A3	40R	M62 J25 - J30	
04/09/15 20:36:38	SIG	M62/2106A3	40R	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2106A1	STOP	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2106A2	40R	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2106A3	40R	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2106A4	40R	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2114A1	40R	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2114A2	40R	M62 J25 - J30	
04/09/15 20:36:44	SIG	M62/2114A3	40R	M62 J25 - J30	
04/09/15 20:36:49	SIG	M62/2106A1	STOP	M62 J25 - J30	
04/09/15 20:38:56	SIG	M62/2106A3	???	M62 J25 - J30	
04/09/15 20:38:57	SIG	M62/2106A3	50R	M62 J25 - J30	
04/09/15 20:39:02	SIG	M62/2106A3	40R	M62 J25 - J30	
04/09/15 20:39:03	SIG	M62/2114A1	50R	M62 J25 - J30	
04/09/15 20:39:03	SIG	M62/2114A2	50R	M62 J25 - J30	
04/09/15 20:39:03	SIG	M62/2114A3	50R	M62 J25 - J30	
04/09/15 20:39:36	SIG	M62/2106A1	REDX	M62 J25 - J30	
04/09/15 20:39:36	SIG	M62/2106A2	50R	M62 J25 - J30	
04/09/15 20:39:36	SIG	M62/2106A3	50R	M62 J25 - J30	
04/09/15 20:39:36	SIG	M62/2106A4	50R	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2097A2	NR	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2097A3	NR	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2097A4	NR	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2106A2	NR	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2106A3	NR	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2106A4	NR	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2114A1	OFF	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2114A2	OFF	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2114A3	OFF	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2117A1	BLNK	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2117A2	OFF	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2117A3	OFF	M62 J25 - J30	
04/09/15 20:40:19	SIG	M62/2117A4	OFF	M62 J25 - J30	
04/09/15 20:43:19	SIG	M62/2106A2	OFF	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2097A1	BLNK	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2097A1	BLNK	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2097A2	OFF	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2097A3	OFF	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2097A4	OFF	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2106A1	BLNK	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2106A3	OFF	M62 J25 - J30	
04/09/15 20:43:20	SIG	M62/2106A4	OFF	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2189B1	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2189B2	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2189B3	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2189B4	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2194B1	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2194B2	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2194B3	60R	M62 J25 - J30	
04/09/15 20:49:29	SIG	M62/2194B4	60R	M62 J25 - J30	
04/09/15 20:52:11	SIG	M62/2183B1	60R	M62 J25 - J30	
04/09/15 20:52:11	SIG	M62/2183B2	60R	M62 J25 - J30	
04/09/15 20:52:11	SIG	M62/2183L1	60R	M62 J25 - J30	
04/09/15 20:52:11	SIG	M62/2183L2	60R	M62 J25 - J30	
04/09/15 20:52:28	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 20:52:28	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 20:54:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 20:54:53	SIG	M62/2183B2	???	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2057A1	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2057A2	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2057A3	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2057J1	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2065A1	BLNK	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2065A2	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2065A3	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M62/2065A4	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M621/1002A1	OFF	M62 J25 - J30	
04/09/15 21:05:57	SIG	M621/1002A2	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2170B1	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2170B2	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2183B1	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2183B2	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2183L1	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2183L2	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2189B1	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2189B2	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2189B3	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2189B4	NR	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2194B1	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2194B2	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2194B3	OFF	M62 J25 - J30	
04/09/15 21:06:29	SIG	M62/2194B4	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2183B1	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2183L1	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2183L2	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2189B1	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2189B2	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2189B3	OFF	M62 J25 - J30	
04/09/15 21:09:29	SIG	M62/2189B4	OFF	M62 J25 - J30	
04/09/15 21:12:30	SIG	M62/2132B1	50R	M62 J25 - J30	
04/09/15 21:12:30	SIG	M62/2132B2	50R	M62 J25 - J30	
04/09/15 21:12:30	SIG	M62/2132B3	50R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2132B1	40R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2132B2	40R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2132B3	40R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2137B1	50R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2137B2	50R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2137B3	50R	M62 J25 - J30	
04/09/15 21:12:35	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2132B1	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2132B2	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2132B3	NR	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2137B1	OFF	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2137B2	OFF	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2137B3	OFF	M62 J25 - J30	
04/09/15 21:16:29	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 21:18:29	SIG	M62/2157A1	60R	M62 J25 - J30	
04/09/15 21:18:29	SIG	M62/2157A2	60R	M62 J25 - J30	
04/09/15 21:18:29	SIG	M62/2157J1	60R	M62 J25 - J30	
04/09/15 21:18:29	SIG	M62/2157J2	60R	M62 J25 - J30	
04/09/15 21:18:29	SIG	M62/2157K1	60R	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2125B1	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2125B2	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2125B3	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2125L1	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2125L2	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2132B1	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2132B2	OFF	M62 J25 - J30	
04/09/15 21:19:30	SIG	M62/2132B3	OFF	M62 J25 - J30	
04/09/15 21:20:17	SIG	M62/2132B1	50R	M62 J25 - J30	
04/09/15 21:20:17	SIG	M62/2132B2	50R	M62 J25 - J30	
04/09/15 21:20:17	SIG	M62/2132B3	50R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2132B1	40R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2132B2	40R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2132B3	40R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2137B1	50R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2137B2	50R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2137B3	50R	M62 J25 - J30	
04/09/15 21:20:23	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 21:21:27	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 21:21:27	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2065B1	REDX	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 21:21:28	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 21:21:28	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 21:21:49	SIG	M62/2074B2	LDR	M62 J25 - J30	
04/09/15 21:21:49	SIG	M62/2074B3	50R	M62 J25 - J30	
04/09/15 21:21:49	SIG	M62/2074B4	50R	M62 J25 - J30	
04/09/15 21:21:50	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 21:21:50	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 21:21:50	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 21:21:55	SIG	M62/2050B2	30R	M62 J25 - J30	
04/09/15 21:21:55	SIG	M62/2050B3	30R	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2050B2	20R	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2050B3	20R	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2057B2	LDR	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2057B3	LDR	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2065B2	LDR	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2065B3	LDR	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 21:22:00	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 21:22:00	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 21:22:06	SIG	M62/2050B2	STOP	M62 J25 - J30	
04/09/15 21:22:06	SIG	M62/2050B3	STOP	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2132B1	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2132B2	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2132B3	NR	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2137B1	OFF	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2137B2	OFF	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2137B3	OFF	M62 J25 - J30	
04/09/15 21:24:19	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 21:26:58	SIG	M62/2057B4	40R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 21:26:58	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2125B1	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2125B2	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2125B3	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2125L1	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2125L2	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2132B1	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2132B2	OFF	M62 J25 - J30	
04/09/15 21:27:19	SIG	M62/2132B3	OFF	M62 J25 - J30	
04/09/15 21:27:25	SIG	M62/2132B1	50R	M62 J25 - J30	
04/09/15 21:27:25	SIG	M62/2132B2	50R	M62 J25 - J30	
04/09/15 21:27:25	SIG	M62/2132B3	50R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2132B1	40R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2132B2	40R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2132B3	40R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2137B1	50R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2137B2	50R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2137B3	50R	M62 J25 - J30	
04/09/15 21:27:31	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 21:28:02	SIG	M62/2137B4	???	M62 J25 - J30	
04/09/15 21:28:03	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 21:28:13	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 21:28:14	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2147B1	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2147B2	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2147B3	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2147B4	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2159B1	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2159B2	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2159M1	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2159M2	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2170B1	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2170B2	60R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2170L1	50R	M62 J25 - J30	
04/09/15 21:34:29	SIG	M62/2170L2	50R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 21:35:33	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 21:36:33	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 21:37:26	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 21:37:32	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 21:37:32	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 21:37:32	SIG	M62/2057B2	40R	M62 J25 - J30	
04/09/15 21:37:32	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 21:37:32	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 21:37:32	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 21:38:48	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 21:38:48	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 21:38:48	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 21:39:35	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 21:39:35	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 21:39:35	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 21:40:32	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 21:40:44	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 21:40:44	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 21:40:45	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 21:42:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
04/09/15 21:42:17	SIG	M62/2157A1	???	M62 J25 - J30	
04/09/15 21:44:52	SIG	M62/2137B4	???	M62 J25 - J30	
04/09/15 21:44:53	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 21:45:03	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 21:45:03	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 21:50:56	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M62/2065B4	50R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M62/2065M1	50R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M621/1002B2	50R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 21:50:56	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2132B1	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2132B2	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2132B3	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2137B1	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2137B2	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2137B3	60R	M62 J25 - J30	
04/09/15 21:53:56	SIG	M62/2137B4	60R	M62 J25 - J30	
04/09/15 21:55:01	SIG	M62/2132B1	50R	M62 J25 - J30	
04/09/15 21:55:01	SIG	M62/2132B2	50R	M62 J25 - J30	
04/09/15 21:55:01	SIG	M62/2132B3	50R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2132B1	40R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2132B2	40R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2132B3	40R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2137B1	50R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2137B2	50R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2137B3	50R	M62 J25 - J30	
04/09/15 21:55:06	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M62/2065B4	40R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M62/2065M1	40R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M621/1002B2	40R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M621/1010B1	50R	M62 J25 - J30	
04/09/15 22:00:39	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2132B1	60R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2132B2	60R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2132B3	60R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2137B1	60R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2137B2	60R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2137B3	60R	M62 J25 - J30	
04/09/15 22:02:19	SIG	M62/2137B4	60R	M62 J25 - J30	
04/09/15 22:07:22	SIG	M62/2041B2	OFF	M62 J25 - J30	
04/09/15 22:07:23	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 22:07:34	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 22:07:34	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 22:07:34	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 22:08:54	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 22:08:54	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 22:08:54	SIG	M62/2050B4	40R	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2132B1	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2132B2	NR	M62 J25 - J30	
04/09/15 22:11:30	SIG	M62/2132B3	NR	M62 J25 - J30	
04/09/15 22:14:30	SIG	M62/2125B1	OFF	M62 J25 - J30	
04/09/15 22:14:31	SIG	M62/2125B2	OFF	M62 J25 - J30	
04/09/15 22:14:31	SIG	M62/2125B3	OFF	M62 J25 - J30	
04/09/15 22:14:31	SIG	M62/2125L1	OFF	M62 J25 - J30	
04/09/15 22:14:31	SIG	M62/2125L2	OFF	M62 J25 - J30	
04/09/15 22:17:08	SIG	M62/2132B1	50R	M62 J25 - J30	
04/09/15 22:17:08	SIG	M62/2132B2	50R	M62 J25 - J30	
04/09/15 22:17:08	SIG	M62/2132B3	50R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2132B1	40R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2132B2	40R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2132B3	40R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2137B1	50R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2137B2	50R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2137B3	50R	M62 J25 - J30	
04/09/15 22:17:13	SIG	M62/2137B4	50R	M62 J25 - J30	
04/09/15 22:17:26	SIG	M62/2050B2	30R	M62 J25 - J30	
04/09/15 22:17:26	SIG	M62/2050B3	30R	M62 J25 - J30	
04/09/15 22:17:26	SIG	M62/2074B2	LDR	M62 J25 - J30	
04/09/15 22:17:26	SIG	M62/2074B3	50R	M62 J25 - J30	
04/09/15 22:17:26	SIG	M62/2074B4	50R	M62 J25 - J30	
04/09/15 22:17:31	SIG	M62/2050B2	20R	M62 J25 - J30	
04/09/15 22:17:31	SIG	M62/2050B3	20R	M62 J25 - J30	
04/09/15 22:17:31	SIG	M62/2057B2	LDR	M62 J25 - J30	
04/09/15 22:17:31	SIG	M62/2057B3	LDR	M62 J25 - J30	
04/09/15 22:17:31	SIG	M62/2065B2	LDR	M62 J25 - J30	
04/09/15 22:17:31	SIG	M62/2065B3	LDR	M62 J25 - J30	
04/09/15 22:17:36	SIG	M62/2050B2	STOP	M62 J25 - J30	
04/09/15 22:17:36	SIG	M62/2050B3	STOP	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2177B1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2177B2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2177L1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2177L2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2183B1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2183B2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2183L1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2183L2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2189B1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2189B2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2189B3	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2189B4	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2194B1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2194B2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2194B3	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2194B4	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2197B1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2197B2	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2197B3	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2199M1	50R	M62 J25 - J30	
04/09/15 22:19:57	SIG	M62/2199M2	50R	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2125B1	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2125B2	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2125B3	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2125L1	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2125L2	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2132B1	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2132B2	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2132B3	NR	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2137B1	60R	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2137B2	60R	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2137B3	60R	M62 J25 - J30	
04/09/15 22:22:15	SIG	M62/2137B4	60R	M62 J25 - J30	
04/09/15 22:22:26	SIG	M62/2183B2	???	M62 J25 - J30	
04/09/15 22:22:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2170K1	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2170K2	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2177A2	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2177A3	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2177A4	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2183A2	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2183A3	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2183A4	60R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2189A3	50R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2189A4	50R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2197A1	50R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2197A2	50R	M62 J25 - J30	
04/09/15 22:23:07	SIG	M62/2197A3	50R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2069M1	40R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2069M2	40R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2074B3	40R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2074B4	40R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2081B1	50R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2081B2	50R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2081B3	50R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M62/2081L1	50R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M621/1010B1	40R	M62 J25 - J30	
04/09/15 22:24:07	SIG	M621/1010B2	40R	M62 J25 - J30	
04/09/15 22:25:15	SIG	M62/2125B1	OFF	M62 J25 - J30	
04/09/15 22:25:15	SIG	M62/2125B2	OFF	M62 J25 - J30	
04/09/15 22:25:15	SIG	M62/2125B3	OFF	M62 J25 - J30	
04/09/15 22:25:15	SIG	M62/2125L1	OFF	M62 J25 - J30	
04/09/15 22:25:15	SIG	M62/2125L2	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2177B1	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2177B2	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2177L1	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2177L2	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2183B1	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2183B2	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2183L1	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2183L2	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2189B1	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2189B2	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2189B3	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2189B4	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2194B1	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2194B2	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2194B3	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2194B4	NR	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2197B1	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2197B2	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2197B3	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2199M1	OFF	M62 J25 - J30	
04/09/15 22:26:50	SIG	M62/2199M2	OFF	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2065B2	50R	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2065B3	50R	M62 J25 - J30	
04/09/15 22:27:42	SIG	M62/2074B2	50R	M62 J25 - J30	
04/09/15 22:27:47	SIG	M62/2074B2	40R	M62 J25 - J30	
04/09/15 22:27:47	SIG	M621/1010B1	LDR	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2050B2	40R	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2050B3	40R	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2057B1	STOP	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2057B2	40R	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2057B3	40R	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2065B1	STOP	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2065B2	40R	M62 J25 - J30	
04/09/15 22:27:48	SIG	M62/2065B3	40R	M62 J25 - J30	
04/09/15 22:27:48	SIG	M621/1002B1	LDR	M62 J25 - J30	
04/09/15 22:27:53	SIG	M62/2065B1	STOP	M62 J25 - J30	
04/09/15 22:27:58	SIG	M62/2057B1	STOP	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2069M1	50R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2069M2	50R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 22:29:28	SIG	M621/1010B2	50R	M62 J25 - J30	
04/09/15 22:29:50	SIG	M62/2194B1	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2183B1	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2183L1	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2183L2	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2189B1	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2189B2	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2189B3	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2189B4	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2194B2	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2194B3	OFF	M62 J25 - J30	
04/09/15 22:29:51	SIG	M62/2194B4	OFF	M62 J25 - J30	
04/09/15 22:30:30	SIG	M62/2157A1	OFF	M62 J25 - J30	
04/09/15 22:30:30	SIG	M62/2157A2	OFF	M62 J25 - J30	
04/09/15 22:30:30	SIG	M62/2157J1	OFF	M62 J25 - J30	
04/09/15 22:30:30	SIG	M62/2157J2	OFF	M62 J25 - J30	
04/09/15 22:30:30	SIG	M62/2157K1	OFF	M62 J25 - J30	
04/09/15 22:32:30	SIG	M62/2081B1	OFF	M62 J25 - J30	
04/09/15 22:32:30	SIG	M62/2081B2	OFF	M62 J25 - J30	
04/09/15 22:32:30	SIG	M62/2081B3	OFF	M62 J25 - J30	
04/09/15 22:32:30	SIG	M62/2081L1	OFF	M62 J25 - J30	
04/09/15 22:36:30	SIG	M62/2081B1	60R	M62 J25 - J30	
04/09/15 22:36:30	SIG	M62/2081B2	60R	M62 J25 - J30	
04/09/15 22:36:30	SIG	M62/2081B3	60R	M62 J25 - J30	
04/09/15 22:36:30	SIG	M62/2081L1	60R	M62 J25 - J30	
04/09/15 22:39:30	SIG	M62/2170B1	OFF	M62 J25 - J30	
04/09/15 22:39:30	SIG	M62/2170B2	OFF	M62 J25 - J30	
04/09/15 22:39:30	SIG	M62/2170L1	OFF	M62 J25 - J30	
04/09/15 22:39:30	SIG	M62/2170L2	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2132B1	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2132B2	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2132B3	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2137B1	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2137B2	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2137B3	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2137B4	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2147B1	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2147B2	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2147B3	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2147B4	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2159B1	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2159B2	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2159M1	OFF	M62 J25 - J30	
04/09/15 22:39:31	SIG	M62/2159M2	OFF	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2050B2	50R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2050B3	50R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2050B4	50R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2057B2	50R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2057B3	50R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2057B4	50R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2065B1	REDX	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 22:46:21	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 22:46:21	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2074B1	BLNK	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2074B2	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2074B3	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2074B4	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2081B1	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2081B2	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2081B3	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2081L1	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2163A1	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2163A2	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2166K1	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M62/2166K2	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 22:46:30	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2041B2	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2041B3	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2041B4	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2050B2	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2050B3	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2050B4	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2057B1	BLNK	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2057B2	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2057B3	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2057B4	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2065B1	BLNK	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2065B2	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2065B3	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2065B4	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2065M1	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2069M1	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M62/2069M2	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M621/1002B1	OFF	M62 J25 - J30	
04/09/15 22:46:31	SIG	M621/1002B2	OFF	M62 J25 - J30	
04/09/15 22:50:30	SIG	M62/2074B1	REDX	M62 J25 - J30	
04/09/15 22:50:30	SIG	M62/2074B2	60R	M62 J25 - J30	
04/09/15 22:50:30	SIG	M62/2074B3	60R	M62 J25 - J30	
04/09/15 22:50:30	SIG	M62/2074B4	60R	M62 J25 - J30	
04/09/15 22:50:30	SIG	M621/1010B1	60R	M62 J25 - J30	
04/09/15 22:50:30	SIG	M621/1010B2	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2041B1	REDX	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2050B2	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2050B3	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2050B4	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2057B1	REDX	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2057B2	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2057B3	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2057B4	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2065B1	REDX	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2065B2	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2065B3	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2065B4	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2065M1	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2069M1	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M62/2069M2	60R	M62 J25 - J30	
04/09/15 22:50:31	SIG	M621/1002B1	HSD	M62 J25 - J30	
04/09/15 22:50:31	SIG	M621/1002B2	60R	M62 J25 - J30	
04/09/15 22:51:30	SIG	M62/2197A1	OFF	M62 J25 - J30	
04/09/15 22:51:30	SIG	M62/2197A2	OFF	M62 J25 - J30	
04/09/15 22:51:30	SIG	M62/2197A3	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2041B2	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2041B3	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2041B4	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2050B2	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2050B3	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2050B4	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2057B1	BLNK	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2057B2	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2057B3	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2057B4	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2065B2	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2065B3	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2065B4	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2065M1	NR	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2069M1	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M62/2069M2	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M621/1002B1	OFF	M62 J25 - J30	
04/09/15 22:54:30	SIG	M621/1002B2	OFF	M62 J25 - J30	
04/09/15 22:54:31	SIG	M62/2074B1	BLNK	M62 J25 - J30	
04/09/15 22:54:31	SIG	M62/2074B2	OFF	M62 J25 - J30	
04/09/15 22:54:31	SIG	M62/2074B3	OFF	M62 J25 - J30	
04/09/15 22:54:31	SIG	M62/2074B4	OFF	M62 J25 - J30	
04/09/15 22:54:31	SIG	M621/1010B1	OFF	M62 J25 - J30	
04/09/15 22:54:31	SIG	M621/1010B2	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2170A1	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2170A2	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2170K1	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2170K2	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2177A1	BLNK	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2177A2	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2177A3	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2177A4	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2183A2	NR	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2183A3	NR	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2183A4	NR	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2189A1	BLNK	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2189A1	BLNK	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2189A2	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2189A3	OFF	M62 J25 - J30	
04/09/15 22:55:31	SIG	M62/2189A4	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2041B2	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2041B3	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2041B4	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2050B2	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2050B3	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2050B4	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2065B2	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2065B3	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2065B4	OFF	M62 J25 - J30	
04/09/15 22:57:31	SIG	M62/2065M1	OFF	M62 J25 - J30	
04/09/15 22:57:32	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 22:57:32	SIG	M62/2041B1	BLNK	M62 J25 - J30	
04/09/15 22:57:32	SIG	M62/2065B1	BLNK	M62 J25 - J30	
04/09/15 22:58:31	SIG	M62/2183A1	BLNK	M62 J25 - J30	
04/09/15 22:58:31	SIG	M62/2183A2	OFF	M62 J25 - J30	
04/09/15 22:58:31	SIG	M62/2183A3	OFF	M62 J25 - J30	
04/09/15 22:58:31	SIG	M62/2183A4	OFF	M62 J25 - J30	
04/09/15 22:58:32	SIG	M62/2183A1	BLNK	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2057A1	50R	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2057A2	50R	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2057A3	50R	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2057J1	50R	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2065A1	REDX	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2065A2	NR	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2065A3	NR	M62 J25 - J30	
05/09/15 00:56:48	SIG	M62/2065A4	NR	M62 J25 - J30	
05/09/15 00:56:48	SIG	M621/1002A1	50R	M62 J25 - J30	
05/09/15 00:56:48	SIG	M621/1002A2	LDL	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2057A1	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2057A2	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2057A3	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2057J1	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2065A1	BLNK	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2065A2	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2065A3	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M62/2065A4	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M621/1002A1	OFF	M62 J25 - J30	
05/09/15 01:41:35	SIG	M621/1002A2	OFF	M62 J25 - J30	
05/09/15 03:03:53	SIG	M62/2197A1	50R	M62 J25 - J30	
05/09/15 03:03:53	SIG	M62/2197A2	50R	M62 J25 - J30	
05/09/15 03:03:53	SIG	M62/2197A3	50R	M62 J25 - J30	
05/09/15 03:03:59	SIG	M62/2197A1	40R	M62 J25 - J30	
05/09/15 03:03:59	SIG	M62/2197A2	40R	M62 J25 - J30	
05/09/15 03:03:59	SIG	M62/2197A3	40R	M62 J25 - J30	
05/09/15 03:04:04	SIG	M62/2197A2	30R	M62 J25 - J30	
05/09/15 03:04:04	SIG	M62/2197A3	30R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2170A1	60R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2170A2	60R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2170K1	50R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2170K2	50R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2177A1	REDX	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2177A2	50R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2177A3	50R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2177A4	LDL	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2183A1	REDX	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2183A2	50R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2183A3	LDL	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2183A4	LDL	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2189A1	REDX	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2189A2	50R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2189A3	LDL	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2189A4	LDL	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2197A1	40R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2197A2	20R	M62 J25 - J30	
05/09/15 03:04:09	SIG	M62/2197A3	20R	M62 J25 - J30	
05/09/15 03:04:15	SIG	M62/2197A2	STOP	M62 J25 - J30	
05/09/15 03:04:15	SIG	M62/2197A3	STOP	M62 J25 - J30	
05/09/15 04:01:43	SIG	M62/2189A3	50R	M62 J25 - J30	
05/09/15 04:01:43	SIG	M62/2189A4	50R	M62 J25 - J30	
05/09/15 04:01:43	SIG	M62/2197A1	30R	M62 J25 - J30	
05/09/15 04:01:43	SIG	M62/2197A2	40R	M62 J25 - J30	
05/09/15 04:01:43	SIG	M62/2197A3	40R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2170A1	OFF	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2170A2	OFF	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2170K1	OFF	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2170K2	OFF	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2177A2	60R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2177A3	60R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2177A4	60R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2183A2	LDR	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2183A3	50R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2183A4	50R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2189A1	STOP	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2189A2	LDR	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2189A3	40R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2189A4	40R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2197A1	20R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2197A2	40R	M62 J25 - J30	
05/09/15 04:01:48	SIG	M62/2197A3	40R	M62 J25 - J30	
05/09/15 04:01:53	SIG	M62/2189A1	STOP	M62 J25 - J30	
05/09/15 04:01:53	SIG	M62/2197A1	STOP	M62 J25 - J30	
05/09/15 04:04:45	SIG	M62/2189A2	50R	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2177A1	BLNK	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2177A2	OFF	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2177A3	OFF	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2177A4	OFF	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2183A2	50R	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2189A2	40R	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2197A1	OFF	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2197A2	OFF	M62 J25 - J30	
05/09/15 04:04:50	SIG	M62/2197A3	OFF	M62 J25 - J30	
05/09/15 04:24:04	SIG	M62/2183A2	NR	M62 J25 - J30	
05/09/15 04:24:04	SIG	M62/2183A3	NR	M62 J25 - J30	
05/09/15 04:24:04	SIG	M62/2183A4	NR	M62 J25 - J30	
05/09/15 04:24:04	SIG	M62/2189A2	OFF	M62 J25 - J30	
05/09/15 04:24:04	SIG	M62/2189A3	OFF	M62 J25 - J30	
05/09/15 04:24:04	SIG	M62/2189A4	OFF	M62 J25 - J30	
05/09/15 04:25:56	SIG	M62/2189A1	BLNK	M62 J25 - J30	
05/09/15 04:27:04	SIG	M62/2183A2	OFF	M62 J25 - J30	
05/09/15 04:27:04	SIG	M62/2183A3	OFF	M62 J25 - J30	
05/09/15 04:27:04	SIG	M62/2183A4	OFF	M62 J25 - J30	
05/09/15 04:27:05	SIG	M62/2183A1	BLNK	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2057A1	50R	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2057A2	50R	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2057A3	50R	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2057J1	50R	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2065A1	REDX	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2065A2	NR	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2065A3	NR	M62 J25 - J30	
05/09/15 04:47:45	SIG	M62/2065A4	NR	M62 J25 - J30	
05/09/15 04:47:45	SIG	M621/1002A1	50R	M62 J25 - J30	
05/09/15 04:47:45	SIG	M621/1002A2	LDL	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2057A1	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2057A2	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2057A3	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2057J1	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2065A1	BLNK	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2065A2	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2065A3	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M62/2065A4	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M621/1002A1	OFF	M62 J25 - J30	
05/09/15 06:03:40	SIG	M621/1002A2	OFF	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1968A1	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1968A2	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1968A3	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1968A4	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1974A1	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1974A2	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1974A3	50R	M62 J25 - J30	
05/09/15 06:41:25	SIG	M62/1974A4	50R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1968A1	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1968A2	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1968A3	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1968A4	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1974A1	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1974A2	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1974A3	40R	M62 J25 - J30	
05/09/15 06:41:30	SIG	M62/1974A4	40R	M62 J25 - J30	
05/09/15 06:41:36	SIG	M62/1974A1	30R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1960A1	50R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1960A2	50R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1960A3	50R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1960K1	50R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1960K2	50R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1968A1	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1968A2	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1968A3	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1968A4	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1974A1	20R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1974A2	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1974A3	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1974A4	40R	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1981A1	NR	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1981A2	NR	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1981A3	NR	M62 J25 - J30	
05/09/15 06:41:41	SIG	M62/1981A4	NR	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1968B1	NR	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1968B2	NR	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1968B3	NR	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1968L1	NR	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1974B1	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1974B2	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1974B3	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1974B4	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1974M1	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1974M2	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1981B1	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1981B2	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1981B3	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1981B4	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1987B1	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1987B2	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1987B3	50R	M62 J25 - J30	
05/09/15 06:41:42	SIG	M62/1987B4	50R	M62 J25 - J30	
05/09/15 06:41:47	SIG	M62/1974A1	STOP	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1979K1	50R	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1979K2	50R	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1981A1	50R	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1981A2	50R	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1981A3	50R	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1981A4	50R	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1987A1	NR	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1987A3	NR	M62 J25 - J30	
05/09/15 06:42:13	SIG	M62/1987J1	NR	M62 J25 - J30	
05/09/15 06:42:19	SIG	M62/1979K1	40R	M62 J25 - J30	
05/09/15 06:42:19	SIG	M62/1979K2	40R	M62 J25 - J30	
05/09/15 06:42:19	SIG	M62/1981A1	40R	M62 J25 - J30	
05/09/15 06:42:19	SIG	M62/1981A2	40R	M62 J25 - J30	
05/09/15 06:42:19	SIG	M62/1981A3	40R	M62 J25 - J30	
05/09/15 06:42:19	SIG	M62/1981A4	40R	M62 J25 - J30	
05/09/15 06:42:25	SIG	M62/1981A1	30R	M62 J25 - J30	
05/09/15 06:42:30	SIG	M62/1979K1	40R	M62 J25 - J30	
05/09/15 06:42:30	SIG	M62/1979K2	40R	M62 J25 - J30	
05/09/15 06:42:30	SIG	M62/1981A1	20R	M62 J25 - J30	
05/09/15 06:42:30	SIG	M62/1981A2	40R	M62 J25 - J30	
05/09/15 06:42:30	SIG	M62/1981A3	40R	M62 J25 - J30	
05/09/15 06:42:30	SIG	M62/1981A4	40R	M62 J25 - J30	
05/09/15 06:42:36	SIG	M62/1981A1	STOP	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1987A1	50R	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1987A3	50R	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1987J1	50R	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1992A1	NR	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1992A2	NR	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1992A3	NR	M62 J25 - J30	
05/09/15 06:45:31	SIG	M62/1992J1	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1968B1	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1968B2	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1968B3	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1968L1	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1974B1	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1974B2	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1974B3	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1974B4	NR	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1974M1	OFF	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1974M2	OFF	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1992B1	50R	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1992B2	50R	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1992B3	50R	M62 J25 - J30	
05/09/15 06:50:05	SIG	M62/1992B4	50R	M62 J25 - J30	
05/09/15 06:50:39	SIG	M62/1955K1	60R	M62 J25 - J30	
05/09/15 06:50:39	SIG	M62/1955K2	60R	M62 J25 - J30	
05/09/15 06:50:39	SIG	M62/1956A1	60R	M62 J25 - J30	
05/09/15 06:50:39	SIG	M62/1956A2	60R	M62 J25 - J30	
05/09/15 06:50:39	SIG	M62/1956A3	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1960A1	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1960A2	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1960A3	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1960K1	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1960K2	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1968A1	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1968A2	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1968A3	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1968A4	60R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1974A1	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1974A2	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1974A3	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1974A4	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1979K1	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1979K2	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1981A1	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1981A2	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1981A3	50R	M62 J25 - J30	
05/09/15 06:52:48	SIG	M62/1981A4	50R	M62 J25 - J30	
05/09/15 06:53:05	SIG	M62/1968L1	OFF	M62 J25 - J30	
05/09/15 06:53:06	SIG	M62/1968B1	OFF	M62 J25 - J30	
05/09/15 06:53:06	SIG	M62/1968B2	OFF	M62 J25 - J30	
05/09/15 06:53:06	SIG	M62/1968B3	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1974B1	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1974B2	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1974B3	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1974B4	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1981B1	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1981B2	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1981B3	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1981B4	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1987B1	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1987B2	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1987B3	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1987B4	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1992B1	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1992B2	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1992B3	OFF	M62 J25 - J30	
05/09/15 07:16:12	SIG	M62/1992B4	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1974A1	60R	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1974A2	60R	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1974A3	60R	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1974A4	60R	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1979K1	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1979K2	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1981A1	NR	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1981A2	NR	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1981A3	NR	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1981A4	NR	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1987A1	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1987A3	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1987J1	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1992A1	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1992A2	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1992A3	OFF	M62 J25 - J30	
05/09/15 07:16:43	SIG	M62/1992J1	OFF	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1955K1	OFF	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1955K2	OFF	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1956A1	OFF	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1956A2	OFF	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1956A3	OFF	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1960A1	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1960A2	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1960A3	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1960K1	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1960K2	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1968A1	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1968A2	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1968A3	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1968A4	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1974A1	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1974A2	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1974A3	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1974A4	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1981A1	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1981A2	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1981A3	NR	M62 J25 - J30	
05/09/15 07:21:40	SIG	M62/1981A4	NR	M62 J25 - J30	
05/09/15 07:24:40	SIG	M62/1960A1	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1960A2	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1960A3	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1960K1	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1960K2	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1968A1	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1968A2	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1968A3	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1968A4	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1974A1	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1974A2	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1974A3	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1974A4	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1981A1	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1981A2	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1981A3	OFF	M62 J25 - J30	
05/09/15 07:24:41	SIG	M62/1981A4	OFF	M62 J25 - J30	
05/09/15 07:37:17	SIG	M62/1960K1	50R	M62 J25 - J30	
05/09/15 07:37:17	SIG	M62/1960K2	50R	M62 J25 - J30	
05/09/15 07:37:17	SIG	M62/1968A1	NR	M62 J25 - J30	
05/09/15 07:37:17	SIG	M62/1968A2	NR	M62 J25 - J30	
05/09/15 07:37:17	SIG	M62/1968A3	NR	M62 J25 - J30	
05/09/15 07:37:17	SIG	M62/1968A4	NR	M62 J25 - J30	
05/09/15 08:13:40	SIG	M62/1960K1	OFF	M62 J25 - J30	
05/09/15 08:13:40	SIG	M62/1960K2	OFF	M62 J25 - J30	
05/09/15 08:13:40	SIG	M62/1968A1	NR	M62 J25 - J30	
05/09/15 08:13:40	SIG	M62/1968A2	NR	M62 J25 - J30	
05/09/15 08:13:40	SIG	M62/1968A3	NR	M62 J25 - J30	
05/09/15 08:13:40	SIG	M62/1968A4	NR	M62 J25 - J30	
05/09/15 08:16:40	SIG	M62/1968A1	OFF	M62 J25 - J30	
05/09/15 08:16:41	SIG	M62/1968A2	OFF	M62 J25 - J30	
05/09/15 08:16:41	SIG	M62/1968A3	OFF	M62 J25 - J30	
05/09/15 08:16:41	SIG	M62/1968A4	OFF	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2057A1	50R	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2057A2	50R	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2057A3	50R	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2057J1	50R	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2065A1	REDX	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2065A2	NR	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2065A3	NR	M62 J25 - J30	
05/09/15 08:40:10	SIG	M62/2065A4	NR	M62 J25 - J30	
05/09/15 08:40:39	SIG	M62/2050A1	REDX	M62 J25 - J30	
05/09/15 08:40:39	SIG	M62/2050A2	50R	M62 J25 - J30	
05/09/15 08:40:39	SIG	M62/2050A3	50R	M62 J25 - J30	
05/09/15 08:40:39	SIG	M62/2050A4	50R	M62 J25 - J30	
05/09/15 08:53:54	SIG	M62/2057A1	40R	M62 J25 - J30	
05/09/15 08:53:54	SIG	M62/2057A2	40R	M62 J25 - J30	
05/09/15 08:53:54	SIG	M62/2057J1	40R	M62 J25 - J30	
05/09/15 08:53:54	SIG	M621/1002A1	50R	M62 J25 - J30	
05/09/15 08:53:54	SIG	M621/1002A2	50R	M62 J25 - J30	
05/09/15 08:54:00	SIG	M62/2057A1	30R	M62 J25 - J30	
05/09/15 08:54:00	SIG	M62/2057A2	30R	M62 J25 - J30	
05/09/15 08:54:00	SIG	M62/2057J1	30R	M62 J25 - J30	
05/09/15 08:54:00	SIG	M621/1002A1	40R	M62 J25 - J30	
05/09/15 08:54:00	SIG	M621/1002A2	40R	M62 J25 - J30	
05/09/15 08:54:05	SIG	M621/1002A2	30R	M62 J25 - J30	
05/09/15 08:54:10	SIG	M62/2057A1	30R	M62 J25 - J30	
05/09/15 08:54:10	SIG	M62/2057A2	30R	M62 J25 - J30	
05/09/15 08:54:10	SIG	M62/2057J1	30R	M62 J25 - J30	
05/09/15 08:54:10	SIG	M621/1002A1	40R	M62 J25 - J30	
05/09/15 08:54:10	SIG	M621/1002A2	20R	M62 J25 - J30	
05/09/15 08:54:15	SIG	M621/1002A2	STOP	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2033A1	REDX	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2033A2	60R	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2033A3	60R	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2033A4	60R	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2041A1	REDX	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2041A2	60R	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2041A3	60R	M62 J25 - J30	
05/09/15 08:58:41	SIG	M62/2041A4	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2008K1	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2008K2	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2012A1	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2012A2	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2012A3	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2018A1	HSD	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2018A2	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2018A3	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2018A4	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2025A1	REDX	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2025A2	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2025A3	60R	M62 J25 - J30	
05/09/15 09:03:42	SIG	M62/2025A4	60R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M62/2050A2	60R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M62/2050A3	60R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M62/2050A4	60R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M62/2057A1	50R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M62/2057A2	50R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M62/2057J1	50R	M62 J25 - J30	
05/09/15 09:14:17	SIG	M621/1002A1	OFF	M62 J25 - J30	
05/09/15 09:14:17	SIG	M621/1002A2	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2008K1	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2008K2	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2012A1	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2012A2	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2012A3	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2018A1	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2018A2	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2018A3	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2018A4	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2025A1	BLNK	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2025A2	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2025A3	OFF	M62 J25 - J30	
05/09/15 09:31:42	SIG	M62/2025A4	OFF	M62 J25 - J30	
05/09/15 09:51:58	SIG	M62/1960K1	50R	M62 J25 - J30	
05/09/15 09:51:58	SIG	M62/1960K2	50R	M62 J25 - J30	
05/09/15 09:52:03	SIG	M62/1960K1	40R	M62 J25 - J30	
05/09/15 09:52:03	SIG	M62/1960K2	40R	M62 J25 - J30	
05/09/15 09:52:09	SIG	M62/1960K1	30R	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1955K1	TI	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1955K2	TI	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1960K1	20R	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1960K2	40R	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1968A1	NR	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1968A2	NR	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1968A3	NR	M62 J25 - J30	
05/09/15 09:52:14	SIG	M62/1968A4	NR	M62 J25 - J30	
05/09/15 09:52:19	SIG	M62/1960K1	STOP	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1955K1	OFF	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1955K2	OFF	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1960K1	NR	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1960K2	NR	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1968A1	NR	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1968A2	NR	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1968A3	NR	M62 J25 - J30	
05/09/15 09:52:35	SIG	M62/1968A4	NR	M62 J25 - J30	
05/09/15 09:55:35	SIG	M62/1960K1	OFF	M62 J25 - J30	
05/09/15 09:55:36	SIG	M62/1960K2	OFF	M62 J25 - J30	
05/09/15 09:55:36	SIG	M62/1968A1	OFF	M62 J25 - J30	
05/09/15 09:55:36	SIG	M62/1968A2	OFF	M62 J25 - J30	
05/09/15 09:55:36	SIG	M62/1968A3	OFF	M62 J25 - J30	
05/09/15 09:55:36	SIG	M62/1968A4	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2033A2	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2033A3	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2033A4	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2041A2	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2041A3	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2041A4	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2050A2	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2050A3	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2050A4	NR	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2057A1	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2057A2	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2057A3	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2057J1	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2065A1	BLNK	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2065A2	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2065A3	OFF	M62 J25 - J30	
05/09/15 10:09:43	SIG	M62/2065A4	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2033A2	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2033A3	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2033A4	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2041A2	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2041A3	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2041A4	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2050A2	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2050A3	OFF	M62 J25 - J30	
05/09/15 10:12:43	SIG	M62/2050A4	OFF	M62 J25 - J30	
05/09/15 10:12:44	SIG	M62/2033A1	BLNK	M62 J25 - J30	
05/09/15 10:12:44	SIG	M62/2033A1	BLNK	M62 J25 - J30	
05/09/15 10:12:44	SIG	M62/2041A1	BLNK	M62 J25 - J30	
05/09/15 10:12:44	SIG	M62/2050A1	BLNK	M62 J25 - J30	
05/09/15 10:12:44	SIG	M62/2050A1	BLNK	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2183A1	REDX	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2183A2	50R	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2183A3	50R	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2183A4	50R	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2189A1	REDX	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2189A2	50R	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2189A3	50R	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2189A4	50R	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2197A1	NR	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2197A2	NR	M62 J25 - J30	
05/09/15 11:20:49	SIG	M62/2197A3	NR	M62 J25 - J30	
05/09/15 11:34:35	SIG	M62/2159B1	NR	M62 J25 - J30	
05/09/15 11:34:35	SIG	M62/2159B2	NR	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2170B1	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2170B2	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2170L1	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2170L2	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2177B1	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2177B2	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2177L1	50R	M62 J25 - J30	
05/09/15 11:34:36	SIG	M62/2177L2	50R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2170B1	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2170B2	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2170L1	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2170L2	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2177B1	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2177B2	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2177L1	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2177L2	40R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2183B1	50R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2183B2	50R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2183L1	50R	M62 J25 - J30	
05/09/15 11:34:41	SIG	M62/2183L2	50R	M62 J25 - J30	
05/09/15 11:36:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:36:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:36:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:36:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2183A2	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2183A3	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2183A4	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2189A2	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2189A3	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2189A4	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2197A1	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2197A2	NR	M62 J25 - J30	
05/09/15 11:38:01	SIG	M62/2197A3	NR	M62 J25 - J30	
05/09/15 11:41:01	SIG	M62/2183A2	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2183A1	BLNK	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2183A3	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2183A4	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2189A1	BLNK	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2189A1	BLNK	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2189A2	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2189A3	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2189A4	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2197A1	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2197A2	OFF	M62 J25 - J30	
05/09/15 11:41:02	SIG	M62/2197A3	OFF	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2189B1	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2189B2	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2189B3	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2189B4	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2194B1	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2194B2	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2194B3	60R	M62 J25 - J30	
05/09/15 11:42:44	SIG	M62/2194B4	60R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2170B1	60R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2170B2	60R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2170L1	50R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2170L2	50R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2177B1	50R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2177B2	50R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2177L1	50R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2177L2	50R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2183B1	60R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2183B2	60R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2183L1	60R	M62 J25 - J30	
05/09/15 11:46:19	SIG	M62/2183L2	60R	M62 J25 - J30	
05/09/15 11:49:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:49:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:49:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:49:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 11:56:45	SIG	M62/2159B1	NR	M62 J25 - J30	
05/09/15 11:56:45	SIG	M62/2159B2	NR	M62 J25 - J30	
05/09/15 11:56:45	SIG	M62/2170B1	NR	M62 J25 - J30	
05/09/15 11:56:45	SIG	M62/2170B2	NR	M62 J25 - J30	
05/09/15 11:56:45	SIG	M62/2170L1	OFF	M62 J25 - J30	
05/09/15 11:56:45	SIG	M62/2170L2	OFF	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2004A1	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2004A2	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2004A3	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2008K1	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2008K2	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2012A1	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2012A2	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2012A3	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2018A1	HSD	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2018A2	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2018A3	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2018A4	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2025A1	REDX	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2025A2	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2025A3	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2025A4	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2033A1	REDX	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2033A2	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2033A3	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2033A4	60R	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2041A1	REDX	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2041A2	NR	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2041A3	NR	M62 J25 - J30	
05/09/15 11:58:45	SIG	M62/2041A4	NR	M62 J25 - J30	
05/09/15 11:59:45	SIG	M62/2159B1	OFF	M62 J25 - J30	
05/09/15 11:59:45	SIG	M62/2159B2	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2004A1	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2004A2	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2004A3	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2008K1	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2008K2	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2012A1	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2012A2	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2012A3	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2018A1	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2018A2	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2018A3	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2018A4	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2025A1	BLNK	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2025A2	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2025A3	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2025A4	OFF	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2033A2	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2033A3	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2033A4	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2041A2	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2041A3	NR	M62 J25 - J30	
05/09/15 12:04:45	SIG	M62/2041A4	NR	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2012A1	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2012A2	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2012A3	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2033A2	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2033A3	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2033A4	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2041A2	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2041A3	OFF	M62 J25 - J30	
05/09/15 12:07:45	SIG	M62/2041A4	OFF	M62 J25 - J30	
05/09/15 12:07:46	SIG	M62/2033A1	BLNK	M62 J25 - J30	
05/09/15 12:07:46	SIG	M62/2041A1	BLNK	M62 J25 - J30	
05/09/15 12:07:46	SIG	M62/2041A1	BLNK	M62 J25 - J30	
05/09/15 12:15:21	SIG	M62/2159B1	NR	M62 J25 - J30	
05/09/15 12:15:21	SIG	M62/2159B2	NR	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2170B1	50R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2170B2	50R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2170L1	50R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2170L2	50R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2177B1	40R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2177B2	40R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2177L1	40R	M62 J25 - J30	
05/09/15 12:15:22	SIG	M62/2177L2	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2170B1	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2170B2	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2170L1	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2170L2	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2177B1	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2177B2	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2177L1	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2177L2	40R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2183B1	50R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2183B2	50R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2183L1	50R	M62 J25 - J30	
05/09/15 12:15:27	SIG	M62/2183L2	50R	M62 J25 - J30	
05/09/15 12:18:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:18:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:18:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:18:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:19:21	SIG	M62/2159B1	NR	M62 J25 - J30	
05/09/15 12:19:21	SIG	M62/2159B2	NR	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2170B1	NR	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2170B2	NR	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2170L1	OFF	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2170L2	OFF	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2177B1	50R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2177B2	50R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2177L1	50R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2177L2	50R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2183B1	60R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2183B2	60R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2183L1	60R	M62 J25 - J30	
05/09/15 12:19:22	SIG	M62/2183L2	60R	M62 J25 - J30	
05/09/15 12:22:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:22:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:22:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:22:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:22:21	SIG	M62/2159B1	OFF	M62 J25 - J30	
05/09/15 12:22:22	SIG	M62/2159B2	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2170B1	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2170B2	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2177B1	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2177B2	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2177L1	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2177L2	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2183B1	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2183B2	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2183L1	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2183L2	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2189B1	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2189B2	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2189B3	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2189B4	NR	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2194B1	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2194B2	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2194B3	OFF	M62 J25 - J30	
05/09/15 12:35:45	SIG	M62/2194B4	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2170B1	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2170B2	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2183B1	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2183L1	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2183L2	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2189B1	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2189B2	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2189B3	OFF	M62 J25 - J30	
05/09/15 12:38:46	SIG	M62/2189B4	OFF	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2159B1	NR	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2159B2	NR	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2170B1	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2170B2	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2170L1	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2170L2	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2177B1	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2177B2	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2177L1	50R	M62 J25 - J30	
05/09/15 13:03:12	SIG	M62/2177L2	50R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2170B1	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2170B2	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2170L1	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2170L2	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2177B1	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2177B2	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2177L1	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2177L2	40R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2183B1	50R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2183B2	50R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2183L1	50R	M62 J25 - J30	
05/09/15 13:03:18	SIG	M62/2183L2	50R	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2122K1	50R	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2122K2	50R	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2124A1	REDX	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2124A2	50R	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2124A4	50R	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2135A1	NR	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2135A2	NR	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2135A3	NR	M62 J25 - J30	
05/09/15 13:05:14	SIG	M62/2135A4	NR	M62 J25 - J30	
05/09/15 13:05:24	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:05:25	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:05:25	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:05:26	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:05:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 13:05:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 13:05:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 13:05:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 13:07:12	SIG	M62/2159B1	NR	M62 J25 - J30	
05/09/15 13:07:12	SIG	M62/2159B2	NR	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2170B1	NR	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2170B2	NR	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2170L1	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2170L2	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2177B1	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2177B2	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2177L1	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2177L2	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2183B1	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2183L1	OFF	M62 J25 - J30	
05/09/15 13:07:13	SIG	M62/2183L2	OFF	M62 J25 - J30	
05/09/15 13:10:13	SIG	M62/2159B1	OFF	M62 J25 - J30	
05/09/15 13:10:13	SIG	M62/2159B2	OFF	M62 J25 - J30	
05/09/15 13:10:13	SIG	M62/2170B1	OFF	M62 J25 - J30	
05/09/15 13:10:13	SIG	M62/2170B2	OFF	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2114A1	60R	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2114A2	60R	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2114A3	60R	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2117A1	REDX	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2117A2	60R	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2117A3	60R	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2117A4	60R	M62 J25 - J30	
05/09/15 13:28:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:28:49	SIG	M62/2122K1	40R	M62 J25 - J30	
05/09/15 13:28:49	SIG	M62/2122K2	40R	M62 J25 - J30	
05/09/15 13:28:49	SIG	M62/2124A2	40R	M62 J25 - J30	
05/09/15 13:28:49	SIG	M62/2124A4	40R	M62 J25 - J30	
05/09/15 13:28:50	SIG	M62/2117A2	50R	M62 J25 - J30	
05/09/15 13:28:50	SIG	M62/2117A3	50R	M62 J25 - J30	
05/09/15 13:28:50	SIG	M62/2117A4	50R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2114A1	50R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2114A2	50R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2114A3	50R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2117A2	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2117A3	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2117A4	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2122K1	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2122K2	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2124A2	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:28:55	SIG	M62/2124A4	40R	M62 J25 - J30	
05/09/15 13:31:06	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:31:06	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:31:12	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:31:22	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:31:22	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:31:28	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:31:38	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:31:38	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:31:44	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:31:54	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:31:54	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:32:00	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:32:01	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:32:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:32:11	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:32:17	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:32:27	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:32:27	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:32:33	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:32:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:32:43	SIG	M62/2124A3	50R	M62 J25 - J30	
05/09/15 13:32:49	SIG	M62/2124A3	40R	M62 J25 - J30	
05/09/15 13:32:50	SIG	M62/2114A1	60R	M62 J25 - J30	
05/09/15 13:32:50	SIG	M62/2114A2	60R	M62 J25 - J30	
05/09/15 13:32:50	SIG	M62/2114A3	60R	M62 J25 - J30	
05/09/15 13:32:50	SIG	M62/2117A2	60R	M62 J25 - J30	
05/09/15 13:32:50	SIG	M62/2117A3	60R	M62 J25 - J30	
05/09/15 13:32:50	SIG	M62/2117A4	60R	M62 J25 - J30	
05/09/15 13:32:51	SIG	M62/2122K1	60R	M62 J25 - J30	
05/09/15 13:32:51	SIG	M62/2122K2	60R	M62 J25 - J30	
05/09/15 13:32:51	SIG	M62/2124A2	60R	M62 J25 - J30	
05/09/15 13:32:51	SIG	M62/2124A3	60R	M62 J25 - J30	
05/09/15 13:32:51	SIG	M62/2124A4	60R	M62 J25 - J30	
05/09/15 13:33:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:33:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:33:06	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:33:07	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2114A1	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2114A2	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2114A3	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2117A1	BLNK	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2117A2	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2117A3	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2117A4	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2122K1	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2122K2	OFF	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2124A2	NR	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2124A3	NR	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2124A4	NR	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2135A1	NR	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2135A2	NR	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2135A3	NR	M62 J25 - J30	
05/09/15 13:42:47	SIG	M62/2135A4	NR	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2124A2	OFF	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2124A4	OFF	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2135A1	OFF	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2135A2	OFF	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2135A3	OFF	M62 J25 - J30	
05/09/15 13:45:47	SIG	M62/2135A4	OFF	M62 J25 - J30	
05/09/15 13:45:48	SIG	M62/2124A1	BLNK	M62 J25 - J30	
05/09/15 15:28:01	SIG	M62/2125L1	50R	M62 J25 - J30	
05/09/15 15:28:01	SIG	M62/2125L2	50R	M62 J25 - J30	
05/09/15 15:43:38	SIG	M62/2125L1	NR	M62 J25 - J30	
05/09/15 15:43:38	SIG	M62/2125L2	NR	M62 J25 - J30	
05/09/15 15:46:38	SIG	M62/2125L1	OFF	M62 J25 - J30	
05/09/15 15:46:39	SIG	M62/2125L2	OFF	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2170A1	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2170A2	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2170K1	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2170K2	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2177A1	REDX	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2177A2	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2177A3	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2177A4	60R	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2183A1	REDX	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2183A2	NR	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2183A3	NR	M62 J25 - J30	
05/09/15 17:46:18	SIG	M62/2183A4	NR	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2170A1	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2170A2	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2170K1	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2170K2	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2177A1	BLNK	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2177A2	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2177A3	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2177A4	OFF	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2183A2	NR	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2183A3	NR	M62 J25 - J30	
05/09/15 18:34:24	SIG	M62/2183A4	NR	M62 J25 - J30	
05/09/15 18:37:24	SIG	M62/2183A1	BLNK	M62 J25 - J30	
05/09/15 18:37:24	SIG	M62/2183A2	OFF	M62 J25 - J30	
05/09/15 18:37:24	SIG	M62/2183A3	OFF	M62 J25 - J30	
05/09/15 18:37:24	SIG	M62/2183A4	OFF	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2117A2	50R	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2117A3	50R	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2117A4	50R	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2124A1	REDX	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2124A2	NR	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2124A3	NR	M62 J25 - J30	
05/09/15 21:02:03	SIG	M62/2124A4	NR	M62 J25 - J30	
05/09/15 21:02:08	SIG	M62/2117A2	40R	M62 J25 - J30	
05/09/15 21:02:08	SIG	M62/2117A3	40R	M62 J25 - J30	
05/09/15 21:02:08	SIG	M62/2117A4	40R	M62 J25 - J30	
05/09/15 21:02:13	SIG	M62/2117A2	30R	M62 J25 - J30	
05/09/15 21:02:13	SIG	M62/2117A3	30R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2106A1	REDX	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2106A2	50R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2106A4	50R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2114A1	LDR	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2114A2	LDR	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2114A3	50R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2117A1	STOP	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2117A2	20R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2117A3	20R	M62 J25 - J30	
05/09/15 21:02:19	SIG	M62/2117A4	40R	M62 J25 - J30	
05/09/15 21:02:24	SIG	M62/2117A1	STOP	M62 J25 - J30	
05/09/15 21:02:24	SIG	M62/2117A2	STOP	M62 J25 - J30	
05/09/15 21:02:24	SIG	M62/2117A3	STOP	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2097A1	REDX	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2097A2	60R	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2097A3	60R	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2097A4	60R	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2106A2	40R	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2106A4	40R	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2114A1	STOP	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2114A2	STOP	M62 J25 - J30	
05/09/15 21:03:17	SIG	M62/2114A3	40R	M62 J25 - J30	
05/09/15 21:03:23	SIG	M62/2114A1	STOP	M62 J25 - J30	
05/09/15 21:03:23	SIG	M62/2114A2	STOP	M62 J25 - J30	
05/09/15 21:06:21	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:06:22	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:06:27	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:09:25	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:09:26	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:09:31	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:09:54	SIG	M62/2088A1	REDX	M62 J25 - J30	
05/09/15 21:09:54	SIG	M62/2088A2	60R	M62 J25 - J30	
05/09/15 21:09:54	SIG	M62/2088A3	60R	M62 J25 - J30	
05/09/15 21:09:54	SIG	M62/2088A4	60R	M62 J25 - J30	
05/09/15 21:12:28	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:12:29	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:12:35	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:13:54	SIG	M62/2079A1	REDX	M62 J25 - J30	
05/09/15 21:13:54	SIG	M62/2079A2	60R	M62 J25 - J30	
05/09/15 21:13:54	SIG	M62/2079A3	60R	M62 J25 - J30	
05/09/15 21:13:54	SIG	M62/2079A4	60R	M62 J25 - J30	
05/09/15 21:14:11	SIG	M62/2114A2	40R	M62 J25 - J30	
05/09/15 21:14:11	SIG	M62/2117A3	40R	M62 J25 - J30	
05/09/15 21:15:32	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:15:32	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:15:38	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:15:49	SIG	M62/2097A2	50R	M62 J25 - J30	
05/09/15 21:15:49	SIG	M62/2097A3	50R	M62 J25 - J30	
05/09/15 21:15:49	SIG	M62/2097A4	50R	M62 J25 - J30	
05/09/15 21:18:36	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:18:36	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:18:41	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:21:39	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:21:40	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:21:45	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:24:43	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:24:44	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:24:49	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:27:47	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:27:48	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:27:53	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:30:51	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:30:52	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:30:57	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2050B2	NR	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2050B3	NR	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2050B4	NR	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2057B2	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2057B3	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2057B4	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2065B1	REDX	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2065B2	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2065B3	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2065B4	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M62/2065M1	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
05/09/15 21:31:35	SIG	M621/1002B2	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M621/1010B1	60R	M62 J25 - J30	
05/09/15 21:31:35	SIG	M621/1010B2	60R	M62 J25 - J30	
05/09/15 21:32:17	SIG	M621/1010B1	OFF	M62 J25 - J30	
05/09/15 21:32:17	SIG	M621/1010B2	OFF	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2050B2	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2050B3	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2050B4	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2057B1	BLNK	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2057B2	OFF	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2057B3	OFF	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2057B4	OFF	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2065B2	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2065B3	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2065B4	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M62/2065M1	NR	M62 J25 - J30	
05/09/15 21:32:18	SIG	M621/1002B1	OFF	M62 J25 - J30	
05/09/15 21:32:18	SIG	M621/1002B2	OFF	M62 J25 - J30	
05/09/15 21:33:55	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:33:55	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:34:01	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2050B2	OFF	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2050B3	OFF	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2050B4	OFF	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2065B2	OFF	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2065B3	OFF	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2065B4	OFF	M62 J25 - J30	
05/09/15 21:35:18	SIG	M62/2065M1	OFF	M62 J25 - J30	
05/09/15 21:36:58	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:36:59	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:37:04	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:40:02	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:40:03	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:40:08	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:43:14	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:43:15	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:43:20	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:46:14	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:46:15	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:46:20	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:49:14	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:49:15	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:49:20	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:52:18	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:52:18	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:52:24	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:55:21	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:55:22	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:55:27	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 21:58:25	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 21:58:26	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 21:58:31	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 22:01:29	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 22:01:29	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 22:01:35	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 22:04:33	SIG	M62/2106A3	???	M62 J25 - J30	
05/09/15 22:04:33	SIG	M62/2106A3	50R	M62 J25 - J30	
05/09/15 22:04:39	SIG	M62/2106A3	40R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2097A2	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2097A3	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2097A4	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2106A2	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2106A3	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2106A4	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2114A1	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2114A2	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2114A3	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2117A1	REDX	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2117A2	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2117A3	60R	M62 J25 - J30	
05/09/15 22:04:41	SIG	M62/2117A4	60R	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2079A1	BLNK	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2079A2	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2079A3	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2079A4	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2088A2	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2088A3	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2088A4	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2097A2	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2097A3	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2097A4	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2106A2	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2106A3	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2106A4	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2114A1	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2114A2	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2114A3	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2117A1	BLNK	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2117A2	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2117A3	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2117A4	OFF	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2124A2	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2124A3	NR	M62 J25 - J30	
05/09/15 22:06:55	SIG	M62/2124A4	NR	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2088A2	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2088A3	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2088A4	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2097A2	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2097A3	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2097A4	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2106A2	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2106A3	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2106A4	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2124A1	BLNK	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2124A2	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2124A3	OFF	M62 J25 - J30	
05/09/15 22:09:56	SIG	M62/2124A4	OFF	M62 J25 - J30	
05/09/15 22:09:57	SIG	M62/2088A1	BLNK	M62 J25 - J30	
05/09/15 22:09:57	SIG	M62/2088A1	BLNK	M62 J25 - J30	
05/09/15 22:09:57	SIG	M62/2097A1	BLNK	M62 J25 - J30	
05/09/15 22:09:57	SIG	M62/2097A1	BLNK	M62 J25 - J30	
05/09/15 22:09:57	SIG	M62/2106A1	BLNK	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2057A1	50R	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2057A2	50R	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2057A3	50R	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2057J1	50R	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2065A1	REDX	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2065A2	NR	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2065A3	NR	M62 J25 - J30	
06/09/15 04:28:16	SIG	M62/2065A4	NR	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2057A1	OFF	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2057A2	OFF	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2057A3	OFF	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2057J1	OFF	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2065A1	BLNK	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2065A2	OFF	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2065A3	OFF	M62 J25 - J30	
06/09/15 05:24:48	SIG	M62/2065A4	OFF	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2057A1	50R	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2057A2	50R	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2057A3	50R	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2057J1	50R	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2065A1	REDX	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2065A2	NR	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2065A3	NR	M62 J25 - J30	
06/09/15 07:10:08	SIG	M62/2065A4	NR	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2057A1	OFF	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2057A2	OFF	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2057A3	OFF	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2057J1	OFF	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2065A1	BLNK	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2065A2	OFF	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2065A3	OFF	M62 J25 - J30	
06/09/15 08:14:51	SIG	M62/2065A4	OFF	M62 J25 - J30	
06/09/15 14:00:27	SIG	M62/2050A1	OFF	M62 J25 - J30	
06/09/15 14:00:28	SIG	M62/2050A1	BLNK	M62 J25 - J30	
06/09/15 14:05:13	SIG	M62/2050A1	OFF	M62 J25 - J30	
06/09/15 14:05:14	SIG	M62/2050A1	BLNK	M62 J25 - J30	
06/09/15 14:29:33	SIG	M62/1968A1	50R	M62 J25 - J30	
06/09/15 14:29:33	SIG	M62/1968A2	50R	M62 J25 - J30	
06/09/15 14:29:33	SIG	M62/1968A3	50R	M62 J25 - J30	
06/09/15 14:29:33	SIG	M62/1968A4	50R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1960A1	50R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1960A2	50R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1960A3	50R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1960K1	50R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1960K2	50R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1968A1	40R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1968A2	40R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1968A3	40R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1968A4	40R	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1974A1	NR	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1974A2	NR	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1974A3	NR	M62 J25 - J30	
06/09/15 14:29:38	SIG	M62/1974A4	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1960A1	OFF	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1960A2	OFF	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1960A3	OFF	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1960K1	OFF	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1960K2	OFF	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1968A1	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1968A2	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1968A3	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1968A4	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1974A1	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1974A2	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1974A3	NR	M62 J25 - J30	
06/09/15 14:33:33	SIG	M62/1974A4	NR	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1968A1	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1968A2	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1968A3	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1968A4	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1974A1	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1974A2	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1974A3	OFF	M62 J25 - J30	
06/09/15 14:36:34	SIG	M62/1974A4	OFF	M62 J25 - J30	
06/09/15 15:50:50	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 15:50:50	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2170B1	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2170B2	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2170L1	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 15:50:51	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2170B1	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2170B2	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2170L1	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2170L2	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2177B1	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2177B2	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2177L1	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2177L2	40R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 15:50:56	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 15:53:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 15:53:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 15:53:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 15:53:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 15:54:50	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 15:54:50	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2170L1	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2170L2	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2177B1	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2177B2	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2177L1	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2177L2	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 15:54:51	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 15:57:51	SIG	M62/2159B1	OFF	M62 J25 - J30	
06/09/15 15:57:51	SIG	M62/2159B2	OFF	M62 J25 - J30	
06/09/15 15:57:51	SIG	M62/2170B1	OFF	M62 J25 - J30	
06/09/15 15:57:51	SIG	M62/2170B2	OFF	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2170B1	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2170B2	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2170L1	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 16:00:08	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2170B1	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2170B2	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2170L1	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2170L2	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2177B1	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2177B2	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2177L1	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2177L2	40R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 16:00:13	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 16:03:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 16:03:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 16:03:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 16:03:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 16:04:06	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 16:04:06	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2170L1	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2170L2	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2177B1	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2177B2	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2177L1	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2177L2	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 16:04:07	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 16:07:07	SIG	M62/2159B1	OFF	M62 J25 - J30	
06/09/15 16:07:07	SIG	M62/2159B2	OFF	M62 J25 - J30	
06/09/15 16:07:07	SIG	M62/2170B1	OFF	M62 J25 - J30	
06/09/15 16:07:07	SIG	M62/2170B2	OFF	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2183B1	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2183B2	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2183L1	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2183L2	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2189B1	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2189B2	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2189B3	60R	M62 J25 - J30	
06/09/15 16:29:55	SIG	M62/2189B4	60R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2189B1	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2189B2	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2189B3	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2189B4	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2199M1	50R	M62 J25 - J30	
06/09/15 16:30:18	SIG	M62/2199M2	50R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2183B1	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2183B2	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2183L1	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2183L2	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2189B1	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2189B2	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2189B3	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2189B4	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2199M1	40R	M62 J25 - J30	
06/09/15 16:30:23	SIG	M62/2199M2	40R	M62 J25 - J30	
06/09/15 16:30:28	SIG	M62/2183L1	30R	M62 J25 - J30	
06/09/15 16:30:28	SIG	M62/2189B1	30R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2183B1	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2183B2	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2183L1	20R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2183L2	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2189B1	20R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2189B2	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2189B3	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2189B4	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2194B1	LDR	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2194B2	50R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2194B3	50R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2194B4	50R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2197B1	50R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2197B2	50R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2197B3	50R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2199M1	40R	M62 J25 - J30	
06/09/15 16:30:34	SIG	M62/2199M2	40R	M62 J25 - J30	
06/09/15 16:30:39	SIG	M62/2183L1	STOP	M62 J25 - J30	
06/09/15 16:30:39	SIG	M62/2189B1	STOP	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2183B1	60R	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2183B2	60R	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2183L1	60R	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2183L2	60R	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2189B1	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2189B2	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2189B3	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2189B4	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2194B1	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2194B2	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2194B3	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2194B4	NR	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2197B1	OFF	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2197B2	OFF	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2197B3	OFF	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2199M1	OFF	M62 J25 - J30	
06/09/15 16:32:44	SIG	M62/2199M2	OFF	M62 J25 - J30	
06/09/15 16:32:58	SIG	M62/2183B1	NR	M62 J25 - J30	
06/09/15 16:32:58	SIG	M62/2183B2	NR	M62 J25 - J30	
06/09/15 16:32:58	SIG	M62/2183L1	NR	M62 J25 - J30	
06/09/15 16:32:58	SIG	M62/2183L2	NR	M62 J25 - J30	
06/09/15 16:35:44	SIG	M62/2194B1	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2189B1	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2189B2	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2189B3	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2189B4	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2194B2	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2194B3	OFF	M62 J25 - J30	
06/09/15 16:35:45	SIG	M62/2194B4	OFF	M62 J25 - J30	
06/09/15 16:35:59	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 16:36:00	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 16:36:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 16:36:00	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2050B2	NR	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2050B3	NR	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2050B4	NR	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2057B1	REDX	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2057B2	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2057B3	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2057B4	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2065B1	REDX	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2065B2	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2065B3	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2065B4	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2065M1	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2069M1	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2069M2	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2074B1	REDX	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2074B2	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2074B3	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M62/2074B4	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M621/1002B1	HSD	M62 J25 - J30	
06/09/15 17:20:16	SIG	M621/1002B2	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M621/1010B1	60R	M62 J25 - J30	
06/09/15 17:20:16	SIG	M621/1010B2	60R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2170B1	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2170B2	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2170L1	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 17:43:10	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2170B1	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2170B2	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2170L1	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2170L2	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2177B1	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2177B2	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2177L1	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2177L2	40R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 17:43:16	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 17:45:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 17:45:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 17:45:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 17:45:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 17:47:09	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 17:47:09	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2170L1	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2170L2	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2177B1	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2177B2	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2177L1	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2177L2	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 17:47:10	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2050B2	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2050B3	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2050B4	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2065B2	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2065B3	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2065B4	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2065M1	NR	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2069M1	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2069M2	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2074B1	BLNK	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2074B2	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2074B3	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M62/2074B4	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M621/1010B1	OFF	M62 J25 - J30	
06/09/15 17:49:17	SIG	M621/1010B2	OFF	M62 J25 - J30	
06/09/15 17:50:10	SIG	M62/2159B1	OFF	M62 J25 - J30	
06/09/15 17:50:10	SIG	M62/2159B2	OFF	M62 J25 - J30	
06/09/15 17:50:11	SIG	M62/2170B1	OFF	M62 J25 - J30	
06/09/15 17:50:11	SIG	M62/2170B2	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2050B2	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2050B3	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2050B4	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2065B3	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2065B4	OFF	M62 J25 - J30	
06/09/15 17:52:17	SIG	M62/2065M1	OFF	M62 J25 - J30	
06/09/15 17:52:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
06/09/15 17:57:19	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 17:57:19	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2170B1	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2170B2	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2170L1	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 17:57:20	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2170B1	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2170B2	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2170L1	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2170L2	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2177B1	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2177B2	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2177L1	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2177L2	40R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 17:57:25	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 18:00:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:00:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:00:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:00:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2170L1	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2170L2	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2177B1	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2177B2	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2177L1	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2177L2	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 18:01:19	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 18:02:46	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 18:02:46	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2170B1	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2170B2	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2170L1	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 18:02:47	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2170B1	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2170B2	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2170L1	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2170L2	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2177B1	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2177B2	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2177L1	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2177L2	40R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 18:02:52	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 18:05:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:05:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:05:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:05:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2189B1	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2189B2	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2189B3	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2189B4	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2194B1	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2194B2	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2194B3	60R	M62 J25 - J30	
06/09/15 18:08:17	SIG	M62/2194B4	60R	M62 J25 - J30	
06/09/15 18:14:17	SIG	M62/2197B1	60R	M62 J25 - J30	
06/09/15 18:14:17	SIG	M62/2197B2	60R	M62 J25 - J30	
06/09/15 18:14:17	SIG	M62/2197B3	60R	M62 J25 - J30	
06/09/15 18:14:17	SIG	M62/2199M1	60R	M62 J25 - J30	
06/09/15 18:14:17	SIG	M62/2199M2	60R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2170B1	60R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2170B2	60R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2170L1	50R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2183B1	60R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2183B2	60R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2183L1	60R	M62 J25 - J30	
06/09/15 18:16:06	SIG	M62/2183L2	60R	M62 J25 - J30	
06/09/15 18:18:17	SIG	M62/2197B1	OFF	M62 J25 - J30	
06/09/15 18:18:17	SIG	M62/2197B2	OFF	M62 J25 - J30	
06/09/15 18:18:17	SIG	M62/2197B3	OFF	M62 J25 - J30	
06/09/15 18:18:17	SIG	M62/2199M1	OFF	M62 J25 - J30	
06/09/15 18:18:17	SIG	M62/2199M2	OFF	M62 J25 - J30	
06/09/15 18:18:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:18:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:18:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:18:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:22:51	SIG	M62/2050A1	BLNK	M62 J25 - J30	
06/09/15 18:22:51	SIG	M62/2050A1	OFF	M62 J25 - J30	
06/09/15 18:25:09	SIG	M62/2050A1	OFF	M62 J25 - J30	
06/09/15 18:25:10	SIG	M62/2050A1	BLNK	M62 J25 - J30	
06/09/15 18:30:17	SIG	M62/2159B1	NR	M62 J25 - J30	
06/09/15 18:30:17	SIG	M62/2159B2	NR	M62 J25 - J30	
06/09/15 18:30:18	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 18:30:18	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 18:30:18	SIG	M62/2170L1	OFF	M62 J25 - J30	
06/09/15 18:30:18	SIG	M62/2170L2	OFF	M62 J25 - J30	
06/09/15 18:33:17	SIG	M62/2159B1	OFF	M62 J25 - J30	
06/09/15 18:33:18	SIG	M62/2159B2	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2177B1	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2177B2	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2177L1	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2177L2	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2183B1	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2183B2	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2183L1	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2183L2	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2189B1	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2189B2	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2189B3	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2189B4	NR	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2194B1	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2194B2	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2194B3	OFF	M62 J25 - J30	
06/09/15 18:37:18	SIG	M62/2194B4	OFF	M62 J25 - J30	
06/09/15 18:40:18	SIG	M62/2189B1	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2170B1	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2170B2	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2189B2	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2189B3	OFF	M62 J25 - J30	
06/09/15 18:40:19	SIG	M62/2189B4	OFF	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1960B1	NR	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1960B2	NR	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1960B3	NR	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1960L1	NR	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1960L2	NR	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1968B1	50R	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1968B2	50R	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1968B3	50R	M62 J25 - J30	
06/09/15 18:52:41	SIG	M62/1968L1	50R	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1960B1	NR	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1960B2	NR	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1960B3	NR	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1960L1	NR	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1960L2	NR	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1968B1	OFF	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1968B2	OFF	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1968B3	OFF	M62 J25 - J30	
06/09/15 18:54:26	SIG	M62/1968L1	OFF	M62 J25 - J30	
06/09/15 18:57:27	SIG	M62/1960B1	OFF	M62 J25 - J30	
06/09/15 18:57:27	SIG	M62/1960B2	OFF	M62 J25 - J30	
06/09/15 18:57:27	SIG	M62/1960B3	OFF	M62 J25 - J30	
06/09/15 18:57:27	SIG	M62/1960L1	OFF	M62 J25 - J30	
06/09/15 18:57:27	SIG	M62/1960L2	OFF	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2097B1	REDX	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2097B2	NR	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2097B3	NR	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2097B4	NR	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2106B1	REDX	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2106B2	60R	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2106B3	60R	M62 J25 - J30	
06/09/15 19:16:12	SIG	M62/2106B4	60R	M62 J25 - J30	
06/09/15 19:29:23	SIG	M62/2097B2	NR	M62 J25 - J30	
06/09/15 19:29:23	SIG	M62/2097B3	NR	M62 J25 - J30	
06/09/15 19:29:23	SIG	M62/2097B4	NR	M62 J25 - J30	
06/09/15 19:29:23	SIG	M62/2106B2	NR	M62 J25 - J30	
06/09/15 19:29:23	SIG	M62/2106B3	NR	M62 J25 - J30	
06/09/15 19:29:23	SIG	M62/2106B4	NR	M62 J25 - J30	
06/09/15 19:32:23	SIG	M62/2106B2	OFF	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2097B1	BLNK	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2097B1	BLNK	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2097B2	OFF	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2097B3	OFF	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2097B4	OFF	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2106B1	BLNK	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2106B3	OFF	M62 J25 - J30	
06/09/15 19:32:24	SIG	M62/2106B4	OFF	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2074B1	REDX	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2074B2	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2074B3	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2074B4	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2081B1	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2081B2	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2081B3	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2081L1	NR	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2088B1	REDX	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2088B2	60R	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2088B3	60R	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2088B4	60R	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2097B1	REDX	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2097B2	60R	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2097B3	60R	M62 J25 - J30	
06/09/15 20:20:05	SIG	M62/2097B4	60R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2081B1	50R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2081B2	50R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2081B3	50R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2081L1	50R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2088B2	50R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2088B3	50R	M62 J25 - J30	
06/09/15 20:21:33	SIG	M62/2088B4	50R	M62 J25 - J30	
06/09/15 20:22:45	SIG	M62/2088B2	NR	M62 J25 - J30	
06/09/15 20:22:45	SIG	M62/2088B3	NR	M62 J25 - J30	
06/09/15 20:22:45	SIG	M62/2088B4	NR	M62 J25 - J30	
06/09/15 20:22:45	SIG	M62/2097B2	NR	M62 J25 - J30	
06/09/15 20:22:45	SIG	M62/2097B3	NR	M62 J25 - J30	
06/09/15 20:22:45	SIG	M62/2097B4	NR	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2074B1	BLNK	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2074B2	OFF	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2074B3	OFF	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2074B4	OFF	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2081B1	OFF	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2081B2	OFF	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2081B3	OFF	M62 J25 - J30	
06/09/15 20:23:39	SIG	M62/2081L1	NR	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2088B1	BLNK	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2088B2	OFF	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2088B3	OFF	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2088B4	OFF	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2097B1	BLNK	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2097B2	OFF	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2097B3	OFF	M62 J25 - J30	
06/09/15 20:25:46	SIG	M62/2097B4	OFF	M62 J25 - J30	
06/09/15 20:25:47	SIG	M62/2088B1	BLNK	M62 J25 - J30	
06/09/15 20:26:39	SIG	M62/2081L1	OFF	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2170L1	LDR	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2170L2	50R	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2177B1	50R	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2177B2	50R	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2177L1	50R	M62 J25 - J30	
06/09/15 22:12:03	SIG	M62/2177L2	50R	M62 J25 - J30	
06/09/15 22:18:00	SIG	M62/2183B1	50R	M62 J25 - J30	
06/09/15 22:18:00	SIG	M62/2183B2	50R	M62 J25 - J30	
06/09/15 22:18:00	SIG	M62/2183L1	50R	M62 J25 - J30	
06/09/15 22:18:00	SIG	M62/2183L2	50R	M62 J25 - J30	
06/09/15 22:21:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 22:21:03	SIG	M62/2183B2	???	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2170B1	NR	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2170B2	NR	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2170L1	OFF	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2170L2	OFF	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2177B1	OFF	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2177B2	OFF	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2177L1	OFF	M62 J25 - J30	
06/09/15 22:37:13	SIG	M62/2177L2	OFF	M62 J25 - J30	
06/09/15 22:40:13	SIG	M62/2170B1	OFF	M62 J25 - J30	
06/09/15 22:40:13	SIG	M62/2170B2	OFF	M62 J25 - J30	
06/09/15 22:50:16	SIG	M62/2183B1	OFF	M62 J25 - J30	
06/09/15 22:50:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
06/09/15 22:50:16	SIG	M62/2183L1	OFF	M62 J25 - J30	
06/09/15 22:50:16	SIG	M62/2183L2	OFF	M62 J25 - J30	
06/09/15 23:31:43	SIG	M62/1968B1	50R	M62 J25 - J30	
06/09/15 23:31:43	SIG	M62/1968B2	50R	M62 J25 - J30	
06/09/15 23:31:43	SIG	M62/1968B3	50R	M62 J25 - J30	
06/09/15 23:31:43	SIG	M62/1968L1	50R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1960B1	NR	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1960B2	NR	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1960B3	NR	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1960L1	NR	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1960L2	NR	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1968B1	40R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1968B2	40R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1968B3	40R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1968L1	40R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1974B1	50R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1974B2	50R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1974B3	50R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1974B4	50R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1974M1	50R	M62 J25 - J30	
06/09/15 23:31:48	SIG	M62/1974M2	50R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1968B1	30R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1968B2	30R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1968B3	30R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1974B1	40R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1974B2	40R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1974B3	40R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1974B4	40R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1974M1	40R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1974M2	40R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1981B1	50R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1981B2	50R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1981B3	50R	M62 J25 - J30	
06/09/15 23:33:13	SIG	M62/1981B4	50R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1968B1	20R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1968B2	20R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1968B3	20R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1974B1	30R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1974B2	30R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1974B3	30R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1974B4	30R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1974M1	30R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1974M2	30R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1981B1	40R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1981B2	40R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1981B3	40R	M62 J25 - J30	
06/09/15 23:33:19	SIG	M62/1981B4	40R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1968B1	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1968B2	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1968B3	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1974B1	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1974B2	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1974B3	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1974B4	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1974M1	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1974M2	20R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1981B1	40R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1981B2	40R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1981B3	40R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1981B4	40R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1987B1	50R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1987B2	50R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1987B3	50R	M62 J25 - J30	
06/09/15 23:33:24	SIG	M62/1987B4	50R	M62 J25 - J30	
06/09/15 23:33:30	SIG	M62/1968B1	STOP	M62 J25 - J30	
06/09/15 23:33:30	SIG	M62/1968B2	STOP	M62 J25 - J30	
06/09/15 23:33:30	SIG	M62/1968B3	STOP	M62 J25 - J30	
06/09/15 23:33:43	SIG	M62/1968L1	30R	M62 J25 - J30	
06/09/15 23:33:48	SIG	M62/1968L1	20R	M62 J25 - J30	
06/09/15 23:33:53	SIG	M62/1968L1	STOP	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1956A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1956A2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1956A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1960A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1960A2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1960A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1960K1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1960K2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1968A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1968A2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1968A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1968A4	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1974A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1974A2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1974A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1974A4	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1979K1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1979K2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1981A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1981A2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1981A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1981A4	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1987A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1987A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1987J1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1992A1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1992A2	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1992A3	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1992J1	50R	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1999A1	NR	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1999A2	NR	M62 J25 - J30	
06/09/15 23:34:35	SIG	M62/1999A3	NR	M62 J25 - J30	
06/09/15 23:34:46	SIG	M606/2003B1	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M606/2003B2	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1992B1	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1992B2	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1992B3	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1992B4	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1999B1	REDX	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1999B2	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1999B3	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/1999B4	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/2005M1	50R	M62 J25 - J30	
06/09/15 23:34:46	SIG	M62/2005M2	50R	M62 J25 - J30	
06/09/15 23:35:01	SIG	M62/1960B1	50R	M62 J25 - J30	
06/09/15 23:35:01	SIG	M62/1960B2	50R	M62 J25 - J30	
06/09/15 23:35:01	SIG	M62/1960B3	50R	M62 J25 - J30	
06/09/15 23:35:05	SIG	M62/1956A3	OFF	M62 J25 - J30	
06/09/15 23:35:06	SIG	M62/1956A3	50R	M62 J25 - J30	
06/09/15 23:35:49	SIG	M62/1956A3	50R	M62 J25 - J30	
06/09/15 23:35:49	SIG	M62/1956A3	OFF	M62 J25 - J30	
06/09/15 23:36:49	SIG	M62/1956A3	50R	M62 J25 - J30	
06/09/15 23:36:49	SIG	M62/1956A3	OFF	M62 J25 - J30	
06/09/15 23:37:49	SIG	M62/1956A3	50R	M62 J25 - J30	
06/09/15 23:37:49	SIG	M62/1956A3	OFF	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1968B1	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1968B2	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1968B3	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1974B1	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1974B2	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1974B3	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1974B4	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1974M1	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1974M2	40R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1981B1	50R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1981B2	50R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1981B3	50R	M62 J25 - J30	
06/09/15 23:37:53	SIG	M62/1981B4	50R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1968L1	40R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1974B1	50R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1974B2	50R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1974B3	50R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1974B4	50R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1974M1	50R	M62 J25 - J30	
06/09/15 23:38:05	SIG	M62/1974M2	50R	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1960L1	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1960L2	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1968B1	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1968B2	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1968B3	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1968L1	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1974B1	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1974B2	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1974B3	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1974B4	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1974M1	OFF	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1974M2	OFF	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1981B1	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1981B2	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1981B3	NR	M62 J25 - J30	
06/09/15 23:38:52	SIG	M62/1981B4	NR	M62 J25 - J30	
06/09/15 23:40:19	SIG	M606/2003B1	OFF	M62 J25 - J30	
06/09/15 23:40:19	SIG	M606/2003B2	OFF	M62 J25 - J30	
06/09/15 23:40:19	SIG	M62/2005M1	OFF	M62 J25 - J30	
06/09/15 23:40:19	SIG	M62/2005M2	OFF	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1981B1	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1981B2	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1981B3	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1981B4	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1987B1	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1987B2	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1987B3	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1987B4	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1992B1	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1992B2	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1992B3	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1992B4	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1999B2	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1999B3	NR	M62 J25 - J30	
06/09/15 23:40:20	SIG	M62/1999B4	NR	M62 J25 - J30	
06/09/15 23:40:34	SIG	M62/1960B1	NR	M62 J25 - J30	
06/09/15 23:40:34	SIG	M62/1960B2	NR	M62 J25 - J30	
06/09/15 23:40:34	SIG	M62/1960B3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1956A1	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1956A2	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1956A3	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1960A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1960A2	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1960A3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1960K1	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1960K2	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1968A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1968A2	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1968A3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1968A4	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1974A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1974A2	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1974A3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1974A4	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1979K1	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1979K2	OFF	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1981A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1981A2	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1981A3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1981A4	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1987A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1987A3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1987J1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1992A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1992A2	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1992A3	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1992J1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1999A1	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1999A2	NR	M62 J25 - J30	
06/09/15 23:41:04	SIG	M62/1999A3	NR	M62 J25 - J30	
06/09/15 23:41:52	SIG	M62/1974B1	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1960L1	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1960L2	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1968B1	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1968B2	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1968B3	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1968L1	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1974B2	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1974B3	OFF	M62 J25 - J30	
06/09/15 23:41:53	SIG	M62/1974B4	OFF	M62 J25 - J30	
06/09/15 23:43:20	SIG	M62/1999B2	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1981B1	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1981B2	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1981B3	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1981B4	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1987B1	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1987B2	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1987B3	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1987B4	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1992B1	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1992B2	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1992B3	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1992B4	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1999B1	BLNK	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1999B3	OFF	M62 J25 - J30	
06/09/15 23:43:21	SIG	M62/1999B4	OFF	M62 J25 - J30	
06/09/15 23:43:35	SIG	M62/1960B1	OFF	M62 J25 - J30	
06/09/15 23:43:35	SIG	M62/1960B2	OFF	M62 J25 - J30	
06/09/15 23:43:35	SIG	M62/1960B3	OFF	M62 J25 - J30	
06/09/15 23:44:04	SIG	M62/1960A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1960A2	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1960A3	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1968A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1968A2	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1968A3	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1968A4	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1974A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1974A2	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1974A3	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1974A4	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1981A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1981A2	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1981A3	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1981A4	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1987A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1987A3	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1987J1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1992A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1992A2	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1992A3	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1992J1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1999A1	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1999A2	OFF	M62 J25 - J30	
06/09/15 23:44:15	SIG	M62/1999A3	OFF	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1960B1	NR	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1960B2	NR	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1960B3	NR	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1960L1	NR	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1960L2	NR	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1968B1	50R	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1968B2	50R	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1968B3	50R	M62 J25 - J30	
07/09/15 00:25:07	SIG	M62/1968L1	50R	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1960B1	NR	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1960B2	NR	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1960B3	NR	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1960L1	NR	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1960L2	NR	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1968B1	OFF	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1968B2	OFF	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1968B3	OFF	M62 J25 - J30	
07/09/15 00:31:29	SIG	M62/1968L1	OFF	M62 J25 - J30	
07/09/15 00:34:30	SIG	M62/1960B1	OFF	M62 J25 - J30	
07/09/15 00:34:30	SIG	M62/1960B2	OFF	M62 J25 - J30	
07/09/15 00:34:30	SIG	M62/1960B3	OFF	M62 J25 - J30	
07/09/15 00:34:30	SIG	M62/1960L1	OFF	M62 J25 - J30	
07/09/15 00:34:30	SIG	M62/1960L2	OFF	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2074B1	REDX	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2074B2	NR	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2074B3	NR	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2074B4	NR	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2081B1	50R	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2081B2	50R	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2081B3	50R	M62 J25 - J30	
07/09/15 00:52:39	SIG	M62/2081L1	50R	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2074B1	BLNK	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2074B2	OFF	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2074B3	OFF	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2074B4	OFF	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2081B1	OFF	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2081B2	OFF	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2081B3	OFF	M62 J25 - J30	
07/09/15 00:57:11	SIG	M62/2081L1	NR	M62 J25 - J30	
07/09/15 01:00:12	SIG	M62/2081L1	OFF	M62 J25 - J30	
07/09/15 06:03:34	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 06:03:34	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 06:03:34	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 06:03:34	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1974A1	NR	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1974A2	NR	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1974A3	NR	M62 J25 - J30	
07/09/15 06:03:40	SIG	M62/1974A4	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1960A1	OFF	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1960A2	OFF	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1960A3	OFF	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1960K1	OFF	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1960K2	OFF	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1968A1	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1968A2	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1968A3	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1968A4	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1974A1	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1974A2	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1974A3	NR	M62 J25 - J30	
07/09/15 06:07:35	SIG	M62/1974A4	NR	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1968A1	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1968A2	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1968A3	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1968A4	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1974A1	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1974A2	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1974A3	OFF	M62 J25 - J30	
07/09/15 06:10:35	SIG	M62/1974A4	OFF	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2012A2	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2012A3	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2018A1	HSD	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2025A1	REDX	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2033A1	REDX	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2041A1	REDX	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2041A2	NR	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2041A3	NR	M62 J25 - J30	
07/09/15 06:33:31	SIG	M62/2041A4	NR	M62 J25 - J30	
07/09/15 06:34:30	SIG	M62/2004A1	60R	M62 J25 - J30	
07/09/15 06:34:30	SIG	M62/2004A2	60R	M62 J25 - J30	
07/09/15 06:34:30	SIG	M62/2004A3	60R	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2050A1	REDX	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2050A2	NR	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2050A3	NR	M62 J25 - J30	
07/09/15 06:35:30	SIG	M62/2050A4	NR	M62 J25 - J30	
07/09/15 06:37:30	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 06:37:30	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 06:37:30	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 06:37:30	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 06:37:30	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2050A2	60R	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2050A3	60R	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2050A4	60R	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2057A1	NR	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2057A2	NR	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2057A3	NR	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2065A1	REDX	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2065A2	NR	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2065A3	NR	M62 J25 - J30	
07/09/15 06:38:31	SIG	M62/2065A4	NR	M62 J25 - J30	
07/09/15 06:39:31	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 06:39:31	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 06:39:31	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2012A1	40R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2012A2	40R	M62 J25 - J30	
07/09/15 06:41:11	SIG	M62/2012A3	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2004A1	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2004A2	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2004A3	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2012A1	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2012A2	40R	M62 J25 - J30	
07/09/15 06:41:16	SIG	M62/2012A3	40R	M62 J25 - J30	
07/09/15 06:42:30	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 06:42:30	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 06:42:30	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 06:42:48	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 06:42:48	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 06:42:48	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 06:42:48	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 06:42:49	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 06:43:53	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 06:44:15	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 06:44:31	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 06:44:37	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 06:44:41	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 06:44:41	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 06:45:48	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 06:45:48	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 06:45:48	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 06:45:48	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 06:45:48	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 06:45:48	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 06:46:31	SIG	M62/1992A1	60R	M62 J25 - J30	
07/09/15 06:46:31	SIG	M62/1992A2	60R	M62 J25 - J30	
07/09/15 06:46:31	SIG	M62/1992A3	60R	M62 J25 - J30	
07/09/15 06:46:31	SIG	M62/1992J1	60R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 06:46:42	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 06:46:47	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 06:47:29	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 06:47:29	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 06:47:29	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 06:47:29	SIG	M62/2004A1	40R	M62 J25 - J30	
07/09/15 06:47:29	SIG	M62/2004A2	40R	M62 J25 - J30	
07/09/15 06:47:29	SIG	M62/2004A3	40R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1979K1	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1979K2	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1981A1	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1981A2	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1981A3	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1981A4	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1987A1	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1987A3	60R	M62 J25 - J30	
07/09/15 06:47:40	SIG	M62/1987J1	60R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 06:48:16	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1992A1	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1992A2	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1992A3	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1992J1	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 06:48:21	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 06:48:51	SIG	M62/2159B1	NR	M62 J25 - J30	
07/09/15 06:48:51	SIG	M62/2159B2	NR	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 06:48:52	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2177B1	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2177B2	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2177L1	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2177L2	40R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2183B1	50R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2183L1	50R	M62 J25 - J30	
07/09/15 06:48:57	SIG	M62/2183L2	50R	M62 J25 - J30	
07/09/15 06:49:44	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 06:49:45	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 06:49:50	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 06:50:43	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 06:50:43	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 06:50:43	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 06:50:43	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 06:51:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:51:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:51:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:51:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:51:46	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 06:51:46	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 06:51:46	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 06:51:46	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1987A1	40R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1987A3	40R	M62 J25 - J30	
07/09/15 06:52:03	SIG	M62/1987J1	40R	M62 J25 - J30	
07/09/15 06:52:31	SIG	M62/1974A1	60R	M62 J25 - J30	
07/09/15 06:52:31	SIG	M62/1974A2	60R	M62 J25 - J30	
07/09/15 06:52:31	SIG	M62/1974A3	60R	M62 J25 - J30	
07/09/15 06:52:31	SIG	M62/1974A4	60R	M62 J25 - J30	
07/09/15 06:52:34	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 06:52:34	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 06:52:34	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 06:52:34	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 06:52:34	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 06:52:47	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 06:52:48	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 06:53:51	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 06:53:52	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2189B1	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2189B2	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2189B3	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2189B4	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2194B1	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2194B2	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2194B3	60R	M62 J25 - J30	
07/09/15 06:54:31	SIG	M62/2194B4	60R	M62 J25 - J30	
07/09/15 06:54:45	SIG	M62/2065M1	NR	M62 J25 - J30	
07/09/15 06:54:45	SIG	M62/2069M1	60R	M62 J25 - J30	
07/09/15 06:54:45	SIG	M62/2069M2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2025B1	REDX	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2025B2	NR	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2025B3	NR	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2025B4	NR	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2033B1	REDX	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2033B2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2033B3	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2033B4	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2041B1	REDX	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2041B2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2041B3	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2041B4	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2050B2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2050B3	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2050B4	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2057B1	REDX	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2057B2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2057B3	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2057B4	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2065B1	REDX	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2065B2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2065B3	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2065B4	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M62/2065M1	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M621/1002B1	HSD	M62 J25 - J30	
07/09/15 06:54:46	SIG	M621/1002B2	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 06:54:46	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2012B1	REDX	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2012B2	NR	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2012B3	NR	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2012B4	NR	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 06:54:47	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 06:55:22	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 06:55:22	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 06:55:22	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2159B1	NR	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2159B2	NR	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2170L1	NR	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2170L2	NR	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2177B1	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2177B2	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2177L1	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2177L2	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2183B1	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2183B2	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2183L1	60R	M62 J25 - J30	
07/09/15 06:55:37	SIG	M62/2183L2	60R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 06:55:53	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 06:56:10	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/1960A1	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/1960A2	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/1960A3	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/1960K1	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/1960K2	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/2197B1	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/2197B2	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/2197B3	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/2199M1	60R	M62 J25 - J30	
07/09/15 06:56:31	SIG	M62/2199M2	60R	M62 J25 - J30	
07/09/15 06:56:36	SIG	M62/2033B1	60R	M62 J25 - J30	
07/09/15 06:56:59	SIG	M62/2041B1	60R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2159B1	NR	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2159B2	NR	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 06:57:10	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2177B1	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2177B2	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2177L1	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2177L2	40R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2183B1	50R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2183L1	50R	M62 J25 - J30	
07/09/15 06:57:16	SIG	M62/2183L2	50R	M62 J25 - J30	
07/09/15 06:57:24	SIG	M62/2057B1	60R	M62 J25 - J30	
07/09/15 06:57:24	SIG	M621/1002B1	60R	M62 J25 - J30	
07/09/15 06:57:24	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 06:57:24	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 06:57:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 06:57:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 06:57:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 06:57:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 06:57:49	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 06:57:49	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 06:57:49	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 06:57:49	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 06:57:49	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 06:58:11	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 06:58:31	SIG	M62/1955K1	60R	M62 J25 - J30	
07/09/15 06:58:31	SIG	M62/1955K2	60R	M62 J25 - J30	
07/09/15 06:58:31	SIG	M62/1956A1	60R	M62 J25 - J30	
07/09/15 06:58:31	SIG	M62/1956A2	60R	M62 J25 - J30	
07/09/15 06:58:31	SIG	M62/1956A3	60R	M62 J25 - J30	
07/09/15 06:59:23	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 06:59:23	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 06:59:23	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 06:59:23	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 06:59:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:59:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:59:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:59:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 06:59:41	SIG	M62/2183B1	40R	M62 J25 - J30	
07/09/15 06:59:41	SIG	M62/2183L1	40R	M62 J25 - J30	
07/09/15 06:59:41	SIG	M62/2183L2	40R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2183B1	40R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2183L1	40R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2183L2	40R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2189B1	50R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2189B2	50R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2189B3	50R	M62 J25 - J30	
07/09/15 06:59:47	SIG	M62/2189B4	50R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 06:59:59	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 07:00:24	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 07:00:24	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 07:00:24	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 07:00:31	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 07:00:31	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 07:00:31	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 07:00:31	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 07:00:31	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 07:00:31	SIG	M62/2012A2	60R	M62 J25 - J30	
07/09/15 07:00:31	SIG	M62/2012A3	60R	M62 J25 - J30	
07/09/15 07:01:31	SIG	M62/2004A1	60R	M62 J25 - J30	
07/09/15 07:01:31	SIG	M62/2004A2	60R	M62 J25 - J30	
07/09/15 07:01:31	SIG	M62/2004A3	60R	M62 J25 - J30	
07/09/15 07:02:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:02:44	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:02:49	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 07:02:49	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 07:02:49	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 07:02:49	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 07:02:49	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 07:02:49	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 07:02:50	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:03:31	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 07:03:31	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 07:03:39	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 07:04:31	SIG	M62/2203B1	60R	M62 J25 - J30	
07/09/15 07:04:31	SIG	M62/2203B2	60R	M62 J25 - J30	
07/09/15 07:04:31	SIG	M62/2203B3	60R	M62 J25 - J30	
07/09/15 07:04:53	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 07:04:53	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 07:04:53	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 07:04:53	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 07:05:22	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 07:05:22	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 07:05:22	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 07:05:22	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 07:05:44	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:05:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:05:49	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:05:54	SIG	M62/1955K1	40R	M62 J25 - J30	
07/09/15 07:05:54	SIG	M62/1955K2	40R	M62 J25 - J30	
07/09/15 07:05:54	SIG	M62/1956A1	40R	M62 J25 - J30	
07/09/15 07:05:54	SIG	M62/1956A2	40R	M62 J25 - J30	
07/09/15 07:05:54	SIG	M62/1956A3	40R	M62 J25 - J30	
07/09/15 07:05:59	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 07:05:59	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 07:05:59	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 07:05:59	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 07:06:05	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 07:06:05	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 07:06:05	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 07:06:05	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1974A1	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1974A2	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1974A3	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1974A4	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1979K1	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1979K2	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1981A1	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1981A2	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1981A3	60R	M62 J25 - J30	
07/09/15 07:06:31	SIG	M62/1981A4	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1987A1	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1987A3	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1987J1	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1992A1	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1992A2	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1992A3	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1992J1	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 07:07:41	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 07:07:51	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 07:07:51	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 07:07:51	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 07:07:51	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2074B1	REDX	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2074B2	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2074B3	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2074B4	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2081B1	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2081B2	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2081B3	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2081L1	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2088B1	REDX	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2088B2	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2088B3	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2088B4	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2097B1	REDX	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2097B2	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2097B3	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2097B4	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2106B1	REDX	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2106B2	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2106B3	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2106B4	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B1	REDX	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B2	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B2	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B3	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B3	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B4	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2113B4	NR	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2117B1	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2117B3	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2120M1	60R	M62 J25 - J30	
07/09/15 07:08:20	SIG	M62/2120M2	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2074B2	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2074B3	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2074B4	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2081B1	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2081B2	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2081B3	60R	M62 J25 - J30	
07/09/15 07:08:21	SIG	M62/2081L1	60R	M62 J25 - J30	
07/09/15 07:08:45	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 07:08:45	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 07:08:45	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 07:08:45	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 07:08:45	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 07:08:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:08:47	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 07:08:50	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 07:08:52	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1955K1	60R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1955K2	60R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1960A1	60R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1960A2	60R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1960A3	60R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1960K1	60R	M62 J25 - J30	
07/09/15 07:10:20	SIG	M62/1960K2	60R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2189B1	40R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2189B2	40R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2189B3	40R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2189B4	40R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2194B1	50R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2194B2	50R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2194B3	50R	M62 J25 - J30	
07/09/15 07:10:26	SIG	M62/2194B4	50R	M62 J25 - J30	
07/09/15 07:11:46	SIG	M62/2088B1	60R	M62 J25 - J30	
07/09/15 07:11:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:11:53	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:11:57	SIG	M62/1956A1	60R	M62 J25 - J30	
07/09/15 07:11:57	SIG	M62/1956A2	60R	M62 J25 - J30	
07/09/15 07:11:57	SIG	M62/1956A3	60R	M62 J25 - J30	
07/09/15 07:11:59	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:12:06	SIG	M62/2097B1	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1992A1	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1992A2	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1992A3	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1992J1	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 07:12:45	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 07:12:47	SIG	M62/2106B1	60R	M62 J25 - J30	
07/09/15 07:12:55	SIG	M62/2113B1	60R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1987A2	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 07:13:28	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1987A1	40R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1987A3	40R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1987J1	40R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1992A1	40R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1992A2	40R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1992A3	40R	M62 J25 - J30	
07/09/15 07:13:43	SIG	M62/1992J1	40R	M62 J25 - J30	
07/09/15 07:14:01	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 07:14:01	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 07:14:01	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 07:14:01	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 07:14:25	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 07:14:30	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2004A1	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2004A2	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2004A3	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2012A1	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2012A2	40R	M62 J25 - J30	
07/09/15 07:14:30	SIG	M62/2012A3	40R	M62 J25 - J30	
07/09/15 07:14:31	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 07:14:31	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 07:14:31	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 07:14:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:15:00	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:15:05	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:15:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:15:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:15:23	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:15:24	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2194B1	40R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2194B2	40R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2194B3	40R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2194B4	40R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2197B1	50R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2197B2	50R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2197B3	50R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2199M1	50R	M62 J25 - J30	
07/09/15 07:15:59	SIG	M62/2199M2	50R	M62 J25 - J30	
07/09/15 07:16:22	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 07:16:22	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 07:16:22	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 07:16:22	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 07:16:23	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 07:16:27	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 07:16:27	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 07:16:27	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 07:16:27	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 07:16:29	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1992A1	60R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1992A2	60R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1992A3	60R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1992J1	60R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 07:17:17	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 07:18:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:18:05	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:18:11	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:18:30	SIG	M62/1987A1	60R	M62 J25 - J30	
07/09/15 07:18:30	SIG	M62/1987A3	60R	M62 J25 - J30	
07/09/15 07:18:30	SIG	M62/1987J1	60R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2197B1	40R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2197B2	40R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2197B3	40R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2199M1	40R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2199M2	40R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2203B1	50R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2203B2	50R	M62 J25 - J30	
07/09/15 07:18:41	SIG	M62/2203B3	50R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2197B1	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2197B2	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2197B3	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2199M1	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2199M2	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2203B1	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2203B2	40R	M62 J25 - J30	
07/09/15 07:18:46	SIG	M62/2203B3	40R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2025B1	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2033B1	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:20:12	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2025B1	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2025B2	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2025B3	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2025B4	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2033B1	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2033B2	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2033B4	40R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2041B1	50R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 07:20:17	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1974A1	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1974A2	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1974A3	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1974A4	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1979K1	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1979K2	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1981A1	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1981A2	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1981A3	60R	M62 J25 - J30	
07/09/15 07:20:24	SIG	M62/1981A4	60R	M62 J25 - J30	
07/09/15 07:21:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:21:12	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:21:17	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2065A2	60R	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2065A3	60R	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2065A4	60R	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2073K1	60R	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2073K2	60R	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2079A1	REDX	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2079A2	NR	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2079A3	NR	M62 J25 - J30	
07/09/15 07:22:16	SIG	M62/2079A4	NR	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2074A1	REDX	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2074A2	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2074A3	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2074A4	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2079A2	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2079A3	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2079A4	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2088A1	REDX	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2088A2	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2088A3	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2088A4	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2097A1	REDX	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2097A2	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2097A3	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2097A4	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2106A1	REDX	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2106A2	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2106A3	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2106A4	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2114A1	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2114A2	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2114A3	60R	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2117A1	REDX	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2117A2	NR	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2117A3	NR	M62 J25 - J30	
07/09/15 07:22:17	SIG	M62/2117A4	NR	M62 J25 - J30	
07/09/15 07:22:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:22:27	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:22:28	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:22:29	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:23:06	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 07:23:06	SIG	M62/1987A2	50R	M62 J25 - J30	
07/09/15 07:23:06	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 07:23:06	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 07:23:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:23:19	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:23:24	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:23:29	SIG	M62/2203B1	50R	M62 J25 - J30	
07/09/15 07:23:29	SIG	M62/2203B2	50R	M62 J25 - J30	
07/09/15 07:23:29	SIG	M62/2203B3	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1987A1	40R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1987A3	40R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1987J1	40R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 07:23:30	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 07:23:31	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 07:23:50	SIG	M62/2106A1	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2033B1	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2033B2	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2033B3	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2033B4	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2041B1	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2041B2	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2041B3	60R	M62 J25 - J30	
07/09/15 07:24:11	SIG	M62/2041B4	60R	M62 J25 - J30	
07/09/15 07:24:17	SIG	M62/2097A1	60R	M62 J25 - J30	
07/09/15 07:24:18	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:24:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:24:24	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:24:52	SIG	M62/2088A1	60R	M62 J25 - J30	
07/09/15 07:25:01	SIG	M62/2079A1	60R	M62 J25 - J30	
07/09/15 07:25:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:25:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:25:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:25:19	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 07:25:35	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 07:26:10	SIG	M62/2203B1	40R	M62 J25 - J30	
07/09/15 07:26:10	SIG	M62/2203B2	40R	M62 J25 - J30	
07/09/15 07:26:10	SIG	M62/2203B3	40R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2025B1	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2033B1	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:26:13	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2025B1	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2025B2	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2025B3	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2025B4	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2033B1	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2033B2	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2033B4	40R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2041B1	50R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 07:26:19	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 07:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1992A1	40R	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1992A2	40R	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1992A3	40R	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1992J1	40R	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 07:26:33	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 07:27:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:27:24	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:27:29	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:27:57	SIG	M62/2018B1	50R	M62 J25 - J30	
07/09/15 07:27:57	SIG	M62/2018B2	50R	M62 J25 - J30	
07/09/15 07:27:57	SIG	M62/2018B3	50R	M62 J25 - J30	
07/09/15 07:27:57	SIG	M62/2018L1	50R	M62 J25 - J30	
07/09/15 07:28:03	SIG	M62/2018B1	40R	M62 J25 - J30	
07/09/15 07:28:03	SIG	M62/2018B2	40R	M62 J25 - J30	
07/09/15 07:28:03	SIG	M62/2018B3	40R	M62 J25 - J30	
07/09/15 07:28:03	SIG	M62/2018L1	40R	M62 J25 - J30	
07/09/15 07:28:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:28:25	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:28:30	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:29:55	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 07:29:55	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 07:30:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:30:30	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 07:30:35	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 07:30:36	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:31:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:31:29	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:31:34	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 07:31:42	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 07:31:57	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 07:31:57	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 07:31:57	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 07:31:57	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2033B1	50R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2041B1	60R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2041B2	60R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2041B3	60R	M62 J25 - J30	
07/09/15 07:32:22	SIG	M62/2041B4	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2033B1	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2033B2	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2033B3	60R	M62 J25 - J30	
07/09/15 07:33:02	SIG	M62/2033B4	60R	M62 J25 - J30	
07/09/15 07:33:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:33:43	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:33:48	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:33:54	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 07:33:54	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 07:33:54	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 07:33:54	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 07:33:54	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 07:35:14	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 07:35:14	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 07:35:14	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 07:35:14	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 07:35:14	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 07:35:14	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 07:35:19	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1960A1	60R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1960A2	60R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1960A3	60R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1960K1	60R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1960K2	60R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:35:42	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:35:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:35:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:35:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:35:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:36:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:36:43	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 07:36:48	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:37:38	SIG	M62/2050A1	40R	M62 J25 - J30	
07/09/15 07:37:38	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 07:37:38	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 07:37:38	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 07:37:55	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 07:38:18	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:38:18	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 07:38:18	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 07:38:18	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 07:38:23	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 07:39:14	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 07:39:14	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 07:39:20	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 07:39:20	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 07:39:20	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 07:39:20	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 07:39:40	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 07:39:40	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 07:39:40	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 07:39:40	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 07:39:40	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 07:39:40	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 07:39:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:39:49	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:39:50	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 07:39:50	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 07:39:54	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:39:55	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 07:39:55	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 07:40:14	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 07:40:14	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 07:40:14	SIG	M62/2012A1	40R	M62 J25 - J30	
07/09/15 07:40:14	SIG	M62/2012A2	40R	M62 J25 - J30	
07/09/15 07:40:14	SIG	M62/2012A3	40R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 07:40:21	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2041A1	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 07:40:27	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 07:40:57	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 07:40:58	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:41:03	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:41:54	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 07:41:54	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 07:41:54	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 07:41:54	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 07:41:58	SIG	M62/2004A1	40R	M62 J25 - J30	
07/09/15 07:41:58	SIG	M62/2004A2	40R	M62 J25 - J30	
07/09/15 07:41:58	SIG	M62/2004A3	40R	M62 J25 - J30	
07/09/15 07:42:32	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 07:42:32	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 07:42:44	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1955K1	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1955K2	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1956A1	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1956A2	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1956A3	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 07:42:49	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 07:42:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:42:54	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:42:59	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:43:12	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:43:12	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:43:12	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:43:12	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 07:43:20	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2194B1	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2194B2	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2194B3	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2194B4	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2197B1	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2197B2	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2197B3	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2199M1	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2199M2	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2203B1	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2203B2	50R	M62 J25 - J30	
07/09/15 07:43:35	SIG	M62/2203B3	50R	M62 J25 - J30	
07/09/15 07:43:46	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 07:43:46	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 07:43:46	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 07:43:46	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 07:43:46	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 07:44:09	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 07:44:15	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 07:44:15	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 07:44:27	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 07:44:27	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1974A1	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1974A2	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1974A3	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M62/1974A4	60R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 07:44:32	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 07:45:32	SIG	M62/1979K1	60R	M62 J25 - J30	
07/09/15 07:45:32	SIG	M62/1979K2	60R	M62 J25 - J30	
07/09/15 07:45:32	SIG	M62/1981A1	60R	M62 J25 - J30	
07/09/15 07:45:32	SIG	M62/1981A2	60R	M62 J25 - J30	
07/09/15 07:45:32	SIG	M62/1981A3	60R	M62 J25 - J30	
07/09/15 07:45:32	SIG	M62/1981A4	60R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 07:45:37	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 07:45:42	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 07:45:56	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:45:56	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:45:56	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:45:56	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:46:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:46:01	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:46:02	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 07:46:02	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 07:46:02	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 07:46:02	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 07:46:06	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:46:36	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 07:46:36	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 07:46:36	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 07:46:36	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1955K1	60R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1955K2	60R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1956A1	60R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1956A2	60R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1956A3	60R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 07:46:44	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 07:47:04	SIG	M62/1992A1	40R	M62 J25 - J30	
07/09/15 07:47:04	SIG	M62/1992A2	40R	M62 J25 - J30	
07/09/15 07:47:04	SIG	M62/1992A3	40R	M62 J25 - J30	
07/09/15 07:47:04	SIG	M62/1992J1	40R	M62 J25 - J30	
07/09/15 07:48:09	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 07:48:09	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:48:15	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2050A2	60R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2050A3	60R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2050A4	60R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 07:48:26	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 07:48:26	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 07:48:55	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 07:48:55	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 07:48:55	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 07:48:55	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1987A1	40R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1987A3	40R	M62 J25 - J30	
07/09/15 07:48:59	SIG	M62/1987J1	40R	M62 J25 - J30	
07/09/15 07:49:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:49:07	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:49:12	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:49:13	SIG	M62/2177B1	60R	M62 J25 - J30	
07/09/15 07:49:13	SIG	M62/2177B2	60R	M62 J25 - J30	
07/09/15 07:49:13	SIG	M62/2177L1	60R	M62 J25 - J30	
07/09/15 07:49:13	SIG	M62/2177L2	60R	M62 J25 - J30	
07/09/15 07:49:36	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 07:49:36	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 07:49:36	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 07:49:36	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 07:49:49	SIG	M62/2025B1	50R	M62 J25 - J30	
07/09/15 07:49:49	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 07:49:49	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 07:49:49	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2025B1	40R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2025B2	40R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2025B3	40R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2025B4	40R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2033B1	50R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:49:55	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1960A1	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1960A2	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1960A3	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1960K1	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1960K2	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 07:49:56	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 07:49:59	SIG	M62/2194B1	40R	M62 J25 - J30	
07/09/15 07:49:59	SIG	M62/2194B2	40R	M62 J25 - J30	
07/09/15 07:49:59	SIG	M62/2194B3	40R	M62 J25 - J30	
07/09/15 07:49:59	SIG	M62/2194B4	40R	M62 J25 - J30	
07/09/15 07:50:07	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 07:50:07	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 07:50:07	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 07:50:07	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 07:50:07	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 07:50:07	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 07:50:13	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2033B1	40R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2033B2	40R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2033B4	40R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2041B1	50R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 07:50:16	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 07:50:32	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 07:51:04	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 07:51:04	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 07:51:07	SIG	M62/2183B1	60R	M62 J25 - J30	
07/09/15 07:51:07	SIG	M62/2183B2	60R	M62 J25 - J30	
07/09/15 07:51:07	SIG	M62/2183L1	60R	M62 J25 - J30	
07/09/15 07:51:07	SIG	M62/2183L2	60R	M62 J25 - J30	
07/09/15 07:51:13	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 07:51:14	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:51:19	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:51:22	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 07:51:22	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 07:51:22	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 07:51:22	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 07:51:23	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 07:51:40	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1955K1	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1955K2	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1956A1	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1956A2	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1956A3	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 07:51:45	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 07:52:05	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 07:52:05	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2183B1	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2183L1	50R	M62 J25 - J30	
07/09/15 07:52:17	SIG	M62/2183L2	50R	M62 J25 - J30	
07/09/15 07:52:19	SIG	M62/2050A1	40R	M62 J25 - J30	
07/09/15 07:52:19	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 07:52:19	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 07:52:19	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2177B1	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2177B2	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2177L1	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2177L2	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2183B1	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2183L1	40R	M62 J25 - J30	
07/09/15 07:52:23	SIG	M62/2183L2	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/2197B1	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/2197B2	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/2197B3	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/2199M1	40R	M62 J25 - J30	
07/09/15 07:52:26	SIG	M62/2199M2	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 07:52:31	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 07:52:47	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 07:52:47	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 07:52:47	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 07:52:47	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 07:52:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:52:57	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 07:53:02	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 07:53:11	SIG	M62/2203B1	40R	M62 J25 - J30	
07/09/15 07:53:11	SIG	M62/2203B2	40R	M62 J25 - J30	
07/09/15 07:53:11	SIG	M62/2203B3	40R	M62 J25 - J30	
07/09/15 07:53:52	SIG	M62/2041A1	40R	M62 J25 - J30	
07/09/15 07:53:52	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 07:53:52	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 07:53:52	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 07:54:07	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 07:54:07	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2033B1	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2033B2	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2033B3	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2033B4	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2041B1	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2041B2	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2041B3	60R	M62 J25 - J30	
07/09/15 07:54:17	SIG	M62/2041B4	60R	M62 J25 - J30	
07/09/15 07:54:18	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 07:54:24	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1987A1	40R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1987A3	40R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1987J1	40R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1992A1	40R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1992A2	40R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1992A3	40R	M62 J25 - J30	
07/09/15 07:55:14	SIG	M62/1992J1	40R	M62 J25 - J30	
07/09/15 07:55:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:55:20	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:55:26	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1955K1	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1955K2	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1956A1	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1956A2	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1956A3	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1960A1	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1960A2	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1960A3	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1960K1	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1960K2	60R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:55:41	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:55:42	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 07:55:42	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 07:55:42	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 07:55:42	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 07:56:18	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 07:56:18	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 07:56:18	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 07:56:18	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 07:56:20	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 07:56:20	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 07:56:20	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 07:56:20	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 07:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 07:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 07:56:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:56:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 07:56:32	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 07:56:32	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 07:57:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:57:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:57:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:57:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2194B1	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2194B2	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2194B3	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2194B4	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2197B1	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2197B2	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2197B3	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2199M1	50R	M62 J25 - J30	
07/09/15 07:57:19	SIG	M62/2199M2	50R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 07:57:42	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 07:57:47	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1974A1	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1974A2	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1974A3	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1974A4	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/2050A2	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/2050A3	60R	M62 J25 - J30	
07/09/15 07:57:52	SIG	M62/2050A4	60R	M62 J25 - J30	
07/09/15 07:57:54	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 07:57:54	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 07:57:54	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 07:57:54	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 07:57:54	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 07:58:00	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 07:58:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 07:58:26	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 07:58:31	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 07:58:32	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 07:58:32	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 07:58:32	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 07:58:32	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 07:59:13	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 07:59:42	SIG	M62/2203B1	50R	M62 J25 - J30	
07/09/15 07:59:42	SIG	M62/2203B2	50R	M62 J25 - J30	
07/09/15 07:59:42	SIG	M62/2203B3	50R	M62 J25 - J30	
07/09/15 07:59:50	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 07:59:50	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 08:00:08	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 08:00:08	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 08:00:26	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:00:26	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:00:31	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:01:04	SIG	M62/2189B1	50R	M62 J25 - J30	
07/09/15 08:01:04	SIG	M62/2189B2	50R	M62 J25 - J30	
07/09/15 08:01:04	SIG	M62/2189B3	50R	M62 J25 - J30	
07/09/15 08:01:04	SIG	M62/2189B4	50R	M62 J25 - J30	
07/09/15 08:01:23	SIG	M62/2189B1	40R	M62 J25 - J30	
07/09/15 08:01:23	SIG	M62/2189B2	40R	M62 J25 - J30	
07/09/15 08:01:23	SIG	M62/2189B3	40R	M62 J25 - J30	
07/09/15 08:01:23	SIG	M62/2189B4	40R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 08:01:24	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2050A1	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 08:01:30	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 08:01:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:01:32	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:01:37	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 08:01:41	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1955K1	60R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1955K2	60R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1956A1	60R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1956A2	60R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1956A3	60R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 08:01:55	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 08:02:41	SIG	M62/2177B1	60R	M62 J25 - J30	
07/09/15 08:02:41	SIG	M62/2177B2	60R	M62 J25 - J30	
07/09/15 08:02:41	SIG	M62/2177L1	60R	M62 J25 - J30	
07/09/15 08:02:41	SIG	M62/2177L2	60R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 08:02:58	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2177B1	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2177B2	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2177L1	40R	M62 J25 - J30	
07/09/15 08:03:05	SIG	M62/2177L2	40R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 08:03:19	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 08:03:31	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:03:32	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:03:37	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:04:32	SIG	M62/2203B1	60R	M62 J25 - J30	
07/09/15 08:04:32	SIG	M62/2203B2	60R	M62 J25 - J30	
07/09/15 08:04:32	SIG	M62/2203B3	60R	M62 J25 - J30	
07/09/15 08:04:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:04:42	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:04:47	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:05:04	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:05:04	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 08:05:04	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 08:05:04	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2050A2	60R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2050A3	60R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2050A4	60R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 08:05:24	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 08:05:24	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 08:05:30	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1974A1	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1974A2	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1974A3	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1974A4	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1979K1	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1979K2	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1981A1	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1981A2	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1981A3	40R	M62 J25 - J30	
07/09/15 08:05:44	SIG	M62/1981A4	40R	M62 J25 - J30	
07/09/15 08:06:06	SIG	M62/1955K1	40R	M62 J25 - J30	
07/09/15 08:06:06	SIG	M62/1955K2	40R	M62 J25 - J30	
07/09/15 08:06:06	SIG	M62/1956A1	40R	M62 J25 - J30	
07/09/15 08:06:06	SIG	M62/1956A2	40R	M62 J25 - J30	
07/09/15 08:06:06	SIG	M62/1956A3	40R	M62 J25 - J30	
07/09/15 08:06:29	SIG	M62/2189B1	50R	M62 J25 - J30	
07/09/15 08:06:29	SIG	M62/2189B2	50R	M62 J25 - J30	
07/09/15 08:06:29	SIG	M62/2189B3	50R	M62 J25 - J30	
07/09/15 08:06:29	SIG	M62/2189B4	50R	M62 J25 - J30	
07/09/15 08:06:37	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 08:06:37	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 08:06:37	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 08:06:37	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 08:07:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:07:44	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:07:45	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 08:07:45	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:07:49	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:08:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 08:09:32	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 08:09:32	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 08:09:32	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 08:09:32	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 08:10:27	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 08:10:33	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1968A1	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1968A2	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1968A3	40R	M62 J25 - J30	
07/09/15 08:10:43	SIG	M62/1968A4	40R	M62 J25 - J30	
07/09/15 08:10:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:10:49	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:10:55	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:12:23	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 08:12:23	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 08:12:23	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 08:12:23	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 08:12:23	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 08:12:23	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 08:12:28	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 08:12:29	SIG	M62/2189B1	40R	M62 J25 - J30	
07/09/15 08:12:29	SIG	M62/2189B2	40R	M62 J25 - J30	
07/09/15 08:12:29	SIG	M62/2189B3	40R	M62 J25 - J30	
07/09/15 08:12:29	SIG	M62/2189B4	40R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 08:12:30	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 08:12:44	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:12:45	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1956A1	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1956A2	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1956A3	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1960A1	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1960A2	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1960A3	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1960K1	40R	M62 J25 - J30	
07/09/15 08:12:58	SIG	M62/1960K2	40R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 08:13:06	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 08:13:14	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 08:13:14	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 08:13:14	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 08:13:38	SIG	M62/2050A1	40R	M62 J25 - J30	
07/09/15 08:13:38	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 08:13:38	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 08:13:38	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 08:13:55	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:13:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:14:01	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:15:30	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 08:15:30	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 08:15:30	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 08:15:30	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 08:15:30	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 08:15:32	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 08:15:32	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 08:15:32	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 08:15:32	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 08:15:54	SIG	M62/1955K1	40R	M62 J25 - J30	
07/09/15 08:15:54	SIG	M62/1955K2	40R	M62 J25 - J30	
07/09/15 08:15:54	SIG	M62/1956A1	40R	M62 J25 - J30	
07/09/15 08:15:54	SIG	M62/1956A2	40R	M62 J25 - J30	
07/09/15 08:15:54	SIG	M62/1956A3	40R	M62 J25 - J30	
07/09/15 08:16:16	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 08:16:16	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 08:16:16	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 08:16:16	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 08:16:37	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 08:16:37	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 08:16:37	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 08:16:37	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 08:17:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:17:01	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:17:07	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:17:35	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 08:17:35	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 08:17:35	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 08:18:20	SIG	M62/2177B1	60R	M62 J25 - J30	
07/09/15 08:18:20	SIG	M62/2177B2	60R	M62 J25 - J30	
07/09/15 08:18:20	SIG	M62/2177L1	60R	M62 J25 - J30	
07/09/15 08:18:20	SIG	M62/2177L2	60R	M62 J25 - J30	
07/09/15 08:18:35	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 08:18:35	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 08:18:35	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 08:18:35	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 08:19:51	SIG	M62/2050A1	40R	M62 J25 - J30	
07/09/15 08:19:51	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 08:19:51	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 08:19:51	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 08:20:01	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 08:20:01	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 08:20:02	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 08:20:02	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 08:20:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:20:07	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:20:08	SIG	M62/1979K1	50R	M62 J25 - J30	
07/09/15 08:20:08	SIG	M62/1979K2	50R	M62 J25 - J30	
07/09/15 08:20:08	SIG	M62/1981A1	50R	M62 J25 - J30	
07/09/15 08:20:08	SIG	M62/1981A2	50R	M62 J25 - J30	
07/09/15 08:20:08	SIG	M62/1981A3	50R	M62 J25 - J30	
07/09/15 08:20:08	SIG	M62/1981A4	50R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2183B1	60R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2183B2	40R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2183B2	60R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2183L1	60R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2183L2	60R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2189B1	50R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2189B2	50R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2189B3	50R	M62 J25 - J30	
07/09/15 08:20:13	SIG	M62/2189B4	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 08:20:24	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2177B1	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2177B2	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2177L1	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2177L2	40R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2183B1	50R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2183L1	50R	M62 J25 - J30	
07/09/15 08:20:30	SIG	M62/2183L2	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 08:21:23	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2041A1	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 08:21:29	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 08:21:44	SIG	M62/1955K1	40R	M62 J25 - J30	
07/09/15 08:21:44	SIG	M62/1955K2	40R	M62 J25 - J30	
07/09/15 08:21:57	SIG	M62/1974A1	50R	M62 J25 - J30	
07/09/15 08:21:57	SIG	M62/1974A2	50R	M62 J25 - J30	
07/09/15 08:21:57	SIG	M62/1974A3	50R	M62 J25 - J30	
07/09/15 08:21:57	SIG	M62/1974A4	50R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 08:22:10	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2189B1	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2189B2	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2189B3	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2189B4	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2194B1	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2194B2	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2194B3	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2194B4	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2197B1	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2197B2	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2197B3	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2199M1	60R	M62 J25 - J30	
07/09/15 08:22:33	SIG	M62/2199M2	60R	M62 J25 - J30	
07/09/15 08:23:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:23:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:23:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:23:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:24:29	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 08:24:29	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 08:24:29	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 08:24:29	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2050A2	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2050A3	60R	M62 J25 - J30	
07/09/15 08:24:42	SIG	M62/2050A4	60R	M62 J25 - J30	
07/09/15 08:24:43	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 08:24:43	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 08:24:43	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 08:24:43	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 08:24:55	SIG	M62/1968A1	50R	M62 J25 - J30	
07/09/15 08:24:55	SIG	M62/1968A2	50R	M62 J25 - J30	
07/09/15 08:24:55	SIG	M62/1968A3	50R	M62 J25 - J30	
07/09/15 08:24:55	SIG	M62/1968A4	50R	M62 J25 - J30	
07/09/15 08:25:02	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:25:03	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:25:08	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:26:10	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 08:26:10	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 08:26:10	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 08:26:10	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 08:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 08:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 08:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 08:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 08:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 08:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 08:26:35	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 08:26:35	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 08:26:35	SIG	M62/2012A1	40R	M62 J25 - J30	
07/09/15 08:26:35	SIG	M62/2012A2	40R	M62 J25 - J30	
07/09/15 08:26:35	SIG	M62/2012A3	40R	M62 J25 - J30	
07/09/15 08:26:36	SIG	M62/2004A1	40R	M62 J25 - J30	
07/09/15 08:26:36	SIG	M62/2004A2	40R	M62 J25 - J30	
07/09/15 08:26:36	SIG	M62/2004A3	40R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1955K1	50R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1955K2	50R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1960A1	50R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1960A2	50R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1960A3	50R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1960K1	50R	M62 J25 - J30	
07/09/15 08:27:21	SIG	M62/1960K2	50R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1979K1	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1979K2	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1981A1	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1981A2	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1981A3	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1981A4	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1987A1	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1987A3	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1987J1	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1992A1	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1992A2	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1992A3	60R	M62 J25 - J30	
07/09/15 08:27:42	SIG	M62/1992J1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2177B1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2177B2	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2177L1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2177L2	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2183B1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2183B2	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2183L1	60R	M62 J25 - J30	
07/09/15 08:27:43	SIG	M62/2183L2	60R	M62 J25 - J30	
07/09/15 08:28:07	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:28:07	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:28:13	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:28:43	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 08:28:43	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 08:28:43	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 08:28:43	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2170B1	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2170B2	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2170L1	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 08:28:44	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2170B1	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2170B2	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2170L1	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2170L2	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2177B1	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2177B2	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2177L1	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2177L2	40R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2183B1	50R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2183L1	50R	M62 J25 - J30	
07/09/15 08:28:49	SIG	M62/2183L2	50R	M62 J25 - J30	
07/09/15 08:28:55	SIG	M62/1956A1	50R	M62 J25 - J30	
07/09/15 08:28:55	SIG	M62/1956A2	50R	M62 J25 - J30	
07/09/15 08:28:55	SIG	M62/1956A3	50R	M62 J25 - J30	
07/09/15 08:28:56	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 08:28:56	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 08:28:56	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 08:28:56	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 08:30:10	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 08:30:10	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 08:30:10	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 08:30:10	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 08:30:15	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 08:31:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:31:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:31:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:31:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 08:31:35	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 08:31:40	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1992A1	50R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1992A2	50R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1992A3	50R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1992J1	50R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 08:32:59	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 08:33:03	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1987A1	50R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1987A3	50R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1987J1	50R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1992A1	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1992A2	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1992A3	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1992J1	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1999A1	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1999A2	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1999A3	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1999J1	40R	M62 J25 - J30	
07/09/15 08:33:04	SIG	M62/1999J2	40R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2170B1	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2170B2	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2170L1	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2170L2	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2177B1	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2177B2	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2177L1	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2177L2	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2183B1	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2183B2	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2183L1	60R	M62 J25 - J30	
07/09/15 08:33:15	SIG	M62/2183L2	60R	M62 J25 - J30	
07/09/15 08:33:33	SIG	M62/1974A1	60R	M62 J25 - J30	
07/09/15 08:33:33	SIG	M62/1974A2	60R	M62 J25 - J30	
07/09/15 08:33:33	SIG	M62/1974A3	60R	M62 J25 - J30	
07/09/15 08:33:33	SIG	M62/1974A4	60R	M62 J25 - J30	
07/09/15 08:34:17	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:34:18	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:34:23	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2004A1	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2004A2	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2004A3	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2012A1	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2012A2	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2012A3	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 08:34:24	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1955K1	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1955K2	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1956A1	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1956A2	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1956A3	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1960A1	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1960A2	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1960A3	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1960K1	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1960K2	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1968A1	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1968A2	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1968A3	60R	M62 J25 - J30	
07/09/15 08:35:33	SIG	M62/1968A4	60R	M62 J25 - J30	
07/09/15 08:35:35	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 08:35:35	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 08:35:35	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 08:35:35	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 08:35:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:35:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:35:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:35:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 08:36:25	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1987A1	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1987A3	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1987J1	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1992A1	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1992A2	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1992A3	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1992J1	60R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1999A1	50R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1999A2	50R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1999A3	50R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 08:36:58	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2004A1	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2004A2	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2004A3	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 08:38:18	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 08:39:18	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 08:39:18	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 08:39:18	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 08:39:18	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 08:39:24	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 08:39:24	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 08:39:24	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 08:39:24	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 08:39:25	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:39:26	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 08:43:06	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 08:43:06	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 08:43:06	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 08:43:06	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 08:43:06	SIG	M621/1002A1	50R	M62 J25 - J30	
07/09/15 08:43:06	SIG	M621/1002A2	50R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2050A1	50R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M621/1002A1	40R	M62 J25 - J30	
07/09/15 08:43:11	SIG	M621/1002A2	40R	M62 J25 - J30	
07/09/15 08:43:18	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 08:43:18	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 08:43:18	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 08:43:18	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2159B1	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2159B2	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2170L1	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2170L2	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2197B1	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2197B2	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2197B3	NR	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2199M1	OFF	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2199M2	OFF	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2203B1	OFF	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2203B2	OFF	M62 J25 - J30	
07/09/15 08:44:33	SIG	M62/2203B3	OFF	M62 J25 - J30	
07/09/15 08:45:04	SIG	M62/2050A1	40R	M62 J25 - J30	
07/09/15 08:45:04	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 08:45:04	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 08:45:04	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2170L1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2170L2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2177B1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2177B2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2177L1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2177L2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2183B1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2183B2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2183L1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2183L2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2189B1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2189B2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2189B3	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2189B4	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2194B1	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2194B2	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2194B3	NR	M62 J25 - J30	
07/09/15 08:46:33	SIG	M62/2194B4	NR	M62 J25 - J30	
07/09/15 08:47:27	SIG	M621/1002A1	OFF	M62 J25 - J30	
07/09/15 08:47:27	SIG	M621/1002A2	OFF	M62 J25 - J30	
07/09/15 08:47:33	SIG	M62/2159B1	OFF	M62 J25 - J30	
07/09/15 08:47:33	SIG	M62/2159B2	OFF	M62 J25 - J30	
07/09/15 08:47:34	SIG	M62/2197B1	OFF	M62 J25 - J30	
07/09/15 08:47:34	SIG	M62/2197B2	OFF	M62 J25 - J30	
07/09/15 08:47:34	SIG	M62/2197B3	OFF	M62 J25 - J30	
07/09/15 08:47:42	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 08:47:42	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 08:47:42	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 08:47:42	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2041A1	40R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 08:47:47	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 08:49:33	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2004A1	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2004A2	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2004A3	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2012A2	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2012A3	60R	M62 J25 - J30	
07/09/15 08:49:33	SIG	M62/2194B1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2170B1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2170B2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2170L1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2170L2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2177B1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2177B2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2177L1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2177L2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2183B1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2183L1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2183L2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2189B1	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2189B2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2189B3	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2189B4	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2194B2	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2194B3	OFF	M62 J25 - J30	
07/09/15 08:49:34	SIG	M62/2194B4	OFF	M62 J25 - J30	
07/09/15 08:50:43	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 08:50:43	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 08:50:43	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 08:50:43	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 08:53:00	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 08:53:16	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 08:53:16	SIG	M62/2050A2	60R	M62 J25 - J30	
07/09/15 08:53:16	SIG	M62/2050A3	60R	M62 J25 - J30	
07/09/15 08:53:16	SIG	M62/2050A4	60R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 08:54:44	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 08:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 08:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 08:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 08:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 08:56:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 08:56:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 08:56:52	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 08:56:53	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 08:56:58	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 08:56:59	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 08:56:59	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 08:56:59	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 08:56:59	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1955K1	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1955K2	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1956A1	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1956A2	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1956A3	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1960A1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1960A2	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1960A3	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1960K1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1960K2	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1968A1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1968A2	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1968A3	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1968A4	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1974A1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1974A2	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1974A3	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1974A4	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1979K1	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1979K2	OFF	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1981A1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1981A2	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1981A3	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1981A4	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1987A1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1987A3	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1987J1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1992A1	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1992A2	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1992A3	NR	M62 J25 - J30	
07/09/15 08:57:43	SIG	M62/1992J1	NR	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 08:58:45	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 09:00:43	SIG	M62/1960A1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1960A2	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1960A3	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1960K1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1960K2	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1968A1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1968A2	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1968A3	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1968A4	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1974A1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1974A2	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1974A3	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1974A4	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1981A1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1981A2	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1981A3	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1981A4	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1987A1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1987A3	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1987J1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1992A1	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1992A2	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1992A3	OFF	M62 J25 - J30	
07/09/15 09:00:54	SIG	M62/1992J1	OFF	M62 J25 - J30	
07/09/15 09:00:58	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 09:00:59	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 09:07:33	SIG	M62/1999A1	OFF	M62 J25 - J30	
07/09/15 09:07:33	SIG	M62/1999A2	OFF	M62 J25 - J30	
07/09/15 09:07:33	SIG	M62/1999A3	OFF	M62 J25 - J30	
07/09/15 09:07:33	SIG	M62/1999J1	OFF	M62 J25 - J30	
07/09/15 09:07:33	SIG	M62/1999J2	OFF	M62 J25 - J30	
07/09/15 09:08:33	SIG	M62/2004A1	OFF	M62 J25 - J30	
07/09/15 09:08:33	SIG	M62/2004A2	OFF	M62 J25 - J30	
07/09/15 09:08:33	SIG	M62/2004A3	OFF	M62 J25 - J30	
07/09/15 09:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 09:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 09:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 09:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 09:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 09:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 09:48:34	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 09:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 09:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 09:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 09:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 09:56:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 09:56:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 09:57:28	SIG	M62/2113B1	HSD	M62 J25 - J30	
07/09/15 09:58:22	SIG	M62/2106B1	HSD	M62 J25 - J30	
07/09/15 09:59:30	SIG	M62/2097B1	HSD	M62 J25 - J30	
07/09/15 09:59:30	SIG	M62/2113B1	REDX	M62 J25 - J30	
07/09/15 10:00:37	SIG	M62/2088B1	HSD	M62 J25 - J30	
07/09/15 10:00:38	SIG	M62/2106B1	REDX	M62 J25 - J30	
07/09/15 10:01:46	SIG	M62/2097B1	REDX	M62 J25 - J30	
07/09/15 10:02:54	SIG	M62/2088B1	REDX	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2088B2	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2088B3	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2088B4	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2097B2	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2097B3	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2097B4	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2106B2	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2106B3	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2106B4	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2113B2	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2113B3	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2113B4	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2117B1	NR	M62 J25 - J30	
07/09/15 10:03:47	SIG	M62/2117B3	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2074B2	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2074B3	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2074B4	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2081B1	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2081B2	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2081B3	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2081L1	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2120M1	NR	M62 J25 - J30	
07/09/15 10:03:48	SIG	M62/2120M2	NR	M62 J25 - J30	
07/09/15 10:04:47	SIG	M62/2120M1	OFF	M62 J25 - J30	
07/09/15 10:04:47	SIG	M62/2120M2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2074B1	BLNK	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2074B2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2074B3	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2074B4	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2081B1	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2081B2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2081B3	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2081L1	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2088B1	BLNK	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2088B2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2088B3	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2088B4	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2097B1	BLNK	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2097B2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2097B3	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2097B4	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2106B1	BLNK	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2106B2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2106B4	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2113B1	BLNK	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2113B2	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2113B3	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2113B4	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2117B1	OFF	M62 J25 - J30	
07/09/15 10:04:48	SIG	M62/2117B3	OFF	M62 J25 - J30	
07/09/15 10:06:21	SIG	M62/2079A1	HSD	M62 J25 - J30	
07/09/15 10:07:30	SIG	M62/2088A1	HSD	M62 J25 - J30	
07/09/15 10:08:37	SIG	M62/2097A1	HSD	M62 J25 - J30	
07/09/15 10:08:38	SIG	M62/2079A1	REDX	M62 J25 - J30	
07/09/15 10:09:45	SIG	M62/2106A1	HSD	M62 J25 - J30	
07/09/15 10:09:46	SIG	M62/2088A1	REDX	M62 J25 - J30	
07/09/15 10:10:53	SIG	M62/2097A1	REDX	M62 J25 - J30	
07/09/15 10:12:01	SIG	M62/2106A1	REDX	M62 J25 - J30	
07/09/15 10:13:02	SIG	M62/2065A2	NR	M62 J25 - J30	
07/09/15 10:13:02	SIG	M62/2065A3	NR	M62 J25 - J30	
07/09/15 10:13:02	SIG	M62/2065A4	NR	M62 J25 - J30	
07/09/15 10:13:02	SIG	M62/2074A2	NR	M62 J25 - J30	
07/09/15 10:13:02	SIG	M62/2074A3	NR	M62 J25 - J30	
07/09/15 10:13:02	SIG	M62/2074A4	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2073K1	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2073K2	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2079A2	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2079A3	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2079A4	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2088A2	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2088A3	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2088A4	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2097A2	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2097A3	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2097A4	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2106A2	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2106A3	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2106A4	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2114A1	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2114A2	NR	M62 J25 - J30	
07/09/15 10:13:03	SIG	M62/2114A3	NR	M62 J25 - J30	
07/09/15 10:14:02	SIG	M62/2073K1	OFF	M62 J25 - J30	
07/09/15 10:14:02	SIG	M62/2073K2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2074A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2074A4	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2079A1	BLNK	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2079A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2079A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2079A4	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2088A1	BLNK	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2088A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2088A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2088A4	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2097A1	BLNK	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2097A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2097A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2097A4	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2106A1	BLNK	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2106A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2106A4	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2114A1	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2114A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2114A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2117A1	BLNK	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2117A2	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2117A3	OFF	M62 J25 - J30	
07/09/15 10:14:03	SIG	M62/2117A4	OFF	M62 J25 - J30	
07/09/15 10:25:06	SIG	M62/2057B1	HSD	M62 J25 - J30	
07/09/15 10:26:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 10:27:05	SIG	M62/2041B1	HSD	M62 J25 - J30	
07/09/15 10:27:05	SIG	M62/2057B1	REDX	M62 J25 - J30	
07/09/15 10:27:05	SIG	M621/1002B1	HSD	M62 J25 - J30	
07/09/15 10:27:05	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 10:27:05	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 10:28:05	SIG	M62/2033B1	HSD	M62 J25 - J30	
07/09/15 10:29:05	SIG	M62/2025B1	HSD	M62 J25 - J30	
07/09/15 10:29:05	SIG	M62/2041B1	REDX	M62 J25 - J30	
07/09/15 10:29:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
07/09/15 10:30:41	SIG	M62/2025B1	REDX	M62 J25 - J30	
07/09/15 10:31:11	SIG	M62/2065B2	NR	M62 J25 - J30	
07/09/15 10:31:11	SIG	M62/2065B3	NR	M62 J25 - J30	
07/09/15 10:31:11	SIG	M62/2065B4	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2018B1	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2018B2	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2018B3	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2018L1	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2025B2	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2025B3	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2025B4	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2033B2	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2033B3	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2033B4	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2041B2	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2041B3	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2041B4	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2050B2	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2050B3	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2050B4	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2057B2	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2057B3	NR	M62 J25 - J30	
07/09/15 10:31:12	SIG	M62/2057B4	NR	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2041B1	BLNK	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2041B2	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2041B3	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2041B4	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2050B2	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2050B3	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2050B4	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2057B1	BLNK	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2057B2	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2057B3	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2057B4	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2065B1	BLNK	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2065B2	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2065B3	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2065B4	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2065M1	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2069M1	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M62/2069M2	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M621/1002B1	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M621/1002B2	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 10:32:12	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2012B1	BLNK	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2012B2	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2012B3	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2012B4	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2018B1	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2018B2	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2018B3	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2018L1	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2025B1	BLNK	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2025B2	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2025B3	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2025B4	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2033B1	BLNK	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2033B2	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 10:32:13	SIG	M62/2033B4	OFF	M62 J25 - J30	
07/09/15 11:37:21	SIG	M62/2025A1	HSD	M62 J25 - J30	
07/09/15 11:38:21	SIG	M62/2033A1	HSD	M62 J25 - J30	
07/09/15 11:39:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
07/09/15 11:39:21	SIG	M62/2025A1	REDX	M62 J25 - J30	
07/09/15 11:39:21	SIG	M62/2041A1	HSD	M62 J25 - J30	
07/09/15 11:40:28	SIG	M62/2033A1	REDX	M62 J25 - J30	
07/09/15 11:40:28	SIG	M62/2050A1	HSD	M62 J25 - J30	
07/09/15 11:41:20	SIG	M62/2041A1	REDX	M62 J25 - J30	
07/09/15 11:42:20	SIG	M62/2050A1	REDX	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2008K1	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2008K2	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2012A1	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2012A2	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2012A3	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2018A1	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2018A2	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2018A3	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2018A4	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2025A1	BLNK	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2025A2	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2025A3	OFF	M62 J25 - J30	
07/09/15 11:44:21	SIG	M62/2025A4	OFF	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2170A1	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2170A2	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2170K1	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2170K2	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2177A1	REDX	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2177A2	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2177A3	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2177A4	50R	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2183A1	REDX	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2183A2	NR	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2183A3	NR	M62 J25 - J30	
07/09/15 12:03:15	SIG	M62/2183A4	NR	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2170A1	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2170A2	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2170K1	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2170K2	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2177A1	BLNK	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2177A2	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2177A3	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2177A4	OFF	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2183A2	NR	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2183A3	NR	M62 J25 - J30	
07/09/15 12:13:51	SIG	M62/2183A4	NR	M62 J25 - J30	
07/09/15 12:16:51	SIG	M62/2183A2	OFF	M62 J25 - J30	
07/09/15 12:16:52	SIG	M62/2183A1	BLNK	M62 J25 - J30	
07/09/15 12:16:52	SIG	M62/2183A3	OFF	M62 J25 - J30	
07/09/15 12:16:52	SIG	M62/2183A4	OFF	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2012A2	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2012A3	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2018A1	HSD	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2025A1	REDX	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 14:27:12	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 14:27:13	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 14:27:13	SIG	M62/2018A1	HSD	M62 J25 - J30	
07/09/15 14:27:13	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 14:28:33	SIG	M62/2050A1	60R	M62 J25 - J30	
07/09/15 14:29:01	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 14:29:25	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 14:29:30	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 14:29:30	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 14:32:32	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 14:32:33	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 14:42:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 14:42:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 14:43:35	SIG	M62/2065M1	NR	M62 J25 - J30	
07/09/15 14:43:35	SIG	M62/2069M1	60R	M62 J25 - J30	
07/09/15 14:43:35	SIG	M62/2069M2	60R	M62 J25 - J30	
07/09/15 14:43:35	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 14:43:35	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2012B1	REDX	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2012B2	NR	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2012B3	NR	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2012B4	NR	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2025B1	REDX	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2033B1	REDX	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2033B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2033B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2033B4	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2041B1	REDX	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2041B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2041B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2041B4	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2050B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2050B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2050B4	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2057B1	REDX	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2057B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2057B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2057B4	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2065B1	REDX	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2065B2	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2065B3	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2065B4	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M62/2065M1	60R	M62 J25 - J30	
07/09/15 14:43:36	SIG	M621/1002B1	HSD	M62 J25 - J30	
07/09/15 14:43:36	SIG	M621/1002B2	60R	M62 J25 - J30	
07/09/15 14:45:17	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 14:45:41	SIG	M62/2033B1	60R	M62 J25 - J30	
07/09/15 14:46:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 14:46:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 14:46:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 14:46:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 14:46:04	SIG	M62/2041B1	60R	M62 J25 - J30	
07/09/15 14:46:25	SIG	M62/2057B1	60R	M62 J25 - J30	
07/09/15 14:46:25	SIG	M621/1002B1	60R	M62 J25 - J30	
07/09/15 14:46:25	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 14:46:25	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 15:07:27	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 15:07:27	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 15:08:09	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 15:08:09	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 15:33:13	SIG	M62/2012A1	OFF	M62 J25 - J30	
07/09/15 15:33:13	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/2004A1	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/2004A2	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/2004A3	60R	M62 J25 - J30	
07/09/15 16:14:41	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2041A1	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 16:15:30	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2041A1	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 16:15:36	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 16:18:07	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 16:18:07	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 16:19:16	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 16:19:21	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 16:19:21	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 16:19:30	SIG	M62/2041A1	60R	M62 J25 - J30	
07/09/15 16:19:30	SIG	M62/2041A2	60R	M62 J25 - J30	
07/09/15 16:19:30	SIG	M62/2041A3	60R	M62 J25 - J30	
07/09/15 16:19:30	SIG	M62/2041A4	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 16:20:22	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 16:20:41	SIG	M62/2074B1	REDX	M62 J25 - J30	
07/09/15 16:20:41	SIG	M62/2074B2	60R	M62 J25 - J30	
07/09/15 16:20:41	SIG	M62/2074B3	60R	M62 J25 - J30	
07/09/15 16:20:41	SIG	M62/2074B4	60R	M62 J25 - J30	
07/09/15 16:20:41	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 16:20:41	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 16:23:14	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 16:23:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 16:23:15	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 16:23:15	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2012A2	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2012A3	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 16:23:15	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 16:24:02	SIG	M62/2033A1	50R	M62 J25 - J30	
07/09/15 16:24:02	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 16:24:02	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 16:24:02	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2033A1	40R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 16:24:07	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2025A2	40R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2025A3	40R	M62 J25 - J30	
07/09/15 16:25:03	SIG	M62/2025A4	40R	M62 J25 - J30	
07/09/15 16:25:16	SIG	M62/2065A2	60R	M62 J25 - J30	
07/09/15 16:25:16	SIG	M62/2065A3	60R	M62 J25 - J30	
07/09/15 16:25:16	SIG	M62/2065A4	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2073K1	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2073K2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2074A1	REDX	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2074A2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2074A3	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2074A4	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A1	REDX	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A2	NR	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A3	NR	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A3	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A4	NR	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2079A4	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2088A1	REDX	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2088A2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2088A3	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2088A4	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2097A1	REDX	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2097A2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2097A3	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2097A4	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2106A1	REDX	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2106A2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2106A3	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2106A4	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2114A1	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2114A2	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2114A3	60R	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2117A1	REDX	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2117A2	NR	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2117A3	NR	M62 J25 - J30	
07/09/15 16:25:17	SIG	M62/2117A4	NR	M62 J25 - J30	
07/09/15 16:26:15	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 16:26:15	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2018B1	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2018B2	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2018B3	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2018L1	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2025B1	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 16:26:47	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2018B1	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2018B2	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2018B3	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2018L1	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2025B1	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2025B2	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2025B3	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2025B4	40R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2033B1	50R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:26:52	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 16:27:21	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 16:27:22	SIG	M62/2025A1	50R	M62 J25 - J30	
07/09/15 16:27:27	SIG	M62/2025A1	40R	M62 J25 - J30	
07/09/15 16:27:30	SIG	M62/2163A1	50R	M62 J25 - J30	
07/09/15 16:27:30	SIG	M62/2163A2	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2170A1	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2170A2	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2170K1	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2170K2	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2177A2	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2177A3	50R	M62 J25 - J30	
07/09/15 16:27:31	SIG	M62/2177A4	50R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2166K1	50R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2166K2	50R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2170A1	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2170A2	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2170K1	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2170K2	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2177A1	REDX	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2177A2	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2177A3	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2177A4	40R	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2183A1	REDX	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2183A2	NR	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2183A3	NR	M62 J25 - J30	
07/09/15 16:27:37	SIG	M62/2183A4	NR	M62 J25 - J30	
07/09/15 16:27:43	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 16:27:44	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 16:27:45	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 16:27:45	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 16:27:51	SIG	M62/2106A1	60R	M62 J25 - J30	
07/09/15 16:28:02	SIG	M62/2033A1	60R	M62 J25 - J30	
07/09/15 16:28:02	SIG	M62/2033A2	60R	M62 J25 - J30	
07/09/15 16:28:02	SIG	M62/2033A3	60R	M62 J25 - J30	
07/09/15 16:28:02	SIG	M62/2033A4	60R	M62 J25 - J30	
07/09/15 16:28:09	SIG	M62/2097A1	60R	M62 J25 - J30	
07/09/15 16:28:31	SIG	M62/2088A1	60R	M62 J25 - J30	
07/09/15 16:28:39	SIG	M62/2079A1	60R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2033B1	40R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2033B2	40R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2033B4	40R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2041B1	50R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 16:28:57	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2018A1	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2025A1	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2025A2	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2025A3	60R	M62 J25 - J30	
07/09/15 16:29:03	SIG	M62/2025A4	60R	M62 J25 - J30	
07/09/15 16:30:47	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 16:30:47	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 16:30:47	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 16:30:47	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2183A2	60R	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2183A3	60R	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2183A4	60R	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2189A1	REDX	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2189A2	NR	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2189A3	NR	M62 J25 - J30	
07/09/15 16:31:01	SIG	M62/2189A4	NR	M62 J25 - J30	
07/09/15 16:31:02	SIG	M62/2189A2	60R	M62 J25 - J30	
07/09/15 16:31:02	SIG	M62/2189A3	60R	M62 J25 - J30	
07/09/15 16:31:02	SIG	M62/2189A4	60R	M62 J25 - J30	
07/09/15 16:31:02	SIG	M62/2197A1	NR	M62 J25 - J30	
07/09/15 16:31:02	SIG	M62/2197A2	NR	M62 J25 - J30	
07/09/15 16:31:02	SIG	M62/2197A3	NR	M62 J25 - J30	
07/09/15 16:31:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:31:09	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:31:14	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:31:27	SIG	M62/2025A1	???	M62 J25 - J30	
07/09/15 16:31:27	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2163A1	OFF	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2163A2	OFF	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2166K1	OFF	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2166K2	OFF	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2170A1	60R	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2170A2	60R	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2170K1	60R	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2170K2	60R	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2177A2	60R	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2177A3	60R	M62 J25 - J30	
07/09/15 16:31:31	SIG	M62/2177A4	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2157A1	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2157A2	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2157J1	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2157J2	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2157K1	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2163A1	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2163A2	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2166K1	60R	M62 J25 - J30	
07/09/15 16:32:41	SIG	M62/2166K2	60R	M62 J25 - J30	
07/09/15 16:34:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:34:13	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:34:18	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:35:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
07/09/15 16:35:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
07/09/15 16:35:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
07/09/15 16:35:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
07/09/15 16:35:48	SIG	M62/2189A1	60R	M62 J25 - J30	
07/09/15 16:36:04	SIG	M62/2183A1	60R	M62 J25 - J30	
07/09/15 16:36:08	SIG	M62/2177A1	60R	M62 J25 - J30	
07/09/15 16:36:15	SIG	M62/2041B1	40R	M62 J25 - J30	
07/09/15 16:36:15	SIG	M62/2041B2	40R	M62 J25 - J30	
07/09/15 16:36:15	SIG	M62/2041B3	40R	M62 J25 - J30	
07/09/15 16:36:15	SIG	M62/2041B4	40R	M62 J25 - J30	
07/09/15 16:36:20	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 16:36:20	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 16:36:20	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 16:36:20	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 16:37:16	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:37:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:37:22	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2018B1	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2018B2	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2018B3	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2018L1	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2025B1	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 16:39:19	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2018B1	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2018B2	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2018B3	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2018L1	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2025B1	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2025B2	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2025B3	40R	M62 J25 - J30	
07/09/15 16:39:24	SIG	M62/2025B4	40R	M62 J25 - J30	
07/09/15 16:39:41	SIG	M62/1999A1	OFF	M62 J25 - J30	
07/09/15 16:39:41	SIG	M62/1999A2	OFF	M62 J25 - J30	
07/09/15 16:39:41	SIG	M62/1999A3	OFF	M62 J25 - J30	
07/09/15 16:39:41	SIG	M62/1999J1	OFF	M62 J25 - J30	
07/09/15 16:39:41	SIG	M62/1999J2	OFF	M62 J25 - J30	
07/09/15 16:40:15	SIG	M62/2041B1	50R	M62 J25 - J30	
07/09/15 16:40:15	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 16:40:15	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 16:40:15	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 16:40:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:40:20	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:40:25	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:40:41	SIG	M62/2004A1	OFF	M62 J25 - J30	
07/09/15 16:40:41	SIG	M62/2004A2	OFF	M62 J25 - J30	
07/09/15 16:40:41	SIG	M62/2004A3	OFF	M62 J25 - J30	
07/09/15 16:43:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:43:24	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:43:29	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:44:02	SIG	M62/2041B1	40R	M62 J25 - J30	
07/09/15 16:44:02	SIG	M62/2041B2	40R	M62 J25 - J30	
07/09/15 16:44:02	SIG	M62/2041B3	40R	M62 J25 - J30	
07/09/15 16:44:02	SIG	M62/2041B4	40R	M62 J25 - J30	
07/09/15 16:46:27	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:46:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:46:33	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:46:41	SIG	M62/2166K1	OFF	M62 J25 - J30	
07/09/15 16:46:41	SIG	M62/2166K2	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2157A1	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2157A2	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2157J1	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2157J2	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2157K1	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2163A1	OFF	M62 J25 - J30	
07/09/15 16:46:42	SIG	M62/2163A2	OFF	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2050B2	50R	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2050B3	50R	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2050B4	50R	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2057B1	50R	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2057B2	50R	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2057B3	50R	M62 J25 - J30	
07/09/15 16:49:24	SIG	M62/2057B4	50R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2050B2	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2050B3	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2050B4	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2057B1	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2057B2	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2057B3	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2057B4	40R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2065B2	50R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2065B3	50R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2065B4	50R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M62/2065M1	50R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M621/1002B1	50R	M62 J25 - J30	
07/09/15 16:49:29	SIG	M621/1002B2	50R	M62 J25 - J30	
07/09/15 16:49:31	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:49:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:49:37	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:52:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:52:35	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:52:40	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:52:41	SIG	M62/2025A1	OFF	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2057B1	50R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2057B2	50R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2057B3	50R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2057B4	50R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2065B2	60R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2065B3	60R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2065B4	60R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M62/2065M1	60R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M621/1002B1	60R	M62 J25 - J30	
07/09/15 16:53:23	SIG	M621/1002B2	60R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2057B1	40R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2057B2	40R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2057B3	40R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2057B4	40R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2065B2	50R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2065B3	50R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2065B4	50R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M62/2065M1	50R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M621/1002B1	50R	M62 J25 - J30	
07/09/15 16:54:14	SIG	M621/1002B2	50R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M62/2065B2	40R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M62/2065B3	40R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M62/2065B4	40R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M62/2065M1	40R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M62/2069M1	50R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M62/2069M2	50R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M621/1002B1	40R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M621/1002B2	40R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M621/1010B1	50R	M62 J25 - J30	
07/09/15 16:55:27	SIG	M621/1010B2	50R	M62 J25 - J30	
07/09/15 16:55:45	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:55:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:55:50	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 16:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 16:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 16:58:01	SIG	M62/2069M1	40R	M62 J25 - J30	
07/09/15 16:58:01	SIG	M62/2069M2	40R	M62 J25 - J30	
07/09/15 16:58:01	SIG	M62/2074B2	50R	M62 J25 - J30	
07/09/15 16:58:01	SIG	M62/2074B3	50R	M62 J25 - J30	
07/09/15 16:58:01	SIG	M62/2074B4	50R	M62 J25 - J30	
07/09/15 16:58:01	SIG	M621/1010B1	40R	M62 J25 - J30	
07/09/15 16:58:01	SIG	M621/1010B2	40R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2074B2	40R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2074B3	40R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2074B4	40R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2081B1	50R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2081B2	50R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2081B3	50R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M62/2081L1	50R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M621/1010B1	40R	M62 J25 - J30	
07/09/15 16:58:07	SIG	M621/1010B2	40R	M62 J25 - J30	
07/09/15 16:58:45	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 16:58:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 16:58:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:01:26	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 17:01:26	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 17:01:26	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 17:01:26	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 17:01:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:01:46	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:01:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:02:49	SIG	M62/2018B1	50R	M62 J25 - J30	
07/09/15 17:02:49	SIG	M62/2018B2	50R	M62 J25 - J30	
07/09/15 17:02:49	SIG	M62/2018B3	50R	M62 J25 - J30	
07/09/15 17:02:49	SIG	M62/2018L1	50R	M62 J25 - J30	
07/09/15 17:02:54	SIG	M62/2018B1	40R	M62 J25 - J30	
07/09/15 17:02:54	SIG	M62/2018B2	40R	M62 J25 - J30	
07/09/15 17:02:54	SIG	M62/2018B3	40R	M62 J25 - J30	
07/09/15 17:02:54	SIG	M62/2018L1	40R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2170L1	NR	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2170L2	NR	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2183B1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2183B2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2183L1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2183L2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2189B1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2189B2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2189B3	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2189B4	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2194B1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2194B2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2194B3	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2194B4	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2197B1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2197B2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2197B3	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2199M1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2199M2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2203B1	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2203B2	50R	M62 J25 - J30	
07/09/15 17:03:09	SIG	M62/2203B3	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2177A1	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2177A2	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2177A3	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2177A4	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2183A1	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2183A2	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2183A3	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2183A4	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2189A1	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2189A2	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2189A3	50R	M62 J25 - J30	
07/09/15 17:03:57	SIG	M62/2189A4	50R	M62 J25 - J30	
07/09/15 17:04:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:04:50	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:04:55	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:05:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 17:05:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 17:05:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 17:05:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2088B1	REDX	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2088B2	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2088B3	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2088B4	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2097B1	REDX	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2097B2	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2097B3	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2097B4	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2106B1	REDX	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2106B2	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2106B3	60R	M62 J25 - J30	
07/09/15 17:05:42	SIG	M62/2106B4	60R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2081B1	40R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2081B2	40R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2081B3	40R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2081L1	40R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2088B2	50R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2088B3	50R	M62 J25 - J30	
07/09/15 17:05:47	SIG	M62/2088B4	50R	M62 J25 - J30	
07/09/15 17:07:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:07:54	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:07:59	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:09:42	SIG	M62/2113B1	REDX	M62 J25 - J30	
07/09/15 17:09:42	SIG	M62/2113B2	60R	M62 J25 - J30	
07/09/15 17:09:42	SIG	M62/2113B3	60R	M62 J25 - J30	
07/09/15 17:09:42	SIG	M62/2113B4	60R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2050B2	50R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2050B3	50R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2050B4	50R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2057B1	50R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2057B2	50R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2057B3	50R	M62 J25 - J30	
07/09/15 17:10:43	SIG	M62/2057B4	50R	M62 J25 - J30	
07/09/15 17:10:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:10:57	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:11:03	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2050B2	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2050B3	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2050B4	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2057B1	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2057B2	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2057B3	40R	M62 J25 - J30	
07/09/15 17:11:30	SIG	M62/2057B4	40R	M62 J25 - J30	
07/09/15 17:11:42	SIG	M62/2097B2	50R	M62 J25 - J30	
07/09/15 17:11:42	SIG	M62/2097B3	50R	M62 J25 - J30	
07/09/15 17:11:42	SIG	M62/2097B4	50R	M62 J25 - J30	
07/09/15 17:12:38	SIG	M62/2088B2	40R	M62 J25 - J30	
07/09/15 17:12:38	SIG	M62/2088B3	40R	M62 J25 - J30	
07/09/15 17:12:38	SIG	M62/2088B4	40R	M62 J25 - J30	
07/09/15 17:14:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:14:01	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:14:07	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:15:51	SIG	M62/2106A3	60R	M62 J25 - J30	
07/09/15 17:15:51	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 17:16:38	SIG	M62/2088B2	50R	M62 J25 - J30	
07/09/15 17:16:38	SIG	M62/2088B3	50R	M62 J25 - J30	
07/09/15 17:16:38	SIG	M62/2088B4	50R	M62 J25 - J30	
07/09/15 17:17:05	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:17:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2170L1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2170L2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177A1	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177A2	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177A3	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177A4	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177B1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177B2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177L1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2177L2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183A1	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183A2	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183A3	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183A4	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183B1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183B2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183L1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2183L2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189A1	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189A2	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189A3	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189A4	60R	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189B1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189B2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189B3	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2189B4	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2194B1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2194B2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2194B3	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2194B4	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2197B1	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2197B2	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2197B3	NR	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2199M1	OFF	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2199M2	OFF	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2203B1	OFF	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2203B2	OFF	M62 J25 - J30	
07/09/15 17:17:06	SIG	M62/2203B3	OFF	M62 J25 - J30	
07/09/15 17:17:11	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:18:25	SIG	M62/2088B2	40R	M62 J25 - J30	
07/09/15 17:18:25	SIG	M62/2088B3	40R	M62 J25 - J30	
07/09/15 17:18:25	SIG	M62/2088B4	40R	M62 J25 - J30	
07/09/15 17:20:06	SIG	M62/2194B1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2170B1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2170B2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2170L1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2170L2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2177B1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2177B2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2177L1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2177L2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2183B1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2183L1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2183L2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2189B1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2189B2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2189B3	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2189B4	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2194B2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2194B3	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2194B4	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2197B1	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2197B2	OFF	M62 J25 - J30	
07/09/15 17:20:07	SIG	M62/2197B3	OFF	M62 J25 - J30	
07/09/15 17:20:09	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:20:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:20:15	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:20:42	SIG	M62/2117B1	60R	M62 J25 - J30	
07/09/15 17:20:42	SIG	M62/2117B3	60R	M62 J25 - J30	
07/09/15 17:20:42	SIG	M62/2120M1	60R	M62 J25 - J30	
07/09/15 17:20:42	SIG	M62/2120M2	60R	M62 J25 - J30	
07/09/15 17:22:24	SIG	M62/2088B2	50R	M62 J25 - J30	
07/09/15 17:22:24	SIG	M62/2088B3	50R	M62 J25 - J30	
07/09/15 17:22:24	SIG	M62/2088B4	50R	M62 J25 - J30	
07/09/15 17:22:44	SIG	M62/2088B2	40R	M62 J25 - J30	
07/09/15 17:22:44	SIG	M62/2088B3	40R	M62 J25 - J30	
07/09/15 17:22:44	SIG	M62/2088B4	40R	M62 J25 - J30	
07/09/15 17:23:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:23:13	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:23:18	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:24:21	SIG	M62/1968B1	50R	M62 J25 - J30	
07/09/15 17:24:21	SIG	M62/1968B2	50R	M62 J25 - J30	
07/09/15 17:24:21	SIG	M62/1968B3	50R	M62 J25 - J30	
07/09/15 17:24:21	SIG	M62/1968L1	50R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1960B1	60R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1960B2	60R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1960B3	60R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1960L1	NR	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1960L2	NR	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1968B1	40R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1968B2	40R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1968B3	40R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1968L1	40R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1974B1	50R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1974B2	50R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1974B3	50R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1974B4	50R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1974M1	50R	M62 J25 - J30	
07/09/15 17:24:26	SIG	M62/1974M2	50R	M62 J25 - J30	
07/09/15 17:24:42	SIG	M62/2106B2	50R	M62 J25 - J30	
07/09/15 17:24:42	SIG	M62/2106B3	50R	M62 J25 - J30	
07/09/15 17:24:42	SIG	M62/2106B4	50R	M62 J25 - J30	
07/09/15 17:24:51	SIG	M62/1960B1	NR	M62 J25 - J30	
07/09/15 17:24:51	SIG	M62/1960B2	NR	M62 J25 - J30	
07/09/15 17:24:51	SIG	M62/1960B3	NR	M62 J25 - J30	
07/09/15 17:24:52	SIG	M62/1960B1	60R	M62 J25 - J30	
07/09/15 17:24:52	SIG	M62/1960B2	60R	M62 J25 - J30	
07/09/15 17:24:52	SIG	M62/1960B3	60R	M62 J25 - J30	
07/09/15 17:26:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:26:17	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:26:22	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 17:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 17:28:52	SIG	M62/1960B1	NR	M62 J25 - J30	
07/09/15 17:28:52	SIG	M62/1960B2	NR	M62 J25 - J30	
07/09/15 17:28:52	SIG	M62/1960B3	NR	M62 J25 - J30	
07/09/15 17:29:05	SIG	M62/1960B1	60R	M62 J25 - J30	
07/09/15 17:29:05	SIG	M62/1960B2	60R	M62 J25 - J30	
07/09/15 17:29:05	SIG	M62/1960B3	60R	M62 J25 - J30	
07/09/15 17:29:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:29:20	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:29:26	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:32:24	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:32:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:32:30	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1981B1	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1981B2	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1981B3	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1981B4	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1987B1	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1987B2	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1987B3	60R	M62 J25 - J30	
07/09/15 17:34:42	SIG	M62/1987B4	60R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1974B1	40R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1974B2	40R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1974B3	40R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1974B4	40R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1974M1	40R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1974M2	40R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1981B1	50R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1981B2	50R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1981B3	50R	M62 J25 - J30	
07/09/15 17:34:45	SIG	M62/1981B4	50R	M62 J25 - J30	
07/09/15 17:35:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:35:28	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:35:33	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:35:56	SIG	M62/2088B2	50R	M62 J25 - J30	
07/09/15 17:35:56	SIG	M62/2088B3	50R	M62 J25 - J30	
07/09/15 17:35:56	SIG	M62/2088B4	50R	M62 J25 - J30	
07/09/15 17:37:42	SIG	M62/2125B1	60R	M62 J25 - J30	
07/09/15 17:37:42	SIG	M62/2125B2	60R	M62 J25 - J30	
07/09/15 17:37:42	SIG	M62/2125B3	60R	M62 J25 - J30	
07/09/15 17:37:42	SIG	M62/2125L1	60R	M62 J25 - J30	
07/09/15 17:37:42	SIG	M62/2125L2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M606/2003B1	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M606/2003B2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1992B1	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1992B2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1992B3	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1992B4	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1999B1	REDX	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1999B2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1999B3	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/1999B4	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2004B1	REDX	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2004B2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2004B3	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2004B4	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2005M1	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2005M2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2012B2	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2012B3	60R	M62 J25 - J30	
07/09/15 17:37:43	SIG	M62/2012B4	60R	M62 J25 - J30	
07/09/15 17:38:06	SIG	M62/2088B2	40R	M62 J25 - J30	
07/09/15 17:38:06	SIG	M62/2088B3	40R	M62 J25 - J30	
07/09/15 17:38:06	SIG	M62/2088B4	40R	M62 J25 - J30	
07/09/15 17:38:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:38:32	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:38:37	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1974B1	50R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1974B2	50R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1974B3	50R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1974B4	50R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1974M1	50R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1974M2	50R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1981B1	60R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1981B2	60R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1981B3	60R	M62 J25 - J30	
07/09/15 17:38:45	SIG	M62/1981B4	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1968B1	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1968B2	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1968B3	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1968L1	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1974B1	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1974B2	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1974B3	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1974B4	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1974M1	60R	M62 J25 - J30	
07/09/15 17:41:18	SIG	M62/1974M2	60R	M62 J25 - J30	
07/09/15 17:41:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:41:45	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:41:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:42:12	SIG	M62/1968B1	50R	M62 J25 - J30	
07/09/15 17:42:12	SIG	M62/1968B2	50R	M62 J25 - J30	
07/09/15 17:42:12	SIG	M62/1968B3	50R	M62 J25 - J30	
07/09/15 17:42:12	SIG	M62/1968L1	50R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1968B1	40R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1968B2	40R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1968B3	40R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1968L1	40R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1974B1	50R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1974B2	50R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1974B3	50R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1974B4	50R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1974M1	50R	M62 J25 - J30	
07/09/15 17:42:18	SIG	M62/1974M2	50R	M62 J25 - J30	
07/09/15 17:44:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:44:45	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:44:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1974B1	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1974B2	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1974B3	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1974B4	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1974M1	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1974M2	40R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1981B1	50R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1981B2	50R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1981B3	50R	M62 J25 - J30	
07/09/15 17:46:22	SIG	M62/1981B4	50R	M62 J25 - J30	
07/09/15 17:47:45	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:47:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:47:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:49:54	SIG	M62/2088B2	50R	M62 J25 - J30	
07/09/15 17:49:54	SIG	M62/2088B3	50R	M62 J25 - J30	
07/09/15 17:49:54	SIG	M62/2088B4	50R	M62 J25 - J30	
07/09/15 17:50:47	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:50:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:50:53	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:51:55	SIG	M62/2088B2	40R	M62 J25 - J30	
07/09/15 17:51:55	SIG	M62/2088B3	40R	M62 J25 - J30	
07/09/15 17:51:55	SIG	M62/2088B4	40R	M62 J25 - J30	
07/09/15 17:53:51	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:53:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:53:57	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:55:02	SIG	M62/1960B1	NR	M62 J25 - J30	
07/09/15 17:55:02	SIG	M62/1960B2	NR	M62 J25 - J30	
07/09/15 17:55:02	SIG	M62/1960B3	NR	M62 J25 - J30	
07/09/15 17:55:22	SIG	M62/1960B1	60R	M62 J25 - J30	
07/09/15 17:55:22	SIG	M62/1960B2	60R	M62 J25 - J30	
07/09/15 17:55:22	SIG	M62/1960B3	60R	M62 J25 - J30	
07/09/15 17:55:56	SIG	M62/2088B2	50R	M62 J25 - J30	
07/09/15 17:55:56	SIG	M62/2088B3	50R	M62 J25 - J30	
07/09/15 17:55:56	SIG	M62/2088B4	50R	M62 J25 - J30	
07/09/15 17:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 17:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 17:56:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:56:55	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 17:57:00	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 17:57:49	SIG	M62/2081B1	50R	M62 J25 - J30	
07/09/15 17:57:49	SIG	M62/2081B2	50R	M62 J25 - J30	
07/09/15 17:57:49	SIG	M62/2081B3	50R	M62 J25 - J30	
07/09/15 17:57:49	SIG	M62/2081L1	50R	M62 J25 - J30	
07/09/15 17:57:58	SIG	M62/2081B1	40R	M62 J25 - J30	
07/09/15 17:57:58	SIG	M62/2081B2	40R	M62 J25 - J30	
07/09/15 17:57:58	SIG	M62/2081B3	40R	M62 J25 - J30	
07/09/15 17:57:58	SIG	M62/2081L1	40R	M62 J25 - J30	
07/09/15 17:59:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 17:59:59	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:00:04	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1974B1	50R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1974B2	50R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1974B3	50R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1974B4	50R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1974M1	50R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1974M2	50R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1981B1	60R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1981B2	60R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1981B3	60R	M62 J25 - J30	
07/09/15 18:02:19	SIG	M62/1981B4	60R	M62 J25 - J30	
07/09/15 18:03:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:03:02	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:03:08	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1968B1	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1968B2	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1968B3	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1968L1	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1974B1	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1974B2	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1974B3	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1974B4	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1974M1	60R	M62 J25 - J30	
07/09/15 18:03:38	SIG	M62/1974M2	60R	M62 J25 - J30	
07/09/15 18:03:40	SIG	M62/2081B1	50R	M62 J25 - J30	
07/09/15 18:03:40	SIG	M62/2081B2	50R	M62 J25 - J30	
07/09/15 18:03:40	SIG	M62/2081B3	50R	M62 J25 - J30	
07/09/15 18:03:40	SIG	M62/2081L1	50R	M62 J25 - J30	
07/09/15 18:05:43	SIG	M62/2106B2	60R	M62 J25 - J30	
07/09/15 18:05:43	SIG	M62/2106B3	60R	M62 J25 - J30	
07/09/15 18:05:43	SIG	M62/2106B4	60R	M62 J25 - J30	
07/09/15 18:06:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:06:06	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:06:11	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:09:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:09:10	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:09:15	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:10:58	SIG	M62/1960B1	NR	M62 J25 - J30	
07/09/15 18:10:58	SIG	M62/1960B2	NR	M62 J25 - J30	
07/09/15 18:10:58	SIG	M62/1960B3	NR	M62 J25 - J30	
07/09/15 18:11:28	SIG	M62/1960B1	60R	M62 J25 - J30	
07/09/15 18:11:28	SIG	M62/1960B2	60R	M62 J25 - J30	
07/09/15 18:11:28	SIG	M62/1960B3	60R	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1960B1	OFF	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1960B2	OFF	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1960B3	OFF	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1960L1	OFF	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1960L2	OFF	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1968B1	NR	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1968B2	NR	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1968B3	NR	M62 J25 - J30	
07/09/15 18:11:43	SIG	M62/1968L1	NR	M62 J25 - J30	
07/09/15 18:12:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:12:14	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:12:19	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2050B2	50R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2050B3	50R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2050B4	50R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2057B1	50R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2057B2	50R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2057B3	50R	M62 J25 - J30	
07/09/15 18:12:24	SIG	M62/2057B4	50R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2050B2	40R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2050B3	40R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2050B4	40R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2057B1	40R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2057B2	40R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2057B3	40R	M62 J25 - J30	
07/09/15 18:14:11	SIG	M62/2057B4	40R	M62 J25 - J30	
07/09/15 18:15:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:15:17	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:15:23	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:15:43	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 18:15:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2004B2	NR	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2004B3	NR	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2004B4	NR	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2005M1	OFF	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2005M2	OFF	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2012B2	NR	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2012B3	NR	M62 J25 - J30	
07/09/15 18:15:43	SIG	M62/2012B4	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1968B1	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1968B2	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1968B3	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1968L1	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1974B1	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1974B2	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1974B3	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1974B4	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1974M1	OFF	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1974M2	OFF	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1981B1	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1981B2	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1981B3	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1981B4	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1987B1	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1987B2	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1987B3	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1987B4	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1992B1	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1992B2	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1992B3	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1992B4	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1999B2	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1999B3	NR	M62 J25 - J30	
07/09/15 18:15:44	SIG	M62/1999B4	NR	M62 J25 - J30	
07/09/15 18:16:43	SIG	M62/2088B2	60R	M62 J25 - J30	
07/09/15 18:16:43	SIG	M62/2088B3	60R	M62 J25 - J30	
07/09/15 18:16:43	SIG	M62/2088B4	60R	M62 J25 - J30	
07/09/15 18:16:43	SIG	M62/2097B2	60R	M62 J25 - J30	
07/09/15 18:16:43	SIG	M62/2097B3	60R	M62 J25 - J30	
07/09/15 18:16:43	SIG	M62/2097B4	60R	M62 J25 - J30	
07/09/15 18:17:43	SIG	M62/2125B1	OFF	M62 J25 - J30	
07/09/15 18:17:43	SIG	M62/2125B2	OFF	M62 J25 - J30	
07/09/15 18:17:43	SIG	M62/2125B3	OFF	M62 J25 - J30	
07/09/15 18:17:43	SIG	M62/2125L1	NR	M62 J25 - J30	
07/09/15 18:17:43	SIG	M62/2125L2	NR	M62 J25 - J30	
07/09/15 18:18:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:18:22	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:18:27	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:18:44	SIG	M62/1999B2	OFF	M62 J25 - J30	
07/09/15 18:18:44	SIG	M62/2004B2	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1968B1	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1968B2	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1968B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1968L1	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1974B1	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1974B2	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1974B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1974B4	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1981B1	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1981B2	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1981B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1981B4	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1987B1	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1987B2	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1987B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1987B4	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1992B1	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1992B2	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1992B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1992B4	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1999B1	BLNK	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1999B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/1999B4	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/2004B1	BLNK	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/2004B3	OFF	M62 J25 - J30	
07/09/15 18:18:45	SIG	M62/2004B4	OFF	M62 J25 - J30	
07/09/15 18:19:52	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 18:19:52	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 18:19:52	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 18:19:52	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 18:20:43	SIG	M62/2125L1	OFF	M62 J25 - J30	
07/09/15 18:20:44	SIG	M62/2125L2	OFF	M62 J25 - J30	
07/09/15 18:21:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:21:25	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:21:31	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:24:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:24:29	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:24:35	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:24:44	SIG	M62/2117B1	OFF	M62 J25 - J30	
07/09/15 18:24:44	SIG	M62/2117B3	OFF	M62 J25 - J30	
07/09/15 18:24:44	SIG	M62/2120M1	OFF	M62 J25 - J30	
07/09/15 18:24:44	SIG	M62/2120M2	OFF	M62 J25 - J30	
07/09/15 18:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 18:26:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 18:27:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:27:33	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:27:39	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:27:43	SIG	M62/2018B1	50R	M62 J25 - J30	
07/09/15 18:27:43	SIG	M62/2018B2	50R	M62 J25 - J30	
07/09/15 18:27:43	SIG	M62/2018B3	50R	M62 J25 - J30	
07/09/15 18:27:43	SIG	M62/2018L1	50R	M62 J25 - J30	
07/09/15 18:27:48	SIG	M62/2018B1	40R	M62 J25 - J30	
07/09/15 18:27:48	SIG	M62/2018B2	40R	M62 J25 - J30	
07/09/15 18:27:48	SIG	M62/2018B3	40R	M62 J25 - J30	
07/09/15 18:27:48	SIG	M62/2018L1	40R	M62 J25 - J30	
07/09/15 18:30:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:30:46	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:30:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2050B2	50R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2050B3	50R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2050B4	50R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2057B1	50R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2057B2	50R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2057B3	50R	M62 J25 - J30	
07/09/15 18:31:20	SIG	M62/2057B4	50R	M62 J25 - J30	
07/09/15 18:32:59	SIG	M62/2177A1	HSD	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2074B2	50R	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2074B3	50R	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2074B4	50R	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2081B1	60R	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2081B2	60R	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2081B3	60R	M62 J25 - J30	
07/09/15 18:33:41	SIG	M62/2081L1	60R	M62 J25 - J30	
07/09/15 18:33:42	SIG	M62/2065B2	50R	M62 J25 - J30	
07/09/15 18:33:42	SIG	M62/2065B3	50R	M62 J25 - J30	
07/09/15 18:33:42	SIG	M62/2065B4	50R	M62 J25 - J30	
07/09/15 18:33:44	SIG	M62/2183A1	HSD	M62 J25 - J30	
07/09/15 18:33:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:33:45	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:33:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:34:29	SIG	M62/2189A1	HSD	M62 J25 - J30	
07/09/15 18:34:30	SIG	M62/2177A1	REDX	M62 J25 - J30	
07/09/15 18:34:40	SIG	M62/2050B2	40R	M62 J25 - J30	
07/09/15 18:34:40	SIG	M62/2050B3	40R	M62 J25 - J30	
07/09/15 18:34:40	SIG	M62/2050B4	40R	M62 J25 - J30	
07/09/15 18:34:55	SIG	M62/2065M1	50R	M62 J25 - J30	
07/09/15 18:34:55	SIG	M62/2069M1	50R	M62 J25 - J30	
07/09/15 18:34:55	SIG	M62/2069M2	50R	M62 J25 - J30	
07/09/15 18:34:55	SIG	M621/1002B1	50R	M62 J25 - J30	
07/09/15 18:34:55	SIG	M621/1002B2	50R	M62 J25 - J30	
07/09/15 18:34:56	SIG	M621/1010B1	50R	M62 J25 - J30	
07/09/15 18:34:56	SIG	M621/1010B2	50R	M62 J25 - J30	
07/09/15 18:35:30	SIG	M62/2183A1	REDX	M62 J25 - J30	
07/09/15 18:35:44	SIG	M62/2113B1	BLNK	M62 J25 - J30	
07/09/15 18:35:44	SIG	M62/2113B2	OFF	M62 J25 - J30	
07/09/15 18:35:44	SIG	M62/2113B3	OFF	M62 J25 - J30	
07/09/15 18:35:44	SIG	M62/2113B4	OFF	M62 J25 - J30	
07/09/15 18:36:29	SIG	M62/2189A1	REDX	M62 J25 - J30	
07/09/15 18:36:30	SIG	M62/2170A1	NR	M62 J25 - J30	
07/09/15 18:36:30	SIG	M62/2170A2	NR	M62 J25 - J30	
07/09/15 18:36:30	SIG	M62/2170K1	NR	M62 J25 - J30	
07/09/15 18:36:30	SIG	M62/2170K2	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2177A2	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2177A3	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2177A4	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2183A2	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2183A3	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2183A4	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2189A2	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2189A3	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2189A4	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2197A1	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2197A2	NR	M62 J25 - J30	
07/09/15 18:36:31	SIG	M62/2197A3	NR	M62 J25 - J30	
07/09/15 18:36:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:36:46	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:36:51	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2170A1	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2170A2	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2170K1	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2170K2	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2177A1	BLNK	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2177A2	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2177A3	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2177A4	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2183A1	BLNK	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2183A2	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2183A3	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2183A4	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2189A1	BLNK	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2189A2	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2189A3	OFF	M62 J25 - J30	
07/09/15 18:37:30	SIG	M62/2189A4	OFF	M62 J25 - J30	
07/09/15 18:38:11	SIG	M62/2057B1	40R	M62 J25 - J30	
07/09/15 18:38:11	SIG	M62/2057B2	40R	M62 J25 - J30	
07/09/15 18:38:11	SIG	M62/2057B3	40R	M62 J25 - J30	
07/09/15 18:38:11	SIG	M62/2057B4	40R	M62 J25 - J30	
07/09/15 18:39:32	SIG	M62/2197A1	OFF	M62 J25 - J30	
07/09/15 18:39:32	SIG	M62/2197A2	OFF	M62 J25 - J30	
07/09/15 18:39:32	SIG	M62/2197A3	OFF	M62 J25 - J30	
07/09/15 18:39:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:39:48	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:39:53	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:40:43	SIG	M62/2069M1	60R	M62 J25 - J30	
07/09/15 18:40:43	SIG	M62/2069M2	60R	M62 J25 - J30	
07/09/15 18:40:44	SIG	M62/2074B2	60R	M62 J25 - J30	
07/09/15 18:40:44	SIG	M62/2074B3	60R	M62 J25 - J30	
07/09/15 18:40:44	SIG	M62/2074B4	60R	M62 J25 - J30	
07/09/15 18:40:44	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 18:40:44	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2041B1	50R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2050B2	50R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2050B3	50R	M62 J25 - J30	
07/09/15 18:42:16	SIG	M62/2050B4	50R	M62 J25 - J30	
07/09/15 18:42:18	SIG	M62/2018B1	60R	M62 J25 - J30	
07/09/15 18:42:18	SIG	M62/2018B2	60R	M62 J25 - J30	
07/09/15 18:42:18	SIG	M62/2018B3	60R	M62 J25 - J30	
07/09/15 18:42:18	SIG	M62/2018L1	60R	M62 J25 - J30	
07/09/15 18:42:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:42:52	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:42:57	SIG	M62/2033B3	40R	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2088B2	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2088B3	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2088B4	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2097B2	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2097B3	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2097B4	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2106B2	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2106B3	NR	M62 J25 - J30	
07/09/15 18:43:44	SIG	M62/2106B4	NR	M62 J25 - J30	
07/09/15 18:43:57	SIG	M62/2057B1	50R	M62 J25 - J30	
07/09/15 18:43:57	SIG	M62/2057B2	50R	M62 J25 - J30	
07/09/15 18:43:57	SIG	M62/2057B3	50R	M62 J25 - J30	
07/09/15 18:43:57	SIG	M62/2057B4	50R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2025B1	60R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2025B2	60R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2025B3	60R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2025B4	60R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2033B1	50R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 18:44:48	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2057B1	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2057B2	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2057B3	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2057B4	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2065B2	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2065B3	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2065B4	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M62/2065M1	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M621/1002B1	60R	M62 J25 - J30	
07/09/15 18:45:44	SIG	M621/1002B2	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2033B1	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2033B2	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2033B3	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2033B4	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2041B1	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2041B2	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2041B3	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2041B4	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2050B2	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2050B3	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2050B4	60R	M62 J25 - J30	
07/09/15 18:46:44	SIG	M62/2097B2	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2088B1	BLNK	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2088B1	BLNK	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2088B2	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2088B3	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2088B4	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2097B1	BLNK	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2097B3	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2097B4	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2106B1	BLNK	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2106B1	BLNK	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2106B2	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 18:46:45	SIG	M62/2106B4	OFF	M62 J25 - J30	
07/09/15 18:48:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:49:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:49:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:49:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 18:51:44	SIG	M62/2081B1	OFF	M62 J25 - J30	
07/09/15 18:51:44	SIG	M62/2081B2	OFF	M62 J25 - J30	
07/09/15 18:51:44	SIG	M62/2081B3	OFF	M62 J25 - J30	
07/09/15 18:51:44	SIG	M62/2081L1	OFF	M62 J25 - J30	
07/09/15 18:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 18:56:22	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 18:57:44	SIG	M62/2074B1	BLNK	M62 J25 - J30	
07/09/15 18:57:44	SIG	M62/2074B2	OFF	M62 J25 - J30	
07/09/15 18:57:44	SIG	M62/2074B3	OFF	M62 J25 - J30	
07/09/15 18:57:44	SIG	M62/2074B4	OFF	M62 J25 - J30	
07/09/15 18:57:44	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 18:57:44	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 19:01:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 19:10:52	SIG	M62/2079A1	HSD	M62 J25 - J30	
07/09/15 19:12:00	SIG	M62/2088A1	HSD	M62 J25 - J30	
07/09/15 19:13:08	SIG	M62/2079A1	REDX	M62 J25 - J30	
07/09/15 19:13:08	SIG	M62/2097A1	HSD	M62 J25 - J30	
07/09/15 19:14:16	SIG	M62/2106A1	HSD	M62 J25 - J30	
07/09/15 19:14:17	SIG	M62/2088A1	REDX	M62 J25 - J30	
07/09/15 19:15:24	SIG	M62/2097A1	REDX	M62 J25 - J30	
07/09/15 19:16:32	SIG	M62/2106A1	REDX	M62 J25 - J30	
07/09/15 19:17:32	SIG	M62/2065A2	NR	M62 J25 - J30	
07/09/15 19:17:32	SIG	M62/2065A3	NR	M62 J25 - J30	
07/09/15 19:17:32	SIG	M62/2065A4	NR	M62 J25 - J30	
07/09/15 19:17:32	SIG	M62/2074A2	NR	M62 J25 - J30	
07/09/15 19:17:32	SIG	M62/2074A3	NR	M62 J25 - J30	
07/09/15 19:17:32	SIG	M62/2074A4	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2073K1	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2073K2	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2079A2	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2079A3	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2079A4	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2088A2	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2088A3	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2088A4	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2097A2	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2097A3	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2097A4	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2106A2	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2106A3	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2106A4	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2114A1	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2114A2	NR	M62 J25 - J30	
07/09/15 19:17:33	SIG	M62/2114A3	NR	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2073K1	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2073K2	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2074A2	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2074A3	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2074A4	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2079A1	BLNK	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2079A2	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2079A3	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2079A4	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2088A1	BLNK	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2088A2	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2088A3	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2088A4	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2097A1	BLNK	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2097A2	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2097A3	OFF	M62 J25 - J30	
07/09/15 19:18:33	SIG	M62/2097A4	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2106A1	BLNK	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2106A2	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2106A4	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2114A1	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2114A2	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2114A3	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2117A1	BLNK	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2117A2	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2117A3	OFF	M62 J25 - J30	
07/09/15 19:18:34	SIG	M62/2117A4	OFF	M62 J25 - J30	
07/09/15 19:18:51	SIG	M62/2025A1	HSD	M62 J25 - J30	
07/09/15 19:19:51	SIG	M62/2033A1	HSD	M62 J25 - J30	
07/09/15 19:20:50	SIG	M62/2041A1	HSD	M62 J25 - J30	
07/09/15 19:20:51	SIG	M62/2018A1	HSD	M62 J25 - J30	
07/09/15 19:20:51	SIG	M62/2025A1	REDX	M62 J25 - J30	
07/09/15 19:21:58	SIG	M62/2033A1	REDX	M62 J25 - J30	
07/09/15 19:21:58	SIG	M62/2050A1	HSD	M62 J25 - J30	
07/09/15 19:22:50	SIG	M62/2041A1	REDX	M62 J25 - J30	
07/09/15 19:23:50	SIG	M62/2050A1	REDX	M62 J25 - J30	
07/09/15 19:24:50	SIG	M62/2025A2	NR	M62 J25 - J30	
07/09/15 19:24:50	SIG	M62/2025A3	NR	M62 J25 - J30	
07/09/15 19:24:50	SIG	M62/2025A4	NR	M62 J25 - J30	
07/09/15 19:24:50	SIG	M62/2033A2	NR	M62 J25 - J30	
07/09/15 19:24:50	SIG	M62/2033A3	NR	M62 J25 - J30	
07/09/15 19:24:50	SIG	M62/2033A4	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2041A2	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2041A3	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2041A4	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2050A2	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2050A3	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2050A4	NR	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2057A1	OFF	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2057A2	OFF	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2057A3	OFF	M62 J25 - J30	
07/09/15 19:24:51	SIG	M62/2057J1	OFF	M62 J25 - J30	
07/09/15 19:25:50	SIG	M62/2065A1	BLNK	M62 J25 - J30	
07/09/15 19:25:50	SIG	M62/2065A2	OFF	M62 J25 - J30	
07/09/15 19:25:50	SIG	M62/2065A3	OFF	M62 J25 - J30	
07/09/15 19:25:50	SIG	M62/2065A4	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2008K1	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2008K2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2012A1	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2012A2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2012A3	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2018A1	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2018A2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2018A3	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2018A4	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2025A1	BLNK	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2025A2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2025A3	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2025A4	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2033A1	BLNK	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2033A2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2033A3	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2033A4	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2041A1	BLNK	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2041A2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2041A3	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2041A4	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2050A1	BLNK	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2050A2	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2050A3	OFF	M62 J25 - J30	
07/09/15 19:25:51	SIG	M62/2050A4	OFF	M62 J25 - J30	
07/09/15 19:26:16	SIG	M62/2057B1	HSD	M62 J25 - J30	
07/09/15 19:27:04	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 19:27:04	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 19:28:15	SIG	M62/2041B1	HSD	M62 J25 - J30	
07/09/15 19:28:15	SIG	M62/2057B1	REDX	M62 J25 - J30	
07/09/15 19:28:15	SIG	M621/1002B1	HSD	M62 J25 - J30	
07/09/15 19:28:15	SIG	M621/1010B1	60R	M62 J25 - J30	
07/09/15 19:28:15	SIG	M621/1010B2	60R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M606/2003B1	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M606/2003B2	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1987B1	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1987B2	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1987B3	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1987B4	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1992B1	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1992B2	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1992B3	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/1992B4	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/2005M1	50R	M62 J25 - J30	
07/09/15 19:29:13	SIG	M62/2005M2	50R	M62 J25 - J30	
07/09/15 19:29:15	SIG	M62/2033B1	HSD	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1981B1	NR	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1981B2	NR	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1981B3	NR	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1981B4	NR	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1987B1	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1987B2	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1987B3	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1987B4	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1992B1	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1992B2	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1992B3	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1992B4	40R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1999B1	REDX	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1999B2	50R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1999B3	50R	M62 J25 - J30	
07/09/15 19:29:19	SIG	M62/1999B4	50R	M62 J25 - J30	
07/09/15 19:30:15	SIG	M62/2025B1	HSD	M62 J25 - J30	
07/09/15 19:30:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
07/09/15 19:31:07	SIG	M62/2033B1	REDX	M62 J25 - J30	
07/09/15 19:31:51	SIG	M62/2025B1	REDX	M62 J25 - J30	
07/09/15 19:31:52	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1981B1	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1981B2	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1981B3	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1981B4	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1987B1	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1987B2	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1987B3	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1987B4	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1992B1	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1992B2	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1992B3	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1992B4	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1999B2	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1999B3	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/1999B4	NR	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/2005M1	OFF	M62 J25 - J30	
07/09/15 19:31:52	SIG	M62/2005M2	OFF	M62 J25 - J30	
07/09/15 19:32:21	SIG	M62/2065B2	NR	M62 J25 - J30	
07/09/15 19:32:21	SIG	M62/2065B3	NR	M62 J25 - J30	
07/09/15 19:32:21	SIG	M62/2065B4	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2018B1	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2018B2	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2018B3	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2018L1	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2025B2	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2025B3	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2025B4	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2033B2	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2033B3	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2033B4	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2041B2	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2041B3	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2041B4	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2050B2	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2050B3	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2050B4	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2057B2	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2057B3	NR	M62 J25 - J30	
07/09/15 19:32:22	SIG	M62/2057B4	NR	M62 J25 - J30	
07/09/15 19:33:21	SIG	M62/2069M1	OFF	M62 J25 - J30	
07/09/15 19:33:21	SIG	M62/2069M2	OFF	M62 J25 - J30	
07/09/15 19:33:21	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 19:33:21	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2025B1	BLNK	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2025B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2025B3	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2025B4	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2033B1	BLNK	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2033B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2033B4	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2041B1	BLNK	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2041B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2041B3	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2041B4	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2050B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2050B3	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2050B4	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2057B1	BLNK	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2057B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2057B3	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2057B4	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2065B1	BLNK	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2065B2	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2065B3	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2065B4	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M62/2065M1	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M621/1002B1	OFF	M62 J25 - J30	
07/09/15 19:33:22	SIG	M621/1002B2	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2012B1	BLNK	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2012B2	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2012B3	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2012B4	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2018B1	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2018B2	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2018B3	OFF	M62 J25 - J30	
07/09/15 19:33:23	SIG	M62/2018L1	OFF	M62 J25 - J30	
07/09/15 19:34:52	SIG	M62/1999B2	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1981B1	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1981B2	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1981B3	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1981B4	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1987B1	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1987B2	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1987B3	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1987B4	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1992B1	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1992B2	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1992B3	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1992B4	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1999B3	OFF	M62 J25 - J30	
07/09/15 19:34:53	SIG	M62/1999B4	OFF	M62 J25 - J30	
07/09/15 19:34:54	SIG	M62/1999B1	BLNK	M62 J25 - J30	
07/09/15 20:00:50	SIG	M62/1960B1	50R	M62 J25 - J30	
07/09/15 20:00:50	SIG	M62/1960B2	50R	M62 J25 - J30	
07/09/15 20:00:50	SIG	M62/1960B3	50R	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2170L1	LDR	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2170L2	50R	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2177B1	50R	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2177B2	50R	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2177L1	50R	M62 J25 - J30	
07/09/15 20:01:50	SIG	M62/2177L2	50R	M62 J25 - J30	
07/09/15 20:07:08	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 20:07:08	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2012B1	REDX	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2012B2	NR	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2012B3	NR	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2012B4	NR	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2025B1	REDX	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2033B1	REDX	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 20:09:58	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 20:10:08	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 20:10:08	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 20:12:45	SIG	M62/2033B3	???	M62 J25 - J30	
07/09/15 20:12:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 20:18:15	SIG	M62/2065M1	50R	M62 J25 - J30	
07/09/15 20:18:15	SIG	M62/2069M1	50R	M62 J25 - J30	
07/09/15 20:18:15	SIG	M62/2069M2	50R	M62 J25 - J30	
07/09/15 20:18:15	SIG	M621/1002B2	50R	M62 J25 - J30	
07/09/15 20:18:15	SIG	M621/1010B1	50R	M62 J25 - J30	
07/09/15 20:18:15	SIG	M621/1010B2	50R	M62 J25 - J30	
07/09/15 20:18:21	SIG	M62/2065M1	40R	M62 J25 - J30	
07/09/15 20:18:21	SIG	M62/2069M1	40R	M62 J25 - J30	
07/09/15 20:18:21	SIG	M62/2069M2	40R	M62 J25 - J30	
07/09/15 20:18:21	SIG	M621/1002B2	40R	M62 J25 - J30	
07/09/15 20:18:21	SIG	M621/1010B1	40R	M62 J25 - J30	
07/09/15 20:18:21	SIG	M621/1010B2	40R	M62 J25 - J30	
07/09/15 20:18:26	SIG	M62/2065M1	30R	M62 J25 - J30	
07/09/15 20:18:26	SIG	M62/2069M1	30R	M62 J25 - J30	
07/09/15 20:18:26	SIG	M62/2069M2	30R	M62 J25 - J30	
07/09/15 20:18:26	SIG	M621/1002B1	HSD	M62 J25 - J30	
07/09/15 20:18:26	SIG	M621/1002B2	30R	M62 J25 - J30	
07/09/15 20:18:26	SIG	M621/1010B1	30R	M62 J25 - J30	
07/09/15 20:18:26	SIG	M621/1010B2	30R	M62 J25 - J30	
07/09/15 20:24:35	SIG	M62/2183A2	50R	M62 J25 - J30	
07/09/15 20:24:35	SIG	M62/2183A3	50R	M62 J25 - J30	
07/09/15 20:24:35	SIG	M62/2183A4	50R	M62 J25 - J30	
07/09/15 20:24:35	SIG	M62/2189A2	50R	M62 J25 - J30	
07/09/15 20:24:35	SIG	M62/2189A3	50R	M62 J25 - J30	
07/09/15 20:24:35	SIG	M62/2189A4	50R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2177A1	REDX	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2177A2	50R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2177A3	50R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2177A4	50R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2183A1	REDX	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2183A2	40R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2183A3	40R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2183A4	40R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2189A1	REDX	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2189A2	40R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2189A3	40R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2189A4	40R	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2197A1	NR	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2197A2	NR	M62 J25 - J30	
07/09/15 20:24:40	SIG	M62/2197A3	NR	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2113B2	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2113B3	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2113B4	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2120M1	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2120M2	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2125B1	LDR	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2125B2	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2125B3	50R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2125L1	NR	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2125L2	NR	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2132B1	60R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2132B2	60R	M62 J25 - J30	
07/09/15 20:28:14	SIG	M62/2132B3	60R	M62 J25 - J30	
07/09/15 20:28:19	SIG	M62/2113B2	40R	M62 J25 - J30	
07/09/15 20:28:19	SIG	M62/2113B3	40R	M62 J25 - J30	
07/09/15 20:28:19	SIG	M62/2113B4	40R	M62 J25 - J30	
07/09/15 20:28:19	SIG	M62/2120M1	40R	M62 J25 - J30	
07/09/15 20:28:19	SIG	M62/2120M2	40R	M62 J25 - J30	
07/09/15 20:28:24	SIG	M62/2113B2	30R	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2113B1	STOP	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2113B2	20R	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2113B3	40R	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2113B4	40R	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2117B1	LDR	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2117B3	50R	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2120M1	40R	M62 J25 - J30	
07/09/15 20:28:29	SIG	M62/2120M2	40R	M62 J25 - J30	
07/09/15 20:28:35	SIG	M62/2113B1	STOP	M62 J25 - J30	
07/09/15 20:28:35	SIG	M62/2113B2	STOP	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2177A1	BLNK	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2177A2	OFF	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2177A3	OFF	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2177A4	OFF	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2183A2	50R	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2183A3	50R	M62 J25 - J30	
07/09/15 20:31:39	SIG	M62/2183A4	50R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2170A1	60R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2170A2	60R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2170K1	60R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2170K2	60R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2177A1	REDX	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2177A2	50R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2177A3	50R	M62 J25 - J30	
07/09/15 20:33:46	SIG	M62/2177A4	50R	M62 J25 - J30	
07/09/15 20:35:11	SIG	M62/2189A2	50R	M62 J25 - J30	
07/09/15 20:35:11	SIG	M62/2189A3	50R	M62 J25 - J30	
07/09/15 20:35:11	SIG	M62/2189A4	50R	M62 J25 - J30	
07/09/15 20:38:46	SIG	M62/2125L1	60R	M62 J25 - J30	
07/09/15 20:38:46	SIG	M62/2125L2	60R	M62 J25 - J30	
07/09/15 20:38:46	SIG	M62/2163A1	60R	M62 J25 - J30	
07/09/15 20:38:46	SIG	M62/2163A2	60R	M62 J25 - J30	
07/09/15 20:38:46	SIG	M62/2166K1	60R	M62 J25 - J30	
07/09/15 20:38:46	SIG	M62/2166K2	60R	M62 J25 - J30	
07/09/15 20:39:08	SIG	M62/2197A1	OFF	M62 J25 - J30	
07/09/15 20:39:08	SIG	M62/2197A2	OFF	M62 J25 - J30	
07/09/15 20:39:08	SIG	M62/2197A3	OFF	M62 J25 - J30	
07/09/15 20:41:15	SIG	M62/2197A1	50R	M62 J25 - J30	
07/09/15 20:41:15	SIG	M62/2197A2	50R	M62 J25 - J30	
07/09/15 20:41:15	SIG	M62/2197A3	50R	M62 J25 - J30	
07/09/15 20:41:20	SIG	M62/2197A1	40R	M62 J25 - J30	
07/09/15 20:41:20	SIG	M62/2197A2	40R	M62 J25 - J30	
07/09/15 20:41:20	SIG	M62/2197A3	40R	M62 J25 - J30	
07/09/15 20:41:25	SIG	M62/2197A2	30R	M62 J25 - J30	
07/09/15 20:41:25	SIG	M62/2197A3	30R	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2170K1	50R	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2170K2	50R	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2177A4	LDL	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2183A3	LDL	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2183A4	LDL	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2189A3	LDL	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2189A4	LDL	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2197A1	40R	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2197A2	20R	M62 J25 - J30	
07/09/15 20:41:30	SIG	M62/2197A3	20R	M62 J25 - J30	
07/09/15 20:41:36	SIG	M62/2197A2	STOP	M62 J25 - J30	
07/09/15 20:41:36	SIG	M62/2197A3	STOP	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2170B1	NR	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2170B2	NR	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2170L1	OFF	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2170L2	OFF	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2177B1	OFF	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2177B2	OFF	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2177L1	OFF	M62 J25 - J30	
07/09/15 20:44:20	SIG	M62/2177L2	OFF	M62 J25 - J30	
07/09/15 20:47:20	SIG	M62/2170B1	OFF	M62 J25 - J30	
07/09/15 20:47:21	SIG	M62/2170B2	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2012B1	BLNK	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2012B2	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2012B3	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2012B4	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2025B1	BLNK	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2025B2	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2025B3	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2025B4	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2033B1	BLNK	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2033B2	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 20:47:59	SIG	M62/2033B4	OFF	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2113B1	REDX	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2113B2	50R	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2113B3	50R	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2113B4	50R	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2117B1	50R	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2120M1	50R	M62 J25 - J30	
07/09/15 20:49:32	SIG	M62/2120M2	50R	M62 J25 - J30	
07/09/15 20:49:33	SIG	M62/2125B1	60R	M62 J25 - J30	
07/09/15 20:49:33	SIG	M62/2125B2	60R	M62 J25 - J30	
07/09/15 20:49:33	SIG	M62/2125B3	60R	M62 J25 - J30	
07/09/15 20:49:33	SIG	M62/2132B1	OFF	M62 J25 - J30	
07/09/15 20:49:33	SIG	M62/2132B2	OFF	M62 J25 - J30	
07/09/15 20:49:33	SIG	M62/2132B3	OFF	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2097B1	REDX	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2097B2	NR	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2097B3	NR	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2097B4	NR	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2106B1	REDX	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2106B2	50R	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2106B3	50R	M62 J25 - J30	
07/09/15 20:49:46	SIG	M62/2106B4	50R	M62 J25 - J30	
07/09/15 20:50:31	SIG	M62/2018A1	50R	M62 J25 - J30	
07/09/15 20:50:31	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 20:50:31	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 20:50:31	SIG	M62/2018A4	50R	M62 J25 - J30	
07/09/15 20:50:37	SIG	M62/2018A1	40R	M62 J25 - J30	
07/09/15 20:50:37	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 20:50:37	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 20:50:37	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 20:50:42	SIG	M62/2018A1	30R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 20:50:47	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2012A1	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2012A2	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2012A3	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2018A1	20R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2018A2	40R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2018A3	40R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2018A4	40R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2025A1	REDX	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2025A2	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2033A1	REDX	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2033A2	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2041A1	REDX	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2041A2	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2041A3	50R	M62 J25 - J30	
07/09/15 20:50:47	SIG	M62/2041A4	50R	M62 J25 - J30	
07/09/15 20:50:52	SIG	M62/2018A1	STOP	M62 J25 - J30	
07/09/15 20:56:50	SIG	M621/1002B2	50R	M62 J25 - J30	
07/09/15 20:56:50	SIG	M621/1010B1	50R	M62 J25 - J30	
07/09/15 20:56:50	SIG	M621/1010B2	50R	M62 J25 - J30	
07/09/15 20:57:01	SIG	M62/2065M1	OFF	M62 J25 - J30	
07/09/15 20:57:01	SIG	M62/2069M1	OFF	M62 J25 - J30	
07/09/15 20:57:01	SIG	M62/2069M2	OFF	M62 J25 - J30	
07/09/15 20:57:01	SIG	M621/1002B1	OFF	M62 J25 - J30	
07/09/15 20:57:01	SIG	M621/1002B2	OFF	M62 J25 - J30	
07/09/15 20:57:01	SIG	M621/1010B1	OFF	M62 J25 - J30	
07/09/15 20:57:01	SIG	M621/1010B2	OFF	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/1999A1	60R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/1999A2	60R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/1999A3	60R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/1999J1	50R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/1999J2	50R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/2004A1	60R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/2004A2	60R	M62 J25 - J30	
07/09/15 21:02:46	SIG	M62/2004A3	60R	M62 J25 - J30	
07/09/15 21:18:42	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 21:18:42	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 21:18:42	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 21:18:47	SIG	M62/2041A3	30R	M62 J25 - J30	
07/09/15 21:18:47	SIG	M62/2041A4	30R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 21:18:53	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2012A1	60R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2012A2	60R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2012A3	60R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2018A1	HSD	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2018A2	50R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2018A3	50R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2018A4	LDL	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2025A3	LDL	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2025A4	LDL	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2033A3	LDL	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2033A4	LDL	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2041A2	40R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2041A3	20R	M62 J25 - J30	
07/09/15 21:18:53	SIG	M62/2041A4	20R	M62 J25 - J30	
07/09/15 21:18:58	SIG	M62/2041A3	STOP	M62 J25 - J30	
07/09/15 21:18:58	SIG	M62/2041A4	STOP	M62 J25 - J30	
07/09/15 21:21:42	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 21:21:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 21:39:48	SIG	M62/2033A2	40R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2170K1	60R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2170K2	60R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2177A4	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2183A3	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2183A4	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2189A3	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2189A4	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2197A1	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2197A2	50R	M62 J25 - J30	
07/09/15 21:55:51	SIG	M62/2197A3	50R	M62 J25 - J30	
07/09/15 22:05:14	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 22:05:14	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 22:05:30	SIG	M62/2008K1	50R	M62 J25 - J30	
07/09/15 22:05:30	SIG	M62/2008K2	50R	M62 J25 - J30	
07/09/15 22:05:35	SIG	M62/2008K1	40R	M62 J25 - J30	
07/09/15 22:05:35	SIG	M62/2008K2	40R	M62 J25 - J30	
07/09/15 22:06:44	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 22:06:44	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 22:06:44	SIG	M62/2008K1	60R	M62 J25 - J30	
07/09/15 22:06:44	SIG	M62/2008K2	60R	M62 J25 - J30	
07/09/15 22:08:47	SIG	M62/2050A1	REDX	M62 J25 - J30	
07/09/15 22:08:47	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 22:08:47	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 22:08:47	SIG	M62/2050A4	50R	M62 J25 - J30	
07/09/15 22:09:44	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 22:09:45	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 22:09:47	SIG	M62/2166K1	OFF	M62 J25 - J30	
07/09/15 22:09:47	SIG	M62/2166K2	OFF	M62 J25 - J30	
07/09/15 22:09:48	SIG	M62/2163A1	OFF	M62 J25 - J30	
07/09/15 22:09:48	SIG	M62/2163A2	OFF	M62 J25 - J30	
07/09/15 22:10:47	SIG	M62/2197A1	OFF	M62 J25 - J30	
07/09/15 22:10:47	SIG	M62/2197A2	OFF	M62 J25 - J30	
07/09/15 22:10:47	SIG	M62/2197A3	OFF	M62 J25 - J30	
07/09/15 22:13:47	SIG	M62/2163A1	60R	M62 J25 - J30	
07/09/15 22:13:47	SIG	M62/2163A2	60R	M62 J25 - J30	
07/09/15 22:13:47	SIG	M62/2166K1	60R	M62 J25 - J30	
07/09/15 22:13:47	SIG	M62/2166K2	60R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2057A1	50R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2057A2	50R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2057A3	50R	M62 J25 - J30	
07/09/15 22:16:12	SIG	M62/2057J1	50R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2050A2	40R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2050A3	40R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2050A4	40R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2057A1	40R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2057A2	40R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2057A3	40R	M62 J25 - J30	
07/09/15 22:16:18	SIG	M62/2057J1	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2106B2	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2106B3	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2106B4	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2113B2	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2113B3	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2113B4	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2117B1	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2117B3	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2120M1	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2120M2	40R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2125B1	50R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2125B2	50R	M62 J25 - J30	
07/09/15 22:19:14	SIG	M62/2125B3	50R	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2097B2	NR	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2097B3	NR	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2097B4	NR	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2106B1	BLNK	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2106B2	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2106B3	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2106B4	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2113B1	BLNK	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2113B2	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2113B3	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2113B4	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2117B1	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2117B3	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2120M1	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2120M2	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2125B1	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2125B2	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2125B3	OFF	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2125L1	NR	M62 J25 - J30	
07/09/15 22:20:48	SIG	M62/2125L2	NR	M62 J25 - J30	
07/09/15 22:23:48	SIG	M62/2097B1	BLNK	M62 J25 - J30	
07/09/15 22:23:48	SIG	M62/2097B2	OFF	M62 J25 - J30	
07/09/15 22:23:48	SIG	M62/2097B3	OFF	M62 J25 - J30	
07/09/15 22:23:48	SIG	M62/2097B4	OFF	M62 J25 - J30	
07/09/15 22:23:48	SIG	M62/2125L1	OFF	M62 J25 - J30	
07/09/15 22:23:48	SIG	M62/2125L2	OFF	M62 J25 - J30	
07/09/15 22:26:48	SIG	M62/2163A1	OFF	M62 J25 - J30	
07/09/15 22:26:48	SIG	M62/2163A2	OFF	M62 J25 - J30	
07/09/15 22:26:48	SIG	M62/2166K1	OFF	M62 J25 - J30	
07/09/15 22:26:48	SIG	M62/2166K2	OFF	M62 J25 - J30	
07/09/15 22:28:56	SIG	M62/2033A3	50R	M62 J25 - J30	
07/09/15 22:28:56	SIG	M62/2033A4	50R	M62 J25 - J30	
07/09/15 22:28:56	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 22:28:56	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2018A2	60R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2018A3	60R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2018A4	60R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2025A3	50R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2025A4	50R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2033A3	40R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2033A4	40R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2041A3	40R	M62 J25 - J30	
07/09/15 22:29:01	SIG	M62/2041A4	40R	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2170A1	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2170A2	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2170K1	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2170K2	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2177A1	BLNK	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2177A2	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2177A3	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2177A4	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2183A1	BLNK	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2183A2	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2183A3	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2183A4	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2189A1	BLNK	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2189A2	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2189A3	OFF	M62 J25 - J30	
07/09/15 22:33:48	SIG	M62/2189A4	OFF	M62 J25 - J30	
07/09/15 22:34:48	SIG	M62/1999A1	OFF	M62 J25 - J30	
07/09/15 22:34:48	SIG	M62/1999A2	OFF	M62 J25 - J30	
07/09/15 22:34:48	SIG	M62/1999A3	OFF	M62 J25 - J30	
07/09/15 22:34:48	SIG	M62/1999J1	OFF	M62 J25 - J30	
07/09/15 22:34:48	SIG	M62/1999J2	OFF	M62 J25 - J30	
07/09/15 22:43:25	SIG	M62/2074A1	OFF	M62 J25 - J30	
07/09/15 22:43:26	SIG	M62/2074A1	BLNK	M62 J25 - J30	
07/09/15 22:59:43	SIG	M62/1960B1	OFF	M62 J25 - J30	
07/09/15 22:59:43	SIG	M62/1960B2	OFF	M62 J25 - J30	
07/09/15 22:59:43	SIG	M62/1960B3	OFF	M62 J25 - J30	
07/09/15 23:00:03	SIG	M606/2003B1	NR	M62 J25 - J30	
07/09/15 23:00:03	SIG	M606/2003B2	NR	M62 J25 - J30	
07/09/15 23:04:46	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 23:04:46	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 23:04:46	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2012B1	REDX	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2012B2	NR	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2012B3	NR	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2012B4	NR	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2025B1	STOP	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2025B2	40R	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2025B3	40R	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2025B4	40R	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2033B1	REDX	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2033B2	50R	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2033B3	50R	M62 J25 - J30	
07/09/15 23:04:51	SIG	M62/2033B4	50R	M62 J25 - J30	
07/09/15 23:04:56	SIG	M62/2025B1	STOP	M62 J25 - J30	
07/09/15 23:05:01	SIG	M62/2041B1	REDX	M62 J25 - J30	
07/09/15 23:05:01	SIG	M62/2041B2	50R	M62 J25 - J30	
07/09/15 23:05:01	SIG	M62/2041B3	50R	M62 J25 - J30	
07/09/15 23:05:01	SIG	M62/2041B4	50R	M62 J25 - J30	
07/09/15 23:07:09	SIG	M62/2033B3	???	M62 J25 - J30	
07/09/15 23:07:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 23:08:48	SIG	M62/2004A1	OFF	M62 J25 - J30	
07/09/15 23:08:48	SIG	M62/2004A2	OFF	M62 J25 - J30	
07/09/15 23:08:48	SIG	M62/2004A3	OFF	M62 J25 - J30	
07/09/15 23:15:30	SIG	M62/2074B1	BLNK	M62 J25 - J30	
07/09/15 23:15:30	SIG	M62/2074B1	OFF	M62 J25 - J30	
07/09/15 23:15:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 23:15:49	SIG	M62/2050B2	50R	M62 J25 - J30	
07/09/15 23:15:49	SIG	M62/2050B3	50R	M62 J25 - J30	
07/09/15 23:15:49	SIG	M62/2050B4	50R	M62 J25 - J30	
07/09/15 23:22:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
07/09/15 23:22:10	SIG	M606/2003B2	OFF	M62 J25 - J30	
07/09/15 23:37:55	SIG	M62/2025B1	REDX	M62 J25 - J30	
07/09/15 23:37:55	SIG	M62/2025B2	50R	M62 J25 - J30	
07/09/15 23:37:55	SIG	M62/2025B3	50R	M62 J25 - J30	
07/09/15 23:37:55	SIG	M62/2025B4	50R	M62 J25 - J30	
07/09/15 23:37:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 23:38:44	SIG	M62/2018B1	NR	M62 J25 - J30	
07/09/15 23:38:44	SIG	M62/2018B2	NR	M62 J25 - J30	
07/09/15 23:38:44	SIG	M62/2018B3	NR	M62 J25 - J30	
07/09/15 23:38:54	SIG	M62/2018L1	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2012B1	BLNK	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2012B2	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2012B3	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2012B4	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2018B1	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2018B2	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2018B3	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2018L1	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2025B2	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2025B3	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2025B4	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2033B2	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2033B3	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2033B4	NR	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2041B1	BLNK	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2041B2	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2041B3	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2041B4	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2050B2	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2050B3	OFF	M62 J25 - J30	
07/09/15 23:39:49	SIG	M62/2050B4	OFF	M62 J25 - J30	
07/09/15 23:42:49	SIG	M62/2033B2	OFF	M62 J25 - J30	
07/09/15 23:42:50	SIG	M62/2018L1	OFF	M62 J25 - J30	
07/09/15 23:42:50	SIG	M62/2025B2	OFF	M62 J25 - J30	
07/09/15 23:42:50	SIG	M62/2025B3	OFF	M62 J25 - J30	
07/09/15 23:42:50	SIG	M62/2025B4	OFF	M62 J25 - J30	
07/09/15 23:42:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
07/09/15 23:42:50	SIG	M62/2033B4	OFF	M62 J25 - J30	
07/09/15 23:42:51	SIG	M62/2025B1	BLNK	M62 J25 - J30	
07/09/15 23:42:51	SIG	M62/2025B1	BLNK	M62 J25 - J30	
07/09/15 23:42:51	SIG	M62/2033B1	BLNK	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2008K1	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2008K2	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2012A1	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2012A2	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2012A3	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2018A1	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2018A2	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2018A3	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2018A4	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2025A1	BLNK	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2025A2	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2025A3	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2025A4	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2033A1	BLNK	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2033A2	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2033A3	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2033A4	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2041A1	BLNK	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2041A2	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2041A3	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2041A4	OFF	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2050A2	50R	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2050A3	50R	M62 J25 - J30	
07/09/15 23:45:30	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 00:19:11	SIG	M62/2074B1	OFF	M62 J25 - J30	
08/09/15 00:19:12	SIG	M62/2074B1	BLNK	M62 J25 - J30	
08/09/15 00:28:38	SIG	M62/2074B1	OFF	M62 J25 - J30	
08/09/15 00:28:39	SIG	M62/2074B1	BLNK	M62 J25 - J30	
08/09/15 00:46:27	SIG	M62/2065A2	50R	M62 J25 - J30	
08/09/15 00:46:27	SIG	M62/2065A3	50R	M62 J25 - J30	
08/09/15 00:46:27	SIG	M62/2065A4	50R	M62 J25 - J30	
08/09/15 00:46:32	SIG	M62/2065A1	REDX	M62 J25 - J30	
08/09/15 00:46:32	SIG	M62/2065A2	40R	M62 J25 - J30	
08/09/15 00:46:32	SIG	M62/2065A3	40R	M62 J25 - J30	
08/09/15 00:46:32	SIG	M62/2065A4	40R	M62 J25 - J30	
08/09/15 00:51:29	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 00:51:29	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 00:51:29	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 00:51:35	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 00:51:35	SIG	M62/2041A3	40R	M62 J25 - J30	
08/09/15 00:51:35	SIG	M62/2041A4	40R	M62 J25 - J30	
08/09/15 00:51:40	SIG	M62/2041A3	30R	M62 J25 - J30	
08/09/15 00:51:40	SIG	M62/2041A4	30R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2018A4	LDL	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2025A3	LDL	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2025A4	LDL	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2033A1	REDX	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2033A3	LDL	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2033A4	LDL	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2041A1	REDX	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2041A3	20R	M62 J25 - J30	
08/09/15 00:51:45	SIG	M62/2041A4	20R	M62 J25 - J30	
08/09/15 00:51:51	SIG	M62/2041A3	STOP	M62 J25 - J30	
08/09/15 00:51:51	SIG	M62/2041A4	STOP	M62 J25 - J30	
08/09/15 00:53:17	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 00:53:17	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 00:53:17	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 00:56:31	SIG	M62/2065A2	OFF	M62 J25 - J30	
08/09/15 00:56:31	SIG	M62/2065A3	OFF	M62 J25 - J30	
08/09/15 00:56:31	SIG	M62/2065A4	OFF	M62 J25 - J30	
08/09/15 01:03:38	SIG	M62/2065M1	50R	M62 J25 - J30	
08/09/15 01:03:38	SIG	M621/1002B1	HSD	M62 J25 - J30	
08/09/15 01:03:38	SIG	M621/1002B2	50R	M62 J25 - J30	
08/09/15 01:04:00	SIG	M62/2065B1	REDX	M62 J25 - J30	
08/09/15 01:04:00	SIG	M62/2065B2	50R	M62 J25 - J30	
08/09/15 01:04:00	SIG	M62/2065B3	50R	M62 J25 - J30	
08/09/15 01:04:00	SIG	M62/2065B4	50R	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2050A2	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2050A3	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2050A4	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2057A1	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2057A2	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2057A3	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2057J1	OFF	M62 J25 - J30	
08/09/15 01:06:10	SIG	M62/2065A1	BLNK	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2074B1	REDX	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2074B2	50R	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2074B3	50R	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2074B4	50R	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2081B1	50R	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2081B2	50R	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2081B3	50R	M62 J25 - J30	
08/09/15 01:06:24	SIG	M62/2081L1	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2113B2	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2113B3	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2113B4	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2120M1	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2120M2	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2125B1	LDR	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2125B2	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2125B3	50R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2125L1	NR	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2125L2	NR	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2132B1	60R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2132B2	60R	M62 J25 - J30	
08/09/15 01:18:14	SIG	M62/2132B3	60R	M62 J25 - J30	
08/09/15 01:18:20	SIG	M62/2113B2	40R	M62 J25 - J30	
08/09/15 01:18:20	SIG	M62/2113B3	40R	M62 J25 - J30	
08/09/15 01:18:20	SIG	M62/2113B4	40R	M62 J25 - J30	
08/09/15 01:18:20	SIG	M62/2120M1	40R	M62 J25 - J30	
08/09/15 01:18:20	SIG	M62/2120M2	40R	M62 J25 - J30	
08/09/15 01:18:25	SIG	M62/2113B2	30R	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2113B1	STOP	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2113B2	20R	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2113B3	40R	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2113B4	40R	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2117B1	LDR	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2117B3	50R	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2120M1	40R	M62 J25 - J30	
08/09/15 01:18:30	SIG	M62/2120M2	40R	M62 J25 - J30	
08/09/15 01:18:35	SIG	M62/2113B1	STOP	M62 J25 - J30	
08/09/15 01:18:35	SIG	M62/2113B2	STOP	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2074B1	BLNK	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2074B2	OFF	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2074B3	OFF	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2074B4	OFF	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2081B1	OFF	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2081B2	OFF	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2081B3	OFF	M62 J25 - J30	
08/09/15 01:26:41	SIG	M62/2081L1	OFF	M62 J25 - J30	
08/09/15 01:28:32	SIG	M62/2057B1	REDX	M62 J25 - J30	
08/09/15 01:28:32	SIG	M62/2057B2	NR	M62 J25 - J30	
08/09/15 01:28:32	SIG	M62/2057B3	NR	M62 J25 - J30	
08/09/15 01:28:32	SIG	M62/2057B4	NR	M62 J25 - J30	
08/09/15 01:29:28	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 01:29:28	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 01:29:28	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 01:29:33	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2018A1	STOP	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 01:29:33	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 01:29:38	SIG	M62/2018A1	STOP	M62 J25 - J30	
08/09/15 01:29:59	SIG	M62/2065B2	NR	M62 J25 - J30	
08/09/15 01:29:59	SIG	M62/2065B3	NR	M62 J25 - J30	
08/09/15 01:29:59	SIG	M62/2065B4	NR	M62 J25 - J30	
08/09/15 01:30:15	SIG	M62/2057B1	BLNK	M62 J25 - J30	
08/09/15 01:30:15	SIG	M62/2057B2	OFF	M62 J25 - J30	
08/09/15 01:30:15	SIG	M62/2057B3	OFF	M62 J25 - J30	
08/09/15 01:30:15	SIG	M62/2057B4	OFF	M62 J25 - J30	
08/09/15 01:30:15	SIG	M62/2065M1	OFF	M62 J25 - J30	
08/09/15 01:30:15	SIG	M621/1002B1	OFF	M62 J25 - J30	
08/09/15 01:30:15	SIG	M621/1002B2	OFF	M62 J25 - J30	
08/09/15 01:33:00	SIG	M62/2065B1	BLNK	M62 J25 - J30	
08/09/15 01:33:00	SIG	M62/2065B2	OFF	M62 J25 - J30	
08/09/15 01:33:00	SIG	M62/2065B3	OFF	M62 J25 - J30	
08/09/15 01:33:00	SIG	M62/2065B4	OFF	M62 J25 - J30	
08/09/15 02:00:09	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 02:00:09	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2018A2	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2018A3	60R	M62 J25 - J30	
08/09/15 02:00:09	SIG	M62/2018A4	60R	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2008K1	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2008K2	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2012A1	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2012A2	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2012A3	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2018A1	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2018A2	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2018A3	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2018A4	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2025A1	BLNK	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2025A2	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2025A3	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2025A4	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2033A1	BLNK	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2033A2	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2033A3	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2033A4	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2041A1	BLNK	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2041A2	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2041A3	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2041A4	OFF	M62 J25 - J30	
08/09/15 02:00:33	SIG	M62/2050A1	BLNK	M62 J25 - J30	
08/09/15 02:03:09	SIG	M606/2003B1	OFF	M62 J25 - J30	
08/09/15 02:03:09	SIG	M606/2003B2	OFF	M62 J25 - J30	
08/09/15 02:33:07	SIG	M62/2183A2	50R	M62 J25 - J30	
08/09/15 02:33:07	SIG	M62/2183A3	50R	M62 J25 - J30	
08/09/15 02:33:07	SIG	M62/2183A4	50R	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2177A2	50R	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2177A3	50R	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2177A4	50R	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2183A1	STOP	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2183A2	40R	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2183A3	40R	M62 J25 - J30	
08/09/15 02:33:13	SIG	M62/2183A4	40R	M62 J25 - J30	
08/09/15 02:33:18	SIG	M62/2183A1	STOP	M62 J25 - J30	
08/09/15 02:33:49	SIG	M62/2170A1	50R	M62 J25 - J30	
08/09/15 02:33:49	SIG	M62/2170A2	50R	M62 J25 - J30	
08/09/15 02:33:49	SIG	M62/2170K1	50R	M62 J25 - J30	
08/09/15 02:33:49	SIG	M62/2170K2	50R	M62 J25 - J30	
08/09/15 02:55:16	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 02:55:16	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1999A1	NR	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1999A2	NR	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1999A3	NR	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 02:55:21	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1992A2	OFF	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1992A3	OFF	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1992J1	OFF	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1999A1	NR	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1999A2	NR	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1999A3	NR	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1999J1	OFF	M62 J25 - J30	
08/09/15 03:09:19	SIG	M62/1999J2	OFF	M62 J25 - J30	
08/09/15 03:12:19	SIG	M62/1999A1	OFF	M62 J25 - J30	
08/09/15 03:12:20	SIG	M62/1999A2	OFF	M62 J25 - J30	
08/09/15 03:12:20	SIG	M62/1999A3	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2170K1	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2170K2	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2183A1	BLNK	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2183A2	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2183A3	OFF	M62 J25 - J30	
08/09/15 03:25:52	SIG	M62/2183A4	OFF	M62 J25 - J30	
08/09/15 03:53:15	SIG	M62/2197A1	50R	M62 J25 - J30	
08/09/15 03:53:15	SIG	M62/2197A2	50R	M62 J25 - J30	
08/09/15 03:53:15	SIG	M62/2197A3	50R	M62 J25 - J30	
08/09/15 03:53:20	SIG	M62/2197A1	40R	M62 J25 - J30	
08/09/15 03:53:20	SIG	M62/2197A2	40R	M62 J25 - J30	
08/09/15 03:53:20	SIG	M62/2197A3	40R	M62 J25 - J30	
08/09/15 03:53:26	SIG	M62/2197A2	30R	M62 J25 - J30	
08/09/15 03:53:26	SIG	M62/2197A3	30R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2170A1	60R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2170A2	60R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2170K1	50R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2170K2	50R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2177A2	50R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2177A3	50R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2177A4	LDL	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2183A1	REDX	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2183A2	50R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2183A3	LDL	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2183A4	LDL	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2189A1	REDX	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2189A2	50R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2189A3	LDL	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2189A4	LDL	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2197A1	40R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2197A2	20R	M62 J25 - J30	
08/09/15 03:53:31	SIG	M62/2197A3	20R	M62 J25 - J30	
08/09/15 03:53:36	SIG	M62/2197A2	STOP	M62 J25 - J30	
08/09/15 03:53:36	SIG	M62/2197A3	STOP	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2170L1	LDR	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 04:54:34	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 04:55:18	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 04:55:18	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 04:55:18	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 04:55:18	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2170K1	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2170K2	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2183A2	NR	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2183A3	NR	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2183A4	NR	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2189A2	NR	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2189A3	NR	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2189A4	NR	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2197A1	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2197A2	OFF	M62 J25 - J30	
08/09/15 04:56:39	SIG	M62/2197A3	OFF	M62 J25 - J30	
08/09/15 04:58:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 04:58:23	SIG	M62/2183B2	???	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2113B1	BLNK	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2113B2	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2113B3	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2113B4	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2117B1	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2117B3	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2120M1	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2120M2	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2125B1	NR	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2125B2	NR	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2125B3	NR	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2125L1	NR	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2125L2	NR	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2132B1	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2132B2	OFF	M62 J25 - J30	
08/09/15 04:58:46	SIG	M62/2132B3	OFF	M62 J25 - J30	
08/09/15 04:59:39	SIG	M62/2183A2	OFF	M62 J25 - J30	
08/09/15 04:59:39	SIG	M62/2183A3	OFF	M62 J25 - J30	
08/09/15 04:59:39	SIG	M62/2183A4	OFF	M62 J25 - J30	
08/09/15 04:59:39	SIG	M62/2189A2	OFF	M62 J25 - J30	
08/09/15 04:59:39	SIG	M62/2189A3	OFF	M62 J25 - J30	
08/09/15 04:59:39	SIG	M62/2189A4	OFF	M62 J25 - J30	
08/09/15 04:59:40	SIG	M62/2183A1	BLNK	M62 J25 - J30	
08/09/15 04:59:40	SIG	M62/2189A1	BLNK	M62 J25 - J30	
08/09/15 04:59:40	SIG	M62/2189A1	BLNK	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2106B1	REDX	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2106B2	NR	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2106B3	NR	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2106B4	NR	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2113B1	REDX	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2113B2	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2113B3	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2113B4	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2117B1	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2117B3	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2120M1	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2120M2	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2125B1	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2125B2	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2125B3	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2125L1	60R	M62 J25 - J30	
08/09/15 05:00:55	SIG	M62/2125L2	60R	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2106B2	NR	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2106B3	NR	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2106B4	NR	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2113B1	BLNK	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2113B2	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2113B3	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2113B4	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2117B3	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2120M1	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2120M2	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2125B1	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2125B2	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2125B3	OFF	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2125L1	NR	M62 J25 - J30	
08/09/15 05:04:55	SIG	M62/2125L2	NR	M62 J25 - J30	
08/09/15 05:07:55	SIG	M62/2106B2	OFF	M62 J25 - J30	
08/09/15 05:07:55	SIG	M62/2125L1	OFF	M62 J25 - J30	
08/09/15 05:07:55	SIG	M62/2125L2	OFF	M62 J25 - J30	
08/09/15 05:07:56	SIG	M62/2106B1	BLNK	M62 J25 - J30	
08/09/15 05:07:56	SIG	M62/2106B3	OFF	M62 J25 - J30	
08/09/15 05:07:56	SIG	M62/2106B4	OFF	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2170L1	OFF	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2170L2	OFF	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2177B1	OFF	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2177B2	OFF	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2177L1	OFF	M62 J25 - J30	
08/09/15 05:16:59	SIG	M62/2177L2	OFF	M62 J25 - J30	
08/09/15 05:17:10	SIG	M62/2183B1	OFF	M62 J25 - J30	
08/09/15 05:17:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 05:17:10	SIG	M62/2183L1	OFF	M62 J25 - J30	
08/09/15 05:17:10	SIG	M62/2183L2	OFF	M62 J25 - J30	
08/09/15 05:20:00	SIG	M62/2170B1	OFF	M62 J25 - J30	
08/09/15 05:20:00	SIG	M62/2170B2	OFF	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2163A1	50R	M62 J25 - J30	
08/09/15 05:28:02	SIG	M62/2163A2	50R	M62 J25 - J30	
08/09/15 05:28:03	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 05:28:03	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 05:28:03	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 05:28:03	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 05:28:03	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 05:28:03	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2163A1	40R	M62 J25 - J30	
08/09/15 05:28:08	SIG	M62/2163A2	40R	M62 J25 - J30	
08/09/15 05:30:28	SIG	M62/2157A1	???	M62 J25 - J30	
08/09/15 05:30:28	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 05:30:34	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 05:33:31	SIG	M62/2157A1	???	M62 J25 - J30	
08/09/15 05:33:32	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 05:33:37	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 05:36:35	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 05:36:35	SIG	M62/2157A1	???	M62 J25 - J30	
08/09/15 05:36:41	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 05:39:38	SIG	M62/2157A1	???	M62 J25 - J30	
08/09/15 05:39:39	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 05:39:44	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 05:42:42	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 05:42:42	SIG	M62/2157A1	???	M62 J25 - J30	
08/09/15 05:42:48	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 05:44:42	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2088A2	60R	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2088A3	60R	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2088A4	60R	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2097A1	REDX	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2097A2	NR	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2097A3	NR	M62 J25 - J30	
08/09/15 05:50:34	SIG	M62/2097A4	NR	M62 J25 - J30	
08/09/15 06:13:59	SIG	M62/2088A2	NR	M62 J25 - J30	
08/09/15 06:13:59	SIG	M62/2088A3	NR	M62 J25 - J30	
08/09/15 06:13:59	SIG	M62/2088A4	NR	M62 J25 - J30	
08/09/15 06:13:59	SIG	M62/2097A2	NR	M62 J25 - J30	
08/09/15 06:13:59	SIG	M62/2097A3	NR	M62 J25 - J30	
08/09/15 06:13:59	SIG	M62/2097A4	NR	M62 J25 - J30	
08/09/15 06:16:59	SIG	M62/2088A2	OFF	M62 J25 - J30	
08/09/15 06:16:59	SIG	M62/2088A3	OFF	M62 J25 - J30	
08/09/15 06:16:59	SIG	M62/2088A4	OFF	M62 J25 - J30	
08/09/15 06:16:59	SIG	M62/2097A2	OFF	M62 J25 - J30	
08/09/15 06:16:59	SIG	M62/2097A3	OFF	M62 J25 - J30	
08/09/15 06:16:59	SIG	M62/2097A4	OFF	M62 J25 - J30	
08/09/15 06:17:00	SIG	M62/2088A1	BLNK	M62 J25 - J30	
08/09/15 06:17:00	SIG	M62/2097A1	BLNK	M62 J25 - J30	
08/09/15 06:17:00	SIG	M62/2097A1	BLNK	M62 J25 - J30	
08/09/15 06:29:25	SIG	M62/1960B1	50R	M62 J25 - J30	
08/09/15 06:29:25	SIG	M62/1960B2	50R	M62 J25 - J30	
08/09/15 06:29:25	SIG	M62/1960B3	50R	M62 J25 - J30	
08/09/15 06:29:25	SIG	M62/1960L1	50R	M62 J25 - J30	
08/09/15 06:29:25	SIG	M62/1960L2	50R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1960B1	40R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1960B2	40R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1960B3	40R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1960L1	40R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1960L2	40R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1968B1	50R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1968B2	50R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1968B3	50R	M62 J25 - J30	
08/09/15 06:29:30	SIG	M62/1968L1	50R	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1960B1	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1960B2	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1960B3	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1960L1	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1960L2	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1968B1	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1968B2	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1968B3	OFF	M62 J25 - J30	
08/09/15 06:33:25	SIG	M62/1968L1	OFF	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2004A1	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2004A2	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2004A3	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2018A2	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2018A3	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2018A4	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2025A2	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2025A3	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2025A4	60R	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2033A1	REDX	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2033A2	NR	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2033A3	NR	M62 J25 - J30	
08/09/15 06:38:57	SIG	M62/2033A4	NR	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2033A2	60R	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2033A3	60R	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2033A4	60R	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2041A1	REDX	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2041A2	NR	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2041A3	NR	M62 J25 - J30	
08/09/15 06:39:56	SIG	M62/2041A4	NR	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2041A2	60R	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2041A3	60R	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2041A4	60R	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2050A1	REDX	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2050A2	NR	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2050A3	NR	M62 J25 - J30	
08/09/15 06:40:57	SIG	M62/2050A4	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2057A1	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2057A2	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2057A3	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2057J1	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2065A1	REDX	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2065A2	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2065A3	NR	M62 J25 - J30	
08/09/15 06:41:16	SIG	M62/2065A4	NR	M62 J25 - J30	
08/09/15 06:41:17	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 06:41:17	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 06:41:17	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 06:41:17	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 06:42:17	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 06:42:37	SIG	M62/2041A1	60R	M62 J25 - J30	
08/09/15 06:42:57	SIG	M62/2004A1	OFF	M62 J25 - J30	
08/09/15 06:42:57	SIG	M62/2004A2	OFF	M62 J25 - J30	
08/09/15 06:42:57	SIG	M62/2004A3	OFF	M62 J25 - J30	
08/09/15 06:43:47	SIG	M62/2033A1	60R	M62 J25 - J30	
08/09/15 06:43:51	SIG	M62/2018A1	60R	M62 J25 - J30	
08/09/15 06:43:51	SIG	M62/2025A1	60R	M62 J25 - J30	
08/09/15 06:46:38	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 06:46:39	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 06:48:27	SIG	M62/2065M1	NR	M62 J25 - J30	
08/09/15 06:48:27	SIG	M62/2069M1	60R	M62 J25 - J30	
08/09/15 06:48:27	SIG	M62/2069M2	60R	M62 J25 - J30	
08/09/15 06:48:27	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 06:48:27	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2057B1	REDX	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2057B2	NR	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2057B3	NR	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2057B4	NR	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2065B1	REDX	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2065B2	60R	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2065B3	60R	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2065B4	60R	M62 J25 - J30	
08/09/15 06:48:28	SIG	M62/2065M1	60R	M62 J25 - J30	
08/09/15 06:48:28	SIG	M621/1002B1	HSD	M62 J25 - J30	
08/09/15 06:48:28	SIG	M621/1002B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2012B1	REDX	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2012B2	NR	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2012B3	NR	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2012B4	NR	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2025B1	REDX	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2033B1	REDX	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2033B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2033B3	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2033B4	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2041B1	REDX	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2050B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2050B3	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2050B4	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2057B2	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2057B3	60R	M62 J25 - J30	
08/09/15 06:48:29	SIG	M62/2057B4	60R	M62 J25 - J30	
08/09/15 06:49:44	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 06:50:08	SIG	M62/2033B1	60R	M62 J25 - J30	
08/09/15 06:50:28	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 06:50:49	SIG	M62/2057B1	60R	M62 J25 - J30	
08/09/15 06:50:49	SIG	M621/1002B1	60R	M62 J25 - J30	
08/09/15 06:50:49	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 06:50:49	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 06:51:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 06:51:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 06:51:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 06:51:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 06:59:01	SIG	M62/1968A1	50R	M62 J25 - J30	
08/09/15 06:59:01	SIG	M62/1968A2	50R	M62 J25 - J30	
08/09/15 06:59:01	SIG	M62/1968A3	50R	M62 J25 - J30	
08/09/15 06:59:01	SIG	M62/1968A4	50R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1960A1	50R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1960A2	50R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1960A3	50R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1960K1	50R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1960K2	50R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1968A1	40R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1968A2	40R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1968A3	40R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1968A4	40R	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1974A1	NR	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1974A2	NR	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1974A3	NR	M62 J25 - J30	
08/09/15 06:59:07	SIG	M62/1974A4	NR	M62 J25 - J30	
08/09/15 07:00:31	SIG	M62/2159B1	NR	M62 J25 - J30	
08/09/15 07:00:31	SIG	M62/2159B2	NR	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:00:32	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 07:00:38	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 07:01:57	SIG	M62/1955K1	60R	M62 J25 - J30	
08/09/15 07:01:57	SIG	M62/1955K2	60R	M62 J25 - J30	
08/09/15 07:01:57	SIG	M62/1956A1	60R	M62 J25 - J30	
08/09/15 07:01:57	SIG	M62/1956A2	60R	M62 J25 - J30	
08/09/15 07:01:57	SIG	M62/1956A3	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1960A1	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1960A2	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1960A3	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1960K1	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1960K2	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1968A1	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1968A2	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1968A3	60R	M62 J25 - J30	
08/09/15 07:03:01	SIG	M62/1968A4	60R	M62 J25 - J30	
08/09/15 07:03:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:03:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:03:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:03:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2189B1	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2189B2	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2189B3	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2189B4	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 07:05:57	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 07:08:13	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 07:08:13	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 07:08:13	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2189B1	50R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2189B2	50R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2189B3	50R	M62 J25 - J30	
08/09/15 07:08:18	SIG	M62/2189B4	50R	M62 J25 - J30	
08/09/15 07:08:57	SIG	M62/2197B1	60R	M62 J25 - J30	
08/09/15 07:08:57	SIG	M62/2197B2	60R	M62 J25 - J30	
08/09/15 07:08:57	SIG	M62/2197B3	60R	M62 J25 - J30	
08/09/15 07:08:57	SIG	M62/2199M1	60R	M62 J25 - J30	
08/09/15 07:08:57	SIG	M62/2199M2	60R	M62 J25 - J30	
08/09/15 07:09:57	SIG	M62/2004A1	60R	M62 J25 - J30	
08/09/15 07:09:57	SIG	M62/2004A2	60R	M62 J25 - J30	
08/09/15 07:09:57	SIG	M62/2004A3	60R	M62 J25 - J30	
08/09/15 07:09:57	SIG	M62/2203B1	60R	M62 J25 - J30	
08/09/15 07:09:57	SIG	M62/2203B2	60R	M62 J25 - J30	
08/09/15 07:09:57	SIG	M62/2203B3	60R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2189B1	40R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2189B2	40R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2189B3	40R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2189B4	40R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 07:10:00	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 07:10:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:10:29	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:10:34	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:13:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:13:35	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:13:40	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:13:58	SIG	M62/1999A1	60R	M62 J25 - J30	
08/09/15 07:13:58	SIG	M62/1999A2	60R	M62 J25 - J30	
08/09/15 07:13:58	SIG	M62/1999A3	60R	M62 J25 - J30	
08/09/15 07:13:58	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 07:13:58	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 07:15:18	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 07:15:18	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 07:15:18	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 07:15:18	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 07:16:38	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 07:16:38	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 07:16:38	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 07:16:38	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 07:16:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:16:41	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:16:46	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2194B1	40R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2194B2	40R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2194B3	40R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2194B4	40R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2197B1	50R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2197B2	50R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2197B3	50R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2199M1	50R	M62 J25 - J30	
08/09/15 07:17:21	SIG	M62/2199M2	50R	M62 J25 - J30	
08/09/15 07:18:46	SIG	M62/2183B1	60R	M62 J25 - J30	
08/09/15 07:18:46	SIG	M62/2183B2	60R	M62 J25 - J30	
08/09/15 07:18:46	SIG	M62/2183L1	60R	M62 J25 - J30	
08/09/15 07:18:46	SIG	M62/2183L2	60R	M62 J25 - J30	
08/09/15 07:18:55	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 07:18:55	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 07:18:55	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 07:19:01	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 07:19:01	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 07:19:01	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 07:19:05	SIG	M62/1999A1	50R	M62 J25 - J30	
08/09/15 07:19:05	SIG	M62/1999A2	50R	M62 J25 - J30	
08/09/15 07:19:05	SIG	M62/1999A3	50R	M62 J25 - J30	
08/09/15 07:19:05	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 07:19:05	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1974A1	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1974A2	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1974A3	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1974A4	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1979K1	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1979K2	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1981A1	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1981A2	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1981A3	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1981A4	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1987A1	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1987A3	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1987J1	60R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1999A1	40R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1999A2	40R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1999A3	40R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 07:19:10	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 07:19:36	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 07:19:41	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 07:19:58	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 07:19:58	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 07:20:58	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2189B1	50R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2189B2	50R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2189B3	50R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2189B4	50R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2197B1	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2197B2	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2197B3	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2199M1	60R	M62 J25 - J30	
08/09/15 07:21:22	SIG	M62/2199M2	60R	M62 J25 - J30	
08/09/15 07:21:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:21:51	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:21:56	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:21:58	SIG	M62/2025B1	50R	M62 J25 - J30	
08/09/15 07:21:58	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 07:21:58	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 07:21:58	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2025B1	40R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2025B2	40R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2025B3	40R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2025B4	40R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:22:04	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 07:22:10	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 07:22:10	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 07:22:10	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 07:22:10	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 07:22:31	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 07:22:31	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 07:22:37	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2189B1	40R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2189B2	40R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2189B3	40R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2189B4	40R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 07:22:44	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 07:22:55	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2004A1	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2004A2	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2004A3	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 07:22:55	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1992A1	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1992A2	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1992A3	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1992J1	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1999A1	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1999A2	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1999A3	60R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 07:22:56	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1987A2	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 07:23:39	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 07:23:54	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2106B1	REDX	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2106B2	NR	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2106B3	NR	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2106B4	NR	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B1	REDX	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B2	NR	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B2	60R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B3	60R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B3	NR	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B4	60R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2113B4	NR	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2117B1	60R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2117B3	60R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2120M1	60R	M62 J25 - J30	
08/09/15 07:24:21	SIG	M62/2120M2	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2074B1	REDX	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2074B2	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2074B3	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2074B4	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2081B1	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2081B2	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2081B3	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2081L1	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2088B1	REDX	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2088B2	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2088B3	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2088B4	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2097B1	REDX	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2097B2	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2097B3	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2097B4	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2106B2	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2106B3	60R	M62 J25 - J30	
08/09/15 07:24:23	SIG	M62/2106B4	60R	M62 J25 - J30	
08/09/15 07:24:55	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:24:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:25:00	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:25:01	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 07:25:01	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 07:25:01	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 07:25:01	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 07:25:01	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 07:25:01	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 07:25:01	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 07:25:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:25:04	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:25:09	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:25:17	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 07:25:17	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 07:25:17	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 07:25:17	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 07:25:37	SIG	M62/2088B1	60R	M62 J25 - J30	
08/09/15 07:25:53	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 07:25:53	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 07:25:53	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 07:25:53	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 07:25:54	SIG	M62/2097B1	60R	M62 J25 - J30	
08/09/15 07:25:57	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 07:25:57	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 07:26:02	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 07:26:02	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 07:26:02	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 07:26:02	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1979K1	40R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1979K2	40R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1981A1	40R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1981A2	40R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1981A3	40R	M62 J25 - J30	
08/09/15 07:26:12	SIG	M62/1981A4	40R	M62 J25 - J30	
08/09/15 07:26:36	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 07:26:36	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 07:26:36	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 07:26:36	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 07:26:44	SIG	M62/2106B1	60R	M62 J25 - J30	
08/09/15 07:26:50	SIG	M62/2113B1	60R	M62 J25 - J30	
08/09/15 07:26:52	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:26:52	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:26:52	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:26:52	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:26:57	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:26:57	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:26:57	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:26:57	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1987A1	60R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1987A3	60R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1987J1	60R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1992A1	60R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1992A2	60R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1992A3	60R	M62 J25 - J30	
08/09/15 07:27:39	SIG	M62/1992J1	60R	M62 J25 - J30	
08/09/15 07:27:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:27:59	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:28:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:28:04	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:28:04	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:28:10	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:28:41	SIG	M62/2025B1	50R	M62 J25 - J30	
08/09/15 07:28:41	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 07:28:41	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 07:28:41	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 07:28:46	SIG	M62/2025B1	40R	M62 J25 - J30	
08/09/15 07:28:46	SIG	M62/2025B2	40R	M62 J25 - J30	
08/09/15 07:28:46	SIG	M62/2025B3	40R	M62 J25 - J30	
08/09/15 07:28:46	SIG	M62/2025B4	40R	M62 J25 - J30	
08/09/15 07:29:21	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 07:29:21	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 07:29:21	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 07:29:21	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 07:29:21	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 07:29:21	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 07:29:26	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 07:29:26	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 07:29:26	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 07:29:26	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 07:29:26	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 07:29:26	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1987A2	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 07:29:38	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 07:29:52	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 07:29:52	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 07:29:52	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 07:29:52	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 07:29:53	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1974A1	60R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1974A2	60R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1974A3	60R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1974A4	60R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 07:30:12	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2194B1	40R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2194B2	40R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2194B3	40R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2194B4	40R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2197B1	50R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2197B2	50R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2197B3	50R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2199M1	50R	M62 J25 - J30	
08/09/15 07:30:50	SIG	M62/2199M2	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 07:30:51	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2151A1	50R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2151A2	50R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2151J1	50R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2151K1	50R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2155A1	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2155A2	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2155J1	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2155K1	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2163A1	NR	M62 J25 - J30	
08/09/15 07:30:57	SIG	M62/2163A2	NR	M62 J25 - J30	
08/09/15 07:31:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:31:03	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:31:08	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:31:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:31:09	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 07:31:09	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 07:31:09	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 07:31:09	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 07:31:09	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:31:14	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:31:25	SIG	M62/1960A1	50R	M62 J25 - J30	
08/09/15 07:31:25	SIG	M62/1960A2	50R	M62 J25 - J30	
08/09/15 07:31:25	SIG	M62/1960A3	50R	M62 J25 - J30	
08/09/15 07:31:25	SIG	M62/1960K1	50R	M62 J25 - J30	
08/09/15 07:31:25	SIG	M62/1960K2	50R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1955K1	50R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1955K2	50R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1956A1	50R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1956A2	50R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1956A3	50R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1960A1	40R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1960A2	40R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1960A3	40R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1960K1	40R	M62 J25 - J30	
08/09/15 07:31:31	SIG	M62/1960K2	40R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1979K1	40R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1979K2	40R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1981A1	40R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1981A2	40R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1981A3	40R	M62 J25 - J30	
08/09/15 07:32:03	SIG	M62/1981A4	40R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2197B1	40R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2197B2	40R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2197B3	40R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2199M1	40R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2199M2	40R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2203B1	50R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2203B2	50R	M62 J25 - J30	
08/09/15 07:32:14	SIG	M62/2203B3	50R	M62 J25 - J30	
08/09/15 07:32:38	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 07:32:38	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 07:32:38	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 07:32:38	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 07:33:21	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 07:33:21	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 07:33:27	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:33:27	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:33:27	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:33:27	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:33:29	SIG	M62/1992A1	60R	M62 J25 - J30	
08/09/15 07:33:29	SIG	M62/1992A2	60R	M62 J25 - J30	
08/09/15 07:33:29	SIG	M62/1992A3	60R	M62 J25 - J30	
08/09/15 07:33:29	SIG	M62/1992J1	60R	M62 J25 - J30	
08/09/15 07:33:32	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:33:32	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:33:32	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:33:32	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:33:47	SIG	M62/2041A1	40R	M62 J25 - J30	
08/09/15 07:33:47	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 07:33:47	SIG	M62/2041A3	40R	M62 J25 - J30	
08/09/15 07:33:47	SIG	M62/2041A4	40R	M62 J25 - J30	
08/09/15 07:33:54	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 07:33:55	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 07:33:58	SIG	M62/2203B1	40R	M62 J25 - J30	
08/09/15 07:33:58	SIG	M62/2203B2	40R	M62 J25 - J30	
08/09/15 07:33:58	SIG	M62/2203B3	40R	M62 J25 - J30	
08/09/15 07:34:00	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 07:34:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:34:07	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:34:12	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:34:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:34:15	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:34:20	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:34:45	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 07:34:45	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 07:34:45	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 07:34:45	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 07:34:50	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 07:34:50	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 07:34:50	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 07:34:50	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2151A1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2151A2	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2151J1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2151K1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 07:34:51	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 07:34:53	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 07:35:08	SIG	M62/1987A1	60R	M62 J25 - J30	
08/09/15 07:35:08	SIG	M62/1987A3	60R	M62 J25 - J30	
08/09/15 07:35:08	SIG	M62/1987J1	60R	M62 J25 - J30	
08/09/15 07:35:17	SIG	M62/1956A1	40R	M62 J25 - J30	
08/09/15 07:35:17	SIG	M62/1956A2	40R	M62 J25 - J30	
08/09/15 07:35:17	SIG	M62/1956A3	40R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1955K1	60R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1955K2	60R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1960A1	60R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1960A2	60R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1960A3	60R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1960K1	60R	M62 J25 - J30	
08/09/15 07:35:26	SIG	M62/1960K2	60R	M62 J25 - J30	
08/09/15 07:35:33	SIG	M62/2033A1	40R	M62 J25 - J30	
08/09/15 07:35:33	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 07:35:33	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 07:35:33	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 07:35:58	SIG	M62/1999A1	50R	M62 J25 - J30	
08/09/15 07:35:58	SIG	M62/1999A2	50R	M62 J25 - J30	
08/09/15 07:35:58	SIG	M62/1999A3	50R	M62 J25 - J30	
08/09/15 07:35:58	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 07:35:58	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 07:35:58	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1974A1	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1974A2	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1974A3	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1974A4	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1979K1	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1979K2	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1981A1	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1981A2	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1981A3	60R	M62 J25 - J30	
08/09/15 07:36:03	SIG	M62/1981A4	60R	M62 J25 - J30	
08/09/15 07:36:07	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 07:36:07	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 07:36:07	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 07:36:12	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:36:12	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 07:36:12	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 07:36:12	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 07:36:13	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 07:36:37	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 07:36:37	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 07:36:37	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 07:36:37	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1999A1	40R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1999A2	40R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1999A3	40R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 07:36:47	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 07:37:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:37:20	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:37:25	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2183B1	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2183B2	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2183L1	60R	M62 J25 - J30	
08/09/15 07:37:27	SIG	M62/2183L2	60R	M62 J25 - J30	
08/09/15 07:37:47	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 07:37:47	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 07:37:47	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 07:37:47	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2197B1	60R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2197B2	60R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2197B3	60R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2199M1	60R	M62 J25 - J30	
08/09/15 07:37:59	SIG	M62/2199M2	60R	M62 J25 - J30	
08/09/15 07:38:10	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 07:38:10	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 07:38:10	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 07:38:10	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2189B1	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2189B2	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2189B3	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2189B4	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 07:38:16	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 07:38:37	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 07:38:45	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 07:38:45	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 07:38:45	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 07:38:45	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 07:38:56	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 07:38:57	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:39:02	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 07:39:11	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 07:39:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:39:13	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:39:18	SIG	M62/1956A1	60R	M62 J25 - J30	
08/09/15 07:39:18	SIG	M62/1956A2	60R	M62 J25 - J30	
08/09/15 07:39:18	SIG	M62/1956A3	60R	M62 J25 - J30	
08/09/15 07:39:18	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:39:25	SIG	M62/2203B1	60R	M62 J25 - J30	
08/09/15 07:39:25	SIG	M62/2203B2	60R	M62 J25 - J30	
08/09/15 07:39:25	SIG	M62/2203B3	60R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 07:39:29	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 07:40:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:40:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:41:00	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 07:41:06	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 07:41:10	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2189B1	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2189B2	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2189B3	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M62/2189B4	50R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 07:41:16	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2189B1	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2189B2	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2189B3	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2189B4	40R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 07:41:22	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 07:41:50	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 07:41:50	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 07:41:50	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 07:41:50	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 07:41:55	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 07:41:55	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 07:41:55	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 07:41:55	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 07:42:00	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 07:42:01	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:42:06	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 07:42:07	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 07:42:14	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 07:42:14	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 07:42:14	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 07:42:14	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 07:43:32	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:43:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:43:38	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:44:05	SIG	M62/1960A1	50R	M62 J25 - J30	
08/09/15 07:44:05	SIG	M62/1960A2	50R	M62 J25 - J30	
08/09/15 07:44:05	SIG	M62/1960A3	50R	M62 J25 - J30	
08/09/15 07:44:05	SIG	M62/1960K1	50R	M62 J25 - J30	
08/09/15 07:44:05	SIG	M62/1960K2	50R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 07:44:06	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1955K1	50R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1955K2	50R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1956A1	50R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1956A2	50R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1956A3	50R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1960A1	40R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1960A2	40R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1960A3	40R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1960K1	40R	M62 J25 - J30	
08/09/15 07:44:10	SIG	M62/1960K2	40R	M62 J25 - J30	
08/09/15 07:44:47	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:44:47	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 07:44:47	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 07:44:47	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 07:44:48	SIG	M62/1956A1	40R	M62 J25 - J30	
08/09/15 07:44:48	SIG	M62/1956A2	40R	M62 J25 - J30	
08/09/15 07:44:48	SIG	M62/1956A3	40R	M62 J25 - J30	
08/09/15 07:45:00	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 07:45:00	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 07:45:00	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 07:45:00	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 07:45:10	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 07:45:10	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1979K1	60R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1979K2	60R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1981A1	60R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1981A2	60R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1981A3	60R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1981A4	60R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 07:45:14	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2033A1	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 07:45:18	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 07:45:34	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 07:45:50	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 07:45:50	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 07:45:50	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 07:45:50	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2189B1	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2189B2	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2189B3	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2189B4	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 07:46:07	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 07:46:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:46:22	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 07:46:27	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2183B1	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2183B2	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2183L1	60R	M62 J25 - J30	
08/09/15 07:47:21	SIG	M62/2183L2	60R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1979K1	40R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1979K2	40R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1981A1	40R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1981A2	40R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1981A3	40R	M62 J25 - J30	
08/09/15 07:47:48	SIG	M62/1981A4	40R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1955K1	60R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1955K2	60R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1960A1	60R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1960A2	60R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1960A3	60R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1960K1	60R	M62 J25 - J30	
08/09/15 07:48:04	SIG	M62/1960K2	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2033B1	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2033B2	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2033B3	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2033B4	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 07:48:05	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 07:48:10	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:48:10	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 07:48:16	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:48:47	SIG	M62/1956A1	60R	M62 J25 - J30	
08/09/15 07:48:47	SIG	M62/1956A2	60R	M62 J25 - J30	
08/09/15 07:48:47	SIG	M62/1956A3	60R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1968A1	50R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1968A2	50R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1968A3	50R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1968A4	50R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1974A1	40R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1974A2	40R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1974A3	40R	M62 J25 - J30	
08/09/15 07:49:18	SIG	M62/1974A4	40R	M62 J25 - J30	
08/09/15 07:49:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:49:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:49:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:49:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:50:07	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 07:50:07	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 07:50:07	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 07:50:07	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 07:50:07	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 07:50:07	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 07:50:13	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 07:50:14	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 07:50:19	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 07:50:19	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 07:50:19	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 07:50:19	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 07:50:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:50:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:50:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:50:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 07:51:24	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 07:51:24	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 07:51:24	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 07:51:24	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 07:51:24	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1960A1	50R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1960A2	50R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1960A3	50R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1960K1	50R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1960K2	50R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1968A1	40R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1968A2	40R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1968A3	40R	M62 J25 - J30	
08/09/15 07:51:28	SIG	M62/1968A4	40R	M62 J25 - J30	
08/09/15 07:51:33	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 07:51:33	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 07:51:33	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1955K1	50R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1955K2	50R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1956A1	50R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1956A2	50R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1956A3	50R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1960A1	40R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1960A2	40R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1960A3	40R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1960K1	40R	M62 J25 - J30	
08/09/15 07:51:42	SIG	M62/1960K2	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1955K1	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1955K2	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1956A1	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1956A2	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1956A3	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1960A1	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1960A2	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1960A3	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1960K1	40R	M62 J25 - J30	
08/09/15 07:51:48	SIG	M62/1960K2	40R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:52:02	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 07:52:08	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 07:52:15	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 07:52:15	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 07:52:15	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 07:52:15	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2065A2	60R	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2065A3	60R	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2065A4	60R	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2073K1	60R	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2079A2	NR	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2079A3	NR	M62 J25 - J30	
08/09/15 07:52:58	SIG	M62/2079A4	NR	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2079A2	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2079A3	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2079A4	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2088A2	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2088A3	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2088A4	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2097A1	REDX	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2097A2	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2097A3	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2097A4	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2106A1	REDX	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2106A2	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2106A3	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2106A4	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2114A1	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2114A2	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2114A3	60R	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2117A1	REDX	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2117A2	NR	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2117A3	NR	M62 J25 - J30	
08/09/15 07:52:59	SIG	M62/2117A4	NR	M62 J25 - J30	
08/09/15 07:53:16	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 07:53:17	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 07:53:20	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 07:54:42	SIG	M62/2106A1	60R	M62 J25 - J30	
08/09/15 07:55:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:55:03	SIG	M62/2097A1	60R	M62 J25 - J30	
08/09/15 07:55:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:55:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:55:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 07:55:30	SIG	M62/2088A1	60R	M62 J25 - J30	
08/09/15 07:55:37	SIG	M62/2079A1	60R	M62 J25 - J30	
08/09/15 07:55:49	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 07:55:49	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2033A1	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2041A1	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2041A3	40R	M62 J25 - J30	
08/09/15 07:55:52	SIG	M62/2041A4	40R	M62 J25 - J30	
08/09/15 07:55:57	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 07:55:57	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 07:56:02	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 07:56:02	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 07:56:02	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 07:56:02	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 07:56:30	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 07:56:35	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2183B1	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2183B2	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2183L1	60R	M62 J25 - J30	
08/09/15 07:56:40	SIG	M62/2183L2	60R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1999A1	50R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1999A2	50R	M62 J25 - J30	
08/09/15 07:56:45	SIG	M62/1999A3	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 07:57:32	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 07:57:40	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 07:57:43	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 07:57:43	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 07:57:43	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 07:57:43	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 07:57:45	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 07:57:52	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 07:57:52	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 07:57:52	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 07:57:52	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 07:58:25	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 07:58:25	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 07:58:25	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 07:58:54	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 07:58:54	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 07:58:54	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 07:58:54	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 07:58:58	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 07:58:58	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2189B1	50R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2189B2	50R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2189B3	50R	M62 J25 - J30	
08/09/15 07:59:12	SIG	M62/2189B4	50R	M62 J25 - J30	
08/09/15 07:59:24	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 07:59:25	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 07:59:30	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 07:59:36	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 07:59:36	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 07:59:36	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 07:59:36	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 07:59:36	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 08:01:11	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 08:01:11	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 08:01:11	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 08:02:05	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 08:02:05	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 08:02:05	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 08:02:05	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 08:02:05	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 08:02:05	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 08:02:09	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:02:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:02:15	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:02:29	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:02:30	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:02:35	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:03:07	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 08:03:07	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 08:03:07	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 08:03:07	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 08:03:18	SIG	M62/1999A1	40R	M62 J25 - J30	
08/09/15 08:03:18	SIG	M62/1999A2	40R	M62 J25 - J30	
08/09/15 08:03:18	SIG	M62/1999A3	40R	M62 J25 - J30	
08/09/15 08:03:18	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 08:03:18	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 08:03:46	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 08:03:46	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 08:03:46	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 08:03:46	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 08:04:03	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 08:04:09	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 08:04:23	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 08:04:51	SIG	M62/1968A1	50R	M62 J25 - J30	
08/09/15 08:04:51	SIG	M62/1968A2	50R	M62 J25 - J30	
08/09/15 08:04:51	SIG	M62/1968A3	50R	M62 J25 - J30	
08/09/15 08:04:51	SIG	M62/1968A4	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 08:05:05	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 08:05:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:05:16	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:05:21	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:05:33	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:05:33	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2189B1	40R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2189B2	40R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2189B3	40R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2189B4	40R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 08:05:35	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 08:05:39	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:06:02	SIG	M62/1979K1	40R	M62 J25 - J30	
08/09/15 08:06:02	SIG	M62/1979K2	40R	M62 J25 - J30	
08/09/15 08:06:02	SIG	M62/1981A1	40R	M62 J25 - J30	
08/09/15 08:06:02	SIG	M62/1981A2	40R	M62 J25 - J30	
08/09/15 08:06:02	SIG	M62/1981A3	40R	M62 J25 - J30	
08/09/15 08:06:02	SIG	M62/1981A4	40R	M62 J25 - J30	
08/09/15 08:06:55	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 08:06:55	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 08:06:55	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 08:06:55	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1955K1	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1955K2	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1960A1	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1960A2	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1960A3	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1960K1	50R	M62 J25 - J30	
08/09/15 08:06:57	SIG	M62/1960K2	50R	M62 J25 - J30	
08/09/15 08:06:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 08:07:21	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 08:07:21	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 08:07:21	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 08:07:21	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 08:07:57	SIG	M62/1974A1	40R	M62 J25 - J30	
08/09/15 08:07:57	SIG	M62/1974A2	40R	M62 J25 - J30	
08/09/15 08:07:57	SIG	M62/1974A3	40R	M62 J25 - J30	
08/09/15 08:07:57	SIG	M62/1974A4	40R	M62 J25 - J30	
08/09/15 08:08:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:08:22	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:08:27	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:08:36	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 08:08:36	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 08:08:37	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:08:38	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:08:43	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:08:45	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 08:08:45	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 08:08:45	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 08:08:45	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 08:08:52	SIG	M62/1956A1	50R	M62 J25 - J30	
08/09/15 08:08:52	SIG	M62/1956A2	50R	M62 J25 - J30	
08/09/15 08:08:52	SIG	M62/1956A3	50R	M62 J25 - J30	
08/09/15 08:08:58	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:08:58	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 08:08:58	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 08:08:58	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 08:09:13	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 08:09:13	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 08:09:18	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 08:09:18	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 08:09:48	SIG	M62/2183B1	60R	M62 J25 - J30	
08/09/15 08:09:48	SIG	M62/2183B2	60R	M62 J25 - J30	
08/09/15 08:09:48	SIG	M62/2183L1	60R	M62 J25 - J30	
08/09/15 08:09:48	SIG	M62/2183L2	60R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 08:10:00	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2183B1	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2183L1	40R	M62 J25 - J30	
08/09/15 08:10:06	SIG	M62/2183L2	40R	M62 J25 - J30	
08/09/15 08:10:13	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 08:10:13	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 08:10:13	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 08:10:13	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 08:10:18	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 08:10:18	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 08:10:18	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 08:10:18	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 08:10:26	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 08:10:26	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 08:10:26	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 08:10:26	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 08:10:28	SIG	M62/2041A1	40R	M62 J25 - J30	
08/09/15 08:10:28	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 08:10:28	SIG	M62/2041A3	40R	M62 J25 - J30	
08/09/15 08:10:28	SIG	M62/2041A4	40R	M62 J25 - J30	
08/09/15 08:10:37	SIG	M62/2033A1	40R	M62 J25 - J30	
08/09/15 08:10:37	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 08:10:37	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 08:10:37	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2189B1	50R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2189B2	50R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2189B3	50R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2189B4	50R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 08:11:36	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 08:11:50	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:11:50	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 08:12:02	SIG	M62/1968A1	40R	M62 J25 - J30	
08/09/15 08:12:02	SIG	M62/1968A2	40R	M62 J25 - J30	
08/09/15 08:12:02	SIG	M62/1968A3	40R	M62 J25 - J30	
08/09/15 08:12:02	SIG	M62/1968A4	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 08:12:27	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 08:12:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:12:30	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 08:12:32	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 08:12:35	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2189B1	40R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2189B2	40R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2189B3	40R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2189B4	40R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 08:13:10	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 08:13:42	SIG	M62/1960A1	40R	M62 J25 - J30	
08/09/15 08:13:42	SIG	M62/1960A2	40R	M62 J25 - J30	
08/09/15 08:13:42	SIG	M62/1960A3	40R	M62 J25 - J30	
08/09/15 08:13:42	SIG	M62/1960K1	40R	M62 J25 - J30	
08/09/15 08:13:42	SIG	M62/1960K2	40R	M62 J25 - J30	
08/09/15 08:14:13	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 08:14:13	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 08:14:13	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 08:14:13	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 08:14:13	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 08:14:13	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 08:14:28	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 08:14:28	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 08:14:28	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 08:14:28	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 08:14:50	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:14:51	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:14:56	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:15:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2194B1	40R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2194B2	40R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2194B3	40R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2194B4	40R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2197B1	50R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2197B2	50R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2197B3	50R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2199M1	50R	M62 J25 - J30	
08/09/15 08:15:36	SIG	M62/2199M2	50R	M62 J25 - J30	
08/09/15 08:15:37	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:15:42	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:15:47	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 08:15:47	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 08:15:47	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 08:15:47	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 08:15:55	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 08:15:55	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 08:16:02	SIG	M62/1955K1	40R	M62 J25 - J30	
08/09/15 08:16:02	SIG	M62/1955K2	40R	M62 J25 - J30	
08/09/15 08:16:02	SIG	M62/1956A1	40R	M62 J25 - J30	
08/09/15 08:16:02	SIG	M62/1956A2	40R	M62 J25 - J30	
08/09/15 08:16:02	SIG	M62/1956A3	40R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 08:16:05	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 08:16:23	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 08:16:23	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 08:16:23	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 08:16:23	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1974A1	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1974A2	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1974A3	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1974A4	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1979K1	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1979K2	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1981A1	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1981A2	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1981A3	40R	M62 J25 - J30	
08/09/15 08:16:42	SIG	M62/1981A4	40R	M62 J25 - J30	
08/09/15 08:16:48	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 08:16:48	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 08:16:48	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 08:16:48	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 08:16:53	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 08:16:53	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 08:16:53	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 08:16:53	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1999A1	50R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1999A2	50R	M62 J25 - J30	
08/09/15 08:17:11	SIG	M62/1999A3	50R	M62 J25 - J30	
08/09/15 08:17:18	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 08:17:18	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 08:17:18	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 08:17:20	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 08:17:20	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 08:17:20	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 08:17:27	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 08:17:27	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 08:17:27	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 08:17:27	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 08:17:50	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:17:51	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:17:56	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:18:06	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 08:18:06	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 08:18:06	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 08:18:06	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 08:18:06	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 08:18:06	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 08:18:11	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2197B1	40R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2197B2	40R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2197B3	40R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2199M1	40R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2199M2	40R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2203B1	50R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2203B2	50R	M62 J25 - J30	
08/09/15 08:18:38	SIG	M62/2203B3	50R	M62 J25 - J30	
08/09/15 08:18:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2197B1	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2197B2	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2197B3	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2199M1	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2199M2	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2203B1	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2203B2	40R	M62 J25 - J30	
08/09/15 08:18:44	SIG	M62/2203B3	40R	M62 J25 - J30	
08/09/15 08:18:49	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1999A1	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1999A2	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1999A3	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 08:19:46	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 08:19:56	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2041A1	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2041A3	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2041A4	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 08:20:23	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 08:20:28	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 08:20:28	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 08:20:28	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 08:20:28	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 08:20:54	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:20:55	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:21:00	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 08:21:22	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 08:21:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:21:50	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:21:55	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:22:06	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 08:22:06	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2065B2	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2065B3	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2065B4	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2065M1	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2074B2	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2074B3	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2074B4	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2081B1	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2081B2	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2081B3	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M62/2081L1	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M621/1002B1	50R	M62 J25 - J30	
08/09/15 08:22:08	SIG	M621/1002B2	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1955K1	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1955K2	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1960A1	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1960A2	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1960A3	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1960K1	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1960K2	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1968A1	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1968A2	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1968A3	50R	M62 J25 - J30	
08/09/15 08:22:14	SIG	M62/1968A4	50R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2197B1	50R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2197B2	50R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2197B3	50R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2199M1	50R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2199M2	50R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2203B1	60R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2203B2	60R	M62 J25 - J30	
08/09/15 08:22:57	SIG	M62/2203B3	60R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 08:23:33	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 08:23:52	SIG	M62/1956A1	50R	M62 J25 - J30	
08/09/15 08:23:52	SIG	M62/1956A2	50R	M62 J25 - J30	
08/09/15 08:23:52	SIG	M62/1956A3	50R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2189B1	50R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2189B2	50R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2189B3	50R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2189B4	50R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2197B1	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2197B2	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2197B3	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2199M1	60R	M62 J25 - J30	
08/09/15 08:23:56	SIG	M62/2199M2	60R	M62 J25 - J30	
08/09/15 08:23:59	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:23:59	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:24:05	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 08:24:23	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 08:25:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:25:02	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:25:07	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:26:22	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 08:26:22	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 08:26:22	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 08:26:22	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 08:26:27	SIG	M62/1979K1	40R	M62 J25 - J30	
08/09/15 08:26:27	SIG	M62/1979K2	40R	M62 J25 - J30	
08/09/15 08:26:27	SIG	M62/1981A1	40R	M62 J25 - J30	
08/09/15 08:26:27	SIG	M62/1981A2	40R	M62 J25 - J30	
08/09/15 08:26:27	SIG	M62/1981A3	40R	M62 J25 - J30	
08/09/15 08:26:27	SIG	M62/1981A4	40R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 08:26:39	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 08:27:03	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:27:04	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:27:09	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:27:12	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 08:27:12	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 08:27:12	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 08:27:12	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 08:27:18	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 08:27:18	SIG	M62/2177B2	40R	M62 J25 - J30	
08/09/15 08:27:18	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 08:27:18	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 08:27:28	SIG	M62/2170B1	50R	M62 J25 - J30	
08/09/15 08:27:28	SIG	M62/2170B2	50R	M62 J25 - J30	
08/09/15 08:27:28	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 08:27:28	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 08:27:34	SIG	M62/2170B1	40R	M62 J25 - J30	
08/09/15 08:27:34	SIG	M62/2170B2	40R	M62 J25 - J30	
08/09/15 08:27:34	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 08:27:34	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 08:27:59	SIG	M62/2194B1	50R	M62 J25 - J30	
08/09/15 08:27:59	SIG	M62/2194B2	50R	M62 J25 - J30	
08/09/15 08:27:59	SIG	M62/2194B3	50R	M62 J25 - J30	
08/09/15 08:27:59	SIG	M62/2194B4	50R	M62 J25 - J30	
08/09/15 08:28:02	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:28:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:28:08	SIG	M62/2183B2	40R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2065B2	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2065B3	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2065B4	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2065M1	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2074B2	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2074B3	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2074B4	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2081B1	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2081B2	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2081B3	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M62/2081L1	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M621/1002B1	60R	M62 J25 - J30	
08/09/15 08:28:09	SIG	M621/1002B2	60R	M62 J25 - J30	
08/09/15 08:28:20	SIG	M62/1974A1	40R	M62 J25 - J30	
08/09/15 08:28:20	SIG	M62/1974A2	40R	M62 J25 - J30	
08/09/15 08:28:20	SIG	M62/1974A3	40R	M62 J25 - J30	
08/09/15 08:28:20	SIG	M62/1974A4	40R	M62 J25 - J30	
08/09/15 08:28:28	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 08:28:28	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 08:28:28	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 08:28:28	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 08:28:28	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 08:28:28	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 08:28:33	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 08:29:49	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 08:29:49	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 08:29:49	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 08:29:49	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 08:30:07	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:30:08	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:30:13	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/1968A1	40R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/1968A2	40R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/1968A3	40R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/1968A4	40R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 08:30:14	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 08:30:35	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 08:30:35	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 08:30:35	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 08:30:35	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 08:31:03	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2170B1	60R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2170B2	60R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2177B1	60R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2177B2	60R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2177L1	60R	M62 J25 - J30	
08/09/15 08:31:27	SIG	M62/2177L2	60R	M62 J25 - J30	
08/09/15 08:32:06	SIG	M62/2033A1	40R	M62 J25 - J30	
08/09/15 08:32:06	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 08:32:06	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 08:32:06	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 08:32:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:32:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:32:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:32:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 08:32:27	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 08:32:27	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 08:32:52	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 08:33:11	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:33:12	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:33:18	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2183B1	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2183B2	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2183L1	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2183L2	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2189B1	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2189B2	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2189B3	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2189B4	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2194B1	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2194B2	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2194B3	60R	M62 J25 - J30	
08/09/15 08:33:59	SIG	M62/2194B4	60R	M62 J25 - J30	
08/09/15 08:34:49	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 08:34:49	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2163A1	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2163A2	50R	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 08:36:07	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2163A1	40R	M62 J25 - J30	
08/09/15 08:36:13	SIG	M62/2163A2	40R	M62 J25 - J30	
08/09/15 08:36:15	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:36:16	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:36:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:36:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 08:36:21	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 08:36:51	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 08:36:56	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1999A1	50R	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1999A2	50R	M62 J25 - J30	
08/09/15 08:37:08	SIG	M62/1999A3	50R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1999A1	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1999A2	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1999A3	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1999J1	40R	M62 J25 - J30	
08/09/15 08:37:30	SIG	M62/1999J2	40R	M62 J25 - J30	
08/09/15 08:37:49	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 08:37:49	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 08:37:49	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 08:37:49	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2163A1	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2163A2	50R	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 08:38:32	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2163A1	40R	M62 J25 - J30	
08/09/15 08:38:37	SIG	M62/2163A2	40R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1968A1	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1968A2	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1968A3	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1968A4	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 08:38:39	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 08:38:44	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:38:44	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 08:38:44	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 08:38:44	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 08:39:06	SIG	M62/1968A1	40R	M62 J25 - J30	
08/09/15 08:39:06	SIG	M62/1968A2	40R	M62 J25 - J30	
08/09/15 08:39:06	SIG	M62/1968A3	40R	M62 J25 - J30	
08/09/15 08:39:06	SIG	M62/1968A4	40R	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 08:39:26	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1987A1	40R	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1987A3	40R	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1987J1	40R	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 08:39:35	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 08:40:18	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 08:40:18	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 08:40:18	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 08:40:18	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 08:40:18	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2033A1	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2163A1	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2163A2	50R	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 08:40:45	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2163A1	40R	M62 J25 - J30	
08/09/15 08:40:51	SIG	M62/2163A2	40R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1979K1	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1979K2	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1981A1	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1981A2	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1981A3	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1981A4	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1987A1	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1987A3	50R	M62 J25 - J30	
08/09/15 08:40:57	SIG	M62/1987J1	50R	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 08:42:32	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 08:43:06	SIG	M62/1974A1	50R	M62 J25 - J30	
08/09/15 08:43:06	SIG	M62/1974A2	50R	M62 J25 - J30	
08/09/15 08:43:06	SIG	M62/1974A3	50R	M62 J25 - J30	
08/09/15 08:43:06	SIG	M62/1974A4	50R	M62 J25 - J30	
08/09/15 08:43:25	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 08:43:25	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 08:43:25	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 08:43:25	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 08:43:27	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:43:27	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:43:33	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:44:10	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 08:44:10	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 08:44:10	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 08:44:10	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 08:44:10	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 08:44:10	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M621/1002A1	40R	M62 J25 - J30	
08/09/15 08:44:16	SIG	M621/1002A2	40R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 08:44:18	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 08:44:44	SIG	M62/1968A1	50R	M62 J25 - J30	
08/09/15 08:44:44	SIG	M62/1968A2	50R	M62 J25 - J30	
08/09/15 08:44:44	SIG	M62/1968A3	50R	M62 J25 - J30	
08/09/15 08:44:44	SIG	M62/1968A4	50R	M62 J25 - J30	
08/09/15 08:45:27	SIG	M62/1992A1	40R	M62 J25 - J30	
08/09/15 08:45:27	SIG	M62/1992A2	40R	M62 J25 - J30	
08/09/15 08:45:27	SIG	M62/1992A3	40R	M62 J25 - J30	
08/09/15 08:45:27	SIG	M62/1992J1	40R	M62 J25 - J30	
08/09/15 08:45:59	SIG	M62/2159B1	NR	M62 J25 - J30	
08/09/15 08:45:59	SIG	M62/2159B2	NR	M62 J25 - J30	
08/09/15 08:45:59	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 08:45:59	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 08:45:59	SIG	M62/2170L1	OFF	M62 J25 - J30	
08/09/15 08:45:59	SIG	M62/2170L2	OFF	M62 J25 - J30	
08/09/15 08:46:31	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:46:31	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:46:37	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:46:52	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 08:46:52	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 08:46:52	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 08:47:38	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:47:38	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 08:47:38	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 08:47:38	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 08:48:09	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 08:48:09	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 08:48:59	SIG	M62/2159B1	OFF	M62 J25 - J30	
08/09/15 08:48:59	SIG	M62/2159B2	OFF	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2018A1	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2018A2	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2018A3	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2018A4	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2025A1	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2025A2	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2025A3	40R	M62 J25 - J30	
08/09/15 08:49:16	SIG	M62/2025A4	40R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1999A1	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1999A2	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1999A3	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 08:49:26	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2025A1	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 08:49:50	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 08:49:57	SIG	M62/2008K1	40R	M62 J25 - J30	
08/09/15 08:49:57	SIG	M62/2008K2	40R	M62 J25 - J30	
08/09/15 08:49:57	SIG	M62/2012A1	40R	M62 J25 - J30	
08/09/15 08:49:57	SIG	M62/2012A2	40R	M62 J25 - J30	
08/09/15 08:49:57	SIG	M62/2012A3	40R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1955K1	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1955K2	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1956A1	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1956A2	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1956A3	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1960A1	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1960A2	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1960A3	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1960K1	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1960K2	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1968A1	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1968A2	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1968A3	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1968A4	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1974A1	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1974A2	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1974A3	60R	M62 J25 - J30	
08/09/15 08:49:59	SIG	M62/1974A4	60R	M62 J25 - J30	
08/09/15 08:51:09	SIG	M62/2004A1	40R	M62 J25 - J30	
08/09/15 08:51:09	SIG	M62/2004A2	40R	M62 J25 - J30	
08/09/15 08:51:09	SIG	M62/2004A3	40R	M62 J25 - J30	
08/09/15 08:51:59	SIG	M62/1979K1	60R	M62 J25 - J30	
08/09/15 08:51:59	SIG	M62/1979K2	60R	M62 J25 - J30	
08/09/15 08:51:59	SIG	M62/1981A1	60R	M62 J25 - J30	
08/09/15 08:51:59	SIG	M62/1981A2	60R	M62 J25 - J30	
08/09/15 08:51:59	SIG	M62/1981A3	60R	M62 J25 - J30	
08/09/15 08:51:59	SIG	M62/1981A4	60R	M62 J25 - J30	
08/09/15 08:52:50	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 08:52:50	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 08:53:57	SIG	M62/2018A1	50R	M62 J25 - J30	
08/09/15 08:53:57	SIG	M62/2018A2	50R	M62 J25 - J30	
08/09/15 08:53:57	SIG	M62/2018A3	50R	M62 J25 - J30	
08/09/15 08:53:57	SIG	M62/2018A4	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2004A1	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2004A2	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2004A3	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2012A1	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2012A2	50R	M62 J25 - J30	
08/09/15 08:55:09	SIG	M62/2012A3	50R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1987A1	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1987A3	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1987J1	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1992A1	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1992A2	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1992A3	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1992J1	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1999A1	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1999A2	60R	M62 J25 - J30	
08/09/15 08:56:09	SIG	M62/1999A3	60R	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2177B1	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2177B2	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2177L1	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2177L2	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2183B1	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2183B2	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2183L1	NR	M62 J25 - J30	
08/09/15 08:59:00	SIG	M62/2183L2	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2183B1	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2183B2	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2183L1	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2183L2	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2189B1	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2189B2	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2189B3	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2189B4	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2194B1	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2194B2	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2194B3	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2194B4	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2197B1	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2197B2	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2197B3	NR	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2199M1	OFF	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2199M2	OFF	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2203B1	OFF	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2203B2	OFF	M62 J25 - J30	
08/09/15 08:59:59	SIG	M62/2203B3	OFF	M62 J25 - J30	
08/09/15 09:00:00	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 09:00:00	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2004A1	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2004A2	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2004A3	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2018A1	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2018A2	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2018A3	60R	M62 J25 - J30	
08/09/15 09:00:00	SIG	M62/2018A4	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2025A1	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2025A2	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2025A3	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2025A4	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2033A1	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2033A2	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2033A3	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2033A4	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2041A1	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2041A2	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2041A3	60R	M62 J25 - J30	
08/09/15 09:00:59	SIG	M62/2041A4	60R	M62 J25 - J30	
08/09/15 09:02:00	SIG	M62/2170B1	OFF	M62 J25 - J30	
08/09/15 09:02:00	SIG	M62/2170B2	OFF	M62 J25 - J30	
08/09/15 09:02:00	SIG	M62/2177B1	OFF	M62 J25 - J30	
08/09/15 09:02:00	SIG	M62/2177B2	OFF	M62 J25 - J30	
08/09/15 09:02:00	SIG	M62/2177L1	OFF	M62 J25 - J30	
08/09/15 09:02:00	SIG	M62/2177L2	OFF	M62 J25 - J30	
08/09/15 09:02:59	SIG	M62/2194B1	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M606/2003B1	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M606/2003B2	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2183B1	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2183L1	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2183L2	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2189B1	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2189B2	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2189B3	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2189B4	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2194B2	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2194B3	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2194B4	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2197B1	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2197B2	OFF	M62 J25 - J30	
08/09/15 09:03:00	SIG	M62/2197B3	OFF	M62 J25 - J30	
08/09/15 09:03:57	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 09:03:57	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 09:16:57	SIG	M62/2079A1	HSD	M62 J25 - J30	
08/09/15 09:18:05	SIG	M62/2088A1	HSD	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1955K1	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1955K2	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1956A1	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1956A2	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1956A3	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1960A1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1960A2	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1960A3	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1960K1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1960K2	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1968A1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1968A2	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1968A3	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1968A4	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1974A1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1974A2	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1974A3	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1974A4	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1979K1	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1979K2	OFF	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1981A1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1981A2	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1981A3	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1981A4	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1987A1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1987A3	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1987J1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1992A1	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1992A2	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1992A3	NR	M62 J25 - J30	
08/09/15 09:18:18	SIG	M62/1992J1	NR	M62 J25 - J30	
08/09/15 09:19:13	SIG	M62/2097A1	HSD	M62 J25 - J30	
08/09/15 09:19:23	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 09:20:21	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 09:20:21	SIG	M62/2106A1	HSD	M62 J25 - J30	
08/09/15 09:21:18	SIG	M62/1960A1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1960A2	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1960A3	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1960K1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1960K2	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1968A1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1968A2	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1968A3	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1968A4	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1974A1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1974A2	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1974A3	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1974A4	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1981A1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1981A2	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1981A3	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1981A4	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1987A1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1987A3	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1987J1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1992A1	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1992A2	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1992A3	OFF	M62 J25 - J30	
08/09/15 09:21:28	SIG	M62/1992J1	OFF	M62 J25 - J30	
08/09/15 09:21:29	SIG	M62/2097A1	REDX	M62 J25 - J30	
08/09/15 09:21:59	SIG	M62/2004A1	OFF	M62 J25 - J30	
08/09/15 09:21:59	SIG	M62/2004A2	OFF	M62 J25 - J30	
08/09/15 09:21:59	SIG	M62/2004A3	OFF	M62 J25 - J30	
08/09/15 09:22:00	SIG	M62/1999A1	OFF	M62 J25 - J30	
08/09/15 09:22:00	SIG	M62/1999A2	OFF	M62 J25 - J30	
08/09/15 09:22:00	SIG	M62/1999A3	OFF	M62 J25 - J30	
08/09/15 09:22:00	SIG	M62/1999J1	OFF	M62 J25 - J30	
08/09/15 09:22:00	SIG	M62/1999J2	OFF	M62 J25 - J30	
08/09/15 09:22:37	SIG	M62/2106A1	REDX	M62 J25 - J30	
08/09/15 09:23:37	SIG	M62/2065A2	NR	M62 J25 - J30	
08/09/15 09:23:37	SIG	M62/2065A3	NR	M62 J25 - J30	
08/09/15 09:23:37	SIG	M62/2065A4	NR	M62 J25 - J30	
08/09/15 09:23:47	SIG	M62/2073K1	NR	M62 J25 - J30	
08/09/15 09:23:47	SIG	M62/2079A2	NR	M62 J25 - J30	
08/09/15 09:23:47	SIG	M62/2079A3	NR	M62 J25 - J30	
08/09/15 09:23:47	SIG	M62/2079A4	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2088A2	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2088A3	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2088A4	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2097A2	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2097A3	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2097A4	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2106A2	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2106A3	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2106A4	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2114A1	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2114A2	NR	M62 J25 - J30	
08/09/15 09:23:48	SIG	M62/2114A3	NR	M62 J25 - J30	
08/09/15 09:24:47	SIG	M62/2073K1	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2079A1	BLNK	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2079A2	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2079A3	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2079A4	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2088A1	BLNK	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2088A2	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2088A3	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2088A4	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2097A1	BLNK	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2097A2	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2097A3	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2097A4	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2106A1	BLNK	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2106A2	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2106A4	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2114A1	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2114A2	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2114A3	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2117A1	BLNK	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2117A2	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2117A3	OFF	M62 J25 - J30	
08/09/15 09:24:48	SIG	M62/2117A4	OFF	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A2	60R	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A2	60R	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A3	60R	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A3	60R	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A4	60R	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2079A4	60R	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A2	NR	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A2	NR	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A3	NR	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A3	NR	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A4	NR	M62 J25 - J30	
08/09/15 09:26:23	SIG	M62/2088A4	NR	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2079A1	BLNK	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2079A2	OFF	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2079A3	OFF	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2079A4	OFF	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2088A2	NR	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2088A3	NR	M62 J25 - J30	
08/09/15 09:27:00	SIG	M62/2088A4	NR	M62 J25 - J30	
08/09/15 09:30:00	SIG	M62/2088A2	OFF	M62 J25 - J30	
08/09/15 09:30:01	SIG	M62/2088A1	BLNK	M62 J25 - J30	
08/09/15 09:30:01	SIG	M62/2088A3	OFF	M62 J25 - J30	
08/09/15 09:30:01	SIG	M62/2088A4	OFF	M62 J25 - J30	
08/09/15 09:53:39	SIG	M62/2113B1	HSD	M62 J25 - J30	
08/09/15 09:54:32	SIG	M62/2106B1	HSD	M62 J25 - J30	
08/09/15 09:55:40	SIG	M62/2097B1	HSD	M62 J25 - J30	
08/09/15 09:55:40	SIG	M62/2113B1	REDX	M62 J25 - J30	
08/09/15 09:56:48	SIG	M62/2088B1	HSD	M62 J25 - J30	
08/09/15 09:56:48	SIG	M62/2106B1	REDX	M62 J25 - J30	
08/09/15 09:57:56	SIG	M62/2097B1	REDX	M62 J25 - J30	
08/09/15 09:59:04	SIG	M62/2088B1	REDX	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2097B2	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2097B3	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2097B4	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2106B2	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2106B3	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2106B4	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2113B2	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2113B3	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2113B4	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2117B1	NR	M62 J25 - J30	
08/09/15 09:59:57	SIG	M62/2117B3	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2074B2	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2074B3	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2074B4	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2081B1	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2081B2	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2081B3	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2081L1	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2088B2	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2088B3	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2088B4	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2120M1	NR	M62 J25 - J30	
08/09/15 09:59:58	SIG	M62/2120M2	NR	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2106B1	BLNK	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2106B2	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2106B3	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2106B4	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2113B1	BLNK	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2113B2	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2113B3	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2113B4	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2117B1	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2117B3	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2120M1	OFF	M62 J25 - J30	
08/09/15 10:00:57	SIG	M62/2120M2	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2074B1	BLNK	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2074B2	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2074B3	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2074B4	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2081B1	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2081B2	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2081B3	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2081L1	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2088B1	BLNK	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2088B2	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2088B3	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2088B4	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2097B1	BLNK	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2097B2	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2097B3	OFF	M62 J25 - J30	
08/09/15 10:00:58	SIG	M62/2097B4	OFF	M62 J25 - J30	
08/09/15 10:03:00	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 10:22:39	SIG	M62/2057B1	HSD	M62 J25 - J30	
08/09/15 10:24:38	SIG	M62/2041B1	HSD	M62 J25 - J30	
08/09/15 10:24:38	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 10:24:38	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 10:24:39	SIG	M62/2057B1	REDX	M62 J25 - J30	
08/09/15 10:24:39	SIG	M621/1002B1	HSD	M62 J25 - J30	
08/09/15 10:25:38	SIG	M62/2033B1	HSD	M62 J25 - J30	
08/09/15 10:26:39	SIG	M62/2025B1	HSD	M62 J25 - J30	
08/09/15 10:26:39	SIG	M62/2041B1	REDX	M62 J25 - J30	
08/09/15 10:27:31	SIG	M62/2033B1	REDX	M62 J25 - J30	
08/09/15 10:28:15	SIG	M62/2025B1	REDX	M62 J25 - J30	
08/09/15 10:28:45	SIG	M62/2057B2	NR	M62 J25 - J30	
08/09/15 10:28:45	SIG	M62/2057B3	NR	M62 J25 - J30	
08/09/15 10:28:45	SIG	M62/2057B4	NR	M62 J25 - J30	
08/09/15 10:28:45	SIG	M62/2065B2	NR	M62 J25 - J30	
08/09/15 10:28:45	SIG	M62/2065B3	NR	M62 J25 - J30	
08/09/15 10:28:45	SIG	M62/2065B4	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2018B1	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2018B2	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2018B3	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2018L1	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2025B2	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2025B3	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2025B4	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2033B2	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2033B3	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2033B4	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2041B2	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2041B3	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2041B4	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2050B2	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2050B3	NR	M62 J25 - J30	
08/09/15 10:28:46	SIG	M62/2050B4	NR	M62 J25 - J30	
08/09/15 10:29:45	SIG	M62/2069M1	OFF	M62 J25 - J30	
08/09/15 10:29:45	SIG	M62/2069M2	OFF	M62 J25 - J30	
08/09/15 10:29:45	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 10:29:45	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2012B1	BLNK	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2012B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2012B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2012B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2018B1	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2018B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2018B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2018L1	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2025B1	BLNK	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2025B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2025B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2025B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2033B1	BLNK	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2033B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2033B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2041B1	BLNK	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2041B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2041B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2041B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2050B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2050B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2050B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2057B1	BLNK	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2057B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2057B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2057B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2065B1	BLNK	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2065B2	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2065B3	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2065B4	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M62/2065M1	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M621/1002B1	OFF	M62 J25 - J30	
08/09/15 10:29:46	SIG	M621/1002B2	OFF	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2163A1	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2163A2	50R	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 11:11:16	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2163A1	40R	M62 J25 - J30	
08/09/15 11:11:22	SIG	M62/2163A2	40R	M62 J25 - J30	
08/09/15 11:14:18	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 11:14:19	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 11:14:25	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 11:14:44	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 11:21:00	SIG	M62/2025A1	HSD	M62 J25 - J30	
08/09/15 11:22:00	SIG	M62/2033A1	HSD	M62 J25 - J30	
08/09/15 11:23:00	SIG	M62/2041A1	HSD	M62 J25 - J30	
08/09/15 11:23:01	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 11:23:01	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 11:24:07	SIG	M62/2033A1	REDX	M62 J25 - J30	
08/09/15 11:24:07	SIG	M62/2050A1	HSD	M62 J25 - J30	
08/09/15 11:24:59	SIG	M62/2041A1	REDX	M62 J25 - J30	
08/09/15 11:25:59	SIG	M62/2050A1	REDX	M62 J25 - J30	
08/09/15 11:26:59	SIG	M62/2025A2	NR	M62 J25 - J30	
08/09/15 11:26:59	SIG	M62/2025A3	NR	M62 J25 - J30	
08/09/15 11:26:59	SIG	M62/2025A4	NR	M62 J25 - J30	
08/09/15 11:26:59	SIG	M62/2033A2	NR	M62 J25 - J30	
08/09/15 11:26:59	SIG	M62/2033A3	NR	M62 J25 - J30	
08/09/15 11:26:59	SIG	M62/2033A4	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2041A2	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2041A3	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2041A4	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2050A2	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2050A3	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2050A4	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2057A1	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2057A2	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2057A3	NR	M62 J25 - J30	
08/09/15 11:27:00	SIG	M62/2057J1	NR	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2008K1	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2008K2	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2012A1	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2012A2	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2012A3	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2018A1	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2018A2	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2018A3	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2018A4	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2025A1	BLNK	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2025A2	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2025A3	OFF	M62 J25 - J30	
08/09/15 11:28:00	SIG	M62/2025A4	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2033A1	BLNK	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2033A2	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2033A3	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2033A4	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2041A1	BLNK	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2041A2	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2041A3	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2041A4	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2050A1	BLNK	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2050A2	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2050A3	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2050A4	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2057A1	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2057A2	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2057A3	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2057J1	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2065A1	BLNK	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2065A2	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2065A3	OFF	M62 J25 - J30	
08/09/15 11:28:01	SIG	M62/2065A4	OFF	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2157A2	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2157J1	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2157J2	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2157K1	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2163A1	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2163A2	50R	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 11:34:21	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2155A1	50R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2155A2	50R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2155J1	50R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2155K1	50R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2157A2	40R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2157J1	40R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2157J2	40R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2157K1	40R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2163A1	40R	M62 J25 - J30	
08/09/15 11:34:27	SIG	M62/2163A2	40R	M62 J25 - J30	
08/09/15 11:36:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 11:36:48	SIG	M62/2157A1	50R	M62 J25 - J30	
08/09/15 11:36:53	SIG	M62/2157A1	40R	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2155A1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2155A2	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2155J1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2155K1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2157A2	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2157J1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2157J2	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2157K1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 11:38:21	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 14:34:40	SIG	M62/2065M1	NR	M62 J25 - J30	
08/09/15 14:34:40	SIG	M62/2069M1	60R	M62 J25 - J30	
08/09/15 14:34:40	SIG	M62/2069M2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2012B1	REDX	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2012B2	NR	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2012B3	NR	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2012B4	NR	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2025B1	REDX	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B1	REDX	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B2	NR	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B3	NR	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B4	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2033B4	NR	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2041B1	REDX	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2050B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2050B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2050B4	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2057B1	REDX	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2057B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2057B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2057B4	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2065B1	REDX	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2065B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2065B3	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2065B4	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M62/2065M1	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M621/1002B1	HSD	M62 J25 - J30	
08/09/15 14:34:41	SIG	M621/1002B2	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 14:34:41	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 14:36:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 14:36:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 14:36:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 14:36:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 14:37:18	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 14:37:43	SIG	M62/2033B1	60R	M62 J25 - J30	
08/09/15 14:38:06	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 14:38:39	SIG	M62/2057B1	60R	M62 J25 - J30	
08/09/15 14:38:39	SIG	M621/1002B1	60R	M62 J25 - J30	
08/09/15 14:38:39	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 14:38:39	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2018A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2018A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2018A4	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A2	NR	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A3	NR	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A4	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2025A4	NR	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2033A1	REDX	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2033A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2033A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2033A4	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2041A1	REDX	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2041A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2041A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2041A4	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2050A1	REDX	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2065A1	REDX	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2065A2	NR	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2065A3	NR	M62 J25 - J30	
08/09/15 14:59:54	SIG	M62/2065A4	NR	M62 J25 - J30	
08/09/15 15:00:54	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 15:01:17	SIG	M62/2041A1	60R	M62 J25 - J30	
08/09/15 15:01:43	SIG	M62/2033A1	60R	M62 J25 - J30	
08/09/15 15:01:48	SIG	M62/2018A1	60R	M62 J25 - J30	
08/09/15 15:01:48	SIG	M62/2025A1	60R	M62 J25 - J30	
08/09/15 15:04:02	SIG	M62/2025A1	???	M62 J25 - J30	
08/09/15 15:04:03	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 15:07:02	SIG	M606/2003B1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M606/2003B2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992A1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992A2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992A3	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992B1	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992B2	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992B3	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992B4	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1992J1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1999A1	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1999A2	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1999A3	NR	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1999J1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/1999J2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2005M1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2005M2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2008K1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2008K2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2065M1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2069M1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M62/2069M2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M621/1002A1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M621/1002A2	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M621/1002B1	50R	M62 J25 - J30	
08/09/15 15:07:02	SIG	M621/1002B2	50R	M62 J25 - J30	
08/09/15 15:07:12	SIG	M62/2073K1	50R	M62 J25 - J30	
08/09/15 15:07:12	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 15:07:12	SIG	M62/2079A2	NR	M62 J25 - J30	
08/09/15 15:07:12	SIG	M62/2079A3	NR	M62 J25 - J30	
08/09/15 15:07:12	SIG	M62/2079A4	NR	M62 J25 - J30	
08/09/15 15:07:12	SIG	M621/1010B1	50R	M62 J25 - J30	
08/09/15 15:07:12	SIG	M621/1010B2	50R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 15:19:56	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2005M1	OFF	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2005M2	OFF	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2065M1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2069M1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M62/2069M2	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M621/1002A1	OFF	M62 J25 - J30	
08/09/15 15:19:56	SIG	M621/1002A2	OFF	M62 J25 - J30	
08/09/15 15:19:56	SIG	M621/1002B1	60R	M62 J25 - J30	
08/09/15 15:19:56	SIG	M621/1002B2	60R	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992A1	OFF	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992A2	OFF	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992A3	OFF	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992B1	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992B2	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992B3	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992B4	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1992J1	OFF	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1999A1	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1999A2	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1999A3	NR	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1999J1	OFF	M62 J25 - J30	
08/09/15 15:19:57	SIG	M62/1999J2	OFF	M62 J25 - J30	
08/09/15 15:20:12	SIG	M62/2073K1	OFF	M62 J25 - J30	
08/09/15 15:20:12	SIG	M62/2079A1	BLNK	M62 J25 - J30	
08/09/15 15:20:12	SIG	M62/2079A2	OFF	M62 J25 - J30	
08/09/15 15:20:12	SIG	M62/2079A3	OFF	M62 J25 - J30	
08/09/15 15:20:12	SIG	M62/2079A4	OFF	M62 J25 - J30	
08/09/15 15:20:12	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 15:20:12	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 15:22:57	SIG	M606/2003B1	OFF	M62 J25 - J30	
08/09/15 15:22:57	SIG	M606/2003B2	OFF	M62 J25 - J30	
08/09/15 15:22:57	SIG	M62/1999A1	OFF	M62 J25 - J30	
08/09/15 15:22:58	SIG	M62/1992B1	OFF	M62 J25 - J30	
08/09/15 15:22:58	SIG	M62/1992B2	OFF	M62 J25 - J30	
08/09/15 15:22:58	SIG	M62/1992B3	OFF	M62 J25 - J30	
08/09/15 15:22:58	SIG	M62/1992B4	OFF	M62 J25 - J30	
08/09/15 15:22:58	SIG	M62/1999A2	OFF	M62 J25 - J30	
08/09/15 15:22:58	SIG	M62/1999A3	OFF	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 16:05:53	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 16:05:59	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 16:08:50	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:08:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:08:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2033B1	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2033B2	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2033B3	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2033B4	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 16:09:54	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 16:12:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:12:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:12:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:12:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:18:07	SIG	M62/2074B1	REDX	M62 J25 - J30	
08/09/15 16:18:07	SIG	M62/2074B2	60R	M62 J25 - J30	
08/09/15 16:18:07	SIG	M62/2074B3	60R	M62 J25 - J30	
08/09/15 16:18:07	SIG	M62/2074B4	60R	M62 J25 - J30	
08/09/15 16:18:07	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 16:18:07	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 16:23:07	SIG	M62/2081B1	60R	M62 J25 - J30	
08/09/15 16:23:07	SIG	M62/2081B2	60R	M62 J25 - J30	
08/09/15 16:23:07	SIG	M62/2081B3	60R	M62 J25 - J30	
08/09/15 16:23:07	SIG	M62/2081L1	60R	M62 J25 - J30	
08/09/15 16:23:17	SIG	M62/2025B1	50R	M62 J25 - J30	
08/09/15 16:23:17	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 16:23:17	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 16:23:17	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2025B1	40R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2025B2	40R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2025B3	40R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2025B4	40R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:23:22	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2065B2	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2065B3	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2065B4	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2065M1	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2069M1	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2069M2	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2074B2	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2074B3	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M62/2074B4	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M621/1002B1	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M621/1002B2	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M621/1010B1	50R	M62 J25 - J30	
08/09/15 16:23:35	SIG	M621/1010B2	50R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2065B2	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2065B3	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2065B4	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2065M1	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2069M1	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2069M2	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2074B2	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2074B3	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2074B4	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2081B1	50R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2081B2	50R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2081B3	50R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M62/2081L1	50R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M621/1002B1	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M621/1002B2	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M621/1010B1	40R	M62 J25 - J30	
08/09/15 16:23:40	SIG	M621/1010B2	40R	M62 J25 - J30	
08/09/15 16:24:40	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 16:24:40	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 16:24:40	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 16:24:40	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 16:24:45	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 16:24:45	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 16:24:45	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 16:24:45	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 16:26:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:26:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:26:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:26:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:26:27	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 16:26:27	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 16:26:27	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 16:26:32	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 16:27:34	SIG	M62/2065B2	60R	M62 J25 - J30	
08/09/15 16:27:34	SIG	M62/2065B3	60R	M62 J25 - J30	
08/09/15 16:27:34	SIG	M62/2065B4	60R	M62 J25 - J30	
08/09/15 16:27:34	SIG	M62/2069M1	50R	M62 J25 - J30	
08/09/15 16:27:34	SIG	M62/2069M2	50R	M62 J25 - J30	
08/09/15 16:27:35	SIG	M621/1010B1	50R	M62 J25 - J30	
08/09/15 16:27:35	SIG	M621/1010B2	50R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M62/2065M1	60R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M62/2069M1	60R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M62/2069M2	60R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M621/1002B1	60R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M621/1002B2	60R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 16:27:39	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 16:29:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:29:10	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:29:15	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:29:22	SIG	M62/2113B1	REDX	M62 J25 - J30	
08/09/15 16:29:22	SIG	M62/2113B2	NR	M62 J25 - J30	
08/09/15 16:29:22	SIG	M62/2113B3	NR	M62 J25 - J30	
08/09/15 16:29:22	SIG	M62/2113B4	NR	M62 J25 - J30	
08/09/15 16:29:22	SIG	M62/2120M1	60R	M62 J25 - J30	
08/09/15 16:29:22	SIG	M62/2120M2	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2088B1	REDX	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2088B2	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2088B3	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2088B4	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2097B1	REDX	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2097B2	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2097B3	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2097B4	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2106B1	REDX	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2106B2	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2106B3	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2106B4	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2113B2	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2113B3	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2113B4	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2117B1	60R	M62 J25 - J30	
08/09/15 16:29:23	SIG	M62/2117B3	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2074B2	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2074B3	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2074B4	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2081B1	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2081B2	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2081B3	60R	M62 J25 - J30	
08/09/15 16:29:57	SIG	M62/2081L1	60R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2065B2	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2065B3	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2065B4	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2065M1	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2069M1	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2069M2	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2074B2	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2074B3	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M62/2074B4	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M621/1002B1	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M621/1002B2	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M621/1010B1	50R	M62 J25 - J30	
08/09/15 16:30:40	SIG	M621/1010B2	50R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2074B2	40R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2074B3	40R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2074B4	40R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2081B1	50R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2081B2	50R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2081B3	50R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M62/2081L1	50R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M621/1010B1	40R	M62 J25 - J30	
08/09/15 16:30:45	SIG	M621/1010B2	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2065B2	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2065B3	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2065B4	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2065M1	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2069M1	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2069M2	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M62/2088B1	60R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M621/1002B1	40R	M62 J25 - J30	
08/09/15 16:30:46	SIG	M621/1002B2	40R	M62 J25 - J30	
08/09/15 16:31:06	SIG	M62/2097B1	60R	M62 J25 - J30	
08/09/15 16:31:40	SIG	M62/2106B1	60R	M62 J25 - J30	
08/09/15 16:31:47	SIG	M62/2113B1	60R	M62 J25 - J30	
08/09/15 16:32:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:32:14	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:32:19	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:33:06	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 16:33:06	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 16:33:06	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 16:33:06	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 16:33:47	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 16:33:47	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 16:33:47	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 16:33:47	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 16:35:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:35:17	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:35:23	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:36:15	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 16:36:15	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 16:36:15	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 16:36:15	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2033B1	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2033B2	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2033B3	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2033B4	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 16:38:01	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2025B1	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 16:39:18	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2025B1	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2025B2	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2025B3	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2025B4	40R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:39:23	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2033B1	40R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2033B2	40R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2033B4	40R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 16:41:23	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 16:42:27	SIG	M62/2065A2	60R	M62 J25 - J30	
08/09/15 16:42:27	SIG	M62/2065A3	60R	M62 J25 - J30	
08/09/15 16:42:27	SIG	M62/2065A4	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2073K1	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A2	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A2	NR	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A3	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A3	NR	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A4	NR	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2079A4	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2088A2	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2088A3	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2088A4	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2097A1	REDX	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2097A2	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2097A3	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2097A4	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2106A1	REDX	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2106A2	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2106A3	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2106A4	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2114A1	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2114A2	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2114A3	60R	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2117A1	REDX	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2117A2	NR	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2117A3	NR	M62 J25 - J30	
08/09/15 16:42:37	SIG	M62/2117A4	NR	M62 J25 - J30	
08/09/15 16:43:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:43:28	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:43:33	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:43:41	SIG	M62/2106A1	60R	M62 J25 - J30	
08/09/15 16:44:02	SIG	M62/2097A1	60R	M62 J25 - J30	
08/09/15 16:44:27	SIG	M62/2088A1	60R	M62 J25 - J30	
08/09/15 16:44:33	SIG	M62/2079A1	60R	M62 J25 - J30	
08/09/15 16:46:31	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:46:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:46:37	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2170A1	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2170A2	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2170K1	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2170K2	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A2	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A3	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2177A4	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2183A1	REDX	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2183A2	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2183A3	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2183A4	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2189A1	REDX	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2189A2	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2189A3	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2189A4	60R	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2197A1	NR	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2197A2	NR	M62 J25 - J30	
08/09/15 16:47:29	SIG	M62/2197A3	NR	M62 J25 - J30	
08/09/15 16:48:15	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 16:48:15	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 16:48:15	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 16:48:15	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 16:48:44	SIG	M62/2189A1	60R	M62 J25 - J30	
08/09/15 16:48:49	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 16:48:49	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 16:48:49	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 16:48:49	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 16:48:51	SIG	M62/2025B1	50R	M62 J25 - J30	
08/09/15 16:48:51	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 16:48:51	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 16:48:51	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 16:48:56	SIG	M62/2025B1	40R	M62 J25 - J30	
08/09/15 16:48:56	SIG	M62/2025B2	40R	M62 J25 - J30	
08/09/15 16:48:56	SIG	M62/2025B3	40R	M62 J25 - J30	
08/09/15 16:48:56	SIG	M62/2025B4	40R	M62 J25 - J30	
08/09/15 16:49:03	SIG	M62/2183A1	60R	M62 J25 - J30	
08/09/15 16:49:07	SIG	M62/2177A1	60R	M62 J25 - J30	
08/09/15 16:49:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:49:35	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:49:41	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:50:08	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 16:50:08	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 16:50:08	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 16:50:08	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2081B1	40R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2081B2	40R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2081B3	40R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2081L1	40R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2088B1	50R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2088B2	50R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2088B3	50R	M62 J25 - J30	
08/09/15 16:50:13	SIG	M62/2088B4	50R	M62 J25 - J30	
08/09/15 16:50:14	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 16:50:14	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 16:50:14	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 16:50:14	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 16:52:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:52:39	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:52:44	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2081B1	50R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2081B2	50R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2081B3	50R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2081L1	50R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2088B1	60R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2088B2	60R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2088B3	60R	M62 J25 - J30	
08/09/15 16:54:14	SIG	M62/2088B4	60R	M62 J25 - J30	
08/09/15 16:55:49	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 16:55:49	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 16:55:49	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 16:55:49	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 16:55:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:55:50	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:55:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:56:47	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 16:56:47	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 16:56:47	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 16:56:47	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 16:56:53	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 16:56:53	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 16:56:53	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 16:56:53	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 16:57:57	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 16:57:57	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 16:57:57	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 16:57:57	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 16:58:02	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 16:58:02	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 16:58:02	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 16:58:02	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 16:58:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 16:58:51	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 16:58:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 16:59:07	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 16:59:12	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 17:01:08	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 17:01:08	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 17:01:08	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 17:01:08	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 17:01:39	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 17:01:39	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 17:01:39	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 17:01:39	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 17:01:44	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 17:01:44	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 17:01:44	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 17:01:44	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 17:01:50	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:01:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:01:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2050B2	60R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2050B3	60R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2050B4	60R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2057B1	60R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2057B2	60R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2057B3	60R	M62 J25 - J30	
08/09/15 17:01:57	SIG	M62/2057B4	60R	M62 J25 - J30	
08/09/15 17:04:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:04:54	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:04:59	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:06:35	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 17:06:35	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 17:06:35	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 17:06:35	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 17:06:57	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 17:06:57	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 17:06:57	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 17:06:57	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 17:07:03	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 17:07:03	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 17:07:03	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 17:07:03	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 17:07:57	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 17:07:57	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 17:07:57	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 17:07:57	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 17:07:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:07:58	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:08:04	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:09:06	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 17:09:06	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 17:09:06	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 17:09:06	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 17:10:08	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 17:10:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 17:10:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 17:10:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 17:10:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 17:10:46	SIG	M62/2106A3	60R	M62 J25 - J30	
08/09/15 17:10:46	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 17:11:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:11:02	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:11:07	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 17:12:48	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 17:14:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:14:06	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:14:12	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 17:16:48	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 17:17:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:17:10	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:17:16	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 17:17:28	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 17:20:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:20:14	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:20:19	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 17:21:28	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 17:23:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:23:18	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:23:23	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 17:26:03	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 17:26:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:26:22	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:26:27	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:29:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:29:26	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:29:32	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:32:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:32:30	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:32:35	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:35:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:35:33	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:35:39	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2081B1	40R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2081B2	40R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2081B3	40R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2081L1	40R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2088B1	50R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2088B2	50R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2088B3	50R	M62 J25 - J30	
08/09/15 17:37:46	SIG	M62/2088B4	50R	M62 J25 - J30	
08/09/15 17:37:53	SIG	M62/1968B1	50R	M62 J25 - J30	
08/09/15 17:37:53	SIG	M62/1968B2	50R	M62 J25 - J30	
08/09/15 17:37:53	SIG	M62/1968B3	50R	M62 J25 - J30	
08/09/15 17:37:53	SIG	M62/1968L1	50R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1960B1	NR	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1960B2	NR	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1960B3	NR	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1960L1	NR	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1960L2	NR	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1968B1	40R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1968B2	40R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1968B3	40R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1968L1	40R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1974B1	50R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1974B2	50R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1974B3	50R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1974B4	50R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1974M1	50R	M62 J25 - J30	
08/09/15 17:37:59	SIG	M62/1974M2	50R	M62 J25 - J30	
08/09/15 17:38:37	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:38:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:38:43	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:38:47	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 17:38:47	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 17:38:47	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 17:38:47	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 17:39:57	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 17:39:57	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 17:39:57	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 17:39:57	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 17:40:02	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 17:40:02	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 17:40:02	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 17:40:02	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2125B1	50R	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2125B2	50R	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2125B3	50R	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2125L1	NR	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2125L2	NR	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2132B1	50R	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2132B2	50R	M62 J25 - J30	
08/09/15 17:40:06	SIG	M62/2132B3	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2097B1	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2097B2	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2097B3	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2097B4	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2106B1	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2106B2	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2106B3	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2106B4	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2113B1	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2113B2	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2113B3	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2113B4	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2117B1	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2117B3	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2120M1	50R	M62 J25 - J30	
08/09/15 17:40:09	SIG	M62/2120M2	50R	M62 J25 - J30	
08/09/15 17:41:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:41:41	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:41:46	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:41:46	SIG	M62/2081B1	50R	M62 J25 - J30	
08/09/15 17:41:46	SIG	M62/2081B2	50R	M62 J25 - J30	
08/09/15 17:41:46	SIG	M62/2081B3	50R	M62 J25 - J30	
08/09/15 17:41:46	SIG	M62/2081L1	50R	M62 J25 - J30	
08/09/15 17:43:58	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 17:43:58	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 17:43:58	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 17:43:58	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 17:44:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:44:51	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:44:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:47:11	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 17:47:11	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 17:47:11	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 17:47:11	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 17:47:16	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 17:47:16	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 17:47:16	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 17:47:16	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 17:47:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:47:51	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:47:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1960B1	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1960B2	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1960B3	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1960L1	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1960L2	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1968B1	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1968B2	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1968B3	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1968L1	NR	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1974B1	OFF	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1974B2	OFF	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1974B3	OFF	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1974B4	OFF	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1974M1	OFF	M62 J25 - J30	
08/09/15 17:49:29	SIG	M62/1974M2	OFF	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 17:50:00	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1960B1	NR	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1960B2	NR	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1960B3	NR	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1960L1	NR	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1960L2	NR	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1968B1	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1968B2	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1968B3	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1968L1	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1974B1	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1974B2	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1974B3	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1974B4	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1974M1	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1974M2	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1981B1	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1981B2	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1981B3	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1981B4	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1987B1	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1987B2	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1987B3	60R	M62 J25 - J30	
08/09/15 17:50:09	SIG	M62/1987B4	60R	M62 J25 - J30	
08/09/15 17:50:32	SIG	M62/1968B1	50R	M62 J25 - J30	
08/09/15 17:50:32	SIG	M62/1968B2	50R	M62 J25 - J30	
08/09/15 17:50:32	SIG	M62/1968B3	50R	M62 J25 - J30	
08/09/15 17:50:32	SIG	M62/1968L1	50R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1968B1	40R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1968B2	40R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1968B3	40R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1968L1	40R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1974B1	50R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1974B2	50R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1974B3	50R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1974B4	50R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1974M1	50R	M62 J25 - J30	
08/09/15 17:50:38	SIG	M62/1974M2	50R	M62 J25 - J30	
08/09/15 17:50:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:50:53	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:50:58	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 17:51:18	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 17:53:56	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:53:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:54:02	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:54:03	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 17:54:03	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 17:54:03	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 17:54:03	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1968B1	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1968B2	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1968B3	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1968L1	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1974B1	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1974B2	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1974B3	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1974B4	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1974M1	60R	M62 J25 - J30	
08/09/15 17:54:33	SIG	M62/1974M2	60R	M62 J25 - J30	
08/09/15 17:55:35	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 17:55:35	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 17:55:35	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 17:55:35	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 17:55:40	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 17:55:40	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 17:55:40	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 17:55:40	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 17:57:00	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 17:57:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 17:57:06	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 17:57:57	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 17:58:07	SIG	M62/1968B1	50R	M62 J25 - J30	
08/09/15 17:58:07	SIG	M62/1968B2	50R	M62 J25 - J30	
08/09/15 17:58:07	SIG	M62/1968B3	50R	M62 J25 - J30	
08/09/15 17:58:07	SIG	M62/1968L1	50R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1968B1	40R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1968B2	40R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1968B3	40R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1968L1	40R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1974B1	50R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1974B2	50R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1974B3	50R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1974B4	50R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1974M1	50R	M62 J25 - J30	
08/09/15 17:58:13	SIG	M62/1974M2	50R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 17:58:40	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2057A1	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2057A2	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2057A3	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2057J1	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2065A2	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2065A3	50R	M62 J25 - J30	
08/09/15 17:59:17	SIG	M62/2065A4	50R	M62 J25 - J30	
08/09/15 17:59:35	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 17:59:35	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 17:59:35	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 17:59:35	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2088B1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2088B2	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2088B3	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2088B4	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2097B1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2097B2	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2097B3	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2097B4	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2106B1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2106B2	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2106B3	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2106B4	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2113B1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2113B2	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2113B3	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2113B4	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2117B1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2117B3	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2120M1	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2120M2	60R	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2125B1	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2125B2	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2125B3	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2125L1	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2125L2	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2132B1	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2132B2	OFF	M62 J25 - J30	
08/09/15 17:59:45	SIG	M62/2132B3	OFF	M62 J25 - J30	
08/09/15 18:00:04	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:00:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:00:10	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1968B1	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1968B2	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1968B3	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1968L1	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1974B1	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1974B2	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1974B3	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1974B4	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1974M1	60R	M62 J25 - J30	
08/09/15 18:02:06	SIG	M62/1974M2	60R	M62 J25 - J30	
08/09/15 18:03:08	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:03:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:03:14	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:03:26	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 18:03:26	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 18:03:26	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 18:03:26	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 18:03:31	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 18:03:31	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 18:03:31	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 18:03:31	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 18:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:06:12	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:06:17	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:06:41	SIG	M62/2065A2	60R	M62 J25 - J30	
08/09/15 18:06:41	SIG	M62/2065A3	60R	M62 J25 - J30	
08/09/15 18:06:41	SIG	M62/2065A4	60R	M62 J25 - J30	
08/09/15 18:06:42	SIG	M62/1968B1	50R	M62 J25 - J30	
08/09/15 18:06:42	SIG	M62/1968B2	50R	M62 J25 - J30	
08/09/15 18:06:42	SIG	M62/1968B3	50R	M62 J25 - J30	
08/09/15 18:06:42	SIG	M62/1968L1	50R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1968B1	40R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1968B2	40R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1968B3	40R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1968L1	40R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1974B1	50R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1974B2	50R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1974B3	50R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1974B4	50R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1974M1	50R	M62 J25 - J30	
08/09/15 18:06:47	SIG	M62/1974M2	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 18:07:14	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 18:07:26	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 18:07:26	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 18:07:26	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 18:07:26	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1981B1	NR	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1981B2	NR	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1981B3	NR	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1981B4	NR	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1987B1	OFF	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1987B2	OFF	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1987B3	OFF	M62 J25 - J30	
08/09/15 18:08:09	SIG	M62/1987B4	OFF	M62 J25 - J30	
08/09/15 18:08:19	SIG	M62/1960B1	60R	M62 J25 - J30	
08/09/15 18:08:19	SIG	M62/1960B2	60R	M62 J25 - J30	
08/09/15 18:08:19	SIG	M62/1960B3	60R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1974B1	40R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1974B2	40R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1974B3	40R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1974B4	40R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1974M1	40R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1974M2	40R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1981B1	50R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1981B2	50R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1981B3	50R	M62 J25 - J30	
08/09/15 18:08:37	SIG	M62/1981B4	50R	M62 J25 - J30	
08/09/15 18:09:16	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:09:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:09:22	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2050B2	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2050B3	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2050B4	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2057B1	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2057B2	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2057B3	40R	M62 J25 - J30	
08/09/15 18:09:34	SIG	M62/2057B4	40R	M62 J25 - J30	
08/09/15 18:10:56	SIG	M62/2113B1	HSD	M62 J25 - J30	
08/09/15 18:11:49	SIG	M62/2106B1	HSD	M62 J25 - J30	
08/09/15 18:12:08	SIG	M62/1981B2	50R	M62 J25 - J30	
08/09/15 18:12:08	SIG	M62/1981B2	OFF	M62 J25 - J30	
08/09/15 18:12:09	SIG	M606/2003B1	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M606/2003B2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1987B1	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1987B2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1987B3	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1987B4	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1992B1	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1992B2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1992B3	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1992B4	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1999B1	REDX	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1999B2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1999B3	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/1999B4	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2004B1	REDX	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2004B2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2004B3	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2004B4	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2005M1	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2005M2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2012B2	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2012B3	60R	M62 J25 - J30	
08/09/15 18:12:09	SIG	M62/2012B4	60R	M62 J25 - J30	
08/09/15 18:12:10	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 18:12:10	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 18:12:10	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 18:12:10	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 18:12:16	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 18:12:16	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 18:12:16	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 18:12:16	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 18:12:19	SIG	M62/1960B1	NR	M62 J25 - J30	
08/09/15 18:12:19	SIG	M62/1960B2	NR	M62 J25 - J30	
08/09/15 18:12:19	SIG	M62/1960B3	NR	M62 J25 - J30	
08/09/15 18:12:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:12:20	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:12:26	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:12:57	SIG	M62/2097B1	HSD	M62 J25 - J30	
08/09/15 18:12:57	SIG	M62/2113B1	REDX	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2050B2	50R	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2050B3	50R	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2050B4	50R	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2057B1	50R	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2057B2	50R	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2057B3	50R	M62 J25 - J30	
08/09/15 18:13:35	SIG	M62/2057B4	50R	M62 J25 - J30	
08/09/15 18:14:08	SIG	M62/2088B1	HSD	M62 J25 - J30	
08/09/15 18:14:08	SIG	M62/2106B1	REDX	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2069M1	50R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2069M2	50R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2074B2	50R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2074B3	50R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2074B4	50R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2081B1	60R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2081B2	60R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2081B3	60R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M62/2081L1	60R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M621/1010B1	50R	M62 J25 - J30	
08/09/15 18:14:11	SIG	M621/1010B2	50R	M62 J25 - J30	
08/09/15 18:14:16	SIG	M62/2065B2	50R	M62 J25 - J30	
08/09/15 18:14:16	SIG	M62/2065B3	50R	M62 J25 - J30	
08/09/15 18:14:16	SIG	M62/2065B4	50R	M62 J25 - J30	
08/09/15 18:15:13	SIG	M62/2097B1	REDX	M62 J25 - J30	
08/09/15 18:15:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:15:24	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:15:30	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:15:30	SIG	M62/2065M1	50R	M62 J25 - J30	
08/09/15 18:15:30	SIG	M621/1002B1	50R	M62 J25 - J30	
08/09/15 18:15:30	SIG	M621/1002B2	50R	M62 J25 - J30	
08/09/15 18:16:21	SIG	M62/2088B1	REDX	M62 J25 - J30	
08/09/15 18:17:04	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 18:17:04	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 18:17:04	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 18:17:04	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 18:17:09	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2113B2	NR	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2113B3	NR	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2113B4	NR	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2117B1	NR	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2117B3	NR	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2120M1	NR	M62 J25 - J30	
08/09/15 18:17:14	SIG	M62/2120M2	NR	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2113B1	BLNK	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2113B2	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2113B3	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2113B4	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2117B3	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2120M1	OFF	M62 J25 - J30	
08/09/15 18:18:28	SIG	M62/2120M2	OFF	M62 J25 - J30	
08/09/15 18:18:29	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:18:34	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:18:52	SIG	M62/2050A1	40R	M62 J25 - J30	
08/09/15 18:18:52	SIG	M62/2050A2	40R	M62 J25 - J30	
08/09/15 18:18:52	SIG	M62/2050A3	40R	M62 J25 - J30	
08/09/15 18:18:52	SIG	M62/2050A4	40R	M62 J25 - J30	
08/09/15 18:19:31	SIG	M62/2057A1	40R	M62 J25 - J30	
08/09/15 18:19:31	SIG	M62/2057A2	40R	M62 J25 - J30	
08/09/15 18:19:31	SIG	M62/2057A3	40R	M62 J25 - J30	
08/09/15 18:19:31	SIG	M62/2057J1	40R	M62 J25 - J30	
08/09/15 18:19:50	SIG	M62/1968B1	60R	M62 J25 - J30	
08/09/15 18:19:50	SIG	M62/1968B2	60R	M62 J25 - J30	
08/09/15 18:19:50	SIG	M62/1968B3	60R	M62 J25 - J30	
08/09/15 18:19:50	SIG	M62/1968L1	60R	M62 J25 - J30	
08/09/15 18:20:36	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 18:20:36	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 18:20:36	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 18:20:36	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2033A1	50R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2041A1	40R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2041A2	40R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2041A3	40R	M62 J25 - J30	
08/09/15 18:20:41	SIG	M62/2041A4	40R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1974B1	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1974B2	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1974B3	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1974B4	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1974M1	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1974M2	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1981B1	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1981B2	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1981B3	60R	M62 J25 - J30	
08/09/15 18:20:56	SIG	M62/1981B4	60R	M62 J25 - J30	
08/09/15 18:21:09	SIG	M62/2074B2	60R	M62 J25 - J30	
08/09/15 18:21:09	SIG	M62/2074B3	60R	M62 J25 - J30	
08/09/15 18:21:09	SIG	M62/2074B4	60R	M62 J25 - J30	
08/09/15 18:21:09	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 18:21:09	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M62/2065B2	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M62/2065B3	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M62/2065B4	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M62/2065M1	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M62/2069M1	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M62/2069M2	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M621/1002B1	60R	M62 J25 - J30	
08/09/15 18:21:10	SIG	M621/1002B2	60R	M62 J25 - J30	
08/09/15 18:21:22	SIG	M62/2018B1	50R	M62 J25 - J30	
08/09/15 18:21:22	SIG	M62/2018B2	50R	M62 J25 - J30	
08/09/15 18:21:22	SIG	M62/2018B3	50R	M62 J25 - J30	
08/09/15 18:21:22	SIG	M62/2018L1	50R	M62 J25 - J30	
08/09/15 18:21:28	SIG	M62/2018B1	40R	M62 J25 - J30	
08/09/15 18:21:28	SIG	M62/2018B2	40R	M62 J25 - J30	
08/09/15 18:21:28	SIG	M62/2018B3	40R	M62 J25 - J30	
08/09/15 18:21:28	SIG	M62/2018L1	40R	M62 J25 - J30	
08/09/15 18:21:32	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:21:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:21:33	SIG	M62/2177A1	HSD	M62 J25 - J30	
08/09/15 18:21:38	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:22:18	SIG	M62/2183A1	HSD	M62 J25 - J30	
08/09/15 18:23:00	SIG	M62/1968B1	50R	M62 J25 - J30	
08/09/15 18:23:00	SIG	M62/1968B2	50R	M62 J25 - J30	
08/09/15 18:23:00	SIG	M62/1968B3	50R	M62 J25 - J30	
08/09/15 18:23:00	SIG	M62/1968L1	50R	M62 J25 - J30	
08/09/15 18:23:03	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 18:23:03	SIG	M62/2189A1	HSD	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1968B1	40R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1968B2	40R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1968B3	40R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1968L1	40R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1974B1	50R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1974B2	50R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1974B3	50R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1974B4	50R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1974M1	50R	M62 J25 - J30	
08/09/15 18:23:06	SIG	M62/1974M2	50R	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2088B2	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2088B3	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2088B4	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2097B2	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2097B3	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2097B4	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2106B2	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2106B3	NR	M62 J25 - J30	
08/09/15 18:23:10	SIG	M62/2106B4	NR	M62 J25 - J30	
08/09/15 18:23:37	SIG	M62/2057A1	60R	M62 J25 - J30	
08/09/15 18:23:37	SIG	M62/2057A2	60R	M62 J25 - J30	
08/09/15 18:23:37	SIG	M62/2057A3	60R	M62 J25 - J30	
08/09/15 18:23:37	SIG	M62/2057J1	60R	M62 J25 - J30	
08/09/15 18:23:59	SIG	M62/1960B1	60R	M62 J25 - J30	
08/09/15 18:23:59	SIG	M62/1960B2	60R	M62 J25 - J30	
08/09/15 18:23:59	SIG	M62/1960B3	60R	M62 J25 - J30	
08/09/15 18:24:02	SIG	M62/2183A1	REDX	M62 J25 - J30	
08/09/15 18:24:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:24:36	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:24:42	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:25:02	SIG	M62/2189A1	REDX	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2170A1	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2170A2	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2170K1	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2170K2	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2177A2	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2177A3	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2177A4	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2183A2	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2183A3	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2183A4	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2189A2	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2189A3	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2189A4	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2197A1	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2197A2	NR	M62 J25 - J30	
08/09/15 18:25:03	SIG	M62/2197A3	NR	M62 J25 - J30	
08/09/15 18:25:23	SIG	M62/2018B1	60R	M62 J25 - J30	
08/09/15 18:25:23	SIG	M62/2018B2	60R	M62 J25 - J30	
08/09/15 18:25:23	SIG	M62/2018B3	60R	M62 J25 - J30	
08/09/15 18:25:23	SIG	M62/2018L1	60R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2041A1	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2041A2	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2041A3	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2041A4	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2050A1	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2050A2	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2050A3	50R	M62 J25 - J30	
08/09/15 18:25:29	SIG	M62/2050A4	50R	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2170K1	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2170K2	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2183A1	BLNK	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2183A2	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2183A3	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2183A4	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2189A1	BLNK	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2189A2	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2189A3	OFF	M62 J25 - J30	
08/09/15 18:26:03	SIG	M62/2189A4	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2088B2	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2088B3	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2088B4	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2097B2	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2097B3	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2097B4	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2106B2	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2106B3	OFF	M62 J25 - J30	
08/09/15 18:26:10	SIG	M62/2106B4	OFF	M62 J25 - J30	
08/09/15 18:26:11	SIG	M62/2088B1	BLNK	M62 J25 - J30	
08/09/15 18:26:11	SIG	M62/2088B1	BLNK	M62 J25 - J30	
08/09/15 18:26:11	SIG	M62/2097B1	BLNK	M62 J25 - J30	
08/09/15 18:26:11	SIG	M62/2106B1	BLNK	M62 J25 - J30	
08/09/15 18:26:11	SIG	M62/2106B1	BLNK	M62 J25 - J30	
08/09/15 18:26:13	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 18:26:13	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 18:26:13	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 18:26:13	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1968B1	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1968B2	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1968B3	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1968L1	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1974B1	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1974B2	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1974B3	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1974B4	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1974M1	60R	M62 J25 - J30	
08/09/15 18:27:01	SIG	M62/1974M2	60R	M62 J25 - J30	
08/09/15 18:27:26	SIG	M62/2041B1	40R	M62 J25 - J30	
08/09/15 18:27:26	SIG	M62/2041B2	40R	M62 J25 - J30	
08/09/15 18:27:26	SIG	M62/2041B3	40R	M62 J25 - J30	
08/09/15 18:27:26	SIG	M62/2041B4	40R	M62 J25 - J30	
08/09/15 18:27:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:27:40	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:27:45	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:27:51	SIG	M62/2025B1	60R	M62 J25 - J30	
08/09/15 18:27:51	SIG	M62/2025B2	60R	M62 J25 - J30	
08/09/15 18:27:51	SIG	M62/2025B3	60R	M62 J25 - J30	
08/09/15 18:27:51	SIG	M62/2025B4	60R	M62 J25 - J30	
08/09/15 18:28:04	SIG	M62/2197A1	OFF	M62 J25 - J30	
08/09/15 18:28:04	SIG	M62/2197A2	OFF	M62 J25 - J30	
08/09/15 18:28:04	SIG	M62/2197A3	OFF	M62 J25 - J30	
08/09/15 18:29:23	SIG	M62/1960B1	NR	M62 J25 - J30	
08/09/15 18:29:23	SIG	M62/1960B2	NR	M62 J25 - J30	
08/09/15 18:29:23	SIG	M62/1960B3	NR	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2033A1	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2033A2	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2033A3	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2033A4	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2041A1	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2041A2	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2041A3	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2041A4	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2050A2	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2050A3	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2050A4	60R	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2081B1	OFF	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2081B2	OFF	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2081B3	OFF	M62 J25 - J30	
08/09/15 18:30:10	SIG	M62/2081L1	OFF	M62 J25 - J30	
08/09/15 18:30:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:30:51	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:30:56	SIG	M62/2033B3	40R	M62 J25 - J30	
08/09/15 18:31:10	SIG	M62/2057B1	60R	M62 J25 - J30	
08/09/15 18:31:10	SIG	M62/2057B2	60R	M62 J25 - J30	
08/09/15 18:31:10	SIG	M62/2057B3	60R	M62 J25 - J30	
08/09/15 18:31:10	SIG	M62/2057B4	60R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2033B1	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2041B1	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 18:31:26	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 18:32:00	SIG	M62/2050A1	60R	M62 J25 - J30	
08/09/15 18:32:00	SIG	M62/2050A1	OFF	M62 J25 - J30	
08/09/15 18:33:07	SIG	M62/1960B1	60R	M62 J25 - J30	
08/09/15 18:33:07	SIG	M62/1960B2	60R	M62 J25 - J30	
08/09/15 18:33:07	SIG	M62/1960B3	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2033B1	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2033B2	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2033B3	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2033B4	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2041B1	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2050B2	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2050B3	60R	M62 J25 - J30	
08/09/15 18:33:10	SIG	M62/2050B4	60R	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1960B1	OFF	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1960B2	OFF	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1960B3	OFF	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1960L1	OFF	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1960L2	OFF	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1968B1	NR	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1968B2	NR	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1968B3	NR	M62 J25 - J30	
08/09/15 18:34:10	SIG	M62/1968L1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
08/09/15 18:35:10	SIG	M606/2003B2	OFF	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1968B1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1968B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1968B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1968L1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1974B1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1974B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1974B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1974B4	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1974M1	OFF	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1974M2	OFF	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1981B1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1981B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1981B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1981B4	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1987B1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1987B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1987B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1987B4	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1992B1	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1992B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1992B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1992B4	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1999B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1999B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/1999B4	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2004B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2004B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2004B4	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2005M1	OFF	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2005M2	OFF	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2012B2	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2012B3	NR	M62 J25 - J30	
08/09/15 18:35:10	SIG	M62/2012B4	NR	M62 J25 - J30	
08/09/15 18:35:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:35:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:35:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:35:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:36:25	SIG	M62/2079A1	HSD	M62 J25 - J30	
08/09/15 18:37:32	SIG	M62/2088A1	HSD	M62 J25 - J30	
08/09/15 18:38:10	SIG	M62/2004B2	OFF	M62 J25 - J30	
08/09/15 18:38:10	SIG	M62/2074B1	BLNK	M62 J25 - J30	
08/09/15 18:38:10	SIG	M62/2074B2	OFF	M62 J25 - J30	
08/09/15 18:38:10	SIG	M62/2074B3	OFF	M62 J25 - J30	
08/09/15 18:38:10	SIG	M62/2074B4	OFF	M62 J25 - J30	
08/09/15 18:38:10	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 18:38:10	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1968B1	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1968B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1968B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1968L1	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1974B1	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1974B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1974B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1974B4	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1981B1	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1981B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1981B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1981B4	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1987B1	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1987B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1987B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1987B4	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1992B1	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1992B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1992B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1992B4	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1999B1	BLNK	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1999B2	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1999B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/1999B4	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/2004B1	BLNK	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/2004B3	OFF	M62 J25 - J30	
08/09/15 18:38:11	SIG	M62/2004B4	OFF	M62 J25 - J30	
08/09/15 18:38:41	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 18:38:41	SIG	M62/2097A1	HSD	M62 J25 - J30	
08/09/15 18:39:49	SIG	M62/2088A1	REDX	M62 J25 - J30	
08/09/15 18:39:49	SIG	M62/2106A1	HSD	M62 J25 - J30	
08/09/15 18:40:57	SIG	M62/2097A1	REDX	M62 J25 - J30	
08/09/15 18:42:07	SIG	M62/2106A1	REDX	M62 J25 - J30	
08/09/15 18:42:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
08/09/15 18:43:05	SIG	M62/2065A2	NR	M62 J25 - J30	
08/09/15 18:43:05	SIG	M62/2065A3	NR	M62 J25 - J30	
08/09/15 18:43:05	SIG	M62/2065A4	NR	M62 J25 - J30	
08/09/15 18:43:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2073K1	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2079A2	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2079A3	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2079A4	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2088A2	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2088A3	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2088A4	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2097A2	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2097A3	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2097A4	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2106A2	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2106A3	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2106A4	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2114A1	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2114A2	NR	M62 J25 - J30	
08/09/15 18:43:17	SIG	M62/2114A3	NR	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2073K1	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2079A1	BLNK	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2079A2	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2079A3	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2079A4	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2088A1	BLNK	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2088A2	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2088A3	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2088A4	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2097A1	BLNK	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2097A2	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2097A3	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2097A4	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2106A1	BLNK	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2106A2	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2106A3	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2106A4	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2114A1	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2114A2	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2114A3	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2117A1	BLNK	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2117A2	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2117A3	OFF	M62 J25 - J30	
08/09/15 18:44:15	SIG	M62/2117A4	OFF	M62 J25 - J30	
08/09/15 18:48:04	SIG	M62/2025A1	HSD	M62 J25 - J30	
08/09/15 18:49:04	SIG	M62/2033A1	HSD	M62 J25 - J30	
08/09/15 18:50:04	SIG	M62/2041A1	HSD	M62 J25 - J30	
08/09/15 18:50:05	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 18:50:05	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 18:51:11	SIG	M62/2050A1	HSD	M62 J25 - J30	
08/09/15 18:51:12	SIG	M62/2033A1	REDX	M62 J25 - J30	
08/09/15 18:52:03	SIG	M62/2041A1	REDX	M62 J25 - J30	
08/09/15 18:53:04	SIG	M62/2050A1	REDX	M62 J25 - J30	
08/09/15 18:54:04	SIG	M62/2025A2	NR	M62 J25 - J30	
08/09/15 18:54:04	SIG	M62/2025A3	NR	M62 J25 - J30	
08/09/15 18:54:04	SIG	M62/2025A4	NR	M62 J25 - J30	
08/09/15 18:54:04	SIG	M62/2033A2	NR	M62 J25 - J30	
08/09/15 18:54:04	SIG	M62/2033A3	NR	M62 J25 - J30	
08/09/15 18:54:04	SIG	M62/2033A4	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2041A2	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2041A3	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2041A4	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2050A2	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2050A3	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2050A4	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2057A1	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2057A2	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2057A3	NR	M62 J25 - J30	
08/09/15 18:54:05	SIG	M62/2057J1	NR	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2008K1	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2008K2	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2012A1	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2012A2	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2012A3	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2018A1	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2018A2	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2018A3	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2018A4	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2025A1	BLNK	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2025A2	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2025A3	OFF	M62 J25 - J30	
08/09/15 18:55:04	SIG	M62/2025A4	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2033A1	BLNK	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2033A2	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2033A3	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2033A4	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2041A1	BLNK	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2041A2	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2041A3	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2041A4	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2050A1	BLNK	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2050A2	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2050A3	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2050A4	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2057A1	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2057A2	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2057A3	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2057J1	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2065A1	BLNK	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2065A2	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2065A3	OFF	M62 J25 - J30	
08/09/15 18:55:05	SIG	M62/2065A4	OFF	M62 J25 - J30	
08/09/15 19:06:59	SIG	M62/2057B1	HSD	M62 J25 - J30	
08/09/15 19:08:58	SIG	M62/2041B1	HSD	M62 J25 - J30	
08/09/15 19:08:58	SIG	M62/2057B1	REDX	M62 J25 - J30	
08/09/15 19:08:58	SIG	M621/1002B1	HSD	M62 J25 - J30	
08/09/15 19:08:58	SIG	M621/1010B1	60R	M62 J25 - J30	
08/09/15 19:08:58	SIG	M621/1010B2	60R	M62 J25 - J30	
08/09/15 19:09:58	SIG	M62/2033B1	HSD	M62 J25 - J30	
08/09/15 19:10:58	SIG	M62/2025B1	HSD	M62 J25 - J30	
08/09/15 19:10:58	SIG	M62/2041B1	REDX	M62 J25 - J30	
08/09/15 19:11:50	SIG	M62/2033B1	REDX	M62 J25 - J30	
08/09/15 19:12:34	SIG	M62/2025B1	REDX	M62 J25 - J30	
08/09/15 19:13:04	SIG	M62/2065B2	NR	M62 J25 - J30	
08/09/15 19:13:04	SIG	M62/2065B3	NR	M62 J25 - J30	
08/09/15 19:13:04	SIG	M62/2065B4	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2018B1	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2018B2	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2018B3	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2018L1	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2025B2	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2025B3	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2025B4	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2033B2	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2033B3	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2033B4	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2041B2	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2041B3	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2041B4	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2050B2	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2050B3	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2050B4	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2057B2	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2057B3	NR	M62 J25 - J30	
08/09/15 19:13:05	SIG	M62/2057B4	NR	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2025B1	BLNK	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2025B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2025B3	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2025B4	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2033B1	BLNK	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2033B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2033B4	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2041B1	BLNK	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2041B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2041B3	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2041B4	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2050B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2050B3	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2050B4	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2057B1	BLNK	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2057B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2057B3	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2057B4	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2065B1	BLNK	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2065B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2065B3	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2065B4	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2065M1	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2069M1	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M62/2069M2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M621/1002B1	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M621/1002B2	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M621/1010B1	OFF	M62 J25 - J30	
08/09/15 19:14:05	SIG	M621/1010B2	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2012B1	BLNK	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2012B2	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2012B3	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2012B4	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2018B1	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2018B2	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2018B3	OFF	M62 J25 - J30	
08/09/15 19:14:06	SIG	M62/2018L1	OFF	M62 J25 - J30	
08/09/15 19:31:02	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 19:31:02	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2033B1	REDX	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2041B1	REDX	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2041B2	50R	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2041B3	50R	M62 J25 - J30	
08/09/15 19:43:00	SIG	M62/2041B4	50R	M62 J25 - J30	
08/09/15 19:43:22	SIG	M62/2012B1	REDX	M62 J25 - J30	
08/09/15 19:43:22	SIG	M62/2012B2	NR	M62 J25 - J30	
08/09/15 19:43:22	SIG	M62/2012B3	NR	M62 J25 - J30	
08/09/15 19:43:22	SIG	M62/2012B4	NR	M62 J25 - J30	
08/09/15 19:45:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 19:45:16	SIG	M62/2033B3	???	M62 J25 - J30	
08/09/15 20:03:51	SIG	M606/2003B1	OFF	M62 J25 - J30	
08/09/15 20:03:51	SIG	M606/2003B2	OFF	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2018A2	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2018A3	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2018A4	60R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2033A1	REDX	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 20:04:04	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2008K1	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2008K2	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2012A1	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2012A2	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2012A3	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2018A1	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2018A2	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2018A3	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2018A4	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2025A1	BLNK	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2025A2	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2025A3	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2025A4	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2033A1	BLNK	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2033A2	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2033A3	OFF	M62 J25 - J30	
08/09/15 20:16:28	SIG	M62/2033A4	OFF	M62 J25 - J30	
08/09/15 20:16:43	SIG	M62/2033A2	50R	M62 J25 - J30	
08/09/15 20:16:43	SIG	M62/2033A3	50R	M62 J25 - J30	
08/09/15 20:16:43	SIG	M62/2033A4	50R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2008K1	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2008K2	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2012A1	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2012A2	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2012A3	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2018A1	HSD	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2018A2	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2018A3	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2018A4	60R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2025A1	REDX	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2025A2	50R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2025A3	50R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2025A4	50R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2033A1	STOP	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2033A2	40R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2033A3	40R	M62 J25 - J30	
08/09/15 20:16:48	SIG	M62/2033A4	40R	M62 J25 - J30	
08/09/15 20:16:53	SIG	M62/2033A1	STOP	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2113B2	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2113B3	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2113B4	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2120M1	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2120M2	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2125B1	LDR	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2125B2	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2125B3	50R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2125L1	NR	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2125L2	NR	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2132B1	60R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2132B2	60R	M62 J25 - J30	
08/09/15 20:22:55	SIG	M62/2132B3	60R	M62 J25 - J30	
08/09/15 20:23:00	SIG	M62/2113B2	40R	M62 J25 - J30	
08/09/15 20:23:00	SIG	M62/2113B3	40R	M62 J25 - J30	
08/09/15 20:23:00	SIG	M62/2113B4	40R	M62 J25 - J30	
08/09/15 20:23:00	SIG	M62/2120M1	40R	M62 J25 - J30	
08/09/15 20:23:00	SIG	M62/2120M2	40R	M62 J25 - J30	
08/09/15 20:23:05	SIG	M62/2113B2	30R	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2113B1	STOP	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2113B2	20R	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2113B3	40R	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2113B4	40R	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2117B1	LDR	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2117B3	50R	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2120M1	40R	M62 J25 - J30	
08/09/15 20:23:10	SIG	M62/2120M2	40R	M62 J25 - J30	
08/09/15 20:23:11	SIG	M62/2097B1	REDX	M62 J25 - J30	
08/09/15 20:23:11	SIG	M62/2097B2	NR	M62 J25 - J30	
08/09/15 20:23:11	SIG	M62/2097B3	NR	M62 J25 - J30	
08/09/15 20:23:11	SIG	M62/2097B4	NR	M62 J25 - J30	
08/09/15 20:23:16	SIG	M62/2113B1	STOP	M62 J25 - J30	
08/09/15 20:23:16	SIG	M62/2113B2	STOP	M62 J25 - J30	
08/09/15 20:28:47	SIG	M62/2079A1	REDX	M62 J25 - J30	
08/09/15 20:28:47	SIG	M62/2079A2	NR	M62 J25 - J30	
08/09/15 20:28:47	SIG	M62/2079A3	NR	M62 J25 - J30	
08/09/15 20:28:47	SIG	M62/2079A4	NR	M62 J25 - J30	
08/09/15 20:30:06	SIG	M62/2170L1	50R	M62 J25 - J30	
08/09/15 20:30:06	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 20:30:06	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 20:30:06	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 20:30:06	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 20:30:11	SIG	M62/2170L1	40R	M62 J25 - J30	
08/09/15 20:30:11	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 20:30:11	SIG	M62/2177B1	40R	M62 J25 - J30	
08/09/15 20:30:11	SIG	M62/2177L1	40R	M62 J25 - J30	
08/09/15 20:30:11	SIG	M62/2177L2	40R	M62 J25 - J30	
08/09/15 20:30:17	SIG	M62/2170L1	30R	M62 J25 - J30	
08/09/15 20:30:17	SIG	M62/2177B1	30R	M62 J25 - J30	
08/09/15 20:30:17	SIG	M62/2177L1	30R	M62 J25 - J30	
08/09/15 20:30:17	SIG	M62/2177L2	30R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2170L1	20R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2170L2	40R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2177B1	30R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2177L1	30R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2177L2	30R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 20:30:22	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 20:30:27	SIG	M62/2170L1	STOP	M62 J25 - J30	
08/09/15 20:32:12	SIG	M62/2125L1	60R	M62 J25 - J30	
08/09/15 20:32:12	SIG	M62/2125L2	60R	M62 J25 - J30	
08/09/15 20:32:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 20:32:31	SIG	M62/2183B2	???	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2033B1	BLNK	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2033B2	OFF	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2033B4	OFF	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2041B1	BLNK	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2041B2	OFF	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2041B3	OFF	M62 J25 - J30	
08/09/15 20:33:22	SIG	M62/2041B4	OFF	M62 J25 - J30	
08/09/15 20:34:13	SIG	M62/2012B1	BLNK	M62 J25 - J30	
08/09/15 20:34:13	SIG	M62/2012B2	OFF	M62 J25 - J30	
08/09/15 20:34:13	SIG	M62/2012B3	OFF	M62 J25 - J30	
08/09/15 20:34:13	SIG	M62/2012B4	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2170L1	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2170L2	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2177B1	NR	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2177B2	NR	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2177L1	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2177L2	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2183B1	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2183L1	OFF	M62 J25 - J30	
08/09/15 20:35:35	SIG	M62/2183L2	OFF	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2170L1	LDR	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2170L2	50R	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2177B1	50R	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2177B2	50R	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2177L1	50R	M62 J25 - J30	
08/09/15 20:35:58	SIG	M62/2177L2	50R	M62 J25 - J30	
08/09/15 20:36:25	SIG	M62/2183B1	50R	M62 J25 - J30	
08/09/15 20:36:25	SIG	M62/2183B2	50R	M62 J25 - J30	
08/09/15 20:36:25	SIG	M62/2183L1	50R	M62 J25 - J30	
08/09/15 20:36:25	SIG	M62/2183L2	50R	M62 J25 - J30	
08/09/15 20:38:33	SIG	M62/2197A1	50R	M62 J25 - J30	
08/09/15 20:38:33	SIG	M62/2197A2	50R	M62 J25 - J30	
08/09/15 20:38:33	SIG	M62/2197A3	50R	M62 J25 - J30	
08/09/15 20:38:38	SIG	M62/2197A1	40R	M62 J25 - J30	
08/09/15 20:38:38	SIG	M62/2197A2	40R	M62 J25 - J30	
08/09/15 20:38:38	SIG	M62/2197A3	40R	M62 J25 - J30	
08/09/15 20:38:41	SIG	M62/2183B2	???	M62 J25 - J30	
08/09/15 20:38:43	SIG	M62/2197A2	30R	M62 J25 - J30	
08/09/15 20:38:43	SIG	M62/2197A3	30R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2170A1	60R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2170A2	60R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2170K1	50R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2170K2	50R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2177A1	REDX	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2177A2	50R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2177A3	50R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2177A4	LDL	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2183A1	REDX	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2183A2	50R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2183A3	LDL	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2183A4	LDL	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2189A1	REDX	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2189A2	50R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2189A3	LDL	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2189A4	LDL	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2197A1	40R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2197A2	20R	M62 J25 - J30	
08/09/15 20:38:49	SIG	M62/2197A3	20R	M62 J25 - J30	
08/09/15 20:38:55	SIG	M62/2197A2	STOP	M62 J25 - J30	
08/09/15 20:38:55	SIG	M62/2197A3	STOP	M62 J25 - J30	
08/09/15 20:41:12	SIG	M62/2106B1	REDX	M62 J25 - J30	
08/09/15 20:41:12	SIG	M62/2106B2	50R	M62 J25 - J30	
08/09/15 20:41:12	SIG	M62/2106B3	50R	M62 J25 - J30	
08/09/15 20:41:12	SIG	M62/2106B4	50R	M62 J25 - J30	
08/09/15 20:44:25	SIG	M62/1960B1	50R	M62 J25 - J30	
08/09/15 20:44:25	SIG	M62/1960B2	50R	M62 J25 - J30	
08/09/15 20:44:25	SIG	M62/1960B3	50R	M62 J25 - J30	
08/09/15 20:54:12	SIG	M62/2163A1	60R	M62 J25 - J30	
08/09/15 20:54:12	SIG	M62/2163A2	60R	M62 J25 - J30	
08/09/15 20:54:12	SIG	M62/2166K1	60R	M62 J25 - J30	
08/09/15 20:54:12	SIG	M62/2166K2	60R	M62 J25 - J30	
08/09/15 20:57:08	SIG	M62/1960B1	OFF	M62 J25 - J30	
08/09/15 20:57:08	SIG	M62/1960B2	OFF	M62 J25 - J30	
08/09/15 20:57:08	SIG	M62/1960B3	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2008K1	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2008K2	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2012A1	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2012A2	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2012A3	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2018A1	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2018A2	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2018A3	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2018A4	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2025A1	BLNK	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2025A2	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2025A3	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2025A4	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2033A2	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2033A3	OFF	M62 J25 - J30	
08/09/15 20:57:32	SIG	M62/2033A4	OFF	M62 J25 - J30	
08/09/15 20:57:42	SIG	M62/2033A1	BLNK	M62 J25 - J30	
08/09/15 20:58:14	SIG	M62/2079A1	BLNK	M62 J25 - J30	
08/09/15 20:58:14	SIG	M62/2079A2	OFF	M62 J25 - J30	
08/09/15 20:58:14	SIG	M62/2079A3	OFF	M62 J25 - J30	
08/09/15 20:58:14	SIG	M62/2079A4	OFF	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2170K1	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2170K2	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2177A2	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2177A3	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2177A4	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2183A2	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2183A3	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2183A4	60R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2189A3	50R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2189A4	50R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2197A1	50R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2197A2	50R	M62 J25 - J30	
08/09/15 21:41:45	SIG	M62/2197A3	50R	M62 J25 - J30	
08/09/15 21:52:13	SIG	M62/2163A1	OFF	M62 J25 - J30	
08/09/15 21:52:13	SIG	M62/2163A2	OFF	M62 J25 - J30	
08/09/15 21:52:13	SIG	M62/2166K1	OFF	M62 J25 - J30	
08/09/15 21:52:13	SIG	M62/2166K2	OFF	M62 J25 - J30	
08/09/15 21:57:13	SIG	M62/2197A1	OFF	M62 J25 - J30	
08/09/15 21:57:13	SIG	M62/2197A2	OFF	M62 J25 - J30	
08/09/15 21:57:13	SIG	M62/2197A3	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2170A1	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2170A2	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2170K1	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2170K2	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2177A1	BLNK	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2177A2	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2177A3	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2177A4	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2183A2	NR	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2183A3	NR	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2183A4	NR	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2189A1	BLNK	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2189A1	BLNK	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2189A2	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2189A3	OFF	M62 J25 - J30	
08/09/15 21:58:14	SIG	M62/2189A4	OFF	M62 J25 - J30	
08/09/15 22:01:14	SIG	M62/2183A2	OFF	M62 J25 - J30	
08/09/15 22:01:14	SIG	M62/2183A3	OFF	M62 J25 - J30	
08/09/15 22:01:14	SIG	M62/2183A4	OFF	M62 J25 - J30	
08/09/15 22:01:15	SIG	M62/2183A1	BLNK	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2170B1	NR	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2170B2	NR	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2170L1	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2170L2	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2177B1	NR	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2177B2	NR	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2177L1	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2177L2	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2183B1	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2183L1	OFF	M62 J25 - J30	
08/09/15 22:23:57	SIG	M62/2183L2	OFF	M62 J25 - J30	
08/09/15 22:26:58	SIG	M62/2170B1	OFF	M62 J25 - J30	
08/09/15 22:26:58	SIG	M62/2170B2	OFF	M62 J25 - J30	
08/09/15 22:26:58	SIG	M62/2177B1	OFF	M62 J25 - J30	
08/09/15 22:26:58	SIG	M62/2177B2	OFF	M62 J25 - J30	
08/09/15 22:42:54	SIG	M606/2003B1	NR	M62 J25 - J30	
08/09/15 22:42:54	SIG	M606/2003B2	NR	M62 J25 - J30	
08/09/15 22:53:51	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 22:53:51	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 22:53:51	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2012B1	REDX	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2012B2	NR	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2012B3	NR	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2012B4	NR	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2025B1	STOP	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2025B2	40R	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2025B3	40R	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2025B4	40R	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2033B1	REDX	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2033B2	50R	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2033B3	50R	M62 J25 - J30	
08/09/15 22:53:56	SIG	M62/2033B4	50R	M62 J25 - J30	
08/09/15 22:54:01	SIG	M62/2025B1	STOP	M62 J25 - J30	
08/09/15 22:56:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 22:56:11	SIG	M62/2033B3	???	M62 J25 - J30	
08/09/15 22:59:43	SIG	M606/2003B1	OFF	M62 J25 - J30	
08/09/15 22:59:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
08/09/15 23:07:14	SIG	M62/2125L1	NR	M62 J25 - J30	
08/09/15 23:07:14	SIG	M62/2125L2	NR	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2041B2	60R	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2041B3	60R	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2041B4	60R	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2050B2	60R	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2050B3	60R	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2050B4	60R	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2106B2	OFF	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2106B3	OFF	M62 J25 - J30	
08/09/15 23:07:15	SIG	M62/2106B4	OFF	M62 J25 - J30	
08/09/15 23:33:28	SIG	M62/2025B1	REDX	M62 J25 - J30	
08/09/15 23:33:28	SIG	M62/2025B2	50R	M62 J25 - J30	
08/09/15 23:33:28	SIG	M62/2025B3	50R	M62 J25 - J30	
08/09/15 23:33:28	SIG	M62/2025B4	50R	M62 J25 - J30	
08/09/15 23:34:27	SIG	M62/2018B1	NR	M62 J25 - J30	
08/09/15 23:34:27	SIG	M62/2018B2	NR	M62 J25 - J30	
08/09/15 23:34:27	SIG	M62/2018B3	NR	M62 J25 - J30	
08/09/15 23:35:36	SIG	M62/2018L1	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2012B1	BLNK	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2012B2	OFF	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2012B3	OFF	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2012B4	OFF	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2018B1	OFF	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2018B2	OFF	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2018B3	OFF	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2018L1	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2025B2	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2025B3	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2025B4	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2033B2	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2033B3	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2033B4	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2041B2	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2041B3	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2041B4	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2050B2	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2050B3	NR	M62 J25 - J30	
08/09/15 23:37:15	SIG	M62/2050B4	NR	M62 J25 - J30	
08/09/15 23:40:15	SIG	M62/2033B2	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2018L1	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2025B1	BLNK	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2025B2	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2025B3	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2025B4	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2033B1	BLNK	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2033B4	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2041B1	BLNK	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2041B2	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2041B3	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2041B4	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2050B2	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2050B3	OFF	M62 J25 - J30	
08/09/15 23:40:16	SIG	M62/2050B4	OFF	M62 J25 - J30	
08/09/15 23:40:17	SIG	M62/2025B1	BLNK	M62 J25 - J30	
08/09/15 23:40:17	SIG	M62/2041B1	BLNK	M62 J25 - J30	
09/09/15 00:09:09	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 00:09:09	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 00:09:09	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2033A1	STOP	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2033A2	40R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2033A3	40R	M62 J25 - J30	
09/09/15 00:09:14	SIG	M62/2033A4	40R	M62 J25 - J30	
09/09/15 00:09:19	SIG	M62/2033A1	STOP	M62 J25 - J30	
09/09/15 00:20:09	SIG	M62/1960B1	50R	M62 J25 - J30	
09/09/15 00:20:09	SIG	M62/1960B2	50R	M62 J25 - J30	
09/09/15 00:20:09	SIG	M62/1960B3	50R	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2008K1	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2008K2	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2012A1	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2012A2	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2012A3	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2018A1	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2018A2	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2018A3	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2018A4	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2025A1	BLNK	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2025A2	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2025A3	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2025A4	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2033A1	BLNK	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2033A2	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2033A3	OFF	M62 J25 - J30	
09/09/15 00:46:58	SIG	M62/2033A4	OFF	M62 J25 - J30	
09/09/15 00:58:15	SIG	M62/1960B1	OFF	M62 J25 - J30	
09/09/15 00:58:15	SIG	M62/1960B2	OFF	M62 J25 - J30	
09/09/15 00:58:15	SIG	M62/1960B3	OFF	M62 J25 - J30	
09/09/15 03:18:36	SIG	M62/2197A1	50R	M62 J25 - J30	
09/09/15 03:18:36	SIG	M62/2197A2	50R	M62 J25 - J30	
09/09/15 03:18:36	SIG	M62/2197A3	50R	M62 J25 - J30	
09/09/15 03:18:42	SIG	M62/2197A1	40R	M62 J25 - J30	
09/09/15 03:18:42	SIG	M62/2197A2	40R	M62 J25 - J30	
09/09/15 03:18:42	SIG	M62/2197A3	40R	M62 J25 - J30	
09/09/15 03:18:47	SIG	M62/2197A2	30R	M62 J25 - J30	
09/09/15 03:18:47	SIG	M62/2197A3	30R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2170A1	60R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2170A2	60R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2170K1	50R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2170K2	50R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2177A1	REDX	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2177A2	50R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2177A3	50R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2177A4	LDL	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2183A1	REDX	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2183A2	50R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2183A3	LDL	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2183A4	LDL	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2189A1	REDX	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2189A2	50R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2189A3	LDL	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2189A4	LDL	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2197A1	40R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2197A2	20R	M62 J25 - J30	
09/09/15 03:18:52	SIG	M62/2197A3	20R	M62 J25 - J30	
09/09/15 03:18:57	SIG	M62/2197A2	STOP	M62 J25 - J30	
09/09/15 03:18:57	SIG	M62/2197A3	STOP	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2170B1	NR	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2170B2	NR	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2170L1	LDR	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 04:21:05	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2170A1	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2170A2	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2170K1	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2170K2	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2177A1	BLNK	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2177A2	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2177A3	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2177A4	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2183A2	NR	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2183A3	NR	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2183A4	NR	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2189A1	BLNK	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2189A2	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2189A3	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2189A4	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2197A1	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2197A2	OFF	M62 J25 - J30	
09/09/15 04:22:43	SIG	M62/2197A3	OFF	M62 J25 - J30	
09/09/15 04:25:44	SIG	M62/2183A2	OFF	M62 J25 - J30	
09/09/15 04:25:44	SIG	M62/2183A3	OFF	M62 J25 - J30	
09/09/15 04:25:44	SIG	M62/2183A4	OFF	M62 J25 - J30	
09/09/15 04:25:45	SIG	M62/2183A1	BLNK	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2097B1	BLNK	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2097B2	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2097B3	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2097B4	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2106B1	BLNK	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2113B1	BLNK	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2113B2	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2113B3	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2113B4	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2117B3	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2120M1	OFF	M62 J25 - J30	
09/09/15 04:37:59	SIG	M62/2120M2	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2125B1	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2125B2	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2125B3	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2125L1	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2125L2	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2132B1	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2132B2	OFF	M62 J25 - J30	
09/09/15 04:38:00	SIG	M62/2132B3	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2170B1	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2170B2	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2170L1	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2170L2	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2177B1	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2177B2	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2177L1	OFF	M62 J25 - J30	
09/09/15 04:44:35	SIG	M62/2177L2	OFF	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2004A1	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2004A2	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2004A3	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2025A2	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2025A3	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2025A4	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2033A2	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2033A3	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2033A4	60R	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2041A1	REDX	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2041A2	NR	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2041A3	NR	M62 J25 - J30	
09/09/15 06:41:23	SIG	M62/2041A4	NR	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2041A2	60R	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2041A3	60R	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2041A4	60R	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2050A1	REDX	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2050A2	NR	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2050A3	NR	M62 J25 - J30	
09/09/15 06:42:23	SIG	M62/2050A4	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2050A2	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2050A3	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2050A4	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057A1	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057A1	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057A2	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057A2	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057A3	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057A3	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057J1	60R	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2057J1	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2065A1	REDX	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2065A2	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2065A3	NR	M62 J25 - J30	
09/09/15 06:43:18	SIG	M62/2065A4	NR	M62 J25 - J30	
09/09/15 06:45:09	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 06:45:23	SIG	M62/2004A1	OFF	M62 J25 - J30	
09/09/15 06:45:23	SIG	M62/2004A2	OFF	M62 J25 - J30	
09/09/15 06:45:23	SIG	M62/2004A3	OFF	M62 J25 - J30	
09/09/15 06:45:36	SIG	M62/2041A1	60R	M62 J25 - J30	
09/09/15 06:46:07	SIG	M62/2033A1	60R	M62 J25 - J30	
09/09/15 06:46:13	SIG	M62/2018A1	60R	M62 J25 - J30	
09/09/15 06:46:13	SIG	M62/2025A1	60R	M62 J25 - J30	
09/09/15 06:49:06	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 06:49:07	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 06:56:25	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 06:56:25	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 06:56:25	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 06:56:25	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1960A3	50R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1960K1	50R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1960K2	50R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1968A1	40R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1968A2	40R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1968A3	40R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1968A4	40R	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1974A1	NR	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1974A2	NR	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1974A3	NR	M62 J25 - J30	
09/09/15 06:56:30	SIG	M62/1974A4	NR	M62 J25 - J30	
09/09/15 07:00:23	SIG	M62/1955K1	60R	M62 J25 - J30	
09/09/15 07:00:23	SIG	M62/1955K2	60R	M62 J25 - J30	
09/09/15 07:00:23	SIG	M62/1956A1	60R	M62 J25 - J30	
09/09/15 07:00:23	SIG	M62/1956A2	60R	M62 J25 - J30	
09/09/15 07:00:23	SIG	M62/1956A3	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1960A1	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1960A2	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1960A3	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1960K1	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1960K2	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1968A1	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1968A2	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1968A3	60R	M62 J25 - J30	
09/09/15 07:00:25	SIG	M62/1968A4	60R	M62 J25 - J30	
09/09/15 07:00:55	SIG	M62/2065M1	NR	M62 J25 - J30	
09/09/15 07:00:55	SIG	M62/2069M1	60R	M62 J25 - J30	
09/09/15 07:00:55	SIG	M62/2069M2	60R	M62 J25 - J30	
09/09/15 07:00:56	SIG	M62/2057B1	REDX	M62 J25 - J30	
09/09/15 07:00:56	SIG	M62/2057B2	NR	M62 J25 - J30	
09/09/15 07:00:56	SIG	M62/2057B3	NR	M62 J25 - J30	
09/09/15 07:00:56	SIG	M62/2057B4	NR	M62 J25 - J30	
09/09/15 07:00:56	SIG	M62/2065M1	60R	M62 J25 - J30	
09/09/15 07:00:56	SIG	M621/1002B1	HSD	M62 J25 - J30	
09/09/15 07:00:56	SIG	M621/1002B2	60R	M62 J25 - J30	
09/09/15 07:00:56	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 07:00:56	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2012B1	REDX	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2025B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2025B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2025B4	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2033B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2033B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2033B4	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2041B1	REDX	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2050B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2050B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2050B4	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2057B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2057B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2057B4	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2065B1	REDX	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2065B2	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2065B3	60R	M62 J25 - J30	
09/09/15 07:00:57	SIG	M62/2065B4	60R	M62 J25 - J30	
09/09/15 07:03:14	SIG	M62/2025B1	60R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2159B1	NR	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2159B2	NR	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 07:03:16	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 07:03:22	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 07:03:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:03:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:03:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:03:41	SIG	M62/2033B1	60R	M62 J25 - J30	
09/09/15 07:03:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:04:04	SIG	M62/2041B1	60R	M62 J25 - J30	
09/09/15 07:04:29	SIG	M62/2057B1	60R	M62 J25 - J30	
09/09/15 07:04:29	SIG	M621/1002B1	60R	M62 J25 - J30	
09/09/15 07:04:29	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 07:04:29	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 07:05:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:05:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:05:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:05:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:06:11	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 07:06:11	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 07:06:11	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:06:17	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2117B1	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2117B2	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2117B3	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2120M1	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2120M2	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2125B1	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2125B2	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2125B3	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2125L1	50R	M62 J25 - J30	
09/09/15 07:07:14	SIG	M62/2125L2	50R	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2113B1	REDX	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2113B2	NR	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2113B3	NR	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2113B4	NR	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2117B1	40R	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2117B3	40R	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2120M1	40R	M62 J25 - J30	
09/09/15 07:07:19	SIG	M62/2120M2	40R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2125B1	40R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2125B2	40R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2125B3	40R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2125L1	40R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2125L2	40R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2132B1	50R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2132B2	50R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2132B3	50R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2137B1	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2137B2	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2137B3	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2137B4	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2147B1	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2147B2	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2147B3	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2147B4	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2159B1	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2159B2	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2159M1	60R	M62 J25 - J30	
09/09/15 07:07:20	SIG	M62/2159M2	60R	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2137B1	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2137B2	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2137B3	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2137B4	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2147B1	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2147B2	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2147B3	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2147B4	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2159B1	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2159B2	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2159M1	OFF	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2159M2	OFF	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2170B1	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2170B2	NR	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2170L1	OFF	M62 J25 - J30	
09/09/15 07:08:21	SIG	M62/2170L2	OFF	M62 J25 - J30	
09/09/15 07:08:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:08:58	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:09:04	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:09:23	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:09:23	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:09:23	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:09:23	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 07:09:48	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 07:10:12	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 07:10:12	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 07:10:12	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 07:10:12	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 07:10:23	SIG	M62/2197B1	60R	M62 J25 - J30	
09/09/15 07:10:23	SIG	M62/2197B2	60R	M62 J25 - J30	
09/09/15 07:10:23	SIG	M62/2197B3	60R	M62 J25 - J30	
09/09/15 07:10:23	SIG	M62/2199M1	60R	M62 J25 - J30	
09/09/15 07:10:23	SIG	M62/2199M2	60R	M62 J25 - J30	
09/09/15 07:11:08	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 07:11:08	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 07:11:08	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 07:11:08	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 07:11:13	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 07:11:13	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 07:11:13	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 07:11:13	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2117B1	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2117B3	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2120M1	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2120M2	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2125B1	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2125B2	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2125B3	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2125L1	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2125L2	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2132B1	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2132B2	60R	M62 J25 - J30	
09/09/15 07:11:14	SIG	M62/2132B3	60R	M62 J25 - J30	
09/09/15 07:11:21	SIG	M62/2159B1	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2137B1	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2137B2	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2137B3	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2137B4	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2147B1	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2147B2	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2147B3	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2147B4	OFF	M62 J25 - J30	
09/09/15 07:11:22	SIG	M62/2159B2	OFF	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2004A1	60R	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2004A2	60R	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2004A3	60R	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2203B1	60R	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2203B2	60R	M62 J25 - J30	
09/09/15 07:11:23	SIG	M62/2203B3	60R	M62 J25 - J30	
09/09/15 07:12:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:12:05	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:12:10	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2065A2	60R	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2065A3	60R	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2065A4	60R	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2124A1	REDX	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2124A2	NR	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2124A3	NR	M62 J25 - J30	
09/09/15 07:12:55	SIG	M62/2124A4	NR	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2073K1	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2079A1	REDX	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2079A2	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2079A3	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2079A4	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2088A2	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2088A3	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2088A4	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2097A2	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2097A3	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2097A4	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2106A2	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2106A3	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2106A4	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2114A1	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2114A2	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2114A3	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2117A1	REDX	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2117A2	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2117A3	60R	M62 J25 - J30	
09/09/15 07:13:05	SIG	M62/2117A4	60R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2194B1	40R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2194B2	40R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2194B3	40R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2194B4	40R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2197B1	50R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2197B2	50R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2197B3	50R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2199M1	50R	M62 J25 - J30	
09/09/15 07:13:21	SIG	M62/2199M2	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 07:13:23	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2033A1	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 07:13:23	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 07:14:23	SIG	M62/2041A1	50R	M62 J25 - J30	
09/09/15 07:14:23	SIG	M62/2041A2	50R	M62 J25 - J30	
09/09/15 07:14:23	SIG	M62/2041A3	50R	M62 J25 - J30	
09/09/15 07:14:23	SIG	M62/2041A4	50R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2197B1	40R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2197B2	40R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2197B3	40R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2199M1	40R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2199M2	40R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2203B1	50R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2203B2	50R	M62 J25 - J30	
09/09/15 07:14:29	SIG	M62/2203B3	50R	M62 J25 - J30	
09/09/15 07:15:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:15:12	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:15:18	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:15:20	SIG	M62/2203B1	40R	M62 J25 - J30	
09/09/15 07:15:20	SIG	M62/2203B2	40R	M62 J25 - J30	
09/09/15 07:15:20	SIG	M62/2203B3	40R	M62 J25 - J30	
09/09/15 07:15:23	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 07:15:23	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 07:15:23	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 07:15:23	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 07:15:55	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 07:15:55	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2137B1	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2137B2	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2137B3	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2137B4	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2147B1	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2147B2	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2147B3	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2147B4	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2159B1	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2159B2	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2159M1	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2159M2	60R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 07:16:25	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 07:16:30	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 07:16:30	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 07:16:30	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:16:30	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:18:24	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:18:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:18:30	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:19:01	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:19:20	SIG	M62/2197B1	60R	M62 J25 - J30	
09/09/15 07:19:20	SIG	M62/2197B2	60R	M62 J25 - J30	
09/09/15 07:19:20	SIG	M62/2197B3	60R	M62 J25 - J30	
09/09/15 07:19:20	SIG	M62/2199M1	60R	M62 J25 - J30	
09/09/15 07:19:20	SIG	M62/2199M2	60R	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2065A2	NR	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2065A3	NR	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2065A4	NR	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2124A1	BLNK	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2124A2	OFF	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
09/09/15 07:19:46	SIG	M62/2124A4	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2073K1	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2079A1	BLNK	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2079A2	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2079A3	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2079A4	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2088A1	BLNK	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2088A2	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2088A3	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2088A4	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2097A1	BLNK	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2097A2	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2097A3	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2097A4	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2106A1	BLNK	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2106A2	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2106A3	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2106A4	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2114A1	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2114A2	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2114A3	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2117A1	BLNK	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2117A2	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2117A3	OFF	M62 J25 - J30	
09/09/15 07:19:56	SIG	M62/2117A4	OFF	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 07:20:35	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 07:20:42	SIG	M62/2203B1	60R	M62 J25 - J30	
09/09/15 07:20:42	SIG	M62/2203B2	60R	M62 J25 - J30	
09/09/15 07:20:42	SIG	M62/2203B3	60R	M62 J25 - J30	
09/09/15 07:21:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:21:25	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:21:30	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2025B1	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:21:38	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2025B1	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2025B2	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2025B3	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2025B4	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2033B1	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 07:21:44	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 07:23:24	SIG	M62/1999A1	60R	M62 J25 - J30	
09/09/15 07:23:24	SIG	M62/1999A2	60R	M62 J25 - J30	
09/09/15 07:23:24	SIG	M62/1999A3	60R	M62 J25 - J30	
09/09/15 07:23:24	SIG	M62/1999J1	50R	M62 J25 - J30	
09/09/15 07:23:24	SIG	M62/1999J2	50R	M62 J25 - J30	
09/09/15 07:24:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:24:07	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:24:13	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:24:31	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:24:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:24:37	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:25:12	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 07:25:12	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 07:25:12	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 07:25:12	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 07:25:48	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 07:25:48	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 07:25:48	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 07:25:48	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 07:25:50	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2137B1	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2137B2	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2137B3	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2137B4	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2147B1	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2147B2	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2147B3	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2147B4	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2159B1	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2159B2	NR	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2159M1	OFF	M62 J25 - J30	
09/09/15 07:26:24	SIG	M62/2159M2	OFF	M62 J25 - J30	
09/09/15 07:27:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:27:11	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:27:17	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:27:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:27:37	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:27:43	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:27:46	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 07:27:46	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 07:27:46	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:27:46	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:27:52	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 07:27:52	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 07:27:52	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:27:52	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:29:24	SIG	M62/2147B1	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2137B1	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2137B2	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2137B3	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2137B4	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2147B2	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2147B3	OFF	M62 J25 - J30	
09/09/15 07:29:25	SIG	M62/2147B4	OFF	M62 J25 - J30	
09/09/15 07:29:39	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 07:29:39	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 07:29:39	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 07:29:39	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 07:29:44	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 07:29:44	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 07:29:44	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 07:29:44	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2033A1	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2033A2	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2033A3	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2033A4	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2041A1	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2041A2	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2041A3	40R	M62 J25 - J30	
09/09/15 07:29:59	SIG	M62/2041A4	40R	M62 J25 - J30	
09/09/15 07:30:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:30:15	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:30:20	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:30:43	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:30:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:30:49	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:31:39	SIG	M62/1999A1	50R	M62 J25 - J30	
09/09/15 07:31:39	SIG	M62/1999A2	50R	M62 J25 - J30	
09/09/15 07:31:39	SIG	M62/1999A3	50R	M62 J25 - J30	
09/09/15 07:31:39	SIG	M62/2004A1	50R	M62 J25 - J30	
09/09/15 07:31:39	SIG	M62/2004A2	50R	M62 J25 - J30	
09/09/15 07:31:39	SIG	M62/2004A3	50R	M62 J25 - J30	
09/09/15 07:31:44	SIG	M62/2004A1	40R	M62 J25 - J30	
09/09/15 07:31:44	SIG	M62/2004A2	40R	M62 J25 - J30	
09/09/15 07:31:44	SIG	M62/2004A3	40R	M62 J25 - J30	
09/09/15 07:31:45	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:31:45	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:31:45	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 07:31:47	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 07:31:50	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:31:50	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:31:50	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:31:50	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2008K1	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2008K2	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2012A1	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2012A2	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2012A3	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2018A1	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 07:32:54	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 07:33:17	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 07:33:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:33:19	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 07:33:23	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 07:33:24	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:33:24	SIG	M62/2125L1	NR	M62 J25 - J30	
09/09/15 07:33:24	SIG	M62/2125L2	NR	M62 J25 - J30	
09/09/15 07:33:25	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 07:33:25	SIG	M62/2050A2	60R	M62 J25 - J30	
09/09/15 07:33:25	SIG	M62/2050A3	60R	M62 J25 - J30	
09/09/15 07:33:25	SIG	M62/2050A4	60R	M62 J25 - J30	
09/09/15 07:33:38	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 07:33:38	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 07:33:38	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 07:33:38	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 07:33:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:33:49	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:33:55	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:34:04	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:34:13	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:34:14	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:34:19	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1974A1	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1974A2	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1974A3	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1974A4	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1979K1	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1979K2	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1981A1	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1981A2	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1981A3	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1981A4	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1987A1	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1987A3	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1987J1	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1992A1	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1992A2	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1992A3	60R	M62 J25 - J30	
09/09/15 07:34:34	SIG	M62/1992J1	60R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:34:43	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1992A1	50R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1992A2	50R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1992A3	50R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1992J1	50R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1999A1	40R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1999A2	40R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1999A3	40R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1999J1	40R	M62 J25 - J30	
09/09/15 07:35:35	SIG	M62/1999J2	40R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2033A1	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2033A2	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2033A3	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2033A4	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2041A1	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2041A2	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2041A3	60R	M62 J25 - J30	
09/09/15 07:35:41	SIG	M62/2041A4	60R	M62 J25 - J30	
09/09/15 07:36:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:36:23	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:36:28	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:36:55	SIG	M62/2025A1	60R	M62 J25 - J30	
09/09/15 07:36:55	SIG	M62/2025A2	60R	M62 J25 - J30	
09/09/15 07:36:55	SIG	M62/2025A3	60R	M62 J25 - J30	
09/09/15 07:36:55	SIG	M62/2025A4	60R	M62 J25 - J30	
09/09/15 07:36:56	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:36:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:37:02	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:37:09	SIG	M62/2125B1	50R	M62 J25 - J30	
09/09/15 07:37:09	SIG	M62/2125B2	50R	M62 J25 - J30	
09/09/15 07:37:09	SIG	M62/2125B3	50R	M62 J25 - J30	
09/09/15 07:37:09	SIG	M62/2125L1	50R	M62 J25 - J30	
09/09/15 07:37:09	SIG	M62/2125L2	50R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2125B1	40R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2125B2	40R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2125B3	40R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2125L1	40R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2125L2	40R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2132B1	50R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2132B2	50R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2132B3	50R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2137B1	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2137B2	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2137B3	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2137B4	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2147B1	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2147B2	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2147B3	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2147B4	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2159B1	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2159B2	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2159M1	60R	M62 J25 - J30	
09/09/15 07:37:14	SIG	M62/2159M2	60R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 07:37:18	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2033A1	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 07:38:04	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2033A1	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2033A2	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2033A3	40R	M62 J25 - J30	
09/09/15 07:38:10	SIG	M62/2033A4	40R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2018A1	60R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 07:38:23	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2132B1	40R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2132B2	40R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2132B3	40R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2137B1	50R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2137B2	50R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2137B3	50R	M62 J25 - J30	
09/09/15 07:39:07	SIG	M62/2137B4	50R	M62 J25 - J30	
09/09/15 07:39:26	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:39:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:39:32	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:39:33	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 07:39:33	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 07:39:33	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 07:39:33	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:39:39	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:39:40	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 07:39:40	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 07:39:40	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 07:39:40	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2018A1	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:39:45	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:40:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:40:03	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:40:08	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 07:40:33	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 07:40:33	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 07:40:47	SIG	M62/2117B1	NR	M62 J25 - J30	
09/09/15 07:40:47	SIG	M62/2117B3	NR	M62 J25 - J30	
09/09/15 07:40:47	SIG	M62/2120M1	OFF	M62 J25 - J30	
09/09/15 07:40:47	SIG	M62/2120M2	OFF	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2018A1	40R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 07:41:04	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 07:41:10	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2008K1	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2008K2	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2012A1	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2012A2	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2012A3	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2018A1	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 07:41:10	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1992A1	60R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1992A2	60R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1992A3	60R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1992J1	60R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1999A1	50R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1999A2	50R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1999A3	50R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1999J1	50R	M62 J25 - J30	
09/09/15 07:41:11	SIG	M62/1999J2	50R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:41:18	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:41:47	SIG	M62/2137B1	40R	M62 J25 - J30	
09/09/15 07:41:47	SIG	M62/2137B2	40R	M62 J25 - J30	
09/09/15 07:41:47	SIG	M62/2137B3	40R	M62 J25 - J30	
09/09/15 07:41:47	SIG	M62/2137B4	40R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 07:41:57	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 07:42:02	SIG	M62/2041A1	50R	M62 J25 - J30	
09/09/15 07:42:02	SIG	M62/2041A2	50R	M62 J25 - J30	
09/09/15 07:42:02	SIG	M62/2041A3	50R	M62 J25 - J30	
09/09/15 07:42:02	SIG	M62/2041A4	50R	M62 J25 - J30	
09/09/15 07:42:03	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 07:42:03	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 07:42:03	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 07:42:03	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 07:42:08	SIG	M62/2041A1	40R	M62 J25 - J30	
09/09/15 07:42:08	SIG	M62/2041A2	40R	M62 J25 - J30	
09/09/15 07:42:08	SIG	M62/2041A3	40R	M62 J25 - J30	
09/09/15 07:42:08	SIG	M62/2041A4	40R	M62 J25 - J30	
09/09/15 07:42:25	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:42:26	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:42:28	SIG	M62/2125B1	60R	M62 J25 - J30	
09/09/15 07:42:28	SIG	M62/2125B2	60R	M62 J25 - J30	
09/09/15 07:42:28	SIG	M62/2125B3	60R	M62 J25 - J30	
09/09/15 07:42:28	SIG	M62/2125L1	60R	M62 J25 - J30	
09/09/15 07:42:28	SIG	M62/2125L2	60R	M62 J25 - J30	
09/09/15 07:42:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:42:29	SIG	M62/2147B1	50R	M62 J25 - J30	
09/09/15 07:42:29	SIG	M62/2147B2	50R	M62 J25 - J30	
09/09/15 07:42:29	SIG	M62/2147B3	50R	M62 J25 - J30	
09/09/15 07:42:29	SIG	M62/2147B4	50R	M62 J25 - J30	
09/09/15 07:42:31	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:42:32	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:42:35	SIG	M62/2147B1	40R	M62 J25 - J30	
09/09/15 07:42:35	SIG	M62/2147B2	40R	M62 J25 - J30	
09/09/15 07:42:35	SIG	M62/2147B3	40R	M62 J25 - J30	
09/09/15 07:42:35	SIG	M62/2147B4	40R	M62 J25 - J30	
09/09/15 07:42:37	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 07:43:03	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 07:43:03	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 07:43:03	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 07:43:03	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 07:43:08	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 07:43:08	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 07:43:08	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 07:43:08	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 07:43:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:43:09	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:43:15	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2041B1	60R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 07:43:20	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 07:43:45	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 07:43:45	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 07:43:45	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 07:43:45	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 07:43:50	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 07:43:50	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 07:43:50	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 07:43:50	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2159B1	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2159B2	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2159M1	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2159M2	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:44:08	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2159B1	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2159B2	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2159M1	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2159M2	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:44:14	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2057A1	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2057A2	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2057A3	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M62/2057J1	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M621/1002A1	50R	M62 J25 - J30	
09/09/15 07:44:32	SIG	M621/1002A2	50R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2050A1	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2050A2	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2050A3	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2050A4	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2057A1	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2057A2	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2057A3	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M62/2057J1	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M621/1002A1	40R	M62 J25 - J30	
09/09/15 07:44:37	SIG	M621/1002A2	40R	M62 J25 - J30	
09/09/15 07:44:54	SIG	M62/2132B1	60R	M62 J25 - J30	
09/09/15 07:44:54	SIG	M62/2132B2	60R	M62 J25 - J30	
09/09/15 07:44:54	SIG	M62/2132B3	60R	M62 J25 - J30	
09/09/15 07:45:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:45:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:45:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:45:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:45:57	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1992A1	50R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1992A2	50R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1992A3	50R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1992J1	50R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1999A1	40R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1999A2	40R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1999A3	40R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1999J1	40R	M62 J25 - J30	
09/09/15 07:46:02	SIG	M62/1999J2	40R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2033A1	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2041A1	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2041A2	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2041A3	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2041A4	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 07:46:03	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:46:07	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:46:30	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:46:30	SIG	M62/2137B1	60R	M62 J25 - J30	
09/09/15 07:46:30	SIG	M62/2137B2	60R	M62 J25 - J30	
09/09/15 07:46:30	SIG	M62/2137B3	60R	M62 J25 - J30	
09/09/15 07:46:30	SIG	M62/2137B4	60R	M62 J25 - J30	
09/09/15 07:46:31	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 07:46:59	SIG	M62/2050A1	40R	M62 J25 - J30	
09/09/15 07:46:59	SIG	M62/2050A2	40R	M62 J25 - J30	
09/09/15 07:46:59	SIG	M62/2050A3	40R	M62 J25 - J30	
09/09/15 07:46:59	SIG	M62/2050A4	40R	M62 J25 - J30	
09/09/15 07:47:03	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 07:47:03	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 07:47:03	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 07:47:03	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 07:47:35	SIG	M62/2018A1	40R	M62 J25 - J30	
09/09/15 07:47:35	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 07:47:35	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 07:47:35	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 07:48:09	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 07:48:09	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 07:48:15	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 07:48:23	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:48:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2025B1	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2025B2	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2025B3	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2025B4	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2033B1	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2033B2	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2033B3	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2033B4	60R	M62 J25 - J30	
09/09/15 07:48:29	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1987A1	50R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1987A3	50R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1987J1	50R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1992A1	40R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1992A2	40R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1992A3	40R	M62 J25 - J30	
09/09/15 07:48:49	SIG	M62/1992J1	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2033A1	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2033A2	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2033A3	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2033A4	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2041A1	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2041A2	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2041A3	40R	M62 J25 - J30	
09/09/15 07:49:12	SIG	M62/2041A4	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2033A1	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2033A2	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2033A3	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2033A4	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2041A1	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2041A2	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2041A3	40R	M62 J25 - J30	
09/09/15 07:49:17	SIG	M62/2041A4	40R	M62 J25 - J30	
09/09/15 07:49:30	SIG	M62/2147B1	60R	M62 J25 - J30	
09/09/15 07:49:30	SIG	M62/2147B2	60R	M62 J25 - J30	
09/09/15 07:49:30	SIG	M62/2147B3	60R	M62 J25 - J30	
09/09/15 07:49:30	SIG	M62/2147B4	60R	M62 J25 - J30	
09/09/15 07:49:49	SIG	M621/1002A1	OFF	M62 J25 - J30	
09/09/15 07:49:49	SIG	M621/1002A2	OFF	M62 J25 - J30	
09/09/15 07:50:08	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 07:50:08	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 07:50:08	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 07:50:08	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 07:50:08	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 07:50:08	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1979K1	50R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1979K2	50R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1981A1	50R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1981A2	50R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1981A3	50R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1981A4	50R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1987A1	40R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1987A3	40R	M62 J25 - J30	
09/09/15 07:50:28	SIG	M62/1987J1	40R	M62 J25 - J30	
09/09/15 07:50:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:50:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:50:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:50:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 07:50:44	SIG	M621/1002A1	50R	M62 J25 - J30	
09/09/15 07:50:44	SIG	M621/1002A2	50R	M62 J25 - J30	
09/09/15 07:50:49	SIG	M621/1002A1	40R	M62 J25 - J30	
09/09/15 07:50:49	SIG	M621/1002A2	40R	M62 J25 - J30	
09/09/15 07:51:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:51:27	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:51:32	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:51:38	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:51:38	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:51:44	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:51:57	SIG	M62/2159B1	60R	M62 J25 - J30	
09/09/15 07:51:57	SIG	M62/2159B2	60R	M62 J25 - J30	
09/09/15 07:51:57	SIG	M62/2159M1	60R	M62 J25 - J30	
09/09/15 07:51:57	SIG	M62/2159M2	60R	M62 J25 - J30	
09/09/15 07:52:15	SIG	M62/2183B1	60R	M62 J25 - J30	
09/09/15 07:52:15	SIG	M62/2183B2	60R	M62 J25 - J30	
09/09/15 07:52:15	SIG	M62/2183L1	60R	M62 J25 - J30	
09/09/15 07:52:15	SIG	M62/2183L2	60R	M62 J25 - J30	
09/09/15 07:52:35	SIG	M62/1999J1	50R	M62 J25 - J30	
09/09/15 07:52:35	SIG	M62/1999J2	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1992A1	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1992A2	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1992A3	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1992J1	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1999A1	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1999A2	50R	M62 J25 - J30	
09/09/15 07:54:18	SIG	M62/1999A3	50R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 07:54:27	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 07:54:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:54:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2065A2	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2065A3	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2065A4	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2073K1	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A1	REDX	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A2	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A2	NR	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A3	NR	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A3	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A4	NR	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2079A4	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2088A2	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2088A3	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2088A4	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2097A2	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2097A3	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2097A4	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2106A2	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2106A3	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2106A4	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2114A1	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2114A2	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2114A3	60R	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2117A1	REDX	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2117A2	NR	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2117A3	NR	M62 J25 - J30	
09/09/15 07:54:36	SIG	M62/2117A4	NR	M62 J25 - J30	
09/09/15 07:54:42	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:54:43	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:54:45	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 07:54:45	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 07:54:45	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 07:54:45	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 07:54:48	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:54:49	SIG	M621/1002A1	OFF	M62 J25 - J30	
09/09/15 07:54:49	SIG	M621/1002A2	OFF	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 07:54:51	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1974A1	50R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1974A2	50R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1974A3	50R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1974A4	50R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1979K1	40R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1979K2	40R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1981A1	40R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1981A2	40R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1981A3	40R	M62 J25 - J30	
09/09/15 07:54:55	SIG	M62/1981A4	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1974A1	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1974A2	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1974A3	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1974A4	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1979K1	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1979K2	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1981A1	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1981A2	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1981A3	40R	M62 J25 - J30	
09/09/15 07:55:01	SIG	M62/1981A4	40R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 07:56:09	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 07:56:11	SIG	M62/2106A1	60R	M62 J25 - J30	
09/09/15 07:56:15	SIG	M62/1987A1	50R	M62 J25 - J30	
09/09/15 07:56:15	SIG	M62/1987A3	50R	M62 J25 - J30	
09/09/15 07:56:15	SIG	M62/1987J1	50R	M62 J25 - J30	
09/09/15 07:56:36	SIG	M62/2097A1	60R	M62 J25 - J30	
09/09/15 07:56:44	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 07:56:44	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 07:56:44	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:56:44	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:56:49	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 07:56:49	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 07:56:49	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 07:56:49	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 07:56:59	SIG	M62/1999A1	40R	M62 J25 - J30	
09/09/15 07:56:59	SIG	M62/1999A2	40R	M62 J25 - J30	
09/09/15 07:56:59	SIG	M62/1999A3	40R	M62 J25 - J30	
09/09/15 07:56:59	SIG	M62/1999J1	40R	M62 J25 - J30	
09/09/15 07:56:59	SIG	M62/1999J2	40R	M62 J25 - J30	
09/09/15 07:57:13	SIG	M62/2057A1	60R	M62 J25 - J30	
09/09/15 07:57:13	SIG	M62/2057A2	60R	M62 J25 - J30	
09/09/15 07:57:13	SIG	M62/2057A3	60R	M62 J25 - J30	
09/09/15 07:57:13	SIG	M62/2057J1	60R	M62 J25 - J30	
09/09/15 07:57:13	SIG	M62/2088A1	60R	M62 J25 - J30	
09/09/15 07:57:21	SIG	M62/2079A1	60R	M62 J25 - J30	
09/09/15 07:57:55	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 07:57:55	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 07:58:01	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 07:58:42	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 07:58:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 07:58:48	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1968A1	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1968A2	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1968A3	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1968A4	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1974A1	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1974A2	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1974A3	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1974A4	60R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1979K1	50R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1979K2	50R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1981A1	50R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1981A2	50R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1981A3	50R	M62 J25 - J30	
09/09/15 07:58:55	SIG	M62/1981A4	50R	M62 J25 - J30	
09/09/15 07:59:09	SIG	M62/1992A1	40R	M62 J25 - J30	
09/09/15 07:59:09	SIG	M62/1992A2	40R	M62 J25 - J30	
09/09/15 07:59:09	SIG	M62/1992A3	40R	M62 J25 - J30	
09/09/15 07:59:09	SIG	M62/1992J1	40R	M62 J25 - J30	
09/09/15 07:59:37	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 07:59:37	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 07:59:37	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 07:59:37	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 08:00:44	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 08:00:44	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 08:00:44	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 08:00:44	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 08:00:55	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:00:55	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:01:01	SIG	M62/1987A1	40R	M62 J25 - J30	
09/09/15 08:01:01	SIG	M62/1987A3	40R	M62 J25 - J30	
09/09/15 08:01:01	SIG	M62/1987J1	40R	M62 J25 - J30	
09/09/15 08:01:01	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 08:01:24	SIG	M62/2113B1	BLNK	M62 J25 - J30	
09/09/15 08:01:24	SIG	M62/2113B2	OFF	M62 J25 - J30	
09/09/15 08:01:24	SIG	M62/2113B3	OFF	M62 J25 - J30	
09/09/15 08:01:24	SIG	M62/2113B4	OFF	M62 J25 - J30	
09/09/15 08:01:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
09/09/15 08:01:24	SIG	M62/2117B3	OFF	M62 J25 - J30	
09/09/15 08:01:25	SIG	M62/2125B1	NR	M62 J25 - J30	
09/09/15 08:01:25	SIG	M62/2125B2	NR	M62 J25 - J30	
09/09/15 08:01:25	SIG	M62/2125B3	NR	M62 J25 - J30	
09/09/15 08:01:25	SIG	M62/2125L1	NR	M62 J25 - J30	
09/09/15 08:01:25	SIG	M62/2125L2	NR	M62 J25 - J30	
09/09/15 08:01:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:01:49	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:01:55	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1974A1	50R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1974A2	50R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1974A3	50R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1974A4	50R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1979K1	40R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1979K2	40R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1981A1	40R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1981A2	40R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1981A3	40R	M62 J25 - J30	
09/09/15 08:02:50	SIG	M62/1981A4	40R	M62 J25 - J30	
09/09/15 08:03:13	SIG	M62/2041A1	50R	M62 J25 - J30	
09/09/15 08:03:13	SIG	M62/2041A2	50R	M62 J25 - J30	
09/09/15 08:03:13	SIG	M62/2041A3	50R	M62 J25 - J30	
09/09/15 08:03:13	SIG	M62/2041A4	50R	M62 J25 - J30	
09/09/15 08:03:56	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:03:57	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:04:02	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 08:04:15	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2125B1	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2125B2	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2125B3	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2125L1	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2125L2	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2132B1	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2132B2	NR	M62 J25 - J30	
09/09/15 08:04:25	SIG	M62/2132B3	NR	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1974A1	40R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1974A2	40R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1974A3	40R	M62 J25 - J30	
09/09/15 08:04:28	SIG	M62/1974A4	40R	M62 J25 - J30	
09/09/15 08:04:38	SIG	M62/2033A1	50R	M62 J25 - J30	
09/09/15 08:04:38	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 08:04:38	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 08:04:38	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2183B1	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2183B2	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2183L1	60R	M62 J25 - J30	
09/09/15 08:04:55	SIG	M62/2183L2	60R	M62 J25 - J30	
09/09/15 08:05:05	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 08:05:05	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 08:05:05	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 08:05:05	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 08:05:10	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 08:07:01	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:07:02	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:07:07	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2050A2	60R	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2050A3	60R	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2050A4	60R	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2125B1	OFF	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2125B2	OFF	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2125B3	OFF	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2125L1	OFF	M62 J25 - J30	
09/09/15 08:07:25	SIG	M62/2125L2	OFF	M62 J25 - J30	
09/09/15 08:07:27	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:07:27	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 08:07:27	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 08:07:27	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1960A3	50R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1960K1	50R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1960K2	50R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1968A1	40R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1968A2	40R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1968A3	40R	M62 J25 - J30	
09/09/15 08:07:42	SIG	M62/1968A4	40R	M62 J25 - J30	
09/09/15 08:08:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:08:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 08:08:16	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 08:08:22	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2132B1	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2132B2	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2132B3	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2137B1	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2137B2	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2137B3	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2137B4	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2147B1	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2147B2	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2147B3	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2147B4	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2159B1	NR	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2159B2	NR	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2159M1	OFF	M62 J25 - J30	
09/09/15 08:08:25	SIG	M62/2159M2	OFF	M62 J25 - J30	
09/09/15 08:08:45	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 08:08:45	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 08:08:45	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 08:08:45	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 08:09:06	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 08:10:06	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:10:07	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 08:10:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 08:11:25	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 08:12:22	SIG	M62/2057A1	50R	M62 J25 - J30	
09/09/15 08:12:22	SIG	M62/2057A2	50R	M62 J25 - J30	
09/09/15 08:12:22	SIG	M62/2057A3	50R	M62 J25 - J30	
09/09/15 08:12:22	SIG	M62/2057J1	50R	M62 J25 - J30	
09/09/15 08:12:22	SIG	M621/1002A1	50R	M62 J25 - J30	
09/09/15 08:12:22	SIG	M621/1002A2	50R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2057A1	40R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2057A2	40R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2057A3	40R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M62/2057J1	40R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M621/1002A1	40R	M62 J25 - J30	
09/09/15 08:12:27	SIG	M621/1002A2	40R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2025A1	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2025A2	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2025A3	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2025A4	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2033A1	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2033A2	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2033A3	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2033A4	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2041A1	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2041A2	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2041A3	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2041A4	60R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 08:12:28	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2065A2	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2065A3	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2065A4	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2088A1	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2088A2	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2088A3	50R	M62 J25 - J30	
09/09/15 08:12:29	SIG	M62/2088A4	50R	M62 J25 - J30	
09/09/15 08:12:34	SIG	M62/2088A1	40R	M62 J25 - J30	
09/09/15 08:12:34	SIG	M62/2088A2	40R	M62 J25 - J30	
09/09/15 08:12:34	SIG	M62/2088A3	40R	M62 J25 - J30	
09/09/15 08:12:34	SIG	M62/2088A4	40R	M62 J25 - J30	
09/09/15 08:12:40	SIG	M62/2088A1	30R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2073K1	50R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2079A1	LDR	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2079A2	50R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2079A3	50R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2079A4	50R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2088A1	20R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2088A2	40R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2088A3	40R	M62 J25 - J30	
09/09/15 08:12:45	SIG	M62/2088A4	40R	M62 J25 - J30	
09/09/15 08:12:47	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 08:12:47	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 08:12:47	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 08:12:47	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 08:12:50	SIG	M62/2088A1	STOP	M62 J25 - J30	
09/09/15 08:12:51	SIG	M62/2097A1	LDR	M62 J25 - J30	
09/09/15 08:12:51	SIG	M62/2097A2	50R	M62 J25 - J30	
09/09/15 08:12:51	SIG	M62/2097A3	50R	M62 J25 - J30	
09/09/15 08:12:51	SIG	M62/2097A4	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2004A1	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2004A2	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2004A3	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 08:13:17	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 08:13:25	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2004A1	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2004A2	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2004A3	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2008K1	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2008K2	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2012A1	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2012A2	40R	M62 J25 - J30	
09/09/15 08:13:29	SIG	M62/2012A3	40R	M62 J25 - J30	
09/09/15 08:14:22	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:14:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:14:28	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:14:47	SIG	M62/2050A1	40R	M62 J25 - J30	
09/09/15 08:14:47	SIG	M62/2050A2	40R	M62 J25 - J30	
09/09/15 08:14:47	SIG	M62/2050A3	40R	M62 J25 - J30	
09/09/15 08:14:47	SIG	M62/2050A4	40R	M62 J25 - J30	
09/09/15 08:15:13	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:15:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 08:15:24	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 08:15:24	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 08:15:24	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 08:15:24	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1955K1	50R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1955K2	50R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1956A1	50R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1956A2	50R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1956A3	50R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1960A1	40R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1960A2	40R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1960A3	40R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1960K1	40R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/1960K2	40R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/2065A2	60R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/2065A3	60R	M62 J25 - J30	
09/09/15 08:15:30	SIG	M62/2065A4	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2073K1	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2079A1	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2079A2	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2079A3	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2079A4	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2088A1	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2088A2	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2088A3	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2088A4	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2097A1	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2097A2	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2097A3	60R	M62 J25 - J30	
09/09/15 08:15:43	SIG	M62/2097A4	60R	M62 J25 - J30	
09/09/15 08:16:14	SIG	M62/1999J1	50R	M62 J25 - J30	
09/09/15 08:16:14	SIG	M62/1999J2	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1992A1	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1992A2	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1992A3	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1992J1	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1999A1	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1999A2	50R	M62 J25 - J30	
09/09/15 08:16:36	SIG	M62/1999A3	50R	M62 J25 - J30	
09/09/15 08:17:03	SIG	M62/2041A1	50R	M62 J25 - J30	
09/09/15 08:17:03	SIG	M62/2041A2	50R	M62 J25 - J30	
09/09/15 08:17:03	SIG	M62/2041A3	50R	M62 J25 - J30	
09/09/15 08:17:03	SIG	M62/2041A4	50R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2033A1	50R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2041A1	40R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2041A2	40R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2041A3	40R	M62 J25 - J30	
09/09/15 08:17:09	SIG	M62/2041A4	40R	M62 J25 - J30	
09/09/15 08:17:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:17:22	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:17:25	SIG	M62/2018A1	60R	M62 J25 - J30	
09/09/15 08:17:25	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 08:17:25	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 08:17:25	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 08:17:28	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2004A1	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2004A2	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2004A3	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 08:17:29	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 08:17:51	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 08:17:51	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 08:17:51	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 08:17:51	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 08:17:56	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 08:17:56	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 08:17:56	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 08:17:56	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 08:18:06	SIG	M621/1002A1	OFF	M62 J25 - J30	
09/09/15 08:18:06	SIG	M621/1002A2	OFF	M62 J25 - J30	
09/09/15 08:18:08	SIG	M62/1987A1	50R	M62 J25 - J30	
09/09/15 08:18:08	SIG	M62/1987A3	50R	M62 J25 - J30	
09/09/15 08:18:08	SIG	M62/1987J1	50R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 08:18:21	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 08:18:30	SIG	M62/1987A1	40R	M62 J25 - J30	
09/09/15 08:18:30	SIG	M62/1987A3	40R	M62 J25 - J30	
09/09/15 08:18:30	SIG	M62/1987J1	40R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2033A1	40R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2033A2	40R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2033A3	40R	M62 J25 - J30	
09/09/15 08:18:41	SIG	M62/2033A4	40R	M62 J25 - J30	
09/09/15 08:18:51	SIG	M62/1987A1	50R	M62 J25 - J30	
09/09/15 08:18:51	SIG	M62/1987A3	50R	M62 J25 - J30	
09/09/15 08:18:51	SIG	M62/1987J1	50R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 08:19:00	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 08:19:25	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 08:19:25	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 08:19:25	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:19:25	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:19:30	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 08:19:30	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 08:19:30	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:19:30	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:19:59	SIG	M62/2057A1	60R	M62 J25 - J30	
09/09/15 08:19:59	SIG	M62/2057A2	60R	M62 J25 - J30	
09/09/15 08:19:59	SIG	M62/2057A3	60R	M62 J25 - J30	
09/09/15 08:19:59	SIG	M62/2057J1	60R	M62 J25 - J30	
09/09/15 08:21:12	SIG	M62/1979K1	50R	M62 J25 - J30	
09/09/15 08:21:12	SIG	M62/1979K2	50R	M62 J25 - J30	
09/09/15 08:21:12	SIG	M62/1981A1	50R	M62 J25 - J30	
09/09/15 08:21:12	SIG	M62/1981A2	50R	M62 J25 - J30	
09/09/15 08:21:12	SIG	M62/1981A3	50R	M62 J25 - J30	
09/09/15 08:21:12	SIG	M62/1981A4	50R	M62 J25 - J30	
09/09/15 08:21:22	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 08:21:22	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:21:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:21:30	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:21:35	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:21:57	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 08:21:57	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 08:21:57	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2025A2	40R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2025A3	40R	M62 J25 - J30	
09/09/15 08:22:02	SIG	M62/2025A4	40R	M62 J25 - J30	
09/09/15 08:22:51	SIG	M62/2050A1	50R	M62 J25 - J30	
09/09/15 08:22:51	SIG	M62/2050A2	50R	M62 J25 - J30	
09/09/15 08:22:51	SIG	M62/2050A3	50R	M62 J25 - J30	
09/09/15 08:22:51	SIG	M62/2050A4	50R	M62 J25 - J30	
09/09/15 08:23:23	SIG	M62/1974A1	50R	M62 J25 - J30	
09/09/15 08:23:23	SIG	M62/1974A2	50R	M62 J25 - J30	
09/09/15 08:23:23	SIG	M62/1974A3	50R	M62 J25 - J30	
09/09/15 08:23:23	SIG	M62/1974A4	50R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 08:23:25	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2004A1	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2004A2	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2004A3	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 08:23:25	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 08:23:56	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2018A1	40R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 08:23:56	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 08:24:27	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:24:27	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:24:33	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 08:24:36	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:24:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:24:42	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 08:24:42	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 08:24:42	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 08:24:42	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 08:24:42	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2004A1	50R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2004A2	50R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2004A3	50R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2008K1	40R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2008K2	40R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2012A1	40R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2012A2	40R	M62 J25 - J30	
09/09/15 08:25:16	SIG	M62/2012A3	40R	M62 J25 - J30	
09/09/15 08:25:20	SIG	M62/2041A1	50R	M62 J25 - J30	
09/09/15 08:25:20	SIG	M62/2041A2	50R	M62 J25 - J30	
09/09/15 08:25:20	SIG	M62/2041A3	50R	M62 J25 - J30	
09/09/15 08:25:20	SIG	M62/2041A4	50R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1987A1	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1987A3	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1987J1	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1992A1	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1992A2	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1992A3	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1992J1	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1999A1	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1999A2	60R	M62 J25 - J30	
09/09/15 08:25:34	SIG	M62/1999A3	60R	M62 J25 - J30	
09/09/15 08:25:44	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 08:25:44	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 08:25:44	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 08:25:44	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 08:25:59	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 08:25:59	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 08:25:59	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:25:59	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:26:05	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 08:26:05	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 08:26:05	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:26:05	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/1999A1	50R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/1999A2	50R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/1999A3	50R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2004A1	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2004A2	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2004A3	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2189B1	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2189B2	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2189B3	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2189B4	40R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2194B1	50R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2194B2	50R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2194B3	50R	M62 J25 - J30	
09/09/15 08:26:47	SIG	M62/2194B4	50R	M62 J25 - J30	
09/09/15 08:26:53	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 08:26:53	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 08:26:53	SIG	M62/1960A3	50R	M62 J25 - J30	
09/09/15 08:26:53	SIG	M62/1960K1	50R	M62 J25 - J30	
09/09/15 08:26:53	SIG	M62/1960K2	50R	M62 J25 - J30	
09/09/15 08:27:20	SIG	M62/2033A1	50R	M62 J25 - J30	
09/09/15 08:27:20	SIG	M62/2033A2	50R	M62 J25 - J30	
09/09/15 08:27:20	SIG	M62/2033A3	50R	M62 J25 - J30	
09/09/15 08:27:20	SIG	M62/2033A4	50R	M62 J25 - J30	
09/09/15 08:27:31	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:27:31	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:27:37	SIG	M62/2025A1	40R	M62 J25 - J30	
09/09/15 08:27:43	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:27:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:27:49	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:28:25	SIG	M62/1979K1	60R	M62 J25 - J30	
09/09/15 08:28:25	SIG	M62/1979K2	60R	M62 J25 - J30	
09/09/15 08:28:25	SIG	M62/1981A1	60R	M62 J25 - J30	
09/09/15 08:28:25	SIG	M62/1981A2	60R	M62 J25 - J30	
09/09/15 08:28:25	SIG	M62/1981A3	60R	M62 J25 - J30	
09/09/15 08:28:25	SIG	M62/1981A4	60R	M62 J25 - J30	
09/09/15 08:29:06	SIG	M62/2025A1	50R	M62 J25 - J30	
09/09/15 08:29:06	SIG	M62/2025A2	50R	M62 J25 - J30	
09/09/15 08:29:06	SIG	M62/2025A3	50R	M62 J25 - J30	
09/09/15 08:29:06	SIG	M62/2025A4	50R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1992A1	50R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1992A2	50R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1992A3	50R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1992J1	50R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1999A1	40R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1999A2	40R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1999A3	40R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1999J1	40R	M62 J25 - J30	
09/09/15 08:30:05	SIG	M62/1999J2	40R	M62 J25 - J30	
09/09/15 08:30:25	SIG	M62/1974A1	60R	M62 J25 - J30	
09/09/15 08:30:25	SIG	M62/1974A2	60R	M62 J25 - J30	
09/09/15 08:30:25	SIG	M62/1974A3	60R	M62 J25 - J30	
09/09/15 08:30:25	SIG	M62/1974A4	60R	M62 J25 - J30	
09/09/15 08:30:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:30:49	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:30:54	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:30:57	SIG	M62/2018A1	50R	M62 J25 - J30	
09/09/15 08:30:57	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 08:30:57	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 08:30:57	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 08:31:36	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:31:37	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1960A1	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1960A2	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1960A3	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1960K1	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1960K2	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1968A1	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1968A2	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1968A3	60R	M62 J25 - J30	
09/09/15 08:32:35	SIG	M62/1968A4	60R	M62 J25 - J30	
09/09/15 08:32:56	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 08:32:56	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 08:32:56	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 08:32:56	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 08:33:25	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 08:33:25	SIG	M62/2050A2	60R	M62 J25 - J30	
09/09/15 08:33:25	SIG	M62/2050A3	60R	M62 J25 - J30	
09/09/15 08:33:25	SIG	M62/2050A4	60R	M62 J25 - J30	
09/09/15 08:33:51	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 08:33:51	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 08:33:51	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 08:33:51	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 08:33:51	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 08:33:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:33:55	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2189B1	50R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 08:34:01	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1987A1	50R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1987A3	50R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1987J1	50R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1992A1	40R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1992A2	40R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1992A3	40R	M62 J25 - J30	
09/09/15 08:34:08	SIG	M62/1992J1	40R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2018A1	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2025A1	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2025A2	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2025A3	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2025A4	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2033A1	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2033A2	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2033A3	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2033A4	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2041A1	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2041A2	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2041A3	60R	M62 J25 - J30	
09/09/15 08:35:26	SIG	M62/2041A4	60R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1979K1	50R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1979K2	50R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1981A1	50R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1981A2	50R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1981A3	50R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1981A4	50R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1987A1	40R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1987A3	40R	M62 J25 - J30	
09/09/15 08:35:33	SIG	M62/1987J1	40R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2183B1	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2183B2	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2183L1	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2183L2	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2189B1	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2189B2	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2189B3	60R	M62 J25 - J30	
09/09/15 08:36:10	SIG	M62/2189B4	60R	M62 J25 - J30	
09/09/15 08:36:33	SIG	M62/2004A1	50R	M62 J25 - J30	
09/09/15 08:36:33	SIG	M62/2004A2	50R	M62 J25 - J30	
09/09/15 08:36:33	SIG	M62/2004A3	50R	M62 J25 - J30	
09/09/15 08:37:25	SIG	M62/1956A1	60R	M62 J25 - J30	
09/09/15 08:37:25	SIG	M62/1956A1	60R	M62 J25 - J30	
09/09/15 08:37:25	SIG	M62/1956A1	OFF	M62 J25 - J30	
09/09/15 08:37:31	SIG	M62/1956A3	OFF	M62 J25 - J30	
09/09/15 08:37:32	SIG	M62/1956A3	60R	M62 J25 - J30	
09/09/15 08:37:32	SIG	M62/1956A3	60R	M62 J25 - J30	
09/09/15 08:37:33	SIG	M62/1955K2	60R	M62 J25 - J30	
09/09/15 08:37:33	SIG	M62/1955K2	60R	M62 J25 - J30	
09/09/15 08:37:33	SIG	M62/1955K2	60R	M62 J25 - J30	
09/09/15 08:37:34	SIG	M62/1956A2	OFF	M62 J25 - J30	
09/09/15 08:37:35	SIG	M62/1956A2	60R	M62 J25 - J30	
09/09/15 08:37:35	SIG	M62/1956A2	60R	M62 J25 - J30	
09/09/15 08:37:43	SIG	M62/1955K1	60R	M62 J25 - J30	
09/09/15 08:37:43	SIG	M62/1955K1	60R	M62 J25 - J30	
09/09/15 08:37:43	SIG	M62/1955K1	OFF	M62 J25 - J30	
09/09/15 08:37:55	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 08:37:56	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 08:37:59	SIG	M62/1999A1	50R	M62 J25 - J30	
09/09/15 08:37:59	SIG	M62/1999A2	50R	M62 J25 - J30	
09/09/15 08:37:59	SIG	M62/1999A3	50R	M62 J25 - J30	
09/09/15 08:37:59	SIG	M62/1999J1	50R	M62 J25 - J30	
09/09/15 08:37:59	SIG	M62/1999J2	50R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 08:38:33	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2170B1	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2170B2	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2170L1	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2170L2	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2177B1	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2177B2	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2177L1	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2177L2	40R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 08:38:38	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1979K1	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1979K2	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1981A1	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1981A2	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1981A3	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1981A4	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1987A1	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1987A3	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1987J1	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1992A1	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1992A2	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1992A3	60R	M62 J25 - J30	
09/09/15 08:39:33	SIG	M62/1992J1	60R	M62 J25 - J30	
09/09/15 08:41:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:41:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:41:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:41:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:42:25	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 08:42:25	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 08:42:25	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 08:42:25	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 08:42:25	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 08:42:25	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 08:42:25	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2177B1	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2177B2	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2177L1	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2177L2	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2183B1	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2183B2	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2183L1	60R	M62 J25 - J30	
09/09/15 08:42:33	SIG	M62/2183L2	60R	M62 J25 - J30	
09/09/15 08:43:25	SIG	M62/1999A1	60R	M62 J25 - J30	
09/09/15 08:43:25	SIG	M62/1999A2	60R	M62 J25 - J30	
09/09/15 08:43:25	SIG	M62/1999A3	60R	M62 J25 - J30	
09/09/15 08:43:25	SIG	M62/2004A1	60R	M62 J25 - J30	
09/09/15 08:43:25	SIG	M62/2004A2	60R	M62 J25 - J30	
09/09/15 08:43:25	SIG	M62/2004A3	60R	M62 J25 - J30	
09/09/15 08:45:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:45:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:45:25	SIG	M606/2003B1	OFF	M62 J25 - J30	
09/09/15 08:45:26	SIG	M606/2003B2	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1955K1	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1955K2	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1956A1	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1956A2	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1956A3	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1960A1	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1960A2	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1960A3	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1960K1	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1960K2	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1968A1	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1968A2	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1968A3	OFF	M62 J25 - J30	
09/09/15 08:47:26	SIG	M62/1968A4	OFF	M62 J25 - J30	
09/09/15 08:51:25	SIG	M62/1974A1	OFF	M62 J25 - J30	
09/09/15 08:51:25	SIG	M62/1974A2	OFF	M62 J25 - J30	
09/09/15 08:51:25	SIG	M62/1974A3	OFF	M62 J25 - J30	
09/09/15 08:51:25	SIG	M62/1974A4	OFF	M62 J25 - J30	
09/09/15 08:52:25	SIG	M62/2159B1	NR	M62 J25 - J30	
09/09/15 08:52:25	SIG	M62/2159B2	NR	M62 J25 - J30	
09/09/15 08:52:25	SIG	M62/2170B1	NR	M62 J25 - J30	
09/09/15 08:52:25	SIG	M62/2170B2	NR	M62 J25 - J30	
09/09/15 08:52:25	SIG	M62/2170L1	OFF	M62 J25 - J30	
09/09/15 08:52:25	SIG	M62/2170L2	OFF	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2197B1	NR	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2197B2	NR	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2197B3	NR	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2199M1	OFF	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2199M2	OFF	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2203B1	OFF	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2203B2	OFF	M62 J25 - J30	
09/09/15 08:54:25	SIG	M62/2203B3	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1979K1	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1979K2	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1981A1	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1981A2	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1981A3	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1981A4	OFF	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1987A1	NR	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1987A3	NR	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1987J1	NR	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1992A1	NR	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1992A2	NR	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1992A3	NR	M62 J25 - J30	
09/09/15 08:54:46	SIG	M62/1992J1	NR	M62 J25 - J30	
09/09/15 08:55:25	SIG	M62/2159B1	OFF	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2159B2	OFF	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2170B1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2170B2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2177B1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2177B2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2177L1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2177L2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2183B1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2183B2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2183L1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2183L2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2189B1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2189B2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2189B3	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2189B4	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2194B1	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2194B2	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2194B3	NR	M62 J25 - J30	
09/09/15 08:55:26	SIG	M62/2194B4	NR	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/1999A1	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/1999A2	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/1999A3	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/1999J1	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/1999J2	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/2004A1	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/2004A2	OFF	M62 J25 - J30	
09/09/15 08:56:25	SIG	M62/2004A3	OFF	M62 J25 - J30	
09/09/15 08:57:26	SIG	M62/2197B1	OFF	M62 J25 - J30	
09/09/15 08:57:26	SIG	M62/2197B2	OFF	M62 J25 - J30	
09/09/15 08:57:26	SIG	M62/2197B3	OFF	M62 J25 - J30	
09/09/15 08:57:46	SIG	M62/1987J1	OFF	M62 J25 - J30	
09/09/15 08:57:56	SIG	M62/1987A1	OFF	M62 J25 - J30	
09/09/15 08:57:56	SIG	M62/1987A3	OFF	M62 J25 - J30	
09/09/15 08:57:56	SIG	M62/1992A1	OFF	M62 J25 - J30	
09/09/15 08:57:56	SIG	M62/1992A2	OFF	M62 J25 - J30	
09/09/15 08:57:56	SIG	M62/1992A3	OFF	M62 J25 - J30	
09/09/15 08:57:56	SIG	M62/1992J1	OFF	M62 J25 - J30	
09/09/15 08:58:26	SIG	M62/2194B1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2170B1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2170B2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2177B1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2177B2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2177L1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2177L2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2183B1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2183L1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2183L2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2189B1	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2189B2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2189B3	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2189B4	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2194B2	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2194B3	OFF	M62 J25 - J30	
09/09/15 08:58:27	SIG	M62/2194B4	OFF	M62 J25 - J30	
09/09/15 08:59:25	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 09:13:22	SIG	M62/2079A1	HSD	M62 J25 - J30	
09/09/15 09:14:30	SIG	M62/2088A1	HSD	M62 J25 - J30	
09/09/15 09:15:43	SIG	M62/2079A1	REDX	M62 J25 - J30	
09/09/15 09:15:43	SIG	M62/2097A1	HSD	M62 J25 - J30	
09/09/15 09:16:47	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 09:16:47	SIG	M62/2106A1	HSD	M62 J25 - J30	
09/09/15 09:17:54	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 09:19:03	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 09:20:03	SIG	M62/2065A2	NR	M62 J25 - J30	
09/09/15 09:20:03	SIG	M62/2065A3	NR	M62 J25 - J30	
09/09/15 09:20:03	SIG	M62/2065A4	NR	M62 J25 - J30	
09/09/15 09:20:12	SIG	M62/2073K1	NR	M62 J25 - J30	
09/09/15 09:20:12	SIG	M62/2079A2	NR	M62 J25 - J30	
09/09/15 09:20:12	SIG	M62/2079A3	NR	M62 J25 - J30	
09/09/15 09:20:12	SIG	M62/2079A4	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2088A2	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2088A3	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2088A4	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2097A2	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2097A3	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2097A4	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2106A2	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2106A3	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2106A4	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2114A1	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2114A2	NR	M62 J25 - J30	
09/09/15 09:20:13	SIG	M62/2114A3	NR	M62 J25 - J30	
09/09/15 09:21:12	SIG	M62/2073K1	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2079A1	BLNK	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2079A2	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2079A3	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2079A4	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2088A1	BLNK	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2088A2	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2088A3	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2088A4	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2097A1	BLNK	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2097A2	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2097A3	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2097A4	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2106A1	BLNK	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2106A2	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2106A3	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2106A4	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2114A1	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2114A2	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2114A3	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2117A1	BLNK	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2117A2	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2117A3	OFF	M62 J25 - J30	
09/09/15 09:21:14	SIG	M62/2117A4	OFF	M62 J25 - J30	
09/09/15 10:26:30	SIG	M62/2197B1	NR	M62 J25 - J30	
09/09/15 10:26:30	SIG	M62/2197B2	NR	M62 J25 - J30	
09/09/15 10:26:30	SIG	M62/2197B3	NR	M62 J25 - J30	
09/09/15 10:26:30	SIG	M62/2203B1	50R	M62 J25 - J30	
09/09/15 10:26:30	SIG	M62/2203B2	50R	M62 J25 - J30	
09/09/15 10:26:30	SIG	M62/2203B3	50R	M62 J25 - J30	
09/09/15 10:28:35	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 10:28:35	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 10:28:35	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 10:28:35	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 10:28:40	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 10:28:40	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 10:28:40	SIG	M62/2183L1	40R	M62 J25 - J30	
09/09/15 10:28:40	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 10:28:46	SIG	M62/2183L1	30R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2177B1	NR	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2177B2	NR	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2177L1	NR	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2177L2	NR	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2183B1	40R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2183B2	40R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2183L1	20R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2183L2	40R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2189B1	LDR	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2189B2	50R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2189B3	50R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2189B4	50R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2194B1	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2194B2	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2194B3	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2194B4	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2197B1	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2197B2	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2197B3	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2199M1	60R	M62 J25 - J30	
09/09/15 10:28:51	SIG	M62/2199M2	60R	M62 J25 - J30	
09/09/15 10:28:56	SIG	M62/2183L1	STOP	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2177B1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2177B2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2177L1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2177L2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2183B1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2183B2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2183L1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2183L2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2189B1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2189B2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2189B3	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2189B4	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2194B1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2194B2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2194B3	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2194B4	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2197B1	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2197B2	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2197B3	NR	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2199M1	OFF	M62 J25 - J30	
09/09/15 10:29:13	SIG	M62/2199M2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2177B1	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2177B2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2177L1	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2177L2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2183B1	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2183L1	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2183L2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2189B1	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2189B2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2189B3	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2189B4	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2194B1	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2194B2	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2194B3	OFF	M62 J25 - J30	
09/09/15 10:32:13	SIG	M62/2194B4	OFF	M62 J25 - J30	
09/09/15 10:38:19	SIG	M62/2197B1	OFF	M62 J25 - J30	
09/09/15 10:38:19	SIG	M62/2197B2	OFF	M62 J25 - J30	
09/09/15 10:38:19	SIG	M62/2197B3	OFF	M62 J25 - J30	
09/09/15 10:38:19	SIG	M62/2203B1	OFF	M62 J25 - J30	
09/09/15 10:38:19	SIG	M62/2203B2	OFF	M62 J25 - J30	
09/09/15 10:38:19	SIG	M62/2203B3	OFF	M62 J25 - J30	
09/09/15 10:57:49	SIG	M62/2057B1	HSD	M62 J25 - J30	
09/09/15 10:59:48	SIG	M62/2041B1	HSD	M62 J25 - J30	
09/09/15 10:59:49	SIG	M62/2057B1	REDX	M62 J25 - J30	
09/09/15 10:59:49	SIG	M621/1002B1	HSD	M62 J25 - J30	
09/09/15 10:59:49	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 10:59:49	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 11:00:48	SIG	M62/2033B1	HSD	M62 J25 - J30	
09/09/15 11:01:48	SIG	M62/2025B1	HSD	M62 J25 - J30	
09/09/15 11:01:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
09/09/15 11:02:41	SIG	M62/2033B1	REDX	M62 J25 - J30	
09/09/15 11:03:25	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2050B2	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2050B3	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2050B4	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2057B2	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2057B3	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2057B4	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2065B2	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2065B3	NR	M62 J25 - J30	
09/09/15 11:03:55	SIG	M62/2065B4	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2018B1	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2018B2	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2018B3	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2018L1	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2025B2	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2025B3	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2025B4	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2033B2	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2033B3	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2033B4	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2041B2	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2041B3	NR	M62 J25 - J30	
09/09/15 11:03:56	SIG	M62/2041B4	NR	M62 J25 - J30	
09/09/15 11:04:55	SIG	M62/2069M1	OFF	M62 J25 - J30	
09/09/15 11:04:55	SIG	M62/2069M2	OFF	M62 J25 - J30	
09/09/15 11:04:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 11:04:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2033B1	BLNK	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2033B2	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2033B4	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2041B1	BLNK	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2041B2	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2041B3	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2041B4	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2050B2	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2050B3	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2050B4	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2057B1	BLNK	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2057B2	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2057B3	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2057B4	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2065B1	BLNK	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2065B2	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2065B3	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2065B4	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M62/2065M1	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M621/1002B1	OFF	M62 J25 - J30	
09/09/15 11:04:56	SIG	M621/1002B2	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2012B1	BLNK	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2012B2	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2012B3	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2012B4	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2018B1	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2018B2	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2018B3	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2018L1	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2025B2	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2025B3	OFF	M62 J25 - J30	
09/09/15 11:04:57	SIG	M62/2025B4	OFF	M62 J25 - J30	
09/09/15 11:39:27	SIG	M62/2074B1	BLNK	M62 J25 - J30	
09/09/15 11:39:27	SIG	M62/2074B1	OFF	M62 J25 - J30	
09/09/15 11:41:58	SIG	M62/2025A1	HSD	M62 J25 - J30	
09/09/15 11:42:58	SIG	M62/2033A1	HSD	M62 J25 - J30	
09/09/15 11:43:58	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 11:43:58	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 11:43:58	SIG	M62/2041A1	HSD	M62 J25 - J30	
09/09/15 11:45:05	SIG	M62/2033A1	REDX	M62 J25 - J30	
09/09/15 11:45:05	SIG	M62/2050A1	HSD	M62 J25 - J30	
09/09/15 11:45:57	SIG	M62/2041A1	REDX	M62 J25 - J30	
09/09/15 11:46:57	SIG	M62/2050A1	REDX	M62 J25 - J30	
09/09/15 11:47:57	SIG	M62/2025A2	NR	M62 J25 - J30	
09/09/15 11:47:57	SIG	M62/2025A3	NR	M62 J25 - J30	
09/09/15 11:47:57	SIG	M62/2025A4	NR	M62 J25 - J30	
09/09/15 11:47:57	SIG	M62/2033A2	NR	M62 J25 - J30	
09/09/15 11:47:57	SIG	M62/2033A3	NR	M62 J25 - J30	
09/09/15 11:47:57	SIG	M62/2033A4	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2041A2	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2041A3	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2041A4	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2050A2	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2050A3	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2050A4	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2057A1	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2057A2	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2057A3	NR	M62 J25 - J30	
09/09/15 11:47:58	SIG	M62/2057J1	NR	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2008K1	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2008K2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2012A1	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2012A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2012A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2018A1	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2018A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2018A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2018A4	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2025A1	BLNK	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2025A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2025A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2025A4	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2033A1	BLNK	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2033A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2033A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2033A4	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2041A1	BLNK	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2041A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2041A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2041A4	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2050A1	BLNK	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2050A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2050A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2050A4	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2057A1	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2057A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2057A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2057J1	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2065A1	BLNK	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2065A2	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2065A3	OFF	M62 J25 - J30	
09/09/15 11:48:58	SIG	M62/2065A4	OFF	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1960A3	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1960K1	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1960K2	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 12:08:57	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1955K1	50R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1955K2	50R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1956A1	50R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1956A2	50R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1956A3	50R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1960A1	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1960A2	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1960A3	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1960K1	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1960K2	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1968A1	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1968A2	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1968A3	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1968A4	40R	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1974A1	NR	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1974A2	NR	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1974A3	NR	M62 J25 - J30	
09/09/15 12:09:03	SIG	M62/1974A4	NR	M62 J25 - J30	
09/09/15 12:12:03	SIG	M62/1955K1	40R	M62 J25 - J30	
09/09/15 12:12:03	SIG	M62/1955K2	40R	M62 J25 - J30	
09/09/15 12:12:03	SIG	M62/1956A1	40R	M62 J25 - J30	
09/09/15 12:12:03	SIG	M62/1956A2	40R	M62 J25 - J30	
09/09/15 12:12:03	SIG	M62/1956A3	40R	M62 J25 - J30	
09/09/15 12:15:43	SIG	M62/1968A1	60R	M62 J25 - J30	
09/09/15 12:15:43	SIG	M62/1968A2	60R	M62 J25 - J30	
09/09/15 12:15:43	SIG	M62/1968A3	60R	M62 J25 - J30	
09/09/15 12:15:43	SIG	M62/1968A4	60R	M62 J25 - J30	
09/09/15 12:17:10	SIG	M62/1960K1	30R	M62 J25 - J30	
09/09/15 12:17:10	SIG	M62/1960K2	30R	M62 J25 - J30	
09/09/15 12:17:10	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 12:17:10	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 12:17:10	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 12:17:10	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 12:17:15	SIG	M62/1968A1	40R	M62 J25 - J30	
09/09/15 12:17:15	SIG	M62/1968A2	40R	M62 J25 - J30	
09/09/15 12:17:15	SIG	M62/1968A3	40R	M62 J25 - J30	
09/09/15 12:17:15	SIG	M62/1968A4	40R	M62 J25 - J30	
09/09/15 12:17:21	SIG	M62/1968A1	30R	M62 J25 - J30	
09/09/15 12:17:21	SIG	M62/1968A2	30R	M62 J25 - J30	
09/09/15 12:17:21	SIG	M62/1968A3	30R	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1956A1	LDR	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1956A2	LDR	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1960A1	LDR	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1960A2	LDR	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1960K1	30R	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1960K2	30R	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1968A1	20R	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1968A2	20R	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1968A3	20R	M62 J25 - J30	
09/09/15 12:17:27	SIG	M62/1968A4	40R	M62 J25 - J30	
09/09/15 12:17:32	SIG	M62/1968A1	STOP	M62 J25 - J30	
09/09/15 12:17:32	SIG	M62/1968A2	STOP	M62 J25 - J30	
09/09/15 12:17:32	SIG	M62/1968A3	STOP	M62 J25 - J30	
09/09/15 12:17:37	SIG	M62/1968A1	STOP	M62 J25 - J30	
09/09/15 12:17:37	SIG	M62/1968A2	STOP	M62 J25 - J30	
09/09/15 12:17:37	SIG	M62/1968A3	STOP	M62 J25 - J30	
09/09/15 12:19:36	SIG	M62/1955K1	TI	M62 J25 - J30	
09/09/15 12:19:36	SIG	M62/1955K2	TI	M62 J25 - J30	
09/09/15 12:19:36	SIG	M62/1960K1	20R	M62 J25 - J30	
09/09/15 12:19:41	SIG	M62/1960K1	STOP	M62 J25 - J30	
09/09/15 12:22:05	SIG	M62/1956A2	50R	M62 J25 - J30	
09/09/15 12:22:05	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 12:22:05	SIG	M62/1968A3	40R	M62 J25 - J30	
09/09/15 12:22:11	SIG	M62/1956A2	40R	M62 J25 - J30	
09/09/15 12:22:11	SIG	M62/1960A2	40R	M62 J25 - J30	
09/09/15 12:22:11	SIG	M62/1968A3	40R	M62 J25 - J30	
09/09/15 12:48:00	SIG	M62/1956A1	50R	M62 J25 - J30	
09/09/15 12:48:00	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 12:48:00	SIG	M62/1968A2	40R	M62 J25 - J30	
09/09/15 12:48:06	SIG	M62/1956A1	40R	M62 J25 - J30	
09/09/15 12:48:06	SIG	M62/1960A1	40R	M62 J25 - J30	
09/09/15 12:48:06	SIG	M62/1968A2	40R	M62 J25 - J30	
09/09/15 13:34:37	SIG	M62/1955K1	50R	M62 J25 - J30	
09/09/15 13:34:37	SIG	M62/1955K2	50R	M62 J25 - J30	
09/09/15 13:34:37	SIG	M62/1960K1	40R	M62 J25 - J30	
09/09/15 13:34:37	SIG	M62/1960K2	40R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1955K1	40R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1955K2	40R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1960K1	40R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1960K2	40R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 13:34:42	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1955K1	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1955K2	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1956A1	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1956A2	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1956A3	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1960A3	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1960K1	50R	M62 J25 - J30	
09/09/15 13:36:07	SIG	M62/1960K2	50R	M62 J25 - J30	
09/09/15 13:39:31	SIG	M62/1968A1	60R	M62 J25 - J30	
09/09/15 13:39:31	SIG	M62/1968A2	60R	M62 J25 - J30	
09/09/15 13:39:31	SIG	M62/1968A3	60R	M62 J25 - J30	
09/09/15 13:39:31	SIG	M62/1968A4	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2025A2	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2025A3	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2025A4	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2033A1	REDX	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2033A2	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2033A3	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2033A4	60R	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2041A1	REDX	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2041A2	NR	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2041A3	NR	M62 J25 - J30	
09/09/15 13:40:31	SIG	M62/2041A4	NR	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1955K1	60R	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1955K2	60R	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1960A1	60R	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1960A2	60R	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1960A3	60R	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1960K1	60R	M62 J25 - J30	
09/09/15 13:41:31	SIG	M62/1960K2	60R	M62 J25 - J30	
09/09/15 13:42:31	SIG	M62/1956A1	60R	M62 J25 - J30	
09/09/15 13:42:31	SIG	M62/1956A2	60R	M62 J25 - J30	
09/09/15 13:42:31	SIG	M62/1956A3	60R	M62 J25 - J30	
09/09/15 13:42:31	SIG	M62/2004A1	60R	M62 J25 - J30	
09/09/15 13:42:31	SIG	M62/2004A2	60R	M62 J25 - J30	
09/09/15 13:42:31	SIG	M62/2004A3	60R	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2041A2	60R	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2041A3	60R	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2041A4	60R	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2050A1	REDX	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2050A2	NR	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2050A3	NR	M62 J25 - J30	
09/09/15 13:43:30	SIG	M62/2050A4	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2050A2	60R	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2050A3	60R	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2050A4	60R	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2057A1	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2057A2	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2057A3	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2057J1	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2065A1	REDX	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2065A2	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2065A3	NR	M62 J25 - J30	
09/09/15 13:45:31	SIG	M62/2065A4	NR	M62 J25 - J30	
09/09/15 13:48:31	SIG	M62/2004A1	OFF	M62 J25 - J30	
09/09/15 13:48:31	SIG	M62/2004A2	OFF	M62 J25 - J30	
09/09/15 13:48:31	SIG	M62/2004A3	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2008K1	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2008K2	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2012A1	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2012A2	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2012A3	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2018A1	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2018A2	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2018A3	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2018A4	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2025A1	BLNK	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2025A2	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2025A3	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2025A4	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2033A2	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2033A3	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2033A4	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2041A2	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2041A3	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2041A4	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2050A2	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2050A3	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2050A4	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2057A1	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2057A2	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2057A3	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2057J1	NR	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2065A1	BLNK	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2065A2	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2065A3	OFF	M62 J25 - J30	
09/09/15 13:49:31	SIG	M62/2065A4	OFF	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1968A1	NR	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1968A2	NR	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1968A3	NR	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1968A4	NR	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1974A1	OFF	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1974A2	OFF	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1974A3	OFF	M62 J25 - J30	
09/09/15 13:51:31	SIG	M62/1974A4	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1955K1	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1955K2	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1956A1	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1956A2	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1956A3	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1960A1	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1960A2	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1960A3	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1960K1	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1960K2	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1968A1	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1968A2	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1968A3	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/1968A4	OFF	M62 J25 - J30	
09/09/15 13:52:31	SIG	M62/2033A2	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2033A1	BLNK	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2033A3	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2033A4	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2041A1	BLNK	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2041A2	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2041A3	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2041A4	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2050A1	BLNK	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2050A2	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2050A3	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2050A4	OFF	M62 J25 - J30	
09/09/15 13:52:32	SIG	M62/2057J1	OFF	M62 J25 - J30	
09/09/15 13:52:33	SIG	M62/2041A1	BLNK	M62 J25 - J30	
09/09/15 13:52:33	SIG	M62/2050A1	BLNK	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2057B2	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2057B3	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2057B4	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2074B1	REDX	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2074B2	60R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2074B3	60R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M62/2074B4	60R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 14:04:24	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2050B2	NR	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2050B3	NR	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2050B4	NR	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2057B1	REDX	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2057B2	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2057B3	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2057B4	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2065B1	REDX	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 14:04:30	SIG	M621/1002B1	HSD	M62 J25 - J30	
09/09/15 14:04:30	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2057B2	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2057B3	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2057B4	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2065B2	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2065B3	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2065B4	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2065M1	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2069M1	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M62/2069M2	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M621/1002B2	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 14:08:24	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2050B2	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2050B3	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2050B4	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2057B1	BLNK	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2057B2	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2057B3	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2057B4	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2065B2	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2065B3	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2065B4	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2065M1	NR	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2069M1	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2069M2	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2074B1	BLNK	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2074B2	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2074B3	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M62/2074B4	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M621/1002B1	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M621/1002B2	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 14:18:31	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2050B2	OFF	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2050B3	OFF	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2050B4	OFF	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2065B1	BLNK	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2065B2	OFF	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2065B3	OFF	M62 J25 - J30	
09/09/15 14:19:36	SIG	M62/2065B4	OFF	M62 J25 - J30	
09/09/15 14:21:32	SIG	M62/2065M1	OFF	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1956A1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1956A2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1956A3	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1960A1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1960A2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1960A3	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1960K1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1960K2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1968A1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1968A2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1968A3	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1968A4	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1974A1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1974A2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1974A3	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1974A4	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1979K1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1979K2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1981A1	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1981A2	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1981A3	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1981A4	50R	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1987A1	NR	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1987A3	NR	M62 J25 - J30	
09/09/15 14:29:10	SIG	M62/1987J1	NR	M62 J25 - J30	
09/09/15 14:40:55	SIG	M62/2065M1	NR	M62 J25 - J30	
09/09/15 14:40:55	SIG	M62/2069M1	60R	M62 J25 - J30	
09/09/15 14:40:55	SIG	M62/2069M2	60R	M62 J25 - J30	
09/09/15 14:40:55	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 14:40:55	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2041B1	REDX	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2041B2	NR	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2041B3	NR	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2041B4	NR	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2050B2	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2050B3	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2050B4	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2057B1	REDX	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2057B2	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2057B3	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2057B4	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2065B1	REDX	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2065B2	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2065B3	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2065B4	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M62/2065M1	60R	M62 J25 - J30	
09/09/15 14:40:56	SIG	M621/1002B1	HSD	M62 J25 - J30	
09/09/15 14:40:56	SIG	M621/1002B2	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2012B1	REDX	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2025B2	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2025B3	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2025B4	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2033B2	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2033B3	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2033B4	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 14:40:57	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 14:42:15	SIG	M62/2025B1	60R	M62 J25 - J30	
09/09/15 14:42:51	SIG	M62/2033B1	60R	M62 J25 - J30	
09/09/15 14:43:11	SIG	M62/2041B1	60R	M62 J25 - J30	
09/09/15 14:43:37	SIG	M62/2057B1	60R	M62 J25 - J30	
09/09/15 14:43:37	SIG	M621/1002B1	60R	M62 J25 - J30	
09/09/15 14:43:37	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 14:43:37	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 14:43:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 14:43:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 14:43:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 14:44:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1956A1	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1956A2	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1956A3	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1960A1	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1960A2	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1960A3	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1960K1	OFF	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1960K2	OFF	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1968A1	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1968A2	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1968A3	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1968A4	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1974A1	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1974A2	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1974A3	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1974A4	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1979K1	OFF	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1979K2	OFF	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1981A1	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1981A2	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1981A3	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1981A4	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1987A1	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1987A3	NR	M62 J25 - J30	
09/09/15 14:56:07	SIG	M62/1987J1	NR	M62 J25 - J30	
09/09/15 14:59:07	SIG	M62/1956A1	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1956A2	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1956A3	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1960A1	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1960A2	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1960A3	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1968A1	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1968A2	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1968A3	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1968A4	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1974A1	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1974A2	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1974A3	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1974A4	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1981A1	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1981A2	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1981A3	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1981A4	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1987A1	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1987A3	OFF	M62 J25 - J30	
09/09/15 14:59:21	SIG	M62/1987J1	OFF	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2008K1	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2008K2	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2012A2	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2012A3	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2018A2	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2018A3	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2018A4	60R	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2025A2	NR	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2025A3	NR	M62 J25 - J30	
09/09/15 15:16:10	SIG	M62/2025A4	NR	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2012A1	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2025A2	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2025A3	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2025A4	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2033A1	REDX	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2033A2	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2033A3	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2033A4	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2041A1	REDX	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2041A2	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2041A3	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2041A4	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2050A1	REDX	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2050A2	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2050A3	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2050A4	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2057A1	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2057A2	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2057A3	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2057J1	60R	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2065A1	REDX	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2065A2	NR	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2065A3	NR	M62 J25 - J30	
09/09/15 15:16:11	SIG	M62/2065A4	NR	M62 J25 - J30	
09/09/15 15:19:08	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 15:19:32	SIG	M62/2041A1	60R	M62 J25 - J30	
09/09/15 15:20:02	SIG	M62/2033A1	60R	M62 J25 - J30	
09/09/15 15:20:09	SIG	M62/2018A1	60R	M62 J25 - J30	
09/09/15 15:20:09	SIG	M62/2025A1	60R	M62 J25 - J30	
09/09/15 15:22:38	SIG	M62/2025A1	OFF	M62 J25 - J30	
09/09/15 15:22:38	SIG	M62/2025A1	???	M62 J25 - J30	
09/09/15 15:42:16	SIG	M62/2050A1	OFF	M62 J25 - J30	
09/09/15 15:42:17	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 15:43:23	SIG	M62/2050A1	OFF	M62 J25 - J30	
09/09/15 15:43:24	SIG	M62/2050A1	60R	M62 J25 - J30	
09/09/15 16:12:48	SIG	M62/2065A2	60R	M62 J25 - J30	
09/09/15 16:12:48	SIG	M62/2065A3	60R	M62 J25 - J30	
09/09/15 16:12:48	SIG	M62/2065A4	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2073K1	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A1	REDX	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A2	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A2	NR	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A3	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A3	NR	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A4	NR	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2079A4	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2088A2	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2088A3	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2088A4	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2097A2	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2097A3	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2097A4	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2106A2	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2106A3	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2106A4	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2114A1	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2114A2	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2114A3	60R	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2117A1	REDX	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2117A2	NR	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2117A3	NR	M62 J25 - J30	
09/09/15 16:12:58	SIG	M62/2117A4	NR	M62 J25 - J30	
09/09/15 16:14:33	SIG	M62/2074B1	REDX	M62 J25 - J30	
09/09/15 16:14:33	SIG	M62/2074B2	60R	M62 J25 - J30	
09/09/15 16:14:33	SIG	M62/2074B3	60R	M62 J25 - J30	
09/09/15 16:14:33	SIG	M62/2074B4	60R	M62 J25 - J30	
09/09/15 16:14:33	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 16:14:33	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 16:14:35	SIG	M62/2106A1	60R	M62 J25 - J30	
09/09/15 16:15:21	SIG	M62/2097A1	60R	M62 J25 - J30	
09/09/15 16:16:10	SIG	M62/2088A1	60R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2155A1	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2155A2	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2155J1	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2155K1	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2157A1	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2157A2	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2157J1	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2157J2	50R	M62 J25 - J30	
09/09/15 16:16:12	SIG	M62/2157K1	50R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2151A1	50R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2151A2	50R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2151J1	50R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2151K1	50R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2155A1	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2155A2	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2155J1	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2155K1	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2157A1	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2157A2	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2157J1	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2157J2	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2157K1	40R	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2163A1	NR	M62 J25 - J30	
09/09/15 16:16:17	SIG	M62/2163A2	NR	M62 J25 - J30	
09/09/15 16:16:30	SIG	M62/2079A1	60R	M62 J25 - J30	
09/09/15 16:19:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 16:19:21	SIG	M62/2157A1	50R	M62 J25 - J30	
09/09/15 16:19:26	SIG	M62/2157A1	40R	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2151A1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2151A2	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2151J1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2151K1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2155A1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2155A2	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2155J1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2155K1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2157A2	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2157J1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2157J2	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2157K1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2163A1	OFF	M62 J25 - J30	
09/09/15 16:20:12	SIG	M62/2163A2	OFF	M62 J25 - J30	
09/09/15 16:21:01	SIG	M62/2025B1	50R	M62 J25 - J30	
09/09/15 16:21:01	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 16:21:01	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 16:21:01	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2025B1	40R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2025B2	40R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2025B3	40R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2025B4	40R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:21:07	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 16:23:26	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 16:23:26	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 16:23:26	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 16:23:26	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 16:23:31	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 16:23:31	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 16:23:31	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 16:23:31	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 16:23:33	SIG	M62/2081B1	60R	M62 J25 - J30	
09/09/15 16:23:33	SIG	M62/2081B2	60R	M62 J25 - J30	
09/09/15 16:23:33	SIG	M62/2081B3	60R	M62 J25 - J30	
09/09/15 16:23:33	SIG	M62/2081L1	60R	M62 J25 - J30	
09/09/15 16:24:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:24:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:24:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:24:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:25:23	SIG	M62/2033B1	40R	M62 J25 - J30	
09/09/15 16:25:23	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 16:25:23	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2033B1	40R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 16:25:28	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 16:27:27	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 16:27:27	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 16:27:27	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 16:27:27	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 16:27:38	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 16:27:38	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 16:27:38	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 16:27:38	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 16:28:08	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:28:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:28:14	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2074B2	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2074B3	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M62/2074B4	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 16:28:27	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2074B2	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2074B3	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2074B4	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M621/1002B1	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 16:28:33	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 16:29:23	SIG	M62/2025B1	60R	M62 J25 - J30	
09/09/15 16:29:23	SIG	M62/2025B2	60R	M62 J25 - J30	
09/09/15 16:29:23	SIG	M62/2025B3	60R	M62 J25 - J30	
09/09/15 16:29:23	SIG	M62/2025B4	60R	M62 J25 - J30	
09/09/15 16:31:12	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:31:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:31:18	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2033B1	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2033B2	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2033B3	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2033B4	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2041B1	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 16:31:38	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2025B1	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 16:32:59	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2025B1	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2025B2	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2025B3	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2025B4	40R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:33:05	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2065B2	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2065B3	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2065B4	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2074B2	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2074B3	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2074B4	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2081B1	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2081B2	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2081B3	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M62/2081L1	60R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 16:33:40	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2033B1	40R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 16:34:01	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M62/2065M1	60R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M62/2069M1	60R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M62/2069M2	60R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M621/1002B1	60R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M621/1002B2	60R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 16:34:16	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 16:35:15	SIG	M62/2170K1	60R	M62 J25 - J30	
09/09/15 16:35:15	SIG	M62/2170K2	60R	M62 J25 - J30	
09/09/15 16:35:15	SIG	M62/2177A1	REDX	M62 J25 - J30	
09/09/15 16:35:15	SIG	M62/2177A2	NR	M62 J25 - J30	
09/09/15 16:35:15	SIG	M62/2177A3	NR	M62 J25 - J30	
09/09/15 16:35:15	SIG	M62/2177A4	NR	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2170A1	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2170A2	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2177A2	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2177A3	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2177A4	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2183A1	REDX	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2183A2	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2183A3	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2183A4	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2189A1	REDX	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2189A2	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2189A3	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2189A4	60R	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2197A1	NR	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2197A2	NR	M62 J25 - J30	
09/09/15 16:35:16	SIG	M62/2197A3	NR	M62 J25 - J30	
09/09/15 16:35:23	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 16:35:23	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M621/1002B1	40R	M62 J25 - J30	
09/09/15 16:35:29	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 16:35:30	SIG	M62/2074B2	50R	M62 J25 - J30	
09/09/15 16:35:30	SIG	M62/2074B3	50R	M62 J25 - J30	
09/09/15 16:35:30	SIG	M62/2074B4	50R	M62 J25 - J30	
09/09/15 16:35:30	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 16:35:30	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2074B2	40R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2074B3	40R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2074B4	40R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 16:35:36	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 16:36:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:36:19	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:36:24	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:36:38	SIG	M62/2189A1	60R	M62 J25 - J30	
09/09/15 16:37:09	SIG	M62/2183A1	60R	M62 J25 - J30	
09/09/15 16:37:15	SIG	M62/2177A1	60R	M62 J25 - J30	
09/09/15 16:39:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:39:23	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:39:28	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 16:39:29	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 16:39:30	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 16:39:30	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2074B2	50R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2074B3	50R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2074B4	50R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2081B1	60R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2081B2	60R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2081B3	60R	M62 J25 - J30	
09/09/15 16:41:12	SIG	M62/2081L1	60R	M62 J25 - J30	
09/09/15 16:42:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:42:27	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:42:32	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2074B2	40R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2074B3	40R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2074B4	40R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 16:42:33	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2088B1	REDX	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2088B2	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2088B3	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2088B4	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2097B1	REDX	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2097B2	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2097B3	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2097B4	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2106B1	REDX	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2106B2	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2106B3	60R	M62 J25 - J30	
09/09/15 16:42:34	SIG	M62/2106B4	60R	M62 J25 - J30	
09/09/15 16:45:04	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 16:45:04	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 16:45:04	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 16:45:04	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 16:45:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:45:31	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:45:36	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B1	REDX	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B2	60R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B2	NR	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B3	NR	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B3	60R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B4	NR	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2113B4	60R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2117B1	60R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2117B3	60R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2120M1	60R	M62 J25 - J30	
09/09/15 16:45:40	SIG	M62/2120M2	60R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M621/1002B1	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 16:46:03	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 16:47:41	SIG	M62/2088B1	60R	M62 J25 - J30	
09/09/15 16:48:20	SIG	M62/2097B1	60R	M62 J25 - J30	
09/09/15 16:48:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:48:35	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:48:40	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:49:03	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 16:49:03	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 16:49:03	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 16:49:03	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 16:49:13	SIG	M62/2106B1	60R	M62 J25 - J30	
09/09/15 16:49:18	SIG	M62/2113B1	60R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2074B2	50R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2074B3	50R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2074B4	50R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2081B1	60R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2081B2	60R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2081B3	60R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M62/2081L1	60R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 16:50:02	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 16:50:03	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 16:50:31	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 16:50:31	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 16:50:31	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 16:50:31	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 16:50:51	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 16:50:51	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 16:50:51	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 16:50:51	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 16:50:51	SIG	M621/1002B1	40R	M62 J25 - J30	
09/09/15 16:50:51	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 16:51:38	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:51:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:51:44	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2074B2	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2074B3	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2074B4	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 16:52:08	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 16:54:42	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:54:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:54:48	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:57:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 16:57:56	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 16:58:01	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 16:58:58	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M621/1002B1	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 16:59:18	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 17:00:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:00:56	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:01:01	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 17:03:18	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 17:03:28	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 17:03:28	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2074B2	50R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2074B3	50R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2074B4	50R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2081B1	60R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2081B2	60R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2081B3	60R	M62 J25 - J30	
09/09/15 17:03:30	SIG	M62/2081L1	60R	M62 J25 - J30	
09/09/15 17:03:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:03:56	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:04:01	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:04:25	SIG	M62/2050B2	50R	M62 J25 - J30	
09/09/15 17:04:25	SIG	M62/2050B3	50R	M62 J25 - J30	
09/09/15 17:04:25	SIG	M62/2050B4	50R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2050B2	40R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2050B3	40R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2050B4	40R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2057B1	50R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2057B2	50R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2057B3	50R	M62 J25 - J30	
09/09/15 17:04:31	SIG	M62/2057B4	50R	M62 J25 - J30	
09/09/15 17:06:37	SIG	M62/2057B1	40R	M62 J25 - J30	
09/09/15 17:06:37	SIG	M62/2057B2	40R	M62 J25 - J30	
09/09/15 17:06:37	SIG	M62/2057B3	40R	M62 J25 - J30	
09/09/15 17:06:37	SIG	M62/2057B4	40R	M62 J25 - J30	
09/09/15 17:06:38	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 17:06:38	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 17:06:38	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 17:06:38	SIG	M62/2065M1	40R	M62 J25 - J30	
09/09/15 17:06:38	SIG	M621/1002B1	40R	M62 J25 - J30	
09/09/15 17:06:38	SIG	M621/1002B2	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2074B2	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2074B3	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2074B4	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 17:06:56	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 17:06:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:06:59	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:07:04	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:10:02	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:10:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:10:08	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2050B2	50R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2050B3	50R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2050B4	50R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2057B1	50R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2057B2	50R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2057B3	50R	M62 J25 - J30	
09/09/15 17:12:11	SIG	M62/2057B4	50R	M62 J25 - J30	
09/09/15 17:13:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:13:06	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:13:11	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:14:11	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 17:14:11	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 17:14:11	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 17:14:11	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 17:14:34	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 17:14:34	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 17:14:34	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 17:14:34	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2081B1	40R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2081B2	40R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2081B3	40R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2081L1	40R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2088B1	50R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2088B2	50R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2088B3	50R	M62 J25 - J30	
09/09/15 17:14:50	SIG	M62/2088B4	50R	M62 J25 - J30	
09/09/15 17:16:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:16:10	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:16:15	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:16:36	SIG	M62/2088B1	40R	M62 J25 - J30	
09/09/15 17:16:36	SIG	M62/2088B2	40R	M62 J25 - J30	
09/09/15 17:16:36	SIG	M62/2088B3	40R	M62 J25 - J30	
09/09/15 17:16:36	SIG	M62/2088B4	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2050B2	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2050B3	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2050B4	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2057B1	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2057B2	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2057B3	40R	M62 J25 - J30	
09/09/15 17:18:52	SIG	M62/2057B4	40R	M62 J25 - J30	
09/09/15 17:19:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:19:15	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:19:20	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:20:17	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 17:20:17	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 17:20:17	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 17:20:17	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2088B1	60R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2088B2	60R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2088B3	60R	M62 J25 - J30	
09/09/15 17:20:36	SIG	M62/2088B4	60R	M62 J25 - J30	
09/09/15 17:21:59	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 17:21:59	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 17:21:59	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 17:21:59	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 17:22:05	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 17:22:05	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 17:22:05	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 17:22:05	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 17:22:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:22:18	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:22:23	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2155A1	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2155A2	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2155J1	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2155K1	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2157A1	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2157A2	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2157J1	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2157J2	50R	M62 J25 - J30	
09/09/15 17:24:23	SIG	M62/2157K1	50R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2151A1	50R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2151A2	50R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2151J1	50R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2151K1	50R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2155A1	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2155A2	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2155J1	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2155K1	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2157A1	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2157A2	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2157J1	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2157J2	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2157K1	40R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2163A1	60R	M62 J25 - J30	
09/09/15 17:24:29	SIG	M62/2163A2	60R	M62 J25 - J30	
09/09/15 17:25:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:25:23	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:25:28	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:26:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:26:46	SIG	M62/2157A1	50R	M62 J25 - J30	
09/09/15 17:26:51	SIG	M62/2157A1	40R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2050B2	50R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2050B3	50R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2050B4	50R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2057B1	50R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2057B2	50R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2057B3	50R	M62 J25 - J30	
09/09/15 17:28:10	SIG	M62/2057B4	50R	M62 J25 - J30	
09/09/15 17:28:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:28:26	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:28:32	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2151A1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2151A2	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2151J1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2151K1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2155A1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2155A2	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2155J1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2155K1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2157A2	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2157J1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2157J2	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2157K1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2163A1	OFF	M62 J25 - J30	
09/09/15 17:29:10	SIG	M62/2163A2	OFF	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2081B1	40R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2081B2	40R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2081B3	40R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2081L1	40R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2088B1	50R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2088B2	50R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2088B3	50R	M62 J25 - J30	
09/09/15 17:29:52	SIG	M62/2088B4	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2155A1	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2155A2	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2155J1	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2155K1	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2157A1	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2157A2	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2157J1	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2157J2	50R	M62 J25 - J30	
09/09/15 17:30:10	SIG	M62/2157K1	50R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2151A1	50R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2151A2	50R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2151J1	50R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2151K1	50R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2155A1	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2155A2	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2155J1	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2155K1	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2157A1	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2157A2	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2157J1	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2157J2	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2157K1	40R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2163A1	60R	M62 J25 - J30	
09/09/15 17:30:15	SIG	M62/2163A2	60R	M62 J25 - J30	
09/09/15 17:30:36	SIG	M62/2088B1	40R	M62 J25 - J30	
09/09/15 17:30:36	SIG	M62/2088B2	40R	M62 J25 - J30	
09/09/15 17:30:36	SIG	M62/2088B3	40R	M62 J25 - J30	
09/09/15 17:30:36	SIG	M62/2088B4	40R	M62 J25 - J30	
09/09/15 17:30:38	SIG	M62/1968B1	50R	M62 J25 - J30	
09/09/15 17:30:38	SIG	M62/1968B2	50R	M62 J25 - J30	
09/09/15 17:30:38	SIG	M62/1968B3	50R	M62 J25 - J30	
09/09/15 17:30:38	SIG	M62/1968L1	50R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1960B1	NR	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1960B2	NR	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1960B3	NR	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1960L1	NR	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1960L2	NR	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1968B1	40R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1968B2	40R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1968B3	40R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1968L1	40R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1974B1	50R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1974B2	50R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1974B3	50R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1974B4	50R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1974M1	50R	M62 J25 - J30	
09/09/15 17:30:43	SIG	M62/1974M2	50R	M62 J25 - J30	
09/09/15 17:31:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:31:30	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:31:35	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:31:37	SIG	M62/1960B1	60R	M62 J25 - J30	
09/09/15 17:31:37	SIG	M62/1960B2	60R	M62 J25 - J30	
09/09/15 17:31:37	SIG	M62/1960B3	60R	M62 J25 - J30	
09/09/15 17:32:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:32:54	SIG	M62/2157A1	50R	M62 J25 - J30	
09/09/15 17:32:59	SIG	M62/2157A1	40R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2097B1	50R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2097B2	50R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2097B3	50R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2097B4	50R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2135A1	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2135A2	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2135A3	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2135A4	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2144A1	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2144A2	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2144J1	60R	M62 J25 - J30	
09/09/15 17:33:35	SIG	M62/2144K1	60R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1974B1	40R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1974B2	40R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1974B3	40R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1974B4	40R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1974M1	40R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1974M2	40R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1981B1	50R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1981B2	50R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1981B3	50R	M62 J25 - J30	
09/09/15 17:33:53	SIG	M62/1981B4	50R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2151A1	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2151A2	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2151J1	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2151K1	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2155A1	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2155A2	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2155J1	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2155K1	60R	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2157A1	NR	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2157A2	NR	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2157J1	NR	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2157J2	NR	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2157K1	NR	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2163A1	OFF	M62 J25 - J30	
09/09/15 17:34:09	SIG	M62/2163A2	OFF	M62 J25 - J30	
09/09/15 17:34:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:34:34	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2157A1	60R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2157A2	60R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2157J1	60R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2157J2	60R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2157K1	60R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2163A1	60R	M62 J25 - J30	
09/09/15 17:34:35	SIG	M62/2163A2	60R	M62 J25 - J30	
09/09/15 17:34:39	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2050B2	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2050B3	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2050B4	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2057B1	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2057B2	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2057B3	40R	M62 J25 - J30	
09/09/15 17:36:01	SIG	M62/2057B4	40R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2088B1	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2088B2	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2088B3	50R	M62 J25 - J30	
09/09/15 17:36:55	SIG	M62/2088B4	50R	M62 J25 - J30	
09/09/15 17:36:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:36:59	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:36:59	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:37:00	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:37:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:37:37	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:37:39	SIG	M62/2081B1	40R	M62 J25 - J30	
09/09/15 17:37:39	SIG	M62/2081B2	40R	M62 J25 - J30	
09/09/15 17:37:39	SIG	M62/2081B3	40R	M62 J25 - J30	
09/09/15 17:37:39	SIG	M62/2081L1	40R	M62 J25 - J30	
09/09/15 17:37:43	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1974B1	50R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1974B2	50R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1974B3	50R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1974B4	50R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1974M1	50R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1974M2	50R	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1981B1	OFF	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1981B2	OFF	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1981B3	OFF	M62 J25 - J30	
09/09/15 17:37:53	SIG	M62/1981B4	OFF	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1974B1	40R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1974B2	40R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1974B3	40R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1974B4	40R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1974M1	40R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1974M2	40R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1981B1	50R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1981B2	50R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1981B3	50R	M62 J25 - J30	
09/09/15 17:37:58	SIG	M62/1981B4	50R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M606/2003B1	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M606/2003B2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1987B1	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1987B2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1987B3	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1987B4	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1992B1	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1992B2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1992B3	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1992B4	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1999B1	REDX	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1999B2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1999B3	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/1999B4	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2004B1	REDX	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2004B2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2004B3	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2004B4	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2005M1	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2005M2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2012B2	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2012B3	60R	M62 J25 - J30	
09/09/15 17:38:35	SIG	M62/2012B4	60R	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2157A1	NR	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2157A2	NR	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2157J1	NR	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2157J2	NR	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2157K1	NR	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2163A1	OFF	M62 J25 - J30	
09/09/15 17:40:35	SIG	M62/2163A2	OFF	M62 J25 - J30	
09/09/15 17:40:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:40:41	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:40:46	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2050B2	50R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2050B3	50R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2050B4	50R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2057B1	50R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2057B2	50R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2057B3	50R	M62 J25 - J30	
09/09/15 17:42:15	SIG	M62/2057B4	50R	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2135A1	OFF	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2135A2	OFF	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2135A3	OFF	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2135A4	OFF	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2144A1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2144A2	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2144J1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2144K1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2151A1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2151A2	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2151J1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2151K1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2155A1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2155A2	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2155J1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2155K1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2157A1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2157A2	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2157J1	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2157J2	NR	M62 J25 - J30	
09/09/15 17:42:35	SIG	M62/2157K1	NR	M62 J25 - J30	
09/09/15 17:43:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:43:45	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:43:50	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 17:44:15	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1974B1	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1974B2	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1974B3	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1974B4	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1974M1	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1974M2	50R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1981B1	60R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1981B2	60R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1981B3	60R	M62 J25 - J30	
09/09/15 17:44:22	SIG	M62/1981B4	60R	M62 J25 - J30	
09/09/15 17:44:54	SIG	M62/2057B1	40R	M62 J25 - J30	
09/09/15 17:44:54	SIG	M62/2057B2	40R	M62 J25 - J30	
09/09/15 17:44:54	SIG	M62/2057B3	40R	M62 J25 - J30	
09/09/15 17:44:54	SIG	M62/2057B4	40R	M62 J25 - J30	
09/09/15 17:45:35	SIG	M62/2144J1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2144A1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2144A2	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2144K1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2151A1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2151A2	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2151J1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2151K1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2155A1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2155A2	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2155J1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2155K1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2157A2	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2157J1	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2157J2	OFF	M62 J25 - J30	
09/09/15 17:45:36	SIG	M62/2157K1	OFF	M62 J25 - J30	
09/09/15 17:46:10	SIG	M62/2088B1	40R	M62 J25 - J30	
09/09/15 17:46:10	SIG	M62/2088B2	40R	M62 J25 - J30	
09/09/15 17:46:10	SIG	M62/2088B3	40R	M62 J25 - J30	
09/09/15 17:46:10	SIG	M62/2088B4	40R	M62 J25 - J30	
09/09/15 17:46:31	SIG	M62/2033B1	40R	M62 J25 - J30	
09/09/15 17:46:31	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 17:46:31	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:46:31	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1974B1	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1974B2	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1974B3	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1974B4	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1974M1	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1974M2	40R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1981B1	50R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1981B2	50R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1981B3	50R	M62 J25 - J30	
09/09/15 17:47:45	SIG	M62/1981B4	50R	M62 J25 - J30	
09/09/15 17:48:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:48:55	SIG	M62/2057B1	50R	M62 J25 - J30	
09/09/15 17:48:55	SIG	M62/2057B2	50R	M62 J25 - J30	
09/09/15 17:48:55	SIG	M62/2057B3	50R	M62 J25 - J30	
09/09/15 17:48:55	SIG	M62/2057B4	50R	M62 J25 - J30	
09/09/15 17:48:56	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:49:01	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:50:09	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 17:50:09	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 17:50:09	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 17:50:09	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 17:51:14	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 17:51:14	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 17:51:14	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 17:51:14	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2088B1	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2088B2	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2088B3	50R	M62 J25 - J30	
09/09/15 17:51:46	SIG	M62/2088B4	50R	M62 J25 - J30	
09/09/15 17:51:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:51:56	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:51:58	SIG	M62/2081B1	40R	M62 J25 - J30	
09/09/15 17:51:58	SIG	M62/2081B2	40R	M62 J25 - J30	
09/09/15 17:51:58	SIG	M62/2081B3	40R	M62 J25 - J30	
09/09/15 17:51:58	SIG	M62/2081L1	40R	M62 J25 - J30	
09/09/15 17:52:01	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1974B1	50R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1974B2	50R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1974B3	50R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1974B4	50R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1974M1	50R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1974M2	50R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1981B1	60R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1981B2	60R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1981B3	60R	M62 J25 - J30	
09/09/15 17:53:12	SIG	M62/1981B4	60R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 17:53:16	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M62/2065B2	40R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M62/2065B3	40R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M62/2065B4	40R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M62/2069M1	40R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M62/2069M2	40R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M621/1010B1	40R	M62 J25 - J30	
09/09/15 17:53:24	SIG	M621/1010B2	40R	M62 J25 - J30	
09/09/15 17:54:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 17:54:58	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:55:04	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:55:14	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 17:55:14	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 17:55:14	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 17:55:14	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1974B1	40R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1974B2	40R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1974B3	40R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1974B4	40R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1974M1	40R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1974M2	40R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1981B1	50R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1981B2	50R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1981B3	50R	M62 J25 - J30	
09/09/15 17:55:28	SIG	M62/1981B4	50R	M62 J25 - J30	
09/09/15 17:55:58	SIG	M62/2081B1	50R	M62 J25 - J30	
09/09/15 17:55:58	SIG	M62/2081B2	50R	M62 J25 - J30	
09/09/15 17:55:58	SIG	M62/2081B3	50R	M62 J25 - J30	
09/09/15 17:55:58	SIG	M62/2081L1	50R	M62 J25 - J30	
09/09/15 17:57:13	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 17:57:13	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 17:57:13	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 17:57:13	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 17:57:20	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 17:57:20	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 17:57:20	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 17:57:20	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 17:57:26	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 17:57:26	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 17:57:26	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 17:57:26	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 17:58:53	SIG	M62/2033B1	40R	M62 J25 - J30	
09/09/15 17:58:53	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 17:58:53	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 17:58:53	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1968B1	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1968B2	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1968B3	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1968L1	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1974B1	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1974B2	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1974B3	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1974B4	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1974M1	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1974M2	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1981B1	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1981B2	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1981B3	60R	M62 J25 - J30	
09/09/15 17:59:28	SIG	M62/1981B4	60R	M62 J25 - J30	
09/09/15 18:01:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:01:06	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:01:11	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2088B1	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2088B2	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2088B3	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2088B4	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2097B1	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2097B2	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2097B3	60R	M62 J25 - J30	
09/09/15 18:02:35	SIG	M62/2097B4	60R	M62 J25 - J30	
09/09/15 18:04:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:04:10	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:04:15	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2074B2	50R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2074B3	50R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2074B4	50R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2081B1	60R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2081B2	60R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2081B3	60R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M62/2081L1	60R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M621/1010B1	50R	M62 J25 - J30	
09/09/15 18:04:17	SIG	M621/1010B2	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M62/2065B2	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M62/2065B3	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M62/2065B4	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M62/2065M1	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M62/2069M1	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M62/2069M2	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M621/1002B1	50R	M62 J25 - J30	
09/09/15 18:04:18	SIG	M621/1002B2	50R	M62 J25 - J30	
09/09/15 18:07:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:07:14	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:07:19	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:07:37	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 18:07:37	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 18:07:37	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 18:07:37	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 18:08:24	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 18:08:24	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 18:08:24	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 18:08:24	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M62/2069M1	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M62/2069M2	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M62/2074B2	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M62/2074B3	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M62/2074B4	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 18:09:35	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 18:10:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:10:18	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:10:23	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:10:35	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 18:10:35	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 18:10:35	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 18:10:35	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2057B1	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2057B2	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2057B3	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2057B4	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2065B2	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2065B3	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2065B4	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M62/2065M1	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M621/1002B1	60R	M62 J25 - J30	
09/09/15 18:10:41	SIG	M621/1002B2	60R	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1960B1	OFF	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1960B2	OFF	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1960B3	OFF	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1960L1	OFF	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1960L2	OFF	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1968B1	NR	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1968B2	NR	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1968B3	NR	M62 J25 - J30	
09/09/15 18:11:52	SIG	M62/1968L1	NR	M62 J25 - J30	
09/09/15 18:13:17	SIG	M62/1968B1	50R	M62 J25 - J30	
09/09/15 18:13:17	SIG	M62/1968B2	50R	M62 J25 - J30	
09/09/15 18:13:17	SIG	M62/1968B3	50R	M62 J25 - J30	
09/09/15 18:13:17	SIG	M62/1968L1	50R	M62 J25 - J30	
09/09/15 18:13:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1960B1	60R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1960B2	60R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1960B3	60R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1960L1	NR	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1960L2	NR	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1968B1	40R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1968B2	40R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1968B3	40R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1968L1	40R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1974B1	50R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1974B2	50R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1974B3	50R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1974B4	50R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1974M1	50R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/1974M2	50R	M62 J25 - J30	
09/09/15 18:13:22	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:13:27	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:15:57	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 18:15:57	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 18:15:57	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 18:15:57	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 18:16:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:16:25	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:16:31	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1974B1	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1974B2	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1974B3	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1974B4	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1974M1	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1974M2	40R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1981B1	50R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1981B2	50R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1981B3	50R	M62 J25 - J30	
09/09/15 18:17:36	SIG	M62/1981B4	50R	M62 J25 - J30	
09/09/15 18:18:06	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 18:18:06	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 18:18:06	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 18:18:06	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 18:18:28	SIG	M62/2041B1	40R	M62 J25 - J30	
09/09/15 18:18:28	SIG	M62/2041B2	40R	M62 J25 - J30	
09/09/15 18:18:28	SIG	M62/2041B3	40R	M62 J25 - J30	
09/09/15 18:18:28	SIG	M62/2041B4	40R	M62 J25 - J30	
09/09/15 18:19:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:19:30	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:19:35	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:19:52	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 18:19:52	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 18:19:52	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 18:19:52	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 18:19:58	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 18:19:58	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 18:19:58	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 18:19:58	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1960B1	OFF	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1960B2	OFF	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1960B3	OFF	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1960L1	OFF	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1960L2	OFF	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1968B1	NR	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1968B2	NR	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1968B3	NR	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1968L1	NR	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1974B1	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1974B2	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1974B3	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1974B4	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1974M1	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1974M2	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1981B1	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1981B2	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1981B3	60R	M62 J25 - J30	
09/09/15 18:21:37	SIG	M62/1981B4	60R	M62 J25 - J30	
09/09/15 18:21:57	SIG	M62/2177A1	HSD	M62 J25 - J30	
09/09/15 18:22:28	SIG	M62/2041B1	50R	M62 J25 - J30	
09/09/15 18:22:28	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 18:22:28	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 18:22:28	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 18:22:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:22:33	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:22:38	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:22:41	SIG	M62/2183A1	HSD	M62 J25 - J30	
09/09/15 18:23:15	SIG	M62/1968B1	50R	M62 J25 - J30	
09/09/15 18:23:15	SIG	M62/1968B2	50R	M62 J25 - J30	
09/09/15 18:23:15	SIG	M62/1968B3	50R	M62 J25 - J30	
09/09/15 18:23:15	SIG	M62/1968L1	50R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1960B1	60R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1960B2	60R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1960B3	60R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1960L1	NR	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1960L2	NR	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1968B1	40R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1968B2	40R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1968B3	40R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1968L1	40R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1974B1	50R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1974B2	50R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1974B3	50R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1974B4	50R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1974M1	50R	M62 J25 - J30	
09/09/15 18:23:20	SIG	M62/1974M2	50R	M62 J25 - J30	
09/09/15 18:23:26	SIG	M62/2189A1	HSD	M62 J25 - J30	
09/09/15 18:23:27	SIG	M62/2177A1	REDX	M62 J25 - J30	
09/09/15 18:24:27	SIG	M62/2183A1	REDX	M62 J25 - J30	
09/09/15 18:25:26	SIG	M62/2189A1	REDX	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2170A1	NR	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2170A2	NR	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2170K1	NR	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2170K2	NR	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2177A2	NR	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2177A3	NR	M62 J25 - J30	
09/09/15 18:25:27	SIG	M62/2177A4	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2183A2	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2183A3	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2183A4	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2189A2	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2189A3	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2189A4	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2197A1	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2197A2	NR	M62 J25 - J30	
09/09/15 18:25:28	SIG	M62/2197A3	NR	M62 J25 - J30	
09/09/15 18:25:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:25:38	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:25:43	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:25:57	SIG	M62/2113B1	HSD	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2170A1	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2170A2	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2170K1	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2170K2	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2177A1	BLNK	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2177A2	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2177A3	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2177A4	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2183A1	BLNK	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2183A2	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2183A3	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2183A4	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2189A1	BLNK	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2189A2	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2189A3	OFF	M62 J25 - J30	
09/09/15 18:26:27	SIG	M62/2189A4	OFF	M62 J25 - J30	
09/09/15 18:26:50	SIG	M62/2106B1	HSD	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1960B1	OFF	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1960B2	OFF	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1960B3	OFF	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1960L1	OFF	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1960L2	OFF	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1968B1	NR	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1968B2	NR	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1968B3	NR	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1968L1	NR	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1974B1	60R	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1974B2	60R	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1974B3	60R	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1974B4	60R	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1974M1	60R	M62 J25 - J30	
09/09/15 18:27:15	SIG	M62/1974M2	60R	M62 J25 - J30	
09/09/15 18:27:58	SIG	M62/2097B1	HSD	M62 J25 - J30	
09/09/15 18:27:58	SIG	M62/2113B1	REDX	M62 J25 - J30	
09/09/15 18:28:28	SIG	M62/2197A1	OFF	M62 J25 - J30	
09/09/15 18:28:28	SIG	M62/2197A2	OFF	M62 J25 - J30	
09/09/15 18:28:28	SIG	M62/2197A3	OFF	M62 J25 - J30	
09/09/15 18:28:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:28:42	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:28:47	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:29:06	SIG	M62/2088B1	HSD	M62 J25 - J30	
09/09/15 18:29:07	SIG	M62/2106B1	REDX	M62 J25 - J30	
09/09/15 18:29:48	SIG	M62/2018B1	60R	M62 J25 - J30	
09/09/15 18:29:48	SIG	M62/2018B2	60R	M62 J25 - J30	
09/09/15 18:29:48	SIG	M62/2018B3	60R	M62 J25 - J30	
09/09/15 18:29:48	SIG	M62/2018L1	60R	M62 J25 - J30	
09/09/15 18:30:14	SIG	M62/2097B1	REDX	M62 J25 - J30	
09/09/15 18:31:32	SIG	M62/2088B1	REDX	M62 J25 - J30	
09/09/15 18:31:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:31:46	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:31:51	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2025B1	60R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2025B2	60R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2025B3	60R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2025B4	60R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2033B1	50R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2117B1	NR	M62 J25 - J30	
09/09/15 18:32:15	SIG	M62/2117B3	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2081B1	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2081B2	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2081B3	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2081L1	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2088B2	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2088B3	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2088B4	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2097B2	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2097B3	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2097B4	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2106B2	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2106B3	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2106B4	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2113B2	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2113B3	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2113B4	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2120M1	NR	M62 J25 - J30	
09/09/15 18:32:16	SIG	M62/2120M2	NR	M62 J25 - J30	
09/09/15 18:33:15	SIG	M62/2120M1	OFF	M62 J25 - J30	
09/09/15 18:33:15	SIG	M62/2120M2	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2106B1	BLNK	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2106B2	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2113B1	BLNK	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2113B2	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2113B3	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2113B4	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
09/09/15 18:33:16	SIG	M62/2117B3	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2081B1	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2081B2	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2081B3	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2081L1	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2088B1	BLNK	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2088B2	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2088B3	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2088B4	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2097B1	BLNK	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2097B2	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2097B3	OFF	M62 J25 - J30	
09/09/15 18:33:17	SIG	M62/2097B4	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M606/2003B1	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M606/2003B2	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1968B1	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1968B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1968B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1968L1	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1974B1	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1974B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1974B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1974B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1974M1	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1974M2	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1981B1	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1981B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1981B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1981B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1987B1	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1987B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1987B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1987B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1992B1	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1992B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1992B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1992B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1999B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1999B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/1999B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2004B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2004B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2004B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2005M1	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2005M2	OFF	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2033B1	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2033B2	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2033B3	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2033B4	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2041B1	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2050B2	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2050B3	60R	M62 J25 - J30	
09/09/15 18:33:36	SIG	M62/2050B4	60R	M62 J25 - J30	
09/09/15 18:35:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:35:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:35:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:35:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:36:36	SIG	M62/1999B2	OFF	M62 J25 - J30	
09/09/15 18:36:36	SIG	M62/2004B2	OFF	M62 J25 - J30	
09/09/15 18:36:36	SIG	M62/2004B3	OFF	M62 J25 - J30	
09/09/15 18:36:36	SIG	M62/2004B4	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1968B1	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1968B2	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1968B3	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1968L1	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1974B1	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1974B2	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1974B3	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1974B4	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1981B1	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1981B2	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1981B3	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1981B4	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1987B1	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1987B2	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1987B3	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1987B4	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1992B1	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1992B2	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1992B3	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1992B4	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1999B1	BLNK	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1999B3	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/1999B4	OFF	M62 J25 - J30	
09/09/15 18:36:37	SIG	M62/2004B1	BLNK	M62 J25 - J30	
09/09/15 18:38:36	SIG	M62/2074B1	BLNK	M62 J25 - J30	
09/09/15 18:38:36	SIG	M62/2074B2	OFF	M62 J25 - J30	
09/09/15 18:38:36	SIG	M62/2074B3	OFF	M62 J25 - J30	
09/09/15 18:38:36	SIG	M62/2074B4	OFF	M62 J25 - J30	
09/09/15 18:38:36	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 18:38:36	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 18:38:43	SIG	M62/2079A1	HSD	M62 J25 - J30	
09/09/15 18:39:51	SIG	M62/2088A1	HSD	M62 J25 - J30	
09/09/15 18:40:59	SIG	M62/2079A1	REDX	M62 J25 - J30	
09/09/15 18:40:59	SIG	M62/2097A1	HSD	M62 J25 - J30	
09/09/15 18:42:07	SIG	M62/2106A1	HSD	M62 J25 - J30	
09/09/15 18:42:08	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 18:43:16	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 18:44:24	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 18:45:24	SIG	M62/2065A2	NR	M62 J25 - J30	
09/09/15 18:45:24	SIG	M62/2065A3	NR	M62 J25 - J30	
09/09/15 18:45:24	SIG	M62/2065A4	NR	M62 J25 - J30	
09/09/15 18:45:33	SIG	M62/2073K1	NR	M62 J25 - J30	
09/09/15 18:45:33	SIG	M62/2079A2	NR	M62 J25 - J30	
09/09/15 18:45:33	SIG	M62/2079A3	NR	M62 J25 - J30	
09/09/15 18:45:33	SIG	M62/2079A4	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2088A2	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2088A3	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2088A4	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2097A2	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2097A3	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2097A4	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2106A2	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2106A3	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2106A4	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2114A1	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2114A2	NR	M62 J25 - J30	
09/09/15 18:45:34	SIG	M62/2114A3	NR	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2073K1	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2079A1	BLNK	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2079A2	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2079A3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2079A4	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2088A1	BLNK	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2088A2	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2088A3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2088A4	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2097A1	BLNK	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2097A2	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2097A3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2097A4	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2106A1	BLNK	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2106A2	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2106A4	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2114A1	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2114A2	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2114A3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2117A1	BLNK	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2117A2	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2117A3	OFF	M62 J25 - J30	
09/09/15 18:46:36	SIG	M62/2117A4	OFF	M62 J25 - J30	
09/09/15 18:52:46	SIG	M62/2057B1	HSD	M62 J25 - J30	
09/09/15 18:54:46	SIG	M62/2041B1	HSD	M62 J25 - J30	
09/09/15 18:54:46	SIG	M62/2057B1	REDX	M62 J25 - J30	
09/09/15 18:54:46	SIG	M621/1002B1	HSD	M62 J25 - J30	
09/09/15 18:54:46	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 18:54:46	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 18:55:45	SIG	M62/2033B1	HSD	M62 J25 - J30	
09/09/15 18:56:45	SIG	M62/2025B1	HSD	M62 J25 - J30	
09/09/15 18:56:46	SIG	M62/2041B1	REDX	M62 J25 - J30	
09/09/15 18:57:38	SIG	M62/2033B1	REDX	M62 J25 - J30	
09/09/15 18:58:22	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 18:58:52	SIG	M62/2057B2	NR	M62 J25 - J30	
09/09/15 18:58:52	SIG	M62/2057B3	NR	M62 J25 - J30	
09/09/15 18:58:52	SIG	M62/2057B4	NR	M62 J25 - J30	
09/09/15 18:58:52	SIG	M62/2065B2	NR	M62 J25 - J30	
09/09/15 18:58:52	SIG	M62/2065B3	NR	M62 J25 - J30	
09/09/15 18:58:52	SIG	M62/2065B4	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2018B1	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2018B2	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2018B3	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2018L1	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2025B2	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2025B3	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2025B4	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2033B2	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2033B3	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2033B4	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2041B2	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2041B3	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2041B4	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2050B2	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2050B3	NR	M62 J25 - J30	
09/09/15 18:58:53	SIG	M62/2050B4	NR	M62 J25 - J30	
09/09/15 18:59:52	SIG	M62/2069M1	OFF	M62 J25 - J30	
09/09/15 18:59:52	SIG	M62/2069M2	OFF	M62 J25 - J30	
09/09/15 18:59:52	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 18:59:52	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2033B1	BLNK	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2033B2	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2033B4	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2041B2	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2041B3	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2041B4	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2050B2	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2050B3	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2050B4	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2057B1	BLNK	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2057B2	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2057B3	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2057B4	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2065B1	BLNK	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2065B2	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2065B3	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2065B4	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M62/2065M1	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M621/1002B1	OFF	M62 J25 - J30	
09/09/15 18:59:53	SIG	M621/1002B2	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2012B1	BLNK	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2012B2	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2012B3	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2012B4	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2018B1	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2018B2	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2018B3	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2018L1	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2025B2	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2025B3	OFF	M62 J25 - J30	
09/09/15 18:59:54	SIG	M62/2025B4	OFF	M62 J25 - J30	
09/09/15 19:01:09	SIG	M62/2025A1	HSD	M62 J25 - J30	
09/09/15 19:02:09	SIG	M62/2033A1	HSD	M62 J25 - J30	
09/09/15 19:03:09	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 19:03:09	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 19:03:09	SIG	M62/2041A1	HSD	M62 J25 - J30	
09/09/15 19:04:16	SIG	M62/2033A1	REDX	M62 J25 - J30	
09/09/15 19:04:16	SIG	M62/2050A1	HSD	M62 J25 - J30	
09/09/15 19:05:08	SIG	M62/2041A1	REDX	M62 J25 - J30	
09/09/15 19:06:08	SIG	M62/2050A1	REDX	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2025A2	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2025A3	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2025A4	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2033A2	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2033A3	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2033A4	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2041A2	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2041A3	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2041A4	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2050A2	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2050A3	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2050A4	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2057A1	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2057A2	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2057A3	NR	M62 J25 - J30	
09/09/15 19:07:09	SIG	M62/2057J1	NR	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2008K1	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2008K2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2012A1	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2012A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2012A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2018A1	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2018A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2018A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2018A4	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2025A1	BLNK	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2025A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2025A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2025A4	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2033A1	BLNK	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2033A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2033A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2033A4	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2041A1	BLNK	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2041A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2041A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2041A4	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2050A1	BLNK	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2050A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2050A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2050A4	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2057A1	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2057A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2057A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2057J1	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2065A1	BLNK	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2065A2	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2065A3	OFF	M62 J25 - J30	
09/09/15 19:08:09	SIG	M62/2065A4	OFF	M62 J25 - J30	
09/09/15 19:33:13	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 19:33:13	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2012B1	REDX	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2033B1	REDX	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2041B1	REDX	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 19:44:55	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 19:47:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 19:47:20	SIG	M62/2033B3	???	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2012B1	BLNK	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2012B2	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2012B3	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2012B4	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2025B2	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2025B3	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2025B4	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2033B1	BLNK	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2033B2	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2041B2	NR	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2041B3	NR	M62 J25 - J30	
09/09/15 19:54:14	SIG	M62/2041B4	NR	M62 J25 - J30	
09/09/15 19:54:15	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 19:54:15	SIG	M62/2033B1	BLNK	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2012B1	REDX	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 19:56:33	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 19:57:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
09/09/15 19:57:15	SIG	M62/2041B1	BLNK	M62 J25 - J30	
09/09/15 19:57:15	SIG	M62/2041B3	OFF	M62 J25 - J30	
09/09/15 19:57:15	SIG	M62/2041B4	OFF	M62 J25 - J30	
09/09/15 20:10:26	SIG	M606/2003B1	OFF	M62 J25 - J30	
09/09/15 20:10:26	SIG	M606/2003B2	OFF	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2012B1	BLNK	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2012B2	OFF	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2012B3	OFF	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2012B4	OFF	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2025B2	OFF	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2025B3	OFF	M62 J25 - J30	
09/09/15 20:12:41	SIG	M62/2025B4	OFF	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2113B2	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2113B3	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2113B4	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2120M1	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2120M2	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2125B1	LDR	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2125B2	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2125B3	50R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2125L1	NR	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2125L2	NR	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2132B1	60R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2132B2	60R	M62 J25 - J30	
09/09/15 20:18:54	SIG	M62/2132B3	60R	M62 J25 - J30	
09/09/15 20:18:59	SIG	M62/2113B2	40R	M62 J25 - J30	
09/09/15 20:18:59	SIG	M62/2113B3	40R	M62 J25 - J30	
09/09/15 20:18:59	SIG	M62/2113B4	40R	M62 J25 - J30	
09/09/15 20:18:59	SIG	M62/2120M1	40R	M62 J25 - J30	
09/09/15 20:18:59	SIG	M62/2120M2	40R	M62 J25 - J30	
09/09/15 20:19:05	SIG	M62/2113B2	30R	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2113B1	STOP	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2113B2	20R	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2113B3	40R	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2113B4	40R	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2117B1	LDR	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2117B3	50R	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2120M1	40R	M62 J25 - J30	
09/09/15 20:19:10	SIG	M62/2120M2	40R	M62 J25 - J30	
09/09/15 20:19:15	SIG	M62/2113B1	STOP	M62 J25 - J30	
09/09/15 20:19:15	SIG	M62/2113B2	STOP	M62 J25 - J30	
09/09/15 20:19:16	SIG	M62/2097B1	REDX	M62 J25 - J30	
09/09/15 20:19:16	SIG	M62/2097B2	NR	M62 J25 - J30	
09/09/15 20:19:16	SIG	M62/2097B3	NR	M62 J25 - J30	
09/09/15 20:19:16	SIG	M62/2097B4	NR	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 20:19:25	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2012B1	REDX	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2025B2	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2025B3	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2025B4	40R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2033B1	REDX	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 20:19:31	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 20:21:23	SIG	M62/2132B1	50R	M62 J25 - J30	
09/09/15 20:21:23	SIG	M62/2132B2	50R	M62 J25 - J30	
09/09/15 20:21:23	SIG	M62/2132B3	50R	M62 J25 - J30	
09/09/15 20:21:38	SIG	M62/2041B1	REDX	M62 J25 - J30	
09/09/15 20:21:38	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 20:21:38	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 20:21:38	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 20:22:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 20:22:04	SIG	M62/2033B3	???	M62 J25 - J30	
09/09/15 20:25:38	SIG	M62/2050B2	60R	M62 J25 - J30	
09/09/15 20:25:38	SIG	M62/2050B3	60R	M62 J25 - J30	
09/09/15 20:25:38	SIG	M62/2050B4	60R	M62 J25 - J30	
09/09/15 20:28:38	SIG	M62/2125L1	60R	M62 J25 - J30	
09/09/15 20:28:38	SIG	M62/2125L2	60R	M62 J25 - J30	
09/09/15 20:31:17	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 20:31:17	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 20:31:17	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 20:31:22	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2018A2	40R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2018A3	40R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2018A4	40R	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2025A1	REDX	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2025A2	NR	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2025A3	NR	M62 J25 - J30	
09/09/15 20:31:22	SIG	M62/2025A4	NR	M62 J25 - J30	
09/09/15 20:32:11	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 20:32:11	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 20:32:16	SIG	M62/2033B2	40R	M62 J25 - J30	
09/09/15 20:32:16	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 20:32:16	SIG	M62/2033B4	40R	M62 J25 - J30	
09/09/15 20:32:16	SIG	M62/2041B2	50R	M62 J25 - J30	
09/09/15 20:32:16	SIG	M62/2041B3	50R	M62 J25 - J30	
09/09/15 20:32:16	SIG	M62/2041B4	50R	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2170B1	NR	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2170B2	NR	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2170L1	LDR	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2170L2	50R	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2177B1	50R	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2177B2	50R	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2177L1	50R	M62 J25 - J30	
09/09/15 20:34:17	SIG	M62/2177L2	50R	M62 J25 - J30	
09/09/15 20:34:21	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 20:34:21	SIG	M62/2033B3	???	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2177A1	REDX	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2177A2	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2177A3	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2177A4	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2183A1	REDX	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2183A2	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2183A3	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2183A4	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2189A1	REDX	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2189A2	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2189A3	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2189A4	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2197A1	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2197A2	50R	M62 J25 - J30	
09/09/15 20:34:23	SIG	M62/2197A3	50R	M62 J25 - J30	
09/09/15 20:34:27	SIG	M62/2033B3	40R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2106B1	REDX	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2106B2	50R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2106B3	50R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2106B4	50R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2183B1	50R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2183B2	50R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2183L1	50R	M62 J25 - J30	
09/09/15 20:34:38	SIG	M62/2183L2	50R	M62 J25 - J30	
09/09/15 20:34:39	SIG	M62/2025A2	OFF	M62 J25 - J30	
09/09/15 20:34:39	SIG	M62/2025A3	OFF	M62 J25 - J30	
09/09/15 20:34:39	SIG	M62/2025A4	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 20:35:17	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2008K1	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2008K2	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2012A1	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2012A2	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2012A3	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2018A1	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2018A2	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2018A3	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2018A4	OFF	M62 J25 - J30	
09/09/15 20:35:17	SIG	M62/2025A1	BLNK	M62 J25 - J30	
09/09/15 20:35:23	SIG	M606/2003B1	NR	M62 J25 - J30	
09/09/15 20:35:23	SIG	M606/2003B2	NR	M62 J25 - J30	
09/09/15 20:35:23	SIG	M62/2008K1	50R	M62 J25 - J30	
09/09/15 20:35:23	SIG	M62/2008K2	50R	M62 J25 - J30	
09/09/15 20:35:23	SIG	M62/2018A1	HSD	M62 J25 - J30	
09/09/15 20:35:23	SIG	M62/2018A2	50R	M62 J25 - J30	
09/09/15 20:35:23	SIG	M62/2018A3	50R	M62 J25 - J30	
09/09/15 20:35:23	SIG	M62/2018A4	50R	M62 J25 - J30	
09/09/15 20:35:51	SIG	M62/2004A1	50R	M62 J25 - J30	
09/09/15 20:35:51	SIG	M62/2004A2	50R	M62 J25 - J30	
09/09/15 20:35:51	SIG	M62/2004A3	50R	M62 J25 - J30	
09/09/15 20:35:51	SIG	M62/2012A1	50R	M62 J25 - J30	
09/09/15 20:35:51	SIG	M62/2012A2	50R	M62 J25 - J30	
09/09/15 20:35:51	SIG	M62/2012A3	50R	M62 J25 - J30	
09/09/15 20:36:11	SIG	M62/2033B2	50R	M62 J25 - J30	
09/09/15 20:36:11	SIG	M62/2033B3	50R	M62 J25 - J30	
09/09/15 20:36:11	SIG	M62/2033B4	50R	M62 J25 - J30	
09/09/15 20:36:11	SIG	M62/2041B2	60R	M62 J25 - J30	
09/09/15 20:36:11	SIG	M62/2041B3	60R	M62 J25 - J30	
09/09/15 20:36:11	SIG	M62/2041B4	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M62/2057B1	REDX	M62 J25 - J30	
09/09/15 20:36:38	SIG	M62/2057B2	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M62/2057B3	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M62/2057B4	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M62/2065M1	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M621/1002B1	HSD	M62 J25 - J30	
09/09/15 20:36:38	SIG	M621/1002B2	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M621/1010B1	60R	M62 J25 - J30	
09/09/15 20:36:38	SIG	M621/1010B2	60R	M62 J25 - J30	
09/09/15 20:37:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 20:37:22	SIG	M62/2183B2	???	M62 J25 - J30	
09/09/15 20:37:24	SIG	M62/2189A1	STOP	M62 J25 - J30	
09/09/15 20:37:24	SIG	M62/2189A2	40R	M62 J25 - J30	
09/09/15 20:37:24	SIG	M62/2189A3	40R	M62 J25 - J30	
09/09/15 20:37:24	SIG	M62/2189A4	40R	M62 J25 - J30	
09/09/15 20:37:30	SIG	M62/2189A1	STOP	M62 J25 - J30	
09/09/15 20:37:52	SIG	M62/2197A1	40R	M62 J25 - J30	
09/09/15 20:37:52	SIG	M62/2197A2	40R	M62 J25 - J30	
09/09/15 20:37:52	SIG	M62/2197A3	40R	M62 J25 - J30	
09/09/15 20:38:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 20:38:26	SIG	M62/2033B3	???	M62 J25 - J30	
09/09/15 20:39:50	SIG	M606/2003B1	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M606/2003B2	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2008K1	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2008K2	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2012A1	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2012A2	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2012A3	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2018A1	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2018A2	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2018A3	OFF	M62 J25 - J30	
09/09/15 20:39:50	SIG	M62/2018A4	OFF	M62 J25 - J30	
09/09/15 20:40:01	SIG	M62/2004A1	OFF	M62 J25 - J30	
09/09/15 20:40:01	SIG	M62/2004A2	OFF	M62 J25 - J30	
09/09/15 20:40:01	SIG	M62/2004A3	OFF	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 20:44:32	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 20:44:56	SIG	M62/2147B1	50R	M62 J25 - J30	
09/09/15 20:44:56	SIG	M62/2147B2	50R	M62 J25 - J30	
09/09/15 20:44:56	SIG	M62/2147B3	50R	M62 J25 - J30	
09/09/15 20:44:56	SIG	M62/2147B4	50R	M62 J25 - J30	
09/09/15 20:44:56	SIG	M62/2170B1	50R	M62 J25 - J30	
09/09/15 20:44:56	SIG	M62/2170B2	50R	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2113B1	REDX	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2113B2	50R	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2113B3	50R	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2113B4	50R	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2117B1	50R	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2120M1	50R	M62 J25 - J30	
09/09/15 20:45:01	SIG	M62/2120M2	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2125B1	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2137B1	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2137B2	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2137B3	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2137B4	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2147B1	40R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2147B2	40R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2147B3	40R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2147B4	40R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2159B1	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2159B2	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2159M1	50R	M62 J25 - J30	
09/09/15 20:45:02	SIG	M62/2159M2	50R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2018B1	40R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2018B2	40R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2018B3	40R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2018L1	40R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2025B2	40R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2025B3	40R	M62 J25 - J30	
09/09/15 20:45:31	SIG	M62/2025B4	40R	M62 J25 - J30	
09/09/15 20:45:38	SIG	M62/2170A1	60R	M62 J25 - J30	
09/09/15 20:45:38	SIG	M62/2170A2	60R	M62 J25 - J30	
09/09/15 20:45:38	SIG	M62/2170K1	60R	M62 J25 - J30	
09/09/15 20:45:38	SIG	M62/2170K2	60R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 20:49:32	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 20:51:00	SIG	M62/2137B2	OFF	M62 J25 - J30	
09/09/15 20:51:01	SIG	M62/2137B2	50R	M62 J25 - J30	
09/09/15 20:51:54	SIG	M62/2197A1	30R	M62 J25 - J30	
09/09/15 20:52:00	SIG	M62/2183A2	LDR	M62 J25 - J30	
09/09/15 20:52:00	SIG	M62/2189A2	LDR	M62 J25 - J30	
09/09/15 20:52:00	SIG	M62/2197A1	20R	M62 J25 - J30	
09/09/15 20:52:05	SIG	M62/2197A1	STOP	M62 J25 - J30	
09/09/15 20:52:38	SIG	M62/2163A1	60R	M62 J25 - J30	
09/09/15 20:52:38	SIG	M62/2163A2	60R	M62 J25 - J30	
09/09/15 20:52:38	SIG	M62/2166K1	60R	M62 J25 - J30	
09/09/15 20:52:38	SIG	M62/2166K2	60R	M62 J25 - J30	
09/09/15 20:52:38	SIG	M62/2170B1	60R	M62 J25 - J30	
09/09/15 20:52:38	SIG	M62/2170B2	60R	M62 J25 - J30	
09/09/15 20:53:15	SIG	M62/2137B2	50R	M62 J25 - J30	
09/09/15 20:53:15	SIG	M62/2137B2	OFF	M62 J25 - J30	
09/09/15 20:53:50	SIG	M62/2065A1	REDX	M62 J25 - J30	
09/09/15 20:53:50	SIG	M62/2065A2	50R	M62 J25 - J30	
09/09/15 20:53:50	SIG	M62/2065A3	50R	M62 J25 - J30	
09/09/15 20:53:50	SIG	M62/2065A4	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2073K1	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2073K2	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2074A2	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2074A3	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2074A4	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2079A2	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2079A3	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2079A4	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2088A2	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2088A3	50R	M62 J25 - J30	
09/09/15 20:55:33	SIG	M62/2088A4	50R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2073K1	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2079A1	STOP	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2079A2	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2079A3	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2079A4	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2088A1	STOP	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2088A2	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2088A3	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2088A4	40R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2170A1	50R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2170A2	50R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2170K1	50R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2170K2	50R	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2177A2	LDR	M62 J25 - J30	
09/09/15 20:55:48	SIG	M62/2189A2	STOP	M62 J25 - J30	
09/09/15 20:55:54	SIG	M62/2189A2	STOP	M62 J25 - J30	
09/09/15 20:55:59	SIG	M62/2088A1	STOP	M62 J25 - J30	
09/09/15 20:56:04	SIG	M62/2079A1	STOP	M62 J25 - J30	
09/09/15 20:56:23	SIG	M62/2073K2	40R	M62 J25 - J30	
09/09/15 21:00:25	SIG	M62/2073K2	50R	M62 J25 - J30	
09/09/15 21:01:34	SIG	M62/2073K2	50R	M62 J25 - J30	
09/09/15 21:02:01	SIG	M62/2147B1	50R	M62 J25 - J30	
09/09/15 21:02:01	SIG	M62/2147B2	50R	M62 J25 - J30	
09/09/15 21:02:01	SIG	M62/2147B3	50R	M62 J25 - J30	
09/09/15 21:02:01	SIG	M62/2147B4	50R	M62 J25 - J30	
09/09/15 21:13:00	SIG	M62/2132B1	40R	M62 J25 - J30	
09/09/15 21:13:00	SIG	M62/2132B2	40R	M62 J25 - J30	
09/09/15 21:13:00	SIG	M62/2132B3	40R	M62 J25 - J30	
09/09/15 21:16:04	SIG	M62/2170L1	50R	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2177B1	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2177B2	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2177L1	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2177L2	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2183B1	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2183L1	OFF	M62 J25 - J30	
09/09/15 21:16:22	SIG	M62/2183L2	OFF	M62 J25 - J30	
09/09/15 21:18:35	SIG	M62/2073K2	50R	M62 J25 - J30	
09/09/15 21:18:50	SIG	M62/2065A2	60R	M62 J25 - J30	
09/09/15 21:18:50	SIG	M62/2065A3	60R	M62 J25 - J30	
09/09/15 21:18:50	SIG	M62/2065A4	60R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2073K1	60R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2079A1	REDX	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2079A2	50R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2079A3	50R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2079A4	50R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2088A2	50R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2088A3	50R	M62 J25 - J30	
09/09/15 21:19:00	SIG	M62/2088A4	50R	M62 J25 - J30	
09/09/15 21:19:32	SIG	M62/2088A2	40R	M62 J25 - J30	
09/09/15 21:19:32	SIG	M62/2088A3	40R	M62 J25 - J30	
09/09/15 21:19:32	SIG	M62/2088A4	40R	M62 J25 - J30	
09/09/15 21:19:37	SIG	M62/2088A2	30R	M62 J25 - J30	
09/09/15 21:19:43	SIG	M62/2073K1	50R	M62 J25 - J30	
09/09/15 21:19:43	SIG	M62/2079A2	LDR	M62 J25 - J30	
09/09/15 21:19:43	SIG	M62/2088A1	STOP	M62 J25 - J30	
09/09/15 21:19:43	SIG	M62/2088A2	20R	M62 J25 - J30	
09/09/15 21:19:43	SIG	M62/2088A3	40R	M62 J25 - J30	
09/09/15 21:19:43	SIG	M62/2088A4	40R	M62 J25 - J30	
09/09/15 21:19:48	SIG	M62/2088A1	STOP	M62 J25 - J30	
09/09/15 21:19:48	SIG	M62/2088A2	STOP	M62 J25 - J30	
09/09/15 21:28:48	SIG	M62/2137B1	40R	M62 J25 - J30	
09/09/15 21:28:48	SIG	M62/2137B3	40R	M62 J25 - J30	
09/09/15 21:28:48	SIG	M62/2137B4	40R	M62 J25 - J30	
09/09/15 21:37:59	SIG	M62/2137B1	50R	M62 J25 - J30	
09/09/15 21:37:59	SIG	M62/2137B3	50R	M62 J25 - J30	
09/09/15 21:37:59	SIG	M62/2137B4	50R	M62 J25 - J30	
09/09/15 21:44:55	SIG	M62/2073K1	60R	M62 J25 - J30	
09/09/15 21:44:55	SIG	M62/2079A2	50R	M62 J25 - J30	
09/09/15 21:44:55	SIG	M62/2088A1	REDX	M62 J25 - J30	
09/09/15 21:44:55	SIG	M62/2088A2	50R	M62 J25 - J30	
09/09/15 21:44:55	SIG	M62/2088A3	50R	M62 J25 - J30	
09/09/15 21:44:55	SIG	M62/2088A4	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2097A2	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2097A3	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2097A4	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2106A2	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2106A3	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2106A4	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2114A1	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2114A2	50R	M62 J25 - J30	
09/09/15 21:47:51	SIG	M62/2114A3	50R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2097A2	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2097A3	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2097A4	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2106A2	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2106A3	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2106A4	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2114A1	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2114A2	40R	M62 J25 - J30	
09/09/15 21:47:56	SIG	M62/2114A3	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2097A2	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2097A3	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2097A4	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2106A1	STOP	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2106A2	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2106A3	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2106A4	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2114A1	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2114A2	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2114A3	40R	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2117A1	REDX	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2117A2	NR	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2117A3	NR	M62 J25 - J30	
09/09/15 21:48:07	SIG	M62/2117A4	NR	M62 J25 - J30	
09/09/15 21:48:12	SIG	M62/2106A1	STOP	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2097A2	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2097A3	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2097A4	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2106A2	NR	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2106A3	NR	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2106A4	NR	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2114A1	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2114A2	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2114A3	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2117A1	BLNK	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2117A2	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2117A3	OFF	M62 J25 - J30	
09/09/15 21:49:55	SIG	M62/2117A4	OFF	M62 J25 - J30	
09/09/15 21:52:56	SIG	M62/2106A1	BLNK	M62 J25 - J30	
09/09/15 21:52:56	SIG	M62/2106A2	OFF	M62 J25 - J30	
09/09/15 21:52:56	SIG	M62/2106A3	OFF	M62 J25 - J30	
09/09/15 21:52:56	SIG	M62/2106A4	OFF	M62 J25 - J30	
09/09/15 22:04:59	SIG	M62/2132B1	60R	M62 J25 - J30	
09/09/15 22:04:59	SIG	M62/2132B2	60R	M62 J25 - J30	
09/09/15 22:04:59	SIG	M62/2132B3	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2170A1	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2170A2	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2170K1	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2170K2	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2177A2	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2177A3	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2177A4	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2183A2	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2183A3	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2183A4	60R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2189A1	REDX	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2189A2	50R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2189A3	50R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2189A4	50R	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2197A1	OFF	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2197A2	OFF	M62 J25 - J30	
09/09/15 22:13:48	SIG	M62/2197A3	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2097B2	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2097B3	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2097B4	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2106B1	BLNK	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2106B2	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2106B3	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2106B4	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2113B1	BLNK	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2113B2	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2113B3	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2113B4	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2117B3	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2120M1	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2120M2	OFF	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2125B1	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2125B2	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2125B3	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2125L1	NR	M62 J25 - J30	
09/09/15 22:16:40	SIG	M62/2125L2	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2125B1	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2125B2	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2125B3	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2125L1	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2125L2	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2132B1	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2132B2	NR	M62 J25 - J30	
09/09/15 22:18:40	SIG	M62/2132B3	NR	M62 J25 - J30	
09/09/15 22:19:40	SIG	M62/2097B2	OFF	M62 J25 - J30	
09/09/15 22:19:41	SIG	M62/2097B1	BLNK	M62 J25 - J30	
09/09/15 22:19:41	SIG	M62/2097B3	OFF	M62 J25 - J30	
09/09/15 22:19:41	SIG	M62/2097B4	OFF	M62 J25 - J30	
09/09/15 22:21:40	SIG	M62/2125B1	OFF	M62 J25 - J30	
09/09/15 22:21:41	SIG	M62/2125B2	OFF	M62 J25 - J30	
09/09/15 22:21:41	SIG	M62/2125B3	OFF	M62 J25 - J30	
09/09/15 22:21:41	SIG	M62/2125L1	OFF	M62 J25 - J30	
09/09/15 22:21:41	SIG	M62/2125L2	OFF	M62 J25 - J30	
09/09/15 22:26:40	SIG	M62/2163A1	OFF	M62 J25 - J30	
09/09/15 22:26:40	SIG	M62/2163A2	OFF	M62 J25 - J30	
09/09/15 22:26:40	SIG	M62/2166K1	OFF	M62 J25 - J30	
09/09/15 22:26:40	SIG	M62/2166K2	OFF	M62 J25 - J30	
09/09/15 22:28:40	SIG	M62/2065A1	BLNK	M62 J25 - J30	
09/09/15 22:28:40	SIG	M62/2065A2	OFF	M62 J25 - J30	
09/09/15 22:28:40	SIG	M62/2065A3	OFF	M62 J25 - J30	
09/09/15 22:28:40	SIG	M62/2065A4	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2073K1	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2079A1	BLNK	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2079A2	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2079A3	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2079A4	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2088A1	BLNK	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2088A1	BLNK	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2088A2	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2088A3	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2088A4	OFF	M62 J25 - J30	
09/09/15 22:28:50	SIG	M62/2097A1	BLNK	M62 J25 - J30	
09/09/15 22:30:38	SIG	M606/2003B1	50R	M62 J25 - J30	
09/09/15 22:30:38	SIG	M606/2003B2	50R	M62 J25 - J30	
09/09/15 22:30:38	SIG	M62/1992B1	NR	M62 J25 - J30	
09/09/15 22:30:38	SIG	M62/1992B2	NR	M62 J25 - J30	
09/09/15 22:30:38	SIG	M62/1992B3	NR	M62 J25 - J30	
09/09/15 22:30:38	SIG	M62/1992B4	NR	M62 J25 - J30	
09/09/15 22:30:43	SIG	M606/2003B1	40R	M62 J25 - J30	
09/09/15 22:30:43	SIG	M606/2003B2	40R	M62 J25 - J30	
09/09/15 22:30:49	SIG	M606/2003B1	30R	M62 J25 - J30	
09/09/15 22:30:54	SIG	M606/2003B1	20R	M62 J25 - J30	
09/09/15 22:30:54	SIG	M606/2003B2	40R	M62 J25 - J30	
09/09/15 22:30:54	SIG	M62/2005M1	TI	M62 J25 - J30	
09/09/15 22:30:54	SIG	M62/2005M2	TI	M62 J25 - J30	
09/09/15 22:30:59	SIG	M606/2003B1	STOP	M62 J25 - J30	
09/09/15 22:32:49	SIG	M62/1999B1	REDX	M62 J25 - J30	
09/09/15 22:32:49	SIG	M62/1999B2	50R	M62 J25 - J30	
09/09/15 22:32:49	SIG	M62/1999B3	50R	M62 J25 - J30	
09/09/15 22:32:49	SIG	M62/1999B4	50R	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2057B1	BLNK	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2057B2	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2057B3	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2057B4	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2065M1	NR	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2170A1	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2170A2	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2170K1	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2170K2	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2177A1	BLNK	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2177A2	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2177A3	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2177A4	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2183A2	NR	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2183A3	NR	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2183A4	NR	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2189A2	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2189A3	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M62/2189A4	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M621/1002B1	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M621/1002B2	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M621/1010B1	OFF	M62 J25 - J30	
09/09/15 22:34:40	SIG	M621/1010B2	OFF	M62 J25 - J30	
09/09/15 22:34:41	SIG	M62/2189A1	BLNK	M62 J25 - J30	
09/09/15 22:34:41	SIG	M62/2189A1	BLNK	M62 J25 - J30	
09/09/15 22:37:40	SIG	M62/2065M1	OFF	M62 J25 - J30	
09/09/15 22:37:41	SIG	M62/2183A1	BLNK	M62 J25 - J30	
09/09/15 22:37:41	SIG	M62/2183A2	OFF	M62 J25 - J30	
09/09/15 22:37:41	SIG	M62/2183A3	OFF	M62 J25 - J30	
09/09/15 22:37:41	SIG	M62/2183A4	OFF	M62 J25 - J30	
09/09/15 22:47:36	SIG	M62/2025B1	STOP	M62 J25 - J30	
09/09/15 22:47:36	SIG	M62/2025B2	40R	M62 J25 - J30	
09/09/15 22:47:36	SIG	M62/2025B3	40R	M62 J25 - J30	
09/09/15 22:47:36	SIG	M62/2025B4	40R	M62 J25 - J30	
09/09/15 22:47:41	SIG	M62/2025B1	STOP	M62 J25 - J30	
09/09/15 22:48:41	SIG	M62/2018B1	OFF	M62 J25 - J30	
09/09/15 22:48:41	SIG	M62/2018B2	OFF	M62 J25 - J30	
09/09/15 22:48:41	SIG	M62/2018B3	OFF	M62 J25 - J30	
09/09/15 22:48:41	SIG	M62/2018L1	OFF	M62 J25 - J30	
09/09/15 22:49:21	SIG	M62/1999B2	40R	M62 J25 - J30	
09/09/15 22:49:21	SIG	M62/1999B3	40R	M62 J25 - J30	
09/09/15 22:49:21	SIG	M62/1999B4	40R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2004B1	REDX	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2004B2	50R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2004B3	50R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2004B4	50R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2012B2	60R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2012B3	60R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2012B4	60R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2018B1	50R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2018B2	50R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2018B3	50R	M62 J25 - J30	
09/09/15 22:49:22	SIG	M62/2018L1	50R	M62 J25 - J30	
09/09/15 23:11:27	SIG	M62/1999B2	50R	M62 J25 - J30	
09/09/15 23:11:27	SIG	M62/1999B3	50R	M62 J25 - J30	
09/09/15 23:11:27	SIG	M62/1999B4	50R	M62 J25 - J30	
09/09/15 23:11:27	SIG	M62/2004B2	60R	M62 J25 - J30	
09/09/15 23:11:27	SIG	M62/2004B3	60R	M62 J25 - J30	
09/09/15 23:11:27	SIG	M62/2004B4	60R	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2097A1	REDX	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2097A2	50R	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2097A3	50R	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2097A4	50R	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2106A1	REDX	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2106A2	NR	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2106A3	NR	M62 J25 - J30	
09/09/15 23:13:07	SIG	M62/2106A4	NR	M62 J25 - J30	
09/09/15 23:15:32	SIG	M62/2025B1	REDX	M62 J25 - J30	
09/09/15 23:15:32	SIG	M62/2025B2	50R	M62 J25 - J30	
09/09/15 23:15:32	SIG	M62/2025B3	50R	M62 J25 - J30	
09/09/15 23:15:32	SIG	M62/2025B4	50R	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2004B1	BLNK	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2004B2	OFF	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2004B3	OFF	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2004B4	OFF	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2012B2	NR	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2012B3	NR	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2012B4	NR	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2018B1	NR	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2018B2	NR	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2018B3	NR	M62 J25 - J30	
09/09/15 23:16:41	SIG	M62/2018L1	NR	M62 J25 - J30	
09/09/15 23:18:41	SIG	M62/2005M1	50R	M62 J25 - J30	
09/09/15 23:18:41	SIG	M62/2005M2	50R	M62 J25 - J30	
09/09/15 23:18:47	SIG	M62/2005M1	40R	M62 J25 - J30	
09/09/15 23:18:47	SIG	M62/2005M2	40R	M62 J25 - J30	
09/09/15 23:19:06	SIG	M606/2003B1	50R	M62 J25 - J30	
09/09/15 23:19:06	SIG	M606/2003B2	50R	M62 J25 - J30	
09/09/15 23:19:06	SIG	M62/2005M1	50R	M62 J25 - J30	
09/09/15 23:19:06	SIG	M62/2005M2	50R	M62 J25 - J30	
09/09/15 23:19:17	SIG	M606/2003B1	OFF	M62 J25 - J30	
09/09/15 23:19:17	SIG	M606/2003B2	OFF	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1992B1	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1992B2	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1992B3	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1992B4	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1999B2	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1999B3	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/1999B4	NR	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/2005M1	OFF	M62 J25 - J30	
09/09/15 23:19:17	SIG	M62/2005M2	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1992B1	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1992B2	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1992B3	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1992B4	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1999B1	BLNK	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1999B2	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1999B3	OFF	M62 J25 - J30	
09/09/15 23:22:18	SIG	M62/1999B4	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2012B1	BLNK	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2012B2	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2012B3	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2012B4	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2018B1	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2018B2	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2018B3	OFF	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2018L1	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2025B2	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2025B3	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2025B4	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2033B2	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2033B3	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2033B4	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2041B2	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2041B3	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2041B4	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2050B2	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2050B3	NR	M62 J25 - J30	
09/09/15 23:56:42	SIG	M62/2050B4	NR	M62 J25 - J30	
09/09/15 23:59:42	SIG	M62/2033B2	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2018L1	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2025B1	BLNK	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2025B2	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2025B3	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2025B4	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2033B1	BLNK	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2033B4	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2041B1	BLNK	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2041B1	BLNK	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2041B2	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2041B3	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2041B4	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2050B2	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2050B3	OFF	M62 J25 - J30	
09/09/15 23:59:43	SIG	M62/2050B4	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2132B1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2132B2	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2132B3	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2137B1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2137B2	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2137B3	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2137B4	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2147B1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2147B2	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2147B3	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2147B4	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2159B1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2159B2	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2159M1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2159M2	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2170B1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2170B2	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 00:01:42	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 00:12:09	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 00:12:09	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 00:12:09	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2097A1	BLNK	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2097A2	OFF	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2097A3	OFF	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2097A4	OFF	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2106A2	NR	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2106A3	NR	M62 J25 - J30	
10/09/15 00:26:40	SIG	M62/2106A4	NR	M62 J25 - J30	
10/09/15 00:29:40	SIG	M62/2106A2	OFF	M62 J25 - J30	
10/09/15 00:29:41	SIG	M62/2106A1	BLNK	M62 J25 - J30	
10/09/15 00:29:41	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 00:29:41	SIG	M62/2106A4	OFF	M62 J25 - J30	
10/09/15 00:32:48	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 00:32:48	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 00:32:53	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 00:32:53	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 00:32:58	SIG	M62/1960K1	30R	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1955K1	TI	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1955K2	TI	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1960K1	20R	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1968A1	NR	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1968A2	NR	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1968A3	NR	M62 J25 - J30	
10/09/15 00:33:04	SIG	M62/1968A4	NR	M62 J25 - J30	
10/09/15 00:33:09	SIG	M62/1960K1	STOP	M62 J25 - J30	
10/09/15 00:44:20	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2004A1	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2004A2	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2004A3	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2008K1	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2008K2	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2012A1	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2012A2	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2012A3	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2018A1	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2018A2	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2018A3	OFF	M62 J25 - J30	
10/09/15 00:44:20	SIG	M62/2018A4	OFF	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1955K1	OFF	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1955K2	OFF	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1960K1	NR	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1960K2	NR	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1968A1	NR	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1968A2	NR	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1968A3	NR	M62 J25 - J30	
10/09/15 02:03:54	SIG	M62/1968A4	NR	M62 J25 - J30	
10/09/15 02:06:54	SIG	M62/1960K1	OFF	M62 J25 - J30	
10/09/15 02:06:55	SIG	M62/1960K2	OFF	M62 J25 - J30	
10/09/15 02:06:55	SIG	M62/1968A1	OFF	M62 J25 - J30	
10/09/15 02:06:55	SIG	M62/1968A2	OFF	M62 J25 - J30	
10/09/15 02:06:55	SIG	M62/1968A3	OFF	M62 J25 - J30	
10/09/15 02:06:55	SIG	M62/1968A4	OFF	M62 J25 - J30	
10/09/15 02:36:35	SIG	M62/2189A2	50R	M62 J25 - J30	
10/09/15 02:36:35	SIG	M62/2189A3	50R	M62 J25 - J30	
10/09/15 02:36:35	SIG	M62/2189A4	50R	M62 J25 - J30	
10/09/15 02:36:35	SIG	M62/2197A1	50R	M62 J25 - J30	
10/09/15 02:36:35	SIG	M62/2197A2	50R	M62 J25 - J30	
10/09/15 02:36:35	SIG	M62/2197A3	50R	M62 J25 - J30	
10/09/15 02:36:41	SIG	M62/2189A2	40R	M62 J25 - J30	
10/09/15 02:36:41	SIG	M62/2189A3	40R	M62 J25 - J30	
10/09/15 02:36:41	SIG	M62/2189A4	40R	M62 J25 - J30	
10/09/15 02:36:41	SIG	M62/2197A1	40R	M62 J25 - J30	
10/09/15 02:36:41	SIG	M62/2197A2	40R	M62 J25 - J30	
10/09/15 02:36:41	SIG	M62/2197A3	40R	M62 J25 - J30	
10/09/15 02:36:46	SIG	M62/2189A2	30R	M62 J25 - J30	
10/09/15 02:36:46	SIG	M62/2197A1	30R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2170A1	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2170A2	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2170K1	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2170K2	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2177A1	REDX	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2177A2	LDR	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2177A3	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2177A4	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2183A1	REDX	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2183A2	LDR	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2183A3	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2183A4	50R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2189A1	STOP	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2189A2	20R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2189A3	40R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2189A4	40R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2197A1	20R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2197A2	40R	M62 J25 - J30	
10/09/15 02:36:51	SIG	M62/2197A3	40R	M62 J25 - J30	
10/09/15 02:36:56	SIG	M62/2189A1	STOP	M62 J25 - J30	
10/09/15 02:36:56	SIG	M62/2189A2	STOP	M62 J25 - J30	
10/09/15 02:36:56	SIG	M62/2197A1	STOP	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2170A1	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2170A2	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2170K1	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2170K2	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2177A1	BLNK	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2177A2	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2177A3	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2177A4	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2183A2	NR	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2183A3	NR	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2183A4	NR	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2189A2	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2189A3	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2189A4	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2197A1	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2197A2	OFF	M62 J25 - J30	
10/09/15 03:47:54	SIG	M62/2197A3	OFF	M62 J25 - J30	
10/09/15 03:50:54	SIG	M62/2183A2	OFF	M62 J25 - J30	
10/09/15 03:50:54	SIG	M62/2183A3	OFF	M62 J25 - J30	
10/09/15 03:50:54	SIG	M62/2183A4	OFF	M62 J25 - J30	
10/09/15 03:50:55	SIG	M62/2183A1	BLNK	M62 J25 - J30	
10/09/15 03:50:55	SIG	M62/2189A1	BLNK	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2177A1	REDX	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2177A2	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2177A3	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2177A4	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2183A1	REDX	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2183A2	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2183A3	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2183A4	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2189A1	REDX	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2189A2	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2189A3	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2189A4	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2197A1	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2197A2	50R	M62 J25 - J30	
10/09/15 03:52:06	SIG	M62/2197A3	50R	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2177A1	BLNK	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2177A2	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2177A3	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2177A4	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2183A1	BLNK	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2183A2	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2183A3	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2183A4	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2189A1	BLNK	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2189A2	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2189A3	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2189A4	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2197A1	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2197A2	OFF	M62 J25 - J30	
10/09/15 04:07:14	SIG	M62/2197A3	OFF	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2170L1	LDR	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 05:13:51	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 05:17:19	SIG	M62/2065A1	REDX	M62 J25 - J30	
10/09/15 05:17:19	SIG	M62/2065A2	60R	M62 J25 - J30	
10/09/15 05:17:19	SIG	M62/2065A3	60R	M62 J25 - J30	
10/09/15 05:17:19	SIG	M62/2065A4	60R	M62 J25 - J30	
10/09/15 05:17:28	SIG	M62/2088A2	50R	M62 J25 - J30	
10/09/15 05:17:28	SIG	M62/2088A3	50R	M62 J25 - J30	
10/09/15 05:17:28	SIG	M62/2088A4	50R	M62 J25 - J30	
10/09/15 05:17:34	SIG	M62/2088A2	40R	M62 J25 - J30	
10/09/15 05:17:34	SIG	M62/2088A3	40R	M62 J25 - J30	
10/09/15 05:17:34	SIG	M62/2088A4	40R	M62 J25 - J30	
10/09/15 05:17:39	SIG	M62/2088A2	30R	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2073K1	50R	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2079A1	REDX	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2079A2	LDR	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2079A3	50R	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2079A4	50R	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2088A1	STOP	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2088A2	20R	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2088A3	40R	M62 J25 - J30	
10/09/15 05:17:44	SIG	M62/2088A4	40R	M62 J25 - J30	
10/09/15 05:17:49	SIG	M62/2088A1	STOP	M62 J25 - J30	
10/09/15 05:17:49	SIG	M62/2088A2	STOP	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2177B1	OFF	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2177B2	OFF	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2177L1	OFF	M62 J25 - J30	
10/09/15 05:24:16	SIG	M62/2177L2	OFF	M62 J25 - J30	
10/09/15 05:27:16	SIG	M62/2170B1	OFF	M62 J25 - J30	
10/09/15 05:27:16	SIG	M62/2170B2	OFF	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2125B1	LDR	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2125B2	50R	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2125B3	50R	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2125L1	NR	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2125L2	NR	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2132B1	60R	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2132B2	60R	M62 J25 - J30	
10/09/15 05:31:14	SIG	M62/2132B3	60R	M62 J25 - J30	
10/09/15 05:31:38	SIG	M62/2113B2	50R	M62 J25 - J30	
10/09/15 05:31:38	SIG	M62/2113B3	50R	M62 J25 - J30	
10/09/15 05:31:38	SIG	M62/2113B4	50R	M62 J25 - J30	
10/09/15 05:31:38	SIG	M62/2120M1	50R	M62 J25 - J30	
10/09/15 05:31:38	SIG	M62/2120M2	50R	M62 J25 - J30	
10/09/15 05:31:43	SIG	M62/2113B2	40R	M62 J25 - J30	
10/09/15 05:31:43	SIG	M62/2113B3	40R	M62 J25 - J30	
10/09/15 05:31:43	SIG	M62/2113B4	40R	M62 J25 - J30	
10/09/15 05:31:43	SIG	M62/2120M1	40R	M62 J25 - J30	
10/09/15 05:31:43	SIG	M62/2120M2	40R	M62 J25 - J30	
10/09/15 05:31:49	SIG	M62/2113B2	30R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2073K1	60R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2079A2	50R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2088A1	REDX	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2088A2	50R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2088A3	50R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2088A4	50R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2113B1	STOP	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2113B2	20R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2113B3	40R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2113B4	40R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2117B1	LDR	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2117B3	50R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2120M1	40R	M62 J25 - J30	
10/09/15 05:31:54	SIG	M62/2120M2	40R	M62 J25 - J30	
10/09/15 05:31:59	SIG	M62/2113B1	STOP	M62 J25 - J30	
10/09/15 05:31:59	SIG	M62/2113B2	STOP	M62 J25 - J30	
10/09/15 05:32:19	SIG	M62/2065A2	50R	M62 J25 - J30	
10/09/15 05:32:19	SIG	M62/2065A3	50R	M62 J25 - J30	
10/09/15 05:32:19	SIG	M62/2065A4	50R	M62 J25 - J30	
10/09/15 05:40:48	SIG	M62/2125L1	60R	M62 J25 - J30	
10/09/15 05:40:48	SIG	M62/2125L2	60R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2113B2	50R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2113B3	50R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2113B4	50R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2117B1	50R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2120M1	50R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2120M2	50R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2125B1	60R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2125B2	60R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2125B3	60R	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2132B1	OFF	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2132B2	OFF	M62 J25 - J30	
10/09/15 05:42:01	SIG	M62/2132B3	OFF	M62 J25 - J30	
10/09/15 05:52:52	SIG	M62/2065A2	60R	M62 J25 - J30	
10/09/15 05:52:52	SIG	M62/2065A3	60R	M62 J25 - J30	
10/09/15 05:52:52	SIG	M62/2065A4	60R	M62 J25 - J30	
10/09/15 05:54:48	SIG	M62/2065A1	BLNK	M62 J25 - J30	
10/09/15 05:54:48	SIG	M62/2065A2	OFF	M62 J25 - J30	
10/09/15 05:54:48	SIG	M62/2065A3	OFF	M62 J25 - J30	
10/09/15 05:54:48	SIG	M62/2065A4	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2073K1	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2079A1	BLNK	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2079A2	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2079A3	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2079A4	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2088A1	BLNK	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2088A2	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2088A3	OFF	M62 J25 - J30	
10/09/15 05:55:07	SIG	M62/2088A4	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2113B1	BLNK	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2113B2	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2113B3	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2113B4	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2117B3	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2120M1	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2120M2	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2125B1	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2125B2	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2125B3	OFF	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2125L1	NR	M62 J25 - J30	
10/09/15 05:59:49	SIG	M62/2125L2	NR	M62 J25 - J30	
10/09/15 06:02:49	SIG	M62/2125L1	OFF	M62 J25 - J30	
10/09/15 06:02:49	SIG	M62/2125L2	OFF	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2025A1	REDX	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2033A1	REDX	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2033A2	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2033A3	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2033A4	60R	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2041A1	REDX	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2041A2	NR	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2041A3	NR	M62 J25 - J30	
10/09/15 06:37:49	SIG	M62/2041A4	NR	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2041A2	60R	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2041A3	60R	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2041A4	60R	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2050A2	NR	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2050A3	NR	M62 J25 - J30	
10/09/15 06:38:49	SIG	M62/2050A4	NR	M62 J25 - J30	
10/09/15 06:39:42	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 06:39:42	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 06:39:42	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 06:39:42	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 06:39:42	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 06:39:42	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 06:39:47	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2050A2	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2050A3	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2050A4	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057A1	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057A2	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057A3	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057J1	60R	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2065A1	REDX	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 06:40:56	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2033A2	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2033A3	60R	M62 J25 - J30	
10/09/15 06:43:42	SIG	M62/2033A4	60R	M62 J25 - J30	
10/09/15 06:43:49	SIG	M62/1999A1	60R	M62 J25 - J30	
10/09/15 06:43:49	SIG	M62/1999A2	60R	M62 J25 - J30	
10/09/15 06:43:49	SIG	M62/1999A3	60R	M62 J25 - J30	
10/09/15 06:43:49	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 06:43:49	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 06:45:12	SIG	M62/2050A1	60R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 06:48:38	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 06:48:44	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 06:48:44	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 06:49:41	SIG	M62/2041A1	60R	M62 J25 - J30	
10/09/15 06:50:03	SIG	M62/2033A1	60R	M62 J25 - J30	
10/09/15 06:50:07	SIG	M62/2018A1	60R	M62 J25 - J30	
10/09/15 06:50:07	SIG	M62/2025A1	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 06:52:39	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 06:52:39	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 06:52:40	SIG	M62/1999A1	60R	M62 J25 - J30	
10/09/15 06:52:40	SIG	M62/1999A2	60R	M62 J25 - J30	
10/09/15 06:52:40	SIG	M62/1999A3	60R	M62 J25 - J30	
10/09/15 06:53:00	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 06:53:01	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 06:53:49	SIG	M62/1992A1	60R	M62 J25 - J30	
10/09/15 06:53:49	SIG	M62/1992A2	60R	M62 J25 - J30	
10/09/15 06:53:49	SIG	M62/1992A3	60R	M62 J25 - J30	
10/09/15 06:53:49	SIG	M62/1992J1	60R	M62 J25 - J30	
10/09/15 06:55:05	SIG	M62/2159B1	NR	M62 J25 - J30	
10/09/15 06:55:05	SIG	M62/2159B2	NR	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 06:55:06	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 06:55:11	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 06:55:40	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 06:55:40	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1979K1	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1979K2	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1981A1	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1981A2	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1981A3	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1981A4	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1987A1	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1987A3	60R	M62 J25 - J30	
10/09/15 06:55:59	SIG	M62/1987J1	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2025B1	REDX	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2025B2	NR	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2025B3	NR	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2025B4	NR	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2033B1	REDX	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2050B2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2050B3	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2050B4	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2057B1	REDX	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2057B2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2057B3	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2057B4	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2065B1	REDX	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2065B2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2065B3	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2065B4	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2065M1	NR	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2065M1	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2069M1	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M62/2069M2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M621/1002B1	HSD	M62 J25 - J30	
10/09/15 06:56:49	SIG	M621/1002B2	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 06:56:49	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2012B1	REDX	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2012B2	NR	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2012B3	NR	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2012B4	NR	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 06:56:50	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2183B1	40R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2183L1	40R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2183L2	40R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 06:57:11	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 06:59:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 06:59:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 06:59:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 06:59:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 06:59:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 06:59:32	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 06:59:38	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:00:01	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 07:00:29	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 07:00:50	SIG	M62/2194B1	60R	M62 J25 - J30	
10/09/15 07:00:50	SIG	M62/2194B2	60R	M62 J25 - J30	
10/09/15 07:00:50	SIG	M62/2194B3	60R	M62 J25 - J30	
10/09/15 07:00:50	SIG	M62/2194B4	60R	M62 J25 - J30	
10/09/15 07:00:53	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 07:00:54	SIG	M62/2159B1	NR	M62 J25 - J30	
10/09/15 07:00:54	SIG	M62/2159B2	NR	M62 J25 - J30	
10/09/15 07:00:54	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 07:00:54	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 07:00:54	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 07:00:54	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2183B1	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2183B2	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2183L1	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2183L2	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2189B1	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2189B2	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2189B3	60R	M62 J25 - J30	
10/09/15 07:01:11	SIG	M62/2189B4	60R	M62 J25 - J30	
10/09/15 07:01:18	SIG	M62/2057B1	60R	M62 J25 - J30	
10/09/15 07:01:18	SIG	M621/1002B1	60R	M62 J25 - J30	
10/09/15 07:01:18	SIG	M621/1010B1	OFF	M62 J25 - J30	
10/09/15 07:01:18	SIG	M621/1010B2	OFF	M62 J25 - J30	
10/09/15 07:01:49	SIG	M62/2197B1	60R	M62 J25 - J30	
10/09/15 07:01:49	SIG	M62/2197B2	60R	M62 J25 - J30	
10/09/15 07:01:49	SIG	M62/2197B3	60R	M62 J25 - J30	
10/09/15 07:01:49	SIG	M62/2199M1	60R	M62 J25 - J30	
10/09/15 07:01:49	SIG	M62/2199M2	60R	M62 J25 - J30	
10/09/15 07:03:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:03:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:03:54	SIG	M62/2159B1	OFF	M62 J25 - J30	
10/09/15 07:03:54	SIG	M62/2159B2	OFF	M62 J25 - J30	
10/09/15 07:04:20	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 07:04:20	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 07:04:20	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 07:04:20	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 07:04:25	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 07:04:50	SIG	M62/2159B1	NR	M62 J25 - J30	
10/09/15 07:04:50	SIG	M62/2159B2	NR	M62 J25 - J30	
10/09/15 07:04:50	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 07:04:50	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 07:04:50	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 07:04:50	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 07:04:55	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 07:04:55	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 07:04:55	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:04:55	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:06:34	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 07:06:34	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 07:06:34	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 07:06:34	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 07:06:34	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1968A1	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1968A2	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1968A3	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1968A4	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1974A1	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1974A2	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1974A3	60R	M62 J25 - J30	
10/09/15 07:06:39	SIG	M62/1974A4	60R	M62 J25 - J30	
10/09/15 07:06:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:06:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:06:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:06:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2033A1	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 07:07:50	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2159B1	NR	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2159B2	NR	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2183B1	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2183B2	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2183L1	60R	M62 J25 - J30	
10/09/15 07:08:50	SIG	M62/2183L2	60R	M62 J25 - J30	
10/09/15 07:08:53	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 07:08:53	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 07:08:53	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2159B1	NR	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2159B2	NR	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 07:09:38	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 07:09:44	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 07:10:26	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 07:10:26	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1955K1	60R	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1955K2	60R	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1960A1	60R	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1960A2	60R	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1960A3	60R	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1960K1	60R	M62 J25 - J30	
10/09/15 07:10:35	SIG	M62/1960K2	60R	M62 J25 - J30	
10/09/15 07:10:38	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 07:10:38	SIG	M62/2113B2	NR	M62 J25 - J30	
10/09/15 07:10:38	SIG	M62/2113B3	NR	M62 J25 - J30	
10/09/15 07:10:38	SIG	M62/2113B4	NR	M62 J25 - J30	
10/09/15 07:10:38	SIG	M62/2120M1	60R	M62 J25 - J30	
10/09/15 07:10:38	SIG	M62/2120M2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2074B1	REDX	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2074B2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2074B3	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2074B4	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2081B1	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2081B2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2081B3	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2081L1	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2088B1	REDX	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2088B2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2088B3	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2088B4	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2097B1	REDX	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2097B2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2097B3	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2097B4	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2106B1	REDX	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2106B2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2106B3	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2106B4	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2113B2	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2113B3	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2113B4	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2117B1	60R	M62 J25 - J30	
10/09/15 07:10:39	SIG	M62/2117B3	60R	M62 J25 - J30	
10/09/15 07:10:40	SIG	M62/2081L1	60R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2183B1	40R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2183L1	40R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2183L2	40R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 07:11:30	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2189B1	40R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2189B2	40R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2189B3	40R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2189B4	40R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2194B1	50R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2194B2	50R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2194B3	50R	M62 J25 - J30	
10/09/15 07:12:18	SIG	M62/2194B4	50R	M62 J25 - J30	
10/09/15 07:12:22	SIG	M62/2088B1	60R	M62 J25 - J30	
10/09/15 07:12:50	SIG	M62/2203B1	60R	M62 J25 - J30	
10/09/15 07:12:50	SIG	M62/2203B2	60R	M62 J25 - J30	
10/09/15 07:12:50	SIG	M62/2203B3	60R	M62 J25 - J30	
10/09/15 07:12:52	SIG	M62/1956A1	60R	M62 J25 - J30	
10/09/15 07:12:52	SIG	M62/1956A2	60R	M62 J25 - J30	
10/09/15 07:12:52	SIG	M62/1956A3	60R	M62 J25 - J30	
10/09/15 07:12:55	SIG	M62/2097B1	60R	M62 J25 - J30	
10/09/15 07:13:23	SIG	M62/2106B1	60R	M62 J25 - J30	
10/09/15 07:13:30	SIG	M62/2113B1	60R	M62 J25 - J30	
10/09/15 07:14:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:14:01	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:14:06	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:15:50	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 07:15:50	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 07:15:50	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 07:15:50	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 07:15:50	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 07:15:50	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 07:15:50	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 07:17:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:17:06	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:17:12	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 07:17:25	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 07:17:31	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 07:17:50	SIG	M62/2041A1	50R	M62 J25 - J30	
10/09/15 07:17:50	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 07:17:50	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 07:17:50	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 07:18:50	SIG	M62/2050A1	50R	M62 J25 - J30	
10/09/15 07:18:50	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 07:18:50	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 07:18:50	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 07:20:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:20:12	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:20:17	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1955K1	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1955K2	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1956A1	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1956A2	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1956A3	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1960A1	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1960A2	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1960A3	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1960K1	60R	M62 J25 - J30	
10/09/15 07:21:25	SIG	M62/1960K2	60R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 07:22:46	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 07:22:52	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 07:23:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:23:19	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:23:24	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 07:23:46	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2106A1	REDX	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2106A2	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2106A3	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2106A4	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2114A1	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2114A2	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2114A3	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2117A1	REDX	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2117A2	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2117A3	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2117A4	60R	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2124A1	REDX	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2124A2	NR	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2124A3	NR	M62 J25 - J30	
10/09/15 07:23:50	SIG	M62/2124A4	NR	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:23:51	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2088A1	REDX	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2088A2	60R	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2088A3	60R	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2088A4	60R	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2097A1	REDX	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2097A2	60R	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2097A3	60R	M62 J25 - J30	
10/09/15 07:24:50	SIG	M62/2097A4	60R	M62 J25 - J30	
10/09/15 07:24:57	SIG	M62/2106A2	50R	M62 J25 - J30	
10/09/15 07:24:57	SIG	M62/2106A3	50R	M62 J25 - J30	
10/09/15 07:24:57	SIG	M62/2106A4	50R	M62 J25 - J30	
10/09/15 07:26:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:26:24	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:26:30	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:26:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:26:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:26:37	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 07:26:37	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 07:26:37	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 07:26:42	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1955K1	60R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1955K2	60R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1960A1	60R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1960A2	60R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1960A3	60R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1960K1	60R	M62 J25 - J30	
10/09/15 07:27:26	SIG	M62/1960K2	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 07:27:45	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2065A2	60R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2065A3	60R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2065A4	60R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2197B1	50R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2197B2	50R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2197B3	50R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2199M1	50R	M62 J25 - J30	
10/09/15 07:27:50	SIG	M62/2199M2	50R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/1956A1	60R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/1956A2	60R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/1956A3	60R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/2073K1	60R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/2079A1	REDX	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/2079A2	60R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/2079A3	60R	M62 J25 - J30	
10/09/15 07:28:04	SIG	M62/2079A4	60R	M62 J25 - J30	
10/09/15 07:29:02	SIG	M62/2106A2	40R	M62 J25 - J30	
10/09/15 07:29:02	SIG	M62/2106A3	40R	M62 J25 - J30	
10/09/15 07:29:02	SIG	M62/2106A4	40R	M62 J25 - J30	
10/09/15 07:29:02	SIG	M62/2114A1	50R	M62 J25 - J30	
10/09/15 07:29:02	SIG	M62/2114A2	50R	M62 J25 - J30	
10/09/15 07:29:02	SIG	M62/2114A3	50R	M62 J25 - J30	
10/09/15 07:29:07	SIG	M62/2106A2	40R	M62 J25 - J30	
10/09/15 07:29:07	SIG	M62/2106A3	40R	M62 J25 - J30	
10/09/15 07:29:07	SIG	M62/2106A4	40R	M62 J25 - J30	
10/09/15 07:29:07	SIG	M62/2114A1	40R	M62 J25 - J30	
10/09/15 07:29:07	SIG	M62/2114A2	40R	M62 J25 - J30	
10/09/15 07:29:07	SIG	M62/2114A3	40R	M62 J25 - J30	
10/09/15 07:29:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:29:30	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:29:35	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:29:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:29:39	SIG	M62/2117A2	50R	M62 J25 - J30	
10/09/15 07:29:39	SIG	M62/2117A3	50R	M62 J25 - J30	
10/09/15 07:29:39	SIG	M62/2117A4	50R	M62 J25 - J30	
10/09/15 07:29:40	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:29:44	SIG	M62/2117A2	40R	M62 J25 - J30	
10/09/15 07:29:44	SIG	M62/2117A3	40R	M62 J25 - J30	
10/09/15 07:29:44	SIG	M62/2117A4	40R	M62 J25 - J30	
10/09/15 07:29:45	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 07:30:37	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 07:31:34	SIG	M62/2117A2	30R	M62 J25 - J30	
10/09/15 07:31:39	SIG	M62/2114A1	LDR	M62 J25 - J30	
10/09/15 07:31:39	SIG	M62/2117A1	STOP	M62 J25 - J30	
10/09/15 07:31:39	SIG	M62/2117A2	20R	M62 J25 - J30	
10/09/15 07:31:40	SIG	M62/2194B1	40R	M62 J25 - J30	
10/09/15 07:31:40	SIG	M62/2194B2	40R	M62 J25 - J30	
10/09/15 07:31:40	SIG	M62/2194B3	40R	M62 J25 - J30	
10/09/15 07:31:40	SIG	M62/2194B4	40R	M62 J25 - J30	
10/09/15 07:31:54	SIG	M62/2117A1	STOP	M62 J25 - J30	
10/09/15 07:31:54	SIG	M62/2117A2	STOP	M62 J25 - J30	
10/09/15 07:31:58	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 07:31:58	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 07:31:58	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 07:31:58	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:32:04	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 07:32:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2197B1	40R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2197B2	40R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2197B3	40R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2199M1	40R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2199M2	40R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2203B1	50R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2203B2	50R	M62 J25 - J30	
10/09/15 07:32:44	SIG	M62/2203B3	50R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 07:32:45	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:32:50	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 07:33:49	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 07:34:25	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 07:34:25	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 07:34:25	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 07:34:25	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 07:34:30	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 07:34:30	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 07:34:30	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 07:34:30	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 07:34:45	SIG	M62/2097A2	50R	M62 J25 - J30	
10/09/15 07:34:45	SIG	M62/2097A3	50R	M62 J25 - J30	
10/09/15 07:34:45	SIG	M62/2097A4	50R	M62 J25 - J30	
10/09/15 07:34:51	SIG	M62/2097A2	40R	M62 J25 - J30	
10/09/15 07:34:51	SIG	M62/2097A3	40R	M62 J25 - J30	
10/09/15 07:34:51	SIG	M62/2097A4	40R	M62 J25 - J30	
10/09/15 07:34:59	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 07:34:59	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 07:34:59	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 07:34:59	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 07:35:04	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 07:35:04	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 07:35:04	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 07:35:04	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 07:35:05	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 07:35:05	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 07:35:05	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:35:05	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 07:35:08	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 07:35:10	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 07:35:10	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 07:35:10	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:35:10	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:35:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:35:44	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:35:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:35:48	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:35:50	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:35:53	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 07:36:20	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 07:36:20	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 07:36:20	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 07:36:20	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 07:36:20	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 07:36:20	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2194B1	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2194B2	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2194B3	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2194B4	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2197B1	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2197B2	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2197B3	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2199M1	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2199M2	50R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2203B1	60R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2203B2	60R	M62 J25 - J30	
10/09/15 07:36:44	SIG	M62/2203B3	60R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 07:36:45	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 07:36:53	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 07:37:44	SIG	M62/2194B1	40R	M62 J25 - J30	
10/09/15 07:37:44	SIG	M62/2194B2	40R	M62 J25 - J30	
10/09/15 07:37:44	SIG	M62/2194B3	40R	M62 J25 - J30	
10/09/15 07:37:44	SIG	M62/2194B4	40R	M62 J25 - J30	
10/09/15 07:38:25	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 07:38:25	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 07:38:25	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 07:38:25	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2197B1	40R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2197B2	40R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2197B3	40R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2199M1	40R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2199M2	40R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2203B1	50R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2203B2	50R	M62 J25 - J30	
10/09/15 07:38:28	SIG	M62/2203B3	50R	M62 J25 - J30	
10/09/15 07:38:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:38:50	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/2057A1	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/2057A2	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/2057A3	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/2057J1	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M621/1002A1	50R	M62 J25 - J30	
10/09/15 07:38:55	SIG	M621/1002A2	50R	M62 J25 - J30	
10/09/15 07:39:01	SIG	M62/2057A1	40R	M62 J25 - J30	
10/09/15 07:39:01	SIG	M62/2057A2	40R	M62 J25 - J30	
10/09/15 07:39:01	SIG	M62/2057A3	40R	M62 J25 - J30	
10/09/15 07:39:01	SIG	M62/2057J1	40R	M62 J25 - J30	
10/09/15 07:39:01	SIG	M621/1002A1	40R	M62 J25 - J30	
10/09/15 07:39:01	SIG	M621/1002A2	40R	M62 J25 - J30	
10/09/15 07:39:05	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 07:39:05	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 07:39:05	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 07:39:05	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 07:39:08	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 07:39:08	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 07:39:08	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 07:39:08	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 07:39:16	SIG	M62/2106A2	50R	M62 J25 - J30	
10/09/15 07:39:16	SIG	M62/2106A3	50R	M62 J25 - J30	
10/09/15 07:39:16	SIG	M62/2106A4	50R	M62 J25 - J30	
10/09/15 07:39:16	SIG	M62/2114A2	50R	M62 J25 - J30	
10/09/15 07:39:16	SIG	M62/2114A3	50R	M62 J25 - J30	
10/09/15 07:39:20	SIG	M62/2106A2	40R	M62 J25 - J30	
10/09/15 07:39:20	SIG	M62/2106A3	40R	M62 J25 - J30	
10/09/15 07:39:20	SIG	M62/2106A4	40R	M62 J25 - J30	
10/09/15 07:39:20	SIG	M62/2114A2	40R	M62 J25 - J30	
10/09/15 07:39:20	SIG	M62/2114A3	40R	M62 J25 - J30	
10/09/15 07:39:48	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 07:39:48	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 07:39:48	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 07:39:48	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 07:39:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:39:59	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:40:04	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 07:40:20	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 07:40:20	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 07:40:20	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 07:40:20	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 07:40:20	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 07:40:26	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 07:40:26	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 07:40:26	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 07:40:26	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2203B1	40R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2203B2	40R	M62 J25 - J30	
10/09/15 07:40:31	SIG	M62/2203B3	40R	M62 J25 - J30	
10/09/15 07:40:42	SIG	M62/2050A1	40R	M62 J25 - J30	
10/09/15 07:40:42	SIG	M62/2050A2	40R	M62 J25 - J30	
10/09/15 07:40:42	SIG	M62/2050A3	40R	M62 J25 - J30	
10/09/15 07:40:42	SIG	M62/2050A4	40R	M62 J25 - J30	
10/09/15 07:40:53	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 07:40:53	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 07:40:53	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 07:40:53	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 07:41:50	SIG	M62/2088A2	50R	M62 J25 - J30	
10/09/15 07:41:50	SIG	M62/2088A3	50R	M62 J25 - J30	
10/09/15 07:41:50	SIG	M62/2088A4	50R	M62 J25 - J30	
10/09/15 07:41:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:41:55	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 07:41:59	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 07:42:01	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:42:08	SIG	M62/2041A1	40R	M62 J25 - J30	
10/09/15 07:42:08	SIG	M62/2041A2	40R	M62 J25 - J30	
10/09/15 07:42:08	SIG	M62/2041A3	40R	M62 J25 - J30	
10/09/15 07:42:08	SIG	M62/2041A4	40R	M62 J25 - J30	
10/09/15 07:42:55	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 07:42:55	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 07:42:55	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1992A1	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1992A2	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1992A3	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1992J1	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1999A1	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1999A2	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1999A3	60R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 07:42:56	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 07:43:14	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 07:43:14	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 07:43:14	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 07:43:22	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 07:43:24	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1992A1	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1992A2	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1992A3	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1992J1	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 07:43:30	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 07:43:35	SIG	M62/2088A2	40R	M62 J25 - J30	
10/09/15 07:43:35	SIG	M62/2088A3	40R	M62 J25 - J30	
10/09/15 07:43:35	SIG	M62/2088A4	40R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1987A1	40R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1987A3	40R	M62 J25 - J30	
10/09/15 07:44:19	SIG	M62/1987J1	40R	M62 J25 - J30	
10/09/15 07:44:26	SIG	M62/2203B1	50R	M62 J25 - J30	
10/09/15 07:44:26	SIG	M62/2203B2	50R	M62 J25 - J30	
10/09/15 07:44:26	SIG	M62/2203B3	50R	M62 J25 - J30	
10/09/15 07:44:35	SIG	M62/2033A1	40R	M62 J25 - J30	
10/09/15 07:44:35	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 07:44:35	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 07:44:35	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 07:44:50	SIG	M62/2079A2	50R	M62 J25 - J30	
10/09/15 07:44:50	SIG	M62/2079A3	50R	M62 J25 - J30	
10/09/15 07:44:50	SIG	M62/2079A4	50R	M62 J25 - J30	
10/09/15 07:44:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:45:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:45:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:45:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:45:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:45:02	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:45:07	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:45:08	SIG	M62/2203B1	40R	M62 J25 - J30	
10/09/15 07:45:08	SIG	M62/2203B2	40R	M62 J25 - J30	
10/09/15 07:45:08	SIG	M62/2203B3	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 07:45:32	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 07:45:37	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 07:45:46	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 07:45:46	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 07:45:46	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 07:45:46	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 07:46:25	SIG	M621/1002A1	OFF	M62 J25 - J30	
10/09/15 07:46:25	SIG	M621/1002A2	OFF	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 07:46:47	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 07:46:52	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 07:47:08	SIG	M62/2183B1	60R	M62 J25 - J30	
10/09/15 07:47:08	SIG	M62/2183B2	60R	M62 J25 - J30	
10/09/15 07:47:08	SIG	M62/2183L1	60R	M62 J25 - J30	
10/09/15 07:47:08	SIG	M62/2183L2	60R	M62 J25 - J30	
10/09/15 07:47:15	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 07:47:15	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 07:47:25	SIG	M62/2073K1	50R	M62 J25 - J30	
10/09/15 07:47:25	SIG	M62/2079A2	40R	M62 J25 - J30	
10/09/15 07:47:25	SIG	M62/2079A3	40R	M62 J25 - J30	
10/09/15 07:47:25	SIG	M62/2079A4	40R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 07:47:31	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2183B1	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2183L1	40R	M62 J25 - J30	
10/09/15 07:47:37	SIG	M62/2183L2	40R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 07:48:14	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 07:48:14	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 07:48:17	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 07:48:18	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1979K1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1979K2	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1981A1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1981A2	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1981A3	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1981A4	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1987A1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1987A3	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1987J1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1992A1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1992A2	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1992A3	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1992J1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1999A1	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1999A2	60R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 07:48:20	SIG	M62/1999A3	60R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2194B1	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2194B2	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2194B3	50R	M62 J25 - J30	
10/09/15 07:48:24	SIG	M62/2194B4	50R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 07:48:29	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 07:48:29	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 07:49:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:49:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:49:05	SIG	M62/2197B1	50R	M62 J25 - J30	
10/09/15 07:49:05	SIG	M62/2197B2	50R	M62 J25 - J30	
10/09/15 07:49:05	SIG	M62/2197B3	50R	M62 J25 - J30	
10/09/15 07:49:05	SIG	M62/2199M1	50R	M62 J25 - J30	
10/09/15 07:49:05	SIG	M62/2199M2	50R	M62 J25 - J30	
10/09/15 07:49:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:49:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:49:16	SIG	M62/2057A1	60R	M62 J25 - J30	
10/09/15 07:49:16	SIG	M62/2057A2	60R	M62 J25 - J30	
10/09/15 07:49:16	SIG	M62/2057A3	60R	M62 J25 - J30	
10/09/15 07:49:16	SIG	M62/2057J1	60R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 07:49:18	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 07:50:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:50:11	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:50:17	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:50:25	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 07:50:25	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 07:50:25	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 07:50:25	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 07:50:25	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 07:50:25	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 07:50:39	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 07:50:39	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 07:50:39	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:50:39	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:50:44	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 07:50:44	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 07:50:44	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:50:44	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 07:50:47	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 07:50:51	SIG	M62/2203B1	50R	M62 J25 - J30	
10/09/15 07:50:51	SIG	M62/2203B2	50R	M62 J25 - J30	
10/09/15 07:50:51	SIG	M62/2203B3	50R	M62 J25 - J30	
10/09/15 07:50:53	SIG	M62/2189B1	40R	M62 J25 - J30	
10/09/15 07:50:53	SIG	M62/2189B2	40R	M62 J25 - J30	
10/09/15 07:50:53	SIG	M62/2189B3	40R	M62 J25 - J30	
10/09/15 07:50:53	SIG	M62/2189B4	40R	M62 J25 - J30	
10/09/15 07:51:18	SIG	M62/2050A1	50R	M62 J25 - J30	
10/09/15 07:51:18	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 07:51:18	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 07:51:18	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 07:51:22	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 07:51:22	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 07:51:28	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 07:52:30	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 07:53:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:53:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:53:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:53:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 07:53:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:53:17	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:53:23	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:54:26	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 07:54:27	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 07:54:32	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 07:54:37	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 07:54:37	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 07:54:37	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 07:54:37	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 07:54:51	SIG	M62/2203B1	60R	M62 J25 - J30	
10/09/15 07:54:51	SIG	M62/2203B2	60R	M62 J25 - J30	
10/09/15 07:54:51	SIG	M62/2203B3	60R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1992A1	40R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1992A2	40R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1992A3	40R	M62 J25 - J30	
10/09/15 07:54:58	SIG	M62/1992J1	40R	M62 J25 - J30	
10/09/15 07:55:37	SIG	M62/2041A1	50R	M62 J25 - J30	
10/09/15 07:55:37	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 07:55:37	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 07:55:37	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1987A1	40R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1987A3	40R	M62 J25 - J30	
10/09/15 07:56:20	SIG	M62/1987J1	40R	M62 J25 - J30	
10/09/15 07:56:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 07:56:23	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:56:28	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:56:47	SIG	M62/2033A1	50R	M62 J25 - J30	
10/09/15 07:56:47	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 07:56:47	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 07:56:47	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 07:57:11	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 07:57:11	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 07:57:11	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 07:57:11	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 07:57:24	SIG	M62/2073K1	40R	M62 J25 - J30	
10/09/15 07:57:30	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 07:57:31	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 07:57:36	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 07:57:41	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 07:57:41	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 07:57:41	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 07:57:41	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2183B1	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2183B2	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2183L1	60R	M62 J25 - J30	
10/09/15 07:57:58	SIG	M62/2183L2	60R	M62 J25 - J30	
10/09/15 07:58:17	SIG	M62/2065A2	50R	M62 J25 - J30	
10/09/15 07:58:17	SIG	M62/2065A3	50R	M62 J25 - J30	
10/09/15 07:58:17	SIG	M62/2065A4	50R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1979K1	40R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1979K2	40R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1981A1	40R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1981A2	40R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1981A3	40R	M62 J25 - J30	
10/09/15 07:58:19	SIG	M62/1981A4	40R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2057A1	50R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2057A2	50R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2057A3	50R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2057J1	50R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2065A2	40R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2065A3	40R	M62 J25 - J30	
10/09/15 07:58:22	SIG	M62/2065A4	40R	M62 J25 - J30	
10/09/15 07:58:24	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 07:58:24	SIG	M62/2189B4	OFF	M62 J25 - J30	
10/09/15 07:58:47	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 07:59:15	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 07:59:20	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2183B1	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2183L1	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2183L2	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2189B1	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2189B2	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2189B3	40R	M62 J25 - J30	
10/09/15 07:59:21	SIG	M62/2189B4	40R	M62 J25 - J30	
10/09/15 07:59:22	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 07:59:22	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 07:59:22	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 07:59:22	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1974A1	40R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1974A2	40R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1974A3	40R	M62 J25 - J30	
10/09/15 07:59:29	SIG	M62/1974A4	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 07:59:58	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 08:00:50	SIG	M62/2050A1	60R	M62 J25 - J30	
10/09/15 08:00:50	SIG	M62/2050A2	60R	M62 J25 - J30	
10/09/15 08:00:50	SIG	M62/2050A3	60R	M62 J25 - J30	
10/09/15 08:00:50	SIG	M62/2050A4	60R	M62 J25 - J30	
10/09/15 08:01:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:01:32	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:01:37	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2050A1	50R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2057A1	40R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2057A2	40R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2057A3	40R	M62 J25 - J30	
10/09/15 08:01:54	SIG	M62/2057J1	40R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1968A1	40R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1968A2	40R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1968A3	40R	M62 J25 - J30	
10/09/15 08:02:06	SIG	M62/1968A4	40R	M62 J25 - J30	
10/09/15 08:02:37	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:02:38	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:02:43	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:03:24	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 08:03:28	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 08:03:33	SIG	M621/1002A1	50R	M62 J25 - J30	
10/09/15 08:03:33	SIG	M621/1002A2	50R	M62 J25 - J30	
10/09/15 08:03:39	SIG	M621/1002A1	40R	M62 J25 - J30	
10/09/15 08:03:39	SIG	M621/1002A2	40R	M62 J25 - J30	
10/09/15 08:03:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 08:03:52	SIG	M62/2050A1	40R	M62 J25 - J30	
10/09/15 08:03:52	SIG	M62/2050A2	40R	M62 J25 - J30	
10/09/15 08:03:52	SIG	M62/2050A3	40R	M62 J25 - J30	
10/09/15 08:03:52	SIG	M62/2050A4	40R	M62 J25 - J30	
10/09/15 08:03:57	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:03:57	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 08:03:57	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 08:03:57	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 08:04:14	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 08:04:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:04:44	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:04:49	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:05:04	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 08:05:04	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 08:05:04	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 08:05:50	SIG	M62/2041A1	40R	M62 J25 - J30	
10/09/15 08:05:50	SIG	M62/2041A2	40R	M62 J25 - J30	
10/09/15 08:05:50	SIG	M62/2041A3	40R	M62 J25 - J30	
10/09/15 08:05:50	SIG	M62/2041A4	40R	M62 J25 - J30	
10/09/15 08:06:43	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 08:06:43	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:07:33	SIG	M621/1002A1	OFF	M62 J25 - J30	
10/09/15 08:07:33	SIG	M621/1002A2	OFF	M62 J25 - J30	
10/09/15 08:07:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:07:44	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:07:49	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:08:02	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 08:08:02	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 08:08:02	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 08:08:02	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 08:08:02	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 08:08:25	SIG	M62/2033A1	40R	M62 J25 - J30	
10/09/15 08:08:25	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 08:08:25	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 08:08:25	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 08:09:50	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 08:09:50	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 08:09:50	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 08:09:56	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:09:56	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 08:09:56	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 08:09:56	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 08:10:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:10:48	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:10:49	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 08:10:49	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 08:10:49	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 08:10:49	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 08:10:54	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:10:57	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 08:10:57	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 08:10:57	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 08:10:57	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 08:10:57	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 08:11:13	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 08:11:13	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 08:11:13	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 08:11:13	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 08:11:24	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 08:11:24	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 08:11:24	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 08:12:30	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 08:12:30	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 08:12:30	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 08:12:30	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 08:12:30	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 08:12:50	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:12:51	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:12:56	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 08:13:13	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 08:13:47	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 08:13:47	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 08:13:47	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 08:13:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:13:55	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:13:56	SIG	M62/2114A2	50R	M62 J25 - J30	
10/09/15 08:13:56	SIG	M62/2114A3	50R	M62 J25 - J30	
10/09/15 08:14:01	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:14:20	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 08:14:20	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 08:14:20	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 08:14:20	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 08:14:52	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:15:11	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 08:15:11	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 08:15:11	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 08:15:11	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 08:15:14	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 08:15:14	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 08:15:14	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 08:15:14	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 08:15:14	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 08:16:00	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:16:01	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:16:06	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1987A1	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1987A3	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1987J1	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1992A1	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1992A2	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1992A3	40R	M62 J25 - J30	
10/09/15 08:16:13	SIG	M62/1992J1	40R	M62 J25 - J30	
10/09/15 08:16:25	SIG	M62/2189B1	40R	M62 J25 - J30	
10/09/15 08:16:25	SIG	M62/2189B2	40R	M62 J25 - J30	
10/09/15 08:16:25	SIG	M62/2189B3	40R	M62 J25 - J30	
10/09/15 08:16:25	SIG	M62/2189B4	40R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 08:16:36	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 08:17:01	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:17:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:17:07	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:17:08	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:17:36	SIG	M62/1979K1	40R	M62 J25 - J30	
10/09/15 08:17:36	SIG	M62/1979K2	40R	M62 J25 - J30	
10/09/15 08:17:36	SIG	M62/1981A1	40R	M62 J25 - J30	
10/09/15 08:17:36	SIG	M62/1981A2	40R	M62 J25 - J30	
10/09/15 08:17:36	SIG	M62/1981A3	40R	M62 J25 - J30	
10/09/15 08:17:36	SIG	M62/1981A4	40R	M62 J25 - J30	
10/09/15 08:17:54	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:18:09	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 08:18:09	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 08:18:09	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 08:18:09	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 08:18:10	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 08:18:10	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 08:18:10	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 08:19:00	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:19:01	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:19:04	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 08:19:04	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 08:19:04	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:19:04	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:19:06	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:19:09	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 08:19:09	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 08:19:09	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:19:09	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:19:12	SIG	M62/1974A1	40R	M62 J25 - J30	
10/09/15 08:19:12	SIG	M62/1974A2	40R	M62 J25 - J30	
10/09/15 08:19:12	SIG	M62/1974A3	40R	M62 J25 - J30	
10/09/15 08:19:12	SIG	M62/1974A4	40R	M62 J25 - J30	
10/09/15 08:19:18	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:19:33	SIG	M62/2114A2	40R	M62 J25 - J30	
10/09/15 08:19:33	SIG	M62/2114A3	40R	M62 J25 - J30	
10/09/15 08:20:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:20:07	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:20:13	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:22:03	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:22:04	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:22:10	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:23:05	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 08:23:05	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 08:23:05	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 08:23:05	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 08:23:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:23:14	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:23:19	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:23:51	SIG	M62/1955K1	60R	M62 J25 - J30	
10/09/15 08:23:51	SIG	M62/1955K2	60R	M62 J25 - J30	
10/09/15 08:23:51	SIG	M62/1956A1	60R	M62 J25 - J30	
10/09/15 08:23:51	SIG	M62/1956A2	60R	M62 J25 - J30	
10/09/15 08:23:51	SIG	M62/1956A3	60R	M62 J25 - J30	
10/09/15 08:24:06	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 08:24:06	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 08:24:06	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 08:24:06	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 08:24:12	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 08:24:12	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 08:24:12	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 08:24:12	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 08:24:13	SIG	M62/1968A1	40R	M62 J25 - J30	
10/09/15 08:24:13	SIG	M62/1968A2	40R	M62 J25 - J30	
10/09/15 08:24:13	SIG	M62/1968A3	40R	M62 J25 - J30	
10/09/15 08:24:13	SIG	M62/1968A4	40R	M62 J25 - J30	
10/09/15 08:24:18	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 08:24:18	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 08:24:18	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 08:24:18	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 08:25:07	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:25:08	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:25:13	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:26:21	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:26:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:26:27	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:26:58	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 08:26:58	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 08:26:58	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:26:58	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:27:03	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 08:27:03	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 08:27:03	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:27:03	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:28:12	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:28:13	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:28:18	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:29:02	SIG	M621/1002A1	50R	M62 J25 - J30	
10/09/15 08:29:02	SIG	M621/1002A2	50R	M62 J25 - J30	
10/09/15 08:29:07	SIG	M621/1002A1	40R	M62 J25 - J30	
10/09/15 08:29:07	SIG	M621/1002A2	40R	M62 J25 - J30	
10/09/15 08:29:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:29:27	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:29:32	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:29:51	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 08:29:51	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 08:29:51	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 08:29:51	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 08:29:51	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 08:29:53	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 08:29:53	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 08:29:53	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 08:29:53	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 08:29:53	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B1	40R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B2	40R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B3	40R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 08:30:56	SIG	M62/2189B4	40R	M62 J25 - J30	
10/09/15 08:31:16	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:31:17	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:31:22	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:31:44	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 08:31:44	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 08:31:44	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 08:31:44	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2041A1	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2050A1	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 08:32:33	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 08:32:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:32:43	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:32:48	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:33:03	SIG	M621/1002A1	OFF	M62 J25 - J30	
10/09/15 08:33:03	SIG	M621/1002A2	OFF	M62 J25 - J30	
10/09/15 08:33:04	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 08:33:04	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 08:33:04	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 08:33:04	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 08:33:04	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 08:34:09	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:34:21	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:34:21	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:34:21	SIG	M62/2033A1	50R	M62 J25 - J30	
10/09/15 08:34:21	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 08:34:21	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 08:34:21	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 08:34:27	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:34:27	SIG	M62/2050A1	40R	M62 J25 - J30	
10/09/15 08:34:27	SIG	M62/2050A2	40R	M62 J25 - J30	
10/09/15 08:34:27	SIG	M62/2050A3	40R	M62 J25 - J30	
10/09/15 08:34:27	SIG	M62/2050A4	40R	M62 J25 - J30	
10/09/15 08:35:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:35:43	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:35:48	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:35:49	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 08:35:49	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 08:35:49	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 08:35:49	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 08:36:11	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:36:11	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 08:36:11	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 08:36:11	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 08:36:21	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 08:36:21	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 08:36:21	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 08:36:21	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 08:36:27	SIG	M62/2177B1	40R	M62 J25 - J30	
10/09/15 08:36:27	SIG	M62/2177B2	40R	M62 J25 - J30	
10/09/15 08:36:27	SIG	M62/2177L1	40R	M62 J25 - J30	
10/09/15 08:36:27	SIG	M62/2177L2	40R	M62 J25 - J30	
10/09/15 08:36:32	SIG	M62/2041A1	40R	M62 J25 - J30	
10/09/15 08:36:32	SIG	M62/2041A2	40R	M62 J25 - J30	
10/09/15 08:36:32	SIG	M62/2041A3	40R	M62 J25 - J30	
10/09/15 08:36:32	SIG	M62/2041A4	40R	M62 J25 - J30	
10/09/15 08:36:42	SIG	M62/2106A1	40R	M62 J25 - J30	
10/09/15 08:37:03	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 08:37:03	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 08:37:03	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 08:37:03	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 08:37:03	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 08:38:03	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 08:38:03	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 08:38:03	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 08:38:03	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 08:38:03	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 08:38:16	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 08:38:16	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 08:38:16	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 08:38:16	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 08:38:26	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:38:26	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 08:38:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:38:47	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:38:53	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:39:20	SIG	M62/2033A1	40R	M62 J25 - J30	
10/09/15 08:39:20	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 08:39:20	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 08:39:20	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 08:40:45	SIG	M62/2114A1	50R	M62 J25 - J30	
10/09/15 08:40:45	SIG	M62/2117A2	40R	M62 J25 - J30	
10/09/15 08:40:50	SIG	M62/2114A1	40R	M62 J25 - J30	
10/09/15 08:40:50	SIG	M62/2117A1	REDX	M62 J25 - J30	
10/09/15 08:40:50	SIG	M62/2117A2	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 08:41:44	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 08:41:50	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 08:41:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:41:53	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:41:59	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:42:10	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:42:26	SIG	M62/2117A2	50R	M62 J25 - J30	
10/09/15 08:42:26	SIG	M62/2117A3	50R	M62 J25 - J30	
10/09/15 08:42:26	SIG	M62/2117A4	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 08:42:29	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 08:42:42	SIG	M62/2114A1	50R	M62 J25 - J30	
10/09/15 08:42:42	SIG	M62/2114A2	50R	M62 J25 - J30	
10/09/15 08:42:42	SIG	M62/2114A3	50R	M62 J25 - J30	
10/09/15 08:42:51	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 08:42:51	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 08:42:51	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 08:43:01	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 08:43:01	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 08:43:01	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:43:01	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:43:06	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 08:43:06	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 08:43:06	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:43:06	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:43:09	SIG	M62/2065A2	50R	M62 J25 - J30	
10/09/15 08:43:09	SIG	M62/2065A3	50R	M62 J25 - J30	
10/09/15 08:43:09	SIG	M62/2065A4	50R	M62 J25 - J30	
10/09/15 08:43:23	SIG	M62/2189B1	50R	M62 J25 - J30	
10/09/15 08:43:23	SIG	M62/2189B2	50R	M62 J25 - J30	
10/09/15 08:43:23	SIG	M62/2189B3	50R	M62 J25 - J30	
10/09/15 08:43:23	SIG	M62/2189B4	50R	M62 J25 - J30	
10/09/15 08:43:28	SIG	M62/2073K1	50R	M62 J25 - J30	
10/09/15 08:43:41	SIG	M62/2065A2	40R	M62 J25 - J30	
10/09/15 08:43:41	SIG	M62/2065A3	40R	M62 J25 - J30	
10/09/15 08:43:41	SIG	M62/2065A4	40R	M62 J25 - J30	
10/09/15 08:43:51	SIG	M62/2073K1	40R	M62 J25 - J30	
10/09/15 08:43:51	SIG	M62/2106A1	50R	M62 J25 - J30	
10/09/15 08:43:51	SIG	M62/2106A2	50R	M62 J25 - J30	
10/09/15 08:43:51	SIG	M62/2106A3	50R	M62 J25 - J30	
10/09/15 08:43:51	SIG	M62/2106A4	50R	M62 J25 - J30	
10/09/15 08:44:09	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 08:44:09	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 08:44:09	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 08:44:09	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 08:44:15	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 08:44:15	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 08:44:15	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 08:44:15	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 08:44:15	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 08:44:35	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:44:35	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:44:41	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:44:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:44:59	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 08:45:04	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 08:45:05	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:45:39	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 08:45:39	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 08:45:39	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 08:45:40	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 08:45:40	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 08:45:40	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 08:45:40	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 08:45:40	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 08:46:05	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 08:46:05	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:46:05	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 08:46:05	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 08:46:08	SIG	M62/2183B1	40R	M62 J25 - J30	
10/09/15 08:46:08	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:46:08	SIG	M62/2183L1	40R	M62 J25 - J30	
10/09/15 08:46:08	SIG	M62/2183L2	40R	M62 J25 - J30	
10/09/15 08:46:44	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2194B1	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2194B2	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2194B3	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2194B4	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2197B1	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2197B2	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2197B3	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2199M1	60R	M62 J25 - J30	
10/09/15 08:46:51	SIG	M62/2199M2	60R	M62 J25 - J30	
10/09/15 08:46:52	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 08:46:52	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 08:46:52	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 08:46:52	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 08:46:52	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 08:46:52	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 08:47:02	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 08:47:09	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 08:47:09	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 08:47:09	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 08:47:09	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 08:47:15	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 08:47:15	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 08:47:15	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 08:47:15	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 08:47:15	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 08:47:29	SIG	M62/2097A2	50R	M62 J25 - J30	
10/09/15 08:47:29	SIG	M62/2097A3	50R	M62 J25 - J30	
10/09/15 08:47:29	SIG	M62/2097A4	50R	M62 J25 - J30	
10/09/15 08:47:39	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:47:39	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:47:45	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:48:51	SIG	M62/2114A1	60R	M62 J25 - J30	
10/09/15 08:48:51	SIG	M62/2114A2	60R	M62 J25 - J30	
10/09/15 08:48:51	SIG	M62/2114A3	60R	M62 J25 - J30	
10/09/15 08:48:58	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 08:48:58	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 08:48:58	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 08:49:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:49:07	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:49:12	SIG	M62/2183B2	40R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2189B1	60R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2189B2	60R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2189B3	60R	M62 J25 - J30	
10/09/15 08:50:09	SIG	M62/2189B4	60R	M62 J25 - J30	
10/09/15 08:50:11	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:50:43	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:50:43	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:50:48	SIG	M62/2088A2	50R	M62 J25 - J30	
10/09/15 08:50:48	SIG	M62/2088A3	50R	M62 J25 - J30	
10/09/15 08:50:48	SIG	M62/2088A4	50R	M62 J25 - J30	
10/09/15 08:50:49	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:50:52	SIG	M62/2106A1	60R	M62 J25 - J30	
10/09/15 08:50:52	SIG	M62/2106A2	60R	M62 J25 - J30	
10/09/15 08:50:52	SIG	M62/2106A3	60R	M62 J25 - J30	
10/09/15 08:50:52	SIG	M62/2106A4	60R	M62 J25 - J30	
10/09/15 08:51:03	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 08:51:03	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 08:51:03	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:51:03	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:51:08	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 08:51:08	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 08:51:08	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:51:08	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:51:17	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 08:51:17	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 08:51:17	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 08:51:17	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 08:51:17	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 08:51:17	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1992A1	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1992A2	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1992A3	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1992J1	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 08:52:18	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 08:52:28	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:52:51	SIG	M62/2097A2	60R	M62 J25 - J30	
10/09/15 08:52:51	SIG	M62/2097A3	60R	M62 J25 - J30	
10/09/15 08:52:51	SIG	M62/2097A4	60R	M62 J25 - J30	
10/09/15 08:52:52	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 08:52:52	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 08:52:52	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 08:52:52	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 08:53:12	SIG	M62/2079A2	50R	M62 J25 - J30	
10/09/15 08:53:12	SIG	M62/2079A3	50R	M62 J25 - J30	
10/09/15 08:53:12	SIG	M62/2079A4	50R	M62 J25 - J30	
10/09/15 08:53:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:53:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:53:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:53:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 08:53:48	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:53:48	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:53:53	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:53:59	SIG	M62/1987A1	40R	M62 J25 - J30	
10/09/15 08:53:59	SIG	M62/1987A3	40R	M62 J25 - J30	
10/09/15 08:53:59	SIG	M62/1987J1	40R	M62 J25 - J30	
10/09/15 08:54:44	SIG	M62/2073K2	50R	M62 J25 - J30	
10/09/15 08:54:59	SIG	M62/2088A2	60R	M62 J25 - J30	
10/09/15 08:54:59	SIG	M62/2088A3	60R	M62 J25 - J30	
10/09/15 08:54:59	SIG	M62/2088A4	60R	M62 J25 - J30	
10/09/15 08:55:14	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 08:55:14	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 08:55:14	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 08:55:14	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 08:55:20	SIG	M62/2073K1	50R	M62 J25 - J30	
10/09/15 08:56:07	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 08:56:07	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 08:56:07	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 08:56:07	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 08:56:33	SIG	M62/2065A2	50R	M62 J25 - J30	
10/09/15 08:56:33	SIG	M62/2065A3	50R	M62 J25 - J30	
10/09/15 08:56:33	SIG	M62/2065A4	50R	M62 J25 - J30	
10/09/15 08:56:43	SIG	M62/1979K1	40R	M62 J25 - J30	
10/09/15 08:56:43	SIG	M62/1979K2	40R	M62 J25 - J30	
10/09/15 08:56:43	SIG	M62/1981A1	40R	M62 J25 - J30	
10/09/15 08:56:43	SIG	M62/1981A2	40R	M62 J25 - J30	
10/09/15 08:56:43	SIG	M62/1981A3	40R	M62 J25 - J30	
10/09/15 08:56:43	SIG	M62/1981A4	40R	M62 J25 - J30	
10/09/15 08:57:01	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 08:57:02	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 08:57:07	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 08:57:21	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 08:57:21	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 08:57:21	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:57:21	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:57:26	SIG	M62/2170B1	40R	M62 J25 - J30	
10/09/15 08:57:26	SIG	M62/2170B2	40R	M62 J25 - J30	
10/09/15 08:57:26	SIG	M62/2170L1	40R	M62 J25 - J30	
10/09/15 08:57:26	SIG	M62/2170L2	40R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 08:57:40	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 08:57:52	SIG	M62/2079A2	60R	M62 J25 - J30	
10/09/15 08:57:52	SIG	M62/2079A3	60R	M62 J25 - J30	
10/09/15 08:57:52	SIG	M62/2079A4	60R	M62 J25 - J30	
10/09/15 08:58:04	SIG	M62/2106A1	50R	M62 J25 - J30	
10/09/15 08:58:04	SIG	M62/2106A2	50R	M62 J25 - J30	
10/09/15 08:58:04	SIG	M62/2106A3	50R	M62 J25 - J30	
10/09/15 08:58:04	SIG	M62/2106A4	50R	M62 J25 - J30	
10/09/15 08:58:16	SIG	M62/1974A1	40R	M62 J25 - J30	
10/09/15 08:58:16	SIG	M62/1974A2	40R	M62 J25 - J30	
10/09/15 08:58:16	SIG	M62/1974A3	40R	M62 J25 - J30	
10/09/15 08:58:16	SIG	M62/1974A4	40R	M62 J25 - J30	
10/09/15 08:58:42	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 08:58:42	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 08:58:42	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 08:58:44	SIG	M62/2057A1	50R	M62 J25 - J30	
10/09/15 08:58:44	SIG	M62/2057A2	50R	M62 J25 - J30	
10/09/15 08:58:44	SIG	M62/2057A3	50R	M62 J25 - J30	
10/09/15 08:58:44	SIG	M62/2057J1	50R	M62 J25 - J30	
10/09/15 08:59:32	SIG	M62/2088A2	50R	M62 J25 - J30	
10/09/15 08:59:32	SIG	M62/2088A3	50R	M62 J25 - J30	
10/09/15 08:59:32	SIG	M62/2088A4	50R	M62 J25 - J30	
10/09/15 08:59:37	SIG	M62/2079A2	50R	M62 J25 - J30	
10/09/15 08:59:37	SIG	M62/2079A3	50R	M62 J25 - J30	
10/09/15 08:59:37	SIG	M62/2079A4	50R	M62 J25 - J30	
10/09/15 08:59:37	SIG	M62/2088A2	40R	M62 J25 - J30	
10/09/15 08:59:37	SIG	M62/2088A3	40R	M62 J25 - J30	
10/09/15 08:59:37	SIG	M62/2088A4	40R	M62 J25 - J30	
10/09/15 09:00:00	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 09:00:01	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 09:00:06	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 09:00:30	SIG	M62/2079A2	40R	M62 J25 - J30	
10/09/15 09:00:30	SIG	M62/2079A3	40R	M62 J25 - J30	
10/09/15 09:00:30	SIG	M62/2079A4	40R	M62 J25 - J30	
10/09/15 09:01:29	SIG	M62/2050A1	50R	M62 J25 - J30	
10/09/15 09:01:29	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 09:01:29	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 09:01:29	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 09:01:52	SIG	M62/2065A2	60R	M62 J25 - J30	
10/09/15 09:01:52	SIG	M62/2065A3	60R	M62 J25 - J30	
10/09/15 09:01:52	SIG	M62/2065A4	60R	M62 J25 - J30	
10/09/15 09:02:49	SIG	M62/1968A1	40R	M62 J25 - J30	
10/09/15 09:02:49	SIG	M62/1968A2	40R	M62 J25 - J30	
10/09/15 09:02:49	SIG	M62/1968A3	40R	M62 J25 - J30	
10/09/15 09:02:49	SIG	M62/1968A4	40R	M62 J25 - J30	
10/09/15 09:03:01	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 09:03:01	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 09:03:07	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 09:03:47	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 09:03:47	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 09:03:47	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 09:03:47	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2073K1	60R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2079A2	60R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2079A3	60R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2079A4	60R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2088A2	60R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2088A3	60R	M62 J25 - J30	
10/09/15 09:04:40	SIG	M62/2088A4	60R	M62 J25 - J30	
10/09/15 09:05:42	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 09:05:42	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 09:05:42	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 09:05:42	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 09:05:42	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 09:05:49	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 09:05:49	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 09:05:52	SIG	M62/2057A1	60R	M62 J25 - J30	
10/09/15 09:05:52	SIG	M62/2057A2	60R	M62 J25 - J30	
10/09/15 09:05:52	SIG	M62/2057A3	60R	M62 J25 - J30	
10/09/15 09:05:52	SIG	M62/2057J1	60R	M62 J25 - J30	
10/09/15 09:06:04	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 09:06:05	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 09:06:10	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 09:06:15	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2177B1	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2177B2	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2177L1	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2177L2	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2183B1	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2183B2	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2183L1	60R	M62 J25 - J30	
10/09/15 09:06:37	SIG	M62/2183L2	60R	M62 J25 - J30	
10/09/15 09:08:41	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 09:08:41	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 09:08:41	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 09:08:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 09:08:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2050A1	60R	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2050A2	60R	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2050A3	60R	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2050A4	60R	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2203B1	OFF	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2203B2	OFF	M62 J25 - J30	
10/09/15 09:08:52	SIG	M62/2203B3	OFF	M62 J25 - J30	
10/09/15 09:09:09	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 09:09:09	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 09:09:15	SIG	M62/2025A1	40R	M62 J25 - J30	
10/09/15 09:09:28	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 09:09:28	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 09:09:28	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 09:09:28	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 09:09:28	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 09:09:49	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 09:10:04	SIG	M62/2183L1	60R	M62 J25 - J30	
10/09/15 09:10:04	SIG	M62/2183L1	OFF	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1987A1	40R	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1987A3	40R	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1987J1	40R	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1992A1	40R	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1992A2	40R	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1992A3	40R	M62 J25 - J30	
10/09/15 09:10:09	SIG	M62/1992J1	40R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2033A1	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2041A1	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 09:10:17	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 09:10:41	SIG	M62/1955K1	40R	M62 J25 - J30	
10/09/15 09:10:41	SIG	M62/1955K2	40R	M62 J25 - J30	
10/09/15 09:10:41	SIG	M62/1956A1	40R	M62 J25 - J30	
10/09/15 09:10:41	SIG	M62/1956A2	40R	M62 J25 - J30	
10/09/15 09:10:41	SIG	M62/1956A3	40R	M62 J25 - J30	
10/09/15 09:11:25	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 09:11:25	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 09:11:25	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 09:11:25	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 09:11:25	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 09:12:13	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 09:12:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 09:13:16	SIG	M62/2106A1	LDR	M62 J25 - J30	
10/09/15 09:13:28	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 09:13:28	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 09:13:28	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 09:14:02	SIG	M62/2106A1	STOP	M62 J25 - J30	
10/09/15 09:14:02	SIG	M62/2106A2	40R	M62 J25 - J30	
10/09/15 09:14:02	SIG	M62/2106A3	40R	M62 J25 - J30	
10/09/15 09:14:02	SIG	M62/2106A4	40R	M62 J25 - J30	
10/09/15 09:14:22	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 09:14:22	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 09:14:22	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 09:14:22	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 09:14:22	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 09:14:24	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 09:14:52	SIG	M62/2197B1	OFF	M62 J25 - J30	
10/09/15 09:14:52	SIG	M62/2197B2	OFF	M62 J25 - J30	
10/09/15 09:14:52	SIG	M62/2197B3	OFF	M62 J25 - J30	
10/09/15 09:14:52	SIG	M62/2199M1	OFF	M62 J25 - J30	
10/09/15 09:14:52	SIG	M62/2199M2	OFF	M62 J25 - J30	
10/09/15 09:15:10	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 09:15:10	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 09:15:10	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 09:15:10	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 09:15:44	SIG	M62/1979K1	40R	M62 J25 - J30	
10/09/15 09:15:44	SIG	M62/1979K2	40R	M62 J25 - J30	
10/09/15 09:15:44	SIG	M62/1981A1	40R	M62 J25 - J30	
10/09/15 09:15:44	SIG	M62/1981A2	40R	M62 J25 - J30	
10/09/15 09:15:44	SIG	M62/1981A3	40R	M62 J25 - J30	
10/09/15 09:15:44	SIG	M62/1981A4	40R	M62 J25 - J30	
10/09/15 09:16:18	SIG	M62/2106A1	60R	M62 J25 - J30	
10/09/15 09:16:18	SIG	M62/2106A2	60R	M62 J25 - J30	
10/09/15 09:16:18	SIG	M62/2106A3	60R	M62 J25 - J30	
10/09/15 09:16:18	SIG	M62/2106A4	60R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1968A1	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1968A2	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1968A3	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1968A4	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1974A1	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1974A2	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1974A3	40R	M62 J25 - J30	
10/09/15 09:16:49	SIG	M62/1974A4	40R	M62 J25 - J30	
10/09/15 09:16:52	SIG	M62/2159B1	NR	M62 J25 - J30	
10/09/15 09:16:52	SIG	M62/2159B2	NR	M62 J25 - J30	
10/09/15 09:16:52	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 09:16:52	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 09:16:52	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 09:16:52	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 09:17:12	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 09:17:12	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 09:17:13	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 09:17:13	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 09:17:13	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 09:17:13	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2177B1	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2177B2	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2177L1	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2177L2	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2183B1	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2183B2	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2183L1	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2183L2	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2189B1	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2189B2	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2189B3	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2189B4	NR	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2194B1	OFF	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2194B2	OFF	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2194B3	OFF	M62 J25 - J30	
10/09/15 09:18:52	SIG	M62/2194B4	OFF	M62 J25 - J30	
10/09/15 09:19:09	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 09:19:09	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 09:19:09	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 09:19:52	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2018A1	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 09:19:52	SIG	M62/2159B1	OFF	M62 J25 - J30	
10/09/15 09:19:53	SIG	M62/2159B2	OFF	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 09:20:05	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 09:20:49	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 09:20:49	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 09:20:49	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 09:20:49	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 09:20:49	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 09:20:49	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 09:20:52	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 09:20:52	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 09:20:52	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 09:21:12	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 09:21:12	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 09:21:12	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 09:21:12	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 09:21:12	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2025A1	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2033A1	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2033A2	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2033A3	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2033A4	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2041A1	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2041A2	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2041A3	60R	M62 J25 - J30	
10/09/15 09:21:52	SIG	M62/2041A4	60R	M62 J25 - J30	
10/09/15 09:21:53	SIG	M62/2189B1	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2170B1	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2170B2	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2177B1	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2177B2	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2177L1	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2177L2	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2183B1	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2183L1	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2183L2	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2189B2	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2189B3	OFF	M62 J25 - J30	
10/09/15 09:21:54	SIG	M62/2189B4	OFF	M62 J25 - J30	
10/09/15 09:22:52	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 09:22:53	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2155A1	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2155A2	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2155J1	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2155K1	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2157A1	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2157A2	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2157J1	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2157J2	50R	M62 J25 - J30	
10/09/15 09:22:53	SIG	M62/2157K1	50R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2122K1	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2122K2	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2124A2	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2124A3	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2124A4	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2135A1	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2135A2	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2135A3	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2135A4	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2144A1	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2144A2	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2144J1	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2144K1	60R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2151A1	50R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2151A2	50R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2151J1	50R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2151K1	50R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2155A1	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2155A2	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2155J1	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2155K1	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2157A1	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2157A2	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2157J1	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2157J2	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2157K1	40R	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2163A1	NR	M62 J25 - J30	
10/09/15 09:22:58	SIG	M62/2163A2	NR	M62 J25 - J30	
10/09/15 09:23:01	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 09:23:01	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 09:23:01	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 09:23:01	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 09:23:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:23:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:23:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:23:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:24:30	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 09:24:31	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1987A1	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1987A3	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1987J1	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1992A1	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1992A2	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1992A3	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1992J1	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1999A1	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1999A2	60R	M62 J25 - J30	
10/09/15 09:25:08	SIG	M62/1999A3	60R	M62 J25 - J30	
10/09/15 09:25:12	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 09:25:12	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 09:25:12	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 09:25:12	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 09:25:22	SIG	M62/2157A1	OFF	M62 J25 - J30	
10/09/15 09:25:22	SIG	M62/2157A1	50R	M62 J25 - J30	
10/09/15 09:25:28	SIG	M62/2157A1	40R	M62 J25 - J30	
10/09/15 09:25:50	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 09:25:50	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 09:25:50	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 09:25:50	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 09:25:50	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 09:25:52	SIG	M62/1979K1	60R	M62 J25 - J30	
10/09/15 09:25:52	SIG	M62/1979K2	60R	M62 J25 - J30	
10/09/15 09:25:52	SIG	M62/1981A1	60R	M62 J25 - J30	
10/09/15 09:25:52	SIG	M62/1981A2	60R	M62 J25 - J30	
10/09/15 09:25:52	SIG	M62/1981A3	60R	M62 J25 - J30	
10/09/15 09:25:52	SIG	M62/1981A4	60R	M62 J25 - J30	
10/09/15 09:25:58	SIG	M62/2097B3	OFF	M62 J25 - J30	
10/09/15 09:26:02	SIG	M62/2097B3	60R	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2122K1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2122K2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2124A2	NR	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2124A3	NR	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2124A4	NR	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2135A1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2135A2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2135A3	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2135A4	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2144A1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2144A2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2144J1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2144K1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2151A1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2151A2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2151J1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2151K1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2155A1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2155A2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2155J1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2155K1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2157A2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2157J1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2157J2	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2157K1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2163A1	OFF	M62 J25 - J30	
10/09/15 09:27:21	SIG	M62/2163A2	OFF	M62 J25 - J30	
10/09/15 09:27:52	SIG	M62/1974A1	60R	M62 J25 - J30	
10/09/15 09:27:52	SIG	M62/1974A2	60R	M62 J25 - J30	
10/09/15 09:27:52	SIG	M62/1974A3	60R	M62 J25 - J30	
10/09/15 09:27:52	SIG	M62/1974A4	60R	M62 J25 - J30	
10/09/15 09:28:06	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 09:28:06	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 09:28:06	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 09:28:06	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 09:28:06	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 09:28:11	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2008K1	40R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2008K2	40R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2012A1	40R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 09:28:11	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2155A1	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2155A2	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2155J1	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2155K1	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2157A1	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2157A2	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2157J1	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2157J2	50R	M62 J25 - J30	
10/09/15 09:28:13	SIG	M62/2157K1	50R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2122K1	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2122K2	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2124A2	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2124A3	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2124A4	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2135A1	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2135A2	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2135A3	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2135A4	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2144A1	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2144A2	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2144J1	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2144K1	60R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2151A1	50R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2151A2	50R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2151J1	50R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2151K1	50R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2155A1	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2155A2	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2155J1	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2155K1	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2157A1	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2157A2	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2157J1	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2157J2	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2157K1	40R	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2163A1	NR	M62 J25 - J30	
10/09/15 09:28:18	SIG	M62/2163A2	NR	M62 J25 - J30	
10/09/15 09:28:23	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:23	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:24	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:25	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:35	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:35	SIG	M62/2124A3	60R	M62 J25 - J30	
10/09/15 09:28:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:28:59	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 09:28:59	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 09:28:59	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 09:28:59	SIG	M62/2004A1	40R	M62 J25 - J30	
10/09/15 09:28:59	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 09:28:59	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 09:30:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
10/09/15 09:30:29	SIG	M62/2157A1	50R	M62 J25 - J30	
10/09/15 09:30:34	SIG	M62/2157A1	40R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1955K1	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1955K2	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1956A1	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1956A2	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1956A3	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1960A1	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1960A2	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1960A3	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1960K1	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1960K2	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1968A1	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1968A2	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1968A3	60R	M62 J25 - J30	
10/09/15 09:31:53	SIG	M62/1968A4	60R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1999A1	40R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1999A2	40R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1999J1	40R	M62 J25 - J30	
10/09/15 09:32:19	SIG	M62/1999J2	40R	M62 J25 - J30	
10/09/15 09:33:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
10/09/15 09:33:32	SIG	M62/2157A1	50R	M62 J25 - J30	
10/09/15 09:33:37	SIG	M62/2157A1	40R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2151A1	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2151A2	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2151J1	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2151K1	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2155A1	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2155A2	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2155J1	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2155K1	60R	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2157A1	NR	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2157A2	NR	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2157J1	NR	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2157J2	NR	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2157K1	NR	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2163A1	OFF	M62 J25 - J30	
10/09/15 09:34:04	SIG	M62/2163A2	OFF	M62 J25 - J30	
10/09/15 09:34:19	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 09:34:19	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 09:34:19	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 09:34:19	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 09:34:24	SIG	M62/2018A1	40R	M62 J25 - J30	
10/09/15 09:34:24	SIG	M62/2018A2	40R	M62 J25 - J30	
10/09/15 09:34:24	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 09:34:24	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1992A1	40R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1992A2	40R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1992A3	40R	M62 J25 - J30	
10/09/15 09:35:34	SIG	M62/1992J1	40R	M62 J25 - J30	
10/09/15 09:38:52	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 09:38:55	SIG	M62/1999A3	LDL	M62 J25 - J30	
10/09/15 09:38:56	SIG	M62/2018A3	30R	M62 J25 - J30	
10/09/15 09:38:56	SIG	M62/2018A4	30R	M62 J25 - J30	
10/09/15 09:39:02	SIG	M62/2004A2	LDL	M62 J25 - J30	
10/09/15 09:39:02	SIG	M62/2004A3	LDL	M62 J25 - J30	
10/09/15 09:39:02	SIG	M62/2012A2	LDL	M62 J25 - J30	
10/09/15 09:39:02	SIG	M62/2012A3	LDL	M62 J25 - J30	
10/09/15 09:39:02	SIG	M62/2018A3	20R	M62 J25 - J30	
10/09/15 09:39:02	SIG	M62/2018A4	20R	M62 J25 - J30	
10/09/15 09:39:07	SIG	M62/2018A3	STOP	M62 J25 - J30	
10/09/15 09:39:07	SIG	M62/2018A4	STOP	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2122K1	OFF	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2122K2	OFF	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2124A2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2124A3	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2124A4	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2135A1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2135A2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2135A3	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2135A4	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2144A1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2144A2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2144J1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2144K1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2151A1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2151A2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2151J1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2151K1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2155A1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2155A2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2155J1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2155K1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2157A1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2157A2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2157J1	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2157J2	NR	M62 J25 - J30	
10/09/15 09:40:52	SIG	M62/2157K1	NR	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1987A1	40R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1987A3	40R	M62 J25 - J30	
10/09/15 09:41:18	SIG	M62/1987J1	40R	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2135A1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2135A2	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2135A3	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2135A4	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2144A1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2144A2	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2144J1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2144K1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2151A1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2151A2	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2151J1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2151K1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2155A1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2155A2	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2155J1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2155K1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2157A2	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2157J1	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2157J2	OFF	M62 J25 - J30	
10/09/15 09:43:53	SIG	M62/2157K1	OFF	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1979K1	40R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1979K2	40R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1981A1	40R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1981A2	40R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1981A3	40R	M62 J25 - J30	
10/09/15 09:45:14	SIG	M62/1981A4	40R	M62 J25 - J30	
10/09/15 09:47:18	SIG	M62/2117A2	NR	M62 J25 - J30	
10/09/15 09:47:18	SIG	M62/2117A3	NR	M62 J25 - J30	
10/09/15 09:47:18	SIG	M62/2117A4	NR	M62 J25 - J30	
10/09/15 09:47:18	SIG	M62/2124A2	NR	M62 J25 - J30	
10/09/15 09:47:18	SIG	M62/2124A3	NR	M62 J25 - J30	
10/09/15 09:47:18	SIG	M62/2124A4	NR	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1974A1	40R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1974A2	40R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1974A3	40R	M62 J25 - J30	
10/09/15 09:47:30	SIG	M62/1974A4	40R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 09:47:47	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 09:47:52	SIG	M62/1999A3	40R	M62 J25 - J30	
10/09/15 09:47:53	SIG	M62/2004A2	40R	M62 J25 - J30	
10/09/15 09:47:53	SIG	M62/2004A3	40R	M62 J25 - J30	
10/09/15 09:47:53	SIG	M62/2012A2	40R	M62 J25 - J30	
10/09/15 09:47:53	SIG	M62/2012A3	40R	M62 J25 - J30	
10/09/15 09:47:53	SIG	M62/2018A3	40R	M62 J25 - J30	
10/09/15 09:47:53	SIG	M62/2018A4	40R	M62 J25 - J30	
10/09/15 09:50:18	SIG	M62/2124A2	OFF	M62 J25 - J30	
10/09/15 09:50:19	SIG	M62/2124A1	BLNK	M62 J25 - J30	
10/09/15 09:50:19	SIG	M62/2124A1	BLNK	M62 J25 - J30	
10/09/15 09:50:19	SIG	M62/2124A3	OFF	M62 J25 - J30	
10/09/15 09:50:19	SIG	M62/2124A4	OFF	M62 J25 - J30	
10/09/15 09:54:02	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 09:54:02	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1999A1	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1999A2	50R	M62 J25 - J30	
10/09/15 09:54:30	SIG	M62/1999A3	50R	M62 J25 - J30	
10/09/15 09:55:05	SIG	M62/2004A1	50R	M62 J25 - J30	
10/09/15 09:55:05	SIG	M62/2004A2	50R	M62 J25 - J30	
10/09/15 09:55:05	SIG	M62/2004A3	50R	M62 J25 - J30	
10/09/15 09:56:06	SIG	M62/1987A1	50R	M62 J25 - J30	
10/09/15 09:56:06	SIG	M62/1987A3	50R	M62 J25 - J30	
10/09/15 09:56:06	SIG	M62/1987J1	50R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1968A1	40R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1968A2	40R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1968A3	40R	M62 J25 - J30	
10/09/15 09:56:07	SIG	M62/1968A4	40R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2008K1	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2008K2	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2012A1	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2012A2	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2012A3	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2018A1	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 09:57:07	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1955K1	50R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1955K2	50R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1956A1	50R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1956A2	50R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1956A3	50R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1960A1	40R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1960A2	40R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1960A3	40R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 09:57:33	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 09:58:05	SIG	M62/2113B1	HSD	M62 J25 - J30	
10/09/15 09:58:42	SIG	M62/1979K1	50R	M62 J25 - J30	
10/09/15 09:58:42	SIG	M62/1979K2	50R	M62 J25 - J30	
10/09/15 09:58:42	SIG	M62/1981A1	50R	M62 J25 - J30	
10/09/15 09:58:42	SIG	M62/1981A2	50R	M62 J25 - J30	
10/09/15 09:58:42	SIG	M62/1981A3	50R	M62 J25 - J30	
10/09/15 09:58:42	SIG	M62/1981A4	50R	M62 J25 - J30	
10/09/15 09:59:01	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 09:59:01	SIG	M62/2106B1	HSD	M62 J25 - J30	
10/09/15 09:59:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 09:59:03	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 09:59:03	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 09:59:53	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 10:00:06	SIG	M62/2097B1	HSD	M62 J25 - J30	
10/09/15 10:00:06	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 10:01:04	SIG	M62/1974A1	50R	M62 J25 - J30	
10/09/15 10:01:04	SIG	M62/1974A2	50R	M62 J25 - J30	
10/09/15 10:01:04	SIG	M62/1974A3	50R	M62 J25 - J30	
10/09/15 10:01:04	SIG	M62/1974A4	50R	M62 J25 - J30	
10/09/15 10:01:14	SIG	M62/2088B1	HSD	M62 J25 - J30	
10/09/15 10:01:14	SIG	M62/2106B1	REDX	M62 J25 - J30	
10/09/15 10:02:22	SIG	M62/2097B1	REDX	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1955K1	60R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1955K2	60R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1956A1	60R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1956A2	60R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1956A3	60R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1968A1	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1968A2	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1968A3	50R	M62 J25 - J30	
10/09/15 10:02:48	SIG	M62/1968A4	50R	M62 J25 - J30	
10/09/15 10:03:30	SIG	M62/2088B1	REDX	M62 J25 - J30	
10/09/15 10:04:23	SIG	M62/2117B1	NR	M62 J25 - J30	
10/09/15 10:04:23	SIG	M62/2117B3	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2097B2	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2097B4	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2106B2	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2106B3	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2106B4	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2113B2	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2113B3	NR	M62 J25 - J30	
10/09/15 10:04:33	SIG	M62/2113B4	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2074B2	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2074B3	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2074B4	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2081B1	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2081B2	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2081B3	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2081L1	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2088B2	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2088B3	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2088B4	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2120M1	NR	M62 J25 - J30	
10/09/15 10:04:34	SIG	M62/2120M2	NR	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1987A1	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1987A3	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1987J1	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1992A1	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1992A2	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1992A3	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1992J1	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1999A1	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1999A2	60R	M62 J25 - J30	
10/09/15 10:05:06	SIG	M62/1999A3	60R	M62 J25 - J30	
10/09/15 10:05:23	SIG	M62/2120M1	OFF	M62 J25 - J30	
10/09/15 10:05:23	SIG	M62/2120M2	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2106B1	BLNK	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2106B2	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2106B3	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2106B4	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2113B1	BLNK	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2113B2	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2113B3	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2113B4	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
10/09/15 10:05:24	SIG	M62/2117B3	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2074B1	BLNK	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2074B2	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2074B3	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2074B4	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2081B1	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2081B2	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2081B3	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2081L1	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2088B1	BLNK	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2088B2	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2088B3	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2088B4	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2097B1	BLNK	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2097B2	OFF	M62 J25 - J30	
10/09/15 10:05:34	SIG	M62/2097B4	OFF	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/1979K1	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/1979K2	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/1981A1	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/1981A2	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/1981A3	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/1981A4	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/2018A1	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 10:06:53	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1960A1	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1960A2	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1960A3	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1960K1	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1960K2	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1968A1	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1968A2	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1968A3	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1968A4	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1974A1	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1974A2	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1974A3	60R	M62 J25 - J30	
10/09/15 10:07:53	SIG	M62/1974A4	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 10:08:53	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 10:08:53	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 10:11:53	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 10:11:54	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 10:16:53	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 10:26:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 10:26:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1955K1	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1955K2	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1956A1	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1956A2	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1956A3	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1960A1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1960A2	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1960A3	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1960K1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1960K2	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1968A1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1968A2	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1968A3	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1968A4	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1974A1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1974A2	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1974A3	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1974A4	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1979K1	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1979K2	OFF	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1981A1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1981A2	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1981A3	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1981A4	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1987A1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1987A3	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1987J1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1992A1	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1992A2	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1992A3	NR	M62 J25 - J30	
10/09/15 10:34:04	SIG	M62/1992J1	NR	M62 J25 - J30	
10/09/15 10:35:26	SIG	M62/2106A1	HSD	M62 J25 - J30	
10/09/15 10:35:53	SIG	M62/2004A1	OFF	M62 J25 - J30	
10/09/15 10:35:53	SIG	M62/2004A2	OFF	M62 J25 - J30	
10/09/15 10:35:53	SIG	M62/2004A3	OFF	M62 J25 - J30	
10/09/15 10:35:53	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 10:35:54	SIG	M62/1999A1	OFF	M62 J25 - J30	
10/09/15 10:35:54	SIG	M62/1999A2	OFF	M62 J25 - J30	
10/09/15 10:35:54	SIG	M62/1999A3	OFF	M62 J25 - J30	
10/09/15 10:35:54	SIG	M62/1999J1	OFF	M62 J25 - J30	
10/09/15 10:35:54	SIG	M62/1999J2	OFF	M62 J25 - J30	
10/09/15 10:37:04	SIG	M62/1960A1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1960A2	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1960A3	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1960K1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1960K2	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1968A1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1968A2	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1968A3	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1968A4	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1974A1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1974A2	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1974A3	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1974A4	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1981A1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1981A2	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1981A3	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1981A4	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1987A1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1987A3	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1987J1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1992A1	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1992A2	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1992A3	OFF	M62 J25 - J30	
10/09/15 10:37:23	SIG	M62/1992J1	OFF	M62 J25 - J30	
10/09/15 10:37:42	SIG	M62/2106A1	REDX	M62 J25 - J30	
10/09/15 10:38:42	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 10:38:42	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 10:38:42	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 10:38:59	SIG	M62/2073K1	NR	M62 J25 - J30	
10/09/15 10:38:59	SIG	M62/2079A2	NR	M62 J25 - J30	
10/09/15 10:38:59	SIG	M62/2079A3	NR	M62 J25 - J30	
10/09/15 10:38:59	SIG	M62/2079A4	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2088A2	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2088A3	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2088A4	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2097A2	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2097A3	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2097A4	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2106A2	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2106A3	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2106A4	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2114A1	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2114A2	NR	M62 J25 - J30	
10/09/15 10:39:09	SIG	M62/2114A3	NR	M62 J25 - J30	
10/09/15 10:39:59	SIG	M62/2073K1	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2079A1	BLNK	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2079A2	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2079A3	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2079A4	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2088A1	BLNK	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2088A2	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2088A3	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2088A4	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2097A1	BLNK	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2097A2	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2097A3	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2097A4	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2106A1	BLNK	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2106A2	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2106A4	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2114A1	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2114A2	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2114A3	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2117A1	BLNK	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2117A2	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2117A3	OFF	M62 J25 - J30	
10/09/15 10:40:09	SIG	M62/2117A4	OFF	M62 J25 - J30	
10/09/15 10:47:31	SIG	M62/2057B1	HSD	M62 J25 - J30	
10/09/15 10:49:30	SIG	M62/2041B1	HSD	M62 J25 - J30	
10/09/15 10:49:31	SIG	M62/2057B1	REDX	M62 J25 - J30	
10/09/15 10:49:31	SIG	M621/1002B1	HSD	M62 J25 - J30	
10/09/15 10:49:31	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 10:49:31	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 10:50:30	SIG	M62/2033B1	HSD	M62 J25 - J30	
10/09/15 10:51:30	SIG	M62/2025B1	HSD	M62 J25 - J30	
10/09/15 10:51:31	SIG	M62/2041B1	REDX	M62 J25 - J30	
10/09/15 10:52:22	SIG	M62/2033B1	REDX	M62 J25 - J30	
10/09/15 10:53:07	SIG	M62/2025B1	REDX	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2018B1	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2018B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2018B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2018L1	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2025B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2025B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2025B4	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2033B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2033B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2033B4	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2041B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2041B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2041B4	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2050B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2050B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2050B4	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2057B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2057B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2057B4	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2065B2	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2065B3	NR	M62 J25 - J30	
10/09/15 10:53:37	SIG	M62/2065B4	NR	M62 J25 - J30	
10/09/15 10:54:37	SIG	M62/2069M1	OFF	M62 J25 - J30	
10/09/15 10:54:37	SIG	M62/2069M2	OFF	M62 J25 - J30	
10/09/15 10:54:37	SIG	M621/1010B1	OFF	M62 J25 - J30	
10/09/15 10:54:37	SIG	M621/1010B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2012B1	BLNK	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2012B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2012B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2012B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2018B1	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2018B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2018B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2018L1	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2025B1	BLNK	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2025B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2025B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2025B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2033B1	BLNK	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2033B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2033B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2041B1	BLNK	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2041B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2041B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2041B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2050B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2050B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2050B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2057B1	BLNK	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2057B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2057B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2057B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2065B1	BLNK	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2065B2	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2065B3	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2065B4	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M62/2065M1	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M621/1002B1	OFF	M62 J25 - J30	
10/09/15 10:54:38	SIG	M621/1002B2	OFF	M62 J25 - J30	
10/09/15 11:05:03	SIG	M62/2025A1	HSD	M62 J25 - J30	
10/09/15 11:06:03	SIG	M62/2033A1	HSD	M62 J25 - J30	
10/09/15 11:07:03	SIG	M62/2041A1	HSD	M62 J25 - J30	
10/09/15 11:07:04	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 11:07:04	SIG	M62/2025A1	REDX	M62 J25 - J30	
10/09/15 11:08:10	SIG	M62/2033A1	REDX	M62 J25 - J30	
10/09/15 11:08:10	SIG	M62/2050A1	HSD	M62 J25 - J30	
10/09/15 11:09:02	SIG	M62/2041A1	REDX	M62 J25 - J30	
10/09/15 11:10:02	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 11:11:02	SIG	M62/2025A2	NR	M62 J25 - J30	
10/09/15 11:11:02	SIG	M62/2025A3	NR	M62 J25 - J30	
10/09/15 11:11:02	SIG	M62/2025A4	NR	M62 J25 - J30	
10/09/15 11:11:02	SIG	M62/2033A2	NR	M62 J25 - J30	
10/09/15 11:11:02	SIG	M62/2033A3	NR	M62 J25 - J30	
10/09/15 11:11:02	SIG	M62/2033A4	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2041A2	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2041A3	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2041A4	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2050A2	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2050A3	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2050A4	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 11:11:03	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2008K1	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2008K2	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2012A1	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2012A2	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2012A3	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2018A1	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2018A2	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2018A3	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2018A4	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2025A1	BLNK	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2025A2	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2025A3	OFF	M62 J25 - J30	
10/09/15 11:12:02	SIG	M62/2025A4	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2033A1	BLNK	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2033A2	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2033A3	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2033A4	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2041A1	BLNK	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2041A2	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2041A3	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2041A4	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2050A1	BLNK	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2050A2	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2050A3	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2050A4	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2057A1	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2057A2	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2057A3	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2057J1	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2065A1	BLNK	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2065A2	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2065A3	OFF	M62 J25 - J30	
10/09/15 11:12:03	SIG	M62/2065A4	OFF	M62 J25 - J30	
10/09/15 11:23:35	SIG	M606/2003B1	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M606/2003B2	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1987B1	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1987B2	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1987B3	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1987B4	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1992B1	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1992B2	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1992B3	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/1992B4	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/2005M1	50R	M62 J25 - J30	
10/09/15 11:23:35	SIG	M62/2005M2	50R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1981B1	NR	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1981B2	NR	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1981B3	NR	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1981B4	NR	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1987B1	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1987B2	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1987B3	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1987B4	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1992B1	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1992B2	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1992B3	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1992B4	40R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1999B1	REDX	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1999B2	50R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1999B3	50R	M62 J25 - J30	
10/09/15 11:23:41	SIG	M62/1999B4	50R	M62 J25 - J30	
10/09/15 11:27:35	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 11:27:35	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1981B1	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1981B2	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1981B3	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1981B4	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1987B1	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1987B2	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1987B3	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1987B4	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1992B1	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1992B2	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1992B3	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1992B4	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1999B2	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1999B3	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/1999B4	NR	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/2005M1	OFF	M62 J25 - J30	
10/09/15 11:27:35	SIG	M62/2005M2	OFF	M62 J25 - J30	
10/09/15 11:30:36	SIG	M62/1999B2	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1981B1	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1981B2	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1981B3	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1981B4	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1987B1	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1987B2	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1987B3	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1987B4	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1992B1	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1992B2	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1992B3	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1992B4	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1999B1	BLNK	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1999B3	OFF	M62 J25 - J30	
10/09/15 11:30:37	SIG	M62/1999B4	OFF	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2113B2	NR	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2113B3	NR	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2113B4	NR	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2117B1	NR	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2117B3	NR	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2170B1	50R	M62 J25 - J30	
10/09/15 11:46:26	SIG	M62/2170B2	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2125B1	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2125B2	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2125B3	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2125L1	NR	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2125L2	NR	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2132B1	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2132B2	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2132B3	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2137B1	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2137B3	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2137B4	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2147B1	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2147B2	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2147B3	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2147B4	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2159B1	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2159B2	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2159M1	50R	M62 J25 - J30	
10/09/15 11:46:36	SIG	M62/2159M2	50R	M62 J25 - J30	
10/09/15 11:54:00	SIG	M62/2113B1	BLNK	M62 J25 - J30	
10/09/15 11:54:00	SIG	M62/2113B2	OFF	M62 J25 - J30	
10/09/15 11:54:00	SIG	M62/2113B3	OFF	M62 J25 - J30	
10/09/15 11:54:00	SIG	M62/2113B4	OFF	M62 J25 - J30	
10/09/15 11:54:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
10/09/15 11:54:00	SIG	M62/2117B3	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2125B1	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2125B2	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2125B3	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2125L1	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2125L2	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2132B1	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2132B2	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2132B3	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2137B1	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2137B3	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2137B4	OFF	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2147B1	NR	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2147B2	NR	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2147B3	NR	M62 J25 - J30	
10/09/15 11:54:10	SIG	M62/2147B4	NR	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2147B1	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2147B2	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2147B3	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2147B4	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2159B1	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2159B2	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2159M1	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2159M2	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2170B1	OFF	M62 J25 - J30	
10/09/15 12:02:10	SIG	M62/2170B2	OFF	M62 J25 - J30	
10/09/15 12:05:16	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 12:05:16	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 12:05:16	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 12:05:16	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 12:05:21	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 12:05:21	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 12:05:21	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 12:05:21	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 12:05:26	SIG	M62/2018L1	30R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2012B1	REDX	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2012B2	NR	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2012B3	NR	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2012B4	NR	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2018L1	20R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2025B1	REDX	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 12:05:31	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 12:05:36	SIG	M62/2018L1	STOP	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1960A1	50R	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1960A2	50R	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1960A3	50R	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1968A1	NR	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1968A2	NR	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1968A3	NR	M62 J25 - J30	
10/09/15 12:05:49	SIG	M62/1968A4	NR	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2033B1	REDX	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2041B1	REDX	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 12:14:55	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 12:17:14	SIG	M62/1960K1	40R	M62 J25 - J30	
10/09/15 12:17:14	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 12:17:20	SIG	M62/1960K1	30R	M62 J25 - J30	
10/09/15 12:17:25	SIG	M62/1955K1	TI	M62 J25 - J30	
10/09/15 12:17:25	SIG	M62/1955K2	TI	M62 J25 - J30	
10/09/15 12:17:25	SIG	M62/1960K1	20R	M62 J25 - J30	
10/09/15 12:17:25	SIG	M62/1960K2	40R	M62 J25 - J30	
10/09/15 12:17:30	SIG	M62/1960K1	STOP	M62 J25 - J30	
10/09/15 12:17:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:17:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:17:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:17:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 12:18:05	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 12:20:07	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 12:20:07	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 12:20:07	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2025B1	STOP	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 12:20:12	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 12:20:17	SIG	M62/2025B1	STOP	M62 J25 - J30	
10/09/15 12:22:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:22:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:22:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:22:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 12:23:55	SIG	M62/2050B2	60R	M62 J25 - J30	
10/09/15 12:23:55	SIG	M62/2050B3	60R	M62 J25 - J30	
10/09/15 12:23:55	SIG	M62/2050B4	60R	M62 J25 - J30	
10/09/15 12:23:57	SIG	M62/1955K1	OFF	M62 J25 - J30	
10/09/15 12:23:57	SIG	M62/1955K2	OFF	M62 J25 - J30	
10/09/15 12:23:57	SIG	M62/1960K1	50R	M62 J25 - J30	
10/09/15 12:23:57	SIG	M62/1960K2	50R	M62 J25 - J30	
10/09/15 12:26:56	SIG	M62/2018B1	NR	M62 J25 - J30	
10/09/15 12:26:56	SIG	M62/2018B2	NR	M62 J25 - J30	
10/09/15 12:26:56	SIG	M62/2018B3	NR	M62 J25 - J30	
10/09/15 12:26:56	SIG	M62/2018L1	NR	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1960A1	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1960A2	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1960A3	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1960K1	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1960K2	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1968A1	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1968A2	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1968A3	OFF	M62 J25 - J30	
10/09/15 12:32:10	SIG	M62/1968A4	OFF	M62 J25 - J30	
10/09/15 12:34:56	SIG	M62/2057B1	REDX	M62 J25 - J30	
10/09/15 12:34:56	SIG	M62/2057B2	60R	M62 J25 - J30	
10/09/15 12:34:56	SIG	M62/2057B3	60R	M62 J25 - J30	
10/09/15 12:34:56	SIG	M62/2057B4	60R	M62 J25 - J30	
10/09/15 12:34:56	SIG	M62/2065M1	60R	M62 J25 - J30	
10/09/15 12:34:56	SIG	M621/1002B1	HSD	M62 J25 - J30	
10/09/15 12:34:56	SIG	M621/1002B2	60R	M62 J25 - J30	
10/09/15 12:34:56	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 12:34:56	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 12:42:06	SIG	M62/2197A1	60R	M62 J25 - J30	
10/09/15 12:42:06	SIG	M62/2197A2	60R	M62 J25 - J30	
10/09/15 12:42:06	SIG	M62/2197A3	60R	M62 J25 - J30	
10/09/15 12:46:06	SIG	M62/2197A1	OFF	M62 J25 - J30	
10/09/15 12:46:06	SIG	M62/2197A2	OFF	M62 J25 - J30	
10/09/15 12:46:06	SIG	M62/2197A3	OFF	M62 J25 - J30	
10/09/15 13:09:08	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 13:09:08	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 13:09:08	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 13:09:08	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 13:09:08	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 13:09:14	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 13:09:14	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 13:09:14	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 13:09:14	SIG	M62/2041B2	40R	M62 J25 - J30	
10/09/15 13:09:14	SIG	M62/2041B3	40R	M62 J25 - J30	
10/09/15 13:09:14	SIG	M62/2041B4	40R	M62 J25 - J30	
10/09/15 13:11:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:11:42	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 13:11:47	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 13:13:09	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 13:13:09	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 13:13:09	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 13:13:09	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 13:13:09	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 13:13:09	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 13:15:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:15:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:15:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:15:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:35:10	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 13:35:10	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 13:35:16	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 13:35:16	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 13:35:16	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 13:35:16	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 13:35:16	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 13:35:16	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 13:35:25	SIG	M62/2041B2	40R	M62 J25 - J30	
10/09/15 13:35:25	SIG	M62/2041B3	40R	M62 J25 - J30	
10/09/15 13:35:25	SIG	M62/2041B4	40R	M62 J25 - J30	
10/09/15 13:35:57	SIG	M62/2065B1	REDX	M62 J25 - J30	
10/09/15 13:35:57	SIG	M62/2065B2	60R	M62 J25 - J30	
10/09/15 13:35:57	SIG	M62/2065B3	60R	M62 J25 - J30	
10/09/15 13:35:57	SIG	M62/2065B4	60R	M62 J25 - J30	
10/09/15 13:37:14	SIG	M62/2050B2	50R	M62 J25 - J30	
10/09/15 13:37:14	SIG	M62/2050B3	50R	M62 J25 - J30	
10/09/15 13:37:14	SIG	M62/2050B4	50R	M62 J25 - J30	
10/09/15 13:37:19	SIG	M62/2050B2	40R	M62 J25 - J30	
10/09/15 13:37:19	SIG	M62/2050B3	40R	M62 J25 - J30	
10/09/15 13:37:19	SIG	M62/2050B4	40R	M62 J25 - J30	
10/09/15 13:37:19	SIG	M62/2057B2	50R	M62 J25 - J30	
10/09/15 13:37:19	SIG	M62/2057B3	50R	M62 J25 - J30	
10/09/15 13:37:19	SIG	M62/2057B4	50R	M62 J25 - J30	
10/09/15 13:38:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:38:17	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 13:38:22	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2057B2	40R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2057B3	40R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2057B4	40R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2065B2	50R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2065B3	50R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2065B4	50R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M62/2065M1	50R	M62 J25 - J30	
10/09/15 13:39:52	SIG	M621/1002B2	50R	M62 J25 - J30	
10/09/15 13:39:56	SIG	M62/2069M1	60R	M62 J25 - J30	
10/09/15 13:39:56	SIG	M62/2069M2	60R	M62 J25 - J30	
10/09/15 13:39:57	SIG	M62/2074B1	REDX	M62 J25 - J30	
10/09/15 13:39:57	SIG	M62/2074B2	60R	M62 J25 - J30	
10/09/15 13:39:57	SIG	M62/2074B3	60R	M62 J25 - J30	
10/09/15 13:39:57	SIG	M62/2074B4	60R	M62 J25 - J30	
10/09/15 13:40:27	SIG	M62/2025B1	REDX	M62 J25 - J30	
10/09/15 13:40:27	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 13:40:27	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 13:40:27	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 13:41:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:41:20	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 13:41:26	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M62/2065B2	40R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M62/2065B3	40R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M62/2065B4	40R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M62/2065M1	40R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M621/1002B2	40R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M621/1010B1	50R	M62 J25 - J30	
10/09/15 13:42:03	SIG	M621/1010B2	50R	M62 J25 - J30	
10/09/15 13:43:26	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 13:43:26	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 13:43:26	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M62/2074B2	50R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M62/2074B3	50R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M62/2074B4	50R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 13:44:06	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2074B2	40R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2074B3	40R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2074B4	40R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 13:44:12	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 13:45:23	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 13:45:23	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 13:45:23	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 13:46:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:46:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:46:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:46:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:47:32	SIG	M62/2050B2	50R	M62 J25 - J30	
10/09/15 13:47:32	SIG	M62/2050B3	50R	M62 J25 - J30	
10/09/15 13:47:32	SIG	M62/2050B4	50R	M62 J25 - J30	
10/09/15 13:50:57	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 13:50:57	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 13:50:57	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 13:50:57	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 13:50:57	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 13:50:57	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2088B1	REDX	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 13:51:17	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2097B1	REDX	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2097B2	60R	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2097B4	60R	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2106B1	REDX	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2106B2	60R	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2106B3	60R	M62 J25 - J30	
10/09/15 13:52:11	SIG	M62/2106B4	60R	M62 J25 - J30	
10/09/15 13:53:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:53:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:53:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:53:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 13:54:22	SIG	M62/2057B2	50R	M62 J25 - J30	
10/09/15 13:54:22	SIG	M62/2057B3	50R	M62 J25 - J30	
10/09/15 13:54:22	SIG	M62/2057B4	50R	M62 J25 - J30	
10/09/15 13:54:57	SIG	M62/2050B2	60R	M62 J25 - J30	
10/09/15 13:54:57	SIG	M62/2050B3	60R	M62 J25 - J30	
10/09/15 13:54:57	SIG	M62/2050B4	60R	M62 J25 - J30	
10/09/15 13:55:20	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 13:55:20	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 13:55:20	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 13:56:11	SIG	M62/2097B2	50R	M62 J25 - J30	
10/09/15 13:56:11	SIG	M62/2097B4	50R	M62 J25 - J30	
10/09/15 13:56:11	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 13:56:11	SIG	M62/2113B2	60R	M62 J25 - J30	
10/09/15 13:56:11	SIG	M62/2113B3	60R	M62 J25 - J30	
10/09/15 13:56:11	SIG	M62/2113B4	60R	M62 J25 - J30	
10/09/15 14:00:20	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 14:00:20	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 14:00:20	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 14:03:51	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 14:03:51	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 14:03:51	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 14:03:51	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 14:04:09	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 14:04:09	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 14:04:09	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 14:04:09	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 14:08:09	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 14:08:09	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 14:08:09	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 14:08:09	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 14:18:28	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 14:18:28	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 14:18:28	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 14:18:28	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2012B1	BLNK	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2012B2	OFF	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2012B3	OFF	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2012B4	OFF	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2018B1	OFF	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2018B2	OFF	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2018B3	OFF	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2018L1	NR	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2025B2	NR	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2025B3	NR	M62 J25 - J30	
10/09/15 14:20:58	SIG	M62/2025B4	NR	M62 J25 - J30	
10/09/15 14:22:28	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 14:22:28	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 14:22:28	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 14:22:28	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 14:23:58	SIG	M62/2018L1	OFF	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2012B1	REDX	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2012B2	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2012B3	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2012B4	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2018B1	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2018B2	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2018B3	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2018L1	NR	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 14:25:44	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 14:25:45	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 14:25:45	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 14:25:45	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 14:25:45	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 14:26:10	SIG	M62/2088B2	60R	M62 J25 - J30	
10/09/15 14:26:10	SIG	M62/2088B3	60R	M62 J25 - J30	
10/09/15 14:26:10	SIG	M62/2088B4	60R	M62 J25 - J30	
10/09/15 14:26:10	SIG	M62/2097B2	60R	M62 J25 - J30	
10/09/15 14:26:10	SIG	M62/2097B4	60R	M62 J25 - J30	
10/09/15 14:27:16	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 14:27:42	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 14:28:04	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 14:29:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 14:30:27	SIG	M621/1002B1	50R	M62 J25 - J30	
10/09/15 14:30:33	SIG	M62/2057B1	50R	M62 J25 - J30	
10/09/15 14:30:33	SIG	M621/1002B1	40R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2065B2	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2065B3	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2065B4	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2065M1	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2074B2	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2074B3	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2074B4	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2081B1	60R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2081B2	60R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2081B3	60R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M62/2081L1	60R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M621/1002B1	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M621/1002B2	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M621/1010B1	50R	M62 J25 - J30	
10/09/15 14:34:52	SIG	M621/1010B2	50R	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2057B1	60R	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2057B2	60R	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2057B3	60R	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2057B4	60R	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2113B1	BLNK	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2113B2	OFF	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2113B3	OFF	M62 J25 - J30	
10/09/15 14:38:58	SIG	M62/2113B4	OFF	M62 J25 - J30	
10/09/15 14:40:06	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 14:40:06	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 14:40:06	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 14:40:06	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 14:40:06	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 14:40:06	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2025A1	REDX	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2033A1	REDX	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2041A1	REDX	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2041A2	40R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2041A3	40R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2041A4	40R	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2050A2	NR	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2050A3	NR	M62 J25 - J30	
10/09/15 14:40:11	SIG	M62/2050A4	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2050A2	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2050A3	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2050A4	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065A1	REDX	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065B2	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065B3	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065B4	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2065M1	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2069M1	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2069M2	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2074B2	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2074B3	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M62/2074B4	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M621/1002B1	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M621/1002B2	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 14:40:58	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2033A2	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2033A3	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2033A4	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2041A2	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2041A3	60R	M62 J25 - J30	
10/09/15 14:44:06	SIG	M62/2041A4	60R	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2088B2	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2088B3	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2088B4	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2097B2	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2097B4	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2106B2	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2106B3	NR	M62 J25 - J30	
10/09/15 14:45:09	SIG	M62/2106B4	NR	M62 J25 - J30	
10/09/15 14:48:10	SIG	M62/2097B2	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2088B1	BLNK	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2088B2	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2088B3	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2088B4	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2097B1	BLNK	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2097B4	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2106B1	BLNK	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2106B2	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
10/09/15 14:48:20	SIG	M62/2106B4	OFF	M62 J25 - J30	
10/09/15 14:48:21	SIG	M62/2088B1	BLNK	M62 J25 - J30	
10/09/15 14:48:21	SIG	M62/2106B1	BLNK	M62 J25 - J30	
10/09/15 14:52:19	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 14:52:19	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 14:52:19	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 14:52:25	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 14:52:25	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 14:52:25	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 14:52:25	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 14:52:25	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 14:52:25	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 14:52:58	SIG	M62/2081B1	OFF	M62 J25 - J30	
10/09/15 14:52:58	SIG	M62/2081B2	OFF	M62 J25 - J30	
10/09/15 14:52:58	SIG	M62/2081B3	OFF	M62 J25 - J30	
10/09/15 14:52:58	SIG	M62/2081L1	OFF	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2004A1	60R	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2004A2	60R	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2004A3	60R	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2074B1	BLNK	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2074B2	OFF	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2074B3	OFF	M62 J25 - J30	
10/09/15 14:55:58	SIG	M62/2074B4	OFF	M62 J25 - J30	
10/09/15 14:55:58	SIG	M621/1010B1	OFF	M62 J25 - J30	
10/09/15 14:55:58	SIG	M621/1010B2	OFF	M62 J25 - J30	
10/09/15 14:56:19	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 14:56:19	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 14:56:19	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 14:56:19	SIG	M62/2033A2	60R	M62 J25 - J30	
10/09/15 14:56:19	SIG	M62/2033A3	60R	M62 J25 - J30	
10/09/15 14:56:19	SIG	M62/2033A4	60R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 14:59:58	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 15:00:28	SIG	M62/2033A2	40R	M62 J25 - J30	
10/09/15 15:00:28	SIG	M62/2033A3	40R	M62 J25 - J30	
10/09/15 15:00:28	SIG	M62/2033A4	40R	M62 J25 - J30	
10/09/15 15:01:07	SIG	M62/2018A2	50R	M62 J25 - J30	
10/09/15 15:01:07	SIG	M62/2018A3	50R	M62 J25 - J30	
10/09/15 15:01:07	SIG	M62/2018A4	50R	M62 J25 - J30	
10/09/15 15:01:07	SIG	M62/2025A2	40R	M62 J25 - J30	
10/09/15 15:01:07	SIG	M62/2025A3	40R	M62 J25 - J30	
10/09/15 15:01:07	SIG	M62/2025A4	40R	M62 J25 - J30	
10/09/15 15:05:07	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 15:05:07	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 15:05:07	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 15:05:53	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 15:05:53	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 15:05:53	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 15:05:53	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 15:05:53	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 15:05:53	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 15:06:00	SIG	M62/2057A1	60R	M62 J25 - J30	
10/09/15 15:06:00	SIG	M62/2057A1	60R	M62 J25 - J30	
10/09/15 15:06:00	SIG	M62/2057A2	60R	M62 J25 - J30	
10/09/15 15:06:00	SIG	M62/2057A3	60R	M62 J25 - J30	
10/09/15 15:06:00	SIG	M62/2057J1	60R	M62 J25 - J30	
10/09/15 15:07:26	SIG	M62/2050A1	60R	M62 J25 - J30	
10/09/15 15:07:57	SIG	M62/2041A1	50R	M62 J25 - J30	
10/09/15 15:08:22	SIG	M62/2033A1	50R	M62 J25 - J30	
10/09/15 15:08:27	SIG	M62/2018A1	60R	M62 J25 - J30	
10/09/15 15:08:27	SIG	M62/2025A1	50R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2025A1	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2033A1	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2033A2	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2033A3	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2033A4	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2041A1	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2041A2	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2041A3	60R	M62 J25 - J30	
10/09/15 15:08:59	SIG	M62/2041A4	60R	M62 J25 - J30	
10/09/15 15:11:03	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 15:11:04	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 15:17:59	SIG	M62/2004A1	OFF	M62 J25 - J30	
10/09/15 15:17:59	SIG	M62/2004A2	OFF	M62 J25 - J30	
10/09/15 15:17:59	SIG	M62/2004A3	OFF	M62 J25 - J30	
10/09/15 15:21:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 15:21:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 15:21:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 15:21:23	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 15:21:23	SIG	M62/2025A1	???	M62 J25 - J30	
10/09/15 15:37:59	SIG	M62/2025A1	OFF	M62 J25 - J30	
10/09/15 16:07:51	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 16:07:51	SIG	M62/2113B2	NR	M62 J25 - J30	
10/09/15 16:07:51	SIG	M62/2113B3	NR	M62 J25 - J30	
10/09/15 16:07:51	SIG	M62/2113B4	NR	M62 J25 - J30	
10/09/15 16:07:51	SIG	M62/2120M1	60R	M62 J25 - J30	
10/09/15 16:07:51	SIG	M62/2120M2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B1	REDX	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B2	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B3	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B3	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B4	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2074B4	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081B1	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081B1	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081B2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081B2	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081B3	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081B3	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081L1	NR	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2081L1	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2088B1	REDX	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2088B2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2088B3	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2088B4	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2097B1	REDX	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2097B2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2097B4	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2106B1	REDX	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2106B2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2106B3	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2106B4	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2113B2	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2113B3	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2113B4	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2117B1	60R	M62 J25 - J30	
10/09/15 16:08:07	SIG	M62/2117B3	60R	M62 J25 - J30	
10/09/15 16:08:59	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 16:08:59	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 16:09:12	SIG	M62/2088B1	60R	M62 J25 - J30	
10/09/15 16:09:36	SIG	M62/2097B1	60R	M62 J25 - J30	
10/09/15 16:10:07	SIG	M62/2106B1	60R	M62 J25 - J30	
10/09/15 16:10:12	SIG	M62/2113B1	60R	M62 J25 - J30	
10/09/15 16:14:26	SIG	M62/2065A2	60R	M62 J25 - J30	
10/09/15 16:14:26	SIG	M62/2065A3	60R	M62 J25 - J30	
10/09/15 16:14:26	SIG	M62/2065A4	60R	M62 J25 - J30	
10/09/15 16:14:36	SIG	M62/2073K1	60R	M62 J25 - J30	
10/09/15 16:14:36	SIG	M62/2079A1	REDX	M62 J25 - J30	
10/09/15 16:14:36	SIG	M62/2079A2	NR	M62 J25 - J30	
10/09/15 16:14:36	SIG	M62/2079A3	NR	M62 J25 - J30	
10/09/15 16:14:36	SIG	M62/2079A4	NR	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2079A2	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2079A3	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2079A4	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2088A1	REDX	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2088A2	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2088A3	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2088A4	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2097A1	REDX	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2097A2	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2097A3	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2097A4	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2106A1	REDX	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2106A2	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2106A3	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2106A4	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2114A1	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2114A2	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2114A3	60R	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2117A1	REDX	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2117A2	NR	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2117A3	NR	M62 J25 - J30	
10/09/15 16:14:37	SIG	M62/2117A4	NR	M62 J25 - J30	
10/09/15 16:17:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:17:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:17:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:17:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:18:26	SIG	M62/2065M1	50R	M62 J25 - J30	
10/09/15 16:18:26	SIG	M621/1002B1	50R	M62 J25 - J30	
10/09/15 16:18:26	SIG	M621/1002B2	50R	M62 J25 - J30	
10/09/15 16:18:26	SIG	M621/1010B1	50R	M62 J25 - J30	
10/09/15 16:18:26	SIG	M621/1010B2	50R	M62 J25 - J30	
10/09/15 16:18:27	SIG	M62/2074B2	50R	M62 J25 - J30	
10/09/15 16:18:27	SIG	M62/2074B3	50R	M62 J25 - J30	
10/09/15 16:18:27	SIG	M62/2074B4	50R	M62 J25 - J30	
10/09/15 16:18:27	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 16:18:27	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 16:18:31	SIG	M62/2065M1	40R	M62 J25 - J30	
10/09/15 16:18:31	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 16:18:31	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 16:18:31	SIG	M621/1002B1	40R	M62 J25 - J30	
10/09/15 16:18:31	SIG	M621/1002B2	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2065B2	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2065B3	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2065B4	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2074B2	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2074B3	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2074B4	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 16:18:32	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 16:18:33	SIG	M62/2106A1	60R	M62 J25 - J30	
10/09/15 16:18:37	SIG	M62/2065B2	40R	M62 J25 - J30	
10/09/15 16:18:37	SIG	M62/2065B3	40R	M62 J25 - J30	
10/09/15 16:18:37	SIG	M62/2065B4	40R	M62 J25 - J30	
10/09/15 16:18:37	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 16:18:37	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 16:18:59	SIG	M62/2097A1	60R	M62 J25 - J30	
10/09/15 16:19:28	SIG	M62/2088A1	60R	M62 J25 - J30	
10/09/15 16:19:34	SIG	M62/2079A1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2065B2	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2065B3	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2065B4	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2065M1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2069M1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2069M2	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2074B2	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2074B3	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2074B4	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2081B1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2081B2	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2081B3	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M62/2081L1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M621/1002B1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M621/1002B2	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 16:22:27	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 16:23:35	SIG	M62/2170K1	60R	M62 J25 - J30	
10/09/15 16:23:35	SIG	M62/2170K2	60R	M62 J25 - J30	
10/09/15 16:23:35	SIG	M62/2177A1	REDX	M62 J25 - J30	
10/09/15 16:23:35	SIG	M62/2177A2	NR	M62 J25 - J30	
10/09/15 16:23:35	SIG	M62/2177A3	NR	M62 J25 - J30	
10/09/15 16:23:35	SIG	M62/2177A4	NR	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2170A1	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2170A2	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2177A2	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2177A3	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2177A4	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2183A1	REDX	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2183A2	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2183A3	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2183A4	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2189A1	REDX	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2189A2	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2189A3	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2189A4	60R	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2197A1	NR	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2197A2	NR	M62 J25 - J30	
10/09/15 16:23:36	SIG	M62/2197A3	NR	M62 J25 - J30	
10/09/15 16:25:26	SIG	M62/2189A1	60R	M62 J25 - J30	
10/09/15 16:25:46	SIG	M62/2183A1	60R	M62 J25 - J30	
10/09/15 16:25:52	SIG	M62/2177A1	60R	M62 J25 - J30	
10/09/15 16:26:13	SIG	M62/2065M1	50R	M62 J25 - J30	
10/09/15 16:26:13	SIG	M621/1002B1	50R	M62 J25 - J30	
10/09/15 16:26:13	SIG	M621/1002B2	50R	M62 J25 - J30	
10/09/15 16:26:13	SIG	M621/1010B1	50R	M62 J25 - J30	
10/09/15 16:26:13	SIG	M621/1010B2	50R	M62 J25 - J30	
10/09/15 16:26:18	SIG	M62/2065M1	40R	M62 J25 - J30	
10/09/15 16:26:18	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 16:26:18	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 16:26:18	SIG	M621/1002B1	40R	M62 J25 - J30	
10/09/15 16:26:18	SIG	M621/1002B2	40R	M62 J25 - J30	
10/09/15 16:26:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:26:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:27:50	SIG	M62/2074B2	50R	M62 J25 - J30	
10/09/15 16:27:50	SIG	M62/2074B3	50R	M62 J25 - J30	
10/09/15 16:27:50	SIG	M62/2074B4	50R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2074B2	40R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2074B3	40R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2074B4	40R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 16:27:55	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M62/2065B2	50R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M62/2065B3	50R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M62/2065B4	50R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 16:28:56	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 16:29:01	SIG	M62/2065B2	40R	M62 J25 - J30	
10/09/15 16:29:01	SIG	M62/2065B3	40R	M62 J25 - J30	
10/09/15 16:29:01	SIG	M62/2065B4	40R	M62 J25 - J30	
10/09/15 16:29:01	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 16:29:01	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 16:31:14	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 16:31:14	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 16:31:14	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 16:31:14	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:31:19	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 16:31:51	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 16:32:33	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M62/2065B2	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M62/2065B3	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M62/2065B4	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M62/2065M1	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M621/1002B1	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M621/1002B2	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M621/1010B1	50R	M62 J25 - J30	
10/09/15 16:32:57	SIG	M621/1010B2	50R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M62/2065B2	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M62/2065B3	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M62/2065B4	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M62/2065M1	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M621/1002B1	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M621/1002B2	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 16:33:00	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 16:35:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:35:01	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:35:06	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 16:35:51	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 16:36:57	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 16:36:57	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 16:36:57	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 16:36:57	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 16:38:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:38:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:38:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:38:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:42:10	SIG	M62/2097B1	50R	M62 J25 - J30	
10/09/15 16:42:10	SIG	M62/2097B2	50R	M62 J25 - J30	
10/09/15 16:42:10	SIG	M62/2097B4	50R	M62 J25 - J30	
10/09/15 16:44:26	SIG	M62/2097B1	40R	M62 J25 - J30	
10/09/15 16:44:26	SIG	M62/2097B2	40R	M62 J25 - J30	
10/09/15 16:44:26	SIG	M62/2097B4	40R	M62 J25 - J30	
10/09/15 16:45:40	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 16:45:40	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 16:45:40	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 16:45:40	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:45:45	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 16:46:52	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2097B1	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2097B2	50R	M62 J25 - J30	
10/09/15 16:48:26	SIG	M62/2097B4	50R	M62 J25 - J30	
10/09/15 16:48:27	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 16:48:27	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 16:48:27	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 16:48:27	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 16:49:00	SIG	M62/2125B1	60R	M62 J25 - J30	
10/09/15 16:49:00	SIG	M62/2125B2	60R	M62 J25 - J30	
10/09/15 16:49:00	SIG	M62/2125B3	60R	M62 J25 - J30	
10/09/15 16:49:00	SIG	M62/2125L1	60R	M62 J25 - J30	
10/09/15 16:49:00	SIG	M62/2125L2	60R	M62 J25 - J30	
10/09/15 16:49:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:49:10	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:49:15	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 16:50:05	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 16:50:05	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 16:50:05	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 16:50:05	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 16:50:52	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 16:51:30	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 16:54:01	SIG	M62/2106B1	50R	M62 J25 - J30	
10/09/15 16:54:01	SIG	M62/2106B2	50R	M62 J25 - J30	
10/09/15 16:54:01	SIG	M62/2106B3	50R	M62 J25 - J30	
10/09/15 16:54:01	SIG	M62/2106B4	50R	M62 J25 - J30	
10/09/15 16:54:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:54:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:54:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:54:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:54:52	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 16:54:52	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 16:54:52	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 16:54:52	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 16:54:57	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 16:54:57	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 16:54:57	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 16:54:57	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:54:58	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 16:55:10	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 16:55:14	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 16:55:14	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 16:55:14	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 16:55:14	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 16:56:01	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 16:56:01	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 16:56:01	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 16:56:01	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 16:56:06	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 16:56:06	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 16:56:06	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 16:56:06	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 16:56:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:56:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 16:57:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 16:57:22	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 16:57:28	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 16:58:15	SIG	M62/2132B1	50R	M62 J25 - J30	
10/09/15 16:58:15	SIG	M62/2132B2	50R	M62 J25 - J30	
10/09/15 16:58:15	SIG	M62/2132B3	50R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2132B1	40R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2132B2	40R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2132B3	40R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2137B1	50R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2137B2	50R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2137B3	50R	M62 J25 - J30	
10/09/15 16:58:21	SIG	M62/2137B4	50R	M62 J25 - J30	
10/09/15 16:59:14	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 16:59:14	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 16:59:14	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 16:59:14	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 17:00:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:00:26	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:00:32	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:01:12	SIG	M62/1968B1	50R	M62 J25 - J30	
10/09/15 17:01:12	SIG	M62/1968B2	50R	M62 J25 - J30	
10/09/15 17:01:12	SIG	M62/1968B3	50R	M62 J25 - J30	
10/09/15 17:01:12	SIG	M62/1968L1	50R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1960B1	NR	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1960B2	NR	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1960B3	NR	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1960L1	NR	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1960L2	NR	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1968B1	40R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1968B2	40R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1968B3	40R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1968L1	40R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1974B1	50R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1974B2	50R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1974B3	50R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1974B4	50R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1974M1	50R	M62 J25 - J30	
10/09/15 17:01:18	SIG	M62/1974M2	50R	M62 J25 - J30	
10/09/15 17:01:32	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:01:32	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:01:32	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:01:32	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:01:35	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 17:01:35	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 17:01:35	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 17:01:35	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2132B1	NR	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2132B2	NR	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2132B3	NR	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2137B1	OFF	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2137B2	OFF	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2137B3	OFF	M62 J25 - J30	
10/09/15 17:03:15	SIG	M62/2137B4	OFF	M62 J25 - J30	
10/09/15 17:03:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:03:30	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:03:35	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:04:59	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:04:59	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:04:59	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:04:59	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:05:04	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:05:04	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:05:04	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:05:04	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1960B1	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1960B2	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1960B3	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1960L1	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1960L2	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1968B1	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1968B2	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1968B3	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1968L1	NR	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1974B1	OFF	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1974B2	OFF	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1974B3	OFF	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1974B4	OFF	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1974M1	OFF	M62 J25 - J30	
10/09/15 17:05:12	SIG	M62/1974M2	OFF	M62 J25 - J30	
10/09/15 17:05:35	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 17:05:35	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 17:05:35	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 17:05:35	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 17:05:49	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 17:06:15	SIG	M62/2132B1	OFF	M62 J25 - J30	
10/09/15 17:06:15	SIG	M62/2132B2	OFF	M62 J25 - J30	
10/09/15 17:06:15	SIG	M62/2132B3	OFF	M62 J25 - J30	
10/09/15 17:06:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:06:34	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:06:39	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1960B1	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1960B2	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1960B3	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1960L1	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1960L2	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1968B1	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1968B2	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1968B3	OFF	M62 J25 - J30	
10/09/15 17:08:12	SIG	M62/1968L1	OFF	M62 J25 - J30	
10/09/15 17:08:59	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:08:59	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:08:59	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:08:59	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:09:26	SIG	M62/1968B1	50R	M62 J25 - J30	
10/09/15 17:09:26	SIG	M62/1968B2	50R	M62 J25 - J30	
10/09/15 17:09:26	SIG	M62/1968B3	50R	M62 J25 - J30	
10/09/15 17:09:26	SIG	M62/1968L1	50R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1960B1	NR	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1960B2	NR	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1960B3	NR	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1960L1	NR	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1960L2	NR	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1968B1	40R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1968B2	40R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1968B3	40R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1968L1	40R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1974B1	50R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1974B2	50R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1974B3	50R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1974B4	50R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1974M1	50R	M62 J25 - J30	
10/09/15 17:09:32	SIG	M62/1974M2	50R	M62 J25 - J30	
10/09/15 17:09:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:09:38	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 17:09:40	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 17:09:43	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:10:00	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 17:10:00	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 17:10:00	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 17:10:00	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 17:10:09	SIG	M62/1960B1	60R	M62 J25 - J30	
10/09/15 17:10:09	SIG	M62/1960B2	60R	M62 J25 - J30	
10/09/15 17:10:09	SIG	M62/1960B3	60R	M62 J25 - J30	
10/09/15 17:10:45	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:10:45	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:10:45	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:10:45	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:10:51	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:10:51	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:10:51	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:10:51	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:12:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:12:42	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:12:47	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:13:08	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 17:13:08	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1960B1	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1960B2	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1960B3	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1960L1	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1960L2	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1968B1	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1968B2	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1968B3	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1968L1	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1974B1	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1974B2	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1974B3	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1974B4	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1974M1	OFF	M62 J25 - J30	
10/09/15 17:13:28	SIG	M62/1974M2	OFF	M62 J25 - J30	
10/09/15 17:14:45	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:14:45	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:14:45	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:14:45	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:15:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:15:46	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:15:51	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:16:15	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 17:16:15	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 17:16:15	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 17:16:15	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 17:16:54	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 17:16:54	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 17:16:54	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 17:16:54	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 17:18:01	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 17:18:07	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 17:18:31	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 17:19:34	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 17:20:49	SIG	M62/2057B1	50R	M62 J25 - J30	
10/09/15 17:20:49	SIG	M62/2057B2	50R	M62 J25 - J30	
10/09/15 17:20:49	SIG	M62/2057B3	50R	M62 J25 - J30	
10/09/15 17:20:49	SIG	M62/2057B4	50R	M62 J25 - J30	
10/09/15 17:20:55	SIG	M62/2057B1	40R	M62 J25 - J30	
10/09/15 17:20:55	SIG	M62/2057B2	40R	M62 J25 - J30	
10/09/15 17:20:55	SIG	M62/2057B3	40R	M62 J25 - J30	
10/09/15 17:20:55	SIG	M62/2057B4	40R	M62 J25 - J30	
10/09/15 17:21:58	SIG	M62/2097B3	50R	M62 J25 - J30	
10/09/15 17:21:58	SIG	M62/2097B3	50R	M62 J25 - J30	
10/09/15 17:21:58	SIG	M62/2097B3	50R	M62 J25 - J30	
10/09/15 17:22:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:22:02	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:22:07	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2041B1	40R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2041B2	40R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2041B3	40R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2041B4	40R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2050B2	50R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2050B3	50R	M62 J25 - J30	
10/09/15 17:22:41	SIG	M62/2050B4	50R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2041B1	40R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2041B2	40R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2041B3	40R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2041B4	40R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2050B2	40R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2050B3	40R	M62 J25 - J30	
10/09/15 17:22:47	SIG	M62/2050B4	40R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 17:23:19	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 17:23:36	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:23:36	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:23:36	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:23:36	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2050B2	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2050B3	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2050B4	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2057B1	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2057B2	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2057B3	60R	M62 J25 - J30	
10/09/15 17:24:49	SIG	M62/2057B4	60R	M62 J25 - J30	
10/09/15 17:25:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:25:01	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:25:06	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:26:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 17:26:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 17:26:42	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 17:26:42	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 17:26:42	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 17:26:42	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 17:26:53	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 17:26:53	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 17:26:53	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 17:26:53	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 17:28:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:28:01	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:28:01	SIG	M62/2106B1	60R	M62 J25 - J30	
10/09/15 17:28:01	SIG	M62/2106B2	60R	M62 J25 - J30	
10/09/15 17:28:01	SIG	M62/2106B3	60R	M62 J25 - J30	
10/09/15 17:28:01	SIG	M62/2106B4	60R	M62 J25 - J30	
10/09/15 17:28:06	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:28:34	SIG	M62/2088B1	40R	M62 J25 - J30	
10/09/15 17:28:34	SIG	M62/2088B2	40R	M62 J25 - J30	
10/09/15 17:28:34	SIG	M62/2088B3	40R	M62 J25 - J30	
10/09/15 17:28:34	SIG	M62/2088B4	40R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 17:28:58	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 17:29:03	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:29:08	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 17:30:28	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 17:32:03	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 17:32:03	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2088B1	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2088B2	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2088B3	50R	M62 J25 - J30	
10/09/15 17:32:34	SIG	M62/2088B4	50R	M62 J25 - J30	
10/09/15 17:33:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:33:07	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:33:13	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:34:10	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 17:34:10	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 17:34:10	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 17:34:10	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 17:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:36:11	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:36:16	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:37:56	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:37:56	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:37:56	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:37:56	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:37:59	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:37:59	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:37:59	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:37:59	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:38:05	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:38:05	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:38:05	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:38:05	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:38:29	SIG	M62/1968B1	50R	M62 J25 - J30	
10/09/15 17:38:29	SIG	M62/1968B2	50R	M62 J25 - J30	
10/09/15 17:38:29	SIG	M62/1968B3	50R	M62 J25 - J30	
10/09/15 17:38:29	SIG	M62/1968L1	50R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1960B1	60R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1960B2	60R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1960B3	60R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1960L1	NR	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1960L2	NR	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1968B1	40R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1968B2	40R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1968B3	40R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1968L1	40R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1974B1	50R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1974B2	50R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1974B3	50R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1974B4	50R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1974M1	50R	M62 J25 - J30	
10/09/15 17:38:34	SIG	M62/1974M2	50R	M62 J25 - J30	
10/09/15 17:39:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:39:15	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:39:20	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:41:21	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 17:41:21	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 17:41:21	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 17:41:21	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 17:41:59	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:41:59	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:41:59	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:41:59	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:42:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:42:19	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:42:24	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:42:26	SIG	M62/2081B1	40R	M62 J25 - J30	
10/09/15 17:42:26	SIG	M62/2081B2	40R	M62 J25 - J30	
10/09/15 17:42:26	SIG	M62/2081B3	40R	M62 J25 - J30	
10/09/15 17:42:26	SIG	M62/2081L1	40R	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1960B1	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1960B2	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1960B3	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1960L1	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1960L2	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1968B1	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1968B2	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1968B3	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1968L1	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1974B1	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1974B2	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1974B3	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1974B4	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1974M1	OFF	M62 J25 - J30	
10/09/15 17:43:10	SIG	M62/1974M2	OFF	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 17:44:04	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2041B1	50R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 17:44:46	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 17:45:01	SIG	M62/2125B1	OFF	M62 J25 - J30	
10/09/15 17:45:01	SIG	M62/2125B2	OFF	M62 J25 - J30	
10/09/15 17:45:01	SIG	M62/2125B3	OFF	M62 J25 - J30	
10/09/15 17:45:01	SIG	M62/2125L1	NR	M62 J25 - J30	
10/09/15 17:45:01	SIG	M62/2125L2	NR	M62 J25 - J30	
10/09/15 17:46:36	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:46:36	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:46:36	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:46:36	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:46:41	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:46:41	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:46:41	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:46:41	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:47:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:47:25	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:47:30	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:47:52	SIG	M62/2081B1	50R	M62 J25 - J30	
10/09/15 17:47:52	SIG	M62/2081B2	50R	M62 J25 - J30	
10/09/15 17:47:52	SIG	M62/2081B3	50R	M62 J25 - J30	
10/09/15 17:47:52	SIG	M62/2081L1	50R	M62 J25 - J30	
10/09/15 17:48:02	SIG	M62/2125L1	OFF	M62 J25 - J30	
10/09/15 17:48:02	SIG	M62/2125L2	OFF	M62 J25 - J30	
10/09/15 17:50:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:50:29	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:50:34	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:50:37	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 17:50:37	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 17:50:37	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 17:50:37	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 17:51:46	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 17:51:46	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 17:51:46	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 17:51:46	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 17:53:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:53:33	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:53:38	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 17:54:43	SIG	M62/2065B2	50R	M62 J25 - J30	
10/09/15 17:54:43	SIG	M62/2065B3	50R	M62 J25 - J30	
10/09/15 17:54:43	SIG	M62/2065B4	50R	M62 J25 - J30	
10/09/15 17:54:43	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 17:54:43	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2018B1	50R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2018B2	50R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2018B3	50R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2018L1	50R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2069M1	40R	M62 J25 - J30	
10/09/15 17:54:48	SIG	M62/2069M2	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2018B1	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2018B2	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2018B3	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2018L1	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2025B1	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2025B2	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2025B3	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2025B4	40R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 17:54:54	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 17:54:57	SIG	M62/2074B2	50R	M62 J25 - J30	
10/09/15 17:54:57	SIG	M62/2074B3	50R	M62 J25 - J30	
10/09/15 17:54:57	SIG	M62/2074B4	50R	M62 J25 - J30	
10/09/15 17:54:57	SIG	M621/1010B1	40R	M62 J25 - J30	
10/09/15 17:54:57	SIG	M621/1010B2	40R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2081B1	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2081B2	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2081B3	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2081L1	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2088B1	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2088B2	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2088B3	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2088B4	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2097B1	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2097B2	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2097B3	60R	M62 J25 - J30	
10/09/15 17:55:02	SIG	M62/2097B4	60R	M62 J25 - J30	
10/09/15 17:56:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 17:56:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 17:57:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:57:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:57:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:57:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 17:58:47	SIG	M62/2065M1	50R	M62 J25 - J30	
10/09/15 17:58:47	SIG	M62/2069M1	50R	M62 J25 - J30	
10/09/15 17:58:47	SIG	M62/2069M2	50R	M62 J25 - J30	
10/09/15 17:58:47	SIG	M621/1002B1	50R	M62 J25 - J30	
10/09/15 17:58:47	SIG	M621/1002B2	50R	M62 J25 - J30	
10/09/15 17:58:48	SIG	M621/1010B1	50R	M62 J25 - J30	
10/09/15 17:58:48	SIG	M621/1010B2	50R	M62 J25 - J30	
10/09/15 18:00:03	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 18:00:03	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 18:00:03	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 18:00:08	SIG	M62/2033B1	40R	M62 J25 - J30	
10/09/15 18:00:08	SIG	M62/2033B2	40R	M62 J25 - J30	
10/09/15 18:00:08	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 18:00:08	SIG	M62/2033B4	40R	M62 J25 - J30	
10/09/15 18:02:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:02:44	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 18:02:50	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M62/2069M1	60R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M62/2069M2	60R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M62/2074B2	60R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M62/2074B3	60R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M62/2074B4	60R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 18:03:02	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 18:04:02	SIG	M62/2065B2	60R	M62 J25 - J30	
10/09/15 18:04:02	SIG	M62/2065B3	60R	M62 J25 - J30	
10/09/15 18:04:02	SIG	M62/2065B4	60R	M62 J25 - J30	
10/09/15 18:04:02	SIG	M62/2065M1	60R	M62 J25 - J30	
10/09/15 18:04:02	SIG	M621/1002B1	60R	M62 J25 - J30	
10/09/15 18:04:02	SIG	M621/1002B2	60R	M62 J25 - J30	
10/09/15 18:05:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:05:48	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 18:05:53	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 18:08:16	SIG	M62/2018B1	60R	M62 J25 - J30	
10/09/15 18:08:16	SIG	M62/2018B2	60R	M62 J25 - J30	
10/09/15 18:08:16	SIG	M62/2018B3	60R	M62 J25 - J30	
10/09/15 18:08:16	SIG	M62/2018L1	60R	M62 J25 - J30	
10/09/15 18:08:51	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 18:08:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:08:57	SIG	M62/2033B3	40R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2025B1	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2025B2	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2025B3	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2025B4	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2033B1	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2033B2	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2033B3	50R	M62 J25 - J30	
10/09/15 18:09:55	SIG	M62/2033B4	50R	M62 J25 - J30	
10/09/15 18:13:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:13:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:13:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2025B1	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2025B2	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2025B3	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2025B4	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2033B1	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2033B2	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2033B3	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2033B4	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2041B1	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2041B2	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2041B3	60R	M62 J25 - J30	
10/09/15 18:13:03	SIG	M62/2041B4	60R	M62 J25 - J30	
10/09/15 18:16:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:16:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:16:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:16:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:24:02	SIG	M62/2113B1	HSD	M62 J25 - J30	
10/09/15 18:24:56	SIG	M62/2106B1	HSD	M62 J25 - J30	
10/09/15 18:26:03	SIG	M62/2097B1	HSD	M62 J25 - J30	
10/09/15 18:26:03	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 18:26:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 18:26:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 18:27:11	SIG	M62/2088B1	HSD	M62 J25 - J30	
10/09/15 18:27:11	SIG	M62/2106B1	REDX	M62 J25 - J30	
10/09/15 18:28:19	SIG	M62/2097B1	REDX	M62 J25 - J30	
10/09/15 18:29:27	SIG	M62/2088B1	REDX	M62 J25 - J30	
10/09/15 18:30:20	SIG	M62/2117B1	NR	M62 J25 - J30	
10/09/15 18:30:20	SIG	M62/2117B3	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2081B1	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2081B2	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2081B3	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2081L1	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2088B2	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2088B3	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2088B4	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2097B2	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2097B3	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2097B4	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2106B2	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2106B3	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2106B4	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2113B2	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2113B3	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2113B4	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2120M1	NR	M62 J25 - J30	
10/09/15 18:30:21	SIG	M62/2120M2	NR	M62 J25 - J30	
10/09/15 18:31:20	SIG	M62/2120M1	OFF	M62 J25 - J30	
10/09/15 18:31:20	SIG	M62/2120M2	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2081B1	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2081B2	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2081B3	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2081L1	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2088B1	BLNK	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2088B2	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2088B3	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2088B4	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2097B1	BLNK	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2097B2	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2097B3	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2097B4	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2106B1	BLNK	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2106B2	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2106B3	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2106B4	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2113B1	BLNK	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2113B2	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2113B3	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2113B4	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
10/09/15 18:31:21	SIG	M62/2117B3	OFF	M62 J25 - J30	
10/09/15 18:34:25	SIG	M62/2177A1	HSD	M62 J25 - J30	
10/09/15 18:35:10	SIG	M62/2183A1	HSD	M62 J25 - J30	
10/09/15 18:35:55	SIG	M62/2177A1	REDX	M62 J25 - J30	
10/09/15 18:35:55	SIG	M62/2189A1	HSD	M62 J25 - J30	
10/09/15 18:36:55	SIG	M62/2183A1	REDX	M62 J25 - J30	
10/09/15 18:37:55	SIG	M62/2189A1	REDX	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2170A1	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2170A2	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2170K1	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2170K2	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2177A2	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2177A3	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2177A4	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2183A2	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2183A3	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2183A4	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2189A2	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2189A3	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2189A4	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2197A1	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2197A2	NR	M62 J25 - J30	
10/09/15 18:37:56	SIG	M62/2197A3	NR	M62 J25 - J30	
10/09/15 18:38:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 18:38:55	SIG	M62/2170K1	OFF	M62 J25 - J30	
10/09/15 18:38:55	SIG	M62/2170K2	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2170A1	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2170A2	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2177A1	BLNK	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2177A2	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2177A3	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2177A4	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2183A1	BLNK	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2183A2	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2183A3	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2183A4	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2189A1	BLNK	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2189A2	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2189A3	OFF	M62 J25 - J30	
10/09/15 18:38:56	SIG	M62/2189A4	OFF	M62 J25 - J30	
10/09/15 18:40:02	SIG	M62/2074B1	BLNK	M62 J25 - J30	
10/09/15 18:40:02	SIG	M62/2074B2	OFF	M62 J25 - J30	
10/09/15 18:40:02	SIG	M62/2074B3	OFF	M62 J25 - J30	
10/09/15 18:40:02	SIG	M62/2074B4	OFF	M62 J25 - J30	
10/09/15 18:40:02	SIG	M621/1010B1	OFF	M62 J25 - J30	
10/09/15 18:40:02	SIG	M621/1010B2	OFF	M62 J25 - J30	
10/09/15 18:40:56	SIG	M62/2197A1	OFF	M62 J25 - J30	
10/09/15 18:40:57	SIG	M62/2197A2	OFF	M62 J25 - J30	
10/09/15 18:40:57	SIG	M62/2197A3	OFF	M62 J25 - J30	
10/09/15 18:42:50	SIG	M62/2079A1	HSD	M62 J25 - J30	
10/09/15 18:43:58	SIG	M62/2088A1	HSD	M62 J25 - J30	
10/09/15 18:45:06	SIG	M62/2079A1	REDX	M62 J25 - J30	
10/09/15 18:45:06	SIG	M62/2097A1	HSD	M62 J25 - J30	
10/09/15 18:46:14	SIG	M62/2088A1	REDX	M62 J25 - J30	
10/09/15 18:46:14	SIG	M62/2106A1	HSD	M62 J25 - J30	
10/09/15 18:47:22	SIG	M62/2097A1	REDX	M62 J25 - J30	
10/09/15 18:48:30	SIG	M62/2106A1	REDX	M62 J25 - J30	
10/09/15 18:49:30	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 18:49:30	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 18:49:30	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2073K1	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2079A2	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2079A3	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2079A4	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2088A2	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2088A3	NR	M62 J25 - J30	
10/09/15 18:49:45	SIG	M62/2088A4	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2097A2	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2097A3	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2097A4	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2106A2	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2106A3	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2106A4	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2114A1	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2114A2	NR	M62 J25 - J30	
10/09/15 18:49:55	SIG	M62/2114A3	NR	M62 J25 - J30	
10/09/15 18:50:45	SIG	M62/2073K1	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2079A1	BLNK	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2079A2	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2079A3	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2079A4	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2088A1	BLNK	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2088A2	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2088A3	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2088A4	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2097A1	BLNK	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2097A2	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2097A3	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2097A4	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2106A1	BLNK	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2106A2	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2106A4	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2114A1	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2114A2	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2114A3	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2117A1	BLNK	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2117A2	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2117A3	OFF	M62 J25 - J30	
10/09/15 18:50:55	SIG	M62/2117A4	OFF	M62 J25 - J30	
10/09/15 18:54:44	SIG	M62/2057B1	HSD	M62 J25 - J30	
10/09/15 18:56:43	SIG	M62/2041B1	HSD	M62 J25 - J30	
10/09/15 18:56:43	SIG	M621/1010B1	60R	M62 J25 - J30	
10/09/15 18:56:43	SIG	M621/1010B2	60R	M62 J25 - J30	
10/09/15 18:56:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
10/09/15 18:56:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
10/09/15 18:57:43	SIG	M62/2033B1	HSD	M62 J25 - J30	
10/09/15 18:58:18	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 18:58:18	SIG	M62/1999J2	50R	M62 J25 - J30	
10/09/15 18:58:44	SIG	M62/2025B1	HSD	M62 J25 - J30	
10/09/15 18:58:44	SIG	M62/2041B1	REDX	M62 J25 - J30	
10/09/15 18:58:51	SIG	M606/2003B1	NR	M62 J25 - J30	
10/09/15 18:58:51	SIG	M606/2003B2	NR	M62 J25 - J30	
10/09/15 18:59:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
10/09/15 19:00:20	SIG	M62/2025B1	REDX	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2050B2	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2050B3	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2050B4	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2057B2	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2057B3	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2057B4	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2065B2	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2065B3	NR	M62 J25 - J30	
10/09/15 19:00:50	SIG	M62/2065B4	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2018B1	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2018B2	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2018B3	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2018L1	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2025B2	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2025B3	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2025B4	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2033B2	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2033B3	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2033B4	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2041B2	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2041B3	NR	M62 J25 - J30	
10/09/15 19:00:51	SIG	M62/2041B4	NR	M62 J25 - J30	
10/09/15 19:01:50	SIG	M62/2069M1	OFF	M62 J25 - J30	
10/09/15 19:01:50	SIG	M62/2069M2	OFF	M62 J25 - J30	
10/09/15 19:01:50	SIG	M621/1010B1	OFF	M62 J25 - J30	
10/09/15 19:01:50	SIG	M621/1010B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2012B1	BLNK	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2012B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2012B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2012B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2018B1	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2018B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2018B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2018L1	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2025B1	BLNK	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2025B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2025B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2025B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2033B1	BLNK	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2033B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2033B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2041B1	BLNK	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2041B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2041B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2041B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2041B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2050B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2050B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2050B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2057B1	BLNK	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2057B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2057B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2057B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2065B1	BLNK	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2065B2	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2065B3	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2065B4	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M62/2065M1	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M621/1002B1	OFF	M62 J25 - J30	
10/09/15 19:01:51	SIG	M621/1002B2	OFF	M62 J25 - J30	
10/09/15 19:03:24	SIG	M62/2025A1	HSD	M62 J25 - J30	
10/09/15 19:04:24	SIG	M62/2033A1	HSD	M62 J25 - J30	
10/09/15 19:05:24	SIG	M62/2041A1	HSD	M62 J25 - J30	
10/09/15 19:05:25	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 19:05:25	SIG	M62/2025A1	REDX	M62 J25 - J30	
10/09/15 19:06:31	SIG	M62/2050A1	HSD	M62 J25 - J30	
10/09/15 19:06:32	SIG	M62/2033A1	REDX	M62 J25 - J30	
10/09/15 19:07:16	SIG	M606/2003B1	OFF	M62 J25 - J30	
10/09/15 19:07:16	SIG	M606/2003B2	OFF	M62 J25 - J30	
10/09/15 19:07:24	SIG	M62/2041A1	REDX	M62 J25 - J30	
10/09/15 19:07:32	SIG	M62/1999J1	OFF	M62 J25 - J30	
10/09/15 19:07:32	SIG	M62/1999J2	OFF	M62 J25 - J30	
10/09/15 19:08:23	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2025A2	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2025A3	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2025A4	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2033A2	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2033A3	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2033A4	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2041A2	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2041A3	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2041A4	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2050A2	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2050A3	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2050A4	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 19:09:24	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2008K1	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2008K2	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2012A1	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2012A2	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2012A3	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2018A1	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2018A2	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2018A3	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2018A4	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2025A1	BLNK	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2025A2	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2025A3	OFF	M62 J25 - J30	
10/09/15 19:10:24	SIG	M62/2025A4	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2033A1	BLNK	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2033A2	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2033A3	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2033A4	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2041A1	BLNK	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2041A2	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2041A3	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2041A4	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2050A1	BLNK	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2050A2	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2050A3	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2050A4	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2057A1	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2057A2	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2057A3	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2057J1	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2065A1	BLNK	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2065A2	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2065A3	OFF	M62 J25 - J30	
10/09/15 19:10:25	SIG	M62/2065A4	OFF	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2079A1	REDX	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2079A2	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2079A3	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2079A4	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2088A1	REDX	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2088A2	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2088A3	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2088A4	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2097A1	REDX	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2097A2	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2097A3	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2097A4	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2106A1	REDX	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2106A2	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2106A3	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2106A4	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2114A1	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2114A2	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2114A3	50R	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2117A1	REDX	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2117A2	NR	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2117A3	NR	M62 J25 - J30	
10/09/15 19:15:27	SIG	M62/2117A4	NR	M62 J25 - J30	
10/09/15 19:17:46	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 19:17:46	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 19:17:47	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 19:17:47	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2106A2	NR	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2106A3	NR	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2106A4	NR	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2114A1	OFF	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2114A2	OFF	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2114A3	OFF	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2117A1	BLNK	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2117A2	OFF	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2117A3	OFF	M62 J25 - J30	
10/09/15 19:21:21	SIG	M62/2117A4	OFF	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2079A1	BLNK	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2079A2	OFF	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2079A3	OFF	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2079A4	OFF	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2088A2	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2088A3	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2088A4	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2097A2	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2097A3	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2097A4	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2106A2	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2106A3	NR	M62 J25 - J30	
10/09/15 19:36:37	SIG	M62/2106A4	NR	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2088A2	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2088A3	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2088A4	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2097A2	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2097A3	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2097A4	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2106A2	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2106A3	OFF	M62 J25 - J30	
10/09/15 19:39:37	SIG	M62/2106A4	OFF	M62 J25 - J30	
10/09/15 19:39:38	SIG	M62/2088A1	BLNK	M62 J25 - J30	
10/09/15 19:39:38	SIG	M62/2097A1	BLNK	M62 J25 - J30	
10/09/15 19:39:38	SIG	M62/2097A1	BLNK	M62 J25 - J30	
10/09/15 19:39:38	SIG	M62/2106A1	BLNK	M62 J25 - J30	
10/09/15 19:39:38	SIG	M62/2106A1	BLNK	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1999A1	NR	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1999A2	NR	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1999A3	NR	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 19:47:07	SIG	M62/1999J2	LDL	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2166K1	50R	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2166K2	50R	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2170K1	50R	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2170K2	50R	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2177A1	REDX	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2177A2	NR	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2177A3	NR	M62 J25 - J30	
10/09/15 19:49:00	SIG	M62/2177A4	NR	M62 J25 - J30	
10/09/15 19:57:30	SIG	M62/2166K1	40R	M62 J25 - J30	
10/09/15 19:57:30	SIG	M62/2166K2	40R	M62 J25 - J30	
10/09/15 19:57:30	SIG	M62/2170K1	40R	M62 J25 - J30	
10/09/15 19:57:30	SIG	M62/2170K2	40R	M62 J25 - J30	
10/09/15 19:57:35	SIG	M62/2170K1	30R	M62 J25 - J30	
10/09/15 19:57:40	SIG	M62/2166K1	40R	M62 J25 - J30	
10/09/15 19:57:40	SIG	M62/2166K2	40R	M62 J25 - J30	
10/09/15 19:57:40	SIG	M62/2170K1	20R	M62 J25 - J30	
10/09/15 19:57:40	SIG	M62/2170K2	40R	M62 J25 - J30	
10/09/15 19:57:46	SIG	M62/2170K1	STOP	M62 J25 - J30	
10/09/15 19:58:29	SIG	M62/2170K2	30R	M62 J25 - J30	
10/09/15 19:58:29	SIG	M62/2177A2	50R	M62 J25 - J30	
10/09/15 19:58:29	SIG	M62/2177A3	50R	M62 J25 - J30	
10/09/15 19:58:29	SIG	M62/2177A4	50R	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2041B1	REDX	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2050B2	50R	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2050B3	50R	M62 J25 - J30	
10/09/15 19:58:31	SIG	M62/2050B4	50R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2170A1	50R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2170A2	50R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2170K2	30R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2177A1	STOP	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2177A2	40R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2177A3	40R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2177A4	40R	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2183A1	REDX	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2183A2	NR	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2183A3	NR	M62 J25 - J30	
10/09/15 19:58:34	SIG	M62/2183A4	NR	M62 J25 - J30	
10/09/15 19:58:39	SIG	M62/2177A1	STOP	M62 J25 - J30	
10/09/15 19:59:59	SIG	M62/2097B1	REDX	M62 J25 - J30	
10/09/15 19:59:59	SIG	M62/2097B2	NR	M62 J25 - J30	
10/09/15 19:59:59	SIG	M62/2097B3	NR	M62 J25 - J30	
10/09/15 19:59:59	SIG	M62/2097B4	NR	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2117B1	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2117B3	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2120M1	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2120M2	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2125B1	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2125B2	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2125B3	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2125L1	NR	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2125L2	NR	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2132B1	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2132B2	50R	M62 J25 - J30	
10/09/15 20:01:03	SIG	M62/2132B3	50R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2132B1	40R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2132B2	40R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2132B3	40R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2137B1	50R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2137B2	50R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2137B3	50R	M62 J25 - J30	
10/09/15 20:01:23	SIG	M62/2137B4	50R	M62 J25 - J30	
10/09/15 20:01:28	SIG	M62/2137B1	40R	M62 J25 - J30	
10/09/15 20:01:28	SIG	M62/2137B2	40R	M62 J25 - J30	
10/09/15 20:01:28	SIG	M62/2137B3	40R	M62 J25 - J30	
10/09/15 20:01:28	SIG	M62/2137B4	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2132B1	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2132B2	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2132B3	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2137B1	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2137B2	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2137B3	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2137B4	40R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2147B1	60R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2147B2	60R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2147B3	60R	M62 J25 - J30	
10/09/15 20:01:34	SIG	M62/2147B4	60R	M62 J25 - J30	
10/09/15 20:02:06	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 20:02:06	SIG	M62/2113B2	50R	M62 J25 - J30	
10/09/15 20:02:06	SIG	M62/2113B3	50R	M62 J25 - J30	
10/09/15 20:02:06	SIG	M62/2113B4	50R	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1992A1	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1992A2	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1992A3	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1992J1	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1999A1	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1999A2	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1999A3	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1999J1	OFF	M62 J25 - J30	
10/09/15 20:09:34	SIG	M62/1999J2	OFF	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2159B1	60R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2159B2	60R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2159M1	60R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2159M2	60R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2170B1	60R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2170B2	60R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2170L1	50R	M62 J25 - J30	
10/09/15 20:10:04	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2166K1	50R	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2166K2	50R	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2170A1	OFF	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2170A2	OFF	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2170K1	NR	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2170K2	NR	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2177A1	REDX	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2177A2	NR	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2177A3	NR	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2177A4	NR	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2183A1	BLNK	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2183A2	OFF	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2183A3	OFF	M62 J25 - J30	
10/09/15 20:12:00	SIG	M62/2183A4	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2166K1	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2166K2	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2170K1	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2170K2	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2177A1	BLNK	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2177A2	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2177A3	OFF	M62 J25 - J30	
10/09/15 20:12:59	SIG	M62/2177A4	OFF	M62 J25 - J30	
10/09/15 20:14:12	SIG	M62/2199M1	50R	M62 J25 - J30	
10/09/15 20:14:12	SIG	M62/2199M2	50R	M62 J25 - J30	
10/09/15 20:14:17	SIG	M62/2199M1	40R	M62 J25 - J30	
10/09/15 20:14:17	SIG	M62/2199M2	40R	M62 J25 - J30	
10/09/15 20:14:22	SIG	M62/2199M1	30R	M62 J25 - J30	
10/09/15 20:14:22	SIG	M62/2199M2	30R	M62 J25 - J30	
10/09/15 20:14:28	SIG	M62/2199M1	20R	M62 J25 - J30	
10/09/15 20:14:28	SIG	M62/2199M2	20R	M62 J25 - J30	
10/09/15 20:14:33	SIG	M62/2199M1	TT	M62 J25 - J30	
10/09/15 20:14:33	SIG	M62/2199M2	TT	M62 J25 - J30	
10/09/15 20:14:47	SIG	M62/2113B2	40R	M62 J25 - J30	
10/09/15 20:14:47	SIG	M62/2113B3	40R	M62 J25 - J30	
10/09/15 20:14:47	SIG	M62/2113B4	40R	M62 J25 - J30	
10/09/15 20:14:47	SIG	M62/2120M1	40R	M62 J25 - J30	
10/09/15 20:14:47	SIG	M62/2120M2	40R	M62 J25 - J30	
10/09/15 20:14:47	SIG	M62/2125B1	LDR	M62 J25 - J30	
10/09/15 20:14:53	SIG	M62/2113B2	30R	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2113B1	STOP	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2113B2	20R	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2113B3	40R	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2113B4	40R	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2117B1	LDR	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2120M1	40R	M62 J25 - J30	
10/09/15 20:14:58	SIG	M62/2120M2	40R	M62 J25 - J30	
10/09/15 20:15:03	SIG	M62/2113B1	STOP	M62 J25 - J30	
10/09/15 20:15:03	SIG	M62/2113B2	STOP	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2132B1	50R	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2132B2	50R	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2132B3	50R	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2137B1	60R	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2137B2	60R	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2137B3	60R	M62 J25 - J30	
10/09/15 20:15:43	SIG	M62/2137B4	60R	M62 J25 - J30	
10/09/15 20:15:53	SIG	M62/2132B1	60R	M62 J25 - J30	
10/09/15 20:15:53	SIG	M62/2132B2	60R	M62 J25 - J30	
10/09/15 20:15:53	SIG	M62/2132B3	60R	M62 J25 - J30	
10/09/15 20:17:39	SIG	M62/2004B1	REDX	M62 J25 - J30	
10/09/15 20:17:39	SIG	M62/2004B2	NR	M62 J25 - J30	
10/09/15 20:17:39	SIG	M62/2004B3	NR	M62 J25 - J30	
10/09/15 20:17:39	SIG	M62/2004B4	NR	M62 J25 - J30	
10/09/15 20:19:04	SIG	M62/2125L1	60R	M62 J25 - J30	
10/09/15 20:19:04	SIG	M62/2125L2	60R	M62 J25 - J30	
10/09/15 20:20:29	SIG	M62/2199M1	OFF	M62 J25 - J30	
10/09/15 20:20:29	SIG	M62/2199M2	OFF	M62 J25 - J30	
10/09/15 20:25:04	SIG	M62/2106B1	REDX	M62 J25 - J30	
10/09/15 20:25:04	SIG	M62/2106B2	50R	M62 J25 - J30	
10/09/15 20:25:04	SIG	M62/2106B3	50R	M62 J25 - J30	
10/09/15 20:25:04	SIG	M62/2106B4	50R	M62 J25 - J30	
10/09/15 20:25:28	SIG	M62/2041B2	OFF	M62 J25 - J30	
10/09/15 20:25:28	SIG	M62/2041B3	OFF	M62 J25 - J30	
10/09/15 20:25:28	SIG	M62/2041B4	OFF	M62 J25 - J30	
10/09/15 20:25:28	SIG	M62/2050B2	OFF	M62 J25 - J30	
10/09/15 20:25:28	SIG	M62/2050B3	OFF	M62 J25 - J30	
10/09/15 20:25:28	SIG	M62/2050B4	OFF	M62 J25 - J30	
10/09/15 20:25:29	SIG	M62/2041B1	BLNK	M62 J25 - J30	
10/09/15 20:25:29	SIG	M62/2041B1	BLNK	M62 J25 - J30	
10/09/15 20:25:49	SIG	M62/2004B2	NR	M62 J25 - J30	
10/09/15 20:25:49	SIG	M62/2004B3	NR	M62 J25 - J30	
10/09/15 20:25:49	SIG	M62/2004B4	NR	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2137B1	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2137B2	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2137B3	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2137B4	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2147B1	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2147B2	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2147B3	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2147B4	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2159B1	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2159B2	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2159M1	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2159M2	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2170B1	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2170B2	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 20:28:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 20:28:49	SIG	M62/2004B2	OFF	M62 J25 - J30	
10/09/15 20:28:49	SIG	M62/2004B3	OFF	M62 J25 - J30	
10/09/15 20:28:49	SIG	M62/2004B4	OFF	M62 J25 - J30	
10/09/15 20:28:50	SIG	M62/2004B1	BLNK	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2113B1	REDX	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2113B2	50R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2113B3	50R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2113B4	50R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2117B1	50R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2120M1	50R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2120M2	50R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2125B1	60R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2125B2	60R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2125B3	60R	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2132B1	OFF	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2132B2	OFF	M62 J25 - J30	
10/09/15 20:29:18	SIG	M62/2132B3	OFF	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2170L1	LDR	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2170L2	50R	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2177B1	50R	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2177B2	50R	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2177L1	50R	M62 J25 - J30	
10/09/15 20:32:17	SIG	M62/2177L2	50R	M62 J25 - J30	
10/09/15 20:32:41	SIG	M62/2183B1	50R	M62 J25 - J30	
10/09/15 20:32:41	SIG	M62/2183B2	50R	M62 J25 - J30	
10/09/15 20:32:41	SIG	M62/2183L1	50R	M62 J25 - J30	
10/09/15 20:32:41	SIG	M62/2183L2	50R	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1992A1	50R	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1992A2	50R	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1992A3	50R	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1992J1	50R	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1999A1	NR	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1999A2	NR	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1999A3	NR	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1999J1	50R	M62 J25 - J30	
10/09/15 20:32:42	SIG	M62/1999J2	LDL	M62 J25 - J30	
10/09/15 20:34:59	SIG	M62/2183B2	???	M62 J25 - J30	
10/09/15 20:35:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1992A1	OFF	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1992A2	OFF	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1992A3	OFF	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1992J1	OFF	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1999A1	NR	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1999A2	NR	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1999A3	NR	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1999J1	OFF	M62 J25 - J30	
10/09/15 20:46:41	SIG	M62/1999J2	OFF	M62 J25 - J30	
10/09/15 20:49:41	SIG	M62/1999A1	OFF	M62 J25 - J30	
10/09/15 20:49:41	SIG	M62/1999A2	OFF	M62 J25 - J30	
10/09/15 20:49:41	SIG	M62/1999A3	OFF	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2025A2	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2033A1	REDX	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2041A1	REDX	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2065A1	REDX	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 20:51:16	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2008K1	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2008K2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2012A1	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2012A2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2012A3	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2018A1	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2018A2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2018A3	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2018A4	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2025A1	BLNK	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2025A2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2025A3	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2025A4	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2033A1	BLNK	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2033A2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2033A3	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2033A4	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2041A1	BLNK	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2041A2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2041A3	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2041A4	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2050A1	BLNK	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2050A2	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2050A3	OFF	M62 J25 - J30	
10/09/15 21:18:02	SIG	M62/2050A4	OFF	M62 J25 - J30	
10/09/15 21:18:31	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 21:18:31	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 21:18:31	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 21:18:36	SIG	M62/2041A2	40R	M62 J25 - J30	
10/09/15 21:18:36	SIG	M62/2041A3	40R	M62 J25 - J30	
10/09/15 21:18:36	SIG	M62/2041A4	40R	M62 J25 - J30	
10/09/15 21:18:41	SIG	M62/2041A2	30R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2008K1	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2008K2	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2012A1	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2012A2	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2012A3	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2018A1	HSD	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2018A2	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2018A3	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2018A4	60R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2025A1	REDX	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2025A2	LDR	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2025A3	50R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2025A4	50R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2033A1	REDX	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2033A2	LDR	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2033A3	50R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2033A4	50R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2041A1	STOP	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2041A2	20R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2041A3	40R	M62 J25 - J30	
10/09/15 21:18:47	SIG	M62/2041A4	40R	M62 J25 - J30	
10/09/15 21:18:52	SIG	M62/2041A1	STOP	M62 J25 - J30	
10/09/15 21:18:52	SIG	M62/2041A2	STOP	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2025A2	60R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2025A3	60R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2025A4	60R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2033A2	50R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2041A1	REDX	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2041A2	50R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2041A3	50R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2041A4	50R	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2057A1	OFF	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2057A2	OFF	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2057A3	OFF	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2065A1	BLNK	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2065A2	OFF	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2065A3	OFF	M62 J25 - J30	
10/09/15 21:46:48	SIG	M62/2065A4	OFF	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2065A1	REDX	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 21:49:06	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2170B1	NR	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2170B2	NR	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2170L1	OFF	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2170L2	OFF	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2177B1	OFF	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2177B2	OFF	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2177L1	OFF	M62 J25 - J30	
10/09/15 21:51:35	SIG	M62/2177L2	OFF	M62 J25 - J30	
10/09/15 21:52:06	SIG	M62/2183B1	OFF	M62 J25 - J30	
10/09/15 21:52:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
10/09/15 21:52:06	SIG	M62/2183L1	OFF	M62 J25 - J30	
10/09/15 21:52:06	SIG	M62/2183L2	OFF	M62 J25 - J30	
10/09/15 21:54:35	SIG	M62/2170B1	OFF	M62 J25 - J30	
10/09/15 21:54:35	SIG	M62/2170B2	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2097B2	NR	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2097B3	NR	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2097B4	NR	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2106B1	BLNK	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2106B2	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2106B3	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2106B4	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2113B1	BLNK	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2113B2	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2113B3	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2113B4	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2117B3	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2120M1	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2120M2	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2125B1	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2125B2	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2125B3	OFF	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2125L1	NR	M62 J25 - J30	
10/09/15 22:29:07	SIG	M62/2125L2	NR	M62 J25 - J30	
10/09/15 22:32:07	SIG	M62/2097B2	OFF	M62 J25 - J30	
10/09/15 22:32:07	SIG	M62/2097B3	OFF	M62 J25 - J30	
10/09/15 22:32:07	SIG	M62/2097B4	OFF	M62 J25 - J30	
10/09/15 22:32:07	SIG	M62/2125L1	OFF	M62 J25 - J30	
10/09/15 22:32:07	SIG	M62/2125L2	OFF	M62 J25 - J30	
10/09/15 22:32:08	SIG	M62/2097B1	BLNK	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2050A2	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2050A3	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2050A4	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2057A1	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2057A2	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2057A3	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2065A1	BLNK	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2065A2	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2065A3	OFF	M62 J25 - J30	
10/09/15 22:48:07	SIG	M62/2065A4	OFF	M62 J25 - J30	
10/09/15 22:51:07	SIG	M62/2057J1	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2008K1	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2008K2	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2012A1	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2012A2	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2012A3	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2018A1	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2018A2	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2018A3	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2018A4	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2025A1	BLNK	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2025A2	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2025A3	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2025A4	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2033A1	BLNK	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2033A2	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2033A3	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2033A4	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2041A1	BLNK	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2041A1	BLNK	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2041A2	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2041A3	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2041A4	OFF	M62 J25 - J30	
10/09/15 23:03:08	SIG	M62/2050A1	BLNK	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2050A1	REDX	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2050A2	50R	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2050A3	50R	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2050A4	50R	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2057A1	NR	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2057A2	NR	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2057A3	NR	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2057J1	NR	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2065A1	REDX	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2065A2	NR	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2065A3	NR	M62 J25 - J30	
10/09/15 23:10:45	SIG	M62/2065A4	NR	M62 J25 - J30	
10/09/15 23:13:09	SIG	M606/2003B1	LDR	M62 J25 - J30	
10/09/15 23:13:09	SIG	M606/2003B2	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/1992B1	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/1992B2	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/1992B3	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/1992B4	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2004B1	REDX	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2004B2	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2004B3	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2004B4	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2005M1	TI	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2005M2	TI	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2012B1	REDX	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2012B2	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2012B3	50R	M62 J25 - J30	
10/09/15 23:13:09	SIG	M62/2012B4	50R	M62 J25 - J30	
10/09/15 23:13:14	SIG	M62/1992B1	40R	M62 J25 - J30	
10/09/15 23:13:14	SIG	M62/1992B2	40R	M62 J25 - J30	
10/09/15 23:13:14	SIG	M62/1992B3	40R	M62 J25 - J30	
10/09/15 23:13:14	SIG	M62/1992B4	40R	M62 J25 - J30	
10/09/15 23:13:20	SIG	M62/1992B1	30R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1992B1	20R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1992B2	40R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1992B3	40R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1992B4	40R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1999B1	REDX	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1999B2	50R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1999B3	50R	M62 J25 - J30	
10/09/15 23:13:25	SIG	M62/1999B4	50R	M62 J25 - J30	
10/09/15 23:13:31	SIG	M62/1992B1	STOP	M62 J25 - J30	
10/09/15 23:25:31	SIG	M606/2003B2	40R	M62 J25 - J30	
10/09/15 23:35:22	SIG	M62/1999B2	40R	M62 J25 - J30	
10/09/15 23:35:22	SIG	M62/1999B3	40R	M62 J25 - J30	
10/09/15 23:35:22	SIG	M62/1999B4	40R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M606/2003B2	50R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M62/1999B2	50R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M62/1999B3	50R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M62/1999B4	50R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M62/2004B2	60R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M62/2004B3	60R	M62 J25 - J30	
10/09/15 23:39:23	SIG	M62/2004B4	60R	M62 J25 - J30	
10/09/15 23:40:06	SIG	M62/2004B2	50R	M62 J25 - J30	
10/09/15 23:40:06	SIG	M62/2004B3	50R	M62 J25 - J30	
10/09/15 23:40:06	SIG	M62/2004B4	50R	M62 J25 - J30	
10/09/15 23:49:44	SIG	M62/2041B2	50R	M62 J25 - J30	
10/09/15 23:49:44	SIG	M62/2041B3	50R	M62 J25 - J30	
10/09/15 23:49:44	SIG	M62/2041B4	50R	M62 J25 - J30	
10/09/15 23:49:50	SIG	M62/2041B1	STOP	M62 J25 - J30	
10/09/15 23:49:50	SIG	M62/2041B2	40R	M62 J25 - J30	
10/09/15 23:49:50	SIG	M62/2041B3	40R	M62 J25 - J30	
10/09/15 23:49:50	SIG	M62/2041B4	40R	M62 J25 - J30	
10/09/15 23:49:55	SIG	M62/2041B1	STOP	M62 J25 - J30	
11/09/15 00:04:17	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 00:04:17	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 00:04:17	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 00:04:17	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 00:13:50	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1992B1	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1992B2	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1992B3	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1992B4	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1999B1	BLNK	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1999B2	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1999B3	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/1999B4	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2004B2	NR	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2004B3	NR	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2004B4	NR	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2005M1	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2005M2	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2012B1	BLNK	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2012B2	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2012B3	OFF	M62 J25 - J30	
11/09/15 00:13:50	SIG	M62/2012B4	OFF	M62 J25 - J30	
11/09/15 00:14:06	SIG	M62/1981B1	OFF	M62 J25 - J30	
11/09/15 00:14:06	SIG	M62/1981B2	OFF	M62 J25 - J30	
11/09/15 00:14:06	SIG	M62/1981B3	OFF	M62 J25 - J30	
11/09/15 00:14:06	SIG	M62/1981B4	OFF	M62 J25 - J30	
11/09/15 00:16:50	SIG	M62/2004B2	OFF	M62 J25 - J30	
11/09/15 00:16:50	SIG	M62/2004B3	OFF	M62 J25 - J30	
11/09/15 00:16:50	SIG	M62/2004B4	OFF	M62 J25 - J30	
11/09/15 00:16:51	SIG	M62/2004B1	BLNK	M62 J25 - J30	
11/09/15 00:36:25	SIG	M62/2041B1	BLNK	M62 J25 - J30	
11/09/15 00:36:25	SIG	M62/2041B2	OFF	M62 J25 - J30	
11/09/15 00:36:25	SIG	M62/2041B3	OFF	M62 J25 - J30	
11/09/15 00:36:25	SIG	M62/2041B4	OFF	M62 J25 - J30	
11/09/15 01:14:18	SIG	M62/2199M1	50R	M62 J25 - J30	
11/09/15 01:14:18	SIG	M62/2199M2	50R	M62 J25 - J30	
11/09/15 01:14:23	SIG	M62/2199M1	40R	M62 J25 - J30	
11/09/15 01:14:23	SIG	M62/2199M2	40R	M62 J25 - J30	
11/09/15 01:14:28	SIG	M62/2199M1	30R	M62 J25 - J30	
11/09/15 01:14:28	SIG	M62/2199M2	30R	M62 J25 - J30	
11/09/15 01:14:33	SIG	M62/2199M1	20R	M62 J25 - J30	
11/09/15 01:14:33	SIG	M62/2199M2	20R	M62 J25 - J30	
11/09/15 01:14:39	SIG	M62/2199M1	TT	M62 J25 - J30	
11/09/15 01:14:39	SIG	M62/2199M2	TT	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2050A1	BLNK	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2050A2	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2050A3	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2050A4	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2057A1	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2057A2	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2057A3	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2057J1	NR	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 01:15:00	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 01:15:01	SIG	M62/2050A1	BLNK	M62 J25 - J30	
11/09/15 01:18:00	SIG	M62/2057J1	OFF	M62 J25 - J30	
11/09/15 01:22:04	SIG	M62/2199M1	OFF	M62 J25 - J30	
11/09/15 01:22:04	SIG	M62/2199M2	OFF	M62 J25 - J30	
11/09/15 01:40:56	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 01:40:56	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 01:40:56	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 01:41:01	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 01:41:01	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 01:41:01	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 01:41:07	SIG	M62/2041A2	30R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2025A2	LDR	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2033A1	REDX	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2033A2	LDR	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2041A1	STOP	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2041A2	20R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 01:41:12	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 01:41:17	SIG	M62/2041A1	STOP	M62 J25 - J30	
11/09/15 01:41:17	SIG	M62/2041A2	STOP	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2008K1	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2008K2	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2012A1	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2012A2	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2012A3	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2018A1	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2018A2	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2018A3	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2018A4	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2025A1	BLNK	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2025A2	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2025A3	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2025A4	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2033A1	BLNK	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2033A2	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2033A3	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2033A4	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2041A1	BLNK	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2041A2	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2041A3	OFF	M62 J25 - J30	
11/09/15 02:24:13	SIG	M62/2041A4	OFF	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2033A1	REDX	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2041A1	REDX	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 02:25:53	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2033A2	OFF	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2033A3	OFF	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2033A4	OFF	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2041A1	BLNK	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2041A1	BLNK	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2041A2	OFF	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2041A3	OFF	M62 J25 - J30	
11/09/15 02:36:09	SIG	M62/2041A4	OFF	M62 J25 - J30	
11/09/15 02:36:28	SIG	M62/2033A2	NR	M62 J25 - J30	
11/09/15 02:36:28	SIG	M62/2033A3	NR	M62 J25 - J30	
11/09/15 02:36:28	SIG	M62/2033A4	NR	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2008K1	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2008K2	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2012A1	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2012A2	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2012A3	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2018A1	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2018A2	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2018A3	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2018A4	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2025A1	BLNK	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2025A2	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2025A3	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2025A4	OFF	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2033A2	NR	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2033A3	NR	M62 J25 - J30	
11/09/15 02:36:59	SIG	M62/2033A4	NR	M62 J25 - J30	
11/09/15 02:40:00	SIG	M62/2033A1	BLNK	M62 J25 - J30	
11/09/15 02:40:00	SIG	M62/2033A2	OFF	M62 J25 - J30	
11/09/15 02:40:00	SIG	M62/2033A3	OFF	M62 J25 - J30	
11/09/15 02:40:00	SIG	M62/2033A4	OFF	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2170B1	NR	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2170B2	NR	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2170L1	LDR	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2177B1	50R	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2177B2	50R	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2177L1	50R	M62 J25 - J30	
11/09/15 02:45:55	SIG	M62/2177L2	50R	M62 J25 - J30	
11/09/15 02:46:08	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 02:46:08	SIG	M62/2065A2	50R	M62 J25 - J30	
11/09/15 02:46:08	SIG	M62/2065A3	50R	M62 J25 - J30	
11/09/15 02:46:08	SIG	M62/2065A4	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2073K1	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2079A2	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2079A3	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2079A4	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2088A1	REDX	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2088A2	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2088A3	50R	M62 J25 - J30	
11/09/15 02:46:25	SIG	M62/2088A4	50R	M62 J25 - J30	
11/09/15 02:48:39	SIG	M62/2106A1	REDX	M62 J25 - J30	
11/09/15 02:48:39	SIG	M62/2106A2	NR	M62 J25 - J30	
11/09/15 02:48:39	SIG	M62/2106A3	NR	M62 J25 - J30	
11/09/15 02:48:39	SIG	M62/2106A4	NR	M62 J25 - J30	
11/09/15 02:53:06	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 02:53:06	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 02:53:06	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 02:53:06	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2073K1	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2079A1	BLNK	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2079A2	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2079A3	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2079A4	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2088A2	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2088A3	OFF	M62 J25 - J30	
11/09/15 02:53:25	SIG	M62/2088A4	OFF	M62 J25 - J30	
11/09/15 02:54:10	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 02:54:10	SIG	M62/2065A2	60R	M62 J25 - J30	
11/09/15 02:54:10	SIG	M62/2065A3	60R	M62 J25 - J30	
11/09/15 02:54:10	SIG	M62/2065A4	60R	M62 J25 - J30	
11/09/15 02:54:25	SIG	M62/2088A2	50R	M62 J25 - J30	
11/09/15 02:54:25	SIG	M62/2088A3	50R	M62 J25 - J30	
11/09/15 02:54:25	SIG	M62/2088A4	50R	M62 J25 - J30	
11/09/15 02:54:30	SIG	M62/2088A2	40R	M62 J25 - J30	
11/09/15 02:54:30	SIG	M62/2088A3	40R	M62 J25 - J30	
11/09/15 02:54:30	SIG	M62/2088A4	40R	M62 J25 - J30	
11/09/15 02:54:35	SIG	M62/2088A2	30R	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2073K1	50R	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2079A2	LDR	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2079A3	50R	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2079A4	50R	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2088A1	STOP	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2088A2	20R	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2088A3	40R	M62 J25 - J30	
11/09/15 02:54:40	SIG	M62/2088A4	40R	M62 J25 - J30	
11/09/15 02:54:56	SIG	M62/2088A1	STOP	M62 J25 - J30	
11/09/15 02:54:56	SIG	M62/2088A2	STOP	M62 J25 - J30	
11/09/15 03:17:13	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 03:17:13	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 03:17:13	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 03:17:13	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2073K1	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2079A1	BLNK	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2079A2	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2079A3	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2079A4	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2088A2	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2088A3	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2088A4	OFF	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2106A2	NR	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2106A3	NR	M62 J25 - J30	
11/09/15 03:17:31	SIG	M62/2106A4	NR	M62 J25 - J30	
11/09/15 03:17:41	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 03:20:41	SIG	M62/2106A2	OFF	M62 J25 - J30	
11/09/15 03:20:41	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 03:20:41	SIG	M62/2106A4	OFF	M62 J25 - J30	
11/09/15 03:20:42	SIG	M62/2106A1	BLNK	M62 J25 - J30	
11/09/15 03:20:42	SIG	M62/2106A1	BLNK	M62 J25 - J30	
11/09/15 03:25:11	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 03:25:11	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 03:25:11	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 03:25:11	SIG	M62/2120M1	50R	M62 J25 - J30	
11/09/15 03:25:11	SIG	M62/2120M2	50R	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2125B1	LDR	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2125B2	50R	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2125B3	50R	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2125L1	NR	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2125L2	NR	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2132B1	60R	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2132B2	60R	M62 J25 - J30	
11/09/15 03:25:12	SIG	M62/2132B3	60R	M62 J25 - J30	
11/09/15 03:25:17	SIG	M62/2113B2	40R	M62 J25 - J30	
11/09/15 03:25:17	SIG	M62/2113B3	40R	M62 J25 - J30	
11/09/15 03:25:17	SIG	M62/2113B4	40R	M62 J25 - J30	
11/09/15 03:25:17	SIG	M62/2120M1	40R	M62 J25 - J30	
11/09/15 03:25:17	SIG	M62/2120M2	40R	M62 J25 - J30	
11/09/15 03:25:22	SIG	M62/2113B2	30R	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2113B1	STOP	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2113B2	20R	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2113B3	40R	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2113B4	40R	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2117B1	LDR	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2117B3	50R	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2120M1	40R	M62 J25 - J30	
11/09/15 03:25:27	SIG	M62/2120M2	40R	M62 J25 - J30	
11/09/15 03:25:33	SIG	M62/2113B1	STOP	M62 J25 - J30	
11/09/15 03:25:33	SIG	M62/2113B2	STOP	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2170B1	NR	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2170B2	NR	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2170L1	OFF	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2170L2	OFF	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2177B1	OFF	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2177B2	OFF	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2177L1	OFF	M62 J25 - J30	
11/09/15 03:27:19	SIG	M62/2177L2	OFF	M62 J25 - J30	
11/09/15 03:30:20	SIG	M62/2170B1	OFF	M62 J25 - J30	
11/09/15 03:30:20	SIG	M62/2170B2	OFF	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2113B1	REDX	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2117B1	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2120M1	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2120M2	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2125B1	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2132B1	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2132B2	50R	M62 J25 - J30	
11/09/15 03:39:39	SIG	M62/2132B3	50R	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2113B1	BLNK	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2113B2	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2113B3	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2113B4	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2117B3	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2120M1	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2120M2	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2125B1	NR	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2125B2	NR	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2125B3	NR	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2125L1	NR	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2125L2	NR	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2132B1	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2132B2	OFF	M62 J25 - J30	
11/09/15 03:47:16	SIG	M62/2132B3	OFF	M62 J25 - J30	
11/09/15 03:50:16	SIG	M62/2125B1	OFF	M62 J25 - J30	
11/09/15 03:50:17	SIG	M62/2125B2	OFF	M62 J25 - J30	
11/09/15 03:50:17	SIG	M62/2125B3	OFF	M62 J25 - J30	
11/09/15 03:50:17	SIG	M62/2125L1	OFF	M62 J25 - J30	
11/09/15 03:50:17	SIG	M62/2125L2	OFF	M62 J25 - J30	
11/09/15 03:51:35	SIG	M606/2003B1	LDR	M62 J25 - J30	
11/09/15 03:51:35	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/1992B1	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2004B1	REDX	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2004B2	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2004B3	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2004B4	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2005M1	TI	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2005M2	TI	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2012B1	REDX	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2012B2	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2012B3	50R	M62 J25 - J30	
11/09/15 03:51:35	SIG	M62/2012B4	50R	M62 J25 - J30	
11/09/15 03:51:41	SIG	M62/1992B1	40R	M62 J25 - J30	
11/09/15 03:51:41	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 03:51:41	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 03:51:41	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 03:51:46	SIG	M62/1992B1	30R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1992B1	20R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1999B1	REDX	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 03:51:51	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 03:51:56	SIG	M62/1992B1	STOP	M62 J25 - J30	
11/09/15 03:52:31	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 03:52:31	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 03:52:31	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 03:52:31	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 04:38:49	SIG	M606/2003B2	40R	M62 J25 - J30	
11/09/15 04:43:05	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 04:44:23	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1981B1	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1981B2	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1981B3	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1981B4	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1992B1	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1992B2	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1992B3	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1992B4	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1999B1	BLNK	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1999B2	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1999B3	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/1999B4	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2004B2	NR	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2004B3	NR	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2004B4	NR	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2005M1	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2005M2	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2012B1	BLNK	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2012B2	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2012B3	OFF	M62 J25 - J30	
11/09/15 04:44:23	SIG	M62/2012B4	OFF	M62 J25 - J30	
11/09/15 04:44:24	SIG	M62/1999B1	BLNK	M62 J25 - J30	
11/09/15 04:47:23	SIG	M62/2004B2	OFF	M62 J25 - J30	
11/09/15 04:47:23	SIG	M62/2004B3	OFF	M62 J25 - J30	
11/09/15 04:47:23	SIG	M62/2004B4	OFF	M62 J25 - J30	
11/09/15 04:47:24	SIG	M62/2004B1	BLNK	M62 J25 - J30	
11/09/15 04:54:18	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 04:54:18	SIG	M62/2065A2	60R	M62 J25 - J30	
11/09/15 04:54:18	SIG	M62/2065A3	60R	M62 J25 - J30	
11/09/15 04:54:18	SIG	M62/2065A4	60R	M62 J25 - J30	
11/09/15 04:54:28	SIG	M62/2088A2	50R	M62 J25 - J30	
11/09/15 04:54:28	SIG	M62/2088A3	50R	M62 J25 - J30	
11/09/15 04:54:28	SIG	M62/2088A4	50R	M62 J25 - J30	
11/09/15 04:54:34	SIG	M62/2088A2	40R	M62 J25 - J30	
11/09/15 04:54:34	SIG	M62/2088A3	40R	M62 J25 - J30	
11/09/15 04:54:34	SIG	M62/2088A4	40R	M62 J25 - J30	
11/09/15 04:54:39	SIG	M62/2088A2	30R	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2073K1	50R	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2079A2	LDR	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2079A3	50R	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2079A4	50R	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2088A1	STOP	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2088A2	20R	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2088A3	40R	M62 J25 - J30	
11/09/15 04:54:44	SIG	M62/2088A4	40R	M62 J25 - J30	
11/09/15 04:55:00	SIG	M62/2088A1	STOP	M62 J25 - J30	
11/09/15 04:55:00	SIG	M62/2088A2	STOP	M62 J25 - J30	
11/09/15 05:17:21	SIG	M62/2073K1	60R	M62 J25 - J30	
11/09/15 05:17:21	SIG	M62/2079A2	50R	M62 J25 - J30	
11/09/15 05:17:21	SIG	M62/2088A1	REDX	M62 J25 - J30	
11/09/15 05:17:21	SIG	M62/2088A2	50R	M62 J25 - J30	
11/09/15 05:17:21	SIG	M62/2088A3	50R	M62 J25 - J30	
11/09/15 05:17:21	SIG	M62/2088A4	50R	M62 J25 - J30	
11/09/15 05:18:14	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 05:18:14	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 05:18:14	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 05:18:14	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2073K1	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2079A1	BLNK	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2079A2	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2079A3	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2079A4	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2088A2	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2088A3	OFF	M62 J25 - J30	
11/09/15 05:18:28	SIG	M62/2088A4	OFF	M62 J25 - J30	
11/09/15 05:18:38	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 05:19:35	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 05:19:35	SIG	M62/2065A2	50R	M62 J25 - J30	
11/09/15 05:19:35	SIG	M62/2065A3	50R	M62 J25 - J30	
11/09/15 05:19:35	SIG	M62/2065A4	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2073K1	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2079A2	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2079A3	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2079A4	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2088A1	REDX	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2088A2	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2088A3	50R	M62 J25 - J30	
11/09/15 05:19:45	SIG	M62/2088A4	50R	M62 J25 - J30	
11/09/15 05:20:26	SIG	M62/2106A1	REDX	M62 J25 - J30	
11/09/15 05:20:26	SIG	M62/2106A2	NR	M62 J25 - J30	
11/09/15 05:20:26	SIG	M62/2106A3	NR	M62 J25 - J30	
11/09/15 05:20:26	SIG	M62/2106A4	NR	M62 J25 - J30	
11/09/15 05:29:33	SIG	M62/2065A2	60R	M62 J25 - J30	
11/09/15 05:29:33	SIG	M62/2065A3	60R	M62 J25 - J30	
11/09/15 05:29:33	SIG	M62/2065A4	60R	M62 J25 - J30	
11/09/15 05:29:43	SIG	M62/2073K1	60R	M62 J25 - J30	
11/09/15 05:30:29	SIG	M62/2097A1	REDX	M62 J25 - J30	
11/09/15 05:30:29	SIG	M62/2097A2	NR	M62 J25 - J30	
11/09/15 05:30:29	SIG	M62/2097A3	NR	M62 J25 - J30	
11/09/15 05:30:29	SIG	M62/2097A4	NR	M62 J25 - J30	
11/09/15 05:30:48	SIG	M62/2106A1	BLNK	M62 J25 - J30	
11/09/15 05:30:48	SIG	M62/2106A2	OFF	M62 J25 - J30	
11/09/15 05:30:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 05:30:48	SIG	M62/2106A4	OFF	M62 J25 - J30	
11/09/15 05:36:14	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 05:36:14	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 05:36:14	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 05:36:14	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2073K1	OFF	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2079A1	BLNK	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2079A2	OFF	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2079A3	OFF	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2079A4	OFF	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2088A2	NR	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2088A3	NR	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2088A4	NR	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2097A2	NR	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2097A3	NR	M62 J25 - J30	
11/09/15 05:36:27	SIG	M62/2097A4	NR	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2088A2	OFF	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2088A3	OFF	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2088A4	OFF	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2097A1	BLNK	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2097A1	BLNK	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2097A2	OFF	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2097A3	OFF	M62 J25 - J30	
11/09/15 05:39:38	SIG	M62/2097A4	OFF	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2033A1	REDX	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2041A1	REDX	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2050A1	REDX	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2050A2	NR	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2050A3	NR	M62 J25 - J30	
11/09/15 06:43:16	SIG	M62/2050A4	NR	M62 J25 - J30	
11/09/15 06:43:37	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 06:43:37	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 06:43:37	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 06:43:42	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 06:43:42	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 06:43:42	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 06:43:42	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 06:43:42	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 06:43:42	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 06:44:16	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 06:44:16	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 06:44:16	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 06:45:14	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 06:45:14	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 06:45:14	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 06:45:14	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 06:45:14	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 06:45:14	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 06:46:19	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 06:46:19	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 06:47:36	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 06:47:37	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 06:47:37	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 06:47:37	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 06:49:16	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 06:49:16	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 06:49:16	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 06:49:16	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 06:49:16	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 06:50:21	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 06:50:21	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 06:50:21	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2050A2	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2050A3	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2050A4	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057A1	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057A1	NR	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057A2	NR	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057A2	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057A3	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057A3	NR	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057J1	60R	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2057J1	NR	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2065A2	NR	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2065A3	NR	M62 J25 - J30	
11/09/15 06:51:14	SIG	M62/2065A4	NR	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 06:51:42	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 06:51:47	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 06:52:13	SIG	M62/2050A1	60R	M62 J25 - J30	
11/09/15 06:52:32	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 06:52:52	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 06:52:57	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 06:52:57	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 06:53:02	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 06:53:02	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 06:53:07	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 06:53:07	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 06:53:08	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 06:55:43	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 06:55:43	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 06:55:43	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 06:55:43	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 06:56:08	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 06:56:08	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 06:56:25	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 06:56:25	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 06:56:25	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 06:56:26	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 06:56:31	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 06:56:31	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 06:56:56	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 07:00:26	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 07:00:26	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 07:01:28	SIG	M62/2065M1	NR	M62 J25 - J30	
11/09/15 07:01:28	SIG	M62/2069M1	60R	M62 J25 - J30	
11/09/15 07:01:28	SIG	M62/2069M2	60R	M62 J25 - J30	
11/09/15 07:01:28	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 07:01:28	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2012B1	REDX	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2012B2	NR	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2012B3	NR	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2012B4	NR	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B1	REDX	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2033B1	REDX	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2041B1	REDX	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2041B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2041B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2041B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2050B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2050B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2050B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2057B1	REDX	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2057B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2057B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2057B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2065B1	REDX	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 07:01:29	SIG	M621/1002B1	HSD	M62 J25 - J30	
11/09/15 07:01:29	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 07:02:16	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 07:02:16	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 07:02:16	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 07:02:16	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 07:03:26	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 07:03:26	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 07:04:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 07:04:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 07:04:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 07:04:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 07:06:51	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 07:07:30	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 07:09:55	SIG	M62/2041B1	60R	M62 J25 - J30	
11/09/15 07:10:13	SIG	M62/2057B1	60R	M62 J25 - J30	
11/09/15 07:10:13	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 07:10:13	SIG	M621/1010B1	OFF	M62 J25 - J30	
11/09/15 07:10:13	SIG	M621/1010B2	OFF	M62 J25 - J30	
11/09/15 07:21:42	SIG	M62/2065A2	60R	M62 J25 - J30	
11/09/15 07:21:42	SIG	M62/2065A3	60R	M62 J25 - J30	
11/09/15 07:21:42	SIG	M62/2065A4	60R	M62 J25 - J30	
11/09/15 07:21:52	SIG	M62/2073K1	60R	M62 J25 - J30	
11/09/15 07:21:52	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 07:21:52	SIG	M62/2079A2	NR	M62 J25 - J30	
11/09/15 07:21:52	SIG	M62/2079A3	NR	M62 J25 - J30	
11/09/15 07:21:52	SIG	M62/2079A4	NR	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2079A2	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2079A3	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2079A4	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2088A1	REDX	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2088A2	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2088A3	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2088A4	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2097A1	REDX	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2097A2	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2097A3	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2097A4	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2106A1	REDX	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2106A2	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2106A3	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2106A4	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2114A1	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2114A2	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2114A3	60R	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2117A1	REDX	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2117A2	NR	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2117A3	NR	M62 J25 - J30	
11/09/15 07:22:02	SIG	M62/2117A4	NR	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2159B1	NR	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2159B2	NR	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2170B1	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2170B2	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2177B1	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2177B2	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2177L1	50R	M62 J25 - J30	
11/09/15 07:22:37	SIG	M62/2177L2	50R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2170B1	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2170B2	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2177B1	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2177B2	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2177L1	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2177L2	40R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2183B1	50R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2183L1	50R	M62 J25 - J30	
11/09/15 07:22:42	SIG	M62/2183L2	50R	M62 J25 - J30	
11/09/15 07:23:16	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 07:23:16	SIG	M62/1992A2	OFF	M62 J25 - J30	
11/09/15 07:23:16	SIG	M62/1992A3	OFF	M62 J25 - J30	
11/09/15 07:23:16	SIG	M62/1992J1	OFF	M62 J25 - J30	
11/09/15 07:23:19	SIG	M62/2106A1	60R	M62 J25 - J30	
11/09/15 07:23:49	SIG	M62/2097A1	60R	M62 J25 - J30	
11/09/15 07:24:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:24:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:24:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:24:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 07:24:16	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 07:24:23	SIG	M62/2088A1	60R	M62 J25 - J30	
11/09/15 07:24:33	SIG	M62/2079A1	60R	M62 J25 - J30	
11/09/15 07:25:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:25:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:25:16	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 07:25:16	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 07:25:16	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 07:25:16	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 07:25:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:25:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:26:16	SIG	M62/2050A1	50R	M62 J25 - J30	
11/09/15 07:26:16	SIG	M62/2050A2	50R	M62 J25 - J30	
11/09/15 07:26:16	SIG	M62/2050A3	50R	M62 J25 - J30	
11/09/15 07:26:16	SIG	M62/2050A4	50R	M62 J25 - J30	
11/09/15 07:26:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:26:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:26:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2189B1	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2189B2	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2189B3	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2189B4	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2194B1	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2194B2	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2194B3	60R	M62 J25 - J30	
11/09/15 07:27:16	SIG	M62/2194B4	60R	M62 J25 - J30	
11/09/15 07:29:16	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 07:29:16	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 07:29:16	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 07:29:16	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 07:29:16	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 07:29:16	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 07:29:16	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 07:31:16	SIG	M62/2197B1	60R	M62 J25 - J30	
11/09/15 07:31:16	SIG	M62/2197B2	60R	M62 J25 - J30	
11/09/15 07:31:16	SIG	M62/2197B3	60R	M62 J25 - J30	
11/09/15 07:31:16	SIG	M62/2199M1	60R	M62 J25 - J30	
11/09/15 07:31:16	SIG	M62/2199M2	60R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 07:33:29	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 07:34:06	SIG	M62/2183B1	40R	M62 J25 - J30	
11/09/15 07:34:06	SIG	M62/2183L1	40R	M62 J25 - J30	
11/09/15 07:34:06	SIG	M62/2183L2	40R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2183B1	40R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2183L1	40R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2183L2	40R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2189B1	50R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2189B2	50R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2189B3	50R	M62 J25 - J30	
11/09/15 07:34:11	SIG	M62/2189B4	50R	M62 J25 - J30	
11/09/15 07:35:04	SIG	M62/2170B1	60R	M62 J25 - J30	
11/09/15 07:35:04	SIG	M62/2170B2	60R	M62 J25 - J30	
11/09/15 07:35:04	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 07:35:04	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 07:36:14	SIG	M62/2170B1	50R	M62 J25 - J30	
11/09/15 07:36:14	SIG	M62/2170B2	50R	M62 J25 - J30	
11/09/15 07:36:14	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 07:36:14	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2050A1	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2050A2	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2050A3	60R	M62 J25 - J30	
11/09/15 07:36:17	SIG	M62/2050A4	60R	M62 J25 - J30	
11/09/15 07:36:19	SIG	M62/2170B1	40R	M62 J25 - J30	
11/09/15 07:36:19	SIG	M62/2170B2	40R	M62 J25 - J30	
11/09/15 07:36:19	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 07:36:19	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 07:36:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:36:37	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:36:42	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 07:37:00	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 07:37:00	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 07:37:00	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 07:37:00	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 07:37:29	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 07:37:29	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 07:37:29	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 07:37:29	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 07:38:17	SIG	M62/2203B1	60R	M62 J25 - J30	
11/09/15 07:38:17	SIG	M62/2203B2	60R	M62 J25 - J30	
11/09/15 07:38:17	SIG	M62/2203B3	60R	M62 J25 - J30	
11/09/15 07:38:22	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 07:38:22	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 07:38:22	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 07:38:22	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2189B1	40R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2189B2	40R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2189B3	40R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2189B4	40R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2194B1	50R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2194B2	50R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2194B3	50R	M62 J25 - J30	
11/09/15 07:39:00	SIG	M62/2194B4	50R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 07:39:12	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 07:39:22	SIG	M62/2113B1	REDX	M62 J25 - J30	
11/09/15 07:39:22	SIG	M62/2113B2	NR	M62 J25 - J30	
11/09/15 07:39:22	SIG	M62/2113B3	NR	M62 J25 - J30	
11/09/15 07:39:22	SIG	M62/2113B4	NR	M62 J25 - J30	
11/09/15 07:39:22	SIG	M62/2120M1	60R	M62 J25 - J30	
11/09/15 07:39:22	SIG	M62/2120M2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2074B1	REDX	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2081B1	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2081B2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2081B3	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2081L1	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2081L1	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2088B1	REDX	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2088B2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2088B3	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2088B4	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2097B1	REDX	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2097B2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2097B3	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2097B4	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2106B1	REDX	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2117B1	60R	M62 J25 - J30	
11/09/15 07:39:23	SIG	M62/2117B3	60R	M62 J25 - J30	
11/09/15 07:39:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:39:43	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:39:49	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 07:40:14	SIG	M62/2170B1	60R	M62 J25 - J30	
11/09/15 07:40:14	SIG	M62/2170B2	60R	M62 J25 - J30	
11/09/15 07:40:14	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 07:40:14	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 07:40:43	SIG	M62/2088B1	60R	M62 J25 - J30	
11/09/15 07:40:59	SIG	M62/2097B1	60R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 07:41:00	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 07:41:00	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 07:41:25	SIG	M62/2106B1	60R	M62 J25 - J30	
11/09/15 07:41:28	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 07:41:57	SIG	M62/2177B1	60R	M62 J25 - J30	
11/09/15 07:41:57	SIG	M62/2177B2	60R	M62 J25 - J30	
11/09/15 07:41:57	SIG	M62/2177L1	60R	M62 J25 - J30	
11/09/15 07:41:57	SIG	M62/2177L2	60R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 07:42:18	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 07:42:18	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 07:42:50	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:42:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:42:55	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 07:43:25	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 07:44:04	SIG	M62/2183B1	60R	M62 J25 - J30	
11/09/15 07:44:04	SIG	M62/2183B2	60R	M62 J25 - J30	
11/09/15 07:44:04	SIG	M62/2183L1	60R	M62 J25 - J30	
11/09/15 07:44:04	SIG	M62/2183L2	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2189B1	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2189B2	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2189B3	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2189B4	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2194B1	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2194B2	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2194B3	60R	M62 J25 - J30	
11/09/15 07:44:25	SIG	M62/2194B4	60R	M62 J25 - J30	
11/09/15 07:44:44	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 07:44:44	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 07:44:44	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 07:44:44	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 07:44:49	SIG	M62/2177B1	50R	M62 J25 - J30	
11/09/15 07:44:49	SIG	M62/2177B2	50R	M62 J25 - J30	
11/09/15 07:44:49	SIG	M62/2177L1	50R	M62 J25 - J30	
11/09/15 07:44:49	SIG	M62/2177L2	50R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2177B1	40R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2177B2	40R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2177L1	40R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2177L2	40R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2183B1	50R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2183L1	50R	M62 J25 - J30	
11/09/15 07:44:54	SIG	M62/2183L2	50R	M62 J25 - J30	
11/09/15 07:45:02	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 07:45:02	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 07:45:02	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 07:45:03	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 07:45:03	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 07:45:03	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 07:46:18	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 07:46:18	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 07:46:18	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 07:46:18	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 07:47:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:47:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:47:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:47:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:47:24	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 07:47:24	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 07:47:24	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 07:47:24	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 07:48:17	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 07:48:17	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 07:48:17	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 07:48:17	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2177B1	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2177B2	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2177L1	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2177L2	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2183B1	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2183B2	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2183L1	60R	M62 J25 - J30	
11/09/15 07:48:48	SIG	M62/2183L2	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 07:50:06	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 07:50:06	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 07:51:04	SIG	M62/2057A1	50R	M62 J25 - J30	
11/09/15 07:51:04	SIG	M62/2057A2	50R	M62 J25 - J30	
11/09/15 07:51:04	SIG	M62/2057A3	50R	M62 J25 - J30	
11/09/15 07:51:04	SIG	M62/2057J1	50R	M62 J25 - J30	
11/09/15 07:51:04	SIG	M621/1002A1	50R	M62 J25 - J30	
11/09/15 07:51:04	SIG	M621/1002A2	50R	M62 J25 - J30	
11/09/15 07:51:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:51:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2050A1	50R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2050A2	50R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2050A3	50R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2050A4	50R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2057A1	40R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2057A2	40R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2057A3	40R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M62/2057J1	40R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M621/1002A1	40R	M62 J25 - J30	
11/09/15 07:51:09	SIG	M621/1002A2	40R	M62 J25 - J30	
11/09/15 07:53:06	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 07:53:06	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 07:53:10	SIG	M62/2050A1	40R	M62 J25 - J30	
11/09/15 07:53:10	SIG	M62/2050A2	40R	M62 J25 - J30	
11/09/15 07:53:10	SIG	M62/2050A3	40R	M62 J25 - J30	
11/09/15 07:53:10	SIG	M62/2050A4	40R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2170B1	50R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2170B2	50R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2177B1	50R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2177B2	50R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2177L1	50R	M62 J25 - J30	
11/09/15 07:53:59	SIG	M62/2177L2	50R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2170B1	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2170B2	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2177B1	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2177B2	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2177L1	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2177L2	40R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2183B1	50R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2183L1	50R	M62 J25 - J30	
11/09/15 07:54:05	SIG	M62/2183L2	50R	M62 J25 - J30	
11/09/15 07:55:02	SIG	M621/1002A1	OFF	M62 J25 - J30	
11/09/15 07:55:02	SIG	M621/1002A2	OFF	M62 J25 - J30	
11/09/15 07:55:27	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 07:55:27	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 07:55:27	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 07:55:27	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 07:55:32	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2183B1	40R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2183L1	40R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2183L2	40R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2189B1	50R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2189B2	50R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2189B3	50R	M62 J25 - J30	
11/09/15 07:55:54	SIG	M62/2189B4	50R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 07:56:15	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 07:56:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:56:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 07:57:21	SIG	M62/2057A1	60R	M62 J25 - J30	
11/09/15 07:57:21	SIG	M62/2057A2	60R	M62 J25 - J30	
11/09/15 07:57:21	SIG	M62/2057A3	60R	M62 J25 - J30	
11/09/15 07:57:21	SIG	M62/2057J1	60R	M62 J25 - J30	
11/09/15 07:58:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 07:58:21	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 07:58:27	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 07:59:26	SIG	M62/2050A1	60R	M62 J25 - J30	
11/09/15 07:59:26	SIG	M62/2050A2	60R	M62 J25 - J30	
11/09/15 07:59:26	SIG	M62/2050A3	60R	M62 J25 - J30	
11/09/15 07:59:26	SIG	M62/2050A4	60R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2170B1	60R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2170B2	60R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2177B1	60R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2177B2	60R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2177L1	60R	M62 J25 - J30	
11/09/15 08:00:15	SIG	M62/2177L2	60R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 08:00:42	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2183B1	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2183B2	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2183L1	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2183L2	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2189B1	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2189B2	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2189B3	60R	M62 J25 - J30	
11/09/15 08:00:50	SIG	M62/2189B4	60R	M62 J25 - J30	
11/09/15 08:01:17	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 08:01:17	SIG	M62/1992A2	OFF	M62 J25 - J30	
11/09/15 08:01:17	SIG	M62/1992A3	OFF	M62 J25 - J30	
11/09/15 08:01:17	SIG	M62/1992J1	OFF	M62 J25 - J30	
11/09/15 08:02:26	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 08:02:26	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 08:02:26	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 08:02:26	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 08:03:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 08:03:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 08:03:59	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 08:03:59	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 08:03:59	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 08:03:59	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 08:04:41	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 08:05:58	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 08:08:00	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 08:08:00	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 08:08:00	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 08:08:00	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 08:09:01	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 08:09:01	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 08:09:01	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 08:09:01	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 08:10:17	SIG	M62/2159B1	NR	M62 J25 - J30	
11/09/15 08:10:17	SIG	M62/2159B2	NR	M62 J25 - J30	
11/09/15 08:10:17	SIG	M62/2170B1	NR	M62 J25 - J30	
11/09/15 08:10:17	SIG	M62/2170B2	NR	M62 J25 - J30	
11/09/15 08:10:17	SIG	M62/2170L1	OFF	M62 J25 - J30	
11/09/15 08:10:17	SIG	M62/2170L2	OFF	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 08:10:35	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 08:13:01	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2159B1	OFF	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2170B1	NR	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2170B2	NR	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2177B1	NR	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2177B2	NR	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2177L1	NR	M62 J25 - J30	
11/09/15 08:13:17	SIG	M62/2177L2	NR	M62 J25 - J30	
11/09/15 08:13:18	SIG	M62/2159B2	OFF	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2177B1	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2177B2	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2177L1	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2177L2	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2183B1	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2183B2	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2183L1	NR	M62 J25 - J30	
11/09/15 08:14:18	SIG	M62/2183L2	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2183B1	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2183B2	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2183L1	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2183L2	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2189B1	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2189B2	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2189B3	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2189B4	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2194B1	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2194B2	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2194B3	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2194B4	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2197B1	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2197B2	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2197B3	NR	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2199M1	OFF	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2199M2	OFF	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2203B1	OFF	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2203B2	OFF	M62 J25 - J30	
11/09/15 08:16:17	SIG	M62/2203B3	OFF	M62 J25 - J30	
11/09/15 08:16:18	SIG	M62/2170B1	OFF	M62 J25 - J30	
11/09/15 08:16:18	SIG	M62/2170B2	OFF	M62 J25 - J30	
11/09/15 08:17:18	SIG	M62/2177L1	OFF	M62 J25 - J30	
11/09/15 08:17:19	SIG	M62/2177B1	OFF	M62 J25 - J30	
11/09/15 08:17:19	SIG	M62/2177B2	OFF	M62 J25 - J30	
11/09/15 08:17:19	SIG	M62/2177L2	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2183B1	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2183L1	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2183L2	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2189B1	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2189B2	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2189B3	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2189B4	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2194B1	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2194B2	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2194B3	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2194B4	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2197B1	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2197B2	OFF	M62 J25 - J30	
11/09/15 08:19:18	SIG	M62/2197B3	OFF	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 08:22:17	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 08:26:18	SIG	M62/1999A1	OFF	M62 J25 - J30	
11/09/15 08:26:18	SIG	M62/1999A2	OFF	M62 J25 - J30	
11/09/15 08:26:18	SIG	M62/1999A3	OFF	M62 J25 - J30	
11/09/15 08:26:18	SIG	M62/1999J1	OFF	M62 J25 - J30	
11/09/15 08:26:18	SIG	M62/1999J2	OFF	M62 J25 - J30	
11/09/15 08:26:51	SIG	M62/2113B1	50R	M62 J25 - J30	
11/09/15 08:26:51	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 08:26:51	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 08:26:51	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 08:26:56	SIG	M62/2113B1	40R	M62 J25 - J30	
11/09/15 08:26:56	SIG	M62/2113B2	40R	M62 J25 - J30	
11/09/15 08:26:56	SIG	M62/2113B3	40R	M62 J25 - J30	
11/09/15 08:26:56	SIG	M62/2113B4	40R	M62 J25 - J30	
11/09/15 08:27:01	SIG	M62/2113B1	30R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2113B1	20R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2113B2	40R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2113B3	40R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2113B4	40R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2117B1	50R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2117B3	50R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2120M1	50R	M62 J25 - J30	
11/09/15 08:27:07	SIG	M62/2120M2	50R	M62 J25 - J30	
11/09/15 08:27:12	SIG	M62/2113B1	STOP	M62 J25 - J30	
11/09/15 08:28:17	SIG	M62/2004A1	OFF	M62 J25 - J30	
11/09/15 08:28:17	SIG	M62/2004A2	OFF	M62 J25 - J30	
11/09/15 08:28:17	SIG	M62/2004A3	OFF	M62 J25 - J30	
11/09/15 08:28:26	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 08:28:26	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 08:28:26	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 08:28:26	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 08:28:31	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 08:28:31	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 08:28:31	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 08:28:31	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 08:28:37	SIG	M62/2106B1	30R	M62 J25 - J30	
11/09/15 08:28:42	SIG	M62/2106B1	20R	M62 J25 - J30	
11/09/15 08:28:42	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 08:28:42	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 08:28:42	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 08:28:57	SIG	M62/2106B1	STOP	M62 J25 - J30	
11/09/15 08:34:18	SIG	M62/2125B1	60R	M62 J25 - J30	
11/09/15 08:34:18	SIG	M62/2125B2	60R	M62 J25 - J30	
11/09/15 08:34:18	SIG	M62/2125B3	60R	M62 J25 - J30	
11/09/15 08:34:18	SIG	M62/2125L1	60R	M62 J25 - J30	
11/09/15 08:34:18	SIG	M62/2125L2	60R	M62 J25 - J30	
11/09/15 08:41:43	SIG	M62/2106B1	60R	M62 J25 - J30	
11/09/15 08:41:43	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 08:41:43	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 08:41:43	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 08:41:43	SIG	M62/2113B1	40R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2117B1	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2117B3	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2120M1	60R	M62 J25 - J30	
11/09/15 08:44:11	SIG	M62/2120M2	60R	M62 J25 - J30	
11/09/15 08:52:35	SIG	M62/2079A1	HSD	M62 J25 - J30	
11/09/15 08:53:18	SIG	M62/2125B1	OFF	M62 J25 - J30	
11/09/15 08:53:18	SIG	M62/2125B2	OFF	M62 J25 - J30	
11/09/15 08:53:18	SIG	M62/2125B3	OFF	M62 J25 - J30	
11/09/15 08:53:18	SIG	M62/2125L1	NR	M62 J25 - J30	
11/09/15 08:53:18	SIG	M62/2125L2	NR	M62 J25 - J30	
11/09/15 08:53:43	SIG	M62/2088A1	HSD	M62 J25 - J30	
11/09/15 08:54:51	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 08:54:51	SIG	M62/2097A1	HSD	M62 J25 - J30	
11/09/15 08:55:59	SIG	M62/2088A1	REDX	M62 J25 - J30	
11/09/15 08:55:59	SIG	M62/2106A1	HSD	M62 J25 - J30	
11/09/15 08:56:18	SIG	M62/2125L1	OFF	M62 J25 - J30	
11/09/15 08:56:18	SIG	M62/2125L2	OFF	M62 J25 - J30	
11/09/15 08:57:07	SIG	M62/2097A1	REDX	M62 J25 - J30	
11/09/15 08:58:22	SIG	M62/2106A1	REDX	M62 J25 - J30	
11/09/15 08:59:15	SIG	M62/2065A2	NR	M62 J25 - J30	
11/09/15 08:59:15	SIG	M62/2065A3	NR	M62 J25 - J30	
11/09/15 08:59:15	SIG	M62/2065A4	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2073K1	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2079A2	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2079A3	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2079A4	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2088A2	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2088A3	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2088A4	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2097A2	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2097A3	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2097A4	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2106A2	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2106A3	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2106A4	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2114A1	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2114A2	NR	M62 J25 - J30	
11/09/15 08:59:35	SIG	M62/2114A3	NR	M62 J25 - J30	
11/09/15 09:00:25	SIG	M62/2073K1	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2079A1	BLNK	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2079A2	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2079A3	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2079A4	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2088A2	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2088A3	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2088A4	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2097A1	BLNK	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2097A2	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2097A3	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2097A4	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2106A1	BLNK	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2106A2	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2106A4	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2114A1	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2114A2	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2114A3	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2117A1	BLNK	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2117A2	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2117A3	OFF	M62 J25 - J30	
11/09/15 09:00:35	SIG	M62/2117A4	OFF	M62 J25 - J30	
11/09/15 09:05:53	SIG	M62/2113B1	HSD	M62 J25 - J30	
11/09/15 09:06:46	SIG	M62/2106B1	HSD	M62 J25 - J30	
11/09/15 09:07:54	SIG	M62/2097B1	HSD	M62 J25 - J30	
11/09/15 09:07:54	SIG	M62/2113B1	REDX	M62 J25 - J30	
11/09/15 09:09:02	SIG	M62/2088B1	HSD	M62 J25 - J30	
11/09/15 09:09:02	SIG	M62/2106B1	REDX	M62 J25 - J30	
11/09/15 09:10:10	SIG	M62/2097B1	REDX	M62 J25 - J30	
11/09/15 09:11:18	SIG	M62/2088B1	REDX	M62 J25 - J30	
11/09/15 09:12:11	SIG	M62/2117B1	NR	M62 J25 - J30	
11/09/15 09:12:11	SIG	M62/2117B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2074B2	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2074B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2074B4	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2081B1	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2081B2	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2081B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2081L1	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2088B2	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2088B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2088B4	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2097B2	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2097B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2097B4	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2106B2	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2106B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2106B4	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2113B2	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2113B3	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2113B4	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2120M1	NR	M62 J25 - J30	
11/09/15 09:12:12	SIG	M62/2120M2	NR	M62 J25 - J30	
11/09/15 09:13:11	SIG	M62/2120M1	OFF	M62 J25 - J30	
11/09/15 09:13:11	SIG	M62/2120M2	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2106B1	BLNK	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2106B2	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2106B3	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2106B4	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2113B1	BLNK	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2113B2	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2113B3	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2113B4	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
11/09/15 09:13:12	SIG	M62/2117B3	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2074B1	BLNK	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2074B2	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2074B3	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2074B4	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2081B1	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2081B2	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2081B3	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2081L1	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2088B1	BLNK	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2088B2	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2088B3	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2088B4	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2097B1	BLNK	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2097B2	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2097B3	OFF	M62 J25 - J30	
11/09/15 09:13:13	SIG	M62/2097B4	OFF	M62 J25 - J30	
11/09/15 09:32:45	SIG	M62/2057B1	HSD	M62 J25 - J30	
11/09/15 09:34:44	SIG	M62/2041B1	HSD	M62 J25 - J30	
11/09/15 09:34:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
11/09/15 09:34:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
11/09/15 09:34:44	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 09:34:44	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 09:35:44	SIG	M62/2033B1	HSD	M62 J25 - J30	
11/09/15 09:36:44	SIG	M62/2025B1	HSD	M62 J25 - J30	
11/09/15 09:36:45	SIG	M62/2041B1	REDX	M62 J25 - J30	
11/09/15 09:37:36	SIG	M62/2033B1	REDX	M62 J25 - J30	
11/09/15 09:38:20	SIG	M62/2025B1	REDX	M62 J25 - J30	
11/09/15 09:38:50	SIG	M62/2065B2	NR	M62 J25 - J30	
11/09/15 09:38:50	SIG	M62/2065B3	NR	M62 J25 - J30	
11/09/15 09:38:50	SIG	M62/2065B4	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2018B1	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2018B2	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2018B3	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2018L1	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2025B2	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2025B3	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2025B4	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2033B2	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2033B3	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2033B4	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2041B2	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2041B3	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2041B4	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2050B2	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2050B3	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2050B4	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2057B2	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2057B3	NR	M62 J25 - J30	
11/09/15 09:38:51	SIG	M62/2057B4	NR	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2041B1	BLNK	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2041B2	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2041B3	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2041B4	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2050B2	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2050B3	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2050B4	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2057B1	BLNK	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2057B2	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2057B3	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2057B4	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2065B1	BLNK	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2065B2	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2065B3	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2065B4	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2065M1	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2069M1	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M62/2069M2	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M621/1002B1	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M621/1002B2	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M621/1010B1	OFF	M62 J25 - J30	
11/09/15 09:39:51	SIG	M621/1010B2	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2012B1	BLNK	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2012B2	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2012B3	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2012B4	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2018B1	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2018B2	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2018B3	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2018L1	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2025B1	BLNK	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2025B2	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2025B3	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2025B4	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2033B1	BLNK	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2033B2	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 09:39:52	SIG	M62/2033B4	OFF	M62 J25 - J30	
11/09/15 10:05:09	SIG	M62/2025A1	HSD	M62 J25 - J30	
11/09/15 10:06:08	SIG	M62/2033A1	HSD	M62 J25 - J30	
11/09/15 10:07:08	SIG	M62/2041A1	HSD	M62 J25 - J30	
11/09/15 10:07:09	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 10:07:09	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 10:08:16	SIG	M62/2033A1	REDX	M62 J25 - J30	
11/09/15 10:08:16	SIG	M62/2050A1	HSD	M62 J25 - J30	
11/09/15 10:09:07	SIG	M62/2041A1	REDX	M62 J25 - J30	
11/09/15 10:10:07	SIG	M62/2050A1	REDX	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2025A2	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2025A3	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2025A4	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2033A2	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2033A3	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2033A4	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2041A2	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2041A3	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2041A4	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2050A2	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2050A3	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2050A4	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2057A1	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2057A2	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2057A3	NR	M62 J25 - J30	
11/09/15 10:11:08	SIG	M62/2057J1	NR	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2008K1	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2008K2	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2012A1	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2012A2	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2012A3	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2018A1	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2018A2	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2018A3	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2018A4	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2025A1	BLNK	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2025A2	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2025A3	OFF	M62 J25 - J30	
11/09/15 10:12:08	SIG	M62/2025A4	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2033A1	BLNK	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2033A2	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2033A3	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2033A4	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2041A1	BLNK	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2041A2	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2041A3	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2041A4	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2050A1	BLNK	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2050A2	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2050A3	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2050A4	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2057A1	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2057A2	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2057A3	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2057J1	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 10:12:09	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 11:11:19	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 11:11:19	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 11:18:12	SIG	M62/2170L1	OFF	M62 J25 - J30	
11/09/15 11:18:12	SIG	M62/2170L2	OFF	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2025A2	NR	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2025A3	NR	M62 J25 - J30	
11/09/15 11:22:21	SIG	M62/2025A4	NR	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2033A1	REDX	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2041A1	REDX	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2050A1	REDX	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2050A2	NR	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2050A3	NR	M62 J25 - J30	
11/09/15 11:23:21	SIG	M62/2050A4	NR	M62 J25 - J30	
11/09/15 11:24:16	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 11:24:16	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 11:24:16	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 11:24:16	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 11:24:16	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 11:24:16	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 11:24:22	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 11:25:57	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 11:25:57	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 11:27:30	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 11:28:16	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 11:28:16	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 11:28:16	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 11:29:57	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 11:29:57	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 11:29:57	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2050A2	60R	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2050A3	60R	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2050A4	60R	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2057A1	NR	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2057A2	NR	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2057A3	NR	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2057J1	NR	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2065A2	NR	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2065A3	NR	M62 J25 - J30	
11/09/15 11:30:21	SIG	M62/2065A4	NR	M62 J25 - J30	
11/09/15 11:31:28	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 11:31:28	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 11:31:28	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 11:33:49	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 11:33:49	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 11:34:21	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 11:34:21	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 11:34:21	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 11:34:21	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 11:34:21	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 11:34:21	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 11:34:26	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 11:34:26	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 11:35:18	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 11:40:55	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 11:40:55	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 11:40:55	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 11:42:55	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 11:42:55	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 11:42:55	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 11:43:54	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 11:43:59	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 11:44:27	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 11:44:56	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 11:44:56	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 11:44:56	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 11:45:58	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 11:45:58	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 11:45:58	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 11:45:58	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 11:45:58	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 11:47:50	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 11:47:50	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 11:47:50	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 11:47:50	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 11:47:50	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 11:47:50	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 11:47:54	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 11:47:54	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 11:47:54	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 11:48:57	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 11:48:57	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 11:48:57	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 11:50:21	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 11:50:21	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 11:50:21	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 11:50:21	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 11:50:24	SIG	M62/1956A1	NR	M62 J25 - J30	
11/09/15 11:50:24	SIG	M62/1956A2	NR	M62 J25 - J30	
11/09/15 11:50:24	SIG	M62/1956A3	NR	M62 J25 - J30	
11/09/15 11:50:24	SIG	M62/1960B1	50R	M62 J25 - J30	
11/09/15 11:50:24	SIG	M62/1960B2	50R	M62 J25 - J30	
11/09/15 11:50:24	SIG	M62/1960B3	50R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1999A1	40R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1999A2	40R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1999A3	40R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 11:50:28	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 11:51:23	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 11:51:23	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 11:51:23	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 11:51:47	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 11:51:47	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 11:51:47	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 11:51:52	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 11:51:52	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 11:51:52	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 11:51:52	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 11:51:52	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 11:51:52	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 11:51:56	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 11:51:56	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 11:51:56	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 11:51:56	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 11:51:56	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 11:53:22	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 11:53:22	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 11:53:22	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 11:53:50	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 11:53:50	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 11:53:51	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 11:54:27	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 11:54:27	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 11:54:27	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1979K1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1979K2	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1981A1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1981A2	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1981A3	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1981A4	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 11:54:31	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 11:54:44	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 11:54:44	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 11:54:44	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 11:55:36	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 11:55:36	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 11:55:36	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 11:55:36	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 11:55:36	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 11:57:22	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 11:57:22	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 11:57:22	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 11:58:04	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 11:58:04	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 11:58:04	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 11:58:04	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 11:58:04	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 11:58:04	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 11:58:44	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 11:58:44	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 11:58:44	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 12:00:15	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:00:15	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:00:15	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:02:04	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 12:02:04	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 12:02:04	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 12:02:04	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 12:02:04	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 12:02:04	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 12:03:52	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 12:03:52	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 12:03:52	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 12:03:52	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 12:03:52	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 12:04:31	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:04:31	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:04:31	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:04:31	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 12:04:31	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 12:04:31	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 12:04:36	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:04:36	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:04:36	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:04:36	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 12:04:36	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 12:04:36	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 12:04:37	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 12:04:37	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 12:04:37	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 12:04:42	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 12:04:42	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 12:04:42	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 12:05:51	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 12:05:51	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 12:05:51	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 12:05:51	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 12:05:51	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 12:06:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 12:06:20	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 12:06:21	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 12:06:22	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 12:07:42	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 12:07:42	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 12:07:42	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 12:07:42	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 12:07:42	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 12:07:42	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1979K1	OFF	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1979K2	OFF	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1981A1	OFF	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1981A2	OFF	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1981A3	OFF	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1981A4	OFF	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1987A1	NR	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1987A3	NR	M62 J25 - J30	
11/09/15 12:08:31	SIG	M62/1987J1	NR	M62 J25 - J30	
11/09/15 12:09:25	SIG	M62/1956A1	NR	M62 J25 - J30	
11/09/15 12:09:25	SIG	M62/1956A2	NR	M62 J25 - J30	
11/09/15 12:09:25	SIG	M62/1956A3	NR	M62 J25 - J30	
11/09/15 12:09:25	SIG	M62/1960B1	OFF	M62 J25 - J30	
11/09/15 12:09:25	SIG	M62/1960B2	OFF	M62 J25 - J30	
11/09/15 12:09:25	SIG	M62/1960B3	OFF	M62 J25 - J30	
11/09/15 12:09:52	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:09:52	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:09:52	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:09:52	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 12:09:52	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 12:09:52	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 12:09:53	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:09:53	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:09:53	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:09:53	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 12:09:53	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 12:09:53	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 12:11:31	SIG	M62/1987J1	OFF	M62 J25 - J30	
11/09/15 12:11:42	SIG	M62/1987A1	OFF	M62 J25 - J30	
11/09/15 12:11:42	SIG	M62/1987A3	OFF	M62 J25 - J30	
11/09/15 12:11:47	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 12:11:47	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 12:11:47	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 12:11:47	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 12:11:47	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 12:11:47	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 12:11:59	SIG	M606/2003B1	50R	M62 J25 - J30	
11/09/15 12:11:59	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 12:11:59	SIG	M62/2005M1	50R	M62 J25 - J30	
11/09/15 12:11:59	SIG	M62/2005M2	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1987B1	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1987B2	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1987B3	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1987B4	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1992B1	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 12:12:00	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1987B1	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1987B2	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1987B3	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1987B4	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1992B1	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1999B1	REDX	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 12:12:05	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 12:12:25	SIG	M62/1956A1	OFF	M62 J25 - J30	
11/09/15 12:12:25	SIG	M62/1956A2	OFF	M62 J25 - J30	
11/09/15 12:12:25	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 12:13:49	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 12:13:49	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 12:13:49	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 12:13:49	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 12:13:49	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 12:13:49	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 12:13:52	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 12:13:52	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 12:13:52	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 12:15:58	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1987B1	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1987B2	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1987B3	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1987B4	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1992B1	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1992B2	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1992B3	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1992B4	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1999B2	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1999B3	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/1999B4	NR	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/2005M1	OFF	M62 J25 - J30	
11/09/15 12:15:58	SIG	M62/2005M2	OFF	M62 J25 - J30	
11/09/15 12:16:13	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 12:16:13	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 12:16:13	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1999A1	40R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1999A2	40R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1999A3	40R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 12:16:34	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 12:16:35	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:16:35	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:16:35	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:18:47	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 12:18:47	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 12:18:47	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 12:18:47	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 12:18:47	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1981B1	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1981B2	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1981B3	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1981B4	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1987B1	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1987B2	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1987B3	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1987B4	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1992B1	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1992B2	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1992B3	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1992B4	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1999B2	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1999B3	OFF	M62 J25 - J30	
11/09/15 12:18:59	SIG	M62/1999B4	OFF	M62 J25 - J30	
11/09/15 12:19:00	SIG	M62/1999B1	BLNK	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1979K1	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1979K2	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1981A1	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1981A2	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1981A3	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1981A4	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 12:19:31	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 12:20:19	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 12:20:19	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 12:20:19	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 12:20:25	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 12:20:25	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 12:20:25	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 12:20:25	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 12:20:25	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 12:20:25	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 12:21:08	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 12:21:08	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 12:21:22	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 12:21:41	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 12:21:41	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 12:21:41	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 12:21:56	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 12:21:56	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 12:21:56	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 12:21:56	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 12:21:56	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 12:21:56	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 12:22:32	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:22:32	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:22:32	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:22:32	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 12:22:32	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 12:22:32	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 12:24:10	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 12:24:20	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 12:24:20	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 12:24:20	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 12:24:22	SIG	M62/1974A1	60R	M62 J25 - J30	
11/09/15 12:24:22	SIG	M62/1974A2	60R	M62 J25 - J30	
11/09/15 12:24:22	SIG	M62/1974A3	60R	M62 J25 - J30	
11/09/15 12:24:22	SIG	M62/1974A4	60R	M62 J25 - J30	
11/09/15 12:25:11	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 12:25:11	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 12:25:11	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 12:25:22	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 12:27:23	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 12:27:23	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 12:27:23	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 12:27:46	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 12:27:46	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 12:27:46	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 12:28:00	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 12:28:00	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 12:28:00	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 12:28:05	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 12:28:05	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 12:28:05	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1999A1	40R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1999A2	40R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1999A3	40R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 12:29:24	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2041B1	REDX	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2041B2	NR	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2041B3	NR	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2041B4	NR	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2050B2	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2050B3	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2050B4	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2057B1	REDX	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2057B2	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2057B3	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2057B4	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2065B1	REDX	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2065M1	NR	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2069M1	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M62/2069M2	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M621/1002B1	HSD	M62 J25 - J30	
11/09/15 12:31:16	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 12:31:16	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2012B1	REDX	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2012B2	NR	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2012B3	NR	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2012B4	NR	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2025B1	REDX	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2033B1	REDX	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2041B2	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2041B3	60R	M62 J25 - J30	
11/09/15 12:31:17	SIG	M62/2041B4	60R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:32:29	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:32:34	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 12:33:31	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 12:33:47	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 12:33:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 12:33:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 12:33:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 12:33:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 12:34:12	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 12:34:33	SIG	M62/2041B1	60R	M62 J25 - J30	
11/09/15 12:35:01	SIG	M62/2057B1	60R	M62 J25 - J30	
11/09/15 12:35:01	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 12:35:01	SIG	M621/1010B1	OFF	M62 J25 - J30	
11/09/15 12:35:01	SIG	M621/1010B2	OFF	M62 J25 - J30	
11/09/15 12:35:17	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 12:35:17	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 12:35:17	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 12:36:35	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 12:36:35	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 12:36:35	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 12:37:31	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 12:37:41	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:37:41	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:37:41	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:37:52	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:37:52	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:37:52	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 12:38:49	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1974A1	OFF	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1974A2	OFF	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1974A3	OFF	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1974A4	OFF	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1979K1	OFF	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1979K2	OFF	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1981A1	NR	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1981A2	NR	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1981A3	NR	M62 J25 - J30	
11/09/15 12:39:22	SIG	M62/1981A4	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2041A2	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2041A3	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2041A4	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2050A2	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2050A3	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2050A4	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2057A1	OFF	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2057A2	OFF	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2057A3	OFF	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2057J1	NR	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 12:39:23	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 12:40:56	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 12:40:56	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 12:40:56	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 12:40:56	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 12:40:56	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 12:40:56	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 12:41:02	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 12:41:02	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 12:41:02	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 12:41:02	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 12:41:02	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 12:41:02	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1979K1	50R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1979K2	50R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1981A1	50R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1981A2	50R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1981A3	50R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1981A4	50R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1987A1	40R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1987A3	40R	M62 J25 - J30	
11/09/15 12:41:10	SIG	M62/1987J1	40R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 12:41:52	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:41:52	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:41:58	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 12:41:58	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 12:41:58	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 12:41:58	SIG	M62/2050A2	NR	M62 J25 - J30	
11/09/15 12:41:58	SIG	M62/2050A3	NR	M62 J25 - J30	
11/09/15 12:41:58	SIG	M62/2050A4	NR	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2050A2	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2050A3	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2050A4	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2057A1	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2057A2	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2057A3	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2057J1	60R	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2065A1	REDX	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2065A2	NR	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2065A3	NR	M62 J25 - J30	
11/09/15 12:41:59	SIG	M62/2065A4	NR	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1968A1	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1968A2	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1968A3	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1968A4	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1974A1	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1974A2	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1974A3	60R	M62 J25 - J30	
11/09/15 12:42:22	SIG	M62/1974A4	60R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 12:42:23	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 12:42:23	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 12:43:19	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 12:43:24	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 12:43:25	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 12:43:25	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 12:43:25	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 12:43:42	SIG	M62/2050A1	60R	M62 J25 - J30	
11/09/15 12:44:12	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 12:44:35	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 12:44:41	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 12:44:41	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 12:44:47	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 12:44:47	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 12:44:56	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 12:44:56	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 12:44:56	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 12:44:56	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 12:45:23	SIG	M62/1960A1	60R	M62 J25 - J30	
11/09/15 12:45:23	SIG	M62/1960A2	60R	M62 J25 - J30	
11/09/15 12:45:23	SIG	M62/1960A3	60R	M62 J25 - J30	
11/09/15 12:45:23	SIG	M62/1960K1	60R	M62 J25 - J30	
11/09/15 12:45:23	SIG	M62/1960K2	60R	M62 J25 - J30	
11/09/15 12:45:48	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 12:45:48	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 12:46:22	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 12:46:22	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 12:46:22	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 12:46:22	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 12:46:23	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 12:46:23	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 12:46:23	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 12:46:23	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 12:46:44	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 12:46:44	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 12:47:06	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 12:47:19	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 12:47:19	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 12:47:19	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 12:47:19	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 12:47:20	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 12:47:20	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 12:47:20	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 12:47:20	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 12:47:22	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 12:52:20	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 12:53:20	SIG	M62/1987A1	40R	M62 J25 - J30	
11/09/15 12:53:20	SIG	M62/1987A3	40R	M62 J25 - J30	
11/09/15 12:53:20	SIG	M62/1987J1	40R	M62 J25 - J30	
11/09/15 12:54:21	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 12:54:21	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 12:54:21	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 12:54:21	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 12:54:21	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 12:54:22	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 12:54:22	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 12:54:22	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 12:54:22	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 12:57:20	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 12:57:23	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 12:57:23	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 12:57:23	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 12:57:23	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 12:57:23	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 12:57:23	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 12:57:23	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 12:59:22	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 12:59:22	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 12:59:22	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 13:00:23	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 13:00:23	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 13:02:23	SIG	M62/1979K1	60R	M62 J25 - J30	
11/09/15 13:02:23	SIG	M62/1979K2	60R	M62 J25 - J30	
11/09/15 13:02:23	SIG	M62/1981A1	60R	M62 J25 - J30	
11/09/15 13:02:23	SIG	M62/1981A2	60R	M62 J25 - J30	
11/09/15 13:02:23	SIG	M62/1981A3	60R	M62 J25 - J30	
11/09/15 13:02:23	SIG	M62/1981A4	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 13:03:32	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 13:06:00	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 13:06:00	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 13:06:00	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 13:06:00	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 13:06:00	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 13:06:00	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 13:06:06	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 13:06:06	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 13:06:06	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 13:06:06	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 13:06:06	SIG	M62/1999J1	30R	M62 J25 - J30	
11/09/15 13:06:06	SIG	M62/1999J2	30R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1999J1	20R	M62 J25 - J30	
11/09/15 13:06:11	SIG	M62/1999J2	20R	M62 J25 - J30	
11/09/15 13:06:16	SIG	M62/1999J1	STOP	M62 J25 - J30	
11/09/15 13:06:16	SIG	M62/1999J2	STOP	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1999J1	30R	M62 J25 - J30	
11/09/15 13:06:44	SIG	M62/1999J2	30R	M62 J25 - J30	
11/09/15 13:09:26	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 13:09:26	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 13:09:26	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 13:09:26	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 13:09:26	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 13:09:26	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 13:10:23	SIG	M62/1960A1	OFF	M62 J25 - J30	
11/09/15 13:10:23	SIG	M62/1960A2	OFF	M62 J25 - J30	
11/09/15 13:10:23	SIG	M62/1960A3	OFF	M62 J25 - J30	
11/09/15 13:10:23	SIG	M62/1960K1	OFF	M62 J25 - J30	
11/09/15 13:10:23	SIG	M62/1960K2	OFF	M62 J25 - J30	
11/09/15 13:12:23	SIG	M62/1968A1	OFF	M62 J25 - J30	
11/09/15 13:12:23	SIG	M62/1968A2	OFF	M62 J25 - J30	
11/09/15 13:12:23	SIG	M62/1968A3	OFF	M62 J25 - J30	
11/09/15 13:12:23	SIG	M62/1968A4	OFF	M62 J25 - J30	
11/09/15 13:15:23	SIG	M62/1974A1	OFF	M62 J25 - J30	
11/09/15 13:15:23	SIG	M62/1974A2	OFF	M62 J25 - J30	
11/09/15 13:15:23	SIG	M62/1974A3	OFF	M62 J25 - J30	
11/09/15 13:15:23	SIG	M62/1974A4	OFF	M62 J25 - J30	
11/09/15 13:16:23	SIG	M62/2004A1	OFF	M62 J25 - J30	
11/09/15 13:16:23	SIG	M62/2004A2	OFF	M62 J25 - J30	
11/09/15 13:16:23	SIG	M62/2004A3	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1979K1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1979K2	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1981A1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1981A2	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1981A3	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1981A4	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1987A1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1987A3	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1987J1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1992A2	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1992A3	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1992J1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1999A1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1999A2	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1999A3	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1999J1	OFF	M62 J25 - J30	
11/09/15 13:16:32	SIG	M62/1999J2	OFF	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2159B1	50R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2159B2	50R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2159M1	50R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2159M2	50R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2170B1	60R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2170B2	60R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 14:06:46	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2147B1	NR	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2147B2	NR	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2147B3	NR	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2147B4	NR	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2159B1	40R	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2159B2	40R	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2159M1	40R	M62 J25 - J30	
11/09/15 14:06:52	SIG	M62/2159M2	40R	M62 J25 - J30	
11/09/15 14:10:24	SIG	M62/2177B1	60R	M62 J25 - J30	
11/09/15 14:10:24	SIG	M62/2177B2	60R	M62 J25 - J30	
11/09/15 14:10:24	SIG	M62/2177L1	60R	M62 J25 - J30	
11/09/15 14:10:24	SIG	M62/2177L2	60R	M62 J25 - J30	
11/09/15 14:11:02	SIG	M62/2170B1	50R	M62 J25 - J30	
11/09/15 14:11:02	SIG	M62/2170B2	50R	M62 J25 - J30	
11/09/15 14:11:02	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 14:11:02	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2170B1	40R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2170B2	40R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2177B1	50R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2177B2	50R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2177L1	50R	M62 J25 - J30	
11/09/15 14:11:07	SIG	M62/2177L2	50R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2177B1	40R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2177B2	40R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2177L1	40R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2177L2	40R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2183B1	50R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2183L1	50R	M62 J25 - J30	
11/09/15 14:16:09	SIG	M62/2183L2	50R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2189B1	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2189B2	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2189B3	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2189B4	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2194B1	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2194B2	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2194B3	60R	M62 J25 - J30	
11/09/15 14:17:24	SIG	M62/2194B4	60R	M62 J25 - J30	
11/09/15 14:18:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:18:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:18:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:18:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:20:18	SIG	M62/2183B1	40R	M62 J25 - J30	
11/09/15 14:20:18	SIG	M62/2183L1	40R	M62 J25 - J30	
11/09/15 14:20:18	SIG	M62/2183L2	40R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2183B1	40R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2183L1	40R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2183L2	40R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2189B1	50R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2189B2	50R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2189B3	50R	M62 J25 - J30	
11/09/15 14:20:23	SIG	M62/2189B4	50R	M62 J25 - J30	
11/09/15 14:22:24	SIG	M62/2197B1	60R	M62 J25 - J30	
11/09/15 14:22:24	SIG	M62/2197B2	60R	M62 J25 - J30	
11/09/15 14:22:24	SIG	M62/2197B3	60R	M62 J25 - J30	
11/09/15 14:22:24	SIG	M62/2199M1	60R	M62 J25 - J30	
11/09/15 14:22:24	SIG	M62/2199M2	60R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2189B1	40R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2189B2	40R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2189B3	40R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2189B4	40R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2194B1	50R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2194B2	50R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2194B3	50R	M62 J25 - J30	
11/09/15 14:22:41	SIG	M62/2194B4	50R	M62 J25 - J30	
11/09/15 14:22:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:22:53	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 14:22:59	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 14:23:24	SIG	M62/2203B1	60R	M62 J25 - J30	
11/09/15 14:23:24	SIG	M62/2203B2	60R	M62 J25 - J30	
11/09/15 14:23:24	SIG	M62/2203B3	60R	M62 J25 - J30	
11/09/15 14:24:15	SIG	M62/2159B1	50R	M62 J25 - J30	
11/09/15 14:24:15	SIG	M62/2159B2	50R	M62 J25 - J30	
11/09/15 14:24:15	SIG	M62/2159M1	50R	M62 J25 - J30	
11/09/15 14:24:15	SIG	M62/2159M2	50R	M62 J25 - J30	
11/09/15 14:24:34	SIG	M62/2170B1	50R	M62 J25 - J30	
11/09/15 14:24:34	SIG	M62/2170B2	50R	M62 J25 - J30	
11/09/15 14:24:34	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 14:24:34	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 14:25:18	SIG	M62/2170B1	40R	M62 J25 - J30	
11/09/15 14:25:18	SIG	M62/2170B2	40R	M62 J25 - J30	
11/09/15 14:25:18	SIG	M62/2170L1	40R	M62 J25 - J30	
11/09/15 14:25:18	SIG	M62/2170L2	40R	M62 J25 - J30	
11/09/15 14:25:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:25:53	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 14:25:58	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 14:28:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:28:55	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 14:29:01	SIG	M62/2183B2	40R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2177B1	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2177B2	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2177L1	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2177L2	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2183B1	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2183B2	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2183L1	50R	M62 J25 - J30	
11/09/15 14:29:12	SIG	M62/2183L2	50R	M62 J25 - J30	
11/09/15 14:29:18	SIG	M62/2170B1	50R	M62 J25 - J30	
11/09/15 14:29:18	SIG	M62/2170B2	50R	M62 J25 - J30	
11/09/15 14:29:18	SIG	M62/2170L1	50R	M62 J25 - J30	
11/09/15 14:29:18	SIG	M62/2170L2	50R	M62 J25 - J30	
11/09/15 14:29:40	SIG	M62/2189B1	50R	M62 J25 - J30	
11/09/15 14:29:40	SIG	M62/2189B2	50R	M62 J25 - J30	
11/09/15 14:29:40	SIG	M62/2189B3	50R	M62 J25 - J30	
11/09/15 14:29:40	SIG	M62/2189B4	50R	M62 J25 - J30	
11/09/15 14:30:24	SIG	M62/2159B1	60R	M62 J25 - J30	
11/09/15 14:30:24	SIG	M62/2159B2	60R	M62 J25 - J30	
11/09/15 14:30:24	SIG	M62/2159M1	60R	M62 J25 - J30	
11/09/15 14:30:24	SIG	M62/2159M2	60R	M62 J25 - J30	
11/09/15 14:32:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:32:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:32:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:32:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:32:24	SIG	M62/2074B1	REDX	M62 J25 - J30	
11/09/15 14:32:24	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 14:32:24	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 14:32:24	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 14:32:24	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 14:32:24	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 14:32:25	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 14:32:30	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 14:35:24	SIG	M62/2194B1	60R	M62 J25 - J30	
11/09/15 14:35:24	SIG	M62/2194B2	60R	M62 J25 - J30	
11/09/15 14:35:24	SIG	M62/2194B3	60R	M62 J25 - J30	
11/09/15 14:35:24	SIG	M62/2194B4	60R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2088B1	REDX	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 14:35:55	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2069M1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2069M2	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2183B1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2183B2	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2183L1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2183L2	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2189B1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2189B2	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2189B3	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M62/2189B4	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 14:36:25	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2097B1	REDX	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2097B2	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2097B3	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2097B4	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2106B1	REDX	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2177B1	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2177B2	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2177L1	60R	M62 J25 - J30	
11/09/15 14:37:25	SIG	M62/2177L2	60R	M62 J25 - J30	
11/09/15 14:38:24	SIG	M62/2170B1	60R	M62 J25 - J30	
11/09/15 14:38:24	SIG	M62/2170B2	60R	M62 J25 - J30	
11/09/15 14:38:32	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 14:38:32	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 14:38:32	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 14:39:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:39:18	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 14:39:18	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 14:39:18	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 14:39:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:39:25	SIG	M62/2113B1	REDX	M62 J25 - J30	
11/09/15 14:39:25	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 14:39:25	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 14:39:25	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 14:40:40	SIG	M62/2097B2	50R	M62 J25 - J30	
11/09/15 14:40:40	SIG	M62/2097B3	50R	M62 J25 - J30	
11/09/15 14:40:40	SIG	M62/2097B4	50R	M62 J25 - J30	
11/09/15 14:40:45	SIG	M62/2097B2	40R	M62 J25 - J30	
11/09/15 14:40:45	SIG	M62/2097B3	40R	M62 J25 - J30	
11/09/15 14:40:45	SIG	M62/2097B4	40R	M62 J25 - J30	
11/09/15 14:42:24	SIG	M62/2117B1	60R	M62 J25 - J30	
11/09/15 14:42:24	SIG	M62/2117B3	60R	M62 J25 - J30	
11/09/15 14:42:24	SIG	M62/2120M1	60R	M62 J25 - J30	
11/09/15 14:42:24	SIG	M62/2120M2	60R	M62 J25 - J30	
11/09/15 14:42:44	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 14:42:44	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 14:42:44	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 14:42:49	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 14:42:49	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 14:42:49	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 14:43:25	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 14:43:25	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 14:43:25	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 14:43:30	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 14:43:30	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 14:43:30	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 14:43:30	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 14:43:30	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 14:43:30	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 14:44:06	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 14:44:11	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 14:44:11	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 14:44:12	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2088B2	60R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2088B3	60R	M62 J25 - J30	
11/09/15 14:44:40	SIG	M62/2088B4	60R	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2125B1	60R	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2125B2	60R	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2125B3	60R	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2125L1	60R	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2125L2	60R	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2147B1	OFF	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2147B2	OFF	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2147B3	OFF	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2147B4	OFF	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2159B1	NR	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2159B2	NR	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2159M1	OFF	M62 J25 - J30	
11/09/15 14:45:24	SIG	M62/2159M2	OFF	M62 J25 - J30	
11/09/15 14:47:26	SIG	M62/2097B2	60R	M62 J25 - J30	
11/09/15 14:47:26	SIG	M62/2097B3	60R	M62 J25 - J30	
11/09/15 14:47:26	SIG	M62/2097B4	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2069M1	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2069M2	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2081B1	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2081B2	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2081B3	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M62/2081L1	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 14:48:06	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2197B1	NR	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2197B2	NR	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2197B3	NR	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2199M1	OFF	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2199M2	OFF	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2203B1	OFF	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2203B2	OFF	M62 J25 - J30	
11/09/15 14:48:25	SIG	M62/2203B3	OFF	M62 J25 - J30	
11/09/15 14:50:24	SIG	M62/2159B1	NR	M62 J25 - J30	
11/09/15 14:50:24	SIG	M62/2159B2	NR	M62 J25 - J30	
11/09/15 14:50:25	SIG	M62/2170B1	NR	M62 J25 - J30	
11/09/15 14:50:25	SIG	M62/2170B2	NR	M62 J25 - J30	
11/09/15 14:50:25	SIG	M62/2170L1	OFF	M62 J25 - J30	
11/09/15 14:50:25	SIG	M62/2170L2	OFF	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2117A2	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2117A3	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2117A4	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2122K1	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2122K2	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2124A2	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:50:35	SIG	M62/2124A4	50R	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2114A1	50R	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2114A2	50R	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2114A3	50R	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2117A1	REDX	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2117A2	40R	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2117A3	40R	M62 J25 - J30	
11/09/15 14:50:40	SIG	M62/2117A4	40R	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2122K1	40R	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2122K2	40R	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2124A1	REDX	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2124A2	40R	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2124A4	40R	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2135A1	NR	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2135A2	NR	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2135A3	NR	M62 J25 - J30	
11/09/15 14:50:41	SIG	M62/2135A4	NR	M62 J25 - J30	
11/09/15 14:50:48	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 14:50:48	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 14:50:48	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 14:50:48	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 14:50:48	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 14:50:48	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 14:51:07	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 14:51:07	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 14:51:07	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 14:51:13	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 14:51:13	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 14:51:13	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 14:51:13	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 14:51:13	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 14:51:13	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 14:51:25	SIG	M62/2197B1	OFF	M62 J25 - J30	
11/09/15 14:51:25	SIG	M62/2197B2	OFF	M62 J25 - J30	
11/09/15 14:51:25	SIG	M62/2197B3	OFF	M62 J25 - J30	
11/09/15 14:52:54	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:52:55	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:53:00	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:53:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:53:11	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:53:17	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 14:53:23	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2159B1	OFF	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2159B2	OFF	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2170B1	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2170B2	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2177B1	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2177B2	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2177L1	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2177L2	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2183B1	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2183B2	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2183L1	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2183L2	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2189B1	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2189B2	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2189B3	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2189B4	NR	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2194B1	OFF	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2194B2	OFF	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2194B3	OFF	M62 J25 - J30	
11/09/15 14:53:25	SIG	M62/2194B4	OFF	M62 J25 - J30	
11/09/15 14:53:26	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:53:27	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2025B1	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2025B2	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2025B3	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2025B4	40R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 14:53:28	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 14:53:32	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:53:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:53:44	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:53:50	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:54:01	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:54:02	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:54:07	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:54:18	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 14:54:18	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:54:23	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2114A1	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2114A2	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2114A3	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2117A2	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2117A3	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2117A4	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2122K1	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2122K2	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2124A2	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2124A3	60R	M62 J25 - J30	
11/09/15 14:54:34	SIG	M62/2124A4	60R	M62 J25 - J30	
11/09/15 14:54:44	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:54:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:54:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:54:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 14:55:07	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 14:55:07	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 14:55:07	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 14:55:07	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 14:55:07	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 14:55:07	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2033B1	40R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2033B2	40R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2033B4	40R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2041B1	50R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 14:55:13	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 14:56:25	SIG	M62/2189B1	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2170B1	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2170B2	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2177B1	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2177B2	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2177L1	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2177L2	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2183B1	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2183L1	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2183L2	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2189B2	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2189B3	OFF	M62 J25 - J30	
11/09/15 14:56:26	SIG	M62/2189B4	OFF	M62 J25 - J30	
11/09/15 14:57:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 14:57:49	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 14:57:54	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 14:59:21	SIG	M62/2041B1	40R	M62 J25 - J30	
11/09/15 14:59:21	SIG	M62/2041B2	40R	M62 J25 - J30	
11/09/15 14:59:21	SIG	M62/2041B3	40R	M62 J25 - J30	
11/09/15 14:59:21	SIG	M62/2041B4	40R	M62 J25 - J30	
11/09/15 15:00:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:00:53	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:00:58	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2114A1	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2114A2	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2114A3	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2117A1	BLNK	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2117A2	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2117A3	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2117A4	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2122K1	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2122K2	OFF	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2124A2	NR	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2124A3	NR	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2124A4	NR	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2135A1	NR	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2135A2	NR	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2135A3	NR	M62 J25 - J30	
11/09/15 15:03:25	SIG	M62/2135A4	NR	M62 J25 - J30	
11/09/15 15:03:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:03:56	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:04:02	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:06:18	SIG	M62/2050B2	50R	M62 J25 - J30	
11/09/15 15:06:18	SIG	M62/2050B3	50R	M62 J25 - J30	
11/09/15 15:06:18	SIG	M62/2050B4	50R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2050B2	40R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2050B3	40R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2050B4	40R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 15:06:23	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 15:06:25	SIG	M62/2124A2	OFF	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2124A1	BLNK	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2124A4	OFF	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2135A1	OFF	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2135A2	OFF	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2135A3	OFF	M62 J25 - J30	
11/09/15 15:06:26	SIG	M62/2135A4	OFF	M62 J25 - J30	
11/09/15 15:07:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:07:06	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:07:11	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1999A1	LDR	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 15:07:38	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 15:07:43	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 15:07:48	SIG	M62/2012A1	30R	M62 J25 - J30	
11/09/15 15:07:48	SIG	M62/2018A1	30R	M62 J25 - J30	
11/09/15 15:07:48	SIG	M62/2025A1	30R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 15:07:54	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2004A1	LDR	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2012A1	20R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2018A1	20R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2025A1	20R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 15:07:54	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 15:07:59	SIG	M62/2012A1	STOP	M62 J25 - J30	
11/09/15 15:07:59	SIG	M62/2018A1	STOP	M62 J25 - J30	
11/09/15 15:07:59	SIG	M62/2025A1	STOP	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 15:08:09	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 15:08:14	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1992A2	OFF	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1992A3	OFF	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1992J1	OFF	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1999A1	NR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1999A2	NR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/1999A3	NR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2004A1	NR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2004A2	NR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2004A3	NR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2018A1	LDR	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 15:09:42	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 15:10:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:10:06	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:10:12	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2069M1	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2069M2	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2081B1	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2081B2	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2081B3	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M62/2081L1	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 15:12:09	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 15:12:42	SIG	M62/1999A1	OFF	M62 J25 - J30	
11/09/15 15:12:42	SIG	M62/2004A1	OFF	M62 J25 - J30	
11/09/15 15:12:43	SIG	M62/1999A2	OFF	M62 J25 - J30	
11/09/15 15:12:43	SIG	M62/1999A3	OFF	M62 J25 - J30	
11/09/15 15:12:43	SIG	M62/2004A2	OFF	M62 J25 - J30	
11/09/15 15:12:43	SIG	M62/2004A3	OFF	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 15:12:50	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 15:13:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:13:08	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:13:13	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:13:33	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 15:13:33	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 15:13:34	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 15:14:25	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 15:14:25	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 15:14:25	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 15:15:18	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 15:15:23	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2088B2	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2088B3	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2088B4	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2097B2	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2097B3	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2097B4	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2106B2	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2106B3	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2106B4	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2113B1	BLNK	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2113B2	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2113B3	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2113B4	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2117B3	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2120M1	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2120M2	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2125B1	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2125B2	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2125B3	OFF	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2125L1	NR	M62 J25 - J30	
11/09/15 15:15:25	SIG	M62/2125L2	NR	M62 J25 - J30	
11/09/15 15:16:11	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:16:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:16:17	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2088B2	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2088B3	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2088B4	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2097B2	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2097B3	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2097B4	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B1	REDX	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B2	NR	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B3	NR	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2113B4	NR	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2117B1	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2117B3	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2120M1	60R	M62 J25 - J30	
11/09/15 15:16:24	SIG	M62/2120M2	60R	M62 J25 - J30	
11/09/15 15:18:15	SIG	M62/2088B1	60R	M62 J25 - J30	
11/09/15 15:18:25	SIG	M62/2125L1	OFF	M62 J25 - J30	
11/09/15 15:18:25	SIG	M62/2125L2	OFF	M62 J25 - J30	
11/09/15 15:18:42	SIG	M62/2097B1	60R	M62 J25 - J30	
11/09/15 15:19:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:19:14	SIG	M62/2106B1	60R	M62 J25 - J30	
11/09/15 15:19:15	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:19:19	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 15:19:20	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:19:52	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 15:19:52	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 15:19:52	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 15:19:52	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 15:19:54	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 15:20:51	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 15:20:51	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 15:20:51	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 15:20:51	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 15:21:28	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 15:21:28	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 15:21:28	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 15:21:28	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 15:21:57	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 15:21:57	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 15:21:57	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 15:21:57	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 15:22:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:22:19	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:22:25	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:25:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:25:23	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:25:28	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:25:58	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 15:25:58	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 15:25:58	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 15:25:58	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 15:26:17	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 15:26:17	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 15:26:17	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 15:26:17	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 15:27:14	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 15:27:14	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 15:27:14	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 15:27:14	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 15:28:11	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2025B1	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2025B2	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2025B3	40R	M62 J25 - J30	
11/09/15 15:28:16	SIG	M62/2025B4	40R	M62 J25 - J30	
11/09/15 15:28:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:28:25	SIG	M62/2097B1	50R	M62 J25 - J30	
11/09/15 15:28:25	SIG	M62/2097B2	50R	M62 J25 - J30	
11/09/15 15:28:25	SIG	M62/2097B3	50R	M62 J25 - J30	
11/09/15 15:28:25	SIG	M62/2097B4	50R	M62 J25 - J30	
11/09/15 15:28:26	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:28:31	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2050B2	50R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2050B3	50R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2050B4	50R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 15:28:32	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 15:29:10	SIG	M62/2097B1	40R	M62 J25 - J30	
11/09/15 15:29:10	SIG	M62/2097B2	40R	M62 J25 - J30	
11/09/15 15:29:10	SIG	M62/2097B3	40R	M62 J25 - J30	
11/09/15 15:29:10	SIG	M62/2097B4	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2050B2	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2050B3	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2050B4	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 15:30:00	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 15:31:25	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 15:31:25	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 15:31:25	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 15:31:25	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 15:31:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:31:30	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:31:35	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:32:05	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 15:32:05	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 15:32:05	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 15:32:05	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 15:32:11	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 15:32:11	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 15:32:11	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 15:32:11	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 15:33:26	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 15:33:32	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 15:33:32	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 15:33:32	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 15:33:32	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 15:33:38	SIG	M62/1968A1	50R	M62 J25 - J30	
11/09/15 15:33:38	SIG	M62/1968A2	50R	M62 J25 - J30	
11/09/15 15:33:38	SIG	M62/1968A3	50R	M62 J25 - J30	
11/09/15 15:33:38	SIG	M62/1968A4	50R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1960A1	50R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1960A2	50R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1960A3	50R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1960K1	50R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1960K2	50R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1968A1	40R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1968A2	40R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1968A3	40R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1968A4	40R	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1974A1	NR	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1974A2	NR	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1974A3	NR	M62 J25 - J30	
11/09/15 15:33:44	SIG	M62/1974A4	NR	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2050B2	50R	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2050B3	50R	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2050B4	50R	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 15:33:59	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 15:34:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:34:33	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 15:34:33	SIG	M62/2050B2	40R	M62 J25 - J30	
11/09/15 15:34:33	SIG	M62/2050B3	40R	M62 J25 - J30	
11/09/15 15:34:33	SIG	M62/2050B4	40R	M62 J25 - J30	
11/09/15 15:34:39	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 15:34:52	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2113B1	50R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 15:35:22	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 15:35:29	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 15:35:29	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 15:35:30	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 15:35:30	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 15:36:25	SIG	M62/2125B1	60R	M62 J25 - J30	
11/09/15 15:36:25	SIG	M62/2125B2	60R	M62 J25 - J30	
11/09/15 15:36:25	SIG	M62/2125B3	60R	M62 J25 - J30	
11/09/15 15:36:25	SIG	M62/2125L1	60R	M62 J25 - J30	
11/09/15 15:36:25	SIG	M62/2125L2	60R	M62 J25 - J30	
11/09/15 15:36:45	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 15:36:45	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 15:36:45	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 15:36:45	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1960A1	OFF	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1960A2	OFF	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1960A3	OFF	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1960K1	OFF	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1960K2	OFF	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1968A1	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1968A2	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1968A3	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1968A4	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1974A1	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1974A2	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1974A3	NR	M62 J25 - J30	
11/09/15 15:37:38	SIG	M62/1974A4	NR	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 15:38:00	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 15:38:34	SIG	M62/2041B1	50R	M62 J25 - J30	
11/09/15 15:38:34	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 15:38:34	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 15:38:34	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 15:39:11	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2050B2	50R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2050B3	50R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2050B4	50R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 15:39:19	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2097B1	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2097B2	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2097B3	50R	M62 J25 - J30	
11/09/15 15:39:30	SIG	M62/2097B4	50R	M62 J25 - J30	
11/09/15 15:39:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:39:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:39:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:39:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2097B1	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2097B2	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2097B3	40R	M62 J25 - J30	
11/09/15 15:39:58	SIG	M62/2097B4	40R	M62 J25 - J30	
11/09/15 15:40:08	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 15:40:08	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 15:40:08	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1968A1	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1968A2	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1968A3	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1968A4	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1974A1	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1974A2	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1974A3	OFF	M62 J25 - J30	
11/09/15 15:40:39	SIG	M62/1974A4	OFF	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 15:40:45	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2097B1	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2097B2	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2097B3	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2097B4	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 15:41:21	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 15:42:11	SIG	M62/2097B1	40R	M62 J25 - J30	
11/09/15 15:42:11	SIG	M62/2097B2	40R	M62 J25 - J30	
11/09/15 15:42:11	SIG	M62/2097B3	40R	M62 J25 - J30	
11/09/15 15:42:11	SIG	M62/2097B4	40R	M62 J25 - J30	
11/09/15 15:42:19	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 15:42:19	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 15:42:19	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 15:42:19	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 15:42:19	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 15:42:19	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 15:43:44	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 15:43:44	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 15:43:44	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 15:43:44	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 15:43:49	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 15:43:49	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 15:43:49	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 15:43:49	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 15:43:55	SIG	M62/2033A1	30R	M62 J25 - J30	
11/09/15 15:44:00	SIG	M62/2033A1	20R	M62 J25 - J30	
11/09/15 15:44:00	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 15:44:00	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 15:44:00	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 15:44:05	SIG	M62/2033A1	STOP	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2041B1	60R	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2041B2	60R	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2041B3	60R	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2041B4	60R	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2050B2	60R	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2050B3	60R	M62 J25 - J30	
11/09/15 15:44:25	SIG	M62/2050B4	60R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2113B1	50R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 15:46:00	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 15:46:20	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 15:46:20	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 15:46:20	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 15:46:20	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 15:46:20	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 15:46:20	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 15:46:35	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 15:46:53	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 15:46:53	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 15:46:53	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 15:46:53	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 15:46:53	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 15:46:53	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 15:47:26	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 15:47:26	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 15:47:26	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 15:47:26	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 15:48:11	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 15:48:11	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 15:48:11	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 15:48:48	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 15:48:48	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 15:48:48	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1999A1	40R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1999A2	40R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1999A3	40R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 15:49:47	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 15:49:58	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 15:50:00	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 15:52:26	SIG	M62/2113B1	50R	M62 J25 - J30	
11/09/15 15:52:26	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 15:52:26	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 15:52:26	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 15:52:32	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 15:52:32	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 15:52:32	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 15:52:32	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 15:53:23	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1979K1	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1979K2	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1981A1	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1981A2	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1981A3	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1981A4	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 15:53:36	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 15:54:08	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 15:54:23	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 15:54:23	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 15:54:23	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 15:54:26	SIG	M62/2057B1	60R	M62 J25 - J30	
11/09/15 15:54:26	SIG	M62/2057B2	60R	M62 J25 - J30	
11/09/15 15:54:26	SIG	M62/2057B3	60R	M62 J25 - J30	
11/09/15 15:54:26	SIG	M62/2057B4	60R	M62 J25 - J30	
11/09/15 15:56:06	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 15:56:06	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 15:56:06	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 15:57:37	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2097B1	50R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2097B2	50R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2097B4	50R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 15:57:47	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 15:59:21	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 15:59:21	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 15:59:21	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 15:59:21	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 15:59:49	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 15:59:49	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 15:59:49	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 15:59:49	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 15:59:54	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 15:59:54	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 15:59:54	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 15:59:54	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 15:59:59	SIG	M62/2033A1	30R	M62 J25 - J30	
11/09/15 16:00:04	SIG	M62/2033A1	20R	M62 J25 - J30	
11/09/15 16:00:04	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 16:00:04	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 16:00:04	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 16:00:07	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 16:00:07	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 16:00:07	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 16:00:07	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 16:00:10	SIG	M62/2033A1	STOP	M62 J25 - J30	
11/09/15 16:00:26	SIG	M62/1974A1	60R	M62 J25 - J30	
11/09/15 16:00:26	SIG	M62/1974A2	60R	M62 J25 - J30	
11/09/15 16:00:26	SIG	M62/1974A3	60R	M62 J25 - J30	
11/09/15 16:00:26	SIG	M62/1974A4	60R	M62 J25 - J30	
11/09/15 16:02:26	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 16:02:26	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 16:02:26	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 16:02:26	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 16:03:06	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 16:03:06	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 16:03:06	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 16:03:06	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2170A1	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2170A2	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2170K1	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2170K2	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A1	REDX	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A2	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A2	NR	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A3	NR	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A3	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A4	NR	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2177A4	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2183A1	REDX	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2183A2	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2183A3	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2183A4	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2189A1	REDX	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2189A2	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2189A3	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2189A4	60R	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2197A1	NR	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2197A2	NR	M62 J25 - J30	
11/09/15 16:03:09	SIG	M62/2197A3	NR	M62 J25 - J30	
11/09/15 16:03:43	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 16:03:43	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 16:03:48	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 16:03:48	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 16:03:48	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 16:03:48	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 16:03:58	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 16:04:02	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 16:04:02	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 16:04:02	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 16:04:02	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 16:04:06	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 16:04:06	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 16:04:06	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 16:04:06	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 16:04:16	SIG	M62/2189A1	60R	M62 J25 - J30	
11/09/15 16:04:36	SIG	M62/2183A1	60R	M62 J25 - J30	
11/09/15 16:04:41	SIG	M62/2177A1	60R	M62 J25 - J30	
11/09/15 16:04:59	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 16:04:59	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 16:04:59	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 16:04:59	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 16:07:58	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 16:08:06	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1979K1	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1979K2	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1981A1	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1981A2	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1981A3	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1981A4	50R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1987A1	40R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1987A3	40R	M62 J25 - J30	
11/09/15 16:08:30	SIG	M62/1987J1	40R	M62 J25 - J30	
11/09/15 16:08:39	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 16:08:39	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 16:08:39	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 16:08:48	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/1968A1	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/1968A2	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/1968A3	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/1968A4	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/2106B1	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 16:11:26	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 16:12:49	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 16:12:56	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 16:13:26	SIG	M62/1960A1	60R	M62 J25 - J30	
11/09/15 16:13:26	SIG	M62/1960A2	60R	M62 J25 - J30	
11/09/15 16:13:26	SIG	M62/1960A3	60R	M62 J25 - J30	
11/09/15 16:13:26	SIG	M62/1960K1	60R	M62 J25 - J30	
11/09/15 16:13:26	SIG	M62/1960K2	60R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1974A1	50R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1974A2	50R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1974A3	50R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1974A4	50R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1979K1	40R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1979K2	40R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1981A1	40R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1981A2	40R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1981A3	40R	M62 J25 - J30	
11/09/15 16:15:23	SIG	M62/1981A4	40R	M62 J25 - J30	
11/09/15 16:16:09	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 16:16:09	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 16:16:09	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 16:16:09	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 16:18:12	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 16:18:12	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 16:18:12	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 16:18:12	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1968A1	50R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1968A2	50R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1968A3	50R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1968A4	50R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1974A1	40R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1974A2	40R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1974A3	40R	M62 J25 - J30	
11/09/15 16:19:32	SIG	M62/1974A4	40R	M62 J25 - J30	
11/09/15 16:21:26	SIG	M62/1955K1	60R	M62 J25 - J30	
11/09/15 16:21:26	SIG	M62/1955K2	60R	M62 J25 - J30	
11/09/15 16:21:26	SIG	M62/1956A1	60R	M62 J25 - J30	
11/09/15 16:21:26	SIG	M62/1956A2	60R	M62 J25 - J30	
11/09/15 16:21:26	SIG	M62/1956A3	60R	M62 J25 - J30	
11/09/15 16:22:52	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 16:22:52	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 16:22:52	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 16:22:58	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2025B1	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2025B2	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2025B3	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2025B4	40R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 16:23:03	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 16:24:26	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 16:24:26	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 16:24:26	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 16:24:26	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1960A1	50R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1960A2	50R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1960A3	50R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1960K1	50R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1960K2	50R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1968A1	40R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1968A2	40R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1968A3	40R	M62 J25 - J30	
11/09/15 16:25:07	SIG	M62/1968A4	40R	M62 J25 - J30	
11/09/15 16:25:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:25:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:25:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:25:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 16:26:58	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 16:27:06	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 16:27:06	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 16:27:06	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 16:27:06	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 16:27:27	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 16:28:51	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 16:28:51	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 16:28:51	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 16:28:51	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 16:28:57	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 16:28:57	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 16:28:57	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 16:28:57	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 16:29:02	SIG	M62/2041A1	30R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2033A1	LDR	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2041A1	20R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 16:29:08	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 16:29:13	SIG	M62/2041A1	STOP	M62 J25 - J30	
11/09/15 16:29:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:29:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:29:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:29:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 16:31:16	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 16:32:18	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 16:32:24	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 16:33:19	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 16:33:19	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1955K1	50R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1955K2	50R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1956A1	50R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1956A2	50R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1960A1	40R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1960A2	40R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1960A3	40R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1960K1	40R	M62 J25 - J30	
11/09/15 16:34:08	SIG	M62/1960K2	40R	M62 J25 - J30	
11/09/15 16:34:48	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:34:49	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 16:35:12	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 16:35:33	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:35:34	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:36:17	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 16:36:17	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 16:36:17	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 16:36:17	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 16:36:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:36:23	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:37:13	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 16:37:13	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 16:37:13	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 16:37:13	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 16:37:23	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:37:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:38:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:38:23	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:39:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:39:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:39:46	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 16:39:46	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 16:39:46	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 16:39:46	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 16:39:51	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 16:39:51	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 16:39:51	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 16:39:51	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 16:39:58	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 16:39:58	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 16:39:58	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 16:39:58	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 16:40:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:40:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:41:11	SIG	M62/2197A1	60R	M62 J25 - J30	
11/09/15 16:41:11	SIG	M62/2197A2	60R	M62 J25 - J30	
11/09/15 16:41:11	SIG	M62/2197A3	60R	M62 J25 - J30	
11/09/15 16:41:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:41:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:42:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:42:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:43:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:43:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 16:43:26	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 16:44:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:44:23	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 16:44:40	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 16:44:44	SIG	M62/1960A1	50R	M62 J25 - J30	
11/09/15 16:44:44	SIG	M62/1960A2	50R	M62 J25 - J30	
11/09/15 16:44:44	SIG	M62/1960A3	50R	M62 J25 - J30	
11/09/15 16:44:44	SIG	M62/1960K1	50R	M62 J25 - J30	
11/09/15 16:44:44	SIG	M62/1960K2	50R	M62 J25 - J30	
11/09/15 16:45:08	SIG	M62/2097B1	40R	M62 J25 - J30	
11/09/15 16:45:08	SIG	M62/2097B2	40R	M62 J25 - J30	
11/09/15 16:45:08	SIG	M62/2097B4	40R	M62 J25 - J30	
11/09/15 16:45:11	SIG	M62/2197A1	NR	M62 J25 - J30	
11/09/15 16:45:11	SIG	M62/2197A2	NR	M62 J25 - J30	
11/09/15 16:45:11	SIG	M62/2197A3	NR	M62 J25 - J30	
11/09/15 16:45:14	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 16:45:14	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 16:45:14	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 16:45:14	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 16:45:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:45:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 16:45:48	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 16:45:51	SIG	M62/1960A1	40R	M62 J25 - J30	
11/09/15 16:45:51	SIG	M62/1960A2	40R	M62 J25 - J30	
11/09/15 16:45:51	SIG	M62/1960A3	40R	M62 J25 - J30	
11/09/15 16:45:51	SIG	M62/1960K1	40R	M62 J25 - J30	
11/09/15 16:45:51	SIG	M62/1960K2	40R	M62 J25 - J30	
11/09/15 16:46:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:46:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 16:46:42	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 16:47:02	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 16:47:02	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 16:47:02	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 16:47:02	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 16:47:08	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 16:47:08	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 16:47:08	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 16:47:08	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 16:47:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:47:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:48:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:48:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 16:49:14	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 16:49:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:49:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:49:30	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 16:49:30	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 16:49:50	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1992A1	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1992A2	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1992A3	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1992J1	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1999A1	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1999A2	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1999A3	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 16:49:52	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 16:49:57	SIG	M62/2197A1	60R	M62 J25 - J30	
11/09/15 16:49:57	SIG	M62/2197A2	60R	M62 J25 - J30	
11/09/15 16:49:57	SIG	M62/2197A3	60R	M62 J25 - J30	
11/09/15 16:50:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:50:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:50:48	SIG	M62/1960A1	50R	M62 J25 - J30	
11/09/15 16:50:48	SIG	M62/1960A2	50R	M62 J25 - J30	
11/09/15 16:50:48	SIG	M62/1960A3	50R	M62 J25 - J30	
11/09/15 16:50:48	SIG	M62/1960K1	50R	M62 J25 - J30	
11/09/15 16:50:48	SIG	M62/1960K2	50R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 16:51:02	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 16:51:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:51:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:52:04	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 16:52:04	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 16:52:04	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 16:52:04	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 16:52:04	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 16:52:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:52:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 16:52:30	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 16:52:36	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1979K1	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1979K2	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1981A1	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1981A2	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1981A3	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1981A4	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 16:53:09	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 16:53:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:53:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 16:53:37	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1979K1	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1979K2	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1981A1	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1981A2	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1981A3	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1981A4	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1987A1	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1987A3	40R	M62 J25 - J30	
11/09/15 16:54:04	SIG	M62/1987J1	40R	M62 J25 - J30	
11/09/15 16:54:05	SIG	M62/2197A1	50R	M62 J25 - J30	
11/09/15 16:54:05	SIG	M62/2197A2	50R	M62 J25 - J30	
11/09/15 16:54:05	SIG	M62/2197A3	50R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2189A1	50R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2189A2	50R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2189A3	50R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2189A4	50R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2197A1	40R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2197A2	40R	M62 J25 - J30	
11/09/15 16:54:10	SIG	M62/2197A3	40R	M62 J25 - J30	
11/09/15 16:54:21	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:54:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:55:21	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:55:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:55:23	SIG	M62/1968A1	50R	M62 J25 - J30	
11/09/15 16:55:23	SIG	M62/1968A2	50R	M62 J25 - J30	
11/09/15 16:55:23	SIG	M62/1968A3	50R	M62 J25 - J30	
11/09/15 16:55:23	SIG	M62/1968A4	50R	M62 J25 - J30	
11/09/15 16:56:21	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:56:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:56:30	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 16:56:30	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 16:56:30	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 16:56:30	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 16:57:09	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 16:57:09	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 16:57:09	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 16:57:09	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2025B1	40R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2025B2	40R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2025B3	40R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2025B4	40R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 16:57:15	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 16:57:22	SIG	M62/1956A3	50R	M62 J25 - J30	
11/09/15 16:57:22	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 16:58:08	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 16:58:08	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 16:58:08	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 16:58:08	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 16:58:14	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 16:58:14	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 16:58:14	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 16:58:14	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 16:58:24	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 16:58:33	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 16:58:33	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 16:58:33	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 16:58:33	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 16:58:38	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 16:58:38	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 16:58:38	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 16:58:38	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2183A1	50R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2183A2	50R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2183A3	50R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2183A4	50R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2189A1	40R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2189A2	40R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2189A3	40R	M62 J25 - J30	
11/09/15 16:59:18	SIG	M62/2189A4	40R	M62 J25 - J30	
11/09/15 16:59:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:59:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:59:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1974A1	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1974A2	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1974A3	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1974A4	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1979K1	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1979K2	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1981A1	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1981A2	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1981A3	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/1981A4	50R	M62 J25 - J30	
11/09/15 16:59:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2113B1	50R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2113B2	50R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2113B3	50R	M62 J25 - J30	
11/09/15 17:00:00	SIG	M62/2113B4	50R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 17:00:03	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 17:00:27	SIG	M62/1955K1	60R	M62 J25 - J30	
11/09/15 17:00:27	SIG	M62/1955K2	60R	M62 J25 - J30	
11/09/15 17:00:27	SIG	M62/1956A1	60R	M62 J25 - J30	
11/09/15 17:00:27	SIG	M62/1956A2	60R	M62 J25 - J30	
11/09/15 17:00:27	SIG	M62/1956A3	60R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2177A1	50R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2177A2	50R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2177A3	50R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2177A4	50R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2183A1	40R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2183A2	40R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2183A3	40R	M62 J25 - J30	
11/09/15 17:00:38	SIG	M62/2183A4	40R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 17:00:45	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 17:00:53	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 17:01:14	SIG	M62/2197A1	60R	M62 J25 - J30	
11/09/15 17:01:14	SIG	M62/2197A2	60R	M62 J25 - J30	
11/09/15 17:01:14	SIG	M62/2197A3	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/1960A1	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/1960A2	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/1960A3	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/1960K1	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/1960K2	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/2163A1	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/2163A2	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/2166K1	60R	M62 J25 - J30	
11/09/15 17:02:27	SIG	M62/2166K2	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 17:02:33	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2170A1	50R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2170A2	50R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2170K1	50R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2170K2	50R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2177A1	40R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2177A2	40R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2177A3	40R	M62 J25 - J30	
11/09/15 17:02:57	SIG	M62/2177A4	40R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2163A1	50R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2163A2	50R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2166K1	50R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2166K2	50R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2170A1	40R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2170A2	40R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2170K1	40R	M62 J25 - J30	
11/09/15 17:03:58	SIG	M62/2170K2	40R	M62 J25 - J30	
11/09/15 17:03:59	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 17:03:59	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 17:03:59	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 17:03:59	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 17:04:02	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 17:04:02	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 17:04:02	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 17:04:02	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 17:04:07	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 17:04:07	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 17:04:27	SIG	M62/2157A1	60R	M62 J25 - J30	
11/09/15 17:04:27	SIG	M62/2157A2	60R	M62 J25 - J30	
11/09/15 17:04:27	SIG	M62/2157J1	60R	M62 J25 - J30	
11/09/15 17:04:27	SIG	M62/2157J2	60R	M62 J25 - J30	
11/09/15 17:04:27	SIG	M62/2157K1	60R	M62 J25 - J30	
11/09/15 17:05:12	SIG	M62/2189A1	60R	M62 J25 - J30	
11/09/15 17:05:12	SIG	M62/2189A2	60R	M62 J25 - J30	
11/09/15 17:05:12	SIG	M62/2189A3	60R	M62 J25 - J30	
11/09/15 17:05:12	SIG	M62/2189A4	60R	M62 J25 - J30	
11/09/15 17:05:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:05:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:05:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:05:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:05:50	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 17:05:50	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 17:05:50	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 17:05:50	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1987A1	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1987A3	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1987J1	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1992A1	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1992A2	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1992A3	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1992J1	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 17:06:07	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 17:06:09	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 17:06:09	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 17:06:09	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 17:06:09	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 17:06:26	SIG	M62/1999A1	40R	M62 J25 - J30	
11/09/15 17:06:26	SIG	M62/1999A2	40R	M62 J25 - J30	
11/09/15 17:06:26	SIG	M62/1999A3	40R	M62 J25 - J30	
11/09/15 17:06:26	SIG	M62/1999J1	40R	M62 J25 - J30	
11/09/15 17:06:26	SIG	M62/1999J2	40R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2157A2	50R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2157K1	50R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2163A1	40R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2163A2	40R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2166K1	40R	M62 J25 - J30	
11/09/15 17:06:39	SIG	M62/2166K2	40R	M62 J25 - J30	
11/09/15 17:06:56	SIG	M62/2183A1	60R	M62 J25 - J30	
11/09/15 17:06:56	SIG	M62/2183A2	60R	M62 J25 - J30	
11/09/15 17:06:56	SIG	M62/2183A3	60R	M62 J25 - J30	
11/09/15 17:06:56	SIG	M62/2183A4	60R	M62 J25 - J30	
11/09/15 17:07:27	SIG	M62/1968A1	60R	M62 J25 - J30	
11/09/15 17:07:27	SIG	M62/1968A2	60R	M62 J25 - J30	
11/09/15 17:07:27	SIG	M62/1968A3	60R	M62 J25 - J30	
11/09/15 17:07:27	SIG	M62/1968A4	60R	M62 J25 - J30	
11/09/15 17:07:52	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 17:07:52	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 17:07:52	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 17:07:52	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 17:07:58	SIG	M62/2177A1	60R	M62 J25 - J30	
11/09/15 17:07:58	SIG	M62/2177A2	60R	M62 J25 - J30	
11/09/15 17:07:58	SIG	M62/2177A3	60R	M62 J25 - J30	
11/09/15 17:07:58	SIG	M62/2177A4	60R	M62 J25 - J30	
11/09/15 17:09:06	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:09:06	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:09:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:09:08	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:09:31	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 17:09:31	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 17:09:31	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 17:09:31	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 17:09:31	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 17:10:27	SIG	M62/1974A1	60R	M62 J25 - J30	
11/09/15 17:10:27	SIG	M62/1974A2	60R	M62 J25 - J30	
11/09/15 17:10:27	SIG	M62/1974A3	60R	M62 J25 - J30	
11/09/15 17:10:27	SIG	M62/1974A4	60R	M62 J25 - J30	
11/09/15 17:10:39	SIG	M62/2166K1	60R	M62 J25 - J30	
11/09/15 17:10:39	SIG	M62/2166K2	60R	M62 J25 - J30	
11/09/15 17:10:39	SIG	M62/2170A1	60R	M62 J25 - J30	
11/09/15 17:10:39	SIG	M62/2170A2	60R	M62 J25 - J30	
11/09/15 17:10:39	SIG	M62/2170K1	60R	M62 J25 - J30	
11/09/15 17:10:39	SIG	M62/2170K2	60R	M62 J25 - J30	
11/09/15 17:10:53	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 17:10:53	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 17:10:53	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 17:11:02	SIG	M62/2033A1	50R	M62 J25 - J30	
11/09/15 17:11:02	SIG	M62/2033A2	50R	M62 J25 - J30	
11/09/15 17:11:02	SIG	M62/2033A3	50R	M62 J25 - J30	
11/09/15 17:11:02	SIG	M62/2033A4	50R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2033A1	40R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2033A2	40R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2033A3	40R	M62 J25 - J30	
11/09/15 17:11:08	SIG	M62/2033A4	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2004A1	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2004A2	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2004A3	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2008K1	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2008K2	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2012A1	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2012A2	40R	M62 J25 - J30	
11/09/15 17:11:15	SIG	M62/2012A3	40R	M62 J25 - J30	
11/09/15 17:11:17	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 17:11:17	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 17:11:17	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 17:11:17	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 17:11:20	SIG	M62/2157A2	40R	M62 J25 - J30	
11/09/15 17:11:20	SIG	M62/2157J1	50R	M62 J25 - J30	
11/09/15 17:11:20	SIG	M62/2157J2	50R	M62 J25 - J30	
11/09/15 17:11:20	SIG	M62/2157K1	40R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2155A1	50R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2155A2	50R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2155J1	50R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2155K1	50R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2157A2	40R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2157J1	40R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2157J2	40R	M62 J25 - J30	
11/09/15 17:11:26	SIG	M62/2157K1	40R	M62 J25 - J30	
11/09/15 17:11:35	SIG	M62/1999A1	50R	M62 J25 - J30	
11/09/15 17:11:35	SIG	M62/1999A2	50R	M62 J25 - J30	
11/09/15 17:11:35	SIG	M62/1999A3	50R	M62 J25 - J30	
11/09/15 17:11:35	SIG	M62/1999J1	50R	M62 J25 - J30	
11/09/15 17:11:35	SIG	M62/1999J2	50R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2151A1	50R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2151A2	50R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2151J1	50R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2151K1	50R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2155A1	40R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2155A2	40R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2155J1	40R	M62 J25 - J30	
11/09/15 17:11:43	SIG	M62/2155K1	40R	M62 J25 - J30	
11/09/15 17:11:45	SIG	M62/2106B1	40R	M62 J25 - J30	
11/09/15 17:11:45	SIG	M62/2106B2	40R	M62 J25 - J30	
11/09/15 17:11:45	SIG	M62/2106B3	40R	M62 J25 - J30	
11/09/15 17:11:45	SIG	M62/2106B4	40R	M62 J25 - J30	
11/09/15 17:12:25	SIG	M62/2157A2	LDL	M62 J25 - J30	
11/09/15 17:12:25	SIG	M62/2163A2	LDL	M62 J25 - J30	
11/09/15 17:12:25	SIG	M62/2170A1	50R	M62 J25 - J30	
11/09/15 17:12:25	SIG	M62/2170A2	50R	M62 J25 - J30	
11/09/15 17:12:25	SIG	M62/2170K1	50R	M62 J25 - J30	
11/09/15 17:12:25	SIG	M62/2170K2	50R	M62 J25 - J30	
11/09/15 17:12:27	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 17:12:27	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 17:12:27	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 17:12:27	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 17:12:31	SIG	M62/2170A1	40R	M62 J25 - J30	
11/09/15 17:12:31	SIG	M62/2170A2	40R	M62 J25 - J30	
11/09/15 17:12:31	SIG	M62/2170K1	40R	M62 J25 - J30	
11/09/15 17:12:31	SIG	M62/2170K2	40R	M62 J25 - J30	
11/09/15 17:12:36	SIG	M62/2170A2	30R	M62 J25 - J30	
11/09/15 17:12:41	SIG	M62/2166K1	50R	M62 J25 - J30	
11/09/15 17:12:41	SIG	M62/2166K2	50R	M62 J25 - J30	
11/09/15 17:12:41	SIG	M62/2170A1	40R	M62 J25 - J30	
11/09/15 17:12:41	SIG	M62/2170A2	20R	M62 J25 - J30	
11/09/15 17:12:41	SIG	M62/2170K1	40R	M62 J25 - J30	
11/09/15 17:12:41	SIG	M62/2170K2	40R	M62 J25 - J30	
11/09/15 17:12:47	SIG	M62/2170A2	STOP	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2144A1	50R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2144A2	50R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2144J1	50R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2144K1	50R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2151A1	40R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2151A2	40R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2151J1	40R	M62 J25 - J30	
11/09/15 17:12:50	SIG	M62/2151K1	40R	M62 J25 - J30	
11/09/15 17:13:27	SIG	M62/2135A1	60R	M62 J25 - J30	
11/09/15 17:13:27	SIG	M62/2135A2	60R	M62 J25 - J30	
11/09/15 17:13:27	SIG	M62/2135A3	60R	M62 J25 - J30	
11/09/15 17:13:27	SIG	M62/2135A4	60R	M62 J25 - J30	
11/09/15 17:13:28	SIG	M62/1979K1	60R	M62 J25 - J30	
11/09/15 17:13:28	SIG	M62/1979K2	60R	M62 J25 - J30	
11/09/15 17:13:28	SIG	M62/1981A1	60R	M62 J25 - J30	
11/09/15 17:13:28	SIG	M62/1981A2	60R	M62 J25 - J30	
11/09/15 17:13:28	SIG	M62/1981A3	60R	M62 J25 - J30	
11/09/15 17:13:28	SIG	M62/1981A4	60R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 17:13:49	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2018A1	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2018A2	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2018A3	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2018A4	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2025A1	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2025A2	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2025A3	40R	M62 J25 - J30	
11/09/15 17:13:54	SIG	M62/2025A4	40R	M62 J25 - J30	
11/09/15 17:14:10	SIG	M62/2144A1	40R	M62 J25 - J30	
11/09/15 17:14:10	SIG	M62/2144A2	40R	M62 J25 - J30	
11/09/15 17:14:10	SIG	M62/2144J1	40R	M62 J25 - J30	
11/09/15 17:14:10	SIG	M62/2144K1	40R	M62 J25 - J30	
11/09/15 17:14:12	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:14:12	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:14:18	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:14:35	SIG	M62/2041A1	50R	M62 J25 - J30	
11/09/15 17:14:35	SIG	M62/2041A2	50R	M62 J25 - J30	
11/09/15 17:14:35	SIG	M62/2041A3	50R	M62 J25 - J30	
11/09/15 17:14:35	SIG	M62/2041A4	50R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1987A1	60R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1987A3	60R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1987J1	60R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1992A1	60R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1992A2	60R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1992A3	60R	M62 J25 - J30	
11/09/15 17:14:37	SIG	M62/1992J1	60R	M62 J25 - J30	
11/09/15 17:14:41	SIG	M62/2041A1	40R	M62 J25 - J30	
11/09/15 17:14:41	SIG	M62/2041A2	40R	M62 J25 - J30	
11/09/15 17:14:41	SIG	M62/2041A3	40R	M62 J25 - J30	
11/09/15 17:14:41	SIG	M62/2041A4	40R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2008K1	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2008K2	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2012A1	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2012A2	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2012A3	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2018A1	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2018A2	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2018A3	50R	M62 J25 - J30	
11/09/15 17:15:15	SIG	M62/2018A4	50R	M62 J25 - J30	
11/09/15 17:15:27	SIG	M62/2122K1	60R	M62 J25 - J30	
11/09/15 17:15:27	SIG	M62/2122K2	60R	M62 J25 - J30	
11/09/15 17:15:27	SIG	M62/2124A1	REDX	M62 J25 - J30	
11/09/15 17:15:27	SIG	M62/2124A2	60R	M62 J25 - J30	
11/09/15 17:15:27	SIG	M62/2124A3	60R	M62 J25 - J30	
11/09/15 17:15:27	SIG	M62/2124A4	60R	M62 J25 - J30	
11/09/15 17:15:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:15:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:15:42	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:15:42	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:16:24	SIG	M62/2135A1	50R	M62 J25 - J30	
11/09/15 17:16:24	SIG	M62/2135A2	50R	M62 J25 - J30	
11/09/15 17:16:24	SIG	M62/2135A3	50R	M62 J25 - J30	
11/09/15 17:16:24	SIG	M62/2135A4	50R	M62 J25 - J30	
11/09/15 17:16:26	SIG	M62/2004A1	50R	M62 J25 - J30	
11/09/15 17:16:26	SIG	M62/2004A2	50R	M62 J25 - J30	
11/09/15 17:16:26	SIG	M62/2004A3	50R	M62 J25 - J30	
11/09/15 17:16:27	SIG	M62/2117A1	REDX	M62 J25 - J30	
11/09/15 17:16:27	SIG	M62/2117A2	60R	M62 J25 - J30	
11/09/15 17:16:27	SIG	M62/2117A3	60R	M62 J25 - J30	
11/09/15 17:16:27	SIG	M62/2117A4	60R	M62 J25 - J30	
11/09/15 17:16:30	SIG	M62/2135A1	40R	M62 J25 - J30	
11/09/15 17:16:30	SIG	M62/2135A2	40R	M62 J25 - J30	
11/09/15 17:16:30	SIG	M62/2135A3	40R	M62 J25 - J30	
11/09/15 17:16:30	SIG	M62/2135A4	40R	M62 J25 - J30	
11/09/15 17:17:16	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:17:16	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:17:22	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2018A1	60R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2018A2	60R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2018A3	60R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2018A4	60R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2025A1	50R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2025A2	50R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2025A3	50R	M62 J25 - J30	
11/09/15 17:17:48	SIG	M62/2025A4	50R	M62 J25 - J30	
11/09/15 17:18:27	SIG	M62/1999A1	60R	M62 J25 - J30	
11/09/15 17:18:27	SIG	M62/1999A2	60R	M62 J25 - J30	
11/09/15 17:18:27	SIG	M62/1999A3	60R	M62 J25 - J30	
11/09/15 17:18:27	SIG	M62/2197A1	NR	M62 J25 - J30	
11/09/15 17:18:27	SIG	M62/2197A2	NR	M62 J25 - J30	
11/09/15 17:18:27	SIG	M62/2197A3	NR	M62 J25 - J30	
11/09/15 17:18:34	SIG	M62/2041A1	60R	M62 J25 - J30	
11/09/15 17:18:34	SIG	M62/2041A2	60R	M62 J25 - J30	
11/09/15 17:18:34	SIG	M62/2041A3	60R	M62 J25 - J30	
11/09/15 17:18:34	SIG	M62/2041A4	60R	M62 J25 - J30	
11/09/15 17:20:20	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:20:20	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:20:25	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 17:20:27	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2004A1	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2004A2	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2004A3	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2008K1	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2008K2	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2012A1	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2012A2	60R	M62 J25 - J30	
11/09/15 17:20:27	SIG	M62/2012A3	60R	M62 J25 - J30	
11/09/15 17:20:28	SIG	M62/2122K1	50R	M62 J25 - J30	
11/09/15 17:20:28	SIG	M62/2122K2	50R	M62 J25 - J30	
11/09/15 17:20:28	SIG	M62/2124A2	50R	M62 J25 - J30	
11/09/15 17:20:28	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:20:28	SIG	M62/2124A4	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2025A1	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2025A2	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2025A3	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2025A4	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2033A1	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2033A2	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2033A3	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2033A4	60R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 17:20:37	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 17:20:41	SIG	M62/2106B1	50R	M62 J25 - J30	
11/09/15 17:20:41	SIG	M62/2106B2	50R	M62 J25 - J30	
11/09/15 17:20:41	SIG	M62/2106B3	50R	M62 J25 - J30	
11/09/15 17:20:41	SIG	M62/2106B4	50R	M62 J25 - J30	
11/09/15 17:20:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:20:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:20:42	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:20:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:21:11	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 17:21:11	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 17:21:11	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2117A2	50R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2117A3	50R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2117A4	50R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2122K1	40R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2122K2	40R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2124A2	40R	M62 J25 - J30	
11/09/15 17:21:53	SIG	M62/2124A4	40R	M62 J25 - J30	
11/09/15 17:21:59	SIG	M62/2122K1	40R	M62 J25 - J30	
11/09/15 17:21:59	SIG	M62/2122K2	40R	M62 J25 - J30	
11/09/15 17:21:59	SIG	M62/2124A2	40R	M62 J25 - J30	
11/09/15 17:21:59	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:21:59	SIG	M62/2124A4	40R	M62 J25 - J30	
11/09/15 17:22:09	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:22:09	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:22:15	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:22:25	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:22:25	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1955K1	OFF	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1955K2	OFF	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1956A1	OFF	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1956A2	OFF	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1960A1	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1960A2	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1960A3	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1960K1	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1960K2	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1968A1	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1968A2	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1968A3	NR	M62 J25 - J30	
11/09/15 17:22:27	SIG	M62/1968A4	NR	M62 J25 - J30	
11/09/15 17:22:31	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:22:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:22:41	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 17:22:45	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 17:22:47	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 17:22:50	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2157A2	50R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2163A2	50R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2166K1	60R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2166K2	60R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2170A1	60R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2170A2	60R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2170K1	60R	M62 J25 - J30	
11/09/15 17:22:56	SIG	M62/2170K2	60R	M62 J25 - J30	
11/09/15 17:22:57	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:23:01	SIG	M62/2157A2	40R	M62 J25 - J30	
11/09/15 17:23:01	SIG	M62/2163A2	40R	M62 J25 - J30	
11/09/15 17:23:02	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:23:02	SIG	M62/2132B1	50R	M62 J25 - J30	
11/09/15 17:23:02	SIG	M62/2132B2	50R	M62 J25 - J30	
11/09/15 17:23:02	SIG	M62/2132B3	50R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2132B1	40R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2132B2	40R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2132B3	40R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2137B1	50R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2137B2	50R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2137B3	50R	M62 J25 - J30	
11/09/15 17:23:07	SIG	M62/2137B4	50R	M62 J25 - J30	
11/09/15 17:23:17	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:23:18	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:23:23	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:23:23	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:23:24	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:23:28	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 17:23:28	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 17:23:28	SIG	M62/1974A1	NR	M62 J25 - J30	
11/09/15 17:23:28	SIG	M62/1974A2	NR	M62 J25 - J30	
11/09/15 17:23:28	SIG	M62/1974A3	NR	M62 J25 - J30	
11/09/15 17:23:28	SIG	M62/1974A4	NR	M62 J25 - J30	
11/09/15 17:23:29	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:23:30	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:23:31	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:23:36	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 17:24:15	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2074B2	40R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2074B3	40R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2074B4	40R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2081B1	40R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2081B2	40R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2081B3	40R	M62 J25 - J30	
11/09/15 17:24:25	SIG	M62/2081L1	40R	M62 J25 - J30	
11/09/15 17:24:28	SIG	M62/2114A1	60R	M62 J25 - J30	
11/09/15 17:24:28	SIG	M62/2114A2	60R	M62 J25 - J30	
11/09/15 17:24:28	SIG	M62/2114A3	60R	M62 J25 - J30	
11/09/15 17:25:21	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 17:25:21	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 17:25:21	SIG	M62/2163A1	50R	M62 J25 - J30	
11/09/15 17:25:21	SIG	M62/2163A2	50R	M62 J25 - J30	
11/09/15 17:25:22	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 17:25:22	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 17:25:24	SIG	M62/2170K1	50R	M62 J25 - J30	
11/09/15 17:25:24	SIG	M62/2170K2	50R	M62 J25 - J30	
11/09/15 17:25:28	SIG	M62/1960A1	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1960A2	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1960A3	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1960K1	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1960K2	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1968A1	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1968A2	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1968A3	OFF	M62 J25 - J30	
11/09/15 17:25:29	SIG	M62/1968A4	OFF	M62 J25 - J30	
11/09/15 17:26:00	SIG	M62/2114A1	50R	M62 J25 - J30	
11/09/15 17:26:00	SIG	M62/2114A2	50R	M62 J25 - J30	
11/09/15 17:26:00	SIG	M62/2114A3	50R	M62 J25 - J30	
11/09/15 17:26:00	SIG	M62/2117A2	40R	M62 J25 - J30	
11/09/15 17:26:00	SIG	M62/2117A3	40R	M62 J25 - J30	
11/09/15 17:26:00	SIG	M62/2117A4	40R	M62 J25 - J30	
11/09/15 17:26:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:26:27	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:26:32	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1979K1	OFF	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1979K2	OFF	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1981A1	NR	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1981A2	NR	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1981A3	NR	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1981A4	NR	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1987A1	NR	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1987A3	NR	M62 J25 - J30	
11/09/15 17:26:37	SIG	M62/1987J1	NR	M62 J25 - J30	
11/09/15 17:26:38	SIG	M62/1974A1	OFF	M62 J25 - J30	
11/09/15 17:26:38	SIG	M62/1974A2	OFF	M62 J25 - J30	
11/09/15 17:26:38	SIG	M62/1974A3	OFF	M62 J25 - J30	
11/09/15 17:26:38	SIG	M62/1974A4	OFF	M62 J25 - J30	
11/09/15 17:26:41	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:26:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:26:45	SIG	M62/2057B1	60R	M62 J25 - J30	
11/09/15 17:26:45	SIG	M62/2057B2	60R	M62 J25 - J30	
11/09/15 17:26:45	SIG	M62/2057B3	60R	M62 J25 - J30	
11/09/15 17:26:45	SIG	M62/2057B4	60R	M62 J25 - J30	
11/09/15 17:26:47	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:26:57	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:26:57	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2132B1	NR	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2132B2	NR	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2132B3	NR	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2137B1	OFF	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2137B2	OFF	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2137B3	OFF	M62 J25 - J30	
11/09/15 17:27:03	SIG	M62/2137B4	OFF	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2097B1	50R	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2097B2	50R	M62 J25 - J30	
11/09/15 17:27:24	SIG	M62/2097B4	50R	M62 J25 - J30	
11/09/15 17:28:20	SIG	M62/2106A2	50R	M62 J25 - J30	
11/09/15 17:28:20	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:28:20	SIG	M62/2106A4	50R	M62 J25 - J30	
11/09/15 17:28:20	SIG	M62/2114A1	40R	M62 J25 - J30	
11/09/15 17:28:20	SIG	M62/2114A2	40R	M62 J25 - J30	
11/09/15 17:28:20	SIG	M62/2114A3	40R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2097A1	REDX	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2097A2	60R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2097A3	60R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2097A4	60R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2106A1	REDX	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2106A2	40R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2106A3	40R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2106A4	40R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2114A1	40R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2114A2	40R	M62 J25 - J30	
11/09/15 17:28:25	SIG	M62/2114A3	40R	M62 J25 - J30	
11/09/15 17:29:12	SIG	M62/2088B1	40R	M62 J25 - J30	
11/09/15 17:29:12	SIG	M62/2088B2	40R	M62 J25 - J30	
11/09/15 17:29:12	SIG	M62/2088B3	40R	M62 J25 - J30	
11/09/15 17:29:12	SIG	M62/2088B4	40R	M62 J25 - J30	
11/09/15 17:29:26	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:29:26	SIG	M62/2157A2	50R	M62 J25 - J30	
11/09/15 17:29:26	SIG	M62/2157J1	50R	M62 J25 - J30	
11/09/15 17:29:26	SIG	M62/2157J2	50R	M62 J25 - J30	
11/09/15 17:29:26	SIG	M62/2157K1	50R	M62 J25 - J30	
11/09/15 17:29:28	SIG	M62/1992A1	NR	M62 J25 - J30	
11/09/15 17:29:28	SIG	M62/1992A2	NR	M62 J25 - J30	
11/09/15 17:29:28	SIG	M62/1992A3	NR	M62 J25 - J30	
11/09/15 17:29:28	SIG	M62/1992J1	NR	M62 J25 - J30	
11/09/15 17:29:37	SIG	M62/1981A1	OFF	M62 J25 - J30	
11/09/15 17:29:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:29:41	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:29:47	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:29:47	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:29:47	SIG	M62/2157A2	40R	M62 J25 - J30	
11/09/15 17:29:47	SIG	M62/2157K1	40R	M62 J25 - J30	
11/09/15 17:29:47	SIG	M62/2163A1	40R	M62 J25 - J30	
11/09/15 17:29:47	SIG	M62/2163A2	40R	M62 J25 - J30	
11/09/15 17:29:48	SIG	M62/1981A2	OFF	M62 J25 - J30	
11/09/15 17:29:48	SIG	M62/1981A3	OFF	M62 J25 - J30	
11/09/15 17:29:48	SIG	M62/1981A4	OFF	M62 J25 - J30	
11/09/15 17:29:48	SIG	M62/1987A1	OFF	M62 J25 - J30	
11/09/15 17:29:48	SIG	M62/1987A3	OFF	M62 J25 - J30	
11/09/15 17:29:48	SIG	M62/1987J1	OFF	M62 J25 - J30	
11/09/15 17:29:50	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 17:29:50	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 17:30:03	SIG	M62/2132B1	OFF	M62 J25 - J30	
11/09/15 17:30:03	SIG	M62/2132B2	OFF	M62 J25 - J30	
11/09/15 17:30:03	SIG	M62/2132B3	OFF	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2065B2	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2065B3	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2065B4	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2065M1	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2069M1	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2069M2	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2155A1	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2155A2	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2155J1	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2155K1	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2157A2	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M62/2157K1	50R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M621/1002B1	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M621/1002B2	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M621/1010B1	40R	M62 J25 - J30	
11/09/15 17:30:15	SIG	M621/1010B2	40R	M62 J25 - J30	
11/09/15 17:30:28	SIG	M62/2088A1	REDX	M62 J25 - J30	
11/09/15 17:30:28	SIG	M62/2088A2	60R	M62 J25 - J30	
11/09/15 17:30:28	SIG	M62/2088A3	60R	M62 J25 - J30	
11/09/15 17:30:28	SIG	M62/2088A4	60R	M62 J25 - J30	
11/09/15 17:30:30	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:30:31	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:30:36	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:31:18	SIG	M62/2151A1	50R	M62 J25 - J30	
11/09/15 17:31:18	SIG	M62/2151A2	50R	M62 J25 - J30	
11/09/15 17:31:18	SIG	M62/2151J1	50R	M62 J25 - J30	
11/09/15 17:31:18	SIG	M62/2151K1	50R	M62 J25 - J30	
11/09/15 17:31:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:31:24	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:31:29	SIG	M62/2106A3	40R	M62 J25 - J30	
11/09/15 17:32:04	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:32:04	SIG	M62/2157A2	40R	M62 J25 - J30	
11/09/15 17:32:04	SIG	M62/2157J1	40R	M62 J25 - J30	
11/09/15 17:32:04	SIG	M62/2157J2	40R	M62 J25 - J30	
11/09/15 17:32:04	SIG	M62/2157K1	40R	M62 J25 - J30	
11/09/15 17:32:28	SIG	M62/1992J1	OFF	M62 J25 - J30	
11/09/15 17:32:28	SIG	M62/2065A2	60R	M62 J25 - J30	
11/09/15 17:32:28	SIG	M62/2065A3	60R	M62 J25 - J30	
11/09/15 17:32:28	SIG	M62/2065A4	60R	M62 J25 - J30	
11/09/15 17:32:29	SIG	M62/1992A1	OFF	M62 J25 - J30	
11/09/15 17:32:29	SIG	M62/1992A2	OFF	M62 J25 - J30	
11/09/15 17:32:29	SIG	M62/1992A3	OFF	M62 J25 - J30	
11/09/15 17:32:37	SIG	M62/2073K1	60R	M62 J25 - J30	
11/09/15 17:32:37	SIG	M62/2079A1	REDX	M62 J25 - J30	
11/09/15 17:32:37	SIG	M62/2079A2	60R	M62 J25 - J30	
11/09/15 17:32:37	SIG	M62/2079A3	60R	M62 J25 - J30	
11/09/15 17:32:37	SIG	M62/2079A4	60R	M62 J25 - J30	
11/09/15 17:32:43	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:32:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:32:49	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:32:58	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:32:59	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:33:05	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:33:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:33:15	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:33:20	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:33:21	SIG	M62/2144A1	50R	M62 J25 - J30	
11/09/15 17:33:21	SIG	M62/2144A2	50R	M62 J25 - J30	
11/09/15 17:33:21	SIG	M62/2144J1	50R	M62 J25 - J30	
11/09/15 17:33:21	SIG	M62/2144K1	50R	M62 J25 - J30	
11/09/15 17:33:28	SIG	M62/2113B1	60R	M62 J25 - J30	
11/09/15 17:33:28	SIG	M62/2113B2	60R	M62 J25 - J30	
11/09/15 17:33:28	SIG	M62/2113B3	60R	M62 J25 - J30	
11/09/15 17:33:28	SIG	M62/2113B4	60R	M62 J25 - J30	
11/09/15 17:33:30	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:33:31	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:33:36	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:33:43	SIG	M62/2163A1	50R	M62 J25 - J30	
11/09/15 17:33:43	SIG	M62/2163A2	50R	M62 J25 - J30	
11/09/15 17:33:45	SIG	M62/2097A2	50R	M62 J25 - J30	
11/09/15 17:33:45	SIG	M62/2097A3	50R	M62 J25 - J30	
11/09/15 17:33:45	SIG	M62/2097A4	50R	M62 J25 - J30	
11/09/15 17:33:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:33:47	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:33:50	SIG	M62/2097A2	40R	M62 J25 - J30	
11/09/15 17:33:50	SIG	M62/2097A3	40R	M62 J25 - J30	
11/09/15 17:33:50	SIG	M62/2097A4	40R	M62 J25 - J30	
11/09/15 17:33:52	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2144A1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2144A2	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2144J1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2144K1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2151A1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2151A2	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2151J1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2151K1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2155A1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2155A2	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2155J1	40R	M62 J25 - J30	
11/09/15 17:34:05	SIG	M62/2155K1	40R	M62 J25 - J30	
11/09/15 17:34:22	SIG	M62/2163A1	40R	M62 J25 - J30	
11/09/15 17:34:22	SIG	M62/2163A2	40R	M62 J25 - J30	
11/09/15 17:34:27	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:34:27	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/1999A1	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/1999A2	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/1999A3	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/1999J1	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/1999J2	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/2004A1	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/2004A2	OFF	M62 J25 - J30	
11/09/15 17:34:28	SIG	M62/2004A3	OFF	M62 J25 - J30	
11/09/15 17:34:33	SIG	M62/2106A3	40R	M62 J25 - J30	
11/09/15 17:34:37	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:34:38	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:34:43	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:35:14	SIG	M62/2088B1	50R	M62 J25 - J30	
11/09/15 17:35:14	SIG	M62/2088B2	50R	M62 J25 - J30	
11/09/15 17:35:14	SIG	M62/2088B3	50R	M62 J25 - J30	
11/09/15 17:35:14	SIG	M62/2088B4	50R	M62 J25 - J30	
11/09/15 17:36:04	SIG	M62/2157J1	50R	M62 J25 - J30	
11/09/15 17:36:04	SIG	M62/2157J2	50R	M62 J25 - J30	
11/09/15 17:36:49	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:36:50	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:36:55	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:37:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:37:06	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:37:11	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:37:21	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:37:21	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:37:27	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:37:30	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:37:31	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:37:31	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:37:31	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:37:36	SIG	M62/2106A3	40R	M62 J25 - J30	
11/09/15 17:37:37	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:37:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:37:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:37:48	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:37:51	SIG	M62/2081B1	50R	M62 J25 - J30	
11/09/15 17:37:51	SIG	M62/2081B2	50R	M62 J25 - J30	
11/09/15 17:37:51	SIG	M62/2081B3	50R	M62 J25 - J30	
11/09/15 17:37:51	SIG	M62/2081L1	50R	M62 J25 - J30	
11/09/15 17:37:53	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:37:54	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:37:59	SIG	M62/2157A1	40R	M62 J25 - J30	
11/09/15 17:38:04	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:38:05	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:38:10	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2155A1	50R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2155A2	50R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2155J1	50R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2155K1	50R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2157A1	50R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2157A2	50R	M62 J25 - J30	
11/09/15 17:38:11	SIG	M62/2157K1	50R	M62 J25 - J30	
11/09/15 17:38:22	SIG	M62/2163A1	50R	M62 J25 - J30	
11/09/15 17:38:22	SIG	M62/2163A2	50R	M62 J25 - J30	
11/09/15 17:39:11	SIG	M62/2151A1	50R	M62 J25 - J30	
11/09/15 17:39:11	SIG	M62/2151A2	50R	M62 J25 - J30	
11/09/15 17:39:11	SIG	M62/2151J1	50R	M62 J25 - J30	
11/09/15 17:39:11	SIG	M62/2151K1	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M62/2069M1	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M62/2069M2	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M621/1010B1	50R	M62 J25 - J30	
11/09/15 17:40:08	SIG	M621/1010B2	50R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2088A2	50R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2088A3	50R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2088A4	50R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2106B1	60R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2106B2	60R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2106B3	60R	M62 J25 - J30	
11/09/15 17:40:28	SIG	M62/2106B4	60R	M62 J25 - J30	
11/09/15 17:40:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:40:34	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:40:40	SIG	M62/2106A3	40R	M62 J25 - J30	
11/09/15 17:40:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:40:48	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:40:49	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:40:49	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 17:40:55	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:40:56	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:41:02	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:41:02	SIG	M62/2151A1	40R	M62 J25 - J30	
11/09/15 17:41:02	SIG	M62/2151A2	40R	M62 J25 - J30	
11/09/15 17:41:02	SIG	M62/2151J1	40R	M62 J25 - J30	
11/09/15 17:41:02	SIG	M62/2151K1	40R	M62 J25 - J30	
11/09/15 17:41:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:41:12	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2122K1	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2122K2	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2124A2	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2124A3	40R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2124A3	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2124A4	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2135A1	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2135A2	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2135A3	50R	M62 J25 - J30	
11/09/15 17:41:18	SIG	M62/2135A4	50R	M62 J25 - J30	
11/09/15 17:41:28	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:41:28	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:41:29	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:41:30	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:42:07	SIG	M62/2074B2	50R	M62 J25 - J30	
11/09/15 17:42:07	SIG	M62/2074B3	50R	M62 J25 - J30	
11/09/15 17:42:07	SIG	M62/2074B4	50R	M62 J25 - J30	
11/09/15 17:42:19	SIG	M62/2117A2	50R	M62 J25 - J30	
11/09/15 17:42:19	SIG	M62/2117A3	50R	M62 J25 - J30	
11/09/15 17:42:19	SIG	M62/2117A4	50R	M62 J25 - J30	
11/09/15 17:42:28	SIG	M62/2079A2	50R	M62 J25 - J30	
11/09/15 17:42:28	SIG	M62/2079A3	50R	M62 J25 - J30	
11/09/15 17:42:28	SIG	M62/2079A4	50R	M62 J25 - J30	
11/09/15 17:42:36	SIG	M62/2114A1	50R	M62 J25 - J30	
11/09/15 17:42:36	SIG	M62/2114A2	50R	M62 J25 - J30	
11/09/15 17:42:36	SIG	M62/2114A3	50R	M62 J25 - J30	
11/09/15 17:43:07	SIG	M62/2088A2	40R	M62 J25 - J30	
11/09/15 17:43:07	SIG	M62/2088A3	40R	M62 J25 - J30	
11/09/15 17:43:07	SIG	M62/2088A4	40R	M62 J25 - J30	
11/09/15 17:43:32	SIG	M62/2135A1	40R	M62 J25 - J30	
11/09/15 17:43:32	SIG	M62/2135A2	40R	M62 J25 - J30	
11/09/15 17:43:32	SIG	M62/2135A3	40R	M62 J25 - J30	
11/09/15 17:43:32	SIG	M62/2135A4	40R	M62 J25 - J30	
11/09/15 17:43:38	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:43:38	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:43:44	SIG	M62/2106A3	40R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2081B1	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2081B2	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2081B3	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2081L1	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2088B1	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2088B2	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2088B3	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2088B4	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2097B1	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2097B2	60R	M62 J25 - J30	
11/09/15 17:44:38	SIG	M62/2097B4	60R	M62 J25 - J30	
11/09/15 17:44:57	SIG	M62/2151A1	50R	M62 J25 - J30	
11/09/15 17:44:57	SIG	M62/2151A2	50R	M62 J25 - J30	
11/09/15 17:44:57	SIG	M62/2151J1	50R	M62 J25 - J30	
11/09/15 17:44:57	SIG	M62/2151K1	50R	M62 J25 - J30	
11/09/15 17:45:02	SIG	M62/2106A2	50R	M62 J25 - J30	
11/09/15 17:45:02	SIG	M62/2106A3	50R	M62 J25 - J30	
11/09/15 17:45:02	SIG	M62/2106A4	50R	M62 J25 - J30	
11/09/15 17:47:08	SIG	M62/2097A2	50R	M62 J25 - J30	
11/09/15 17:47:08	SIG	M62/2097A3	50R	M62 J25 - J30	
11/09/15 17:47:08	SIG	M62/2097A4	50R	M62 J25 - J30	
11/09/15 17:47:32	SIG	M62/2144A1	50R	M62 J25 - J30	
11/09/15 17:47:32	SIG	M62/2144A2	50R	M62 J25 - J30	
11/09/15 17:47:32	SIG	M62/2144J1	50R	M62 J25 - J30	
11/09/15 17:47:32	SIG	M62/2144K1	50R	M62 J25 - J30	
11/09/15 17:47:42	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:47:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:47:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:47:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:48:10	SIG	M62/2135A1	50R	M62 J25 - J30	
11/09/15 17:48:10	SIG	M62/2135A2	50R	M62 J25 - J30	
11/09/15 17:48:10	SIG	M62/2135A3	50R	M62 J25 - J30	
11/09/15 17:48:10	SIG	M62/2135A4	50R	M62 J25 - J30	
11/09/15 17:48:27	SIG	M62/2073K1	50R	M62 J25 - J30	
11/09/15 17:48:27	SIG	M62/2079A2	40R	M62 J25 - J30	
11/09/15 17:48:27	SIG	M62/2079A3	40R	M62 J25 - J30	
11/09/15 17:48:27	SIG	M62/2079A4	40R	M62 J25 - J30	
11/09/15 17:48:28	SIG	M62/2125B1	OFF	M62 J25 - J30	
11/09/15 17:48:28	SIG	M62/2125B2	OFF	M62 J25 - J30	
11/09/15 17:48:28	SIG	M62/2125B3	OFF	M62 J25 - J30	
11/09/15 17:48:28	SIG	M62/2125L1	NR	M62 J25 - J30	
11/09/15 17:48:28	SIG	M62/2125L2	NR	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2114A1	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2114A2	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2114A3	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2117A2	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2117A3	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2117A4	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2122K1	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2122K2	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2124A2	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2124A3	60R	M62 J25 - J30	
11/09/15 17:50:28	SIG	M62/2124A4	60R	M62 J25 - J30	
11/09/15 17:50:40	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:50:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:50:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:50:42	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 17:50:56	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2025B1	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2025B2	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2025B3	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2025B4	40R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 17:51:02	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2069M1	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2069M2	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2097A2	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2097A3	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2097A4	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2106A2	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2106A3	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2106A4	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M62/2125L1	OFF	M62 J25 - J30	
11/09/15 17:51:28	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 17:51:28	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 17:51:29	SIG	M62/2125L2	OFF	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2073K1	60R	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2079A2	60R	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2079A3	60R	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2079A4	60R	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2088A2	60R	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2088A3	60R	M62 J25 - J30	
11/09/15 17:52:12	SIG	M62/2088A4	60R	M62 J25 - J30	
11/09/15 17:52:28	SIG	M62/2135A1	60R	M62 J25 - J30	
11/09/15 17:52:28	SIG	M62/2135A2	60R	M62 J25 - J30	
11/09/15 17:52:28	SIG	M62/2135A3	60R	M62 J25 - J30	
11/09/15 17:52:28	SIG	M62/2135A4	60R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2033B1	40R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2033B2	40R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2033B4	40R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2041B1	50R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 17:52:38	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 17:53:50	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:53:50	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:53:51	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:53:52	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 17:54:28	SIG	M62/2144A1	60R	M62 J25 - J30	
11/09/15 17:54:28	SIG	M62/2144A2	60R	M62 J25 - J30	
11/09/15 17:54:28	SIG	M62/2144J1	60R	M62 J25 - J30	
11/09/15 17:54:28	SIG	M62/2144K1	60R	M62 J25 - J30	
11/09/15 17:54:56	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 17:54:56	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 17:54:56	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 17:54:56	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 17:55:28	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 17:55:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:55:34	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 17:56:13	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 17:56:13	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 17:56:13	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 17:56:13	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 17:56:19	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 17:56:19	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 17:56:19	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 17:56:19	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2151A1	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2151A2	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2151J1	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2151K1	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2155A1	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2155A2	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2155J1	60R	M62 J25 - J30	
11/09/15 17:56:29	SIG	M62/2155K1	60R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2041B1	60R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2041B2	60R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2041B3	60R	M62 J25 - J30	
11/09/15 17:56:38	SIG	M62/2041B4	60R	M62 J25 - J30	
11/09/15 17:58:02	SIG	M62/2170K1	60R	M62 J25 - J30	
11/09/15 17:58:02	SIG	M62/2170K2	60R	M62 J25 - J30	
11/09/15 17:58:29	SIG	M62/2157A1	60R	M62 J25 - J30	
11/09/15 17:58:29	SIG	M62/2157A2	60R	M62 J25 - J30	
11/09/15 17:58:29	SIG	M62/2157J1	60R	M62 J25 - J30	
11/09/15 17:58:29	SIG	M62/2157J2	60R	M62 J25 - J30	
11/09/15 17:58:29	SIG	M62/2157K1	60R	M62 J25 - J30	
11/09/15 17:59:28	SIG	M62/2163A1	60R	M62 J25 - J30	
11/09/15 17:59:28	SIG	M62/2163A2	60R	M62 J25 - J30	
11/09/15 17:59:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:59:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:59:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 17:59:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:00:13	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 18:00:13	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 18:00:13	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 18:00:13	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 18:01:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 18:01:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 18:01:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 18:01:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 18:01:30	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 18:02:28	SIG	M62/2065A2	NR	M62 J25 - J30	
11/09/15 18:02:28	SIG	M62/2065A3	NR	M62 J25 - J30	
11/09/15 18:02:28	SIG	M62/2065A4	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2073K1	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2079A1	BLNK	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2079A2	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2079A3	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2079A4	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2088A2	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2088A3	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2088A4	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2097A2	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2097A3	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2097A4	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2106A2	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2106A3	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2106A4	NR	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2114A1	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2114A2	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2114A3	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2117A1	BLNK	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2117A2	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2117A3	OFF	M62 J25 - J30	
11/09/15 18:02:38	SIG	M62/2117A4	OFF	M62 J25 - J30	
11/09/15 18:03:28	SIG	M62/2122K1	OFF	M62 J25 - J30	
11/09/15 18:03:28	SIG	M62/2122K2	OFF	M62 J25 - J30	
11/09/15 18:03:28	SIG	M62/2124A2	NR	M62 J25 - J30	
11/09/15 18:03:28	SIG	M62/2124A3	NR	M62 J25 - J30	
11/09/15 18:03:28	SIG	M62/2124A4	NR	M62 J25 - J30	
11/09/15 18:03:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:03:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:03:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:03:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:05:28	SIG	M62/2135A1	NR	M62 J25 - J30	
11/09/15 18:05:28	SIG	M62/2135A2	NR	M62 J25 - J30	
11/09/15 18:05:28	SIG	M62/2135A3	NR	M62 J25 - J30	
11/09/15 18:05:28	SIG	M62/2135A4	NR	M62 J25 - J30	
11/09/15 18:05:28	SIG	M621/1010B1	OFF	M62 J25 - J30	
11/09/15 18:05:28	SIG	M621/1010B2	OFF	M62 J25 - J30	
11/09/15 18:05:38	SIG	M62/2106A2	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2088A2	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2088A3	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2088A4	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2097A2	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2097A3	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2097A4	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
11/09/15 18:05:48	SIG	M62/2106A4	OFF	M62 J25 - J30	
11/09/15 18:05:49	SIG	M62/2088A1	BLNK	M62 J25 - J30	
11/09/15 18:05:49	SIG	M62/2097A1	BLNK	M62 J25 - J30	
11/09/15 18:05:49	SIG	M62/2106A1	BLNK	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2144A1	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2144A2	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2144J1	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2144K1	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2151A1	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2151A2	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2151J1	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2151K1	NR	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2166K1	OFF	M62 J25 - J30	
11/09/15 18:06:28	SIG	M62/2166K2	OFF	M62 J25 - J30	
11/09/15 18:06:29	SIG	M62/2124A1	BLNK	M62 J25 - J30	
11/09/15 18:06:29	SIG	M62/2124A2	OFF	M62 J25 - J30	
11/09/15 18:06:29	SIG	M62/2124A3	OFF	M62 J25 - J30	
11/09/15 18:06:29	SIG	M62/2124A4	OFF	M62 J25 - J30	
11/09/15 18:06:30	SIG	M62/2124A1	BLNK	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2155A1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2155A2	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2155J1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2155K1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2157A2	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2157J1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2157J2	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2157K1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2163A1	OFF	M62 J25 - J30	
11/09/15 18:08:28	SIG	M62/2163A2	OFF	M62 J25 - J30	
11/09/15 18:08:29	SIG	M62/2135A1	OFF	M62 J25 - J30	
11/09/15 18:08:29	SIG	M62/2135A2	OFF	M62 J25 - J30	
11/09/15 18:08:29	SIG	M62/2135A3	OFF	M62 J25 - J30	
11/09/15 18:08:29	SIG	M62/2135A4	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2144A1	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2144A2	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2144J1	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2144K1	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2151A1	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2151A2	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2151J1	OFF	M62 J25 - J30	
11/09/15 18:09:29	SIG	M62/2151K1	OFF	M62 J25 - J30	
11/09/15 18:15:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:15:43	SIG	M62/2113B1	HSD	M62 J25 - J30	
11/09/15 18:16:36	SIG	M62/2106B1	HSD	M62 J25 - J30	
11/09/15 18:17:44	SIG	M62/2097B1	HSD	M62 J25 - J30	
11/09/15 18:17:44	SIG	M62/2113B1	REDX	M62 J25 - J30	
11/09/15 18:18:25	SIG	M62/1987B1	50R	M62 J25 - J30	
11/09/15 18:18:25	SIG	M62/1987B2	50R	M62 J25 - J30	
11/09/15 18:18:25	SIG	M62/1987B3	50R	M62 J25 - J30	
11/09/15 18:18:25	SIG	M62/1987B4	50R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1987B1	40R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1987B2	40R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1987B3	40R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1987B4	40R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1992B1	50R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 18:18:30	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 18:18:52	SIG	M62/2088B1	HSD	M62 J25 - J30	
11/09/15 18:18:52	SIG	M62/2106B1	REDX	M62 J25 - J30	
11/09/15 18:20:00	SIG	M62/2097B1	REDX	M62 J25 - J30	
11/09/15 18:20:20	SIG	M606/2003B1	50R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1992B1	40R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1999B1	REDX	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/2005M1	50R	M62 J25 - J30	
11/09/15 18:20:20	SIG	M62/2005M2	50R	M62 J25 - J30	
11/09/15 18:21:08	SIG	M62/2088B1	REDX	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2004B1	REDX	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2004B2	60R	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2004B3	60R	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2004B4	60R	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2012B2	60R	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2012B3	60R	M62 J25 - J30	
11/09/15 18:21:28	SIG	M62/2012B4	60R	M62 J25 - J30	
11/09/15 18:22:01	SIG	M62/2117B1	NR	M62 J25 - J30	
11/09/15 18:22:01	SIG	M62/2117B3	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2088B2	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2088B3	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2088B4	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2097B2	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2097B4	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2106B2	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2106B3	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2106B4	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2113B2	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2113B3	NR	M62 J25 - J30	
11/09/15 18:22:11	SIG	M62/2113B4	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2074B2	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2074B3	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2074B4	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2081B1	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2081B2	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2081B3	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2081L1	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2120M1	NR	M62 J25 - J30	
11/09/15 18:22:12	SIG	M62/2120M2	NR	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1960B1	NR	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1960B2	NR	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1960B3	NR	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1960L1	NR	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1960L2	NR	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1968B1	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1968B2	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1968B3	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1968L1	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1974B1	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1974B2	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1974B3	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1974B4	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1974M1	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1974M2	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1981B1	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1981B2	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1981B3	50R	M62 J25 - J30	
11/09/15 18:22:36	SIG	M62/1981B4	50R	M62 J25 - J30	
11/09/15 18:22:57	SIG	M62/1999B2	40R	M62 J25 - J30	
11/09/15 18:22:57	SIG	M62/1999B3	40R	M62 J25 - J30	
11/09/15 18:22:57	SIG	M62/1999B4	40R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M606/2003B1	40R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M606/2003B2	40R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2004B2	50R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2004B3	50R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2004B4	50R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2005M1	40R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2005M2	40R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2012B2	50R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2012B3	50R	M62 J25 - J30	
11/09/15 18:22:58	SIG	M62/2012B4	50R	M62 J25 - J30	
11/09/15 18:23:01	SIG	M62/2120M1	OFF	M62 J25 - J30	
11/09/15 18:23:01	SIG	M62/2120M2	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2106B1	BLNK	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2106B2	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2106B3	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2106B4	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2113B1	BLNK	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2113B2	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2113B3	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2113B4	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
11/09/15 18:23:02	SIG	M62/2117B3	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2074B1	BLNK	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2074B2	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2074B3	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2074B4	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2081B1	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2081B2	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2081B3	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2081L1	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2088B1	BLNK	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2088B2	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2088B3	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2088B4	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2097B1	BLNK	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2097B2	OFF	M62 J25 - J30	
11/09/15 18:23:12	SIG	M62/2097B4	OFF	M62 J25 - J30	
11/09/15 18:23:28	SIG	M62/2012B2	60R	M62 J25 - J30	
11/09/15 18:23:28	SIG	M62/2012B3	60R	M62 J25 - J30	
11/09/15 18:23:28	SIG	M62/2012B4	60R	M62 J25 - J30	
11/09/15 18:25:03	SIG	M606/2003B1	LDR	M62 J25 - J30	
11/09/15 18:25:03	SIG	M62/1987B1	30R	M62 J25 - J30	
11/09/15 18:25:03	SIG	M62/1987B2	30R	M62 J25 - J30	
11/09/15 18:25:03	SIG	M62/2005M1	TI	M62 J25 - J30	
11/09/15 18:25:03	SIG	M62/2005M2	TI	M62 J25 - J30	
11/09/15 18:25:08	SIG	M62/1987B1	20R	M62 J25 - J30	
11/09/15 18:25:08	SIG	M62/1987B2	20R	M62 J25 - J30	
11/09/15 18:25:08	SIG	M62/1992B1	LDR	M62 J25 - J30	
11/09/15 18:25:08	SIG	M62/1992B2	LDR	M62 J25 - J30	
11/09/15 18:25:08	SIG	M62/1999B2	LDR	M62 J25 - J30	
11/09/15 18:25:13	SIG	M62/1987B1	STOP	M62 J25 - J30	
11/09/15 18:25:13	SIG	M62/1987B2	STOP	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1960B1	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1960B2	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1960B3	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1960L1	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1960L2	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1968B1	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1968B2	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1968B3	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1968L1	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1974B1	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1974B2	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1974B3	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1974B4	NR	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1974M1	OFF	M62 J25 - J30	
11/09/15 18:25:16	SIG	M62/1974M2	OFF	M62 J25 - J30	
11/09/15 18:26:09	SIG	M62/2004B2	40R	M62 J25 - J30	
11/09/15 18:26:09	SIG	M62/2004B3	40R	M62 J25 - J30	
11/09/15 18:26:09	SIG	M62/2004B4	40R	M62 J25 - J30	
11/09/15 18:26:09	SIG	M62/2012B2	50R	M62 J25 - J30	
11/09/15 18:26:09	SIG	M62/2012B3	50R	M62 J25 - J30	
11/09/15 18:26:09	SIG	M62/2012B4	50R	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1974B1	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1974B2	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1974B3	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1974B4	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 18:26:22	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1960B1	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1960B2	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1960B3	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1960L1	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1960L2	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1968B1	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1968B2	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1968B3	OFF	M62 J25 - J30	
11/09/15 18:28:16	SIG	M62/1968L1	OFF	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2012B2	40R	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2012B3	40R	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2012B4	40R	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 18:28:35	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 18:29:22	SIG	M62/1974B1	OFF	M62 J25 - J30	
11/09/15 18:29:23	SIG	M62/1974B2	OFF	M62 J25 - J30	
11/09/15 18:29:23	SIG	M62/1974B3	OFF	M62 J25 - J30	
11/09/15 18:29:23	SIG	M62/1974B4	OFF	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2018B1	40R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2018B2	40R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2018B3	40R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2018L1	40R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 18:32:10	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 18:32:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:38:29	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 18:38:29	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 18:38:29	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 18:38:29	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 18:39:29	SIG	M62/2025B1	40R	M62 J25 - J30	
11/09/15 18:39:29	SIG	M62/2025B2	40R	M62 J25 - J30	
11/09/15 18:39:29	SIG	M62/2025B3	40R	M62 J25 - J30	
11/09/15 18:39:29	SIG	M62/2025B4	40R	M62 J25 - J30	
11/09/15 18:41:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:41:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:41:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:41:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:44:15	SIG	M62/2033B1	40R	M62 J25 - J30	
11/09/15 18:44:15	SIG	M62/2033B2	40R	M62 J25 - J30	
11/09/15 18:44:15	SIG	M62/2033B4	40R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2033B1	40R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2033B2	40R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2033B4	40R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2041B1	50R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 18:44:20	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 18:46:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:46:33	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 18:46:38	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 18:49:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:49:37	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 18:49:42	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 18:50:44	SIG	M62/2041B1	40R	M62 J25 - J30	
11/09/15 18:50:44	SIG	M62/2041B2	40R	M62 J25 - J30	
11/09/15 18:50:44	SIG	M62/2041B3	40R	M62 J25 - J30	
11/09/15 18:50:44	SIG	M62/2041B4	40R	M62 J25 - J30	
11/09/15 18:52:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:52:40	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 18:52:46	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 18:53:29	SIG	M62/2050B2	50R	M62 J25 - J30	
11/09/15 18:53:29	SIG	M62/2050B3	50R	M62 J25 - J30	
11/09/15 18:53:29	SIG	M62/2050B4	50R	M62 J25 - J30	
11/09/15 18:54:44	SIG	M62/2041B1	50R	M62 J25 - J30	
11/09/15 18:54:44	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 18:54:44	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 18:54:44	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 18:55:03	SIG	M62/2041B1	40R	M62 J25 - J30	
11/09/15 18:55:03	SIG	M62/2041B2	40R	M62 J25 - J30	
11/09/15 18:55:03	SIG	M62/2041B3	40R	M62 J25 - J30	
11/09/15 18:55:03	SIG	M62/2041B4	40R	M62 J25 - J30	
11/09/15 18:55:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:55:44	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 18:55:50	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 18:58:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 18:58:48	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 18:58:54	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 18:59:46	SIG	M62/2177A1	HSD	M62 J25 - J30	
11/09/15 19:00:31	SIG	M62/2183A1	HSD	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2050B2	40R	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2050B3	40R	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2050B4	40R	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 19:00:35	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 19:01:16	SIG	M62/2177A1	REDX	M62 J25 - J30	
11/09/15 19:01:16	SIG	M62/2189A1	HSD	M62 J25 - J30	
11/09/15 19:01:32	SIG	M62/2097B3	OFF	M62 J25 - J30	
11/09/15 19:01:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:01:52	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 19:01:57	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 19:02:16	SIG	M62/2183A1	REDX	M62 J25 - J30	
11/09/15 19:03:11	SIG	M62/1987B2	40R	M62 J25 - J30	
11/09/15 19:03:11	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 19:03:11	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 19:03:16	SIG	M62/1987B2	40R	M62 J25 - J30	
11/09/15 19:03:16	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 19:03:16	SIG	M62/1999B2	40R	M62 J25 - J30	
11/09/15 19:03:16	SIG	M62/2189A1	REDX	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2170A1	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2170A2	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2170K1	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2170K2	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2177A2	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2177A3	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2177A4	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2183A2	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2183A3	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2183A4	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2189A2	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2189A3	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2189A4	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2197A1	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2197A2	NR	M62 J25 - J30	
11/09/15 19:03:17	SIG	M62/2197A3	NR	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2170A1	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2170A2	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2170K1	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2170K2	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2177A1	BLNK	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2177A2	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2177A3	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2177A4	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2183A1	BLNK	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2183A2	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2183A3	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2183A4	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2189A1	BLNK	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2189A2	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2189A3	OFF	M62 J25 - J30	
11/09/15 19:04:16	SIG	M62/2189A4	OFF	M62 J25 - J30	
11/09/15 19:04:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:04:56	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 19:05:01	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 19:05:30	SIG	M62/2074B1	REDX	M62 J25 - J30	
11/09/15 19:05:30	SIG	M62/2074B2	60R	M62 J25 - J30	
11/09/15 19:05:30	SIG	M62/2074B3	60R	M62 J25 - J30	
11/09/15 19:05:30	SIG	M62/2074B4	60R	M62 J25 - J30	
11/09/15 19:05:30	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 19:05:30	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 19:05:32	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 19:05:32	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 19:05:32	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 19:06:17	SIG	M62/2197A1	OFF	M62 J25 - J30	
11/09/15 19:06:18	SIG	M62/2197A2	OFF	M62 J25 - J30	
11/09/15 19:06:18	SIG	M62/2197A3	OFF	M62 J25 - J30	
11/09/15 19:06:24	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 19:06:24	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 19:06:24	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 19:06:24	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 19:08:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:08:07	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 19:08:12	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 19:08:25	SIG	M62/2004B2	50R	M62 J25 - J30	
11/09/15 19:08:25	SIG	M62/2004B3	50R	M62 J25 - J30	
11/09/15 19:08:25	SIG	M62/2004B4	50R	M62 J25 - J30	
11/09/15 19:09:30	SIG	M62/2065B2	50R	M62 J25 - J30	
11/09/15 19:09:30	SIG	M62/2065B3	50R	M62 J25 - J30	
11/09/15 19:09:30	SIG	M62/2065B4	50R	M62 J25 - J30	
11/09/15 19:09:30	SIG	M62/2065M1	50R	M62 J25 - J30	
11/09/15 19:09:30	SIG	M621/1002B1	50R	M62 J25 - J30	
11/09/15 19:09:30	SIG	M621/1002B2	50R	M62 J25 - J30	
11/09/15 19:10:21	SIG	M62/2012B2	50R	M62 J25 - J30	
11/09/15 19:10:21	SIG	M62/2012B3	50R	M62 J25 - J30	
11/09/15 19:10:21	SIG	M62/2012B4	50R	M62 J25 - J30	
11/09/15 19:11:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:11:07	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 19:11:12	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 19:11:55	SIG	M62/2057B1	40R	M62 J25 - J30	
11/09/15 19:11:55	SIG	M62/2057B2	40R	M62 J25 - J30	
11/09/15 19:11:55	SIG	M62/2057B3	40R	M62 J25 - J30	
11/09/15 19:11:55	SIG	M62/2057B4	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M606/2003B2	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M62/1999B2	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M62/1999B3	40R	M62 J25 - J30	
11/09/15 19:12:02	SIG	M62/1999B4	40R	M62 J25 - J30	
11/09/15 19:12:18	SIG	M62/2025A1	HSD	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2018B1	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2018B2	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2018B3	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2018L1	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2025B1	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 19:12:38	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 19:13:18	SIG	M62/2033A1	HSD	M62 J25 - J30	
11/09/15 19:13:26	SIG	M62/2004B2	40R	M62 J25 - J30	
11/09/15 19:13:26	SIG	M62/2004B3	40R	M62 J25 - J30	
11/09/15 19:13:26	SIG	M62/2004B4	40R	M62 J25 - J30	
11/09/15 19:14:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:14:07	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 19:14:12	SIG	M62/2033B3	40R	M62 J25 - J30	
11/09/15 19:14:13	SIG	M62/2012B2	40R	M62 J25 - J30	
11/09/15 19:14:13	SIG	M62/2012B3	40R	M62 J25 - J30	
11/09/15 19:14:13	SIG	M62/2012B4	40R	M62 J25 - J30	
11/09/15 19:14:18	SIG	M62/2018A1	HSD	M62 J25 - J30	
11/09/15 19:14:18	SIG	M62/2025A1	REDX	M62 J25 - J30	
11/09/15 19:14:18	SIG	M62/2041A1	HSD	M62 J25 - J30	
11/09/15 19:15:25	SIG	M62/2033A1	REDX	M62 J25 - J30	
11/09/15 19:15:25	SIG	M62/2050A1	HSD	M62 J25 - J30	
11/09/15 19:15:37	SIG	M62/2033B1	50R	M62 J25 - J30	
11/09/15 19:15:37	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 19:15:37	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 19:15:37	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 19:15:55	SIG	M62/2057B1	50R	M62 J25 - J30	
11/09/15 19:15:55	SIG	M62/2057B2	50R	M62 J25 - J30	
11/09/15 19:15:55	SIG	M62/2057B3	50R	M62 J25 - J30	
11/09/15 19:15:55	SIG	M62/2057B4	50R	M62 J25 - J30	
11/09/15 19:16:02	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 19:16:03	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 19:16:03	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 19:16:03	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 19:16:03	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 19:16:03	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 19:16:03	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 19:16:17	SIG	M62/2041A1	REDX	M62 J25 - J30	
11/09/15 19:17:17	SIG	M62/2050A1	REDX	M62 J25 - J30	
11/09/15 19:18:11	SIG	M62/2004B2	50R	M62 J25 - J30	
11/09/15 19:18:11	SIG	M62/2004B3	50R	M62 J25 - J30	
11/09/15 19:18:11	SIG	M62/2004B4	50R	M62 J25 - J30	
11/09/15 19:18:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:18:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:18:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:18:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2025A2	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2025A3	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2025A4	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2033A2	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2033A3	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2033A4	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2041A2	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2041A3	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2041A4	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2050A2	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2050A3	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2050A4	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2057A1	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2057A2	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2057A3	NR	M62 J25 - J30	
11/09/15 19:18:18	SIG	M62/2057J1	NR	M62 J25 - J30	
11/09/15 19:18:20	SIG	M62/2041B1	50R	M62 J25 - J30	
11/09/15 19:18:20	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 19:18:20	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 19:18:20	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 19:18:35	SIG	M62/2050B2	50R	M62 J25 - J30	
11/09/15 19:18:35	SIG	M62/2050B3	50R	M62 J25 - J30	
11/09/15 19:18:35	SIG	M62/2050B4	50R	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2008K1	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2008K2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2012A1	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2012A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2012A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2018A1	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2018A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2018A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2018A4	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2025A1	BLNK	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2025A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2025A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2025A4	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2033A1	BLNK	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2033A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2033A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2033A4	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2041A1	BLNK	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2041A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2041A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2041A4	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2050A1	BLNK	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2050A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2050A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2050A4	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2057A1	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2057A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2057A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2057J1	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2065A1	BLNK	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2065A2	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2065A3	OFF	M62 J25 - J30	
11/09/15 19:19:18	SIG	M62/2065A4	OFF	M62 J25 - J30	
11/09/15 19:20:07	SIG	M606/2003B2	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/1999B2	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/1999B3	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/1999B4	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/2004B2	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/2004B3	40R	M62 J25 - J30	
11/09/15 19:20:07	SIG	M62/2004B4	40R	M62 J25 - J30	
11/09/15 19:20:20	SIG	M62/2012B2	50R	M62 J25 - J30	
11/09/15 19:20:20	SIG	M62/2012B3	50R	M62 J25 - J30	
11/09/15 19:20:20	SIG	M62/2012B4	50R	M62 J25 - J30	
11/09/15 19:22:33	SIG	M62/2012B2	40R	M62 J25 - J30	
11/09/15 19:22:33	SIG	M62/2012B3	40R	M62 J25 - J30	
11/09/15 19:22:33	SIG	M62/2012B4	40R	M62 J25 - J30	
11/09/15 19:24:06	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 19:24:07	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 19:24:07	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 19:24:07	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 19:24:07	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 19:24:07	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 19:24:07	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M606/2003B2	40R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M62/1992B2	40R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M62/1992B3	40R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M62/1992B4	40R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M62/1999B2	40R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M62/1999B3	40R	M62 J25 - J30	
11/09/15 19:24:19	SIG	M62/1999B4	40R	M62 J25 - J30	
11/09/15 19:24:30	SIG	M62/2065B2	60R	M62 J25 - J30	
11/09/15 19:24:30	SIG	M62/2065B3	60R	M62 J25 - J30	
11/09/15 19:24:30	SIG	M62/2065B4	60R	M62 J25 - J30	
11/09/15 19:24:30	SIG	M62/2065M1	60R	M62 J25 - J30	
11/09/15 19:24:30	SIG	M621/1002B1	60R	M62 J25 - J30	
11/09/15 19:24:30	SIG	M621/1002B2	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2041B1	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2041B2	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2041B3	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2041B4	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2050B2	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2050B3	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2050B4	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2057B1	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2057B2	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2057B3	60R	M62 J25 - J30	
11/09/15 19:26:30	SIG	M62/2057B4	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2025B1	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2025B2	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2025B3	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2025B4	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2033B1	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2033B2	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2033B3	60R	M62 J25 - J30	
11/09/15 19:27:30	SIG	M62/2033B4	60R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2012B2	50R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2012B3	50R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2012B4	50R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2018B1	60R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2018B2	60R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2018B3	60R	M62 J25 - J30	
11/09/15 19:27:39	SIG	M62/2018L1	60R	M62 J25 - J30	
11/09/15 19:29:44	SIG	M606/2003B1	50R	M62 J25 - J30	
11/09/15 19:29:44	SIG	M62/1992B1	50R	M62 J25 - J30	
11/09/15 19:29:44	SIG	M62/2005M1	50R	M62 J25 - J30	
11/09/15 19:29:44	SIG	M62/2005M2	50R	M62 J25 - J30	
11/09/15 19:29:49	SIG	M606/2003B1	40R	M62 J25 - J30	
11/09/15 19:29:49	SIG	M62/2005M1	40R	M62 J25 - J30	
11/09/15 19:29:49	SIG	M62/2005M2	40R	M62 J25 - J30	
11/09/15 19:29:50	SIG	M62/1987B1	50R	M62 J25 - J30	
11/09/15 19:29:50	SIG	M62/1987B2	50R	M62 J25 - J30	
11/09/15 19:29:50	SIG	M62/1987B3	50R	M62 J25 - J30	
11/09/15 19:29:50	SIG	M62/1987B4	50R	M62 J25 - J30	
11/09/15 19:29:50	SIG	M62/1992B1	40R	M62 J25 - J30	
11/09/15 19:30:27	SIG	M62/2033B3	???	M62 J25 - J30	
11/09/15 19:30:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:31:25	SIG	M62/1992B1	50R	M62 J25 - J30	
11/09/15 19:31:25	SIG	M62/1992B2	50R	M62 J25 - J30	
11/09/15 19:31:25	SIG	M62/1992B3	50R	M62 J25 - J30	
11/09/15 19:31:25	SIG	M62/1992B4	50R	M62 J25 - J30	
11/09/15 19:33:30	SIG	M62/2074B1	BLNK	M62 J25 - J30	
11/09/15 19:33:30	SIG	M62/2074B2	OFF	M62 J25 - J30	
11/09/15 19:33:30	SIG	M62/2074B3	OFF	M62 J25 - J30	
11/09/15 19:33:30	SIG	M62/2074B4	OFF	M62 J25 - J30	
11/09/15 19:33:30	SIG	M621/1010B1	OFF	M62 J25 - J30	
11/09/15 19:33:30	SIG	M621/1010B2	OFF	M62 J25 - J30	
11/09/15 19:33:57	SIG	M606/2003B1	50R	M62 J25 - J30	
11/09/15 19:33:57	SIG	M606/2003B2	50R	M62 J25 - J30	
11/09/15 19:33:57	SIG	M62/1999B2	50R	M62 J25 - J30	
11/09/15 19:33:57	SIG	M62/1999B3	50R	M62 J25 - J30	
11/09/15 19:33:57	SIG	M62/1999B4	50R	M62 J25 - J30	
11/09/15 19:33:57	SIG	M62/2005M1	50R	M62 J25 - J30	
11/09/15 19:33:57	SIG	M62/2005M2	50R	M62 J25 - J30	
11/09/15 19:34:37	SIG	M62/2004B2	50R	M62 J25 - J30	
11/09/15 19:34:37	SIG	M62/2004B3	50R	M62 J25 - J30	
11/09/15 19:34:37	SIG	M62/2004B4	50R	M62 J25 - J30	
11/09/15 19:36:50	SIG	M62/2057B1	HSD	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/1987B1	60R	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/1987B2	60R	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/1987B3	60R	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/1987B4	60R	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/2012B2	60R	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/2012B3	60R	M62 J25 - J30	
11/09/15 19:37:30	SIG	M62/2012B4	60R	M62 J25 - J30	
11/09/15 19:38:49	SIG	M62/2041B1	HSD	M62 J25 - J30	
11/09/15 19:38:49	SIG	M62/2057B1	REDX	M62 J25 - J30	
11/09/15 19:38:49	SIG	M621/1002B1	HSD	M62 J25 - J30	
11/09/15 19:38:49	SIG	M621/1010B1	60R	M62 J25 - J30	
11/09/15 19:38:49	SIG	M621/1010B2	60R	M62 J25 - J30	
11/09/15 19:39:30	SIG	M62/1992B1	60R	M62 J25 - J30	
11/09/15 19:39:30	SIG	M62/1992B2	60R	M62 J25 - J30	
11/09/15 19:39:30	SIG	M62/1992B3	60R	M62 J25 - J30	
11/09/15 19:39:30	SIG	M62/1992B4	60R	M62 J25 - J30	
11/09/15 19:39:49	SIG	M62/2033B1	HSD	M62 J25 - J30	
11/09/15 19:40:49	SIG	M62/2025B1	HSD	M62 J25 - J30	
11/09/15 19:40:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
11/09/15 19:41:30	SIG	M606/2003B1	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M606/2003B2	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/1999B2	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/1999B3	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/1999B4	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/2004B2	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/2004B3	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/2004B4	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/2005M1	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/2005M2	60R	M62 J25 - J30	
11/09/15 19:41:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:41:41	SIG	M62/2033B1	REDX	M62 J25 - J30	
11/09/15 19:42:25	SIG	M62/2025B1	REDX	M62 J25 - J30	
11/09/15 19:42:55	SIG	M62/2057B2	NR	M62 J25 - J30	
11/09/15 19:42:55	SIG	M62/2057B3	NR	M62 J25 - J30	
11/09/15 19:42:55	SIG	M62/2057B4	NR	M62 J25 - J30	
11/09/15 19:42:55	SIG	M62/2065B2	NR	M62 J25 - J30	
11/09/15 19:42:55	SIG	M62/2065B3	NR	M62 J25 - J30	
11/09/15 19:42:55	SIG	M62/2065B4	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2025B2	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2025B3	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2025B4	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2033B2	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2033B3	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2033B4	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2041B2	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2041B3	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2041B4	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2050B2	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2050B3	NR	M62 J25 - J30	
11/09/15 19:42:56	SIG	M62/2050B4	NR	M62 J25 - J30	
11/09/15 19:43:55	SIG	M62/2069M1	OFF	M62 J25 - J30	
11/09/15 19:43:55	SIG	M62/2069M2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2025B1	BLNK	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2025B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2025B3	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2025B4	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2033B1	BLNK	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2033B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2033B4	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2041B1	BLNK	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2041B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2041B3	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2041B4	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2050B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2050B3	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2050B4	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2057B1	BLNK	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2057B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2057B3	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2057B4	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2065B1	BLNK	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2065B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2065B3	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2065B4	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M62/2065M1	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M621/1002B1	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M621/1002B2	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M621/1010B1	OFF	M62 J25 - J30	
11/09/15 19:43:56	SIG	M621/1010B2	OFF	M62 J25 - J30	
11/09/15 19:48:30	SIG	M62/2018B1	OFF	M62 J25 - J30	
11/09/15 19:48:30	SIG	M62/2018B2	OFF	M62 J25 - J30	
11/09/15 19:48:30	SIG	M62/2018B3	OFF	M62 J25 - J30	
11/09/15 19:48:30	SIG	M62/2018L1	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1981B1	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1981B2	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1981B3	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1981B4	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1987B1	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1987B2	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1987B3	NR	M62 J25 - J30	
11/09/15 19:50:31	SIG	M62/1987B4	NR	M62 J25 - J30	
11/09/15 19:51:31	SIG	M62/2018L1	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 19:52:30	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1987B1	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1987B2	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1987B3	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1987B4	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1992B1	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1992B2	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1992B3	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1992B4	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1999B1	BLNK	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1999B2	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1999B3	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/1999B4	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2004B1	BLNK	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2004B2	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2004B3	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2004B4	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2005M1	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2005M2	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2012B1	BLNK	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2012B2	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2012B3	OFF	M62 J25 - J30	
11/09/15 19:52:30	SIG	M62/2012B4	OFF	M62 J25 - J30	
11/09/15 19:53:31	SIG	M62/1981B1	OFF	M62 J25 - J30	
11/09/15 19:53:31	SIG	M62/1981B2	OFF	M62 J25 - J30	
11/09/15 19:53:31	SIG	M62/1981B3	OFF	M62 J25 - J30	
11/09/15 19:53:31	SIG	M62/1981B4	OFF	M62 J25 - J30	
11/09/15 20:01:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 20:01:10	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 20:25:56	SIG	M62/2189A3	50R	M62 J25 - J30	
11/09/15 20:25:56	SIG	M62/2189A4	50R	M62 J25 - J30	
11/09/15 20:25:56	SIG	M62/2197A1	50R	M62 J25 - J30	
11/09/15 20:25:56	SIG	M62/2197A2	50R	M62 J25 - J30	
11/09/15 20:25:56	SIG	M62/2197A3	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2012B1	REDX	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2012B2	NR	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2012B3	NR	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2012B4	NR	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2025B2	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2025B3	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2025B4	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2033B2	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2033B3	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2033B4	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2041B1	REDX	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2041B2	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2041B3	50R	M62 J25 - J30	
11/09/15 20:25:57	SIG	M62/2041B4	50R	M62 J25 - J30	
11/09/15 20:26:01	SIG	M62/2189A3	40R	M62 J25 - J30	
11/09/15 20:26:01	SIG	M62/2189A4	40R	M62 J25 - J30	
11/09/15 20:26:01	SIG	M62/2197A1	40R	M62 J25 - J30	
11/09/15 20:26:01	SIG	M62/2197A2	40R	M62 J25 - J30	
11/09/15 20:26:01	SIG	M62/2197A3	40R	M62 J25 - J30	
11/09/15 20:26:06	SIG	M62/2197A1	30R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2177A1	REDX	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2177A2	60R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2177A3	60R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2177A4	60R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2183A1	REDX	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2183A2	LDR	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2183A3	50R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2183A4	50R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2189A1	STOP	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2189A2	LDR	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2189A3	40R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2189A4	40R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2197A1	20R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2197A2	40R	M62 J25 - J30	
11/09/15 20:26:11	SIG	M62/2197A3	40R	M62 J25 - J30	
11/09/15 20:26:17	SIG	M62/2189A1	STOP	M62 J25 - J30	
11/09/15 20:26:17	SIG	M62/2197A1	STOP	M62 J25 - J30	
11/09/15 20:28:40	SIG	M62/2033B3	???	M62 J25 - J30	
11/09/15 20:28:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 20:35:31	SIG	M62/2170A1	60R	M62 J25 - J30	
11/09/15 20:35:31	SIG	M62/2170A2	60R	M62 J25 - J30	
11/09/15 20:35:31	SIG	M62/2170K1	60R	M62 J25 - J30	
11/09/15 20:35:31	SIG	M62/2170K2	60R	M62 J25 - J30	
11/09/15 20:38:31	SIG	M62/2163A1	60R	M62 J25 - J30	
11/09/15 20:38:31	SIG	M62/2163A2	60R	M62 J25 - J30	
11/09/15 20:38:31	SIG	M62/2166K1	60R	M62 J25 - J30	
11/09/15 20:38:31	SIG	M62/2166K2	60R	M62 J25 - J30	
11/09/15 21:06:41	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 21:06:41	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2012B1	BLNK	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2012B2	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2012B3	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2012B4	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2025B1	BLNK	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2025B2	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2025B3	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2025B4	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2033B1	BLNK	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2033B2	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2033B4	OFF	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2041B2	NR	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2041B3	NR	M62 J25 - J30	
11/09/15 21:18:56	SIG	M62/2041B4	NR	M62 J25 - J30	
11/09/15 21:21:56	SIG	M62/2041B2	OFF	M62 J25 - J30	
11/09/15 21:21:56	SIG	M62/2041B3	OFF	M62 J25 - J30	
11/09/15 21:21:56	SIG	M62/2041B4	OFF	M62 J25 - J30	
11/09/15 21:21:57	SIG	M62/2041B1	BLNK	M62 J25 - J30	
11/09/15 21:24:46	SIG	M62/2189A1	REDX	M62 J25 - J30	
11/09/15 21:24:46	SIG	M62/2189A3	50R	M62 J25 - J30	
11/09/15 21:24:46	SIG	M62/2189A4	50R	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2183A2	60R	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2183A3	60R	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2183A4	60R	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2189A2	50R	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2197A1	OFF	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2197A2	OFF	M62 J25 - J30	
11/09/15 21:26:35	SIG	M62/2197A3	OFF	M62 J25 - J30	
11/09/15 21:28:26	SIG	M606/2003B1	NR	M62 J25 - J30	
11/09/15 21:28:26	SIG	M606/2003B2	NR	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2163A1	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2163A2	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2166K1	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2166K2	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2170A1	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2170A2	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2170K1	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2170K2	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2177A1	BLNK	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2177A2	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2177A3	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2177A4	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2183A2	NR	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2183A3	NR	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2183A4	NR	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2189A1	BLNK	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2189A1	BLNK	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2189A2	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2189A3	OFF	M62 J25 - J30	
11/09/15 21:28:32	SIG	M62/2189A4	OFF	M62 J25 - J30	
11/09/15 21:31:26	SIG	M606/2003B1	OFF	M62 J25 - J30	
11/09/15 21:31:27	SIG	M606/2003B2	OFF	M62 J25 - J30	
11/09/15 21:31:32	SIG	M62/2183A2	OFF	M62 J25 - J30	
11/09/15 21:31:33	SIG	M62/2183A1	BLNK	M62 J25 - J30	
11/09/15 21:31:33	SIG	M62/2183A3	OFF	M62 J25 - J30	
11/09/15 21:31:33	SIG	M62/2183A4	OFF	M62 J25 - J30	
11/09/15 22:15:05	SIG	M62/1956A1	NR	M62 J25 - J30	
11/09/15 22:15:05	SIG	M62/1956A2	NR	M62 J25 - J30	
11/09/15 22:15:05	SIG	M62/1956A3	NR	M62 J25 - J30	
11/09/15 22:27:29	SIG	M62/1956A1	NR	M62 J25 - J30	
11/09/15 22:27:29	SIG	M62/1956A2	NR	M62 J25 - J30	
11/09/15 22:27:29	SIG	M62/1956A3	NR	M62 J25 - J30	
11/09/15 22:30:29	SIG	M62/1956A1	OFF	M62 J25 - J30	
11/09/15 22:30:29	SIG	M62/1956A2	OFF	M62 J25 - J30	
11/09/15 22:30:29	SIG	M62/1956A3	OFF	M62 J25 - J30	
11/09/15 22:47:36	SIG	M62/1956A1	NR	M62 J25 - J30	
11/09/15 22:47:36	SIG	M62/1956A2	NR	M62 J25 - J30	
11/09/15 22:47:36	SIG	M62/1956A3	NR	M62 J25 - J30	
11/09/15 22:47:36	SIG	M62/1960B1	50R	M62 J25 - J30	
11/09/15 22:47:36	SIG	M62/1960B2	50R	M62 J25 - J30	
11/09/15 22:47:36	SIG	M62/1960B3	50R	M62 J25 - J30	
11/09/15 22:57:01	SIG	M62/1956A1	NR	M62 J25 - J30	
11/09/15 22:57:01	SIG	M62/1956A2	NR	M62 J25 - J30	
11/09/15 22:57:01	SIG	M62/1956A3	NR	M62 J25 - J30	
11/09/15 22:57:19	SIG	M62/1960B1	OFF	M62 J25 - J30	
11/09/15 22:57:19	SIG	M62/1960B2	OFF	M62 J25 - J30	
11/09/15 22:57:19	SIG	M62/1960B3	OFF	M62 J25 - J30	
11/09/15 23:00:01	SIG	M62/1956A1	OFF	M62 J25 - J30	
11/09/15 23:00:02	SIG	M62/1956A2	OFF	M62 J25 - J30	
11/09/15 23:00:02	SIG	M62/1956A3	OFF	M62 J25 - J30	
12/09/15 03:06:55	SIG	M62/2197A1	50R	M62 J25 - J30	
12/09/15 03:06:55	SIG	M62/2197A2	50R	M62 J25 - J30	
12/09/15 03:06:55	SIG	M62/2197A3	50R	M62 J25 - J30	
12/09/15 03:07:01	SIG	M62/2197A1	40R	M62 J25 - J30	
12/09/15 03:07:01	SIG	M62/2197A2	40R	M62 J25 - J30	
12/09/15 03:07:01	SIG	M62/2197A3	40R	M62 J25 - J30	
12/09/15 03:07:06	SIG	M62/2197A1	30R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2177A1	REDX	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2177A2	60R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2177A3	60R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2177A4	60R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2183A1	REDX	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2183A2	LDR	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2183A3	50R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2183A4	50R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2189A1	REDX	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2189A2	LDR	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2189A3	50R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2189A4	50R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2197A1	20R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2197A2	40R	M62 J25 - J30	
12/09/15 03:07:11	SIG	M62/2197A3	40R	M62 J25 - J30	
12/09/15 03:07:16	SIG	M62/2197A1	STOP	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2177A1	BLNK	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2177A2	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2177A3	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2177A4	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2183A1	BLNK	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2183A2	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2183A3	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2183A4	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2189A1	BLNK	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2189A2	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2189A3	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2189A4	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2197A1	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2197A2	OFF	M62 J25 - J30	
12/09/15 03:55:43	SIG	M62/2197A3	OFF	M62 J25 - J30	
12/09/15 06:13:00	SIG	M62/2197A1	50R	M62 J25 - J30	
12/09/15 06:13:00	SIG	M62/2197A2	50R	M62 J25 - J30	
12/09/15 06:13:00	SIG	M62/2197A3	50R	M62 J25 - J30	
12/09/15 06:30:31	SIG	M62/2197A1	OFF	M62 J25 - J30	
12/09/15 06:30:31	SIG	M62/2197A2	OFF	M62 J25 - J30	
12/09/15 06:30:31	SIG	M62/2197A3	OFF	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2106B1	REDX	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2106B2	NR	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2106B3	NR	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2106B4	NR	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2113B1	REDX	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2113B2	60R	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2113B3	60R	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2113B4	60R	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2117B1	60R	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2117B3	60R	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2120M1	60R	M62 J25 - J30	
12/09/15 06:44:41	SIG	M62/2120M2	60R	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2106B2	NR	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2106B3	NR	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2106B4	NR	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2113B1	BLNK	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2113B2	OFF	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2113B3	OFF	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2113B4	OFF	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2117B3	OFF	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2120M1	OFF	M62 J25 - J30	
12/09/15 07:06:15	SIG	M62/2120M2	OFF	M62 J25 - J30	
12/09/15 07:09:15	SIG	M62/2106B2	OFF	M62 J25 - J30	
12/09/15 07:09:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
12/09/15 07:09:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
12/09/15 07:09:17	SIG	M62/2106B1	BLNK	M62 J25 - J30	
12/09/15 08:05:15	SIG	M62/1968A1	50R	M62 J25 - J30	
12/09/15 08:05:15	SIG	M62/1968A2	50R	M62 J25 - J30	
12/09/15 08:05:15	SIG	M62/1968A3	50R	M62 J25 - J30	
12/09/15 08:05:15	SIG	M62/1968A4	50R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1960A1	50R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1960A2	50R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1960A3	50R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1960K1	50R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1960K2	50R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1968A1	40R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1968A2	40R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1968A3	40R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1968A4	40R	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1974A1	NR	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1974A2	NR	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1974A3	NR	M62 J25 - J30	
12/09/15 08:05:20	SIG	M62/1974A4	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1960A1	OFF	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1960A2	OFF	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1960A3	OFF	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1960K1	OFF	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1960K2	OFF	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1968A1	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1968A2	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1968A3	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1968A4	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1974A1	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1974A2	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1974A3	NR	M62 J25 - J30	
12/09/15 08:09:15	SIG	M62/1974A4	NR	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1968A1	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1968A2	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1968A3	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1968A4	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1974A1	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1974A2	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1974A3	OFF	M62 J25 - J30	
12/09/15 08:12:15	SIG	M62/1974A4	OFF	M62 J25 - J30	
12/09/15 08:27:14	SIG	M62/2065A1	REDX	M62 J25 - J30	
12/09/15 08:27:14	SIG	M62/2065A2	50R	M62 J25 - J30	
12/09/15 08:27:14	SIG	M62/2065A3	50R	M62 J25 - J30	
12/09/15 08:27:14	SIG	M62/2065A4	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2073K1	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2079A1	REDX	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2079A2	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2079A3	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2079A4	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2088A1	REDX	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2088A2	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2088A3	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2088A4	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2097A1	REDX	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2097A2	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2097A3	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2097A4	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2106A1	REDX	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2106A2	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2106A3	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2106A4	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2114A1	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2114A2	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2114A3	50R	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2117A1	REDX	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2117A2	NR	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2117A3	NR	M62 J25 - J30	
12/09/15 08:27:23	SIG	M62/2117A4	NR	M62 J25 - J30	
12/09/15 08:29:53	SIG	M62/2106A3	OFF	M62 J25 - J30	
12/09/15 08:29:54	SIG	M62/2106A3	OFF	M62 J25 - J30	
12/09/15 08:29:54	SIG	M62/2106A3	OFF	M62 J25 - J30	
12/09/15 08:29:55	SIG	M62/2106A3	OFF	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2117A2	60R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2117A3	60R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2117A4	60R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2135A1	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2135A2	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2135A3	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2135A4	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2144A1	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2144A2	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2144J1	50R	M62 J25 - J30	
12/09/15 08:45:29	SIG	M62/2144K1	50R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2122K1	60R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2122K2	60R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2124A1	REDX	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2124A2	60R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2124A3	60R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2124A4	60R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2135A1	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2135A2	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2135A3	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2135A4	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2144A1	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2144A2	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2144J1	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2144K1	40R	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2151A1	NR	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2151A2	NR	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2151J1	NR	M62 J25 - J30	
12/09/15 08:45:34	SIG	M62/2151K1	NR	M62 J25 - J30	
12/09/15 08:45:40	SIG	M62/2124A3	OFF	M62 J25 - J30	
12/09/15 08:45:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
12/09/15 08:45:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
12/09/15 08:45:42	SIG	M62/2124A3	OFF	M62 J25 - J30	
12/09/15 08:45:58	SIG	M62/2065A1	BLNK	M62 J25 - J30	
12/09/15 08:45:58	SIG	M62/2065A2	OFF	M62 J25 - J30	
12/09/15 08:45:58	SIG	M62/2065A3	OFF	M62 J25 - J30	
12/09/15 08:45:58	SIG	M62/2065A4	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2073K1	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2079A1	BLNK	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2079A2	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2079A3	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2079A4	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2088A2	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2088A3	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2088A4	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2097A2	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2097A3	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2097A4	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2106A2	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2106A3	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2106A4	NR	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2114A1	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2114A2	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2114A3	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2117A1	BLNK	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2117A2	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2117A3	OFF	M62 J25 - J30	
12/09/15 08:46:07	SIG	M62/2117A4	OFF	M62 J25 - J30	
12/09/15 08:49:07	SIG	M62/2106A2	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2088A2	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2088A3	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2088A4	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2097A2	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2097A3	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2097A4	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
12/09/15 08:49:17	SIG	M62/2106A4	OFF	M62 J25 - J30	
12/09/15 08:49:18	SIG	M62/2088A1	BLNK	M62 J25 - J30	
12/09/15 08:49:18	SIG	M62/2088A1	BLNK	M62 J25 - J30	
12/09/15 08:49:18	SIG	M62/2097A1	BLNK	M62 J25 - J30	
12/09/15 08:49:18	SIG	M62/2097A1	BLNK	M62 J25 - J30	
12/09/15 08:49:18	SIG	M62/2106A1	BLNK	M62 J25 - J30	
12/09/15 08:50:32	SIG	M62/2144A1	LDR	M62 J25 - J30	
12/09/15 08:50:32	SIG	M62/2144J1	50R	M62 J25 - J30	
12/09/15 08:50:32	SIG	M62/2144K1	50R	M62 J25 - J30	
12/09/15 08:53:34	SIG	M62/2124A3	OFF	M62 J25 - J30	
12/09/15 08:53:44	SIG	M62/2117A1	REDX	M62 J25 - J30	
12/09/15 08:53:44	SIG	M62/2117A2	60R	M62 J25 - J30	
12/09/15 08:53:44	SIG	M62/2117A3	60R	M62 J25 - J30	
12/09/15 08:53:44	SIG	M62/2117A4	60R	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2144A1	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2144A2	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2144J1	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2144K1	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2151A1	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2151A2	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2151J1	NR	M62 J25 - J30	
12/09/15 08:54:23	SIG	M62/2151K1	NR	M62 J25 - J30	
12/09/15 08:57:23	SIG	M62/2151A1	OFF	M62 J25 - J30	
12/09/15 08:57:23	SIG	M62/2151A2	OFF	M62 J25 - J30	
12/09/15 08:57:23	SIG	M62/2151J1	OFF	M62 J25 - J30	
12/09/15 08:57:23	SIG	M62/2151K1	OFF	M62 J25 - J30	
12/09/15 08:57:34	SIG	M62/2135A1	60R	M62 J25 - J30	
12/09/15 08:57:34	SIG	M62/2135A2	60R	M62 J25 - J30	
12/09/15 08:57:34	SIG	M62/2135A3	60R	M62 J25 - J30	
12/09/15 08:57:34	SIG	M62/2135A4	60R	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2122K1	OFF	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2122K2	OFF	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2124A2	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2124A3	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2124A4	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2135A1	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2135A2	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2135A3	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2135A4	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2144A1	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2144A2	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2144J1	NR	M62 J25 - J30	
12/09/15 09:06:44	SIG	M62/2144K1	NR	M62 J25 - J30	
12/09/15 09:06:45	SIG	M62/2117A1	BLNK	M62 J25 - J30	
12/09/15 09:06:45	SIG	M62/2117A2	OFF	M62 J25 - J30	
12/09/15 09:06:45	SIG	M62/2117A3	OFF	M62 J25 - J30	
12/09/15 09:06:45	SIG	M62/2117A4	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2124A1	BLNK	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2124A2	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2124A4	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2135A1	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2135A2	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2135A3	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2135A4	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2144A1	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2144A2	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2144J1	OFF	M62 J25 - J30	
12/09/15 09:09:45	SIG	M62/2144K1	OFF	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2079A1	REDX	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2079A2	60R	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2079A3	60R	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2079A4	60R	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2088A1	REDX	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2088A2	NR	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2088A3	NR	M62 J25 - J30	
12/09/15 09:21:17	SIG	M62/2088A4	NR	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2079A1	BLNK	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2079A2	OFF	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2079A3	OFF	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2079A4	OFF	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2088A2	NR	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2088A3	NR	M62 J25 - J30	
12/09/15 09:23:19	SIG	M62/2088A4	NR	M62 J25 - J30	
12/09/15 09:26:20	SIG	M62/2088A1	BLNK	M62 J25 - J30	
12/09/15 09:26:20	SIG	M62/2088A2	OFF	M62 J25 - J30	
12/09/15 09:26:20	SIG	M62/2088A3	OFF	M62 J25 - J30	
12/09/15 09:26:20	SIG	M62/2088A4	OFF	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1955K1	50R	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1955K2	50R	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1960K1	50R	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1960K2	50R	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1968A1	NR	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1968A2	NR	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1968A3	NR	M62 J25 - J30	
12/09/15 10:16:32	SIG	M62/1968A4	NR	M62 J25 - J30	
12/09/15 10:30:59	SIG	M62/1960K1	NR	M62 J25 - J30	
12/09/15 10:30:59	SIG	M62/1960K2	NR	M62 J25 - J30	
12/09/15 10:30:59	SIG	M62/1968A1	NR	M62 J25 - J30	
12/09/15 10:30:59	SIG	M62/1968A2	NR	M62 J25 - J30	
12/09/15 10:30:59	SIG	M62/1968A3	NR	M62 J25 - J30	
12/09/15 10:30:59	SIG	M62/1968A4	NR	M62 J25 - J30	
12/09/15 10:32:49	SIG	M62/1955K1	OFF	M62 J25 - J30	
12/09/15 10:32:49	SIG	M62/1955K2	OFF	M62 J25 - J30	
12/09/15 10:32:49	SIG	M62/1960K1	NR	M62 J25 - J30	
12/09/15 10:32:49	SIG	M62/1960K2	NR	M62 J25 - J30	
12/09/15 10:34:00	SIG	M62/1968A1	OFF	M62 J25 - J30	
12/09/15 10:34:01	SIG	M62/1968A2	OFF	M62 J25 - J30	
12/09/15 10:34:01	SIG	M62/1968A3	OFF	M62 J25 - J30	
12/09/15 10:34:01	SIG	M62/1968A4	OFF	M62 J25 - J30	
12/09/15 10:35:49	SIG	M62/1960K1	OFF	M62 J25 - J30	
12/09/15 10:35:49	SIG	M62/1960K2	OFF	M62 J25 - J30	
12/09/15 10:41:33	SIG	M62/2194B1	NR	M62 J25 - J30	
12/09/15 10:41:33	SIG	M62/2194B2	NR	M62 J25 - J30	
12/09/15 10:41:33	SIG	M62/2194B3	NR	M62 J25 - J30	
12/09/15 10:41:33	SIG	M62/2194B4	NR	M62 J25 - J30	
12/09/15 10:41:33	SIG	M62/2199M1	50R	M62 J25 - J30	
12/09/15 10:41:33	SIG	M62/2199M2	50R	M62 J25 - J30	
12/09/15 10:44:20	SIG	M62/2194B1	NR	M62 J25 - J30	
12/09/15 10:44:20	SIG	M62/2194B2	NR	M62 J25 - J30	
12/09/15 10:44:20	SIG	M62/2194B3	NR	M62 J25 - J30	
12/09/15 10:44:20	SIG	M62/2194B4	NR	M62 J25 - J30	
12/09/15 10:44:20	SIG	M62/2199M1	OFF	M62 J25 - J30	
12/09/15 10:44:20	SIG	M62/2199M2	OFF	M62 J25 - J30	
12/09/15 10:47:21	SIG	M62/2194B1	OFF	M62 J25 - J30	
12/09/15 10:47:21	SIG	M62/2194B2	OFF	M62 J25 - J30	
12/09/15 10:47:21	SIG	M62/2194B3	OFF	M62 J25 - J30	
12/09/15 10:47:21	SIG	M62/2194B4	OFF	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2008K1	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2008K2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2012A1	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2012A1	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2012A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2012A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2018A1	HSD	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2018A1	HSD	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2018A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2018A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2018A4	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A1	REDX	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A2	NR	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A3	NR	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A4	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2025A4	NR	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2033A1	REDX	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2033A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2033A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2033A4	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2041A1	REDX	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2041A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2041A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2041A4	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2050A1	REDX	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2050A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2050A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2050A4	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2057A1	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2057A2	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2057A3	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2057J1	60R	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2065A1	REDX	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2065A2	NR	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2065A3	NR	M62 J25 - J30	
12/09/15 11:06:00	SIG	M62/2065A4	NR	M62 J25 - J30	
12/09/15 11:20:31	SIG	M62/2050A1	60R	M62 J25 - J30	
12/09/15 11:20:56	SIG	M62/2041A1	60R	M62 J25 - J30	
12/09/15 11:21:20	SIG	M62/2033A1	60R	M62 J25 - J30	
12/09/15 11:21:24	SIG	M62/2018A1	60R	M62 J25 - J30	
12/09/15 11:21:24	SIG	M62/2025A1	60R	M62 J25 - J30	
12/09/15 11:39:55	SIG	M62/1968A1	50R	M62 J25 - J30	
12/09/15 11:39:55	SIG	M62/1968A2	50R	M62 J25 - J30	
12/09/15 11:39:55	SIG	M62/1968A3	50R	M62 J25 - J30	
12/09/15 11:39:55	SIG	M62/1968A4	50R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1960A1	50R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1960A2	50R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1960A3	50R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1960K1	50R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1960K2	50R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1968A1	40R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1968A2	40R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1968A3	40R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1968A4	40R	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1974A1	NR	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1974A2	NR	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1974A3	NR	M62 J25 - J30	
12/09/15 11:40:01	SIG	M62/1974A4	NR	M62 J25 - J30	
12/09/15 11:42:47	SIG	M62/2074B1	REDX	M62 J25 - J30	
12/09/15 11:42:47	SIG	M62/2074B2	60R	M62 J25 - J30	
12/09/15 11:42:47	SIG	M62/2074B3	60R	M62 J25 - J30	
12/09/15 11:42:47	SIG	M62/2074B4	60R	M62 J25 - J30	
12/09/15 11:42:47	SIG	M621/1010B1	60R	M62 J25 - J30	
12/09/15 11:42:47	SIG	M621/1010B2	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2057B1	REDX	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2057B2	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2057B3	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2057B4	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2065B1	REDX	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2065B2	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2065B3	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2065B4	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2065M1	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2069M1	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M62/2069M2	60R	M62 J25 - J30	
12/09/15 11:42:48	SIG	M621/1002B1	HSD	M62 J25 - J30	
12/09/15 11:42:48	SIG	M621/1002B2	60R	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1960A1	OFF	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1960A2	OFF	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1960A3	OFF	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1960K1	OFF	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1960K2	OFF	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1968A1	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1968A2	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1968A3	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1968A4	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1974A1	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1974A2	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1974A3	NR	M62 J25 - J30	
12/09/15 11:43:56	SIG	M62/1974A4	NR	M62 J25 - J30	
12/09/15 11:46:56	SIG	M62/1968A1	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1968A2	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1968A3	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1968A4	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1974A1	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1974A2	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1974A3	OFF	M62 J25 - J30	
12/09/15 11:46:57	SIG	M62/1974A4	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2057B1	BLNK	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2057B2	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2057B3	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2057B4	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2065B2	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2065B3	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2065B4	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2065M1	NR	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2069M1	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2069M2	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2074B1	BLNK	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2074B2	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2074B3	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M62/2074B4	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M621/1002B1	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M621/1002B2	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M621/1010B1	OFF	M62 J25 - J30	
12/09/15 11:51:48	SIG	M621/1010B2	OFF	M62 J25 - J30	
12/09/15 11:54:48	SIG	M62/2065B2	OFF	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2050B2	OFF	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2050B3	OFF	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2050B4	OFF	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2065B1	BLNK	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2065B3	OFF	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2065B4	OFF	M62 J25 - J30	
12/09/15 11:54:49	SIG	M62/2065M1	OFF	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2065B2	50R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2065B3	50R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2065B4	50R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2065M1	50R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2074B1	REDX	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2074B2	60R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2074B3	60R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M62/2074B4	60R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M621/1002B2	50R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M621/1010B1	50R	M62 J25 - J30	
12/09/15 12:49:36	SIG	M621/1010B2	50R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2057B1	REDX	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2057B2	NR	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2057B3	NR	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2057B4	NR	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2065B1	REDX	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2065B2	40R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2065B3	40R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2065B4	40R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2065M1	40R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2069M1	50R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M62/2069M2	50R	M62 J25 - J30	
12/09/15 12:49:41	SIG	M621/1002B1	HSD	M62 J25 - J30	
12/09/15 12:49:41	SIG	M621/1002B2	40R	M62 J25 - J30	
12/09/15 12:50:49	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 12:50:49	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 12:50:49	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 12:50:49	SIG	M62/2057B2	60R	M62 J25 - J30	
12/09/15 12:50:49	SIG	M62/2057B3	60R	M62 J25 - J30	
12/09/15 12:50:49	SIG	M62/2057B4	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M62/2065B2	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M62/2065B3	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M62/2065B4	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M62/2065M1	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M62/2069M1	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M62/2069M2	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M621/1002B2	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M621/1010B1	60R	M62 J25 - J30	
12/09/15 12:54:02	SIG	M621/1010B2	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2012B1	REDX	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2012B2	NR	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2012B3	NR	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2012B4	NR	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2018B1	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2018B2	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2018B3	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2018L1	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2025B1	REDX	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2025B2	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2025B3	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2025B4	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2033B1	REDX	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2033B2	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2033B3	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2033B4	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B1	REDX	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B2	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B2	NR	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B3	NR	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B3	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B4	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2041B4	NR	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2050B2	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2050B3	60R	M62 J25 - J30	
12/09/15 12:55:07	SIG	M62/2050B4	60R	M62 J25 - J30	
12/09/15 12:57:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 12:57:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 12:57:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 12:57:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 12:58:32	SIG	M62/2025B1	60R	M62 J25 - J30	
12/09/15 13:00:11	SIG	M62/2033B1	60R	M62 J25 - J30	
12/09/15 13:00:55	SIG	M62/2041B1	60R	M62 J25 - J30	
12/09/15 13:01:26	SIG	M62/2057B1	60R	M62 J25 - J30	
12/09/15 13:01:26	SIG	M621/1002B1	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2137B1	NR	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2137B2	NR	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2137B3	NR	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2137B4	NR	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2147B1	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2147B2	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2147B3	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2147B4	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2159B1	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2159B2	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2159M1	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2159M2	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2170B1	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2170B2	60R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2170L1	50R	M62 J25 - J30	
12/09/15 13:03:49	SIG	M62/2170L2	50R	M62 J25 - J30	
12/09/15 13:04:49	SIG	M62/2177B1	60R	M62 J25 - J30	
12/09/15 13:04:49	SIG	M62/2177B2	60R	M62 J25 - J30	
12/09/15 13:04:49	SIG	M62/2177L1	60R	M62 J25 - J30	
12/09/15 13:04:49	SIG	M62/2177L2	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2144A1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2144A2	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2144J1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2144K1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2151A1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2151A2	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2151J1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2151K1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2155A1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2155A2	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2155J1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2155K1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2157A1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2157A2	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2157J1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2157J2	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2157K1	60R	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2163A1	NR	M62 J25 - J30	
12/09/15 13:05:49	SIG	M62/2163A2	NR	M62 J25 - J30	
12/09/15 13:06:49	SIG	M62/2135A1	60R	M62 J25 - J30	
12/09/15 13:06:49	SIG	M62/2135A2	60R	M62 J25 - J30	
12/09/15 13:06:49	SIG	M62/2135A3	60R	M62 J25 - J30	
12/09/15 13:06:49	SIG	M62/2135A4	60R	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2132B1	NR	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2132B2	NR	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2132B3	NR	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2137B1	60R	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2137B2	60R	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2137B3	60R	M62 J25 - J30	
12/09/15 13:07:49	SIG	M62/2137B4	60R	M62 J25 - J30	
12/09/15 13:08:37	SIG	M62/2157A1	OFF	M62 J25 - J30	
12/09/15 13:08:38	SIG	M62/2157A1	OFF	M62 J25 - J30	
12/09/15 13:08:38	SIG	M62/2157A1	OFF	M62 J25 - J30	
12/09/15 13:08:39	SIG	M62/2157A1	OFF	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2163A1	60R	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2163A2	60R	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2170A1	NR	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2170A2	NR	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2177A1	REDX	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2177A2	NR	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2177A3	NR	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2177A4	NR	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2183B1	60R	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2183B2	60R	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2183L1	60R	M62 J25 - J30	
12/09/15 13:09:49	SIG	M62/2183L2	60R	M62 J25 - J30	
12/09/15 13:12:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
12/09/15 13:12:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
12/09/15 13:14:49	SIG	M62/2074B1	BLNK	M62 J25 - J30	
12/09/15 13:14:49	SIG	M62/2074B2	OFF	M62 J25 - J30	
12/09/15 13:14:49	SIG	M62/2074B3	OFF	M62 J25 - J30	
12/09/15 13:14:49	SIG	M62/2074B4	OFF	M62 J25 - J30	
12/09/15 13:14:49	SIG	M621/1010B1	OFF	M62 J25 - J30	
12/09/15 13:14:49	SIG	M621/1010B2	OFF	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2189B1	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2189B2	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2189B3	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2189B4	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2194B1	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2194B2	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2194B3	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2194B4	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2197B1	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2197B2	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2197B3	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2199M1	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2199M2	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2203B1	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2203B2	60R	M62 J25 - J30	
12/09/15 13:15:50	SIG	M62/2203B3	60R	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2163A1	NR	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2163A2	NR	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2170A1	OFF	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2170A2	OFF	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2177A1	BLNK	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2177A2	OFF	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2177A3	OFF	M62 J25 - J30	
12/09/15 13:17:49	SIG	M62/2177A4	OFF	M62 J25 - J30	
12/09/15 13:18:49	SIG	M62/2135A1	OFF	M62 J25 - J30	
12/09/15 13:18:49	SIG	M62/2135A2	OFF	M62 J25 - J30	
12/09/15 13:18:49	SIG	M62/2135A3	OFF	M62 J25 - J30	
12/09/15 13:18:49	SIG	M62/2135A4	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2144A1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2144A2	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2144J1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2144K1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2151A1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2151A2	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2151J1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2151K1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2155A1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2155A2	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2155J1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2155K1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2157A1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2157A2	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2157J1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2157J2	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2157K1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2163A1	OFF	M62 J25 - J30	
12/09/15 13:20:49	SIG	M62/2163A2	OFF	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2132B1	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2132B2	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2132B3	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2137B1	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2137B2	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2137B3	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2137B4	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2147B1	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2147B2	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2147B3	NR	M62 J25 - J30	
12/09/15 13:21:49	SIG	M62/2147B4	NR	M62 J25 - J30	
12/09/15 13:24:49	SIG	M62/2137B1	OFF	M62 J25 - J30	
12/09/15 13:24:50	SIG	M62/2132B1	OFF	M62 J25 - J30	
12/09/15 13:24:50	SIG	M62/2132B2	OFF	M62 J25 - J30	
12/09/15 13:24:50	SIG	M62/2132B3	OFF	M62 J25 - J30	
12/09/15 13:24:50	SIG	M62/2137B2	OFF	M62 J25 - J30	
12/09/15 13:24:50	SIG	M62/2137B3	OFF	M62 J25 - J30	
12/09/15 13:24:50	SIG	M62/2137B4	OFF	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2147B1	OFF	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2147B2	OFF	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2147B3	OFF	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2147B4	OFF	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2159B1	NR	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2159B2	NR	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2159M1	OFF	M62 J25 - J30	
12/09/15 13:25:49	SIG	M62/2159M2	OFF	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2189B1	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2189B2	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2189B3	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2189B4	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2194B1	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2194B2	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2194B3	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2194B4	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2197B1	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2197B2	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2197B3	NR	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2199M1	OFF	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2199M2	OFF	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2203B1	OFF	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2203B2	OFF	M62 J25 - J30	
12/09/15 13:27:49	SIG	M62/2203B3	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2189B1	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2189B2	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2189B3	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2189B4	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2194B1	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2194B2	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2194B3	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2194B4	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2197B1	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2197B2	OFF	M62 J25 - J30	
12/09/15 13:30:50	SIG	M62/2197B3	OFF	M62 J25 - J30	
12/09/15 13:38:50	SIG	M62/2183B1	OFF	M62 J25 - J30	
12/09/15 13:38:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
12/09/15 13:38:50	SIG	M62/2183L1	OFF	M62 J25 - J30	
12/09/15 13:38:50	SIG	M62/2183L2	OFF	M62 J25 - J30	
12/09/15 13:42:49	SIG	M62/2159B1	NR	M62 J25 - J30	
12/09/15 13:42:49	SIG	M62/2159B2	NR	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2170B1	NR	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2170B2	NR	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2170L1	OFF	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2170L2	OFF	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2177B1	OFF	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2177B2	OFF	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2177L1	OFF	M62 J25 - J30	
12/09/15 13:42:50	SIG	M62/2177L2	OFF	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2004B1	REDX	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2004B2	NR	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2004B3	NR	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2004B4	NR	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2012B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2012B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2012B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2018B1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2018B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2018B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2018L1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2025B1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2025B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2025B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2025B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2033B1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2033B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2033B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2033B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2041B1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2041B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2041B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2041B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2050B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2050B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2050B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2057B1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2057B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2057B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2057B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2065B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2065B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2065B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2065M1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2074B1	REDX	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2074B2	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2074B3	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M62/2074B4	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M621/1002B1	50R	M62 J25 - J30	
12/09/15 13:43:27	SIG	M621/1002B2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M606/2003B1	NR	M62 J25 - J30	
12/09/15 13:43:50	SIG	M606/2003B2	NR	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2004A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2004A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2004A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2008K1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2008K2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2012A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2012A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2012A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2018A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2018A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2018A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2018A4	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2025A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2025A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2025A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2025A4	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2033A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2033A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2033A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2033A4	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2041A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2041A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2041A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2041A4	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2050A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2050A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2050A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2050A4	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2057A1	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2057A2	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2057A3	50R	M62 J25 - J30	
12/09/15 13:43:50	SIG	M62/2057J1	50R	M62 J25 - J30	
12/09/15 13:45:50	SIG	M62/2159B1	OFF	M62 J25 - J30	
12/09/15 13:45:50	SIG	M62/2159B2	OFF	M62 J25 - J30	
12/09/15 13:45:50	SIG	M62/2170B1	OFF	M62 J25 - J30	
12/09/15 13:45:51	SIG	M62/2170B2	OFF	M62 J25 - J30	
12/09/15 13:46:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 13:46:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 13:46:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 13:46:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 13:52:50	SIG	M621/1010B1	60R	M62 J25 - J30	
12/09/15 13:52:50	SIG	M621/1010B2	60R	M62 J25 - J30	
12/09/15 13:56:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:09:42	SIG	M606/2003B1	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M606/2003B2	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2004A1	OFF	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2004A2	OFF	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2004A3	OFF	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2004B2	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2004B3	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2004B4	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2008K1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2008K2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2012A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2012A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2012A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2012B2	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2012B3	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2012B4	NR	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018A4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018B1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2018L1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025A4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025B1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2025B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033A4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033B1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2033B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041A4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041B1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2041B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050A4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2050B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057A1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057A2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057A3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057B1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2057J1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2065B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2065B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2065B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2065M1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2074B2	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2074B3	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M62/2074B4	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M621/1002B1	60R	M62 J25 - J30	
12/09/15 14:09:42	SIG	M621/1002B2	60R	M62 J25 - J30	
12/09/15 14:10:34	SIG	M62/1960B1	50R	M62 J25 - J30	
12/09/15 14:10:34	SIG	M62/1960B2	50R	M62 J25 - J30	
12/09/15 14:10:34	SIG	M62/1960B3	50R	M62 J25 - J30	
12/09/15 14:11:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:11:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:11:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:11:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:12:42	SIG	M606/2003B1	OFF	M62 J25 - J30	
12/09/15 14:12:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
12/09/15 14:12:43	SIG	M62/2004B1	BLNK	M62 J25 - J30	
12/09/15 14:12:43	SIG	M62/2004B2	OFF	M62 J25 - J30	
12/09/15 14:12:43	SIG	M62/2004B3	OFF	M62 J25 - J30	
12/09/15 14:12:43	SIG	M62/2004B4	OFF	M62 J25 - J30	
12/09/15 14:17:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:17:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:17:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:22:50	SIG	M62/2074B1	BLNK	M62 J25 - J30	
12/09/15 14:22:50	SIG	M62/2074B2	OFF	M62 J25 - J30	
12/09/15 14:22:50	SIG	M62/2074B3	OFF	M62 J25 - J30	
12/09/15 14:22:50	SIG	M62/2074B4	OFF	M62 J25 - J30	
12/09/15 14:22:50	SIG	M621/1010B1	OFF	M62 J25 - J30	
12/09/15 14:22:50	SIG	M621/1010B2	OFF	M62 J25 - J30	
12/09/15 14:37:17	SIG	M62/2025B1	50R	M62 J25 - J30	
12/09/15 14:37:17	SIG	M62/2025B2	50R	M62 J25 - J30	
12/09/15 14:37:17	SIG	M62/2025B3	50R	M62 J25 - J30	
12/09/15 14:37:17	SIG	M62/2025B4	50R	M62 J25 - J30	
12/09/15 14:37:22	SIG	M62/2025B1	40R	M62 J25 - J30	
12/09/15 14:37:22	SIG	M62/2025B2	40R	M62 J25 - J30	
12/09/15 14:37:22	SIG	M62/2025B3	40R	M62 J25 - J30	
12/09/15 14:37:22	SIG	M62/2025B4	40R	M62 J25 - J30	
12/09/15 14:37:27	SIG	M62/2025B1	30R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2025B1	20R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2025B2	40R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2025B3	40R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2025B4	40R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2033B1	LDR	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2033B2	50R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2033B3	50R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2033B4	50R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2041B1	LDR	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2041B2	50R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2041B3	50R	M62 J25 - J30	
12/09/15 14:37:33	SIG	M62/2041B4	50R	M62 J25 - J30	
12/09/15 14:37:38	SIG	M62/2025B1	STOP	M62 J25 - J30	
12/09/15 14:39:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:39:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:39:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:39:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2025B1	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2025B2	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2025B3	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2025B4	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2033B1	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2033B2	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2033B3	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2033B4	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2041B1	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2041B2	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2041B3	60R	M62 J25 - J30	
12/09/15 14:39:42	SIG	M62/2041B4	60R	M62 J25 - J30	
12/09/15 14:42:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:42:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:42:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:42:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 14:47:38	SIG	M62/1960B1	OFF	M62 J25 - J30	
12/09/15 14:47:38	SIG	M62/1960B2	OFF	M62 J25 - J30	
12/09/15 14:47:38	SIG	M62/1960B3	OFF	M62 J25 - J30	
12/09/15 15:08:15	SIG	M62/2025A1	HSD	M62 J25 - J30	
12/09/15 15:09:15	SIG	M62/2033A1	HSD	M62 J25 - J30	
12/09/15 15:10:15	SIG	M62/2041A1	HSD	M62 J25 - J30	
12/09/15 15:10:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
12/09/15 15:10:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
12/09/15 15:11:22	SIG	M62/2050A1	HSD	M62 J25 - J30	
12/09/15 15:11:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
12/09/15 15:12:14	SIG	M62/2041A1	REDX	M62 J25 - J30	
12/09/15 15:13:15	SIG	M62/2050A1	REDX	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2025A2	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2025A3	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2025A4	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2033A2	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2033A3	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2033A4	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2041A2	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2041A3	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2041A4	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2050A2	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2050A3	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2050A4	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2057A1	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2057A2	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2057A3	NR	M62 J25 - J30	
12/09/15 15:14:15	SIG	M62/2057J1	NR	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2008K1	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2008K2	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2012A1	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2012A2	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2012A3	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2018A1	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2018A2	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2018A3	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2018A4	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2025A1	BLNK	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2025A2	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2025A3	OFF	M62 J25 - J30	
12/09/15 15:15:15	SIG	M62/2025A4	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2033A1	BLNK	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2033A2	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2033A3	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2033A4	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2041A1	BLNK	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2041A2	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2041A3	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2041A4	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2050A1	BLNK	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2050A2	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2050A3	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2050A4	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2057A1	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2057A2	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2057A3	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2057J1	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2065A1	BLNK	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2065A2	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2065A3	OFF	M62 J25 - J30	
12/09/15 15:15:16	SIG	M62/2065A4	OFF	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2033A1	REDX	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2033A2	50R	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2033A3	50R	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2033A4	50R	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2041A1	REDX	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2041A2	NR	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2041A3	NR	M62 J25 - J30	
12/09/15 15:38:02	SIG	M62/2041A4	NR	M62 J25 - J30	
12/09/15 15:43:54	SIG	M62/2033A2	NR	M62 J25 - J30	
12/09/15 15:43:54	SIG	M62/2033A3	NR	M62 J25 - J30	
12/09/15 15:43:54	SIG	M62/2033A4	NR	M62 J25 - J30	
12/09/15 15:43:54	SIG	M62/2041A2	NR	M62 J25 - J30	
12/09/15 15:43:54	SIG	M62/2041A3	NR	M62 J25 - J30	
12/09/15 15:43:54	SIG	M62/2041A4	NR	M62 J25 - J30	
12/09/15 15:46:54	SIG	M62/2033A2	OFF	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2033A1	BLNK	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2033A3	OFF	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2033A4	OFF	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2041A1	BLNK	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2041A1	BLNK	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2041A2	OFF	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2041A3	OFF	M62 J25 - J30	
12/09/15 15:46:55	SIG	M62/2041A4	OFF	M62 J25 - J30	
12/09/15 16:06:43	SIG	M62/2057B1	HSD	M62 J25 - J30	
12/09/15 16:08:43	SIG	M62/2041B1	HSD	M62 J25 - J30	
12/09/15 16:08:43	SIG	M621/1010B1	60R	M62 J25 - J30	
12/09/15 16:08:43	SIG	M621/1010B2	60R	M62 J25 - J30	
12/09/15 16:08:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
12/09/15 16:08:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
12/09/15 16:09:42	SIG	M62/2033B1	HSD	M62 J25 - J30	
12/09/15 16:10:43	SIG	M62/2025B1	HSD	M62 J25 - J30	
12/09/15 16:10:43	SIG	M62/2041B1	REDX	M62 J25 - J30	
12/09/15 16:11:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
12/09/15 16:12:19	SIG	M62/2025B1	REDX	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2057B2	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2057B3	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2057B4	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2065B2	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2065B3	NR	M62 J25 - J30	
12/09/15 16:12:49	SIG	M62/2065B4	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2018B1	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2018B2	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2018B3	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2018L1	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2025B2	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2025B3	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2025B4	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2033B2	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2033B3	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2033B4	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2041B2	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2041B3	NR	M62 J25 - J30	
12/09/15 16:12:50	SIG	M62/2041B4	NR	M62 J25 - J30	
12/09/15 16:13:49	SIG	M62/2069M1	OFF	M62 J25 - J30	
12/09/15 16:13:49	SIG	M62/2069M2	OFF	M62 J25 - J30	
12/09/15 16:13:49	SIG	M621/1010B1	OFF	M62 J25 - J30	
12/09/15 16:13:49	SIG	M621/1010B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2012B1	BLNK	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2012B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2012B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2012B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2018B1	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2018B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2018B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2018L1	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2025B1	BLNK	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2025B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2025B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2025B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2033B1	BLNK	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2033B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2033B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2041B1	BLNK	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2041B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2041B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2041B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2050B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2050B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2050B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2057B1	BLNK	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2057B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2057B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2057B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2065B1	BLNK	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2065B2	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2065B3	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2065B4	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M62/2065M1	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M621/1002B1	OFF	M62 J25 - J30	
12/09/15 16:13:50	SIG	M621/1002B2	OFF	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2106A1	REDX	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2106A2	60R	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2106A3	60R	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2106A4	60R	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2114A1	NR	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2114A2	NR	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2114A3	NR	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2117A1	REDX	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2117A2	NR	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2117A3	NR	M62 J25 - J30	
12/09/15 17:10:44	SIG	M62/2117A4	NR	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2106A2	NR	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2106A3	NR	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2106A4	NR	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2114A1	OFF	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2114A2	OFF	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2114A3	OFF	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2117A1	BLNK	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2117A2	OFF	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2117A3	OFF	M62 J25 - J30	
12/09/15 17:11:20	SIG	M62/2117A4	OFF	M62 J25 - J30	
12/09/15 17:14:20	SIG	M62/2106A2	OFF	M62 J25 - J30	
12/09/15 17:14:21	SIG	M62/2106A1	BLNK	M62 J25 - J30	
12/09/15 17:14:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
12/09/15 17:14:21	SIG	M62/2106A4	OFF	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2041B1	REDX	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2041B2	NR	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2041B3	NR	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2041B4	NR	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2050B2	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2050B3	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2050B4	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2057B1	REDX	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2057B2	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2057B3	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2057B4	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2065B1	REDX	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2065B2	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2065B3	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2065B4	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2065M1	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2069M1	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2069M2	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2074B1	REDX	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2074B2	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2074B3	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M62/2074B4	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M621/1002B1	HSD	M62 J25 - J30	
12/09/15 17:23:54	SIG	M621/1002B2	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M621/1010B1	60R	M62 J25 - J30	
12/09/15 17:23:54	SIG	M621/1010B2	60R	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2025B1	REDX	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2025B2	NR	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2025B3	NR	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2025B4	NR	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2033B1	REDX	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2033B2	60R	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2033B3	60R	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2033B4	60R	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2041B2	60R	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2041B3	60R	M62 J25 - J30	
12/09/15 17:24:54	SIG	M62/2041B4	60R	M62 J25 - J30	
12/09/15 17:27:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 17:27:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 17:27:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 17:27:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 17:31:44	SIG	M62/2065B2	50R	M62 J25 - J30	
12/09/15 17:31:44	SIG	M62/2065B3	50R	M62 J25 - J30	
12/09/15 17:31:44	SIG	M62/2065B4	50R	M62 J25 - J30	
12/09/15 17:31:44	SIG	M62/2065M1	50R	M62 J25 - J30	
12/09/15 17:31:44	SIG	M621/1002B2	50R	M62 J25 - J30	
12/09/15 17:31:45	SIG	M621/1010B1	50R	M62 J25 - J30	
12/09/15 17:31:45	SIG	M621/1010B2	50R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M62/2065B2	40R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M62/2065B3	40R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M62/2065B4	40R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M62/2065M1	40R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M62/2069M1	50R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M62/2069M2	50R	M62 J25 - J30	
12/09/15 17:31:50	SIG	M621/1002B2	40R	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2025B2	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2025B3	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2025B4	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2033B2	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2033B3	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2033B4	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2041B2	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2041B3	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2041B4	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 17:31:54	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 17:33:51	SIG	M62/2069M1	40R	M62 J25 - J30	
12/09/15 17:33:51	SIG	M62/2069M2	40R	M62 J25 - J30	
12/09/15 17:33:51	SIG	M62/2074B2	50R	M62 J25 - J30	
12/09/15 17:33:51	SIG	M62/2074B3	50R	M62 J25 - J30	
12/09/15 17:33:51	SIG	M62/2074B4	50R	M62 J25 - J30	
12/09/15 17:33:51	SIG	M621/1010B1	40R	M62 J25 - J30	
12/09/15 17:33:51	SIG	M621/1010B2	40R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2074B2	40R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2074B3	40R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2074B4	40R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2081B1	50R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2081B2	50R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2081B3	50R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M62/2081L1	50R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M621/1010B1	40R	M62 J25 - J30	
12/09/15 17:33:57	SIG	M621/1010B2	40R	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2025B2	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2025B3	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2025B4	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2033B2	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2033B4	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2041B2	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2041B3	OFF	M62 J25 - J30	
12/09/15 17:34:54	SIG	M62/2041B4	OFF	M62 J25 - J30	
12/09/15 17:34:55	SIG	M62/2025B1	BLNK	M62 J25 - J30	
12/09/15 17:34:55	SIG	M62/2025B1	BLNK	M62 J25 - J30	
12/09/15 17:34:55	SIG	M62/2033B1	BLNK	M62 J25 - J30	
12/09/15 17:34:55	SIG	M62/2033B1	BLNK	M62 J25 - J30	
12/09/15 17:34:55	SIG	M62/2041B1	BLNK	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2069M1	50R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2069M2	50R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2074B2	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2074B3	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2074B4	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2081B1	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2081B2	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2081B3	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M62/2081L1	60R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M621/1010B1	50R	M62 J25 - J30	
12/09/15 17:41:47	SIG	M621/1010B2	50R	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2041B1	REDX	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2041B2	NR	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2041B3	NR	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2041B4	NR	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2050B2	60R	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2050B3	60R	M62 J25 - J30	
12/09/15 17:42:54	SIG	M62/2050B4	60R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M62/2065B2	50R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M62/2065B3	50R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M62/2065B4	50R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M62/2065M1	50R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M62/2069M1	60R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M62/2069M2	60R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M621/1002B2	50R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M621/1010B1	60R	M62 J25 - J30	
12/09/15 17:50:36	SIG	M621/1010B2	60R	M62 J25 - J30	
12/09/15 17:56:54	SIG	M62/2065B2	60R	M62 J25 - J30	
12/09/15 17:56:54	SIG	M62/2065B3	60R	M62 J25 - J30	
12/09/15 17:56:54	SIG	M62/2065B4	60R	M62 J25 - J30	
12/09/15 17:56:54	SIG	M62/2065M1	60R	M62 J25 - J30	
12/09/15 17:56:54	SIG	M621/1002B2	60R	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2041B1	BLNK	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2041B2	OFF	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2041B3	OFF	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2041B4	OFF	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2081B1	OFF	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2081B2	OFF	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2081B3	OFF	M62 J25 - J30	
12/09/15 18:01:54	SIG	M62/2081L1	OFF	M62 J25 - J30	
12/09/15 18:05:54	SIG	M62/2050B2	NR	M62 J25 - J30	
12/09/15 18:05:54	SIG	M62/2050B3	NR	M62 J25 - J30	
12/09/15 18:05:54	SIG	M62/2050B4	NR	M62 J25 - J30	
12/09/15 18:05:54	SIG	M62/2057B2	NR	M62 J25 - J30	
12/09/15 18:05:54	SIG	M62/2057B3	NR	M62 J25 - J30	
12/09/15 18:05:54	SIG	M62/2057B4	NR	M62 J25 - J30	
12/09/15 18:08:54	SIG	M62/2050B2	OFF	M62 J25 - J30	
12/09/15 18:08:55	SIG	M62/2050B3	OFF	M62 J25 - J30	
12/09/15 18:08:55	SIG	M62/2050B4	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2057B1	BLNK	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2057B2	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2057B3	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2057B4	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2065B2	NR	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2065B3	NR	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2065B4	NR	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2065M1	NR	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2069M1	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M62/2069M2	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M621/1002B1	OFF	M62 J25 - J30	
12/09/15 18:09:54	SIG	M621/1002B2	OFF	M62 J25 - J30	
12/09/15 18:09:55	SIG	M62/2074B1	BLNK	M62 J25 - J30	
12/09/15 18:09:55	SIG	M62/2074B2	OFF	M62 J25 - J30	
12/09/15 18:09:55	SIG	M62/2074B3	OFF	M62 J25 - J30	
12/09/15 18:09:55	SIG	M62/2074B4	OFF	M62 J25 - J30	
12/09/15 18:09:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
12/09/15 18:09:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
12/09/15 18:12:55	SIG	M62/2065B1	BLNK	M62 J25 - J30	
12/09/15 18:12:55	SIG	M62/2065B2	OFF	M62 J25 - J30	
12/09/15 18:12:55	SIG	M62/2065B3	OFF	M62 J25 - J30	
12/09/15 18:12:55	SIG	M62/2065B4	OFF	M62 J25 - J30	
12/09/15 18:12:55	SIG	M62/2065M1	OFF	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2097A1	REDX	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2097A2	60R	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2097A3	60R	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2097A4	60R	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2106A1	REDX	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2106A2	NR	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2106A3	NR	M62 J25 - J30	
13/09/15 06:16:52	SIG	M62/2106A4	NR	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2106A2	60R	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2106A3	60R	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2106A4	60R	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2114A1	NR	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2114A2	NR	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2114A3	NR	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2117A1	REDX	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2117A2	NR	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2117A3	NR	M62 J25 - J30	
13/09/15 06:37:01	SIG	M62/2117A4	NR	M62 J25 - J30	
13/09/15 06:39:02	SIG	M62/2097A2	NR	M62 J25 - J30	
13/09/15 06:39:02	SIG	M62/2097A3	NR	M62 J25 - J30	
13/09/15 06:39:02	SIG	M62/2097A4	NR	M62 J25 - J30	
13/09/15 06:39:16	SIG	M62/2106A3	OFF	M62 J25 - J30	
13/09/15 06:39:16	SIG	M62/2106A3	OFF	M62 J25 - J30	
13/09/15 06:39:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
13/09/15 06:39:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
13/09/15 06:42:02	SIG	M62/2097A2	OFF	M62 J25 - J30	
13/09/15 06:42:03	SIG	M62/2097A1	BLNK	M62 J25 - J30	
13/09/15 06:42:03	SIG	M62/2097A3	OFF	M62 J25 - J30	
13/09/15 06:42:03	SIG	M62/2097A4	OFF	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2106A2	NR	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2106A3	NR	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2106A4	NR	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2114A1	OFF	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2114A2	OFF	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2114A3	OFF	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2117A1	BLNK	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2117A2	OFF	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2117A3	OFF	M62 J25 - J30	
13/09/15 06:42:08	SIG	M62/2117A4	OFF	M62 J25 - J30	
13/09/15 06:45:08	SIG	M62/2106A2	OFF	M62 J25 - J30	
13/09/15 06:45:09	SIG	M62/2106A1	BLNK	M62 J25 - J30	
13/09/15 06:45:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
13/09/15 06:45:09	SIG	M62/2106A4	OFF	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2097B1	REDX	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2097B2	NR	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2097B4	NR	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2106B1	REDX	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2106B2	60R	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2106B3	60R	M62 J25 - J30	
13/09/15 08:45:31	SIG	M62/2106B4	60R	M62 J25 - J30	
13/09/15 08:47:21	SIG	M62/2097B2	NR	M62 J25 - J30	
13/09/15 08:47:21	SIG	M62/2097B4	NR	M62 J25 - J30	
13/09/15 08:47:21	SIG	M62/2106B2	NR	M62 J25 - J30	
13/09/15 08:47:21	SIG	M62/2106B3	NR	M62 J25 - J30	
13/09/15 08:47:21	SIG	M62/2106B4	NR	M62 J25 - J30	
13/09/15 08:50:22	SIG	M62/2106B2	OFF	M62 J25 - J30	
13/09/15 08:50:32	SIG	M62/2097B1	BLNK	M62 J25 - J30	
13/09/15 08:50:32	SIG	M62/2097B2	OFF	M62 J25 - J30	
13/09/15 08:50:32	SIG	M62/2097B4	OFF	M62 J25 - J30	
13/09/15 08:50:32	SIG	M62/2106B1	BLNK	M62 J25 - J30	
13/09/15 08:50:32	SIG	M62/2106B3	OFF	M62 J25 - J30	
13/09/15 08:50:32	SIG	M62/2106B4	OFF	M62 J25 - J30	
13/09/15 09:01:40	SIG	M606/2003B1	NR	M62 J25 - J30	
13/09/15 09:01:40	SIG	M606/2003B2	NR	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2008K1	50R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2008K2	50R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2012A1	60R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2012A2	60R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2012A3	60R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2018A1	HSD	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2018A2	60R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2018A3	60R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2018A4	60R	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2025A1	REDX	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2025A2	NR	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2025A3	NR	M62 J25 - J30	
13/09/15 09:01:40	SIG	M62/2025A4	NR	M62 J25 - J30	
13/09/15 09:46:08	SIG	M606/2003B1	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M606/2003B2	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2008K1	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2008K2	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2012A1	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2012A2	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2012A3	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2018A1	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2018A2	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2018A3	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2018A4	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2025A1	BLNK	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2025A2	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2025A3	OFF	M62 J25 - J30	
13/09/15 09:46:08	SIG	M62/2025A4	OFF	M62 J25 - J30	
13/09/15 11:22:15	SIG	M606/2003B1	NR	M62 J25 - J30	
13/09/15 11:22:15	SIG	M606/2003B2	NR	M62 J25 - J30	
13/09/15 11:30:05	SIG	M606/2003B1	NR	M62 J25 - J30	
13/09/15 11:30:05	SIG	M606/2003B2	NR	M62 J25 - J30	
13/09/15 11:33:05	SIG	M606/2003B1	OFF	M62 J25 - J30	
13/09/15 11:33:06	SIG	M606/2003B2	OFF	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/1999B1	REDX	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/1999B2	NR	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/1999B3	NR	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/1999B4	NR	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/2004B1	REDX	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/2004B2	60R	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/2004B3	60R	M62 J25 - J30	
13/09/15 12:01:57	SIG	M62/2004B4	60R	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/1999B1	BLNK	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/1999B2	OFF	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/1999B3	OFF	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/1999B4	OFF	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/2004B1	BLNK	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/2004B2	OFF	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/2004B3	OFF	M62 J25 - J30	
13/09/15 12:19:27	SIG	M62/2004B4	OFF	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2033B1	REDX	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2033B2	NR	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2033B3	NR	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2033B4	NR	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2041B1	REDX	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2041B2	60R	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2041B3	60R	M62 J25 - J30	
13/09/15 13:33:13	SIG	M62/2041B4	60R	M62 J25 - J30	
13/09/15 13:46:57	SIG	M62/2033B2	NR	M62 J25 - J30	
13/09/15 13:46:57	SIG	M62/2033B3	NR	M62 J25 - J30	
13/09/15 13:46:57	SIG	M62/2033B4	NR	M62 J25 - J30	
13/09/15 13:46:57	SIG	M62/2041B2	NR	M62 J25 - J30	
13/09/15 13:46:57	SIG	M62/2041B3	NR	M62 J25 - J30	
13/09/15 13:46:57	SIG	M62/2041B4	NR	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2033B1	BLNK	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2033B2	OFF	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2033B4	OFF	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2041B1	BLNK	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2041B2	OFF	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2041B3	OFF	M62 J25 - J30	
13/09/15 13:49:58	SIG	M62/2041B4	OFF	M62 J25 - J30	
13/09/15 13:49:59	SIG	M62/2033B1	BLNK	M62 J25 - J30	
13/09/15 15:07:43	SIG	M62/2122K1	50R	M62 J25 - J30	
13/09/15 15:07:43	SIG	M62/2122K2	50R	M62 J25 - J30	
13/09/15 15:07:43	SIG	M62/2135A1	NR	M62 J25 - J30	
13/09/15 15:07:43	SIG	M62/2135A2	NR	M62 J25 - J30	
13/09/15 15:07:43	SIG	M62/2135A3	NR	M62 J25 - J30	
13/09/15 15:07:43	SIG	M62/2135A4	NR	M62 J25 - J30	
13/09/15 15:18:30	SIG	M62/2122K1	OFF	M62 J25 - J30	
13/09/15 15:18:30	SIG	M62/2122K2	OFF	M62 J25 - J30	
13/09/15 15:18:30	SIG	M62/2135A1	NR	M62 J25 - J30	
13/09/15 15:18:30	SIG	M62/2135A2	NR	M62 J25 - J30	
13/09/15 15:18:30	SIG	M62/2135A3	NR	M62 J25 - J30	
13/09/15 15:18:30	SIG	M62/2135A4	NR	M62 J25 - J30	
13/09/15 15:21:30	SIG	M62/2135A1	OFF	M62 J25 - J30	
13/09/15 15:21:30	SIG	M62/2135A2	OFF	M62 J25 - J30	
13/09/15 15:21:30	SIG	M62/2135A3	OFF	M62 J25 - J30	
13/09/15 15:21:30	SIG	M62/2135A4	OFF	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2033B1	REDX	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2033B2	NR	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2033B3	NR	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2033B4	NR	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2041B1	REDX	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2041B2	60R	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2041B3	60R	M62 J25 - J30	
13/09/15 16:43:06	SIG	M62/2041B4	60R	M62 J25 - J30	
13/09/15 17:02:10	SIG	M62/2033B2	NR	M62 J25 - J30	
13/09/15 17:02:10	SIG	M62/2033B3	NR	M62 J25 - J30	
13/09/15 17:02:10	SIG	M62/2033B4	NR	M62 J25 - J30	
13/09/15 17:02:10	SIG	M62/2041B2	NR	M62 J25 - J30	
13/09/15 17:02:10	SIG	M62/2041B3	NR	M62 J25 - J30	
13/09/15 17:02:10	SIG	M62/2041B4	NR	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2033B1	BLNK	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2033B1	BLNK	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2033B2	OFF	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2033B4	OFF	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2041B1	BLNK	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2041B2	OFF	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2041B3	OFF	M62 J25 - J30	
13/09/15 17:05:11	SIG	M62/2041B4	OFF	M62 J25 - J30	
13/09/15 17:24:24	SIG	M606/2003B1	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M606/2003B2	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1987B1	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1987B2	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1987B3	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1987B4	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1992B1	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1992B2	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1992B3	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/1992B4	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/2005M1	50R	M62 J25 - J30	
13/09/15 17:24:24	SIG	M62/2005M2	50R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1987B1	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1987B2	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1987B3	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1987B4	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1992B1	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1992B2	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1992B3	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1992B4	40R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1999B1	REDX	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1999B2	50R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1999B3	50R	M62 J25 - J30	
13/09/15 17:24:30	SIG	M62/1999B4	50R	M62 J25 - J30	
13/09/15 17:28:24	SIG	M606/2003B1	OFF	M62 J25 - J30	
13/09/15 17:28:24	SIG	M606/2003B2	OFF	M62 J25 - J30	
13/09/15 17:28:24	SIG	M62/2005M1	OFF	M62 J25 - J30	
13/09/15 17:28:24	SIG	M62/2005M2	OFF	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1987B1	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1987B2	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1987B3	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1987B4	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1992B1	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1992B2	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1992B3	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1992B4	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1999B2	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1999B3	NR	M62 J25 - J30	
13/09/15 17:28:25	SIG	M62/1999B4	NR	M62 J25 - J30	
13/09/15 17:29:46	SIG	M606/2003B1	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M606/2003B2	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1987B1	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1987B2	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1987B3	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1987B4	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1992B1	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1992B2	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1992B3	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/1992B4	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/2005M1	50R	M62 J25 - J30	
13/09/15 17:29:46	SIG	M62/2005M2	50R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1987B1	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1987B2	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1987B3	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1987B4	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1992B1	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1992B2	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1992B3	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1992B4	40R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1999B2	50R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1999B3	50R	M62 J25 - J30	
13/09/15 17:29:52	SIG	M62/1999B4	50R	M62 J25 - J30	
13/09/15 17:30:54	SIG	M606/2003B1	OFF	M62 J25 - J30	
13/09/15 17:30:54	SIG	M606/2003B2	OFF	M62 J25 - J30	
13/09/15 17:30:54	SIG	M62/2005M1	OFF	M62 J25 - J30	
13/09/15 17:30:54	SIG	M62/2005M2	OFF	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1987B1	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1987B2	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1987B3	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1987B4	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1992B1	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1992B2	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1992B3	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1992B4	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1999B2	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1999B3	NR	M62 J25 - J30	
13/09/15 17:30:55	SIG	M62/1999B4	NR	M62 J25 - J30	
13/09/15 17:33:02	SIG	M606/2003B1	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M606/2003B2	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1987B1	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1987B2	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1987B3	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1987B4	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1992B1	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1992B2	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1992B3	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/1992B4	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/2005M1	50R	M62 J25 - J30	
13/09/15 17:33:02	SIG	M62/2005M2	50R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1987B1	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1987B2	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1987B3	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1987B4	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1992B1	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1992B2	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1992B3	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1992B4	40R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1999B2	50R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1999B3	50R	M62 J25 - J30	
13/09/15 17:33:07	SIG	M62/1999B4	50R	M62 J25 - J30	
13/09/15 17:33:46	SIG	M606/2003B1	OFF	M62 J25 - J30	
13/09/15 17:33:46	SIG	M606/2003B2	OFF	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1987B1	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1987B2	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1987B3	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1987B4	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1992B1	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1992B2	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1992B3	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1992B4	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1999B2	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1999B3	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/1999B4	NR	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/2005M1	OFF	M62 J25 - J30	
13/09/15 17:33:46	SIG	M62/2005M2	OFF	M62 J25 - J30	
13/09/15 17:35:20	SIG	M606/2003B1	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M606/2003B2	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1981B1	NR	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1981B2	NR	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1981B3	NR	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1981B4	NR	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1987B1	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1987B2	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1987B3	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1987B4	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1992B1	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1992B2	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1992B3	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1992B4	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1999B2	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1999B3	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/1999B4	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/2004B1	REDX	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/2004B2	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/2004B3	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/2004B4	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/2005M1	60R	M62 J25 - J30	
13/09/15 17:35:20	SIG	M62/2005M2	60R	M62 J25 - J30	
13/09/15 17:39:20	SIG	M606/2003B1	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M606/2003B2	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1981B1	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1981B2	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1981B3	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1981B4	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1987B1	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1987B2	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1987B3	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1987B4	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1992B1	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1992B2	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1992B3	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1992B4	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1999B1	BLNK	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1999B2	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1999B3	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/1999B4	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/2004B1	BLNK	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/2004B2	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/2004B3	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/2004B4	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/2005M1	OFF	M62 J25 - J30	
13/09/15 17:39:20	SIG	M62/2005M2	OFF	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2159B1	NR	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2159B2	NR	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2170B1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2170B2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2177B1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2177B2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2177L1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2177L2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2183B1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2183B2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2183L1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2183L2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2189B1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2189B2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2189B3	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2189B4	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2194B1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2194B2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2194B3	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2194B4	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2197B1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2197B2	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2197B3	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2199M1	50R	M62 J25 - J30	
13/09/15 20:08:25	SIG	M62/2199M2	50R	M62 J25 - J30	
13/09/15 20:11:25	SIG	M62/2183B2	???	M62 J25 - J30	
13/09/15 20:11:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
13/09/15 20:24:51	SIG	M62/2159B1	OFF	M62 J25 - J30	
13/09/15 20:24:51	SIG	M62/2159B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2170B1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2170B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2177B1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2177B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2177L1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2177L2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2183B1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2183L1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2183L2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2189B1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2189B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2189B3	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2189B4	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2194B1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2194B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2194B3	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2194B4	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2197B1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2197B2	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2197B3	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2199M1	OFF	M62 J25 - J30	
13/09/15 20:24:52	SIG	M62/2199M2	OFF	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2157A1	60R	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2157A2	60R	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2157J1	50R	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2157J2	50R	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2157K1	60R	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2163A1	NR	M62 J25 - J30	
13/09/15 21:18:02	SIG	M62/2163A2	NR	M62 J25 - J30	
13/09/15 21:20:57	SIG	M62/2157A1	???	M62 J25 - J30	
13/09/15 21:20:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2157A1	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2157A2	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2157J1	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2157J2	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2157K1	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2163A1	OFF	M62 J25 - J30	
13/09/15 21:23:41	SIG	M62/2163A2	OFF	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2177B1	NR	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2177B2	NR	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2177L1	NR	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2177L2	NR	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2183B1	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2183B2	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2183L1	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2183L2	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2189B1	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2189B2	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2189B3	50R	M62 J25 - J30	
13/09/15 22:21:01	SIG	M62/2189B4	50R	M62 J25 - J30	
13/09/15 22:23:10	SIG	M62/2183B2	???	M62 J25 - J30	
13/09/15 22:23:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
13/09/15 22:27:27	SIG	M62/2194B1	50R	M62 J25 - J30	
13/09/15 22:27:27	SIG	M62/2194B2	50R	M62 J25 - J30	
13/09/15 22:27:27	SIG	M62/2194B3	50R	M62 J25 - J30	
13/09/15 22:27:27	SIG	M62/2194B4	50R	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2177B1	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2177B2	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2177L1	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2177L2	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2183B1	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2183B2	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2183L1	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2183L2	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2189B1	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2189B2	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2189B3	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2189B4	NR	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2194B1	OFF	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2194B2	OFF	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2194B3	OFF	M62 J25 - J30	
13/09/15 22:40:32	SIG	M62/2194B4	OFF	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2183B1	NR	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2183B2	NR	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2183L1	NR	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2183L2	NR	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2189B1	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2189B2	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2189B3	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2189B4	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2194B1	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2194B2	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2194B3	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2194B4	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2197B1	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2197B2	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2197B3	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2199M1	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2199M2	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2203B1	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2203B2	60R	M62 J25 - J30	
13/09/15 22:41:25	SIG	M62/2203B3	60R	M62 J25 - J30	
13/09/15 22:43:32	SIG	M62/2177L1	OFF	M62 J25 - J30	
13/09/15 22:43:33	SIG	M62/2177B1	OFF	M62 J25 - J30	
13/09/15 22:43:33	SIG	M62/2177B2	OFF	M62 J25 - J30	
13/09/15 22:43:33	SIG	M62/2177L2	OFF	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2183B1	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2183B2	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2183L1	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2183L2	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2189B1	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2189B2	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2189B3	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2189B4	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2194B1	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2194B2	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2194B3	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2194B4	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2197B1	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2197B2	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2197B3	NR	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2199M1	OFF	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2199M2	OFF	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2203B1	OFF	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2203B2	OFF	M62 J25 - J30	
13/09/15 22:47:25	SIG	M62/2203B3	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2183B1	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2183L1	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2183L2	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2189B1	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2189B2	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2189B3	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2189B4	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2194B1	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2194B2	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2194B3	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2194B4	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2197B1	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2197B2	OFF	M62 J25 - J30	
13/09/15 22:50:26	SIG	M62/2197B3	OFF	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 01:14:33	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 01:17:15	SIG	M62/2183B2	???	M62 J25 - J30	
14/09/15 01:17:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 01:27:19	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 01:27:19	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2177B1	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2177B2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2177L1	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2177L2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2183B1	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2183B2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2183L1	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2183L2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2189B1	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2189B2	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2189B3	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2189B4	NR	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2194B1	OFF	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2194B2	OFF	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2194B3	OFF	M62 J25 - J30	
14/09/15 01:27:20	SIG	M62/2194B4	OFF	M62 J25 - J30	
14/09/15 01:30:19	SIG	M62/2159B1	OFF	M62 J25 - J30	
14/09/15 01:30:20	SIG	M62/2159B2	OFF	M62 J25 - J30	
14/09/15 01:30:20	SIG	M62/2189B1	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2170B1	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2170B2	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2177B1	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2177B2	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2177L1	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2177L2	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2183B1	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2183L1	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2183L2	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2189B2	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2189B3	OFF	M62 J25 - J30	
14/09/15 01:30:21	SIG	M62/2189B4	OFF	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2050B2	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2050B3	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2050B4	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2057B1	REDX	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2057B2	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2057B3	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2057B4	50R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M62/2065M1	60R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M621/1002B1	HSD	M62 J25 - J30	
14/09/15 01:43:13	SIG	M621/1002B2	60R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M621/1010B1	60R	M62 J25 - J30	
14/09/15 01:43:13	SIG	M621/1010B2	60R	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2041B2	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2041B3	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2041B4	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2050B2	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2050B3	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2050B4	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2057B1	BLNK	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2057B2	OFF	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2057B3	OFF	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2057B4	OFF	M62 J25 - J30	
14/09/15 01:47:56	SIG	M62/2065M1	NR	M62 J25 - J30	
14/09/15 01:47:56	SIG	M621/1002B1	OFF	M62 J25 - J30	
14/09/15 01:47:56	SIG	M621/1002B2	OFF	M62 J25 - J30	
14/09/15 01:47:56	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 01:47:56	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 01:50:56	SIG	M62/2065M1	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2033B2	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2033B4	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2041B3	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2041B4	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2050B2	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2050B3	OFF	M62 J25 - J30	
14/09/15 01:50:57	SIG	M62/2050B4	OFF	M62 J25 - J30	
14/09/15 02:59:05	SIG	M62/2106B2	50R	M62 J25 - J30	
14/09/15 02:59:05	SIG	M62/2106B3	50R	M62 J25 - J30	
14/09/15 02:59:05	SIG	M62/2106B4	50R	M62 J25 - J30	
14/09/15 02:59:05	SIG	M62/2113B2	50R	M62 J25 - J30	
14/09/15 02:59:05	SIG	M62/2113B3	50R	M62 J25 - J30	
14/09/15 02:59:05	SIG	M62/2113B4	50R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2106B2	40R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2106B3	40R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2106B4	40R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2113B2	40R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2113B3	40R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2113B4	40R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2117B1	50R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2117B3	50R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2120M1	50R	M62 J25 - J30	
14/09/15 02:59:10	SIG	M62/2120M2	50R	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2106B2	NR	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2106B3	NR	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2106B4	NR	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2113B1	BLNK	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2113B2	OFF	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2113B3	OFF	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2113B4	OFF	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2117B3	OFF	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2120M1	OFF	M62 J25 - J30	
14/09/15 03:03:04	SIG	M62/2120M2	OFF	M62 J25 - J30	
14/09/15 03:06:04	SIG	M62/2106B2	OFF	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2097B2	OFF	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2097B3	OFF	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2097B4	OFF	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2106B1	BLNK	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2106B3	OFF	M62 J25 - J30	
14/09/15 03:06:05	SIG	M62/2106B4	OFF	M62 J25 - J30	
14/09/15 03:12:41	SIG	M62/1960B1	50R	M62 J25 - J30	
14/09/15 03:12:41	SIG	M62/1960B2	50R	M62 J25 - J30	
14/09/15 03:12:41	SIG	M62/1960B3	50R	M62 J25 - J30	
14/09/15 03:12:41	SIG	M62/1960L1	50R	M62 J25 - J30	
14/09/15 03:12:41	SIG	M62/1960L2	50R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1960B1	40R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1960B2	40R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1960B3	40R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1960L1	40R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1960L2	40R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1968B1	50R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1968B2	50R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1968B3	50R	M62 J25 - J30	
14/09/15 03:12:47	SIG	M62/1968L1	50R	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1960B1	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1960B2	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1960B3	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1960L1	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1960L2	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1968B1	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1968B2	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1968B3	OFF	M62 J25 - J30	
14/09/15 03:16:41	SIG	M62/1968L1	OFF	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2008K1	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2008K2	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2012A1	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2012A2	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2012A3	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2025A1	REDX	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2033A1	REDX	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2041A1	REDX	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2041A2	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2041A3	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2041A4	60R	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2050A1	REDX	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2050A2	NR	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2050A3	NR	M62 J25 - J30	
14/09/15 06:31:34	SIG	M62/2050A4	NR	M62 J25 - J30	
14/09/15 06:32:34	SIG	M62/2004A1	60R	M62 J25 - J30	
14/09/15 06:32:34	SIG	M62/2004A2	60R	M62 J25 - J30	
14/09/15 06:32:34	SIG	M62/2004A3	60R	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2050A2	60R	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2050A3	60R	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2050A4	60R	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2057A1	NR	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2057A2	NR	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2057A3	NR	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2057J1	NR	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2065A1	REDX	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2065A2	NR	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2065A3	NR	M62 J25 - J30	
14/09/15 06:33:34	SIG	M62/2065A4	NR	M62 J25 - J30	
14/09/15 06:36:34	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 06:36:34	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 06:36:34	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 06:37:34	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 06:37:34	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 06:37:34	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 06:37:34	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 06:37:34	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 06:37:34	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 06:38:39	SIG	M62/2057A1	60R	M62 J25 - J30	
14/09/15 06:38:39	SIG	M62/2057A1	60R	M62 J25 - J30	
14/09/15 06:38:39	SIG	M62/2057A2	60R	M62 J25 - J30	
14/09/15 06:38:39	SIG	M62/2057A3	60R	M62 J25 - J30	
14/09/15 06:38:39	SIG	M62/2057J1	60R	M62 J25 - J30	
14/09/15 06:39:56	SIG	M62/2050A1	60R	M62 J25 - J30	
14/09/15 06:40:18	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 06:40:34	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/1999A1	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/1999A2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/1999A3	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2008K1	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2008K2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2012A1	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2012A2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2012A3	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2041A1	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2041A2	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2041A3	60R	M62 J25 - J30	
14/09/15 06:40:34	SIG	M62/2041A4	60R	M62 J25 - J30	
14/09/15 06:40:40	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 06:40:44	SIG	M62/2018A1	60R	M62 J25 - J30	
14/09/15 06:40:44	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 06:43:16	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 06:43:16	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 06:43:16	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 06:43:16	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 06:43:21	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 06:43:34	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 06:43:34	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 06:46:42	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 06:46:48	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 06:46:48	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 06:47:16	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2057B1	REDX	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2057B2	NR	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2057B3	NR	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2057B4	NR	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2065B1	REDX	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2065B2	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2065B3	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2065B4	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2065M1	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2065M1	NR	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2069M1	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M62/2069M2	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M621/1002B1	HSD	M62 J25 - J30	
14/09/15 06:47:36	SIG	M621/1002B2	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M621/1010B1	60R	M62 J25 - J30	
14/09/15 06:47:36	SIG	M621/1010B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2050B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2050B3	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2050B4	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2057B2	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2057B3	60R	M62 J25 - J30	
14/09/15 06:47:37	SIG	M62/2057B4	60R	M62 J25 - J30	
14/09/15 06:47:50	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 06:47:50	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 06:47:51	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 06:47:57	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 06:49:06	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 06:49:38	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 06:50:02	SIG	M62/2041B1	60R	M62 J25 - J30	
14/09/15 06:50:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 06:50:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 06:50:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 06:50:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 06:50:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 06:50:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 06:50:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 06:50:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 06:50:34	SIG	M62/2057B1	60R	M62 J25 - J30	
14/09/15 06:50:34	SIG	M621/1002B1	60R	M62 J25 - J30	
14/09/15 06:50:35	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 06:50:35	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 06:50:43	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 06:50:43	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2004A1	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2004A2	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2004A3	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2008K1	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2008K2	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2012A1	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2012A2	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2012A3	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2018A1	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 06:50:43	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 06:52:55	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 06:52:55	SIG	M62/2113B2	NR	M62 J25 - J30	
14/09/15 06:52:55	SIG	M62/2113B3	NR	M62 J25 - J30	
14/09/15 06:52:55	SIG	M62/2113B4	NR	M62 J25 - J30	
14/09/15 06:52:55	SIG	M62/2120M1	60R	M62 J25 - J30	
14/09/15 06:52:55	SIG	M62/2120M2	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2074B1	REDX	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2074B2	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2074B3	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2074B4	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2081B1	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2081B2	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2081B3	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2081L1	NR	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2088B1	REDX	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2088B2	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2088B3	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2088B4	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2097B2	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2097B3	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2097B4	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2106B2	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2106B3	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2106B4	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2113B2	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2113B3	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2113B4	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2117B1	60R	M62 J25 - J30	
14/09/15 06:52:56	SIG	M62/2117B3	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2074B2	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2074B3	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2074B4	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2081B1	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2081B2	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2081B3	60R	M62 J25 - J30	
14/09/15 06:52:57	SIG	M62/2081L1	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 06:53:34	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 06:53:43	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 06:53:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 06:54:10	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 06:54:10	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 06:54:10	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 06:54:14	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 06:54:14	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 06:54:15	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 06:54:16	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 06:54:16	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 06:54:16	SIG	M62/2170L1	OFF	M62 J25 - J30	
14/09/15 06:54:16	SIG	M62/2170L2	OFF	M62 J25 - J30	
14/09/15 06:54:21	SIG	M62/2088B1	60R	M62 J25 - J30	
14/09/15 06:54:41	SIG	M62/2097B1	60R	M62 J25 - J30	
14/09/15 06:55:06	SIG	M62/2106B1	60R	M62 J25 - J30	
14/09/15 06:55:10	SIG	M62/2113B1	60R	M62 J25 - J30	
14/09/15 06:55:33	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 06:55:33	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 06:55:33	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 06:55:33	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 06:55:33	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 06:55:33	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 06:55:39	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 06:55:39	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 06:55:39	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 06:55:39	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 06:56:34	SIG	M62/2197B1	60R	M62 J25 - J30	
14/09/15 06:56:34	SIG	M62/2197B2	60R	M62 J25 - J30	
14/09/15 06:56:34	SIG	M62/2197B3	60R	M62 J25 - J30	
14/09/15 06:56:34	SIG	M62/2199M1	60R	M62 J25 - J30	
14/09/15 06:56:34	SIG	M62/2199M2	60R	M62 J25 - J30	
14/09/15 06:56:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 06:56:38	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 06:56:44	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 06:57:50	SIG	M62/2065A2	60R	M62 J25 - J30	
14/09/15 06:57:50	SIG	M62/2065A3	60R	M62 J25 - J30	
14/09/15 06:57:50	SIG	M62/2065A4	60R	M62 J25 - J30	
14/09/15 06:57:59	SIG	M62/2073K1	60R	M62 J25 - J30	
14/09/15 06:57:59	SIG	M62/2079A1	REDX	M62 J25 - J30	
14/09/15 06:57:59	SIG	M62/2079A2	NR	M62 J25 - J30	
14/09/15 06:57:59	SIG	M62/2079A3	NR	M62 J25 - J30	
14/09/15 06:57:59	SIG	M62/2079A4	NR	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2079A2	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2079A3	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2079A4	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2088A1	REDX	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2088A2	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2088A3	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2088A4	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2097A1	REDX	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2097A2	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2097A3	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2097A4	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2106A1	REDX	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2106A2	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2106A3	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2106A4	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2114A1	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2114A2	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2114A3	60R	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2117A1	REDX	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2117A2	NR	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2117A3	NR	M62 J25 - J30	
14/09/15 06:58:16	SIG	M62/2117A4	NR	M62 J25 - J30	
14/09/15 06:59:16	SIG	M62/2106A1	60R	M62 J25 - J30	
14/09/15 06:59:34	SIG	M62/2203B1	60R	M62 J25 - J30	
14/09/15 06:59:34	SIG	M62/2203B2	60R	M62 J25 - J30	
14/09/15 06:59:34	SIG	M62/2203B3	60R	M62 J25 - J30	
14/09/15 06:59:43	SIG	M62/2097A1	60R	M62 J25 - J30	
14/09/15 06:59:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 06:59:43	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2189B1	40R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2189B2	40R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2189B3	40R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2189B4	40R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 06:59:50	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 07:00:14	SIG	M62/2088A1	60R	M62 J25 - J30	
14/09/15 07:00:18	SIG	M62/2079A1	60R	M62 J25 - J30	
14/09/15 07:00:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 07:00:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 07:00:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 07:00:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 07:02:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:02:50	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:02:56	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2194B1	40R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2194B2	40R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2194B3	40R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2194B4	40R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2197B1	50R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2197B2	50R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2197B3	50R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2199M1	50R	M62 J25 - J30	
14/09/15 07:04:59	SIG	M62/2199M2	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 07:05:34	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2197B1	40R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2197B2	40R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2197B3	40R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2199M1	40R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2199M2	40R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2203B1	50R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2203B2	50R	M62 J25 - J30	
14/09/15 07:05:51	SIG	M62/2203B3	50R	M62 J25 - J30	
14/09/15 07:05:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:05:56	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:06:01	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:06:34	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 07:06:34	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 07:06:34	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 07:06:34	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 07:08:35	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 07:08:35	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 07:08:35	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 07:08:35	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 07:08:35	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 07:08:35	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 07:08:35	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 07:09:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:09:07	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:09:12	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2197B1	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2197B2	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2197B3	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2199M1	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2199M2	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2203B1	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2203B2	60R	M62 J25 - J30	
14/09/15 07:09:52	SIG	M62/2203B3	60R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2194B1	40R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2194B2	40R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2194B3	40R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2194B4	40R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2197B1	50R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2197B2	50R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2197B3	50R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2199M1	50R	M62 J25 - J30	
14/09/15 07:10:44	SIG	M62/2199M2	50R	M62 J25 - J30	
14/09/15 07:12:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:12:07	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:12:12	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2197B1	40R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2197B2	40R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2197B3	40R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2199M1	40R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2199M2	40R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2203B1	50R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2203B2	50R	M62 J25 - J30	
14/09/15 07:12:20	SIG	M62/2203B3	50R	M62 J25 - J30	
14/09/15 07:12:42	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 07:12:42	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 07:12:42	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 07:12:42	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 07:12:57	SIG	M62/2203B1	40R	M62 J25 - J30	
14/09/15 07:12:57	SIG	M62/2203B2	40R	M62 J25 - J30	
14/09/15 07:12:57	SIG	M62/2203B3	40R	M62 J25 - J30	
14/09/15 07:15:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:15:14	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:15:20	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:16:57	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 07:16:57	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 07:16:57	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 07:16:57	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 07:18:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:18:20	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:18:25	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2197B1	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2197B2	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2197B3	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2199M1	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2199M2	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2203B1	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2203B2	50R	M62 J25 - J30	
14/09/15 07:18:38	SIG	M62/2203B3	50R	M62 J25 - J30	
14/09/15 07:18:40	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 07:18:40	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 07:18:40	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 07:18:40	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2197B1	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2197B2	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2197B3	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2199M1	60R	M62 J25 - J30	
14/09/15 07:19:27	SIG	M62/2199M2	60R	M62 J25 - J30	
14/09/15 07:19:31	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 07:19:31	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 07:19:31	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 07:19:31	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 07:20:22	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 07:21:15	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 07:21:20	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 07:21:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:21:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:21:29	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 07:21:29	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 07:21:29	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 07:21:29	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 07:21:34	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 07:21:35	SIG	M62/2041A1	60R	M62 J25 - J30	
14/09/15 07:21:35	SIG	M62/2041A2	60R	M62 J25 - J30	
14/09/15 07:21:35	SIG	M62/2041A3	60R	M62 J25 - J30	
14/09/15 07:21:35	SIG	M62/2041A4	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1979K1	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1979K2	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1981A1	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1981A2	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1981A3	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1981A4	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1987A1	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1987A3	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1987J1	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1992A1	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1992A2	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1992A3	60R	M62 J25 - J30	
14/09/15 07:22:44	SIG	M62/1992J1	60R	M62 J25 - J30	
14/09/15 07:24:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:24:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:24:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:24:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:25:03	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 07:25:03	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 07:25:03	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 07:25:08	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 07:25:13	SIG	M62/1999A1	60R	M62 J25 - J30	
14/09/15 07:25:13	SIG	M62/1999A2	60R	M62 J25 - J30	
14/09/15 07:25:13	SIG	M62/1999A3	60R	M62 J25 - J30	
14/09/15 07:25:14	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 07:25:14	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 07:25:14	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 07:25:32	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 07:25:32	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 07:25:32	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 07:25:32	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 07:25:32	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 07:25:32	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 07:26:08	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 07:26:08	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 07:26:08	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 07:26:08	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:26:13	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 07:26:14	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 07:26:14	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 07:26:14	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 07:26:14	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 07:26:35	SIG	M62/2203B1	60R	M62 J25 - J30	
14/09/15 07:26:35	SIG	M62/2203B2	60R	M62 J25 - J30	
14/09/15 07:26:35	SIG	M62/2203B3	60R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1992A1	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1992A2	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1992A3	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1992J1	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1999A1	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1999A2	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1999A3	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1999J1	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/1999J2	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2189B1	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2189B2	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2189B3	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2189B4	40R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 07:27:08	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 07:27:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:27:38	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:27:44	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:27:54	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 07:27:54	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 07:27:54	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 07:27:54	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 07:28:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:28:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:28:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:28:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:28:35	SIG	M62/1974A1	60R	M62 J25 - J30	
14/09/15 07:28:35	SIG	M62/1974A2	60R	M62 J25 - J30	
14/09/15 07:28:35	SIG	M62/1974A3	60R	M62 J25 - J30	
14/09/15 07:28:35	SIG	M62/1974A4	60R	M62 J25 - J30	
14/09/15 07:28:41	SIG	M62/2018A1	60R	M62 J25 - J30	
14/09/15 07:28:41	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 07:28:41	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 07:28:41	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1955K1	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1955K2	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1956A1	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1956A2	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1956A3	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1960A1	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1960A2	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1960A3	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1960K1	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1960K2	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1968A1	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1968A2	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1968A3	60R	M62 J25 - J30	
14/09/15 07:29:35	SIG	M62/1968A4	60R	M62 J25 - J30	
14/09/15 07:29:36	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 07:29:36	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 07:29:36	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 07:29:36	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 07:30:08	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1992A1	40R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1992A2	40R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1992A3	40R	M62 J25 - J30	
14/09/15 07:30:31	SIG	M62/1992J1	40R	M62 J25 - J30	
14/09/15 07:30:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:30:44	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:30:50	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 07:31:08	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 07:31:27	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 07:31:28	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 07:32:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:32:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:32:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:32:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1968A1	50R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1968A2	50R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1968A3	50R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1968A4	50R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 07:32:49	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 07:32:52	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 07:32:52	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 07:32:52	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 07:32:52	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 07:32:52	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 07:33:02	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 07:33:02	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 07:33:02	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 07:33:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:33:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 07:34:18	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 07:35:11	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1960A1	50R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1960A2	50R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1960A3	50R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1960K1	50R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1960K2	50R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1968A1	40R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1968A2	40R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1968A3	40R	M62 J25 - J30	
14/09/15 07:35:14	SIG	M62/1968A4	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 07:35:16	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1955K1	50R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1955K2	50R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1956A1	50R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1956A2	50R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1956A3	50R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1960A1	40R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1960A2	40R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1960A3	40R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1960K1	40R	M62 J25 - J30	
14/09/15 07:36:19	SIG	M62/1960K2	40R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1992A1	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1992A2	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1992A3	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1992J1	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 07:36:58	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 07:37:25	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 07:37:25	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 07:37:25	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 07:37:25	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:37:30	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2033B1	40R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2033B2	40R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2033B4	40R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 07:37:47	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 07:38:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:38:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:38:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:38:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:38:40	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 07:38:40	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 07:38:40	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1992A1	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1992A2	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1992A3	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1992J1	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1999A1	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1999A2	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1999A3	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1999J1	40R	M62 J25 - J30	
14/09/15 07:39:19	SIG	M62/1999J2	40R	M62 J25 - J30	
14/09/15 07:39:47	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 07:39:47	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 07:39:47	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 07:39:47	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 07:39:52	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 07:39:52	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 07:39:52	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 07:39:53	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 07:39:57	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 07:40:02	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 07:40:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:40:35	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 07:40:40	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 07:40:46	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 07:40:52	SIG	M62/1955K1	40R	M62 J25 - J30	
14/09/15 07:40:52	SIG	M62/1955K2	40R	M62 J25 - J30	
14/09/15 07:40:52	SIG	M62/1956A1	40R	M62 J25 - J30	
14/09/15 07:40:52	SIG	M62/1956A2	40R	M62 J25 - J30	
14/09/15 07:40:52	SIG	M62/1956A3	40R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2189B1	40R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2189B2	40R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2189B3	40R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2189B4	40R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 07:41:08	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 07:41:21	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 07:41:23	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 07:41:42	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2041B1	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 07:41:48	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 07:42:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:42:08	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:42:13	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 07:42:27	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 07:43:28	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 07:44:39	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 07:44:39	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 07:44:39	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 07:44:39	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 07:44:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:44:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:44:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:44:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1968A1	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1968A2	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1968A3	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1968A4	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 07:44:47	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 07:44:59	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 07:44:59	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 07:44:59	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 07:44:59	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B1	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B2	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2033B4	40R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 07:45:05	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 07:45:14	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:45:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:45:20	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:45:25	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 07:45:25	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 07:45:25	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 07:45:25	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 07:46:03	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 07:46:09	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 07:46:38	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 07:46:38	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 07:46:38	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 07:46:38	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 07:46:43	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 07:46:43	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 07:46:43	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 07:46:43	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 07:47:37	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 07:47:39	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 07:47:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:47:44	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:47:49	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:48:21	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:48:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1955K1	50R	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1955K2	50R	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1960A1	50R	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1960A2	50R	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1960A3	50R	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1960K1	50R	M62 J25 - J30	
14/09/15 07:48:25	SIG	M62/1960K2	50R	M62 J25 - J30	
14/09/15 07:48:26	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:48:55	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 07:48:55	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 07:48:55	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 07:49:45	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 07:49:48	SIG	M62/1956A1	50R	M62 J25 - J30	
14/09/15 07:49:48	SIG	M62/1956A2	50R	M62 J25 - J30	
14/09/15 07:49:48	SIG	M62/1956A3	50R	M62 J25 - J30	
14/09/15 07:50:31	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 07:50:31	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 07:50:31	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 07:50:31	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 07:50:31	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 07:50:31	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 07:50:38	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 07:50:38	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 07:50:38	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 07:50:38	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 07:50:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:50:48	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:50:53	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 07:50:59	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 07:51:39	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 07:51:39	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 07:51:39	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 07:51:39	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 07:51:51	SIG	M62/2041B1	40R	M62 J25 - J30	
14/09/15 07:51:51	SIG	M62/2041B2	40R	M62 J25 - J30	
14/09/15 07:51:51	SIG	M62/2041B3	40R	M62 J25 - J30	
14/09/15 07:51:51	SIG	M62/2041B4	40R	M62 J25 - J30	
14/09/15 07:51:56	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 07:51:56	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 07:51:56	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 07:51:56	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 07:52:50	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 07:52:50	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 07:52:50	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 07:52:50	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 07:53:32	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 07:53:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:53:38	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 07:53:41	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 07:53:41	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 07:53:41	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 07:53:41	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 07:53:44	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 07:53:44	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 07:53:44	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 07:53:44	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 07:53:50	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 07:53:50	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 07:53:50	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 07:53:50	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 07:53:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:53:52	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:53:57	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:54:05	SIG	M62/2018A1	60R	M62 J25 - J30	
14/09/15 07:54:05	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 07:54:05	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 07:54:05	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 07:54:23	SIG	M62/1968A1	40R	M62 J25 - J30	
14/09/15 07:54:23	SIG	M62/1968A2	40R	M62 J25 - J30	
14/09/15 07:54:23	SIG	M62/1968A3	40R	M62 J25 - J30	
14/09/15 07:54:23	SIG	M62/1968A4	40R	M62 J25 - J30	
14/09/15 07:54:46	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 07:54:46	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 07:54:46	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 07:54:46	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 07:55:32	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 07:55:51	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 07:55:51	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 07:55:51	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 07:55:51	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 07:56:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 07:56:56	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/1960A1	40R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/1960A2	40R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/1960A3	40R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/1960K1	40R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/1960K2	40R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 07:56:58	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 07:57:01	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2189B1	40R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2189B2	40R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2189B3	40R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2189B4	40R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 07:57:04	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 07:57:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:57:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 07:59:34	SIG	M62/1955K1	40R	M62 J25 - J30	
14/09/15 07:59:34	SIG	M62/1955K2	40R	M62 J25 - J30	
14/09/15 07:59:34	SIG	M62/1956A1	40R	M62 J25 - J30	
14/09/15 07:59:34	SIG	M62/1956A2	40R	M62 J25 - J30	
14/09/15 07:59:34	SIG	M62/1956A3	40R	M62 J25 - J30	
14/09/15 07:59:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 08:00:00	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 08:00:05	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 08:00:59	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2041B1	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 08:01:01	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 08:03:58	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 08:04:03	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 08:04:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 08:04:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 08:04:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 08:04:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1955K1	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1955K2	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1956A1	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1956A2	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1956A3	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1960A1	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1960A2	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1960A3	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1960K1	50R	M62 J25 - J30	
14/09/15 08:04:13	SIG	M62/1960K2	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 08:05:36	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 08:05:42	SIG	M62/1960A1	40R	M62 J25 - J30	
14/09/15 08:05:42	SIG	M62/1960A2	40R	M62 J25 - J30	
14/09/15 08:05:42	SIG	M62/1960A3	40R	M62 J25 - J30	
14/09/15 08:05:42	SIG	M62/1960K1	40R	M62 J25 - J30	
14/09/15 08:05:42	SIG	M62/1960K2	40R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2189B1	40R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2189B2	40R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2189B3	40R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2189B4	40R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 08:07:27	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 08:07:59	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 08:08:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:08:05	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:08:10	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:08:41	SIG	M62/1955K1	40R	M62 J25 - J30	
14/09/15 08:08:41	SIG	M62/1955K2	40R	M62 J25 - J30	
14/09/15 08:08:41	SIG	M62/1956A1	40R	M62 J25 - J30	
14/09/15 08:08:41	SIG	M62/1956A2	40R	M62 J25 - J30	
14/09/15 08:08:41	SIG	M62/1956A3	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 08:09:23	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1968A1	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1968A2	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1968A3	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1968A4	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 08:10:47	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 08:11:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:11:10	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:11:16	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2194B1	40R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2194B2	40R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2194B3	40R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2194B4	40R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2197B1	50R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2197B2	50R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2197B3	50R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2199M1	50R	M62 J25 - J30	
14/09/15 08:11:48	SIG	M62/2199M2	50R	M62 J25 - J30	
14/09/15 08:11:57	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 08:11:57	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 08:11:57	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 08:11:57	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 08:11:57	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1955K1	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1955K2	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1960A1	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1960A2	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1960A3	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1960K1	50R	M62 J25 - J30	
14/09/15 08:12:40	SIG	M62/1960K2	50R	M62 J25 - J30	
14/09/15 08:13:14	SIG	M62/2057A1	50R	M62 J25 - J30	
14/09/15 08:13:14	SIG	M62/2057A2	50R	M62 J25 - J30	
14/09/15 08:13:14	SIG	M62/2057A3	50R	M62 J25 - J30	
14/09/15 08:13:14	SIG	M62/2057J1	50R	M62 J25 - J30	
14/09/15 08:13:14	SIG	M621/1002A1	50R	M62 J25 - J30	
14/09/15 08:13:14	SIG	M621/1002A2	50R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2050A1	50R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2050A2	50R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2050A3	50R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2050A4	50R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2057A1	40R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2057A2	40R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2057A3	40R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M62/2057J1	40R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M621/1002A1	40R	M62 J25 - J30	
14/09/15 08:13:20	SIG	M621/1002A2	40R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2197B1	40R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2197B2	40R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2197B3	40R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2199M1	40R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2199M2	40R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2203B1	50R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2203B2	50R	M62 J25 - J30	
14/09/15 08:13:33	SIG	M62/2203B3	50R	M62 J25 - J30	
14/09/15 08:14:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:14:16	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:14:21	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:15:26	SIG	M62/1956A1	50R	M62 J25 - J30	
14/09/15 08:15:26	SIG	M62/1956A2	50R	M62 J25 - J30	
14/09/15 08:15:26	SIG	M62/1956A3	50R	M62 J25 - J30	
14/09/15 08:15:44	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 08:15:44	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 08:15:44	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 08:15:44	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 08:16:06	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 08:16:06	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 08:16:06	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 08:16:06	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 08:17:21	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:17:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 08:17:25	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 08:17:27	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2197B1	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2197B2	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2197B3	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2199M1	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2199M2	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2203B1	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2203B2	60R	M62 J25 - J30	
14/09/15 08:17:33	SIG	M62/2203B3	60R	M62 J25 - J30	
14/09/15 08:18:25	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 08:18:25	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 08:18:25	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 08:18:25	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 08:18:25	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 08:18:25	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2194B1	40R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2194B2	40R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2194B3	40R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2194B4	40R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2197B1	50R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2197B2	50R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2197B3	50R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2199M1	50R	M62 J25 - J30	
14/09/15 08:19:01	SIG	M62/2199M2	50R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2041A1	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2041A2	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2041A3	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2041A4	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2050A1	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2050A2	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2050A3	40R	M62 J25 - J30	
14/09/15 08:19:07	SIG	M62/2050A4	40R	M62 J25 - J30	
14/09/15 08:19:08	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 08:19:08	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 08:19:08	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 08:19:08	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 08:19:13	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 08:19:13	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 08:19:13	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 08:19:13	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 08:19:44	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 08:20:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:20:27	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:20:32	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1960A1	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1960A2	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1960A3	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1960K1	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1960K2	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1968A1	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1968A2	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1968A3	40R	M62 J25 - J30	
14/09/15 08:20:34	SIG	M62/1968A4	40R	M62 J25 - J30	
14/09/15 08:21:24	SIG	M621/1002A1	OFF	M62 J25 - J30	
14/09/15 08:21:24	SIG	M621/1002A2	OFF	M62 J25 - J30	
14/09/15 08:21:25	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:21:25	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:21:25	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:21:25	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2041A1	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2041A2	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2041A3	40R	M62 J25 - J30	
14/09/15 08:21:28	SIG	M62/2041A4	40R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:22:47	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:23:01	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 08:23:01	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 08:23:01	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 08:23:01	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 08:23:17	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 08:23:17	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 08:23:17	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 08:23:17	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 08:23:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:23:32	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:23:37	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:23:54	SIG	M62/2194B1	40R	M62 J25 - J30	
14/09/15 08:23:54	SIG	M62/2194B2	40R	M62 J25 - J30	
14/09/15 08:23:54	SIG	M62/2194B3	40R	M62 J25 - J30	
14/09/15 08:23:54	SIG	M62/2194B4	40R	M62 J25 - J30	
14/09/15 08:24:08	SIG	M62/2057A1	60R	M62 J25 - J30	
14/09/15 08:24:08	SIG	M62/2057A2	60R	M62 J25 - J30	
14/09/15 08:24:08	SIG	M62/2057A3	60R	M62 J25 - J30	
14/09/15 08:24:08	SIG	M62/2057J1	60R	M62 J25 - J30	
14/09/15 08:24:19	SIG	M62/2057A1	50R	M62 J25 - J30	
14/09/15 08:24:19	SIG	M62/2057A2	50R	M62 J25 - J30	
14/09/15 08:24:19	SIG	M62/2057A3	50R	M62 J25 - J30	
14/09/15 08:24:19	SIG	M62/2057J1	50R	M62 J25 - J30	
14/09/15 08:24:24	SIG	M62/2057A1	40R	M62 J25 - J30	
14/09/15 08:24:24	SIG	M62/2057A2	40R	M62 J25 - J30	
14/09/15 08:24:24	SIG	M62/2057A3	40R	M62 J25 - J30	
14/09/15 08:24:24	SIG	M62/2057J1	40R	M62 J25 - J30	
14/09/15 08:24:25	SIG	M621/1002A1	50R	M62 J25 - J30	
14/09/15 08:24:25	SIG	M621/1002A2	50R	M62 J25 - J30	
14/09/15 08:24:30	SIG	M621/1002A1	40R	M62 J25 - J30	
14/09/15 08:24:30	SIG	M621/1002A2	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 08:24:31	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 08:24:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:24:40	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:24:53	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 08:24:53	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 08:24:53	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 08:25:37	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 08:25:37	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 08:25:37	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 08:25:37	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 08:25:47	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 08:25:52	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 08:25:55	SIG	M62/1955K1	40R	M62 J25 - J30	
14/09/15 08:25:55	SIG	M62/1955K2	40R	M62 J25 - J30	
14/09/15 08:25:55	SIG	M62/1956A1	40R	M62 J25 - J30	
14/09/15 08:25:55	SIG	M62/1956A2	40R	M62 J25 - J30	
14/09/15 08:25:55	SIG	M62/1956A3	40R	M62 J25 - J30	
14/09/15 08:26:58	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 08:26:58	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 08:26:58	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:26:58	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:27:03	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 08:27:03	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 08:27:03	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:27:03	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:28:01	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 08:28:01	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 08:28:01	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 08:28:01	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 08:28:22	SIG	M621/1002A1	OFF	M62 J25 - J30	
14/09/15 08:28:22	SIG	M621/1002A2	OFF	M62 J25 - J30	
14/09/15 08:28:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:28:43	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:28:49	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:29:06	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 08:29:06	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 08:29:06	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 08:29:06	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 08:29:41	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 08:29:55	SIG	M62/1955K1	50R	M62 J25 - J30	
14/09/15 08:29:55	SIG	M62/1955K2	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 08:30:04	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2041A1	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2041A2	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2041A3	40R	M62 J25 - J30	
14/09/15 08:30:42	SIG	M62/2041A4	40R	M62 J25 - J30	
14/09/15 08:30:58	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 08:30:58	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 08:30:58	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 08:30:58	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 08:31:20	SIG	M62/1956A1	50R	M62 J25 - J30	
14/09/15 08:31:20	SIG	M62/1956A2	50R	M62 J25 - J30	
14/09/15 08:31:20	SIG	M62/1956A3	50R	M62 J25 - J30	
14/09/15 08:31:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:31:50	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:31:55	SIG	M62/2183B2	40R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 08:31:59	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 08:32:01	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 08:32:05	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 08:32:12	SIG	M62/1955K1	40R	M62 J25 - J30	
14/09/15 08:32:12	SIG	M62/1955K2	40R	M62 J25 - J30	
14/09/15 08:32:12	SIG	M62/1956A1	40R	M62 J25 - J30	
14/09/15 08:32:12	SIG	M62/1956A2	40R	M62 J25 - J30	
14/09/15 08:32:12	SIG	M62/1956A3	40R	M62 J25 - J30	
14/09/15 08:32:13	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 08:32:13	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 08:32:13	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 08:32:13	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 08:32:37	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 08:32:37	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 08:33:23	SIG	M62/1999J1	40R	M62 J25 - J30	
14/09/15 08:33:23	SIG	M62/1999J2	40R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:33:42	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:33:57	SIG	M62/2057A1	60R	M62 J25 - J30	
14/09/15 08:33:57	SIG	M62/2057A2	60R	M62 J25 - J30	
14/09/15 08:33:57	SIG	M62/2057A3	60R	M62 J25 - J30	
14/09/15 08:33:57	SIG	M62/2057J1	60R	M62 J25 - J30	
14/09/15 08:34:35	SIG	M62/2057A1	50R	M62 J25 - J30	
14/09/15 08:34:35	SIG	M62/2057A2	50R	M62 J25 - J30	
14/09/15 08:34:35	SIG	M62/2057A3	50R	M62 J25 - J30	
14/09/15 08:34:35	SIG	M62/2057J1	50R	M62 J25 - J30	
14/09/15 08:34:35	SIG	M621/1002A1	50R	M62 J25 - J30	
14/09/15 08:34:35	SIG	M621/1002A2	50R	M62 J25 - J30	
14/09/15 08:34:41	SIG	M62/2057A1	40R	M62 J25 - J30	
14/09/15 08:34:41	SIG	M62/2057A2	40R	M62 J25 - J30	
14/09/15 08:34:41	SIG	M62/2057A3	40R	M62 J25 - J30	
14/09/15 08:34:41	SIG	M62/2057J1	40R	M62 J25 - J30	
14/09/15 08:34:41	SIG	M621/1002A1	40R	M62 J25 - J30	
14/09/15 08:34:41	SIG	M621/1002A2	40R	M62 J25 - J30	
14/09/15 08:35:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:35:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 08:35:11	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 08:35:16	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 08:35:40	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1955K1	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1955K2	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1960A1	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1960A2	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1960A3	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1960K1	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1960K2	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1968A1	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1968A2	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1968A3	50R	M62 J25 - J30	
14/09/15 08:36:38	SIG	M62/1968A4	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:36:51	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 08:37:00	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 08:38:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:38:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:38:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:38:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 08:38:14	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 08:38:19	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 08:38:19	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 08:38:19	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 08:38:19	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 08:38:19	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 08:38:19	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 08:38:28	SIG	M62/1956A1	50R	M62 J25 - J30	
14/09/15 08:38:28	SIG	M62/1956A2	50R	M62 J25 - J30	
14/09/15 08:38:28	SIG	M62/1956A3	50R	M62 J25 - J30	
14/09/15 08:38:35	SIG	M621/1002A1	OFF	M62 J25 - J30	
14/09/15 08:38:35	SIG	M621/1002A2	OFF	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 08:38:54	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 08:39:03	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 08:39:10	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 08:39:30	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 08:39:30	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 08:39:30	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 08:39:30	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 08:39:32	SIG	M62/2057A1	60R	M62 J25 - J30	
14/09/15 08:39:32	SIG	M62/2057A2	60R	M62 J25 - J30	
14/09/15 08:39:32	SIG	M62/2057A3	60R	M62 J25 - J30	
14/09/15 08:39:32	SIG	M62/2057J1	60R	M62 J25 - J30	
14/09/15 08:42:03	SIG	M62/1968A1	40R	M62 J25 - J30	
14/09/15 08:42:03	SIG	M62/1968A2	40R	M62 J25 - J30	
14/09/15 08:42:03	SIG	M62/1968A3	40R	M62 J25 - J30	
14/09/15 08:42:03	SIG	M62/1968A4	40R	M62 J25 - J30	
14/09/15 08:42:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:42:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:42:23	SIG	M62/2050A1	50R	M62 J25 - J30	
14/09/15 08:42:23	SIG	M62/2050A2	50R	M62 J25 - J30	
14/09/15 08:42:23	SIG	M62/2050A3	50R	M62 J25 - J30	
14/09/15 08:42:23	SIG	M62/2050A4	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1992A1	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1992A2	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1992A3	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1992J1	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 08:42:30	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2197B1	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2197B2	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2197B3	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2199M1	60R	M62 J25 - J30	
14/09/15 08:42:37	SIG	M62/2199M2	60R	M62 J25 - J30	
14/09/15 08:43:22	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 08:43:22	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 08:43:22	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 08:44:10	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:44:11	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2170B1	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2170B2	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2170L1	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2170L2	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 08:44:16	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1992A1	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1992A2	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1992A3	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1992J1	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1999A1	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1999A2	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1999A3	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1999J1	40R	M62 J25 - J30	
14/09/15 08:44:28	SIG	M62/1999J2	40R	M62 J25 - J30	
14/09/15 08:45:23	SIG	M62/2018A1	40R	M62 J25 - J30	
14/09/15 08:45:23	SIG	M62/2018A2	40R	M62 J25 - J30	
14/09/15 08:45:23	SIG	M62/2018A3	40R	M62 J25 - J30	
14/09/15 08:45:23	SIG	M62/2018A4	40R	M62 J25 - J30	
14/09/15 08:46:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:46:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:46:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:46:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2008K1	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2008K2	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2012A1	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2012A2	40R	M62 J25 - J30	
14/09/15 08:46:42	SIG	M62/2012A3	40R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 08:46:58	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 08:47:00	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 08:47:00	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 08:47:00	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 08:47:00	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 08:47:26	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 08:48:09	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 08:48:24	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 08:48:24	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 08:48:24	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 08:48:24	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 08:48:44	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 08:49:22	SIG	M62/1968A1	50R	M62 J25 - J30	
14/09/15 08:49:22	SIG	M62/1968A2	50R	M62 J25 - J30	
14/09/15 08:49:22	SIG	M62/1968A3	50R	M62 J25 - J30	
14/09/15 08:49:22	SIG	M62/1968A4	50R	M62 J25 - J30	
14/09/15 08:49:23	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:49:23	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:49:23	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:49:23	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2025A1	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2025A2	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2025A3	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2025A4	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2041A1	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2041A2	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2041A3	40R	M62 J25 - J30	
14/09/15 08:49:26	SIG	M62/2041A4	40R	M62 J25 - J30	
14/09/15 08:50:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:50:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2018A1	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2025A1	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2025A2	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2025A3	50R	M62 J25 - J30	
14/09/15 08:50:42	SIG	M62/2025A4	50R	M62 J25 - J30	
14/09/15 08:51:49	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 08:51:49	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 08:51:49	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 08:51:49	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 08:51:49	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 08:51:49	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 08:52:55	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 08:52:55	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 08:52:55	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 08:52:55	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 08:52:55	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2041A1	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2041A2	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2041A3	50R	M62 J25 - J30	
14/09/15 08:53:42	SIG	M62/2041A4	50R	M62 J25 - J30	
14/09/15 08:54:36	SIG	M62/1955K1	60R	M62 J25 - J30	
14/09/15 08:54:36	SIG	M62/1955K2	60R	M62 J25 - J30	
14/09/15 08:54:36	SIG	M62/1956A1	60R	M62 J25 - J30	
14/09/15 08:54:36	SIG	M62/1956A2	60R	M62 J25 - J30	
14/09/15 08:54:36	SIG	M62/1956A3	60R	M62 J25 - J30	
14/09/15 08:55:11	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 08:55:11	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 08:55:11	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 08:55:37	SIG	M62/2050A1	60R	M62 J25 - J30	
14/09/15 08:55:37	SIG	M62/2050A2	60R	M62 J25 - J30	
14/09/15 08:55:37	SIG	M62/2050A3	60R	M62 J25 - J30	
14/09/15 08:55:37	SIG	M62/2050A4	60R	M62 J25 - J30	
14/09/15 08:55:48	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 08:55:48	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 08:55:48	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 08:55:48	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 08:55:48	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 08:55:48	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 08:56:37	SIG	M62/1960A1	60R	M62 J25 - J30	
14/09/15 08:56:37	SIG	M62/1960A2	60R	M62 J25 - J30	
14/09/15 08:56:37	SIG	M62/1960A3	60R	M62 J25 - J30	
14/09/15 08:56:37	SIG	M62/1960K1	60R	M62 J25 - J30	
14/09/15 08:56:37	SIG	M62/1960K2	60R	M62 J25 - J30	
14/09/15 08:59:01	SIG	M62/2033A1	40R	M62 J25 - J30	
14/09/15 08:59:01	SIG	M62/2033A2	40R	M62 J25 - J30	
14/09/15 08:59:01	SIG	M62/2033A3	40R	M62 J25 - J30	
14/09/15 08:59:01	SIG	M62/2033A4	40R	M62 J25 - J30	
14/09/15 08:59:25	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 08:59:25	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 08:59:25	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 08:59:25	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 08:59:25	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1992A1	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1992A2	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1992A3	50R	M62 J25 - J30	
14/09/15 09:00:21	SIG	M62/1992J1	50R	M62 J25 - J30	
14/09/15 09:00:37	SIG	M62/1968A1	60R	M62 J25 - J30	
14/09/15 09:00:37	SIG	M62/1968A2	60R	M62 J25 - J30	
14/09/15 09:00:37	SIG	M62/1968A3	60R	M62 J25 - J30	
14/09/15 09:00:37	SIG	M62/1968A4	60R	M62 J25 - J30	
14/09/15 09:02:36	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 09:02:36	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2170L1	OFF	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2170L2	OFF	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2203B1	OFF	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2203B2	OFF	M62 J25 - J30	
14/09/15 09:02:37	SIG	M62/2203B3	OFF	M62 J25 - J30	
14/09/15 09:03:37	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 09:03:37	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/1974A1	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/1974A2	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/1974A3	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/1974A4	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2004A1	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2004A2	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2004A3	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2008K1	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2008K2	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2012A1	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2012A2	60R	M62 J25 - J30	
14/09/15 09:03:37	SIG	M62/2012A3	60R	M62 J25 - J30	
14/09/15 09:03:58	SIG	M62/2033A1	50R	M62 J25 - J30	
14/09/15 09:03:58	SIG	M62/2033A2	50R	M62 J25 - J30	
14/09/15 09:03:58	SIG	M62/2033A3	50R	M62 J25 - J30	
14/09/15 09:03:58	SIG	M62/2033A4	50R	M62 J25 - J30	
14/09/15 09:04:37	SIG	M62/2197B1	OFF	M62 J25 - J30	
14/09/15 09:04:37	SIG	M62/2197B2	OFF	M62 J25 - J30	
14/09/15 09:04:37	SIG	M62/2197B3	OFF	M62 J25 - J30	
14/09/15 09:04:37	SIG	M62/2199M1	OFF	M62 J25 - J30	
14/09/15 09:04:37	SIG	M62/2199M2	OFF	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/1979K1	60R	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/1979K2	60R	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/1981A1	60R	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/1981A2	60R	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/1981A3	60R	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/1981A4	60R	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/2159B1	OFF	M62 J25 - J30	
14/09/15 09:05:37	SIG	M62/2159B2	OFF	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2177B1	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2177B2	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2177L1	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2177L2	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2183B1	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2183B2	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2183L1	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2183L2	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2189B1	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2189B2	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2189B3	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2189B4	NR	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2194B1	OFF	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2194B2	OFF	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2194B3	OFF	M62 J25 - J30	
14/09/15 09:06:37	SIG	M62/2194B4	OFF	M62 J25 - J30	
14/09/15 09:06:38	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 09:06:38	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 09:07:37	SIG	M62/2018A1	60R	M62 J25 - J30	
14/09/15 09:07:37	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 09:07:37	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 09:07:37	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1987A1	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1987A3	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1987J1	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1992A1	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1992A2	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1992A3	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1992J1	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1999A1	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1999A2	60R	M62 J25 - J30	
14/09/15 09:07:50	SIG	M62/1999A3	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2041A1	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2041A2	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2041A3	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2041A4	60R	M62 J25 - J30	
14/09/15 09:09:37	SIG	M62/2189B1	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2170B1	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2170B2	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2177B1	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2177B2	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2177L1	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2177L2	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2183B1	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2183L1	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2183L2	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2189B2	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2189B3	OFF	M62 J25 - J30	
14/09/15 09:09:38	SIG	M62/2189B4	OFF	M62 J25 - J30	
14/09/15 09:23:10	SIG	M62/2079A1	HSD	M62 J25 - J30	
14/09/15 09:24:39	SIG	M62/2088A1	HSD	M62 J25 - J30	
14/09/15 09:25:26	SIG	M62/2079A1	REDX	M62 J25 - J30	
14/09/15 09:25:26	SIG	M62/2097A1	HSD	M62 J25 - J30	
14/09/15 09:26:34	SIG	M62/2088A1	REDX	M62 J25 - J30	
14/09/15 09:26:34	SIG	M62/2106A1	HSD	M62 J25 - J30	
14/09/15 09:27:42	SIG	M62/2097A1	REDX	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1955K1	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1955K2	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1956A1	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1956A2	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1956A3	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1960A1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1960A2	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1960A3	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1960K1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1960K2	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1968A1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1968A2	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1968A3	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1968A4	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1974A1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1974A2	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1974A3	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1974A4	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1979K1	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1979K2	OFF	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1981A1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1981A2	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1981A3	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1981A4	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1987A1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1987A3	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1987J1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1992A1	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1992A2	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1992A3	NR	M62 J25 - J30	
14/09/15 09:28:49	SIG	M62/1992J1	NR	M62 J25 - J30	
14/09/15 09:28:50	SIG	M62/2106A1	REDX	M62 J25 - J30	
14/09/15 09:29:50	SIG	M62/2065A2	NR	M62 J25 - J30	
14/09/15 09:29:50	SIG	M62/2065A3	NR	M62 J25 - J30	
14/09/15 09:29:50	SIG	M62/2065A4	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2073K1	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2079A2	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2079A3	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2079A4	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2088A2	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2088A3	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2088A4	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2097A2	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2097A3	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2097A4	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2106A2	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2106A3	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2106A4	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2114A1	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2114A2	NR	M62 J25 - J30	
14/09/15 09:30:19	SIG	M62/2114A3	NR	M62 J25 - J30	
14/09/15 09:30:50	SIG	M62/2073K1	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2079A1	BLNK	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2079A2	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2079A3	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2079A4	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2088A1	BLNK	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2088A2	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2088A3	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2088A4	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2097A1	BLNK	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2097A2	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2097A3	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2097A4	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2106A1	BLNK	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2106A2	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2106A4	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2114A1	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2114A2	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2114A3	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2117A1	BLNK	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2117A2	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2117A3	OFF	M62 J25 - J30	
14/09/15 09:31:01	SIG	M62/2117A4	OFF	M62 J25 - J30	
14/09/15 09:31:49	SIG	M62/1960A1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1960A2	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1960A3	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1960K1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1960K2	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1968A1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1968A2	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1968A3	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1968A4	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1974A1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1974A2	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1974A3	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1974A4	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1981A1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1981A2	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1981A3	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1981A4	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1987A1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1987A3	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1987J1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1992A1	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1992A2	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1992A3	OFF	M62 J25 - J30	
14/09/15 09:31:59	SIG	M62/1992J1	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/1999A1	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/1999A2	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/1999A3	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/1999J1	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/1999J2	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/2004A1	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/2004A2	OFF	M62 J25 - J30	
14/09/15 09:32:37	SIG	M62/2004A3	OFF	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2194B1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2194B2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2194B3	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2194B4	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2197B1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2197B2	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2197B3	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2199M1	50R	M62 J25 - J30	
14/09/15 09:33:26	SIG	M62/2199M2	50R	M62 J25 - J30	
14/09/15 09:33:42	SIG	M62/2113B1	HSD	M62 J25 - J30	
14/09/15 09:34:35	SIG	M62/2106B1	HSD	M62 J25 - J30	
14/09/15 09:35:43	SIG	M62/2097B1	HSD	M62 J25 - J30	
14/09/15 09:35:43	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 09:36:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:36:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:36:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:36:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:36:51	SIG	M62/2088B1	HSD	M62 J25 - J30	
14/09/15 09:36:52	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 09:37:59	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 09:39:08	SIG	M62/2088B1	REDX	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2074B2	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2074B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2074B4	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2081B1	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2081B2	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2081B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2081L1	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2088B2	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2088B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2088B4	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2106B2	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2106B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2106B4	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2113B2	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2113B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2113B4	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2117B1	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2117B3	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2120M1	NR	M62 J25 - J30	
14/09/15 09:40:01	SIG	M62/2120M2	NR	M62 J25 - J30	
14/09/15 09:41:01	SIG	M62/2120M1	OFF	M62 J25 - J30	
14/09/15 09:41:01	SIG	M62/2120M2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2074B1	BLNK	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2074B2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2074B3	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2074B4	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2081B1	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2081B2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2081B3	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2081L1	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2088B1	BLNK	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2088B2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2088B3	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2088B4	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2097B2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2097B3	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2097B4	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2106B1	BLNK	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2106B2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2106B3	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2106B4	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2113B1	BLNK	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2113B2	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2113B3	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2113B4	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
14/09/15 09:41:02	SIG	M62/2117B3	OFF	M62 J25 - J30	
14/09/15 09:41:20	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 09:41:20	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 09:41:20	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 09:41:20	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 09:41:32	SIG	M62/2170B1	50R	M62 J25 - J30	
14/09/15 09:41:32	SIG	M62/2170B2	50R	M62 J25 - J30	
14/09/15 09:42:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:42:22	SIG	M62/2189B1	40R	M62 J25 - J30	
14/09/15 09:42:22	SIG	M62/2189B2	40R	M62 J25 - J30	
14/09/15 09:42:22	SIG	M62/2189B3	40R	M62 J25 - J30	
14/09/15 09:42:22	SIG	M62/2189B4	40R	M62 J25 - J30	
14/09/15 09:42:54	SIG	M62/2203B1	60R	M62 J25 - J30	
14/09/15 09:42:54	SIG	M62/2203B2	60R	M62 J25 - J30	
14/09/15 09:42:54	SIG	M62/2203B3	60R	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2177B1	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2177B2	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2177L1	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2177L2	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2183B1	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2183B2	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2183L1	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2183L2	NR	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2197B1	60R	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2197B2	60R	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2197B3	60R	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2199M1	60R	M62 J25 - J30	
14/09/15 09:44:18	SIG	M62/2199M2	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2189B1	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2189B2	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2189B3	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2189B4	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2194B1	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2194B2	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2194B3	60R	M62 J25 - J30	
14/09/15 09:46:22	SIG	M62/2194B4	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2177B1	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2177B2	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2177L1	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2177L2	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2183B1	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2183B2	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2183L1	60R	M62 J25 - J30	
14/09/15 09:46:37	SIG	M62/2183L2	60R	M62 J25 - J30	
14/09/15 09:47:18	SIG	M62/2159B1	OFF	M62 J25 - J30	
14/09/15 09:47:18	SIG	M62/2159B2	OFF	M62 J25 - J30	
14/09/15 09:48:37	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 09:48:37	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 09:48:37	SIG	M62/2170B1	60R	M62 J25 - J30	
14/09/15 09:48:37	SIG	M62/2170B2	60R	M62 J25 - J30	
14/09/15 09:48:37	SIG	M62/2170L1	50R	M62 J25 - J30	
14/09/15 09:48:37	SIG	M62/2170L2	50R	M62 J25 - J30	
14/09/15 09:49:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:49:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 09:50:30	SIG	M62/2159B1	50R	M62 J25 - J30	
14/09/15 09:50:30	SIG	M62/2159B2	50R	M62 J25 - J30	
14/09/15 09:50:30	SIG	M62/2159M1	50R	M62 J25 - J30	
14/09/15 09:50:30	SIG	M62/2159M2	50R	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2147B1	NR	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2147B2	NR	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2147B3	NR	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2147B4	NR	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2159B1	40R	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2159B2	40R	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2159M1	40R	M62 J25 - J30	
14/09/15 09:50:35	SIG	M62/2159M2	40R	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2147B1	OFF	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2147B2	OFF	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2147B3	OFF	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2147B4	OFF	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2159M1	OFF	M62 J25 - J30	
14/09/15 09:54:29	SIG	M62/2159M2	OFF	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2125B1	NR	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2125B2	NR	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2125B3	NR	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2125L1	NR	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2125L2	NR	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2132B1	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2132B2	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2132B3	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2137B1	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2137B2	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2137B3	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2137B4	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2147B1	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2147B2	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2147B3	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2147B4	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2159B1	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2159B2	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2159M1	60R	M62 J25 - J30	
14/09/15 09:54:38	SIG	M62/2159M2	60R	M62 J25 - J30	
14/09/15 09:55:00	SIG	M62/2106B2	50R	M62 J25 - J30	
14/09/15 09:55:00	SIG	M62/2106B3	50R	M62 J25 - J30	
14/09/15 09:55:00	SIG	M62/2106B4	50R	M62 J25 - J30	
14/09/15 09:55:00	SIG	M62/2125B1	60R	M62 J25 - J30	
14/09/15 09:55:00	SIG	M62/2125B2	60R	M62 J25 - J30	
14/09/15 09:55:00	SIG	M62/2125B3	60R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2106B2	40R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2106B3	40R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2106B4	40R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2113B2	50R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2113B3	50R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2113B4	50R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2117B1	60R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2117B3	60R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2120M1	60R	M62 J25 - J30	
14/09/15 09:55:05	SIG	M62/2120M2	60R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2113B2	40R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2113B3	40R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2113B4	40R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2117B1	50R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2117B3	50R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2120M1	50R	M62 J25 - J30	
14/09/15 09:55:17	SIG	M62/2120M2	50R	M62 J25 - J30	
14/09/15 09:56:37	SIG	M62/2125L1	60R	M62 J25 - J30	
14/09/15 09:56:37	SIG	M62/2125L2	60R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2117B1	40R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2117B3	40R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2120M1	40R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2120M2	40R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2125B1	50R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2125B2	50R	M62 J25 - J30	
14/09/15 09:57:20	SIG	M62/2125B3	50R	M62 J25 - J30	
14/09/15 09:58:05	SIG	M62/2125B1	40R	M62 J25 - J30	
14/09/15 09:58:05	SIG	M62/2125B2	40R	M62 J25 - J30	
14/09/15 09:58:05	SIG	M62/2125B3	40R	M62 J25 - J30	
14/09/15 09:58:05	SIG	M62/2125L1	50R	M62 J25 - J30	
14/09/15 09:58:05	SIG	M62/2125L2	50R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2125B1	40R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2125B2	40R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2125B3	40R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2125L1	40R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2125L2	40R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2132B1	50R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2132B2	50R	M62 J25 - J30	
14/09/15 09:58:11	SIG	M62/2132B3	50R	M62 J25 - J30	
14/09/15 09:59:00	SIG	M62/2106B2	60R	M62 J25 - J30	
14/09/15 09:59:00	SIG	M62/2106B3	60R	M62 J25 - J30	
14/09/15 09:59:00	SIG	M62/2106B4	60R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M606/2003B1	50R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M606/2003B2	50R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M62/1999B2	50R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M62/1999B3	50R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M62/1999B4	50R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M62/2005M1	50R	M62 J25 - J30	
14/09/15 09:59:40	SIG	M62/2005M2	50R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M606/2003B1	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M606/2003B2	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1992B1	NR	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1992B2	NR	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1992B3	NR	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1992B4	NR	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1999B1	REDX	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1999B2	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1999B3	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/1999B4	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2004B1	REDX	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2004B2	50R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2004B3	50R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2004B4	50R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2005M1	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2005M2	40R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2012B2	50R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2012B3	50R	M62 J25 - J30	
14/09/15 09:59:45	SIG	M62/2012B4	50R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2074B1	REDX	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2074B2	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2074B3	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2074B4	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2081B1	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2081B2	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2081B3	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2081L1	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2088B1	REDX	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2088B2	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2088B3	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2088B4	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2097B2	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2097B3	60R	M62 J25 - J30	
14/09/15 10:01:38	SIG	M62/2097B4	60R	M62 J25 - J30	
14/09/15 10:01:48	SIG	M62/2113B2	60R	M62 J25 - J30	
14/09/15 10:01:48	SIG	M62/2113B3	60R	M62 J25 - J30	
14/09/15 10:01:48	SIG	M62/2113B4	60R	M62 J25 - J30	
14/09/15 10:02:05	SIG	M62/2117B1	60R	M62 J25 - J30	
14/09/15 10:02:05	SIG	M62/2117B3	60R	M62 J25 - J30	
14/09/15 10:02:05	SIG	M62/2120M1	60R	M62 J25 - J30	
14/09/15 10:02:05	SIG	M62/2120M2	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2125B1	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2125B2	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2125B3	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2125L1	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2125L2	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2132B1	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2132B2	60R	M62 J25 - J30	
14/09/15 10:02:06	SIG	M62/2132B3	60R	M62 J25 - J30	
14/09/15 10:02:14	SIG	M62/2057B1	HSD	M62 J25 - J30	
14/09/15 10:03:35	SIG	M62/2081B1	50R	M62 J25 - J30	
14/09/15 10:03:35	SIG	M62/2081B2	50R	M62 J25 - J30	
14/09/15 10:03:35	SIG	M62/2081B3	50R	M62 J25 - J30	
14/09/15 10:03:35	SIG	M62/2081L1	50R	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2197B1	NR	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2197B2	NR	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2197B3	NR	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2199M1	OFF	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2199M2	OFF	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2203B1	OFF	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2203B2	OFF	M62 J25 - J30	
14/09/15 10:03:38	SIG	M62/2203B3	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1992B1	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1992B2	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1992B3	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1992B4	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1999B1	BLNK	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1999B2	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1999B3	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/1999B4	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2004B2	NR	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2004B3	NR	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2004B4	NR	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2005M1	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2005M2	OFF	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 10:03:39	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2081B1	40R	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2081B2	40R	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2081B3	40R	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2081L1	40R	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2088B2	50R	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2088B3	50R	M62 J25 - J30	
14/09/15 10:03:40	SIG	M62/2088B4	50R	M62 J25 - J30	
14/09/15 10:04:13	SIG	M62/2041B1	HSD	M62 J25 - J30	
14/09/15 10:04:13	SIG	M62/2057B1	REDX	M62 J25 - J30	
14/09/15 10:04:13	SIG	M621/1002B1	HSD	M62 J25 - J30	
14/09/15 10:04:13	SIG	M621/1010B1	60R	M62 J25 - J30	
14/09/15 10:04:13	SIG	M621/1010B2	60R	M62 J25 - J30	
14/09/15 10:05:13	SIG	M62/2033B1	HSD	M62 J25 - J30	
14/09/15 10:06:13	SIG	M62/2025B1	HSD	M62 J25 - J30	
14/09/15 10:06:14	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 10:06:38	SIG	M62/2197B1	OFF	M62 J25 - J30	
14/09/15 10:06:39	SIG	M62/2004B2	OFF	M62 J25 - J30	
14/09/15 10:06:39	SIG	M62/2197B2	OFF	M62 J25 - J30	
14/09/15 10:06:39	SIG	M62/2197B3	OFF	M62 J25 - J30	
14/09/15 10:06:40	SIG	M62/2004B1	BLNK	M62 J25 - J30	
14/09/15 10:06:40	SIG	M62/2004B3	OFF	M62 J25 - J30	
14/09/15 10:06:40	SIG	M62/2004B4	OFF	M62 J25 - J30	
14/09/15 10:07:05	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2081B1	60R	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2081B2	60R	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2081B3	60R	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2081L1	60R	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2088B2	60R	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2088B3	60R	M62 J25 - J30	
14/09/15 10:07:36	SIG	M62/2088B4	60R	M62 J25 - J30	
14/09/15 10:07:49	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2018B1	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2018B2	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2018B3	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2025B2	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2025B3	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2025B4	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2041B2	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2041B3	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2041B4	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2050B2	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2050B3	NR	M62 J25 - J30	
14/09/15 10:08:20	SIG	M62/2050B4	NR	M62 J25 - J30	
14/09/15 10:09:20	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 10:09:20	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 10:09:20	SIG	M62/2041B3	OFF	M62 J25 - J30	
14/09/15 10:09:20	SIG	M62/2041B4	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2012B1	BLNK	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2012B2	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2012B3	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2012B4	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2025B1	BLNK	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2025B2	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2025B3	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2025B4	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2033B2	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2033B4	OFF	M62 J25 - J30	
14/09/15 10:09:21	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 10:09:38	SIG	M606/2003B1	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M606/2003B2	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1992B1	NR	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1992B2	NR	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1992B3	NR	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1992B4	NR	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1999B1	REDX	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1999B2	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1999B3	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/1999B4	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2004B1	REDX	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2004B2	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2004B3	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2004B4	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2005M1	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2005M2	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2012B2	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2012B3	60R	M62 J25 - J30	
14/09/15 10:09:38	SIG	M62/2012B4	60R	M62 J25 - J30	
14/09/15 10:10:17	SIG	M62/2004B2	50R	M62 J25 - J30	
14/09/15 10:10:17	SIG	M62/2004B3	50R	M62 J25 - J30	
14/09/15 10:10:17	SIG	M62/2004B4	50R	M62 J25 - J30	
14/09/15 10:10:22	SIG	M62/2004B2	40R	M62 J25 - J30	
14/09/15 10:10:22	SIG	M62/2004B3	40R	M62 J25 - J30	
14/09/15 10:10:22	SIG	M62/2004B4	40R	M62 J25 - J30	
14/09/15 10:10:22	SIG	M62/2012B2	50R	M62 J25 - J30	
14/09/15 10:10:22	SIG	M62/2012B3	50R	M62 J25 - J30	
14/09/15 10:10:22	SIG	M62/2012B4	50R	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1987B1	NR	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1987B2	NR	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1987B3	NR	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1987B4	NR	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1992B1	60R	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1992B2	60R	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1992B3	60R	M62 J25 - J30	
14/09/15 10:10:38	SIG	M62/1992B4	60R	M62 J25 - J30	
14/09/15 10:11:38	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 10:11:38	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 10:11:38	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 10:11:38	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 10:11:38	SIG	M62/2170L1	OFF	M62 J25 - J30	
14/09/15 10:11:38	SIG	M62/2170L2	OFF	M62 J25 - J30	
14/09/15 10:14:17	SIG	M62/2004B2	60R	M62 J25 - J30	
14/09/15 10:14:17	SIG	M62/2004B3	60R	M62 J25 - J30	
14/09/15 10:14:17	SIG	M62/2004B4	60R	M62 J25 - J30	
14/09/15 10:14:17	SIG	M62/2012B2	60R	M62 J25 - J30	
14/09/15 10:14:17	SIG	M62/2012B3	60R	M62 J25 - J30	
14/09/15 10:14:17	SIG	M62/2012B4	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1960B1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1960B2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1960B3	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1960L1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1960L2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1968B1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1968B2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1968B3	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1968L1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1974B1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1974B2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1974B3	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1974B4	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1974M1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1974M2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1987B1	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1987B2	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1987B3	60R	M62 J25 - J30	
14/09/15 10:14:39	SIG	M62/1987B4	60R	M62 J25 - J30	
14/09/15 10:14:46	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 10:14:46	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 10:14:46	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 10:14:46	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 10:14:46	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 10:14:46	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1974B1	40R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1974B2	40R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1974B3	40R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1974B4	40R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1974M1	40R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1974M2	40R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 10:14:51	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2132B1	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2132B2	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2132B3	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2137B1	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2137B2	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2137B3	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2137B4	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2147B1	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2147B2	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2147B3	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2147B4	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2159B1	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2159B2	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2159M1	OFF	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2159M2	OFF	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 10:17:38	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 10:18:44	SIG	M62/2004B4	OFF	M62 J25 - J30	
14/09/15 10:18:45	SIG	M62/2004B1	OFF	M62 J25 - J30	
14/09/15 10:18:45	SIG	M62/2004B1	REDX	M62 J25 - J30	
14/09/15 10:18:45	SIG	M62/2004B4	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1974B1	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1974B2	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1974B3	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1974B4	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1974M1	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1974M2	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 10:18:46	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 10:18:53	SIG	M62/2004B3	OFF	M62 J25 - J30	
14/09/15 10:18:54	SIG	M62/2004B3	60R	M62 J25 - J30	
14/09/15 10:18:58	SIG	M62/2004B2	60R	M62 J25 - J30	
14/09/15 10:18:58	SIG	M62/2004B2	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2074B1	BLNK	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2074B2	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2074B3	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2074B4	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2081B1	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2081B2	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2081B3	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2081L1	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2088B2	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2088B3	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2088B4	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 10:20:38	SIG	M62/2137B1	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 10:20:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2050B2	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2050B3	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2050B4	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2057B1	BLNK	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2057B2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2057B3	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2057B4	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2065B2	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2065B3	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2065B4	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2065M1	NR	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2069M1	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2069M2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2132B1	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2132B2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2132B3	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2137B2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2137B3	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2137B4	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2147B1	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2147B2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2147B3	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2147B4	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2159B1	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M62/2159B2	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M621/1002B1	OFF	M62 J25 - J30	
14/09/15 10:20:39	SIG	M621/1002B2	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2106B2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2106B3	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2106B4	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2113B1	BLNK	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2113B2	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2113B3	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2113B4	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2117B3	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2120M1	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2120M2	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2125B1	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2125B2	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2125B3	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2125L1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2125L2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2177B1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2177B2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2177L1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2177L2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2183B1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2183B2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2183L1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2183L2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2189B1	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2189B2	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2189B3	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2189B4	NR	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2194B1	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2194B2	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2194B3	OFF	M62 J25 - J30	
14/09/15 10:21:38	SIG	M62/2194B4	OFF	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1968B1	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1968B2	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1968B3	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1968L1	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 10:21:39	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2050B2	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2050B3	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2050B4	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2065B2	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2065B3	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2065B4	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2065M1	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2081L1	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2088B1	BLNK	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2088B1	BLNK	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2088B2	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2088B3	OFF	M62 J25 - J30	
14/09/15 10:23:39	SIG	M62/2088B4	OFF	M62 J25 - J30	
14/09/15 10:23:40	SIG	M62/2065B1	BLNK	M62 J25 - J30	
14/09/15 10:24:38	SIG	M62/2106B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/1960B1	50R	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/1960B2	50R	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/1960B3	50R	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/1960L1	50R	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/1960L2	50R	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2097B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2097B3	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2097B4	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2106B1	BLNK	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2106B3	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2106B4	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2125L1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2125L2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2170B1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2170B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2177B1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2177B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2177L1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2177L2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2183B1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2183L1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2183L2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2189B1	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2189B2	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2189B3	OFF	M62 J25 - J30	
14/09/15 10:24:39	SIG	M62/2189B4	OFF	M62 J25 - J30	
14/09/15 10:24:40	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 10:27:39	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 10:29:39	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 10:29:39	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 10:29:39	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 10:29:39	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1960B1	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1960B2	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1960B3	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1960L1	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1960L2	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1968B1	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1968B2	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1968B3	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1968L1	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1974B1	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1974B2	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1974B3	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1974B4	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1974M1	60R	M62 J25 - J30	
14/09/15 10:30:39	SIG	M62/1974M2	60R	M62 J25 - J30	
14/09/15 10:39:39	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1987B1	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1987B2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1987B3	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1987B4	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1992B1	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1992B2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1992B3	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1992B4	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1999B1	BLNK	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1999B2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1999B3	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/1999B4	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2004B1	BLNK	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2004B2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2004B3	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2004B4	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2005M1	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2005M2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2012B1	BLNK	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2012B2	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2012B3	OFF	M62 J25 - J30	
14/09/15 10:39:39	SIG	M62/2012B4	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1960B1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1960B2	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1960B3	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1960L1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1960L2	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1968B1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1968B2	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1968B3	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1968L1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1974B1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1974B2	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1974B3	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1974B4	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1974M1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1974M2	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1981B1	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1981B2	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1981B3	OFF	M62 J25 - J30	
14/09/15 10:40:39	SIG	M62/1981B4	OFF	M62 J25 - J30	
14/09/15 11:00:59	SIG	M62/2025A1	HSD	M62 J25 - J30	
14/09/15 11:01:58	SIG	M62/2033A1	HSD	M62 J25 - J30	
14/09/15 11:02:58	SIG	M62/2041A1	HSD	M62 J25 - J30	
14/09/15 11:02:59	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 11:02:59	SIG	M62/2025A1	REDX	M62 J25 - J30	
14/09/15 11:04:06	SIG	M62/2033A1	REDX	M62 J25 - J30	
14/09/15 11:04:06	SIG	M62/2050A1	HSD	M62 J25 - J30	
14/09/15 11:04:58	SIG	M62/2041A1	REDX	M62 J25 - J30	
14/09/15 11:05:58	SIG	M62/2050A1	REDX	M62 J25 - J30	
14/09/15 11:06:58	SIG	M62/2025A2	NR	M62 J25 - J30	
14/09/15 11:06:58	SIG	M62/2025A3	NR	M62 J25 - J30	
14/09/15 11:06:58	SIG	M62/2025A4	NR	M62 J25 - J30	
14/09/15 11:06:58	SIG	M62/2033A2	NR	M62 J25 - J30	
14/09/15 11:06:58	SIG	M62/2033A3	NR	M62 J25 - J30	
14/09/15 11:06:58	SIG	M62/2033A4	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2041A2	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2041A3	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2041A4	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2050A2	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2050A3	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2050A4	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2057A1	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2057A2	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2057A3	NR	M62 J25 - J30	
14/09/15 11:06:59	SIG	M62/2057J1	NR	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2008K1	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2008K2	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2012A1	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2012A2	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2012A3	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2018A1	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2018A2	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2018A3	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2018A4	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2025A1	BLNK	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2025A2	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2025A3	OFF	M62 J25 - J30	
14/09/15 11:07:59	SIG	M62/2025A4	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2033A1	BLNK	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2033A2	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2033A3	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2033A4	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2041A1	BLNK	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2041A2	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2041A3	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2041A4	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2050A1	BLNK	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2050A2	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2050A3	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2050A4	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2057A1	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2057A2	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2057A3	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2057J1	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2065A1	BLNK	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2065A2	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2065A3	OFF	M62 J25 - J30	
14/09/15 11:08:00	SIG	M62/2065A4	OFF	M62 J25 - J30	
14/09/15 11:34:06	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 11:34:06	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 11:34:06	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2018B1	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2018B2	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2018B3	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 11:34:11	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 11:36:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:36:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:36:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:36:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2012B1	BLNK	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2012B2	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2012B3	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2012B4	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2025B2	NR	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2025B3	NR	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2025B4	NR	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 11:38:06	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2018B1	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2018B2	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2018B3	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2050B2	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2050B3	60R	M62 J25 - J30	
14/09/15 11:38:40	SIG	M62/2050B4	60R	M62 J25 - J30	
14/09/15 11:41:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:41:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:41:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 11:41:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2177B1	50R	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2177B2	50R	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2177L1	50R	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2177L2	50R	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2183B1	50R	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2183L1	50R	M62 J25 - J30	
14/09/15 12:08:48	SIG	M62/2183L2	50R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2177L1	40R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2183B1	40R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2183L1	40R	M62 J25 - J30	
14/09/15 12:08:53	SIG	M62/2183L2	40R	M62 J25 - J30	
14/09/15 12:08:59	SIG	M62/2177L1	30R	M62 J25 - J30	
14/09/15 12:08:59	SIG	M62/2183B1	30R	M62 J25 - J30	
14/09/15 12:08:59	SIG	M62/2183L1	30R	M62 J25 - J30	
14/09/15 12:08:59	SIG	M62/2183L2	30R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2177B1	40R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2177B2	40R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2177L1	20R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2177L2	40R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2183B1	30R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2183B2	50R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2183L1	30R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2183L2	30R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2189B1	50R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2189B2	50R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2189B3	50R	M62 J25 - J30	
14/09/15 12:09:04	SIG	M62/2189B4	50R	M62 J25 - J30	
14/09/15 12:09:09	SIG	M62/2177L1	STOP	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2012B1	BLNK	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2012B2	OFF	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2012B3	OFF	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2012B4	OFF	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2025B2	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2025B3	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2025B4	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2041B2	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2041B3	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2041B4	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2050B2	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2050B3	NR	M62 J25 - J30	
14/09/15 12:09:40	SIG	M62/2050B4	NR	M62 J25 - J30	
14/09/15 12:10:38	SIG	M62/2183L1	LDR	M62 J25 - J30	
14/09/15 12:11:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 12:11:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 12:11:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 12:11:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2170B1	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2170B2	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2177B1	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2177B2	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2177L1	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2177L2	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2183B1	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2183B2	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2183L1	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2183L2	NR	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2189B1	OFF	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2189B2	OFF	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2189B3	OFF	M62 J25 - J30	
14/09/15 12:11:53	SIG	M62/2189B4	OFF	M62 J25 - J30	
14/09/15 12:12:40	SIG	M62/2033B2	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2025B1	BLNK	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2025B2	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2025B3	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2025B4	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2033B4	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2041B3	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2041B4	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2050B2	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2050B3	OFF	M62 J25 - J30	
14/09/15 12:12:41	SIG	M62/2050B4	OFF	M62 J25 - J30	
14/09/15 12:12:42	SIG	M62/2025B1	BLNK	M62 J25 - J30	
14/09/15 12:12:42	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 12:14:53	SIG	M62/2183L1	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2170B1	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2170B2	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2177B1	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2177B2	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2177L1	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2177L2	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2183B1	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
14/09/15 12:14:54	SIG	M62/2183L2	OFF	M62 J25 - J30	
14/09/15 13:54:05	SIG	M621/1010B1	50R	M62 J25 - J30	
14/09/15 13:54:05	SIG	M621/1010B2	50R	M62 J25 - J30	
14/09/15 13:54:06	SIG	M62/2057B1	REDX	M62 J25 - J30	
14/09/15 13:54:06	SIG	M62/2057B2	NR	M62 J25 - J30	
14/09/15 13:54:06	SIG	M62/2057B3	NR	M62 J25 - J30	
14/09/15 13:54:06	SIG	M62/2057B4	NR	M62 J25 - J30	
14/09/15 13:54:06	SIG	M62/2065M1	50R	M62 J25 - J30	
14/09/15 13:54:06	SIG	M621/1002B1	HSD	M62 J25 - J30	
14/09/15 13:54:06	SIG	M621/1002B2	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2065B1	REDX	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2065B2	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2065B3	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2065B4	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2074B1	REDX	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2074B2	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2074B3	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2074B4	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2081B1	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2081B2	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2081B3	50R	M62 J25 - J30	
14/09/15 13:54:28	SIG	M62/2081L1	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2057A1	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2057A2	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2057A3	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2057J1	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2065A1	REDX	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2065A2	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2065A3	50R	M62 J25 - J30	
14/09/15 13:54:40	SIG	M62/2065A4	50R	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2073K1	50R	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2079A1	REDX	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2079A2	50R	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2079A3	50R	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2079A4	50R	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2088A1	REDX	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2088A2	NR	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2088A3	NR	M62 J25 - J30	
14/09/15 13:54:50	SIG	M62/2088A4	NR	M62 J25 - J30	
14/09/15 13:54:56	SIG	M621/1002A1	50R	M62 J25 - J30	
14/09/15 13:54:56	SIG	M621/1002A2	50R	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057A1	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057A2	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057A3	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2057J1	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065A1	BLNK	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065A2	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065A3	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065A4	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065B2	NR	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065B3	NR	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065B4	NR	M62 J25 - J30	
14/09/15 14:06:17	SIG	M62/2065M1	NR	M62 J25 - J30	
14/09/15 14:06:17	SIG	M621/1002A1	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M621/1002A2	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
14/09/15 14:06:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2073K1	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2074B1	BLNK	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2074B2	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2074B3	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2074B4	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2079A1	BLNK	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2079A2	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2079A3	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2079A4	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2081B1	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2081B2	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2081B3	OFF	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2081L1	NR	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2088A2	NR	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2088A3	NR	M62 J25 - J30	
14/09/15 14:06:26	SIG	M62/2088A4	NR	M62 J25 - J30	
14/09/15 14:06:26	SIG	M621/1010B1	NR	M62 J25 - J30	
14/09/15 14:06:26	SIG	M621/1010B2	NR	M62 J25 - J30	
14/09/15 14:09:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
14/09/15 14:09:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
14/09/15 14:09:18	SIG	M62/2065B3	OFF	M62 J25 - J30	
14/09/15 14:09:18	SIG	M62/2065B4	OFF	M62 J25 - J30	
14/09/15 14:09:18	SIG	M62/2065M1	OFF	M62 J25 - J30	
14/09/15 14:09:36	SIG	M62/2081L1	OFF	M62 J25 - J30	
14/09/15 14:09:36	SIG	M62/2088A2	OFF	M62 J25 - J30	
14/09/15 14:09:36	SIG	M62/2088A3	OFF	M62 J25 - J30	
14/09/15 14:09:36	SIG	M62/2088A4	OFF	M62 J25 - J30	
14/09/15 14:09:36	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 14:09:36	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 14:09:37	SIG	M62/2088A1	BLNK	M62 J25 - J30	
14/09/15 14:09:37	SIG	M62/2088A1	BLNK	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1968A1	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1968A2	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1968A3	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1968A4	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 14:50:03	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1960A1	50R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1960A2	50R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1960A3	50R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1960K1	50R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1960K2	50R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1968A1	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1968A2	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1968A3	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1968A4	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1974A1	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1974A2	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1974A3	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1974A4	40R	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1981A1	NR	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1981A2	NR	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1981A3	NR	M62 J25 - J30	
14/09/15 14:50:09	SIG	M62/1981A4	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1960A1	OFF	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1960A2	OFF	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1960A3	OFF	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1960K1	OFF	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1960K2	OFF	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1968A1	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1968A2	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1968A3	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1968A4	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1974A1	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1974A2	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1974A3	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1974A4	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1981A1	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1981A2	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1981A3	NR	M62 J25 - J30	
14/09/15 14:52:26	SIG	M62/1981A4	NR	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1955K1	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1955K2	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1956A1	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1956A2	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1956A3	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1960A1	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1960A2	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1960A3	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1960K1	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1960K2	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1968A1	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1968A2	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1968A3	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1968A4	60R	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1974A1	NR	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1974A2	NR	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1974A3	NR	M62 J25 - J30	
14/09/15 14:52:43	SIG	M62/1974A4	NR	M62 J25 - J30	
14/09/15 14:55:26	SIG	M62/1981A1	OFF	M62 J25 - J30	
14/09/15 14:55:27	SIG	M62/1981A2	OFF	M62 J25 - J30	
14/09/15 14:55:27	SIG	M62/1981A3	OFF	M62 J25 - J30	
14/09/15 14:55:27	SIG	M62/1981A4	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1955K1	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1955K2	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1956A1	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1956A2	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1956A3	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1960A1	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1960A2	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1960A3	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1960K1	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1960K2	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1968A1	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1968A2	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1968A3	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1968A4	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1974A1	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1974A2	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1974A3	OFF	M62 J25 - J30	
14/09/15 15:00:43	SIG	M62/1974A4	OFF	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2050B2	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2050B3	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2050B4	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2057B1	REDX	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2057B2	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2057B3	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2057B4	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2065B1	REDX	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2065B2	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2065B3	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2065B4	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2065M1	NR	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2065M1	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2069M1	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M62/2069M2	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M621/1002B1	HSD	M62 J25 - J30	
14/09/15 15:09:39	SIG	M621/1002B2	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M621/1010B1	60R	M62 J25 - J30	
14/09/15 15:09:39	SIG	M621/1010B2	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 15:09:40	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 15:10:58	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 15:11:21	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 15:11:42	SIG	M62/2041B1	60R	M62 J25 - J30	
14/09/15 15:11:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 15:11:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 15:11:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 15:11:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 15:12:02	SIG	M62/2057B1	60R	M62 J25 - J30	
14/09/15 15:12:02	SIG	M621/1002B1	60R	M62 J25 - J30	
14/09/15 15:12:02	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 15:12:02	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2033A1	REDX	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2041A1	REDX	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2041A2	60R	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2041A3	60R	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2041A4	60R	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2050A1	REDX	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2050A2	NR	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2050A3	NR	M62 J25 - J30	
14/09/15 15:35:29	SIG	M62/2050A4	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2033A2	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2033A3	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2033A4	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2041A2	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2041A3	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2041A4	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2050A2	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2050A3	NR	M62 J25 - J30	
14/09/15 15:38:17	SIG	M62/2050A4	NR	M62 J25 - J30	
14/09/15 15:41:17	SIG	M62/2041A2	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2033A1	BLNK	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2033A1	BLNK	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2033A2	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2033A3	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2033A4	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2041A1	BLNK	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2041A3	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2041A4	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2050A1	BLNK	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2050A1	BLNK	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2050A2	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2050A3	OFF	M62 J25 - J30	
14/09/15 15:41:18	SIG	M62/2050A4	OFF	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2008K1	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2008K2	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2012A1	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2012A2	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2012A3	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2018A2	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2018A3	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2018A4	60R	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2025A1	REDX	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2025A2	NR	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2025A3	NR	M62 J25 - J30	
14/09/15 16:10:41	SIG	M62/2025A4	NR	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2012A1	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2025A2	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2025A3	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2025A4	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2033A1	REDX	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2033A2	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2033A3	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2033A4	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2041A1	REDX	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2041A2	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2041A3	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2041A4	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2050A1	REDX	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2050A2	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2050A3	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2050A4	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2057A1	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2057A2	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2057A3	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2057J1	60R	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2065A1	REDX	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2065A2	NR	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2065A3	NR	M62 J25 - J30	
14/09/15 16:10:42	SIG	M62/2065A4	NR	M62 J25 - J30	
14/09/15 16:12:11	SIG	M62/2050A1	60R	M62 J25 - J30	
14/09/15 16:12:32	SIG	M62/2041A1	60R	M62 J25 - J30	
14/09/15 16:12:52	SIG	M62/2033A1	60R	M62 J25 - J30	
14/09/15 16:12:55	SIG	M62/2018A1	60R	M62 J25 - J30	
14/09/15 16:12:55	SIG	M62/2025A1	60R	M62 J25 - J30	
14/09/15 16:15:44	SIG	M62/2074B1	REDX	M62 J25 - J30	
14/09/15 16:15:44	SIG	M62/2074B2	60R	M62 J25 - J30	
14/09/15 16:15:44	SIG	M62/2074B3	60R	M62 J25 - J30	
14/09/15 16:15:44	SIG	M62/2074B4	60R	M62 J25 - J30	
14/09/15 16:15:44	SIG	M621/1010B1	60R	M62 J25 - J30	
14/09/15 16:15:44	SIG	M621/1010B2	60R	M62 J25 - J30	
14/09/15 16:24:16	SIG	M62/2065A2	60R	M62 J25 - J30	
14/09/15 16:24:16	SIG	M62/2065A3	60R	M62 J25 - J30	
14/09/15 16:24:16	SIG	M62/2065A4	60R	M62 J25 - J30	
14/09/15 16:24:25	SIG	M62/2073K1	60R	M62 J25 - J30	
14/09/15 16:24:25	SIG	M62/2079A1	REDX	M62 J25 - J30	
14/09/15 16:24:25	SIG	M62/2079A2	NR	M62 J25 - J30	
14/09/15 16:24:25	SIG	M62/2079A3	NR	M62 J25 - J30	
14/09/15 16:24:25	SIG	M62/2079A4	NR	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2079A2	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2079A3	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2079A4	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2088A1	REDX	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2088A2	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2088A3	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2088A4	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2097A1	REDX	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2097A2	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2097A3	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2097A4	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2106A1	REDX	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2106A2	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2106A3	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2106A4	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2114A1	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2114A2	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2114A3	60R	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2117A1	REDX	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2117A2	NR	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2117A3	NR	M62 J25 - J30	
14/09/15 16:24:36	SIG	M62/2117A4	NR	M62 J25 - J30	
14/09/15 16:25:31	SIG	M62/2106A1	60R	M62 J25 - J30	
14/09/15 16:25:50	SIG	M62/2097A1	60R	M62 J25 - J30	
14/09/15 16:26:11	SIG	M62/2088A1	60R	M62 J25 - J30	
14/09/15 16:26:14	SIG	M62/2079A1	60R	M62 J25 - J30	
14/09/15 16:26:57	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 16:26:58	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 16:26:58	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 16:26:59	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2170A1	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2170A2	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2170K1	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2170K2	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A1	REDX	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A2	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A2	NR	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A3	NR	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A3	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A4	NR	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2177A4	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2183A1	REDX	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2183A2	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2183A3	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2183A4	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2189A1	REDX	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2189A2	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2189A3	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2189A4	60R	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2197A1	NR	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2197A2	NR	M62 J25 - J30	
14/09/15 16:31:32	SIG	M62/2197A3	NR	M62 J25 - J30	
14/09/15 16:32:26	SIG	M62/2189A1	60R	M62 J25 - J30	
14/09/15 16:32:41	SIG	M62/2183A1	60R	M62 J25 - J30	
14/09/15 16:32:45	SIG	M62/2177A1	60R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/1999A1	60R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/1999A2	60R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/1999A3	60R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/2004A1	60R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/2004A2	60R	M62 J25 - J30	
14/09/15 16:51:45	SIG	M62/2004A3	60R	M62 J25 - J30	
14/09/15 16:52:54	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 16:52:54	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 16:52:54	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 16:52:54	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 16:53:00	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 16:54:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:55:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:55:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:55:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 16:56:55	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 16:59:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:59:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:59:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 16:59:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:00:11	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 17:00:11	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 17:00:11	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 17:00:11	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:00:16	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 17:03:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:03:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:03:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:03:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 17:04:11	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 17:07:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:07:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:07:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:07:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:10:14	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 17:10:14	SIG	M62/2113B2	NR	M62 J25 - J30	
14/09/15 17:10:14	SIG	M62/2113B3	NR	M62 J25 - J30	
14/09/15 17:10:14	SIG	M62/2113B4	NR	M62 J25 - J30	
14/09/15 17:10:14	SIG	M62/2120M1	60R	M62 J25 - J30	
14/09/15 17:10:14	SIG	M62/2120M2	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2081B1	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2081B2	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2081B3	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2081L1	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2088B1	REDX	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2088B2	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2088B3	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2088B4	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2097B2	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2097B3	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2097B4	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2106B2	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2106B3	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2106B4	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2113B2	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2113B3	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2113B4	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2117B1	60R	M62 J25 - J30	
14/09/15 17:10:15	SIG	M62/2117B3	60R	M62 J25 - J30	
14/09/15 17:11:21	SIG	M62/2088B1	60R	M62 J25 - J30	
14/09/15 17:11:39	SIG	M62/2097B1	60R	M62 J25 - J30	
14/09/15 17:12:06	SIG	M62/2106B1	60R	M62 J25 - J30	
14/09/15 17:12:10	SIG	M62/2113B1	60R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 17:14:21	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:14:27	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 17:15:30	SIG	M62/1968B1	50R	M62 J25 - J30	
14/09/15 17:15:30	SIG	M62/1968B2	50R	M62 J25 - J30	
14/09/15 17:15:30	SIG	M62/1968B3	50R	M62 J25 - J30	
14/09/15 17:15:30	SIG	M62/1968L1	50R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1960B1	60R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1960B2	60R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1960B3	60R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1960L1	NR	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1960L2	NR	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1968B1	40R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1968B2	40R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1968B3	40R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1968L1	40R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 17:15:35	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 17:15:45	SIG	M62/2004A1	OFF	M62 J25 - J30	
14/09/15 17:15:45	SIG	M62/2004A2	OFF	M62 J25 - J30	
14/09/15 17:15:45	SIG	M62/2004A3	OFF	M62 J25 - J30	
14/09/15 17:15:46	SIG	M62/1999A1	OFF	M62 J25 - J30	
14/09/15 17:15:46	SIG	M62/1999A2	OFF	M62 J25 - J30	
14/09/15 17:15:46	SIG	M62/1999A3	OFF	M62 J25 - J30	
14/09/15 17:15:46	SIG	M62/1999J1	OFF	M62 J25 - J30	
14/09/15 17:15:46	SIG	M62/1999J2	OFF	M62 J25 - J30	
14/09/15 17:16:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:16:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:16:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:16:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1974B1	40R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1974B2	40R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1974B3	40R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1974B4	40R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1974M1	40R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1974M2	40R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 17:17:08	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 17:18:39	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 17:18:39	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 17:18:39	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 17:18:39	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 17:18:48	SIG	M62/2033B1	40R	M62 J25 - J30	
14/09/15 17:18:48	SIG	M62/2033B2	40R	M62 J25 - J30	
14/09/15 17:18:48	SIG	M62/2033B4	40R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2033B1	40R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2033B2	40R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2033B4	40R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 17:18:54	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 17:21:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:21:34	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:21:40	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M606/2003B1	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M606/2003B2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1987B1	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1987B2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1987B3	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1987B4	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1992B1	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1992B2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1992B3	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1992B4	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1999B1	REDX	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1999B2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1999B3	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/1999B4	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2004B1	REDX	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2004B2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2004B3	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2004B4	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2005M1	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2005M2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2012B2	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2012B3	60R	M62 J25 - J30	
14/09/15 17:22:46	SIG	M62/2012B4	60R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 17:23:56	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 17:24:37	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:24:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1974B1	40R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1974B2	40R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1974B3	40R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1974B4	40R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1974M1	40R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1974M2	40R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 17:24:42	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 17:24:43	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:26:46	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 17:26:46	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 17:26:46	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 17:26:46	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 17:27:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:27:41	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:27:47	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:27:51	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 17:27:51	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 17:27:51	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 17:27:51	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 17:27:57	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 17:27:57	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 17:27:57	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 17:27:57	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 17:28:21	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 17:28:21	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 17:28:21	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 17:28:21	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 17:28:26	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 17:28:26	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 17:28:26	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 17:28:26	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 17:30:45	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:30:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:30:51	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:32:19	SIG	M62/2041B1	40R	M62 J25 - J30	
14/09/15 17:32:19	SIG	M62/2041B2	40R	M62 J25 - J30	
14/09/15 17:32:19	SIG	M62/2041B3	40R	M62 J25 - J30	
14/09/15 17:32:19	SIG	M62/2041B4	40R	M62 J25 - J30	
14/09/15 17:33:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:33:49	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:33:54	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1981B1	40R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1981B2	40R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1981B3	40R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1981B4	40R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1987B1	50R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1987B2	50R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1987B3	50R	M62 J25 - J30	
14/09/15 17:35:02	SIG	M62/1987B4	50R	M62 J25 - J30	
14/09/15 17:35:56	SIG	M62/1968B1	60R	M62 J25 - J30	
14/09/15 17:35:56	SIG	M62/1968B2	60R	M62 J25 - J30	
14/09/15 17:35:56	SIG	M62/1968B3	60R	M62 J25 - J30	
14/09/15 17:35:56	SIG	M62/1968L1	60R	M62 J25 - J30	
14/09/15 17:36:21	SIG	M62/1968B1	50R	M62 J25 - J30	
14/09/15 17:36:21	SIG	M62/1968B2	50R	M62 J25 - J30	
14/09/15 17:36:21	SIG	M62/1968B3	50R	M62 J25 - J30	
14/09/15 17:36:21	SIG	M62/1968L1	50R	M62 J25 - J30	
14/09/15 17:36:26	SIG	M62/1968B1	40R	M62 J25 - J30	
14/09/15 17:36:26	SIG	M62/1968B2	40R	M62 J25 - J30	
14/09/15 17:36:26	SIG	M62/1968B3	40R	M62 J25 - J30	
14/09/15 17:36:26	SIG	M62/1968L1	40R	M62 J25 - J30	
14/09/15 17:36:52	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:36:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:36:58	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1987B1	60R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1987B2	60R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1987B3	60R	M62 J25 - J30	
14/09/15 17:39:02	SIG	M62/1987B4	60R	M62 J25 - J30	
14/09/15 17:39:56	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:39:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:40:01	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:42:30	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 17:42:30	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 17:42:30	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 17:42:30	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 17:42:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:43:00	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:43:05	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:43:59	SIG	M62/2041B1	40R	M62 J25 - J30	
14/09/15 17:43:59	SIG	M62/2041B2	40R	M62 J25 - J30	
14/09/15 17:43:59	SIG	M62/2041B3	40R	M62 J25 - J30	
14/09/15 17:43:59	SIG	M62/2041B4	40R	M62 J25 - J30	
14/09/15 17:44:20	SIG	M62/1968B1	60R	M62 J25 - J30	
14/09/15 17:44:20	SIG	M62/1968B2	60R	M62 J25 - J30	
14/09/15 17:44:20	SIG	M62/1968B3	60R	M62 J25 - J30	
14/09/15 17:44:20	SIG	M62/1968L1	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1974B1	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1974B2	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1974B3	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1974B4	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1974M1	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1974M2	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 17:44:34	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 17:45:30	SIG	M62/1968B1	50R	M62 J25 - J30	
14/09/15 17:45:30	SIG	M62/1968B2	50R	M62 J25 - J30	
14/09/15 17:45:30	SIG	M62/1968B3	50R	M62 J25 - J30	
14/09/15 17:45:30	SIG	M62/1968L1	50R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1968B1	40R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1968B2	40R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1968B3	40R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1968L1	40R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 17:45:35	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 17:46:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:46:04	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:46:09	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1974B1	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1974B2	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1974B3	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1974B4	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1974M1	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1974M2	40R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 17:46:58	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 17:47:59	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 17:47:59	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 17:47:59	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 17:47:59	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 17:49:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:49:08	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:49:13	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:50:11	SIG	M62/2041B1	40R	M62 J25 - J30	
14/09/15 17:50:11	SIG	M62/2041B2	40R	M62 J25 - J30	
14/09/15 17:50:11	SIG	M62/2041B3	40R	M62 J25 - J30	
14/09/15 17:50:11	SIG	M62/2041B4	40R	M62 J25 - J30	
14/09/15 17:51:45	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 17:51:45	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 17:51:45	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 17:51:45	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 17:52:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:52:11	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:52:16	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:52:46	SIG	M62/2050B2	50R	M62 J25 - J30	
14/09/15 17:52:46	SIG	M62/2050B3	50R	M62 J25 - J30	
14/09/15 17:52:46	SIG	M62/2050B4	50R	M62 J25 - J30	
14/09/15 17:54:15	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 17:54:15	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 17:54:15	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 17:54:15	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 17:54:20	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 17:54:20	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 17:54:20	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 17:54:20	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 17:54:30	SIG	M62/2041B1	50R	M62 J25 - J30	
14/09/15 17:54:30	SIG	M62/2041B2	50R	M62 J25 - J30	
14/09/15 17:54:30	SIG	M62/2041B3	50R	M62 J25 - J30	
14/09/15 17:54:30	SIG	M62/2041B4	50R	M62 J25 - J30	
14/09/15 17:55:01	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 17:55:01	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 17:55:01	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:55:01	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 17:55:36	SIG	M62/2033B1	40R	M62 J25 - J30	
14/09/15 17:55:36	SIG	M62/2033B2	40R	M62 J25 - J30	
14/09/15 17:55:36	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:55:36	SIG	M62/2033B4	40R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 17:55:51	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 17:58:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 17:58:22	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1974B1	40R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1974B2	40R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1974B3	40R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1974B4	40R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1974M1	40R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1974M2	40R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 17:58:25	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 17:58:28	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 17:58:28	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 17:58:28	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 17:58:28	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 17:58:28	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 17:59:04	SIG	M62/2050B2	40R	M62 J25 - J30	
14/09/15 17:59:04	SIG	M62/2050B3	40R	M62 J25 - J30	
14/09/15 17:59:04	SIG	M62/2050B4	40R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2050B2	40R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2050B3	40R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2050B4	40R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2057B1	LDR	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2057B2	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2057B3	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2057B4	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2065B2	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2065B3	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2065B4	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M62/2065M1	50R	M62 J25 - J30	
14/09/15 17:59:15	SIG	M621/1002B1	LDR	M62 J25 - J30	
14/09/15 17:59:15	SIG	M621/1002B2	50R	M62 J25 - J30	
14/09/15 17:59:52	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 17:59:52	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 17:59:52	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 17:59:52	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 17:59:57	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 17:59:57	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 17:59:57	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 17:59:57	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 18:01:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:01:23	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 18:01:29	SIG	M62/2033B3	40R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2050B2	50R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2050B3	50R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2050B4	50R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2057B1	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2057B2	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2057B3	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2057B4	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2065B2	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2065B3	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2065B4	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M62/2065M1	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M621/1002B1	60R	M62 J25 - J30	
14/09/15 18:02:14	SIG	M621/1002B2	60R	M62 J25 - J30	
14/09/15 18:03:37	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 18:03:37	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 18:03:37	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 18:03:37	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 18:04:16	SIG	M62/2018B1	60R	M62 J25 - J30	
14/09/15 18:04:16	SIG	M62/2018B2	60R	M62 J25 - J30	
14/09/15 18:04:16	SIG	M62/2018B3	60R	M62 J25 - J30	
14/09/15 18:04:16	SIG	M62/2018L1	60R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 18:04:39	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2041B1	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2050B2	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2050B3	60R	M62 J25 - J30	
14/09/15 18:04:47	SIG	M62/2050B4	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 18:05:13	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1974B1	40R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1974B2	40R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1974B3	40R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1974B4	40R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1974M1	40R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1974M2	40R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1981B1	50R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1981B2	50R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1981B3	50R	M62 J25 - J30	
14/09/15 18:05:40	SIG	M62/1981B4	50R	M62 J25 - J30	
14/09/15 18:07:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:07:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:07:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:07:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:07:53	SIG	M62/2025B1	50R	M62 J25 - J30	
14/09/15 18:07:53	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 18:07:53	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 18:07:53	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2025B1	40R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2025B2	40R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2025B3	40R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2025B4	40R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2033B1	50R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 18:07:58	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 18:10:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:10:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:10:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:10:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2025B1	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2025B2	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2025B3	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2025B4	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2033B1	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2033B2	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2033B3	60R	M62 J25 - J30	
14/09/15 18:11:53	SIG	M62/2033B4	60R	M62 J25 - J30	
14/09/15 18:14:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:14:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:14:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:14:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1974B1	50R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1974B2	50R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1974B3	50R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1974B4	50R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1974M1	50R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1974M2	50R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1981B1	60R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1981B2	60R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1981B3	60R	M62 J25 - J30	
14/09/15 18:15:41	SIG	M62/1981B4	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1968B1	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1968B2	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1968B3	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1968L1	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1974B1	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1974B2	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1974B3	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1974B4	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1974M1	60R	M62 J25 - J30	
14/09/15 18:16:41	SIG	M62/1974M2	60R	M62 J25 - J30	
14/09/15 18:21:47	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 18:21:47	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/1999B2	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/1999B3	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/1999B4	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2004B2	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2004B3	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2004B4	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2005M1	OFF	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2005M2	OFF	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 18:21:47	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/1999B1	BLNK	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/1999B2	OFF	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/1999B3	OFF	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/1999B4	OFF	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/2004B1	BLNK	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/2004B2	OFF	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/2004B3	OFF	M62 J25 - J30	
14/09/15 18:24:48	SIG	M62/2004B4	OFF	M62 J25 - J30	
14/09/15 18:25:47	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 18:25:47	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1960B1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1960B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1960B3	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1960L1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1960L2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1968B1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1968B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1968B3	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1968L1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1974B1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1974B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1974B3	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1974B4	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1974M1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1974M2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1981B1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1981B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1981B3	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1981B4	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1987B1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1987B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1987B3	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1987B4	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1992B1	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1992B2	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1992B3	OFF	M62 J25 - J30	
14/09/15 18:26:47	SIG	M62/1992B4	OFF	M62 J25 - J30	
14/09/15 18:27:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 18:29:27	SIG	M62/2177A1	HSD	M62 J25 - J30	
14/09/15 18:30:12	SIG	M62/2183A1	HSD	M62 J25 - J30	
14/09/15 18:30:57	SIG	M62/2177A1	REDX	M62 J25 - J30	
14/09/15 18:30:57	SIG	M62/2189A1	HSD	M62 J25 - J30	
14/09/15 18:31:57	SIG	M62/2183A1	REDX	M62 J25 - J30	
14/09/15 18:32:57	SIG	M62/2170A1	NR	M62 J25 - J30	
14/09/15 18:32:57	SIG	M62/2170A2	NR	M62 J25 - J30	
14/09/15 18:32:57	SIG	M62/2170K1	NR	M62 J25 - J30	
14/09/15 18:32:57	SIG	M62/2170K2	NR	M62 J25 - J30	
14/09/15 18:32:57	SIG	M62/2189A1	REDX	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2177A2	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2177A3	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2177A4	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2183A2	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2183A3	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2183A4	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2189A2	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2189A3	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2189A4	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2197A1	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2197A2	NR	M62 J25 - J30	
14/09/15 18:32:58	SIG	M62/2197A3	NR	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2170A1	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2170A2	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2170K1	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2170K2	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2177A1	BLNK	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2177A2	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2177A3	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2177A4	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2183A1	BLNK	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2183A2	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2183A3	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2183A4	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2189A1	BLNK	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2189A2	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2189A3	OFF	M62 J25 - J30	
14/09/15 18:33:58	SIG	M62/2189A4	OFF	M62 J25 - J30	
14/09/15 18:34:47	SIG	M62/2079A1	HSD	M62 J25 - J30	
14/09/15 18:35:58	SIG	M62/2197A1	OFF	M62 J25 - J30	
14/09/15 18:35:58	SIG	M62/2197A2	OFF	M62 J25 - J30	
14/09/15 18:35:58	SIG	M62/2197A3	OFF	M62 J25 - J30	
14/09/15 18:36:04	SIG	M62/2088A1	HSD	M62 J25 - J30	
14/09/15 18:37:03	SIG	M62/2079A1	REDX	M62 J25 - J30	
14/09/15 18:37:03	SIG	M62/2097A1	HSD	M62 J25 - J30	
14/09/15 18:38:12	SIG	M62/2088A1	REDX	M62 J25 - J30	
14/09/15 18:38:12	SIG	M62/2106A1	HSD	M62 J25 - J30	
14/09/15 18:39:20	SIG	M62/2097A1	REDX	M62 J25 - J30	
14/09/15 18:40:27	SIG	M62/2106A1	REDX	M62 J25 - J30	
14/09/15 18:41:28	SIG	M62/2065A2	NR	M62 J25 - J30	
14/09/15 18:41:28	SIG	M62/2065A3	NR	M62 J25 - J30	
14/09/15 18:41:28	SIG	M62/2065A4	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2073K1	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2079A2	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2079A3	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2079A4	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2088A2	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2088A3	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2088A4	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2097A2	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2097A3	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2097A4	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2106A2	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2106A3	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2106A4	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2114A1	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2114A2	NR	M62 J25 - J30	
14/09/15 18:41:48	SIG	M62/2114A3	NR	M62 J25 - J30	
14/09/15 18:42:37	SIG	M62/2073K1	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2079A1	BLNK	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2079A2	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2079A3	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2079A4	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2088A1	BLNK	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2088A2	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2088A3	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2088A4	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2097A1	BLNK	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2097A2	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2097A3	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2097A4	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2106A1	BLNK	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2106A2	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2106A3	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2106A4	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2114A1	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2114A2	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2114A3	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2117A1	BLNK	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2117A2	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2117A3	OFF	M62 J25 - J30	
14/09/15 18:42:56	SIG	M62/2117A4	OFF	M62 J25 - J30	
14/09/15 18:47:57	SIG	M62/2113B1	HSD	M62 J25 - J30	
14/09/15 18:48:50	SIG	M62/2106B1	HSD	M62 J25 - J30	
14/09/15 18:49:59	SIG	M62/2097B1	HSD	M62 J25 - J30	
14/09/15 18:49:59	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 18:51:06	SIG	M62/2088B1	HSD	M62 J25 - J30	
14/09/15 18:51:07	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 18:52:15	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 18:53:23	SIG	M62/2088B1	REDX	M62 J25 - J30	
14/09/15 18:54:15	SIG	M62/2117B1	NR	M62 J25 - J30	
14/09/15 18:54:15	SIG	M62/2117B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2074B2	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2074B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2074B4	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2081B1	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2081B2	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2081B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2081L1	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2088B2	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2088B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2088B4	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2106B2	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2106B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2106B4	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2113B2	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2113B3	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2113B4	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2120M1	NR	M62 J25 - J30	
14/09/15 18:54:16	SIG	M62/2120M2	NR	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2097B2	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2097B3	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2097B4	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2106B1	BLNK	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2106B2	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2113B1	BLNK	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2113B2	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2113B3	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2113B4	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2117B3	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2120M1	OFF	M62 J25 - J30	
14/09/15 18:55:16	SIG	M62/2120M2	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2074B1	BLNK	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2074B2	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2074B3	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2074B4	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2081B1	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2081B2	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2081B3	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2081L1	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2088B1	BLNK	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2088B2	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2088B3	OFF	M62 J25 - J30	
14/09/15 18:55:17	SIG	M62/2088B4	OFF	M62 J25 - J30	
14/09/15 18:56:37	SIG	M62/2025A1	HSD	M62 J25 - J30	
14/09/15 18:57:37	SIG	M62/2033A1	HSD	M62 J25 - J30	
14/09/15 18:58:37	SIG	M62/2041A1	HSD	M62 J25 - J30	
14/09/15 18:58:38	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 18:58:38	SIG	M62/2025A1	REDX	M62 J25 - J30	
14/09/15 18:59:44	SIG	M62/2033A1	REDX	M62 J25 - J30	
14/09/15 18:59:44	SIG	M62/2050A1	HSD	M62 J25 - J30	
14/09/15 19:00:36	SIG	M62/2041A1	REDX	M62 J25 - J30	
14/09/15 19:01:36	SIG	M62/2050A1	REDX	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2025A2	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2025A3	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2025A4	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2033A2	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2033A3	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2033A4	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2041A2	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2041A3	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2041A4	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2050A2	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2050A3	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2050A4	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2057A1	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2057A2	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2057A3	NR	M62 J25 - J30	
14/09/15 19:02:37	SIG	M62/2057J1	NR	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2008K1	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2008K2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2012A1	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2012A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2012A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2018A1	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2018A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2018A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2018A4	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2025A1	BLNK	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2025A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2025A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2025A4	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2033A1	BLNK	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2033A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2033A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2033A4	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2041A1	BLNK	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2041A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2041A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2041A4	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2050A1	BLNK	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2050A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2050A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2050A4	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2057A1	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2057A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2057A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2057J1	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2065A1	BLNK	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2065A2	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2065A3	OFF	M62 J25 - J30	
14/09/15 19:03:37	SIG	M62/2065A4	OFF	M62 J25 - J30	
14/09/15 19:04:34	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 19:04:34	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 19:05:49	SIG	M62/2057B1	HSD	M62 J25 - J30	
14/09/15 19:07:47	SIG	M62/2041B1	HSD	M62 J25 - J30	
14/09/15 19:07:48	SIG	M62/2057B1	REDX	M62 J25 - J30	
14/09/15 19:07:48	SIG	M621/1002B1	HSD	M62 J25 - J30	
14/09/15 19:07:48	SIG	M621/1010B1	60R	M62 J25 - J30	
14/09/15 19:07:48	SIG	M621/1010B2	60R	M62 J25 - J30	
14/09/15 19:08:48	SIG	M62/2033B1	HSD	M62 J25 - J30	
14/09/15 19:09:48	SIG	M62/2025B1	HSD	M62 J25 - J30	
14/09/15 19:09:48	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 19:10:40	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 19:11:24	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2041B2	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2041B3	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2041B4	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2050B2	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2050B3	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2050B4	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2057B2	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2057B3	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2057B4	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2065B2	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2065B3	NR	M62 J25 - J30	
14/09/15 19:11:54	SIG	M62/2065B4	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2018B1	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2018B2	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2018B3	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2018L1	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2025B2	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2025B3	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2025B4	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2033B2	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2033B3	NR	M62 J25 - J30	
14/09/15 19:11:55	SIG	M62/2033B4	NR	M62 J25 - J30	
14/09/15 19:12:54	SIG	M62/2069M1	OFF	M62 J25 - J30	
14/09/15 19:12:54	SIG	M62/2069M2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2033B2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2033B4	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2041B3	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2041B4	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2050B2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2050B3	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2050B4	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2057B1	BLNK	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2057B2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2057B3	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2057B4	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2065B1	BLNK	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2065B2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2065B3	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2065B4	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M62/2065M1	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M621/1002B1	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M621/1002B2	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
14/09/15 19:12:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2012B1	BLNK	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2012B2	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2012B3	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2012B4	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2025B1	BLNK	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2025B2	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2025B3	OFF	M62 J25 - J30	
14/09/15 19:12:56	SIG	M62/2025B4	OFF	M62 J25 - J30	
14/09/15 19:40:09	SIG	M62/2065A1	REDX	M62 J25 - J30	
14/09/15 19:40:09	SIG	M62/2065A2	50R	M62 J25 - J30	
14/09/15 19:40:09	SIG	M62/2065A3	50R	M62 J25 - J30	
14/09/15 19:40:09	SIG	M62/2065A4	50R	M62 J25 - J30	
14/09/15 19:40:19	SIG	M62/2073K1	50R	M62 J25 - J30	
14/09/15 19:45:30	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 19:45:30	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 19:56:05	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 19:56:05	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 19:56:05	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 19:56:05	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 19:56:10	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 19:56:10	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 19:56:10	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 19:56:10	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 19:56:15	SIG	M62/2018L1	30R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2018L1	20R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 19:56:21	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 19:56:26	SIG	M62/2018L1	STOP	M62 J25 - J30	
14/09/15 19:56:26	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 19:56:26	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 19:56:26	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 19:56:26	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 19:58:47	SIG	M62/2033B3	???	M62 J25 - J30	
14/09/15 19:58:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2177A1	REDX	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2177A2	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2177A3	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2177A4	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2183A1	REDX	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2183A2	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2183A3	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2183A4	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2189A1	REDX	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2189A2	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2189A3	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2189A4	50R	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2197A1	NR	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2197A2	NR	M62 J25 - J30	
14/09/15 19:59:22	SIG	M62/2197A3	NR	M62 J25 - J30	
14/09/15 19:59:53	SIG	M62/2197A1	OFF	M62 J25 - J30	
14/09/15 19:59:53	SIG	M62/2197A2	OFF	M62 J25 - J30	
14/09/15 19:59:53	SIG	M62/2197A3	OFF	M62 J25 - J30	
14/09/15 20:07:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 20:07:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 20:07:49	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 20:07:49	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 20:07:49	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1987A1	NR	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1987A3	NR	M62 J25 - J30	
14/09/15 20:12:14	SIG	M62/1987J1	NR	M62 J25 - J30	
14/09/15 20:12:31	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 20:12:31	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 20:12:31	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 20:12:31	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 20:12:31	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 20:12:31	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 20:12:36	SIG	M62/1981A1	30R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1968A1	60R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1968A2	60R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1968A3	60R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1968A4	60R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1974A1	LDR	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1981A1	20R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 20:12:41	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 20:12:47	SIG	M62/1981A1	STOP	M62 J25 - J30	
14/09/15 20:13:06	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 20:13:06	SIG	M62/1987A2	50R	M62 J25 - J30	
14/09/15 20:13:06	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 20:13:06	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 20:13:22	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 20:13:22	SIG	M62/1987A2	40R	M62 J25 - J30	
14/09/15 20:13:22	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 20:13:22	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 20:13:27	SIG	M62/1987J1	30R	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1987J1	20R	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1992A1	NR	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1992A2	NR	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1992A3	NR	M62 J25 - J30	
14/09/15 20:13:32	SIG	M62/1992J1	NR	M62 J25 - J30	
14/09/15 20:13:37	SIG	M62/1987J1	STOP	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2132B1	50R	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2132B2	50R	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2132B3	50R	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2137B1	50R	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2137B2	50R	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2137B3	50R	M62 J25 - J30	
14/09/15 20:21:36	SIG	M62/2137B4	50R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2132B1	40R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2132B2	40R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2132B3	40R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2137B1	40R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2137B2	40R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2137B3	40R	M62 J25 - J30	
14/09/15 20:21:41	SIG	M62/2137B4	40R	M62 J25 - J30	
14/09/15 20:21:49	SIG	M62/1960A1	60R	M62 J25 - J30	
14/09/15 20:21:49	SIG	M62/1960A2	60R	M62 J25 - J30	
14/09/15 20:21:49	SIG	M62/1960A3	60R	M62 J25 - J30	
14/09/15 20:21:49	SIG	M62/1960K1	60R	M62 J25 - J30	
14/09/15 20:21:49	SIG	M62/1960K2	60R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2125B1	NR	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2125B2	NR	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2125B3	NR	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2125L1	NR	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2125L2	NR	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2132B1	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2132B2	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2132B3	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2137B1	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2137B2	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2137B3	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2137B4	40R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2147B1	60R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2147B2	60R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2147B3	60R	M62 J25 - J30	
14/09/15 20:21:51	SIG	M62/2147B4	60R	M62 J25 - J30	
14/09/15 20:22:02	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 20:22:02	SIG	M62/2113B2	50R	M62 J25 - J30	
14/09/15 20:22:02	SIG	M62/2113B3	50R	M62 J25 - J30	
14/09/15 20:22:02	SIG	M62/2113B4	50R	M62 J25 - J30	
14/09/15 20:22:49	SIG	M62/2050B2	60R	M62 J25 - J30	
14/09/15 20:22:49	SIG	M62/2050B3	60R	M62 J25 - J30	
14/09/15 20:22:49	SIG	M62/2050B4	60R	M62 J25 - J30	
14/09/15 20:23:21	SIG	M62/2113B1	BLNK	M62 J25 - J30	
14/09/15 20:23:21	SIG	M62/2113B2	OFF	M62 J25 - J30	
14/09/15 20:23:21	SIG	M62/2113B3	OFF	M62 J25 - J30	
14/09/15 20:23:21	SIG	M62/2113B4	OFF	M62 J25 - J30	
14/09/15 20:23:49	SIG	M62/1955K1	60R	M62 J25 - J30	
14/09/15 20:23:49	SIG	M62/1955K2	60R	M62 J25 - J30	
14/09/15 20:23:49	SIG	M62/1956A1	60R	M62 J25 - J30	
14/09/15 20:23:49	SIG	M62/1956A2	60R	M62 J25 - J30	
14/09/15 20:23:49	SIG	M62/1956A3	60R	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2125B1	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2125B2	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2125B3	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2125L1	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2125L2	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2132B1	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2132B2	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2132B3	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2137B1	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2137B2	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2137B3	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2137B4	NR	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2147B1	OFF	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2147B2	OFF	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2147B3	OFF	M62 J25 - J30	
14/09/15 20:24:27	SIG	M62/2147B4	OFF	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2125B1	LDR	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2125B2	50R	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2125B3	50R	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2125L1	NR	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2125L2	NR	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2132B1	60R	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2132B2	60R	M62 J25 - J30	
14/09/15 20:24:56	SIG	M62/2132B3	60R	M62 J25 - J30	
14/09/15 20:25:01	SIG	M62/2113B2	50R	M62 J25 - J30	
14/09/15 20:25:01	SIG	M62/2113B3	50R	M62 J25 - J30	
14/09/15 20:25:01	SIG	M62/2113B4	50R	M62 J25 - J30	
14/09/15 20:25:01	SIG	M62/2120M1	50R	M62 J25 - J30	
14/09/15 20:25:01	SIG	M62/2120M2	50R	M62 J25 - J30	
14/09/15 20:25:07	SIG	M62/2113B2	40R	M62 J25 - J30	
14/09/15 20:25:07	SIG	M62/2113B3	40R	M62 J25 - J30	
14/09/15 20:25:07	SIG	M62/2113B4	40R	M62 J25 - J30	
14/09/15 20:25:07	SIG	M62/2120M1	40R	M62 J25 - J30	
14/09/15 20:25:07	SIG	M62/2120M2	40R	M62 J25 - J30	
14/09/15 20:25:12	SIG	M62/2113B2	30R	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2113B1	STOP	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2113B2	20R	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2113B3	40R	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2113B4	40R	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2117B1	LDR	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2117B3	50R	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2120M1	40R	M62 J25 - J30	
14/09/15 20:25:17	SIG	M62/2120M2	40R	M62 J25 - J30	
14/09/15 20:25:22	SIG	M62/2113B1	STOP	M62 J25 - J30	
14/09/15 20:25:22	SIG	M62/2113B2	STOP	M62 J25 - J30	
14/09/15 20:26:43	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 20:26:43	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 20:26:43	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1987A1	30R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1987J1	LDR	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1992A1	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1992A2	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1992A3	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1992J1	LDR	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 20:26:57	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 20:27:27	SIG	M62/2137B1	OFF	M62 J25 - J30	
14/09/15 20:27:28	SIG	M62/2137B2	OFF	M62 J25 - J30	
14/09/15 20:27:28	SIG	M62/2137B3	OFF	M62 J25 - J30	
14/09/15 20:27:28	SIG	M62/2137B4	OFF	M62 J25 - J30	
14/09/15 20:28:33	SIG	M62/1999A1	LDR	M62 J25 - J30	
14/09/15 20:28:33	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 20:28:33	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 20:28:33	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 20:28:38	SIG	M62/2004A1	30R	M62 J25 - J30	
14/09/15 20:28:43	SIG	M62/2004A1	20R	M62 J25 - J30	
14/09/15 20:28:43	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 20:28:43	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 20:28:49	SIG	M62/2004A1	STOP	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1974A1	50R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1979K1	30R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1979K2	30R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1981A1	30R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1992A1	60R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1992A2	60R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1992A3	60R	M62 J25 - J30	
14/09/15 20:29:42	SIG	M62/1992J1	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1974A1	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1974A2	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1974A3	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1974A4	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1981A1	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1981A2	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1981A3	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1981A4	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1987A1	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1987A3	60R	M62 J25 - J30	
14/09/15 20:29:54	SIG	M62/1987J1	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2163A1	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2163A2	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2166K1	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2166K2	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2170A1	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2170A2	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2170K1	60R	M62 J25 - J30	
14/09/15 20:32:49	SIG	M62/2170K2	60R	M62 J25 - J30	
14/09/15 20:36:00	SIG	M62/2065A1	BLNK	M62 J25 - J30	
14/09/15 20:36:00	SIG	M62/2065A2	OFF	M62 J25 - J30	
14/09/15 20:36:00	SIG	M62/2065A3	OFF	M62 J25 - J30	
14/09/15 20:36:00	SIG	M62/2065A4	OFF	M62 J25 - J30	
14/09/15 20:36:32	SIG	M62/2073K1	OFF	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2097B1	REDX	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2106B1	REDX	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2106B2	50R	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2106B3	50R	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2106B4	50R	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2125L1	60R	M62 J25 - J30	
14/09/15 20:37:49	SIG	M62/2125L2	60R	M62 J25 - J30	
14/09/15 20:38:05	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 20:38:05	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 20:39:03	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 20:39:03	SIG	M62/2097B3	OFF	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2177A2	60R	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2177A3	60R	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2177A4	60R	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2183A2	60R	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2183A3	60R	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2183A4	60R	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2189A2	OFF	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2189A3	OFF	M62 J25 - J30	
14/09/15 20:41:24	SIG	M62/2189A4	OFF	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1955K1	OFF	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1955K2	OFF	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1956A1	OFF	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1956A2	OFF	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1956A3	OFF	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1960A1	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1960A2	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1960A3	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1960K1	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1960K2	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1968A1	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1968A2	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1968A3	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1968A4	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1974A1	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1974A2	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1974A3	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1974A4	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1981A1	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1981A2	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1981A3	NR	M62 J25 - J30	
14/09/15 20:42:05	SIG	M62/1981A4	NR	M62 J25 - J30	
14/09/15 20:42:23	SIG	M62/2197A1	50R	M62 J25 - J30	
14/09/15 20:42:23	SIG	M62/2197A2	50R	M62 J25 - J30	
14/09/15 20:42:23	SIG	M62/2197A3	50R	M62 J25 - J30	
14/09/15 20:42:29	SIG	M62/2197A1	40R	M62 J25 - J30	
14/09/15 20:42:29	SIG	M62/2197A2	40R	M62 J25 - J30	
14/09/15 20:42:29	SIG	M62/2197A3	40R	M62 J25 - J30	
14/09/15 20:42:34	SIG	M62/2197A1	30R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2183A2	LDR	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2183A3	50R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2183A4	50R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2189A2	LDR	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2189A3	50R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2189A4	50R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2197A1	20R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2197A2	40R	M62 J25 - J30	
14/09/15 20:42:39	SIG	M62/2197A3	40R	M62 J25 - J30	
14/09/15 20:42:44	SIG	M62/2197A1	STOP	M62 J25 - J30	
14/09/15 20:42:49	SIG	M62/2177A2	50R	M62 J25 - J30	
14/09/15 20:42:49	SIG	M62/2177A3	50R	M62 J25 - J30	
14/09/15 20:42:49	SIG	M62/2177A4	50R	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1960A1	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1960A2	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1960A3	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1960K1	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1960K2	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1968A1	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1968A2	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1968A3	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1968A4	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1974A1	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1974A2	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1974A3	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1974A4	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1981A1	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1981A2	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1981A3	OFF	M62 J25 - J30	
14/09/15 20:45:05	SIG	M62/1981A4	OFF	M62 J25 - J30	
14/09/15 20:56:20	SIG	M62/1987A1	NR	M62 J25 - J30	
14/09/15 20:56:20	SIG	M62/1987A3	NR	M62 J25 - J30	
14/09/15 20:56:20	SIG	M62/1987J1	NR	M62 J25 - J30	
14/09/15 20:57:20	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 20:57:20	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 20:57:20	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 20:57:20	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 20:57:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 21:03:46	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 21:03:46	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 21:03:46	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 21:03:46	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2113B1	REDX	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2113B2	50R	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2113B3	50R	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2113B4	50R	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2117B1	50R	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2120M1	50R	M62 J25 - J30	
14/09/15 21:12:29	SIG	M62/2120M2	50R	M62 J25 - J30	
14/09/15 21:12:30	SIG	M62/2125B1	60R	M62 J25 - J30	
14/09/15 21:12:30	SIG	M62/2125B2	60R	M62 J25 - J30	
14/09/15 21:12:30	SIG	M62/2125B3	60R	M62 J25 - J30	
14/09/15 21:12:30	SIG	M62/2132B1	OFF	M62 J25 - J30	
14/09/15 21:12:30	SIG	M62/2132B2	OFF	M62 J25 - J30	
14/09/15 21:12:30	SIG	M62/2132B3	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2097B2	NR	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2097B3	NR	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2097B4	NR	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2106B1	BLNK	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2106B2	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2106B3	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2106B4	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2113B1	BLNK	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2113B2	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2113B3	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2113B4	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2117B3	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2120M1	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2120M2	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2125B1	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2125B2	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2125B3	OFF	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2125L1	NR	M62 J25 - J30	
14/09/15 21:15:50	SIG	M62/2125L2	NR	M62 J25 - J30	
14/09/15 21:15:51	SIG	M62/2106B1	BLNK	M62 J25 - J30	
14/09/15 21:18:50	SIG	M62/2097B2	OFF	M62 J25 - J30	
14/09/15 21:18:50	SIG	M62/2125L1	OFF	M62 J25 - J30	
14/09/15 21:18:50	SIG	M62/2125L2	OFF	M62 J25 - J30	
14/09/15 21:18:51	SIG	M62/2097B1	BLNK	M62 J25 - J30	
14/09/15 21:18:51	SIG	M62/2097B3	OFF	M62 J25 - J30	
14/09/15 21:18:51	SIG	M62/2097B4	OFF	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2183A2	60R	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2183A3	60R	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2183A4	60R	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2189A2	OFF	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2189A3	OFF	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2189A4	OFF	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2197A1	OFF	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2197A2	OFF	M62 J25 - J30	
14/09/15 21:28:41	SIG	M62/2197A3	OFF	M62 J25 - J30	
14/09/15 21:38:01	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 21:38:01	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2025A1	REDX	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2025A2	NR	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2025A3	NR	M62 J25 - J30	
14/09/15 21:38:01	SIG	M62/2025A4	NR	M62 J25 - J30	
14/09/15 21:38:38	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2008K1	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2008K2	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2012A1	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2012A2	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2012A3	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2018A1	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2018A2	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2018A3	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2018A4	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2025A1	BLNK	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2025A2	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2025A3	OFF	M62 J25 - J30	
14/09/15 21:38:38	SIG	M62/2025A4	OFF	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2163A1	OFF	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2163A2	OFF	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2166K1	OFF	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2166K2	OFF	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2170A1	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2170A2	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2170K1	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2170K2	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2183A2	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2183A3	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2183A4	NR	M62 J25 - J30	
14/09/15 21:38:50	SIG	M62/2189A1	BLNK	M62 J25 - J30	
14/09/15 21:41:51	SIG	M62/2170A1	OFF	M62 J25 - J30	
14/09/15 21:41:52	SIG	M62/2170A2	OFF	M62 J25 - J30	
14/09/15 21:41:52	SIG	M62/2170K1	OFF	M62 J25 - J30	
14/09/15 21:41:52	SIG	M62/2170K2	OFF	M62 J25 - J30	
14/09/15 21:50:41	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 21:50:41	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 21:50:42	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 21:50:43	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 22:02:35	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 22:02:36	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 22:02:36	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 22:02:36	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 22:02:56	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 22:02:56	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 22:02:56	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 22:02:57	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 22:04:16	SIG	M606/2003B2	NR	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2008K1	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2008K2	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2012A1	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2012A2	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2012A3	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2025A2	NR	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2025A3	NR	M62 J25 - J30	
14/09/15 22:04:16	SIG	M62/2025A4	NR	M62 J25 - J30	
14/09/15 22:16:51	SIG	M606/2003B1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M606/2003B2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1992A1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1992A2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1992A3	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1992J1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1999A1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1999A2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1999A3	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1999J1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/1999J2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2004A1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2004A2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2004A3	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2008K1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2008K2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2012A1	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2012A2	OFF	M62 J25 - J30	
14/09/15 22:16:51	SIG	M62/2012A3	OFF	M62 J25 - J30	
14/09/15 22:20:45	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 22:20:45	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 22:20:48	SIG	M62/2018A4	OFF	M62 J25 - J30	
14/09/15 22:20:48	SIG	M62/2018A4	50R	M62 J25 - J30	
14/09/15 22:20:51	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 22:20:52	SIG	M62/2018A2	50R	M62 J25 - J30	
14/09/15 22:20:52	SIG	M62/2018A2	OFF	M62 J25 - J30	
14/09/15 22:20:52	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 22:21:07	SIG	M62/2018A1	HSD	M62 J25 - J30	
14/09/15 22:21:07	SIG	M62/2018A1	OFF	M62 J25 - J30	
14/09/15 22:21:23	SIG	M62/2018A3	OFF	M62 J25 - J30	
14/09/15 22:21:23	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 22:21:23	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 22:21:24	SIG	M62/2018A3	50R	M62 J25 - J30	
14/09/15 22:21:24	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 22:21:24	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2018A1	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2018A2	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2018A3	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2018A4	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2025A1	BLNK	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2025A2	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2025A3	OFF	M62 J25 - J30	
14/09/15 22:22:53	SIG	M62/2025A4	OFF	M62 J25 - J30	
14/09/15 22:28:35	SIG	M62/1979K1	OFF	M62 J25 - J30	
14/09/15 22:28:35	SIG	M62/1979K2	OFF	M62 J25 - J30	
14/09/15 22:28:35	SIG	M62/1987A1	NR	M62 J25 - J30	
14/09/15 22:28:35	SIG	M62/1987A3	NR	M62 J25 - J30	
14/09/15 22:28:35	SIG	M62/1987J1	NR	M62 J25 - J30	
14/09/15 22:31:35	SIG	M62/1987J1	OFF	M62 J25 - J30	
14/09/15 22:31:45	SIG	M62/1987A1	OFF	M62 J25 - J30	
14/09/15 22:31:45	SIG	M62/1987A3	OFF	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1992A1	60R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1992A2	60R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1992A3	60R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1992J1	60R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1999A1	LDR	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/2004A1	50R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/2004A2	50R	M62 J25 - J30	
14/09/15 22:46:23	SIG	M62/2004A3	50R	M62 J25 - J30	
14/09/15 22:46:29	SIG	M62/2004A1	40R	M62 J25 - J30	
14/09/15 22:46:29	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 22:46:29	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 22:46:34	SIG	M62/2004A1	30R	M62 J25 - J30	
14/09/15 22:46:39	SIG	M62/2004A1	20R	M62 J25 - J30	
14/09/15 22:46:39	SIG	M62/2004A2	40R	M62 J25 - J30	
14/09/15 22:46:39	SIG	M62/2004A3	40R	M62 J25 - J30	
14/09/15 22:46:44	SIG	M62/2004A1	STOP	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1979K1	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1979K2	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1981A1	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1981A2	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1981A3	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1981A4	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1987A1	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1987A2	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1987A3	50R	M62 J25 - J30	
14/09/15 22:58:13	SIG	M62/1987J1	50R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1981A1	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1987A2	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 22:58:28	SIG	M62/1987J1	40R	M62 J25 - J30	
14/09/15 22:58:33	SIG	M62/1981A1	30R	M62 J25 - J30	
14/09/15 22:58:33	SIG	M62/1987J1	30R	M62 J25 - J30	
14/09/15 22:58:34	SIG	M62/2004A1	OFF	M62 J25 - J30	
14/09/15 22:58:34	SIG	M62/2004A2	OFF	M62 J25 - J30	
14/09/15 22:58:34	SIG	M62/2004A3	OFF	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1968A1	60R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1968A2	60R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1968A3	60R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1968A4	60R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1974A1	LDR	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1974A2	50R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1974A3	50R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1974A4	50R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1979K1	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1979K2	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1981A1	20R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1981A2	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1981A3	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1981A4	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1987A1	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1987A3	40R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1987J1	20R	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1992A1	NR	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1992A2	NR	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1992A3	NR	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1992J1	NR	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1999A1	OFF	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1999A2	OFF	M62 J25 - J30	
14/09/15 22:58:39	SIG	M62/1999A3	OFF	M62 J25 - J30	
14/09/15 22:58:44	SIG	M62/1981A1	STOP	M62 J25 - J30	
14/09/15 22:58:44	SIG	M62/1987J1	STOP	M62 J25 - J30	
14/09/15 22:59:11	SIG	M62/1992A1	50R	M62 J25 - J30	
14/09/15 22:59:11	SIG	M62/1992A2	50R	M62 J25 - J30	
14/09/15 22:59:11	SIG	M62/1992A3	50R	M62 J25 - J30	
14/09/15 22:59:11	SIG	M62/1992J1	50R	M62 J25 - J30	
14/09/15 22:59:17	SIG	M62/1992A1	40R	M62 J25 - J30	
14/09/15 22:59:17	SIG	M62/1992A2	40R	M62 J25 - J30	
14/09/15 22:59:17	SIG	M62/1992A3	40R	M62 J25 - J30	
14/09/15 22:59:17	SIG	M62/1992J1	40R	M62 J25 - J30	
14/09/15 22:59:22	SIG	M62/1992J1	30R	M62 J25 - J30	
14/09/15 22:59:27	SIG	M62/1992A1	40R	M62 J25 - J30	
14/09/15 22:59:27	SIG	M62/1992A2	40R	M62 J25 - J30	
14/09/15 22:59:27	SIG	M62/1992A3	40R	M62 J25 - J30	
14/09/15 22:59:27	SIG	M62/1992J1	20R	M62 J25 - J30	
14/09/15 22:59:32	SIG	M62/1992J1	STOP	M62 J25 - J30	
14/09/15 23:02:04	SIG	M62/1999A1	50R	M62 J25 - J30	
14/09/15 23:02:04	SIG	M62/1999A2	50R	M62 J25 - J30	
14/09/15 23:02:04	SIG	M62/1999A3	50R	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2177A1	BLNK	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2177A2	OFF	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2177A3	OFF	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2177A4	OFF	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2183A1	BLNK	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2183A2	OFF	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2183A3	OFF	M62 J25 - J30	
14/09/15 23:02:30	SIG	M62/2183A4	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2012B1	BLNK	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2012B2	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2012B3	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2012B4	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2018B1	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2018B2	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2018B3	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2018L1	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2025B1	BLNK	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2025B2	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2025B3	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2025B4	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2033B2	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2033B4	OFF	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2041B2	NR	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2041B3	NR	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2041B4	NR	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2050B2	NR	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2050B3	NR	M62 J25 - J30	
14/09/15 23:02:52	SIG	M62/2050B4	NR	M62 J25 - J30	
14/09/15 23:02:53	SIG	M62/2025B1	BLNK	M62 J25 - J30	
14/09/15 23:02:53	SIG	M62/2033B1	BLNK	M62 J25 - J30	
14/09/15 23:04:40	SIG	M62/1999J1	50R	M62 J25 - J30	
14/09/15 23:04:40	SIG	M62/1999J2	50R	M62 J25 - J30	
14/09/15 23:05:52	SIG	M62/2050B2	OFF	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2041B3	OFF	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2041B4	OFF	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2050B3	OFF	M62 J25 - J30	
14/09/15 23:05:53	SIG	M62/2050B4	OFF	M62 J25 - J30	
14/09/15 23:14:09	SIG	M62/2018B1	50R	M62 J25 - J30	
14/09/15 23:14:09	SIG	M62/2018B2	50R	M62 J25 - J30	
14/09/15 23:14:09	SIG	M62/2018B3	50R	M62 J25 - J30	
14/09/15 23:14:09	SIG	M62/2018L1	50R	M62 J25 - J30	
14/09/15 23:14:14	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 23:14:14	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 23:14:14	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 23:14:14	SIG	M62/2018L1	40R	M62 J25 - J30	
14/09/15 23:14:20	SIG	M62/2018L1	30R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2012B1	REDX	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2012B2	NR	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2012B3	NR	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2012B4	NR	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2018B1	40R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2018B2	40R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2018B3	40R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2018L1	20R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2025B1	REDX	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2025B2	50R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2025B3	50R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2025B4	50R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2033B1	REDX	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2033B2	50R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2033B3	50R	M62 J25 - J30	
14/09/15 23:14:25	SIG	M62/2033B4	50R	M62 J25 - J30	
14/09/15 23:14:30	SIG	M62/2018L1	STOP	M62 J25 - J30	
14/09/15 23:14:52	SIG	M62/1960A1	60R	M62 J25 - J30	
14/09/15 23:14:52	SIG	M62/1960A2	60R	M62 J25 - J30	
14/09/15 23:14:52	SIG	M62/1960A3	60R	M62 J25 - J30	
14/09/15 23:14:52	SIG	M62/1960K1	60R	M62 J25 - J30	
14/09/15 23:14:52	SIG	M62/1960K2	60R	M62 J25 - J30	
14/09/15 23:16:45	SIG	M62/2033B3	???	M62 J25 - J30	
14/09/15 23:16:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 23:23:52	SIG	M62/1960A1	OFF	M62 J25 - J30	
14/09/15 23:23:52	SIG	M62/1960A2	OFF	M62 J25 - J30	
14/09/15 23:23:52	SIG	M62/1960A3	OFF	M62 J25 - J30	
14/09/15 23:23:52	SIG	M62/1960K1	OFF	M62 J25 - J30	
14/09/15 23:23:52	SIG	M62/1960K2	OFF	M62 J25 - J30	
14/09/15 23:25:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 23:25:52	SIG	M62/2041B1	REDX	M62 J25 - J30	
14/09/15 23:25:52	SIG	M62/2041B2	60R	M62 J25 - J30	
14/09/15 23:25:52	SIG	M62/2041B3	60R	M62 J25 - J30	
14/09/15 23:25:52	SIG	M62/2041B4	60R	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1968A1	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1968A2	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1968A3	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1968A4	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1974A1	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1974A2	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1974A3	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1974A4	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1979K1	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1979K2	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1981A1	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1981A2	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1981A3	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1981A4	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1987A1	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1987A3	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1987J1	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1992A1	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1992A2	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1992A3	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1992J1	NR	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1999A1	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1999A2	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1999A3	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1999J1	OFF	M62 J25 - J30	
14/09/15 23:28:18	SIG	M62/1999J2	OFF	M62 J25 - J30	
14/09/15 23:31:19	SIG	M62/1987J1	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1974A1	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1974A2	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1974A3	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1974A4	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1981A1	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1981A2	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1981A3	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1981A4	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1987A1	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1987A3	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1992A1	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1992A2	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1992A3	OFF	M62 J25 - J30	
14/09/15 23:31:29	SIG	M62/1992J1	OFF	M62 J25 - J30	
14/09/15 23:44:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
14/09/15 23:44:52	SIG	M62/2041B2	NR	M62 J25 - J30	
14/09/15 23:44:52	SIG	M62/2041B3	NR	M62 J25 - J30	
14/09/15 23:44:52	SIG	M62/2041B4	NR	M62 J25 - J30	
14/09/15 23:47:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
14/09/15 23:47:53	SIG	M62/2041B2	OFF	M62 J25 - J30	
14/09/15 23:47:53	SIG	M62/2041B3	OFF	M62 J25 - J30	
14/09/15 23:47:53	SIG	M62/2041B4	OFF	M62 J25 - J30	
14/09/15 23:59:15	SIG	M606/2003B1	NR	M62 J25 - J30	
14/09/15 23:59:15	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2012B1	BLNK	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2012B2	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2012B3	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2012B4	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2018B1	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2018B2	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2018B3	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2018L1	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2025B2	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2025B3	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2025B4	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2033B2	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 00:04:10	SIG	M62/2033B4	OFF	M62 J25 - J30	
15/09/15 00:04:11	SIG	M62/2025B1	BLNK	M62 J25 - J30	
15/09/15 00:04:11	SIG	M62/2025B1	BLNK	M62 J25 - J30	
15/09/15 00:04:11	SIG	M62/2033B1	BLNK	M62 J25 - J30	
15/09/15 00:04:11	SIG	M62/2033B1	BLNK	M62 J25 - J30	
15/09/15 00:09:17	SIG	M62/2065A1	REDX	M62 J25 - J30	
15/09/15 00:09:17	SIG	M62/2065A2	50R	M62 J25 - J30	
15/09/15 00:09:17	SIG	M62/2065A3	50R	M62 J25 - J30	
15/09/15 00:09:17	SIG	M62/2065A4	50R	M62 J25 - J30	
15/09/15 00:09:27	SIG	M62/2073K1	50R	M62 J25 - J30	
15/09/15 00:20:34	SIG	M606/2003B1	OFF	M62 J25 - J30	
15/09/15 00:20:34	SIG	M606/2003B2	OFF	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2120M1	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2120M2	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2125B1	LDR	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2132B1	60R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2132B2	60R	M62 J25 - J30	
15/09/15 00:37:19	SIG	M62/2132B3	60R	M62 J25 - J30	
15/09/15 00:37:24	SIG	M62/2113B2	40R	M62 J25 - J30	
15/09/15 00:37:24	SIG	M62/2113B3	40R	M62 J25 - J30	
15/09/15 00:37:24	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 00:37:24	SIG	M62/2120M1	40R	M62 J25 - J30	
15/09/15 00:37:24	SIG	M62/2120M2	40R	M62 J25 - J30	
15/09/15 00:37:29	SIG	M62/2113B2	30R	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2113B1	STOP	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2113B2	20R	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2113B3	40R	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2117B1	LDR	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2117B3	50R	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2120M1	40R	M62 J25 - J30	
15/09/15 00:37:34	SIG	M62/2120M2	40R	M62 J25 - J30	
15/09/15 00:37:40	SIG	M62/2113B1	STOP	M62 J25 - J30	
15/09/15 00:37:40	SIG	M62/2113B2	STOP	M62 J25 - J30	
15/09/15 00:41:34	SIG	M62/2065A1	BLNK	M62 J25 - J30	
15/09/15 00:41:34	SIG	M62/2065A2	OFF	M62 J25 - J30	
15/09/15 00:41:34	SIG	M62/2065A3	OFF	M62 J25 - J30	
15/09/15 00:41:34	SIG	M62/2065A4	OFF	M62 J25 - J30	
15/09/15 00:42:24	SIG	M62/2073K1	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2117B3	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2120M1	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2120M2	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2132B1	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2132B2	OFF	M62 J25 - J30	
15/09/15 00:50:09	SIG	M62/2132B3	OFF	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2132B1	50R	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2132B2	50R	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2132B3	50R	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2137B1	50R	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2137B2	50R	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2137B3	50R	M62 J25 - J30	
15/09/15 00:51:58	SIG	M62/2137B4	50R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2132B1	40R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2132B2	40R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2132B3	40R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2137B1	40R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2137B2	40R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2137B3	40R	M62 J25 - J30	
15/09/15 00:52:03	SIG	M62/2137B4	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2132B1	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2132B2	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2132B3	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2137B1	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2137B2	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2137B3	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2137B4	40R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2147B1	60R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2147B2	60R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2147B3	60R	M62 J25 - J30	
15/09/15 00:52:13	SIG	M62/2147B4	60R	M62 J25 - J30	
15/09/15 00:52:42	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 00:52:42	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 00:52:42	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 00:52:42	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2132B1	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2132B2	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2132B3	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2137B1	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2137B2	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2137B3	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2137B4	NR	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2147B1	OFF	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2147B2	OFF	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2147B3	OFF	M62 J25 - J30	
15/09/15 01:09:35	SIG	M62/2147B4	OFF	M62 J25 - J30	
15/09/15 01:09:52	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 01:09:52	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 01:09:52	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 01:09:52	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 01:12:35	SIG	M62/2137B1	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2132B1	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2132B2	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2132B3	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2137B2	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2137B3	OFF	M62 J25 - J30	
15/09/15 01:12:36	SIG	M62/2137B4	OFF	M62 J25 - J30	
15/09/15 02:28:47	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 02:28:47	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 02:44:56	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 02:44:56	SIG	M62/1987A2	50R	M62 J25 - J30	
15/09/15 02:44:56	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 02:44:56	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1999A1	NR	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1999A2	NR	M62 J25 - J30	
15/09/15 02:45:11	SIG	M62/1999A3	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1979K1	OFF	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1979K2	OFF	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1981A1	OFF	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1981A2	OFF	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1981A3	OFF	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1981A4	OFF	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1987A1	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1987A3	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1987J1	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1992A1	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1992A2	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1992A3	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1992J1	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1999A1	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1999A2	NR	M62 J25 - J30	
15/09/15 02:48:56	SIG	M62/1999A3	NR	M62 J25 - J30	
15/09/15 02:51:57	SIG	M62/1987J1	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1987A1	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1987A3	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1992A1	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1992A2	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1992A3	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1992J1	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1999A1	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1999A2	OFF	M62 J25 - J30	
15/09/15 02:52:07	SIG	M62/1999A3	OFF	M62 J25 - J30	
15/09/15 03:22:21	SIG	M62/1999J1	OFF	M62 J25 - J30	
15/09/15 03:22:21	SIG	M62/1999J2	OFF	M62 J25 - J30	
15/09/15 03:45:08	SIG	M62/2197A1	50R	M62 J25 - J30	
15/09/15 03:45:08	SIG	M62/2197A2	50R	M62 J25 - J30	
15/09/15 03:45:08	SIG	M62/2197A3	50R	M62 J25 - J30	
15/09/15 03:45:13	SIG	M62/2197A1	40R	M62 J25 - J30	
15/09/15 03:45:13	SIG	M62/2197A2	40R	M62 J25 - J30	
15/09/15 03:45:13	SIG	M62/2197A3	40R	M62 J25 - J30	
15/09/15 03:45:18	SIG	M62/2197A1	30R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2177A1	REDX	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2177A2	60R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2177A3	60R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2177A4	60R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2183A1	REDX	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2183A2	LDR	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2183A3	50R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2183A4	50R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2189A1	REDX	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2189A2	LDR	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2189A3	50R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2189A4	50R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2197A1	20R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2197A2	40R	M62 J25 - J30	
15/09/15 03:45:24	SIG	M62/2197A3	40R	M62 J25 - J30	
15/09/15 03:45:29	SIG	M62/2197A1	STOP	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2177A2	50R	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2177A3	50R	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2177A4	50R	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2183A2	50R	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2189A2	50R	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2197A1	OFF	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2197A2	OFF	M62 J25 - J30	
15/09/15 04:18:52	SIG	M62/2197A3	OFF	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2177A1	BLNK	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2177A2	OFF	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2177A3	OFF	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2177A4	OFF	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2183A2	NR	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2183A3	NR	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2183A4	NR	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2189A1	BLNK	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2189A2	OFF	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2189A3	OFF	M62 J25 - J30	
15/09/15 04:44:15	SIG	M62/2189A4	OFF	M62 J25 - J30	
15/09/15 04:44:16	SIG	M62/2189A1	BLNK	M62 J25 - J30	
15/09/15 04:46:41	SIG	M606/2003B1	50R	M62 J25 - J30	
15/09/15 04:46:41	SIG	M606/2003B2	50R	M62 J25 - J30	
15/09/15 04:46:41	SIG	M62/1992B1	NR	M62 J25 - J30	
15/09/15 04:46:41	SIG	M62/1992B2	NR	M62 J25 - J30	
15/09/15 04:46:41	SIG	M62/1992B3	NR	M62 J25 - J30	
15/09/15 04:46:41	SIG	M62/1992B4	NR	M62 J25 - J30	
15/09/15 04:46:41	SIG	M62/2005M1	50R	M62 J25 - J30	
15/09/15 04:46:41	SIG	M62/2005M2	50R	M62 J25 - J30	
15/09/15 04:47:15	SIG	M62/2183A2	OFF	M62 J25 - J30	
15/09/15 04:47:15	SIG	M62/2183A3	OFF	M62 J25 - J30	
15/09/15 04:47:15	SIG	M62/2183A4	OFF	M62 J25 - J30	
15/09/15 04:47:16	SIG	M62/2183A1	BLNK	M62 J25 - J30	
15/09/15 05:06:06	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 05:06:06	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 05:06:06	SIG	M62/1992B1	NR	M62 J25 - J30	
15/09/15 05:06:06	SIG	M62/1992B2	NR	M62 J25 - J30	
15/09/15 05:06:06	SIG	M62/1992B3	NR	M62 J25 - J30	
15/09/15 05:06:06	SIG	M62/1992B4	NR	M62 J25 - J30	
15/09/15 05:06:06	SIG	M62/2005M1	OFF	M62 J25 - J30	
15/09/15 05:06:06	SIG	M62/2005M2	OFF	M62 J25 - J30	
15/09/15 05:09:07	SIG	M606/2003B1	OFF	M62 J25 - J30	
15/09/15 05:09:07	SIG	M606/2003B2	OFF	M62 J25 - J30	
15/09/15 05:09:07	SIG	M62/1992B1	OFF	M62 J25 - J30	
15/09/15 05:09:07	SIG	M62/1992B2	OFF	M62 J25 - J30	
15/09/15 05:09:07	SIG	M62/1992B3	OFF	M62 J25 - J30	
15/09/15 05:09:07	SIG	M62/1992B4	OFF	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2008K1	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2008K2	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2012A1	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2012A2	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2012A3	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2025A1	REDX	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2025A2	NR	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2025A3	NR	M62 J25 - J30	
15/09/15 06:37:58	SIG	M62/2025A4	NR	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2012A1	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2033A1	REDX	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2041A1	REDX	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A1	REDX	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2065A1	REDX	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2065A2	NR	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2065A3	NR	M62 J25 - J30	
15/09/15 06:37:59	SIG	M62/2065A4	NR	M62 J25 - J30	
15/09/15 06:38:01	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 06:38:01	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 06:38:01	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 06:38:01	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2170B1	NR	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2170B2	NR	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2177B1	40R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2177B2	40R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2177L1	40R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2177L2	40R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2183B1	50R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2183L1	50R	M62 J25 - J30	
15/09/15 06:38:06	SIG	M62/2183L2	50R	M62 J25 - J30	
15/09/15 06:38:49	SIG	M62/2159B1	NR	M62 J25 - J30	
15/09/15 06:38:49	SIG	M62/2159B2	NR	M62 J25 - J30	
15/09/15 06:38:49	SIG	M62/2170B1	50R	M62 J25 - J30	
15/09/15 06:38:49	SIG	M62/2170B2	50R	M62 J25 - J30	
15/09/15 06:38:49	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 06:38:49	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 06:38:54	SIG	M62/2170B1	40R	M62 J25 - J30	
15/09/15 06:38:54	SIG	M62/2170B2	40R	M62 J25 - J30	
15/09/15 06:38:54	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 06:38:54	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 06:39:11	SIG	M62/2050A1	60R	M62 J25 - J30	
15/09/15 06:39:36	SIG	M62/2041A1	60R	M62 J25 - J30	
15/09/15 06:40:03	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 06:40:10	SIG	M62/2018A1	60R	M62 J25 - J30	
15/09/15 06:40:10	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 06:40:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:40:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:40:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:40:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2189B1	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2189B2	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2189B3	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2189B4	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2194B1	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2194B2	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2194B3	60R	M62 J25 - J30	
15/09/15 06:43:00	SIG	M62/2194B4	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1955K1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1955K2	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1956A1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1956A2	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1960A1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1960A2	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1960A3	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1960K1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1960K2	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1968A1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1968A2	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1968A3	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1968A4	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1974A1	NR	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1974A2	NR	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1974A3	NR	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/1974A4	NR	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/2197B1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/2197B2	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/2197B3	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/2199M1	60R	M62 J25 - J30	
15/09/15 06:44:00	SIG	M62/2199M2	60R	M62 J25 - J30	
15/09/15 06:45:05	SIG	M62/1960A1	50R	M62 J25 - J30	
15/09/15 06:45:05	SIG	M62/1960A2	50R	M62 J25 - J30	
15/09/15 06:45:05	SIG	M62/1960A3	50R	M62 J25 - J30	
15/09/15 06:45:05	SIG	M62/1960K1	50R	M62 J25 - J30	
15/09/15 06:45:05	SIG	M62/1960K2	50R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1960A1	40R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1960A2	40R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1960A3	40R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1960K1	40R	M62 J25 - J30	
15/09/15 06:45:10	SIG	M62/1960K2	40R	M62 J25 - J30	
15/09/15 06:45:53	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 06:45:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 06:46:03	SIG	M62/2183B1	40R	M62 J25 - J30	
15/09/15 06:46:03	SIG	M62/2183L1	40R	M62 J25 - J30	
15/09/15 06:46:03	SIG	M62/2183L2	40R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2183B1	40R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2183L1	40R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2183L2	40R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2189B1	50R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2189B2	50R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2189B3	50R	M62 J25 - J30	
15/09/15 06:46:09	SIG	M62/2189B4	50R	M62 J25 - J30	
15/09/15 06:46:42	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 06:46:43	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2050A1	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2050A2	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2050A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2050A4	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 06:47:49	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 06:49:00	SIG	M62/2203B1	60R	M62 J25 - J30	
15/09/15 06:49:00	SIG	M62/2203B2	60R	M62 J25 - J30	
15/09/15 06:49:00	SIG	M62/2203B3	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1955K1	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1955K2	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1956A1	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1956A2	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1960A1	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1960A2	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1960A3	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1960K1	60R	M62 J25 - J30	
15/09/15 06:49:05	SIG	M62/1960K2	60R	M62 J25 - J30	
15/09/15 06:49:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:49:08	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 06:49:13	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 06:49:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 06:49:53	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2189B1	40R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2189B2	40R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2189B3	40R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2189B4	40R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 06:50:36	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 06:51:00	SIG	M62/2004A1	60R	M62 J25 - J30	
15/09/15 06:51:00	SIG	M62/2004A2	60R	M62 J25 - J30	
15/09/15 06:51:00	SIG	M62/2004A3	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1974A1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1974A2	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1974A3	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1974A4	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1979K1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1979K2	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1981A1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1981A2	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1981A3	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1981A4	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1987A1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1987A3	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1987J1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1992A1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1992A2	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1992A3	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1992J1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1999A1	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1999A2	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1999A3	60R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 06:51:10	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 06:52:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:52:15	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 06:52:20	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2018A1	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2041A1	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2050A1	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 06:54:20	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 06:55:27	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 06:55:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:55:32	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 06:58:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 06:58:27	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 06:58:33	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:01:33	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:01:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2057B1	REDX	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2057B2	NR	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2057B3	NR	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2057B4	NR	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2065B1	REDX	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2065B2	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2065B3	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2065B4	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2065M1	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2065M1	NR	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2069M1	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M62/2069M2	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M621/1002B1	HSD	M62 J25 - J30	
15/09/15 07:01:37	SIG	M621/1002B2	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M621/1010B1	60R	M62 J25 - J30	
15/09/15 07:01:37	SIG	M621/1010B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2012B1	REDX	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2012B2	NR	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2012B3	NR	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2012B4	NR	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2025B1	REDX	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2033B1	REDX	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2041B1	REDX	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2050B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2050B3	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2050B4	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2057B2	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2057B3	60R	M62 J25 - J30	
15/09/15 07:01:38	SIG	M62/2057B4	60R	M62 J25 - J30	
15/09/15 07:01:39	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:03:03	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 07:03:40	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 07:04:02	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 07:04:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:04:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:04:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:04:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:04:22	SIG	M62/2057B1	60R	M62 J25 - J30	
15/09/15 07:04:22	SIG	M621/1002B1	60R	M62 J25 - J30	
15/09/15 07:04:22	SIG	M621/1010B1	OFF	M62 J25 - J30	
15/09/15 07:04:22	SIG	M621/1010B2	OFF	M62 J25 - J30	
15/09/15 07:04:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:04:40	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:04:45	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:06:29	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 07:06:29	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 07:06:29	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 07:06:29	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 07:07:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:07:46	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:07:51	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:08:01	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 07:08:01	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 07:08:01	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 07:08:01	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 07:08:01	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 07:08:20	SIG	M62/2170B1	50R	M62 J25 - J30	
15/09/15 07:08:20	SIG	M62/2170B2	50R	M62 J25 - J30	
15/09/15 07:08:20	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 07:08:20	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 07:08:26	SIG	M62/2170B1	40R	M62 J25 - J30	
15/09/15 07:08:26	SIG	M62/2170B2	40R	M62 J25 - J30	
15/09/15 07:08:26	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 07:08:26	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 07:10:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:10:51	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:10:57	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:13:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:13:57	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:14:02	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:14:26	SIG	M62/2194B1	40R	M62 J25 - J30	
15/09/15 07:14:26	SIG	M62/2194B2	40R	M62 J25 - J30	
15/09/15 07:14:26	SIG	M62/2194B3	40R	M62 J25 - J30	
15/09/15 07:14:26	SIG	M62/2194B4	40R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2197B1	40R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2197B2	40R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2197B3	40R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2199M1	40R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2199M2	40R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 07:15:57	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 07:16:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2197B1	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2197B2	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2197B3	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2199M1	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2199M2	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2203B1	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2203B2	40R	M62 J25 - J30	
15/09/15 07:16:02	SIG	M62/2203B3	40R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/1999A1	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/1999A2	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/1999A3	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2004A1	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2004A2	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2004A3	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2008K1	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2008K2	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2012A1	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2012A2	50R	M62 J25 - J30	
15/09/15 07:16:23	SIG	M62/2012A3	50R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 07:16:29	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2004A1	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2004A2	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2004A3	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2008K1	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2008K2	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2012A1	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2012A2	40R	M62 J25 - J30	
15/09/15 07:16:29	SIG	M62/2012A3	40R	M62 J25 - J30	
15/09/15 07:17:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:17:02	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:17:07	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:17:08	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 07:17:08	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 07:17:08	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 07:17:08	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 07:17:13	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 07:17:46	SIG	M62/2065A2	60R	M62 J25 - J30	
15/09/15 07:17:46	SIG	M62/2065A3	60R	M62 J25 - J30	
15/09/15 07:17:46	SIG	M62/2065A4	60R	M62 J25 - J30	
15/09/15 07:17:56	SIG	M62/2073K1	60R	M62 J25 - J30	
15/09/15 07:17:56	SIG	M62/2079A1	REDX	M62 J25 - J30	
15/09/15 07:17:56	SIG	M62/2079A2	NR	M62 J25 - J30	
15/09/15 07:17:56	SIG	M62/2079A3	NR	M62 J25 - J30	
15/09/15 07:17:56	SIG	M62/2079A4	NR	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2079A2	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2079A3	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2079A4	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2088A1	REDX	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2088A2	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2088A3	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2088A4	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2097A1	REDX	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2097A2	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2097A3	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2097A4	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2106A1	REDX	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2106A2	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2106A3	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2106A4	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2114A1	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2114A2	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2114A3	60R	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2117A1	REDX	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2117A2	NR	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2117A3	NR	M62 J25 - J30	
15/09/15 07:18:06	SIG	M62/2117A4	NR	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1999A1	40R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1999A2	40R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1999A3	40R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1999J1	40R	M62 J25 - J30	
15/09/15 07:18:46	SIG	M62/1999J2	40R	M62 J25 - J30	
15/09/15 07:18:50	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 07:18:50	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 07:18:50	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:18:50	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2033B2	40R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2033B4	40R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 07:18:55	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:19:19	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:19:25	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:19:28	SIG	M62/2106A1	60R	M62 J25 - J30	
15/09/15 07:19:49	SIG	M62/2097A1	60R	M62 J25 - J30	
15/09/15 07:20:08	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:20:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:20:14	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:20:20	SIG	M62/2088A1	60R	M62 J25 - J30	
15/09/15 07:20:26	SIG	M62/2079A1	60R	M62 J25 - J30	
15/09/15 07:20:34	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 07:20:34	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 07:20:34	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 07:20:34	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 07:20:38	SIG	M62/2106A3	OFF	M62 J25 - J30	
15/09/15 07:20:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
15/09/15 07:20:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
15/09/15 07:20:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
15/09/15 07:20:45	SIG	M62/2106A3	OFF	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1987A2	50R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1992A1	40R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1992A2	40R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1992A3	40R	M62 J25 - J30	
15/09/15 07:21:23	SIG	M62/1992J1	40R	M62 J25 - J30	
15/09/15 07:21:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:21:31	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:21:37	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1992A1	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1992A2	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1992A3	40R	M62 J25 - J30	
15/09/15 07:21:38	SIG	M62/1992J1	40R	M62 J25 - J30	
15/09/15 07:22:45	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 07:22:45	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 07:22:49	SIG	M62/2177B1	60R	M62 J25 - J30	
15/09/15 07:22:49	SIG	M62/2177B2	60R	M62 J25 - J30	
15/09/15 07:22:49	SIG	M62/2177L1	60R	M62 J25 - J30	
15/09/15 07:22:49	SIG	M62/2177L2	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 07:22:50	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/1999A1	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/1999A2	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/1999A3	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2004A1	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2004A2	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2004A3	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2008K1	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2008K2	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2012A1	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2012A2	50R	M62 J25 - J30	
15/09/15 07:22:54	SIG	M62/2012A3	50R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2008K1	40R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2008K2	40R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2012A1	40R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2012A2	40R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2012A3	40R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 07:22:59	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 07:23:04	SIG	M62/2177B1	40R	M62 J25 - J30	
15/09/15 07:23:04	SIG	M62/2177B2	40R	M62 J25 - J30	
15/09/15 07:23:04	SIG	M62/2177L1	40R	M62 J25 - J30	
15/09/15 07:23:04	SIG	M62/2177L2	40R	M62 J25 - J30	
15/09/15 07:23:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:23:14	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:23:17	SIG	M62/1999A1	40R	M62 J25 - J30	
15/09/15 07:23:17	SIG	M62/1999A2	40R	M62 J25 - J30	
15/09/15 07:23:17	SIG	M62/1999A3	40R	M62 J25 - J30	
15/09/15 07:23:17	SIG	M62/2004A1	40R	M62 J25 - J30	
15/09/15 07:23:17	SIG	M62/2004A2	40R	M62 J25 - J30	
15/09/15 07:23:17	SIG	M62/2004A3	40R	M62 J25 - J30	
15/09/15 07:23:18	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 07:23:18	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 07:23:18	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 07:23:18	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 07:23:20	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1974A1	50R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1974A2	50R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1974A3	50R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1974A4	50R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1979K1	40R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1979K2	40R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1981A1	40R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1981A2	40R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1981A3	40R	M62 J25 - J30	
15/09/15 07:23:30	SIG	M62/1981A4	40R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1968A1	50R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1968A2	50R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1968A3	50R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1968A4	50R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1974A1	40R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1974A2	40R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1974A3	40R	M62 J25 - J30	
15/09/15 07:23:59	SIG	M62/1974A4	40R	M62 J25 - J30	
15/09/15 07:24:02	SIG	M62/1999J1	40R	M62 J25 - J30	
15/09/15 07:24:02	SIG	M62/1999J2	40R	M62 J25 - J30	
15/09/15 07:24:52	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 07:24:52	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 07:24:52	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 07:24:52	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 07:25:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:25:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:25:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:25:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:26:19	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 07:26:19	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 07:26:19	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 07:26:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:26:26	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:26:32	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:26:55	SIG	M62/2203B1	40R	M62 J25 - J30	
15/09/15 07:26:55	SIG	M62/2203B2	40R	M62 J25 - J30	
15/09/15 07:26:55	SIG	M62/2203B3	40R	M62 J25 - J30	
15/09/15 07:26:59	SIG	M62/2018A1	60R	M62 J25 - J30	
15/09/15 07:26:59	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 07:26:59	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 07:26:59	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 07:27:56	SIG	M62/2177B1	60R	M62 J25 - J30	
15/09/15 07:27:56	SIG	M62/2177B2	60R	M62 J25 - J30	
15/09/15 07:27:56	SIG	M62/2177L1	60R	M62 J25 - J30	
15/09/15 07:27:56	SIG	M62/2177L2	60R	M62 J25 - J30	
15/09/15 07:28:21	SIG	M62/2025B1	50R	M62 J25 - J30	
15/09/15 07:28:21	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 07:28:21	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 07:28:21	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2025B1	40R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:28:27	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2033B2	40R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2033B4	40R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 07:28:42	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1960A1	50R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1960A2	50R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1960A3	50R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1960K1	50R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1960K2	50R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1968A1	40R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1968A2	40R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1968A3	40R	M62 J25 - J30	
15/09/15 07:29:05	SIG	M62/1968A4	40R	M62 J25 - J30	
15/09/15 07:29:26	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:29:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:29:32	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:29:33	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 07:29:33	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 07:29:33	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 07:29:33	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 07:29:33	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 07:29:33	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2050A1	50R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2050A2	50R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2050A3	50R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2050A4	50R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 07:29:38	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 07:29:48	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 07:29:48	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 07:29:48	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 07:29:48	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 07:30:13	SIG	M62/2183B1	50R	M62 J25 - J30	
15/09/15 07:30:13	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:30:13	SIG	M62/2183L1	50R	M62 J25 - J30	
15/09/15 07:30:13	SIG	M62/2183L2	50R	M62 J25 - J30	
15/09/15 07:30:43	SIG	M62/2008K1	50R	M62 J25 - J30	
15/09/15 07:30:43	SIG	M62/2008K2	50R	M62 J25 - J30	
15/09/15 07:30:43	SIG	M62/2012A1	50R	M62 J25 - J30	
15/09/15 07:30:43	SIG	M62/2012A2	50R	M62 J25 - J30	
15/09/15 07:30:43	SIG	M62/2012A3	50R	M62 J25 - J30	
15/09/15 07:30:46	SIG	M62/2008K1	40R	M62 J25 - J30	
15/09/15 07:30:46	SIG	M62/2008K2	40R	M62 J25 - J30	
15/09/15 07:30:46	SIG	M62/2012A1	40R	M62 J25 - J30	
15/09/15 07:30:46	SIG	M62/2012A2	40R	M62 J25 - J30	
15/09/15 07:30:46	SIG	M62/2012A3	40R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1960A1	40R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1960A2	40R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1960A3	40R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1960K1	40R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/1960K2	40R	M62 J25 - J30	
15/09/15 07:31:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:31:44	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:31:49	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:32:14	SIG	M62/2183B1	40R	M62 J25 - J30	
15/09/15 07:32:14	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:32:14	SIG	M62/2183L1	40R	M62 J25 - J30	
15/09/15 07:32:14	SIG	M62/2183L2	40R	M62 J25 - J30	
15/09/15 07:32:17	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 07:32:17	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2189B1	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2189B2	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2189B3	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2189B4	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 07:32:21	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 07:33:04	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 07:33:10	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2189B1	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2189B2	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2189B3	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2189B4	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2194B1	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2194B2	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2194B3	40R	M62 J25 - J30	
15/09/15 07:33:17	SIG	M62/2194B4	40R	M62 J25 - J30	
15/09/15 07:33:25	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 07:33:25	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 07:33:25	SIG	M62/1956A1	40R	M62 J25 - J30	
15/09/15 07:33:25	SIG	M62/1956A2	40R	M62 J25 - J30	
15/09/15 07:33:25	SIG	M62/1956A3	40R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2050A1	40R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2050A2	40R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2050A3	40R	M62 J25 - J30	
15/09/15 07:33:41	SIG	M62/2050A4	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2041A1	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2041A2	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2041A3	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2041A4	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2050A1	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2050A2	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2050A3	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2050A4	40R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 07:33:47	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 07:34:00	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 07:34:00	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 07:34:00	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1999A1	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1999A2	50R	M62 J25 - J30	
15/09/15 07:34:24	SIG	M62/1999A3	50R	M62 J25 - J30	
15/09/15 07:34:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:34:35	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:34:41	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 07:34:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:34:48	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:34:53	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2194B1	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2194B2	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2194B3	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2194B4	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2197B1	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2197B2	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2197B3	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2199M1	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2199M2	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2203B1	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2203B2	40R	M62 J25 - J30	
15/09/15 07:35:43	SIG	M62/2203B3	40R	M62 J25 - J30	
15/09/15 07:36:25	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 07:36:25	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 07:36:25	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2183B1	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2183L1	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2183L2	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2189B1	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2189B2	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2189B3	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2189B4	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 07:37:17	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 07:37:38	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 07:37:47	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 07:37:47	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 07:37:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:37:51	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 07:37:57	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 07:38:43	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 07:38:48	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 07:39:32	SIG	M62/1999A1	40R	M62 J25 - J30	
15/09/15 07:39:32	SIG	M62/1999A2	40R	M62 J25 - J30	
15/09/15 07:39:32	SIG	M62/1999A3	40R	M62 J25 - J30	
15/09/15 07:39:32	SIG	M62/1999J1	40R	M62 J25 - J30	
15/09/15 07:39:32	SIG	M62/1999J2	40R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 07:39:41	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 07:39:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:39:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:39:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:39:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2018A1	60R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 07:39:48	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 07:39:52	SIG	M62/1974A1	50R	M62 J25 - J30	
15/09/15 07:39:52	SIG	M62/1974A2	50R	M62 J25 - J30	
15/09/15 07:39:52	SIG	M62/1974A3	50R	M62 J25 - J30	
15/09/15 07:39:52	SIG	M62/1974A4	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/1992B1	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/1992B2	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/1992B3	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/1992B4	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:40:12	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/1992B1	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/1992B2	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/1992B3	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/1992B4	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:40:17	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:40:18	SIG	M606/2003B1	LDR	M62 J25 - J30	
15/09/15 07:40:18	SIG	M606/2003B2	50R	M62 J25 - J30	
15/09/15 07:40:18	SIG	M62/2005M1	TI	M62 J25 - J30	
15/09/15 07:40:18	SIG	M62/2005M2	TI	M62 J25 - J30	
15/09/15 07:40:22	SIG	M62/1992B1	30R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1987B1	NR	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1987B2	NR	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1987B3	NR	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1987B4	NR	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1992B1	20R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1992B2	40R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1992B3	40R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1992B4	40R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1999B1	REDX	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1999B2	50R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1999B3	50R	M62 J25 - J30	
15/09/15 07:40:28	SIG	M62/1999B4	50R	M62 J25 - J30	
15/09/15 07:40:34	SIG	M62/1992B1	STOP	M62 J25 - J30	
15/09/15 07:40:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:40:55	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1987B1	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1987B2	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1987B3	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1987B4	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1992B1	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1992B2	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1992B3	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1992B4	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1999B1	BLNK	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1999B2	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1999B3	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/1999B4	OFF	M62 J25 - J30	
15/09/15 07:41:00	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:41:01	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 07:41:01	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 07:41:01	SIG	M62/2005M1	OFF	M62 J25 - J30	
15/09/15 07:41:01	SIG	M62/2005M2	OFF	M62 J25 - J30	
15/09/15 07:41:33	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 07:41:33	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 07:41:33	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 07:41:33	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 07:42:03	SIG	M62/1992A1	40R	M62 J25 - J30	
15/09/15 07:42:03	SIG	M62/1992A2	40R	M62 J25 - J30	
15/09/15 07:42:03	SIG	M62/1992A3	40R	M62 J25 - J30	
15/09/15 07:42:03	SIG	M62/1992J1	40R	M62 J25 - J30	
15/09/15 07:43:31	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 07:43:31	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 07:43:31	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 07:43:45	SIG	M62/1968A1	50R	M62 J25 - J30	
15/09/15 07:43:45	SIG	M62/1968A2	50R	M62 J25 - J30	
15/09/15 07:43:45	SIG	M62/1968A3	50R	M62 J25 - J30	
15/09/15 07:43:45	SIG	M62/1968A4	50R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 07:43:57	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 07:43:58	SIG	M62/2025B1	50R	M62 J25 - J30	
15/09/15 07:43:58	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 07:43:58	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 07:43:58	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2025B1	40R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:44:03	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 07:44:20	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 07:44:20	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 07:44:20	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 07:44:20	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 07:44:25	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 07:44:25	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 07:44:25	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 07:44:25	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2033B2	40R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2033B4	40R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 07:44:56	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 07:46:03	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 07:46:03	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 07:46:08	SIG	M62/1979K1	40R	M62 J25 - J30	
15/09/15 07:46:08	SIG	M62/1979K2	40R	M62 J25 - J30	
15/09/15 07:46:08	SIG	M62/1981A1	40R	M62 J25 - J30	
15/09/15 07:46:08	SIG	M62/1981A2	40R	M62 J25 - J30	
15/09/15 07:46:08	SIG	M62/1981A3	40R	M62 J25 - J30	
15/09/15 07:46:08	SIG	M62/1981A4	40R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2197B1	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2197B2	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2197B3	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2199M1	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2199M2	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2203B1	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2203B2	60R	M62 J25 - J30	
15/09/15 07:47:01	SIG	M62/2203B3	60R	M62 J25 - J30	
15/09/15 07:47:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:47:03	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:47:08	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:47:11	SIG	M62/1999J1	40R	M62 J25 - J30	
15/09/15 07:47:11	SIG	M62/1999J2	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1968A1	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1968A2	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1968A3	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1968A4	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1974A1	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1974A2	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1974A3	40R	M62 J25 - J30	
15/09/15 07:47:28	SIG	M62/1974A4	40R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 07:47:49	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:47:53	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2183B1	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2183B2	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2183L1	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2183L2	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2189B1	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2189B2	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2189B3	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2189B4	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2194B1	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2194B2	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2194B3	60R	M62 J25 - J30	
15/09/15 07:48:02	SIG	M62/2194B4	60R	M62 J25 - J30	
15/09/15 07:49:12	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 07:49:12	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 07:49:12	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 07:49:12	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 07:49:35	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 07:49:53	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 07:49:53	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 07:49:53	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 07:49:53	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 07:50:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:50:06	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:50:12	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1992A1	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1992A2	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1992A3	40R	M62 J25 - J30	
15/09/15 07:50:41	SIG	M62/1992J1	40R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1960A1	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1960A2	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1960A3	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1960K1	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M62/1960K2	50R	M62 J25 - J30	
15/09/15 07:50:56	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 07:50:56	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 07:51:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:51:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 07:51:12	SIG	M62/1960A1	40R	M62 J25 - J30	
15/09/15 07:51:12	SIG	M62/1960A2	40R	M62 J25 - J30	
15/09/15 07:51:12	SIG	M62/1960A3	40R	M62 J25 - J30	
15/09/15 07:51:12	SIG	M62/1960K1	40R	M62 J25 - J30	
15/09/15 07:51:12	SIG	M62/1960K2	40R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 07:51:38	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1979K1	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1979K2	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1981A1	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1981A2	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1981A3	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1981A4	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 07:51:49	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 07:52:11	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2041A1	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2041A2	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2041A3	40R	M62 J25 - J30	
15/09/15 07:52:24	SIG	M62/2041A4	40R	M62 J25 - J30	
15/09/15 07:52:40	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 07:52:40	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 07:52:40	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 07:52:40	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 07:52:55	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 07:52:55	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 07:52:55	SIG	M62/1956A1	40R	M62 J25 - J30	
15/09/15 07:52:55	SIG	M62/1956A2	40R	M62 J25 - J30	
15/09/15 07:52:55	SIG	M62/1956A3	40R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1974A1	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1974A2	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1974A3	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1974A4	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 07:53:08	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 07:53:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:53:10	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:53:16	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1974A1	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1974A2	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1974A3	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1974A4	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1979K1	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1979K2	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1981A1	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1981A2	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1981A3	40R	M62 J25 - J30	
15/09/15 07:53:49	SIG	M62/1981A4	40R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 07:54:18	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 07:54:43	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 07:54:43	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 07:54:43	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 07:54:43	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 07:54:48	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 07:54:48	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 07:54:48	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 07:54:48	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 07:56:10	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 07:56:10	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 07:56:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:56:15	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 07:56:15	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 07:56:16	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:56:21	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 07:56:22	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 07:57:04	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 07:57:04	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 07:57:04	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 07:57:04	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 07:57:32	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 07:57:43	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 07:57:43	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 07:57:43	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 07:57:43	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1992A1	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1992A2	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1992A3	40R	M62 J25 - J30	
15/09/15 07:57:58	SIG	M62/1992J1	40R	M62 J25 - J30	
15/09/15 07:59:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 07:59:26	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 07:59:31	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 08:00:58	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 08:02:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:02:26	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:02:31	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 08:02:49	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 08:03:51	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 08:03:51	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 08:04:16	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 08:04:16	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 08:04:16	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 08:04:16	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 08:04:22	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 08:04:22	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 08:04:22	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 08:04:22	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 08:05:09	SIG	M62/2004A1	50R	M62 J25 - J30	
15/09/15 08:05:09	SIG	M62/2004A2	50R	M62 J25 - J30	
15/09/15 08:05:09	SIG	M62/2004A3	50R	M62 J25 - J30	
15/09/15 08:05:10	SIG	M62/1999A1	50R	M62 J25 - J30	
15/09/15 08:05:10	SIG	M62/1999A2	50R	M62 J25 - J30	
15/09/15 08:05:10	SIG	M62/1999A3	50R	M62 J25 - J30	
15/09/15 08:05:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:05:26	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:05:31	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:05:37	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 08:05:37	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 08:05:37	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 08:05:37	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 08:05:38	SIG	M62/2004A1	40R	M62 J25 - J30	
15/09/15 08:05:38	SIG	M62/2004A2	40R	M62 J25 - J30	
15/09/15 08:05:38	SIG	M62/2004A3	40R	M62 J25 - J30	
15/09/15 08:06:42	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 08:06:42	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 08:06:42	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 08:06:42	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 08:07:09	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 08:07:09	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 08:08:27	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 08:08:27	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 08:08:27	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 08:08:28	SIG	M62/1999A1	40R	M62 J25 - J30	
15/09/15 08:08:28	SIG	M62/1999A2	40R	M62 J25 - J30	
15/09/15 08:08:28	SIG	M62/1999A3	40R	M62 J25 - J30	
15/09/15 08:08:28	SIG	M62/1999J1	40R	M62 J25 - J30	
15/09/15 08:08:28	SIG	M62/1999J2	40R	M62 J25 - J30	
15/09/15 08:08:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:08:29	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:08:35	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:09:03	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 08:09:03	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 08:09:09	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 08:09:09	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 08:09:30	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 08:09:30	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 08:09:30	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 08:09:30	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1987A1	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1987A3	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1987J1	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1992A1	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1992A2	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1992A3	40R	M62 J25 - J30	
15/09/15 08:10:19	SIG	M62/1992J1	40R	M62 J25 - J30	
15/09/15 08:11:33	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:11:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:11:39	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1974A1	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1974A2	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1974A3	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1974A4	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 08:13:20	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 08:13:58	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 08:13:58	SIG	M62/2113B2	NR	M62 J25 - J30	
15/09/15 08:13:58	SIG	M62/2113B3	NR	M62 J25 - J30	
15/09/15 08:13:58	SIG	M62/2113B4	NR	M62 J25 - J30	
15/09/15 08:13:58	SIG	M62/2120M1	60R	M62 J25 - J30	
15/09/15 08:13:58	SIG	M62/2120M2	60R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1974A1	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1974A2	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1974A3	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1974A4	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1979K1	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1979K2	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1981A1	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1981A2	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1981A3	40R	M62 J25 - J30	
15/09/15 08:14:05	SIG	M62/1981A4	40R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2088B1	REDX	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2088B2	NR	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2088B3	NR	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2088B4	NR	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2097B2	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2097B4	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2106B2	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2106B3	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2106B4	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2113B2	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2113B3	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2113B4	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:14:08	SIG	M62/2117B3	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2074B1	REDX	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2074B2	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2074B3	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2074B4	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2081B1	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2081B2	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2081B3	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2081L1	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2088B2	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2088B3	60R	M62 J25 - J30	
15/09/15 08:14:09	SIG	M62/2088B4	60R	M62 J25 - J30	
15/09/15 08:14:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:14:37	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:14:42	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:14:44	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 08:14:44	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 08:14:50	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 08:14:50	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 08:14:50	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 08:14:50	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 08:15:15	SIG	M62/2088B1	60R	M62 J25 - J30	
15/09/15 08:15:36	SIG	M62/2097B1	60R	M62 J25 - J30	
15/09/15 08:16:00	SIG	M62/2106B1	60R	M62 J25 - J30	
15/09/15 08:16:04	SIG	M62/2113B1	60R	M62 J25 - J30	
15/09/15 08:16:53	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 08:16:53	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 08:16:53	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 08:16:53	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 08:17:41	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:17:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:17:47	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:18:20	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 08:18:20	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 08:18:20	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 08:18:20	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 08:18:26	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 08:18:26	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 08:18:26	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 08:18:26	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 08:19:06	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 08:19:06	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1960A1	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1960A2	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1960A3	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1960K1	50R	M62 J25 - J30	
15/09/15 08:19:48	SIG	M62/1960K2	50R	M62 J25 - J30	
15/09/15 08:20:19	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 08:20:19	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 08:20:24	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 08:20:24	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 08:20:42	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 08:20:42	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 08:20:42	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 08:20:42	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 08:20:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:20:46	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:20:51	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 08:21:14	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2033B2	40R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2033B4	40R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 08:21:24	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 08:23:49	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:23:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:23:55	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1956A1	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1956A2	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1956A3	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1960A1	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1960A2	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1960A3	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1960K1	40R	M62 J25 - J30	
15/09/15 08:24:08	SIG	M62/1960K2	40R	M62 J25 - J30	
15/09/15 08:26:30	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 08:26:30	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 08:26:30	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 08:26:30	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 08:26:35	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 08:26:35	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 08:26:35	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 08:26:35	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 08:26:53	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:26:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:26:59	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:27:23	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 08:27:23	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 08:27:35	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 08:27:35	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 08:28:29	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 08:28:49	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 08:28:49	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 08:28:49	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 08:28:49	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 08:29:09	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 08:29:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:29:57	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:30:02	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:30:30	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 08:30:30	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 08:30:30	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 08:30:30	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 08:31:08	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 08:31:08	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 08:31:08	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 08:31:08	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 08:31:08	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 08:31:08	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 08:31:14	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 08:31:14	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 08:31:14	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 08:31:14	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 08:31:14	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 08:31:14	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 08:32:29	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 08:32:29	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 08:33:00	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:33:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:33:06	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:33:26	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 08:33:26	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 08:33:26	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 08:33:26	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 08:34:52	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 08:34:52	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 08:34:52	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 08:34:55	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 08:34:55	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 08:34:55	SIG	M62/1956A1	40R	M62 J25 - J30	
15/09/15 08:34:55	SIG	M62/1956A2	40R	M62 J25 - J30	
15/09/15 08:34:55	SIG	M62/1956A3	40R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 08:35:35	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2025B1	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:36:28	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2025B1	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2033B2	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2033B4	40R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 08:36:34	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 08:36:38	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 08:36:38	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 08:36:59	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 08:36:59	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 08:36:59	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 08:36:59	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 08:37:02	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 08:37:02	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 08:37:02	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 08:37:02	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 08:37:07	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 08:37:07	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 08:37:07	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 08:37:07	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 08:39:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:39:09	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:39:14	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 08:39:24	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 08:39:49	SIG	M62/2050A1	50R	M62 J25 - J30	
15/09/15 08:39:49	SIG	M62/2050A2	50R	M62 J25 - J30	
15/09/15 08:39:49	SIG	M62/2050A3	50R	M62 J25 - J30	
15/09/15 08:39:49	SIG	M62/2050A4	50R	M62 J25 - J30	
15/09/15 08:39:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:40:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:40:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:40:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:40:11	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:40:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2018A1	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2018A2	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2018A3	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2018A4	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2025A1	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2025A2	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2025A3	40R	M62 J25 - J30	
15/09/15 08:41:08	SIG	M62/2025A4	40R	M62 J25 - J30	
15/09/15 08:41:33	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 08:41:33	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 08:42:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:42:13	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:42:18	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:42:54	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 08:42:54	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 08:42:54	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 08:42:54	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 08:42:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:42:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:43:46	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 08:43:46	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 08:43:46	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 08:43:46	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 08:43:46	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 08:43:46	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 08:43:48	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 08:43:48	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 08:43:48	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 08:43:48	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 08:43:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:43:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:44:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:44:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:45:08	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 08:45:08	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 08:45:08	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 08:45:08	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 08:45:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:45:26	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:45:31	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:45:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:45:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:46:11	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 08:46:11	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 08:46:11	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 08:46:11	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 08:46:38	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 08:46:38	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 08:46:38	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 08:46:38	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 08:46:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:46:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:47:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:47:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:48:01	SIG	M62/2025B1	50R	M62 J25 - J30	
15/09/15 08:48:01	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 08:48:01	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 08:48:01	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 08:48:06	SIG	M62/2025B1	40R	M62 J25 - J30	
15/09/15 08:48:06	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 08:48:06	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 08:48:06	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 08:48:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:48:26	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:48:31	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:48:33	SIG	M62/2018A1	50R	M62 J25 - J30	
15/09/15 08:48:33	SIG	M62/2018A2	50R	M62 J25 - J30	
15/09/15 08:48:33	SIG	M62/2018A3	50R	M62 J25 - J30	
15/09/15 08:48:33	SIG	M62/2018A4	50R	M62 J25 - J30	
15/09/15 08:48:40	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 08:48:40	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 08:48:40	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 08:48:40	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 08:48:46	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 08:48:46	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 08:48:46	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 08:48:46	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 08:48:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:48:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:49:34	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 08:49:34	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 08:49:34	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 08:49:34	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 08:49:55	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 08:49:55	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 08:49:55	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 08:49:55	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 08:49:55	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 08:49:55	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 08:49:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:49:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:50:00	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 08:50:00	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 08:50:00	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 08:50:00	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 08:50:00	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 08:50:00	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 08:50:27	SIG	M62/2008K1	50R	M62 J25 - J30	
15/09/15 08:50:27	SIG	M62/2008K2	50R	M62 J25 - J30	
15/09/15 08:50:27	SIG	M62/2012A1	50R	M62 J25 - J30	
15/09/15 08:50:27	SIG	M62/2012A2	50R	M62 J25 - J30	
15/09/15 08:50:27	SIG	M62/2012A3	50R	M62 J25 - J30	
15/09/15 08:50:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:50:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:51:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:51:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:51:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:51:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:51:17	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 08:51:17	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 08:51:17	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 08:51:17	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 08:51:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:51:24	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:51:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:51:26	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:51:31	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:51:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:52:00	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:52:16	SIG	M62/2050A1	40R	M62 J25 - J30	
15/09/15 08:52:16	SIG	M62/2050A2	40R	M62 J25 - J30	
15/09/15 08:52:16	SIG	M62/2050A3	40R	M62 J25 - J30	
15/09/15 08:52:16	SIG	M62/2050A4	40R	M62 J25 - J30	
15/09/15 08:52:41	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 08:52:41	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 08:52:41	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 08:52:41	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 08:52:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:52:59	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 08:53:00	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 08:53:00	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 08:53:00	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 08:53:00	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 08:53:06	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 08:53:06	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 08:53:06	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 08:53:06	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 08:53:54	SIG	M62/2041A1	40R	M62 J25 - J30	
15/09/15 08:53:54	SIG	M62/2041A2	40R	M62 J25 - J30	
15/09/15 08:53:54	SIG	M62/2041A3	40R	M62 J25 - J30	
15/09/15 08:53:54	SIG	M62/2041A4	40R	M62 J25 - J30	
15/09/15 08:53:55	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 08:53:55	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 08:54:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:54:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:54:10	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:54:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 08:54:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:54:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:54:34	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:56:15	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 08:56:15	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 08:56:15	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 08:56:15	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 08:56:34	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 08:56:34	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 08:56:34	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 08:56:34	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 08:56:41	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 08:56:41	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 08:56:41	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 08:56:41	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 08:57:32	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 08:57:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 08:57:37	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 08:57:37	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 08:57:38	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 08:57:38	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 08:57:38	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 08:57:38	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 08:57:38	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 08:57:46	SIG	M62/2004A1	50R	M62 J25 - J30	
15/09/15 08:57:46	SIG	M62/2004A2	50R	M62 J25 - J30	
15/09/15 08:57:46	SIG	M62/2004A3	50R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2050A1	60R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 08:57:54	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 08:59:21	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 08:59:21	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 08:59:21	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 08:59:21	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 08:59:27	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 08:59:27	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 08:59:27	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 08:59:27	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 08:59:34	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 08:59:34	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 08:59:34	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 08:59:59	SIG	M62/1999A1	50R	M62 J25 - J30	
15/09/15 08:59:59	SIG	M62/1999A2	50R	M62 J25 - J30	
15/09/15 08:59:59	SIG	M62/1999A3	50R	M62 J25 - J30	
15/09/15 08:59:59	SIG	M62/1999J1	50R	M62 J25 - J30	
15/09/15 08:59:59	SIG	M62/1999J2	50R	M62 J25 - J30	
15/09/15 09:00:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:00:37	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 09:00:43	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2018A1	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2041A1	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 09:01:03	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 09:01:19	SIG	M62/1956A1	40R	M62 J25 - J30	
15/09/15 09:01:19	SIG	M62/1956A2	40R	M62 J25 - J30	
15/09/15 09:01:19	SIG	M62/1956A3	40R	M62 J25 - J30	
15/09/15 09:01:29	SIG	M62/1992A1	50R	M62 J25 - J30	
15/09/15 09:01:29	SIG	M62/1992A2	50R	M62 J25 - J30	
15/09/15 09:01:29	SIG	M62/1992A3	50R	M62 J25 - J30	
15/09/15 09:01:29	SIG	M62/1992J1	50R	M62 J25 - J30	
15/09/15 09:01:40	SIG	M62/2157J1	50R	M62 J25 - J30	
15/09/15 09:01:40	SIG	M62/2157J2	50R	M62 J25 - J30	
15/09/15 09:02:09	SIG	M62/1955K1	40R	M62 J25 - J30	
15/09/15 09:02:09	SIG	M62/1955K2	40R	M62 J25 - J30	
15/09/15 09:03:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:03:41	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 09:03:43	SIG	M62/1987A1	50R	M62 J25 - J30	
15/09/15 09:03:43	SIG	M62/1987A3	50R	M62 J25 - J30	
15/09/15 09:03:43	SIG	M62/1987J1	50R	M62 J25 - J30	
15/09/15 09:03:46	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 09:04:03	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 09:04:03	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 09:04:03	SIG	M62/2008K1	60R	M62 J25 - J30	
15/09/15 09:04:03	SIG	M62/2008K2	60R	M62 J25 - J30	
15/09/15 09:04:03	SIG	M62/2012A1	60R	M62 J25 - J30	
15/09/15 09:04:03	SIG	M62/2012A2	60R	M62 J25 - J30	
15/09/15 09:04:03	SIG	M62/2012A3	60R	M62 J25 - J30	
15/09/15 09:05:40	SIG	M62/2157J1	OFF	M62 J25 - J30	
15/09/15 09:05:40	SIG	M62/2157J2	OFF	M62 J25 - J30	
15/09/15 09:06:32	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 09:06:32	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 09:06:32	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 09:06:32	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 09:06:32	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 09:06:32	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 09:06:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:06:45	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 09:06:50	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 09:07:03	SIG	M606/2003B1	OFF	M62 J25 - J30	
15/09/15 09:07:03	SIG	M606/2003B2	OFF	M62 J25 - J30	
15/09/15 09:07:03	SIG	M62/2004A1	60R	M62 J25 - J30	
15/09/15 09:07:03	SIG	M62/2004A2	60R	M62 J25 - J30	
15/09/15 09:07:03	SIG	M62/2004A3	60R	M62 J25 - J30	
15/09/15 09:07:24	SIG	M62/1974A1	50R	M62 J25 - J30	
15/09/15 09:07:24	SIG	M62/1974A2	50R	M62 J25 - J30	
15/09/15 09:07:24	SIG	M62/1974A3	50R	M62 J25 - J30	
15/09/15 09:07:24	SIG	M62/1974A4	50R	M62 J25 - J30	
15/09/15 09:08:15	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 09:08:15	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 09:08:15	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 09:08:15	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 09:08:15	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 09:08:15	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2050A1	50R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2050A2	50R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2050A3	50R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2050A4	50R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 09:08:20	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 09:09:19	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 09:09:19	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 09:09:19	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 09:09:19	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 09:09:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:09:49	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 09:09:54	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 09:10:04	SIG	M62/2050A1	40R	M62 J25 - J30	
15/09/15 09:10:04	SIG	M62/2050A2	40R	M62 J25 - J30	
15/09/15 09:10:04	SIG	M62/2050A3	40R	M62 J25 - J30	
15/09/15 09:10:04	SIG	M62/2050A4	40R	M62 J25 - J30	
15/09/15 09:10:33	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 09:10:33	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 09:10:33	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 09:10:33	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 09:10:43	SIG	M62/1968A1	50R	M62 J25 - J30	
15/09/15 09:10:43	SIG	M62/1968A2	50R	M62 J25 - J30	
15/09/15 09:10:43	SIG	M62/1968A3	50R	M62 J25 - J30	
15/09/15 09:10:43	SIG	M62/1968A4	50R	M62 J25 - J30	
15/09/15 09:12:14	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 09:12:14	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 09:12:20	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1955K1	50R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1955K2	50R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1960A1	50R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1960A2	50R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1960A3	50R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1960K1	50R	M62 J25 - J30	
15/09/15 09:12:29	SIG	M62/1960K2	50R	M62 J25 - J30	
15/09/15 09:12:40	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 09:12:40	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 09:12:40	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 09:13:20	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 09:13:20	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:14:00	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:14:01	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1992A1	60R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1992A2	60R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1992A3	60R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1992J1	60R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1999A1	60R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1999A2	60R	M62 J25 - J30	
15/09/15 09:14:03	SIG	M62/1999A3	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2050A1	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 09:14:04	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 09:14:43	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:14:44	SIG	M62/1956A3	50R	M62 J25 - J30	
15/09/15 09:14:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:14:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:14:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:14:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1979K1	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1979K2	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1981A1	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1981A2	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1981A3	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1981A4	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1987A1	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1987A3	60R	M62 J25 - J30	
15/09/15 09:15:15	SIG	M62/1987J1	60R	M62 J25 - J30	
15/09/15 09:18:03	SIG	M62/1974A1	60R	M62 J25 - J30	
15/09/15 09:18:03	SIG	M62/1974A2	60R	M62 J25 - J30	
15/09/15 09:18:03	SIG	M62/1974A3	60R	M62 J25 - J30	
15/09/15 09:18:03	SIG	M62/1974A4	60R	M62 J25 - J30	
15/09/15 09:18:28	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 09:18:28	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 09:18:28	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 09:18:28	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 09:18:28	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 09:18:28	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2050A1	50R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2050A2	50R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2050A3	50R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2050A4	50R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 09:18:34	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 09:19:03	SIG	M62/2159B1	NR	M62 J25 - J30	
15/09/15 09:19:03	SIG	M62/2159B2	NR	M62 J25 - J30	
15/09/15 09:19:03	SIG	M62/2170B1	NR	M62 J25 - J30	
15/09/15 09:19:03	SIG	M62/2170B2	NR	M62 J25 - J30	
15/09/15 09:19:03	SIG	M62/2170L1	OFF	M62 J25 - J30	
15/09/15 09:19:03	SIG	M62/2170L2	OFF	M62 J25 - J30	
15/09/15 09:20:50	SIG	M62/2050A1	40R	M62 J25 - J30	
15/09/15 09:20:50	SIG	M62/2050A2	40R	M62 J25 - J30	
15/09/15 09:20:50	SIG	M62/2050A3	40R	M62 J25 - J30	
15/09/15 09:20:50	SIG	M62/2050A4	40R	M62 J25 - J30	
15/09/15 09:22:03	SIG	M62/2159B1	OFF	M62 J25 - J30	
15/09/15 09:22:04	SIG	M62/2159B2	OFF	M62 J25 - J30	
15/09/15 09:22:29	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 09:22:29	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 09:22:29	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 09:22:29	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 09:22:29	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 09:22:29	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1955K1	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1955K2	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1956A1	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1956A2	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1960A1	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1960A2	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1960A3	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1960K1	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1960K2	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1968A1	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1968A2	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1968A3	60R	M62 J25 - J30	
15/09/15 09:23:03	SIG	M62/1968A4	60R	M62 J25 - J30	
15/09/15 09:23:43	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:23:43	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2197B1	NR	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2197B2	NR	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2197B3	NR	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2199M1	OFF	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2199M2	OFF	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2203B1	OFF	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2203B2	OFF	M62 J25 - J30	
15/09/15 09:24:03	SIG	M62/2203B3	OFF	M62 J25 - J30	
15/09/15 09:24:32	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:24:32	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:24:51	SIG	M62/2050A1	60R	M62 J25 - J30	
15/09/15 09:24:51	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 09:24:51	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 09:24:51	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2170B1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2170B2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2177B1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2177B2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2177L1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2177L2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2183B1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2183B2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2183L1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2183L2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2189B1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2189B2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2189B3	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2189B4	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2194B1	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2194B2	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2194B3	NR	M62 J25 - J30	
15/09/15 09:25:03	SIG	M62/2194B4	NR	M62 J25 - J30	
15/09/15 09:25:15	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 09:25:15	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 09:25:15	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 09:25:15	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2041A1	40R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2041A2	40R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2041A3	40R	M62 J25 - J30	
15/09/15 09:25:20	SIG	M62/2041A4	40R	M62 J25 - J30	
15/09/15 09:27:03	SIG	M62/2197B1	OFF	M62 J25 - J30	
15/09/15 09:27:04	SIG	M62/2197B2	OFF	M62 J25 - J30	
15/09/15 09:27:04	SIG	M62/2197B3	OFF	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2166K1	50R	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2166K2	50R	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2170K1	50R	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2170K2	50R	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2177A1	REDX	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2177A2	NR	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2177A3	NR	M62 J25 - J30	
15/09/15 09:27:27	SIG	M62/2177A4	NR	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2170A1	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2170A2	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2177A2	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2177A3	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2177A4	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2183A1	REDX	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2183A2	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2183A3	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2183A4	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2189A1	REDX	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2189A2	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2189A3	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2189A4	50R	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2197A1	NR	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2197A2	NR	M62 J25 - J30	
15/09/15 09:27:44	SIG	M62/2197A3	NR	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2159B1	NR	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2159B2	NR	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2170B1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2170B2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2183B1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2183L1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2183L2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2189B1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2189B2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2189B3	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2189B4	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 09:27:58	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2041A1	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 09:29:16	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 09:30:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:30:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:30:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:30:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2117A2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2117A3	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2117A4	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2122K1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2122K2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2124A1	REDX	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2124A2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2124A3	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2124A4	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2135A1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2135A2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2135A3	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2135A4	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2144A1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2144A2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2144J1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2144K1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2151A1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2151A2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2151J1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2151K1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2155A1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2155A2	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2155J1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2155K1	50R	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2157A1	NR	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2157A2	NR	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2157J1	NR	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2157J2	NR	M62 J25 - J30	
15/09/15 09:31:01	SIG	M62/2157K1	NR	M62 J25 - J30	
15/09/15 09:31:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 09:31:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
15/09/15 09:31:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
15/09/15 09:31:06	SIG	M62/2124A3	OFF	M62 J25 - J30	
15/09/15 09:31:07	SIG	M62/2124A3	OFF	M62 J25 - J30	
15/09/15 09:31:30	SIG	M62/2157J1	50R	M62 J25 - J30	
15/09/15 09:31:30	SIG	M62/2157J2	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2125B1	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2132B1	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2132B2	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2132B3	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2137B1	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2137B2	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2137B3	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2137B4	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2147B1	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2147B2	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2147B3	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2147B4	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2159B1	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2159B2	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2159M1	50R	M62 J25 - J30	
15/09/15 09:32:24	SIG	M62/2159M2	50R	M62 J25 - J30	
15/09/15 09:33:53	SIG	M62/2113B1	HSD	M62 J25 - J30	
15/09/15 09:34:46	SIG	M62/2106B1	HSD	M62 J25 - J30	
15/09/15 09:35:54	SIG	M62/2097B1	HSD	M62 J25 - J30	
15/09/15 09:35:54	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 09:37:02	SIG	M62/2088B1	HSD	M62 J25 - J30	
15/09/15 09:37:02	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 09:38:10	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 09:39:18	SIG	M62/2088B1	REDX	M62 J25 - J30	
15/09/15 09:40:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2106B2	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2106B3	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2106B4	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2113B2	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2113B3	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2113B4	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2117B1	NR	M62 J25 - J30	
15/09/15 09:40:12	SIG	M62/2117B3	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2074B2	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2074B3	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2074B4	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2081B1	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2081B2	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2081B3	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2081L1	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2088B2	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2088B3	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2088B4	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2097B2	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2097B4	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2120M1	NR	M62 J25 - J30	
15/09/15 09:40:22	SIG	M62/2120M2	NR	M62 J25 - J30	
15/09/15 09:41:11	SIG	M62/2120M1	OFF	M62 J25 - J30	
15/09/15 09:41:11	SIG	M62/2120M2	OFF	M62 J25 - J30	
15/09/15 09:41:12	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 09:41:12	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 09:41:12	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 09:41:12	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1974A1	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1974A2	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1974A3	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1974A4	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1979K1	OFF	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1979K2	OFF	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1981A1	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1981A2	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1981A3	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1981A4	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1987A1	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1987A3	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1987J1	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1992A1	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1992A2	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1992A3	NR	M62 J25 - J30	
15/09/15 09:41:13	SIG	M62/1992J1	NR	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2074B1	BLNK	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2074B2	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2074B3	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2074B4	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2081B1	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2081B2	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2081B3	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2081L1	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2088B1	BLNK	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2088B2	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2088B3	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2088B4	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2097B2	OFF	M62 J25 - J30	
15/09/15 09:41:22	SIG	M62/2097B4	OFF	M62 J25 - J30	
15/09/15 09:42:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:42:03	SIG	M62/2203B1	60R	M62 J25 - J30	
15/09/15 09:42:03	SIG	M62/2203B2	60R	M62 J25 - J30	
15/09/15 09:42:03	SIG	M62/2203B3	60R	M62 J25 - J30	
15/09/15 09:42:19	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:42:20	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:43:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1955K1	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1955K2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1956A1	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1956A2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1960A1	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1960A2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1960A3	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1960K1	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1960K2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1968A1	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1968A2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1968A3	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1968A4	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1974A1	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1974A2	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1974A3	OFF	M62 J25 - J30	
15/09/15 09:43:13	SIG	M62/1974A4	OFF	M62 J25 - J30	
15/09/15 09:43:23	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:43:33	SIG	M62/1956A3	60R	M62 J25 - J30	
15/09/15 09:44:01	SIG	M62/1956A3	OFF	M62 J25 - J30	
15/09/15 09:44:14	SIG	M62/1981A1	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1981A2	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1981A3	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1981A4	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1987A1	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1987A3	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1987J1	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1992A1	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1992A2	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1992A3	OFF	M62 J25 - J30	
15/09/15 09:44:24	SIG	M62/1992J1	OFF	M62 J25 - J30	
15/09/15 09:45:50	SIG	M62/2079A1	HSD	M62 J25 - J30	
15/09/15 09:46:58	SIG	M62/2088A1	HSD	M62 J25 - J30	
15/09/15 09:47:03	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 09:47:03	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/1999A1	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/1999A2	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/1999A3	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/1999J1	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/1999J2	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/2004A1	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/2004A2	OFF	M62 J25 - J30	
15/09/15 09:47:04	SIG	M62/2004A3	OFF	M62 J25 - J30	
15/09/15 09:48:06	SIG	M62/2079A1	REDX	M62 J25 - J30	
15/09/15 09:48:06	SIG	M62/2097A1	HSD	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2117B3	OFF	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2132B1	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2132B2	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2132B3	NR	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2137B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2137B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2137B3	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2137B4	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2147B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2147B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2147B3	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2147B4	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2159B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2159B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2159M1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2159M2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2177B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2177B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2177L1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2177L2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2183B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2183B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2183L1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2183L2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2189B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2189B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2189B3	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2189B4	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2194B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2194B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2194B3	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2194B4	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2197B1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2197B2	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2197B3	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2199M1	60R	M62 J25 - J30	
15/09/15 09:48:44	SIG	M62/2199M2	60R	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2117A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2117A3	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2117A4	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2122K1	OFF	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2122K2	OFF	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2124A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2124A3	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2124A4	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2135A1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2135A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2135A3	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2135A4	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2144A1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2144A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2144J1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2144K1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2151A1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2151A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2151J1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2151K1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2155A1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2155A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2155J1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2155K1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2157A1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2157A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2157K1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2170A1	OFF	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2170A2	OFF	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2177A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2177A3	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2177A4	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2183A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2183A3	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2183A4	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2189A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2189A3	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2189A4	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2197A1	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2197A2	NR	M62 J25 - J30	
15/09/15 09:48:58	SIG	M62/2197A3	NR	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2132B1	60R	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2132B2	60R	M62 J25 - J30	
15/09/15 09:49:04	SIG	M62/2132B3	60R	M62 J25 - J30	
15/09/15 09:49:14	SIG	M62/2088A1	REDX	M62 J25 - J30	
15/09/15 09:49:14	SIG	M62/2106A1	HSD	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2166K1	OFF	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2166K2	OFF	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2170K1	OFF	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2170K2	OFF	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2177A1	BLNK	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2177A2	OFF	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2177A3	OFF	M62 J25 - J30	
15/09/15 09:50:08	SIG	M62/2177A4	OFF	M62 J25 - J30	
15/09/15 09:50:19	SIG	M62/2157J1	NR	M62 J25 - J30	
15/09/15 09:50:19	SIG	M62/2157J2	NR	M62 J25 - J30	
15/09/15 09:50:22	SIG	M62/2097A1	REDX	M62 J25 - J30	
15/09/15 09:50:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:50:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 09:51:30	SIG	M62/2106A1	REDX	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2124A1	BLNK	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2124A2	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2124A3	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2124A4	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2135A1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2135A2	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2135A3	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2135A4	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2144A1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2144A2	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2144J1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2144K1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2151A1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2151A2	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2151J1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2151K1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2155A1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2155A2	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2155J1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2155K1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2157A1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2157A2	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2157K1	OFF	M62 J25 - J30	
15/09/15 09:51:59	SIG	M62/2183A2	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2124A1	BLNK	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2183A1	BLNK	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2183A3	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2183A4	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2189A1	BLNK	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2189A2	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2189A3	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2189A4	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2197A1	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2197A2	OFF	M62 J25 - J30	
15/09/15 09:52:00	SIG	M62/2197A3	OFF	M62 J25 - J30	
15/09/15 09:52:01	SIG	M62/2189A1	BLNK	M62 J25 - J30	
15/09/15 09:52:31	SIG	M62/2065A2	NR	M62 J25 - J30	
15/09/15 09:52:31	SIG	M62/2065A3	NR	M62 J25 - J30	
15/09/15 09:52:31	SIG	M62/2065A4	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2073K1	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2079A2	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2079A3	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2079A4	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2088A2	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2088A3	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2088A4	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2097A2	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2097A3	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2097A4	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2106A2	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2106A3	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2106A4	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2114A1	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2114A2	NR	M62 J25 - J30	
15/09/15 09:52:48	SIG	M62/2114A3	NR	M62 J25 - J30	
15/09/15 09:53:20	SIG	M62/2157J1	OFF	M62 J25 - J30	
15/09/15 09:53:20	SIG	M62/2157J2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2073K1	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2079A1	BLNK	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2079A2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2079A3	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2079A4	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2088A1	BLNK	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2088A2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2088A3	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2088A4	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2097A1	BLNK	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2097A2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2097A3	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2097A4	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2106A1	BLNK	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2106A2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2106A4	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2114A1	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2114A2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2114A3	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2117A1	BLNK	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2117A2	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2117A3	OFF	M62 J25 - J30	
15/09/15 09:53:48	SIG	M62/2117A4	OFF	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2132B1	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2132B2	NR	M62 J25 - J30	
15/09/15 09:58:04	SIG	M62/2132B3	NR	M62 J25 - J30	
15/09/15 10:01:04	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 10:01:04	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 10:01:04	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 10:01:04	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 10:01:04	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2132B1	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2132B2	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2132B3	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2137B1	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2137B2	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2137B3	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2137B4	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2147B1	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2147B2	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2147B3	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2147B4	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2159B1	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2159B2	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2159M1	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2159M2	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2170B1	NR	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2170B2	NR	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
15/09/15 10:02:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
15/09/15 10:02:16	SIG	M62/2025A1	HSD	M62 J25 - J30	
15/09/15 10:03:16	SIG	M62/2033A1	HSD	M62 J25 - J30	
15/09/15 10:03:55	SIG	M62/2137B1	50R	M62 J25 - J30	
15/09/15 10:03:55	SIG	M62/2137B2	50R	M62 J25 - J30	
15/09/15 10:03:55	SIG	M62/2137B3	50R	M62 J25 - J30	
15/09/15 10:03:55	SIG	M62/2137B4	50R	M62 J25 - J30	
15/09/15 10:03:55	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 10:03:55	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2132B1	NR	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2132B2	NR	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2132B3	NR	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2137B1	40R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2137B2	40R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2137B3	40R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2137B4	40R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2147B1	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2147B2	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2147B3	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2147B4	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2159B1	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2159B2	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2159M1	60R	M62 J25 - J30	
15/09/15 10:04:00	SIG	M62/2159M2	60R	M62 J25 - J30	
15/09/15 10:04:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 10:04:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
15/09/15 10:04:16	SIG	M62/2041A1	HSD	M62 J25 - J30	
15/09/15 10:04:36	SIG	M62/2147B1	50R	M62 J25 - J30	
15/09/15 10:04:36	SIG	M62/2147B2	50R	M62 J25 - J30	
15/09/15 10:04:36	SIG	M62/2147B3	50R	M62 J25 - J30	
15/09/15 10:04:36	SIG	M62/2147B4	50R	M62 J25 - J30	
15/09/15 10:04:42	SIG	M62/2147B1	40R	M62 J25 - J30	
15/09/15 10:04:42	SIG	M62/2147B2	40R	M62 J25 - J30	
15/09/15 10:04:42	SIG	M62/2147B3	40R	M62 J25 - J30	
15/09/15 10:04:42	SIG	M62/2147B4	40R	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2132B1	60R	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2132B2	60R	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2132B3	60R	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2197B1	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2197B2	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2197B3	NR	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2199M1	OFF	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2199M2	OFF	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2203B1	OFF	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2203B2	OFF	M62 J25 - J30	
15/09/15 10:05:04	SIG	M62/2203B3	OFF	M62 J25 - J30	
15/09/15 10:05:23	SIG	M62/2050A1	HSD	M62 J25 - J30	
15/09/15 10:05:24	SIG	M62/2033A1	REDX	M62 J25 - J30	
15/09/15 10:06:15	SIG	M62/2041A1	REDX	M62 J25 - J30	
15/09/15 10:07:15	SIG	M62/2050A1	REDX	M62 J25 - J30	
15/09/15 10:08:04	SIG	M62/2197B1	OFF	M62 J25 - J30	
15/09/15 10:08:05	SIG	M62/2197B2	OFF	M62 J25 - J30	
15/09/15 10:08:05	SIG	M62/2197B3	OFF	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2025A2	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2025A3	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2025A4	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2033A2	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2033A3	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2033A4	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2041A2	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2041A3	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2041A4	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2050A2	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2050A3	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2050A4	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2057A1	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2057A2	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2057A3	NR	M62 J25 - J30	
15/09/15 10:08:16	SIG	M62/2057J1	NR	M62 J25 - J30	
15/09/15 10:08:36	SIG	M62/2137B1	60R	M62 J25 - J30	
15/09/15 10:08:36	SIG	M62/2137B2	60R	M62 J25 - J30	
15/09/15 10:08:36	SIG	M62/2137B3	60R	M62 J25 - J30	
15/09/15 10:08:36	SIG	M62/2137B4	60R	M62 J25 - J30	
15/09/15 10:08:40	SIG	M62/2125B1	50R	M62 J25 - J30	
15/09/15 10:08:40	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 10:08:40	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 10:08:51	SIG	M62/2159B1	50R	M62 J25 - J30	
15/09/15 10:08:51	SIG	M62/2159B2	50R	M62 J25 - J30	
15/09/15 10:08:51	SIG	M62/2159M1	50R	M62 J25 - J30	
15/09/15 10:08:51	SIG	M62/2159M2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2074B1	REDX	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2074B2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2074B3	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2074B4	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2081B1	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2081B2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2081B3	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2081L1	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2088B1	REDX	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2117B3	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2120M1	50R	M62 J25 - J30	
15/09/15 10:08:55	SIG	M62/2120M2	50R	M62 J25 - J30	
15/09/15 10:08:57	SIG	M62/2159B1	40R	M62 J25 - J30	
15/09/15 10:08:57	SIG	M62/2159B2	40R	M62 J25 - J30	
15/09/15 10:08:57	SIG	M62/2159M1	40R	M62 J25 - J30	
15/09/15 10:08:57	SIG	M62/2159M2	40R	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2008K1	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2008K2	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2012A1	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2012A2	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2012A3	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2018A1	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2018A2	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2018A3	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2018A4	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2025A1	BLNK	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2025A2	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2025A3	OFF	M62 J25 - J30	
15/09/15 10:09:16	SIG	M62/2025A4	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2033A1	BLNK	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2033A2	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2033A3	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2033A4	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2041A1	BLNK	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2041A2	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2041A3	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2041A4	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2050A1	BLNK	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2050A2	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2050A3	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2050A4	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2057A1	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2057A2	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2057A3	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2057J1	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2065A1	BLNK	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2065A2	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2065A3	OFF	M62 J25 - J30	
15/09/15 10:09:17	SIG	M62/2065A4	OFF	M62 J25 - J30	
15/09/15 10:11:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 10:11:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 10:11:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 10:11:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2147B1	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2147B2	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2147B3	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2147B4	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2159B1	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2159B2	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2159M1	60R	M62 J25 - J30	
15/09/15 10:12:52	SIG	M62/2159M2	60R	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2177B1	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2177B2	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2177L1	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2177L2	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2183B1	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2183B2	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2183L1	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2183L2	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2189B1	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2189B2	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2189B3	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2189B4	NR	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2194B1	OFF	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2194B2	OFF	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2194B3	OFF	M62 J25 - J30	
15/09/15 10:14:04	SIG	M62/2194B4	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2177B1	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2177B2	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2177L1	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2177L2	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2183B1	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2183L1	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2183L2	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2189B1	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2189B2	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2189B3	OFF	M62 J25 - J30	
15/09/15 10:17:05	SIG	M62/2189B4	OFF	M62 J25 - J30	
15/09/15 10:22:46	SIG	M62/2137B4	OFF	M62 J25 - J30	
15/09/15 10:22:47	SIG	M62/2137B4	60R	M62 J25 - J30	
15/09/15 10:28:29	SIG	M62/2057B1	HSD	M62 J25 - J30	
15/09/15 10:30:28	SIG	M62/2041B1	HSD	M62 J25 - J30	
15/09/15 10:30:28	SIG	M62/2057B1	REDX	M62 J25 - J30	
15/09/15 10:30:28	SIG	M621/1002B1	HSD	M62 J25 - J30	
15/09/15 10:30:28	SIG	M621/1010B1	60R	M62 J25 - J30	
15/09/15 10:30:28	SIG	M621/1010B2	60R	M62 J25 - J30	
15/09/15 10:31:27	SIG	M62/2033B1	HSD	M62 J25 - J30	
15/09/15 10:32:04	SIG	M62/2170B1	OFF	M62 J25 - J30	
15/09/15 10:32:04	SIG	M62/2170B2	OFF	M62 J25 - J30	
15/09/15 10:32:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
15/09/15 10:32:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
15/09/15 10:32:28	SIG	M62/2025B1	HSD	M62 J25 - J30	
15/09/15 10:32:28	SIG	M62/2041B1	REDX	M62 J25 - J30	
15/09/15 10:33:20	SIG	M62/2033B1	REDX	M62 J25 - J30	
15/09/15 10:34:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
15/09/15 10:34:34	SIG	M62/2057B2	NR	M62 J25 - J30	
15/09/15 10:34:34	SIG	M62/2057B3	NR	M62 J25 - J30	
15/09/15 10:34:34	SIG	M62/2057B4	NR	M62 J25 - J30	
15/09/15 10:34:34	SIG	M62/2065B2	NR	M62 J25 - J30	
15/09/15 10:34:34	SIG	M62/2065B3	NR	M62 J25 - J30	
15/09/15 10:34:34	SIG	M62/2065B4	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2018B1	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2018B2	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2018B3	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2018L1	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2025B2	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2025B3	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2025B4	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2033B2	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2033B3	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2033B4	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2041B2	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2041B3	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2041B4	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2050B2	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2050B3	NR	M62 J25 - J30	
15/09/15 10:34:35	SIG	M62/2050B4	NR	M62 J25 - J30	
15/09/15 10:35:34	SIG	M62/2069M1	OFF	M62 J25 - J30	
15/09/15 10:35:34	SIG	M62/2069M2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2012B1	BLNK	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2012B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2012B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2012B4	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2018B1	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2018B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2018B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2018L1	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2025B1	BLNK	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2025B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2025B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2025B4	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2033B1	BLNK	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2033B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2033B4	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2041B1	BLNK	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2041B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2041B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2041B4	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2050B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2050B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2050B4	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2057B1	BLNK	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2057B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2057B3	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2057B4	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M62/2065M1	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M621/1002B1	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M621/1002B2	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M621/1010B1	OFF	M62 J25 - J30	
15/09/15 10:35:35	SIG	M621/1010B2	OFF	M62 J25 - J30	
15/09/15 10:43:17	SIG	M62/2065B2	NR	M62 J25 - J30	
15/09/15 10:43:17	SIG	M62/2065B3	NR	M62 J25 - J30	
15/09/15 10:43:17	SIG	M62/2065B4	NR	M62 J25 - J30	
15/09/15 10:43:17	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 10:43:17	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 10:43:17	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2074B1	BLNK	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2074B2	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2074B3	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2074B4	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2081B1	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2081B2	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2081B3	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2081L1	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2088B2	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2088B3	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2088B4	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2097B2	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2097B4	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2106B2	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2106B3	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2106B4	NR	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2117B3	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2120M1	OFF	M62 J25 - J30	
15/09/15 10:43:27	SIG	M62/2120M2	OFF	M62 J25 - J30	
15/09/15 10:46:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
15/09/15 10:46:17	SIG	M62/2065B3	OFF	M62 J25 - J30	
15/09/15 10:46:17	SIG	M62/2065B4	OFF	M62 J25 - J30	
15/09/15 10:46:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
15/09/15 10:46:27	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2081L1	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2088B2	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2088B3	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2088B4	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2097B2	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2097B4	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 10:46:37	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 10:46:38	SIG	M62/2088B1	BLNK	M62 J25 - J30	
15/09/15 10:46:38	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 10:46:38	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2132B1	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2132B2	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2132B3	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2137B1	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2137B2	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2137B3	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2137B4	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2147B1	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2147B2	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2147B3	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2147B4	NR	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2159B1	OFF	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2159B2	OFF	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2159M1	OFF	M62 J25 - J30	
15/09/15 10:48:05	SIG	M62/2159M2	OFF	M62 J25 - J30	
15/09/15 10:51:05	SIG	M62/2137B1	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2132B1	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2132B2	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2132B3	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2137B2	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2137B3	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2137B4	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2147B1	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2147B2	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2147B3	OFF	M62 J25 - J30	
15/09/15 10:51:06	SIG	M62/2147B4	OFF	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2106B2	NR	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2106B3	NR	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2106B4	NR	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 12:48:17	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 12:48:47	SIG	M62/2113B2	60R	M62 J25 - J30	
15/09/15 12:48:47	SIG	M62/2113B3	60R	M62 J25 - J30	
15/09/15 12:48:47	SIG	M62/2113B4	60R	M62 J25 - J30	
15/09/15 12:58:56	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 12:58:56	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 12:58:56	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 12:58:56	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 12:58:56	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 12:58:56	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 12:59:01	SIG	M62/2194B1	40R	M62 J25 - J30	
15/09/15 12:59:01	SIG	M62/2194B2	40R	M62 J25 - J30	
15/09/15 12:59:01	SIG	M62/2194B3	40R	M62 J25 - J30	
15/09/15 12:59:01	SIG	M62/2194B4	40R	M62 J25 - J30	
15/09/15 12:59:01	SIG	M62/2199M1	40R	M62 J25 - J30	
15/09/15 12:59:01	SIG	M62/2199M2	40R	M62 J25 - J30	
15/09/15 12:59:06	SIG	M62/2194B1	30R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2189B1	NR	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2189B2	NR	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2189B3	NR	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2189B4	NR	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2194B1	20R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2194B2	40R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2194B3	40R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2194B4	40R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2199M1	40R	M62 J25 - J30	
15/09/15 12:59:11	SIG	M62/2199M2	40R	M62 J25 - J30	
15/09/15 12:59:16	SIG	M62/2194B1	STOP	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2189B1	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2189B2	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2189B3	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2189B4	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2194B1	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2194B2	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2194B3	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2194B4	NR	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2197B1	OFF	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2197B2	OFF	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2197B3	OFF	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2199M1	OFF	M62 J25 - J30	
15/09/15 13:00:53	SIG	M62/2199M2	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2189B1	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2189B2	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2189B3	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2189B4	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2194B1	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2194B2	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2194B3	OFF	M62 J25 - J30	
15/09/15 13:03:54	SIG	M62/2194B4	OFF	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 13:15:10	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1956A1	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1956A2	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1960A1	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1960A2	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1960A3	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1960K1	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1960K2	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1968A1	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1968A2	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1968A3	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1968A4	50R	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1974A1	NR	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1974A2	NR	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1974A3	NR	M62 J25 - J30	
15/09/15 13:28:05	SIG	M62/1974A4	NR	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1956A1	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1956A2	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1960A1	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1960A2	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1960A3	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1960K1	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1960K2	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1968A1	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1968A2	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1968A3	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1968A4	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1974A1	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1974A2	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1974A3	OFF	M62 J25 - J30	
15/09/15 13:32:07	SIG	M62/1974A4	OFF	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2008K1	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2008K2	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2012A1	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2012A2	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2012A3	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2025A1	REDX	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2025A2	NR	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2025A3	NR	M62 J25 - J30	
15/09/15 14:43:02	SIG	M62/2025A4	NR	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2012A1	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2033A1	REDX	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2041A1	REDX	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2050A1	REDX	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2057A1	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2057A2	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2057A3	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2057J1	60R	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2065A1	REDX	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2065A2	NR	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2065A3	NR	M62 J25 - J30	
15/09/15 14:43:03	SIG	M62/2065A4	NR	M62 J25 - J30	
15/09/15 14:44:10	SIG	M62/2050A1	60R	M62 J25 - J30	
15/09/15 14:44:29	SIG	M62/2041A1	60R	M62 J25 - J30	
15/09/15 14:44:49	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 14:44:53	SIG	M62/2018A1	60R	M62 J25 - J30	
15/09/15 14:44:53	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 14:46:18	SIG	M62/2065M1	NR	M62 J25 - J30	
15/09/15 14:46:18	SIG	M62/2069M1	60R	M62 J25 - J30	
15/09/15 14:46:18	SIG	M62/2069M2	60R	M62 J25 - J30	
15/09/15 14:46:18	SIG	M621/1010B1	60R	M62 J25 - J30	
15/09/15 14:46:18	SIG	M621/1010B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2012B1	REDX	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2012B2	NR	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2012B3	NR	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2012B4	NR	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2025B1	REDX	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2033B1	REDX	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2041B1	REDX	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2050B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2050B2	NR	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2050B3	NR	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2050B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2050B4	NR	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2050B4	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2057B1	REDX	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2057B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2057B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2057B4	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2065B1	REDX	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2065B2	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2065B3	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2065B4	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M62/2065M1	60R	M62 J25 - J30	
15/09/15 14:46:19	SIG	M621/1002B1	HSD	M62 J25 - J30	
15/09/15 14:46:19	SIG	M621/1002B2	60R	M62 J25 - J30	
15/09/15 14:46:57	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 14:46:57	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 14:46:57	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 14:47:02	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 14:47:02	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 14:47:02	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 14:47:02	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 14:47:02	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 14:47:02	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 14:47:30	SIG	M62/2025B1	40R	M62 J25 - J30	
15/09/15 14:47:55	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 14:48:12	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 14:48:37	SIG	M62/2057B1	60R	M62 J25 - J30	
15/09/15 14:48:37	SIG	M621/1002B1	60R	M62 J25 - J30	
15/09/15 14:48:37	SIG	M621/1010B1	OFF	M62 J25 - J30	
15/09/15 14:48:37	SIG	M621/1010B2	OFF	M62 J25 - J30	
15/09/15 14:49:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:49:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:49:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:49:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 14:50:57	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 14:53:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:53:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:53:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:53:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2025B1	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 14:57:18	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2018B1	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2018B2	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2018B3	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2018L1	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2025B1	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 14:57:24	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 14:59:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:59:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:59:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 14:59:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2079A1	REDX	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2079A2	60R	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2079A3	60R	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2079A4	60R	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2088A1	REDX	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2088A2	NR	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2088A3	NR	M62 J25 - J30	
15/09/15 15:02:35	SIG	M62/2088A4	NR	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2018B1	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2018B2	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2018B3	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2018L1	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2025B1	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2025B2	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2025B3	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2025B4	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 15:05:43	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 15:07:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 15:07:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 15:07:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 15:07:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 15:18:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:14:39	SIG	M62/2065B2	50R	M62 J25 - J30	
15/09/15 16:14:39	SIG	M62/2065B3	50R	M62 J25 - J30	
15/09/15 16:14:39	SIG	M62/2065B4	50R	M62 J25 - J30	
15/09/15 16:14:39	SIG	M62/2065M1	50R	M62 J25 - J30	
15/09/15 16:14:39	SIG	M621/1002B1	50R	M62 J25 - J30	
15/09/15 16:14:39	SIG	M621/1002B2	50R	M62 J25 - J30	
15/09/15 16:14:40	SIG	M62/2074B1	REDX	M62 J25 - J30	
15/09/15 16:14:40	SIG	M62/2074B2	60R	M62 J25 - J30	
15/09/15 16:14:40	SIG	M62/2074B3	60R	M62 J25 - J30	
15/09/15 16:14:40	SIG	M62/2074B4	60R	M62 J25 - J30	
15/09/15 16:14:40	SIG	M621/1010B1	50R	M62 J25 - J30	
15/09/15 16:14:40	SIG	M621/1010B2	50R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M62/2065B2	40R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M62/2065B3	40R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M62/2065B4	40R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M62/2065M1	40R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M62/2069M1	50R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M62/2069M2	50R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M621/1002B1	40R	M62 J25 - J30	
15/09/15 16:14:45	SIG	M621/1002B2	40R	M62 J25 - J30	
15/09/15 16:17:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:18:11	SIG	M62/2081B1	60R	M62 J25 - J30	
15/09/15 16:18:11	SIG	M62/2081B2	60R	M62 J25 - J30	
15/09/15 16:18:11	SIG	M62/2081B3	60R	M62 J25 - J30	
15/09/15 16:18:11	SIG	M62/2081L1	60R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 16:18:23	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2033B2	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2033B4	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 16:18:29	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M62/2065B2	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M62/2065B3	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M62/2065B4	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M62/2065M1	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M62/2069M1	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M62/2069M2	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M621/1002B1	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M621/1002B2	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M621/1010B1	60R	M62 J25 - J30	
15/09/15 16:18:40	SIG	M621/1010B2	60R	M62 J25 - J30	
15/09/15 16:20:07	SIG	M621/1010B1	50R	M62 J25 - J30	
15/09/15 16:20:07	SIG	M621/1010B2	50R	M62 J25 - J30	
15/09/15 16:20:08	SIG	M62/2065M1	50R	M62 J25 - J30	
15/09/15 16:20:08	SIG	M621/1002B1	50R	M62 J25 - J30	
15/09/15 16:20:08	SIG	M621/1002B2	50R	M62 J25 - J30	
15/09/15 16:20:13	SIG	M62/2065M1	40R	M62 J25 - J30	
15/09/15 16:20:13	SIG	M62/2069M1	50R	M62 J25 - J30	
15/09/15 16:20:13	SIG	M62/2069M2	50R	M62 J25 - J30	
15/09/15 16:20:13	SIG	M621/1002B1	40R	M62 J25 - J30	
15/09/15 16:20:13	SIG	M621/1002B2	40R	M62 J25 - J30	
15/09/15 16:21:27	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:21:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:21:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:22:36	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 16:22:36	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 16:22:36	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2050B2	40R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2050B3	40R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2050B4	40R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2057B1	50R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2057B2	50R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2057B3	50R	M62 J25 - J30	
15/09/15 16:22:41	SIG	M62/2057B4	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2057B1	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2057B2	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2057B3	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2057B4	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2065B2	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2065B3	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2065B4	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2069M1	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2069M2	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2074B2	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2074B3	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M62/2074B4	50R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M621/1010B1	40R	M62 J25 - J30	
15/09/15 16:23:28	SIG	M621/1010B2	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2057B1	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2057B2	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2057B3	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2057B4	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2065B2	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2065B3	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2065B4	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2069M1	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2069M2	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2074B2	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2074B3	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2074B4	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2081B1	50R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2081B2	50R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2081B3	50R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M62/2081L1	50R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M621/1010B1	40R	M62 J25 - J30	
15/09/15 16:23:34	SIG	M621/1010B2	40R	M62 J25 - J30	
15/09/15 16:23:39	SIG	M62/2033B1	30R	M62 J25 - J30	
15/09/15 16:23:44	SIG	M62/2033B1	20R	M62 J25 - J30	
15/09/15 16:23:44	SIG	M62/2041B1	LDR	M62 J25 - J30	
15/09/15 16:23:49	SIG	M62/2033B1	STOP	M62 J25 - J30	
15/09/15 16:24:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:24:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:24:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2081B1	40R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2081B2	40R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2081B3	40R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2081L1	40R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2088B1	REDX	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 16:26:30	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 16:27:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:27:31	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:27:36	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2097B2	60R	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2097B4	60R	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2106B2	60R	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2106B3	60R	M62 J25 - J30	
15/09/15 16:28:21	SIG	M62/2106B4	60R	M62 J25 - J30	
15/09/15 16:28:25	SIG	M62/2088B2	40R	M62 J25 - J30	
15/09/15 16:28:25	SIG	M62/2088B3	40R	M62 J25 - J30	
15/09/15 16:28:25	SIG	M62/2088B4	40R	M62 J25 - J30	
15/09/15 16:29:08	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 16:29:08	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 16:29:08	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 16:29:11	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 16:29:11	SIG	M62/2113B2	60R	M62 J25 - J30	
15/09/15 16:29:11	SIG	M62/2113B3	60R	M62 J25 - J30	
15/09/15 16:29:11	SIG	M62/2113B4	60R	M62 J25 - J30	
15/09/15 16:30:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:30:35	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:30:40	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:30:55	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 16:30:55	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 16:30:55	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2033A1	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2033A2	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2033A3	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2033A4	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2041A1	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2041A2	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2041A3	50R	M62 J25 - J30	
15/09/15 16:31:20	SIG	M62/2041A4	50R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2025A1	50R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2025A2	50R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2025A3	50R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2025A4	50R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2033A1	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2033A2	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2033A3	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2033A4	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2041A1	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2041A2	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2041A3	40R	M62 J25 - J30	
15/09/15 16:31:25	SIG	M62/2041A4	40R	M62 J25 - J30	
15/09/15 16:32:26	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 16:32:26	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 16:32:26	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 16:32:41	SIG	M62/2088B2	40R	M62 J25 - J30	
15/09/15 16:32:41	SIG	M62/2088B3	40R	M62 J25 - J30	
15/09/15 16:32:41	SIG	M62/2088B4	40R	M62 J25 - J30	
15/09/15 16:33:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:33:39	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:33:44	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:34:11	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 16:34:11	SIG	M62/2117B3	60R	M62 J25 - J30	
15/09/15 16:34:11	SIG	M62/2120M1	60R	M62 J25 - J30	
15/09/15 16:34:11	SIG	M62/2120M2	60R	M62 J25 - J30	
15/09/15 16:35:00	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 16:35:00	SIG	M62/2097B3	50R	M62 J25 - J30	
15/09/15 16:35:00	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 16:35:20	SIG	M62/2041A1	60R	M62 J25 - J30	
15/09/15 16:35:20	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 16:35:20	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 16:35:20	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 16:35:23	SIG	M62/2097B2	40R	M62 J25 - J30	
15/09/15 16:35:23	SIG	M62/2097B4	40R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2025A1	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2033A1	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 16:35:50	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 16:36:11	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 16:36:11	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 16:36:11	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 16:36:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:36:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:36:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:36:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:36:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:36:43	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:36:48	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:37:09	SIG	M62/2106B2	40R	M62 J25 - J30	
15/09/15 16:37:09	SIG	M62/2106B3	40R	M62 J25 - J30	
15/09/15 16:37:09	SIG	M62/2106B4	40R	M62 J25 - J30	
15/09/15 16:37:09	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 16:37:09	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 16:37:09	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 16:39:11	SIG	M62/2125B1	60R	M62 J25 - J30	
15/09/15 16:39:11	SIG	M62/2125B2	60R	M62 J25 - J30	
15/09/15 16:39:11	SIG	M62/2125B3	60R	M62 J25 - J30	
15/09/15 16:39:11	SIG	M62/2125L1	60R	M62 J25 - J30	
15/09/15 16:39:11	SIG	M62/2125L2	60R	M62 J25 - J30	
15/09/15 16:39:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:39:46	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:39:52	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2113B2	40R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2113B3	40R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2117B3	50R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2120M1	50R	M62 J25 - J30	
15/09/15 16:40:04	SIG	M62/2120M2	50R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2117B3	40R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2120M1	40R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2120M2	40R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2125B1	50R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 16:42:12	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 16:42:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:42:50	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:42:56	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:43:32	SIG	M62/2125B1	40R	M62 J25 - J30	
15/09/15 16:43:32	SIG	M62/2125B2	40R	M62 J25 - J30	
15/09/15 16:43:32	SIG	M62/2125B3	40R	M62 J25 - J30	
15/09/15 16:43:32	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 16:43:32	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2125B1	40R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2125B2	40R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2125B3	40R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2125L1	40R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2125L2	40R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2132B1	50R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2132B2	50R	M62 J25 - J30	
15/09/15 16:43:37	SIG	M62/2132B3	50R	M62 J25 - J30	
15/09/15 16:44:34	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:44:34	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:44:40	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 16:45:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:45:54	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:45:59	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2132B1	40R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2132B2	40R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2132B3	40R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2137B1	50R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2137B2	50R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2137B3	50R	M62 J25 - J30	
15/09/15 16:46:56	SIG	M62/2137B4	50R	M62 J25 - J30	
15/09/15 16:47:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:47:40	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:47:45	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 16:47:47	SIG	M62/2041B2	40R	M62 J25 - J30	
15/09/15 16:47:47	SIG	M62/2041B3	40R	M62 J25 - J30	
15/09/15 16:47:47	SIG	M62/2041B4	40R	M62 J25 - J30	
15/09/15 16:47:47	SIG	M62/2050B2	40R	M62 J25 - J30	
15/09/15 16:47:47	SIG	M62/2050B3	40R	M62 J25 - J30	
15/09/15 16:47:47	SIG	M62/2050B4	40R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2147B1	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2147B2	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2147B3	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2147B4	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2159B1	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2159B2	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2159M1	60R	M62 J25 - J30	
15/09/15 16:48:11	SIG	M62/2159M2	60R	M62 J25 - J30	
15/09/15 16:48:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:48:58	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:49:03	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:50:02	SIG	M62/2137B1	40R	M62 J25 - J30	
15/09/15 16:50:02	SIG	M62/2137B2	40R	M62 J25 - J30	
15/09/15 16:50:02	SIG	M62/2137B3	40R	M62 J25 - J30	
15/09/15 16:50:02	SIG	M62/2137B4	40R	M62 J25 - J30	
15/09/15 16:50:12	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 16:50:12	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 16:50:12	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 16:50:12	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 16:50:45	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:50:46	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:50:51	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 16:52:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:52:01	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:52:07	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:52:16	SIG	M62/2147B1	50R	M62 J25 - J30	
15/09/15 16:52:16	SIG	M62/2147B2	50R	M62 J25 - J30	
15/09/15 16:52:16	SIG	M62/2147B3	50R	M62 J25 - J30	
15/09/15 16:52:16	SIG	M62/2147B4	50R	M62 J25 - J30	
15/09/15 16:52:22	SIG	M62/2147B1	40R	M62 J25 - J30	
15/09/15 16:52:22	SIG	M62/2147B2	40R	M62 J25 - J30	
15/09/15 16:52:22	SIG	M62/2147B3	40R	M62 J25 - J30	
15/09/15 16:52:22	SIG	M62/2147B4	40R	M62 J25 - J30	
15/09/15 16:53:30	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 16:53:30	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 16:53:34	SIG	M62/2125L1	40R	M62 J25 - J30	
15/09/15 16:53:34	SIG	M62/2125L2	40R	M62 J25 - J30	
15/09/15 16:53:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:53:56	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:54:01	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 16:55:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:55:05	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:55:11	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:55:47	SIG	M62/2159B1	50R	M62 J25 - J30	
15/09/15 16:55:47	SIG	M62/2159B2	50R	M62 J25 - J30	
15/09/15 16:55:47	SIG	M62/2159M1	50R	M62 J25 - J30	
15/09/15 16:55:47	SIG	M62/2159M2	50R	M62 J25 - J30	
15/09/15 16:55:53	SIG	M62/2159B1	40R	M62 J25 - J30	
15/09/15 16:55:53	SIG	M62/2159B2	40R	M62 J25 - J30	
15/09/15 16:55:53	SIG	M62/2159M1	40R	M62 J25 - J30	
15/09/15 16:55:53	SIG	M62/2159M2	40R	M62 J25 - J30	
15/09/15 16:56:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 16:56:57	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:57:02	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 16:58:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 16:58:10	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 16:58:16	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2117B3	50R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2120M1	50R	M62 J25 - J30	
15/09/15 16:59:22	SIG	M62/2120M2	50R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2113B2	40R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2113B3	40R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2125B1	50R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 16:59:51	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 17:00:47	SIG	M62/2125B1	40R	M62 J25 - J30	
15/09/15 17:00:47	SIG	M62/2125B2	40R	M62 J25 - J30	
15/09/15 17:00:47	SIG	M62/2125B3	40R	M62 J25 - J30	
15/09/15 17:00:48	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:00:48	SIG	M62/2117B3	40R	M62 J25 - J30	
15/09/15 17:00:48	SIG	M62/2120M1	40R	M62 J25 - J30	
15/09/15 17:00:48	SIG	M62/2120M2	40R	M62 J25 - J30	
15/09/15 17:01:11	SIG	M62/2177B1	60R	M62 J25 - J30	
15/09/15 17:01:11	SIG	M62/2177B2	60R	M62 J25 - J30	
15/09/15 17:01:11	SIG	M62/2177L1	60R	M62 J25 - J30	
15/09/15 17:01:11	SIG	M62/2177L2	60R	M62 J25 - J30	
15/09/15 17:01:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:01:14	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:01:20	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:01:45	SIG	M62/2170B1	50R	M62 J25 - J30	
15/09/15 17:01:45	SIG	M62/2170B2	50R	M62 J25 - J30	
15/09/15 17:01:45	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 17:01:45	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2170B1	40R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2170B2	40R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 17:01:50	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 17:02:20	SIG	M62/2125L1	40R	M62 J25 - J30	
15/09/15 17:02:20	SIG	M62/2125L2	40R	M62 J25 - J30	
15/09/15 17:03:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:03:07	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:03:13	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2132B1	50R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2132B2	50R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2132B3	50R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2137B1	50R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2137B2	50R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2137B3	50R	M62 J25 - J30	
15/09/15 17:04:24	SIG	M62/2137B4	50R	M62 J25 - J30	
15/09/15 17:04:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:04:27	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:04:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:06:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:06:14	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:06:19	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2177B1	60R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2177B2	60R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2177L1	60R	M62 J25 - J30	
15/09/15 17:06:43	SIG	M62/2177L2	60R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2132B1	40R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2132B2	40R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2132B3	40R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2137B1	40R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2137B2	40R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2137B3	40R	M62 J25 - J30	
15/09/15 17:07:06	SIG	M62/2137B4	40R	M62 J25 - J30	
15/09/15 17:07:12	SIG	M62/2183B1	60R	M62 J25 - J30	
15/09/15 17:07:12	SIG	M62/2183B2	60R	M62 J25 - J30	
15/09/15 17:07:12	SIG	M62/2183L1	60R	M62 J25 - J30	
15/09/15 17:07:12	SIG	M62/2183L2	60R	M62 J25 - J30	
15/09/15 17:07:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:07:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:07:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:09:10	SIG	M62/2170B1	50R	M62 J25 - J30	
15/09/15 17:09:10	SIG	M62/2170B2	50R	M62 J25 - J30	
15/09/15 17:09:10	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 17:09:10	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2170B1	40R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2170B2	40R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2170L1	40R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2170L2	40R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 17:09:15	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 17:09:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:09:19	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:09:25	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:09:38	SIG	M62/2097B4	30R	M62 J25 - J30	
15/09/15 17:09:43	SIG	M62/2097B4	20R	M62 J25 - J30	
15/09/15 17:09:43	SIG	M62/2106B4	LDL	M62 J25 - J30	
15/09/15 17:09:43	SIG	M62/2113B4	LDL	M62 J25 - J30	
15/09/15 17:09:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:09:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:09:48	SIG	M62/2097B4	STOP	M62 J25 - J30	
15/09/15 17:10:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:10:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:10:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:12:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:12:25	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:12:31	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2189B1	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2189B2	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2189B3	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2189B4	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2194B1	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2194B2	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2194B3	60R	M62 J25 - J30	
15/09/15 17:13:12	SIG	M62/2194B4	60R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2177B1	40R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2177B2	40R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2177L1	40R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2177L2	40R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2183B1	50R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2183L1	50R	M62 J25 - J30	
15/09/15 17:13:16	SIG	M62/2183L2	50R	M62 J25 - J30	
15/09/15 17:13:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:13:30	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:13:35	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:15:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:15:31	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:15:36	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:15:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:15:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:15:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:15:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:16:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:16:34	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:16:39	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:18:36	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:18:37	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:18:42	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:19:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:19:38	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:19:43	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:20:12	SIG	M62/2197B1	60R	M62 J25 - J30	
15/09/15 17:20:12	SIG	M62/2197B2	60R	M62 J25 - J30	
15/09/15 17:20:12	SIG	M62/2197B3	60R	M62 J25 - J30	
15/09/15 17:20:12	SIG	M62/2199M1	60R	M62 J25 - J30	
15/09/15 17:20:12	SIG	M62/2199M2	60R	M62 J25 - J30	
15/09/15 17:21:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:21:42	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:21:48	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:22:13	SIG	M62/2183B1	40R	M62 J25 - J30	
15/09/15 17:22:13	SIG	M62/2183L1	40R	M62 J25 - J30	
15/09/15 17:22:13	SIG	M62/2183L2	40R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2183B1	40R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2183L1	40R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2183L2	40R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2189B1	50R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2189B2	50R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2189B3	50R	M62 J25 - J30	
15/09/15 17:22:19	SIG	M62/2189B4	50R	M62 J25 - J30	
15/09/15 17:22:41	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:22:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:22:47	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:24:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:24:55	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2189B1	40R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2189B2	40R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2189B3	40R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2189B4	40R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 17:24:58	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 17:25:00	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:25:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:25:13	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:25:19	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:25:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:25:45	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:25:50	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:26:12	SIG	M62/2203B1	60R	M62 J25 - J30	
15/09/15 17:26:12	SIG	M62/2203B2	60R	M62 J25 - J30	
15/09/15 17:26:12	SIG	M62/2203B3	60R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2057B1	50R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2057B2	50R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2057B3	50R	M62 J25 - J30	
15/09/15 17:26:46	SIG	M62/2057B4	50R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2050B2	40R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2050B3	40R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2050B4	40R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2057B1	40R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2057B2	40R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2057B3	40R	M62 J25 - J30	
15/09/15 17:27:10	SIG	M62/2057B4	40R	M62 J25 - J30	
15/09/15 17:27:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:27:55	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:28:00	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:28:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:28:20	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:28:25	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:28:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:28:49	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:28:54	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:30:59	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:30:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:31:05	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:31:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:31:26	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:31:31	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:31:53	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:31:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:31:59	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:33:12	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 17:33:12	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 17:33:12	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 17:33:12	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 17:33:12	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 17:33:59	SIG	M62/2189A2	50R	M62 J25 - J30	
15/09/15 17:33:59	SIG	M62/2189A3	50R	M62 J25 - J30	
15/09/15 17:33:59	SIG	M62/2189A4	50R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2183A1	REDX	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2183A2	50R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2183A3	50R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2183A4	50R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2189A1	REDX	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2189A2	40R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2189A3	40R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2189A4	40R	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2197A1	NR	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2197A2	NR	M62 J25 - J30	
15/09/15 17:34:04	SIG	M62/2197A3	NR	M62 J25 - J30	
15/09/15 17:34:05	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:34:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:34:11	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:34:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:34:31	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:34:36	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:34:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:34:57	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:35:02	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:35:58	SIG	M62/2194B1	40R	M62 J25 - J30	
15/09/15 17:35:58	SIG	M62/2194B2	40R	M62 J25 - J30	
15/09/15 17:35:58	SIG	M62/2194B3	40R	M62 J25 - J30	
15/09/15 17:35:58	SIG	M62/2194B4	40R	M62 J25 - J30	
15/09/15 17:36:31	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 17:36:31	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 17:36:31	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 17:37:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:37:12	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:37:17	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2197B1	40R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2197B2	40R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2197B3	40R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2199M1	40R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2199M2	40R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 17:37:21	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 17:37:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:37:37	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2097B2	30R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2097B3	30R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2106B2	30R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2106B3	30R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 17:37:42	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:37:57	SIG	M62/2097B2	20R	M62 J25 - J30	
15/09/15 17:37:57	SIG	M62/2097B3	20R	M62 J25 - J30	
15/09/15 17:37:57	SIG	M62/2106B2	20R	M62 J25 - J30	
15/09/15 17:37:57	SIG	M62/2106B3	20R	M62 J25 - J30	
15/09/15 17:37:57	SIG	M62/2106B4	40R	M62 J25 - J30	
15/09/15 17:37:57	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 17:38:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:38:01	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:38:03	SIG	M62/2106B4	30R	M62 J25 - J30	
15/09/15 17:38:06	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:38:08	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 17:38:08	SIG	M62/2097B2	20R	M62 J25 - J30	
15/09/15 17:38:08	SIG	M62/2106B2	20R	M62 J25 - J30	
15/09/15 17:38:08	SIG	M62/2106B3	20R	M62 J25 - J30	
15/09/15 17:38:08	SIG	M62/2106B4	20R	M62 J25 - J30	
15/09/15 17:38:08	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 17:38:23	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 17:38:23	SIG	M62/2097B2	STOP	M62 J25 - J30	
15/09/15 17:38:43	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 17:38:43	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 17:38:43	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 17:38:43	SIG	M62/2106B2	40R	M62 J25 - J30	
15/09/15 17:38:43	SIG	M62/2106B3	40R	M62 J25 - J30	
15/09/15 17:38:43	SIG	M62/2106B4	40R	M62 J25 - J30	
15/09/15 17:39:12	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 17:39:12	SIG	M62/2097B2	40R	M62 J25 - J30	
15/09/15 17:39:12	SIG	M62/2097B4	40R	M62 J25 - J30	
15/09/15 17:39:17	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 17:39:20	SIG	M62/2081B1	50R	M62 J25 - J30	
15/09/15 17:39:20	SIG	M62/2081B2	50R	M62 J25 - J30	
15/09/15 17:39:20	SIG	M62/2081B3	50R	M62 J25 - J30	
15/09/15 17:39:20	SIG	M62/2081L1	50R	M62 J25 - J30	
15/09/15 17:40:17	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:40:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:40:23	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:40:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:40:41	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:40:47	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:41:04	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:41:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:41:10	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2163A1	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2163A2	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2166K1	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2166K2	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2170A1	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2170A2	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2170K1	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2170K2	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2177A1	REDX	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2177A2	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2177A3	60R	M62 J25 - J30	
15/09/15 17:41:12	SIG	M62/2177A4	60R	M62 J25 - J30	
15/09/15 17:42:00	SIG	M62/2203B1	40R	M62 J25 - J30	
15/09/15 17:42:00	SIG	M62/2203B2	40R	M62 J25 - J30	
15/09/15 17:42:00	SIG	M62/2203B3	40R	M62 J25 - J30	
15/09/15 17:42:44	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 17:42:44	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 17:42:44	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 17:42:56	SIG	M62/2081B1	40R	M62 J25 - J30	
15/09/15 17:42:56	SIG	M62/2081B2	40R	M62 J25 - J30	
15/09/15 17:42:56	SIG	M62/2081B3	40R	M62 J25 - J30	
15/09/15 17:42:56	SIG	M62/2081L1	40R	M62 J25 - J30	
15/09/15 17:43:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:43:22	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:43:27	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 17:43:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:43:47	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:43:52	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:43:54	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 17:43:54	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 17:43:54	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 17:44:08	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:44:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:44:14	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:46:06	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 17:46:06	SIG	M62/2117B3	50R	M62 J25 - J30	
15/09/15 17:46:06	SIG	M62/2120M1	50R	M62 J25 - J30	
15/09/15 17:46:06	SIG	M62/2120M2	50R	M62 J25 - J30	
15/09/15 17:46:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:46:52	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:46:57	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:47:03	SIG	M62/2088B2	40R	M62 J25 - J30	
15/09/15 17:47:03	SIG	M62/2088B3	40R	M62 J25 - J30	
15/09/15 17:47:03	SIG	M62/2088B4	40R	M62 J25 - J30	
15/09/15 17:47:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:47:12	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:47:17	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:47:39	SIG	M62/2125B1	50R	M62 J25 - J30	
15/09/15 17:47:39	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 17:47:39	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 17:47:39	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 17:47:39	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 17:48:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:48:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:48:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:48:32	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 17:49:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:49:56	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 17:50:01	SIG	M62/2183B2	40R	M62 J25 - J30	
15/09/15 17:50:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:50:16	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:50:21	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2057B1	50R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2057B2	50R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2057B3	50R	M62 J25 - J30	
15/09/15 17:50:35	SIG	M62/2057B4	50R	M62 J25 - J30	
15/09/15 17:51:12	SIG	M62/2177A2	50R	M62 J25 - J30	
15/09/15 17:51:12	SIG	M62/2177A3	50R	M62 J25 - J30	
15/09/15 17:51:12	SIG	M62/2177A4	50R	M62 J25 - J30	
15/09/15 17:51:12	SIG	M62/2183A2	40R	M62 J25 - J30	
15/09/15 17:51:12	SIG	M62/2183A3	40R	M62 J25 - J30	
15/09/15 17:51:12	SIG	M62/2183A4	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2050B2	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2050B3	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2050B4	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2057B1	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2057B2	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2057B3	40R	M62 J25 - J30	
15/09/15 17:52:22	SIG	M62/2057B4	40R	M62 J25 - J30	
15/09/15 17:53:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:53:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 17:53:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:53:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:53:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:55:09	SIG	M62/2189A1	40R	M62 J25 - J30	
15/09/15 17:55:24	SIG	M62/2183A1	40R	M62 J25 - J30	
15/09/15 17:55:28	SIG	M62/2177A1	50R	M62 J25 - J30	
15/09/15 17:56:11	SIG	M62/2106B2	40R	M62 J25 - J30	
15/09/15 17:56:11	SIG	M62/2106B3	40R	M62 J25 - J30	
15/09/15 17:56:11	SIG	M62/2106B4	40R	M62 J25 - J30	
15/09/15 17:56:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:56:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:56:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2125L1	60R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2125L2	60R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2157A1	60R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2157A2	60R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2157J1	60R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2157J2	60R	M62 J25 - J30	
15/09/15 17:57:13	SIG	M62/2157K1	60R	M62 J25 - J30	
15/09/15 17:59:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 17:59:27	SIG	M62/2113B2	40R	M62 J25 - J30	
15/09/15 17:59:27	SIG	M62/2113B3	40R	M62 J25 - J30	
15/09/15 17:59:27	SIG	M62/2113B4	40R	M62 J25 - J30	
15/09/15 17:59:28	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 17:59:33	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2170A1	50R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2170A2	50R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2170K1	50R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2170K2	50R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2177A1	40R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2177A2	40R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2177A3	40R	M62 J25 - J30	
15/09/15 18:00:00	SIG	M62/2177A4	40R	M62 J25 - J30	
15/09/15 18:00:16	SIG	M62/2157A1	OFF	M62 J25 - J30	
15/09/15 18:00:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
15/09/15 18:00:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
15/09/15 18:00:18	SIG	M62/2157A1	OFF	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2117B2	40R	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2117B3	40R	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2120M1	40R	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2120M2	40R	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2125B1	40R	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2125B2	40R	M62 J25 - J30	
15/09/15 18:00:50	SIG	M62/2125B3	40R	M62 J25 - J30	
15/09/15 18:00:56	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:00:56	SIG	M62/2117B3	40R	M62 J25 - J30	
15/09/15 18:00:56	SIG	M62/2120M1	40R	M62 J25 - J30	
15/09/15 18:00:56	SIG	M62/2120M2	40R	M62 J25 - J30	
15/09/15 18:02:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:02:31	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:02:37	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2079A1	BLNK	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2079A2	OFF	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2079A3	OFF	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2079A4	OFF	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2088A2	NR	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2088A3	NR	M62 J25 - J30	
15/09/15 18:02:47	SIG	M62/2088A4	NR	M62 J25 - J30	
15/09/15 18:03:25	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 18:03:25	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 18:03:31	SIG	M62/2125L1	40R	M62 J25 - J30	
15/09/15 18:03:31	SIG	M62/2125L2	40R	M62 J25 - J30	
15/09/15 18:04:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:04:01	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:04:06	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:05:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:05:35	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:05:40	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:05:47	SIG	M62/2088A2	OFF	M62 J25 - J30	
15/09/15 18:05:48	SIG	M62/2088A1	BLNK	M62 J25 - J30	
15/09/15 18:05:48	SIG	M62/2088A3	OFF	M62 J25 - J30	
15/09/15 18:05:48	SIG	M62/2088A4	OFF	M62 J25 - J30	
15/09/15 18:07:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:07:06	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:07:11	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2057B1	50R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2057B2	50R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2057B3	50R	M62 J25 - J30	
15/09/15 18:08:22	SIG	M62/2057B4	50R	M62 J25 - J30	
15/09/15 18:08:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:08:39	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:08:44	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2050B2	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2050B3	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2050B4	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2057B1	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2057B2	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2057B3	40R	M62 J25 - J30	
15/09/15 18:08:49	SIG	M62/2057B4	40R	M62 J25 - J30	
15/09/15 18:10:10	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:10:11	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:10:16	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2170A1	60R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2170A2	60R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2170K1	60R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2170K2	60R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2177A1	50R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2177A2	50R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2177A3	50R	M62 J25 - J30	
15/09/15 18:10:37	SIG	M62/2177A4	50R	M62 J25 - J30	
15/09/15 18:11:37	SIG	M62/2125L1	60R	M62 J25 - J30	
15/09/15 18:11:37	SIG	M62/2125L2	60R	M62 J25 - J30	
15/09/15 18:11:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:11:42	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:11:48	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:12:51	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 18:12:51	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 18:12:56	SIG	M62/2125L1	40R	M62 J25 - J30	
15/09/15 18:12:56	SIG	M62/2125L2	40R	M62 J25 - J30	
15/09/15 18:13:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:13:16	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:13:21	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:14:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:14:47	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:14:52	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2057B1	50R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2057B2	50R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2057B3	50R	M62 J25 - J30	
15/09/15 18:15:50	SIG	M62/2057B4	50R	M62 J25 - J30	
15/09/15 18:16:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:16:23	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:16:28	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:17:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:17:50	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:17:55	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2050B2	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2050B3	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2050B4	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2057B1	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2057B2	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2057B3	40R	M62 J25 - J30	
15/09/15 18:18:31	SIG	M62/2057B4	40R	M62 J25 - J30	
15/09/15 18:19:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:19:29	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:19:34	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:20:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:20:54	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:20:59	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:22:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:22:34	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:22:40	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:23:04	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 18:23:04	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 18:23:09	SIG	M62/2033B1	40R	M62 J25 - J30	
15/09/15 18:23:09	SIG	M62/2041B1	40R	M62 J25 - J30	
15/09/15 18:23:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:23:57	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:24:03	SIG	M62/2033B3	40R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2033B1	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2041B1	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2041B2	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2041B3	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2041B4	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2050B2	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2050B3	50R	M62 J25 - J30	
15/09/15 18:24:46	SIG	M62/2050B4	50R	M62 J25 - J30	
15/09/15 18:25:18	SIG	M62/2057B1	50R	M62 J25 - J30	
15/09/15 18:25:18	SIG	M62/2057B2	50R	M62 J25 - J30	
15/09/15 18:25:18	SIG	M62/2057B3	50R	M62 J25 - J30	
15/09/15 18:25:18	SIG	M62/2057B4	50R	M62 J25 - J30	
15/09/15 18:25:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:25:40	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:25:45	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:27:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:27:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:27:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:27:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:28:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:28:53	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:28:59	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:31:13	SIG	M62/2033B1	60R	M62 J25 - J30	
15/09/15 18:31:13	SIG	M62/2033B2	60R	M62 J25 - J30	
15/09/15 18:31:13	SIG	M62/2033B3	60R	M62 J25 - J30	
15/09/15 18:31:13	SIG	M62/2033B4	60R	M62 J25 - J30	
15/09/15 18:31:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:31:53	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:31:58	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:34:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:34:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:34:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:34:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 18:34:57	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:34:57	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:35:02	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2177A1	60R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2177A2	60R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2177A3	60R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2177A4	60R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2183A1	50R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2183A2	50R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2183A3	50R	M62 J25 - J30	
15/09/15 18:35:12	SIG	M62/2183A4	50R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2177A1	50R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2177A2	50R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2177A3	50R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2177A4	50R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2183A1	40R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2183A2	40R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2183A3	40R	M62 J25 - J30	
15/09/15 18:36:43	SIG	M62/2183A4	40R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2041B1	60R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2050B2	60R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2050B3	60R	M62 J25 - J30	
15/09/15 18:37:13	SIG	M62/2050B4	60R	M62 J25 - J30	
15/09/15 18:38:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:38:04	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:38:09	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:40:41	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2177A1	60R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2177A2	60R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2177A3	60R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2177A4	60R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2183A1	50R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2183A2	50R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2183A3	50R	M62 J25 - J30	
15/09/15 18:40:44	SIG	M62/2183A4	50R	M62 J25 - J30	
15/09/15 18:41:03	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 18:41:03	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 18:41:03	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 18:41:03	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 18:41:03	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 18:41:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:41:13	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 18:41:13	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 18:41:13	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 18:41:13	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 18:41:13	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 18:41:14	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:41:20	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:42:21	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 18:42:21	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 18:42:21	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 18:42:28	SIG	M62/2088B2	40R	M62 J25 - J30	
15/09/15 18:42:28	SIG	M62/2088B3	40R	M62 J25 - J30	
15/09/15 18:42:28	SIG	M62/2088B4	40R	M62 J25 - J30	
15/09/15 18:44:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:44:14	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:44:19	SIG	M62/2117B1	40R	M62 J25 - J30	
15/09/15 18:45:35	SIG	M62/2125L1	50R	M62 J25 - J30	
15/09/15 18:45:35	SIG	M62/2125L2	50R	M62 J25 - J30	
15/09/15 18:45:52	SIG	M62/2125B1	50R	M62 J25 - J30	
15/09/15 18:45:52	SIG	M62/2125B2	50R	M62 J25 - J30	
15/09/15 18:45:52	SIG	M62/2125B3	50R	M62 J25 - J30	
15/09/15 18:45:53	SIG	M62/2117B1	50R	M62 J25 - J30	
15/09/15 18:45:53	SIG	M62/2117B3	50R	M62 J25 - J30	
15/09/15 18:45:53	SIG	M62/2120M1	50R	M62 J25 - J30	
15/09/15 18:45:53	SIG	M62/2120M2	50R	M62 J25 - J30	
15/09/15 18:47:23	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 18:47:23	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 18:47:23	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 18:48:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:48:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:48:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:48:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:50:16	SIG	M62/2097B2	40R	M62 J25 - J30	
15/09/15 18:50:16	SIG	M62/2097B4	40R	M62 J25 - J30	
15/09/15 18:52:13	SIG	M62/2125L1	60R	M62 J25 - J30	
15/09/15 18:52:13	SIG	M62/2125L2	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2183A1	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2183A2	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2183A3	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2183A4	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2189A1	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2189A2	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2189A3	60R	M62 J25 - J30	
15/09/15 18:52:15	SIG	M62/2189A4	60R	M62 J25 - J30	
15/09/15 18:53:13	SIG	M62/2125B1	60R	M62 J25 - J30	
15/09/15 18:53:13	SIG	M62/2125B2	60R	M62 J25 - J30	
15/09/15 18:53:13	SIG	M62/2125B3	60R	M62 J25 - J30	
15/09/15 18:53:14	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 18:53:14	SIG	M62/2117B3	60R	M62 J25 - J30	
15/09/15 18:53:14	SIG	M62/2120M1	60R	M62 J25 - J30	
15/09/15 18:53:14	SIG	M62/2120M2	60R	M62 J25 - J30	
15/09/15 18:54:16	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 18:54:16	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 18:54:16	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 18:54:16	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 18:54:16	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 18:55:14	SIG	M62/2157A1	OFF	M62 J25 - J30	
15/09/15 18:55:14	SIG	M62/2157A2	OFF	M62 J25 - J30	
15/09/15 18:55:14	SIG	M62/2157J1	OFF	M62 J25 - J30	
15/09/15 18:55:14	SIG	M62/2157J2	OFF	M62 J25 - J30	
15/09/15 18:55:14	SIG	M62/2157K1	OFF	M62 J25 - J30	
15/09/15 18:55:28	SIG	M62/2081B1	50R	M62 J25 - J30	
15/09/15 18:55:28	SIG	M62/2081B2	50R	M62 J25 - J30	
15/09/15 18:55:28	SIG	M62/2081B3	50R	M62 J25 - J30	
15/09/15 18:55:28	SIG	M62/2081L1	50R	M62 J25 - J30	
15/09/15 18:55:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:55:34	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:55:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:55:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 18:56:14	SIG	M62/2113B2	60R	M62 J25 - J30	
15/09/15 18:56:14	SIG	M62/2113B3	60R	M62 J25 - J30	
15/09/15 18:56:14	SIG	M62/2113B4	60R	M62 J25 - J30	
15/09/15 18:58:10	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 18:58:10	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 18:58:10	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 18:58:22	SIG	M62/2203B1	40R	M62 J25 - J30	
15/09/15 18:58:22	SIG	M62/2203B2	40R	M62 J25 - J30	
15/09/15 18:58:22	SIG	M62/2203B3	40R	M62 J25 - J30	
15/09/15 19:00:13	SIG	M62/2163A1	OFF	M62 J25 - J30	
15/09/15 19:00:13	SIG	M62/2163A2	OFF	M62 J25 - J30	
15/09/15 19:00:13	SIG	M62/2166K1	OFF	M62 J25 - J30	
15/09/15 19:00:13	SIG	M62/2166K2	OFF	M62 J25 - J30	
15/09/15 19:00:14	SIG	M62/2106B2	60R	M62 J25 - J30	
15/09/15 19:00:14	SIG	M62/2106B3	60R	M62 J25 - J30	
15/09/15 19:00:14	SIG	M62/2106B4	60R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2197B1	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2197B2	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2197B3	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2199M1	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2199M2	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2203B1	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2203B2	50R	M62 J25 - J30	
15/09/15 19:02:22	SIG	M62/2203B3	50R	M62 J25 - J30	
15/09/15 19:02:37	SIG	M62/2194B1	50R	M62 J25 - J30	
15/09/15 19:02:37	SIG	M62/2194B2	50R	M62 J25 - J30	
15/09/15 19:02:37	SIG	M62/2194B3	50R	M62 J25 - J30	
15/09/15 19:02:37	SIG	M62/2194B4	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2065B2	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2065B3	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2065B4	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2065M1	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2069M1	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2069M2	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2074B2	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2074B3	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M62/2074B4	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M621/1002B1	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M621/1002B2	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M621/1010B1	50R	M62 J25 - J30	
15/09/15 19:03:26	SIG	M621/1010B2	50R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2081B1	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2081B2	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2081B3	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2081L1	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2088B2	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2088B3	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2088B4	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2097B2	60R	M62 J25 - J30	
15/09/15 19:06:23	SIG	M62/2097B4	60R	M62 J25 - J30	
15/09/15 19:07:06	SIG	M62/2189B1	50R	M62 J25 - J30	
15/09/15 19:07:06	SIG	M62/2189B2	50R	M62 J25 - J30	
15/09/15 19:07:06	SIG	M62/2189B3	50R	M62 J25 - J30	
15/09/15 19:07:06	SIG	M62/2189B4	50R	M62 J25 - J30	
15/09/15 19:07:14	SIG	M62/2203B1	60R	M62 J25 - J30	
15/09/15 19:07:14	SIG	M62/2203B2	60R	M62 J25 - J30	
15/09/15 19:07:14	SIG	M62/2203B3	60R	M62 J25 - J30	
15/09/15 19:08:14	SIG	M62/2057B1	60R	M62 J25 - J30	
15/09/15 19:08:14	SIG	M62/2057B2	60R	M62 J25 - J30	
15/09/15 19:08:14	SIG	M62/2057B3	60R	M62 J25 - J30	
15/09/15 19:08:14	SIG	M62/2057B4	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2065B2	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2065B3	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2065B4	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2065M1	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2069M1	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2069M2	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2074B2	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2074B3	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M62/2074B4	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M621/1002B1	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M621/1002B2	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M621/1010B1	60R	M62 J25 - J30	
15/09/15 19:10:14	SIG	M621/1010B2	60R	M62 J25 - J30	
15/09/15 19:13:09	SIG	M62/2183B1	50R	M62 J25 - J30	
15/09/15 19:13:09	SIG	M62/2183B2	50R	M62 J25 - J30	
15/09/15 19:13:09	SIG	M62/2183L1	50R	M62 J25 - J30	
15/09/15 19:13:09	SIG	M62/2183L2	50R	M62 J25 - J30	
15/09/15 19:13:12	SIG	M62/2170L1	50R	M62 J25 - J30	
15/09/15 19:13:12	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 19:13:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 19:13:15	SIG	M62/2170B1	50R	M62 J25 - J30	
15/09/15 19:13:15	SIG	M62/2170B2	50R	M62 J25 - J30	
15/09/15 19:13:15	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 19:13:15	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 19:13:15	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 19:13:15	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 19:13:32	SIG	M62/2159B1	50R	M62 J25 - J30	
15/09/15 19:13:32	SIG	M62/2159B2	50R	M62 J25 - J30	
15/09/15 19:13:32	SIG	M62/2159M1	50R	M62 J25 - J30	
15/09/15 19:13:32	SIG	M62/2159M2	50R	M62 J25 - J30	
15/09/15 19:13:44	SIG	M62/2177A1	HSD	M62 J25 - J30	
15/09/15 19:14:14	SIG	M62/2197B1	60R	M62 J25 - J30	
15/09/15 19:14:14	SIG	M62/2197B2	60R	M62 J25 - J30	
15/09/15 19:14:14	SIG	M62/2197B3	60R	M62 J25 - J30	
15/09/15 19:14:14	SIG	M62/2199M1	60R	M62 J25 - J30	
15/09/15 19:14:14	SIG	M62/2199M2	60R	M62 J25 - J30	
15/09/15 19:14:29	SIG	M62/2183A1	HSD	M62 J25 - J30	
15/09/15 19:15:14	SIG	M62/2177A1	REDX	M62 J25 - J30	
15/09/15 19:15:14	SIG	M62/2189A1	HSD	M62 J25 - J30	
15/09/15 19:15:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 19:15:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 19:15:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 19:15:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1974A1	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1974A2	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1974A3	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1974A4	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1979K1	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1979K2	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1981A1	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1981A2	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1981A3	50R	M62 J25 - J30	
15/09/15 19:15:36	SIG	M62/1981A4	50R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1968A1	50R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1968A2	50R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1968A3	50R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1968A4	50R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1974A1	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1974A2	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1974A3	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1974A4	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1979K1	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1979K2	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1981A1	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1981A2	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1981A3	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1981A4	40R	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1987A1	NR	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1987A3	NR	M62 J25 - J30	
15/09/15 19:15:41	SIG	M62/1987J1	NR	M62 J25 - J30	
15/09/15 19:16:14	SIG	M62/2183A1	REDX	M62 J25 - J30	
15/09/15 19:17:14	SIG	M62/2194B1	60R	M62 J25 - J30	
15/09/15 19:17:14	SIG	M62/2194B2	60R	M62 J25 - J30	
15/09/15 19:17:14	SIG	M62/2194B3	60R	M62 J25 - J30	
15/09/15 19:17:14	SIG	M62/2194B4	60R	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2170A1	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2170A2	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2170K1	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2170K2	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2177A2	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2177A3	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2177A4	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2183A2	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2183A3	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2183A4	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2189A1	REDX	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2189A2	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2189A3	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2189A4	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2197A1	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2197A2	NR	M62 J25 - J30	
15/09/15 19:17:15	SIG	M62/2197A3	NR	M62 J25 - J30	
15/09/15 19:18:14	SIG	M62/2170K1	OFF	M62 J25 - J30	
15/09/15 19:18:14	SIG	M62/2170K2	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2170A1	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2170A2	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2177A1	BLNK	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2177A2	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2177A3	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2177A4	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2183A1	BLNK	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2183A2	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2183A3	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2183A4	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2189A1	BLNK	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2189A2	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2189A3	OFF	M62 J25 - J30	
15/09/15 19:18:15	SIG	M62/2189A4	OFF	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1955K1	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1955K2	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1956A1	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1956A2	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1960A1	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1960A2	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1960A3	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1960K1	60R	M62 J25 - J30	
15/09/15 19:18:24	SIG	M62/1960K2	60R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2137B1	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2137B2	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2137B3	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2137B4	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2147B1	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2147B2	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2147B3	50R	M62 J25 - J30	
15/09/15 19:18:54	SIG	M62/2147B4	50R	M62 J25 - J30	
15/09/15 19:19:17	SIG	M62/1979K1	60R	M62 J25 - J30	
15/09/15 19:19:17	SIG	M62/1979K2	60R	M62 J25 - J30	
15/09/15 19:19:17	SIG	M62/1981A1	60R	M62 J25 - J30	
15/09/15 19:19:17	SIG	M62/1981A2	60R	M62 J25 - J30	
15/09/15 19:19:17	SIG	M62/1981A3	60R	M62 J25 - J30	
15/09/15 19:19:17	SIG	M62/1981A4	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1968A1	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1968A2	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1968A3	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1968A4	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1974A1	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1974A2	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1974A3	60R	M62 J25 - J30	
15/09/15 19:20:11	SIG	M62/1974A4	60R	M62 J25 - J30	
15/09/15 19:20:15	SIG	M62/2197A1	OFF	M62 J25 - J30	
15/09/15 19:20:16	SIG	M62/2197A2	OFF	M62 J25 - J30	
15/09/15 19:20:16	SIG	M62/2197A3	OFF	M62 J25 - J30	
15/09/15 19:21:10	SIG	M62/2132B1	60R	M62 J25 - J30	
15/09/15 19:21:10	SIG	M62/2132B2	60R	M62 J25 - J30	
15/09/15 19:21:10	SIG	M62/2132B3	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2170B1	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2170B2	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2177B1	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2177B2	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2177L1	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2177L2	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2183B1	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2183B2	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2183L1	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2183L2	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2189B1	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2189B2	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2189B3	60R	M62 J25 - J30	
15/09/15 19:21:14	SIG	M62/2189B4	60R	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2106B2	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2106B3	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2106B4	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2113B2	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2113B3	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2113B4	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2117B1	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2117B3	NR	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2120M1	OFF	M62 J25 - J30	
15/09/15 19:22:24	SIG	M62/2120M2	OFF	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2081B1	OFF	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2081B2	OFF	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2081B3	OFF	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2081L1	OFF	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2088B2	NR	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2088B3	NR	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2088B4	NR	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2137B1	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2137B2	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2137B3	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2137B4	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2147B1	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2147B2	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2147B3	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2147B4	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2159B1	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2159B2	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2159M1	60R	M62 J25 - J30	
15/09/15 19:23:14	SIG	M62/2159M2	60R	M62 J25 - J30	
15/09/15 19:23:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 19:23:32	SIG	M62/2183B2	???	M62 J25 - J30	
15/09/15 19:24:04	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 19:24:04	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 19:25:24	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 19:25:24	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 19:25:24	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 19:25:24	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 19:25:25	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 19:25:49	SIG	M62/2057B1	HSD	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1979K1	OFF	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1979K2	OFF	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1981A1	NR	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1981A2	NR	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1981A3	NR	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1981A4	NR	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1987A1	NR	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1987A3	NR	M62 J25 - J30	
15/09/15 19:26:24	SIG	M62/1987J1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1955K1	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1955K2	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1956A1	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1956A2	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1960A1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1960A2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1960A3	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1960K1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1960K2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1968A1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1968A2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1968A3	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1968A4	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1974A1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1974A2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1974A3	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1974A4	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1981A1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1981A2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1981A3	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/1981A4	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2074B1	BLNK	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2074B2	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2074B3	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2074B4	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2117B3	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 19:27:14	SIG	M621/1010B1	OFF	M62 J25 - J30	
15/09/15 19:27:14	SIG	M621/1010B2	OFF	M62 J25 - J30	
15/09/15 19:27:48	SIG	M62/2041B1	HSD	M62 J25 - J30	
15/09/15 19:27:48	SIG	M621/1010B1	60R	M62 J25 - J30	
15/09/15 19:27:48	SIG	M621/1010B2	60R	M62 J25 - J30	
15/09/15 19:27:49	SIG	M62/2057B1	REDX	M62 J25 - J30	
15/09/15 19:27:49	SIG	M621/1002B1	HSD	M62 J25 - J30	
15/09/15 19:28:14	SIG	M62/2203B1	OFF	M62 J25 - J30	
15/09/15 19:28:14	SIG	M62/2203B2	OFF	M62 J25 - J30	
15/09/15 19:28:14	SIG	M62/2203B3	OFF	M62 J25 - J30	
15/09/15 19:28:48	SIG	M62/2033B1	HSD	M62 J25 - J30	
15/09/15 19:29:24	SIG	M62/1987A1	OFF	M62 J25 - J30	
15/09/15 19:29:24	SIG	M62/1987A3	OFF	M62 J25 - J30	
15/09/15 19:29:24	SIG	M62/1987J1	OFF	M62 J25 - J30	
15/09/15 19:29:48	SIG	M62/2025B1	HSD	M62 J25 - J30	
15/09/15 19:29:48	SIG	M62/2041B1	REDX	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1960A1	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1960A2	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1960A3	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1960K1	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1960K2	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1968A1	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1968A2	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1968A3	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1968A4	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1974A1	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1974A2	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1974A3	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1974A4	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1981A1	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1981A2	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1981A3	OFF	M62 J25 - J30	
15/09/15 19:30:15	SIG	M62/1981A4	OFF	M62 J25 - J30	
15/09/15 19:30:40	SIG	M62/2033B1	REDX	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2125B1	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2125B2	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2125B3	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2132B1	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2132B2	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2132B3	NR	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2197B1	OFF	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2197B2	OFF	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2197B3	OFF	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2199M1	OFF	M62 J25 - J30	
15/09/15 19:31:14	SIG	M62/2199M2	OFF	M62 J25 - J30	
15/09/15 19:31:24	SIG	M62/2025B1	REDX	M62 J25 - J30	
15/09/15 19:31:54	SIG	M62/2065B2	NR	M62 J25 - J30	
15/09/15 19:31:54	SIG	M62/2065B3	NR	M62 J25 - J30	
15/09/15 19:31:54	SIG	M62/2065B4	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2018B1	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2018B2	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2018B3	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2018L1	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2025B2	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2025B3	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2025B4	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2033B2	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2033B3	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2033B4	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2041B2	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2041B3	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2041B4	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2050B2	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2050B3	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2050B4	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2057B2	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2057B3	NR	M62 J25 - J30	
15/09/15 19:31:55	SIG	M62/2057B4	NR	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2041B1	BLNK	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2041B2	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2041B3	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2041B4	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2050B2	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2050B3	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2050B4	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2057B1	BLNK	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2057B2	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2057B3	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2057B4	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2065B1	BLNK	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2065B2	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2065B3	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2065B4	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2065M1	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2069M1	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M62/2069M2	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M621/1002B1	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M621/1002B2	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
15/09/15 19:32:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2012B1	BLNK	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2012B2	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2012B3	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2012B4	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2018B1	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2018B2	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2018B3	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2018L1	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2025B1	BLNK	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2025B2	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2025B3	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2025B4	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2033B1	BLNK	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2033B2	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2033B4	OFF	M62 J25 - J30	
15/09/15 19:32:56	SIG	M62/2041B2	OFF	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2189B1	NR	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2189B2	NR	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2189B3	NR	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2189B4	NR	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2194B1	OFF	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2194B2	OFF	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2194B3	OFF	M62 J25 - J30	
15/09/15 19:34:14	SIG	M62/2194B4	OFF	M62 J25 - J30	
15/09/15 19:34:15	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 19:34:15	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 19:34:15	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 19:34:15	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2177B1	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2177B2	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2177L1	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2177L2	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2183B1	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2183B2	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2183L1	NR	M62 J25 - J30	
15/09/15 19:35:14	SIG	M62/2183L2	NR	M62 J25 - J30	
15/09/15 19:36:52	SIG	M62/2025A1	HSD	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2132B1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2132B2	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2132B3	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2137B1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2137B2	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2137B3	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2137B4	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2147B1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2147B2	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2147B3	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2147B4	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2159B1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2159B2	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2159M1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2159M2	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2170B1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2170B2	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2170L1	OFF	M62 J25 - J30	
15/09/15 19:37:14	SIG	M62/2170L2	OFF	M62 J25 - J30	
15/09/15 19:37:15	SIG	M62/2189B1	OFF	M62 J25 - J30	
15/09/15 19:37:15	SIG	M62/2189B2	OFF	M62 J25 - J30	
15/09/15 19:37:15	SIG	M62/2189B3	OFF	M62 J25 - J30	
15/09/15 19:37:15	SIG	M62/2189B4	OFF	M62 J25 - J30	
15/09/15 19:37:52	SIG	M62/2033A1	HSD	M62 J25 - J30	
15/09/15 19:38:14	SIG	M62/2183L1	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2177B1	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2177B2	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2177L1	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2177L2	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2183B1	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
15/09/15 19:38:15	SIG	M62/2183L2	OFF	M62 J25 - J30	
15/09/15 19:38:52	SIG	M62/2041A1	HSD	M62 J25 - J30	
15/09/15 19:38:53	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 19:38:53	SIG	M62/2025A1	REDX	M62 J25 - J30	
15/09/15 19:39:59	SIG	M62/2050A1	HSD	M62 J25 - J30	
15/09/15 19:40:00	SIG	M62/2033A1	REDX	M62 J25 - J30	
15/09/15 19:40:51	SIG	M62/2041A1	REDX	M62 J25 - J30	
15/09/15 19:41:52	SIG	M62/2050A1	REDX	M62 J25 - J30	
15/09/15 19:42:52	SIG	M62/2025A2	NR	M62 J25 - J30	
15/09/15 19:42:52	SIG	M62/2025A3	NR	M62 J25 - J30	
15/09/15 19:42:52	SIG	M62/2025A4	NR	M62 J25 - J30	
15/09/15 19:42:52	SIG	M62/2033A2	NR	M62 J25 - J30	
15/09/15 19:42:52	SIG	M62/2033A3	NR	M62 J25 - J30	
15/09/15 19:42:52	SIG	M62/2033A4	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2041A2	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2041A3	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2041A4	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2050A2	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2050A3	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2050A4	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2057A1	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2057A2	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2057A3	NR	M62 J25 - J30	
15/09/15 19:42:53	SIG	M62/2057J1	NR	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2008K1	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2008K2	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2012A1	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2012A2	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2012A3	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2018A1	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2018A2	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2018A3	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2018A4	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2025A1	BLNK	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2025A2	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2025A3	OFF	M62 J25 - J30	
15/09/15 19:43:52	SIG	M62/2025A4	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2033A1	BLNK	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2033A2	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2033A3	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2033A4	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2041A1	BLNK	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2041A2	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2041A3	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2041A4	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2050A1	BLNK	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2050A2	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2050A3	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2050A4	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2057A1	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2057A2	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2057A3	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2057J1	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2065A1	BLNK	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2065A2	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2065A3	OFF	M62 J25 - J30	
15/09/15 19:43:53	SIG	M62/2065A4	OFF	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2050A1	REDX	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2050A2	50R	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2050A3	50R	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2050A4	50R	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 19:46:45	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 19:47:05	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 19:47:05	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 19:47:05	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 19:47:05	SIG	M62/2057J1	40R	M62 J25 - J30	
15/09/15 19:47:11	SIG	M62/2057J1	30R	M62 J25 - J30	
15/09/15 19:47:16	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 19:47:16	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 19:47:16	SIG	M62/2057A3	40R	M62 J25 - J30	
15/09/15 19:47:16	SIG	M62/2057J1	20R	M62 J25 - J30	
15/09/15 19:47:21	SIG	M62/2057J1	STOP	M62 J25 - J30	
15/09/15 19:48:41	SIG	M62/2065A1	REDX	M62 J25 - J30	
15/09/15 19:48:41	SIG	M62/2065A2	50R	M62 J25 - J30	
15/09/15 19:48:41	SIG	M62/2065A3	50R	M62 J25 - J30	
15/09/15 19:48:41	SIG	M62/2065A4	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2073K1	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2079A1	REDX	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2079A2	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2079A3	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2079A4	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2088A1	REDX	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2088A2	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2088A3	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2088A4	50R	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2097A1	REDX	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2097A2	NR	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2097A3	NR	M62 J25 - J30	
15/09/15 19:48:51	SIG	M62/2097A4	NR	M62 J25 - J30	
15/09/15 19:53:11	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 19:53:11	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 19:55:00	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 19:55:00	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 19:55:00	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2012B1	REDX	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2012B2	NR	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2012B3	NR	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2012B4	NR	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2025B1	STOP	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2033B1	REDX	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 19:55:05	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 19:55:10	SIG	M62/2025B1	STOP	M62 J25 - J30	
15/09/15 19:55:54	SIG	M62/2088B2	NR	M62 J25 - J30	
15/09/15 19:55:54	SIG	M62/2088B3	NR	M62 J25 - J30	
15/09/15 19:55:54	SIG	M62/2088B4	NR	M62 J25 - J30	
15/09/15 19:55:54	SIG	M62/2097B2	NR	M62 J25 - J30	
15/09/15 19:55:54	SIG	M62/2097B4	NR	M62 J25 - J30	
15/09/15 19:56:11	SIG	M606/2003B1	OFF	M62 J25 - J30	
15/09/15 19:56:11	SIG	M606/2003B2	OFF	M62 J25 - J30	
15/09/15 19:57:51	SIG	M62/2033B3	???	M62 J25 - J30	
15/09/15 19:57:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 19:58:54	SIG	M62/2097B2	OFF	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2088B1	BLNK	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2088B1	BLNK	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2088B2	OFF	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2088B3	OFF	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2088B4	OFF	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 19:59:05	SIG	M62/2097B4	OFF	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2033A1	REDX	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2033A2	60R	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2033A3	60R	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2033A4	60R	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2041A1	REDX	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2041A2	60R	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2041A3	60R	M62 J25 - J30	
15/09/15 20:01:15	SIG	M62/2041A4	60R	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2050B2	60R	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2050B3	60R	M62 J25 - J30	
15/09/15 20:02:15	SIG	M62/2050B4	60R	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2097B3	50R	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 20:09:22	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 20:14:15	SIG	M62/2018B1	50R	M62 J25 - J30	
15/09/15 20:14:15	SIG	M62/2018B2	50R	M62 J25 - J30	
15/09/15 20:14:15	SIG	M62/2018B3	50R	M62 J25 - J30	
15/09/15 20:14:15	SIG	M62/2018L1	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2183A1	REDX	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2183A2	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2183A3	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2183A4	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2189A1	REDX	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2189A2	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2189A3	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2189A4	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2197A1	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2197A2	50R	M62 J25 - J30	
15/09/15 20:15:11	SIG	M62/2197A3	50R	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2097B2	OFF	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2097B4	OFF	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 20:15:14	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2008K1	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2008K2	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2012A1	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2012A2	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2012A3	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2018A1	HSD	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2018A2	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2018A3	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2018A4	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2025A1	REDX	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2025A2	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2025A3	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2025A4	60R	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 20:15:15	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 20:15:39	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 20:15:39	SIG	M62/2097B3	50R	M62 J25 - J30	
15/09/15 20:15:39	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 20:15:39	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 20:15:39	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 20:15:39	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2097B2	40R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2097B4	40R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2106B1	STOP	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2106B2	40R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2106B3	40R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2106B4	40R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 20:15:59	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 20:16:05	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 20:16:05	SIG	M62/2106B1	STOP	M62 J25 - J30	
15/09/15 20:17:25	SIG	M606/2003B2	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1981B1	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1981B2	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1981B3	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1981B4	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1987B1	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1987B2	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1987B3	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1987B4	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1992B1	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1992B2	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1992B3	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1992B4	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1999B2	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1999B3	50R	M62 J25 - J30	
15/09/15 20:17:25	SIG	M62/1999B4	50R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M606/2003B1	LDR	M62 J25 - J30	
15/09/15 20:17:30	SIG	M606/2003B2	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1981B1	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1981B2	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1981B3	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1981B4	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1987B1	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1987B2	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1987B3	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1987B4	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1992B1	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1992B2	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1992B3	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1992B4	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1999B2	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1999B3	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/1999B4	40R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2004B1	REDX	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2004B2	50R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2004B3	50R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2004B4	50R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2005M1	TI	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2005M2	TI	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2012B2	50R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2012B3	50R	M62 J25 - J30	
15/09/15 20:17:30	SIG	M62/2012B4	50R	M62 J25 - J30	
15/09/15 20:17:35	SIG	M62/1981B1	30R	M62 J25 - J30	
15/09/15 20:17:35	SIG	M62/1987B1	30R	M62 J25 - J30	
15/09/15 20:17:35	SIG	M62/1992B1	30R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1981B1	20R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1981B2	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1981B3	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1981B4	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1987B1	20R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1987B2	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1987B3	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1987B4	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1992B1	20R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1992B2	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1992B3	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1992B4	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1999B1	STOP	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1999B2	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1999B3	40R	M62 J25 - J30	
15/09/15 20:17:41	SIG	M62/1999B4	40R	M62 J25 - J30	
15/09/15 20:17:46	SIG	M62/1999B1	STOP	M62 J25 - J30	
15/09/15 20:17:51	SIG	M62/1981B1	STOP	M62 J25 - J30	
15/09/15 20:17:51	SIG	M62/1987B1	STOP	M62 J25 - J30	
15/09/15 20:17:56	SIG	M62/1992B1	STOP	M62 J25 - J30	
15/09/15 20:20:15	SIG	M62/2125B1	60R	M62 J25 - J30	
15/09/15 20:20:15	SIG	M62/2125B2	60R	M62 J25 - J30	
15/09/15 20:20:15	SIG	M62/2125B3	60R	M62 J25 - J30	
15/09/15 20:20:15	SIG	M62/2125L1	60R	M62 J25 - J30	
15/09/15 20:20:15	SIG	M62/2125L2	60R	M62 J25 - J30	
15/09/15 20:20:38	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 20:20:38	SIG	M62/2117B3	60R	M62 J25 - J30	
15/09/15 20:20:38	SIG	M62/2120M1	60R	M62 J25 - J30	
15/09/15 20:20:38	SIG	M62/2120M2	60R	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2170B1	NR	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2170B2	NR	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2170L1	LDR	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2170L2	50R	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2177B1	50R	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2177B2	50R	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2177L1	50R	M62 J25 - J30	
15/09/15 20:21:18	SIG	M62/2177L2	50R	M62 J25 - J30	
15/09/15 20:22:49	SIG	M62/2117B1	???	M62 J25 - J30	
15/09/15 20:22:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 20:24:15	SIG	M62/2012B2	60R	M62 J25 - J30	
15/09/15 20:24:15	SIG	M62/2012B3	60R	M62 J25 - J30	
15/09/15 20:24:15	SIG	M62/2012B4	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M606/2003B1	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M606/2003B2	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1981B1	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1981B2	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1981B3	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1981B4	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1987B1	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1987B2	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1987B3	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1987B4	50R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1992B1	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1992B2	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1992B3	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1992B4	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1999B1	REDX	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1999B2	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1999B3	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/1999B4	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/2004B2	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/2004B3	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/2004B4	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/2005M1	60R	M62 J25 - J30	
15/09/15 20:34:57	SIG	M62/2005M2	60R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M606/2003B1	50R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M606/2003B2	50R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M62/1981B1	40R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M62/1981B2	40R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M62/1981B3	40R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M62/1981B4	40R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M62/2005M1	50R	M62 J25 - J30	
15/09/15 20:35:09	SIG	M62/2005M2	50R	M62 J25 - J30	
15/09/15 20:35:14	SIG	M62/1981B4	30R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1981B1	40R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1981B2	40R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1981B3	40R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1981B4	20R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1987B4	LDL	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1992B1	50R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1992B2	50R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1992B3	50R	M62 J25 - J30	
15/09/15 20:35:20	SIG	M62/1992B4	LDL	M62 J25 - J30	
15/09/15 20:35:25	SIG	M62/1981B4	STOP	M62 J25 - J30	
15/09/15 20:37:11	SIG	M62/2189A2	40R	M62 J25 - J30	
15/09/15 20:37:11	SIG	M62/2189A3	40R	M62 J25 - J30	
15/09/15 20:37:11	SIG	M62/2189A4	40R	M62 J25 - J30	
15/09/15 20:37:11	SIG	M62/2197A1	40R	M62 J25 - J30	
15/09/15 20:37:11	SIG	M62/2197A2	40R	M62 J25 - J30	
15/09/15 20:37:11	SIG	M62/2197A3	40R	M62 J25 - J30	
15/09/15 20:37:16	SIG	M62/2189A2	30R	M62 J25 - J30	
15/09/15 20:37:16	SIG	M62/2197A1	30R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2170A1	50R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2170A2	50R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2170K1	50R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2170K2	50R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2177A1	REDX	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2177A2	LDR	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2177A3	50R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2177A4	50R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2183A2	LDR	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2189A1	STOP	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2189A2	20R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2189A3	40R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2189A4	40R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2197A1	20R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2197A2	40R	M62 J25 - J30	
15/09/15 20:37:21	SIG	M62/2197A3	40R	M62 J25 - J30	
15/09/15 20:37:27	SIG	M62/2189A1	STOP	M62 J25 - J30	
15/09/15 20:37:27	SIG	M62/2189A2	STOP	M62 J25 - J30	
15/09/15 20:37:27	SIG	M62/2197A1	STOP	M62 J25 - J30	
15/09/15 20:38:47	SIG	M62/2057A1	30R	M62 J25 - J30	
15/09/15 20:38:47	SIG	M62/2057A2	30R	M62 J25 - J30	
15/09/15 20:38:47	SIG	M621/1002A1	50R	M62 J25 - J30	
15/09/15 20:38:47	SIG	M621/1002A2	50R	M62 J25 - J30	
15/09/15 20:38:52	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 20:38:52	SIG	M621/1002A2	40R	M62 J25 - J30	
15/09/15 20:38:58	SIG	M621/1002A2	30R	M62 J25 - J30	
15/09/15 20:39:03	SIG	M62/2057A1	30R	M62 J25 - J30	
15/09/15 20:39:03	SIG	M62/2057A2	30R	M62 J25 - J30	
15/09/15 20:39:03	SIG	M621/1002A1	40R	M62 J25 - J30	
15/09/15 20:39:03	SIG	M621/1002A2	20R	M62 J25 - J30	
15/09/15 20:39:08	SIG	M621/1002A2	STOP	M62 J25 - J30	
15/09/15 20:44:27	SIG	M62/2025B1	REDX	M62 J25 - J30	
15/09/15 20:44:27	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 20:44:27	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 20:44:27	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2097B2	OFF	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2097B4	OFF	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2113B2	60R	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2113B3	60R	M62 J25 - J30	
15/09/15 20:46:37	SIG	M62/2113B4	60R	M62 J25 - J30	
15/09/15 20:47:15	SIG	M62/2163A1	60R	M62 J25 - J30	
15/09/15 20:47:15	SIG	M62/2163A2	60R	M62 J25 - J30	
15/09/15 20:47:15	SIG	M62/2166K1	60R	M62 J25 - J30	
15/09/15 20:47:15	SIG	M62/2166K2	60R	M62 J25 - J30	
15/09/15 20:48:00	SIG	M62/1955K1	TI	M62 J25 - J30	
15/09/15 20:48:00	SIG	M62/1955K2	TI	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2170A1	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2170A2	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2170K1	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2170K2	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2177A2	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2177A3	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2177A4	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2183A2	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2183A3	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2183A4	60R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2189A1	REDX	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2189A2	50R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2189A3	50R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2189A4	50R	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2197A1	OFF	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2197A2	OFF	M62 J25 - J30	
15/09/15 21:15:49	SIG	M62/2197A3	OFF	M62 J25 - J30	
15/09/15 21:18:50	SIG	M62/2057A1	40R	M62 J25 - J30	
15/09/15 21:18:50	SIG	M62/2057A2	40R	M62 J25 - J30	
15/09/15 21:18:50	SIG	M621/1002A1	OFF	M62 J25 - J30	
15/09/15 21:18:50	SIG	M621/1002A2	OFF	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2170B1	NR	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2170B2	NR	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2170L1	OFF	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2170L2	OFF	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2177B1	OFF	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2177B2	OFF	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2177L1	OFF	M62 J25 - J30	
15/09/15 21:20:45	SIG	M62/2177L2	OFF	M62 J25 - J30	
15/09/15 21:23:45	SIG	M62/2170B1	OFF	M62 J25 - J30	
15/09/15 21:23:46	SIG	M62/2170B2	OFF	M62 J25 - J30	
15/09/15 21:26:16	SIG	M62/2163A1	OFF	M62 J25 - J30	
15/09/15 21:26:16	SIG	M62/2163A2	OFF	M62 J25 - J30	
15/09/15 21:26:16	SIG	M62/2166K1	OFF	M62 J25 - J30	
15/09/15 21:26:16	SIG	M62/2166K2	OFF	M62 J25 - J30	
15/09/15 21:35:38	SIG	M606/2003B1	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M606/2003B2	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1981B1	50R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1981B2	50R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1981B3	50R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1981B4	50R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1987B4	50R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1992B1	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1992B2	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1992B3	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/1992B4	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/2005M1	60R	M62 J25 - J30	
15/09/15 21:35:38	SIG	M62/2005M2	60R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2050A2	60R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2050A3	60R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2050A4	60R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2057A1	50R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2057A2	50R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2057A3	50R	M62 J25 - J30	
15/09/15 21:37:00	SIG	M62/2057J1	50R	M62 J25 - J30	
15/09/15 21:37:55	SIG	M62/2065A2	OFF	M62 J25 - J30	
15/09/15 21:37:55	SIG	M62/2065A3	OFF	M62 J25 - J30	
15/09/15 21:37:55	SIG	M62/2065A4	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2073K1	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2079A1	BLNK	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2079A2	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2079A3	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2079A4	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2088A1	BLNK	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2088A2	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2088A3	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2088A4	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2097A1	BLNK	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2097A2	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2097A3	OFF	M62 J25 - J30	
15/09/15 21:38:11	SIG	M62/2097A4	OFF	M62 J25 - J30	
15/09/15 21:39:16	SIG	M62/2065A2	NR	M62 J25 - J30	
15/09/15 21:39:16	SIG	M62/2065A3	NR	M62 J25 - J30	
15/09/15 21:39:16	SIG	M62/2065A4	NR	M62 J25 - J30	
15/09/15 21:40:36	SIG	M62/1955K1	OFF	M62 J25 - J30	
15/09/15 21:40:36	SIG	M62/1955K2	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2170A1	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2170A2	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2170K1	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2170K2	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2177A1	BLNK	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2177A2	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2177A3	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2177A4	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2183A2	NR	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2183A3	NR	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2183A4	NR	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2189A1	BLNK	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2189A2	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2189A3	OFF	M62 J25 - J30	
15/09/15 21:41:17	SIG	M62/2189A4	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2008K1	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2008K2	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2012A1	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2012A2	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2012A3	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2018A1	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2018A2	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2018A3	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2018A4	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2025A1	BLNK	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2025A2	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2025A3	OFF	M62 J25 - J30	
15/09/15 21:43:17	SIG	M62/2025A4	OFF	M62 J25 - J30	
15/09/15 21:44:17	SIG	M62/2183A2	OFF	M62 J25 - J30	
15/09/15 21:44:17	SIG	M62/2183A3	OFF	M62 J25 - J30	
15/09/15 21:44:17	SIG	M62/2183A4	OFF	M62 J25 - J30	
15/09/15 21:44:18	SIG	M62/2183A1	BLNK	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2033A2	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2033A3	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2033A4	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2041A2	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2041A3	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2041A4	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2050A2	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2050A3	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2050A4	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2057A1	OFF	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2057A2	OFF	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2057A3	OFF	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2057J1	NR	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2065A1	BLNK	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2065A2	OFF	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2065A3	OFF	M62 J25 - J30	
15/09/15 21:55:17	SIG	M62/2065A4	OFF	M62 J25 - J30	
15/09/15 21:58:17	SIG	M62/2057J1	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2033A2	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2033A3	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2033A4	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2041A2	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2041A3	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2041A4	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2050A2	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2050A3	OFF	M62 J25 - J30	
15/09/15 21:58:18	SIG	M62/2050A4	OFF	M62 J25 - J30	
15/09/15 21:58:19	SIG	M62/2033A1	BLNK	M62 J25 - J30	
15/09/15 21:58:19	SIG	M62/2033A1	BLNK	M62 J25 - J30	
15/09/15 21:58:19	SIG	M62/2041A1	BLNK	M62 J25 - J30	
15/09/15 21:58:19	SIG	M62/2041A1	BLNK	M62 J25 - J30	
15/09/15 21:58:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
15/09/15 21:58:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
15/09/15 22:12:20	SIG	M62/2122K1	50R	M62 J25 - J30	
15/09/15 22:12:20	SIG	M62/2122K2	50R	M62 J25 - J30	
15/09/15 22:12:26	SIG	M62/2122K1	40R	M62 J25 - J30	
15/09/15 22:12:26	SIG	M62/2122K2	40R	M62 J25 - J30	
15/09/15 22:12:31	SIG	M62/2122K1	30R	M62 J25 - J30	
15/09/15 22:12:31	SIG	M62/2122K2	30R	M62 J25 - J30	
15/09/15 22:12:36	SIG	M62/2122K1	20R	M62 J25 - J30	
15/09/15 22:12:36	SIG	M62/2122K2	20R	M62 J25 - J30	
15/09/15 22:12:41	SIG	M62/2122K1	TT	M62 J25 - J30	
15/09/15 22:12:41	SIG	M62/2122K2	TT	M62 J25 - J30	
15/09/15 22:19:52	SIG	M62/2122K1	OFF	M62 J25 - J30	
15/09/15 22:19:52	SIG	M62/2122K2	OFF	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2057B1	REDX	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2057B2	60R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2057B3	60R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2057B4	60R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2065B1	REDX	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2065B2	60R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2065B3	60R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2065B4	60R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M62/2065M1	50R	M62 J25 - J30	
15/09/15 22:26:18	SIG	M621/1002B1	HSD	M62 J25 - J30	
15/09/15 22:26:18	SIG	M621/1002B2	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2074B1	REDX	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2074B2	60R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2074B3	60R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2074B4	60R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2081B1	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2081B2	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2081B3	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2081L1	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2088B1	REDX	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2088B2	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2088B3	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2088B4	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2097B1	REDX	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 22:26:34	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 22:27:17	SIG	M62/2117B1	NR	M62 J25 - J30	
15/09/15 22:27:17	SIG	M62/2117B3	NR	M62 J25 - J30	
15/09/15 22:27:17	SIG	M62/2120M1	OFF	M62 J25 - J30	
15/09/15 22:27:17	SIG	M62/2120M2	OFF	M62 J25 - J30	
15/09/15 22:27:18	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 22:27:18	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 22:27:18	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 22:27:18	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 22:27:18	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2065B2	NR	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2065B3	NR	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2065B4	NR	M62 J25 - J30	
15/09/15 22:30:17	SIG	M62/2065M1	NR	M62 J25 - J30	
15/09/15 22:30:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
15/09/15 22:30:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
15/09/15 22:30:18	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 22:30:18	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2074B1	BLNK	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2074B2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2074B3	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2074B4	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2081B1	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2081B2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2081B3	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2081L1	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2088B2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2088B3	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2088B4	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2097B2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2097B4	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 22:30:34	SIG	M62/2117B3	OFF	M62 J25 - J30	
15/09/15 22:30:35	SIG	M62/2088B1	BLNK	M62 J25 - J30	
15/09/15 22:30:35	SIG	M62/2088B1	BLNK	M62 J25 - J30	
15/09/15 22:30:35	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 22:30:35	SIG	M62/2097B1	BLNK	M62 J25 - J30	
15/09/15 22:30:35	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 22:30:35	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 22:31:18	SIG	M62/2125B1	60R	M62 J25 - J30	
15/09/15 22:31:18	SIG	M62/2125B2	60R	M62 J25 - J30	
15/09/15 22:31:18	SIG	M62/2125B3	60R	M62 J25 - J30	
15/09/15 22:31:18	SIG	M62/2125L1	60R	M62 J25 - J30	
15/09/15 22:31:18	SIG	M62/2125L2	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2106B1	REDX	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2113B2	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2113B3	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2113B4	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2117B1	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2117B3	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2120M1	60R	M62 J25 - J30	
15/09/15 22:31:34	SIG	M62/2120M2	60R	M62 J25 - J30	
15/09/15 22:33:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
15/09/15 22:33:18	SIG	M62/2065B2	OFF	M62 J25 - J30	
15/09/15 22:33:18	SIG	M62/2065B3	OFF	M62 J25 - J30	
15/09/15 22:33:18	SIG	M62/2065B4	OFF	M62 J25 - J30	
15/09/15 22:33:18	SIG	M62/2065M1	OFF	M62 J25 - J30	
15/09/15 22:33:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 22:33:59	SIG	M62/2117B1	???	M62 J25 - J30	
15/09/15 22:37:18	SIG	M606/2003B1	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M606/2003B2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1981B1	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1981B2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1981B3	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1981B4	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1987B1	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1987B2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1987B3	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1987B4	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1992B1	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1992B2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1992B3	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1992B4	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1999B1	BLNK	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1999B2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1999B3	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/1999B4	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2004B1	BLNK	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2004B2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2004B3	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2004B4	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2005M1	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2005M2	OFF	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2012B2	NR	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2012B3	NR	M62 J25 - J30	
15/09/15 22:37:18	SIG	M62/2012B4	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2012B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2012B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2012B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2012B4	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2018B1	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2018B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2018B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2018L1	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2025B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2025B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2025B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2025B4	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2033B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2033B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2033B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2033B4	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2041B2	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2041B3	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2041B4	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2050B2	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2050B3	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2050B4	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2106B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2106B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2106B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2106B4	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2113B1	BLNK	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2113B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2113B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2113B4	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2117B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2120M1	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2120M2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2125B1	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2125B2	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2125B3	OFF	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2125L1	NR	M62 J25 - J30	
15/09/15 22:38:18	SIG	M62/2125L2	NR	M62 J25 - J30	
15/09/15 22:41:18	SIG	M62/2050B2	OFF	M62 J25 - J30	
15/09/15 22:41:18	SIG	M62/2125L1	OFF	M62 J25 - J30	
15/09/15 22:41:18	SIG	M62/2125L2	OFF	M62 J25 - J30	
15/09/15 22:41:19	SIG	M62/2041B2	OFF	M62 J25 - J30	
15/09/15 22:41:19	SIG	M62/2041B3	OFF	M62 J25 - J30	
15/09/15 22:41:19	SIG	M62/2041B4	OFF	M62 J25 - J30	
15/09/15 22:41:19	SIG	M62/2050B3	OFF	M62 J25 - J30	
15/09/15 22:41:19	SIG	M62/2050B4	OFF	M62 J25 - J30	
15/09/15 22:41:20	SIG	M62/2041B1	BLNK	M62 J25 - J30	
15/09/15 22:41:20	SIG	M62/2041B1	BLNK	M62 J25 - J30	
15/09/15 23:00:56	SIG	M62/2097B3	OFF	M62 J25 - J30	
15/09/15 23:00:56	SIG	M62/2097B3	OFF	M62 J25 - J30	
15/09/15 23:00:56	SIG	M62/2097B3	OFF	M62 J25 - J30	
15/09/15 23:04:33	SIG	M62/2025B2	50R	M62 J25 - J30	
15/09/15 23:04:33	SIG	M62/2025B3	50R	M62 J25 - J30	
15/09/15 23:04:33	SIG	M62/2025B4	50R	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2012B1	REDX	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2012B2	NR	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2012B3	NR	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2012B4	NR	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2025B1	STOP	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2025B2	40R	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2025B3	40R	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2025B4	40R	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2033B1	REDX	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2033B2	50R	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2033B3	50R	M62 J25 - J30	
15/09/15 23:04:38	SIG	M62/2033B4	50R	M62 J25 - J30	
15/09/15 23:04:43	SIG	M62/2025B1	STOP	M62 J25 - J30	
15/09/15 23:07:37	SIG	M62/2033B3	???	M62 J25 - J30	
15/09/15 23:07:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2041B1	REDX	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2041B2	60R	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2041B3	60R	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2041B4	60R	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2050B2	60R	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2050B3	60R	M62 J25 - J30	
15/09/15 23:18:18	SIG	M62/2050B4	60R	M62 J25 - J30	
15/09/15 23:24:21	SIG	M62/2122K1	50R	M62 J25 - J30	
15/09/15 23:24:21	SIG	M62/2122K2	50R	M62 J25 - J30	
15/09/15 23:24:27	SIG	M62/2122K1	40R	M62 J25 - J30	
15/09/15 23:24:27	SIG	M62/2122K2	40R	M62 J25 - J30	
15/09/15 23:24:32	SIG	M62/2122K1	30R	M62 J25 - J30	
15/09/15 23:24:32	SIG	M62/2122K2	30R	M62 J25 - J30	
15/09/15 23:24:37	SIG	M62/2122K1	20R	M62 J25 - J30	
15/09/15 23:24:37	SIG	M62/2122K2	20R	M62 J25 - J30	
15/09/15 23:24:43	SIG	M62/2122K1	TT	M62 J25 - J30	
15/09/15 23:24:43	SIG	M62/2122K2	TT	M62 J25 - J30	
15/09/15 23:31:53	SIG	M62/2122K1	OFF	M62 J25 - J30	
15/09/15 23:31:53	SIG	M62/2122K2	OFF	M62 J25 - J30	
15/09/15 23:37:38	SIG	M606/2003B1	NR	M62 J25 - J30	
15/09/15 23:37:38	SIG	M606/2003B2	NR	M62 J25 - J30	
15/09/15 23:38:58	SIG	M606/2003B1	OFF	M62 J25 - J30	
15/09/15 23:38:58	SIG	M606/2003B2	OFF	M62 J25 - J30	
15/09/15 23:44:52	SIG	M62/2097B2	50R	M62 J25 - J30	
15/09/15 23:44:52	SIG	M62/2097B3	50R	M62 J25 - J30	
15/09/15 23:44:52	SIG	M62/2097B4	50R	M62 J25 - J30	
15/09/15 23:44:52	SIG	M62/2106B2	50R	M62 J25 - J30	
15/09/15 23:44:52	SIG	M62/2106B3	50R	M62 J25 - J30	
15/09/15 23:44:52	SIG	M62/2106B4	50R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2097B2	40R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2097B4	40R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2106B1	STOP	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2106B2	40R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2106B3	40R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2106B4	40R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2113B1	REDX	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2113B2	50R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2113B3	50R	M62 J25 - J30	
15/09/15 23:45:07	SIG	M62/2113B4	50R	M62 J25 - J30	
15/09/15 23:45:12	SIG	M62/2097B1	STOP	M62 J25 - J30	
15/09/15 23:45:12	SIG	M62/2106B1	STOP	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2041B2	NR	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2041B3	NR	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2041B4	NR	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2050B2	NR	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2050B3	NR	M62 J25 - J30	
15/09/15 23:57:19	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 00:00:19	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 00:00:20	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 00:00:20	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 00:00:20	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 00:00:20	SIG	M62/2041B4	OFF	M62 J25 - J30	
16/09/15 00:00:20	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 00:00:20	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 00:01:19	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2113B1	BLNK	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2113B2	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2113B3	OFF	M62 J25 - J30	
16/09/15 00:15:46	SIG	M62/2113B4	OFF	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2106B2	50R	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2106B3	50R	M62 J25 - J30	
16/09/15 00:16:07	SIG	M62/2106B4	50R	M62 J25 - J30	
16/09/15 00:17:20	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 00:17:20	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 00:17:20	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 00:17:20	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 00:18:45	SIG	M62/2018B1	NR	M62 J25 - J30	
16/09/15 00:18:45	SIG	M62/2018B2	NR	M62 J25 - J30	
16/09/15 00:18:45	SIG	M62/2018B3	NR	M62 J25 - J30	
16/09/15 00:18:49	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2041B2	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2041B3	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2041B4	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2050B2	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2050B3	NR	M62 J25 - J30	
16/09/15 00:20:20	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2041B4	OFF	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 00:23:20	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 00:23:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 00:23:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 00:33:11	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 00:33:11	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 00:33:11	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 00:34:51	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 02:07:44	SIG	M606/2003B1	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M62/1981B1	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M62/1981B2	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M62/1981B3	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M62/1981B4	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M62/2005M1	50R	M62 J25 - J30	
16/09/15 02:07:44	SIG	M62/2005M2	50R	M62 J25 - J30	
16/09/15 02:07:50	SIG	M62/1981B1	40R	M62 J25 - J30	
16/09/15 02:07:50	SIG	M62/1981B2	40R	M62 J25 - J30	
16/09/15 02:07:50	SIG	M62/1981B3	40R	M62 J25 - J30	
16/09/15 02:07:50	SIG	M62/1981B4	40R	M62 J25 - J30	
16/09/15 02:07:55	SIG	M62/1981B4	30R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1981B1	40R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1981B2	40R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1981B3	40R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1981B4	20R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1987B1	50R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1987B2	50R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1987B3	50R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1987B4	LDL	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1992B1	50R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1992B2	50R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1992B3	50R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1992B4	LDL	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1999B1	REDX	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1999B2	60R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1999B3	60R	M62 J25 - J30	
16/09/15 02:08:00	SIG	M62/1999B4	60R	M62 J25 - J30	
16/09/15 02:08:05	SIG	M62/1981B4	STOP	M62 J25 - J30	
16/09/15 02:47:35	SIG	M606/2003B1	LDR	M62 J25 - J30	
16/09/15 02:47:35	SIG	M606/2003B2	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1981B1	30R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1981B4	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1987B1	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1987B2	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1987B3	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1987B4	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1992B1	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1992B4	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1999B2	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1999B3	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/1999B4	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/2004B1	REDX	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/2004B2	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/2004B3	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/2004B4	50R	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/2005M1	TI	M62 J25 - J30	
16/09/15 02:47:35	SIG	M62/2005M2	TI	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1981B1	20R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1987B1	30R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1987B4	40R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1992B1	30R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1999B2	40R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1999B3	40R	M62 J25 - J30	
16/09/15 02:47:40	SIG	M62/1999B4	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1981B1	20R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1981B4	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1987B1	20R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1987B2	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1987B3	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1987B4	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1992B1	20R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1999B1	STOP	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1999B2	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1999B3	40R	M62 J25 - J30	
16/09/15 02:47:46	SIG	M62/1999B4	40R	M62 J25 - J30	
16/09/15 02:47:51	SIG	M62/1999B1	STOP	M62 J25 - J30	
16/09/15 02:47:56	SIG	M62/1981B1	STOP	M62 J25 - J30	
16/09/15 02:47:56	SIG	M62/1987B1	STOP	M62 J25 - J30	
16/09/15 02:48:01	SIG	M62/1992B1	STOP	M62 J25 - J30	
16/09/15 03:05:53	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1981B1	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1981B2	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1981B3	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1981B4	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1987B1	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1987B2	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1987B3	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1987B4	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1992B1	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1992B2	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1992B3	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1992B4	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1999B1	BLNK	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1999B2	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1999B3	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/1999B4	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/2004B1	BLNK	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/2004B2	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/2004B3	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/2004B4	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 03:05:53	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2170L1	LDR	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 03:13:25	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 03:32:08	SIG	M62/2189A2	50R	M62 J25 - J30	
16/09/15 03:32:08	SIG	M62/2189A3	50R	M62 J25 - J30	
16/09/15 03:32:08	SIG	M62/2189A4	50R	M62 J25 - J30	
16/09/15 03:32:08	SIG	M62/2197A1	50R	M62 J25 - J30	
16/09/15 03:32:08	SIG	M62/2197A2	50R	M62 J25 - J30	
16/09/15 03:32:08	SIG	M62/2197A3	50R	M62 J25 - J30	
16/09/15 03:32:13	SIG	M62/2189A2	40R	M62 J25 - J30	
16/09/15 03:32:13	SIG	M62/2189A3	40R	M62 J25 - J30	
16/09/15 03:32:13	SIG	M62/2189A4	40R	M62 J25 - J30	
16/09/15 03:32:13	SIG	M62/2197A1	40R	M62 J25 - J30	
16/09/15 03:32:13	SIG	M62/2197A2	40R	M62 J25 - J30	
16/09/15 03:32:13	SIG	M62/2197A3	40R	M62 J25 - J30	
16/09/15 03:32:19	SIG	M62/2189A2	30R	M62 J25 - J30	
16/09/15 03:32:19	SIG	M62/2197A1	30R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2170A1	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2170A2	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2170K1	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2170K2	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2177A1	REDX	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2177A2	LDR	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2177A3	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2177A4	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2183A1	REDX	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2183A2	LDR	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2183A3	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2183A4	50R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2189A1	STOP	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2189A2	20R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2189A3	40R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2189A4	40R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2197A1	20R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2197A2	40R	M62 J25 - J30	
16/09/15 03:32:24	SIG	M62/2197A3	40R	M62 J25 - J30	
16/09/15 03:32:29	SIG	M62/2189A1	STOP	M62 J25 - J30	
16/09/15 03:32:29	SIG	M62/2189A2	STOP	M62 J25 - J30	
16/09/15 03:32:29	SIG	M62/2197A1	STOP	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2170B1	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2170B2	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2170L1	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2170L2	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2177B1	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2177B2	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2177L1	OFF	M62 J25 - J30	
16/09/15 03:37:43	SIG	M62/2177L2	OFF	M62 J25 - J30	
16/09/15 03:38:05	SIG	M62/1960B1	60R	M62 J25 - J30	
16/09/15 03:38:05	SIG	M62/1960B2	60R	M62 J25 - J30	
16/09/15 03:38:05	SIG	M62/1960B3	60R	M62 J25 - J30	
16/09/15 03:38:05	SIG	M62/1960L1	60R	M62 J25 - J30	
16/09/15 03:38:05	SIG	M62/1960L2	60R	M62 J25 - J30	
16/09/15 03:42:06	SIG	M62/1960B1	OFF	M62 J25 - J30	
16/09/15 03:42:06	SIG	M62/1960B2	OFF	M62 J25 - J30	
16/09/15 03:42:06	SIG	M62/1960B3	OFF	M62 J25 - J30	
16/09/15 03:42:06	SIG	M62/1960L1	OFF	M62 J25 - J30	
16/09/15 03:42:06	SIG	M62/1960L2	OFF	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2088B2	NR	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2088B3	NR	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2088B4	NR	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 03:51:19	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 03:52:56	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 03:52:56	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 03:52:56	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 03:52:56	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 03:52:56	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 03:53:02	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 03:53:02	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 03:53:02	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 03:53:02	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 03:53:02	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 03:53:07	SIG	M62/2057A1	30R	M62 J25 - J30	
16/09/15 03:53:07	SIG	M62/2057A2	30R	M62 J25 - J30	
16/09/15 03:53:07	SIG	M62/2057J1	30R	M62 J25 - J30	
16/09/15 03:53:07	SIG	M621/1002A2	30R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2050A2	50R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2050A3	50R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2050A4	50R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2057A1	30R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2057A2	30R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2057J1	30R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2065A1	REDX	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 03:53:12	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 03:53:12	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 03:53:12	SIG	M621/1002A2	20R	M62 J25 - J30	
16/09/15 03:53:17	SIG	M621/1002A2	STOP	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2170A1	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2170A2	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2170K1	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2170K2	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2177A1	BLNK	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2177A2	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2177A3	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2177A4	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2183A2	NR	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2183A3	NR	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2183A4	NR	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2189A1	BLNK	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2189A2	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2189A3	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2189A4	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2197A1	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2197A2	OFF	M62 J25 - J30	
16/09/15 04:16:36	SIG	M62/2197A3	OFF	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2183A2	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2183A3	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2183A4	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2189A1	REDX	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2189A2	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2189A3	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2189A4	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2197A1	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2197A2	50R	M62 J25 - J30	
16/09/15 04:17:02	SIG	M62/2197A3	50R	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2183A2	NR	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2183A3	NR	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2183A4	NR	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2189A1	BLNK	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2189A2	OFF	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2189A3	OFF	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2189A4	OFF	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2197A1	OFF	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2197A2	OFF	M62 J25 - J30	
16/09/15 04:30:33	SIG	M62/2197A3	OFF	M62 J25 - J30	
16/09/15 04:33:33	SIG	M62/2183A2	OFF	M62 J25 - J30	
16/09/15 04:33:33	SIG	M62/2183A3	OFF	M62 J25 - J30	
16/09/15 04:33:33	SIG	M62/2183A4	OFF	M62 J25 - J30	
16/09/15 04:33:34	SIG	M62/2183A1	BLNK	M62 J25 - J30	
16/09/15 04:33:49	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 04:33:49	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2050A2	NR	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2050A3	NR	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2050A4	NR	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2057A1	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2057A2	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2057A3	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2057J1	NR	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2065A1	BLNK	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2065A2	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2065A3	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M62/2065A4	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 04:35:42	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 04:38:42	SIG	M62/2050A2	OFF	M62 J25 - J30	
16/09/15 04:38:42	SIG	M62/2050A3	OFF	M62 J25 - J30	
16/09/15 04:38:42	SIG	M62/2050A4	OFF	M62 J25 - J30	
16/09/15 04:38:42	SIG	M62/2057J1	OFF	M62 J25 - J30	
16/09/15 04:38:43	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 04:38:43	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 04:41:55	SIG	M62/2088B2	NR	M62 J25 - J30	
16/09/15 04:41:55	SIG	M62/2088B3	NR	M62 J25 - J30	
16/09/15 04:41:55	SIG	M62/2088B4	NR	M62 J25 - J30	
16/09/15 04:41:55	SIG	M62/2097B2	NR	M62 J25 - J30	
16/09/15 04:41:55	SIG	M62/2097B3	NR	M62 J25 - J30	
16/09/15 04:41:55	SIG	M62/2097B4	NR	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2088B2	OFF	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2088B3	OFF	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2088B4	OFF	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 04:44:56	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 04:44:57	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2004A1	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2004A2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2004A3	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2008K1	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2008K2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2012A2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2012A3	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2018A2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2018A3	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2018A4	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2025A1	REDX	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2033A1	REDX	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2041A1	REDX	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2050A2	NR	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2050A3	NR	M62 J25 - J30	
16/09/15 06:37:27	SIG	M62/2050A4	NR	M62 J25 - J30	
16/09/15 06:40:09	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 06:40:09	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 06:40:09	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 06:40:09	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2177B1	40R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2177B2	40R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2177L1	40R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2177L2	40R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2183B1	50R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2183L1	50R	M62 J25 - J30	
16/09/15 06:40:14	SIG	M62/2183L2	50R	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2057A1	NR	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2057A2	NR	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2057A3	NR	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2057J1	NR	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2065A1	REDX	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 06:40:27	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 06:42:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:42:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:42:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:42:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:43:22	SIG	M62/2159B1	NR	M62 J25 - J30	
16/09/15 06:43:22	SIG	M62/2159B2	NR	M62 J25 - J30	
16/09/15 06:43:22	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 06:43:22	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 06:43:22	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 06:43:22	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 06:43:27	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2008K1	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2008K2	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2012A1	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2012A2	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2012A3	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 06:43:27	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 06:44:26	SIG	M62/2041A2	50R	M62 J25 - J30	
16/09/15 06:44:26	SIG	M62/2041A3	50R	M62 J25 - J30	
16/09/15 06:44:26	SIG	M62/2041A4	50R	M62 J25 - J30	
16/09/15 06:46:39	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 06:46:39	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 06:46:39	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 06:46:39	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 06:46:39	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 06:47:15	SIG	M62/2183B1	40R	M62 J25 - J30	
16/09/15 06:47:15	SIG	M62/2183L1	40R	M62 J25 - J30	
16/09/15 06:47:15	SIG	M62/2183L2	40R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2183B1	40R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2183L1	40R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2183L2	40R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 06:47:20	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 06:47:22	SIG	M62/2159B1	NR	M62 J25 - J30	
16/09/15 06:47:22	SIG	M62/2159B2	NR	M62 J25 - J30	
16/09/15 06:47:22	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 06:47:22	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 06:47:22	SIG	M62/2170L1	OFF	M62 J25 - J30	
16/09/15 06:47:22	SIG	M62/2170L2	OFF	M62 J25 - J30	
16/09/15 06:47:27	SIG	M62/2194B1	60R	M62 J25 - J30	
16/09/15 06:47:27	SIG	M62/2194B2	60R	M62 J25 - J30	
16/09/15 06:47:27	SIG	M62/2194B3	60R	M62 J25 - J30	
16/09/15 06:47:27	SIG	M62/2194B4	60R	M62 J25 - J30	
16/09/15 06:47:49	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 06:48:22	SIG	M62/2041A1	50R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 06:48:27	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2004A1	OFF	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2004A2	OFF	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2004A3	OFF	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2008K1	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2008K2	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2012A2	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2012A3	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2018A2	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2018A3	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2018A4	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 06:48:27	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 06:49:00	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 06:49:05	SIG	M62/2018A1	60R	M62 J25 - J30	
16/09/15 06:49:05	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 06:49:26	SIG	M62/2197B1	60R	M62 J25 - J30	
16/09/15 06:49:26	SIG	M62/2197B2	60R	M62 J25 - J30	
16/09/15 06:49:26	SIG	M62/2197B3	60R	M62 J25 - J30	
16/09/15 06:49:26	SIG	M62/2199M1	60R	M62 J25 - J30	
16/09/15 06:49:26	SIG	M62/2199M2	60R	M62 J25 - J30	
16/09/15 06:49:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:49:57	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 06:50:02	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 06:50:22	SIG	M62/2159B1	OFF	M62 J25 - J30	
16/09/15 06:50:23	SIG	M62/2159B2	OFF	M62 J25 - J30	
16/09/15 06:50:33	SIG	M62/2159B1	NR	M62 J25 - J30	
16/09/15 06:50:33	SIG	M62/2159B2	NR	M62 J25 - J30	
16/09/15 06:50:33	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 06:50:33	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 06:50:33	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 06:50:33	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 06:50:38	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 06:50:38	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 06:50:38	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 06:50:38	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2183B1	50R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2183L1	50R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2183L2	50R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2189B1	60R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2189B2	60R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2189B3	60R	M62 J25 - J30	
16/09/15 06:51:14	SIG	M62/2189B4	60R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2183B1	40R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2183L1	40R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2183L2	40R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 06:51:17	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 06:51:27	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 06:51:27	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 06:52:26	SIG	M62/2203B1	60R	M62 J25 - J30	
16/09/15 06:52:26	SIG	M62/2203B2	60R	M62 J25 - J30	
16/09/15 06:52:26	SIG	M62/2203B3	60R	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2057B2	NR	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2057B3	NR	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2057B4	NR	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2065M1	NR	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2069M1	60R	M62 J25 - J30	
16/09/15 06:53:03	SIG	M62/2069M2	60R	M62 J25 - J30	
16/09/15 06:53:03	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 06:53:03	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 06:53:03	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 06:53:03	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2012B2	NR	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2012B3	NR	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2012B4	NR	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2065B1	REDX	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2065B2	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2065B3	60R	M62 J25 - J30	
16/09/15 06:53:04	SIG	M62/2065B4	60R	M62 J25 - J30	
16/09/15 06:54:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:54:06	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 06:54:12	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 06:54:31	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 06:54:49	SIG	M62/2159B1	NR	M62 J25 - J30	
16/09/15 06:54:49	SIG	M62/2159B2	NR	M62 J25 - J30	
16/09/15 06:54:50	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 06:54:50	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 06:54:50	SIG	M62/2170L1	OFF	M62 J25 - J30	
16/09/15 06:54:50	SIG	M62/2170L2	OFF	M62 J25 - J30	
16/09/15 06:55:18	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 06:55:24	SIG	M62/2159B1	NR	M62 J25 - J30	
16/09/15 06:55:24	SIG	M62/2159B2	NR	M62 J25 - J30	
16/09/15 06:55:25	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 06:55:25	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 06:55:25	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 06:55:25	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 06:55:30	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 06:55:30	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 06:55:30	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 06:55:30	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 06:55:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 06:55:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 06:55:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 06:55:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 06:55:54	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2189B1	40R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2189B2	40R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2189B3	40R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2189B4	40R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 06:56:21	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 06:56:22	SIG	M62/2057B1	60R	M62 J25 - J30	
16/09/15 06:56:22	SIG	M621/1002B1	60R	M62 J25 - J30	
16/09/15 06:56:22	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 06:56:22	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 06:57:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 06:57:13	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 06:57:18	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:00:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:00:19	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:00:24	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:01:27	SIG	M62/2004A1	60R	M62 J25 - J30	
16/09/15 07:01:27	SIG	M62/2004A2	60R	M62 J25 - J30	
16/09/15 07:01:27	SIG	M62/2004A3	60R	M62 J25 - J30	
16/09/15 07:02:53	SIG	M62/2073K1	60R	M62 J25 - J30	
16/09/15 07:02:53	SIG	M62/2079A1	REDX	M62 J25 - J30	
16/09/15 07:02:53	SIG	M62/2079A2	NR	M62 J25 - J30	
16/09/15 07:02:53	SIG	M62/2079A3	NR	M62 J25 - J30	
16/09/15 07:02:53	SIG	M62/2079A4	NR	M62 J25 - J30	
16/09/15 07:02:54	SIG	M62/2065A2	60R	M62 J25 - J30	
16/09/15 07:02:54	SIG	M62/2065A3	60R	M62 J25 - J30	
16/09/15 07:02:54	SIG	M62/2065A4	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2079A2	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2079A3	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2079A4	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2088A1	REDX	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2088A2	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2088A3	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2088A4	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2097A1	REDX	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2097A2	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2097A3	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2097A4	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2106A1	REDX	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2106A2	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2106A3	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2106A4	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2114A1	NR	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2114A1	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2114A2	NR	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2114A2	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2114A3	NR	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2114A3	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2117A1	REDX	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2117A2	NR	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2117A3	NR	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2117A4	NR	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 07:03:04	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 07:03:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:03:25	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:03:30	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:04:19	SIG	M62/2106A1	60R	M62 J25 - J30	
16/09/15 07:04:49	SIG	M62/2097A1	60R	M62 J25 - J30	
16/09/15 07:05:55	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 07:06:03	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 07:06:04	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 07:06:04	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 07:06:05	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 07:06:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:06:32	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:06:38	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:06:42	SIG	M62/2177B1	60R	M62 J25 - J30	
16/09/15 07:06:42	SIG	M62/2177B2	60R	M62 J25 - J30	
16/09/15 07:06:42	SIG	M62/2177L1	60R	M62 J25 - J30	
16/09/15 07:06:42	SIG	M62/2177L2	60R	M62 J25 - J30	
16/09/15 07:07:02	SIG	M62/2065A2	50R	M62 J25 - J30	
16/09/15 07:07:02	SIG	M62/2065A3	50R	M62 J25 - J30	
16/09/15 07:07:02	SIG	M62/2065A4	50R	M62 J25 - J30	
16/09/15 07:07:13	SIG	M62/2073K1	50R	M62 J25 - J30	
16/09/15 07:07:13	SIG	M62/2079A2	50R	M62 J25 - J30	
16/09/15 07:07:13	SIG	M62/2079A3	50R	M62 J25 - J30	
16/09/15 07:07:13	SIG	M62/2079A4	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 07:08:27	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2008K1	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2008K2	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2012A1	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2012A2	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2012A3	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2018A1	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 07:08:27	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 07:09:11	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 07:09:11	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 07:09:11	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 07:09:11	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 07:09:16	SIG	M62/2177B1	40R	M62 J25 - J30	
16/09/15 07:09:16	SIG	M62/2177B2	40R	M62 J25 - J30	
16/09/15 07:09:16	SIG	M62/2177L1	40R	M62 J25 - J30	
16/09/15 07:09:16	SIG	M62/2177L2	40R	M62 J25 - J30	
16/09/15 07:09:23	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 07:09:23	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 07:09:23	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:09:23	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:09:27	SIG	M62/2033A1	50R	M62 J25 - J30	
16/09/15 07:09:27	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 07:09:27	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 07:09:27	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 07:09:28	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 07:09:28	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 07:09:28	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:09:28	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 07:09:31	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 07:09:47	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:09:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:09:53	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:10:27	SIG	M62/2041A1	50R	M62 J25 - J30	
16/09/15 07:10:27	SIG	M62/2041A2	50R	M62 J25 - J30	
16/09/15 07:10:27	SIG	M62/2041A3	50R	M62 J25 - J30	
16/09/15 07:10:27	SIG	M62/2041A4	50R	M62 J25 - J30	
16/09/15 07:12:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:12:48	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:12:53	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2197B1	60R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2197B2	60R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2197B3	60R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2199M1	60R	M62 J25 - J30	
16/09/15 07:13:31	SIG	M62/2199M2	60R	M62 J25 - J30	
16/09/15 07:15:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:15:51	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:15:56	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 07:16:14	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 07:16:19	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 07:16:27	SIG	M62/1999A1	60R	M62 J25 - J30	
16/09/15 07:16:27	SIG	M62/1999A2	60R	M62 J25 - J30	
16/09/15 07:16:27	SIG	M62/1999A3	60R	M62 J25 - J30	
16/09/15 07:16:27	SIG	M62/1999J1	50R	M62 J25 - J30	
16/09/15 07:16:27	SIG	M62/1999J2	50R	M62 J25 - J30	
16/09/15 07:16:49	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 07:16:49	SIG	M62/2113B2	NR	M62 J25 - J30	
16/09/15 07:16:49	SIG	M62/2113B3	NR	M62 J25 - J30	
16/09/15 07:16:49	SIG	M62/2113B4	NR	M62 J25 - J30	
16/09/15 07:16:49	SIG	M62/2120M1	60R	M62 J25 - J30	
16/09/15 07:16:49	SIG	M62/2120M2	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2088B2	NR	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2088B3	NR	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2088B4	NR	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2106B2	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2106B3	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2106B4	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2113B2	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2113B3	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2113B4	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2117B1	60R	M62 J25 - J30	
16/09/15 07:16:59	SIG	M62/2117B3	60R	M62 J25 - J30	
16/09/15 07:17:00	SIG	M62/2203B1	40R	M62 J25 - J30	
16/09/15 07:17:00	SIG	M62/2203B2	40R	M62 J25 - J30	
16/09/15 07:17:00	SIG	M62/2203B3	40R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2081B1	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2081B2	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2081B3	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2081L1	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2088B2	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2088B3	60R	M62 J25 - J30	
16/09/15 07:17:09	SIG	M62/2088B4	60R	M62 J25 - J30	
16/09/15 07:17:41	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 07:17:41	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 07:17:41	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 07:17:41	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 07:18:12	SIG	M62/2088B1	60R	M62 J25 - J30	
16/09/15 07:18:38	SIG	M62/2097B1	60R	M62 J25 - J30	
16/09/15 07:18:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:18:56	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:18:57	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 07:18:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 07:18:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 07:18:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 07:19:02	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:19:09	SIG	M62/2106B1	60R	M62 J25 - J30	
16/09/15 07:19:14	SIG	M62/2113B1	60R	M62 J25 - J30	
16/09/15 07:19:25	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 07:19:25	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 07:19:25	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 07:19:25	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 07:21:06	SIG	M62/2018A1	40R	M62 J25 - J30	
16/09/15 07:21:06	SIG	M62/2018A2	40R	M62 J25 - J30	
16/09/15 07:21:06	SIG	M62/2018A3	40R	M62 J25 - J30	
16/09/15 07:21:06	SIG	M62/2018A4	40R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2197B1	60R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2197B2	60R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2197B3	60R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2199M1	60R	M62 J25 - J30	
16/09/15 07:22:01	SIG	M62/2199M2	60R	M62 J25 - J30	
16/09/15 07:22:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:22:04	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2004A1	50R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2004A2	50R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2004A3	50R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2008K1	40R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2008K2	40R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2012A1	40R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2012A2	40R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2012A3	40R	M62 J25 - J30	
16/09/15 07:22:09	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:22:27	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 07:22:27	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 07:22:27	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 07:22:27	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 07:22:27	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 07:22:29	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 07:22:29	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 07:22:29	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 07:22:39	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:22:39	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:22:39	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:22:39	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:23:25	SIG	M62/2033A1	50R	M62 J25 - J30	
16/09/15 07:23:25	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 07:23:25	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 07:23:25	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 07:23:31	SIG	M62/2065A2	60R	M62 J25 - J30	
16/09/15 07:23:31	SIG	M62/2065A3	60R	M62 J25 - J30	
16/09/15 07:23:31	SIG	M62/2065A4	60R	M62 J25 - J30	
16/09/15 07:23:41	SIG	M62/2073K1	60R	M62 J25 - J30	
16/09/15 07:23:41	SIG	M62/2079A2	60R	M62 J25 - J30	
16/09/15 07:23:41	SIG	M62/2079A3	60R	M62 J25 - J30	
16/09/15 07:23:41	SIG	M62/2079A4	60R	M62 J25 - J30	
16/09/15 07:24:11	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 07:24:11	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 07:24:11	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 07:24:11	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 07:24:33	SIG	M62/2088A1	60R	M62 J25 - J30	
16/09/15 07:24:34	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 07:24:34	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 07:24:34	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:24:34	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:24:39	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 07:24:39	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 07:24:39	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:24:39	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:24:40	SIG	M62/2079A1	60R	M62 J25 - J30	
16/09/15 07:24:53	SIG	M62/1999A1	50R	M62 J25 - J30	
16/09/15 07:24:53	SIG	M62/1999A2	50R	M62 J25 - J30	
16/09/15 07:24:53	SIG	M62/1999A3	50R	M62 J25 - J30	
16/09/15 07:24:53	SIG	M62/2004A1	40R	M62 J25 - J30	
16/09/15 07:24:53	SIG	M62/2004A2	40R	M62 J25 - J30	
16/09/15 07:24:53	SIG	M62/2004A3	40R	M62 J25 - J30	
16/09/15 07:25:06	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 07:25:06	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 07:25:06	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 07:25:06	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 07:25:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:25:11	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:25:17	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2203B1	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2203B2	40R	M62 J25 - J30	
16/09/15 07:25:49	SIG	M62/2203B3	40R	M62 J25 - J30	
16/09/15 07:26:02	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 07:26:02	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 07:26:02	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 07:26:10	SIG	M62/2018A1	50R	M62 J25 - J30	
16/09/15 07:26:10	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 07:26:10	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 07:26:10	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 07:26:27	SIG	M62/1992A1	60R	M62 J25 - J30	
16/09/15 07:26:27	SIG	M62/1992A2	60R	M62 J25 - J30	
16/09/15 07:26:27	SIG	M62/1992A3	60R	M62 J25 - J30	
16/09/15 07:26:27	SIG	M62/1992J1	60R	M62 J25 - J30	
16/09/15 07:26:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1979K1	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1979K2	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1981A1	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1981A2	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1981A3	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1981A4	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1987A1	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1987A3	60R	M62 J25 - J30	
16/09/15 07:27:37	SIG	M62/1987J1	60R	M62 J25 - J30	
16/09/15 07:28:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:28:17	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:28:22	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:28:40	SIG	M62/2203B1	40R	M62 J25 - J30	
16/09/15 07:28:40	SIG	M62/2203B2	40R	M62 J25 - J30	
16/09/15 07:28:40	SIG	M62/2203B3	40R	M62 J25 - J30	
16/09/15 07:28:52	SIG	M62/1999A1	60R	M62 J25 - J30	
16/09/15 07:28:52	SIG	M62/1999A2	60R	M62 J25 - J30	
16/09/15 07:28:52	SIG	M62/1999A3	60R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2004A1	60R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2004A2	60R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2004A3	60R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2008K1	50R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2008K2	50R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2012A1	50R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2012A2	50R	M62 J25 - J30	
16/09/15 07:28:53	SIG	M62/2012A3	50R	M62 J25 - J30	
16/09/15 07:29:27	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 07:29:27	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 07:29:27	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 07:29:27	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 07:29:49	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 07:31:19	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 07:31:19	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 07:31:19	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:31:19	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:31:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:31:24	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 07:31:24	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 07:31:24	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:31:24	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:31:25	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:31:30	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:31:31	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 07:31:31	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 07:31:31	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 07:31:31	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:31:37	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 07:32:39	SIG	M62/2203B1	60R	M62 J25 - J30	
16/09/15 07:32:39	SIG	M62/2203B2	60R	M62 J25 - J30	
16/09/15 07:32:39	SIG	M62/2203B3	60R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 07:32:53	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2203B1	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2203B2	40R	M62 J25 - J30	
16/09/15 07:32:58	SIG	M62/2203B3	40R	M62 J25 - J30	
16/09/15 07:33:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:33:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:33:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:33:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/1999A1	50R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/1999A2	50R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/1999A3	50R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2004A1	50R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2004A2	50R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2004A3	50R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2008K1	40R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2008K2	40R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2012A1	40R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2012A2	40R	M62 J25 - J30	
16/09/15 07:33:52	SIG	M62/2012A3	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1992A1	50R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1992A2	50R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1992A3	50R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1992J1	50R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1999A1	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1999A2	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1999A3	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1999J1	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/1999J2	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2004A1	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2004A2	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2004A3	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2008K1	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2008K2	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2012A1	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2012A2	40R	M62 J25 - J30	
16/09/15 07:33:58	SIG	M62/2012A3	40R	M62 J25 - J30	
16/09/15 07:34:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:34:30	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:34:35	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2050A1	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2050A2	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2050A3	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2050A4	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 07:35:34	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2050A1	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 07:35:39	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1987A1	50R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1987A3	50R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1987J1	50R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1992A1	40R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1992A2	40R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1992A3	40R	M62 J25 - J30	
16/09/15 07:35:47	SIG	M62/1992J1	40R	M62 J25 - J30	
16/09/15 07:36:27	SIG	M62/1974A1	60R	M62 J25 - J30	
16/09/15 07:36:27	SIG	M62/1974A2	60R	M62 J25 - J30	
16/09/15 07:36:27	SIG	M62/1974A3	60R	M62 J25 - J30	
16/09/15 07:36:27	SIG	M62/1974A4	60R	M62 J25 - J30	
16/09/15 07:36:36	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 07:36:36	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 07:36:41	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 07:36:41	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 07:36:45	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 07:36:45	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 07:36:45	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 07:36:50	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2203B1	60R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2203B2	60R	M62 J25 - J30	
16/09/15 07:36:53	SIG	M62/2203B3	60R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1979K1	50R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1979K2	50R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1981A1	50R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1981A2	50R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1981A3	50R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1981A4	50R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1987A1	40R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1987A3	40R	M62 J25 - J30	
16/09/15 07:37:33	SIG	M62/1987J1	40R	M62 J25 - J30	
16/09/15 07:37:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:37:37	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:37:42	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:37:43	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 07:37:43	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 07:37:43	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 07:37:43	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 07:37:58	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 07:37:58	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 07:37:58	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 07:39:18	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 07:39:18	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 07:39:18	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:39:18	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:39:24	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 07:39:24	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 07:39:24	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:39:24	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:39:28	SIG	M62/1968A1	60R	M62 J25 - J30	
16/09/15 07:39:28	SIG	M62/1968A2	60R	M62 J25 - J30	
16/09/15 07:39:28	SIG	M62/1968A3	60R	M62 J25 - J30	
16/09/15 07:39:28	SIG	M62/1968A4	60R	M62 J25 - J30	
16/09/15 07:39:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:39:46	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:39:52	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:39:53	SIG	M62/2018A1	40R	M62 J25 - J30	
16/09/15 07:39:53	SIG	M62/2018A2	40R	M62 J25 - J30	
16/09/15 07:39:53	SIG	M62/2018A3	40R	M62 J25 - J30	
16/09/15 07:39:53	SIG	M62/2018A4	40R	M62 J25 - J30	
16/09/15 07:39:59	SIG	M62/2041A1	40R	M62 J25 - J30	
16/09/15 07:39:59	SIG	M62/2041A2	40R	M62 J25 - J30	
16/09/15 07:39:59	SIG	M62/2041A3	40R	M62 J25 - J30	
16/09/15 07:39:59	SIG	M62/2041A4	40R	M62 J25 - J30	
16/09/15 07:40:28	SIG	M62/1960A1	60R	M62 J25 - J30	
16/09/15 07:40:28	SIG	M62/1960A2	60R	M62 J25 - J30	
16/09/15 07:40:28	SIG	M62/1960A3	60R	M62 J25 - J30	
16/09/15 07:40:28	SIG	M62/1960K1	60R	M62 J25 - J30	
16/09/15 07:40:28	SIG	M62/1960K2	60R	M62 J25 - J30	
16/09/15 07:40:35	SIG	M62/1999J1	50R	M62 J25 - J30	
16/09/15 07:40:35	SIG	M62/1999J2	50R	M62 J25 - J30	
16/09/15 07:40:36	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 07:40:36	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 07:40:36	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 07:40:36	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 07:40:36	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 07:40:36	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 07:40:41	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 07:40:41	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 07:40:41	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 07:40:41	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 07:40:43	SIG	M62/1999J1	40R	M62 J25 - J30	
16/09/15 07:40:43	SIG	M62/1999J2	40R	M62 J25 - J30	
16/09/15 07:40:46	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 07:40:46	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 07:40:46	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 07:40:46	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 07:40:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 07:40:47	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:40:52	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:40:54	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 07:40:54	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 07:40:54	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 07:40:54	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 07:40:54	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 07:40:54	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 07:40:59	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 07:40:59	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 07:40:59	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 07:40:59	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 07:40:59	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 07:40:59	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 07:41:38	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 07:41:38	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 07:41:38	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 07:41:38	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 07:41:58	SIG	M62/2203B1	60R	M62 J25 - J30	
16/09/15 07:41:58	SIG	M62/2203B2	60R	M62 J25 - J30	
16/09/15 07:41:58	SIG	M62/2203B3	60R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 07:42:09	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 07:42:43	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 07:42:52	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 07:43:19	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 07:43:19	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 07:43:19	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 07:43:19	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 07:43:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:43:49	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2018A1	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 07:43:51	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 07:43:54	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:44:41	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 07:44:41	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 07:44:41	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 07:44:41	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 07:44:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:44:53	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:44:58	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2018A1	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2018A2	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2018A3	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2018A4	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 07:44:59	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 07:44:59	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 07:45:21	SIG	M62/2203B1	40R	M62 J25 - J30	
16/09/15 07:45:21	SIG	M62/2203B2	40R	M62 J25 - J30	
16/09/15 07:45:21	SIG	M62/2203B3	40R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1974A1	50R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1974A2	50R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1974A3	50R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1974A4	50R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1979K1	40R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1979K2	40R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1981A1	40R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1981A2	40R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1981A3	40R	M62 J25 - J30	
16/09/15 07:45:32	SIG	M62/1981A4	40R	M62 J25 - J30	
16/09/15 07:46:18	SIG	M62/2177B1	60R	M62 J25 - J30	
16/09/15 07:46:18	SIG	M62/2177B2	60R	M62 J25 - J30	
16/09/15 07:46:18	SIG	M62/2177L1	60R	M62 J25 - J30	
16/09/15 07:46:18	SIG	M62/2177L2	60R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1968A1	50R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1968A2	50R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1968A3	50R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1968A4	50R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1974A1	40R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1974A2	40R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1974A3	40R	M62 J25 - J30	
16/09/15 07:46:29	SIG	M62/1974A4	40R	M62 J25 - J30	
16/09/15 07:46:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:46:56	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:47:01	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:47:28	SIG	M62/1955K1	60R	M62 J25 - J30	
16/09/15 07:47:28	SIG	M62/1955K2	60R	M62 J25 - J30	
16/09/15 07:47:28	SIG	M62/1956A1	60R	M62 J25 - J30	
16/09/15 07:47:28	SIG	M62/1956A2	60R	M62 J25 - J30	
16/09/15 07:47:28	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 07:47:38	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 07:47:38	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 07:47:38	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 07:47:38	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 07:47:44	SIG	M62/2177B1	40R	M62 J25 - J30	
16/09/15 07:47:44	SIG	M62/2177B2	40R	M62 J25 - J30	
16/09/15 07:47:44	SIG	M62/2177L1	40R	M62 J25 - J30	
16/09/15 07:47:44	SIG	M62/2177L2	40R	M62 J25 - J30	
16/09/15 07:47:48	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 07:47:48	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 07:47:48	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 07:47:48	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 07:47:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:47:57	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:48:03	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:48:14	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 07:48:14	SIG	M62/1956A3	OFF	M62 J25 - J30	
16/09/15 07:48:42	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 07:48:42	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 07:48:42	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 07:48:42	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 07:48:58	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 07:48:58	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 07:48:58	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 07:48:58	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1968A1	40R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1968A2	40R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1968A3	40R	M62 J25 - J30	
16/09/15 07:49:15	SIG	M62/1968A4	40R	M62 J25 - J30	
16/09/15 07:50:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:50:02	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:50:07	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:50:31	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 07:50:31	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 07:50:31	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 07:50:31	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1979K1	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1979K2	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1981A1	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1981A2	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1981A3	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1981A4	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1987A1	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1987A3	50R	M62 J25 - J30	
16/09/15 07:50:46	SIG	M62/1987J1	50R	M62 J25 - J30	
16/09/15 07:51:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:51:01	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:51:07	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:51:20	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 07:51:20	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 07:51:20	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:51:20	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:51:25	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 07:51:25	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 07:51:25	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 07:51:25	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1955K1	50R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1955K2	50R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1956A1	50R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1956A2	50R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1960A1	40R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1960A2	40R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1960A3	40R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1960K1	40R	M62 J25 - J30	
16/09/15 07:51:32	SIG	M62/1960K2	40R	M62 J25 - J30	
16/09/15 07:51:40	SIG	M62/2018A1	50R	M62 J25 - J30	
16/09/15 07:51:40	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 07:51:40	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 07:51:40	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1979K1	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1979K2	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1981A1	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1981A2	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1981A3	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1981A4	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1987A1	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1987A3	40R	M62 J25 - J30	
16/09/15 07:51:58	SIG	M62/1987J1	40R	M62 J25 - J30	
16/09/15 07:52:39	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 07:52:39	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 07:52:39	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 07:52:39	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 07:52:39	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 07:52:39	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2050A1	50R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2050A2	50R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2050A3	50R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2050A4	50R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 07:52:44	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 07:53:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:53:09	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:53:14	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:54:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:54:05	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:54:11	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1955K1	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1955K2	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1956A1	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1956A2	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1960A1	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1960A2	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1960A3	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1960K1	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1960K2	60R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1968A1	50R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1968A2	50R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1968A3	50R	M62 J25 - J30	
16/09/15 07:55:32	SIG	M62/1968A4	50R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1968A1	40R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1968A2	40R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1968A3	40R	M62 J25 - J30	
16/09/15 07:56:02	SIG	M62/1968A4	40R	M62 J25 - J30	
16/09/15 07:56:04	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 07:56:04	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 07:56:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 07:56:15	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 07:56:18	SIG	M62/2050A1	40R	M62 J25 - J30	
16/09/15 07:56:18	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 07:56:18	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 07:56:18	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 07:56:20	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 07:57:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 07:57:10	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:57:15	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 07:57:15	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 07:57:15	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 07:57:15	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 07:57:15	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:57:21	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 07:57:21	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 07:57:21	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 07:57:21	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 07:57:29	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 07:58:51	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2177B1	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2177B2	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2177L1	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2177L2	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2183B1	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2183B2	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2183L1	60R	M62 J25 - J30	
16/09/15 07:58:52	SIG	M62/2183L2	60R	M62 J25 - J30	
16/09/15 07:59:35	SIG	M62/1999J1	50R	M62 J25 - J30	
16/09/15 07:59:35	SIG	M62/1999J2	50R	M62 J25 - J30	
16/09/15 07:59:55	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 07:59:55	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1955K1	50R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1955K2	50R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1956A1	50R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1956A2	50R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1960A1	40R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1960A2	40R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1960A3	40R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1960K1	40R	M62 J25 - J30	
16/09/15 08:00:13	SIG	M62/1960K2	40R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 08:00:18	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1992A1	50R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1992A2	50R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1992A3	50R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1992J1	50R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1999A1	50R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1999A2	50R	M62 J25 - J30	
16/09/15 08:00:28	SIG	M62/1999A3	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2050A1	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2050A2	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2050A3	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2050A4	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 08:00:33	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2050A1	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 08:00:39	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 08:01:11	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 08:01:11	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 08:01:11	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 08:01:11	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 08:01:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:01:14	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 08:01:18	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 08:01:18	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 08:01:18	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 08:01:18	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 08:01:20	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 08:01:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:01:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:01:54	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 08:01:54	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 08:01:59	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 08:01:59	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 08:02:26	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 08:02:26	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 08:02:26	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 08:02:26	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 08:02:34	SIG	M62/1955K1	40R	M62 J25 - J30	
16/09/15 08:02:34	SIG	M62/1955K2	40R	M62 J25 - J30	
16/09/15 08:02:34	SIG	M62/1956A1	40R	M62 J25 - J30	
16/09/15 08:02:34	SIG	M62/1956A2	40R	M62 J25 - J30	
16/09/15 08:02:34	SIG	M62/1956A3	40R	M62 J25 - J30	
16/09/15 08:02:50	SIG	M62/2041A1	50R	M62 J25 - J30	
16/09/15 08:02:50	SIG	M62/2041A2	50R	M62 J25 - J30	
16/09/15 08:02:50	SIG	M62/2041A3	50R	M62 J25 - J30	
16/09/15 08:02:50	SIG	M62/2041A4	50R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2033A1	50R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2041A1	40R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2041A2	40R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2041A3	40R	M62 J25 - J30	
16/09/15 08:02:55	SIG	M62/2041A4	40R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 08:02:56	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 08:03:11	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 08:03:11	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 08:03:11	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 08:03:11	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 08:03:11	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 08:03:28	SIG	M62/2189B1	60R	M62 J25 - J30	
16/09/15 08:03:28	SIG	M62/2189B2	60R	M62 J25 - J30	
16/09/15 08:03:28	SIG	M62/2189B3	60R	M62 J25 - J30	
16/09/15 08:03:28	SIG	M62/2189B4	60R	M62 J25 - J30	
16/09/15 08:03:33	SIG	M62/1987A1	50R	M62 J25 - J30	
16/09/15 08:03:33	SIG	M62/1987A3	50R	M62 J25 - J30	
16/09/15 08:03:33	SIG	M62/1987J1	50R	M62 J25 - J30	
16/09/15 08:04:24	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 08:04:24	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 08:04:24	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 08:04:30	SIG	M62/1979K1	50R	M62 J25 - J30	
16/09/15 08:04:30	SIG	M62/1979K2	50R	M62 J25 - J30	
16/09/15 08:04:30	SIG	M62/1981A1	50R	M62 J25 - J30	
16/09/15 08:04:30	SIG	M62/1981A2	50R	M62 J25 - J30	
16/09/15 08:04:30	SIG	M62/1981A3	50R	M62 J25 - J30	
16/09/15 08:04:30	SIG	M62/1981A4	50R	M62 J25 - J30	
16/09/15 08:05:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:05:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:05:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:05:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:05:32	SIG	M62/1999A1	40R	M62 J25 - J30	
16/09/15 08:05:32	SIG	M62/1999A2	40R	M62 J25 - J30	
16/09/15 08:05:32	SIG	M62/1999A3	40R	M62 J25 - J30	
16/09/15 08:05:32	SIG	M62/1999J1	40R	M62 J25 - J30	
16/09/15 08:05:32	SIG	M62/1999J2	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2018A1	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2018A2	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2018A3	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2018A4	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 08:05:42	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2018A1	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2018A2	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2018A3	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2018A4	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 08:05:47	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 08:06:10	SIG	M62/1974A1	50R	M62 J25 - J30	
16/09/15 08:06:10	SIG	M62/1974A2	50R	M62 J25 - J30	
16/09/15 08:06:10	SIG	M62/1974A3	50R	M62 J25 - J30	
16/09/15 08:06:10	SIG	M62/1974A4	50R	M62 J25 - J30	
16/09/15 08:06:37	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 08:06:37	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 08:06:42	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 08:06:42	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 08:06:42	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 08:06:42	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 08:06:47	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 08:06:57	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2177B1	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2177B2	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2177L1	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2177L2	40R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2183B1	50R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2183L1	50R	M62 J25 - J30	
16/09/15 08:07:02	SIG	M62/2183L2	50R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2183B1	40R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2183L1	40R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2183L2	40R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 08:08:17	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 08:08:34	SIG	M62/1992A1	40R	M62 J25 - J30	
16/09/15 08:08:34	SIG	M62/1992A2	40R	M62 J25 - J30	
16/09/15 08:08:34	SIG	M62/1992A3	40R	M62 J25 - J30	
16/09/15 08:08:34	SIG	M62/1992J1	40R	M62 J25 - J30	
16/09/15 08:08:35	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 08:08:35	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 08:08:35	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 08:08:35	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 08:08:45	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 08:08:45	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 08:08:45	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 08:08:45	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 08:08:45	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 08:08:45	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 08:08:51	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 08:08:51	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 08:08:51	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 08:08:51	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 08:08:51	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 08:08:51	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 08:08:58	SIG	M62/1968A1	50R	M62 J25 - J30	
16/09/15 08:08:58	SIG	M62/1968A2	50R	M62 J25 - J30	
16/09/15 08:08:58	SIG	M62/1968A3	50R	M62 J25 - J30	
16/09/15 08:08:58	SIG	M62/1968A4	50R	M62 J25 - J30	
16/09/15 08:09:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:09:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:09:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:09:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 08:10:41	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 08:10:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:10:46	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:10:51	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:11:03	SIG	M62/2189B1	40R	M62 J25 - J30	
16/09/15 08:11:03	SIG	M62/2189B2	40R	M62 J25 - J30	
16/09/15 08:11:03	SIG	M62/2189B3	40R	M62 J25 - J30	
16/09/15 08:11:03	SIG	M62/2189B4	40R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1955K1	50R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1955K2	50R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 08:11:25	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 08:12:28	SIG	M62/1956A1	50R	M62 J25 - J30	
16/09/15 08:12:28	SIG	M62/1956A2	50R	M62 J25 - J30	
16/09/15 08:12:28	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 08:12:33	SIG	M62/1992A1	50R	M62 J25 - J30	
16/09/15 08:12:33	SIG	M62/1992A2	50R	M62 J25 - J30	
16/09/15 08:12:33	SIG	M62/1992A3	50R	M62 J25 - J30	
16/09/15 08:12:33	SIG	M62/1992J1	50R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 08:12:45	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 08:12:45	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 08:12:57	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 08:12:57	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 08:12:57	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 08:12:57	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 08:13:04	SIG	M62/2177B1	60R	M62 J25 - J30	
16/09/15 08:13:04	SIG	M62/2177B2	60R	M62 J25 - J30	
16/09/15 08:13:04	SIG	M62/2177L1	60R	M62 J25 - J30	
16/09/15 08:13:04	SIG	M62/2177L2	60R	M62 J25 - J30	
16/09/15 08:13:13	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 08:13:13	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 08:13:13	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 08:13:13	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 08:13:29	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 08:13:29	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 08:13:29	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 08:13:29	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 08:13:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:13:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:13:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:13:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:13:35	SIG	M62/2177B1	40R	M62 J25 - J30	
16/09/15 08:13:35	SIG	M62/2177B2	40R	M62 J25 - J30	
16/09/15 08:13:35	SIG	M62/2177L1	40R	M62 J25 - J30	
16/09/15 08:13:35	SIG	M62/2177L2	40R	M62 J25 - J30	
16/09/15 08:13:36	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 08:13:36	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 08:13:36	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 08:13:36	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 08:13:36	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 08:13:36	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 08:13:39	SIG	M62/1992A1	40R	M62 J25 - J30	
16/09/15 08:13:39	SIG	M62/1992A2	40R	M62 J25 - J30	
16/09/15 08:13:39	SIG	M62/1992A3	40R	M62 J25 - J30	
16/09/15 08:13:39	SIG	M62/1992J1	40R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2050A1	50R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2050A2	50R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2050A3	50R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2050A4	50R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 08:13:41	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 08:13:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:13:49	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:13:54	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2041A1	50R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2041A2	50R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2041A3	50R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2041A4	50R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2050A1	40R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 08:14:10	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2041A1	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2041A2	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2041A3	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2041A4	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2050A1	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 08:14:16	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 08:15:34	SIG	M62/1987A1	40R	M62 J25 - J30	
16/09/15 08:15:34	SIG	M62/1987A3	40R	M62 J25 - J30	
16/09/15 08:15:34	SIG	M62/1987J1	40R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 08:16:16	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 08:16:28	SIG	M62/2203B1	60R	M62 J25 - J30	
16/09/15 08:16:28	SIG	M62/2203B2	60R	M62 J25 - J30	
16/09/15 08:16:28	SIG	M62/2203B3	60R	M62 J25 - J30	
16/09/15 08:16:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:16:55	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:17:00	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:17:22	SIG	M62/1979K1	40R	M62 J25 - J30	
16/09/15 08:17:22	SIG	M62/1979K2	40R	M62 J25 - J30	
16/09/15 08:17:22	SIG	M62/1981A1	40R	M62 J25 - J30	
16/09/15 08:17:22	SIG	M62/1981A2	40R	M62 J25 - J30	
16/09/15 08:17:22	SIG	M62/1981A3	40R	M62 J25 - J30	
16/09/15 08:17:22	SIG	M62/1981A4	40R	M62 J25 - J30	
16/09/15 08:18:10	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 08:18:10	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 08:18:10	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 08:18:10	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 08:18:20	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 08:18:20	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 08:18:28	SIG	M62/2041A1	50R	M62 J25 - J30	
16/09/15 08:18:28	SIG	M62/2041A2	50R	M62 J25 - J30	
16/09/15 08:18:28	SIG	M62/2041A3	50R	M62 J25 - J30	
16/09/15 08:18:28	SIG	M62/2041A4	50R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2033A1	50R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2041A1	40R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2041A2	40R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2041A3	40R	M62 J25 - J30	
16/09/15 08:18:33	SIG	M62/2041A4	40R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2189B1	30R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 08:18:39	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 08:18:45	SIG	M62/2189B1	20R	M62 J25 - J30	
16/09/15 08:18:45	SIG	M62/2194B1	30R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/1974A1	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/1974A2	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/1974A3	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/1974A4	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2189B1	20R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2194B1	20R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 08:18:51	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 08:18:56	SIG	M62/2189B1	STOP	M62 J25 - J30	
16/09/15 08:18:56	SIG	M62/2194B1	STOP	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1955K1	60R	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1955K2	60R	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1960A1	60R	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1960A2	60R	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1960A3	60R	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1960K1	60R	M62 J25 - J30	
16/09/15 08:19:28	SIG	M62/1960K2	60R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 08:19:43	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 08:19:48	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 08:20:01	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:20:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:20:07	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2018A1	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 08:20:16	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 08:20:28	SIG	M62/1956A1	60R	M62 J25 - J30	
16/09/15 08:20:28	SIG	M62/1956A2	60R	M62 J25 - J30	
16/09/15 08:20:28	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 08:20:40	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 08:20:40	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 08:20:40	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 08:20:40	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 08:20:46	SIG	M62/2189B1	40R	M62 J25 - J30	
16/09/15 08:20:46	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 08:20:46	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 08:20:46	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 08:21:17	SIG	M62/2057A1	50R	M62 J25 - J30	
16/09/15 08:21:17	SIG	M62/2057A2	50R	M62 J25 - J30	
16/09/15 08:21:17	SIG	M62/2057A3	50R	M62 J25 - J30	
16/09/15 08:21:17	SIG	M62/2057J1	50R	M62 J25 - J30	
16/09/15 08:21:17	SIG	M621/1002A1	50R	M62 J25 - J30	
16/09/15 08:21:17	SIG	M621/1002A2	50R	M62 J25 - J30	
16/09/15 08:21:23	SIG	M62/2057A1	40R	M62 J25 - J30	
16/09/15 08:21:23	SIG	M62/2057A2	40R	M62 J25 - J30	
16/09/15 08:21:23	SIG	M62/2057A3	40R	M62 J25 - J30	
16/09/15 08:21:23	SIG	M62/2057J1	40R	M62 J25 - J30	
16/09/15 08:21:23	SIG	M621/1002A1	40R	M62 J25 - J30	
16/09/15 08:21:23	SIG	M621/1002A2	40R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1968A1	40R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1968A2	40R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1968A3	40R	M62 J25 - J30	
16/09/15 08:21:30	SIG	M62/1968A4	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2018A1	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2018A2	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2018A3	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2018A4	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 08:22:20	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 08:23:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:23:07	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:23:13	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 08:23:31	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2197B1	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2197B2	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2197B3	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2199M1	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2199M2	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2203B1	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2203B2	40R	M62 J25 - J30	
16/09/15 08:23:36	SIG	M62/2203B3	40R	M62 J25 - J30	
16/09/15 08:23:37	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 08:23:37	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 08:23:37	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 08:23:37	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 08:23:42	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 08:23:42	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 08:23:42	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 08:23:42	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 08:24:27	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 08:24:28	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1955K1	50R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1955K2	50R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1956A1	50R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1956A2	50R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1960A1	40R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1960A2	40R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1960A3	40R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1960K1	40R	M62 J25 - J30	
16/09/15 08:24:31	SIG	M62/1960K2	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2189B1	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2189B2	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2189B3	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2189B4	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2194B1	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2194B2	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2194B3	40R	M62 J25 - J30	
16/09/15 08:24:58	SIG	M62/2194B4	40R	M62 J25 - J30	
16/09/15 08:25:07	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 08:25:07	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 08:25:07	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 08:25:12	SIG	M62/1956A3	OFF	M62 J25 - J30	
16/09/15 08:25:12	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 08:25:17	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 08:25:17	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 08:25:17	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 08:25:17	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 08:25:17	SIG	M621/1002A1	OFF	M62 J25 - J30	
16/09/15 08:25:17	SIG	M621/1002A2	OFF	M62 J25 - J30	
16/09/15 08:26:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:26:14	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:26:20	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 08:26:20	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 08:26:20	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 08:26:20	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 08:26:20	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:26:26	SIG	M62/1999J1	50R	M62 J25 - J30	
16/09/15 08:26:26	SIG	M62/1999J2	50R	M62 J25 - J30	
16/09/15 08:26:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 08:26:54	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 08:26:54	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 08:26:54	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 08:26:54	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 08:27:10	SIG	M62/1999J1	40R	M62 J25 - J30	
16/09/15 08:27:10	SIG	M62/1999J2	40R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2197B1	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2197B2	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2197B3	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2199M1	50R	M62 J25 - J30	
16/09/15 08:28:17	SIG	M62/2199M2	50R	M62 J25 - J30	
16/09/15 08:28:58	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 08:28:58	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 08:28:58	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 08:28:58	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2033A1	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:29:19	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2025A1	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2025A2	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2025A3	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2025A4	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 08:29:25	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:29:38	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 08:29:39	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 08:29:50	SIG	M62/2189B1	40R	M62 J25 - J30	
16/09/15 08:29:50	SIG	M62/2189B2	40R	M62 J25 - J30	
16/09/15 08:29:50	SIG	M62/2189B3	40R	M62 J25 - J30	
16/09/15 08:29:50	SIG	M62/2189B4	40R	M62 J25 - J30	
16/09/15 08:30:54	SIG	M62/2203B1	50R	M62 J25 - J30	
16/09/15 08:30:54	SIG	M62/2203B2	50R	M62 J25 - J30	
16/09/15 08:30:54	SIG	M62/2203B3	50R	M62 J25 - J30	
16/09/15 08:31:16	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 08:31:16	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 08:31:16	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 08:31:16	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 08:31:16	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 08:32:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:32:26	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:32:32	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2197B1	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2197B2	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2197B3	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2199M1	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2199M2	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2203B1	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2203B2	60R	M62 J25 - J30	
16/09/15 08:32:33	SIG	M62/2203B3	60R	M62 J25 - J30	
16/09/15 08:32:34	SIG	M62/1960A1	40R	M62 J25 - J30	
16/09/15 08:32:34	SIG	M62/1960A2	40R	M62 J25 - J30	
16/09/15 08:32:34	SIG	M62/1960A3	40R	M62 J25 - J30	
16/09/15 08:32:34	SIG	M62/1960K1	40R	M62 J25 - J30	
16/09/15 08:32:34	SIG	M62/1960K2	40R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2189B1	50R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2189B2	50R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2189B3	50R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2189B4	50R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2194B1	60R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2194B2	60R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2194B3	60R	M62 J25 - J30	
16/09/15 08:33:50	SIG	M62/2194B4	60R	M62 J25 - J30	
16/09/15 08:34:28	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 08:34:28	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 08:34:28	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 08:34:28	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 08:34:42	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 08:34:42	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 08:34:42	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 08:34:42	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2189B1	40R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2189B2	40R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2189B3	40R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2189B4	40R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2194B1	50R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2194B2	50R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2194B3	50R	M62 J25 - J30	
16/09/15 08:34:46	SIG	M62/2194B4	50R	M62 J25 - J30	
16/09/15 08:35:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:35:33	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:35:36	SIG	M62/1955K1	40R	M62 J25 - J30	
16/09/15 08:35:36	SIG	M62/1955K2	40R	M62 J25 - J30	
16/09/15 08:35:36	SIG	M62/1956A1	40R	M62 J25 - J30	
16/09/15 08:35:36	SIG	M62/1956A2	40R	M62 J25 - J30	
16/09/15 08:35:36	SIG	M62/1956A3	40R	M62 J25 - J30	
16/09/15 08:35:38	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:37:14	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 08:37:14	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 08:37:14	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 08:37:14	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 08:37:36	SIG	M62/2177B1	60R	M62 J25 - J30	
16/09/15 08:37:36	SIG	M62/2177B2	60R	M62 J25 - J30	
16/09/15 08:37:36	SIG	M62/2177L1	60R	M62 J25 - J30	
16/09/15 08:37:36	SIG	M62/2177L2	60R	M62 J25 - J30	
16/09/15 08:38:19	SIG	M62/2018A1	50R	M62 J25 - J30	
16/09/15 08:38:19	SIG	M62/2018A2	50R	M62 J25 - J30	
16/09/15 08:38:19	SIG	M62/2018A3	50R	M62 J25 - J30	
16/09/15 08:38:19	SIG	M62/2018A4	50R	M62 J25 - J30	
16/09/15 08:38:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:38:45	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:38:50	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:39:02	SIG	M62/2183B1	60R	M62 J25 - J30	
16/09/15 08:39:02	SIG	M62/2183B2	60R	M62 J25 - J30	
16/09/15 08:39:02	SIG	M62/2183L1	60R	M62 J25 - J30	
16/09/15 08:39:02	SIG	M62/2183L2	60R	M62 J25 - J30	
16/09/15 08:39:36	SIG	M62/1955K1	50R	M62 J25 - J30	
16/09/15 08:39:36	SIG	M62/1955K2	50R	M62 J25 - J30	
16/09/15 08:40:24	SIG	M62/1956A1	50R	M62 J25 - J30	
16/09/15 08:40:24	SIG	M62/1956A2	50R	M62 J25 - J30	
16/09/15 08:40:24	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2170B1	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2170B2	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2183B1	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2183L1	50R	M62 J25 - J30	
16/09/15 08:40:28	SIG	M62/2183L2	50R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2170B1	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2170B2	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2170L1	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2170L2	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2177B1	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2177B2	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2177L1	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2177L2	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2183B1	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2183B2	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2183L1	40R	M62 J25 - J30	
16/09/15 08:40:34	SIG	M62/2183L2	40R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1974A1	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1974A2	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1974A3	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1974A4	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1979K1	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1979K2	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1981A1	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1981A2	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1981A3	50R	M62 J25 - J30	
16/09/15 08:40:52	SIG	M62/1981A4	50R	M62 J25 - J30	
16/09/15 08:41:10	SIG	M62/1956A3	50R	M62 J25 - J30	
16/09/15 08:41:10	SIG	M62/1956A3	OFF	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2183B1	50R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2183B2	50R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2183L1	50R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2183L2	50R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2189B1	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2189B2	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2189B3	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2189B4	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2194B1	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2194B2	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2194B3	60R	M62 J25 - J30	
16/09/15 08:42:24	SIG	M62/2194B4	60R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1968A1	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1968A2	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1968A3	50R	M62 J25 - J30	
16/09/15 08:43:05	SIG	M62/1968A4	50R	M62 J25 - J30	
16/09/15 08:43:25	SIG	M62/1979K1	40R	M62 J25 - J30	
16/09/15 08:43:25	SIG	M62/1979K2	40R	M62 J25 - J30	
16/09/15 08:43:25	SIG	M62/1981A1	40R	M62 J25 - J30	
16/09/15 08:43:25	SIG	M62/1981A2	40R	M62 J25 - J30	
16/09/15 08:43:25	SIG	M62/1981A3	40R	M62 J25 - J30	
16/09/15 08:43:25	SIG	M62/1981A4	40R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2004A1	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2004A2	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2004A3	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2008K1	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2008K2	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2012A1	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2012A2	50R	M62 J25 - J30	
16/09/15 08:43:37	SIG	M62/2012A3	50R	M62 J25 - J30	
16/09/15 08:43:43	SIG	M62/1999A1	50R	M62 J25 - J30	
16/09/15 08:43:43	SIG	M62/1999A2	50R	M62 J25 - J30	
16/09/15 08:43:43	SIG	M62/1999A3	50R	M62 J25 - J30	
16/09/15 08:43:43	SIG	M62/1999J1	50R	M62 J25 - J30	
16/09/15 08:43:43	SIG	M62/1999J2	50R	M62 J25 - J30	
16/09/15 08:44:14	SIG	M62/1992A1	50R	M62 J25 - J30	
16/09/15 08:44:14	SIG	M62/1992A2	50R	M62 J25 - J30	
16/09/15 08:44:14	SIG	M62/1992A3	50R	M62 J25 - J30	
16/09/15 08:44:14	SIG	M62/1992J1	50R	M62 J25 - J30	
16/09/15 08:44:29	SIG	M62/2018A1	60R	M62 J25 - J30	
16/09/15 08:44:29	SIG	M62/2018A2	60R	M62 J25 - J30	
16/09/15 08:44:29	SIG	M62/2018A3	60R	M62 J25 - J30	
16/09/15 08:44:29	SIG	M62/2018A4	60R	M62 J25 - J30	
16/09/15 08:44:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:44:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:44:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:44:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:45:08	SIG	M62/1974A1	40R	M62 J25 - J30	
16/09/15 08:45:08	SIG	M62/1974A2	40R	M62 J25 - J30	
16/09/15 08:45:08	SIG	M62/1974A3	40R	M62 J25 - J30	
16/09/15 08:45:08	SIG	M62/1974A4	40R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2170B1	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2170B2	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2170L1	50R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2177B1	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2177B2	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2177L1	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2177L2	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2183B1	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2183B2	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2183L1	60R	M62 J25 - J30	
16/09/15 08:45:11	SIG	M62/2183L2	60R	M62 J25 - J30	
16/09/15 08:46:44	SIG	M62/1987A1	50R	M62 J25 - J30	
16/09/15 08:46:44	SIG	M62/1987A3	50R	M62 J25 - J30	
16/09/15 08:46:44	SIG	M62/1987J1	50R	M62 J25 - J30	
16/09/15 08:47:29	SIG	M62/1955K1	60R	M62 J25 - J30	
16/09/15 08:47:29	SIG	M62/1955K2	60R	M62 J25 - J30	
16/09/15 08:47:29	SIG	M62/1956A1	60R	M62 J25 - J30	
16/09/15 08:47:29	SIG	M62/1956A2	60R	M62 J25 - J30	
16/09/15 08:47:29	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 08:47:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:47:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 08:48:10	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 08:48:10	SIG	M62/1956A3	OFF	M62 J25 - J30	
16/09/15 08:48:29	SIG	M62/1960A1	60R	M62 J25 - J30	
16/09/15 08:48:29	SIG	M62/1960A2	60R	M62 J25 - J30	
16/09/15 08:48:29	SIG	M62/1960A3	60R	M62 J25 - J30	
16/09/15 08:48:29	SIG	M62/1960K1	60R	M62 J25 - J30	
16/09/15 08:48:29	SIG	M62/1960K2	60R	M62 J25 - J30	
16/09/15 08:49:00	SIG	M62/1956A3	OFF	M62 J25 - J30	
16/09/15 08:49:01	SIG	M62/1956A3	60R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1974A1	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1974A2	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1974A3	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1974A4	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1979K1	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1979K2	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1981A1	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1981A2	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1981A3	50R	M62 J25 - J30	
16/09/15 08:49:08	SIG	M62/1981A4	50R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 08:51:29	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2004A1	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2004A2	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2004A3	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2008K1	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2008K2	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2012A2	60R	M62 J25 - J30	
16/09/15 08:51:29	SIG	M62/2012A3	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1968A1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1968A2	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1968A3	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1968A4	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1974A1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1974A2	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1974A3	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1974A4	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1979K1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1979K2	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1981A1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1981A2	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1981A3	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1981A4	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1987A1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1987A3	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1987J1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1992A1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1992A2	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1992A3	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1992J1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1999A1	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1999A2	60R	M62 J25 - J30	
16/09/15 08:52:42	SIG	M62/1999A3	60R	M62 J25 - J30	
16/09/15 08:54:29	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 08:54:29	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 08:57:29	SIG	M62/2159B1	NR	M62 J25 - J30	
16/09/15 08:57:29	SIG	M62/2159B2	NR	M62 J25 - J30	
16/09/15 08:57:29	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 08:57:29	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 08:57:29	SIG	M62/2170L1	OFF	M62 J25 - J30	
16/09/15 08:57:29	SIG	M62/2170L2	OFF	M62 J25 - J30	
16/09/15 08:59:29	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 08:59:29	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 08:59:29	SIG	M62/2177B1	NR	M62 J25 - J30	
16/09/15 08:59:29	SIG	M62/2177B2	NR	M62 J25 - J30	
16/09/15 08:59:29	SIG	M62/2177L1	NR	M62 J25 - J30	
16/09/15 08:59:29	SIG	M62/2177L2	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2159B1	OFF	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2177B1	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2177B2	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2177L1	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2177L2	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2183B1	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2183B2	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2183L1	NR	M62 J25 - J30	
16/09/15 09:00:29	SIG	M62/2183L2	NR	M62 J25 - J30	
16/09/15 09:00:30	SIG	M62/2159B2	OFF	M62 J25 - J30	
16/09/15 09:02:29	SIG	M62/2170B1	OFF	M62 J25 - J30	
16/09/15 09:02:29	SIG	M62/2170B2	OFF	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2183B1	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2183B2	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2183L1	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2183L2	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2189B1	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2189B2	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2189B3	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2189B4	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2194B1	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2194B2	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2194B3	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2194B4	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2197B1	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2197B2	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2197B3	NR	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2199M1	OFF	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2199M2	OFF	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2203B1	OFF	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2203B2	OFF	M62 J25 - J30	
16/09/15 09:03:29	SIG	M62/2203B3	OFF	M62 J25 - J30	
16/09/15 09:03:30	SIG	M62/2177B1	OFF	M62 J25 - J30	
16/09/15 09:03:30	SIG	M62/2177B2	OFF	M62 J25 - J30	
16/09/15 09:03:30	SIG	M62/2177L1	OFF	M62 J25 - J30	
16/09/15 09:03:30	SIG	M62/2177L2	OFF	M62 J25 - J30	
16/09/15 09:04:08	SIG	M62/2079A1	HSD	M62 J25 - J30	
16/09/15 09:05:17	SIG	M62/2088A1	HSD	M62 J25 - J30	
16/09/15 09:06:25	SIG	M62/2079A1	REDX	M62 J25 - J30	
16/09/15 09:06:25	SIG	M62/2097A1	HSD	M62 J25 - J30	
16/09/15 09:06:29	SIG	M62/2194B1	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2183B1	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2183L1	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2183L2	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2189B1	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2189B2	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2189B3	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2189B4	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2194B2	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2194B3	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2194B4	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2197B1	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2197B2	OFF	M62 J25 - J30	
16/09/15 09:06:30	SIG	M62/2197B3	OFF	M62 J25 - J30	
16/09/15 09:07:33	SIG	M62/2088A1	REDX	M62 J25 - J30	
16/09/15 09:07:33	SIG	M62/2106A1	HSD	M62 J25 - J30	
16/09/15 09:08:41	SIG	M62/2097A1	REDX	M62 J25 - J30	
16/09/15 09:09:29	SIG	M62/2004A1	OFF	M62 J25 - J30	
16/09/15 09:09:29	SIG	M62/2004A2	OFF	M62 J25 - J30	
16/09/15 09:09:29	SIG	M62/2004A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1955K1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1955K2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1956A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1956A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1956A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1960A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1960A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1960A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1960K1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1960K2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1968A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1968A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1968A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1968A4	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1974A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1974A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1974A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1974A4	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1979K1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1979K2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1981A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1981A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1981A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1981A4	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1987A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1987A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1987J1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1992A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1992A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1992A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1992J1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1999A1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1999A2	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1999A3	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1999J1	OFF	M62 J25 - J30	
16/09/15 09:09:41	SIG	M62/1999J2	OFF	M62 J25 - J30	
16/09/15 09:09:49	SIG	M62/2106A1	REDX	M62 J25 - J30	
16/09/15 09:10:49	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 09:10:49	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 09:10:49	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2073K1	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2079A2	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2079A3	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2079A4	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2088A2	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2088A3	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2088A4	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2097A2	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2097A3	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2097A4	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2106A2	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2106A3	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2106A4	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2114A1	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2114A2	NR	M62 J25 - J30	
16/09/15 09:11:09	SIG	M62/2114A3	NR	M62 J25 - J30	
16/09/15 09:11:59	SIG	M62/2073K1	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2079A1	BLNK	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2079A2	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2079A3	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2079A4	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2088A1	BLNK	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2088A2	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2088A3	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2088A4	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2097A1	BLNK	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2097A2	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2097A3	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2097A4	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2106A1	BLNK	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2106A2	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2106A4	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2114A1	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2114A2	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2114A3	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2117A1	BLNK	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2117A2	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2117A3	OFF	M62 J25 - J30	
16/09/15 09:12:09	SIG	M62/2117A4	OFF	M62 J25 - J30	
16/09/15 09:25:53	SIG	M62/2113B1	HSD	M62 J25 - J30	
16/09/15 09:26:46	SIG	M62/2106B1	HSD	M62 J25 - J30	
16/09/15 09:27:54	SIG	M62/2097B1	HSD	M62 J25 - J30	
16/09/15 09:27:55	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 09:29:02	SIG	M62/2088B1	HSD	M62 J25 - J30	
16/09/15 09:29:02	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 09:30:11	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 09:31:18	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2074B2	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2074B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2074B4	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2081B1	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2081B2	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2081B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2081L1	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2088B2	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2088B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2088B4	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2097B2	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2097B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2097B4	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2106B2	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2106B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2106B4	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2113B2	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2113B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2113B4	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2117B1	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2117B3	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2120M1	NR	M62 J25 - J30	
16/09/15 09:32:12	SIG	M62/2120M2	NR	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2113B1	BLNK	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2113B2	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2113B3	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2113B4	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2117B3	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2120M1	OFF	M62 J25 - J30	
16/09/15 09:33:12	SIG	M62/2120M2	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2074B2	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2074B3	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2074B4	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2081B1	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2081B2	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2081B3	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2081L1	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2088B2	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2088B3	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2088B4	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 09:33:13	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 09:49:59	SIG	M62/2057B1	50R	M62 J25 - J30	
16/09/15 09:49:59	SIG	M62/2057B2	50R	M62 J25 - J30	
16/09/15 09:49:59	SIG	M62/2057B3	50R	M62 J25 - J30	
16/09/15 09:49:59	SIG	M62/2057B4	50R	M62 J25 - J30	
16/09/15 09:49:59	SIG	M621/1010B1	LDR	M62 J25 - J30	
16/09/15 09:49:59	SIG	M621/1010B2	50R	M62 J25 - J30	
16/09/15 09:50:05	SIG	M62/2057B1	40R	M62 J25 - J30	
16/09/15 09:50:05	SIG	M62/2057B2	40R	M62 J25 - J30	
16/09/15 09:50:05	SIG	M62/2057B3	40R	M62 J25 - J30	
16/09/15 09:50:05	SIG	M62/2057B4	40R	M62 J25 - J30	
16/09/15 09:50:10	SIG	M62/2057B1	30R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2057B1	20R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2057B2	40R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2057B3	40R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2057B4	40R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 09:50:15	SIG	M621/1002B1	LDR	M62 J25 - J30	
16/09/15 09:50:15	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 09:50:20	SIG	M62/2057B1	STOP	M62 J25 - J30	
16/09/15 09:50:30	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 09:50:30	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 09:50:30	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 09:50:30	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 09:59:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1960B1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1960B2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1960B3	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1960L1	NR	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1960L2	NR	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1968B1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1968B2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1968B3	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1968L1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1974B1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1974B2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1974B3	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1974B4	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1974M1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1974M2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1981B1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1981B2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1981B3	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1981B4	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1987B1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1987B2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1987B3	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1987B4	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1992B1	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1992B2	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1992B3	50R	M62 J25 - J30	
16/09/15 10:02:46	SIG	M62/1992B4	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 10:04:40	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2041B1	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2041B2	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2041B3	40R	M62 J25 - J30	
16/09/15 10:04:45	SIG	M62/2041B4	40R	M62 J25 - J30	
16/09/15 10:05:21	SIG	M62/2033B1	30R	M62 J25 - J30	
16/09/15 10:05:26	SIG	M62/2033B1	20R	M62 J25 - J30	
16/09/15 10:05:26	SIG	M62/2041B1	LDR	M62 J25 - J30	
16/09/15 10:05:26	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 10:05:26	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 10:05:26	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 10:05:31	SIG	M62/2033B1	STOP	M62 J25 - J30	
16/09/15 10:07:28	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 10:07:28	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 10:07:28	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 10:07:28	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 10:07:28	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 10:07:28	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 10:07:34	SIG	M62/2050B2	40R	M62 J25 - J30	
16/09/15 10:07:34	SIG	M62/2050B3	40R	M62 J25 - J30	
16/09/15 10:07:34	SIG	M62/2050B4	40R	M62 J25 - J30	
16/09/15 10:07:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:07:51	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 10:07:56	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 10:08:35	SIG	M62/2041B1	STOP	M62 J25 - J30	
16/09/15 10:08:41	SIG	M62/2041B1	STOP	M62 J25 - J30	
16/09/15 10:08:46	SIG	M62/2041B1	STOP	M62 J25 - J30	
16/09/15 10:10:34	SIG	M62/2025B1	HSD	M62 J25 - J30	
16/09/15 10:10:54	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 10:10:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:11:00	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 10:12:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2018B1	NR	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2018B2	NR	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2018B3	NR	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2025B2	NR	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2025B3	NR	M62 J25 - J30	
16/09/15 10:12:41	SIG	M62/2025B4	NR	M62 J25 - J30	
16/09/15 10:13:27	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 10:13:27	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 10:13:27	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 10:13:27	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 10:13:27	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 10:13:27	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 10:13:27	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 10:13:42	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 10:13:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:13:58	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 10:14:04	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 10:17:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:17:02	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 10:17:07	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 10:20:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:20:06	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 10:20:11	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 10:21:23	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2065B2	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2065B3	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2065B4	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 10:21:24	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 10:24:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:24:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:24:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:24:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:26:30	SIG	M62/1999B1	REDX	M62 J25 - J30	
16/09/15 10:26:30	SIG	M62/1999B2	60R	M62 J25 - J30	
16/09/15 10:26:30	SIG	M62/1999B3	60R	M62 J25 - J30	
16/09/15 10:26:30	SIG	M62/1999B4	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M606/2003B1	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M606/2003B2	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2004B1	REDX	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2004B2	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2004B3	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2004B4	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2005M1	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2005M2	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2012B2	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2012B3	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2012B4	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 10:26:31	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1960B1	OFF	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1960B2	OFF	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1960B3	OFF	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1960L1	OFF	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1960L2	OFF	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1968B1	NR	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1968B2	NR	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1968B3	NR	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1968L1	NR	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1974B1	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1974B2	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1974B3	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1974B4	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1974M1	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1974M2	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1981B1	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1981B2	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1981B3	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1981B4	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1987B1	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1987B2	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1987B3	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1987B4	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1992B1	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1992B2	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1992B3	60R	M62 J25 - J30	
16/09/15 10:28:42	SIG	M62/1992B4	60R	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2018B1	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2018B2	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2018B3	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2025B2	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2025B3	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2025B4	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2033B2	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2033B3	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2033B4	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2041B2	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2041B3	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2041B4	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2050B2	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2050B3	NR	M62 J25 - J30	
16/09/15 10:32:31	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M606/2003B1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M606/2003B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1968B1	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1968B2	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1968B3	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1968L1	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1974B1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1974B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1974B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1974B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1974M1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1974M2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1981B1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1981B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1981B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1981B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1987A2	40R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1987B1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1987B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1987B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1987B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1992B1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1992B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1992B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1992B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1999B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1999B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/1999B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2004B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2004B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2004B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2005M1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2005M2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2012B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2012B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2012B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2050B2	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2050B3	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2065B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2065B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2065B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2069M1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2069M2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 10:36:18	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 10:36:18	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 10:36:19	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/1999B1	BLNK	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2041B4	OFF	M62 J25 - J30	
16/09/15 10:36:20	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2004B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 10:36:21	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 10:36:28	SIG	M62/2183L1	OFF	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/1999B1	BLNK	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/1999B1	REDX	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2004B1	REDX	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2004B1	BLNK	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2065B1	REDX	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 10:38:18	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 10:38:18	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 10:38:18	SIG	M621/1002B1	OFF	M62 J25 - J30	
16/09/15 10:51:06	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 10:51:06	SIG	M62/2074B2	OFF	M62 J25 - J30	
16/09/15 10:51:06	SIG	M62/2074B3	OFF	M62 J25 - J30	
16/09/15 10:51:06	SIG	M62/2074B4	OFF	M62 J25 - J30	
16/09/15 10:51:06	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 10:51:06	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2050B2	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2050B3	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2057B2	OFF	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2057B3	OFF	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2057B4	OFF	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2065B2	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2065B3	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2065B4	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M62/2065M1	NR	M62 J25 - J30	
16/09/15 10:51:07	SIG	M621/1002B1	OFF	M62 J25 - J30	
16/09/15 10:51:07	SIG	M621/1002B2	OFF	M62 J25 - J30	
16/09/15 10:51:12	SIG	M62/2170K1	60R	M62 J25 - J30	
16/09/15 10:51:12	SIG	M62/2170K2	60R	M62 J25 - J30	
16/09/15 10:51:12	SIG	M62/2177A1	REDX	M62 J25 - J30	
16/09/15 10:51:12	SIG	M62/2177A2	NR	M62 J25 - J30	
16/09/15 10:51:12	SIG	M62/2177A3	NR	M62 J25 - J30	
16/09/15 10:51:12	SIG	M62/2177A4	NR	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2170A1	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2170A2	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2177A2	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2177A3	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2177A4	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2183A1	REDX	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2183A2	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2183A3	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2183A4	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2189A1	REDX	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2189A2	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2189A3	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2189A4	60R	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2197A1	NR	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2197A2	NR	M62 J25 - J30	
16/09/15 10:51:13	SIG	M62/2197A3	NR	M62 J25 - J30	
16/09/15 10:51:57	SIG	M62/2170A1	OFF	M62 J25 - J30	
16/09/15 10:51:57	SIG	M62/2170A2	OFF	M62 J25 - J30	
16/09/15 10:51:57	SIG	M62/2170K1	OFF	M62 J25 - J30	
16/09/15 10:51:57	SIG	M62/2170K2	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2177A1	BLNK	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2177A2	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2177A3	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2177A4	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2183A1	BLNK	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2183A2	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2183A3	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2183A4	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2189A1	BLNK	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2189A2	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2189A3	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2189A4	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2197A1	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2197A2	OFF	M62 J25 - J30	
16/09/15 10:51:59	SIG	M62/2197A3	OFF	M62 J25 - J30	
16/09/15 10:53:41	SIG	M62/2065A2	60R	M62 J25 - J30	
16/09/15 10:53:41	SIG	M62/2065A3	60R	M62 J25 - J30	
16/09/15 10:53:41	SIG	M62/2065A4	60R	M62 J25 - J30	
16/09/15 10:53:56	SIG	M62/2073K1	60R	M62 J25 - J30	
16/09/15 10:53:56	SIG	M62/2079A1	REDX	M62 J25 - J30	
16/09/15 10:53:56	SIG	M62/2079A2	NR	M62 J25 - J30	
16/09/15 10:53:56	SIG	M62/2079A3	NR	M62 J25 - J30	
16/09/15 10:53:56	SIG	M62/2079A4	NR	M62 J25 - J30	
16/09/15 10:54:07	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 10:54:07	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 10:54:07	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 10:54:07	SIG	M62/2065B2	OFF	M62 J25 - J30	
16/09/15 10:54:07	SIG	M62/2065B3	OFF	M62 J25 - J30	
16/09/15 10:54:07	SIG	M62/2065B4	OFF	M62 J25 - J30	
16/09/15 10:54:08	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2079A2	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2079A3	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2079A4	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2088A1	REDX	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2088A2	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2088A3	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2088A4	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2097A1	REDX	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2097A2	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2097A3	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2097A4	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2106A1	REDX	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2106A2	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2106A3	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2106A4	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2114A1	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2114A2	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2114A3	60R	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2117A1	REDX	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2117A2	NR	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2117A3	NR	M62 J25 - J30	
16/09/15 10:54:13	SIG	M62/2117A4	NR	M62 J25 - J30	
16/09/15 10:54:41	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 10:54:41	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 10:54:41	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 10:54:56	SIG	M62/2073K1	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2074B2	NR	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2074B3	NR	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2074B4	NR	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2079A1	BLNK	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2079A2	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2079A3	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2079A4	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2081B1	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2081B2	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2081B3	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2081L1	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088A1	BLNK	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088A2	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088A3	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088A4	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088B2	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088B3	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2088B4	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097A1	BLNK	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097A2	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097A3	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097A4	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106A1	BLNK	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106A2	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106A4	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106B2	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106B3	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2106B4	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2113B2	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2113B3	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2113B4	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2114A1	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2114A2	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2114A3	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2117A1	BLNK	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2117A2	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2117A3	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2117A4	OFF	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2117B1	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2117B3	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2120M1	60R	M62 J25 - J30	
16/09/15 10:54:57	SIG	M62/2120M2	60R	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2074B2	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2074B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2074B4	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2081B1	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2081B2	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2081B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2081L1	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2088B2	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2088B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2088B4	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2113B1	BLNK	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2113B2	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2113B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2113B4	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2117B3	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2120M1	OFF	M62 J25 - J30	
16/09/15 10:55:51	SIG	M62/2120M2	OFF	M62 J25 - J30	
16/09/15 10:57:02	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 10:57:02	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B2	NR	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B3	NR	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2057B4	NR	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2065B1	REDX	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2065B2	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2065B3	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2065B4	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 10:57:03	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 10:57:03	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 10:57:03	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 10:57:35	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 10:57:35	SIG	M62/2065B2	OFF	M62 J25 - J30	
16/09/15 10:57:35	SIG	M62/2065B3	OFF	M62 J25 - J30	
16/09/15 10:57:35	SIG	M62/2065B4	OFF	M62 J25 - J30	
16/09/15 10:57:35	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 10:57:35	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2041B4	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2057B2	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2057B3	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2057B4	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M62/2065M1	NR	M62 J25 - J30	
16/09/15 10:57:36	SIG	M621/1002B1	OFF	M62 J25 - J30	
16/09/15 10:57:36	SIG	M621/1002B2	OFF	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2057B2	NR	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2057B3	NR	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2057B4	NR	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2065B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2074B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2074B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2074B4	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2081B1	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2081B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2081B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2081L1	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2088B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2088B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2088B4	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2106B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2106B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2106B4	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2113B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2113B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2113B4	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2117B1	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2117B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2120M1	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2120M2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2125B1	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2125B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M62/2125B3	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 10:57:54	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 10:57:54	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 11:00:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:00:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:00:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:00:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:06:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:06:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2057B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2057B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2057B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2065B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2065B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2065B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2065M1	NR	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2074B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2074B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2074B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2081B1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2081B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2081B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2081L1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2088B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2088B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2088B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2113B1	BLNK	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2113B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2113B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2113B4	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2117B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2120M1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2120M2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2125B1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2125B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M62/2125B3	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M621/1002B1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M621/1002B2	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 11:11:21	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 11:25:41	SIG	M62/2025A1	HSD	M62 J25 - J30	
16/09/15 11:26:41	SIG	M62/2033A1	HSD	M62 J25 - J30	
16/09/15 11:27:41	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 11:27:41	SIG	M62/2025A1	REDX	M62 J25 - J30	
16/09/15 11:27:41	SIG	M62/2041A1	HSD	M62 J25 - J30	
16/09/15 11:28:48	SIG	M62/2033A1	REDX	M62 J25 - J30	
16/09/15 11:28:48	SIG	M62/2050A1	HSD	M62 J25 - J30	
16/09/15 11:29:40	SIG	M62/2041A1	REDX	M62 J25 - J30	
16/09/15 11:30:40	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 11:31:40	SIG	M62/2025A2	NR	M62 J25 - J30	
16/09/15 11:31:40	SIG	M62/2025A3	NR	M62 J25 - J30	
16/09/15 11:31:40	SIG	M62/2025A4	NR	M62 J25 - J30	
16/09/15 11:31:40	SIG	M62/2033A2	NR	M62 J25 - J30	
16/09/15 11:31:40	SIG	M62/2033A3	NR	M62 J25 - J30	
16/09/15 11:31:40	SIG	M62/2033A4	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2041A2	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2041A3	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2041A4	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2050A2	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2050A3	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2050A4	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2057A1	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2057A2	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2057A3	NR	M62 J25 - J30	
16/09/15 11:31:41	SIG	M62/2057J1	NR	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2008K1	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2008K2	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2012A1	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2012A2	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2012A3	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2018A1	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2018A2	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2018A3	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2018A4	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2025A1	BLNK	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2025A2	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2025A3	OFF	M62 J25 - J30	
16/09/15 11:32:40	SIG	M62/2025A4	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2033A1	BLNK	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2033A2	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2033A3	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2033A4	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2041A1	BLNK	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2041A2	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2041A3	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2041A4	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2050A2	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2050A3	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2050A4	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2057A1	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2057A2	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2057A3	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2057J1	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2065A1	BLNK	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2065A2	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2065A3	OFF	M62 J25 - J30	
16/09/15 11:32:41	SIG	M62/2065A4	OFF	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2004B2	NR	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2004B3	NR	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2004B4	NR	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 11:37:22	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1974B1	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1974B2	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1974B3	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1974B4	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1987B1	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1987B2	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1987B3	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1987B4	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1992B1	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1992B2	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1992B3	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1992B4	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1999B2	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1999B3	NR	M62 J25 - J30	
16/09/15 11:37:23	SIG	M62/1999B4	NR	M62 J25 - J30	
16/09/15 11:37:36	SIG	M62/1968B1	NR	M62 J25 - J30	
16/09/15 11:37:36	SIG	M62/1968B2	NR	M62 J25 - J30	
16/09/15 11:37:36	SIG	M62/1968B3	NR	M62 J25 - J30	
16/09/15 11:37:36	SIG	M62/1968L1	NR	M62 J25 - J30	
16/09/15 11:37:36	SIG	M62/1974M1	OFF	M62 J25 - J30	
16/09/15 11:37:36	SIG	M62/1974M2	OFF	M62 J25 - J30	
16/09/15 11:40:23	SIG	M62/1999B2	OFF	M62 J25 - J30	
16/09/15 11:40:23	SIG	M62/2004B1	BLNK	M62 J25 - J30	
16/09/15 11:40:23	SIG	M62/2004B2	OFF	M62 J25 - J30	
16/09/15 11:40:23	SIG	M62/2004B3	OFF	M62 J25 - J30	
16/09/15 11:40:23	SIG	M62/2004B4	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1974B1	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1974B2	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1974B3	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1974B4	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1981B1	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1981B2	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1981B3	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1981B4	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1987B1	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1987B2	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1987B3	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1987B4	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1999B1	BLNK	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1999B3	OFF	M62 J25 - J30	
16/09/15 11:40:24	SIG	M62/1999B4	OFF	M62 J25 - J30	
16/09/15 11:40:36	SIG	M62/1968L1	OFF	M62 J25 - J30	
16/09/15 11:40:37	SIG	M62/1968B1	OFF	M62 J25 - J30	
16/09/15 11:40:37	SIG	M62/1968B2	OFF	M62 J25 - J30	
16/09/15 11:40:37	SIG	M62/1968B3	OFF	M62 J25 - J30	
16/09/15 12:01:02	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 12:01:02	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 12:01:02	SIG	M62/1992B1	NR	M62 J25 - J30	
16/09/15 12:01:02	SIG	M62/1992B2	NR	M62 J25 - J30	
16/09/15 12:01:02	SIG	M62/1992B3	NR	M62 J25 - J30	
16/09/15 12:01:02	SIG	M62/1992B4	NR	M62 J25 - J30	
16/09/15 12:01:02	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 12:01:02	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 12:01:22	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 12:01:22	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 12:04:02	SIG	M62/1992B1	OFF	M62 J25 - J30	
16/09/15 12:04:03	SIG	M62/1992B2	OFF	M62 J25 - J30	
16/09/15 12:04:03	SIG	M62/1992B3	OFF	M62 J25 - J30	
16/09/15 12:04:03	SIG	M62/1992B4	OFF	M62 J25 - J30	
16/09/15 12:04:22	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 12:04:22	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2008K1	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2008K2	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2012A2	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2012A3	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2018A2	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2018A3	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2018A4	60R	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2025A1	REDX	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2025A2	NR	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2025A3	NR	M62 J25 - J30	
16/09/15 13:33:42	SIG	M62/2025A4	NR	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2033A1	REDX	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2041A1	REDX	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2065A1	REDX	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 13:33:43	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2008K1	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2008K2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2012A1	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2012A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2012A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2018A1	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2018A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2018A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2018A4	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2025A1	BLNK	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2025A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2025A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2025A4	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2033A1	BLNK	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2033A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2033A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2033A4	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2041A1	BLNK	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2041A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2041A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2041A4	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2050A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2050A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2050A4	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2057A1	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2057A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2057A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2057J1	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2065A1	BLNK	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2065A2	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2065A3	OFF	M62 J25 - J30	
16/09/15 13:34:23	SIG	M62/2065A4	OFF	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2041A1	REDX	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2050A2	NR	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2050A3	NR	M62 J25 - J30	
16/09/15 14:37:32	SIG	M62/2050A4	NR	M62 J25 - J30	
16/09/15 14:38:56	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 14:38:56	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 14:38:56	SIG	M62/2050A1	OFF	M62 J25 - J30	
16/09/15 14:41:32	SIG	M606/2003B1	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1987B1	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1987B2	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1987B3	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1987B4	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1992B1	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1992B2	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1992B3	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/1992B4	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/2005M1	50R	M62 J25 - J30	
16/09/15 14:41:32	SIG	M62/2005M2	50R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1987B1	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1987B2	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1987B3	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1987B4	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1992B1	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1999B1	REDX	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1999B2	50R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1999B3	50R	M62 J25 - J30	
16/09/15 14:41:37	SIG	M62/1999B4	50R	M62 J25 - J30	
16/09/15 14:42:22	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 14:42:22	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1987B1	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1987B2	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1987B3	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1987B4	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1992B1	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1992B2	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1992B3	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1992B4	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1999B2	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1999B3	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/1999B4	NR	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 14:42:22	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 14:44:19	SIG	M606/2003B1	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1987B1	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1987B2	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1987B3	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1987B4	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1992B1	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1992B2	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1992B3	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/1992B4	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/2005M1	50R	M62 J25 - J30	
16/09/15 14:44:19	SIG	M62/2005M2	50R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1987B1	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1987B2	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1987B3	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1987B4	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1992B1	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1999B2	50R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1999B3	50R	M62 J25 - J30	
16/09/15 14:44:25	SIG	M62/1999B4	50R	M62 J25 - J30	
16/09/15 14:48:19	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 14:48:19	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 14:48:19	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 14:48:19	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1987B1	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1987B2	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1987B3	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1987B4	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1992B1	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1992B2	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1992B3	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1992B4	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1999B2	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1999B3	NR	M62 J25 - J30	
16/09/15 14:48:20	SIG	M62/1999B4	NR	M62 J25 - J30	
16/09/15 14:48:37	SIG	M606/2003B1	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1987B1	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1987B2	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1987B3	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1987B4	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1992B1	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1992B2	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1992B3	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/1992B4	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/2005M1	50R	M62 J25 - J30	
16/09/15 14:48:37	SIG	M62/2005M2	50R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1987B1	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1987B2	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1987B3	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1987B4	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1992B1	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1999B2	50R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1999B3	50R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/1999B4	50R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2004B1	REDX	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2004B2	60R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2004B3	60R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2004B4	60R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2012B2	60R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2012B3	60R	M62 J25 - J30	
16/09/15 14:48:43	SIG	M62/2012B4	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M606/2003B1	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M606/2003B2	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1987B1	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1987B2	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1987B3	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1987B4	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1992B1	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1992B2	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1992B3	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1992B4	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1999B2	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1999B3	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/1999B4	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/2005M1	60R	M62 J25 - J30	
16/09/15 14:52:36	SIG	M62/2005M2	60R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M621/1010B1	50R	M62 J25 - J30	
16/09/15 14:52:47	SIG	M621/1010B2	50R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2057B2	NR	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2057B3	NR	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2057B4	NR	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2065B1	REDX	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2065B2	40R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2065B3	40R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2065B4	40R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2065M1	40R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2069M1	50R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M62/2069M2	50R	M62 J25 - J30	
16/09/15 14:52:52	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 14:52:52	SIG	M621/1002B2	40R	M62 J25 - J30	
16/09/15 14:53:10	SIG	M62/2041A2	NR	M62 J25 - J30	
16/09/15 14:53:10	SIG	M62/2041A3	NR	M62 J25 - J30	
16/09/15 14:53:10	SIG	M62/2041A4	NR	M62 J25 - J30	
16/09/15 14:53:10	SIG	M62/2050A2	NR	M62 J25 - J30	
16/09/15 14:53:10	SIG	M62/2050A3	NR	M62 J25 - J30	
16/09/15 14:53:10	SIG	M62/2050A4	NR	M62 J25 - J30	
16/09/15 14:53:52	SIG	M62/2069M1	40R	M62 J25 - J30	
16/09/15 14:53:52	SIG	M62/2069M2	40R	M62 J25 - J30	
16/09/15 14:53:53	SIG	M62/2074B2	50R	M62 J25 - J30	
16/09/15 14:53:53	SIG	M62/2074B3	50R	M62 J25 - J30	
16/09/15 14:53:53	SIG	M62/2074B4	50R	M62 J25 - J30	
16/09/15 14:53:53	SIG	M621/1010B1	40R	M62 J25 - J30	
16/09/15 14:53:53	SIG	M621/1010B2	40R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2074B2	40R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2074B3	40R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2074B4	40R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2081B1	50R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2081B2	50R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2081B3	50R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M62/2081L1	50R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M621/1010B1	40R	M62 J25 - J30	
16/09/15 14:53:58	SIG	M621/1010B2	40R	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2041A1	BLNK	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2041A2	OFF	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2041A3	OFF	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2041A4	OFF	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2050A2	OFF	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2050A3	OFF	M62 J25 - J30	
16/09/15 14:56:11	SIG	M62/2050A4	OFF	M62 J25 - J30	
16/09/15 14:56:12	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 15:01:14	SIG	M62/2050B2	NR	M62 J25 - J30	
16/09/15 15:01:14	SIG	M62/2050B3	NR	M62 J25 - J30	
16/09/15 15:01:14	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 15:01:14	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 15:01:14	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 15:01:14	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 15:01:15	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 15:03:42	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 15:03:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:03:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:03:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:03:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:04:05	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 15:04:23	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 15:04:43	SIG	M621/1002B1	50R	M62 J25 - J30	
16/09/15 15:04:49	SIG	M62/2057B1	60R	M62 J25 - J30	
16/09/15 15:04:49	SIG	M621/1002B1	40R	M62 J25 - J30	
16/09/15 15:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1987B1	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1987B2	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1987B3	NR	M62 J25 - J30	
16/09/15 15:06:43	SIG	M62/1987B4	NR	M62 J25 - J30	
16/09/15 15:09:43	SIG	M62/1981B1	OFF	M62 J25 - J30	
16/09/15 15:09:44	SIG	M62/1981B2	OFF	M62 J25 - J30	
16/09/15 15:09:44	SIG	M62/1981B3	OFF	M62 J25 - J30	
16/09/15 15:09:44	SIG	M62/1981B4	OFF	M62 J25 - J30	
16/09/15 15:15:43	SIG	M62/2057B1	50R	M62 J25 - J30	
16/09/15 15:15:43	SIG	M62/2057B2	50R	M62 J25 - J30	
16/09/15 15:15:43	SIG	M62/2057B3	50R	M62 J25 - J30	
16/09/15 15:15:43	SIG	M62/2057B4	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2069M1	60R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2069M2	60R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2081B1	OFF	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2081B2	OFF	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2081B3	OFF	M62 J25 - J30	
16/09/15 15:15:46	SIG	M62/2081L1	NR	M62 J25 - J30	
16/09/15 15:15:46	SIG	M621/1002B1	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 15:15:46	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2057B1	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2065B2	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2065B3	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2065B4	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M621/1002B1	60R	M62 J25 - J30	
16/09/15 15:18:44	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 15:18:46	SIG	M62/2081L1	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2004B1	BLNK	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2004B2	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2004B3	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2004B4	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2012B2	NR	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2012B3	NR	M62 J25 - J30	
16/09/15 15:25:43	SIG	M62/2012B4	NR	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1987B1	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1987B2	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1987B3	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1987B4	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1992B1	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1992B2	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1992B3	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1992B4	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1999B1	BLNK	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1999B2	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1999B3	OFF	M62 J25 - J30	
16/09/15 15:25:44	SIG	M62/1999B4	OFF	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2008K1	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2008K2	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2012A2	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2012A3	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2018A2	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2018A3	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2018A4	60R	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2025A1	REDX	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2025A2	NR	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2025A3	NR	M62 J25 - J30	
16/09/15 15:26:20	SIG	M62/2025A4	NR	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2012A1	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2033A1	REDX	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2041A1	REDX	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2057A1	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2057A2	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2057A3	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2057J1	60R	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2065A1	REDX	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 15:26:21	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 15:28:00	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 15:28:21	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 15:28:42	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 15:28:46	SIG	M62/2018A1	60R	M62 J25 - J30	
16/09/15 15:28:46	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 15:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 15:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2041A1	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2041A2	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2041A3	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2041A4	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2050A1	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2050A2	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2050A3	50R	M62 J25 - J30	
16/09/15 16:04:45	SIG	M62/2050A4	50R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2041A1	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2041A2	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2041A3	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2041A4	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2050A1	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 16:05:33	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 16:05:38	SIG	M62/2041A1	30R	M62 J25 - J30	
16/09/15 16:05:38	SIG	M62/2050A1	30R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2025A1	LDR	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2033A1	LDR	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2041A1	20R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2041A2	40R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2041A3	40R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2041A4	40R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2050A1	20R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2050A2	40R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2050A3	40R	M62 J25 - J30	
16/09/15 16:05:44	SIG	M62/2050A4	40R	M62 J25 - J30	
16/09/15 16:05:49	SIG	M62/2041A1	STOP	M62 J25 - J30	
16/09/15 16:05:49	SIG	M62/2050A1	STOP	M62 J25 - J30	
16/09/15 16:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2041A1	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2041A2	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2041A3	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2041A4	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2050A1	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2050A2	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2050A3	60R	M62 J25 - J30	
16/09/15 16:06:38	SIG	M62/2050A4	60R	M62 J25 - J30	
16/09/15 16:21:21	SIG	M62/2170K1	60R	M62 J25 - J30	
16/09/15 16:21:21	SIG	M62/2170K2	60R	M62 J25 - J30	
16/09/15 16:21:21	SIG	M62/2177A1	REDX	M62 J25 - J30	
16/09/15 16:21:21	SIG	M62/2177A2	NR	M62 J25 - J30	
16/09/15 16:21:21	SIG	M62/2177A3	NR	M62 J25 - J30	
16/09/15 16:21:21	SIG	M62/2177A4	NR	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2170A1	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2170A2	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2177A2	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2177A3	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2177A4	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2183A1	REDX	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2183A2	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2183A3	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2183A4	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2189A1	REDX	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2189A2	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2189A3	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2189A4	60R	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2197A1	NR	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2197A2	NR	M62 J25 - J30	
16/09/15 16:21:22	SIG	M62/2197A3	NR	M62 J25 - J30	
16/09/15 16:21:47	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 16:21:47	SIG	M621/1002B1	50R	M62 J25 - J30	
16/09/15 16:21:47	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 16:21:47	SIG	M621/1010B1	50R	M62 J25 - J30	
16/09/15 16:21:47	SIG	M621/1010B2	50R	M62 J25 - J30	
16/09/15 16:21:52	SIG	M62/2065M1	40R	M62 J25 - J30	
16/09/15 16:21:52	SIG	M62/2069M1	50R	M62 J25 - J30	
16/09/15 16:21:52	SIG	M62/2069M2	50R	M62 J25 - J30	
16/09/15 16:21:52	SIG	M621/1002B1	40R	M62 J25 - J30	
16/09/15 16:21:52	SIG	M621/1002B2	40R	M62 J25 - J30	
16/09/15 16:22:31	SIG	M62/2189A1	60R	M62 J25 - J30	
16/09/15 16:22:48	SIG	M62/2183A1	60R	M62 J25 - J30	
16/09/15 16:22:52	SIG	M62/2177A1	60R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2069M1	40R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2069M2	40R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2074B2	50R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2074B3	50R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M62/2074B4	50R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M621/1010B1	40R	M62 J25 - J30	
16/09/15 16:23:02	SIG	M621/1010B2	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2065B2	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2065B3	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2065B4	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2069M1	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2069M2	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2074B2	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2074B3	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2074B4	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2081B1	50R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2081B2	50R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2081B3	50R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M62/2081L1	50R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M621/1010B1	40R	M62 J25 - J30	
16/09/15 16:23:07	SIG	M621/1010B2	40R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 16:23:18	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 16:23:24	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 16:23:35	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 16:23:35	SIG	M62/2113B2	NR	M62 J25 - J30	
16/09/15 16:23:35	SIG	M62/2113B3	NR	M62 J25 - J30	
16/09/15 16:23:35	SIG	M62/2113B4	NR	M62 J25 - J30	
16/09/15 16:23:35	SIG	M62/2120M1	60R	M62 J25 - J30	
16/09/15 16:23:35	SIG	M62/2120M2	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2088B2	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2088B3	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2088B4	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2106B2	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2106B3	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2106B4	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2113B2	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2113B3	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2113B4	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2117B1	60R	M62 J25 - J30	
16/09/15 16:23:36	SIG	M62/2117B3	60R	M62 J25 - J30	
16/09/15 16:24:50	SIG	M62/2088B1	60R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 16:25:02	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 16:25:08	SIG	M62/2097B1	60R	M62 J25 - J30	
16/09/15 16:25:32	SIG	M62/2106B1	60R	M62 J25 - J30	
16/09/15 16:25:36	SIG	M62/2113B1	60R	M62 J25 - J30	
16/09/15 16:26:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:26:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:26:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:26:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:27:18	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 16:27:18	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 16:27:18	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 16:27:18	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 16:27:21	SIG	M62/2147B1	50R	M62 J25 - J30	
16/09/15 16:27:21	SIG	M62/2147B2	50R	M62 J25 - J30	
16/09/15 16:27:21	SIG	M62/2147B3	50R	M62 J25 - J30	
16/09/15 16:27:21	SIG	M62/2147B4	50R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2137B1	NR	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2137B2	NR	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2137B3	NR	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2137B4	NR	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2147B1	40R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2147B2	40R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2147B3	40R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2147B4	40R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2159B1	60R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2159B2	60R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2159M1	60R	M62 J25 - J30	
16/09/15 16:27:27	SIG	M62/2159M2	60R	M62 J25 - J30	
16/09/15 16:27:32	SIG	M62/2065A2	60R	M62 J25 - J30	
16/09/15 16:27:32	SIG	M62/2065A3	60R	M62 J25 - J30	
16/09/15 16:27:32	SIG	M62/2065A4	60R	M62 J25 - J30	
16/09/15 16:27:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:27:34	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 16:27:39	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 16:27:46	SIG	M62/2073K1	60R	M62 J25 - J30	
16/09/15 16:27:46	SIG	M62/2079A1	REDX	M62 J25 - J30	
16/09/15 16:27:46	SIG	M62/2079A2	NR	M62 J25 - J30	
16/09/15 16:27:46	SIG	M62/2079A3	NR	M62 J25 - J30	
16/09/15 16:27:46	SIG	M62/2079A4	NR	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2079A2	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2079A3	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2079A4	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2088A1	REDX	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2088A2	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2088A3	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2088A4	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2097A1	REDX	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2097A2	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2097A3	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2097A4	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2106A1	REDX	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2106A2	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2106A3	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2106A4	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2114A1	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2114A2	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2114A3	60R	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2117A1	REDX	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2117A2	NR	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2117A3	NR	M62 J25 - J30	
16/09/15 16:27:57	SIG	M62/2117A4	NR	M62 J25 - J30	
16/09/15 16:29:12	SIG	M62/2106A1	60R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2081B1	40R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2081B2	40R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2081B3	40R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2081L1	40R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2088B1	50R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2088B2	50R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2088B3	50R	M62 J25 - J30	
16/09/15 16:29:15	SIG	M62/2088B4	50R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 16:29:29	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 16:29:33	SIG	M62/2097A1	60R	M62 J25 - J30	
16/09/15 16:29:53	SIG	M62/2088A1	60R	M62 J25 - J30	
16/09/15 16:29:57	SIG	M62/2079A1	60R	M62 J25 - J30	
16/09/15 16:30:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 16:30:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 16:30:26	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 16:30:27	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 16:31:03	SIG	M62/2088B1	40R	M62 J25 - J30	
16/09/15 16:31:03	SIG	M62/2088B2	40R	M62 J25 - J30	
16/09/15 16:31:03	SIG	M62/2088B3	40R	M62 J25 - J30	
16/09/15 16:31:03	SIG	M62/2088B4	40R	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2137B1	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2137B2	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2137B3	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2137B4	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2147B1	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2147B2	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2147B3	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2147B4	NR	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2159B1	OFF	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2159B2	OFF	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2159M1	OFF	M62 J25 - J30	
16/09/15 16:31:22	SIG	M62/2159M2	OFF	M62 J25 - J30	
16/09/15 16:31:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:31:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:31:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:31:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 16:33:37	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2137B1	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2137B2	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2137B3	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2137B4	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2147B1	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2147B2	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2147B3	OFF	M62 J25 - J30	
16/09/15 16:34:22	SIG	M62/2147B4	OFF	M62 J25 - J30	
16/09/15 16:35:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:35:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:35:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:35:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:36:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 16:36:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:36:19	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 16:36:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 16:37:02	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 16:37:08	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 16:37:14	SIG	M62/2097B1	50R	M62 J25 - J30	
16/09/15 16:37:14	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 16:37:14	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 16:37:14	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 16:37:20	SIG	M62/2097B1	40R	M62 J25 - J30	
16/09/15 16:37:20	SIG	M62/2097B2	40R	M62 J25 - J30	
16/09/15 16:37:20	SIG	M62/2097B3	40R	M62 J25 - J30	
16/09/15 16:37:20	SIG	M62/2097B4	40R	M62 J25 - J30	
16/09/15 16:38:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:38:26	SIG	M62/2132B1	50R	M62 J25 - J30	
16/09/15 16:38:26	SIG	M62/2132B2	50R	M62 J25 - J30	
16/09/15 16:38:26	SIG	M62/2132B3	50R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2125B1	60R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2125B2	60R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2125B3	60R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2125L1	NR	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2125L2	NR	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2132B1	40R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2132B2	40R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2132B3	40R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2137B1	50R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2137B2	50R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2137B3	50R	M62 J25 - J30	
16/09/15 16:38:31	SIG	M62/2137B4	50R	M62 J25 - J30	
16/09/15 16:39:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:39:51	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 16:39:56	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 16:40:46	SIG	M62/2033A1	50R	M62 J25 - J30	
16/09/15 16:40:46	SIG	M62/2033A2	50R	M62 J25 - J30	
16/09/15 16:40:46	SIG	M62/2033A3	50R	M62 J25 - J30	
16/09/15 16:40:46	SIG	M62/2033A4	50R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2025A1	50R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2025A2	50R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2025A3	50R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2025A4	50R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2033A1	40R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2033A2	40R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2033A3	40R	M62 J25 - J30	
16/09/15 16:40:51	SIG	M62/2033A4	40R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 16:41:01	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 16:42:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2125B1	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2125B2	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2125B3	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2125L1	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2125L2	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2132B1	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2132B2	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2132B3	NR	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2137B1	OFF	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2137B2	OFF	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2137B3	OFF	M62 J25 - J30	
16/09/15 16:42:26	SIG	M62/2137B4	OFF	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 16:43:17	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2025A1	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2025A2	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2025A3	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2025A4	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2033A1	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2033A2	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2033A3	60R	M62 J25 - J30	
16/09/15 16:44:46	SIG	M62/2033A4	60R	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2125B1	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2125B2	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2125B3	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2125L1	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2125L2	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2132B1	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2132B2	OFF	M62 J25 - J30	
16/09/15 16:45:26	SIG	M62/2132B3	OFF	M62 J25 - J30	
16/09/15 16:45:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:45:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:45:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:45:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 16:47:09	SIG	M62/2097B1	60R	M62 J25 - J30	
16/09/15 16:47:09	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 16:47:09	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 16:47:09	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 16:47:16	SIG	M62/2097B1	50R	M62 J25 - J30	
16/09/15 16:47:16	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 16:47:16	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 16:47:16	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 16:47:21	SIG	M62/2097B1	40R	M62 J25 - J30	
16/09/15 16:47:21	SIG	M62/2097B2	40R	M62 J25 - J30	
16/09/15 16:47:21	SIG	M62/2097B3	40R	M62 J25 - J30	
16/09/15 16:47:21	SIG	M62/2097B4	40R	M62 J25 - J30	
16/09/15 16:59:53	SIG	M62/2097B1	60R	M62 J25 - J30	
16/09/15 16:59:53	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 16:59:53	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 16:59:53	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 17:00:29	SIG	M62/2097B1	50R	M62 J25 - J30	
16/09/15 17:00:29	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 17:00:29	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 17:00:29	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 17:00:34	SIG	M62/2097B1	40R	M62 J25 - J30	
16/09/15 17:00:34	SIG	M62/2097B2	40R	M62 J25 - J30	
16/09/15 17:00:34	SIG	M62/2097B3	40R	M62 J25 - J30	
16/09/15 17:00:34	SIG	M62/2097B4	40R	M62 J25 - J30	
16/09/15 17:00:52	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 17:00:52	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 17:00:52	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 17:00:52	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:00:58	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 17:03:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:03:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:03:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:03:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 17:04:52	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 17:06:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 17:06:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 17:06:19	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 17:06:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 17:07:22	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:07:28	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 17:09:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:09:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:09:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:09:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 17:11:23	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 17:11:34	SIG	M62/2025B1	50R	M62 J25 - J30	
16/09/15 17:11:34	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 17:11:34	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 17:11:34	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2025B1	40R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:11:39	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 17:12:27	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 17:12:27	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 17:12:27	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 17:12:27	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 17:12:32	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 17:12:32	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 17:12:32	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 17:12:32	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2033B1	40R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 17:12:44	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 17:15:00	SIG	M62/2097B1	60R	M62 J25 - J30	
16/09/15 17:15:00	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 17:15:00	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 17:15:00	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 17:15:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:15:37	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:15:42	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:16:25	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 17:16:25	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 17:16:25	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 17:16:25	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 17:16:54	SIG	M62/2097B1	50R	M62 J25 - J30	
16/09/15 17:16:54	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 17:16:54	SIG	M62/2097B3	50R	M62 J25 - J30	
16/09/15 17:16:54	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 17:17:00	SIG	M62/2097B1	40R	M62 J25 - J30	
16/09/15 17:17:00	SIG	M62/2097B2	40R	M62 J25 - J30	
16/09/15 17:17:00	SIG	M62/2097B3	40R	M62 J25 - J30	
16/09/15 17:17:00	SIG	M62/2097B4	40R	M62 J25 - J30	
16/09/15 17:18:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:18:41	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:18:46	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:21:06	SIG	M62/2097B1	60R	M62 J25 - J30	
16/09/15 17:21:06	SIG	M62/2097B2	60R	M62 J25 - J30	
16/09/15 17:21:06	SIG	M62/2097B3	60R	M62 J25 - J30	
16/09/15 17:21:06	SIG	M62/2097B4	60R	M62 J25 - J30	
16/09/15 17:21:24	SIG	M62/2088B1	50R	M62 J25 - J30	
16/09/15 17:21:24	SIG	M62/2088B2	50R	M62 J25 - J30	
16/09/15 17:21:24	SIG	M62/2088B3	50R	M62 J25 - J30	
16/09/15 17:21:24	SIG	M62/2088B4	50R	M62 J25 - J30	
16/09/15 17:21:40	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 17:21:40	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 17:21:40	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 17:21:40	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 17:21:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:21:46	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 17:21:46	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 17:21:46	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 17:21:46	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 17:21:46	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:21:52	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:22:18	SIG	M62/2041B1	40R	M62 J25 - J30	
16/09/15 17:22:18	SIG	M62/2041B2	40R	M62 J25 - J30	
16/09/15 17:22:18	SIG	M62/2041B3	40R	M62 J25 - J30	
16/09/15 17:22:18	SIG	M62/2041B4	40R	M62 J25 - J30	
16/09/15 17:22:19	SIG	M62/2088B1	40R	M62 J25 - J30	
16/09/15 17:22:19	SIG	M62/2088B2	40R	M62 J25 - J30	
16/09/15 17:22:19	SIG	M62/2088B3	40R	M62 J25 - J30	
16/09/15 17:22:19	SIG	M62/2088B4	40R	M62 J25 - J30	
16/09/15 17:22:30	SIG	M62/1968B1	50R	M62 J25 - J30	
16/09/15 17:22:30	SIG	M62/1968B2	50R	M62 J25 - J30	
16/09/15 17:22:30	SIG	M62/1968B3	50R	M62 J25 - J30	
16/09/15 17:22:30	SIG	M62/1968L1	50R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1960B1	60R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1960B2	60R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1960B3	60R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1960L1	NR	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1960L2	NR	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1968B1	40R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1968B2	40R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1968B3	40R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1968L1	40R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1974B1	50R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1974B2	50R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1974B3	50R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1974B4	50R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1974M1	50R	M62 J25 - J30	
16/09/15 17:22:35	SIG	M62/1974M2	50R	M62 J25 - J30	
16/09/15 17:24:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:24:49	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:24:54	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:26:33	SIG	M62/2088B1	50R	M62 J25 - J30	
16/09/15 17:26:33	SIG	M62/2088B2	50R	M62 J25 - J30	
16/09/15 17:26:33	SIG	M62/2088B3	50R	M62 J25 - J30	
16/09/15 17:26:33	SIG	M62/2088B4	50R	M62 J25 - J30	
16/09/15 17:27:27	SIG	M62/2088B1	40R	M62 J25 - J30	
16/09/15 17:27:27	SIG	M62/2088B2	40R	M62 J25 - J30	
16/09/15 17:27:27	SIG	M62/2088B3	40R	M62 J25 - J30	
16/09/15 17:27:27	SIG	M62/2088B4	40R	M62 J25 - J30	
16/09/15 17:27:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:27:52	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:27:58	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1974B1	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1974B2	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1974B3	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1974B4	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1974M1	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1974M2	40R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1981B1	50R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1981B2	50R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1981B3	50R	M62 J25 - J30	
16/09/15 17:28:04	SIG	M62/1981B4	50R	M62 J25 - J30	
16/09/15 17:28:17	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 17:28:17	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 17:28:17	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 17:28:17	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 17:28:41	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 17:28:41	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 17:28:41	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 17:28:41	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 17:30:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:30:56	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:31:02	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:33:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:34:00	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:34:05	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:34:06	SIG	M62/2041B1	40R	M62 J25 - J30	
16/09/15 17:34:06	SIG	M62/2041B2	40R	M62 J25 - J30	
16/09/15 17:34:06	SIG	M62/2041B3	40R	M62 J25 - J30	
16/09/15 17:34:06	SIG	M62/2041B4	40R	M62 J25 - J30	
16/09/15 17:34:12	SIG	M62/2088B1	50R	M62 J25 - J30	
16/09/15 17:34:12	SIG	M62/2088B2	50R	M62 J25 - J30	
16/09/15 17:34:12	SIG	M62/2088B3	50R	M62 J25 - J30	
16/09/15 17:34:12	SIG	M62/2088B4	50R	M62 J25 - J30	
16/09/15 17:34:31	SIG	M62/2088B1	40R	M62 J25 - J30	
16/09/15 17:34:31	SIG	M62/2088B2	40R	M62 J25 - J30	
16/09/15 17:34:31	SIG	M62/2088B3	40R	M62 J25 - J30	
16/09/15 17:34:31	SIG	M62/2088B4	40R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1974B1	50R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1974B2	50R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1974B3	50R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1974B4	50R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1974M1	50R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1974M2	50R	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1981B1	OFF	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1981B2	OFF	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1981B3	OFF	M62 J25 - J30	
16/09/15 17:36:25	SIG	M62/1981B4	OFF	M62 J25 - J30	
16/09/15 17:36:44	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 17:36:44	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 17:36:44	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 17:36:44	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 17:36:49	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 17:36:49	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 17:36:49	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 17:36:49	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 17:37:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:37:04	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1960B1	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1960B2	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1960B3	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1960L1	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1960L2	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1968B1	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1968B2	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1968B3	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1968L1	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1974B1	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1974B2	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1974B3	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1974B4	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1974M1	OFF	M62 J25 - J30	
16/09/15 17:37:07	SIG	M62/1974M2	OFF	M62 J25 - J30	
16/09/15 17:37:09	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:38:31	SIG	M62/2088B1	50R	M62 J25 - J30	
16/09/15 17:38:31	SIG	M62/2088B2	50R	M62 J25 - J30	
16/09/15 17:38:31	SIG	M62/2088B3	50R	M62 J25 - J30	
16/09/15 17:38:31	SIG	M62/2088B4	50R	M62 J25 - J30	
16/09/15 17:38:48	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 17:38:48	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 17:38:48	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 17:38:48	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 17:39:06	SIG	M62/1968B1	50R	M62 J25 - J30	
16/09/15 17:39:06	SIG	M62/1968B2	50R	M62 J25 - J30	
16/09/15 17:39:06	SIG	M62/1968B3	50R	M62 J25 - J30	
16/09/15 17:39:06	SIG	M62/1968L1	50R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1960B1	60R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1960B2	60R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1960B3	60R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1960L1	NR	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1960L2	NR	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1968B1	40R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1968B2	40R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1968B3	40R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1968L1	40R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1974B1	50R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1974B2	50R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1974B3	50R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1974B4	50R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1974M1	50R	M62 J25 - J30	
16/09/15 17:39:12	SIG	M62/1974M2	50R	M62 J25 - J30	
16/09/15 17:40:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:40:07	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:40:13	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2081B1	50R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2081B2	50R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2081B3	50R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2081L1	50R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2088B1	60R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2088B2	60R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2088B3	60R	M62 J25 - J30	
16/09/15 17:42:53	SIG	M62/2088B4	60R	M62 J25 - J30	
16/09/15 17:43:00	SIG	M62/2041B1	40R	M62 J25 - J30	
16/09/15 17:43:00	SIG	M62/2041B2	40R	M62 J25 - J30	
16/09/15 17:43:00	SIG	M62/2041B3	40R	M62 J25 - J30	
16/09/15 17:43:00	SIG	M62/2041B4	40R	M62 J25 - J30	
16/09/15 17:43:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:43:11	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:43:17	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1974B1	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1974B2	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1974B3	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1974B4	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1974M1	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1974M2	40R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1981B1	50R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1981B2	50R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1981B3	50R	M62 J25 - J30	
16/09/15 17:44:57	SIG	M62/1981B4	50R	M62 J25 - J30	
16/09/15 17:46:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:46:15	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:46:21	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:48:40	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 17:48:40	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 17:48:40	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 17:48:40	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2057B1	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2057B2	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2057B3	50R	M62 J25 - J30	
16/09/15 17:48:46	SIG	M62/2057B4	50R	M62 J25 - J30	
16/09/15 17:49:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:49:19	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:49:24	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:49:59	SIG	M62/2041B1	40R	M62 J25 - J30	
16/09/15 17:49:59	SIG	M62/2041B2	40R	M62 J25 - J30	
16/09/15 17:49:59	SIG	M62/2041B3	40R	M62 J25 - J30	
16/09/15 17:49:59	SIG	M62/2041B4	40R	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1960B1	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1960B2	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1960B3	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1960L1	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1960L2	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1968B1	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1968B2	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1968B3	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1968L1	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1974B1	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1974B2	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1974B3	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1974B4	NR	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1974M1	OFF	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1974M2	OFF	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1981B1	OFF	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1981B2	OFF	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1981B3	OFF	M62 J25 - J30	
16/09/15 17:50:14	SIG	M62/1981B4	OFF	M62 J25 - J30	
16/09/15 17:51:22	SIG	M62/1968B1	50R	M62 J25 - J30	
16/09/15 17:51:22	SIG	M62/1968B2	50R	M62 J25 - J30	
16/09/15 17:51:22	SIG	M62/1968B3	50R	M62 J25 - J30	
16/09/15 17:51:22	SIG	M62/1968L1	50R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1960B1	60R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1960B2	60R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1960B3	60R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1960L1	NR	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1960L2	NR	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1968B1	40R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1968B2	40R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1968B3	40R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1968L1	40R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1974B1	50R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1974B2	50R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1974B3	50R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1974B4	50R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1974M1	50R	M62 J25 - J30	
16/09/15 17:51:27	SIG	M62/1974M2	50R	M62 J25 - J30	
16/09/15 17:52:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:52:23	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:52:28	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2050B2	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2050B3	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2050B4	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2057B1	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2057B2	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2057B3	40R	M62 J25 - J30	
16/09/15 17:52:48	SIG	M62/2057B4	40R	M62 J25 - J30	
16/09/15 17:53:58	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 17:53:58	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 17:53:58	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 17:53:58	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1960B1	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1960B2	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1960B3	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1960L1	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1960L2	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1968B1	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1968B2	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1968B3	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1968L1	NR	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1974B1	OFF	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1974B2	OFF	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1974B3	OFF	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1974B4	OFF	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1974M1	OFF	M62 J25 - J30	
16/09/15 17:55:21	SIG	M62/1974M2	OFF	M62 J25 - J30	
16/09/15 17:55:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:55:33	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:55:38	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2069M1	50R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2069M2	50R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2081B1	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2081B2	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2081B3	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M62/2081L1	60R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M621/1010B1	50R	M62 J25 - J30	
16/09/15 17:56:05	SIG	M621/1010B2	50R	M62 J25 - J30	
16/09/15 17:56:42	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 17:56:42	SIG	M62/2069M1	60R	M62 J25 - J30	
16/09/15 17:56:42	SIG	M62/2069M2	60R	M62 J25 - J30	
16/09/15 17:56:42	SIG	M621/1002B1	50R	M62 J25 - J30	
16/09/15 17:56:42	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 17:56:45	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 17:56:45	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M62/2065B2	40R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M62/2065B3	40R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M62/2065B4	40R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M62/2065M1	40R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M62/2069M1	50R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M62/2069M2	50R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M621/1002B1	40R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M621/1002B2	40R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M621/1010B1	50R	M62 J25 - J30	
16/09/15 17:57:06	SIG	M621/1010B2	50R	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1960B1	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1960B2	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1960B3	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1960L1	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1960L2	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1968B1	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1968B2	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1968B3	OFF	M62 J25 - J30	
16/09/15 17:58:22	SIG	M62/1968L1	OFF	M62 J25 - J30	
16/09/15 17:58:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 17:58:34	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 17:58:39	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 18:00:30	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 18:00:51	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 18:00:51	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 18:00:51	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 18:00:51	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2041B1	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2041B2	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2041B3	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2041B4	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2050B2	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2050B3	40R	M62 J25 - J30	
16/09/15 18:00:57	SIG	M62/2050B4	40R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2057B1	50R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2057B2	50R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2057B3	50R	M62 J25 - J30	
16/09/15 18:01:07	SIG	M62/2057B4	50R	M62 J25 - J30	
16/09/15 18:01:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:01:35	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:01:40	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:02:19	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 18:02:19	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M62/2065B2	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M62/2065B3	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M62/2065B4	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M62/2069M1	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M62/2069M2	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M621/1002B1	60R	M62 J25 - J30	
16/09/15 18:02:20	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 18:03:22	SIG	M62/2177A1	HSD	M62 J25 - J30	
16/09/15 18:04:07	SIG	M62/2183A1	HSD	M62 J25 - J30	
16/09/15 18:04:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:04:39	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:04:44	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:04:52	SIG	M62/2189A1	HSD	M62 J25 - J30	
16/09/15 18:04:53	SIG	M62/2041B1	50R	M62 J25 - J30	
16/09/15 18:04:53	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 18:04:53	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 18:04:53	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 18:04:53	SIG	M62/2177A1	REDX	M62 J25 - J30	
16/09/15 18:05:52	SIG	M62/2183A1	REDX	M62 J25 - J30	
16/09/15 18:06:52	SIG	M62/2189A1	REDX	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2170A1	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2170A2	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2170K1	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2170K2	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2177A2	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2177A3	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2177A4	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2183A2	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2183A3	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2183A4	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2189A2	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2189A3	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2189A4	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2197A1	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2197A2	NR	M62 J25 - J30	
16/09/15 18:06:53	SIG	M62/2197A3	NR	M62 J25 - J30	
16/09/15 18:07:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:07:43	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:07:48	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:07:52	SIG	M62/2170K1	OFF	M62 J25 - J30	
16/09/15 18:07:52	SIG	M62/2170K2	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2170A1	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2170A2	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2177A1	BLNK	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2177A2	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2177A3	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2177A4	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2183A1	BLNK	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2183A2	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2183A3	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2183A4	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2189A1	BLNK	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2189A2	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2189A3	OFF	M62 J25 - J30	
16/09/15 18:07:53	SIG	M62/2189A4	OFF	M62 J25 - J30	
16/09/15 18:07:58	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 18:07:58	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 18:07:58	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 18:07:58	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 18:09:43	SIG	M62/2113B1	HSD	M62 J25 - J30	
16/09/15 18:09:53	SIG	M62/2197A1	OFF	M62 J25 - J30	
16/09/15 18:09:53	SIG	M62/2197A2	OFF	M62 J25 - J30	
16/09/15 18:09:53	SIG	M62/2197A3	OFF	M62 J25 - J30	
16/09/15 18:10:36	SIG	M62/2106B1	HSD	M62 J25 - J30	
16/09/15 18:10:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:10:47	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:10:52	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:11:29	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 18:11:29	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 18:11:29	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 18:11:29	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 18:11:35	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 18:11:35	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 18:11:35	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 18:11:35	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 18:11:44	SIG	M62/2097B1	HSD	M62 J25 - J30	
16/09/15 18:11:45	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 18:12:52	SIG	M62/2088B1	HSD	M62 J25 - J30	
16/09/15 18:12:53	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 18:13:50	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:13:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:13:56	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:14:01	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 18:14:46	SIG	M62/2057B1	60R	M62 J25 - J30	
16/09/15 18:14:46	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 18:14:46	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 18:14:46	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 18:15:09	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 18:15:29	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 18:15:29	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 18:15:29	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 18:15:29	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 18:16:02	SIG	M62/2117B1	NR	M62 J25 - J30	
16/09/15 18:16:02	SIG	M62/2117B3	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2081B1	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2081B2	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2081B3	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2081L1	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2088B2	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2088B3	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2088B4	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2097B2	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2097B4	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2106B2	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2106B3	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2106B4	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2113B2	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2113B3	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2113B4	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2120M1	NR	M62 J25 - J30	
16/09/15 18:16:12	SIG	M62/2120M2	NR	M62 J25 - J30	
16/09/15 18:16:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:16:55	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:17:00	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2113B1	BLNK	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2113B2	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2113B3	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2113B4	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2117B3	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2120M1	OFF	M62 J25 - J30	
16/09/15 18:17:02	SIG	M62/2120M2	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2081B1	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2081B2	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2081B3	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2081L1	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2088B2	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2088B3	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2088B4	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 18:17:12	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 18:19:13	SIG	M62/2079A1	HSD	M62 J25 - J30	
16/09/15 18:19:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:19:58	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:20:04	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:20:21	SIG	M62/2088A1	HSD	M62 J25 - J30	
16/09/15 18:21:29	SIG	M62/2079A1	REDX	M62 J25 - J30	
16/09/15 18:21:29	SIG	M62/2097A1	HSD	M62 J25 - J30	
16/09/15 18:22:44	SIG	M62/2088A1	REDX	M62 J25 - J30	
16/09/15 18:22:44	SIG	M62/2106A1	HSD	M62 J25 - J30	
16/09/15 18:23:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:23:02	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:23:08	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 18:23:45	SIG	M62/2097A1	REDX	M62 J25 - J30	
16/09/15 18:24:29	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 18:24:29	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 18:24:29	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 18:24:29	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 18:24:34	SIG	M62/2018B1	40R	M62 J25 - J30	
16/09/15 18:24:34	SIG	M62/2018B2	40R	M62 J25 - J30	
16/09/15 18:24:34	SIG	M62/2018B3	40R	M62 J25 - J30	
16/09/15 18:24:34	SIG	M62/2018L1	40R	M62 J25 - J30	
16/09/15 18:25:04	SIG	M62/2106A1	REDX	M62 J25 - J30	
16/09/15 18:25:24	SIG	M62/2033B1	50R	M62 J25 - J30	
16/09/15 18:25:24	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 18:25:24	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 18:25:24	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 18:25:53	SIG	M62/2065A2	NR	M62 J25 - J30	
16/09/15 18:25:53	SIG	M62/2065A3	NR	M62 J25 - J30	
16/09/15 18:25:53	SIG	M62/2065A4	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2073K1	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2079A2	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2079A3	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2079A4	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2088A2	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2088A3	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2088A4	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2097A2	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2097A3	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2097A4	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2106A2	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2106A3	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2106A4	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2114A1	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2114A2	NR	M62 J25 - J30	
16/09/15 18:26:04	SIG	M62/2114A3	NR	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2041B1	60R	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 18:26:47	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 18:27:03	SIG	M62/2073K1	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2079A1	BLNK	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2079A2	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2079A3	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2079A4	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2088A1	BLNK	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2088A2	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2088A3	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2088A4	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2097A1	BLNK	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2097A2	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2097A3	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2097A4	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2106A1	BLNK	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2106A2	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2106A4	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2114A1	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2114A2	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2114A3	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2117A1	BLNK	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2117A2	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2117A3	OFF	M62 J25 - J30	
16/09/15 18:27:23	SIG	M62/2117A4	OFF	M62 J25 - J30	
16/09/15 18:28:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:28:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:28:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:28:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:28:29	SIG	M62/2018B1	60R	M62 J25 - J30	
16/09/15 18:28:29	SIG	M62/2018B2	60R	M62 J25 - J30	
16/09/15 18:28:29	SIG	M62/2018B3	60R	M62 J25 - J30	
16/09/15 18:28:29	SIG	M62/2018L1	60R	M62 J25 - J30	
16/09/15 18:29:03	SIG	M62/2025A1	HSD	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2025B1	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2025B2	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2025B3	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2025B4	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2033B1	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2033B2	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2033B3	60R	M62 J25 - J30	
16/09/15 18:29:37	SIG	M62/2033B4	60R	M62 J25 - J30	
16/09/15 18:30:03	SIG	M62/2033A1	HSD	M62 J25 - J30	
16/09/15 18:31:03	SIG	M62/2018A1	HSD	M62 J25 - J30	
16/09/15 18:31:03	SIG	M62/2025A1	REDX	M62 J25 - J30	
16/09/15 18:31:03	SIG	M62/2041A1	HSD	M62 J25 - J30	
16/09/15 18:31:47	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 18:31:47	SIG	M62/2074B2	OFF	M62 J25 - J30	
16/09/15 18:31:47	SIG	M62/2074B3	OFF	M62 J25 - J30	
16/09/15 18:31:47	SIG	M62/2074B4	OFF	M62 J25 - J30	
16/09/15 18:31:47	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 18:31:47	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 18:32:10	SIG	M62/2033A1	REDX	M62 J25 - J30	
16/09/15 18:32:10	SIG	M62/2050A1	HSD	M62 J25 - J30	
16/09/15 18:32:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:32:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:32:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:32:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:33:02	SIG	M62/2041A1	REDX	M62 J25 - J30	
16/09/15 18:34:02	SIG	M62/2050A1	REDX	M62 J25 - J30	
16/09/15 18:35:02	SIG	M62/2025A2	NR	M62 J25 - J30	
16/09/15 18:35:02	SIG	M62/2025A3	NR	M62 J25 - J30	
16/09/15 18:35:02	SIG	M62/2025A4	NR	M62 J25 - J30	
16/09/15 18:35:02	SIG	M62/2033A2	NR	M62 J25 - J30	
16/09/15 18:35:02	SIG	M62/2033A3	NR	M62 J25 - J30	
16/09/15 18:35:02	SIG	M62/2033A4	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2041A2	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2041A3	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2041A4	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2050A2	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2050A3	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2050A4	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2057A1	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2057A2	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2057A3	NR	M62 J25 - J30	
16/09/15 18:35:03	SIG	M62/2057J1	NR	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2008K1	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2008K2	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2012A1	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2012A2	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2012A3	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2018A1	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2018A2	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2018A3	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2018A4	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2025A1	BLNK	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2025A2	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2025A3	OFF	M62 J25 - J30	
16/09/15 18:36:02	SIG	M62/2025A4	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2033A1	BLNK	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2033A2	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2033A3	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2033A4	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2041A1	BLNK	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2041A2	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2041A3	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2041A4	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2050A1	BLNK	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2050A2	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2050A3	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2050A4	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2057A1	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2057A2	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2057A3	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2057J1	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2065A1	BLNK	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2065A2	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2065A3	OFF	M62 J25 - J30	
16/09/15 18:36:03	SIG	M62/2065A4	OFF	M62 J25 - J30	
16/09/15 18:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:38:52	SIG	M62/1999J1	50R	M62 J25 - J30	
16/09/15 18:38:52	SIG	M62/1999J2	50R	M62 J25 - J30	
16/09/15 18:45:31	SIG	M62/2097B3	OFF	M62 J25 - J30	
16/09/15 18:48:05	SIG	M62/2057B1	HSD	M62 J25 - J30	
16/09/15 18:50:04	SIG	M62/2041B1	HSD	M62 J25 - J30	
16/09/15 18:50:04	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 18:50:04	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 18:50:05	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 18:50:05	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 18:51:04	SIG	M62/2033B1	HSD	M62 J25 - J30	
16/09/15 18:51:43	SIG	M62/1999J1	OFF	M62 J25 - J30	
16/09/15 18:51:43	SIG	M62/1999J2	OFF	M62 J25 - J30	
16/09/15 18:52:04	SIG	M62/2025B1	HSD	M62 J25 - J30	
16/09/15 18:52:05	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 18:52:56	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 18:53:40	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 18:54:10	SIG	M62/2065B2	NR	M62 J25 - J30	
16/09/15 18:54:10	SIG	M62/2065B3	NR	M62 J25 - J30	
16/09/15 18:54:10	SIG	M62/2065B4	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2018B1	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2018B2	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2018B3	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2057B2	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2057B3	NR	M62 J25 - J30	
16/09/15 18:54:11	SIG	M62/2057B4	NR	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2057B2	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2057B3	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2057B4	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2065B2	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2065B3	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2065B4	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M62/2065M1	NR	M62 J25 - J30	
16/09/15 18:55:11	SIG	M621/1002B1	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M621/1002B2	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 18:55:11	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2025B2	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2025B3	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2025B4	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2033B2	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2033B3	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2033B4	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2041B2	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2041B3	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2041B4	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2050B2	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2050B3	NR	M62 J25 - J30	
16/09/15 18:56:47	SIG	M62/2050B4	NR	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2041B4	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 18:59:48	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 18:59:49	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 18:59:49	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 18:59:49	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 18:59:49	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 18:59:49	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 19:05:49	SIG	M606/2003B1	NR	M62 J25 - J30	
16/09/15 19:05:49	SIG	M606/2003B2	NR	M62 J25 - J30	
16/09/15 19:40:25	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 19:40:25	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2012B2	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2012B3	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2012B4	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2018B1	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2018B2	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2018B3	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 19:41:49	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 19:42:12	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 19:42:12	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 19:42:12	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 19:42:36	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 19:44:44	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 19:44:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 19:48:35	SIG	M606/2003B1	50R	M62 J25 - J30	
16/09/15 19:48:35	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 19:48:35	SIG	M62/1992B1	NR	M62 J25 - J30	
16/09/15 19:48:35	SIG	M62/1992B2	NR	M62 J25 - J30	
16/09/15 19:48:35	SIG	M62/1992B3	NR	M62 J25 - J30	
16/09/15 19:48:35	SIG	M62/1992B4	NR	M62 J25 - J30	
16/09/15 19:48:35	SIG	M62/2005M1	50R	M62 J25 - J30	
16/09/15 19:48:35	SIG	M62/2005M2	50R	M62 J25 - J30	
16/09/15 19:48:40	SIG	M606/2003B1	40R	M62 J25 - J30	
16/09/15 19:48:40	SIG	M606/2003B2	40R	M62 J25 - J30	
16/09/15 19:48:40	SIG	M62/2005M1	40R	M62 J25 - J30	
16/09/15 19:48:40	SIG	M62/2005M2	40R	M62 J25 - J30	
16/09/15 19:52:35	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 19:52:35	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 19:52:35	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 19:52:35	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 19:52:36	SIG	M62/1992B1	OFF	M62 J25 - J30	
16/09/15 19:52:36	SIG	M62/1992B2	OFF	M62 J25 - J30	
16/09/15 19:52:36	SIG	M62/1992B3	OFF	M62 J25 - J30	
16/09/15 19:52:36	SIG	M62/1992B4	OFF	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2117B1	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2117B2	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2117B3	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2120M1	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2120M2	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2125B1	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2125B2	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2125B3	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2132B1	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2132B2	50R	M62 J25 - J30	
16/09/15 19:55:20	SIG	M62/2132B3	50R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2117B1	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2117B2	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2117B3	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2120M1	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2120M2	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2125B1	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2125B2	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2125B3	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2132B1	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2132B2	40R	M62 J25 - J30	
16/09/15 19:55:26	SIG	M62/2132B3	40R	M62 J25 - J30	
16/09/15 19:55:31	SIG	M62/2117B1	30R	M62 J25 - J30	
16/09/15 19:55:31	SIG	M62/2125B1	30R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2117B1	20R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2117B3	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2120M1	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2120M2	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2125B1	20R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2125B2	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2125B3	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2125L1	NR	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2125L2	NR	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2132B1	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2132B2	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2132B3	40R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2137B1	50R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2137B2	50R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2137B3	50R	M62 J25 - J30	
16/09/15 19:55:36	SIG	M62/2137B4	50R	M62 J25 - J30	
16/09/15 19:55:42	SIG	M62/2117B1	STOP	M62 J25 - J30	
16/09/15 19:55:42	SIG	M62/2125B1	STOP	M62 J25 - J30	
16/09/15 20:03:04	SIG	M62/2137B2	50R	M62 J25 - J30	
16/09/15 20:03:04	SIG	M62/2137B2	OFF	M62 J25 - J30	
16/09/15 20:06:09	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2041B2	NR	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2041B3	NR	M62 J25 - J30	
16/09/15 20:17:12	SIG	M62/2041B4	NR	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2012B2	NR	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2012B3	NR	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2012B4	NR	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2050B2	60R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2050B3	60R	M62 J25 - J30	
16/09/15 20:18:49	SIG	M62/2050B4	60R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 20:18:52	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 20:21:33	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:21:34	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:21:39	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2170B1	NR	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2170B2	NR	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2170L1	LDR	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2170L2	50R	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2177B1	50R	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2177B2	50R	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2177L1	50R	M62 J25 - J30	
16/09/15 20:21:50	SIG	M62/2177L2	50R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M62/2057B1	REDX	M62 J25 - J30	
16/09/15 20:22:49	SIG	M62/2057B2	60R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M62/2057B3	60R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M62/2057B4	60R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M621/1002B1	HSD	M62 J25 - J30	
16/09/15 20:22:49	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 20:22:49	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 20:22:53	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 20:23:50	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M606/2003B1	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M62/1999B1	REDX	M62 J25 - J30	
16/09/15 20:24:46	SIG	M62/1999B2	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M62/1999B3	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M62/1999B4	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M62/2005M1	50R	M62 J25 - J30	
16/09/15 20:24:46	SIG	M62/2005M2	50R	M62 J25 - J30	
16/09/15 20:24:57	SIG	M62/1992B1	50R	M62 J25 - J30	
16/09/15 20:24:57	SIG	M62/1992B2	50R	M62 J25 - J30	
16/09/15 20:24:57	SIG	M62/1992B3	50R	M62 J25 - J30	
16/09/15 20:24:57	SIG	M62/1992B4	50R	M62 J25 - J30	
16/09/15 20:25:09	SIG	M606/2003B1	LDR	M62 J25 - J30	
16/09/15 20:25:09	SIG	M62/1992B1	40R	M62 J25 - J30	
16/09/15 20:25:09	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 20:25:09	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 20:25:09	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 20:25:09	SIG	M62/2005M1	TI	M62 J25 - J30	
16/09/15 20:25:09	SIG	M62/2005M2	TI	M62 J25 - J30	
16/09/15 20:25:14	SIG	M62/1992B1	30R	M62 J25 - J30	
16/09/15 20:25:19	SIG	M62/1992B1	20R	M62 J25 - J30	
16/09/15 20:25:19	SIG	M62/1992B2	40R	M62 J25 - J30	
16/09/15 20:25:19	SIG	M62/1992B3	40R	M62 J25 - J30	
16/09/15 20:25:19	SIG	M62/1992B4	40R	M62 J25 - J30	
16/09/15 20:25:25	SIG	M62/1992B1	STOP	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2004B1	REDX	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2004B2	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2004B3	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2004B4	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2012B2	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2012B3	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2012B4	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2018B1	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2018B2	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2018B3	50R	M62 J25 - J30	
16/09/15 20:25:46	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 20:26:37	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:26:38	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:26:43	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2125B1	LDR	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2125B2	50R	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2125B3	50R	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2125L1	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2125L2	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2132B1	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2132B2	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2132B3	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2137B1	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2137B2	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2137B3	OFF	M62 J25 - J30	
16/09/15 20:28:53	SIG	M62/2137B4	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2117B3	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2120M1	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2120M2	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2125B1	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2125B2	OFF	M62 J25 - J30	
16/09/15 20:29:05	SIG	M62/2125B3	OFF	M62 J25 - J30	
16/09/15 20:29:41	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:29:42	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:29:47	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 20:30:26	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 20:31:36	SIG	M62/1981B1	NR	M62 J25 - J30	
16/09/15 20:31:36	SIG	M62/1981B2	NR	M62 J25 - J30	
16/09/15 20:31:36	SIG	M62/1981B3	NR	M62 J25 - J30	
16/09/15 20:31:36	SIG	M62/1981B4	NR	M62 J25 - J30	
16/09/15 20:32:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 20:32:45	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 20:36:09	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:37:02	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 20:37:02	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 20:37:02	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 20:37:02	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 20:37:02	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 20:37:08	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 20:39:53	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:39:54	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:39:59	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:40:54	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 20:42:31	SIG	M606/2003B2	40R	M62 J25 - J30	
16/09/15 20:42:31	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 20:42:50	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 20:42:57	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:42:58	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:43:03	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 20:44:07	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2033B2	40R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2033B4	40R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2041B2	50R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2041B3	50R	M62 J25 - J30	
16/09/15 20:45:01	SIG	M62/2041B4	50R	M62 J25 - J30	
16/09/15 20:48:00	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 20:48:04	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:48:04	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:48:10	SIG	M62/2033B3	40R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 20:49:01	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 20:50:59	SIG	M606/2003B2	50R	M62 J25 - J30	
16/09/15 20:50:59	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 20:51:08	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 20:51:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 20:53:17	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 20:59:49	SIG	M62/2018L1	50R	M62 J25 - J30	
16/09/15 20:59:57	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1968A1	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1968A2	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1968A3	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1968A4	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1974A1	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1974A2	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1974A3	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1974A4	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1979K1	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1979K2	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1981A1	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1981A2	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1981A3	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1981A4	50R	M62 J25 - J30	
16/09/15 21:00:07	SIG	M62/1987A1	50R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1968A1	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1968A2	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1968A3	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1968A4	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1974A1	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1974A2	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1974A3	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1974A4	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1979K1	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1979K2	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1981A1	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1981A2	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1981A3	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1981A4	40R	M62 J25 - J30	
16/09/15 21:00:13	SIG	M62/1987A1	40R	M62 J25 - J30	
16/09/15 21:00:18	SIG	M62/1974A1	30R	M62 J25 - J30	
16/09/15 21:00:18	SIG	M62/1981A1	30R	M62 J25 - J30	
16/09/15 21:00:18	SIG	M62/1987A1	30R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1960A1	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1960A2	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1960A3	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1960K1	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1960K2	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1968A1	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1968A2	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1968A3	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1968A4	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1974A1	20R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1974A2	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1974A3	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1974A4	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1979K1	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1979K2	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1981A1	20R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1981A2	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1981A3	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1981A4	40R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1987A1	30R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1987A3	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1987J1	LDR	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1992A1	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1992A2	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1992A3	50R	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1992J1	LDR	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1999A1	NR	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1999A2	NR	M62 J25 - J30	
16/09/15 21:00:23	SIG	M62/1999A3	NR	M62 J25 - J30	
16/09/15 21:00:29	SIG	M62/1974A1	STOP	M62 J25 - J30	
16/09/15 21:00:29	SIG	M62/1981A1	STOP	M62 J25 - J30	
16/09/15 21:03:27	SIG	M62/1987A3	40R	M62 J25 - J30	
16/09/15 21:03:27	SIG	M62/1987J1	STOP	M62 J25 - J30	
16/09/15 21:03:33	SIG	M62/1987J1	STOP	M62 J25 - J30	
16/09/15 21:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 21:06:09	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2004B1	BLNK	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2004B2	OFF	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2004B3	OFF	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2004B4	OFF	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2012B2	NR	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2012B3	NR	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2012B4	NR	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 21:11:23	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 21:11:55	SIG	M606/2003B1	OFF	M62 J25 - J30	
16/09/15 21:11:55	SIG	M606/2003B2	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1992B1	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1992B2	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1992B3	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1992B4	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1999B1	BLNK	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1999B2	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1999B3	OFF	M62 J25 - J30	
16/09/15 21:11:56	SIG	M62/1999B4	OFF	M62 J25 - J30	
16/09/15 21:12:08	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 21:12:08	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1960A1	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1960A2	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1960A3	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1960K1	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1960K2	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1968A1	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1968A2	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1968A3	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1968A4	OFF	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1974A1	50R	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1974A2	50R	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1974A3	50R	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1974A4	50R	M62 J25 - J30	
16/09/15 21:12:24	SIG	M62/1981A1	40R	M62 J25 - J30	
16/09/15 21:13:35	SIG	M62/1987A1	40R	M62 J25 - J30	
16/09/15 21:13:35	SIG	M62/1992A1	40R	M62 J25 - J30	
16/09/15 21:13:35	SIG	M62/1992A2	40R	M62 J25 - J30	
16/09/15 21:13:35	SIG	M62/1992A3	40R	M62 J25 - J30	
16/09/15 21:13:35	SIG	M62/1992J1	STOP	M62 J25 - J30	
16/09/15 21:13:40	SIG	M62/1992J1	STOP	M62 J25 - J30	
16/09/15 21:20:04	SIG	M62/2005M1	TI	M62 J25 - J30	
16/09/15 21:20:04	SIG	M62/2005M2	TI	M62 J25 - J30	
16/09/15 21:25:21	SIG	M62/2005M1	OFF	M62 J25 - J30	
16/09/15 21:25:21	SIG	M62/2005M2	OFF	M62 J25 - J30	
16/09/15 21:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 21:36:09	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2170B1	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2170B2	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2170L1	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2170L2	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2177B1	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2177B2	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2177L1	OFF	M62 J25 - J30	
16/09/15 21:39:08	SIG	M62/2177L2	OFF	M62 J25 - J30	
16/09/15 21:41:40	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 21:41:40	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 21:41:40	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 21:41:40	SIG	M62/2057B2	50R	M62 J25 - J30	
16/09/15 21:41:40	SIG	M62/2057B3	50R	M62 J25 - J30	
16/09/15 21:41:40	SIG	M62/2057B4	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2074B1	REDX	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2074B2	60R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2074B3	60R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M62/2074B4	60R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M621/1010B1	50R	M62 J25 - J30	
16/09/15 21:43:39	SIG	M621/1010B2	50R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2065B1	STOP	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2065B2	40R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2065B3	40R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2065B4	40R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2065M1	40R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2069M1	50R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M62/2069M2	50R	M62 J25 - J30	
16/09/15 21:43:44	SIG	M621/1002B2	40R	M62 J25 - J30	
16/09/15 21:43:50	SIG	M62/2065B1	STOP	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2065B1	REDX	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2065B2	50R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2065B3	50R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2065B4	50R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2065M1	50R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2069M1	60R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2069M2	60R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2074B1	BLNK	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2074B2	OFF	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2074B3	OFF	M62 J25 - J30	
16/09/15 21:47:12	SIG	M62/2074B4	OFF	M62 J25 - J30	
16/09/15 21:47:12	SIG	M621/1002B2	50R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M621/1010B1	60R	M62 J25 - J30	
16/09/15 21:47:12	SIG	M621/1010B2	60R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2088B1	REDX	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2088B2	NR	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2088B3	NR	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2088B4	NR	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2097B1	REDX	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2097B2	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2097B4	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2106B1	REDX	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2106B2	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2106B3	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2106B4	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2113B1	REDX	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2113B2	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2113B3	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2113B4	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2117B1	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2117B3	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2120M1	50R	M62 J25 - J30	
16/09/15 21:50:09	SIG	M62/2120M2	50R	M62 J25 - J30	
16/09/15 21:52:52	SIG	M62/2117B1	???	M62 J25 - J30	
16/09/15 21:52:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1974A1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1974A2	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1974A3	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1974A4	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1979K1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1979K2	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1981A1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1981A2	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1981A3	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1981A4	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1987A1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1987A3	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1987J1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1992A1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1992A2	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1992A3	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1992J1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1999A1	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1999A2	OFF	M62 J25 - J30	
16/09/15 21:55:52	SIG	M62/1999A3	OFF	M62 J25 - J30	
16/09/15 21:58:10	SIG	M62/2170K1	50R	M62 J25 - J30	
16/09/15 21:58:10	SIG	M62/2170K2	50R	M62 J25 - J30	
16/09/15 21:58:10	SIG	M62/2177A1	REDX	M62 J25 - J30	
16/09/15 21:58:10	SIG	M62/2177A2	NR	M62 J25 - J30	
16/09/15 21:58:10	SIG	M62/2177A3	NR	M62 J25 - J30	
16/09/15 21:58:10	SIG	M62/2177A4	NR	M62 J25 - J30	
16/09/15 21:58:19	SIG	M62/2170A1	50R	M62 J25 - J30	
16/09/15 21:58:19	SIG	M62/2170A2	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2170K1	40R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2170K2	40R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2177A2	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2177A3	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2177A4	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2183A2	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2183A3	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2183A4	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2189A2	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2189A3	50R	M62 J25 - J30	
16/09/15 21:58:47	SIG	M62/2189A4	50R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2166K1	50R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2166K2	50R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2170K1	30R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2170K2	30R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2177A1	STOP	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2177A2	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2177A3	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2177A4	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2183A1	STOP	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2183A2	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2183A3	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2183A4	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2189A1	STOP	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2189A2	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2189A3	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2189A4	40R	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2197A1	NR	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2197A2	NR	M62 J25 - J30	
16/09/15 21:58:53	SIG	M62/2197A3	NR	M62 J25 - J30	
16/09/15 21:58:58	SIG	M62/2177A1	STOP	M62 J25 - J30	
16/09/15 21:58:58	SIG	M62/2183A1	STOP	M62 J25 - J30	
16/09/15 21:58:58	SIG	M62/2189A1	STOP	M62 J25 - J30	
16/09/15 22:02:52	SIG	M62/2197A1	OFF	M62 J25 - J30	
16/09/15 22:02:52	SIG	M62/2197A2	OFF	M62 J25 - J30	
16/09/15 22:02:52	SIG	M62/2197A3	OFF	M62 J25 - J30	
16/09/15 22:06:09	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 22:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2166K1	OFF	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2166K2	OFF	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2170A1	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2170A2	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2170K1	50R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2170K2	50R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2177A1	REDX	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2177A2	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2177A3	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2177A4	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2183A1	REDX	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2183A2	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2183A3	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2183A4	60R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2189A1	REDX	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2189A2	50R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2189A3	50R	M62 J25 - J30	
16/09/15 22:14:17	SIG	M62/2189A4	50R	M62 J25 - J30	
16/09/15 22:14:34	SIG	M62/2197A1	50R	M62 J25 - J30	
16/09/15 22:14:34	SIG	M62/2197A2	50R	M62 J25 - J30	
16/09/15 22:14:34	SIG	M62/2197A3	50R	M62 J25 - J30	
16/09/15 22:14:39	SIG	M62/2197A1	40R	M62 J25 - J30	
16/09/15 22:14:39	SIG	M62/2197A2	40R	M62 J25 - J30	
16/09/15 22:14:39	SIG	M62/2197A3	40R	M62 J25 - J30	
16/09/15 22:14:45	SIG	M62/2197A1	30R	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2183A2	LDR	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2183A3	50R	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2183A4	50R	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2189A2	LDR	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2197A1	20R	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2197A2	40R	M62 J25 - J30	
16/09/15 22:14:50	SIG	M62/2197A3	40R	M62 J25 - J30	
16/09/15 22:14:55	SIG	M62/2197A1	STOP	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2088B1	BLNK	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2088B2	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2088B3	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2088B4	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2097B1	BLNK	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2097B2	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2097B4	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2106B1	BLNK	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2106B2	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2106B4	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2113B1	BLNK	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2113B2	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2113B3	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2113B4	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2117B3	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2120M1	OFF	M62 J25 - J30	
16/09/15 22:17:22	SIG	M62/2120M2	OFF	M62 J25 - J30	
16/09/15 22:19:45	SIG	M62/2065B1	BLNK	M62 J25 - J30	
16/09/15 22:19:45	SIG	M62/2065B2	OFF	M62 J25 - J30	
16/09/15 22:19:45	SIG	M62/2065B3	OFF	M62 J25 - J30	
16/09/15 22:19:45	SIG	M62/2065B4	OFF	M62 J25 - J30	
16/09/15 22:19:45	SIG	M62/2065M1	60R	M62 J25 - J30	
16/09/15 22:19:45	SIG	M621/1002B2	60R	M62 J25 - J30	
16/09/15 22:20:02	SIG	M62/2170K1	60R	M62 J25 - J30	
16/09/15 22:20:02	SIG	M62/2170K2	60R	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2041B2	NR	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2041B3	NR	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2041B4	NR	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2057B1	BLNK	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2057B2	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2057B3	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2057B4	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M62/2065M1	NR	M62 J25 - J30	
16/09/15 22:21:51	SIG	M621/1002B1	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M621/1002B2	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M621/1010B1	OFF	M62 J25 - J30	
16/09/15 22:21:51	SIG	M621/1010B2	OFF	M62 J25 - J30	
16/09/15 22:21:52	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 22:21:52	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 22:26:49	SIG	M62/1981B1	OFF	M62 J25 - J30	
16/09/15 22:26:49	SIG	M62/1981B2	OFF	M62 J25 - J30	
16/09/15 22:26:49	SIG	M62/1981B3	OFF	M62 J25 - J30	
16/09/15 22:26:49	SIG	M62/1981B4	OFF	M62 J25 - J30	
16/09/15 22:38:51	SIG	M62/2170A1	OFF	M62 J25 - J30	
16/09/15 22:38:51	SIG	M62/2170A2	OFF	M62 J25 - J30	
16/09/15 22:38:51	SIG	M62/2170K1	OFF	M62 J25 - J30	
16/09/15 22:38:51	SIG	M62/2170K2	OFF	M62 J25 - J30	
16/09/15 22:45:41	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 22:45:41	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 22:45:41	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 22:45:41	SIG	M62/2041B4	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2177A1	BLNK	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2177A2	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2177A3	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2177A4	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2183A2	NR	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2183A3	NR	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2183A4	NR	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2189A1	BLNK	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2189A2	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2189A3	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2189A4	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2197A1	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2197A2	OFF	M62 J25 - J30	
16/09/15 22:52:07	SIG	M62/2197A3	OFF	M62 J25 - J30	
16/09/15 22:52:08	SIG	M62/2189A1	BLNK	M62 J25 - J30	
16/09/15 22:55:07	SIG	M62/2183A2	OFF	M62 J25 - J30	
16/09/15 22:55:08	SIG	M62/2183A1	BLNK	M62 J25 - J30	
16/09/15 22:55:08	SIG	M62/2183A3	OFF	M62 J25 - J30	
16/09/15 22:55:08	SIG	M62/2183A4	OFF	M62 J25 - J30	
16/09/15 23:21:06	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 23:21:06	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 23:21:06	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2012B1	REDX	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2012B2	NR	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2012B3	NR	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2012B4	NR	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2025B1	STOP	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2025B2	40R	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2025B3	40R	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2025B4	40R	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2033B1	REDX	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2033B2	50R	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2033B3	50R	M62 J25 - J30	
16/09/15 23:21:12	SIG	M62/2033B4	50R	M62 J25 - J30	
16/09/15 23:21:17	SIG	M62/2025B1	STOP	M62 J25 - J30	
16/09/15 23:23:14	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 23:23:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2041B1	REDX	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2041B2	60R	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2041B3	60R	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2041B4	60R	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2050B2	50R	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2050B3	50R	M62 J25 - J30	
16/09/15 23:31:52	SIG	M62/2050B4	50R	M62 J25 - J30	
16/09/15 23:36:09	SIG	M62/2033B3	???	M62 J25 - J30	
16/09/15 23:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 23:48:13	SIG	M62/2025B1	REDX	M62 J25 - J30	
16/09/15 23:48:13	SIG	M62/2025B2	50R	M62 J25 - J30	
16/09/15 23:48:13	SIG	M62/2025B3	50R	M62 J25 - J30	
16/09/15 23:48:13	SIG	M62/2025B4	50R	M62 J25 - J30	
16/09/15 23:49:32	SIG	M62/2018B1	NR	M62 J25 - J30	
16/09/15 23:49:32	SIG	M62/2018B2	NR	M62 J25 - J30	
16/09/15 23:49:32	SIG	M62/2018B3	NR	M62 J25 - J30	
16/09/15 23:49:36	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2012B1	BLNK	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2012B2	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2012B3	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2012B4	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2018B1	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2018B2	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2018B3	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2018L1	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2025B2	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2025B3	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2025B4	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2033B2	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2033B3	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2033B4	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2041B2	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2041B3	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2041B4	NR	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2050B2	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2050B3	OFF	M62 J25 - J30	
16/09/15 23:50:52	SIG	M62/2050B4	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2018L1	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2025B1	BLNK	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2025B2	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2025B3	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2025B4	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2033B1	BLNK	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2033B2	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2033B4	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2041B2	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2041B3	OFF	M62 J25 - J30	
16/09/15 23:53:53	SIG	M62/2041B4	OFF	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2117B2	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 00:06:58	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 00:07:03	SIG	M62/2125B1	40R	M62 J25 - J30	
17/09/15 00:07:03	SIG	M62/2125B2	40R	M62 J25 - J30	
17/09/15 00:07:03	SIG	M62/2125B3	40R	M62 J25 - J30	
17/09/15 00:07:03	SIG	M62/2132B1	40R	M62 J25 - J30	
17/09/15 00:07:03	SIG	M62/2132B2	40R	M62 J25 - J30	
17/09/15 00:07:03	SIG	M62/2132B3	40R	M62 J25 - J30	
17/09/15 00:07:04	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 00:07:04	SIG	M62/2117B2	40R	M62 J25 - J30	
17/09/15 00:07:04	SIG	M62/2117B3	40R	M62 J25 - J30	
17/09/15 00:07:04	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 00:07:04	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 00:07:08	SIG	M62/2125B1	30R	M62 J25 - J30	
17/09/15 00:07:09	SIG	M62/2117B1	30R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2117B1	20R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2117B3	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2125B1	20R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2125B2	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2125B3	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2132B1	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2132B2	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2132B3	40R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2137B1	50R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2137B3	50R	M62 J25 - J30	
17/09/15 00:07:14	SIG	M62/2137B4	50R	M62 J25 - J30	
17/09/15 00:07:19	SIG	M62/2117B1	STOP	M62 J25 - J30	
17/09/15 00:07:19	SIG	M62/2125B1	STOP	M62 J25 - J30	
17/09/15 00:44:46	SIG	M62/2197A1	50R	M62 J25 - J30	
17/09/15 00:44:46	SIG	M62/2197A2	50R	M62 J25 - J30	
17/09/15 00:44:46	SIG	M62/2197A3	50R	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2189A1	REDX	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2189A2	50R	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2189A3	50R	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2189A4	50R	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2197A1	40R	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2197A2	40R	M62 J25 - J30	
17/09/15 00:44:51	SIG	M62/2197A3	40R	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2189A1	BLNK	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2189A2	OFF	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2189A3	OFF	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2189A4	OFF	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2197A1	OFF	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2197A2	OFF	M62 J25 - J30	
17/09/15 00:48:22	SIG	M62/2197A3	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2132B1	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2132B2	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2132B3	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2137B1	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2137B3	OFF	M62 J25 - J30	
17/09/15 01:01:54	SIG	M62/2137B4	OFF	M62 J25 - J30	
17/09/15 01:04:33	SIG	M62/2117B1	???	M62 J25 - J30	
17/09/15 01:04:34	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 01:04:55	SIG	M62/2125L1	OFF	M62 J25 - J30	
17/09/15 01:04:55	SIG	M62/2125L2	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2117B3	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2120M1	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2120M2	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2125B1	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2125B2	OFF	M62 J25 - J30	
17/09/15 01:28:01	SIG	M62/2125B3	OFF	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2065B1	REDX	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 01:38:36	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 01:38:36	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2057B1	BLNK	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2057B2	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2057B3	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2057B4	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2065B1	BLNK	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2065B2	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2065B3	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2065B4	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M62/2065M1	NR	M62 J25 - J30	
17/09/15 02:05:20	SIG	M621/1002B1	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M621/1002B2	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 02:05:20	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1979K1	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1979K2	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1981A1	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1981A2	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1981A3	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1981A4	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1987A1	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1987A2	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1987A3	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1987J1	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1992A1	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1992A2	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1992A3	50R	M62 J25 - J30	
17/09/15 02:55:49	SIG	M62/1992J1	50R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1979K1	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1979K2	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1981A1	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1981A2	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1981A3	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1981A4	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1987A2	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1987J1	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 02:56:04	SIG	M62/1992J1	40R	M62 J25 - J30	
17/09/15 02:56:09	SIG	M62/1987J1	30R	M62 J25 - J30	
17/09/15 02:56:09	SIG	M62/1992J1	30R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1974A1	50R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1974A2	50R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1974A3	50R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1974A4	50R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1979K1	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1979K2	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1981A1	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1981A2	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1981A3	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1981A4	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1987J1	20R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1992J1	20R	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1999A1	NR	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1999A2	NR	M62 J25 - J30	
17/09/15 02:56:14	SIG	M62/1999A3	NR	M62 J25 - J30	
17/09/15 02:56:19	SIG	M62/1987J1	STOP	M62 J25 - J30	
17/09/15 02:56:19	SIG	M62/1992J1	STOP	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2170B1	NR	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2170B2	NR	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2170L1	LDR	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 03:04:49	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M606/2003B1	LDR	M62 J25 - J30	
17/09/15 03:07:59	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/2004B1	REDX	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/2004B2	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/2004B3	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/2004B4	50R	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/2005M1	TI	M62 J25 - J30	
17/09/15 03:07:59	SIG	M62/2005M2	TI	M62 J25 - J30	
17/09/15 03:08:05	SIG	M62/1992B1	40R	M62 J25 - J30	
17/09/15 03:08:05	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 03:08:05	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 03:08:05	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 03:08:10	SIG	M62/1992B1	30R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1992B1	20R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1999B1	REDX	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 03:08:15	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 03:08:21	SIG	M62/1992B1	STOP	M62 J25 - J30	
17/09/15 03:13:26	SIG	M62/1981B1	NR	M62 J25 - J30	
17/09/15 03:13:26	SIG	M62/1981B2	NR	M62 J25 - J30	
17/09/15 03:13:26	SIG	M62/1981B3	NR	M62 J25 - J30	
17/09/15 03:13:26	SIG	M62/1981B4	NR	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1974A1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1974A2	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1974A3	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1974A4	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1979K1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1979K2	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1981A1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1981A2	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1981A3	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1981A4	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1987A1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1987A3	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1987J1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1992A2	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1992A3	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1992J1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1999A1	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1999A2	OFF	M62 J25 - J30	
17/09/15 03:26:06	SIG	M62/1999A3	OFF	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2106B1	REDX	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2106B2	NR	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2106B3	NR	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2106B4	NR	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2113B2	60R	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2113B3	60R	M62 J25 - J30	
17/09/15 03:27:09	SIG	M62/2113B4	60R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1974A1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1974A2	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1974A3	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1974A4	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1979K1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1979K2	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1981A1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1981A2	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1981A3	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1981A4	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1987A1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1987A2	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1987A3	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1987J1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1992A1	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1992A2	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1992A3	50R	M62 J25 - J30	
17/09/15 03:28:10	SIG	M62/1992J1	50R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1974A1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1974A2	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1974A3	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1974A4	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1979K1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1979K2	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1981A1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1981A2	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1981A3	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1981A4	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1987A2	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1987J1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 03:28:30	SIG	M62/1992J1	40R	M62 J25 - J30	
17/09/15 03:28:36	SIG	M62/1974A1	30R	M62 J25 - J30	
17/09/15 03:28:36	SIG	M62/1981A1	30R	M62 J25 - J30	
17/09/15 03:28:36	SIG	M62/1987J1	30R	M62 J25 - J30	
17/09/15 03:28:36	SIG	M62/1992J1	30R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1974A1	20R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1974A2	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1974A3	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1974A4	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1979K1	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1979K2	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1981A1	20R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1981A2	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1981A3	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1981A4	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1987J1	20R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1992J1	20R	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1999A1	NR	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1999A2	NR	M62 J25 - J30	
17/09/15 03:28:41	SIG	M62/1999A3	NR	M62 J25 - J30	
17/09/15 03:28:46	SIG	M62/1974A1	STOP	M62 J25 - J30	
17/09/15 03:28:46	SIG	M62/1981A1	STOP	M62 J25 - J30	
17/09/15 03:28:46	SIG	M62/1987J1	STOP	M62 J25 - J30	
17/09/15 03:28:46	SIG	M62/1992J1	STOP	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2106B2	NR	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2106B3	NR	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2106B4	NR	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2113B1	BLNK	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2113B2	OFF	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2113B3	OFF	M62 J25 - J30	
17/09/15 03:29:16	SIG	M62/2113B4	OFF	M62 J25 - J30	
17/09/15 03:29:23	SIG	M62/2197A1	50R	M62 J25 - J30	
17/09/15 03:29:23	SIG	M62/2197A2	50R	M62 J25 - J30	
17/09/15 03:29:23	SIG	M62/2197A3	50R	M62 J25 - J30	
17/09/15 03:29:28	SIG	M62/2197A1	40R	M62 J25 - J30	
17/09/15 03:29:28	SIG	M62/2197A2	40R	M62 J25 - J30	
17/09/15 03:29:28	SIG	M62/2197A3	40R	M62 J25 - J30	
17/09/15 03:29:33	SIG	M62/2197A1	30R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2177A1	REDX	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2177A2	60R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2177A3	60R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2177A4	60R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2183A1	REDX	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2183A2	LDR	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2183A3	50R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2183A4	50R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2189A1	REDX	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2189A2	LDR	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2189A3	50R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2189A4	50R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2197A1	20R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2197A2	40R	M62 J25 - J30	
17/09/15 03:29:39	SIG	M62/2197A3	40R	M62 J25 - J30	
17/09/15 03:29:44	SIG	M62/2197A1	STOP	M62 J25 - J30	
17/09/15 03:32:16	SIG	M62/2106B1	BLNK	M62 J25 - J30	
17/09/15 03:32:16	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 03:32:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
17/09/15 03:32:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2170B1	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2170B2	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2170L1	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2170L2	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2177B1	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2177B2	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2177L1	OFF	M62 J25 - J30	
17/09/15 03:43:03	SIG	M62/2177L2	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1960A1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1960A2	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1960A3	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1960K1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1960K2	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1968A1	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1968A2	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1968A3	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1968A4	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1974A1	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1974A2	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1974A3	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1974A4	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1979K1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1979K2	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1981A1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1981A2	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1981A3	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1981A4	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1987A1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1987A3	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1987J1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1992A1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1992A2	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1992A3	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1992J1	OFF	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1999A1	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1999A2	NR	M62 J25 - J30	
17/09/15 03:45:27	SIG	M62/1999A3	NR	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2177A1	BLNK	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2177A2	OFF	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2177A3	OFF	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2177A4	OFF	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2183A2	NR	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2183A3	NR	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2183A4	NR	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2189A2	50R	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2197A1	50R	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2197A2	50R	M62 J25 - J30	
17/09/15 03:48:13	SIG	M62/2197A3	50R	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1968A1	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1968A2	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1968A3	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1968A4	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1974A1	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1974A2	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1974A3	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1974A4	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1999A1	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1999A2	OFF	M62 J25 - J30	
17/09/15 03:48:28	SIG	M62/1999A3	OFF	M62 J25 - J30	
17/09/15 03:51:13	SIG	M62/2183A2	OFF	M62 J25 - J30	
17/09/15 03:51:14	SIG	M62/2183A1	BLNK	M62 J25 - J30	
17/09/15 03:51:14	SIG	M62/2183A3	OFF	M62 J25 - J30	
17/09/15 03:51:14	SIG	M62/2183A4	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1992B1	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1992B2	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1992B3	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1992B4	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1999B1	BLNK	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1999B1	BLNK	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1999B2	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1999B3	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/1999B4	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/2004B1	BLNK	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/2004B2	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/2004B3	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/2004B4	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/2005M1	OFF	M62 J25 - J30	
17/09/15 03:56:24	SIG	M62/2005M2	OFF	M62 J25 - J30	
17/09/15 03:56:25	SIG	M62/2004B1	BLNK	M62 J25 - J30	
17/09/15 03:57:40	SIG	M62/1981B1	OFF	M62 J25 - J30	
17/09/15 03:57:40	SIG	M62/1981B2	OFF	M62 J25 - J30	
17/09/15 03:57:40	SIG	M62/1981B3	OFF	M62 J25 - J30	
17/09/15 03:57:40	SIG	M62/1981B4	OFF	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2189A1	BLNK	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2189A2	OFF	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2189A3	OFF	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2189A4	OFF	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2197A1	OFF	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2197A2	OFF	M62 J25 - J30	
17/09/15 04:06:54	SIG	M62/2197A3	OFF	M62 J25 - J30	
17/09/15 05:43:07	SIG	M62/1960B1	50R	M62 J25 - J30	
17/09/15 05:43:07	SIG	M62/1960B2	50R	M62 J25 - J30	
17/09/15 05:43:07	SIG	M62/1960B3	50R	M62 J25 - J30	
17/09/15 06:36:19	SIG	M62/2065M1	NR	M62 J25 - J30	
17/09/15 06:36:19	SIG	M62/2069M1	OFF	M62 J25 - J30	
17/09/15 06:36:19	SIG	M62/2069M2	OFF	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2008K1	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2008K2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2012A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2012A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2018A1	HSD	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2018A1	HSD	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2018A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2018A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2018A4	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A1	REDX	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A2	NR	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A3	NR	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A4	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2025A4	NR	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2033A1	REDX	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2033A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2033A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2033A4	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2041A1	REDX	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2041A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2041A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2041A4	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2050A1	REDX	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2050A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2050A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2050A4	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2057A1	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2057A2	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2057A3	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2057J1	60R	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2065A1	REDX	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2065A2	NR	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2065A3	NR	M62 J25 - J30	
17/09/15 06:37:50	SIG	M62/2065A4	NR	M62 J25 - J30	
17/09/15 06:39:19	SIG	M62/2065M1	OFF	M62 J25 - J30	
17/09/15 06:39:59	SIG	M62/2004A1	60R	M62 J25 - J30	
17/09/15 06:39:59	SIG	M62/2004A2	60R	M62 J25 - J30	
17/09/15 06:39:59	SIG	M62/2004A3	60R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 06:46:00	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2008K1	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2008K2	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2012A1	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2012A2	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2012A3	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 06:46:00	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 06:47:00	SIG	M62/2041A2	50R	M62 J25 - J30	
17/09/15 06:47:00	SIG	M62/2041A3	50R	M62 J25 - J30	
17/09/15 06:47:00	SIG	M62/2041A4	50R	M62 J25 - J30	
17/09/15 06:49:00	SIG	M62/2050A2	50R	M62 J25 - J30	
17/09/15 06:49:00	SIG	M62/2050A3	50R	M62 J25 - J30	
17/09/15 06:49:00	SIG	M62/2050A4	50R	M62 J25 - J30	
17/09/15 06:50:15	SIG	M62/2050A1	50R	M62 J25 - J30	
17/09/15 06:50:40	SIG	M62/2041A1	50R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 06:51:00	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2004A1	OFF	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2004A2	OFF	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2004A3	OFF	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2008K1	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2008K2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2012A2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2012A3	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2018A2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2018A3	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2018A4	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2025A2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2025A3	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2025A4	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2033A2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2033A3	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2033A4	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2041A1	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2041A2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2041A3	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2041A4	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2050A1	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2050A2	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2050A3	60R	M62 J25 - J30	
17/09/15 06:51:00	SIG	M62/2050A4	60R	M62 J25 - J30	
17/09/15 06:51:06	SIG	M62/2033A1	60R	M62 J25 - J30	
17/09/15 06:51:10	SIG	M62/2018A1	60R	M62 J25 - J30	
17/09/15 06:51:10	SIG	M62/2025A1	60R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 06:51:21	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 06:51:22	SIG	M62/2159B1	NR	M62 J25 - J30	
17/09/15 06:51:22	SIG	M62/2159B2	NR	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 06:51:27	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 06:54:00	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 06:54:01	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 06:54:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 06:54:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 06:54:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 06:54:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 06:55:34	SIG	M62/2065M1	NR	M62 J25 - J30	
17/09/15 06:55:34	SIG	M62/2069M1	60R	M62 J25 - J30	
17/09/15 06:55:34	SIG	M62/2069M2	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2050B2	NR	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2050B3	NR	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2050B4	NR	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2057B2	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2057B3	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2057B4	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2065B1	REDX	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2065B2	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2065B3	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2065B4	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 06:55:35	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 06:55:35	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2012B1	REDX	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2012B2	NR	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2012B3	NR	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2012B4	NR	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2018B1	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2018B2	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2018B3	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2018L1	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2025B1	REDX	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2025B2	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2025B3	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2025B4	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2033B1	REDX	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2050B2	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2050B3	60R	M62 J25 - J30	
17/09/15 06:55:36	SIG	M62/2050B4	60R	M62 J25 - J30	
17/09/15 06:57:39	SIG	M62/2025B1	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2194B1	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2194B2	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2194B3	60R	M62 J25 - J30	
17/09/15 06:58:01	SIG	M62/2194B4	60R	M62 J25 - J30	
17/09/15 06:58:02	SIG	M62/2033B1	60R	M62 J25 - J30	
17/09/15 06:58:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 06:58:24	SIG	M62/2041B1	60R	M62 J25 - J30	
17/09/15 06:58:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 06:58:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 06:58:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 06:58:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 07:01:10	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 07:03:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:03:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:03:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:03:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:06:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:06:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:06:46	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 07:06:46	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1992B1	NR	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1992B2	NR	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1992B3	NR	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1992B4	NR	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1999B1	REDX	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 07:06:46	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 07:10:27	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 07:10:27	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 07:10:27	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 07:10:27	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 07:10:33	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2183B1	40R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2183L1	40R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2183L2	40R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2189B1	50R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2189B2	50R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2189B3	50R	M62 J25 - J30	
17/09/15 07:12:32	SIG	M62/2189B4	50R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/1999A1	60R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/1999A2	60R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/1999A3	60R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/1999J1	50R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/1999J2	50R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/2004A1	60R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/2004A2	60R	M62 J25 - J30	
17/09/15 07:13:01	SIG	M62/2004A3	60R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 07:13:18	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2033A1	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 07:13:23	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 07:14:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:14:39	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:14:45	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:15:00	SIG	M62/2197B1	60R	M62 J25 - J30	
17/09/15 07:15:00	SIG	M62/2197B2	60R	M62 J25 - J30	
17/09/15 07:15:00	SIG	M62/2197B3	60R	M62 J25 - J30	
17/09/15 07:15:00	SIG	M62/2199M1	60R	M62 J25 - J30	
17/09/15 07:15:00	SIG	M62/2199M2	60R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/1999A1	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/1999A2	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/1999A3	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2004A1	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2004A2	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2004A3	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2008K1	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2008K2	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2012A1	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2012A2	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2012A3	50R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 07:16:15	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2004A1	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2004A2	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2004A3	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2008K1	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2008K2	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2012A1	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2012A2	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2012A3	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 07:16:20	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 07:17:00	SIG	M62/2203B1	60R	M62 J25 - J30	
17/09/15 07:17:00	SIG	M62/2203B2	60R	M62 J25 - J30	
17/09/15 07:17:00	SIG	M62/2203B3	60R	M62 J25 - J30	
17/09/15 07:17:18	SIG	M62/2033A1	60R	M62 J25 - J30	
17/09/15 07:17:18	SIG	M62/2033A2	60R	M62 J25 - J30	
17/09/15 07:17:18	SIG	M62/2033A3	60R	M62 J25 - J30	
17/09/15 07:17:18	SIG	M62/2033A4	60R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2074B1	REDX	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 07:17:39	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 07:17:42	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 07:17:42	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 07:17:42	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 07:17:42	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 07:17:42	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2065B2	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2065B3	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2065B4	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2065M1	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2069M1	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2069M2	40R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 07:17:44	SIG	M621/1002B2	40R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2074B2	40R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2074B3	40R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2074B4	40R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:17:47	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 07:17:47	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 07:17:53	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2065A2	60R	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2065A3	60R	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2065A4	60R	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2073K1	60R	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2079A2	NR	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2079A3	NR	M62 J25 - J30	
17/09/15 07:18:32	SIG	M62/2079A4	NR	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2189B1	40R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2189B2	40R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2189B3	40R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2189B4	40R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2194B1	50R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2194B2	50R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2194B3	50R	M62 J25 - J30	
17/09/15 07:18:37	SIG	M62/2194B4	50R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2079A2	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2079A3	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2079A4	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2088A1	REDX	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2088A2	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2088A3	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2088A4	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2097A1	REDX	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2097A2	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2097A3	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2097A4	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2106A1	REDX	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2106A2	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2106A3	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2106A4	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2114A1	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2114A2	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2114A3	60R	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2117A1	REDX	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2117A2	NR	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2117A3	NR	M62 J25 - J30	
17/09/15 07:18:43	SIG	M62/2117A4	NR	M62 J25 - J30	
17/09/15 07:20:01	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 07:20:01	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 07:20:01	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 07:20:01	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 07:20:15	SIG	M62/2004A1	50R	M62 J25 - J30	
17/09/15 07:20:15	SIG	M62/2004A2	50R	M62 J25 - J30	
17/09/15 07:20:15	SIG	M62/2004A3	50R	M62 J25 - J30	
17/09/15 07:20:16	SIG	M62/1999A1	60R	M62 J25 - J30	
17/09/15 07:20:16	SIG	M62/1999A2	60R	M62 J25 - J30	
17/09/15 07:20:16	SIG	M62/1999A3	60R	M62 J25 - J30	
17/09/15 07:20:27	SIG	M62/2004A1	40R	M62 J25 - J30	
17/09/15 07:20:27	SIG	M62/2004A2	40R	M62 J25 - J30	
17/09/15 07:20:27	SIG	M62/2004A3	40R	M62 J25 - J30	
17/09/15 07:20:28	SIG	M62/1999A1	50R	M62 J25 - J30	
17/09/15 07:20:28	SIG	M62/1999A2	50R	M62 J25 - J30	
17/09/15 07:20:28	SIG	M62/1999A3	50R	M62 J25 - J30	
17/09/15 07:20:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:20:54	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:20:59	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:21:08	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 07:21:08	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 07:21:08	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 07:21:08	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 07:21:14	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 07:21:20	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 07:21:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 07:21:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 07:21:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 07:21:24	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 07:21:26	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 07:21:41	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M62/2069M1	40R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M62/2069M2	40R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 07:21:51	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2074B2	40R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2074B3	40R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2074B4	40R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 07:21:56	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1979K1	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1979K2	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1981A1	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1981A2	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1981A3	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1981A4	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1987A1	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1987A3	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1987J1	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1992A1	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1992A2	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1992A3	60R	M62 J25 - J30	
17/09/15 07:22:13	SIG	M62/1992J1	60R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1992A1	50R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1992A2	50R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1992A3	50R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1992J1	50R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1999A1	40R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1999A2	40R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1999A3	40R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1999J1	40R	M62 J25 - J30	
17/09/15 07:22:42	SIG	M62/1999J2	40R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 07:22:56	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 07:23:58	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 07:24:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:24:07	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:24:12	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2189B1	50R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2189B2	50R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2189B3	50R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2189B4	50R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2194B1	60R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2194B2	60R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2194B3	60R	M62 J25 - J30	
17/09/15 07:24:44	SIG	M62/2194B4	60R	M62 J25 - J30	
17/09/15 07:25:20	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 07:25:20	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 07:25:20	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 07:25:20	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1987A1	50R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1987A3	50R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1987J1	50R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 07:25:22	SIG	M62/1992J1	40R	M62 J25 - J30	
17/09/15 07:25:41	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 07:25:41	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 07:25:41	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:25:41	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:25:46	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 07:25:46	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 07:25:46	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:25:46	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:27:01	SIG	M62/1974A1	60R	M62 J25 - J30	
17/09/15 07:27:01	SIG	M62/1974A2	60R	M62 J25 - J30	
17/09/15 07:27:01	SIG	M62/1974A3	60R	M62 J25 - J30	
17/09/15 07:27:01	SIG	M62/1974A4	60R	M62 J25 - J30	
17/09/15 07:27:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:27:07	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1979K1	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1979K2	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1981A1	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1981A2	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1981A3	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1981A4	50R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/1987J1	40R	M62 J25 - J30	
17/09/15 07:27:13	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2189B1	40R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2189B2	40R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2189B3	40R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2189B4	40R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2194B1	50R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2194B2	50R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2194B3	50R	M62 J25 - J30	
17/09/15 07:27:15	SIG	M62/2194B4	50R	M62 J25 - J30	
17/09/15 07:27:37	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 07:27:37	SIG	M62/2113B2	NR	M62 J25 - J30	
17/09/15 07:27:37	SIG	M62/2113B3	NR	M62 J25 - J30	
17/09/15 07:27:37	SIG	M62/2113B4	NR	M62 J25 - J30	
17/09/15 07:27:37	SIG	M62/2120M1	60R	M62 J25 - J30	
17/09/15 07:27:37	SIG	M62/2120M2	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2088B1	REDX	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2088B2	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2088B3	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2088B4	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2097B1	REDX	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2097B2	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2097B4	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2106B1	REDX	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2106B2	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2106B3	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2106B4	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2113B2	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2113B3	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2113B4	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2117B1	60R	M62 J25 - J30	
17/09/15 07:27:48	SIG	M62/2117B3	60R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 07:27:57	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 07:28:01	SIG	M62/1968A1	60R	M62 J25 - J30	
17/09/15 07:28:01	SIG	M62/1968A2	60R	M62 J25 - J30	
17/09/15 07:28:01	SIG	M62/1968A3	60R	M62 J25 - J30	
17/09/15 07:28:01	SIG	M62/1968A4	60R	M62 J25 - J30	
17/09/15 07:28:37	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:28:37	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:28:38	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:28:39	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:28:52	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:28:52	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:28:53	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:28:53	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:29:10	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:29:10	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:29:11	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:29:11	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:29:12	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:29:12	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:29:26	SIG	M62/2057B1	40R	M62 J25 - J30	
17/09/15 07:29:26	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 07:29:31	SIG	M62/2057B1	40R	M62 J25 - J30	
17/09/15 07:29:31	SIG	M621/1002B1	40R	M62 J25 - J30	
17/09/15 07:29:43	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 07:29:43	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 07:29:43	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 07:29:43	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 07:29:44	SIG	M62/2057B1	60R	M62 J25 - J30	
17/09/15 07:29:44	SIG	M62/2057B2	60R	M62 J25 - J30	
17/09/15 07:29:44	SIG	M62/2057B3	60R	M62 J25 - J30	
17/09/15 07:29:44	SIG	M62/2057B4	60R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1974A1	50R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1974A2	50R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1974A3	50R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1974A4	50R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1979K1	40R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1979K2	40R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1981A1	40R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1981A2	40R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1981A3	40R	M62 J25 - J30	
17/09/15 07:29:45	SIG	M62/1981A4	40R	M62 J25 - J30	
17/09/15 07:30:01	SIG	M62/1960A1	60R	M62 J25 - J30	
17/09/15 07:30:01	SIG	M62/1960A2	60R	M62 J25 - J30	
17/09/15 07:30:01	SIG	M62/1960A3	60R	M62 J25 - J30	
17/09/15 07:30:01	SIG	M62/1960K1	60R	M62 J25 - J30	
17/09/15 07:30:01	SIG	M62/1960K2	60R	M62 J25 - J30	
17/09/15 07:30:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:30:12	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:30:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 07:30:18	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2081B1	40R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2081B2	40R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2081B3	40R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2081L1	40R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 07:30:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 07:30:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 07:30:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1974A1	40R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1974A2	40R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1974A3	40R	M62 J25 - J30	
17/09/15 07:31:34	SIG	M62/1974A4	40R	M62 J25 - J30	
17/09/15 07:33:01	SIG	M62/1955K1	60R	M62 J25 - J30	
17/09/15 07:33:01	SIG	M62/1955K2	60R	M62 J25 - J30	
17/09/15 07:33:01	SIG	M62/1956A1	60R	M62 J25 - J30	
17/09/15 07:33:01	SIG	M62/1956A2	60R	M62 J25 - J30	
17/09/15 07:33:01	SIG	M62/1956A3	60R	M62 J25 - J30	
17/09/15 07:33:18	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:33:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:33:24	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:34:31	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 07:34:31	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 07:34:31	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:34:31	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:34:36	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 07:34:36	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 07:34:36	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:34:36	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:34:43	SIG	M62/1999J1	50R	M62 J25 - J30	
17/09/15 07:34:43	SIG	M62/1999J2	50R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2088B2	60R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2088B3	60R	M62 J25 - J30	
17/09/15 07:34:59	SIG	M62/2088B4	60R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992A1	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992A2	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992A3	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992J1	40R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1992J1	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1999A1	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1999A2	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/1999A3	50R	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:36:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:36:25	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:36:30	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:37:58	SIG	M62/2057A1	50R	M62 J25 - J30	
17/09/15 07:37:58	SIG	M62/2057A2	50R	M62 J25 - J30	
17/09/15 07:37:58	SIG	M62/2057A3	50R	M62 J25 - J30	
17/09/15 07:37:58	SIG	M62/2057J1	50R	M62 J25 - J30	
17/09/15 07:37:58	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 07:37:58	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2050A1	50R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2050A2	50R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2050A3	50R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2050A4	50R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2057A1	40R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2057A2	40R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2057A3	40R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M62/2057J1	40R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 07:38:03	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 07:38:14	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 07:38:30	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 07:38:30	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 07:38:30	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 07:38:30	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 07:39:14	SIG	M62/1987A1	50R	M62 J25 - J30	
17/09/15 07:39:14	SIG	M62/1987A3	50R	M62 J25 - J30	
17/09/15 07:39:14	SIG	M62/1987J1	50R	M62 J25 - J30	
17/09/15 07:39:23	SIG	M62/2088B1	60R	M62 J25 - J30	
17/09/15 07:39:27	SIG	M62/1979K1	50R	M62 J25 - J30	
17/09/15 07:39:27	SIG	M62/1979K2	50R	M62 J25 - J30	
17/09/15 07:39:27	SIG	M62/1981A1	50R	M62 J25 - J30	
17/09/15 07:39:27	SIG	M62/1981A2	50R	M62 J25 - J30	
17/09/15 07:39:27	SIG	M62/1981A3	50R	M62 J25 - J30	
17/09/15 07:39:27	SIG	M62/1981A4	50R	M62 J25 - J30	
17/09/15 07:39:30	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:39:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:39:36	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:39:42	SIG	M62/2097B1	60R	M62 J25 - J30	
17/09/15 07:40:09	SIG	M62/2106B1	60R	M62 J25 - J30	
17/09/15 07:40:13	SIG	M62/2113B1	60R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1960A1	40R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1960A2	40R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1960A3	40R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1960K1	40R	M62 J25 - J30	
17/09/15 07:40:15	SIG	M62/1960K2	40R	M62 J25 - J30	
17/09/15 07:40:26	SIG	M62/1999A1	40R	M62 J25 - J30	
17/09/15 07:40:26	SIG	M62/1999A2	40R	M62 J25 - J30	
17/09/15 07:40:26	SIG	M62/1999A3	40R	M62 J25 - J30	
17/09/15 07:40:26	SIG	M62/1999J1	40R	M62 J25 - J30	
17/09/15 07:40:26	SIG	M62/1999J2	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 07:40:39	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 07:40:40	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2041A1	50R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2041A2	50R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2041A3	50R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2041A4	50R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2050A1	40R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2050A2	40R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2050A3	40R	M62 J25 - J30	
17/09/15 07:41:03	SIG	M62/2050A4	40R	M62 J25 - J30	
17/09/15 07:41:58	SIG	M62/2057A1	60R	M62 J25 - J30	
17/09/15 07:41:58	SIG	M62/2057A2	60R	M62 J25 - J30	
17/09/15 07:41:58	SIG	M62/2057A3	60R	M62 J25 - J30	
17/09/15 07:41:58	SIG	M62/2057J1	60R	M62 J25 - J30	
17/09/15 07:41:58	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 07:41:58	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 07:42:14	SIG	M62/1974A1	50R	M62 J25 - J30	
17/09/15 07:42:14	SIG	M62/1974A2	50R	M62 J25 - J30	
17/09/15 07:42:14	SIG	M62/1974A3	50R	M62 J25 - J30	
17/09/15 07:42:14	SIG	M62/1974A4	50R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 07:42:15	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 07:42:16	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 07:42:16	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 07:42:16	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 07:42:16	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 07:42:16	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 07:42:21	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1992B1	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1992B2	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1992B3	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1992B4	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1999B2	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1999B3	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/1999B4	NR	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/2005M1	OFF	M62 J25 - J30	
17/09/15 07:42:21	SIG	M62/2005M2	OFF	M62 J25 - J30	
17/09/15 07:42:25	SIG	M62/2057A1	50R	M62 J25 - J30	
17/09/15 07:42:25	SIG	M62/2057A2	50R	M62 J25 - J30	
17/09/15 07:42:25	SIG	M62/2057A3	50R	M62 J25 - J30	
17/09/15 07:42:25	SIG	M62/2057J1	50R	M62 J25 - J30	
17/09/15 07:42:25	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 07:42:25	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 07:42:30	SIG	M62/2057A1	40R	M62 J25 - J30	
17/09/15 07:42:30	SIG	M62/2057A2	40R	M62 J25 - J30	
17/09/15 07:42:30	SIG	M62/2057A3	40R	M62 J25 - J30	
17/09/15 07:42:30	SIG	M62/2057J1	40R	M62 J25 - J30	
17/09/15 07:42:30	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 07:42:30	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 07:42:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:42:37	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:42:42	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1987J1	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 07:43:29	SIG	M62/1992J1	40R	M62 J25 - J30	
17/09/15 07:44:14	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 07:44:14	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 07:44:14	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 07:44:14	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2033A1	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2041A1	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2041A2	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2041A3	40R	M62 J25 - J30	
17/09/15 07:44:27	SIG	M62/2041A4	40R	M62 J25 - J30	
17/09/15 07:44:32	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 07:44:32	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 07:44:32	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:44:32	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:44:37	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 07:44:37	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 07:44:37	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:44:37	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1992B1	OFF	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1992B2	OFF	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1992B3	OFF	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1992B4	OFF	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1999B2	OFF	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1999B3	OFF	M62 J25 - J30	
17/09/15 07:45:21	SIG	M62/1999B4	OFF	M62 J25 - J30	
17/09/15 07:45:22	SIG	M62/1999B1	BLNK	M62 J25 - J30	
17/09/15 07:45:22	SIG	M62/1999J1	50R	M62 J25 - J30	
17/09/15 07:45:22	SIG	M62/1999J2	50R	M62 J25 - J30	
17/09/15 07:45:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:45:43	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:45:48	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:46:09	SIG	M62/1979K1	40R	M62 J25 - J30	
17/09/15 07:46:09	SIG	M62/1979K2	40R	M62 J25 - J30	
17/09/15 07:46:09	SIG	M62/1981A1	40R	M62 J25 - J30	
17/09/15 07:46:09	SIG	M62/1981A2	40R	M62 J25 - J30	
17/09/15 07:46:09	SIG	M62/1981A3	40R	M62 J25 - J30	
17/09/15 07:46:09	SIG	M62/1981A4	40R	M62 J25 - J30	
17/09/15 07:46:25	SIG	M62/1999J1	40R	M62 J25 - J30	
17/09/15 07:46:25	SIG	M62/1999J2	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1974A1	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1974A2	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1974A3	40R	M62 J25 - J30	
17/09/15 07:46:56	SIG	M62/1974A4	40R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1955K1	60R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1955K2	60R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 07:47:01	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 07:47:15	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 07:47:37	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 07:47:42	SIG	M62/2106A1	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2065B2	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2065B3	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2065B4	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2069M1	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2069M2	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M621/1002B1	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 07:48:01	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 07:48:03	SIG	M62/2097A1	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1956A1	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1956A2	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1956A3	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1960A1	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1960A2	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1960A3	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1960K1	60R	M62 J25 - J30	
17/09/15 07:48:35	SIG	M62/1960K2	60R	M62 J25 - J30	
17/09/15 07:48:38	SIG	M62/2088A1	60R	M62 J25 - J30	
17/09/15 07:48:44	SIG	M62/2079A1	60R	M62 J25 - J30	
17/09/15 07:48:49	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:48:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:48:54	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:49:00	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 07:49:00	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 07:49:19	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 07:49:19	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 07:49:21	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 07:49:24	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 07:49:24	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 07:49:36	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 07:49:36	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 07:49:36	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 07:49:36	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2025B1	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2033B1	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 07:51:29	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1960A1	40R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1960A2	40R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1960A3	40R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1960K1	40R	M62 J25 - J30	
17/09/15 07:51:31	SIG	M62/1960K2	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2025B1	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2025B2	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2025B3	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2025B4	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2033B1	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2033B2	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2033B4	40R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2041B1	50R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 07:51:35	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 07:51:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:51:55	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:52:00	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:52:42	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 07:52:42	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 07:52:42	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 07:52:42	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 07:53:25	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 07:53:25	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 07:53:25	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 07:53:25	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 07:53:25	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2050A1	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2050A2	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2050A3	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2050A4	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2057A1	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2057A2	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2057A3	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M62/2057J1	60R	M62 J25 - J30	
17/09/15 07:53:33	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 07:53:33	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 07:53:37	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 07:54:11	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 07:54:11	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2033A1	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 07:54:14	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 07:54:17	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 07:54:17	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 07:54:17	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 07:54:17	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 07:54:23	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2183B1	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2183L1	40R	M62 J25 - J30	
17/09/15 07:54:28	SIG	M62/2183L2	40R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2194B1	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2194B2	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2194B3	60R	M62 J25 - J30	
17/09/15 07:54:36	SIG	M62/2194B4	60R	M62 J25 - J30	
17/09/15 07:54:42	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2050A1	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2050A2	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2050A3	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2050A4	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2057A1	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2057A2	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2057A3	50R	M62 J25 - J30	
17/09/15 07:54:55	SIG	M62/2057J1	50R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2050A1	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2050A2	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2050A3	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2050A4	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2057A1	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2057A2	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2057A3	40R	M62 J25 - J30	
17/09/15 07:55:01	SIG	M62/2057J1	40R	M62 J25 - J30	
17/09/15 07:55:03	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 07:55:03	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 07:55:08	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 07:55:08	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 07:55:09	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2025B1	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2025B2	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2025B3	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2025B4	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2033B1	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2041B1	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 07:55:29	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2183B1	40R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2183L1	40R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2183L2	40R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2189B1	50R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2189B2	50R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2189B3	50R	M62 J25 - J30	
17/09/15 07:55:47	SIG	M62/2189B4	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1987A1	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1987A3	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1987J1	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1992A1	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1992A2	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1992A3	50R	M62 J25 - J30	
17/09/15 07:55:50	SIG	M62/1992J1	50R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 07:55:53	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1987A1	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1987A3	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1987J1	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1992A1	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1992A2	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1992A3	40R	M62 J25 - J30	
17/09/15 07:56:11	SIG	M62/1992J1	40R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2189B1	40R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2189B2	40R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2189B3	40R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2189B4	40R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2194B1	50R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2194B2	50R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2194B3	50R	M62 J25 - J30	
17/09/15 07:57:04	SIG	M62/2194B4	50R	M62 J25 - J30	
17/09/15 07:57:26	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 07:57:26	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 07:57:26	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 07:57:26	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 07:57:26	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 07:57:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:57:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:57:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:57:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 07:58:01	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 07:58:01	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 07:58:01	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 07:58:01	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 07:58:01	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 07:58:07	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 07:58:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 07:58:13	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 07:59:03	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 07:59:03	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 07:59:09	SIG	M62/2057A1	60R	M62 J25 - J30	
17/09/15 07:59:09	SIG	M62/2057A2	60R	M62 J25 - J30	
17/09/15 07:59:09	SIG	M62/2057A3	60R	M62 J25 - J30	
17/09/15 07:59:09	SIG	M62/2057J1	60R	M62 J25 - J30	
17/09/15 07:59:29	SIG	M62/2057A1	50R	M62 J25 - J30	
17/09/15 07:59:29	SIG	M62/2057A2	50R	M62 J25 - J30	
17/09/15 07:59:29	SIG	M62/2057A3	50R	M62 J25 - J30	
17/09/15 07:59:29	SIG	M62/2057J1	50R	M62 J25 - J30	
17/09/15 07:59:29	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 07:59:29	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 07:59:35	SIG	M62/2057A1	40R	M62 J25 - J30	
17/09/15 07:59:35	SIG	M62/2057A2	40R	M62 J25 - J30	
17/09/15 07:59:35	SIG	M62/2057A3	40R	M62 J25 - J30	
17/09/15 07:59:35	SIG	M62/2057J1	40R	M62 J25 - J30	
17/09/15 07:59:35	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 07:59:35	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 08:01:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:01:13	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:01:18	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 08:02:42	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2194B1	40R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2194B2	40R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2194B3	40R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2194B4	40R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2197B1	50R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2197B2	50R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2197B3	50R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2199M1	50R	M62 J25 - J30	
17/09/15 08:03:08	SIG	M62/2199M2	50R	M62 J25 - J30	
17/09/15 08:04:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:04:19	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:04:25	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 08:04:29	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 08:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2194B1	50R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2194B2	50R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2194B3	50R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2194B4	50R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2197B1	60R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2197B2	60R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2197B3	60R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2199M1	60R	M62 J25 - J30	
17/09/15 08:07:09	SIG	M62/2199M2	60R	M62 J25 - J30	
17/09/15 08:07:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:07:25	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:07:30	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:07:52	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 08:07:52	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 08:08:56	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 08:08:56	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 08:09:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:09:02	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 08:09:02	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 08:10:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:10:31	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:10:36	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:11:01	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 08:11:01	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2025B1	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 08:11:17	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2018B1	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2018B2	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2018B3	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2025B1	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2025B2	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2025B3	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2025B4	40R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2033B1	50R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 08:11:22	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 08:11:25	SIG	M62/2097B3	60R	M62 J25 - J30	
17/09/15 08:11:25	SIG	M62/2097B3	OFF	M62 J25 - J30	
17/09/15 08:11:26	SIG	M62/2097B3	60R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2041A1	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2041A2	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2041A3	50R	M62 J25 - J30	
17/09/15 08:13:29	SIG	M62/2041A4	50R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2033B1	40R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2033B2	40R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2033B4	40R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2041B1	50R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 08:13:34	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 08:13:36	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 08:13:36	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 08:13:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:13:37	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:13:43	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:14:55	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 08:14:55	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 08:15:08	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 08:15:08	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 08:15:08	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 08:15:08	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 08:15:09	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 08:15:09	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 08:15:15	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 08:15:15	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 08:15:16	SIG	M62/2018B1	60R	M62 J25 - J30	
17/09/15 08:15:16	SIG	M62/2018B2	60R	M62 J25 - J30	
17/09/15 08:15:16	SIG	M62/2018B3	60R	M62 J25 - J30	
17/09/15 08:15:16	SIG	M62/2018L1	60R	M62 J25 - J30	
17/09/15 08:15:31	SIG	M62/2041A1	40R	M62 J25 - J30	
17/09/15 08:15:31	SIG	M62/2041A2	40R	M62 J25 - J30	
17/09/15 08:15:31	SIG	M62/2041A3	40R	M62 J25 - J30	
17/09/15 08:15:31	SIG	M62/2041A4	40R	M62 J25 - J30	
17/09/15 08:15:59	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:15:59	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:15:59	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 08:16:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:16:01	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 08:16:06	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 08:16:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:16:42	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:16:48	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:17:13	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 08:17:13	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 08:17:13	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 08:17:13	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2025B1	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2025B2	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2025B3	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2025B4	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2033B1	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2041B1	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 08:17:33	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 08:17:36	SIG	M62/2033A1	40R	M62 J25 - J30	
17/09/15 08:17:36	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 08:17:36	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 08:17:36	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 08:18:24	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 08:19:10	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 08:19:10	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 08:19:10	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 08:19:10	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 08:19:10	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 08:19:10	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 08:19:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:19:49	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:19:54	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 08:19:59	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 08:20:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:20:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:20:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:20:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:20:12	SIG	M621/1002A1	50R	M62 J25 - J30	
17/09/15 08:20:12	SIG	M621/1002A2	50R	M62 J25 - J30	
17/09/15 08:20:17	SIG	M621/1002A1	40R	M62 J25 - J30	
17/09/15 08:20:17	SIG	M621/1002A2	40R	M62 J25 - J30	
17/09/15 08:20:31	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 08:20:31	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 08:20:31	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 08:20:31	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 08:21:24	SIG	M62/1960A1	40R	M62 J25 - J30	
17/09/15 08:21:24	SIG	M62/1960A2	40R	M62 J25 - J30	
17/09/15 08:21:24	SIG	M62/1960A3	40R	M62 J25 - J30	
17/09/15 08:21:24	SIG	M62/1960K1	40R	M62 J25 - J30	
17/09/15 08:21:24	SIG	M62/1960K2	40R	M62 J25 - J30	
17/09/15 08:22:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:22:54	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:23:00	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 08:23:39	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 08:23:57	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 08:23:57	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 08:23:57	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 08:23:57	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 08:23:57	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2194B1	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2194B2	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2194B3	60R	M62 J25 - J30	
17/09/15 08:24:31	SIG	M62/2194B4	60R	M62 J25 - J30	
17/09/15 08:24:37	SIG	M621/1002A1	OFF	M62 J25 - J30	
17/09/15 08:24:37	SIG	M621/1002A2	OFF	M62 J25 - J30	
17/09/15 08:25:44	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 08:25:44	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 08:25:44	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 08:25:44	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:25:49	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2183B1	40R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2183L1	40R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2183L2	40R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2189B1	50R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2189B2	50R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2189B3	50R	M62 J25 - J30	
17/09/15 08:26:13	SIG	M62/2189B4	50R	M62 J25 - J30	
17/09/15 08:27:57	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 08:27:57	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 08:27:57	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:27:57	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:27:57	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 08:28:13	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 08:28:13	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 08:28:13	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 08:28:13	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 08:28:13	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 08:29:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:29:07	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:29:13	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2041A1	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2041A2	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2041A3	50R	M62 J25 - J30	
17/09/15 08:29:21	SIG	M62/2041A4	50R	M62 J25 - J30	
17/09/15 08:29:37	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 08:29:37	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 08:29:37	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 08:29:37	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 08:29:43	SIG	M62/2057A1	60R	M62 J25 - J30	
17/09/15 08:29:43	SIG	M62/2057A2	60R	M62 J25 - J30	
17/09/15 08:29:43	SIG	M62/2057A3	60R	M62 J25 - J30	
17/09/15 08:29:43	SIG	M62/2057J1	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 08:30:13	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 08:30:14	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:30:19	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 08:30:28	SIG	M62/2050A1	50R	M62 J25 - J30	
17/09/15 08:30:28	SIG	M62/2050A2	50R	M62 J25 - J30	
17/09/15 08:30:28	SIG	M62/2050A3	50R	M62 J25 - J30	
17/09/15 08:30:28	SIG	M62/2050A4	50R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2033A1	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 08:31:12	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 08:32:13	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 08:33:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:33:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:33:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:33:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 08:34:14	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 08:34:20	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:34:26	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 08:35:12	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 08:35:12	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 08:35:12	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 08:35:12	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 08:35:13	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1960A1	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1960A2	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1960A3	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1960K1	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1960K2	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 08:35:15	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 08:35:33	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:35:33	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 08:36:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 08:36:42	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1960A1	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1960A2	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1960A3	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1960K1	40R	M62 J25 - J30	
17/09/15 08:37:06	SIG	M62/1960K2	40R	M62 J25 - J30	
17/09/15 08:37:07	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:37:07	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:37:07	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 08:37:11	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 08:37:11	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 08:37:11	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 08:37:11	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 08:37:11	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2183B1	40R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2183L2	40R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2189B1	50R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2189B2	50R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2189B3	50R	M62 J25 - J30	
17/09/15 08:37:25	SIG	M62/2189B4	50R	M62 J25 - J30	
17/09/15 08:37:35	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:37:55	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:37:55	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 08:37:56	SIG	M62/2183L1	40R	M62 J25 - J30	
17/09/15 08:38:02	SIG	M62/2050A1	60R	M62 J25 - J30	
17/09/15 08:38:02	SIG	M62/2050A2	60R	M62 J25 - J30	
17/09/15 08:38:02	SIG	M62/2050A3	60R	M62 J25 - J30	
17/09/15 08:38:02	SIG	M62/2050A4	60R	M62 J25 - J30	
17/09/15 08:38:21	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 08:38:21	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 08:38:21	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 08:38:21	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 08:38:44	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 08:38:44	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 08:38:44	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 08:38:44	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 08:38:49	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 08:38:49	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 08:38:49	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 08:38:49	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 08:39:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:39:29	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:39:34	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2025A1	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2025A2	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2025A3	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2025A4	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2033A1	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2033A2	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2033A3	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2033A4	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2041A1	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2041A2	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2041A3	60R	M62 J25 - J30	
17/09/15 08:41:02	SIG	M62/2041A4	60R	M62 J25 - J30	
17/09/15 08:41:59	SIG	M62/1960B1	OFF	M62 J25 - J30	
17/09/15 08:41:59	SIG	M62/1960B2	OFF	M62 J25 - J30	
17/09/15 08:41:59	SIG	M62/1960B3	OFF	M62 J25 - J30	
17/09/15 08:42:05	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 08:42:05	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 08:42:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:42:35	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:42:40	SIG	M62/2183B2	40R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 08:43:17	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 08:43:48	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:43:48	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:43:48	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 08:44:28	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 08:44:28	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 08:44:28	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 08:44:28	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 08:44:28	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 08:45:38	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 08:47:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:47:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:47:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:47:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 08:50:34	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 08:50:34	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 08:50:47	SIG	M62/1999J1	50R	M62 J25 - J30	
17/09/15 08:50:47	SIG	M62/1999J2	50R	M62 J25 - J30	
17/09/15 08:51:02	SIG	M62/2018A1	60R	M62 J25 - J30	
17/09/15 08:51:02	SIG	M62/2018A2	60R	M62 J25 - J30	
17/09/15 08:51:02	SIG	M62/2018A3	60R	M62 J25 - J30	
17/09/15 08:51:02	SIG	M62/2018A4	60R	M62 J25 - J30	
17/09/15 08:51:30	SIG	M62/2008K1	50R	M62 J25 - J30	
17/09/15 08:51:30	SIG	M62/2008K2	50R	M62 J25 - J30	
17/09/15 08:51:30	SIG	M62/2012A1	50R	M62 J25 - J30	
17/09/15 08:51:30	SIG	M62/2012A2	50R	M62 J25 - J30	
17/09/15 08:51:30	SIG	M62/2012A3	50R	M62 J25 - J30	
17/09/15 08:51:51	SIG	M62/1999J1	40R	M62 J25 - J30	
17/09/15 08:51:51	SIG	M62/1999J2	40R	M62 J25 - J30	
17/09/15 08:52:52	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 08:52:52	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 08:54:25	SIG	M62/2189B4	???	M62 J25 - J30	
17/09/15 08:54:26	SIG	M62/2189B4	OFF	M62 J25 - J30	
17/09/15 08:54:36	SIG	M62/2189B4	OFF	M62 J25 - J30	
17/09/15 08:54:37	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 08:55:51	SIG	M62/2004A1	50R	M62 J25 - J30	
17/09/15 08:55:51	SIG	M62/2004A2	50R	M62 J25 - J30	
17/09/15 08:55:51	SIG	M62/2004A3	50R	M62 J25 - J30	
17/09/15 08:56:52	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 08:56:52	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 08:57:11	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 08:57:42	SIG	M62/1999A1	50R	M62 J25 - J30	
17/09/15 08:57:42	SIG	M62/1999A2	50R	M62 J25 - J30	
17/09/15 08:57:42	SIG	M62/1999A3	50R	M62 J25 - J30	
17/09/15 08:57:42	SIG	M62/1999J1	50R	M62 J25 - J30	
17/09/15 08:57:42	SIG	M62/1999J2	50R	M62 J25 - J30	
17/09/15 08:58:03	SIG	M62/2203B1	OFF	M62 J25 - J30	
17/09/15 08:58:03	SIG	M62/2203B2	OFF	M62 J25 - J30	
17/09/15 08:58:03	SIG	M62/2203B3	OFF	M62 J25 - J30	
17/09/15 08:58:18	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 08:58:18	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 08:58:18	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 08:58:18	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1960A1	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1960A2	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1960A3	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1960K1	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1960K2	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 08:58:45	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 08:59:02	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 08:59:02	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 08:59:02	SIG	M62/2008K1	60R	M62 J25 - J30	
17/09/15 08:59:02	SIG	M62/2008K2	60R	M62 J25 - J30	
17/09/15 08:59:02	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 08:59:02	SIG	M62/2012A2	60R	M62 J25 - J30	
17/09/15 08:59:02	SIG	M62/2012A3	60R	M62 J25 - J30	
17/09/15 08:59:03	SIG	M62/2197B1	OFF	M62 J25 - J30	
17/09/15 08:59:03	SIG	M62/2197B2	OFF	M62 J25 - J30	
17/09/15 08:59:03	SIG	M62/2197B3	OFF	M62 J25 - J30	
17/09/15 08:59:03	SIG	M62/2199M1	OFF	M62 J25 - J30	
17/09/15 08:59:03	SIG	M62/2199M2	OFF	M62 J25 - J30	
17/09/15 08:59:06	SIG	M62/1992A1	50R	M62 J25 - J30	
17/09/15 08:59:06	SIG	M62/1992A2	50R	M62 J25 - J30	
17/09/15 08:59:06	SIG	M62/1992A3	50R	M62 J25 - J30	
17/09/15 08:59:06	SIG	M62/1992J1	50R	M62 J25 - J30	
17/09/15 08:59:17	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 08:59:17	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 08:59:17	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 09:00:02	SIG	M62/2159B1	NR	M62 J25 - J30	
17/09/15 09:00:02	SIG	M62/2159B2	NR	M62 J25 - J30	
17/09/15 09:00:02	SIG	M62/2170B1	NR	M62 J25 - J30	
17/09/15 09:00:02	SIG	M62/2170B2	NR	M62 J25 - J30	
17/09/15 09:00:02	SIG	M62/2170L1	OFF	M62 J25 - J30	
17/09/15 09:00:02	SIG	M62/2170L2	OFF	M62 J25 - J30	
17/09/15 09:00:50	SIG	M62/1987A1	50R	M62 J25 - J30	
17/09/15 09:00:50	SIG	M62/1987A3	50R	M62 J25 - J30	
17/09/15 09:00:50	SIG	M62/1987J1	50R	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2170B1	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2170B2	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2177B1	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2177B2	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2177L1	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2177L2	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2183B1	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2183B2	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2183L1	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2183L2	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2189B1	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2189B2	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2189B3	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2189B4	NR	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2194B1	OFF	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2194B2	OFF	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2194B3	OFF	M62 J25 - J30	
17/09/15 09:01:02	SIG	M62/2194B4	OFF	M62 J25 - J30	
17/09/15 09:01:47	SIG	M62/1979K1	50R	M62 J25 - J30	
17/09/15 09:01:47	SIG	M62/1979K2	50R	M62 J25 - J30	
17/09/15 09:01:47	SIG	M62/1981A1	50R	M62 J25 - J30	
17/09/15 09:01:47	SIG	M62/1981A2	50R	M62 J25 - J30	
17/09/15 09:01:47	SIG	M62/1981A3	50R	M62 J25 - J30	
17/09/15 09:01:47	SIG	M62/1981A4	50R	M62 J25 - J30	
17/09/15 09:02:02	SIG	M62/2004A1	60R	M62 J25 - J30	
17/09/15 09:02:02	SIG	M62/2004A2	60R	M62 J25 - J30	
17/09/15 09:02:02	SIG	M62/2004A3	60R	M62 J25 - J30	
17/09/15 09:02:03	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 09:02:03	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 09:03:02	SIG	M62/2159B1	OFF	M62 J25 - J30	
17/09/15 09:03:03	SIG	M62/2159B2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2170B1	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2170B2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2177B1	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2177B2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2177L1	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2177L2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2183B1	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2183L2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2189B1	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2189B2	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2189B3	OFF	M62 J25 - J30	
17/09/15 09:04:03	SIG	M62/2189B4	OFF	M62 J25 - J30	
17/09/15 09:04:09	SIG	M62/2120M1	60R	M62 J25 - J30	
17/09/15 09:04:09	SIG	M62/2120M1	OFF	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1955K1	40R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1955K2	40R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1956A1	40R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1956A2	40R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1956A3	40R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1974A1	50R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1974A2	50R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1974A3	50R	M62 J25 - J30	
17/09/15 09:04:13	SIG	M62/1974A4	50R	M62 J25 - J30	
17/09/15 09:06:01	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 09:06:01	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 09:06:01	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 09:06:01	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 09:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2004A1	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2004A2	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2004A3	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2008K1	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2008K2	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2012A1	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2012A2	50R	M62 J25 - J30	
17/09/15 09:08:10	SIG	M62/2012A3	50R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 09:08:15	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2004A1	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2004A2	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2004A3	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2008K1	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2008K2	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2012A1	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2012A2	40R	M62 J25 - J30	
17/09/15 09:08:15	SIG	M62/2012A3	40R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1955K1	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1955K2	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1987A1	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1987A3	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1987J1	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1992A1	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1992A2	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1992A3	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1992J1	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1999A1	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1999A1	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1999A2	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1999A2	50R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1999A3	60R	M62 J25 - J30	
17/09/15 09:08:16	SIG	M62/1999A3	50R	M62 J25 - J30	
17/09/15 09:09:03	SIG	M62/1979K1	60R	M62 J25 - J30	
17/09/15 09:09:03	SIG	M62/1979K2	60R	M62 J25 - J30	
17/09/15 09:09:03	SIG	M62/1981A1	60R	M62 J25 - J30	
17/09/15 09:09:03	SIG	M62/1981A2	60R	M62 J25 - J30	
17/09/15 09:09:03	SIG	M62/1981A3	60R	M62 J25 - J30	
17/09/15 09:09:03	SIG	M62/1981A4	60R	M62 J25 - J30	
17/09/15 09:09:37	SIG	M62/1956A1	50R	M62 J25 - J30	
17/09/15 09:09:37	SIG	M62/1956A2	50R	M62 J25 - J30	
17/09/15 09:09:37	SIG	M62/1956A3	50R	M62 J25 - J30	
17/09/15 09:11:03	SIG	M62/1974A1	60R	M62 J25 - J30	
17/09/15 09:11:03	SIG	M62/1974A2	60R	M62 J25 - J30	
17/09/15 09:11:03	SIG	M62/1974A3	60R	M62 J25 - J30	
17/09/15 09:11:03	SIG	M62/1974A4	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 09:12:10	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/1999A1	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/1999A2	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/1999A3	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2004A1	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2004A2	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2004A3	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2008K1	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2008K2	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2012A2	60R	M62 J25 - J30	
17/09/15 09:12:10	SIG	M62/2012A3	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1955K1	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1955K2	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1956A1	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1956A2	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1956A3	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1960A1	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1960A2	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1960A3	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1960K1	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1960K2	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1968A1	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1968A2	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1968A3	60R	M62 J25 - J30	
17/09/15 09:15:03	SIG	M62/1968A4	60R	M62 J25 - J30	
17/09/15 09:15:11	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 09:15:11	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2025A1	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2025A2	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2025A3	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2025A4	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2033A1	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2033A2	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2033A3	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2033A4	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2041A1	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2041A2	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2041A3	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2041A4	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2050A1	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2050A2	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2050A3	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2050A4	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2057A1	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2057A2	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2057A3	50R	M62 J25 - J30	
17/09/15 09:20:53	SIG	M62/2057J1	50R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2018A1	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2025A1	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2033A1	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2041A1	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2041A2	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2041A3	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2041A4	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2050A1	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2050A2	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2050A3	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2050A4	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2057A1	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2057A2	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2057A3	40R	M62 J25 - J30	
17/09/15 09:20:58	SIG	M62/2057J1	40R	M62 J25 - J30	
17/09/15 09:21:03	SIG	M62/2018A1	30R	M62 J25 - J30	
17/09/15 09:21:03	SIG	M62/2025A1	30R	M62 J25 - J30	
17/09/15 09:21:03	SIG	M62/2033A1	30R	M62 J25 - J30	
17/09/15 09:21:03	SIG	M62/2041A1	30R	M62 J25 - J30	
17/09/15 09:21:03	SIG	M62/2050A1	30R	M62 J25 - J30	
17/09/15 09:21:03	SIG	M62/2057J1	30R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 09:21:09	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2008K1	50R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2008K2	50R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2012A1	50R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2012A2	50R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2012A3	50R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2018A1	20R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2018A2	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2018A3	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2018A4	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2025A1	20R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2025A2	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2025A3	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2025A4	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2033A1	20R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2033A2	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2033A3	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2033A4	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2041A1	20R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2041A2	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2041A3	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2041A4	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2050A1	20R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2050A2	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2050A3	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2050A4	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2057A1	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2057A2	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2057A3	40R	M62 J25 - J30	
17/09/15 09:21:09	SIG	M62/2057J1	20R	M62 J25 - J30	
17/09/15 09:21:14	SIG	M62/2018A1	STOP	M62 J25 - J30	
17/09/15 09:21:14	SIG	M62/2025A1	STOP	M62 J25 - J30	
17/09/15 09:21:14	SIG	M62/2033A1	STOP	M62 J25 - J30	
17/09/15 09:21:14	SIG	M62/2041A1	STOP	M62 J25 - J30	
17/09/15 09:21:14	SIG	M62/2050A1	STOP	M62 J25 - J30	
17/09/15 09:21:14	SIG	M62/2057J1	STOP	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2033A1	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2033A2	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2033A3	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2033A4	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2041A1	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2041A2	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2041A3	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2041A4	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2050A1	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2050A2	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2050A3	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2050A4	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2057A1	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2057A2	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2057A3	60R	M62 J25 - J30	
17/09/15 09:25:42	SIG	M62/2057J1	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 09:26:16	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2008K1	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2008K2	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2012A2	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2012A3	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2018A1	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2018A2	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2018A3	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2018A4	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2025A1	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2025A2	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2025A3	60R	M62 J25 - J30	
17/09/15 09:26:16	SIG	M62/2025A4	60R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 09:27:29	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2008K1	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2008K2	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2012A1	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2012A2	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2012A3	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2018A1	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2018A2	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2018A3	50R	M62 J25 - J30	
17/09/15 09:27:29	SIG	M62/2018A4	50R	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1974A1	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1974A2	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1974A3	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1974A4	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1979K1	OFF	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1979K2	OFF	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1981A1	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1981A2	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1981A3	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1981A4	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1987A1	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1987A3	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1987J1	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1992A1	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1992A2	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1992A3	NR	M62 J25 - J30	
17/09/15 09:30:13	SIG	M62/1992J1	NR	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1955K1	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1955K2	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1956A1	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1956A2	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1956A3	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1960A1	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1960A2	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1960A3	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1960K1	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1960K2	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1968A1	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1968A2	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1968A3	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1968A4	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1974A1	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1974A2	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1974A3	OFF	M62 J25 - J30	
17/09/15 09:31:03	SIG	M62/1974A4	OFF	M62 J25 - J30	
17/09/15 09:32:03	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 09:32:03	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2008K1	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2008K2	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2012A1	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2012A2	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2012A3	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2018A1	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2018A2	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2018A3	60R	M62 J25 - J30	
17/09/15 09:32:03	SIG	M62/2018A4	60R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2018B1	30R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2018B2	30R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2018B3	30R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2025B1	30R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2025B2	30R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2025B3	30R	M62 J25 - J30	
17/09/15 09:32:13	SIG	M62/2025B4	30R	M62 J25 - J30	
17/09/15 09:32:19	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2018B1	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2018B2	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2018B3	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2018L1	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2025B1	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2025B2	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2025B3	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2025B4	30R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2033B1	50R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 09:32:24	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 09:33:13	SIG	M62/1981A1	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1981A2	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1981A3	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1981A4	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1987A1	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1987A3	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1987J1	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1992A1	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1992A2	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1992A3	OFF	M62 J25 - J30	
17/09/15 09:33:23	SIG	M62/1992J1	OFF	M62 J25 - J30	
17/09/15 09:34:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:34:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:34:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:34:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:35:03	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 09:35:04	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 09:36:03	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 09:36:03	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 09:36:03	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 09:36:03	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 09:36:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:36:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:36:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 09:37:54	SIG	M62/2018B2	30R	M62 J25 - J30	
17/09/15 09:37:54	SIG	M62/2018B3	30R	M62 J25 - J30	
17/09/15 09:37:54	SIG	M62/2025B3	30R	M62 J25 - J30	
17/09/15 09:37:54	SIG	M62/2025B4	30R	M62 J25 - J30	
17/09/15 09:42:02	SIG	M62/2147B1	50R	M62 J25 - J30	
17/09/15 09:42:02	SIG	M62/2147B2	50R	M62 J25 - J30	
17/09/15 09:42:02	SIG	M62/2147B3	50R	M62 J25 - J30	
17/09/15 09:42:02	SIG	M62/2147B4	50R	M62 J25 - J30	
17/09/15 09:42:03	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 09:42:03	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 09:42:03	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 09:42:03	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2137B1	NR	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2137B3	NR	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2137B4	NR	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2147B1	40R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2147B2	40R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2147B3	40R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2147B4	40R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2159B1	60R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2159B2	60R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2159M1	60R	M62 J25 - J30	
17/09/15 09:42:07	SIG	M62/2159M2	60R	M62 J25 - J30	
17/09/15 09:42:08	SIG	M62/2132B1	NR	M62 J25 - J30	
17/09/15 09:42:08	SIG	M62/2132B2	NR	M62 J25 - J30	
17/09/15 09:42:08	SIG	M62/2132B3	NR	M62 J25 - J30	
17/09/15 09:42:08	SIG	M62/2137B1	60R	M62 J25 - J30	
17/09/15 09:42:08	SIG	M62/2137B3	60R	M62 J25 - J30	
17/09/15 09:42:08	SIG	M62/2137B4	60R	M62 J25 - J30	
17/09/15 09:44:16	SIG	M62/2159B1	50R	M62 J25 - J30	
17/09/15 09:44:16	SIG	M62/2159B2	50R	M62 J25 - J30	
17/09/15 09:44:16	SIG	M62/2159M1	50R	M62 J25 - J30	
17/09/15 09:44:16	SIG	M62/2159M2	50R	M62 J25 - J30	
17/09/15 09:44:22	SIG	M62/2159B1	40R	M62 J25 - J30	
17/09/15 09:44:22	SIG	M62/2159B2	40R	M62 J25 - J30	
17/09/15 09:44:22	SIG	M62/2159M1	40R	M62 J25 - J30	
17/09/15 09:44:22	SIG	M62/2159M2	40R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2137B1	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2137B3	50R	M62 J25 - J30	
17/09/15 09:44:30	SIG	M62/2137B4	50R	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2125B1	OFF	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2125B2	OFF	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2125B3	OFF	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2125L1	OFF	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2125L2	OFF	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2132B1	NR	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2132B2	NR	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2132B3	NR	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2137B1	60R	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2137B3	60R	M62 J25 - J30	
17/09/15 09:46:01	SIG	M62/2137B4	60R	M62 J25 - J30	
17/09/15 09:48:16	SIG	M62/2147B1	60R	M62 J25 - J30	
17/09/15 09:48:16	SIG	M62/2147B2	60R	M62 J25 - J30	
17/09/15 09:48:16	SIG	M62/2147B3	60R	M62 J25 - J30	
17/09/15 09:48:16	SIG	M62/2147B4	60R	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/1999A1	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/1999A2	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/1999A3	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/1999J1	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/1999J2	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/2004A1	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/2004A2	OFF	M62 J25 - J30	
17/09/15 09:51:03	SIG	M62/2004A3	OFF	M62 J25 - J30	
17/09/15 09:53:37	SIG	M62/2079A1	HSD	M62 J25 - J30	
17/09/15 09:54:18	SIG	M62/2088A1	HSD	M62 J25 - J30	
17/09/15 09:55:24	SIG	M62/2097A1	HSD	M62 J25 - J30	
17/09/15 09:55:25	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 09:56:03	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 09:56:03	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 09:56:03	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 09:56:03	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 09:56:15	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2088B1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2097B1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2097B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2097B4	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2106B1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2113B1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 09:56:24	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 09:56:32	SIG	M62/2106A1	HSD	M62 J25 - J30	
17/09/15 09:56:33	SIG	M62/2088A1	REDX	M62 J25 - J30	
17/09/15 09:57:40	SIG	M62/2097A1	REDX	M62 J25 - J30	
17/09/15 09:58:49	SIG	M62/2106A1	REDX	M62 J25 - J30	
17/09/15 09:59:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 09:59:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 09:59:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 09:59:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 09:59:48	SIG	M62/2065A2	NR	M62 J25 - J30	
17/09/15 09:59:48	SIG	M62/2065A3	NR	M62 J25 - J30	
17/09/15 09:59:48	SIG	M62/2065A4	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2073K1	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2079A2	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2079A3	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2079A4	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2088A2	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2088A3	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2088A4	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2097A2	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2097A3	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2097A4	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2106A2	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2106A3	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2106A4	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2114A1	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2114A2	NR	M62 J25 - J30	
17/09/15 10:00:17	SIG	M62/2114A3	NR	M62 J25 - J30	
17/09/15 10:00:59	SIG	M62/2073K1	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2079A1	BLNK	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2079A2	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2079A3	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2079A4	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2088A1	BLNK	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2088A2	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2088A3	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2088A4	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2097A1	BLNK	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2097A2	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2097A3	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2097A4	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2106A1	BLNK	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2106A2	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2106A4	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2114A1	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2114A2	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2114A3	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2117A1	BLNK	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2117A2	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2117A3	OFF	M62 J25 - J30	
17/09/15 10:01:10	SIG	M62/2117A4	OFF	M62 J25 - J30	
17/09/15 10:03:50	SIG	M62/2147B1	50R	M62 J25 - J30	
17/09/15 10:03:50	SIG	M62/2147B2	50R	M62 J25 - J30	
17/09/15 10:03:50	SIG	M62/2147B3	50R	M62 J25 - J30	
17/09/15 10:03:50	SIG	M62/2147B4	50R	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2065B2	60R	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2065B3	60R	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2065B4	60R	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2125B1	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2125B2	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2125B3	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2132B1	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2132B2	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M62/2132B3	NR	M62 J25 - J30	
17/09/15 10:05:17	SIG	M621/1002B1	60R	M62 J25 - J30	
17/09/15 10:05:17	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2088B1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2088B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2088B3	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2088B4	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2097B1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2097B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2097B4	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2106B1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2106B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2106B3	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2106B4	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2113B1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2113B2	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2113B3	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2113B4	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2117B1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2117B3	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2120M1	60R	M62 J25 - J30	
17/09/15 10:05:34	SIG	M62/2120M2	60R	M62 J25 - J30	
17/09/15 10:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:08:17	SIG	M62/2125B1	OFF	M62 J25 - J30	
17/09/15 10:08:18	SIG	M62/2125B2	OFF	M62 J25 - J30	
17/09/15 10:08:18	SIG	M62/2125B3	OFF	M62 J25 - J30	
17/09/15 10:08:18	SIG	M62/2125L1	OFF	M62 J25 - J30	
17/09/15 10:08:18	SIG	M62/2125L2	OFF	M62 J25 - J30	
17/09/15 10:08:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 10:08:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 10:08:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 10:08:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2050B2	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2050B3	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2050B4	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2057B1	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 10:09:34	SIG	M621/1010B1	LDR	M62 J25 - J30	
17/09/15 10:09:34	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2050B2	40R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2050B4	40R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2057B1	40R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 10:09:40	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 10:09:45	SIG	M62/2057B1	30R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2050B2	40R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2050B4	40R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2057B1	20R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 10:09:51	SIG	M621/1002B1	LDR	M62 J25 - J30	
17/09/15 10:09:51	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 10:09:56	SIG	M62/2057B1	STOP	M62 J25 - J30	
17/09/15 10:10:47	SIG	M62/2113B1	HSD	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2050B2	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2050B3	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2050B4	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2057B1	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2057B2	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2057B3	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2057B4	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2065B2	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2065B3	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2065B4	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M621/1002B1	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 10:11:08	SIG	M621/1010B1	NR	M62 J25 - J30	
17/09/15 10:11:08	SIG	M621/1010B2	NR	M62 J25 - J30	
17/09/15 10:11:40	SIG	M62/2106B1	HSD	M62 J25 - J30	
17/09/15 10:12:47	SIG	M62/2097B1	HSD	M62 J25 - J30	
17/09/15 10:12:48	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 10:13:18	SIG	M62/2132B1	NR	M62 J25 - J30	
17/09/15 10:13:18	SIG	M62/2132B2	NR	M62 J25 - J30	
17/09/15 10:13:18	SIG	M62/2132B3	NR	M62 J25 - J30	
17/09/15 10:13:18	SIG	M62/2137B1	NR	M62 J25 - J30	
17/09/15 10:13:18	SIG	M62/2137B3	NR	M62 J25 - J30	
17/09/15 10:13:18	SIG	M62/2137B4	NR	M62 J25 - J30	
17/09/15 10:13:55	SIG	M62/2088B1	HSD	M62 J25 - J30	
17/09/15 10:13:56	SIG	M62/2106B1	REDX	M62 J25 - J30	
17/09/15 10:14:08	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 10:14:09	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 10:15:04	SIG	M62/2097B1	REDX	M62 J25 - J30	
17/09/15 10:16:12	SIG	M62/2088B1	REDX	M62 J25 - J30	
17/09/15 10:16:18	SIG	M62/2132B1	OFF	M62 J25 - J30	
17/09/15 10:16:18	SIG	M62/2132B2	OFF	M62 J25 - J30	
17/09/15 10:16:18	SIG	M62/2132B3	OFF	M62 J25 - J30	
17/09/15 10:16:36	SIG	M62/2159B1	50R	M62 J25 - J30	
17/09/15 10:16:36	SIG	M62/2159B2	50R	M62 J25 - J30	
17/09/15 10:16:36	SIG	M62/2159M1	50R	M62 J25 - J30	
17/09/15 10:16:36	SIG	M62/2159M2	50R	M62 J25 - J30	
17/09/15 10:17:05	SIG	M62/2117B1	NR	M62 J25 - J30	
17/09/15 10:17:05	SIG	M62/2117B3	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2088B2	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2088B3	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2088B4	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2097B2	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2097B4	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2106B2	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2106B3	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2106B4	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2113B2	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2113B3	NR	M62 J25 - J30	
17/09/15 10:17:15	SIG	M62/2113B4	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2074B2	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2074B3	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2074B4	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2081B1	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2081B2	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2081B3	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2081L1	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2120M1	NR	M62 J25 - J30	
17/09/15 10:17:16	SIG	M62/2120M2	NR	M62 J25 - J30	
17/09/15 10:18:05	SIG	M62/2120M1	OFF	M62 J25 - J30	
17/09/15 10:18:05	SIG	M62/2120M2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2074B1	BLNK	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2074B2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2074B3	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2074B4	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2081B1	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2081B2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2081B3	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2081L1	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2088B1	BLNK	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2088B2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2088B3	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2088B4	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2097B1	BLNK	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2097B2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2097B4	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2106B1	BLNK	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2106B3	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2113B1	BLNK	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2113B2	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2113B3	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2113B4	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 10:18:15	SIG	M62/2117B3	OFF	M62 J25 - J30	
17/09/15 10:23:23	SIG	M62/2057B1	HSD	M62 J25 - J30	
17/09/15 10:24:39	SIG	M62/2147B1	40R	M62 J25 - J30	
17/09/15 10:24:39	SIG	M62/2147B2	40R	M62 J25 - J30	
17/09/15 10:24:39	SIG	M62/2147B3	40R	M62 J25 - J30	
17/09/15 10:24:39	SIG	M62/2147B4	40R	M62 J25 - J30	
17/09/15 10:24:39	SIG	M62/2159M1	40R	M62 J25 - J30	
17/09/15 10:24:39	SIG	M62/2159M2	40R	M62 J25 - J30	
17/09/15 10:24:44	SIG	M62/2147B1	30R	M62 J25 - J30	
17/09/15 10:24:44	SIG	M62/2159M1	30R	M62 J25 - J30	
17/09/15 10:24:44	SIG	M62/2159M2	30R	M62 J25 - J30	
17/09/15 10:24:49	SIG	M62/2147B1	20R	M62 J25 - J30	
17/09/15 10:24:49	SIG	M62/2147B2	40R	M62 J25 - J30	
17/09/15 10:24:49	SIG	M62/2147B3	40R	M62 J25 - J30	
17/09/15 10:24:49	SIG	M62/2147B4	40R	M62 J25 - J30	
17/09/15 10:24:49	SIG	M62/2159M1	30R	M62 J25 - J30	
17/09/15 10:24:49	SIG	M62/2159M2	30R	M62 J25 - J30	
17/09/15 10:24:54	SIG	M62/2147B1	STOP	M62 J25 - J30	
17/09/15 10:25:22	SIG	M62/2041B1	HSD	M62 J25 - J30	
17/09/15 10:25:22	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 10:25:22	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 10:25:22	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 10:25:22	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 10:25:55	SIG	M62/1968A1	50R	M62 J25 - J30	
17/09/15 10:25:55	SIG	M62/1968A2	50R	M62 J25 - J30	
17/09/15 10:25:55	SIG	M62/1968A3	50R	M62 J25 - J30	
17/09/15 10:25:55	SIG	M62/1968A4	50R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1960A1	50R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1960A2	50R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1960A3	50R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1960K1	50R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1960K2	50R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1968A1	40R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1968A2	40R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1968A3	40R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1968A4	40R	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1974A1	NR	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1974A2	NR	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1974A3	NR	M62 J25 - J30	
17/09/15 10:26:00	SIG	M62/1974A4	NR	M62 J25 - J30	
17/09/15 10:26:02	SIG	M62/2147B1	50R	M62 J25 - J30	
17/09/15 10:26:02	SIG	M62/2147B2	50R	M62 J25 - J30	
17/09/15 10:26:02	SIG	M62/2147B3	50R	M62 J25 - J30	
17/09/15 10:26:02	SIG	M62/2147B4	50R	M62 J25 - J30	
17/09/15 10:26:02	SIG	M62/2159M1	50R	M62 J25 - J30	
17/09/15 10:26:02	SIG	M62/2159M2	50R	M62 J25 - J30	
17/09/15 10:26:22	SIG	M62/2033B1	HSD	M62 J25 - J30	
17/09/15 10:27:22	SIG	M62/2025B1	HSD	M62 J25 - J30	
17/09/15 10:27:22	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 10:28:14	SIG	M62/2033B1	REDX	M62 J25 - J30	
17/09/15 10:28:58	SIG	M62/2025B1	REDX	M62 J25 - J30	
17/09/15 10:29:28	SIG	M62/2065B2	NR	M62 J25 - J30	
17/09/15 10:29:28	SIG	M62/2065B3	NR	M62 J25 - J30	
17/09/15 10:29:28	SIG	M62/2065B4	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1960A1	OFF	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1960A2	OFF	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1960A3	OFF	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1960K1	OFF	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1960K2	OFF	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1968A1	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1968A2	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1968A3	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1968A4	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1974A1	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1974A2	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1974A3	NR	M62 J25 - J30	
17/09/15 10:29:55	SIG	M62/1974A4	NR	M62 J25 - J30	
17/09/15 10:30:28	SIG	M62/2069M1	OFF	M62 J25 - J30	
17/09/15 10:30:28	SIG	M62/2069M2	OFF	M62 J25 - J30	
17/09/15 10:30:29	SIG	M62/2065B1	BLNK	M62 J25 - J30	
17/09/15 10:30:29	SIG	M62/2065B2	OFF	M62 J25 - J30	
17/09/15 10:30:29	SIG	M62/2065B3	OFF	M62 J25 - J30	
17/09/15 10:30:29	SIG	M62/2065B4	OFF	M62 J25 - J30	
17/09/15 10:32:56	SIG	M62/1968A1	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1968A2	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1968A3	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1968A4	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1974A1	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1974A2	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1974A3	OFF	M62 J25 - J30	
17/09/15 10:32:57	SIG	M62/1974A4	OFF	M62 J25 - J30	
17/09/15 10:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:44:42	SIG	M62/2097B3	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2012B1	BLNK	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2012B2	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2012B3	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2012B4	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2018B1	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2018B2	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2018B3	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2018L1	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2025B2	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2025B3	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2025B4	OFF	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 10:48:04	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2025B1	BLNK	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2033B2	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2033B3	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2033B4	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2041B2	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2041B3	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2041B4	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2050B2	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2050B3	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2050B4	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2057B1	BLNK	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2057B2	OFF	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2057B3	OFF	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2057B4	OFF	M62 J25 - J30	
17/09/15 10:50:04	SIG	M62/2065M1	NR	M62 J25 - J30	
17/09/15 10:50:04	SIG	M621/1002B1	OFF	M62 J25 - J30	
17/09/15 10:50:04	SIG	M621/1002B2	OFF	M62 J25 - J30	
17/09/15 10:50:04	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 10:50:04	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2012B1	REDX	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2012B2	NR	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2012B3	NR	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2012B4	NR	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2025B2	30R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2025B3	30R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2025B4	30R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2050B2	60R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2050B3	60R	M62 J25 - J30	
17/09/15 10:52:04	SIG	M62/2050B4	60R	M62 J25 - J30	
17/09/15 10:53:05	SIG	M62/2065M1	OFF	M62 J25 - J30	
17/09/15 10:54:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:54:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:54:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:54:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2012B1	BLNK	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2012B2	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2012B3	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2012B4	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2025B1	BLNK	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2025B2	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2025B3	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2025B4	OFF	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2033B2	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2033B3	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2033B4	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2041B2	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2041B3	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2041B4	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2050B2	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2050B3	NR	M62 J25 - J30	
17/09/15 10:56:04	SIG	M62/2050B4	NR	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2147B1	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2147B2	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2147B3	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2147B4	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2159B1	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2159B2	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2159M1	60R	M62 J25 - J30	
17/09/15 10:57:20	SIG	M62/2159M2	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2050B2	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2050B3	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2050B4	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2057B2	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2057B3	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2057B4	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 10:58:04	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 10:58:04	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 11:00:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 11:00:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 11:00:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 11:00:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 11:01:05	SIG	M62/2177B1	OFF	M62 J25 - J30	
17/09/15 11:01:05	SIG	M62/2177B2	OFF	M62 J25 - J30	
17/09/15 11:01:05	SIG	M62/2177L1	OFF	M62 J25 - J30	
17/09/15 11:01:05	SIG	M62/2177L2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2033B1	BLNK	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2033B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2033B4	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2041B1	BLNK	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2041B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2041B3	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2041B4	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2050B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2050B3	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2050B4	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2057B1	BLNK	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2057B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2057B3	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2057B4	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2065M1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2137B1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2137B3	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2137B4	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2147B1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2147B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2147B3	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2147B4	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2159B1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2159B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2159M1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2159M2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2170B1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2170B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2170L1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M62/2170L2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M621/1002B1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M621/1002B2	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 11:06:05	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 11:16:01	SIG	M62/1968B1	NR	M62 J25 - J30	
17/09/15 11:16:01	SIG	M62/1968B2	NR	M62 J25 - J30	
17/09/15 11:16:01	SIG	M62/1968B3	NR	M62 J25 - J30	
17/09/15 11:16:01	SIG	M62/1968L1	NR	M62 J25 - J30	
17/09/15 11:16:01	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 11:16:01	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 12:03:05	SIG	M62/1968B1	OFF	M62 J25 - J30	
17/09/15 12:03:05	SIG	M62/1968B2	OFF	M62 J25 - J30	
17/09/15 12:03:05	SIG	M62/1968B3	OFF	M62 J25 - J30	
17/09/15 12:03:05	SIG	M62/1968L1	OFF	M62 J25 - J30	
17/09/15 12:03:05	SIG	M62/1974M1	OFF	M62 J25 - J30	
17/09/15 12:03:05	SIG	M62/1974M2	OFF	M62 J25 - J30	
17/09/15 13:26:42	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M62/2050B2	50R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M62/2050B3	50R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M62/2050B4	50R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 13:26:42	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2033B1	REDX	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2033B2	NR	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2033B3	NR	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2033B4	NR	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2041B2	40R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2041B4	40R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2050B2	40R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2050B4	40R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 13:26:47	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 13:26:47	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 13:28:08	SIG	M62/2065B1	REDX	M62 J25 - J30	
17/09/15 13:28:08	SIG	M62/2065B2	60R	M62 J25 - J30	
17/09/15 13:28:08	SIG	M62/2065B3	60R	M62 J25 - J30	
17/09/15 13:28:08	SIG	M62/2065B4	60R	M62 J25 - J30	
17/09/15 13:30:07	SIG	M62/2069M1	60R	M62 J25 - J30	
17/09/15 13:30:07	SIG	M62/2069M2	60R	M62 J25 - J30	
17/09/15 13:30:07	SIG	M62/2074B1	REDX	M62 J25 - J30	
17/09/15 13:30:07	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 13:30:07	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 13:30:07	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2041B3	30R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2041B4	30R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2050B3	30R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2050B4	30R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2074B4	LDL	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 13:30:38	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2041B3	20R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2041B4	20R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2050B3	20R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2050B4	20R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2057B3	LDL	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2057B4	LDL	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2065B3	LDL	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2065B4	LDL	M62 J25 - J30	
17/09/15 13:30:43	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 13:30:43	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 13:30:49	SIG	M62/2041B3	STOP	M62 J25 - J30	
17/09/15 13:30:49	SIG	M62/2041B4	STOP	M62 J25 - J30	
17/09/15 13:30:49	SIG	M62/2050B3	STOP	M62 J25 - J30	
17/09/15 13:30:49	SIG	M62/2050B4	STOP	M62 J25 - J30	
17/09/15 13:30:54	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2041B4	40R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2050B4	40R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2081B1	OFF	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2081B2	OFF	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2081B3	OFF	M62 J25 - J30	
17/09/15 13:30:58	SIG	M62/2081L1	NR	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2041B4	40R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2050B4	40R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 13:31:03	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2041B2	30R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2041B3	30R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2050B2	30R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2050B3	30R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2074B2	LDR	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 13:31:15	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2041B1	STOP	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2041B2	20R	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2041B3	20R	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2050B2	20R	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2050B3	20R	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2057B2	LDR	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2057B3	LDR	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2065B2	LDR	M62 J25 - J30	
17/09/15 13:31:20	SIG	M62/2065B3	LDR	M62 J25 - J30	
17/09/15 13:31:26	SIG	M62/2041B1	STOP	M62 J25 - J30	
17/09/15 13:31:26	SIG	M62/2041B2	STOP	M62 J25 - J30	
17/09/15 13:31:26	SIG	M62/2041B3	STOP	M62 J25 - J30	
17/09/15 13:31:26	SIG	M62/2050B2	STOP	M62 J25 - J30	
17/09/15 13:31:26	SIG	M62/2050B3	STOP	M62 J25 - J30	
17/09/15 13:31:45	SIG	M62/2065B4	40R	M62 J25 - J30	
17/09/15 13:31:45	SIG	M62/2065M1	40R	M62 J25 - J30	
17/09/15 13:31:45	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 13:31:45	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 13:31:45	SIG	M621/1002B2	40R	M62 J25 - J30	
17/09/15 13:31:45	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 13:31:45	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2081B1	OFF	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2081B2	OFF	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2081B3	OFF	M62 J25 - J30	
17/09/15 13:32:23	SIG	M62/2081L1	NR	M62 J25 - J30	
17/09/15 13:32:29	SIG	M62/2050B2	LDR	M62 J25 - J30	
17/09/15 13:32:29	SIG	M62/2050B3	LDR	M62 J25 - J30	
17/09/15 13:32:29	SIG	M62/2065B3	40R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M62/2069M1	40R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M62/2069M2	40R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 13:32:41	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2074B2	40R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2074B3	40R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2074B4	40R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 13:32:46	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2081B1	40R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2081B2	40R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2081B3	40R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2081L1	40R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2088B1	REDX	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 13:37:52	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2097B1	REDX	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2097B2	60R	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2097B3	60R	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2097B4	60R	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2106B1	REDX	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2106B2	60R	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2106B3	60R	M62 J25 - J30	
17/09/15 13:38:07	SIG	M62/2106B4	60R	M62 J25 - J30	
17/09/15 13:40:03	SIG	M62/2088B2	40R	M62 J25 - J30	
17/09/15 13:40:03	SIG	M62/2088B3	40R	M62 J25 - J30	
17/09/15 13:40:03	SIG	M62/2088B4	40R	M62 J25 - J30	
17/09/15 13:41:07	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 13:41:07	SIG	M62/2113B2	60R	M62 J25 - J30	
17/09/15 13:41:07	SIG	M62/2113B3	60R	M62 J25 - J30	
17/09/15 13:41:07	SIG	M62/2113B4	60R	M62 J25 - J30	
17/09/15 13:42:07	SIG	M62/2097B2	50R	M62 J25 - J30	
17/09/15 13:42:07	SIG	M62/2097B3	50R	M62 J25 - J30	
17/09/15 13:42:07	SIG	M62/2097B4	50R	M62 J25 - J30	
17/09/15 13:43:26	SIG	M62/2097B2	40R	M62 J25 - J30	
17/09/15 13:43:26	SIG	M62/2097B3	40R	M62 J25 - J30	
17/09/15 13:43:26	SIG	M62/2097B4	40R	M62 J25 - J30	
17/09/15 13:44:07	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 13:44:07	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 13:44:07	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 13:46:08	SIG	M62/2117B1	60R	M62 J25 - J30	
17/09/15 13:46:08	SIG	M62/2117B3	60R	M62 J25 - J30	
17/09/15 13:46:08	SIG	M62/2120M1	60R	M62 J25 - J30	
17/09/15 13:46:08	SIG	M62/2120M2	60R	M62 J25 - J30	
17/09/15 13:46:58	SIG	M62/2106B2	40R	M62 J25 - J30	
17/09/15 13:46:58	SIG	M62/2106B3	40R	M62 J25 - J30	
17/09/15 13:46:58	SIG	M62/2106B4	40R	M62 J25 - J30	
17/09/15 13:46:58	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 13:46:58	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 13:46:58	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2041B2	40R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2050B2	50R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2050B3	50R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 13:47:20	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2041B2	40R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2050B2	40R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 13:47:25	SIG	M62/2065B2	40R	M62 J25 - J30	
17/09/15 13:47:30	SIG	M62/2041B3	30R	M62 J25 - J30	
17/09/15 13:47:30	SIG	M62/2041B4	30R	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2041B3	20R	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2041B4	20R	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2050B3	LDL	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2050B4	LDL	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2057B3	LDL	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2057B4	LDL	M62 J25 - J30	
17/09/15 13:47:35	SIG	M62/2065B4	LDL	M62 J25 - J30	
17/09/15 13:47:40	SIG	M62/2041B3	STOP	M62 J25 - J30	
17/09/15 13:47:40	SIG	M62/2041B4	STOP	M62 J25 - J30	
17/09/15 13:48:47	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 13:48:47	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 13:48:48	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 13:48:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 13:49:07	SIG	M62/2125B1	60R	M62 J25 - J30	
17/09/15 13:49:07	SIG	M62/2125B2	60R	M62 J25 - J30	
17/09/15 13:49:07	SIG	M62/2125B3	60R	M62 J25 - J30	
17/09/15 13:49:07	SIG	M62/2125L1	60R	M62 J25 - J30	
17/09/15 13:49:07	SIG	M62/2125L2	60R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2113B2	40R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2113B3	40R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2113B4	40R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 13:50:38	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 13:52:21	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 13:52:21	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 13:52:21	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 13:52:22	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 13:52:22	SIG	M62/2117B3	40R	M62 J25 - J30	
17/09/15 13:52:22	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 13:52:22	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 13:54:05	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 13:54:05	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 13:54:05	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2012B1	REDX	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2012B2	NR	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2012B3	NR	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2012B4	NR	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2025B1	REDX	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 13:54:06	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 13:54:58	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 13:54:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 13:55:04	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 13:55:12	SIG	M62/2125B1	40R	M62 J25 - J30	
17/09/15 13:55:12	SIG	M62/2125B2	40R	M62 J25 - J30	
17/09/15 13:55:12	SIG	M62/2125B3	40R	M62 J25 - J30	
17/09/15 13:55:12	SIG	M62/2125L1	50R	M62 J25 - J30	
17/09/15 13:55:12	SIG	M62/2125L2	50R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2125B1	40R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2125B2	40R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2125B3	40R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2125L1	40R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2125L2	40R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 13:55:17	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 13:55:50	SIG	M62/2025B1	50R	M62 J25 - J30	
17/09/15 13:56:09	SIG	M62/2033B1	60R	M62 J25 - J30	
17/09/15 13:56:25	SIG	M62/2041B1	40R	M62 J25 - J30	
17/09/15 13:56:43	SIG	M62/2057B1	40R	M62 J25 - J30	
17/09/15 13:56:43	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 13:56:48	SIG	M62/2057B1	40R	M62 J25 - J30	
17/09/15 13:56:48	SIG	M621/1002B1	40R	M62 J25 - J30	
17/09/15 13:56:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 13:56:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 13:56:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 13:56:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 13:58:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 13:58:04	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 13:58:09	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:00:08	SIG	M62/2137B1	60R	M62 J25 - J30	
17/09/15 14:00:08	SIG	M62/2137B2	60R	M62 J25 - J30	
17/09/15 14:00:08	SIG	M62/2137B3	60R	M62 J25 - J30	
17/09/15 14:00:08	SIG	M62/2137B4	60R	M62 J25 - J30	
17/09/15 14:01:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:01:09	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:01:14	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2132B1	40R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2132B2	40R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2132B3	40R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2137B1	50R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2137B3	50R	M62 J25 - J30	
17/09/15 14:02:03	SIG	M62/2137B4	50R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2147B1	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2147B2	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2147B3	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2147B4	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2159B1	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2159B2	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2159M1	60R	M62 J25 - J30	
17/09/15 14:02:08	SIG	M62/2159M2	60R	M62 J25 - J30	
17/09/15 14:04:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:04:14	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:04:19	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 14:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 14:07:08	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 14:07:08	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 14:07:08	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 14:07:08	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 14:07:13	SIG	M62/2137B1	40R	M62 J25 - J30	
17/09/15 14:07:13	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:07:13	SIG	M62/2137B3	40R	M62 J25 - J30	
17/09/15 14:07:13	SIG	M62/2137B4	40R	M62 J25 - J30	
17/09/15 14:07:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:07:19	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:07:23	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:07:23	SIG	M62/2147B1	50R	M62 J25 - J30	
17/09/15 14:07:23	SIG	M62/2147B2	50R	M62 J25 - J30	
17/09/15 14:07:23	SIG	M62/2147B3	50R	M62 J25 - J30	
17/09/15 14:07:23	SIG	M62/2147B4	50R	M62 J25 - J30	
17/09/15 14:07:25	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:07:33	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:07:50	SIG	M62/2137B2	40R	M62 J25 - J30	
17/09/15 14:07:50	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 14:09:01	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 14:09:01	SIG	M62/2147B1	40R	M62 J25 - J30	
17/09/15 14:09:01	SIG	M62/2147B2	40R	M62 J25 - J30	
17/09/15 14:09:01	SIG	M62/2147B3	40R	M62 J25 - J30	
17/09/15 14:09:01	SIG	M62/2147B4	40R	M62 J25 - J30	
17/09/15 14:09:02	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:09:07	SIG	M62/2137B2	40R	M62 J25 - J30	
17/09/15 14:10:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:10:24	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:10:30	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:12:08	SIG	M62/2159B1	50R	M62 J25 - J30	
17/09/15 14:12:08	SIG	M62/2159B2	50R	M62 J25 - J30	
17/09/15 14:12:08	SIG	M62/2159M1	50R	M62 J25 - J30	
17/09/15 14:12:08	SIG	M62/2159M2	50R	M62 J25 - J30	
17/09/15 14:13:14	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:13:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:13:30	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:13:35	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:14:35	SIG	M62/2159B1	40R	M62 J25 - J30	
17/09/15 14:14:35	SIG	M62/2159B2	40R	M62 J25 - J30	
17/09/15 14:14:35	SIG	M62/2159M1	40R	M62 J25 - J30	
17/09/15 14:14:35	SIG	M62/2159M2	40R	M62 J25 - J30	
17/09/15 14:16:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:16:40	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:16:45	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:18:23	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:18:35	SIG	M62/2159B1	50R	M62 J25 - J30	
17/09/15 14:18:35	SIG	M62/2159B2	50R	M62 J25 - J30	
17/09/15 14:18:35	SIG	M62/2159M1	50R	M62 J25 - J30	
17/09/15 14:18:35	SIG	M62/2159M2	50R	M62 J25 - J30	
17/09/15 14:19:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:19:41	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:19:46	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:21:20	SIG	M62/2159B1	40R	M62 J25 - J30	
17/09/15 14:21:20	SIG	M62/2159B2	40R	M62 J25 - J30	
17/09/15 14:21:20	SIG	M62/2159M1	40R	M62 J25 - J30	
17/09/15 14:21:20	SIG	M62/2159M2	40R	M62 J25 - J30	
17/09/15 14:22:46	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:22:46	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:22:52	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:23:10	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 14:25:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:25:52	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:25:57	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:28:08	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 14:28:08	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 14:28:08	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 14:28:08	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 14:28:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:28:57	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:29:02	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:32:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:32:03	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:32:08	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:34:09	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 14:34:09	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 14:34:10	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 14:35:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:35:09	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:35:14	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 14:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 14:38:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:38:15	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:38:20	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 14:40:11	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 14:41:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:41:20	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:41:26	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:44:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:44:26	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:44:31	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 14:46:09	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 14:47:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:47:38	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:47:44	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:50:38	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:50:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:50:44	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:52:18	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 14:52:18	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 14:52:18	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 14:53:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:53:42	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:53:47	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:54:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 14:54:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 14:54:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 14:54:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 14:56:10	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 14:56:10	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 14:56:10	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 14:56:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:56:49	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 14:56:54	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 14:59:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 14:59:54	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:00:00	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2194B1	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2194B2	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2194B3	60R	M62 J25 - J30	
17/09/15 15:01:09	SIG	M62/2194B4	60R	M62 J25 - J30	
17/09/15 15:02:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:03:00	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:03:05	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:05:33	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 15:05:33	SIG	M62/2050B3	50R	M62 J25 - J30	
17/09/15 15:05:33	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 15:05:33	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 15:05:38	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 15:05:38	SIG	M62/2050B3	40R	M62 J25 - J30	
17/09/15 15:05:38	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 15:05:38	SIG	M62/2065B4	40R	M62 J25 - J30	
17/09/15 15:06:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:06:05	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 15:06:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 15:06:10	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:06:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:09:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:09:10	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:09:15	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:11:05	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 15:11:06	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 15:12:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:12:15	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:12:21	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 15:14:30	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 15:15:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:15:20	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:15:26	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:16:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:16:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:16:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:16:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:17:04	SIG	M62/2050B4	50R	M62 J25 - J30	
17/09/15 15:17:04	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 15:17:09	SIG	M62/2041B1	50R	M62 J25 - J30	
17/09/15 15:17:09	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 15:17:09	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 15:17:09	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 15:17:09	SIG	M62/2050B4	40R	M62 J25 - J30	
17/09/15 15:17:09	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 15:18:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 15:18:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:18:26	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:18:32	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:21:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:21:19	SIG	M62/2189B1	50R	M62 J25 - J30	
17/09/15 15:21:19	SIG	M62/2189B2	50R	M62 J25 - J30	
17/09/15 15:21:19	SIG	M62/2189B3	50R	M62 J25 - J30	
17/09/15 15:21:19	SIG	M62/2189B4	50R	M62 J25 - J30	
17/09/15 15:21:29	SIG	M62/2050B2	50R	M62 J25 - J30	
17/09/15 15:21:29	SIG	M62/2050B3	50R	M62 J25 - J30	
17/09/15 15:21:29	SIG	M62/2050B4	50R	M62 J25 - J30	
17/09/15 15:21:37	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:21:38	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:21:43	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:21:52	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 15:21:52	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 15:21:52	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 15:22:30	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 15:22:30	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 15:22:30	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 15:22:30	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 15:24:37	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:24:37	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:24:43	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:24:59	SIG	M62/2057B1	50R	M62 J25 - J30	
17/09/15 15:24:59	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 15:24:59	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 15:24:59	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 15:27:09	SIG	M62/2041B1	60R	M62 J25 - J30	
17/09/15 15:27:09	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 15:27:09	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 15:27:09	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 15:27:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:27:42	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:27:47	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:28:57	SIG	M62/2088B1	40R	M62 J25 - J30	
17/09/15 15:30:10	SIG	M62/2097B1	40R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 15:30:19	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 15:30:46	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:30:47	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:30:53	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:31:10	SIG	M62/2050B2	60R	M62 J25 - J30	
17/09/15 15:31:10	SIG	M62/2050B3	60R	M62 J25 - J30	
17/09/15 15:31:10	SIG	M62/2050B4	60R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 15:32:00	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 15:33:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:33:52	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:33:57	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:34:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:34:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:34:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:34:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 15:36:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 15:36:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2097B1	50R	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2097B2	50R	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2097B3	50R	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2097B4	50R	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 15:36:30	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 15:36:55	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 15:36:55	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 15:36:55	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 15:36:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:36:57	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:37:02	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:38:08	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 15:38:08	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 15:38:08	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 15:38:08	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 15:39:02	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 15:39:30	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 15:39:30	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 15:39:30	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 15:39:30	SIG	M62/2125L1	50R	M62 J25 - J30	
17/09/15 15:39:30	SIG	M62/2125L2	50R	M62 J25 - J30	
17/09/15 15:39:47	SIG	M62/2113B2	40R	M62 J25 - J30	
17/09/15 15:39:47	SIG	M62/2113B3	40R	M62 J25 - J30	
17/09/15 15:39:47	SIG	M62/2113B4	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2097B1	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2097B2	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2097B3	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2097B4	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2106B2	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2106B3	40R	M62 J25 - J30	
17/09/15 15:40:11	SIG	M62/2106B4	40R	M62 J25 - J30	
17/09/15 15:41:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:41:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:41:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:41:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 15:41:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:41:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:41:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:41:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:42:07	SIG	M62/2106B1	40R	M62 J25 - J30	
17/09/15 15:42:11	SIG	M62/2113B1	40R	M62 J25 - J30	
17/09/15 15:42:13	SIG	M62/1960B1	50R	M62 J25 - J30	
17/09/15 15:42:13	SIG	M62/1960B2	50R	M62 J25 - J30	
17/09/15 15:42:13	SIG	M62/1960B3	50R	M62 J25 - J30	
17/09/15 15:42:13	SIG	M62/1960L1	50R	M62 J25 - J30	
17/09/15 15:42:13	SIG	M62/1960L2	50R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1960B1	40R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1960B2	40R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1960B3	40R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1960L1	40R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1960L2	40R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 15:42:18	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 15:43:18	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 15:43:18	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 15:43:18	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 15:43:46	SIG	M62/2113B1	50R	M62 J25 - J30	
17/09/15 15:43:46	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 15:43:46	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 15:43:46	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 15:44:38	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 15:44:38	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 15:44:38	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 15:44:38	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1968B1	40R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1968B2	40R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1968B3	40R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1968L1	40R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 15:44:54	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 15:45:10	SIG	M62/1981B1	60R	M62 J25 - J30	
17/09/15 15:45:10	SIG	M62/1981B2	60R	M62 J25 - J30	
17/09/15 15:45:10	SIG	M62/1981B3	60R	M62 J25 - J30	
17/09/15 15:45:10	SIG	M62/1981B4	60R	M62 J25 - J30	
17/09/15 15:45:15	SIG	M62/2137B1	50R	M62 J25 - J30	
17/09/15 15:45:15	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 15:45:15	SIG	M62/2137B3	50R	M62 J25 - J30	
17/09/15 15:45:15	SIG	M62/2137B4	50R	M62 J25 - J30	
17/09/15 15:46:10	SIG	M62/1987B1	60R	M62 J25 - J30	
17/09/15 15:46:10	SIG	M62/1987B2	60R	M62 J25 - J30	
17/09/15 15:46:10	SIG	M62/1987B3	60R	M62 J25 - J30	
17/09/15 15:46:10	SIG	M62/1987B4	60R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1974B1	40R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1974B2	40R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1974B3	40R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1974B4	40R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1974M1	40R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1974M2	40R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1981B1	50R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1981B2	50R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1981B3	50R	M62 J25 - J30	
17/09/15 15:46:34	SIG	M62/1981B4	50R	M62 J25 - J30	
17/09/15 15:47:03	SIG	M62/2106B1	50R	M62 J25 - J30	
17/09/15 15:47:03	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 15:47:03	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 15:47:03	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 15:48:03	SIG	M62/2147B1	50R	M62 J25 - J30	
17/09/15 15:48:03	SIG	M62/2147B2	50R	M62 J25 - J30	
17/09/15 15:48:03	SIG	M62/2147B3	50R	M62 J25 - J30	
17/09/15 15:48:03	SIG	M62/2147B4	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 15:48:29	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 15:49:10	SIG	M62/1992B1	60R	M62 J25 - J30	
17/09/15 15:49:10	SIG	M62/1992B2	60R	M62 J25 - J30	
17/09/15 15:49:10	SIG	M62/1992B3	60R	M62 J25 - J30	
17/09/15 15:49:10	SIG	M62/1992B4	60R	M62 J25 - J30	
17/09/15 15:49:10	SIG	M62/2125L1	60R	M62 J25 - J30	
17/09/15 15:49:10	SIG	M62/2125L2	60R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1981B1	40R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1981B2	40R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1981B3	40R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1981B4	40R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1987B1	50R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1987B2	50R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1987B3	50R	M62 J25 - J30	
17/09/15 15:49:23	SIG	M62/1987B4	50R	M62 J25 - J30	
17/09/15 15:49:35	SIG	M62/2106B1	40R	M62 J25 - J30	
17/09/15 15:49:35	SIG	M62/2106B2	40R	M62 J25 - J30	
17/09/15 15:49:35	SIG	M62/2106B3	40R	M62 J25 - J30	
17/09/15 15:49:35	SIG	M62/2106B4	40R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M62/1999B1	REDX	M62 J25 - J30	
17/09/15 15:50:10	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 15:50:10	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 15:51:32	SIG	M62/2113B1	40R	M62 J25 - J30	
17/09/15 15:51:32	SIG	M62/2113B2	40R	M62 J25 - J30	
17/09/15 15:51:32	SIG	M62/2113B3	40R	M62 J25 - J30	
17/09/15 15:51:32	SIG	M62/2113B4	40R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1987B1	40R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1987B2	40R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1987B3	40R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1987B4	40R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 15:51:41	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 15:52:31	SIG	M62/2159B1	50R	M62 J25 - J30	
17/09/15 15:52:31	SIG	M62/2159B2	50R	M62 J25 - J30	
17/09/15 15:52:31	SIG	M62/2159M1	50R	M62 J25 - J30	
17/09/15 15:52:31	SIG	M62/2159M2	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1960B1	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1960B2	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1960B3	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1960L1	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1960L2	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 15:52:43	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M62/2065B2	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M62/2065B3	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M62/2065B4	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M62/2065M1	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M62/2069M1	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M62/2069M2	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M621/1002B1	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M621/1002B2	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 15:53:01	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2004B1	REDX	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2004B2	60R	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2004B3	60R	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2004B4	60R	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2012B2	60R	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2012B3	60R	M62 J25 - J30	
17/09/15 15:53:10	SIG	M62/2012B4	60R	M62 J25 - J30	
17/09/15 15:53:58	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 15:53:58	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 15:53:58	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 15:53:58	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1992B1	40R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 15:53:59	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 15:54:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 15:54:26	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2088B1	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 15:55:30	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 15:55:32	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 15:55:32	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 15:55:32	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 15:55:32	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 15:55:32	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 15:55:32	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 15:56:10	SIG	M62/2125B1	60R	M62 J25 - J30	
17/09/15 15:56:10	SIG	M62/2125B2	60R	M62 J25 - J30	
17/09/15 15:56:10	SIG	M62/2125B3	60R	M62 J25 - J30	
17/09/15 15:56:10	SIG	M62/2132B1	60R	M62 J25 - J30	
17/09/15 15:56:10	SIG	M62/2132B2	60R	M62 J25 - J30	
17/09/15 15:56:10	SIG	M62/2132B3	60R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2081B1	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2081B2	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2081B3	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2081L1	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2088B1	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2088B2	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2088B3	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2088B4	40R	M62 J25 - J30	
17/09/15 15:56:11	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 15:56:12	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 15:56:47	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 15:56:47	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 15:56:47	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 15:56:47	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 15:57:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:57:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:57:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:57:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 15:57:58	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 15:57:58	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 15:58:26	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 15:58:42	SIG	M62/2004B2	50R	M62 J25 - J30	
17/09/15 15:58:42	SIG	M62/2004B3	50R	M62 J25 - J30	
17/09/15 15:58:42	SIG	M62/2004B4	50R	M62 J25 - J30	
17/09/15 15:58:47	SIG	M62/2004B2	40R	M62 J25 - J30	
17/09/15 15:58:47	SIG	M62/2004B3	40R	M62 J25 - J30	
17/09/15 15:58:47	SIG	M62/2004B4	40R	M62 J25 - J30	
17/09/15 15:58:47	SIG	M62/2012B2	50R	M62 J25 - J30	
17/09/15 15:58:47	SIG	M62/2012B3	50R	M62 J25 - J30	
17/09/15 15:58:47	SIG	M62/2012B4	50R	M62 J25 - J30	
17/09/15 15:58:57	SIG	M62/1974B1	40R	M62 J25 - J30	
17/09/15 15:58:57	SIG	M62/1974B2	40R	M62 J25 - J30	
17/09/15 15:58:57	SIG	M62/1974B3	40R	M62 J25 - J30	
17/09/15 15:58:57	SIG	M62/1974B4	40R	M62 J25 - J30	
17/09/15 15:58:57	SIG	M62/1974M1	40R	M62 J25 - J30	
17/09/15 15:58:57	SIG	M62/1974M2	40R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2117B2	40R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2117B3	40R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 15:59:01	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 15:59:06	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 15:59:06	SIG	M62/2117B3	40R	M62 J25 - J30	
17/09/15 15:59:06	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 15:59:06	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 15:59:18	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 15:59:19	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2137B1	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2137B2	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2137B3	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2137B4	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2147B1	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2147B2	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2147B3	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2147B4	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2159B1	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2159B2	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2159M1	60R	M62 J25 - J30	
17/09/15 16:01:10	SIG	M62/2159M2	60R	M62 J25 - J30	
17/09/15 16:01:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:01:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:01:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:01:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:01:43	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:01:43	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 16:01:49	SIG	M62/2117B1	40R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:02:10	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:02:24	SIG	M62/2137B2	60R	M62 J25 - J30	
17/09/15 16:02:24	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 16:02:42	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2004B2	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2004B3	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2004B4	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2012B2	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2012B3	60R	M62 J25 - J30	
17/09/15 16:02:42	SIG	M62/2012B4	60R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2125B1	60R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2125B2	60R	M62 J25 - J30	
17/09/15 16:03:01	SIG	M62/2125B3	60R	M62 J25 - J30	
17/09/15 16:03:10	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 16:03:10	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 16:03:10	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 16:03:10	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 16:03:10	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 16:03:10	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1992B1	40R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:03:32	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:05:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:05:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:06:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 16:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 16:06:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:06:44	SIG	M62/2113B1	50R	M62 J25 - J30	
17/09/15 16:06:44	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 16:06:44	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 16:06:44	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 16:07:10	SIG	M62/2106B1	50R	M62 J25 - J30	
17/09/15 16:07:10	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 16:07:10	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 16:07:10	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 16:07:21	SIG	M62/2106B1	40R	M62 J25 - J30	
17/09/15 16:07:21	SIG	M62/2106B2	40R	M62 J25 - J30	
17/09/15 16:07:21	SIG	M62/2106B3	40R	M62 J25 - J30	
17/09/15 16:07:21	SIG	M62/2106B4	40R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1987B1	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1987B2	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1987B3	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1987B4	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 16:07:30	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/2004B2	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/2004B3	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/2004B4	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:07:35	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M606/2003B1	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M606/2003B2	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2004B2	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2004B3	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2004B4	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2005M1	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2005M2	40R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2012B2	50R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2012B3	50R	M62 J25 - J30	
17/09/15 16:07:40	SIG	M62/2012B4	50R	M62 J25 - J30	
17/09/15 16:07:41	SIG	M62/1999B2	40R	M62 J25 - J30	
17/09/15 16:07:41	SIG	M62/1999B3	40R	M62 J25 - J30	
17/09/15 16:07:41	SIG	M62/1999B4	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1987B1	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1987B2	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1987B3	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1987B4	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1992B1	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 16:08:11	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 16:10:00	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 16:10:00	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 16:10:00	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 16:10:00	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 16:10:00	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 16:10:00	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 16:12:11	SIG	M62/1981B1	50R	M62 J25 - J30	
17/09/15 16:12:11	SIG	M62/1981B2	50R	M62 J25 - J30	
17/09/15 16:12:11	SIG	M62/1981B3	50R	M62 J25 - J30	
17/09/15 16:12:11	SIG	M62/1981B4	50R	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2065A2	60R	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2065A3	60R	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2065A4	60R	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2073K1	60R	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2079A2	NR	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2079A3	NR	M62 J25 - J30	
17/09/15 16:12:15	SIG	M62/2079A4	NR	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2079A2	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2079A3	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2079A4	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2088A1	REDX	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2088A2	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2088A3	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2088A4	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2097A1	REDX	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2097A2	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2097A3	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2097A4	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2106A1	REDX	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2106A2	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2106A3	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2106A4	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2114A1	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2114A2	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2114A3	60R	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2117A1	REDX	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2117A2	NR	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2117A3	NR	M62 J25 - J30	
17/09/15 16:12:25	SIG	M62/2117A4	NR	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1987B1	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1987B2	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1987B3	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1987B4	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 16:13:00	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 16:13:23	SIG	M62/2203B1	50R	M62 J25 - J30	
17/09/15 16:13:23	SIG	M62/2203B2	50R	M62 J25 - J30	
17/09/15 16:13:23	SIG	M62/2203B3	50R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2197B1	60R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2197B2	60R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2197B3	60R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2199M1	60R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2199M2	60R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2203B1	40R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2203B2	40R	M62 J25 - J30	
17/09/15 16:13:28	SIG	M62/2203B3	40R	M62 J25 - J30	
17/09/15 16:13:40	SIG	M62/2012B2	40R	M62 J25 - J30	
17/09/15 16:13:40	SIG	M62/2012B3	40R	M62 J25 - J30	
17/09/15 16:13:40	SIG	M62/2012B4	40R	M62 J25 - J30	
17/09/15 16:13:50	SIG	M62/2106B1	50R	M62 J25 - J30	
17/09/15 16:13:50	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 16:13:50	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 16:13:50	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 16:15:07	SIG	M62/2106A1	60R	M62 J25 - J30	
17/09/15 16:15:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 16:15:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 16:15:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2177B1	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2177B2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2177L1	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2177L2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2183B1	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2183B2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2183L2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2189B1	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2189B2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2189B3	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2189B4	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2194B1	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2194B2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2194B3	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2194B4	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2197B1	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2197B2	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2197B3	NR	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2199M1	OFF	M62 J25 - J30	
17/09/15 16:15:10	SIG	M62/2199M2	OFF	M62 J25 - J30	
17/09/15 16:15:30	SIG	M62/2097A1	60R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:15:43	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:16:01	SIG	M606/2003B1	40R	M62 J25 - J30	
17/09/15 16:16:01	SIG	M606/2003B2	40R	M62 J25 - J30	
17/09/15 16:16:01	SIG	M62/2005M1	40R	M62 J25 - J30	
17/09/15 16:16:01	SIG	M62/2005M2	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1987B1	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1987B2	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1987B3	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1987B4	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1992B1	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1999B2	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1999B3	40R	M62 J25 - J30	
17/09/15 16:16:02	SIG	M62/1999B4	40R	M62 J25 - J30	
17/09/15 16:16:07	SIG	M62/2088A1	60R	M62 J25 - J30	
17/09/15 16:16:18	SIG	M62/2079A1	60R	M62 J25 - J30	
17/09/15 16:17:24	SIG	M62/2203B1	60R	M62 J25 - J30	
17/09/15 16:17:24	SIG	M62/2203B2	60R	M62 J25 - J30	
17/09/15 16:17:24	SIG	M62/2203B3	60R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2004B2	60R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2004B3	60R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2004B4	60R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2012B2	60R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2012B3	60R	M62 J25 - J30	
17/09/15 16:17:41	SIG	M62/2012B4	60R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1960B1	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1960B2	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1960B3	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1960L1	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1960L2	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1968B1	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1968B2	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1968B3	40R	M62 J25 - J30	
17/09/15 16:18:08	SIG	M62/1968L1	40R	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2177B1	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2177B2	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2177L1	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2177L2	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2183B1	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2183L2	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2189B1	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2189B2	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2189B3	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2189B4	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2194B1	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2194B2	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2194B3	OFF	M62 J25 - J30	
17/09/15 16:18:11	SIG	M62/2194B4	OFF	M62 J25 - J30	
17/09/15 16:18:34	SIG	M606/2003B1	40R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M606/2003B2	40R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/1999B2	40R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/1999B3	40R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/1999B4	40R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/2004B2	50R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/2004B3	50R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/2004B4	50R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/2005M1	40R	M62 J25 - J30	
17/09/15 16:18:34	SIG	M62/2005M2	40R	M62 J25 - J30	
17/09/15 16:19:10	SIG	M62/2117B1	60R	M62 J25 - J30	
17/09/15 16:19:10	SIG	M62/2117B3	60R	M62 J25 - J30	
17/09/15 16:19:10	SIG	M62/2120M1	60R	M62 J25 - J30	
17/09/15 16:19:10	SIG	M62/2120M2	60R	M62 J25 - J30	
17/09/15 16:19:24	SIG	M62/2004B2	40R	M62 J25 - J30	
17/09/15 16:19:24	SIG	M62/2004B3	40R	M62 J25 - J30	
17/09/15 16:19:24	SIG	M62/2004B4	40R	M62 J25 - J30	
17/09/15 16:19:24	SIG	M62/2012B2	50R	M62 J25 - J30	
17/09/15 16:19:24	SIG	M62/2012B3	50R	M62 J25 - J30	
17/09/15 16:19:24	SIG	M62/2012B4	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1987B1	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1987B2	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1987B3	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1987B4	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 16:20:00	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1974B1	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1974B2	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1974B3	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1974B4	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1974M1	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1974M2	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1981B1	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1981B2	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1981B3	40R	M62 J25 - J30	
17/09/15 16:20:12	SIG	M62/1981B4	40R	M62 J25 - J30	
17/09/15 16:21:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:21:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:21:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:21:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 16:23:24	SIG	M62/2097B1	50R	M62 J25 - J30	
17/09/15 16:23:24	SIG	M62/2097B2	50R	M62 J25 - J30	
17/09/15 16:23:24	SIG	M62/2097B4	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:23:25	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2004B2	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2004B3	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2004B4	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2012B2	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2012B3	60R	M62 J25 - J30	
17/09/15 16:23:49	SIG	M62/2012B4	60R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1981B1	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1981B2	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1981B3	50R	M62 J25 - J30	
17/09/15 16:24:12	SIG	M62/1981B4	50R	M62 J25 - J30	
17/09/15 16:25:06	SIG	M62/2170K1	60R	M62 J25 - J30	
17/09/15 16:25:06	SIG	M62/2170K2	60R	M62 J25 - J30	
17/09/15 16:25:06	SIG	M62/2177A1	REDX	M62 J25 - J30	
17/09/15 16:25:06	SIG	M62/2177A2	NR	M62 J25 - J30	
17/09/15 16:25:06	SIG	M62/2177A3	NR	M62 J25 - J30	
17/09/15 16:25:06	SIG	M62/2177A4	NR	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2170A1	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2170A2	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2177A2	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2177A3	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2177A4	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2183A1	REDX	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2183A2	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2183A3	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2183A4	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2189A1	REDX	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2189A2	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2189A3	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2189A4	60R	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2197A1	NR	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2197A2	NR	M62 J25 - J30	
17/09/15 16:25:07	SIG	M62/2197A3	NR	M62 J25 - J30	
17/09/15 16:25:11	SIG	M62/2197B1	NR	M62 J25 - J30	
17/09/15 16:25:11	SIG	M62/2197B2	NR	M62 J25 - J30	
17/09/15 16:25:11	SIG	M62/2197B3	NR	M62 J25 - J30	
17/09/15 16:25:11	SIG	M62/2203B1	OFF	M62 J25 - J30	
17/09/15 16:25:11	SIG	M62/2203B2	OFF	M62 J25 - J30	
17/09/15 16:25:11	SIG	M62/2203B3	OFF	M62 J25 - J30	
17/09/15 16:25:14	SIG	M62/2004B2	50R	M62 J25 - J30	
17/09/15 16:25:14	SIG	M62/2004B3	50R	M62 J25 - J30	
17/09/15 16:25:14	SIG	M62/2004B4	50R	M62 J25 - J30	
17/09/15 16:25:15	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 16:25:15	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 16:25:15	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2004B2	40R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2004B3	40R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2004B4	40R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2012B2	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2012B3	50R	M62 J25 - J30	
17/09/15 16:25:20	SIG	M62/2012B4	50R	M62 J25 - J30	
17/09/15 16:26:20	SIG	M62/2189A1	60R	M62 J25 - J30	
17/09/15 16:26:37	SIG	M62/2183A1	60R	M62 J25 - J30	
17/09/15 16:26:41	SIG	M62/2177A1	60R	M62 J25 - J30	
17/09/15 16:28:10	SIG	M606/2003B1	60R	M62 J25 - J30	
17/09/15 16:28:10	SIG	M606/2003B2	60R	M62 J25 - J30	
17/09/15 16:28:10	SIG	M62/2005M1	60R	M62 J25 - J30	
17/09/15 16:28:10	SIG	M62/2005M2	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1987B1	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1987B2	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1987B3	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1987B4	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1992B1	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1992B2	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1992B3	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1992B4	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1999B2	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1999B3	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/1999B4	60R	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/2197B1	OFF	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/2197B2	OFF	M62 J25 - J30	
17/09/15 16:28:11	SIG	M62/2197B3	OFF	M62 J25 - J30	
17/09/15 16:29:14	SIG	M62/2004B2	60R	M62 J25 - J30	
17/09/15 16:29:14	SIG	M62/2004B3	60R	M62 J25 - J30	
17/09/15 16:29:14	SIG	M62/2004B4	60R	M62 J25 - J30	
17/09/15 16:29:14	SIG	M62/2012B2	60R	M62 J25 - J30	
17/09/15 16:29:14	SIG	M62/2012B3	60R	M62 J25 - J30	
17/09/15 16:29:14	SIG	M62/2012B4	60R	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2132B1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2132B2	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2132B3	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2137B1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2137B3	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2137B4	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2147B1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2147B2	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2147B3	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2147B4	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2159B1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2159B2	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2159M1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2159M2	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2170B1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2170B2	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2170L1	OFF	M62 J25 - J30	
17/09/15 16:30:11	SIG	M62/2170L2	OFF	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1960B1	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1960B2	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1960B3	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1960L1	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1960L2	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 16:32:37	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 16:34:11	SIG	M62/2113B1	60R	M62 J25 - J30	
17/09/15 16:34:11	SIG	M62/2113B2	60R	M62 J25 - J30	
17/09/15 16:34:11	SIG	M62/2113B3	60R	M62 J25 - J30	
17/09/15 16:34:11	SIG	M62/2113B4	60R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1981B1	40R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1981B2	40R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1981B3	40R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1981B4	40R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1987B1	50R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1987B2	50R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1987B3	50R	M62 J25 - J30	
17/09/15 16:34:36	SIG	M62/1987B4	50R	M62 J25 - J30	
17/09/15 16:34:47	SIG	M62/1960B1	40R	M62 J25 - J30	
17/09/15 16:34:47	SIG	M62/1960B2	40R	M62 J25 - J30	
17/09/15 16:34:47	SIG	M62/1960B3	40R	M62 J25 - J30	
17/09/15 16:34:47	SIG	M62/1960L1	40R	M62 J25 - J30	
17/09/15 16:34:47	SIG	M62/1960L2	40R	M62 J25 - J30	
17/09/15 16:35:11	SIG	M62/2097B1	40R	M62 J25 - J30	
17/09/15 16:35:11	SIG	M62/2097B2	40R	M62 J25 - J30	
17/09/15 16:35:11	SIG	M62/2097B4	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1968B1	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1968B2	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1968B3	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1968L1	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1974B1	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1974B2	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1974B3	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1974B4	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1974M1	40R	M62 J25 - J30	
17/09/15 16:35:37	SIG	M62/1974M2	40R	M62 J25 - J30	
17/09/15 16:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1981B1	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1981B2	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1981B3	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1981B4	50R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1987B1	60R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1987B2	60R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1987B3	60R	M62 J25 - J30	
17/09/15 16:38:35	SIG	M62/1987B4	60R	M62 J25 - J30	
17/09/15 16:39:23	SIG	M62/2097B1	50R	M62 J25 - J30	
17/09/15 16:39:23	SIG	M62/2097B2	50R	M62 J25 - J30	
17/09/15 16:39:23	SIG	M62/2097B4	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1960B1	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1960B2	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1960B3	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1960L1	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1960L2	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 16:39:38	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1960B1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1960B2	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1960B3	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1960L1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1960L2	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1968B1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1968B2	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1968B3	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1968L1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1974B1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1974B2	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1974B3	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1974B4	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1974M1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1974M2	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1981B1	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1981B2	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1981B3	60R	M62 J25 - J30	
17/09/15 16:44:11	SIG	M62/1981B4	60R	M62 J25 - J30	
17/09/15 16:47:10	SIG	M62/2088B1	50R	M62 J25 - J30	
17/09/15 16:47:10	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 16:47:10	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 16:47:10	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 16:50:28	SIG	M62/2088B1	40R	M62 J25 - J30	
17/09/15 16:50:28	SIG	M62/2088B2	40R	M62 J25 - J30	
17/09/15 16:50:28	SIG	M62/2088B3	40R	M62 J25 - J30	
17/09/15 16:50:28	SIG	M62/2088B4	40R	M62 J25 - J30	
17/09/15 16:56:54	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 16:56:54	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 16:56:54	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 16:56:54	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1968B1	40R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1968B2	40R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1968B3	40R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1968L1	40R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 16:56:59	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1974B1	40R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1974B2	40R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1974B3	40R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1974B4	40R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1974M1	40R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1974M2	40R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1981B1	50R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1981B2	50R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1981B3	50R	M62 J25 - J30	
17/09/15 16:59:54	SIG	M62/1981B4	50R	M62 J25 - J30	
17/09/15 17:03:12	SIG	M62/2088B1	50R	M62 J25 - J30	
17/09/15 17:03:12	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 17:03:12	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 17:03:12	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 17:03:36	SIG	M62/2088B1	40R	M62 J25 - J30	
17/09/15 17:03:36	SIG	M62/2088B2	40R	M62 J25 - J30	
17/09/15 17:03:36	SIG	M62/2088B3	40R	M62 J25 - J30	
17/09/15 17:03:36	SIG	M62/2088B4	40R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1968B1	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1968B2	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1968B3	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1968L1	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1974B1	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1974B2	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1974B3	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1974B4	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1974M1	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1974M2	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1981B1	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1981B2	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1981B3	60R	M62 J25 - J30	
17/09/15 17:03:55	SIG	M62/1981B4	60R	M62 J25 - J30	
17/09/15 17:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:06:22	SIG	M62/2097B1	40R	M62 J25 - J30	
17/09/15 17:06:22	SIG	M62/2097B2	40R	M62 J25 - J30	
17/09/15 17:06:22	SIG	M62/2097B4	40R	M62 J25 - J30	
17/09/15 17:09:11	SIG	M62/1960L1	NR	M62 J25 - J30	
17/09/15 17:09:11	SIG	M62/1960L2	NR	M62 J25 - J30	
17/09/15 17:10:22	SIG	M62/2097B1	50R	M62 J25 - J30	
17/09/15 17:10:22	SIG	M62/2097B2	50R	M62 J25 - J30	
17/09/15 17:10:22	SIG	M62/2097B4	50R	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1960B1	OFF	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1960B2	OFF	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1960B3	OFF	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1960L1	OFF	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1960L2	OFF	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1968B1	NR	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1968B2	NR	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1968B3	NR	M62 J25 - J30	
17/09/15 17:12:34	SIG	M62/1968L1	NR	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1960B1	60R	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1960B2	60R	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1960B3	60R	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1960L1	NR	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1960L2	NR	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1968B1	60R	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1968B2	60R	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1968B3	60R	M62 J25 - J30	
17/09/15 17:12:40	SIG	M62/1968L1	60R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2159B1	NR	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2159B2	NR	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 17:17:38	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 17:17:44	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 17:20:11	SIG	M62/2057B1	60R	M62 J25 - J30	
17/09/15 17:20:11	SIG	M62/2057B2	60R	M62 J25 - J30	
17/09/15 17:20:11	SIG	M62/2057B3	60R	M62 J25 - J30	
17/09/15 17:20:11	SIG	M62/2057B4	60R	M62 J25 - J30	
17/09/15 17:20:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:20:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:20:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:20:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1960B1	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1960B2	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1960B3	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1960L1	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1960L2	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1968B1	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1968B2	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1968B3	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1968L1	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1974B1	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1974B2	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1974B3	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1974B4	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1974M1	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1974M2	OFF	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1981B1	NR	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1981B2	NR	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1981B3	NR	M62 J25 - J30	
17/09/15 17:23:12	SIG	M62/1981B4	NR	M62 J25 - J30	
17/09/15 17:25:00	SIG	M62/2088B1	50R	M62 J25 - J30	
17/09/15 17:25:00	SIG	M62/2088B2	50R	M62 J25 - J30	
17/09/15 17:25:00	SIG	M62/2088B3	50R	M62 J25 - J30	
17/09/15 17:25:00	SIG	M62/2088B4	50R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2189B1	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2189B2	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2189B3	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2189B4	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2194B1	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2194B2	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2194B3	60R	M62 J25 - J30	
17/09/15 17:25:11	SIG	M62/2194B4	60R	M62 J25 - J30	
17/09/15 17:25:42	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 17:25:42	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 17:25:42	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2132B1	40R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2132B2	40R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2132B3	40R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2137B1	50R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2137B3	50R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2137B4	50R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2147B1	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2147B2	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2147B3	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2147B4	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2159B1	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2159B2	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2159M1	60R	M62 J25 - J30	
17/09/15 17:25:48	SIG	M62/2159M2	60R	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1981B1	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1981B2	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1981B3	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1981B4	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1987B1	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1987B2	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1987B3	NR	M62 J25 - J30	
17/09/15 17:27:12	SIG	M62/1987B4	NR	M62 J25 - J30	
17/09/15 17:28:11	SIG	M62/2197B1	60R	M62 J25 - J30	
17/09/15 17:28:11	SIG	M62/2197B2	60R	M62 J25 - J30	
17/09/15 17:28:11	SIG	M62/2197B3	60R	M62 J25 - J30	
17/09/15 17:28:11	SIG	M62/2199M1	60R	M62 J25 - J30	
17/09/15 17:28:11	SIG	M62/2199M2	60R	M62 J25 - J30	
17/09/15 17:29:07	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 17:29:07	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 17:29:07	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 17:29:07	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 17:30:12	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1981B1	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1987B1	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1987B2	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1987B3	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1987B4	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1992B1	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1992B2	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1992B3	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1992B4	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1999B1	BLNK	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1999B2	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1999B3	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/1999B4	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2004B1	BLNK	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2004B2	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2004B3	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2004B4	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2005M1	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2005M2	OFF	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2012B2	NR	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2012B3	NR	M62 J25 - J30	
17/09/15 17:30:12	SIG	M62/2012B4	NR	M62 J25 - J30	
17/09/15 17:30:13	SIG	M62/1981B2	OFF	M62 J25 - J30	
17/09/15 17:30:13	SIG	M62/1981B3	OFF	M62 J25 - J30	
17/09/15 17:30:13	SIG	M62/1981B4	OFF	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2132B1	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2132B2	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2132B3	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2137B1	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2137B2	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2137B3	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2137B4	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2147B1	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2147B2	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2147B3	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2147B4	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2159B1	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2159B2	NR	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2159M1	OFF	M62 J25 - J30	
17/09/15 17:31:18	SIG	M62/2159M2	OFF	M62 J25 - J30	
17/09/15 17:31:19	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 17:31:19	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 17:31:19	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 17:31:19	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1960B1	60R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1960B2	60R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1960B3	60R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1960L1	NR	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1960L2	NR	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1968B1	40R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1968B2	40R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1968B3	40R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1968L1	40R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 17:31:24	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2025B1	40R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2025B2	40R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2025B3	40R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2025B4	40R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2033B1	50R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 17:31:43	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 17:31:45	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 17:31:45	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 17:31:45	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2132B1	40R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2132B2	40R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2132B3	40R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2137B1	50R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2137B2	50R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2137B3	50R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2137B4	50R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2147B1	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2147B2	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2147B3	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2147B4	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2159B1	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2159B2	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2159M1	60R	M62 J25 - J30	
17/09/15 17:31:51	SIG	M62/2159M2	60R	M62 J25 - J30	
17/09/15 17:32:12	SIG	M62/2106B1	60R	M62 J25 - J30	
17/09/15 17:32:12	SIG	M62/2106B2	60R	M62 J25 - J30	
17/09/15 17:32:12	SIG	M62/2106B3	60R	M62 J25 - J30	
17/09/15 17:32:12	SIG	M62/2106B4	60R	M62 J25 - J30	
17/09/15 17:34:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:34:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:34:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:34:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1960B1	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1960B2	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1960B3	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1960L1	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1960L2	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1968B1	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1968B2	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1968B3	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1968L1	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1974B1	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1974B2	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1974B3	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1974B4	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1974M1	OFF	M62 J25 - J30	
17/09/15 17:35:18	SIG	M62/1974M2	OFF	M62 J25 - J30	
17/09/15 17:36:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:36:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:36:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 17:37:19	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2088B1	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2088B2	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2088B3	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2088B4	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2097B1	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2097B2	60R	M62 J25 - J30	
17/09/15 17:38:21	SIG	M62/2097B4	60R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 17:39:44	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 17:39:49	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 17:39:52	SIG	M62/2018B1	40R	M62 J25 - J30	
17/09/15 17:39:52	SIG	M62/2018B2	40R	M62 J25 - J30	
17/09/15 17:39:52	SIG	M62/2018B3	40R	M62 J25 - J30	
17/09/15 17:39:52	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2132B1	60R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2132B2	60R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2132B3	60R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2137B1	60R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2137B2	60R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2137B3	60R	M62 J25 - J30	
17/09/15 17:41:26	SIG	M62/2137B4	60R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 17:42:14	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 17:42:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:42:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:42:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:42:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:42:20	SIG	M62/2065B2	40R	M62 J25 - J30	
17/09/15 17:42:20	SIG	M62/2065B3	40R	M62 J25 - J30	
17/09/15 17:42:20	SIG	M62/2065B4	40R	M62 J25 - J30	
17/09/15 17:42:20	SIG	M62/2065M1	40R	M62 J25 - J30	
17/09/15 17:42:20	SIG	M621/1002B1	40R	M62 J25 - J30	
17/09/15 17:42:20	SIG	M621/1002B2	40R	M62 J25 - J30	
17/09/15 17:43:05	SIG	M62/2069M1	40R	M62 J25 - J30	
17/09/15 17:43:05	SIG	M62/2069M2	40R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2074B2	40R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2074B3	40R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2074B4	40R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2081B1	50R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2081B2	50R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2081B3	50R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2081L1	50R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 17:43:12	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 17:43:12	SIG	M621/1010B1	40R	M62 J25 - J30	
17/09/15 17:43:12	SIG	M621/1010B2	40R	M62 J25 - J30	
17/09/15 17:48:31	SIG	M62/2033B1	40R	M62 J25 - J30	
17/09/15 17:48:31	SIG	M62/2033B2	40R	M62 J25 - J30	
17/09/15 17:48:31	SIG	M62/2033B4	40R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2033B1	40R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2033B2	40R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2033B4	40R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2041B1	50R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 17:48:36	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2069M1	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2069M2	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2074B2	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2074B3	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2074B4	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2081B1	60R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2081B2	60R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2081B3	60R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M62/2081L1	60R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M621/1002B1	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M621/1010B1	50R	M62 J25 - J30	
17/09/15 17:48:41	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 17:49:05	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 17:49:05	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 17:49:05	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 17:49:05	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 17:49:18	SIG	M62/2018B1	40R	M62 J25 - J30	
17/09/15 17:49:18	SIG	M62/2018B2	40R	M62 J25 - J30	
17/09/15 17:49:18	SIG	M62/2018B3	40R	M62 J25 - J30	
17/09/15 17:49:18	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 17:51:03	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 17:51:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:51:38	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 17:51:44	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2125B1	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2125B2	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2125B3	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2132B1	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2132B2	NR	M62 J25 - J30	
17/09/15 17:53:12	SIG	M62/2132B3	NR	M62 J25 - J30	
17/09/15 17:53:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:53:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:53:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:53:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:53:48	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 17:53:48	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 17:53:48	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 17:53:48	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M62/2069M1	60R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M62/2069M2	60R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 17:54:12	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2170B1	50R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2170B2	50R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2177B1	50R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2177B2	50R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2177L1	50R	M62 J25 - J30	
17/09/15 17:54:35	SIG	M62/2177L2	50R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2170B1	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2170B2	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2170L1	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2170L2	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2177B1	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2177B2	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2177L1	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2177L2	40R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2183B1	50R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2183B2	50R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2183L1	50R	M62 J25 - J30	
17/09/15 17:54:40	SIG	M62/2183L2	50R	M62 J25 - J30	
17/09/15 17:54:46	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2065B2	60R	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2065B3	60R	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2065B4	60R	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2065M1	60R	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2132B1	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2132B2	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2132B3	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2137B1	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2137B2	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2137B3	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2137B4	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2147B1	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2147B2	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2147B3	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2147B4	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2159B1	NR	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2159B2	NR	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2159M1	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M62/2159M2	OFF	M62 J25 - J30	
17/09/15 17:55:12	SIG	M621/1002B1	60R	M62 J25 - J30	
17/09/15 17:55:12	SIG	M621/1002B2	60R	M62 J25 - J30	
17/09/15 17:56:12	SIG	M62/2125B1	OFF	M62 J25 - J30	
17/09/15 17:56:13	SIG	M62/2125B2	OFF	M62 J25 - J30	
17/09/15 17:56:13	SIG	M62/2125B3	OFF	M62 J25 - J30	
17/09/15 17:56:13	SIG	M62/2125L1	OFF	M62 J25 - J30	
17/09/15 17:56:13	SIG	M62/2125L2	OFF	M62 J25 - J30	
17/09/15 17:56:31	SIG	M62/2018B1	40R	M62 J25 - J30	
17/09/15 17:56:31	SIG	M62/2018B2	40R	M62 J25 - J30	
17/09/15 17:56:31	SIG	M62/2018B3	40R	M62 J25 - J30	
17/09/15 17:56:31	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 17:56:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:56:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:56:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:56:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 17:57:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 17:57:44	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 17:57:50	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2170B1	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2170B2	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2170L1	50R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2170L2	50R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2177B1	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2177B2	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2177L1	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2177L2	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2183B1	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2183B2	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2183L1	60R	M62 J25 - J30	
17/09/15 17:58:35	SIG	M62/2183L2	60R	M62 J25 - J30	
17/09/15 18:00:31	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 18:00:31	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 18:00:31	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 18:00:31	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 18:00:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:00:48	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 18:00:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:00:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:00:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:00:53	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 18:00:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:01:45	SIG	M62/2018B1	40R	M62 J25 - J30	
17/09/15 18:01:45	SIG	M62/2018B2	40R	M62 J25 - J30	
17/09/15 18:01:45	SIG	M62/2018B3	40R	M62 J25 - J30	
17/09/15 18:01:45	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 18:02:36	SIG	M62/2041B1	40R	M62 J25 - J30	
17/09/15 18:02:36	SIG	M62/2041B2	40R	M62 J25 - J30	
17/09/15 18:02:36	SIG	M62/2041B3	40R	M62 J25 - J30	
17/09/15 18:02:36	SIG	M62/2041B4	40R	M62 J25 - J30	
17/09/15 18:03:12	SIG	M62/2197B1	OFF	M62 J25 - J30	
17/09/15 18:03:12	SIG	M62/2197B2	OFF	M62 J25 - J30	
17/09/15 18:03:12	SIG	M62/2197B3	OFF	M62 J25 - J30	
17/09/15 18:03:12	SIG	M62/2199M1	OFF	M62 J25 - J30	
17/09/15 18:03:12	SIG	M62/2199M2	OFF	M62 J25 - J30	
17/09/15 18:03:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:03:52	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 18:03:57	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2025B1	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 18:05:44	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 18:06:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:06:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:06:12	SIG	M62/2159B1	NR	M62 J25 - J30	
17/09/15 18:06:12	SIG	M62/2159B2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2170B1	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2170B2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2170L1	OFF	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2170L2	OFF	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2177B1	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2177B2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2177L1	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2177L2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2183B1	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2183B2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2183L1	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2183L2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2189B1	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2189B2	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2189B3	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2189B4	NR	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2194B1	OFF	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2194B2	OFF	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2194B3	OFF	M62 J25 - J30	
17/09/15 18:06:13	SIG	M62/2194B4	OFF	M62 J25 - J30	
17/09/15 18:06:37	SIG	M62/2041B1	50R	M62 J25 - J30	
17/09/15 18:06:37	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 18:06:37	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 18:06:37	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 18:06:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:06:55	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 18:07:00	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2018B1	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2018B2	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2018B3	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2018L1	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2025B1	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2025B2	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2025B3	40R	M62 J25 - J30	
17/09/15 18:07:13	SIG	M62/2025B4	40R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2033B1	50R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2041B1	60R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 18:08:09	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 18:09:12	SIG	M62/2159B1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2159B2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2170B1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2170B2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2177B1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2177B2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2177L1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2177L2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2183B1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2183L1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2183L2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2189B1	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2189B2	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2189B3	OFF	M62 J25 - J30	
17/09/15 18:09:13	SIG	M62/2189B4	OFF	M62 J25 - J30	
17/09/15 18:11:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:11:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:11:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:11:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:14:21	SIG	M62/2018B1	50R	M62 J25 - J30	
17/09/15 18:14:21	SIG	M62/2018B2	50R	M62 J25 - J30	
17/09/15 18:14:21	SIG	M62/2018B3	50R	M62 J25 - J30	
17/09/15 18:14:21	SIG	M62/2018L1	50R	M62 J25 - J30	
17/09/15 18:15:29	SIG	M62/2033B1	40R	M62 J25 - J30	
17/09/15 18:15:29	SIG	M62/2033B2	40R	M62 J25 - J30	
17/09/15 18:15:29	SIG	M62/2033B4	40R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2033B1	40R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2033B2	40R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2033B4	40R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2041B1	50R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 18:15:35	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 18:15:48	SIG	M62/2025B1	50R	M62 J25 - J30	
17/09/15 18:15:48	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 18:15:48	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 18:15:48	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 18:15:50	SIG	M62/1968B1	50R	M62 J25 - J30	
17/09/15 18:15:50	SIG	M62/1968B2	50R	M62 J25 - J30	
17/09/15 18:15:50	SIG	M62/1968B3	50R	M62 J25 - J30	
17/09/15 18:15:50	SIG	M62/1968L1	50R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1960B1	60R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1960B2	60R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1960B3	60R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1960L1	NR	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1960L2	NR	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1968B1	40R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1968B2	40R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1968B3	40R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1968L1	40R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1974B1	50R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1974B2	50R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1974B3	50R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1974B4	50R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1974M1	50R	M62 J25 - J30	
17/09/15 18:15:56	SIG	M62/1974M2	50R	M62 J25 - J30	
17/09/15 18:18:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:18:09	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 18:18:15	SIG	M62/2033B3	40R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2033B1	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2033B2	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2033B3	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2033B4	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2041B1	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2041B2	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2041B3	60R	M62 J25 - J30	
17/09/15 18:19:30	SIG	M62/2041B4	60R	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1960B1	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1960B2	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1960B3	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1960L1	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1960L2	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1968B1	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1968B2	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1968B3	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1968L1	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1974B1	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1974B2	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1974B3	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1974B4	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1974M1	OFF	M62 J25 - J30	
17/09/15 18:19:51	SIG	M62/1974M2	OFF	M62 J25 - J30	
17/09/15 18:22:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:22:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:22:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:22:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:29:13	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 18:29:13	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 18:40:02	SIG	M62/2113B1	HSD	M62 J25 - J30	
17/09/15 18:41:03	SIG	M62/2106B1	HSD	M62 J25 - J30	
17/09/15 18:41:06	SIG	M62/2079A1	HSD	M62 J25 - J30	
17/09/15 18:42:03	SIG	M62/2097B1	HSD	M62 J25 - J30	
17/09/15 18:42:04	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 18:42:14	SIG	M62/2088A1	HSD	M62 J25 - J30	
17/09/15 18:43:11	SIG	M62/2088B1	HSD	M62 J25 - J30	
17/09/15 18:43:12	SIG	M62/2106B1	REDX	M62 J25 - J30	
17/09/15 18:43:22	SIG	M62/2097A1	HSD	M62 J25 - J30	
17/09/15 18:43:23	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 18:44:20	SIG	M62/2097B1	REDX	M62 J25 - J30	
17/09/15 18:44:30	SIG	M62/2106A1	HSD	M62 J25 - J30	
17/09/15 18:44:31	SIG	M62/2088A1	REDX	M62 J25 - J30	
17/09/15 18:45:28	SIG	M62/2088B1	REDX	M62 J25 - J30	
17/09/15 18:45:39	SIG	M62/2097A1	REDX	M62 J25 - J30	
17/09/15 18:46:21	SIG	M62/2117B1	NR	M62 J25 - J30	
17/09/15 18:46:21	SIG	M62/2117B3	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2074B2	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2074B3	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2074B4	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2081B1	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2081B2	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2081B3	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2081L1	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2088B2	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2088B3	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2088B4	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2097B2	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2097B4	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2106B2	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2106B3	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2106B4	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2113B2	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2113B3	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2113B4	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2120M1	NR	M62 J25 - J30	
17/09/15 18:46:31	SIG	M62/2120M2	NR	M62 J25 - J30	
17/09/15 18:46:46	SIG	M62/2106A1	REDX	M62 J25 - J30	
17/09/15 18:47:19	SIG	M62/2177A1	HSD	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2113B1	BLNK	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2113B2	OFF	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2113B3	OFF	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2113B4	OFF	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2117B3	OFF	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2120M1	OFF	M62 J25 - J30	
17/09/15 18:47:21	SIG	M62/2120M2	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2074B1	BLNK	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2074B2	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2074B3	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2074B4	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2081B1	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2081B2	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2081B3	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2081L1	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2088B1	BLNK	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2088B2	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2088B3	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2088B4	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2097B1	BLNK	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2097B2	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2097B4	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2106B1	BLNK	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2106B3	OFF	M62 J25 - J30	
17/09/15 18:47:31	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 18:47:47	SIG	M62/2065A2	NR	M62 J25 - J30	
17/09/15 18:47:47	SIG	M62/2065A3	NR	M62 J25 - J30	
17/09/15 18:47:47	SIG	M62/2065A4	NR	M62 J25 - J30	
17/09/15 18:48:05	SIG	M62/2183A1	HSD	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2073K1	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2079A2	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2079A3	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2079A4	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2088A2	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2088A3	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2088A4	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2097A2	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2097A3	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2097A4	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2106A2	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2106A3	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2106A4	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2114A1	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2114A2	NR	M62 J25 - J30	
17/09/15 18:48:07	SIG	M62/2114A3	NR	M62 J25 - J30	
17/09/15 18:48:49	SIG	M62/2189A1	HSD	M62 J25 - J30	
17/09/15 18:48:50	SIG	M62/2177A1	REDX	M62 J25 - J30	
17/09/15 18:49:02	SIG	M62/2073K1	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2079A1	BLNK	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2079A2	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2079A3	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2079A4	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2088A1	BLNK	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2088A2	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2088A3	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2088A4	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2097A1	BLNK	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2097A2	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2097A3	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2097A4	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2106A1	BLNK	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2106A2	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2106A4	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2114A1	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2114A2	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2114A3	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2117A1	BLNK	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2117A2	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2117A3	OFF	M62 J25 - J30	
17/09/15 18:49:12	SIG	M62/2117A4	OFF	M62 J25 - J30	
17/09/15 18:49:50	SIG	M62/2183A1	REDX	M62 J25 - J30	
17/09/15 18:50:49	SIG	M62/2189A1	REDX	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2170A1	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2170A2	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2170K1	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2170K2	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2177A2	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2177A3	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2177A4	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2183A2	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2183A3	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2183A4	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2189A2	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2189A3	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2189A4	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2197A1	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2197A2	NR	M62 J25 - J30	
17/09/15 18:50:50	SIG	M62/2197A3	NR	M62 J25 - J30	
17/09/15 18:51:16	SIG	M62/2025A1	HSD	M62 J25 - J30	
17/09/15 18:51:50	SIG	M62/2170K1	OFF	M62 J25 - J30	
17/09/15 18:51:50	SIG	M62/2170K2	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2170A1	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2170A2	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2177A1	BLNK	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2177A2	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2177A3	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2177A4	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2183A1	BLNK	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2183A2	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2183A3	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2183A4	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2189A1	BLNK	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2189A2	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2189A3	OFF	M62 J25 - J30	
17/09/15 18:51:51	SIG	M62/2189A4	OFF	M62 J25 - J30	
17/09/15 18:52:16	SIG	M62/2033A1	HSD	M62 J25 - J30	
17/09/15 18:53:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
17/09/15 18:53:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
17/09/15 18:53:16	SIG	M62/2041A1	HSD	M62 J25 - J30	
17/09/15 18:53:51	SIG	M62/2197A1	OFF	M62 J25 - J30	
17/09/15 18:53:51	SIG	M62/2197A2	OFF	M62 J25 - J30	
17/09/15 18:53:51	SIG	M62/2197A3	OFF	M62 J25 - J30	
17/09/15 18:54:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
17/09/15 18:54:23	SIG	M62/2050A1	HSD	M62 J25 - J30	
17/09/15 18:55:15	SIG	M62/2041A1	REDX	M62 J25 - J30	
17/09/15 18:56:15	SIG	M62/2050A1	REDX	M62 J25 - J30	
17/09/15 18:57:15	SIG	M62/2025A2	NR	M62 J25 - J30	
17/09/15 18:57:15	SIG	M62/2025A3	NR	M62 J25 - J30	
17/09/15 18:57:15	SIG	M62/2025A4	NR	M62 J25 - J30	
17/09/15 18:57:15	SIG	M62/2033A2	NR	M62 J25 - J30	
17/09/15 18:57:15	SIG	M62/2033A3	NR	M62 J25 - J30	
17/09/15 18:57:15	SIG	M62/2033A4	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2041A2	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2041A3	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2041A4	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2050A2	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2050A3	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2050A4	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2057A1	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2057A2	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2057A3	NR	M62 J25 - J30	
17/09/15 18:57:16	SIG	M62/2057J1	NR	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2008K1	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2008K2	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2012A1	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2012A2	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2012A3	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2018A1	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2018A2	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2018A3	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2018A4	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2025A1	BLNK	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2025A2	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2025A3	OFF	M62 J25 - J30	
17/09/15 18:58:15	SIG	M62/2025A4	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2033A1	BLNK	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2033A2	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2033A3	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2033A4	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2041A1	BLNK	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2041A2	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2041A3	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2041A4	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2050A1	BLNK	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2050A2	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2050A3	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2050A4	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2057A1	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2057A2	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2057A3	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2057J1	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2065A1	BLNK	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2065A2	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2065A3	OFF	M62 J25 - J30	
17/09/15 18:58:16	SIG	M62/2065A4	OFF	M62 J25 - J30	
17/09/15 19:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 19:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 19:07:28	SIG	M62/2057B1	HSD	M62 J25 - J30	
17/09/15 19:09:27	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 19:09:27	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 19:09:28	SIG	M62/2041B1	HSD	M62 J25 - J30	
17/09/15 19:09:28	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 19:09:28	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 19:10:27	SIG	M62/2033B1	HSD	M62 J25 - J30	
17/09/15 19:11:09	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 19:11:09	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 19:11:27	SIG	M62/2025B1	HSD	M62 J25 - J30	
17/09/15 19:11:28	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 19:12:20	SIG	M62/2033B1	REDX	M62 J25 - J30	
17/09/15 19:13:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2018B1	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2018B2	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2018B3	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2018L1	OFF	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2025B2	60R	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2025B3	60R	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2025B4	60R	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2057B2	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2057B3	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2057B4	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2065B2	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2065B3	NR	M62 J25 - J30	
17/09/15 19:13:34	SIG	M62/2065B4	NR	M62 J25 - J30	
17/09/15 19:14:34	SIG	M62/2069M1	OFF	M62 J25 - J30	
17/09/15 19:14:34	SIG	M62/2069M2	OFF	M62 J25 - J30	
17/09/15 19:14:34	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 19:14:34	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2057B1	BLNK	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2057B2	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2057B3	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2057B4	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2065B1	BLNK	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2065B2	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2065B3	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2065B4	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M62/2065M1	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M621/1002B1	OFF	M62 J25 - J30	
17/09/15 19:14:35	SIG	M621/1002B2	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2012B1	BLNK	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2012B2	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2012B3	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2012B4	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2018B1	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2018B2	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2018B3	OFF	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2025B2	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2025B3	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2025B4	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2033B2	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2033B3	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2033B4	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2041B2	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2041B3	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2041B4	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2050B2	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2050B3	NR	M62 J25 - J30	
17/09/15 19:17:14	SIG	M62/2050B4	NR	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2025B2	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2025B3	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2025B4	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2033B2	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2041B3	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2041B4	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2050B2	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2050B3	OFF	M62 J25 - J30	
17/09/15 19:20:14	SIG	M62/2050B4	OFF	M62 J25 - J30	
17/09/15 19:20:15	SIG	M62/2025B1	BLNK	M62 J25 - J30	
17/09/15 19:20:15	SIG	M62/2033B1	BLNK	M62 J25 - J30	
17/09/15 19:20:15	SIG	M62/2041B1	BLNK	M62 J25 - J30	
17/09/15 19:20:15	SIG	M62/2041B1	BLNK	M62 J25 - J30	
17/09/15 19:50:17	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 19:50:17	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 19:53:17	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 19:53:18	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2012B1	REDX	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2012B2	NR	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2012B3	NR	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2012B4	NR	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2025B1	REDX	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2033B1	REDX	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2041B2	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2041B3	50R	M62 J25 - J30	
17/09/15 19:57:13	SIG	M62/2041B4	50R	M62 J25 - J30	
17/09/15 20:00:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 20:00:13	SIG	M62/2033B3	???	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2033B1	BLNK	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2033B2	OFF	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2033B4	OFF	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2041B1	BLNK	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2041B2	OFF	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2041B3	OFF	M62 J25 - J30	
17/09/15 20:05:19	SIG	M62/2041B4	OFF	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2079A2	50R	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2079A3	50R	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2079A4	50R	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2088A1	REDX	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2088A2	50R	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2088A3	50R	M62 J25 - J30	
17/09/15 20:11:41	SIG	M62/2088A4	50R	M62 J25 - J30	
17/09/15 20:12:45	SIG	M62/2124A1	REDX	M62 J25 - J30	
17/09/15 20:12:45	SIG	M62/2124A2	NR	M62 J25 - J30	
17/09/15 20:12:45	SIG	M62/2124A3	NR	M62 J25 - J30	
17/09/15 20:12:45	SIG	M62/2124A4	NR	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2125B1	50R	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2125B2	50R	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2125B3	50R	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2132B1	50R	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2132B2	50R	M62 J25 - J30	
17/09/15 20:13:47	SIG	M62/2132B3	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2117B3	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 20:13:57	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 20:15:17	SIG	M62/2097B1	REDX	M62 J25 - J30	
17/09/15 20:15:17	SIG	M62/2097B2	NR	M62 J25 - J30	
17/09/15 20:15:17	SIG	M62/2097B4	NR	M62 J25 - J30	
17/09/15 20:16:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 20:16:29	SIG	M62/2117B1	???	M62 J25 - J30	
17/09/15 20:20:22	SIG	M62/2113B2	40R	M62 J25 - J30	
17/09/15 20:20:22	SIG	M62/2113B3	40R	M62 J25 - J30	
17/09/15 20:20:22	SIG	M62/2113B4	40R	M62 J25 - J30	
17/09/15 20:20:22	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 20:20:22	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 20:20:22	SIG	M62/2125B1	LDR	M62 J25 - J30	
17/09/15 20:20:28	SIG	M62/2113B2	30R	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2113B1	STOP	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2113B2	20R	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2113B3	40R	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2113B4	40R	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2117B1	LDR	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2120M1	40R	M62 J25 - J30	
17/09/15 20:20:33	SIG	M62/2120M2	40R	M62 J25 - J30	
17/09/15 20:20:38	SIG	M62/2113B1	STOP	M62 J25 - J30	
17/09/15 20:20:38	SIG	M62/2113B2	STOP	M62 J25 - J30	
17/09/15 20:21:06	SIG	M62/2132B1	60R	M62 J25 - J30	
17/09/15 20:21:06	SIG	M62/2132B2	60R	M62 J25 - J30	
17/09/15 20:21:06	SIG	M62/2132B3	60R	M62 J25 - J30	
17/09/15 20:24:42	SIG	M62/2088A1	STOP	M62 J25 - J30	
17/09/15 20:24:42	SIG	M62/2088A2	40R	M62 J25 - J30	
17/09/15 20:24:42	SIG	M62/2088A3	40R	M62 J25 - J30	
17/09/15 20:24:42	SIG	M62/2088A4	40R	M62 J25 - J30	
17/09/15 20:24:47	SIG	M62/2088A1	STOP	M62 J25 - J30	
17/09/15 20:24:55	SIG	M62/2079A1	BLNK	M62 J25 - J30	
17/09/15 20:24:55	SIG	M62/2079A2	OFF	M62 J25 - J30	
17/09/15 20:24:55	SIG	M62/2079A3	OFF	M62 J25 - J30	
17/09/15 20:24:55	SIG	M62/2079A4	OFF	M62 J25 - J30	
17/09/15 20:26:15	SIG	M62/2125L1	60R	M62 J25 - J30	
17/09/15 20:26:15	SIG	M62/2125L2	60R	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2012B1	BLNK	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2012B2	OFF	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2012B3	OFF	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2012B4	OFF	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2025B1	BLNK	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2025B2	OFF	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2025B3	OFF	M62 J25 - J30	
17/09/15 20:27:42	SIG	M62/2025B4	OFF	M62 J25 - J30	
17/09/15 20:35:15	SIG	M62/2065A1	REDX	M62 J25 - J30	
17/09/15 20:35:15	SIG	M62/2065A2	60R	M62 J25 - J30	
17/09/15 20:35:15	SIG	M62/2065A3	60R	M62 J25 - J30	
17/09/15 20:35:15	SIG	M62/2065A4	60R	M62 J25 - J30	
17/09/15 20:35:25	SIG	M62/2073K1	60R	M62 J25 - J30	
17/09/15 20:35:25	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 20:35:25	SIG	M62/2079A2	50R	M62 J25 - J30	
17/09/15 20:35:25	SIG	M62/2079A3	50R	M62 J25 - J30	
17/09/15 20:35:25	SIG	M62/2079A4	50R	M62 J25 - J30	
17/09/15 20:40:53	SIG	M62/2189A1	REDX	M62 J25 - J30	
17/09/15 20:40:53	SIG	M62/2189A2	50R	M62 J25 - J30	
17/09/15 20:40:53	SIG	M62/2189A3	50R	M62 J25 - J30	
17/09/15 20:40:53	SIG	M62/2189A4	50R	M62 J25 - J30	
17/09/15 20:41:04	SIG	M62/2197A1	50R	M62 J25 - J30	
17/09/15 20:41:04	SIG	M62/2197A2	50R	M62 J25 - J30	
17/09/15 20:41:04	SIG	M62/2197A3	50R	M62 J25 - J30	
17/09/15 20:42:25	SIG	M62/2106B1	REDX	M62 J25 - J30	
17/09/15 20:42:25	SIG	M62/2106B2	50R	M62 J25 - J30	
17/09/15 20:42:25	SIG	M62/2106B3	50R	M62 J25 - J30	
17/09/15 20:42:25	SIG	M62/2106B4	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2113B1	REDX	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2113B2	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2113B3	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2113B4	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2117B1	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2120M1	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2120M2	50R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2125B1	60R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2125B2	60R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2125B3	60R	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2132B1	OFF	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2132B2	OFF	M62 J25 - J30	
17/09/15 20:43:57	SIG	M62/2132B3	OFF	M62 J25 - J30	
17/09/15 20:47:03	SIG	M62/2117B1	???	M62 J25 - J30	
17/09/15 20:47:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 20:47:15	SIG	M62/2125B1	OFF	M62 J25 - J30	
17/09/15 20:47:15	SIG	M62/2125B2	OFF	M62 J25 - J30	
17/09/15 20:47:15	SIG	M62/2125B3	OFF	M62 J25 - J30	
17/09/15 20:47:15	SIG	M62/2125L1	NR	M62 J25 - J30	
17/09/15 20:47:15	SIG	M62/2125L2	NR	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2106B1	BLNK	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2106B2	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2106B3	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2106B4	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2113B1	BLNK	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2113B2	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2113B3	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2113B4	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2117B3	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2120M1	OFF	M62 J25 - J30	
17/09/15 20:47:25	SIG	M62/2120M2	OFF	M62 J25 - J30	
17/09/15 20:50:15	SIG	M62/2125L1	OFF	M62 J25 - J30	
17/09/15 20:50:16	SIG	M62/2125L2	OFF	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2189A1	BLNK	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2189A2	OFF	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2189A3	OFF	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2189A4	OFF	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2197A1	OFF	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2197A2	OFF	M62 J25 - J30	
17/09/15 20:52:26	SIG	M62/2197A3	OFF	M62 J25 - J30	
17/09/15 20:53:06	SIG	M62/2197A1	50R	M62 J25 - J30	
17/09/15 20:53:06	SIG	M62/2197A2	50R	M62 J25 - J30	
17/09/15 20:53:06	SIG	M62/2197A3	50R	M62 J25 - J30	
17/09/15 20:53:11	SIG	M62/2197A1	40R	M62 J25 - J30	
17/09/15 20:53:11	SIG	M62/2197A2	40R	M62 J25 - J30	
17/09/15 20:53:11	SIG	M62/2197A3	40R	M62 J25 - J30	
17/09/15 20:53:17	SIG	M62/2197A1	30R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2177A1	REDX	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2177A2	60R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2177A3	60R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2177A4	60R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2183A1	REDX	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2183A2	LDR	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2183A3	50R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2183A4	50R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2189A1	REDX	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2189A2	LDR	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2189A3	50R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2189A4	50R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2197A1	20R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2197A2	40R	M62 J25 - J30	
17/09/15 20:53:22	SIG	M62/2197A3	40R	M62 J25 - J30	
17/09/15 20:53:27	SIG	M62/2197A1	STOP	M62 J25 - J30	
17/09/15 20:57:38	SIG	M62/2088A1	REDX	M62 J25 - J30	
17/09/15 20:57:38	SIG	M62/2088A2	50R	M62 J25 - J30	
17/09/15 20:57:38	SIG	M62/2088A3	50R	M62 J25 - J30	
17/09/15 20:57:38	SIG	M62/2088A4	50R	M62 J25 - J30	
17/09/15 21:02:08	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 21:02:08	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2065B1	REDX	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 21:02:09	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 21:02:09	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 21:03:24	SIG	M62/2041B1	REDX	M62 J25 - J30	
17/09/15 21:03:24	SIG	M62/2041B2	NR	M62 J25 - J30	
17/09/15 21:03:24	SIG	M62/2041B3	NR	M62 J25 - J30	
17/09/15 21:03:24	SIG	M62/2041B4	NR	M62 J25 - J30	
17/09/15 21:09:05	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 21:09:05	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2057B1	BLNK	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2057B2	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2057B3	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2057B4	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2065B1	BLNK	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2065B2	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2065B3	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2065B4	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M62/2065M1	NR	M62 J25 - J30	
17/09/15 21:09:06	SIG	M621/1002B1	OFF	M62 J25 - J30	
17/09/15 21:09:06	SIG	M621/1002B2	OFF	M62 J25 - J30	
17/09/15 21:09:26	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 21:09:26	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 21:09:26	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 21:09:27	SIG	M621/1010B1	LDR	M62 J25 - J30	
17/09/15 21:09:27	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2057B1	STOP	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2065B1	REDX	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 21:09:31	SIG	M621/1002B1	LDR	M62 J25 - J30	
17/09/15 21:09:31	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 21:09:37	SIG	M62/2057B1	STOP	M62 J25 - J30	
17/09/15 21:16:16	SIG	M62/2069M1	60R	M62 J25 - J30	
17/09/15 21:16:16	SIG	M62/2069M2	60R	M62 J25 - J30	
17/09/15 21:16:16	SIG	M62/2074B1	REDX	M62 J25 - J30	
17/09/15 21:16:16	SIG	M62/2074B2	60R	M62 J25 - J30	
17/09/15 21:16:16	SIG	M62/2074B3	60R	M62 J25 - J30	
17/09/15 21:16:16	SIG	M62/2074B4	60R	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2177A1	BLNK	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2177A2	OFF	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2177A3	OFF	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2177A4	OFF	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2183A2	NR	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2183A3	NR	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2183A4	NR	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2189A2	50R	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2197A1	50R	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2197A2	50R	M62 J25 - J30	
17/09/15 21:18:30	SIG	M62/2197A3	50R	M62 J25 - J30	
17/09/15 21:21:30	SIG	M62/2183A2	OFF	M62 J25 - J30	
17/09/15 21:21:31	SIG	M62/2183A1	BLNK	M62 J25 - J30	
17/09/15 21:21:31	SIG	M62/2183A3	OFF	M62 J25 - J30	
17/09/15 21:21:31	SIG	M62/2183A4	OFF	M62 J25 - J30	
17/09/15 21:22:23	SIG	M62/2057B1	REDX	M62 J25 - J30	
17/09/15 21:22:23	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 21:22:23	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 21:22:23	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 21:22:23	SIG	M621/1002B1	HSD	M62 J25 - J30	
17/09/15 21:22:23	SIG	M621/1010B1	60R	M62 J25 - J30	
17/09/15 21:22:23	SIG	M621/1010B2	60R	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2189A1	BLNK	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2189A2	OFF	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2189A3	OFF	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2189A4	OFF	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2197A1	OFF	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2197A2	OFF	M62 J25 - J30	
17/09/15 21:29:16	SIG	M62/2197A3	OFF	M62 J25 - J30	
17/09/15 21:37:06	SIG	M606/2003B1	LDR	M62 J25 - J30	
17/09/15 21:37:06	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/1992B1	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/1992B2	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/1992B3	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/1992B4	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2004B1	REDX	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2004B2	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2004B3	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2004B4	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2005M1	TI	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2005M2	TI	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2012B1	REDX	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2012B2	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2012B3	50R	M62 J25 - J30	
17/09/15 21:37:06	SIG	M62/2012B4	50R	M62 J25 - J30	
17/09/15 21:37:12	SIG	M62/1992B1	40R	M62 J25 - J30	
17/09/15 21:37:12	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 21:37:12	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 21:37:12	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 21:37:17	SIG	M62/1992B1	30R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1992B1	20R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1992B2	40R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1992B3	40R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1992B4	40R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1999B1	REDX	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 21:37:22	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 21:37:28	SIG	M62/1992B1	STOP	M62 J25 - J30	
17/09/15 21:37:58	SIG	M62/1981B1	NR	M62 J25 - J30	
17/09/15 21:37:58	SIG	M62/1981B2	NR	M62 J25 - J30	
17/09/15 21:37:58	SIG	M62/1981B3	NR	M62 J25 - J30	
17/09/15 21:37:58	SIG	M62/1981B4	NR	M62 J25 - J30	
17/09/15 21:42:35	SIG	M606/2003B2	40R	M62 J25 - J30	
17/09/15 21:46:31	SIG	M62/1999B2	40R	M62 J25 - J30	
17/09/15 21:46:31	SIG	M62/1999B3	40R	M62 J25 - J30	
17/09/15 21:46:31	SIG	M62/1999B4	40R	M62 J25 - J30	
17/09/15 21:52:24	SIG	M606/2003B2	50R	M62 J25 - J30	
17/09/15 21:52:24	SIG	M62/1999B2	50R	M62 J25 - J30	
17/09/15 21:52:24	SIG	M62/1999B3	50R	M62 J25 - J30	
17/09/15 21:52:24	SIG	M62/1999B4	50R	M62 J25 - J30	
17/09/15 22:07:06	SIG	M606/2003B1	50R	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/1992B1	OFF	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/1992B2	OFF	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/1992B3	OFF	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/1992B4	OFF	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/2005M1	50R	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/2005M2	50R	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/2012B2	60R	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/2012B3	60R	M62 J25 - J30	
17/09/15 22:07:06	SIG	M62/2012B4	60R	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2065B1	BLNK	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2065B3	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2065B4	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2065M1	NR	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2069M1	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2069M2	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2074B1	BLNK	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2074B2	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2074B3	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M62/2074B4	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M621/1010B1	OFF	M62 J25 - J30	
17/09/15 22:38:17	SIG	M621/1010B2	OFF	M62 J25 - J30	
17/09/15 22:41:17	SIG	M62/2065M1	OFF	M62 J25 - J30	
17/09/15 22:47:17	SIG	M62/2065A1	BLNK	M62 J25 - J30	
17/09/15 22:47:17	SIG	M62/2065A2	OFF	M62 J25 - J30	
17/09/15 22:47:17	SIG	M62/2065A3	OFF	M62 J25 - J30	
17/09/15 22:47:17	SIG	M62/2065A4	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2073K1	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2079A1	BLNK	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2079A2	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2079A3	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2079A4	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2088A1	BLNK	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2088A2	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2088A3	OFF	M62 J25 - J30	
17/09/15 22:47:27	SIG	M62/2088A4	OFF	M62 J25 - J30	
17/09/15 23:41:35	SIG	M62/2057B2	50R	M62 J25 - J30	
17/09/15 23:41:35	SIG	M62/2057B3	50R	M62 J25 - J30	
17/09/15 23:41:35	SIG	M62/2057B4	50R	M62 J25 - J30	
17/09/15 23:41:35	SIG	M621/1010B1	LDR	M62 J25 - J30	
17/09/15 23:41:35	SIG	M621/1010B2	50R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2057B1	STOP	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2057B2	40R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2057B3	40R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2057B4	40R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2065B1	REDX	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2065B2	50R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2065B3	50R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2065B4	50R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M62/2065M1	50R	M62 J25 - J30	
17/09/15 23:41:41	SIG	M621/1002B1	LDR	M62 J25 - J30	
17/09/15 23:41:41	SIG	M621/1002B2	50R	M62 J25 - J30	
17/09/15 23:41:46	SIG	M62/2057B1	STOP	M62 J25 - J30	
17/09/15 23:48:18	SIG	M62/1999B1	BLNK	M62 J25 - J30	
17/09/15 23:48:18	SIG	M62/1999B2	OFF	M62 J25 - J30	
17/09/15 23:48:18	SIG	M62/1999B3	OFF	M62 J25 - J30	
17/09/15 23:48:18	SIG	M62/1999B4	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M606/2003B1	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M606/2003B2	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2004B1	BLNK	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2004B2	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2004B3	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2004B4	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2005M1	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2005M2	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2012B1	BLNK	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2012B2	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2012B3	OFF	M62 J25 - J30	
17/09/15 23:48:19	SIG	M62/2012B4	OFF	M62 J25 - J30	
17/09/15 23:53:52	SIG	M62/2025B2	50R	M62 J25 - J30	
17/09/15 23:53:52	SIG	M62/2025B3	50R	M62 J25 - J30	
17/09/15 23:53:52	SIG	M62/2025B4	50R	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2012B1	REDX	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2012B2	NR	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2012B3	NR	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2012B4	NR	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2025B1	STOP	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2025B2	40R	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2025B3	40R	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2025B4	40R	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2033B1	REDX	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2033B2	50R	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2033B3	50R	M62 J25 - J30	
17/09/15 23:53:58	SIG	M62/2033B4	50R	M62 J25 - J30	
17/09/15 23:54:03	SIG	M62/2025B1	STOP	M62 J25 - J30	
17/09/15 23:56:13	SIG	M606/2003B1	NR	M62 J25 - J30	
17/09/15 23:56:13	SIG	M606/2003B2	NR	M62 J25 - J30	
17/09/15 23:56:42	SIG	M62/2088A2	50R	M62 J25 - J30	
17/09/15 23:56:42	SIG	M62/2088A3	50R	M62 J25 - J30	
17/09/15 23:56:42	SIG	M62/2088A4	50R	M62 J25 - J30	
17/09/15 23:56:48	SIG	M62/2088A1	STOP	M62 J25 - J30	
17/09/15 23:56:48	SIG	M62/2088A2	40R	M62 J25 - J30	
17/09/15 23:56:48	SIG	M62/2088A3	40R	M62 J25 - J30	
17/09/15 23:56:48	SIG	M62/2088A4	40R	M62 J25 - J30	
17/09/15 23:56:53	SIG	M62/2033B3	???	M62 J25 - J30	
17/09/15 23:56:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
17/09/15 23:56:53	SIG	M62/2088A1	STOP	M62 J25 - J30	
17/09/15 23:58:13	SIG	M62/2079A1	REDX	M62 J25 - J30	
17/09/15 23:58:13	SIG	M62/2079A2	50R	M62 J25 - J30	
17/09/15 23:58:13	SIG	M62/2079A3	50R	M62 J25 - J30	
17/09/15 23:58:13	SIG	M62/2079A4	50R	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2041B2	50R	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2041B3	50R	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2041B4	50R	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2057B1	BLNK	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2057B2	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2057B3	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2057B4	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2065B1	BLNK	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2065B2	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2065B3	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2065B4	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M62/2065M1	NR	M62 J25 - J30	
18/09/15 00:05:23	SIG	M621/1002B1	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M621/1002B2	OFF	M62 J25 - J30	
18/09/15 00:05:23	SIG	M621/1010B1	NR	M62 J25 - J30	
18/09/15 00:05:23	SIG	M621/1010B2	NR	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2050B2	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2050B3	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2050B4	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2057B1	REDX	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2057B2	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2057B3	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2057B4	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2065B1	REDX	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2065B2	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2065B3	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2065B4	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M62/2065M1	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M621/1002B1	HSD	M62 J25 - J30	
18/09/15 00:05:53	SIG	M621/1002B2	50R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 00:05:53	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 00:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 00:06:10	SIG	M62/2033B3	???	M62 J25 - J30	
18/09/15 00:14:19	SIG	M62/2069M1	60R	M62 J25 - J30	
18/09/15 00:14:19	SIG	M62/2069M2	60R	M62 J25 - J30	
18/09/15 00:14:19	SIG	M62/2074B1	REDX	M62 J25 - J30	
18/09/15 00:14:19	SIG	M62/2074B2	60R	M62 J25 - J30	
18/09/15 00:14:19	SIG	M62/2074B3	60R	M62 J25 - J30	
18/09/15 00:14:19	SIG	M62/2074B4	60R	M62 J25 - J30	
18/09/15 00:15:13	SIG	M606/2003B1	OFF	M62 J25 - J30	
18/09/15 00:15:13	SIG	M606/2003B2	OFF	M62 J25 - J30	
18/09/15 00:16:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 00:21:19	SIG	M62/2069M1	OFF	M62 J25 - J30	
18/09/15 00:21:19	SIG	M62/2069M2	OFF	M62 J25 - J30	
18/09/15 00:21:19	SIG	M62/2074B1	BLNK	M62 J25 - J30	
18/09/15 00:21:19	SIG	M62/2074B2	OFF	M62 J25 - J30	
18/09/15 00:21:19	SIG	M62/2074B3	OFF	M62 J25 - J30	
18/09/15 00:21:19	SIG	M62/2074B4	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2041B2	60R	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2041B3	60R	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2041B4	60R	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2057B1	BLNK	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2057B2	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2057B3	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2057B4	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2065B1	BLNK	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2065B2	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2065B3	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2065B4	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M62/2065M1	NR	M62 J25 - J30	
18/09/15 00:23:40	SIG	M621/1002B1	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M621/1002B2	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 00:23:40	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 00:24:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
18/09/15 00:24:04	SIG	M62/2025B2	50R	M62 J25 - J30	
18/09/15 00:24:04	SIG	M62/2025B3	50R	M62 J25 - J30	
18/09/15 00:24:04	SIG	M62/2025B4	50R	M62 J25 - J30	
18/09/15 00:24:40	SIG	M62/2018B1	NR	M62 J25 - J30	
18/09/15 00:24:40	SIG	M62/2018B2	NR	M62 J25 - J30	
18/09/15 00:24:40	SIG	M62/2018B3	NR	M62 J25 - J30	
18/09/15 00:25:36	SIG	M62/2018L1	NR	M62 J25 - J30	
18/09/15 00:26:40	SIG	M62/2065M1	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2012B1	BLNK	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2012B2	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2012B3	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2012B4	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2018B1	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2018B2	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2018B3	OFF	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2018L1	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2025B2	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2025B3	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2025B4	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2033B2	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2033B3	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2033B4	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2041B2	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2041B3	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2041B4	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2050B2	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2050B3	NR	M62 J25 - J30	
18/09/15 00:28:19	SIG	M62/2050B4	NR	M62 J25 - J30	
18/09/15 00:29:49	SIG	M62/2088A2	OFF	M62 J25 - J30	
18/09/15 00:29:49	SIG	M62/2088A3	OFF	M62 J25 - J30	
18/09/15 00:29:49	SIG	M62/2088A4	OFF	M62 J25 - J30	
18/09/15 00:30:21	SIG	M62/2088A1	REDX	M62 J25 - J30	
18/09/15 00:30:21	SIG	M62/2088A2	50R	M62 J25 - J30	
18/09/15 00:30:21	SIG	M62/2088A3	50R	M62 J25 - J30	
18/09/15 00:30:21	SIG	M62/2088A4	50R	M62 J25 - J30	
18/09/15 00:31:19	SIG	M62/2033B2	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2018L1	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2025B1	BLNK	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2025B2	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2025B3	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2025B4	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2033B1	BLNK	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2033B4	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2041B1	BLNK	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2041B2	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2041B3	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2041B4	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2050B2	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2050B3	OFF	M62 J25 - J30	
18/09/15 00:31:20	SIG	M62/2050B4	OFF	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2079A1	BLNK	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2079A2	OFF	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2079A3	OFF	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2079A4	OFF	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2088A2	OFF	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2088A3	OFF	M62 J25 - J30	
18/09/15 00:46:10	SIG	M62/2088A4	OFF	M62 J25 - J30	
18/09/15 00:46:11	SIG	M62/2088A1	BLNK	M62 J25 - J30	
18/09/15 00:46:11	SIG	M62/2088A1	BLNK	M62 J25 - J30	
18/09/15 00:48:07	SIG	M62/2124A2	NR	M62 J25 - J30	
18/09/15 00:48:07	SIG	M62/2124A3	NR	M62 J25 - J30	
18/09/15 00:48:07	SIG	M62/2124A4	NR	M62 J25 - J30	
18/09/15 00:51:07	SIG	M62/2124A1	BLNK	M62 J25 - J30	
18/09/15 00:51:07	SIG	M62/2124A2	OFF	M62 J25 - J30	
18/09/15 00:51:07	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 00:51:07	SIG	M62/2124A4	OFF	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2113B2	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2113B3	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2113B4	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2120M1	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2120M2	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2125B1	LDR	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2125B2	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2125B3	50R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2125L1	NR	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2125L2	NR	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2132B1	60R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2132B2	60R	M62 J25 - J30	
18/09/15 01:12:56	SIG	M62/2132B3	60R	M62 J25 - J30	
18/09/15 01:13:02	SIG	M62/2113B2	40R	M62 J25 - J30	
18/09/15 01:13:02	SIG	M62/2113B3	40R	M62 J25 - J30	
18/09/15 01:13:02	SIG	M62/2113B4	40R	M62 J25 - J30	
18/09/15 01:13:02	SIG	M62/2120M1	40R	M62 J25 - J30	
18/09/15 01:13:02	SIG	M62/2120M2	40R	M62 J25 - J30	
18/09/15 01:13:07	SIG	M62/2113B2	30R	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2113B1	STOP	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2113B2	20R	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2113B3	40R	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2113B4	40R	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2117B1	LDR	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2117B3	50R	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2120M1	40R	M62 J25 - J30	
18/09/15 01:13:12	SIG	M62/2120M2	40R	M62 J25 - J30	
18/09/15 01:13:17	SIG	M62/2113B1	STOP	M62 J25 - J30	
18/09/15 01:13:17	SIG	M62/2113B2	STOP	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2113B1	REDX	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2113B2	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2113B3	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2113B4	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2117B1	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2120M1	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2120M2	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2125B1	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2132B1	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2132B2	50R	M62 J25 - J30	
18/09/15 01:52:23	SIG	M62/2132B3	50R	M62 J25 - J30	
18/09/15 01:54:34	SIG	M62/2117B1	???	M62 J25 - J30	
18/09/15 01:54:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 02:15:26	SIG	M62/2125L1	NR	M62 J25 - J30	
18/09/15 02:15:26	SIG	M62/2125L2	NR	M62 J25 - J30	
18/09/15 02:15:26	SIG	M62/2132B1	OFF	M62 J25 - J30	
18/09/15 02:15:26	SIG	M62/2132B2	OFF	M62 J25 - J30	
18/09/15 02:15:26	SIG	M62/2132B3	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2113B1	BLNK	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2113B2	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2113B3	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2113B4	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2117B3	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2120M1	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2120M2	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2125B1	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2125B2	OFF	M62 J25 - J30	
18/09/15 02:15:52	SIG	M62/2125B3	OFF	M62 J25 - J30	
18/09/15 02:18:26	SIG	M62/2125L1	OFF	M62 J25 - J30	
18/09/15 02:18:27	SIG	M62/2125L2	OFF	M62 J25 - J30	
18/09/15 02:20:39	SIG	M62/2097B2	NR	M62 J25 - J30	
18/09/15 02:20:39	SIG	M62/2097B4	NR	M62 J25 - J30	
18/09/15 02:23:39	SIG	M62/2097B2	OFF	M62 J25 - J30	
18/09/15 02:23:49	SIG	M62/2097B1	BLNK	M62 J25 - J30	
18/09/15 02:23:49	SIG	M62/2097B4	OFF	M62 J25 - J30	
18/09/15 02:57:02	SIG	M606/2003B1	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M606/2003B2	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/1999B1	REDX	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/1999B2	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/1999B3	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/1999B4	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2004B1	REDX	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2004B2	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2004B3	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2004B4	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2005M1	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2005M2	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2012B1	REDX	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2012B2	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2012B3	50R	M62 J25 - J30	
18/09/15 02:57:02	SIG	M62/2012B4	50R	M62 J25 - J30	
18/09/15 02:57:24	SIG	M606/2003B1	LDR	M62 J25 - J30	
18/09/15 02:57:24	SIG	M62/1992B1	50R	M62 J25 - J30	
18/09/15 02:57:24	SIG	M62/1992B2	50R	M62 J25 - J30	
18/09/15 02:57:24	SIG	M62/1992B3	50R	M62 J25 - J30	
18/09/15 02:57:24	SIG	M62/1992B4	50R	M62 J25 - J30	
18/09/15 02:57:24	SIG	M62/2005M1	TI	M62 J25 - J30	
18/09/15 02:57:24	SIG	M62/2005M2	TI	M62 J25 - J30	
18/09/15 02:57:30	SIG	M62/1992B1	40R	M62 J25 - J30	
18/09/15 02:57:30	SIG	M62/1992B2	40R	M62 J25 - J30	
18/09/15 02:57:30	SIG	M62/1992B3	40R	M62 J25 - J30	
18/09/15 02:57:30	SIG	M62/1992B4	40R	M62 J25 - J30	
18/09/15 02:57:35	SIG	M62/1992B1	30R	M62 J25 - J30	
18/09/15 02:57:40	SIG	M62/1992B1	20R	M62 J25 - J30	
18/09/15 02:57:40	SIG	M62/1992B2	40R	M62 J25 - J30	
18/09/15 02:57:40	SIG	M62/1992B3	40R	M62 J25 - J30	
18/09/15 02:57:40	SIG	M62/1992B4	40R	M62 J25 - J30	
18/09/15 02:57:45	SIG	M62/1992B1	STOP	M62 J25 - J30	
18/09/15 03:15:12	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 03:15:12	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 03:15:12	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 03:15:17	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 03:15:17	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 03:15:17	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 03:15:23	SIG	M62/2197A1	30R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2177A1	REDX	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2183A1	REDX	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2183A2	LDR	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2189A1	REDX	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2189A2	LDR	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2197A1	20R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 03:15:28	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 03:15:33	SIG	M62/2197A1	STOP	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2177A1	BLNK	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2177A2	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2177A3	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2177A4	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2183A2	NR	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2183A3	NR	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2183A4	NR	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2189A2	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2189A3	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2189A4	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2197A1	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2197A2	OFF	M62 J25 - J30	
18/09/15 03:40:00	SIG	M62/2197A3	OFF	M62 J25 - J30	
18/09/15 03:40:01	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2189A1	REDX	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 03:40:56	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 03:43:00	SIG	M62/2183A2	OFF	M62 J25 - J30	
18/09/15 03:43:01	SIG	M62/2183A1	BLNK	M62 J25 - J30	
18/09/15 03:43:01	SIG	M62/2183A3	OFF	M62 J25 - J30	
18/09/15 03:43:01	SIG	M62/2183A4	OFF	M62 J25 - J30	
18/09/15 04:00:23	SIG	M62/2189A2	OFF	M62 J25 - J30	
18/09/15 04:00:23	SIG	M62/2189A3	OFF	M62 J25 - J30	
18/09/15 04:00:23	SIG	M62/2189A4	OFF	M62 J25 - J30	
18/09/15 04:00:23	SIG	M62/2197A1	OFF	M62 J25 - J30	
18/09/15 04:00:23	SIG	M62/2197A2	OFF	M62 J25 - J30	
18/09/15 04:00:23	SIG	M62/2197A3	OFF	M62 J25 - J30	
18/09/15 04:00:24	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 04:00:24	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 04:11:49	SIG	M606/2003B1	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M606/2003B2	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1992B1	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1992B2	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1992B3	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1992B4	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1999B1	BLNK	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1999B1	BLNK	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1999B2	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1999B3	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/1999B4	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2004B1	BLNK	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2004B2	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2004B3	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2004B4	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2005M1	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2005M2	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2012B1	BLNK	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2012B2	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2012B3	OFF	M62 J25 - J30	
18/09/15 04:11:49	SIG	M62/2012B4	OFF	M62 J25 - J30	
18/09/15 04:11:50	SIG	M62/2004B1	BLNK	M62 J25 - J30	
18/09/15 04:12:59	SIG	M606/2003B1	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M606/2003B2	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2004B1	REDX	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2004B2	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2004B3	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2004B4	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2005M1	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2005M2	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2012B1	REDX	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2012B2	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2012B3	50R	M62 J25 - J30	
18/09/15 04:12:59	SIG	M62/2012B4	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1992B1	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1992B2	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1992B3	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1992B4	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1999B1	REDX	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1999B2	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1999B3	50R	M62 J25 - J30	
18/09/15 04:13:00	SIG	M62/1999B4	50R	M62 J25 - J30	
18/09/15 04:13:22	SIG	M606/2003B1	LDR	M62 J25 - J30	
18/09/15 04:13:22	SIG	M62/1992B1	40R	M62 J25 - J30	
18/09/15 04:13:22	SIG	M62/1992B2	40R	M62 J25 - J30	
18/09/15 04:13:22	SIG	M62/1992B3	40R	M62 J25 - J30	
18/09/15 04:13:22	SIG	M62/1992B4	40R	M62 J25 - J30	
18/09/15 04:13:22	SIG	M62/2005M1	TI	M62 J25 - J30	
18/09/15 04:13:22	SIG	M62/2005M2	TI	M62 J25 - J30	
18/09/15 04:13:27	SIG	M62/1992B1	30R	M62 J25 - J30	
18/09/15 04:13:32	SIG	M62/1992B1	20R	M62 J25 - J30	
18/09/15 04:13:32	SIG	M62/1992B2	40R	M62 J25 - J30	
18/09/15 04:13:32	SIG	M62/1992B3	40R	M62 J25 - J30	
18/09/15 04:13:32	SIG	M62/1992B4	40R	M62 J25 - J30	
18/09/15 04:13:37	SIG	M62/1992B1	STOP	M62 J25 - J30	
18/09/15 04:43:17	SIG	M606/2003B2	40R	M62 J25 - J30	
18/09/15 04:43:18	SIG	M62/1999B2	40R	M62 J25 - J30	
18/09/15 04:43:18	SIG	M62/1999B3	40R	M62 J25 - J30	
18/09/15 04:43:18	SIG	M62/1999B4	40R	M62 J25 - J30	
18/09/15 04:45:41	SIG	M62/2012B1	BLNK	M62 J25 - J30	
18/09/15 04:45:41	SIG	M62/2012B2	OFF	M62 J25 - J30	
18/09/15 04:45:41	SIG	M62/2012B3	OFF	M62 J25 - J30	
18/09/15 04:45:41	SIG	M62/2012B4	OFF	M62 J25 - J30	
18/09/15 04:45:56	SIG	M606/2003B1	50R	M62 J25 - J30	
18/09/15 04:45:56	SIG	M62/1992B1	OFF	M62 J25 - J30	
18/09/15 04:45:56	SIG	M62/1992B2	OFF	M62 J25 - J30	
18/09/15 04:45:56	SIG	M62/1992B3	OFF	M62 J25 - J30	
18/09/15 04:45:56	SIG	M62/1992B4	OFF	M62 J25 - J30	
18/09/15 04:45:56	SIG	M62/2005M1	50R	M62 J25 - J30	
18/09/15 04:45:56	SIG	M62/2005M2	50R	M62 J25 - J30	
18/09/15 04:46:02	SIG	M606/2003B1	40R	M62 J25 - J30	
18/09/15 04:46:02	SIG	M62/2005M1	40R	M62 J25 - J30	
18/09/15 04:46:02	SIG	M62/2005M2	40R	M62 J25 - J30	
18/09/15 04:46:10	SIG	M62/1981B1	OFF	M62 J25 - J30	
18/09/15 04:46:10	SIG	M62/1981B2	OFF	M62 J25 - J30	
18/09/15 04:46:10	SIG	M62/1981B3	OFF	M62 J25 - J30	
18/09/15 04:46:10	SIG	M62/1981B4	OFF	M62 J25 - J30	
18/09/15 04:47:10	SIG	M62/1992B1	NR	M62 J25 - J30	
18/09/15 04:47:10	SIG	M62/1992B2	NR	M62 J25 - J30	
18/09/15 04:47:10	SIG	M62/1992B3	NR	M62 J25 - J30	
18/09/15 04:47:10	SIG	M62/1992B4	NR	M62 J25 - J30	
18/09/15 04:47:18	SIG	M606/2003B1	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M606/2003B2	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1992B1	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1992B2	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1992B3	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1992B4	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1999B1	BLNK	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1999B2	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1999B3	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/1999B4	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/2004B1	BLNK	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/2004B2	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/2004B3	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/2004B4	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/2005M1	OFF	M62 J25 - J30	
18/09/15 04:47:18	SIG	M62/2005M2	OFF	M62 J25 - J30	
18/09/15 04:49:24	SIG	M606/2003B1	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M606/2003B2	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1987B1	NR	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1987B2	NR	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1987B3	NR	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1987B4	NR	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1992B1	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1992B2	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1992B3	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1992B4	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1999B1	REDX	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1999B2	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1999B3	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/1999B4	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2004B1	REDX	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2004B2	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2004B3	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2004B4	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2005M1	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2005M2	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2012B1	REDX	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2012B2	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2012B3	60R	M62 J25 - J30	
18/09/15 04:49:24	SIG	M62/2012B4	60R	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1987B1	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1987B2	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1987B3	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1987B4	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1992B1	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1992B2	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1992B3	NR	M62 J25 - J30	
18/09/15 04:53:24	SIG	M62/1992B4	NR	M62 J25 - J30	
18/09/15 04:56:24	SIG	M606/2003B1	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M606/2003B2	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1992B1	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1992B2	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1992B3	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1992B4	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1999B1	BLNK	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1999B2	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1999B3	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/1999B4	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2004B1	BLNK	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2004B2	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2004B3	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2004B4	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2005M1	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2005M2	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2012B1	BLNK	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2012B2	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2012B3	OFF	M62 J25 - J30	
18/09/15 04:56:24	SIG	M62/2012B4	OFF	M62 J25 - J30	
18/09/15 04:56:25	SIG	M62/1987B1	OFF	M62 J25 - J30	
18/09/15 04:56:25	SIG	M62/1987B2	OFF	M62 J25 - J30	
18/09/15 04:56:25	SIG	M62/1987B3	OFF	M62 J25 - J30	
18/09/15 04:56:25	SIG	M62/1987B4	OFF	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2008K1	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2008K2	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2012A1	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2012A2	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2012A3	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2018A1	HSD	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2018A2	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2018A3	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2018A4	60R	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2025A1	REDX	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2025A2	NR	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2025A3	NR	M62 J25 - J30	
18/09/15 06:36:40	SIG	M62/2025A4	NR	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2012A1	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2018A1	HSD	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2025A2	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2025A3	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2025A4	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2033A1	REDX	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2033A2	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2033A3	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2033A4	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2041A1	REDX	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2041A2	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2041A3	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2041A4	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2050A1	REDX	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2050A2	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2050A3	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2050A4	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2057A1	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2057A2	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2057A3	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2057J1	60R	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2065A1	REDX	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2065A2	NR	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2065A3	NR	M62 J25 - J30	
18/09/15 06:36:41	SIG	M62/2065A4	NR	M62 J25 - J30	
18/09/15 06:39:31	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 06:39:38	SIG	M62/2050A1	60R	M62 J25 - J30	
18/09/15 06:40:02	SIG	M62/2041A1	60R	M62 J25 - J30	
18/09/15 06:40:27	SIG	M62/2033A1	60R	M62 J25 - J30	
18/09/15 06:40:32	SIG	M62/2018A1	60R	M62 J25 - J30	
18/09/15 06:40:32	SIG	M62/2025A1	60R	M62 J25 - J30	
18/09/15 06:55:47	SIG	M62/2065M1	NR	M62 J25 - J30	
18/09/15 06:55:47	SIG	M62/2069M1	60R	M62 J25 - J30	
18/09/15 06:55:47	SIG	M62/2069M2	60R	M62 J25 - J30	
18/09/15 06:55:47	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 06:55:47	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2012B1	REDX	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2012B2	NR	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2012B3	NR	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2012B4	NR	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2018B1	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2018B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2018B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2018L1	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2025B1	REDX	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2025B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2025B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2025B4	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2033B1	REDX	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2033B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2033B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2033B4	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2041B1	REDX	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2041B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2041B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2041B4	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2050B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2050B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2050B4	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2057B1	REDX	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2057B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2057B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2057B4	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2065B1	REDX	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2065B2	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2065B3	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2065B4	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M62/2065M1	60R	M62 J25 - J30	
18/09/15 06:55:48	SIG	M621/1002B1	HSD	M62 J25 - J30	
18/09/15 06:55:48	SIG	M621/1002B2	60R	M62 J25 - J30	
18/09/15 06:57:18	SIG	M62/2025B1	60R	M62 J25 - J30	
18/09/15 06:57:54	SIG	M62/2033B1	60R	M62 J25 - J30	
18/09/15 06:58:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 06:58:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 06:58:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 06:58:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 06:58:16	SIG	M62/2041B1	60R	M62 J25 - J30	
18/09/15 06:58:40	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 06:58:40	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 06:58:41	SIG	M62/2057B1	60R	M62 J25 - J30	
18/09/15 06:58:41	SIG	M621/1002B1	60R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 06:59:19	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 06:59:25	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 07:02:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:02:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:02:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:02:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2177B1	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2177B2	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2177L1	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2177L2	NR	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 07:03:19	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 07:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:06:19	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 07:06:19	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 07:06:20	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 07:06:20	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 07:06:20	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 07:06:20	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 07:06:20	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 07:06:20	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/1999A1	60R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/1999A2	60R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/1999A3	60R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/1999J1	50R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/1999J2	50R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/2004A1	60R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/2004A2	60R	M62 J25 - J30	
18/09/15 07:13:26	SIG	M62/2004A3	60R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2025A1	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2025A2	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2025A3	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2025A4	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2033A1	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 07:15:33	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2018A1	50R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2018A2	50R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2018A3	50R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2018A4	50R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2025A1	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2025A2	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2025A3	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2025A4	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2033A1	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2033A2	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2033A3	40R	M62 J25 - J30	
18/09/15 07:15:38	SIG	M62/2033A4	40R	M62 J25 - J30	
18/09/15 07:16:27	SIG	M62/1999A1	50R	M62 J25 - J30	
18/09/15 07:16:27	SIG	M62/1999A2	50R	M62 J25 - J30	
18/09/15 07:16:27	SIG	M62/1999A3	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2004A1	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2004A2	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2004A3	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2008K1	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2008K2	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2012A1	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2012A2	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2012A3	50R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2018A1	40R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2018A2	40R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2018A3	40R	M62 J25 - J30	
18/09/15 07:16:28	SIG	M62/2018A4	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M606/2003B1	NR	M62 J25 - J30	
18/09/15 07:16:33	SIG	M606/2003B2	NR	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2004A1	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2004A2	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2004A3	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2008K1	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2008K2	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2012A1	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2012A2	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2012A3	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2018A1	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2018A2	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2018A3	40R	M62 J25 - J30	
18/09/15 07:16:33	SIG	M62/2018A4	40R	M62 J25 - J30	
18/09/15 07:20:23	SIG	M62/2033A1	60R	M62 J25 - J30	
18/09/15 07:20:23	SIG	M62/2033A2	60R	M62 J25 - J30	
18/09/15 07:20:23	SIG	M62/2033A3	60R	M62 J25 - J30	
18/09/15 07:20:23	SIG	M62/2033A4	60R	M62 J25 - J30	
18/09/15 07:20:54	SIG	M62/2033A1	50R	M62 J25 - J30	
18/09/15 07:20:54	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 07:20:54	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 07:20:54	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 07:21:00	SIG	M62/2033A1	40R	M62 J25 - J30	
18/09/15 07:21:00	SIG	M62/2033A2	40R	M62 J25 - J30	
18/09/15 07:21:00	SIG	M62/2033A3	40R	M62 J25 - J30	
18/09/15 07:21:00	SIG	M62/2033A4	40R	M62 J25 - J30	
18/09/15 07:22:27	SIG	M62/1992A1	60R	M62 J25 - J30	
18/09/15 07:22:27	SIG	M62/1992A2	60R	M62 J25 - J30	
18/09/15 07:22:27	SIG	M62/1992A3	60R	M62 J25 - J30	
18/09/15 07:22:27	SIG	M62/1992J1	60R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1992A1	50R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1992A2	50R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1992A3	50R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1992J1	50R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1999A1	40R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1999A2	40R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1999A3	40R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1999J1	40R	M62 J25 - J30	
18/09/15 07:22:57	SIG	M62/1999J2	40R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 07:25:04	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 07:25:09	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1979K1	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1979K2	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1981A1	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1981A2	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1981A3	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1981A4	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1987A1	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1987A3	60R	M62 J25 - J30	
18/09/15 07:25:38	SIG	M62/1987J1	60R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2025B1	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2025B2	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2025B3	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2025B4	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2033B1	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2033B2	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2033B3	50R	M62 J25 - J30	
18/09/15 07:26:31	SIG	M62/2033B4	50R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2025B1	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2025B2	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2025B3	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2025B4	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2033B1	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2033B2	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2033B3	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2033B4	40R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2041B1	50R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2041B2	50R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2041B3	50R	M62 J25 - J30	
18/09/15 07:26:36	SIG	M62/2041B4	50R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1987A1	50R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1987A3	50R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1987J1	50R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1992A1	40R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1992A2	40R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1992A3	40R	M62 J25 - J30	
18/09/15 07:26:41	SIG	M62/1992J1	40R	M62 J25 - J30	
18/09/15 07:27:17	SIG	M62/2033A1	50R	M62 J25 - J30	
18/09/15 07:27:17	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 07:27:17	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 07:27:17	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 07:27:31	SIG	M62/2025A1	50R	M62 J25 - J30	
18/09/15 07:27:31	SIG	M62/2025A2	50R	M62 J25 - J30	
18/09/15 07:27:31	SIG	M62/2025A3	50R	M62 J25 - J30	
18/09/15 07:27:31	SIG	M62/2025A4	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1979K1	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1979K2	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1981A1	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1981A2	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1981A3	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1981A4	50R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1987A1	40R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1987A3	40R	M62 J25 - J30	
18/09/15 07:28:00	SIG	M62/1987J1	40R	M62 J25 - J30	
18/09/15 07:28:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:28:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:28:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:28:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:28:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:28:46	SIG	M62/2033B3	50R	M62 J25 - J30	
18/09/15 07:28:52	SIG	M62/2033B3	40R	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2177B1	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2177B2	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2177L1	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2177L2	NR	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 07:29:04	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 07:29:15	SIG	M62/2018A1	50R	M62 J25 - J30	
18/09/15 07:29:15	SIG	M62/2018A2	50R	M62 J25 - J30	
18/09/15 07:29:15	SIG	M62/2018A3	50R	M62 J25 - J30	
18/09/15 07:29:15	SIG	M62/2018A4	50R	M62 J25 - J30	
18/09/15 07:29:27	SIG	M62/1974A1	60R	M62 J25 - J30	
18/09/15 07:29:27	SIG	M62/1974A2	60R	M62 J25 - J30	
18/09/15 07:29:27	SIG	M62/1974A3	60R	M62 J25 - J30	
18/09/15 07:29:27	SIG	M62/1974A4	60R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1974A1	50R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1974A2	50R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1974A3	50R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1974A4	50R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1979K1	40R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1979K2	40R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1981A1	40R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1981A2	40R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1981A3	40R	M62 J25 - J30	
18/09/15 07:30:08	SIG	M62/1981A4	40R	M62 J25 - J30	
18/09/15 07:30:27	SIG	M62/1968A1	60R	M62 J25 - J30	
18/09/15 07:30:27	SIG	M62/1968A2	60R	M62 J25 - J30	
18/09/15 07:30:27	SIG	M62/1968A3	60R	M62 J25 - J30	
18/09/15 07:30:27	SIG	M62/1968A4	60R	M62 J25 - J30	
18/09/15 07:30:29	SIG	M62/2025B1	60R	M62 J25 - J30	
18/09/15 07:30:29	SIG	M62/2025B2	60R	M62 J25 - J30	
18/09/15 07:30:29	SIG	M62/2025B3	60R	M62 J25 - J30	
18/09/15 07:30:29	SIG	M62/2025B4	60R	M62 J25 - J30	
18/09/15 07:31:27	SIG	M62/1960A1	60R	M62 J25 - J30	
18/09/15 07:31:27	SIG	M62/1960A2	60R	M62 J25 - J30	
18/09/15 07:31:27	SIG	M62/1960A3	60R	M62 J25 - J30	
18/09/15 07:31:27	SIG	M62/1960K1	60R	M62 J25 - J30	
18/09/15 07:31:27	SIG	M62/1960K2	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2033B1	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2033B2	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2033B3	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2033B4	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2041B1	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2041B2	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2041B3	60R	M62 J25 - J30	
18/09/15 07:31:33	SIG	M62/2041B4	60R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1968A1	50R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1968A2	50R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1968A3	50R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1968A4	50R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1974A1	40R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1974A2	40R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1974A3	40R	M62 J25 - J30	
18/09/15 07:31:59	SIG	M62/1974A4	40R	M62 J25 - J30	
18/09/15 07:32:04	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 07:32:04	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 07:32:05	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 07:32:05	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 07:32:05	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 07:32:05	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 07:32:05	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 07:32:05	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 07:33:44	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 07:33:49	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 07:33:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:33:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:33:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:33:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:34:27	SIG	M62/1955K1	60R	M62 J25 - J30	
18/09/15 07:34:27	SIG	M62/1955K2	60R	M62 J25 - J30	
18/09/15 07:34:27	SIG	M62/1956A1	60R	M62 J25 - J30	
18/09/15 07:34:27	SIG	M62/1956A2	60R	M62 J25 - J30	
18/09/15 07:34:27	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:34:44	SIG	M62/2025B1	50R	M62 J25 - J30	
18/09/15 07:34:44	SIG	M62/2025B2	50R	M62 J25 - J30	
18/09/15 07:34:44	SIG	M62/2025B3	50R	M62 J25 - J30	
18/09/15 07:34:44	SIG	M62/2025B4	50R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2025B1	40R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2025B2	40R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2025B3	40R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2025B4	40R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2033B1	50R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2033B2	50R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2033B3	50R	M62 J25 - J30	
18/09/15 07:34:50	SIG	M62/2033B4	50R	M62 J25 - J30	
18/09/15 07:35:07	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:35:07	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2183B1	40R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2183B2	40R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2183L1	40R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2183L2	40R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2189B1	50R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2189B2	50R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2189B3	50R	M62 J25 - J30	
18/09/15 07:35:41	SIG	M62/2189B4	50R	M62 J25 - J30	
18/09/15 07:35:55	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:35:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:36:27	SIG	M62/2194B1	60R	M62 J25 - J30	
18/09/15 07:36:27	SIG	M62/2194B2	60R	M62 J25 - J30	
18/09/15 07:36:27	SIG	M62/2194B3	60R	M62 J25 - J30	
18/09/15 07:36:27	SIG	M62/2194B4	60R	M62 J25 - J30	
18/09/15 07:36:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:36:55	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:36:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:36:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:36:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:36:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1960A1	50R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1960A2	50R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1960A3	50R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1960K1	50R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1960K2	50R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1968A1	40R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1968A2	40R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1968A3	40R	M62 J25 - J30	
18/09/15 07:37:30	SIG	M62/1968A4	40R	M62 J25 - J30	
18/09/15 07:37:45	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:37:45	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:37:45	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 07:37:45	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 07:37:45	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 07:37:45	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 07:37:55	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:37:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:38:27	SIG	M62/2197B1	60R	M62 J25 - J30	
18/09/15 07:38:27	SIG	M62/2197B2	60R	M62 J25 - J30	
18/09/15 07:38:27	SIG	M62/2197B3	60R	M62 J25 - J30	
18/09/15 07:38:27	SIG	M62/2199M1	60R	M62 J25 - J30	
18/09/15 07:38:27	SIG	M62/2199M2	60R	M62 J25 - J30	
18/09/15 07:38:33	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 07:38:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:38:39	SIG	M62/2183B2	40R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2025B1	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2025B2	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2025B3	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2025B4	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2033B1	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2033B2	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2033B3	60R	M62 J25 - J30	
18/09/15 07:38:44	SIG	M62/2033B4	60R	M62 J25 - J30	
18/09/15 07:38:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:38:55	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1955K1	50R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1955K2	50R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1956A1	50R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1956A2	50R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1960A1	40R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1960A2	40R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1960A3	40R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1960K1	40R	M62 J25 - J30	
18/09/15 07:39:27	SIG	M62/1960K2	40R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2177B1	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2177B2	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2177L1	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2177L2	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2183B1	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2183B2	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2183L1	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2183L2	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2189B1	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2189B2	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2189B3	60R	M62 J25 - J30	
18/09/15 07:39:42	SIG	M62/2189B4	60R	M62 J25 - J30	
18/09/15 07:40:06	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:40:07	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:40:45	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 07:40:45	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 07:40:55	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:40:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:41:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:41:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:41:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:41:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:41:20	SIG	M62/1999J1	50R	M62 J25 - J30	
18/09/15 07:41:20	SIG	M62/1999J2	50R	M62 J25 - J30	
18/09/15 07:41:32	SIG	M62/1999J1	40R	M62 J25 - J30	
18/09/15 07:41:32	SIG	M62/1999J2	40R	M62 J25 - J30	
18/09/15 07:41:55	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:41:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:42:05	SIG	M62/1955K1	40R	M62 J25 - J30	
18/09/15 07:42:05	SIG	M62/1955K2	40R	M62 J25 - J30	
18/09/15 07:42:05	SIG	M62/1956A1	40R	M62 J25 - J30	
18/09/15 07:42:05	SIG	M62/1956A2	40R	M62 J25 - J30	
18/09/15 07:42:05	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:42:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:42:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:42:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:42:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:42:45	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:42:46	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:42:51	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:43:31	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:43:31	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:43:36	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:44:16	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:44:17	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:44:22	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:45:05	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:45:05	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:45:10	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1974A1	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1974A2	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1974A3	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1974A4	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1979K1	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1979K2	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1981A1	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1981A2	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1981A3	50R	M62 J25 - J30	
18/09/15 07:45:11	SIG	M62/1981A4	50R	M62 J25 - J30	
18/09/15 07:45:50	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:45:50	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:45:55	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:45:55	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:45:55	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 07:46:03	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 07:46:06	SIG	M62/1955K1	50R	M62 J25 - J30	
18/09/15 07:46:06	SIG	M62/1955K2	50R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 07:46:08	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 07:46:22	SIG	M62/2065A2	60R	M62 J25 - J30	
18/09/15 07:46:22	SIG	M62/2065A3	60R	M62 J25 - J30	
18/09/15 07:46:22	SIG	M62/2065A4	60R	M62 J25 - J30	
18/09/15 07:46:35	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:46:35	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:46:40	SIG	M62/2073K1	60R	M62 J25 - J30	
18/09/15 07:46:40	SIG	M62/2079A1	REDX	M62 J25 - J30	
18/09/15 07:46:40	SIG	M62/2079A2	NR	M62 J25 - J30	
18/09/15 07:46:40	SIG	M62/2079A3	NR	M62 J25 - J30	
18/09/15 07:46:40	SIG	M62/2079A4	NR	M62 J25 - J30	
18/09/15 07:46:41	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2079A2	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2079A3	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2079A4	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2088A1	REDX	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2088A2	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2088A3	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2088A4	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2097A1	REDX	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2097A2	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2097A3	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2097A4	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2106A1	REDX	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2106A2	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2106A3	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2106A4	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2114A1	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2114A2	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2114A3	60R	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2117A1	REDX	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2117A2	NR	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2117A3	NR	M62 J25 - J30	
18/09/15 07:46:51	SIG	M62/2117A4	NR	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1974A1	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1974A2	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1974A3	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1974A4	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1979K1	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1979K2	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1981A1	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1981A2	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1981A3	40R	M62 J25 - J30	
18/09/15 07:46:54	SIG	M62/1981A4	40R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1955K1	60R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1955K2	60R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1960A1	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1960A2	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1960A3	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1960K1	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1960K2	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1968A1	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1968A2	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1968A3	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1968A4	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1974A1	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1974A2	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1974A3	50R	M62 J25 - J30	
18/09/15 07:47:11	SIG	M62/1974A4	50R	M62 J25 - J30	
18/09/15 07:47:21	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:47:21	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:47:26	SIG	M62/1956A3	40R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1956A1	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1956A2	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1960A1	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1960A2	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1960A3	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1960K1	60R	M62 J25 - J30	
18/09/15 07:47:55	SIG	M62/1960K2	60R	M62 J25 - J30	
18/09/15 07:48:10	SIG	M62/2106A1	60R	M62 J25 - J30	
18/09/15 07:48:22	SIG	M62/1974A1	40R	M62 J25 - J30	
18/09/15 07:48:22	SIG	M62/1974A2	40R	M62 J25 - J30	
18/09/15 07:48:22	SIG	M62/1974A3	40R	M62 J25 - J30	
18/09/15 07:48:22	SIG	M62/1974A4	40R	M62 J25 - J30	
18/09/15 07:48:31	SIG	M62/2097A1	60R	M62 J25 - J30	
18/09/15 07:48:35	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:48:36	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:48:38	SIG	M62/2008K1	50R	M62 J25 - J30	
18/09/15 07:48:38	SIG	M62/2008K2	50R	M62 J25 - J30	
18/09/15 07:48:38	SIG	M62/2012A1	50R	M62 J25 - J30	
18/09/15 07:48:38	SIG	M62/2012A2	50R	M62 J25 - J30	
18/09/15 07:48:38	SIG	M62/2012A3	50R	M62 J25 - J30	
18/09/15 07:48:53	SIG	M62/2088A1	60R	M62 J25 - J30	
18/09/15 07:48:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:48:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:48:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:48:56	SIG	M62/2079A1	60R	M62 J25 - J30	
18/09/15 07:48:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:49:16	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:49:16	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:49:28	SIG	M62/2004A1	50R	M62 J25 - J30	
18/09/15 07:49:28	SIG	M62/2004A2	50R	M62 J25 - J30	
18/09/15 07:49:28	SIG	M62/2004A3	50R	M62 J25 - J30	
18/09/15 07:49:42	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 07:49:42	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 07:49:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 07:49:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1960A1	50R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1960A2	50R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1960A3	50R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1960K1	50R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1960K2	50R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1968A1	40R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1968A2	40R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1968A3	40R	M62 J25 - J30	
18/09/15 07:49:58	SIG	M62/1968A4	40R	M62 J25 - J30	
18/09/15 07:50:03	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 07:50:03	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2177B1	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2177B2	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2177L1	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2177L2	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2183B1	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2183B2	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2183L1	60R	M62 J25 - J30	
18/09/15 07:50:04	SIG	M62/2183L2	60R	M62 J25 - J30	
18/09/15 07:50:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:50:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:51:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:51:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1955K1	50R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1955K2	50R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1956A1	50R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1956A2	50R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1960A1	40R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1960A2	40R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1960A3	40R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1960K1	40R	M62 J25 - J30	
18/09/15 07:51:58	SIG	M62/1960K2	40R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2018A1	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2018A2	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2018A3	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2018A4	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2025A1	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2025A2	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2025A3	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2025A4	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2033A1	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2033A2	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2033A3	60R	M62 J25 - J30	
18/09/15 07:52:27	SIG	M62/2033A4	60R	M62 J25 - J30	
18/09/15 07:52:37	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:52:38	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:53:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:53:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:53:03	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 07:53:03	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 07:53:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:53:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1992A1	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1992A2	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1992A3	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1992J1	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1999A1	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1999A2	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1999A3	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1999J1	50R	M62 J25 - J30	
18/09/15 07:53:06	SIG	M62/1999J2	50R	M62 J25 - J30	
18/09/15 07:53:17	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:53:17	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:54:04	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:54:04	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:54:54	SIG	M62/1956A3	50R	M62 J25 - J30	
18/09/15 07:54:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:55:18	SIG	M62/2033A1	50R	M62 J25 - J30	
18/09/15 07:55:18	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 07:55:18	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 07:55:18	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2025A1	50R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2025A2	50R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2025A3	50R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2025A4	50R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2033A1	40R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2033A2	40R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2033A3	40R	M62 J25 - J30	
18/09/15 07:55:23	SIG	M62/2033A4	40R	M62 J25 - J30	
18/09/15 07:55:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1955K1	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1955K2	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1956A1	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1956A2	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1960A1	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1960A2	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1960A3	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1960K1	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1960K2	60R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1968A1	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1968A2	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1968A3	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1968A4	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1974A1	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1974A2	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1974A3	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1974A4	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1987A1	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1987A3	50R	M62 J25 - J30	
18/09/15 07:56:00	SIG	M62/1987J1	50R	M62 J25 - J30	
18/09/15 07:56:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:56:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2018A1	50R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2018A2	50R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2018A3	50R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2018A4	50R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2025A1	40R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2025A2	40R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2025A3	40R	M62 J25 - J30	
18/09/15 07:57:01	SIG	M62/2025A4	40R	M62 J25 - J30	
18/09/15 07:57:06	SIG	M62/1979K1	50R	M62 J25 - J30	
18/09/15 07:57:06	SIG	M62/1979K2	50R	M62 J25 - J30	
18/09/15 07:57:06	SIG	M62/1981A1	50R	M62 J25 - J30	
18/09/15 07:57:06	SIG	M62/1981A2	50R	M62 J25 - J30	
18/09/15 07:57:06	SIG	M62/1981A3	50R	M62 J25 - J30	
18/09/15 07:57:06	SIG	M62/1981A4	50R	M62 J25 - J30	
18/09/15 07:57:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 07:57:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:57:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/1999A1	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/1999A2	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/1999A3	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/1999J1	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/1999J2	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/2004A1	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/2004A2	40R	M62 J25 - J30	
18/09/15 07:58:23	SIG	M62/2004A3	40R	M62 J25 - J30	
18/09/15 07:58:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 07:58:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2008K1	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2008K2	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2012A1	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2012A2	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2012A3	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2018A1	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2018A2	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2018A3	40R	M62 J25 - J30	
18/09/15 07:59:09	SIG	M62/2018A4	40R	M62 J25 - J30	
18/09/15 07:59:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 07:59:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:00:47	SIG	M62/1992A1	40R	M62 J25 - J30	
18/09/15 08:00:47	SIG	M62/1992A2	40R	M62 J25 - J30	
18/09/15 08:00:47	SIG	M62/1992A3	40R	M62 J25 - J30	
18/09/15 08:00:47	SIG	M62/1992J1	40R	M62 J25 - J30	
18/09/15 08:00:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:00:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:01:01	SIG	M62/2033A1	60R	M62 J25 - J30	
18/09/15 08:01:01	SIG	M62/2033A2	60R	M62 J25 - J30	
18/09/15 08:01:01	SIG	M62/2033A3	60R	M62 J25 - J30	
18/09/15 08:01:01	SIG	M62/2033A4	60R	M62 J25 - J30	
18/09/15 08:01:27	SIG	M62/1968A1	60R	M62 J25 - J30	
18/09/15 08:01:27	SIG	M62/1968A2	60R	M62 J25 - J30	
18/09/15 08:01:27	SIG	M62/1968A3	60R	M62 J25 - J30	
18/09/15 08:01:27	SIG	M62/1968A4	60R	M62 J25 - J30	
18/09/15 08:01:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:01:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:02:27	SIG	M62/2197B1	OFF	M62 J25 - J30	
18/09/15 08:02:27	SIG	M62/2197B2	OFF	M62 J25 - J30	
18/09/15 08:02:27	SIG	M62/2197B3	OFF	M62 J25 - J30	
18/09/15 08:02:27	SIG	M62/2199M1	OFF	M62 J25 - J30	
18/09/15 08:02:27	SIG	M62/2199M2	OFF	M62 J25 - J30	
18/09/15 08:02:28	SIG	M62/1974A1	60R	M62 J25 - J30	
18/09/15 08:02:28	SIG	M62/1974A2	60R	M62 J25 - J30	
18/09/15 08:02:28	SIG	M62/1974A3	60R	M62 J25 - J30	
18/09/15 08:02:28	SIG	M62/1974A4	60R	M62 J25 - J30	
18/09/15 08:02:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:02:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:03:09	SIG	M62/2025A1	60R	M62 J25 - J30	
18/09/15 08:03:09	SIG	M62/2025A2	60R	M62 J25 - J30	
18/09/15 08:03:09	SIG	M62/2025A3	60R	M62 J25 - J30	
18/09/15 08:03:09	SIG	M62/2025A4	60R	M62 J25 - J30	
18/09/15 08:03:18	SIG	M62/1987A1	40R	M62 J25 - J30	
18/09/15 08:03:18	SIG	M62/1987A3	40R	M62 J25 - J30	
18/09/15 08:03:18	SIG	M62/1987J1	40R	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2177B1	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2177B2	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2177L1	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2177L2	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2183B1	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2183B2	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2183L1	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2183L2	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2189B1	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2189B2	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2189B3	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2189B4	NR	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2194B1	OFF	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2194B2	OFF	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2194B3	OFF	M62 J25 - J30	
18/09/15 08:03:28	SIG	M62/2194B4	OFF	M62 J25 - J30	
18/09/15 08:03:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:03:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:04:49	SIG	M62/2018A1	60R	M62 J25 - J30	
18/09/15 08:04:49	SIG	M62/2018A2	60R	M62 J25 - J30	
18/09/15 08:04:49	SIG	M62/2018A3	60R	M62 J25 - J30	
18/09/15 08:04:49	SIG	M62/2018A4	60R	M62 J25 - J30	
18/09/15 08:04:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:04:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:05:16	SIG	M62/2057B1	50R	M62 J25 - J30	
18/09/15 08:05:16	SIG	M62/2057B2	50R	M62 J25 - J30	
18/09/15 08:05:16	SIG	M62/2057B3	50R	M62 J25 - J30	
18/09/15 08:05:16	SIG	M62/2057B4	50R	M62 J25 - J30	
18/09/15 08:05:16	SIG	M621/1010B1	LDR	M62 J25 - J30	
18/09/15 08:05:16	SIG	M621/1010B2	50R	M62 J25 - J30	
18/09/15 08:05:22	SIG	M62/2057B1	40R	M62 J25 - J30	
18/09/15 08:05:22	SIG	M62/2057B2	40R	M62 J25 - J30	
18/09/15 08:05:22	SIG	M62/2057B3	40R	M62 J25 - J30	
18/09/15 08:05:22	SIG	M62/2057B4	40R	M62 J25 - J30	
18/09/15 08:05:27	SIG	M62/2057B1	30R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2057B1	20R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2057B2	40R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2057B3	40R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2057B4	40R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2065B2	50R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2065B3	50R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2065B4	50R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M62/2065M1	50R	M62 J25 - J30	
18/09/15 08:05:32	SIG	M621/1002B1	LDR	M62 J25 - J30	
18/09/15 08:05:32	SIG	M621/1002B2	50R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1974A1	50R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1974A2	50R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1974A3	50R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1974A4	50R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1979K1	40R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1979K2	40R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1981A1	40R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1981A2	40R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1981A3	40R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/1981A4	40R	M62 J25 - J30	
18/09/15 08:05:37	SIG	M62/2057B1	STOP	M62 J25 - J30	
18/09/15 08:05:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:05:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 08:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 08:06:28	SIG	M62/2189B1	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2189B2	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2189B3	OFF	M62 J25 - J30	
18/09/15 08:06:29	SIG	M62/2189B4	OFF	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2018A1	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2018A2	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2018A3	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2018A4	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2025A1	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2025A2	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2025A3	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2025A4	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2033A1	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 08:06:37	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2018A1	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2018A2	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2018A3	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2018A4	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2025A1	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2025A2	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2025A3	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2025A4	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2033A1	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2033A2	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2033A3	40R	M62 J25 - J30	
18/09/15 08:06:42	SIG	M62/2033A4	40R	M62 J25 - J30	
18/09/15 08:06:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:06:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:07:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:07:54	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2057B1	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2057B2	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2057B3	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2057B4	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2065B2	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2065B3	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2065B4	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M62/2065M1	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M621/1002B1	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M621/1002B2	60R	M62 J25 - J30	
18/09/15 08:08:34	SIG	M621/1010B1	NR	M62 J25 - J30	
18/09/15 08:08:34	SIG	M621/1010B2	NR	M62 J25 - J30	
18/09/15 08:08:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:08:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:09:27	SIG	M62/2074B1	REDX	M62 J25 - J30	
18/09/15 08:09:27	SIG	M62/2074B2	60R	M62 J25 - J30	
18/09/15 08:09:27	SIG	M62/2074B3	60R	M62 J25 - J30	
18/09/15 08:09:27	SIG	M62/2074B4	60R	M62 J25 - J30	
18/09/15 08:09:27	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 08:09:27	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 08:09:37	SIG	M62/1979K1	50R	M62 J25 - J30	
18/09/15 08:09:37	SIG	M62/1979K2	50R	M62 J25 - J30	
18/09/15 08:09:37	SIG	M62/1981A1	50R	M62 J25 - J30	
18/09/15 08:09:37	SIG	M62/1981A2	50R	M62 J25 - J30	
18/09/15 08:09:37	SIG	M62/1981A3	50R	M62 J25 - J30	
18/09/15 08:09:37	SIG	M62/1981A4	50R	M62 J25 - J30	
18/09/15 08:09:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:09:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:10:17	SIG	M62/1979K1	40R	M62 J25 - J30	
18/09/15 08:10:17	SIG	M62/1979K2	40R	M62 J25 - J30	
18/09/15 08:10:17	SIG	M62/1981A1	40R	M62 J25 - J30	
18/09/15 08:10:17	SIG	M62/1981A2	40R	M62 J25 - J30	
18/09/15 08:10:17	SIG	M62/1981A3	40R	M62 J25 - J30	
18/09/15 08:10:17	SIG	M62/1981A4	40R	M62 J25 - J30	
18/09/15 08:10:22	SIG	M62/1999J1	50R	M62 J25 - J30	
18/09/15 08:10:22	SIG	M62/1999J2	50R	M62 J25 - J30	
18/09/15 08:10:37	SIG	M62/2033A1	60R	M62 J25 - J30	
18/09/15 08:10:37	SIG	M62/2033A2	60R	M62 J25 - J30	
18/09/15 08:10:37	SIG	M62/2033A3	60R	M62 J25 - J30	
18/09/15 08:10:37	SIG	M62/2033A4	60R	M62 J25 - J30	
18/09/15 08:10:45	SIG	M62/1999A1	50R	M62 J25 - J30	
18/09/15 08:10:45	SIG	M62/1999A2	50R	M62 J25 - J30	
18/09/15 08:10:45	SIG	M62/1999A3	50R	M62 J25 - J30	
18/09/15 08:10:45	SIG	M62/2004A1	50R	M62 J25 - J30	
18/09/15 08:10:45	SIG	M62/2004A2	50R	M62 J25 - J30	
18/09/15 08:10:45	SIG	M62/2004A3	50R	M62 J25 - J30	
18/09/15 08:10:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:10:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:11:03	SIG	M62/1999A1	40R	M62 J25 - J30	
18/09/15 08:11:03	SIG	M62/1999A2	40R	M62 J25 - J30	
18/09/15 08:11:03	SIG	M62/1999A3	40R	M62 J25 - J30	
18/09/15 08:11:03	SIG	M62/2004A1	40R	M62 J25 - J30	
18/09/15 08:11:03	SIG	M62/2004A2	40R	M62 J25 - J30	
18/09/15 08:11:03	SIG	M62/2004A3	40R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1992A1	50R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1992A2	50R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1992A3	50R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1992J1	50R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1999A1	50R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1999A2	50R	M62 J25 - J30	
18/09/15 08:11:08	SIG	M62/1999A3	50R	M62 J25 - J30	
18/09/15 08:11:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:11:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:12:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:12:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:13:03	SIG	M62/2025A1	60R	M62 J25 - J30	
18/09/15 08:13:03	SIG	M62/2025A2	60R	M62 J25 - J30	
18/09/15 08:13:03	SIG	M62/2025A3	60R	M62 J25 - J30	
18/09/15 08:13:03	SIG	M62/2025A4	60R	M62 J25 - J30	
18/09/15 08:13:05	SIG	M62/1987A1	50R	M62 J25 - J30	
18/09/15 08:13:05	SIG	M62/1987A3	50R	M62 J25 - J30	
18/09/15 08:13:05	SIG	M62/1987J1	50R	M62 J25 - J30	
18/09/15 08:13:14	SIG	M62/1999A1	40R	M62 J25 - J30	
18/09/15 08:13:14	SIG	M62/1999A2	40R	M62 J25 - J30	
18/09/15 08:13:14	SIG	M62/1999A3	40R	M62 J25 - J30	
18/09/15 08:13:14	SIG	M62/1999J1	40R	M62 J25 - J30	
18/09/15 08:13:14	SIG	M62/1999J2	40R	M62 J25 - J30	
18/09/15 08:13:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:13:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:14:09	SIG	M62/2018A1	60R	M62 J25 - J30	
18/09/15 08:14:09	SIG	M62/2018A2	60R	M62 J25 - J30	
18/09/15 08:14:09	SIG	M62/2018A3	60R	M62 J25 - J30	
18/09/15 08:14:09	SIG	M62/2018A4	60R	M62 J25 - J30	
18/09/15 08:14:18	SIG	M62/1979K1	50R	M62 J25 - J30	
18/09/15 08:14:18	SIG	M62/1979K2	50R	M62 J25 - J30	
18/09/15 08:14:18	SIG	M62/1981A1	50R	M62 J25 - J30	
18/09/15 08:14:18	SIG	M62/1981A2	50R	M62 J25 - J30	
18/09/15 08:14:18	SIG	M62/1981A3	50R	M62 J25 - J30	
18/09/15 08:14:18	SIG	M62/1981A4	50R	M62 J25 - J30	
18/09/15 08:14:46	SIG	M62/1992A1	40R	M62 J25 - J30	
18/09/15 08:14:46	SIG	M62/1992A2	40R	M62 J25 - J30	
18/09/15 08:14:46	SIG	M62/1992A3	40R	M62 J25 - J30	
18/09/15 08:14:46	SIG	M62/1992J1	40R	M62 J25 - J30	
18/09/15 08:14:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:14:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:15:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:15:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:16:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:16:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:17:35	SIG	M62/1987A1	40R	M62 J25 - J30	
18/09/15 08:17:35	SIG	M62/1987A3	40R	M62 J25 - J30	
18/09/15 08:17:35	SIG	M62/1987J1	40R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2004A1	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2004A2	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2004A3	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2008K1	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2008K2	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2012A1	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2012A2	50R	M62 J25 - J30	
18/09/15 08:17:37	SIG	M62/2012A3	50R	M62 J25 - J30	
18/09/15 08:17:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:17:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:18:28	SIG	M62/1974A1	60R	M62 J25 - J30	
18/09/15 08:18:28	SIG	M62/1974A2	60R	M62 J25 - J30	
18/09/15 08:18:28	SIG	M62/1974A3	60R	M62 J25 - J30	
18/09/15 08:18:28	SIG	M62/1974A4	60R	M62 J25 - J30	
18/09/15 08:18:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:18:53	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:18:58	SIG	M62/1999A1	50R	M62 J25 - J30	
18/09/15 08:18:58	SIG	M62/1999A2	50R	M62 J25 - J30	
18/09/15 08:18:58	SIG	M62/1999A3	50R	M62 J25 - J30	
18/09/15 08:18:58	SIG	M62/1999J1	50R	M62 J25 - J30	
18/09/15 08:18:58	SIG	M62/1999J2	50R	M62 J25 - J30	
18/09/15 08:19:52	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:19:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:20:52	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:20:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:21:41	SIG	M62/1992A1	50R	M62 J25 - J30	
18/09/15 08:21:41	SIG	M62/1992A2	50R	M62 J25 - J30	
18/09/15 08:21:41	SIG	M62/1992A3	50R	M62 J25 - J30	
18/09/15 08:21:41	SIG	M62/1992J1	50R	M62 J25 - J30	
18/09/15 08:22:09	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:22:10	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 08:22:46	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2163A1	NR	M62 J25 - J30	
18/09/15 08:22:52	SIG	M62/2163A2	NR	M62 J25 - J30	
18/09/15 08:23:20	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:23:21	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:23:34	SIG	M62/1987A1	50R	M62 J25 - J30	
18/09/15 08:23:34	SIG	M62/1987A3	50R	M62 J25 - J30	
18/09/15 08:23:34	SIG	M62/1987J1	50R	M62 J25 - J30	
18/09/15 08:24:02	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:24:02	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:24:28	SIG	M62/2074B1	BLNK	M62 J25 - J30	
18/09/15 08:24:28	SIG	M62/2074B2	OFF	M62 J25 - J30	
18/09/15 08:24:28	SIG	M62/2074B3	OFF	M62 J25 - J30	
18/09/15 08:24:28	SIG	M62/2074B4	OFF	M62 J25 - J30	
18/09/15 08:24:28	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 08:24:28	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 08:24:52	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:24:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:25:13	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 08:25:14	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 08:25:19	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M606/2003B1	NR	M62 J25 - J30	
18/09/15 08:25:28	SIG	M606/2003B2	NR	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2004A1	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2004A2	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2004A3	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2008K1	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2008K2	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2012A1	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2012A2	60R	M62 J25 - J30	
18/09/15 08:25:28	SIG	M62/2012A3	60R	M62 J25 - J30	
18/09/15 08:27:05	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:27:05	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1979K1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1979K2	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1981A1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1981A2	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1981A3	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1981A4	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1987A1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1987A3	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1987J1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1992A1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1992A2	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1992A3	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1992J1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1999A1	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1999A2	60R	M62 J25 - J30	
18/09/15 08:27:38	SIG	M62/1999A3	60R	M62 J25 - J30	
18/09/15 08:27:52	SIG	M62/1956A3	60R	M62 J25 - J30	
18/09/15 08:27:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
18/09/15 08:28:13	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 08:28:14	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 08:28:19	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 08:28:29	SIG	M606/2003B1	OFF	M62 J25 - J30	
18/09/15 08:28:29	SIG	M606/2003B2	OFF	M62 J25 - J30	
18/09/15 08:29:03	SIG	M62/2065A2	50R	M62 J25 - J30	
18/09/15 08:29:03	SIG	M62/2065A3	50R	M62 J25 - J30	
18/09/15 08:29:03	SIG	M62/2065A4	50R	M62 J25 - J30	
18/09/15 08:29:12	SIG	M62/2088A1	50R	M62 J25 - J30	
18/09/15 08:29:12	SIG	M62/2088A2	50R	M62 J25 - J30	
18/09/15 08:29:12	SIG	M62/2088A3	50R	M62 J25 - J30	
18/09/15 08:29:12	SIG	M62/2088A4	50R	M62 J25 - J30	
18/09/15 08:29:18	SIG	M62/2088A1	40R	M62 J25 - J30	
18/09/15 08:29:18	SIG	M62/2088A2	40R	M62 J25 - J30	
18/09/15 08:29:18	SIG	M62/2088A3	40R	M62 J25 - J30	
18/09/15 08:29:18	SIG	M62/2088A4	40R	M62 J25 - J30	
18/09/15 08:29:23	SIG	M62/2088A1	30R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2073K1	50R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2079A1	LDR	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2079A2	50R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2079A3	50R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2079A4	50R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2088A1	20R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2088A2	40R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2088A3	40R	M62 J25 - J30	
18/09/15 08:29:28	SIG	M62/2088A4	40R	M62 J25 - J30	
18/09/15 08:29:43	SIG	M62/2088A1	STOP	M62 J25 - J30	
18/09/15 08:31:15	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 08:31:15	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 08:31:21	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2135A1	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2135A2	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2135A3	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2135A4	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2144A1	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2144A2	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2144J1	60R	M62 J25 - J30	
18/09/15 08:31:28	SIG	M62/2144K1	60R	M62 J25 - J30	
18/09/15 08:32:08	SIG	M62/2097A1	LDR	M62 J25 - J30	
18/09/15 08:32:08	SIG	M62/2097A2	50R	M62 J25 - J30	
18/09/15 08:32:08	SIG	M62/2097A3	50R	M62 J25 - J30	
18/09/15 08:32:08	SIG	M62/2097A4	50R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2151A1	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2151A2	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2151J1	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2151K1	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2157A1	NR	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2157A2	NR	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2157J1	NR	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2157J2	NR	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2157K1	NR	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2163A1	OFF	M62 J25 - J30	
18/09/15 08:33:14	SIG	M62/2163A2	OFF	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 08:33:47	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 08:33:49	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2163A1	NR	M62 J25 - J30	
18/09/15 08:33:53	SIG	M62/2163A2	NR	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 08:33:55	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 08:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 08:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 08:36:20	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 08:36:21	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 08:36:26	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 08:36:28	SIG	M62/2065A2	60R	M62 J25 - J30	
18/09/15 08:36:28	SIG	M62/2065A3	60R	M62 J25 - J30	
18/09/15 08:36:28	SIG	M62/2065A4	60R	M62 J25 - J30	
18/09/15 08:36:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 08:36:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 08:36:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 08:36:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2151A1	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2151A2	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2151J1	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2151K1	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2157A1	NR	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2157A2	NR	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2157J1	NR	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2157J2	NR	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2157K1	NR	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2163A1	OFF	M62 J25 - J30	
18/09/15 08:37:47	SIG	M62/2163A2	OFF	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2177B1	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2177B2	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2177L1	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2177L2	NR	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 08:37:49	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1974A1	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1974A2	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1974A3	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1974A4	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1979K1	OFF	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1979K2	OFF	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1981A1	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1981A2	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1981A3	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1981A4	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1987A1	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1987A3	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1987J1	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1992A1	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1992A2	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1992A3	NR	M62 J25 - J30	
18/09/15 08:39:38	SIG	M62/1992J1	NR	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2073K1	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2079A1	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2079A2	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2079A3	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2079A4	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2088A1	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2088A2	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2088A3	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2088A4	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2097A1	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2097A2	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2097A3	60R	M62 J25 - J30	
18/09/15 08:40:01	SIG	M62/2097A4	60R	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/1999A1	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/1999A2	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/1999A3	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/1999J1	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/1999J2	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/2004A1	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/2004A2	OFF	M62 J25 - J30	
18/09/15 08:40:28	SIG	M62/2004A3	OFF	M62 J25 - J30	
18/09/15 08:40:49	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 08:40:49	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 08:40:50	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 08:40:50	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 08:40:50	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 08:40:50	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 08:40:50	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 08:40:50	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1955K1	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1955K2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1956A1	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1956A2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1960A1	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1960A2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1960A3	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1960K1	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1960K2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1968A1	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1968A2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1968A3	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1968A4	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1974A1	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1974A2	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1974A3	OFF	M62 J25 - J30	
18/09/15 08:41:38	SIG	M62/1974A4	OFF	M62 J25 - J30	
18/09/15 08:42:38	SIG	M62/1981A1	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1981A2	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1981A3	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1981A4	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1987A1	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1987A3	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1987J1	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1992A1	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1992A2	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1992A3	OFF	M62 J25 - J30	
18/09/15 08:42:48	SIG	M62/1992J1	OFF	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2135A1	OFF	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2135A2	OFF	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2135A3	OFF	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2135A4	OFF	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2144A1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2144A2	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2144J1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2144K1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2151A1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2151A2	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2151J1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2151K1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2155A1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2155A2	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2155J1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2155K1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2157A1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2157A2	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2157J1	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2157J2	NR	M62 J25 - J30	
18/09/15 08:45:28	SIG	M62/2157K1	NR	M62 J25 - J30	
18/09/15 08:48:28	SIG	M62/2144J1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2144A1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2144A2	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2144K1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2151A1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2151A2	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2151J1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2151K1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2155A1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2155A2	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2155J1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2155K1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2157A2	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2157J1	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2157J2	OFF	M62 J25 - J30	
18/09/15 08:48:29	SIG	M62/2157K1	OFF	M62 J25 - J30	
18/09/15 09:06:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 09:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 09:17:07	SIG	M62/2079A1	HSD	M62 J25 - J30	
18/09/15 09:18:15	SIG	M62/2088A1	HSD	M62 J25 - J30	
18/09/15 09:19:23	SIG	M62/2097A1	HSD	M62 J25 - J30	
18/09/15 09:19:24	SIG	M62/2079A1	REDX	M62 J25 - J30	
18/09/15 09:20:31	SIG	M62/2088A1	REDX	M62 J25 - J30	
18/09/15 09:20:31	SIG	M62/2106A1	HSD	M62 J25 - J30	
18/09/15 09:21:39	SIG	M62/2097A1	REDX	M62 J25 - J30	
18/09/15 09:22:48	SIG	M62/2106A1	REDX	M62 J25 - J30	
18/09/15 09:23:48	SIG	M62/2065A2	NR	M62 J25 - J30	
18/09/15 09:23:48	SIG	M62/2065A3	NR	M62 J25 - J30	
18/09/15 09:23:48	SIG	M62/2065A4	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2073K1	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2079A2	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2079A3	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2079A4	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2088A2	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2088A3	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2088A4	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2097A2	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2097A3	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2097A4	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2106A2	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2106A3	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2106A4	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2114A1	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2114A2	NR	M62 J25 - J30	
18/09/15 09:24:08	SIG	M62/2114A3	NR	M62 J25 - J30	
18/09/15 09:24:57	SIG	M62/2073K1	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2079A1	BLNK	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2079A2	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2079A3	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2079A4	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2088A1	BLNK	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2088A2	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2088A3	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2088A4	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2097A1	BLNK	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2097A2	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2097A3	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2097A4	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2106A1	BLNK	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2106A2	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2106A4	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2114A1	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2114A2	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2114A3	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2117A1	BLNK	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2117A2	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2117A3	OFF	M62 J25 - J30	
18/09/15 09:25:08	SIG	M62/2117A4	OFF	M62 J25 - J30	
18/09/15 09:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 09:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 10:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 10:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 10:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 10:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 11:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 11:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 11:19:06	SIG	M62/2097B3	OFF	M62 J25 - J30	
18/09/15 11:30:25	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 11:30:25	SIG	M62/2025A1	???	M62 J25 - J30	
18/09/15 11:30:44	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 11:30:44	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 11:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 11:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 11:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 11:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 12:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 12:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 12:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 12:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 12:07:59	SIG	M62/1999J1	50R	M62 J25 - J30	
18/09/15 12:07:59	SIG	M62/1999J2	50R	M62 J25 - J30	
18/09/15 12:22:08	SIG	M62/1999J1	OFF	M62 J25 - J30	
18/09/15 12:22:08	SIG	M62/1999J2	OFF	M62 J25 - J30	
18/09/15 12:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 12:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 12:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 12:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 13:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 13:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 13:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 13:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 13:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 13:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 13:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 13:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 13:39:34	SIG	M62/2074B1	REDX	M62 J25 - J30	
18/09/15 13:39:34	SIG	M62/2074B2	60R	M62 J25 - J30	
18/09/15 13:39:34	SIG	M62/2074B3	60R	M62 J25 - J30	
18/09/15 13:39:34	SIG	M62/2074B4	60R	M62 J25 - J30	
18/09/15 13:39:34	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 13:39:34	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 13:55:34	SIG	M62/2074B1	BLNK	M62 J25 - J30	
18/09/15 13:55:34	SIG	M62/2074B2	OFF	M62 J25 - J30	
18/09/15 13:55:34	SIG	M62/2074B3	OFF	M62 J25 - J30	
18/09/15 13:55:34	SIG	M62/2074B4	OFF	M62 J25 - J30	
18/09/15 13:55:34	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 13:55:34	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 14:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 14:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 14:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 14:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 14:24:39	SIG	M62/2113B1	REDX	M62 J25 - J30	
18/09/15 14:24:39	SIG	M62/2113B2	NR	M62 J25 - J30	
18/09/15 14:24:39	SIG	M62/2113B3	NR	M62 J25 - J30	
18/09/15 14:24:39	SIG	M62/2113B4	NR	M62 J25 - J30	
18/09/15 14:24:39	SIG	M62/2120M1	60R	M62 J25 - J30	
18/09/15 14:24:39	SIG	M62/2120M2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2074B1	REDX	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2074B2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2074B3	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2074B4	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2081B1	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2081B2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2081B3	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2081L1	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2088B1	REDX	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2088B2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2088B3	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2088B4	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2097B1	REDX	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2097B2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2097B3	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2097B4	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2106B1	REDX	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2106B2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2106B3	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2106B4	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2113B2	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2113B3	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2113B4	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2117B1	60R	M62 J25 - J30	
18/09/15 14:24:40	SIG	M62/2117B3	60R	M62 J25 - J30	
18/09/15 14:24:41	SIG	M62/2081L1	60R	M62 J25 - J30	
18/09/15 14:27:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 14:27:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 14:27:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 14:27:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 14:27:59	SIG	M62/2088B1	60R	M62 J25 - J30	
18/09/15 14:28:17	SIG	M62/2097B1	60R	M62 J25 - J30	
18/09/15 14:30:45	SIG	M62/2106B1	60R	M62 J25 - J30	
18/09/15 14:30:50	SIG	M62/2113B1	60R	M62 J25 - J30	
18/09/15 14:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 14:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 14:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 14:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 14:54:53	SIG	M62/2065A2	60R	M62 J25 - J30	
18/09/15 14:54:53	SIG	M62/2065A3	60R	M62 J25 - J30	
18/09/15 14:54:53	SIG	M62/2065A4	60R	M62 J25 - J30	
18/09/15 14:55:03	SIG	M62/2073K1	60R	M62 J25 - J30	
18/09/15 14:55:03	SIG	M62/2079A1	REDX	M62 J25 - J30	
18/09/15 14:55:03	SIG	M62/2079A2	NR	M62 J25 - J30	
18/09/15 14:55:03	SIG	M62/2079A3	NR	M62 J25 - J30	
18/09/15 14:55:03	SIG	M62/2079A4	NR	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2079A2	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2079A3	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2079A4	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2088A1	REDX	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2088A2	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2088A3	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2088A4	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2097A1	REDX	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2097A2	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2097A3	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2097A4	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2106A1	REDX	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2106A2	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2106A3	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2106A4	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2114A1	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2114A2	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2114A3	60R	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2117A1	REDX	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2117A2	NR	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2117A3	NR	M62 J25 - J30	
18/09/15 14:55:21	SIG	M62/2117A4	NR	M62 J25 - J30	
18/09/15 14:56:14	SIG	M62/2106A1	60R	M62 J25 - J30	
18/09/15 14:56:36	SIG	M62/2097A1	60R	M62 J25 - J30	
18/09/15 14:56:59	SIG	M62/2088A1	60R	M62 J25 - J30	
18/09/15 14:57:02	SIG	M62/2079A1	60R	M62 J25 - J30	
18/09/15 14:57:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 14:57:24	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 14:57:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 14:57:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 15:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 15:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 15:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 15:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 15:12:35	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 15:12:35	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 15:18:03	SIG	M62/2197A1	60R	M62 J25 - J30	
18/09/15 15:18:03	SIG	M62/2197A2	60R	M62 J25 - J30	
18/09/15 15:18:03	SIG	M62/2197A3	60R	M62 J25 - J30	
18/09/15 15:18:30	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 15:18:30	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 15:18:30	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 15:20:16	SIG	M62/2050A1	OFF	M62 J25 - J30	
18/09/15 15:20:17	SIG	M62/2050A1	60R	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2189A1	REDX	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 15:22:26	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A1	REDX	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A2	NR	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A3	NR	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A4	NR	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2183A1	REDX	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2183A2	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2183A3	60R	M62 J25 - J30	
18/09/15 15:23:10	SIG	M62/2183A4	60R	M62 J25 - J30	
18/09/15 15:24:35	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 15:25:11	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 15:25:27	SIG	M62/2183A1	60R	M62 J25 - J30	
18/09/15 15:25:31	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2189A1	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2189A2	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2189A3	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2189A4	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2197A1	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2197A2	60R	M62 J25 - J30	
18/09/15 15:28:44	SIG	M62/2197A3	60R	M62 J25 - J30	
18/09/15 15:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 15:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 15:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 15:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 15:36:40	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 15:36:40	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 15:36:40	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 15:36:45	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 15:42:44	SIG	M62/2050A1	60R	M62 J25 - J30	
18/09/15 15:42:44	SIG	M62/2050A1	OFF	M62 J25 - J30	
18/09/15 15:44:56	SIG	M62/2050A1	60R	M62 J25 - J30	
18/09/15 15:44:56	SIG	M62/2050A1	OFF	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 15:45:44	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 15:47:18	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 15:49:36	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 15:49:36	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 15:49:36	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 15:49:36	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 15:50:41	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2065B2	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2065B3	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2065B4	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2065M1	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2069M1	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2069M2	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2074B2	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2074B3	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M62/2074B4	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M621/1002B1	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M621/1002B2	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M621/1010B1	50R	M62 J25 - J30	
18/09/15 15:51:49	SIG	M621/1010B2	50R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M62/2065B2	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M62/2065B3	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M62/2065B4	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M62/2065M1	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M62/2069M1	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M62/2069M2	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M621/1002B1	40R	M62 J25 - J30	
18/09/15 15:51:54	SIG	M621/1002B2	40R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2074B2	40R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2074B3	40R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2074B4	40R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2081B1	50R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2081B2	50R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2081B3	50R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M62/2081L1	50R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M621/1010B1	40R	M62 J25 - J30	
18/09/15 15:51:55	SIG	M621/1010B2	40R	M62 J25 - J30	
18/09/15 15:54:36	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 15:54:36	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 15:54:36	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 15:54:36	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 15:54:36	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 15:54:41	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M62/2065B2	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M62/2065B3	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M62/2065B4	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M62/2065M1	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M62/2069M1	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M62/2069M2	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M621/1002B1	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M621/1002B2	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 15:55:49	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 15:57:06	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 15:57:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 15:57:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 15:57:08	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 15:57:18	SIG	M62/2065B2	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M62/2065B3	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M62/2065B4	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M62/2065M1	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M62/2069M1	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M62/2069M2	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M621/1002B1	50R	M62 J25 - J30	
18/09/15 15:57:18	SIG	M621/1002B2	50R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M62/2065B2	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M62/2065B3	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M62/2065B4	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M62/2065M1	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M62/2069M1	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M62/2069M2	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M621/1002B1	40R	M62 J25 - J30	
18/09/15 15:57:24	SIG	M621/1002B2	40R	M62 J25 - J30	
18/09/15 15:57:27	SIG	M621/1010B1	50R	M62 J25 - J30	
18/09/15 15:57:27	SIG	M621/1010B2	50R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 15:57:29	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 15:57:33	SIG	M621/1010B1	40R	M62 J25 - J30	
18/09/15 15:57:33	SIG	M621/1010B2	40R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2183A1	60R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2183A2	60R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2183A3	60R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2183A4	60R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 15:58:35	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 15:58:58	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 15:59:04	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 15:59:22	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 15:59:22	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 15:59:22	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:00:59	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 16:00:59	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 16:00:59	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:01:29	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:01:36	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:02:44	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:02:49	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2081B1	40R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2081B2	40R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2081B3	40R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2081L1	40R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2088B1	50R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2088B2	50R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2088B3	50R	M62 J25 - J30	
18/09/15 16:04:36	SIG	M62/2088B4	50R	M62 J25 - J30	
18/09/15 16:05:50	SIG	M62/2088B1	40R	M62 J25 - J30	
18/09/15 16:05:50	SIG	M62/2088B2	40R	M62 J25 - J30	
18/09/15 16:05:50	SIG	M62/2088B3	40R	M62 J25 - J30	
18/09/15 16:05:50	SIG	M62/2088B4	40R	M62 J25 - J30	
18/09/15 16:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 16:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 16:06:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:06:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:07:34	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:08:08	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:09:15	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 16:09:15	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 16:09:15	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:09:59	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:10:28	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 16:10:28	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 16:10:28	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 16:11:43	SIG	M62/2088B1	50R	M62 J25 - J30	
18/09/15 16:11:43	SIG	M62/2088B2	50R	M62 J25 - J30	
18/09/15 16:11:43	SIG	M62/2088B3	50R	M62 J25 - J30	
18/09/15 16:11:43	SIG	M62/2088B4	50R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:12:18	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:13:19	SIG	M62/2088B1	40R	M62 J25 - J30	
18/09/15 16:13:19	SIG	M62/2088B2	40R	M62 J25 - J30	
18/09/15 16:13:19	SIG	M62/2088B3	40R	M62 J25 - J30	
18/09/15 16:13:19	SIG	M62/2088B4	40R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 16:13:58	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 16:14:36	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 16:14:45	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 16:16:14	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:16:18	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:16:36	SIG	M62/2097B1	50R	M62 J25 - J30	
18/09/15 16:16:36	SIG	M62/2097B2	50R	M62 J25 - J30	
18/09/15 16:16:36	SIG	M62/2097B3	50R	M62 J25 - J30	
18/09/15 16:16:36	SIG	M62/2097B4	50R	M62 J25 - J30	
18/09/15 16:17:23	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:17:24	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:17:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:17:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:17:42	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:18:23	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:18:23	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 16:18:23	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 16:18:23	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 16:18:28	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:18:45	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 16:18:54	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:19:08	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:19:36	SIG	M62/2144A1	60R	M62 J25 - J30	
18/09/15 16:19:36	SIG	M62/2144A2	60R	M62 J25 - J30	
18/09/15 16:19:36	SIG	M62/2144J1	60R	M62 J25 - J30	
18/09/15 16:19:36	SIG	M62/2144K1	60R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2151A1	40R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2151A2	40R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2151J1	40R	M62 J25 - J30	
18/09/15 16:20:03	SIG	M62/2151K1	40R	M62 J25 - J30	
18/09/15 16:20:36	SIG	M62/2106B1	50R	M62 J25 - J30	
18/09/15 16:20:36	SIG	M62/2106B2	50R	M62 J25 - J30	
18/09/15 16:20:36	SIG	M62/2106B3	50R	M62 J25 - J30	
18/09/15 16:20:36	SIG	M62/2106B4	50R	M62 J25 - J30	
18/09/15 16:20:36	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:21:03	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:21:08	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:21:08	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:21:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:21:29	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:21:34	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:21:36	SIG	M62/2135A1	60R	M62 J25 - J30	
18/09/15 16:21:36	SIG	M62/2135A2	60R	M62 J25 - J30	
18/09/15 16:21:36	SIG	M62/2135A3	60R	M62 J25 - J30	
18/09/15 16:21:36	SIG	M62/2135A4	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2117A2	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2117A3	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2117A4	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2122K1	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2122K2	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2124A1	REDX	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2124A2	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2124A3	60R	M62 J25 - J30	
18/09/15 16:22:37	SIG	M62/2124A4	60R	M62 J25 - J30	
18/09/15 16:22:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:22:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:22:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:22:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:22:53	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 16:23:11	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 16:23:16	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 16:23:17	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:23:17	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:23:17	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:23:17	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:23:17	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:23:24	SIG	M62/2088B1	50R	M62 J25 - J30	
18/09/15 16:23:24	SIG	M62/2088B2	50R	M62 J25 - J30	
18/09/15 16:23:24	SIG	M62/2088B3	50R	M62 J25 - J30	
18/09/15 16:23:24	SIG	M62/2088B4	50R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 16:23:57	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 16:24:05	SIG	M62/2144A1	40R	M62 J25 - J30	
18/09/15 16:24:05	SIG	M62/2144A2	40R	M62 J25 - J30	
18/09/15 16:24:05	SIG	M62/2144J1	40R	M62 J25 - J30	
18/09/15 16:24:05	SIG	M62/2144K1	40R	M62 J25 - J30	
18/09/15 16:24:06	SIG	M62/2088B1	40R	M62 J25 - J30	
18/09/15 16:24:06	SIG	M62/2088B2	40R	M62 J25 - J30	
18/09/15 16:24:06	SIG	M62/2088B3	40R	M62 J25 - J30	
18/09/15 16:24:06	SIG	M62/2088B4	40R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:24:12	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:24:44	SIG	M62/2135A3	OFF	M62 J25 - J30	
18/09/15 16:24:45	SIG	M62/2135A3	OFF	M62 J25 - J30	
18/09/15 16:24:45	SIG	M62/2135A3	60R	M62 J25 - J30	
18/09/15 16:25:59	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 16:25:59	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 16:25:59	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:26:35	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:26:35	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:26:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:26:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:27:11	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 16:27:16	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:27:27	SIG	M62/2097B1	40R	M62 J25 - J30	
18/09/15 16:27:27	SIG	M62/2097B2	40R	M62 J25 - J30	
18/09/15 16:27:27	SIG	M62/2097B3	40R	M62 J25 - J30	
18/09/15 16:27:27	SIG	M62/2097B4	40R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2144A1	60R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2144A2	60R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2144J1	60R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2144K1	60R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 16:28:04	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2151A1	40R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2151A2	40R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2151J1	40R	M62 J25 - J30	
18/09/15 16:28:39	SIG	M62/2151K1	40R	M62 J25 - J30	
18/09/15 16:28:41	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 16:28:41	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 16:28:41	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:28:56	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:29:06	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:29:11	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:29:11	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:29:23	SIG	M62/2144A1	40R	M62 J25 - J30	
18/09/15 16:29:23	SIG	M62/2144A2	40R	M62 J25 - J30	
18/09/15 16:29:23	SIG	M62/2144J1	40R	M62 J25 - J30	
18/09/15 16:29:23	SIG	M62/2144K1	40R	M62 J25 - J30	
18/09/15 16:29:39	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:29:40	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:29:45	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2125B1	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2125B2	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2125B3	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2125L1	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2125L2	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:31:37	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 16:31:38	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 16:31:44	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:31:44	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:31:44	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:31:44	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:31:44	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:31:56	SIG	M62/2135A1	50R	M62 J25 - J30	
18/09/15 16:31:56	SIG	M62/2135A2	50R	M62 J25 - J30	
18/09/15 16:31:56	SIG	M62/2135A3	50R	M62 J25 - J30	
18/09/15 16:31:56	SIG	M62/2135A4	50R	M62 J25 - J30	
18/09/15 16:32:02	SIG	M62/2135A1	40R	M62 J25 - J30	
18/09/15 16:32:02	SIG	M62/2135A2	40R	M62 J25 - J30	
18/09/15 16:32:02	SIG	M62/2135A3	40R	M62 J25 - J30	
18/09/15 16:32:02	SIG	M62/2135A4	40R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:32:39	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:32:42	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 16:32:42	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 16:32:42	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:33:23	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 16:33:23	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 16:33:23	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 16:33:23	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 16:33:52	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 16:33:52	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 16:33:52	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 16:34:01	SIG	M62/2097B1	50R	M62 J25 - J30	
18/09/15 16:34:01	SIG	M62/2097B2	50R	M62 J25 - J30	
18/09/15 16:34:01	SIG	M62/2097B3	50R	M62 J25 - J30	
18/09/15 16:34:01	SIG	M62/2097B4	50R	M62 J25 - J30	
18/09/15 16:34:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:34:46	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:34:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:34:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:35:13	SIG	M62/2097B1	40R	M62 J25 - J30	
18/09/15 16:35:13	SIG	M62/2097B2	40R	M62 J25 - J30	
18/09/15 16:35:13	SIG	M62/2097B3	40R	M62 J25 - J30	
18/09/15 16:35:13	SIG	M62/2097B4	40R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:35:38	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:35:56	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 16:36:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:36:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 16:36:49	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 16:37:04	SIG	M62/2135A1	60R	M62 J25 - J30	
18/09/15 16:37:04	SIG	M62/2135A2	60R	M62 J25 - J30	
18/09/15 16:37:04	SIG	M62/2135A3	60R	M62 J25 - J30	
18/09/15 16:37:04	SIG	M62/2135A4	60R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 16:37:34	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2106B1	40R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2106B2	40R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2106B3	40R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2106B4	40R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2113B1	50R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2113B2	50R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2113B3	50R	M62 J25 - J30	
18/09/15 16:38:33	SIG	M62/2113B4	50R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2144A1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2144A2	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2144J1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2144K1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2151A1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2151A2	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2151J1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2151K1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 16:38:37	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 16:38:39	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 16:39:52	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:39:52	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:39:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:39:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:39:57	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:40:14	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:41:18	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:41:18	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 16:41:18	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 16:41:18	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 16:41:24	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:41:35	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 16:41:43	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:42:16	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2151A1	40R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2151A2	40R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2151J1	40R	M62 J25 - J30	
18/09/15 16:42:52	SIG	M62/2151K1	40R	M62 J25 - J30	
18/09/15 16:43:19	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 16:43:19	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 16:43:19	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:43:19	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:43:19	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:43:19	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:43:20	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 16:43:20	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 16:43:27	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:43:27	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:43:28	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:43:28	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:43:28	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:43:28	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:43:28	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:43:28	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:43:33	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:43:33	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:44:04	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 16:44:04	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 16:44:04	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:44:05	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:44:06	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:44:11	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:44:15	SIG	M62/2144A1	40R	M62 J25 - J30	
18/09/15 16:44:15	SIG	M62/2144A2	40R	M62 J25 - J30	
18/09/15 16:44:15	SIG	M62/2144J1	40R	M62 J25 - J30	
18/09/15 16:44:15	SIG	M62/2144K1	40R	M62 J25 - J30	
18/09/15 16:44:54	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 16:44:54	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 16:44:54	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 16:44:54	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:45:44	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 16:45:51	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 16:46:16	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 16:46:16	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 16:46:17	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 16:46:22	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:46:22	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:46:22	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:46:22	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:46:22	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:46:23	SIG	M62/2135A1	50R	M62 J25 - J30	
18/09/15 16:46:23	SIG	M62/2135A2	50R	M62 J25 - J30	
18/09/15 16:46:23	SIG	M62/2135A3	50R	M62 J25 - J30	
18/09/15 16:46:23	SIG	M62/2135A4	50R	M62 J25 - J30	
18/09/15 16:46:28	SIG	M62/2135A1	40R	M62 J25 - J30	
18/09/15 16:46:28	SIG	M62/2135A2	40R	M62 J25 - J30	
18/09/15 16:46:28	SIG	M62/2135A3	40R	M62 J25 - J30	
18/09/15 16:46:28	SIG	M62/2135A4	40R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:46:52	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:47:27	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:47:27	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:47:27	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:47:27	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2183A1	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2183A2	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2183A3	60R	M62 J25 - J30	
18/09/15 16:47:37	SIG	M62/2183A4	60R	M62 J25 - J30	
18/09/15 16:47:42	SIG	M62/2033A1	50R	M62 J25 - J30	
18/09/15 16:47:42	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 16:47:42	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 16:47:42	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2025A1	50R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2025A2	50R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2025A3	50R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2025A4	50R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2033A1	40R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2033A2	40R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2033A3	40R	M62 J25 - J30	
18/09/15 16:47:48	SIG	M62/2033A4	40R	M62 J25 - J30	
18/09/15 16:48:15	SIG	M62/2151A1	60R	M62 J25 - J30	
18/09/15 16:48:15	SIG	M62/2151A2	60R	M62 J25 - J30	
18/09/15 16:48:15	SIG	M62/2151J1	60R	M62 J25 - J30	
18/09/15 16:48:15	SIG	M62/2151K1	60R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2117A2	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2117A3	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2117A4	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2122K1	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2122K2	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2124A2	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:48:52	SIG	M62/2124A4	50R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 16:48:53	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 16:48:57	SIG	M62/2122K1	40R	M62 J25 - J30	
18/09/15 16:48:57	SIG	M62/2122K2	40R	M62 J25 - J30	
18/09/15 16:48:57	SIG	M62/2124A2	40R	M62 J25 - J30	
18/09/15 16:48:57	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:48:57	SIG	M62/2124A4	40R	M62 J25 - J30	
18/09/15 16:49:05	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:49:06	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:49:06	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:49:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:49:08	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:49:08	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:49:14	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:49:24	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:49:24	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:49:30	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:49:33	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:49:33	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 16:49:33	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 16:49:33	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:49:39	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:49:40	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:49:40	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 16:49:45	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 16:49:46	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:49:58	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:49:59	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:50:04	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:50:14	SIG	M62/2025A1	???	M62 J25 - J30	
18/09/15 16:50:14	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:50:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:50:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 16:50:19	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 16:50:20	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:50:28	SIG	M62/2144A1	60R	M62 J25 - J30	
18/09/15 16:50:28	SIG	M62/2144A2	60R	M62 J25 - J30	
18/09/15 16:50:28	SIG	M62/2144J1	60R	M62 J25 - J30	
18/09/15 16:50:28	SIG	M62/2144K1	60R	M62 J25 - J30	
18/09/15 16:50:30	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:50:31	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:50:36	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:50:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:50:47	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:50:48	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:50:52	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:50:53	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:50:53	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 16:50:53	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 16:50:54	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 16:50:54	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 16:50:54	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:51:03	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:51:03	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:51:09	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:51:38	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 16:51:38	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 16:51:38	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 16:51:41	SIG	M62/2106B1	50R	M62 J25 - J30	
18/09/15 16:51:41	SIG	M62/2106B2	50R	M62 J25 - J30	
18/09/15 16:51:41	SIG	M62/2106B3	50R	M62 J25 - J30	
18/09/15 16:51:41	SIG	M62/2106B4	50R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2025A1	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2025A2	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2025A3	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2025A4	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2033A1	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2033A2	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2033A3	60R	M62 J25 - J30	
18/09/15 16:51:44	SIG	M62/2033A4	60R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 16:51:56	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 16:52:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:52:08	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:52:13	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:52:52	SIG	M62/2135A1	60R	M62 J25 - J30	
18/09/15 16:52:52	SIG	M62/2135A2	60R	M62 J25 - J30	
18/09/15 16:52:52	SIG	M62/2135A3	60R	M62 J25 - J30	
18/09/15 16:52:52	SIG	M62/2135A4	60R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 16:53:26	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 16:53:31	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:53:31	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 16:53:34	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 16:53:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:53:47	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:53:48	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:53:53	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:53:53	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:54:03	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:54:04	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:54:09	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:54:12	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 16:54:17	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 16:54:20	SIG	M62/2025A1	???	M62 J25 - J30	
18/09/15 16:54:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 16:56:08	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 16:56:08	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2117A2	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2117A3	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2117A4	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2122K1	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2122K2	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2124A2	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2124A3	60R	M62 J25 - J30	
18/09/15 16:56:47	SIG	M62/2124A4	60R	M62 J25 - J30	
18/09/15 16:56:56	SIG	M62/2117A2	50R	M62 J25 - J30	
18/09/15 16:56:56	SIG	M62/2117A3	50R	M62 J25 - J30	
18/09/15 16:56:56	SIG	M62/2117A4	50R	M62 J25 - J30	
18/09/15 16:56:58	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:56:58	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:56:59	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:57:00	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:57:01	SIG	M62/2114A1	50R	M62 J25 - J30	
18/09/15 16:57:01	SIG	M62/2114A2	50R	M62 J25 - J30	
18/09/15 16:57:01	SIG	M62/2114A3	50R	M62 J25 - J30	
18/09/15 16:57:01	SIG	M62/2117A2	40R	M62 J25 - J30	
18/09/15 16:57:01	SIG	M62/2117A3	40R	M62 J25 - J30	
18/09/15 16:57:01	SIG	M62/2117A4	40R	M62 J25 - J30	
18/09/15 16:57:13	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 16:57:14	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:57:19	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:57:33	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 16:57:33	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 16:57:33	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2122K1	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2122K2	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2124A2	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2124A4	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2135A1	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2135A2	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2135A3	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2135A4	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2197A1	60R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2197A2	60R	M62 J25 - J30	
18/09/15 16:57:37	SIG	M62/2197A3	60R	M62 J25 - J30	
18/09/15 16:57:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:57:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:57:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:57:49	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 16:58:12	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 16:58:37	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 16:59:39	SIG	M62/2106B1	40R	M62 J25 - J30	
18/09/15 16:59:39	SIG	M62/2106B2	40R	M62 J25 - J30	
18/09/15 16:59:39	SIG	M62/2106B3	40R	M62 J25 - J30	
18/09/15 16:59:39	SIG	M62/2106B4	40R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 16:59:43	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2157J1	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2157J2	40R	M62 J25 - J30	
18/09/15 16:59:48	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 17:00:07	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 17:00:07	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 17:00:50	SIG	M62/2151A1	40R	M62 J25 - J30	
18/09/15 17:00:50	SIG	M62/2151A2	40R	M62 J25 - J30	
18/09/15 17:00:50	SIG	M62/2151J1	40R	M62 J25 - J30	
18/09/15 17:00:50	SIG	M62/2151K1	40R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2114A1	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2114A2	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2114A3	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2117A2	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2117A3	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2117A4	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2122K1	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2122K2	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2124A2	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2124A3	60R	M62 J25 - J30	
18/09/15 17:00:55	SIG	M62/2124A4	60R	M62 J25 - J30	
18/09/15 17:01:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:01:05	SIG	M62/2189A1	60R	M62 J25 - J30	
18/09/15 17:01:05	SIG	M62/2189A2	60R	M62 J25 - J30	
18/09/15 17:01:05	SIG	M62/2189A3	60R	M62 J25 - J30	
18/09/15 17:01:05	SIG	M62/2189A4	60R	M62 J25 - J30	
18/09/15 17:01:06	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:01:07	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:01:07	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:02:00	SIG	M62/2183A1	60R	M62 J25 - J30	
18/09/15 17:02:00	SIG	M62/2183A2	60R	M62 J25 - J30	
18/09/15 17:02:00	SIG	M62/2183A3	60R	M62 J25 - J30	
18/09/15 17:02:00	SIG	M62/2183A4	60R	M62 J25 - J30	
18/09/15 17:02:07	SIG	M62/2144A1	40R	M62 J25 - J30	
18/09/15 17:02:07	SIG	M62/2144A2	40R	M62 J25 - J30	
18/09/15 17:02:07	SIG	M62/2144J1	40R	M62 J25 - J30	
18/09/15 17:02:07	SIG	M62/2144K1	40R	M62 J25 - J30	
18/09/15 17:02:19	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:02:20	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 17:02:25	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 17:03:23	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 17:03:23	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 17:03:31	SIG	M62/2135A1	40R	M62 J25 - J30	
18/09/15 17:03:31	SIG	M62/2135A2	40R	M62 J25 - J30	
18/09/15 17:03:31	SIG	M62/2135A3	40R	M62 J25 - J30	
18/09/15 17:03:31	SIG	M62/2135A4	40R	M62 J25 - J30	
18/09/15 17:03:39	SIG	M62/2106B1	50R	M62 J25 - J30	
18/09/15 17:03:39	SIG	M62/2106B2	50R	M62 J25 - J30	
18/09/15 17:03:39	SIG	M62/2106B3	50R	M62 J25 - J30	
18/09/15 17:03:39	SIG	M62/2106B4	50R	M62 J25 - J30	
18/09/15 17:04:03	SIG	M62/2157J1	50R	M62 J25 - J30	
18/09/15 17:04:03	SIG	M62/2157J2	50R	M62 J25 - J30	
18/09/15 17:04:10	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 17:04:10	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 17:04:10	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 17:04:10	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 17:04:37	SIG	M62/2122K1	50R	M62 J25 - J30	
18/09/15 17:04:37	SIG	M62/2122K2	50R	M62 J25 - J30	
18/09/15 17:04:37	SIG	M62/2124A2	50R	M62 J25 - J30	
18/09/15 17:04:37	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:04:37	SIG	M62/2124A4	50R	M62 J25 - J30	
18/09/15 17:04:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:04:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:04:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:04:49	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 17:04:50	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 17:06:07	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 17:06:07	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 17:06:07	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 17:06:07	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 17:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 17:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 17:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 17:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 17:06:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:06:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2117A2	50R	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2117A3	50R	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2117A4	50R	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2122K1	40R	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2122K2	40R	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2124A2	40R	M62 J25 - J30	
18/09/15 17:06:58	SIG	M62/2124A4	40R	M62 J25 - J30	
18/09/15 17:07:04	SIG	M62/2122K1	40R	M62 J25 - J30	
18/09/15 17:07:04	SIG	M62/2122K2	40R	M62 J25 - J30	
18/09/15 17:07:04	SIG	M62/2124A2	40R	M62 J25 - J30	
18/09/15 17:07:04	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:07:04	SIG	M62/2124A4	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2151A1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2151A2	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2151J1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2151K1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2155A1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2155A2	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2155J1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2155K1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2157A1	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2157A2	40R	M62 J25 - J30	
18/09/15 17:07:06	SIG	M62/2157K1	40R	M62 J25 - J30	
18/09/15 17:07:14	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:07:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:07:20	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:07:23	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 17:07:23	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 17:07:23	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 17:07:23	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 17:07:23	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 17:07:23	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 17:07:30	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:07:31	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:07:36	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:08:38	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 17:08:38	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 17:08:38	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 17:08:38	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 17:08:38	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 17:10:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:10:12	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:10:17	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:10:27	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:10:28	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:10:33	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:10:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:10:44	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:10:47	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:10:49	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:10:50	SIG	M62/2124A3	40R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2117A2	60R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2117A3	60R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2117A4	60R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2122K1	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2122K2	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2124A2	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2124A3	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2124A4	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2135A1	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2135A2	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2135A3	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2135A4	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 17:10:58	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 17:11:08	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:11:08	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:11:09	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:11:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:11:16	SIG	M62/2144A1	40R	M62 J25 - J30	
18/09/15 17:11:16	SIG	M62/2144A2	40R	M62 J25 - J30	
18/09/15 17:11:16	SIG	M62/2144J1	40R	M62 J25 - J30	
18/09/15 17:11:16	SIG	M62/2144K1	40R	M62 J25 - J30	
18/09/15 17:11:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:11:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:11:32	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:11:32	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:11:37	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 17:12:09	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 17:12:15	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 17:12:36	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 17:12:41	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 17:14:11	SIG	M62/2155A1	50R	M62 J25 - J30	
18/09/15 17:14:11	SIG	M62/2155A2	50R	M62 J25 - J30	
18/09/15 17:14:11	SIG	M62/2155J1	50R	M62 J25 - J30	
18/09/15 17:14:11	SIG	M62/2155K1	50R	M62 J25 - J30	
18/09/15 17:15:16	SIG	M62/2151A1	50R	M62 J25 - J30	
18/09/15 17:15:16	SIG	M62/2151A2	50R	M62 J25 - J30	
18/09/15 17:15:16	SIG	M62/2151J1	50R	M62 J25 - J30	
18/09/15 17:15:16	SIG	M62/2151K1	50R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 17:16:09	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 17:16:22	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 17:17:01	SIG	M62/2197A1	60R	M62 J25 - J30	
18/09/15 17:17:01	SIG	M62/2197A2	60R	M62 J25 - J30	
18/09/15 17:17:01	SIG	M62/2197A3	60R	M62 J25 - J30	
18/09/15 17:17:04	SIG	M62/2097B1	50R	M62 J25 - J30	
18/09/15 17:17:04	SIG	M62/2097B2	50R	M62 J25 - J30	
18/09/15 17:17:04	SIG	M62/2097B3	50R	M62 J25 - J30	
18/09/15 17:17:04	SIG	M62/2097B4	50R	M62 J25 - J30	
18/09/15 17:17:18	SIG	M62/2144A1	50R	M62 J25 - J30	
18/09/15 17:17:18	SIG	M62/2144A2	50R	M62 J25 - J30	
18/09/15 17:17:18	SIG	M62/2144J1	50R	M62 J25 - J30	
18/09/15 17:17:18	SIG	M62/2144K1	50R	M62 J25 - J30	
18/09/15 17:17:58	SIG	M62/2097B1	40R	M62 J25 - J30	
18/09/15 17:17:58	SIG	M62/2097B2	40R	M62 J25 - J30	
18/09/15 17:17:58	SIG	M62/2097B3	40R	M62 J25 - J30	
18/09/15 17:17:58	SIG	M62/2097B4	40R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2122K1	60R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2122K2	60R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2124A2	60R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2124A3	60R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2124A4	60R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 17:18:37	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 17:18:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:18:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:18:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:18:49	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 17:20:04	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 17:20:37	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 17:20:38	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 17:20:38	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 17:20:38	SIG	M62/2157J1	60R	M62 J25 - J30	
18/09/15 17:20:38	SIG	M62/2157J2	60R	M62 J25 - J30	
18/09/15 17:20:38	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 17:21:11	SIG	M62/2189A1	60R	M62 J25 - J30	
18/09/15 17:21:11	SIG	M62/2189A2	60R	M62 J25 - J30	
18/09/15 17:21:11	SIG	M62/2189A3	60R	M62 J25 - J30	
18/09/15 17:21:11	SIG	M62/2189A4	60R	M62 J25 - J30	
18/09/15 17:22:30	SIG	M62/2097B1	50R	M62 J25 - J30	
18/09/15 17:22:30	SIG	M62/2097B2	50R	M62 J25 - J30	
18/09/15 17:22:30	SIG	M62/2097B3	50R	M62 J25 - J30	
18/09/15 17:22:30	SIG	M62/2097B4	50R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2135A1	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2135A2	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2135A3	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2135A4	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2183A1	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2183A2	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2183A3	60R	M62 J25 - J30	
18/09/15 17:22:38	SIG	M62/2183A4	60R	M62 J25 - J30	
18/09/15 17:22:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:22:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:22:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:22:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:22:47	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 17:22:47	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 17:22:48	SIG	M62/2157A1	50R	M62 J25 - J30	
18/09/15 17:22:48	SIG	M62/2157A2	50R	M62 J25 - J30	
18/09/15 17:22:48	SIG	M62/2157K1	50R	M62 J25 - J30	
18/09/15 17:22:48	SIG	M62/2163A1	40R	M62 J25 - J30	
18/09/15 17:22:48	SIG	M62/2163A2	40R	M62 J25 - J30	
18/09/15 17:23:07	SIG	M62/2097B1	40R	M62 J25 - J30	
18/09/15 17:23:07	SIG	M62/2097B2	40R	M62 J25 - J30	
18/09/15 17:23:07	SIG	M62/2097B3	40R	M62 J25 - J30	
18/09/15 17:23:07	SIG	M62/2097B4	40R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2144A1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2144A2	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2144J1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2144K1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2151A1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2151A2	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2151J1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2151K1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2155A1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2155A2	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2155J1	60R	M62 J25 - J30	
18/09/15 17:23:38	SIG	M62/2155K1	60R	M62 J25 - J30	
18/09/15 17:24:03	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 17:24:03	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 17:24:03	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 17:24:03	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 17:24:55	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 17:24:55	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 17:24:55	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 17:25:00	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 17:25:46	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2183A1	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2183A2	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2183A3	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2183A4	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 17:25:51	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 17:25:52	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:25:52	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:26:47	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 17:26:47	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 17:26:47	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 17:26:47	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 17:26:47	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 17:26:47	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 17:26:48	SIG	M62/2157A1	60R	M62 J25 - J30	
18/09/15 17:26:48	SIG	M62/2157A2	60R	M62 J25 - J30	
18/09/15 17:26:48	SIG	M62/2157K1	60R	M62 J25 - J30	
18/09/15 17:26:48	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 17:26:48	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 17:27:07	SIG	M62/2097B1	50R	M62 J25 - J30	
18/09/15 17:27:07	SIG	M62/2097B2	50R	M62 J25 - J30	
18/09/15 17:27:07	SIG	M62/2097B3	50R	M62 J25 - J30	
18/09/15 17:27:07	SIG	M62/2097B4	50R	M62 J25 - J30	
18/09/15 17:28:33	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 17:28:33	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 17:28:34	SIG	M62/2166K1	50R	M62 J25 - J30	
18/09/15 17:28:34	SIG	M62/2166K2	50R	M62 J25 - J30	
18/09/15 17:28:34	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 17:28:34	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 17:28:34	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 17:28:34	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 17:28:54	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:28:55	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:28:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:28:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:29:38	SIG	M62/2113B1	60R	M62 J25 - J30	
18/09/15 17:29:38	SIG	M62/2113B2	60R	M62 J25 - J30	
18/09/15 17:29:38	SIG	M62/2113B3	60R	M62 J25 - J30	
18/09/15 17:29:38	SIG	M62/2113B4	60R	M62 J25 - J30	
18/09/15 17:31:48	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 17:31:48	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 17:31:48	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 17:32:15	SIG	M62/2166K1	40R	M62 J25 - J30	
18/09/15 17:32:15	SIG	M62/2166K2	40R	M62 J25 - J30	
18/09/15 17:32:20	SIG	M62/2166K1	30R	M62 J25 - J30	
18/09/15 17:32:20	SIG	M62/2166K2	30R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 17:32:34	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2117A2	NR	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2117A3	NR	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2117A4	NR	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2122K1	OFF	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2122K2	OFF	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2124A2	NR	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2124A3	NR	M62 J25 - J30	
18/09/15 17:32:38	SIG	M62/2124A4	NR	M62 J25 - J30	
18/09/15 17:33:13	SIG	M62/2088B1	50R	M62 J25 - J30	
18/09/15 17:33:13	SIG	M62/2088B2	50R	M62 J25 - J30	
18/09/15 17:33:13	SIG	M62/2088B3	50R	M62 J25 - J30	
18/09/15 17:33:13	SIG	M62/2088B4	50R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 17:33:18	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2135A1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2135A2	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2135A3	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2135A4	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2144A1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2144A2	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2144J1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2144K1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2151A1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2151A2	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2151J1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2151K1	NR	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2197A1	60R	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2197A2	60R	M62 J25 - J30	
18/09/15 17:34:38	SIG	M62/2197A3	60R	M62 J25 - J30	
18/09/15 17:35:27	SIG	M62/2189A1	60R	M62 J25 - J30	
18/09/15 17:35:27	SIG	M62/2189A2	60R	M62 J25 - J30	
18/09/15 17:35:27	SIG	M62/2189A3	60R	M62 J25 - J30	
18/09/15 17:35:27	SIG	M62/2189A4	60R	M62 J25 - J30	
18/09/15 17:35:38	SIG	M62/2124A1	BLNK	M62 J25 - J30	
18/09/15 17:35:38	SIG	M62/2124A2	OFF	M62 J25 - J30	
18/09/15 17:35:38	SIG	M62/2124A3	OFF	M62 J25 - J30	
18/09/15 17:35:38	SIG	M62/2124A4	OFF	M62 J25 - J30	
18/09/15 17:35:48	SIG	M62/2189A1	50R	M62 J25 - J30	
18/09/15 17:35:48	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 17:35:48	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 17:35:48	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 17:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 17:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 17:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 17:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 17:36:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:36:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:36:14	SIG	M62/2163A1	50R	M62 J25 - J30	
18/09/15 17:36:14	SIG	M62/2163A2	50R	M62 J25 - J30	
18/09/15 17:36:14	SIG	M62/2170A1	40R	M62 J25 - J30	
18/09/15 17:36:14	SIG	M62/2170A2	40R	M62 J25 - J30	
18/09/15 17:36:14	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 17:36:14	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 17:37:17	SIG	M62/2183A1	50R	M62 J25 - J30	
18/09/15 17:37:17	SIG	M62/2183A2	50R	M62 J25 - J30	
18/09/15 17:37:17	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 17:37:17	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 17:37:38	SIG	M62/2144J1	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2135A1	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2135A2	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2135A3	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2135A4	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2144A1	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2144A2	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2144K1	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2151A1	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2151A2	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2151J1	OFF	M62 J25 - J30	
18/09/15 17:37:39	SIG	M62/2151K1	OFF	M62 J25 - J30	
18/09/15 17:38:18	SIG	M62/2189A1	40R	M62 J25 - J30	
18/09/15 17:38:18	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 17:38:18	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 17:38:18	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 17:38:24	SIG	M62/2189A1	30R	M62 J25 - J30	
18/09/15 17:38:29	SIG	M62/2177A1	LDR	M62 J25 - J30	
18/09/15 17:38:29	SIG	M62/2183A1	LDR	M62 J25 - J30	
18/09/15 17:38:29	SIG	M62/2189A1	20R	M62 J25 - J30	
18/09/15 17:38:29	SIG	M62/2189A2	40R	M62 J25 - J30	
18/09/15 17:38:29	SIG	M62/2189A3	40R	M62 J25 - J30	
18/09/15 17:38:29	SIG	M62/2189A4	40R	M62 J25 - J30	
18/09/15 17:38:34	SIG	M62/2189A1	STOP	M62 J25 - J30	
18/09/15 17:38:38	SIG	M62/2155A1	OFF	M62 J25 - J30	
18/09/15 17:38:38	SIG	M62/2155A2	OFF	M62 J25 - J30	
18/09/15 17:38:38	SIG	M62/2155J1	OFF	M62 J25 - J30	
18/09/15 17:38:38	SIG	M62/2155K1	OFF	M62 J25 - J30	
18/09/15 17:40:11	SIG	M62/2081B1	50R	M62 J25 - J30	
18/09/15 17:40:11	SIG	M62/2081B2	50R	M62 J25 - J30	
18/09/15 17:40:11	SIG	M62/2081B3	50R	M62 J25 - J30	
18/09/15 17:40:11	SIG	M62/2081L1	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2163A1	60R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2163A2	60R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 17:40:14	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2183A1	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2183A2	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2183A3	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2183A4	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2189A1	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2189A2	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2189A3	60R	M62 J25 - J30	
18/09/15 17:40:47	SIG	M62/2189A4	60R	M62 J25 - J30	
18/09/15 17:41:53	SIG	M62/2170K1	50R	M62 J25 - J30	
18/09/15 17:41:53	SIG	M62/2170K2	50R	M62 J25 - J30	
18/09/15 17:41:59	SIG	M62/2170K1	40R	M62 J25 - J30	
18/09/15 17:41:59	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 17:42:04	SIG	M62/2170K1	30R	M62 J25 - J30	
18/09/15 17:42:09	SIG	M62/2170K1	20R	M62 J25 - J30	
18/09/15 17:42:09	SIG	M62/2170K2	40R	M62 J25 - J30	
18/09/15 17:42:15	SIG	M62/2170K1	STOP	M62 J25 - J30	
18/09/15 17:42:38	SIG	M62/2106B1	60R	M62 J25 - J30	
18/09/15 17:42:38	SIG	M62/2106B2	60R	M62 J25 - J30	
18/09/15 17:42:38	SIG	M62/2106B3	60R	M62 J25 - J30	
18/09/15 17:42:38	SIG	M62/2106B4	60R	M62 J25 - J30	
18/09/15 17:43:44	SIG	M62/2170K2	30R	M62 J25 - J30	
18/09/15 17:43:44	SIG	M62/2177A1	50R	M62 J25 - J30	
18/09/15 17:43:44	SIG	M62/2177A2	50R	M62 J25 - J30	
18/09/15 17:43:44	SIG	M62/2177A3	50R	M62 J25 - J30	
18/09/15 17:43:44	SIG	M62/2177A4	50R	M62 J25 - J30	
18/09/15 17:43:49	SIG	M62/2177A1	40R	M62 J25 - J30	
18/09/15 17:43:49	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 17:43:49	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 17:43:49	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 17:43:55	SIG	M62/2177A1	30R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2170A1	50R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2170A2	50R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2170K2	30R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2177A1	20R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2177A2	40R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2177A3	40R	M62 J25 - J30	
18/09/15 17:44:00	SIG	M62/2177A4	40R	M62 J25 - J30	
18/09/15 17:44:05	SIG	M62/2177A1	STOP	M62 J25 - J30	
18/09/15 17:44:06	SIG	M62/2081B1	40R	M62 J25 - J30	
18/09/15 17:44:06	SIG	M62/2081B2	40R	M62 J25 - J30	
18/09/15 17:44:06	SIG	M62/2081B3	40R	M62 J25 - J30	
18/09/15 17:44:06	SIG	M62/2081L1	40R	M62 J25 - J30	
18/09/15 17:45:38	SIG	M62/2197A1	NR	M62 J25 - J30	
18/09/15 17:45:38	SIG	M62/2197A2	NR	M62 J25 - J30	
18/09/15 17:45:38	SIG	M62/2197A3	NR	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2170A1	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2170A2	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2170K1	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2170K2	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2177A1	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 17:46:28	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 17:46:53	SIG	M62/2166K1	60R	M62 J25 - J30	
18/09/15 17:46:53	SIG	M62/2166K2	60R	M62 J25 - J30	
18/09/15 17:48:05	SIG	M62/2081B1	50R	M62 J25 - J30	
18/09/15 17:48:05	SIG	M62/2081B2	50R	M62 J25 - J30	
18/09/15 17:48:05	SIG	M62/2081B3	50R	M62 J25 - J30	
18/09/15 17:48:05	SIG	M62/2081L1	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2065B2	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2065B3	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2065B4	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2065M1	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2069M1	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2069M2	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2074B2	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2074B3	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M62/2074B4	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M621/1002B1	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M621/1002B2	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M621/1010B1	50R	M62 J25 - J30	
18/09/15 17:49:37	SIG	M621/1010B2	50R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2081B1	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2081B2	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2081B3	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2081L1	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2088B1	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2088B2	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2088B3	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2088B4	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2097B1	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2097B2	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2097B3	60R	M62 J25 - J30	
18/09/15 17:53:38	SIG	M62/2097B4	60R	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2157A1	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2157A2	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2157J1	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2157J2	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2157K1	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2163A1	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2163A2	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2166K1	OFF	M62 J25 - J30	
18/09/15 17:55:38	SIG	M62/2166K2	OFF	M62 J25 - J30	
18/09/15 17:56:38	SIG	M62/2125B1	OFF	M62 J25 - J30	
18/09/15 17:56:38	SIG	M62/2125B2	OFF	M62 J25 - J30	
18/09/15 17:56:38	SIG	M62/2125B3	OFF	M62 J25 - J30	
18/09/15 17:56:38	SIG	M62/2125L1	NR	M62 J25 - J30	
18/09/15 17:56:38	SIG	M62/2125L2	NR	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2065B2	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2065B3	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2065B4	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2065M1	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2069M1	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2069M2	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2074B2	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2074B3	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M62/2074B4	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M621/1002B1	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M621/1002B2	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 17:57:38	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 17:59:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 17:59:38	SIG	M62/2125L1	OFF	M62 J25 - J30	
18/09/15 17:59:39	SIG	M62/2125L2	OFF	M62 J25 - J30	
18/09/15 18:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 18:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 18:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 18:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 18:10:02	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 18:10:02	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 18:10:02	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 18:10:02	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 18:10:02	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 18:10:08	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 18:10:08	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 18:10:08	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 18:10:08	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 18:10:08	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 18:10:13	SIG	M62/2170L1	30R	M62 J25 - J30	
18/09/15 18:10:13	SIG	M62/2177B1	30R	M62 J25 - J30	
18/09/15 18:10:13	SIG	M62/2177L1	30R	M62 J25 - J30	
18/09/15 18:10:13	SIG	M62/2177L2	30R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2170L1	20R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2177B1	30R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2177L1	30R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2177L2	30R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 18:10:18	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 18:10:24	SIG	M62/2170L1	STOP	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2170L1	30R	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2170L2	30R	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 18:12:04	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 18:12:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 18:12:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 18:15:15	SIG	M62/2177A1	HSD	M62 J25 - J30	
18/09/15 18:16:00	SIG	M62/2183A1	HSD	M62 J25 - J30	
18/09/15 18:16:45	SIG	M62/2177A1	REDX	M62 J25 - J30	
18/09/15 18:16:45	SIG	M62/2189A1	HSD	M62 J25 - J30	
18/09/15 18:17:45	SIG	M62/2183A1	REDX	M62 J25 - J30	
18/09/15 18:18:45	SIG	M62/2189A1	REDX	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2170A1	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2170A2	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2170K1	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2170K2	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2177A2	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2177A3	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2177A4	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2183A2	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2183A3	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2183A4	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2189A2	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2189A3	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2189A4	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2197A1	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2197A2	NR	M62 J25 - J30	
18/09/15 18:18:46	SIG	M62/2197A3	NR	M62 J25 - J30	
18/09/15 18:19:45	SIG	M62/2170K1	OFF	M62 J25 - J30	
18/09/15 18:19:45	SIG	M62/2170K2	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2170A1	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2170A2	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2177A1	BLNK	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2177A2	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2177A3	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2177A4	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2183A1	BLNK	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2183A2	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2183A3	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2183A4	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2189A2	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2189A3	OFF	M62 J25 - J30	
18/09/15 18:19:46	SIG	M62/2189A4	OFF	M62 J25 - J30	
18/09/15 18:21:46	SIG	M62/2197A1	OFF	M62 J25 - J30	
18/09/15 18:21:46	SIG	M62/2197A2	OFF	M62 J25 - J30	
18/09/15 18:21:46	SIG	M62/2197A3	OFF	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 18:21:58	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2177B1	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2177B2	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2177L1	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2177L2	40R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2183B1	50R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2183B2	50R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2183L1	50R	M62 J25 - J30	
18/09/15 18:22:03	SIG	M62/2183L2	50R	M62 J25 - J30	
18/09/15 18:23:44	SIG	M62/2170L1	LDR	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2189B1	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2189B2	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2189B3	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2189B4	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2194B1	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2194B2	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2194B3	60R	M62 J25 - J30	
18/09/15 18:24:39	SIG	M62/2194B4	60R	M62 J25 - J30	
18/09/15 18:24:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:24:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:24:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:24:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:25:53	SIG	M62/2113B1	HSD	M62 J25 - J30	
18/09/15 18:26:47	SIG	M62/2106B1	HSD	M62 J25 - J30	
18/09/15 18:27:54	SIG	M62/2097B1	HSD	M62 J25 - J30	
18/09/15 18:27:55	SIG	M62/2113B1	REDX	M62 J25 - J30	
18/09/15 18:29:03	SIG	M62/2088B1	HSD	M62 J25 - J30	
18/09/15 18:29:03	SIG	M62/2106B1	REDX	M62 J25 - J30	
18/09/15 18:30:11	SIG	M62/2097B1	REDX	M62 J25 - J30	
18/09/15 18:30:39	SIG	M62/2197B1	60R	M62 J25 - J30	
18/09/15 18:30:39	SIG	M62/2197B2	60R	M62 J25 - J30	
18/09/15 18:30:39	SIG	M62/2197B3	60R	M62 J25 - J30	
18/09/15 18:30:39	SIG	M62/2199M1	60R	M62 J25 - J30	
18/09/15 18:30:39	SIG	M62/2199M2	60R	M62 J25 - J30	
18/09/15 18:31:23	SIG	M62/2088B1	REDX	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2088B2	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2088B3	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2088B4	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2097B2	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2097B3	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2097B4	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2106B2	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2106B3	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2106B4	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2113B2	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2113B3	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2113B4	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2117B1	NR	M62 J25 - J30	
18/09/15 18:32:12	SIG	M62/2117B3	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2074B2	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2074B3	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2074B4	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2081B1	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2081B2	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2081B3	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2081L1	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2120M1	NR	M62 J25 - J30	
18/09/15 18:32:22	SIG	M62/2120M2	NR	M62 J25 - J30	
18/09/15 18:33:12	SIG	M62/2120M1	OFF	M62 J25 - J30	
18/09/15 18:33:12	SIG	M62/2120M2	OFF	M62 J25 - J30	
18/09/15 18:33:13	SIG	M62/2113B1	BLNK	M62 J25 - J30	
18/09/15 18:33:13	SIG	M62/2113B2	OFF	M62 J25 - J30	
18/09/15 18:33:13	SIG	M62/2113B3	OFF	M62 J25 - J30	
18/09/15 18:33:13	SIG	M62/2113B4	OFF	M62 J25 - J30	
18/09/15 18:33:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
18/09/15 18:33:13	SIG	M62/2117B3	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2074B1	BLNK	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2074B2	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2074B3	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2074B4	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2081B1	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2081B2	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2081B3	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2081L1	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2088B1	BLNK	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2088B2	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2088B3	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2088B4	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2097B1	BLNK	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2097B2	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2097B3	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2097B4	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2106B1	BLNK	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2106B2	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2106B3	OFF	M62 J25 - J30	
18/09/15 18:33:23	SIG	M62/2106B4	OFF	M62 J25 - J30	
18/09/15 18:35:11	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 18:35:11	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 18:35:16	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 18:35:16	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 18:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 18:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
18/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 18:36:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:36:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:36:44	SIG	M62/2079A1	HSD	M62 J25 - J30	
18/09/15 18:37:52	SIG	M62/2088A1	HSD	M62 J25 - J30	
18/09/15 18:39:00	SIG	M62/2079A1	REDX	M62 J25 - J30	
18/09/15 18:39:00	SIG	M62/2097A1	HSD	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2170B1	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2170B2	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2177B1	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2177B2	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2177L1	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2177L2	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2183B1	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2183B2	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2183L1	60R	M62 J25 - J30	
18/09/15 18:39:55	SIG	M62/2183L2	60R	M62 J25 - J30	
18/09/15 18:40:08	SIG	M62/2088A1	REDX	M62 J25 - J30	
18/09/15 18:40:08	SIG	M62/2106A1	HSD	M62 J25 - J30	
18/09/15 18:41:16	SIG	M62/2097A1	REDX	M62 J25 - J30	
18/09/15 18:42:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:42:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:42:24	SIG	M62/2106A1	REDX	M62 J25 - J30	
18/09/15 18:42:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:42:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:43:24	SIG	M62/2065A2	NR	M62 J25 - J30	
18/09/15 18:43:24	SIG	M62/2065A3	NR	M62 J25 - J30	
18/09/15 18:43:24	SIG	M62/2065A4	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2073K1	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2079A2	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2079A3	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2079A4	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2088A2	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2088A3	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2088A4	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2097A2	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2097A3	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2097A4	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2106A2	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2106A3	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2106A4	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2114A1	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2114A2	NR	M62 J25 - J30	
18/09/15 18:43:46	SIG	M62/2114A3	NR	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2073K1	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2079A1	BLNK	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2079A2	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2079A3	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2079A4	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2088A1	BLNK	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2088A2	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2088A3	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2088A4	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2097A1	BLNK	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2097A2	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2097A3	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2097A4	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2106A1	BLNK	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2106A2	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2106A3	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2106A4	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2114A1	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2114A2	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2114A3	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2117A1	BLNK	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2117A2	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2117A3	OFF	M62 J25 - J30	
18/09/15 18:44:52	SIG	M62/2117A4	OFF	M62 J25 - J30	
18/09/15 18:46:39	SIG	M62/2197B1	OFF	M62 J25 - J30	
18/09/15 18:46:39	SIG	M62/2197B2	OFF	M62 J25 - J30	
18/09/15 18:46:39	SIG	M62/2197B3	OFF	M62 J25 - J30	
18/09/15 18:46:39	SIG	M62/2199M1	OFF	M62 J25 - J30	
18/09/15 18:46:39	SIG	M62/2199M2	OFF	M62 J25 - J30	
18/09/15 18:47:36	SIG	M62/2057B1	HSD	M62 J25 - J30	
18/09/15 18:48:39	SIG	M62/2159B1	NR	M62 J25 - J30	
18/09/15 18:48:39	SIG	M62/2159B2	NR	M62 J25 - J30	
18/09/15 18:48:39	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 18:48:39	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 18:48:39	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 18:48:39	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 18:49:35	SIG	M62/2041B1	HSD	M62 J25 - J30	
18/09/15 18:49:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
18/09/15 18:49:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
18/09/15 18:49:35	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 18:49:35	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2177B1	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2177B2	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2177L1	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2177L2	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2183B1	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2183B2	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2183L1	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2183L2	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2189B1	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2189B2	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2189B3	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2189B4	NR	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2194B1	OFF	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2194B2	OFF	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2194B3	OFF	M62 J25 - J30	
18/09/15 18:49:39	SIG	M62/2194B4	OFF	M62 J25 - J30	
18/09/15 18:50:35	SIG	M62/2033B1	HSD	M62 J25 - J30	
18/09/15 18:51:35	SIG	M62/2025B1	HSD	M62 J25 - J30	
18/09/15 18:51:35	SIG	M62/2041B1	REDX	M62 J25 - J30	
18/09/15 18:51:39	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 18:51:39	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 18:52:27	SIG	M62/2033B1	REDX	M62 J25 - J30	
18/09/15 18:52:39	SIG	M62/2189B1	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2189B2	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2189B3	OFF	M62 J25 - J30	
18/09/15 18:52:40	SIG	M62/2189B4	OFF	M62 J25 - J30	
18/09/15 18:53:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
18/09/15 18:53:41	SIG	M62/2065B2	NR	M62 J25 - J30	
18/09/15 18:53:41	SIG	M62/2065B3	NR	M62 J25 - J30	
18/09/15 18:53:41	SIG	M62/2065B4	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2018B1	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2018B2	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2018B3	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2018L1	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2025B2	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2025B3	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2025B4	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2033B2	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2033B3	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2033B4	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2041B2	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2041B3	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2041B4	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2050B2	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2050B3	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2050B4	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2057B2	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2057B3	NR	M62 J25 - J30	
18/09/15 18:53:42	SIG	M62/2057B4	NR	M62 J25 - J30	
18/09/15 18:54:41	SIG	M62/2069M1	OFF	M62 J25 - J30	
18/09/15 18:54:41	SIG	M62/2069M2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2012B1	BLNK	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2012B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2012B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2012B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2018B1	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2018B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2018B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2018L1	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2025B1	BLNK	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2025B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2025B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2025B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2033B1	BLNK	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2033B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2033B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2041B1	BLNK	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2041B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2041B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2041B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2050B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2050B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2050B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2057B1	BLNK	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2057B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2057B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2057B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2065B1	BLNK	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2065B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2065B3	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2065B4	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M62/2065M1	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M621/1002B1	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M621/1002B2	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 18:54:42	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 18:56:51	SIG	M62/2025A1	HSD	M62 J25 - J30	
18/09/15 18:57:51	SIG	M62/2033A1	HSD	M62 J25 - J30	
18/09/15 18:58:51	SIG	M62/2018A1	HSD	M62 J25 - J30	
18/09/15 18:58:51	SIG	M62/2025A1	REDX	M62 J25 - J30	
18/09/15 18:58:51	SIG	M62/2041A1	HSD	M62 J25 - J30	
18/09/15 18:59:58	SIG	M62/2033A1	REDX	M62 J25 - J30	
18/09/15 18:59:58	SIG	M62/2050A1	HSD	M62 J25 - J30	
18/09/15 19:00:50	SIG	M62/2041A1	REDX	M62 J25 - J30	
18/09/15 19:01:50	SIG	M62/2050A1	REDX	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2025A2	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2025A3	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2025A4	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2033A2	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2033A3	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2033A4	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2041A2	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2041A3	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2041A4	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2050A2	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2050A3	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2050A4	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2057A1	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2057A2	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2057A3	NR	M62 J25 - J30	
18/09/15 19:02:51	SIG	M62/2057J1	NR	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2008K1	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2008K2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2012A1	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2012A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2012A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2018A1	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2018A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2018A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2018A4	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2025A1	BLNK	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2025A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2025A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2025A4	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2033A1	BLNK	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2033A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2033A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2033A4	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2041A1	BLNK	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2041A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2041A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2041A4	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2050A1	BLNK	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2050A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2050A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2050A4	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2057A1	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2057A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2057A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2057J1	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2065A1	BLNK	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2065A2	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2065A3	OFF	M62 J25 - J30	
18/09/15 19:03:51	SIG	M62/2065A4	OFF	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2159B1	50R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2159B2	50R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2159M1	50R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2159M2	50R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2170B1	60R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2170B2	60R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 19:23:10	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2147B1	NR	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2147B2	NR	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2147B3	NR	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2147B4	NR	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2159B1	40R	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2159B2	40R	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2159M1	40R	M62 J25 - J30	
18/09/15 19:23:15	SIG	M62/2159M2	40R	M62 J25 - J30	
18/09/15 19:27:32	SIG	M62/2159B1	60R	M62 J25 - J30	
18/09/15 19:27:32	SIG	M62/2159B2	60R	M62 J25 - J30	
18/09/15 19:27:32	SIG	M62/2159M1	60R	M62 J25 - J30	
18/09/15 19:27:32	SIG	M62/2159M2	60R	M62 J25 - J30	
18/09/15 19:28:07	SIG	M62/2159B1	50R	M62 J25 - J30	
18/09/15 19:28:07	SIG	M62/2159B2	50R	M62 J25 - J30	
18/09/15 19:28:07	SIG	M62/2159M1	50R	M62 J25 - J30	
18/09/15 19:28:07	SIG	M62/2159M2	50R	M62 J25 - J30	
18/09/15 19:28:12	SIG	M62/2159B1	40R	M62 J25 - J30	
18/09/15 19:28:12	SIG	M62/2159B2	40R	M62 J25 - J30	
18/09/15 19:28:12	SIG	M62/2159M1	40R	M62 J25 - J30	
18/09/15 19:28:12	SIG	M62/2159M2	40R	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2159B2	30R	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2170B2	LDL	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2177B1	60R	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2177B2	60R	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2177L1	60R	M62 J25 - J30	
18/09/15 19:29:10	SIG	M62/2177L2	60R	M62 J25 - J30	
18/09/15 19:29:15	SIG	M62/2159B2	20R	M62 J25 - J30	
18/09/15 19:29:20	SIG	M62/2159B2	STOP	M62 J25 - J30	
18/09/15 19:31:23	SIG	M62/2159M2	30R	M62 J25 - J30	
18/09/15 19:31:28	SIG	M62/2159M2	20R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2170B1	40R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2170L1	40R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2170L2	40R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 19:31:29	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 19:31:34	SIG	M62/2159M2	STOP	M62 J25 - J30	
18/09/15 19:36:09	SIG	M62/2159B2	40R	M62 J25 - J30	
18/09/15 19:36:09	SIG	M62/2159M2	40R	M62 J25 - J30	
18/09/15 19:36:09	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 19:36:10	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 19:36:15	SIG	M62/2170B2	40R	M62 J25 - J30	
18/09/15 19:37:40	SIG	M62/2183B1	60R	M62 J25 - J30	
18/09/15 19:37:40	SIG	M62/2183B2	60R	M62 J25 - J30	
18/09/15 19:37:40	SIG	M62/2183L1	60R	M62 J25 - J30	
18/09/15 19:37:40	SIG	M62/2183L2	60R	M62 J25 - J30	
18/09/15 19:40:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 19:40:07	SIG	M62/2183B2	???	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2170B1	50R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2170B2	50R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2170L1	50R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2177B1	60R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2177B2	60R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2177L1	60R	M62 J25 - J30	
18/09/15 19:53:46	SIG	M62/2177L2	60R	M62 J25 - J30	
18/09/15 19:59:23	SIG	M62/2159B1	50R	M62 J25 - J30	
18/09/15 19:59:23	SIG	M62/2159B2	50R	M62 J25 - J30	
18/09/15 19:59:23	SIG	M62/2159M1	50R	M62 J25 - J30	
18/09/15 19:59:23	SIG	M62/2159M2	50R	M62 J25 - J30	
18/09/15 20:04:40	SIG	M62/2170B1	60R	M62 J25 - J30	
18/09/15 20:04:40	SIG	M62/2170B2	60R	M62 J25 - J30	
18/09/15 20:07:41	SIG	M62/2159B1	60R	M62 J25 - J30	
18/09/15 20:07:41	SIG	M62/2159B2	60R	M62 J25 - J30	
18/09/15 20:07:41	SIG	M62/2159M1	60R	M62 J25 - J30	
18/09/15 20:07:41	SIG	M62/2159M2	60R	M62 J25 - J30	
18/09/15 20:10:41	SIG	M62/2183B1	OFF	M62 J25 - J30	
18/09/15 20:10:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
18/09/15 20:10:41	SIG	M62/2183L1	OFF	M62 J25 - J30	
18/09/15 20:10:41	SIG	M62/2183L2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2147B1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2147B2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2147B3	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2147B4	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2159B1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2159B2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2159M1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2159M2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 20:15:41	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2170B1	NR	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2170B2	NR	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2170L1	LDR	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2170L2	50R	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2177B1	50R	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2177B2	50R	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2177L1	50R	M62 J25 - J30	
18/09/15 20:19:05	SIG	M62/2177L2	50R	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2189A1	REDX	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 20:24:03	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 20:31:43	SIG	M62/2189A2	OFF	M62 J25 - J30	
18/09/15 20:31:43	SIG	M62/2189A3	OFF	M62 J25 - J30	
18/09/15 20:31:43	SIG	M62/2189A4	OFF	M62 J25 - J30	
18/09/15 20:31:43	SIG	M62/2197A1	OFF	M62 J25 - J30	
18/09/15 20:31:43	SIG	M62/2197A2	OFF	M62 J25 - J30	
18/09/15 20:31:43	SIG	M62/2197A3	OFF	M62 J25 - J30	
18/09/15 20:31:44	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 20:31:44	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 20:32:20	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 20:32:20	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 20:32:20	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 20:32:25	SIG	M62/2197A1	40R	M62 J25 - J30	
18/09/15 20:32:25	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 20:32:25	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 20:32:30	SIG	M62/2197A1	30R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2177A1	REDX	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2177A2	60R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2177A3	60R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2177A4	60R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2183A1	REDX	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2183A2	LDR	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2183A3	50R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2183A4	50R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2189A1	REDX	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2189A2	LDR	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2189A3	50R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2189A4	50R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2197A1	20R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2197A2	40R	M62 J25 - J30	
18/09/15 20:32:36	SIG	M62/2197A3	40R	M62 J25 - J30	
18/09/15 20:32:41	SIG	M62/2197A1	STOP	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2177A1	BLNK	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2177A2	OFF	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2177A3	OFF	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2177A4	OFF	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2183A2	NR	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2183A3	NR	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2183A4	NR	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2189A2	50R	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2197A1	50R	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2197A2	50R	M62 J25 - J30	
18/09/15 21:09:09	SIG	M62/2197A3	50R	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2170B1	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2170B2	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2170L1	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2170L2	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2177B1	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2177B2	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2177L1	OFF	M62 J25 - J30	
18/09/15 21:11:46	SIG	M62/2177L2	OFF	M62 J25 - J30	
18/09/15 21:12:10	SIG	M62/2183A1	BLNK	M62 J25 - J30	
18/09/15 21:12:10	SIG	M62/2183A2	OFF	M62 J25 - J30	
18/09/15 21:12:10	SIG	M62/2183A3	OFF	M62 J25 - J30	
18/09/15 21:12:10	SIG	M62/2183A4	OFF	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2189A1	BLNK	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2189A2	OFF	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2189A3	OFF	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2189A4	OFF	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2197A1	OFF	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2197A2	OFF	M62 J25 - J30	
18/09/15 21:22:42	SIG	M62/2197A3	OFF	M62 J25 - J30	
18/09/15 22:34:11	SIG	M62/2203B1	NR	M62 J25 - J30	
18/09/15 22:34:11	SIG	M62/2203B2	NR	M62 J25 - J30	
18/09/15 22:34:11	SIG	M62/2203B3	NR	M62 J25 - J30	
18/09/15 22:39:12	SIG	M62/2203B1	OFF	M62 J25 - J30	
18/09/15 22:39:12	SIG	M62/2203B2	OFF	M62 J25 - J30	
18/09/15 22:39:12	SIG	M62/2203B3	OFF	M62 J25 - J30	
18/09/15 23:43:05	SIG	M621/1010B1	60R	M62 J25 - J30	
18/09/15 23:43:05	SIG	M621/1010B2	60R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2004B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2004B2	NR	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2004B3	NR	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2004B4	NR	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2012B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2012B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2012B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2012B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2018B1	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2018B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2018B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2018L1	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2025B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2025B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2025B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2025B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2033B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2033B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2033B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2033B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2041B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2041B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2041B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2041B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2050B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2050B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2050B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2057B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2057B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2057B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2057B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2065B1	REDX	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2065B2	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2065B3	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2065B4	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M62/2065M1	50R	M62 J25 - J30	
18/09/15 23:43:06	SIG	M621/1002B1	HSD	M62 J25 - J30	
18/09/15 23:43:06	SIG	M621/1002B2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M606/2003B1	NR	M62 J25 - J30	
18/09/15 23:44:35	SIG	M606/2003B2	NR	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2004A1	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2004A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2004A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2008K1	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2008K2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2012A1	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2012A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2012A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2018A1	HSD	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2018A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2018A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2018A4	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2025A1	REDX	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2025A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2025A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2025A4	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2033A1	REDX	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2033A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2033A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2033A4	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2041A1	REDX	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2041A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2041A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2041A4	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2050A1	REDX	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2050A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2050A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2050A4	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2057A1	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2057A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2057A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2057J1	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2065A1	REDX	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2065A2	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2065A3	50R	M62 J25 - J30	
18/09/15 23:44:35	SIG	M62/2065A4	50R	M62 J25 - J30	
18/09/15 23:45:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 23:45:24	SIG	M62/2033B3	???	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2004B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2004B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2004B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2004B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2012B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2012B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2012B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2012B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2018B1	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2018B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2018B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2018L1	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2025B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2025B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2025B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2025B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2033B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2033B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2033B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2041B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2041B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2041B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2041B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2050B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2050B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2050B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2057B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2057B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2057B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2057B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2065B1	BLNK	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2065B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2065B3	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2065B4	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M62/2065M1	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M621/1002B1	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M621/1002B2	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M621/1010B1	OFF	M62 J25 - J30	
18/09/15 23:58:43	SIG	M621/1010B2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M606/2003B1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M606/2003B2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2004A1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2004A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2004A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2008K1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2008K2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2012A1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2012A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2012A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2018A1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2018A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2018A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2018A4	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2025A1	BLNK	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2025A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2025A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2025A4	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2033A1	BLNK	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2033A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2033A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2033A4	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2041A1	BLNK	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2041A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2041A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2041A4	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2050A1	BLNK	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2050A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2050A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2050A4	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2057A1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2057A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2057A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2057J1	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2065A1	BLNK	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2065A2	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2065A3	OFF	M62 J25 - J30	
18/09/15 23:59:02	SIG	M62/2065A4	OFF	M62 J25 - J30	
19/09/15 03:09:44	SIG	M62/2197A1	50R	M62 J25 - J30	
19/09/15 03:09:44	SIG	M62/2197A2	50R	M62 J25 - J30	
19/09/15 03:09:44	SIG	M62/2197A3	50R	M62 J25 - J30	
19/09/15 03:09:49	SIG	M62/2197A1	40R	M62 J25 - J30	
19/09/15 03:09:49	SIG	M62/2197A2	40R	M62 J25 - J30	
19/09/15 03:09:49	SIG	M62/2197A3	40R	M62 J25 - J30	
19/09/15 03:09:54	SIG	M62/2197A1	30R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2177A1	REDX	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2177A2	60R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2177A3	60R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2177A4	60R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2183A1	REDX	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2183A2	LDR	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2183A3	50R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2183A4	50R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2189A1	REDX	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2189A2	LDR	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2189A3	50R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2189A4	50R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2197A1	20R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2197A2	40R	M62 J25 - J30	
19/09/15 03:09:59	SIG	M62/2197A3	40R	M62 J25 - J30	
19/09/15 03:10:04	SIG	M62/2197A1	STOP	M62 J25 - J30	
19/09/15 03:38:36	SIG	M62/2189A1	STOP	M62 J25 - J30	
19/09/15 03:38:36	SIG	M62/2189A3	40R	M62 J25 - J30	
19/09/15 03:38:36	SIG	M62/2189A4	40R	M62 J25 - J30	
19/09/15 03:38:41	SIG	M62/2189A1	STOP	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2177A1	BLNK	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2177A2	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2177A3	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2177A4	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2183A1	BLNK	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2183A2	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2183A3	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2183A4	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2189A1	BLNK	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2189A2	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2189A3	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2189A4	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2197A1	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2197A2	OFF	M62 J25 - J30	
19/09/15 04:01:08	SIG	M62/2197A3	OFF	M62 J25 - J30	
19/09/15 04:31:51	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 04:31:51	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2041B1	REDX	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2041B2	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2041B3	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2041B4	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2050B2	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2050B3	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2050B4	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2057B1	REDX	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2057B2	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2057B3	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2057B4	50R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M62/2065M1	60R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M621/1002B1	HSD	M62 J25 - J30	
19/09/15 04:40:05	SIG	M621/1002B2	60R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M621/1010B1	60R	M62 J25 - J30	
19/09/15 04:40:05	SIG	M621/1010B2	60R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1979K1	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1979K2	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1981A1	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1981A2	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1981A3	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1981A4	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1987A1	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1987A2	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1987A3	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1987J1	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1992A2	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1992A3	50R	M62 J25 - J30	
19/09/15 04:51:24	SIG	M62/1992J1	50R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1979K1	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1979K2	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1981A1	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1981A2	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1981A3	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1981A4	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1987A1	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1987A2	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1987A3	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1987J1	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1992A1	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1992A2	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1992A3	40R	M62 J25 - J30	
19/09/15 04:51:39	SIG	M62/1992J1	40R	M62 J25 - J30	
19/09/15 04:51:44	SIG	M62/1987J1	30R	M62 J25 - J30	
19/09/15 04:51:44	SIG	M62/1992J1	30R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1974A1	50R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1974A2	50R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1974A3	50R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1974A4	50R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1979K1	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1979K2	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1981A1	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1981A2	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1981A3	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1981A4	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1987A1	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1987A3	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1987J1	20R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1992A1	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1992A2	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1992A3	40R	M62 J25 - J30	
19/09/15 04:51:50	SIG	M62/1992J1	20R	M62 J25 - J30	
19/09/15 04:51:55	SIG	M62/1987J1	STOP	M62 J25 - J30	
19/09/15 04:51:55	SIG	M62/1992J1	STOP	M62 J25 - J30	
19/09/15 04:52:48	SIG	M62/2041B2	40R	M62 J25 - J30	
19/09/15 04:52:48	SIG	M62/2041B3	40R	M62 J25 - J30	
19/09/15 04:52:48	SIG	M62/2041B4	40R	M62 J25 - J30	
19/09/15 04:52:53	SIG	M62/2041B4	30R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2041B2	40R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2041B3	40R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2041B4	20R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2050B4	LDL	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2057B4	LDL	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2065B1	REDX	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2065B2	60R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2065B3	60R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2065B4	60R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M62/2065M1	50R	M62 J25 - J30	
19/09/15 04:52:59	SIG	M621/1002B2	50R	M62 J25 - J30	
19/09/15 04:53:04	SIG	M62/2041B4	STOP	M62 J25 - J30	
19/09/15 05:12:29	SIG	M62/1981A1	30R	M62 J25 - J30	
19/09/15 05:12:35	SIG	M62/1968A1	60R	M62 J25 - J30	
19/09/15 05:12:35	SIG	M62/1968A2	60R	M62 J25 - J30	
19/09/15 05:12:35	SIG	M62/1968A3	60R	M62 J25 - J30	
19/09/15 05:12:35	SIG	M62/1968A4	60R	M62 J25 - J30	
19/09/15 05:12:35	SIG	M62/1974A1	LDR	M62 J25 - J30	
19/09/15 05:12:35	SIG	M62/1981A1	20R	M62 J25 - J30	
19/09/15 05:12:40	SIG	M62/1981A1	STOP	M62 J25 - J30	
19/09/15 05:22:12	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 05:22:12	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 05:25:13	SIG	M606/2003B1	OFF	M62 J25 - J30	
19/09/15 05:25:13	SIG	M606/2003B2	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2041B2	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2041B3	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2041B4	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2050B2	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2050B3	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2050B4	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2057B1	BLNK	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2057B2	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2057B3	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2057B4	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2065B2	NR	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2065B3	NR	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2065B4	NR	M62 J25 - J30	
19/09/15 05:32:47	SIG	M62/2065M1	NR	M62 J25 - J30	
19/09/15 05:32:47	SIG	M621/1002B1	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M621/1002B2	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 05:32:47	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 05:32:48	SIG	M62/2041B1	BLNK	M62 J25 - J30	
19/09/15 05:32:48	SIG	M62/2041B1	BLNK	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1987A1	NR	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1987A3	NR	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1987J1	NR	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1992A2	OFF	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1992A3	OFF	M62 J25 - J30	
19/09/15 05:34:54	SIG	M62/1992J1	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1974A1	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1974A2	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1974A3	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1974A4	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1979K1	OFF	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1979K2	OFF	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1981A1	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1981A2	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1981A3	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1981A4	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1987A1	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1987A3	NR	M62 J25 - J30	
19/09/15 05:35:14	SIG	M62/1987J1	NR	M62 J25 - J30	
19/09/15 05:35:48	SIG	M62/2065B1	BLNK	M62 J25 - J30	
19/09/15 05:35:48	SIG	M62/2065B2	OFF	M62 J25 - J30	
19/09/15 05:35:48	SIG	M62/2065B3	OFF	M62 J25 - J30	
19/09/15 05:35:48	SIG	M62/2065B4	OFF	M62 J25 - J30	
19/09/15 05:35:48	SIG	M62/2065M1	OFF	M62 J25 - J30	
19/09/15 05:36:14	SIG	M62/1999A1	50R	M62 J25 - J30	
19/09/15 05:36:14	SIG	M62/1999A2	50R	M62 J25 - J30	
19/09/15 05:36:14	SIG	M62/1999A3	50R	M62 J25 - J30	
19/09/15 05:36:19	SIG	M62/1999A1	40R	M62 J25 - J30	
19/09/15 05:36:19	SIG	M62/1999A2	40R	M62 J25 - J30	
19/09/15 05:36:19	SIG	M62/1999A3	40R	M62 J25 - J30	
19/09/15 05:36:24	SIG	M62/1999A3	30R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1979K1	60R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1979K2	60R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1981A1	60R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1981A2	60R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1981A3	60R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1981A4	60R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1987A1	50R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1987A3	LDL	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1987J1	50R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1992A2	50R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1992A3	LDL	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1992J1	50R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1999A1	40R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1999A2	40R	M62 J25 - J30	
19/09/15 05:36:29	SIG	M62/1999A3	20R	M62 J25 - J30	
19/09/15 05:36:35	SIG	M62/1999A3	STOP	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1955K1	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1955K2	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1956A1	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1956A2	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1956A3	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1960A1	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1960A2	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1960A3	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1960K1	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1960K2	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1968A1	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1968A2	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1968A3	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1968A4	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1974A1	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1974A2	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1974A3	60R	M62 J25 - J30	
19/09/15 05:37:00	SIG	M62/1974A4	60R	M62 J25 - J30	
19/09/15 05:38:06	SIG	M62/1979K1	50R	M62 J25 - J30	
19/09/15 05:38:06	SIG	M62/1979K2	50R	M62 J25 - J30	
19/09/15 05:38:06	SIG	M62/1981A1	50R	M62 J25 - J30	
19/09/15 05:38:06	SIG	M62/1981A2	50R	M62 J25 - J30	
19/09/15 05:38:06	SIG	M62/1981A3	50R	M62 J25 - J30	
19/09/15 05:38:06	SIG	M62/1981A4	50R	M62 J25 - J30	
19/09/15 05:39:41	SIG	M62/2041A1	REDX	M62 J25 - J30	
19/09/15 05:39:41	SIG	M62/2041A2	NR	M62 J25 - J30	
19/09/15 05:39:41	SIG	M62/2041A3	NR	M62 J25 - J30	
19/09/15 05:39:41	SIG	M62/2041A4	NR	M62 J25 - J30	
19/09/15 05:41:38	SIG	M62/1979K1	60R	M62 J25 - J30	
19/09/15 05:41:38	SIG	M62/1979K2	60R	M62 J25 - J30	
19/09/15 05:41:38	SIG	M62/1981A1	60R	M62 J25 - J30	
19/09/15 05:41:38	SIG	M62/1981A2	60R	M62 J25 - J30	
19/09/15 05:41:38	SIG	M62/1981A3	60R	M62 J25 - J30	
19/09/15 05:41:38	SIG	M62/1981A4	60R	M62 J25 - J30	
19/09/15 05:44:51	SIG	M62/1999J1	50R	M62 J25 - J30	
19/09/15 05:44:51	SIG	M62/1999J2	50R	M62 J25 - J30	
19/09/15 05:46:51	SIG	M62/1955K1	OFF	M62 J25 - J30	
19/09/15 05:46:51	SIG	M62/1955K2	OFF	M62 J25 - J30	
19/09/15 05:46:51	SIG	M62/1956A1	OFF	M62 J25 - J30	
19/09/15 05:46:51	SIG	M62/1956A2	OFF	M62 J25 - J30	
19/09/15 05:46:51	SIG	M62/1956A3	OFF	M62 J25 - J30	
19/09/15 05:49:10	SIG	M62/1999J1	OFF	M62 J25 - J30	
19/09/15 05:49:10	SIG	M62/1999J2	OFF	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1960A1	OFF	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1960A2	OFF	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1960A3	OFF	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1960K1	OFF	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1960K2	OFF	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1968A1	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1968A2	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1968A3	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1968A4	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1974A1	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1974A2	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1974A3	NR	M62 J25 - J30	
19/09/15 05:50:10	SIG	M62/1974A4	NR	M62 J25 - J30	
19/09/15 05:53:10	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1974A1	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1974A2	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1974A3	OFF	M62 J25 - J30	
19/09/15 05:53:11	SIG	M62/1974A4	OFF	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1960A1	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1960A2	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1960A3	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1960K1	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1960K2	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1968A1	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1968A2	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1968A3	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1968A4	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1974A1	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1974A2	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1974A3	60R	M62 J25 - J30	
19/09/15 05:54:09	SIG	M62/1974A4	60R	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1960A1	OFF	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1960A2	OFF	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1960A3	OFF	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1960K1	OFF	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1960K2	OFF	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1968A1	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1968A2	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1968A3	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1968A4	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1974A1	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1974A2	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1974A3	NR	M62 J25 - J30	
19/09/15 05:58:09	SIG	M62/1974A4	NR	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1974A1	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1974A2	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1974A3	OFF	M62 J25 - J30	
19/09/15 06:01:10	SIG	M62/1974A4	OFF	M62 J25 - J30	
19/09/15 06:10:08	SIG	M62/1974A1	60R	M62 J25 - J30	
19/09/15 06:10:08	SIG	M62/1974A2	60R	M62 J25 - J30	
19/09/15 06:10:08	SIG	M62/1974A3	60R	M62 J25 - J30	
19/09/15 06:10:08	SIG	M62/1974A4	60R	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1987A1	60R	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1987A3	60R	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1987J1	60R	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1992A3	50R	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1999A1	OFF	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1999A2	OFF	M62 J25 - J30	
19/09/15 06:12:52	SIG	M62/1999A3	OFF	M62 J25 - J30	
19/09/15 06:13:54	SIG	M62/2041A1	BLNK	M62 J25 - J30	
19/09/15 06:13:54	SIG	M62/2041A2	OFF	M62 J25 - J30	
19/09/15 06:13:54	SIG	M62/2041A3	OFF	M62 J25 - J30	
19/09/15 06:13:54	SIG	M62/2041A4	OFF	M62 J25 - J30	
19/09/15 06:14:51	SIG	M62/1999A1	50R	M62 J25 - J30	
19/09/15 06:14:51	SIG	M62/1999A2	50R	M62 J25 - J30	
19/09/15 06:14:51	SIG	M62/1999A3	50R	M62 J25 - J30	
19/09/15 06:14:51	SIG	M62/1999J1	50R	M62 J25 - J30	
19/09/15 06:14:51	SIG	M62/1999J2	50R	M62 J25 - J30	
19/09/15 06:22:52	SIG	M62/1974A1	OFF	M62 J25 - J30	
19/09/15 06:22:52	SIG	M62/1974A2	OFF	M62 J25 - J30	
19/09/15 06:22:52	SIG	M62/1974A3	OFF	M62 J25 - J30	
19/09/15 06:22:52	SIG	M62/1974A4	OFF	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2018A1	HSD	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2018A2	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2018A3	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2018A4	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2025A1	REDX	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2025A2	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2025A3	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2025A4	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2033A1	REDX	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2033A2	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2033A3	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2033A4	50R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2041A1	REDX	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2041A2	60R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2041A3	60R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2041A4	60R	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2050A1	REDX	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2050A2	NR	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2050A3	NR	M62 J25 - J30	
19/09/15 06:23:51	SIG	M62/2050A4	NR	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2018A1	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2018A2	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2018A3	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2018A4	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2025A1	BLNK	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2025A2	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2025A3	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2025A4	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2033A1	BLNK	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2033A2	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2033A3	OFF	M62 J25 - J30	
19/09/15 06:27:21	SIG	M62/2033A4	OFF	M62 J25 - J30	
19/09/15 06:41:25	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 06:45:47	SIG	M62/2041A2	NR	M62 J25 - J30	
19/09/15 06:45:47	SIG	M62/2041A3	NR	M62 J25 - J30	
19/09/15 06:45:47	SIG	M62/2041A4	NR	M62 J25 - J30	
19/09/15 06:45:47	SIG	M62/2050A2	NR	M62 J25 - J30	
19/09/15 06:45:47	SIG	M62/2050A3	NR	M62 J25 - J30	
19/09/15 06:45:47	SIG	M62/2050A4	NR	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2041A1	BLNK	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2041A2	OFF	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2041A3	OFF	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2041A4	OFF	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2050A1	BLNK	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2050A2	OFF	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2050A3	OFF	M62 J25 - J30	
19/09/15 06:48:47	SIG	M62/2050A4	OFF	M62 J25 - J30	
19/09/15 06:48:48	SIG	M62/2050A1	BLNK	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1979K1	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1979K2	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1981A1	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1981A2	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1981A3	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1981A4	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1987A1	NR	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1987A3	NR	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1987J1	NR	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1992A2	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1992A3	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1992J1	NR	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1999A1	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1999A2	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1999A3	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1999J1	OFF	M62 J25 - J30	
19/09/15 06:49:06	SIG	M62/1999J2	OFF	M62 J25 - J30	
19/09/15 06:52:06	SIG	M62/1987J1	OFF	M62 J25 - J30	
19/09/15 06:52:16	SIG	M62/1987A1	OFF	M62 J25 - J30	
19/09/15 06:52:16	SIG	M62/1987A3	OFF	M62 J25 - J30	
19/09/15 06:52:16	SIG	M62/1992J1	OFF	M62 J25 - J30	
19/09/15 08:00:01	SIG	M62/2041B2	50R	M62 J25 - J30	
19/09/15 08:00:01	SIG	M62/2041B3	50R	M62 J25 - J30	
19/09/15 08:00:01	SIG	M62/2041B4	50R	M62 J25 - J30	
19/09/15 08:00:01	SIG	M621/1010B1	60R	M62 J25 - J30	
19/09/15 08:00:01	SIG	M621/1010B2	60R	M62 J25 - J30	
19/09/15 08:00:06	SIG	M62/2041B2	40R	M62 J25 - J30	
19/09/15 08:00:06	SIG	M62/2041B3	40R	M62 J25 - J30	
19/09/15 08:00:06	SIG	M62/2041B4	40R	M62 J25 - J30	
19/09/15 08:00:11	SIG	M62/2041B4	30R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2041B1	REDX	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2041B2	40R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2041B3	40R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2041B4	20R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2050B2	50R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2050B3	50R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2050B4	LDL	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2057B1	REDX	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2057B2	50R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2057B3	50R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2057B4	LDL	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2065B1	REDX	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2065B2	60R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2065B3	60R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2065B4	60R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M62/2065M1	50R	M62 J25 - J30	
19/09/15 08:00:16	SIG	M621/1002B1	HSD	M62 J25 - J30	
19/09/15 08:00:16	SIG	M621/1002B2	50R	M62 J25 - J30	
19/09/15 08:00:22	SIG	M62/2041B4	STOP	M62 J25 - J30	
19/09/15 08:01:01	SIG	M62/1999B1	REDX	M62 J25 - J30	
19/09/15 08:01:01	SIG	M62/1999B2	NR	M62 J25 - J30	
19/09/15 08:01:01	SIG	M62/1999B3	NR	M62 J25 - J30	
19/09/15 08:01:01	SIG	M62/1999B4	NR	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2122K1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2122K2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2124A1	REDX	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2124A2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2124A3	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2124A4	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2135A1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2135A2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2135A3	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2135A4	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2144A1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2144A2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2144J1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2144K1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2151A1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2151A2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2151J1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2151K1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2155A1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2155A2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2155J1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2155K1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2157A1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2157A2	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2157J1	NR	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2157J2	NR	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2157K1	50R	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2163A1	NR	M62 J25 - J30	
19/09/15 08:03:45	SIG	M62/2163A2	NR	M62 J25 - J30	
19/09/15 08:03:46	SIG	M62/2117A1	REDX	M62 J25 - J30	
19/09/15 08:03:46	SIG	M62/2117A2	50R	M62 J25 - J30	
19/09/15 08:03:46	SIG	M62/2117A3	50R	M62 J25 - J30	
19/09/15 08:03:46	SIG	M62/2117A4	50R	M62 J25 - J30	
19/09/15 08:03:59	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:03:59	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:04:00	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:04:01	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:05:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:05:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:05:57	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:05:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:06:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:06:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:06:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:06:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2117A1	BLNK	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2117A2	OFF	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2117A3	OFF	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2117A4	OFF	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2122K1	OFF	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2122K2	OFF	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2124A2	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2124A3	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2124A4	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2135A1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2135A2	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2135A3	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2135A4	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2144A1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2144A2	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2144J1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2144K1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2151A1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2151A2	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2151J1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2151K1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2155A1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2155A2	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2155J1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2155K1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2157J1	NR	M62 J25 - J30	
19/09/15 08:12:49	SIG	M62/2157J2	NR	M62 J25 - J30	
19/09/15 08:13:04	SIG	M62/2157A1	OFF	M62 J25 - J30	
19/09/15 08:13:04	SIG	M62/2157A2	OFF	M62 J25 - J30	
19/09/15 08:13:04	SIG	M62/2157K1	OFF	M62 J25 - J30	
19/09/15 08:13:04	SIG	M62/2163A1	OFF	M62 J25 - J30	
19/09/15 08:13:04	SIG	M62/2163A2	OFF	M62 J25 - J30	
19/09/15 08:15:49	SIG	M62/2144J1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2124A1	BLNK	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2124A1	BLNK	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2124A2	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2124A3	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2124A4	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2135A1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2135A2	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2135A3	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2135A4	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2144A1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2144A2	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2144K1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2151A1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2151A2	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2151J1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2151K1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2155A1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2155A2	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2155J1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2155K1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2157J1	OFF	M62 J25 - J30	
19/09/15 08:15:50	SIG	M62/2157J2	OFF	M62 J25 - J30	
19/09/15 08:16:52	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 08:16:52	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 08:23:54	SIG	M62/2069M1	60R	M62 J25 - J30	
19/09/15 08:23:54	SIG	M62/2069M2	60R	M62 J25 - J30	
19/09/15 08:23:54	SIG	M62/2074B1	REDX	M62 J25 - J30	
19/09/15 08:23:54	SIG	M62/2074B2	60R	M62 J25 - J30	
19/09/15 08:23:54	SIG	M62/2074B3	60R	M62 J25 - J30	
19/09/15 08:23:54	SIG	M62/2074B4	60R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2041B2	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2041B3	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2041B4	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2050B4	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2057B4	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2065B2	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2065B3	50R	M62 J25 - J30	
19/09/15 08:26:58	SIG	M62/2065B4	50R	M62 J25 - J30	
19/09/15 08:42:26	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 08:42:26	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 08:43:31	SIG	M62/2041B2	OFF	M62 J25 - J30	
19/09/15 08:43:31	SIG	M62/2041B3	OFF	M62 J25 - J30	
19/09/15 08:43:31	SIG	M62/2041B4	OFF	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2041B1	BLNK	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2050B2	OFF	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2050B3	OFF	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2050B4	OFF	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2057B2	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2057B3	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2057B4	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2065B2	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2065B3	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2065B4	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M62/2065M1	60R	M62 J25 - J30	
19/09/15 08:44:00	SIG	M621/1002B2	60R	M62 J25 - J30	
19/09/15 08:44:13	SIG	M62/1999B2	NR	M62 J25 - J30	
19/09/15 08:44:13	SIG	M62/1999B3	NR	M62 J25 - J30	
19/09/15 08:44:13	SIG	M62/1999B4	NR	M62 J25 - J30	
19/09/15 08:45:27	SIG	M606/2003B1	OFF	M62 J25 - J30	
19/09/15 08:45:27	SIG	M606/2003B2	OFF	M62 J25 - J30	
19/09/15 08:46:16	SIG	M62/1999A1	50R	M62 J25 - J30	
19/09/15 08:46:16	SIG	M62/1999A2	50R	M62 J25 - J30	
19/09/15 08:46:16	SIG	M62/1999A3	50R	M62 J25 - J30	
19/09/15 08:46:21	SIG	M62/1999A1	40R	M62 J25 - J30	
19/09/15 08:46:21	SIG	M62/1999A2	40R	M62 J25 - J30	
19/09/15 08:46:21	SIG	M62/1999A3	40R	M62 J25 - J30	
19/09/15 08:46:27	SIG	M62/1999A3	30R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1979K1	60R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1979K2	60R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1981A1	60R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1981A2	60R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1981A3	60R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1981A4	60R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1987A1	50R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1987A3	LDL	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1987J1	50R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1992A2	50R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1992A3	LDL	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1992J1	50R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1999A1	40R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1999A2	40R	M62 J25 - J30	
19/09/15 08:46:32	SIG	M62/1999A3	20R	M62 J25 - J30	
19/09/15 08:46:37	SIG	M62/1999A3	STOP	M62 J25 - J30	
19/09/15 08:46:40	SIG	M62/1979K1	50R	M62 J25 - J30	
19/09/15 08:46:40	SIG	M62/1979K2	50R	M62 J25 - J30	
19/09/15 08:46:40	SIG	M62/1981A1	50R	M62 J25 - J30	
19/09/15 08:46:40	SIG	M62/1981A2	50R	M62 J25 - J30	
19/09/15 08:46:40	SIG	M62/1981A3	50R	M62 J25 - J30	
19/09/15 08:46:40	SIG	M62/1981A4	50R	M62 J25 - J30	
19/09/15 08:46:59	SIG	M62/2041A1	REDX	M62 J25 - J30	
19/09/15 08:46:59	SIG	M62/2041A2	NR	M62 J25 - J30	
19/09/15 08:46:59	SIG	M62/2041A3	NR	M62 J25 - J30	
19/09/15 08:46:59	SIG	M62/2041A4	NR	M62 J25 - J30	
19/09/15 08:47:13	SIG	M62/1999B1	BLNK	M62 J25 - J30	
19/09/15 08:47:13	SIG	M62/1999B2	OFF	M62 J25 - J30	
19/09/15 08:47:13	SIG	M62/1999B3	OFF	M62 J25 - J30	
19/09/15 08:47:13	SIG	M62/1999B4	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2057B1	BLNK	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2057B2	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2057B3	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2057B4	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2065B2	NR	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2065B3	NR	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2065B4	NR	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2065M1	NR	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2069M1	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2069M2	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2074B1	BLNK	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2074B2	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2074B3	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M62/2074B4	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M621/1002B1	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M621/1002B2	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 08:48:54	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 08:51:55	SIG	M62/2065B2	OFF	M62 J25 - J30	
19/09/15 08:51:55	SIG	M62/2065B3	OFF	M62 J25 - J30	
19/09/15 08:51:55	SIG	M62/2065B4	OFF	M62 J25 - J30	
19/09/15 08:51:55	SIG	M62/2065M1	OFF	M62 J25 - J30	
19/09/15 08:51:56	SIG	M62/2065B1	BLNK	M62 J25 - J30	
19/09/15 08:56:04	SIG	M62/1999J1	50R	M62 J25 - J30	
19/09/15 08:56:04	SIG	M62/1999J2	50R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1979K1	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1979K2	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1981A1	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1981A2	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1981A3	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1981A4	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1987A1	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1987A2	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1987A3	50R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1987J1	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1992A1	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1992A2	40R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1992A3	50R	M62 J25 - J30	
19/09/15 09:14:56	SIG	M62/1992J1	40R	M62 J25 - J30	
19/09/15 09:15:01	SIG	M62/1981A1	30R	M62 J25 - J30	
19/09/15 09:15:01	SIG	M62/1987A3	40R	M62 J25 - J30	
19/09/15 09:15:01	SIG	M62/1987J1	30R	M62 J25 - J30	
19/09/15 09:15:01	SIG	M62/1992A3	40R	M62 J25 - J30	
19/09/15 09:15:01	SIG	M62/1992J1	30R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1968A1	60R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1968A2	60R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1968A3	60R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1968A4	60R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1974A1	LDR	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1974A2	50R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1974A3	50R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1974A4	50R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1979K1	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1979K2	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1981A1	20R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1981A2	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1981A3	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1981A4	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1987A1	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1987A3	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1987J1	20R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1992A1	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1992A2	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1992A3	40R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1992J1	20R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1999A1	50R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1999A2	50R	M62 J25 - J30	
19/09/15 09:15:07	SIG	M62/1999A3	50R	M62 J25 - J30	
19/09/15 09:15:12	SIG	M62/1981A1	STOP	M62 J25 - J30	
19/09/15 09:15:12	SIG	M62/1987J1	STOP	M62 J25 - J30	
19/09/15 09:15:12	SIG	M62/1992J1	STOP	M62 J25 - J30	
19/09/15 09:17:55	SIG	M62/1960A1	60R	M62 J25 - J30	
19/09/15 09:17:55	SIG	M62/1960A2	60R	M62 J25 - J30	
19/09/15 09:17:55	SIG	M62/1960A3	60R	M62 J25 - J30	
19/09/15 09:17:55	SIG	M62/1960K1	60R	M62 J25 - J30	
19/09/15 09:17:55	SIG	M62/1960K2	60R	M62 J25 - J30	
19/09/15 09:24:55	SIG	M62/1955K1	60R	M62 J25 - J30	
19/09/15 09:24:55	SIG	M62/1955K2	60R	M62 J25 - J30	
19/09/15 09:24:55	SIG	M62/1956A1	60R	M62 J25 - J30	
19/09/15 09:24:55	SIG	M62/1956A2	60R	M62 J25 - J30	
19/09/15 09:24:55	SIG	M62/1956A3	60R	M62 J25 - J30	
19/09/15 09:33:36	SIG	M62/1960L1	50R	M62 J25 - J30	
19/09/15 09:33:36	SIG	M62/1960L2	50R	M62 J25 - J30	
19/09/15 09:36:52	SIG	M62/1960L1	OFF	M62 J25 - J30	
19/09/15 09:36:52	SIG	M62/1960L2	OFF	M62 J25 - J30	
19/09/15 09:43:32	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 09:43:32	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 09:43:32	SIG	M62/2008K1	50R	M62 J25 - J30	
19/09/15 09:43:32	SIG	M62/2008K2	50R	M62 J25 - J30	
19/09/15 09:43:32	SIG	M62/2018A1	HSD	M62 J25 - J30	
19/09/15 09:43:32	SIG	M62/2018A2	50R	M62 J25 - J30	
19/09/15 09:43:32	SIG	M62/2018A3	50R	M62 J25 - J30	
19/09/15 09:43:32	SIG	M62/2018A4	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1974A1	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1974A2	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1974A3	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1974A4	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1979K1	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1979K2	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1981A1	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1981A2	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1981A3	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1981A4	60R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1987A1	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1987A3	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1987J1	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1992A2	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1992A3	50R	M62 J25 - J30	
19/09/15 09:43:37	SIG	M62/1992J1	50R	M62 J25 - J30	
19/09/15 09:44:02	SIG	M62/1987A1	60R	M62 J25 - J30	
19/09/15 09:44:02	SIG	M62/1987A3	60R	M62 J25 - J30	
19/09/15 09:44:02	SIG	M62/1987J1	60R	M62 J25 - J30	
19/09/15 09:44:51	SIG	M62/2041A2	NR	M62 J25 - J30	
19/09/15 09:44:51	SIG	M62/2041A3	NR	M62 J25 - J30	
19/09/15 09:44:51	SIG	M62/2041A4	NR	M62 J25 - J30	
19/09/15 09:46:59	SIG	M62/2025A1	REDX	M62 J25 - J30	
19/09/15 09:46:59	SIG	M62/2025A2	NR	M62 J25 - J30	
19/09/15 09:46:59	SIG	M62/2025A3	NR	M62 J25 - J30	
19/09/15 09:46:59	SIG	M62/2025A4	NR	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2004A1	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2004A2	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2004A3	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2012A1	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2012A2	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2012A3	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2018A2	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2018A3	60R	M62 J25 - J30	
19/09/15 09:47:20	SIG	M62/2018A4	60R	M62 J25 - J30	
19/09/15 09:47:51	SIG	M62/2041A2	OFF	M62 J25 - J30	
19/09/15 09:47:51	SIG	M62/2041A3	OFF	M62 J25 - J30	
19/09/15 09:47:51	SIG	M62/2041A4	OFF	M62 J25 - J30	
19/09/15 09:47:52	SIG	M62/2041A1	BLNK	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2025A2	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2025A3	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2025A4	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A1	REDX	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A2	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A2	NR	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A3	NR	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A3	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A4	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2033A4	NR	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2041A1	REDX	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2041A2	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2041A3	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2041A4	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2050A1	REDX	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2050A2	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2050A3	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2050A4	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2057A1	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2057A2	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2057A3	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2057J1	60R	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2065A1	REDX	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2065A2	NR	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2065A3	NR	M62 J25 - J30	
19/09/15 09:52:35	SIG	M62/2065A4	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1955K1	OFF	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1955K2	OFF	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1956A1	OFF	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1956A2	OFF	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1956A3	OFF	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1960A1	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1960A2	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1960A3	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1960K1	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1960K2	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1968A1	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1968A2	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1968A3	NR	M62 J25 - J30	
19/09/15 09:53:55	SIG	M62/1968A4	NR	M62 J25 - J30	
19/09/15 09:54:10	SIG	M62/2050A1	60R	M62 J25 - J30	
19/09/15 09:54:34	SIG	M62/2041A1	60R	M62 J25 - J30	
19/09/15 09:54:58	SIG	M62/2033A1	60R	M62 J25 - J30	
19/09/15 09:55:04	SIG	M62/2018A1	60R	M62 J25 - J30	
19/09/15 09:55:04	SIG	M62/2025A1	60R	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1960A1	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1960A2	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1960A3	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1960K1	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1960K2	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 09:56:56	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 09:57:48	SIG	M62/2025A1	???	M62 J25 - J30	
19/09/15 09:57:49	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 10:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 10:06:10	SIG	M62/2025A1	???	M62 J25 - J30	
19/09/15 10:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 10:36:10	SIG	M62/2025A1	???	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2159B1	NR	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2159B2	NR	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2170B1	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2170B2	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2177B1	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2177B2	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2177L1	50R	M62 J25 - J30	
19/09/15 10:46:49	SIG	M62/2177L2	50R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2170B1	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2170B2	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2170L1	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2170L2	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2177B1	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2177B2	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2177L1	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2177L2	40R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2183B1	50R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2183B2	50R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2183L1	50R	M62 J25 - J30	
19/09/15 10:46:55	SIG	M62/2183L2	50R	M62 J25 - J30	
19/09/15 10:47:39	SIG	M62/2004A1	50R	M62 J25 - J30	
19/09/15 10:47:39	SIG	M62/2004A2	50R	M62 J25 - J30	
19/09/15 10:47:39	SIG	M62/2004A3	50R	M62 J25 - J30	
19/09/15 10:47:44	SIG	M62/2004A1	40R	M62 J25 - J30	
19/09/15 10:47:44	SIG	M62/2004A2	40R	M62 J25 - J30	
19/09/15 10:47:44	SIG	M62/2004A3	40R	M62 J25 - J30	
19/09/15 10:49:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:49:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:49:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:49:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:50:45	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 10:50:45	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 10:50:45	SIG	M62/2008K1	60R	M62 J25 - J30	
19/09/15 10:50:45	SIG	M62/2008K2	60R	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2159B1	NR	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2159B2	NR	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2170L1	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2170L2	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2177B1	NR	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2177B2	NR	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2177L1	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2177L2	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2183B1	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 10:50:49	SIG	M62/2183L2	OFF	M62 J25 - J30	
19/09/15 10:51:39	SIG	M62/2004A1	60R	M62 J25 - J30	
19/09/15 10:51:39	SIG	M62/2004A2	60R	M62 J25 - J30	
19/09/15 10:51:39	SIG	M62/2004A3	60R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2159B1	NR	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2159B2	NR	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2170B1	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2170B2	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2177B1	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2177B2	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2177L1	50R	M62 J25 - J30	
19/09/15 10:53:00	SIG	M62/2177L2	50R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2170B1	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2170B2	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2170L1	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2170L2	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2177B1	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2177B2	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2177L1	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2177L2	40R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2183B1	50R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2183B2	50R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2183L1	50R	M62 J25 - J30	
19/09/15 10:53:06	SIG	M62/2183L2	50R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2033B1	REDX	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2033B2	NR	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2033B3	NR	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2033B4	NR	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2041B1	REDX	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2041B2	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2041B3	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2041B4	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2050B2	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2050B3	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2050B4	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2057B1	REDX	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2057B2	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2057B3	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2057B4	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2065B1	REDX	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2065B2	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2065B3	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2065B4	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2065M1	NR	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2065M1	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2069M1	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M62/2069M2	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M621/1002B1	HSD	M62 J25 - J30	
19/09/15 10:53:28	SIG	M621/1002B2	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M621/1010B1	60R	M62 J25 - J30	
19/09/15 10:53:28	SIG	M621/1010B2	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2012B1	REDX	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2012B2	NR	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2012B3	NR	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2012B4	NR	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2018B1	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2018B2	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2018B3	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2018L1	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2025B1	REDX	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2025B2	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2025B3	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2025B4	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2033B2	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2033B3	60R	M62 J25 - J30	
19/09/15 10:53:29	SIG	M62/2033B4	60R	M62 J25 - J30	
19/09/15 10:53:45	SIG	M606/2003B1	OFF	M62 J25 - J30	
19/09/15 10:53:46	SIG	M606/2003B2	OFF	M62 J25 - J30	
19/09/15 10:53:56	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 10:55:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:55:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:55:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:55:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:55:43	SIG	M62/2025B1	60R	M62 J25 - J30	
19/09/15 10:55:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 10:55:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 10:55:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 10:55:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 10:56:09	SIG	M62/2033B1	60R	M62 J25 - J30	
19/09/15 10:56:34	SIG	M62/2041B1	60R	M62 J25 - J30	
19/09/15 10:56:57	SIG	M62/2057B1	60R	M62 J25 - J30	
19/09/15 10:56:57	SIG	M621/1002B1	60R	M62 J25 - J30	
19/09/15 10:56:57	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 10:56:57	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 10:57:52	SIG	M62/2159B1	NR	M62 J25 - J30	
19/09/15 10:57:52	SIG	M62/2159B2	NR	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2170L1	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2170L2	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2177B1	NR	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2177B2	NR	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2177L1	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2177L2	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2183B1	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 10:57:53	SIG	M62/2183L2	OFF	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2177B1	50R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2177B2	50R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2177L1	50R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2177L2	50R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2183B1	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2183B2	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2183L2	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2189B1	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2189B2	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2189B3	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2189B4	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2194B1	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2194B2	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2194B3	60R	M62 J25 - J30	
19/09/15 10:57:57	SIG	M62/2194B4	60R	M62 J25 - J30	
19/09/15 11:00:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:00:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:00:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:00:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:00:53	SIG	M62/2159B1	OFF	M62 J25 - J30	
19/09/15 11:00:53	SIG	M62/2159B2	OFF	M62 J25 - J30	
19/09/15 11:01:07	SIG	M606/2003B1	50R	M62 J25 - J30	
19/09/15 11:01:07	SIG	M606/2003B2	50R	M62 J25 - J30	
19/09/15 11:01:07	SIG	M62/2005M1	50R	M62 J25 - J30	
19/09/15 11:01:07	SIG	M62/2005M2	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1987B1	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1987B2	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1987B3	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1987B4	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1992B1	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1992B2	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1992B3	50R	M62 J25 - J30	
19/09/15 11:01:08	SIG	M62/1992B4	50R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1981B1	NR	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1981B2	NR	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1981B3	NR	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1981B4	NR	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1987B1	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1987B2	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1987B3	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1987B4	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1992B1	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1992B2	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1992B3	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1992B4	40R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1999B1	REDX	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1999B2	50R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1999B3	50R	M62 J25 - J30	
19/09/15 11:01:13	SIG	M62/1999B4	50R	M62 J25 - J30	
19/09/15 11:03:51	SIG	M606/2003B1	OFF	M62 J25 - J30	
19/09/15 11:03:51	SIG	M606/2003B2	OFF	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1981B1	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1981B2	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1981B3	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1981B4	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1987B1	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1987B2	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1987B3	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1987B4	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1992B1	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1992B2	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1992B3	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1992B4	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1999B2	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1999B3	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/1999B4	NR	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/2005M1	OFF	M62 J25 - J30	
19/09/15 11:03:51	SIG	M62/2005M2	OFF	M62 J25 - J30	
19/09/15 11:04:22	SIG	M62/2050A1	60R	M62 J25 - J30	
19/09/15 11:04:22	SIG	M62/2050A1	OFF	M62 J25 - J30	
19/09/15 11:05:45	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 11:05:45	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 11:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 11:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 11:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 11:06:51	SIG	M62/1999B2	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1981B1	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1981B2	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1981B3	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1981B4	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1987B1	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1987B2	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1987B3	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1987B4	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1992B1	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1992B2	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1992B3	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1992B4	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1999B1	BLNK	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1999B3	OFF	M62 J25 - J30	
19/09/15 11:06:52	SIG	M62/1999B4	OFF	M62 J25 - J30	
19/09/15 11:07:57	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 11:13:34	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:13:35	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 11:17:44	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:17:45	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:17:45	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:17:46	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:17:56	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:17:57	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 11:23:04	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 11:23:04	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 11:23:04	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 11:23:04	SIG	M62/2170B1	60R	M62 J25 - J30	
19/09/15 11:23:04	SIG	M62/2170B2	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2159B1	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2159B2	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2159M1	60R	M62 J25 - J30	
19/09/15 11:23:09	SIG	M62/2159M2	60R	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2132B1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2132B2	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2132B3	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2137B1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2137B3	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2137B4	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2147B1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2147B2	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2147B3	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2147B4	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2159B1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2159B2	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2159M1	OFF	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2159M2	OFF	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 11:27:49	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2125B1	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2125B2	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2125B3	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2125L1	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2125L2	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2132B1	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2132B2	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2132B3	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2137B1	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2137B3	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2137B4	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2147B1	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2147B2	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2147B3	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2147B4	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2159B1	OFF	M62 J25 - J30	
19/09/15 11:30:50	SIG	M62/2159B2	OFF	M62 J25 - J30	
19/09/15 11:31:16	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 11:31:16	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 11:31:16	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 11:31:16	SIG	M62/2170B1	60R	M62 J25 - J30	
19/09/15 11:31:16	SIG	M62/2170B2	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2159B1	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2159B2	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2159M1	60R	M62 J25 - J30	
19/09/15 11:31:22	SIG	M62/2159M2	60R	M62 J25 - J30	
19/09/15 11:35:25	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:35:26	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:35:27	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:35:28	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:35:43	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 11:35:43	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 11:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 11:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 11:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 11:36:11	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 11:36:11	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 11:36:11	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 11:36:57	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 11:36:57	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2170B1	50R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2170B2	50R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2170L1	40R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2170L2	40R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2177B1	40R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2177B2	40R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2177L1	40R	M62 J25 - J30	
19/09/15 11:42:36	SIG	M62/2177L2	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2170B1	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2170B2	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2170L1	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2170L2	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2177B1	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2177B2	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2177L1	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2177L2	40R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2183B1	50R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2183B2	50R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2183L1	50R	M62 J25 - J30	
19/09/15 11:42:41	SIG	M62/2183L2	50R	M62 J25 - J30	
19/09/15 11:44:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:44:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:44:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:44:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2170B1	60R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2170B2	60R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2177B1	50R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2177B2	50R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2177L1	50R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2177L2	50R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2183B1	60R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2183B2	60R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 11:46:37	SIG	M62/2183L2	60R	M62 J25 - J30	
19/09/15 11:49:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:49:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:49:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:49:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 11:49:32	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 11:49:33	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 11:49:51	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 11:49:51	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 11:49:51	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 11:49:51	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 11:49:56	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 11:49:56	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 11:49:56	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 11:49:56	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 11:50:36	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 11:50:36	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 11:50:44	SIG	M62/2008K1	50R	M62 J25 - J30	
19/09/15 11:50:44	SIG	M62/2008K2	50R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2079A1	REDX	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2079A2	60R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2079A3	60R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2079A4	60R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2088A1	REDX	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2088A2	60R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2088A3	60R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2088A4	60R	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2097A1	REDX	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2097A2	NR	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2097A3	NR	M62 J25 - J30	
19/09/15 11:52:13	SIG	M62/2097A4	NR	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2079A1	BLNK	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2079A2	OFF	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2079A3	OFF	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2079A4	OFF	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2088A2	NR	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2088A3	NR	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2088A4	NR	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2097A2	NR	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2097A3	NR	M62 J25 - J30	
19/09/15 11:55:38	SIG	M62/2097A4	NR	M62 J25 - J30	
19/09/15 11:55:52	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 11:55:52	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 11:55:52	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 11:55:52	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 11:55:59	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 11:55:59	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 11:55:59	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 11:55:59	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 11:56:05	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 11:56:05	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 11:56:05	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 11:56:05	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2088A1	BLNK	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2088A2	OFF	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2088A3	OFF	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2088A4	OFF	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2097A1	BLNK	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2097A1	BLNK	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2097A2	OFF	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2097A3	OFF	M62 J25 - J30	
19/09/15 11:58:39	SIG	M62/2097A4	OFF	M62 J25 - J30	
19/09/15 12:00:00	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 12:00:00	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 12:00:00	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 12:00:00	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 12:05:22	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 12:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 12:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 12:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 12:06:27	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:07:32	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:08:12	SIG	M606/2003B1	NR	M62 J25 - J30	
19/09/15 12:08:12	SIG	M606/2003B2	NR	M62 J25 - J30	
19/09/15 12:08:12	SIG	M62/2008K1	60R	M62 J25 - J30	
19/09/15 12:08:12	SIG	M62/2008K2	60R	M62 J25 - J30	
19/09/15 12:09:40	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:11:12	SIG	M606/2003B1	OFF	M62 J25 - J30	
19/09/15 12:11:12	SIG	M606/2003B2	OFF	M62 J25 - J30	
19/09/15 12:11:20	SIG	M62/2050A1	60R	M62 J25 - J30	
19/09/15 12:11:20	SIG	M62/2050A1	OFF	M62 J25 - J30	
19/09/15 12:11:48	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:12:09	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 12:12:09	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 12:12:09	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 12:12:09	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 12:12:14	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 12:12:14	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 12:12:14	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 12:12:14	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 12:12:51	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:15:03	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:20:14	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:25:58	SIG	M62/2159B1	50R	M62 J25 - J30	
19/09/15 12:25:58	SIG	M62/2159B2	50R	M62 J25 - J30	
19/09/15 12:25:58	SIG	M62/2159M1	50R	M62 J25 - J30	
19/09/15 12:25:58	SIG	M62/2159M2	50R	M62 J25 - J30	
19/09/15 12:26:18	SIG	M62/2159B1	40R	M62 J25 - J30	
19/09/15 12:26:18	SIG	M62/2159B2	40R	M62 J25 - J30	
19/09/15 12:26:18	SIG	M62/2159M1	40R	M62 J25 - J30	
19/09/15 12:26:18	SIG	M62/2159M2	40R	M62 J25 - J30	
19/09/15 12:26:30	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:27:34	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:30:18	SIG	M62/2159B1	50R	M62 J25 - J30	
19/09/15 12:30:18	SIG	M62/2159B2	50R	M62 J25 - J30	
19/09/15 12:30:18	SIG	M62/2159M1	50R	M62 J25 - J30	
19/09/15 12:30:18	SIG	M62/2159M2	50R	M62 J25 - J30	
19/09/15 12:31:45	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2159B1	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2159B2	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2159M1	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2159M2	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2170B1	50R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2170B2	50R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2170L1	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2170L2	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2177B1	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2177B2	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2177L1	40R	M62 J25 - J30	
19/09/15 12:32:30	SIG	M62/2177L2	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2170B1	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2170B2	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2170L1	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2170L2	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2177B1	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2177B2	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2177L1	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2177L2	40R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2183B1	50R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2183B2	50R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2183L1	50R	M62 J25 - J30	
19/09/15 12:32:35	SIG	M62/2183L2	50R	M62 J25 - J30	
19/09/15 12:35:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:35:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:35:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:35:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 12:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 12:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 12:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2159B1	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2159B2	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2159M1	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2159M2	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2170B1	60R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2170B2	60R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2177B1	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2177B2	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2177L1	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2177L2	50R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2183B1	60R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2183B2	60R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 12:36:30	SIG	M62/2183L2	60R	M62 J25 - J30	
19/09/15 12:38:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:38:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:38:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:38:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 12:40:31	SIG	M62/2159B1	40R	M62 J25 - J30	
19/09/15 12:40:31	SIG	M62/2159B2	40R	M62 J25 - J30	
19/09/15 12:40:31	SIG	M62/2159M1	40R	M62 J25 - J30	
19/09/15 12:40:31	SIG	M62/2159M2	40R	M62 J25 - J30	
19/09/15 12:41:39	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 12:41:40	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 12:44:30	SIG	M62/2159B1	50R	M62 J25 - J30	
19/09/15 12:44:30	SIG	M62/2159B2	50R	M62 J25 - J30	
19/09/15 12:44:30	SIG	M62/2159M1	50R	M62 J25 - J30	
19/09/15 12:44:30	SIG	M62/2159M2	50R	M62 J25 - J30	
19/09/15 12:44:58	SIG	M62/2159B1	40R	M62 J25 - J30	
19/09/15 12:44:58	SIG	M62/2159B2	40R	M62 J25 - J30	
19/09/15 12:44:58	SIG	M62/2159M1	40R	M62 J25 - J30	
19/09/15 12:44:58	SIG	M62/2159M2	40R	M62 J25 - J30	
19/09/15 12:49:22	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 12:49:23	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 12:51:47	SIG	M62/1960A1	50R	M62 J25 - J30	
19/09/15 12:51:47	SIG	M62/1960A2	50R	M62 J25 - J30	
19/09/15 12:51:47	SIG	M62/1960A3	50R	M62 J25 - J30	
19/09/15 12:51:47	SIG	M62/1960K1	50R	M62 J25 - J30	
19/09/15 12:51:47	SIG	M62/1960K2	50R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1955K1	50R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1955K2	50R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1956A1	50R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1956A2	50R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1956A3	50R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1960A1	40R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1960A2	40R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1960A3	40R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1960K1	40R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1960K2	40R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1968A1	60R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1968A2	60R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1968A3	60R	M62 J25 - J30	
19/09/15 12:51:52	SIG	M62/1968A4	60R	M62 J25 - J30	
19/09/15 12:52:24	SIG	M62/2159B1	50R	M62 J25 - J30	
19/09/15 12:52:24	SIG	M62/2159B2	50R	M62 J25 - J30	
19/09/15 12:52:24	SIG	M62/2159M1	50R	M62 J25 - J30	
19/09/15 12:52:24	SIG	M62/2159M2	50R	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1955K1	OFF	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1955K2	OFF	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1956A1	OFF	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1956A2	OFF	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1956A3	OFF	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1960A1	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1960A2	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1960A3	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1960K1	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1960K2	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1968A1	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1968A2	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1968A3	NR	M62 J25 - J30	
19/09/15 12:55:48	SIG	M62/1968A4	NR	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1960A1	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1960A2	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1960A3	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1960K1	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1960K2	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 12:58:48	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 13:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 13:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 13:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 13:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2057B1	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2057B2	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2057B3	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2057B4	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2065B2	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2065B3	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2065B4	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M62/2065M1	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M621/1002B1	50R	M62 J25 - J30	
19/09/15 13:09:37	SIG	M621/1002B2	50R	M62 J25 - J30	
19/09/15 13:09:38	SIG	M62/2074B1	REDX	M62 J25 - J30	
19/09/15 13:09:38	SIG	M62/2074B2	60R	M62 J25 - J30	
19/09/15 13:09:38	SIG	M62/2074B3	60R	M62 J25 - J30	
19/09/15 13:09:38	SIG	M62/2074B4	60R	M62 J25 - J30	
19/09/15 13:09:38	SIG	M621/1010B1	50R	M62 J25 - J30	
19/09/15 13:09:38	SIG	M621/1010B2	50R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2057B1	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2057B2	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2057B3	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2057B4	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2065B2	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2065B3	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2065B4	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2065M1	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2069M1	50R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M62/2069M2	50R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M621/1002B1	40R	M62 J25 - J30	
19/09/15 13:09:43	SIG	M621/1002B2	40R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2057B1	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2057B2	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2057B3	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2057B4	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2065B2	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2065B3	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2065B4	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2065M1	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2069M1	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2069M2	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2074B1	BLNK	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2074B2	OFF	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2074B3	OFF	M62 J25 - J30	
19/09/15 13:13:38	SIG	M62/2074B4	OFF	M62 J25 - J30	
19/09/15 13:13:38	SIG	M621/1002B1	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M621/1002B2	60R	M62 J25 - J30	
19/09/15 13:13:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 13:13:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 13:14:59	SIG	M62/2074B1	REDX	M62 J25 - J30	
19/09/15 13:14:59	SIG	M62/2074B2	60R	M62 J25 - J30	
19/09/15 13:14:59	SIG	M62/2074B3	60R	M62 J25 - J30	
19/09/15 13:14:59	SIG	M62/2074B4	60R	M62 J25 - J30	
19/09/15 13:14:59	SIG	M621/1010B1	60R	M62 J25 - J30	
19/09/15 13:14:59	SIG	M621/1010B2	60R	M62 J25 - J30	
19/09/15 13:25:59	SIG	M62/2074B1	BLNK	M62 J25 - J30	
19/09/15 13:25:59	SIG	M62/2074B2	OFF	M62 J25 - J30	
19/09/15 13:25:59	SIG	M62/2074B3	OFF	M62 J25 - J30	
19/09/15 13:25:59	SIG	M62/2074B4	OFF	M62 J25 - J30	
19/09/15 13:25:59	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 13:25:59	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 13:26:16	SIG	M62/2041A1	50R	M62 J25 - J30	
19/09/15 13:26:16	SIG	M62/2041A2	50R	M62 J25 - J30	
19/09/15 13:26:16	SIG	M62/2041A3	50R	M62 J25 - J30	
19/09/15 13:26:16	SIG	M62/2041A4	50R	M62 J25 - J30	
19/09/15 13:26:21	SIG	M62/2041A1	40R	M62 J25 - J30	
19/09/15 13:26:21	SIG	M62/2041A2	40R	M62 J25 - J30	
19/09/15 13:26:21	SIG	M62/2041A3	40R	M62 J25 - J30	
19/09/15 13:26:21	SIG	M62/2041A4	40R	M62 J25 - J30	
19/09/15 13:26:26	SIG	M62/2041A1	30R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2025A1	LDR	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2025A2	50R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2025A3	50R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2025A4	50R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2033A1	LDR	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2033A2	50R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2033A3	50R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2033A4	50R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2041A1	20R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2041A2	40R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2041A3	40R	M62 J25 - J30	
19/09/15 13:26:32	SIG	M62/2041A4	40R	M62 J25 - J30	
19/09/15 13:26:37	SIG	M62/2041A1	STOP	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2025A1	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2025A2	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2025A3	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2025A4	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2033A1	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2033A2	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2033A3	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2033A4	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2041A1	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2041A2	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2041A3	60R	M62 J25 - J30	
19/09/15 13:29:07	SIG	M62/2041A4	60R	M62 J25 - J30	
19/09/15 13:32:00	SIG	M62/2025A1	???	M62 J25 - J30	
19/09/15 13:32:01	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 13:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 13:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 13:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 13:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 13:47:52	SIG	M62/2050A1	60R	M62 J25 - J30	
19/09/15 13:47:52	SIG	M62/2050A1	OFF	M62 J25 - J30	
19/09/15 13:50:53	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 13:50:53	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 13:50:53	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 13:50:53	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 13:52:12	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 13:52:12	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 13:52:12	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 13:52:12	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 13:54:59	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 13:56:13	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 13:56:13	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 13:56:13	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 13:56:13	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 13:56:34	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 13:56:34	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 13:56:35	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 13:56:36	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 13:56:46	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 13:56:47	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 13:58:34	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 13:58:34	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 13:58:34	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 13:58:34	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 14:02:33	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 14:02:33	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 14:02:33	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 14:02:33	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 14:04:32	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 14:04:32	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:04:32	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 14:04:32	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 14:05:19	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 14:05:19	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 14:05:19	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 14:05:19	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 14:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 14:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 14:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 14:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 14:08:07	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 14:08:07	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 14:08:07	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 14:08:07	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 14:08:23	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 14:08:23	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 14:09:50	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 14:09:51	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:09:56	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 14:11:57	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 14:11:58	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:12:03	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 14:13:12	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 14:13:12	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:13:17	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 14:14:19	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 14:14:20	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:14:25	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 14:14:45	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 14:14:45	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 14:14:45	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 14:14:45	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 14:16:28	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:17:34	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2159B1	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2159B2	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2159M1	40R	M62 J25 - J30	
19/09/15 14:17:54	SIG	M62/2159M2	40R	M62 J25 - J30	
19/09/15 14:19:45	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:20:51	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:21:54	SIG	M62/2159B1	50R	M62 J25 - J30	
19/09/15 14:21:54	SIG	M62/2159B2	50R	M62 J25 - J30	
19/09/15 14:21:54	SIG	M62/2159M1	50R	M62 J25 - J30	
19/09/15 14:21:54	SIG	M62/2159M2	50R	M62 J25 - J30	
19/09/15 14:22:59	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:26:13	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 14:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 14:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 14:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 14:36:29	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 14:36:29	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 14:36:29	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 14:36:29	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 14:38:21	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 14:38:21	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 14:38:21	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 14:38:21	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 14:44:36	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 14:44:36	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 14:44:36	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 14:44:36	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 14:48:18	SIG	M62/2147B1	40R	M62 J25 - J30	
19/09/15 14:48:18	SIG	M62/2147B2	40R	M62 J25 - J30	
19/09/15 14:48:18	SIG	M62/2147B3	40R	M62 J25 - J30	
19/09/15 14:48:18	SIG	M62/2147B4	40R	M62 J25 - J30	
19/09/15 14:52:17	SIG	M62/2147B1	50R	M62 J25 - J30	
19/09/15 14:52:17	SIG	M62/2147B2	50R	M62 J25 - J30	
19/09/15 14:52:17	SIG	M62/2147B3	50R	M62 J25 - J30	
19/09/15 14:52:17	SIG	M62/2147B4	50R	M62 J25 - J30	
19/09/15 14:54:15	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 14:54:16	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 14:55:08	SIG	M62/2137B4	OFF	M62 J25 - J30	
19/09/15 14:55:09	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 14:55:14	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 14:55:46	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 14:58:35	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 15:01:09	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 15:01:09	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 15:02:01	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:02:01	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:02:01	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:03:54	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 15:03:54	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 15:03:54	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 15:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 15:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 15:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 15:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 15:07:53	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:07:53	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:07:53	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:09:59	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 15:09:59	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 15:09:59	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 15:12:42	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 15:13:49	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:13:49	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:13:49	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:16:37	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 15:16:37	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 15:16:37	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 15:16:47	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 15:17:44	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 15:17:45	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 15:17:45	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 15:17:46	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 15:17:56	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 15:17:57	SIG	M62/1992A1	50R	M62 J25 - J30	
19/09/15 15:19:07	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 15:20:27	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:20:27	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:20:27	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:23:44	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 15:23:44	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 15:23:44	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 15:23:44	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 15:23:44	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 15:23:44	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 15:24:05	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 15:24:05	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 15:24:05	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 15:24:05	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:24:05	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:24:05	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:32:02	SIG	M62/1974A1	OFF	M62 J25 - J30	
19/09/15 15:32:02	SIG	M62/1974A2	OFF	M62 J25 - J30	
19/09/15 15:32:02	SIG	M62/1974A3	OFF	M62 J25 - J30	
19/09/15 15:32:02	SIG	M62/1974A4	OFF	M62 J25 - J30	
19/09/15 15:34:46	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 15:34:46	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 15:34:46	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 15:34:46	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 15:34:46	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 15:34:46	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 15:35:39	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 15:35:39	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 15:35:39	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 15:35:39	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:35:39	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:35:39	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 15:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
19/09/15 15:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 15:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 15:44:01	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 15:44:01	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 15:44:01	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 15:44:01	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 15:44:01	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 15:44:01	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 15:47:33	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 15:47:33	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 15:47:33	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 15:47:33	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 15:47:33	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 15:47:33	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 15:48:41	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 15:48:41	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 15:59:53	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 15:59:53	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 15:59:53	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 15:59:53	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 15:59:53	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 15:59:53	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 16:00:41	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 16:00:41	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 16:00:41	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 16:00:41	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 16:00:41	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 16:00:41	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 16:04:41	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 16:04:41	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 16:04:41	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 16:04:41	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 16:04:41	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 16:04:41	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 16:05:01	SIG	M62/2025A1	HSD	M62 J25 - J30	
19/09/15 16:06:01	SIG	M62/2033A1	HSD	M62 J25 - J30	
19/09/15 16:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 16:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 16:07:02	SIG	M62/2018A1	HSD	M62 J25 - J30	
19/09/15 16:07:02	SIG	M62/2025A1	REDX	M62 J25 - J30	
19/09/15 16:07:02	SIG	M62/2041A1	HSD	M62 J25 - J30	
19/09/15 16:07:49	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 16:07:49	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 16:07:49	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 16:08:06	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 16:08:06	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 16:08:06	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 16:08:09	SIG	M62/2033A1	REDX	M62 J25 - J30	
19/09/15 16:08:09	SIG	M62/2050A1	HSD	M62 J25 - J30	
19/09/15 16:08:11	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 16:08:11	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 16:08:11	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 16:08:11	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 16:08:11	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 16:08:11	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 16:09:00	SIG	M62/2041A1	REDX	M62 J25 - J30	
19/09/15 16:09:36	SIG	M62/1979K1	60R	M62 J25 - J30	
19/09/15 16:09:36	SIG	M62/1979K1	OFF	M62 J25 - J30	
19/09/15 16:10:00	SIG	M62/2050A1	REDX	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2025A2	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2025A3	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2025A4	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2033A2	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2033A3	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2033A4	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2041A2	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2041A3	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2041A4	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2050A2	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2050A3	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2050A4	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2057A1	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2057A2	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2057A3	NR	M62 J25 - J30	
19/09/15 16:11:01	SIG	M62/2057J1	NR	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2004A1	NR	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2004A2	NR	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2004A3	NR	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2008K1	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2008K2	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2012A1	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2012A2	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2012A3	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2018A1	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2018A2	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2018A3	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2018A4	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2025A1	BLNK	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2025A2	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2025A3	OFF	M62 J25 - J30	
19/09/15 16:12:01	SIG	M62/2025A4	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2033A1	BLNK	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2033A2	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2033A3	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2033A4	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2041A1	BLNK	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2041A2	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2041A3	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2041A4	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2050A1	BLNK	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2050A2	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2050A3	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2050A4	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2057A1	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2057A2	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2057A3	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2057J1	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2065A1	BLNK	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2065A2	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2065A3	OFF	M62 J25 - J30	
19/09/15 16:12:02	SIG	M62/2065A4	OFF	M62 J25 - J30	
19/09/15 16:20:08	SIG	M62/2050A1	OFF	M62 J25 - J30	
19/09/15 16:20:09	SIG	M62/2050A1	BLNK	M62 J25 - J30	
19/09/15 16:20:21	SIG	M62/2159B1	60R	M62 J25 - J30	
19/09/15 16:20:21	SIG	M62/2159B2	60R	M62 J25 - J30	
19/09/15 16:20:21	SIG	M62/2159M1	60R	M62 J25 - J30	
19/09/15 16:20:21	SIG	M62/2159M2	60R	M62 J25 - J30	
19/09/15 16:22:23	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 16:22:23	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 16:22:23	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 16:22:23	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 16:22:23	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 16:22:23	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 16:22:59	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 16:22:59	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 16:22:59	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 16:23:04	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 16:23:04	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 16:23:04	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 16:23:04	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 16:23:04	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 16:23:04	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 16:26:59	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 16:26:59	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 16:26:59	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 16:26:59	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 16:26:59	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 16:26:59	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2132B1	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2132B2	NR	M62 J25 - J30	
19/09/15 16:35:02	SIG	M62/2132B3	NR	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2132B1	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2132B2	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2132B3	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2137B1	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2137B3	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2137B4	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2147B1	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2147B2	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2147B3	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2147B4	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2159B1	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2159B2	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2159M1	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2159M2	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2170L1	OFF	M62 J25 - J30	
19/09/15 16:36:03	SIG	M62/2170L2	OFF	M62 J25 - J30	
19/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 16:38:03	SIG	M62/2125B1	OFF	M62 J25 - J30	
19/09/15 16:38:03	SIG	M62/2125B2	OFF	M62 J25 - J30	
19/09/15 16:38:03	SIG	M62/2125B3	OFF	M62 J25 - J30	
19/09/15 16:38:03	SIG	M62/2125L1	OFF	M62 J25 - J30	
19/09/15 16:38:03	SIG	M62/2125L2	OFF	M62 J25 - J30	
19/09/15 16:39:25	SIG	M62/2170B1	60R	M62 J25 - J30	
19/09/15 16:39:25	SIG	M62/2170B2	60R	M62 J25 - J30	
19/09/15 16:39:26	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 16:39:26	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 16:39:26	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2159B1	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2159B2	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2159M1	60R	M62 J25 - J30	
19/09/15 16:39:31	SIG	M62/2159M2	60R	M62 J25 - J30	
19/09/15 16:47:03	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 16:47:03	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 16:48:14	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 16:48:14	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 16:48:14	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 16:48:14	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 16:48:14	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 16:48:14	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 16:49:58	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 16:49:58	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 16:49:58	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 16:50:03	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 16:50:03	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 16:50:03	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 16:50:03	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 16:50:03	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 16:50:03	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 16:53:58	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 16:53:58	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 16:53:58	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 16:53:58	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 16:53:58	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 16:53:58	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2132B1	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2132B2	NR	M62 J25 - J30	
19/09/15 17:03:03	SIG	M62/2132B3	NR	M62 J25 - J30	
19/09/15 17:04:03	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 17:04:03	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 17:04:03	SIG	M62/2170L1	OFF	M62 J25 - J30	
19/09/15 17:04:03	SIG	M62/2170L2	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2132B1	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2132B2	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2132B3	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2137B1	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2137B3	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2137B4	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2147B1	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2147B2	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2147B3	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2147B4	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2159B1	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2159B2	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2159M1	OFF	M62 J25 - J30	
19/09/15 17:04:04	SIG	M62/2159M2	OFF	M62 J25 - J30	
19/09/15 17:06:03	SIG	M62/2125B1	OFF	M62 J25 - J30	
19/09/15 17:06:04	SIG	M62/2125B2	OFF	M62 J25 - J30	
19/09/15 17:06:04	SIG	M62/2125B3	OFF	M62 J25 - J30	
19/09/15 17:06:04	SIG	M62/2125L1	OFF	M62 J25 - J30	
19/09/15 17:06:04	SIG	M62/2125L2	OFF	M62 J25 - J30	
19/09/15 17:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 17:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 17:09:21	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 17:09:21	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 17:09:21	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 17:09:21	SIG	M62/2170B1	60R	M62 J25 - J30	
19/09/15 17:09:21	SIG	M62/2170B2	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2147B1	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2147B2	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2147B3	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2147B4	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2159B1	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2159B2	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2159M1	60R	M62 J25 - J30	
19/09/15 17:09:26	SIG	M62/2159M2	60R	M62 J25 - J30	
19/09/15 17:11:25	SIG	M62/1968A1	50R	M62 J25 - J30	
19/09/15 17:11:25	SIG	M62/1968A2	50R	M62 J25 - J30	
19/09/15 17:11:25	SIG	M62/1968A3	50R	M62 J25 - J30	
19/09/15 17:11:25	SIG	M62/1968A4	50R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1960A1	50R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1960A2	50R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1960A3	50R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1960K1	50R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1960K2	50R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1968A1	40R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1968A2	40R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1968A3	40R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1968A4	40R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1974A1	60R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1974A2	60R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1974A3	60R	M62 J25 - J30	
19/09/15 17:11:31	SIG	M62/1974A4	60R	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1960A1	OFF	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1960A2	OFF	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1960A3	OFF	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1960K1	OFF	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1960K2	OFF	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1968A1	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1968A2	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1968A3	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1968A4	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1974A1	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1974A2	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1974A3	NR	M62 J25 - J30	
19/09/15 17:15:26	SIG	M62/1974A4	NR	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2074B1	REDX	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2074B2	60R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2074B3	60R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2074B4	60R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2081B1	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2081B2	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2081B3	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2081L1	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2088B1	REDX	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2088B2	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2088B3	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2088B4	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2097B1	REDX	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2097B2	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2097B3	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2097B4	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2106B1	REDX	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2106B2	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2106B3	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2106B4	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2113B1	REDX	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2113B2	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2113B3	50R	M62 J25 - J30	
19/09/15 17:16:14	SIG	M62/2113B4	50R	M62 J25 - J30	
19/09/15 17:17:03	SIG	M62/2170L1	50R	M62 J25 - J30	
19/09/15 17:17:03	SIG	M62/2170L2	50R	M62 J25 - J30	
19/09/15 17:18:26	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1974A1	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1974A2	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1974A3	OFF	M62 J25 - J30	
19/09/15 17:18:27	SIG	M62/1974A4	OFF	M62 J25 - J30	
19/09/15 17:18:35	SIG	M62/2081B1	40R	M62 J25 - J30	
19/09/15 17:18:35	SIG	M62/2081B2	40R	M62 J25 - J30	
19/09/15 17:18:35	SIG	M62/2081B3	40R	M62 J25 - J30	
19/09/15 17:18:35	SIG	M62/2081L1	40R	M62 J25 - J30	
19/09/15 17:18:40	SIG	M62/2081L1	30R	M62 J25 - J30	
19/09/15 17:18:45	SIG	M62/2081B1	40R	M62 J25 - J30	
19/09/15 17:18:45	SIG	M62/2081B2	40R	M62 J25 - J30	
19/09/15 17:18:45	SIG	M62/2081B3	40R	M62 J25 - J30	
19/09/15 17:18:45	SIG	M62/2081L1	20R	M62 J25 - J30	
19/09/15 17:18:50	SIG	M62/2081L1	STOP	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2097B2	NR	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2097B3	NR	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2097B4	NR	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2106B2	NR	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2106B3	NR	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2106B4	NR	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2113B1	BLNK	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2113B2	OFF	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2113B3	OFF	M62 J25 - J30	
19/09/15 17:19:10	SIG	M62/2113B4	OFF	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2081B1	50R	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2081B2	50R	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2081B3	50R	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2081L1	50R	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2088B2	NR	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2088B3	NR	M62 J25 - J30	
19/09/15 17:20:31	SIG	M62/2088B4	NR	M62 J25 - J30	
19/09/15 17:22:10	SIG	M62/2106B2	OFF	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2097B1	BLNK	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2097B1	BLNK	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2097B2	OFF	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2097B3	OFF	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2097B4	OFF	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2106B1	BLNK	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2106B3	OFF	M62 J25 - J30	
19/09/15 17:22:11	SIG	M62/2106B4	OFF	M62 J25 - J30	
19/09/15 17:23:31	SIG	M62/2088B2	OFF	M62 J25 - J30	
19/09/15 17:23:32	SIG	M62/2088B1	BLNK	M62 J25 - J30	
19/09/15 17:23:32	SIG	M62/2088B3	OFF	M62 J25 - J30	
19/09/15 17:23:32	SIG	M62/2088B4	OFF	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2137B2	60R	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 17:24:52	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 17:25:22	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 17:25:22	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 17:25:22	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 17:25:28	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2137B2	60R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 17:30:09	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 17:30:52	SIG	M62/2132B1	50R	M62 J25 - J30	
19/09/15 17:30:52	SIG	M62/2132B2	50R	M62 J25 - J30	
19/09/15 17:30:52	SIG	M62/2132B3	50R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2132B1	40R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2132B2	40R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2132B3	40R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 17:30:57	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 17:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 17:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 17:45:20	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 17:45:20	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 17:45:20	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 17:45:20	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 17:49:21	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 17:49:21	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 17:49:21	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 17:49:21	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 17:49:36	SIG	M62/2137B1	40R	M62 J25 - J30	
19/09/15 17:49:36	SIG	M62/2137B2	40R	M62 J25 - J30	
19/09/15 17:49:36	SIG	M62/2137B3	40R	M62 J25 - J30	
19/09/15 17:49:36	SIG	M62/2137B4	40R	M62 J25 - J30	
19/09/15 17:53:35	SIG	M62/2137B1	50R	M62 J25 - J30	
19/09/15 17:53:35	SIG	M62/2137B2	50R	M62 J25 - J30	
19/09/15 17:53:35	SIG	M62/2137B3	50R	M62 J25 - J30	
19/09/15 17:53:35	SIG	M62/2137B4	50R	M62 J25 - J30	
19/09/15 18:01:34	SIG	M62/1968A1	50R	M62 J25 - J30	
19/09/15 18:01:34	SIG	M62/1968A2	50R	M62 J25 - J30	
19/09/15 18:01:34	SIG	M62/1968A3	50R	M62 J25 - J30	
19/09/15 18:01:34	SIG	M62/1968A4	50R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1960A1	50R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1960A2	50R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1960A3	50R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1960K1	50R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1960K2	50R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1968A1	40R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1968A2	40R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1968A3	40R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1968A4	40R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1974A1	60R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1974A2	60R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1974A3	60R	M62 J25 - J30	
19/09/15 18:01:40	SIG	M62/1974A4	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2132B1	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2132B2	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2132B3	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2137B1	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2137B2	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2137B3	60R	M62 J25 - J30	
19/09/15 18:02:15	SIG	M62/2137B4	60R	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1960A1	OFF	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1960A2	OFF	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1960A3	OFF	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1960K1	OFF	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1960K2	OFF	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1968A1	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1968A2	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1968A3	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1968A4	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1974A1	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1974A2	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1974A3	NR	M62 J25 - J30	
19/09/15 18:05:35	SIG	M62/1974A4	NR	M62 J25 - J30	
19/09/15 18:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 18:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 18:08:35	SIG	M62/1968A1	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1968A2	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1968A3	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1968A4	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1974A1	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1974A2	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1974A3	OFF	M62 J25 - J30	
19/09/15 18:08:36	SIG	M62/1974A4	OFF	M62 J25 - J30	
19/09/15 18:12:41	SIG	M62/2137B2	60R	M62 J25 - J30	
19/09/15 18:12:41	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2125B1	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2125B2	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2125B3	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2125L1	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2125L2	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2132B1	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2132B2	NR	M62 J25 - J30	
19/09/15 18:13:04	SIG	M62/2132B3	NR	M62 J25 - J30	
19/09/15 18:13:57	SIG	M62/2137B2	60R	M62 J25 - J30	
19/09/15 18:13:57	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 18:15:04	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 18:15:04	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 18:15:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
19/09/15 18:15:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
19/09/15 18:15:10	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2132B1	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2132B2	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2132B3	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2137B1	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2137B2	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2137B3	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2137B4	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2147B1	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2147B2	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2147B3	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2147B4	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2159B1	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2159B2	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2159M1	OFF	M62 J25 - J30	
19/09/15 18:15:11	SIG	M62/2159M2	OFF	M62 J25 - J30	
19/09/15 18:16:04	SIG	M62/2125B1	OFF	M62 J25 - J30	
19/09/15 18:16:05	SIG	M62/2125B2	OFF	M62 J25 - J30	
19/09/15 18:16:05	SIG	M62/2125B3	OFF	M62 J25 - J30	
19/09/15 18:16:05	SIG	M62/2125L1	OFF	M62 J25 - J30	
19/09/15 18:16:05	SIG	M62/2125L2	OFF	M62 J25 - J30	
19/09/15 18:35:54	SIG	M62/2183L1	60R	M62 J25 - J30	
19/09/15 18:35:54	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 18:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 18:43:18	SIG	M62/2057B1	HSD	M62 J25 - J30	
19/09/15 18:45:16	SIG	M62/2041B1	HSD	M62 J25 - J30	
19/09/15 18:45:17	SIG	M62/2057B1	REDX	M62 J25 - J30	
19/09/15 18:45:17	SIG	M621/1002B1	HSD	M62 J25 - J30	
19/09/15 18:45:17	SIG	M621/1010B1	60R	M62 J25 - J30	
19/09/15 18:45:17	SIG	M621/1010B2	60R	M62 J25 - J30	
19/09/15 18:46:16	SIG	M62/2033B1	HSD	M62 J25 - J30	
19/09/15 18:47:17	SIG	M62/2025B1	HSD	M62 J25 - J30	
19/09/15 18:47:17	SIG	M62/2041B1	REDX	M62 J25 - J30	
19/09/15 18:48:09	SIG	M62/2033B1	REDX	M62 J25 - J30	
19/09/15 18:48:53	SIG	M62/2025B1	REDX	M62 J25 - J30	
19/09/15 18:49:23	SIG	M62/2065B2	NR	M62 J25 - J30	
19/09/15 18:49:23	SIG	M62/2065B3	NR	M62 J25 - J30	
19/09/15 18:49:23	SIG	M62/2065B4	NR	M62 J25 - J30	
19/09/15 18:49:23	SIG	M62/2074B2	NR	M62 J25 - J30	
19/09/15 18:49:23	SIG	M62/2074B3	NR	M62 J25 - J30	
19/09/15 18:49:23	SIG	M62/2074B4	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2018B1	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2018B2	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2018B3	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2018L1	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2025B2	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2025B3	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2025B4	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2033B2	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2033B3	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2033B4	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2041B2	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2041B3	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2041B4	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2050B2	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2050B3	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2050B4	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2057B2	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2057B3	NR	M62 J25 - J30	
19/09/15 18:49:24	SIG	M62/2057B4	NR	M62 J25 - J30	
19/09/15 18:50:23	SIG	M62/2069M1	OFF	M62 J25 - J30	
19/09/15 18:50:23	SIG	M62/2069M2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2033B1	BLNK	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2033B2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2033B4	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2041B1	BLNK	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2041B2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2041B3	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2041B4	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2050B2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2050B3	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2050B4	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2057B1	BLNK	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2057B2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2057B3	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2057B4	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2065B1	BLNK	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2065B2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2065B3	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2065B4	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M62/2065M1	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M621/1002B1	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M621/1002B2	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 18:50:24	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2012B1	BLNK	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2012B2	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2012B3	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2012B4	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2018B1	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2018B2	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2018B3	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2018L1	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2025B1	BLNK	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2025B2	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2025B3	OFF	M62 J25 - J30	
19/09/15 18:50:25	SIG	M62/2025B4	OFF	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2170B1	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2170B2	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2177B1	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2177B2	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2177L1	OFF	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2177L2	OFF	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2183B1	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2183B2	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2183L1	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2183L2	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2189B1	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2189B2	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2189B3	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2189B4	NR	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2194B1	OFF	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2194B2	OFF	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2194B3	OFF	M62 J25 - J30	
19/09/15 18:55:05	SIG	M62/2194B4	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2170B1	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2170B2	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2177B1	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2177B2	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2183B1	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2183L1	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2183L2	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2189B1	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2189B2	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2189B3	OFF	M62 J25 - J30	
19/09/15 18:58:06	SIG	M62/2189B4	OFF	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2004B1	REDX	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2004B2	NR	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2004B3	NR	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2004B4	NR	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2012B1	REDX	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2012B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2012B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2012B4	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2018B1	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2018B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2018B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2018L1	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2025B1	REDX	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2025B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2025B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2025B4	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2033B1	REDX	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2033B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2033B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2033B4	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2041B1	REDX	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2041B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2041B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2041B4	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2050B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2050B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2050B4	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2057B1	REDX	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2057B2	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2057B3	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2057B4	50R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M62/2065M1	60R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M621/1002B1	HSD	M62 J25 - J30	
19/09/15 20:33:05	SIG	M621/1002B2	60R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M621/1010B1	60R	M62 J25 - J30	
19/09/15 20:33:05	SIG	M621/1010B2	60R	M62 J25 - J30	
19/09/15 20:35:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 20:35:13	SIG	M62/2033B3	???	M62 J25 - J30	
19/09/15 20:36:10	SIG	M62/2033B3	???	M62 J25 - J30	
19/09/15 20:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2074B1	BLNK	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2074B2	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2074B3	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2074B4	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2081B1	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2081B2	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2081B3	OFF	M62 J25 - J30	
19/09/15 20:38:16	SIG	M62/2081L1	NR	M62 J25 - J30	
19/09/15 20:41:17	SIG	M62/2081L1	OFF	M62 J25 - J30	
19/09/15 20:42:41	SIG	M621/1010B1	OFF	M62 J25 - J30	
19/09/15 20:42:41	SIG	M621/1010B2	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2004B2	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2004B3	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2004B4	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2012B1	BLNK	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2012B2	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2012B3	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2012B4	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2018B1	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2018B2	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2018B3	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2018L1	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2025B2	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2025B3	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2025B4	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2033B2	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2033B3	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2033B4	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2041B2	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2041B3	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2041B4	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2050B2	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2050B3	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2050B4	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2057B1	BLNK	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2057B2	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2057B3	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2057B4	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M62/2065M1	NR	M62 J25 - J30	
19/09/15 20:42:42	SIG	M621/1002B1	OFF	M62 J25 - J30	
19/09/15 20:42:42	SIG	M621/1002B2	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2004B2	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2004B3	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2004B4	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2018L1	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2025B2	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2025B3	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2025B4	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2033B2	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2033B4	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2041B2	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2041B3	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2041B4	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2050B2	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2050B3	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2050B4	OFF	M62 J25 - J30	
19/09/15 20:45:42	SIG	M62/2065M1	OFF	M62 J25 - J30	
19/09/15 20:45:43	SIG	M62/2004B1	BLNK	M62 J25 - J30	
19/09/15 20:45:43	SIG	M62/2004B1	BLNK	M62 J25 - J30	
19/09/15 20:45:43	SIG	M62/2025B1	BLNK	M62 J25 - J30	
19/09/15 20:45:43	SIG	M62/2033B1	BLNK	M62 J25 - J30	
19/09/15 20:45:43	SIG	M62/2041B1	BLNK	M62 J25 - J30	
19/09/15 20:45:43	SIG	M62/2041B1	BLNK	M62 J25 - J30	
19/09/15 21:50:08	SIG	M62/2004A1	NR	M62 J25 - J30	
19/09/15 21:50:08	SIG	M62/2004A2	NR	M62 J25 - J30	
19/09/15 21:50:08	SIG	M62/2004A3	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1979K1	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1979K2	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1981A1	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1981A2	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1981A3	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1981A4	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1987A1	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1987A3	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1987J1	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1992A1	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1992A2	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1992A3	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1992J1	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1999A1	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1999A2	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1999A3	NR	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1999J1	OFF	M62 J25 - J30	
19/09/15 21:50:18	SIG	M62/1999J2	OFF	M62 J25 - J30	
19/09/15 21:53:08	SIG	M62/2004A1	OFF	M62 J25 - J30	
19/09/15 21:53:09	SIG	M62/2004A2	OFF	M62 J25 - J30	
19/09/15 21:53:09	SIG	M62/2004A3	OFF	M62 J25 - J30	
19/09/15 21:53:18	SIG	M62/1987J1	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1987A1	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1987A3	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1992A1	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1992A2	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1992A3	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1992J1	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1999A1	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1999A2	OFF	M62 J25 - J30	
19/09/15 21:53:28	SIG	M62/1999A3	OFF	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2008K1	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2008K2	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2012A1	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2012A2	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2012A3	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2018A1	HSD	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2018A2	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2018A3	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2018A4	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2025A1	REDX	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2025A2	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2025A3	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2025A4	60R	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2033A1	REDX	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2033A2	NR	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2033A3	NR	M62 J25 - J30	
19/09/15 21:57:50	SIG	M62/2033A4	NR	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2008K1	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2008K2	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2012A1	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2012A2	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2012A3	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2018A1	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2018A2	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2018A3	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2018A4	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2025A1	BLNK	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2025A2	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2025A3	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2025A4	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2033A1	BLNK	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2033A2	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2033A3	OFF	M62 J25 - J30	
19/09/15 21:59:52	SIG	M62/2033A4	OFF	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2170L1	LDR	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2170L2	50R	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 03:18:08	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2170B1	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2170B2	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2170L1	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2170L2	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2177B1	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2177B2	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2177L1	OFF	M62 J25 - J30	
20/09/15 03:48:06	SIG	M62/2177L2	OFF	M62 J25 - J30	
20/09/15 04:50:41	SIG	M62/2018B1	50R	M62 J25 - J30	
20/09/15 04:50:41	SIG	M62/2018B2	50R	M62 J25 - J30	
20/09/15 04:50:41	SIG	M62/2018B3	50R	M62 J25 - J30	
20/09/15 04:50:41	SIG	M62/2018L1	50R	M62 J25 - J30	
20/09/15 04:50:47	SIG	M62/2018B1	40R	M62 J25 - J30	
20/09/15 04:50:47	SIG	M62/2018B2	40R	M62 J25 - J30	
20/09/15 04:50:47	SIG	M62/2018B3	40R	M62 J25 - J30	
20/09/15 04:50:47	SIG	M62/2018L1	40R	M62 J25 - J30	
20/09/15 04:50:52	SIG	M62/2018L1	30R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2012B1	REDX	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2012B2	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2012B3	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2012B4	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2018B1	40R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2018B2	40R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2018B3	40R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2018L1	20R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2025B2	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2025B3	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2025B4	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2033B2	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2033B3	50R	M62 J25 - J30	
20/09/15 04:50:57	SIG	M62/2033B4	50R	M62 J25 - J30	
20/09/15 04:51:03	SIG	M62/2018L1	STOP	M62 J25 - J30	
20/09/15 04:53:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 04:53:09	SIG	M62/2033B3	???	M62 J25 - J30	
20/09/15 05:06:10	SIG	M62/2033B3	???	M62 J25 - J30	
20/09/15 05:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2018B1	50R	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2018B2	50R	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2018B3	50R	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2018L1	50R	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2025B2	NR	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2025B3	NR	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2025B4	NR	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2033B2	NR	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2033B3	NR	M62 J25 - J30	
20/09/15 05:12:30	SIG	M62/2033B4	NR	M62 J25 - J30	
20/09/15 05:13:07	SIG	M62/2012B2	50R	M62 J25 - J30	
20/09/15 05:13:07	SIG	M62/2012B3	50R	M62 J25 - J30	
20/09/15 05:13:07	SIG	M62/2012B4	LDL	M62 J25 - J30	
20/09/15 05:13:47	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 05:13:47	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 05:13:47	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 05:13:58	SIG	M62/2012B2	50R	M62 J25 - J30	
20/09/15 05:13:58	SIG	M62/2012B3	50R	M62 J25 - J30	
20/09/15 05:13:58	SIG	M62/2012B4	50R	M62 J25 - J30	
20/09/15 05:14:03	SIG	M62/2012B2	40R	M62 J25 - J30	
20/09/15 05:14:03	SIG	M62/2012B3	40R	M62 J25 - J30	
20/09/15 05:14:03	SIG	M62/2012B4	40R	M62 J25 - J30	
20/09/15 05:14:09	SIG	M62/2012B4	30R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2012B2	40R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2012B3	40R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2012B4	20R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2018B3	LDL	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2025B2	50R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2025B3	50R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2025B4	LDL	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2033B2	60R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2033B3	60R	M62 J25 - J30	
20/09/15 05:14:14	SIG	M62/2033B4	60R	M62 J25 - J30	
20/09/15 05:14:19	SIG	M62/2012B4	STOP	M62 J25 - J30	
20/09/15 05:16:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 05:16:38	SIG	M62/2033B3	???	M62 J25 - J30	
20/09/15 05:36:10	SIG	M62/2033B3	???	M62 J25 - J30	
20/09/15 05:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2012B1	BLNK	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2018B1	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2018B2	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2018B3	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2018L1	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2025B1	BLNK	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2025B2	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2025B3	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2025B4	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2033B1	BLNK	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2033B2	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 05:50:00	SIG	M62/2033B4	OFF	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2159B1	NR	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2159B2	NR	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2170B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2170B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2183B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2183B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2183L1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2183L2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2189B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2189B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2189B3	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2189B4	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2194B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2194B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2194B3	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2194B4	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2197B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2197B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2197B3	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2199M1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2199M2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2203B1	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2203B2	50R	M62 J25 - J30	
20/09/15 06:09:33	SIG	M62/2203B3	50R	M62 J25 - J30	
20/09/15 06:10:59	SIG	M62/2170L1	50R	M62 J25 - J30	
20/09/15 06:10:59	SIG	M62/2170L2	50R	M62 J25 - J30	
20/09/15 06:11:57	SIG	M62/2183B2	???	M62 J25 - J30	
20/09/15 06:11:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2159B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2159B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2170L1	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2170L2	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2177B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2177B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2177L1	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2177L2	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2183B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2183B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2183L1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2183L2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2189B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2189B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2189B3	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2189B4	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2194B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2194B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2194B3	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2194B4	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2197B1	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2197B2	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2197B3	NR	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2199M1	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2199M2	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2203B1	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2203B2	OFF	M62 J25 - J30	
20/09/15 06:23:46	SIG	M62/2203B3	OFF	M62 J25 - J30	
20/09/15 06:26:46	SIG	M62/2159B1	OFF	M62 J25 - J30	
20/09/15 06:26:46	SIG	M62/2159B2	OFF	M62 J25 - J30	
20/09/15 06:26:46	SIG	M62/2194B1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2170B1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2170B2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2177B1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2177B2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2183B1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2183L1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2183L2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2189B1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2189B2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2189B3	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2189B4	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2194B2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2194B3	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2194B4	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2197B1	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2197B2	OFF	M62 J25 - J30	
20/09/15 06:26:47	SIG	M62/2197B3	OFF	M62 J25 - J30	
20/09/15 08:37:07	SIG	M62/2012B2	50R	M62 J25 - J30	
20/09/15 08:37:07	SIG	M62/2012B3	50R	M62 J25 - J30	
20/09/15 08:37:07	SIG	M62/2012B4	50R	M62 J25 - J30	
20/09/15 08:37:13	SIG	M62/2012B2	40R	M62 J25 - J30	
20/09/15 08:37:13	SIG	M62/2012B3	40R	M62 J25 - J30	
20/09/15 08:37:13	SIG	M62/2012B4	40R	M62 J25 - J30	
20/09/15 08:37:18	SIG	M62/2012B4	30R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2012B1	REDX	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2012B2	40R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2012B3	40R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2012B4	20R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2018B1	50R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2018B2	50R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2018B3	LDL	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2018L1	50R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2025B1	REDX	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2025B2	50R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2025B3	50R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2025B4	LDL	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2033B1	REDX	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2033B2	60R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2033B3	60R	M62 J25 - J30	
20/09/15 08:37:23	SIG	M62/2033B4	60R	M62 J25 - J30	
20/09/15 08:37:28	SIG	M62/2012B4	STOP	M62 J25 - J30	
20/09/15 08:39:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 08:39:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 08:39:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 08:39:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 08:57:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 08:57:20	SIG	M62/2041B1	REDX	M62 J25 - J30	
20/09/15 08:57:20	SIG	M62/2041B2	60R	M62 J25 - J30	
20/09/15 08:57:20	SIG	M62/2041B3	60R	M62 J25 - J30	
20/09/15 08:57:20	SIG	M62/2041B4	60R	M62 J25 - J30	
20/09/15 09:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2012B2	50R	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2012B3	50R	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2012B4	50R	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2018B3	50R	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2025B2	60R	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2025B3	60R	M62 J25 - J30	
20/09/15 09:09:14	SIG	M62/2025B4	60R	M62 J25 - J30	
20/09/15 09:10:12	SIG	M62/2025B2	50R	M62 J25 - J30	
20/09/15 09:10:12	SIG	M62/2025B3	50R	M62 J25 - J30	
20/09/15 09:10:12	SIG	M62/2025B4	50R	M62 J25 - J30	
20/09/15 09:10:12	SIG	M62/2033B2	50R	M62 J25 - J30	
20/09/15 09:10:12	SIG	M62/2033B3	50R	M62 J25 - J30	
20/09/15 09:10:12	SIG	M62/2033B4	50R	M62 J25 - J30	
20/09/15 09:12:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:12:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:12:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:12:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:24:21	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 09:24:21	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 09:24:21	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2012B1	BLNK	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2018B1	OFF	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2018B2	OFF	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2018B3	OFF	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2018L1	NR	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2041B2	NR	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2041B3	NR	M62 J25 - J30	
20/09/15 09:35:21	SIG	M62/2041B4	NR	M62 J25 - J30	
20/09/15 09:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 09:38:21	SIG	M62/2041B2	OFF	M62 J25 - J30	
20/09/15 09:38:21	SIG	M62/2041B3	OFF	M62 J25 - J30	
20/09/15 09:38:21	SIG	M62/2041B4	OFF	M62 J25 - J30	
20/09/15 09:38:22	SIG	M62/2041B1	BLNK	M62 J25 - J30	
20/09/15 10:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2012B1	REDX	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2012B2	50R	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2012B3	50R	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2012B4	50R	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2018B1	50R	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2018B2	50R	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2018B3	50R	M62 J25 - J30	
20/09/15 10:09:58	SIG	M62/2018L1	50R	M62 J25 - J30	
20/09/15 10:10:16	SIG	M62/2018B1	40R	M62 J25 - J30	
20/09/15 10:10:16	SIG	M62/2018B2	40R	M62 J25 - J30	
20/09/15 10:10:16	SIG	M62/2018B3	40R	M62 J25 - J30	
20/09/15 10:10:16	SIG	M62/2018L1	40R	M62 J25 - J30	
20/09/15 10:10:21	SIG	M62/2018L1	30R	M62 J25 - J30	
20/09/15 10:10:27	SIG	M62/2018B1	40R	M62 J25 - J30	
20/09/15 10:10:27	SIG	M62/2018B2	40R	M62 J25 - J30	
20/09/15 10:10:27	SIG	M62/2018B3	40R	M62 J25 - J30	
20/09/15 10:10:27	SIG	M62/2018L1	20R	M62 J25 - J30	
20/09/15 10:10:32	SIG	M62/2018L1	STOP	M62 J25 - J30	
20/09/15 10:18:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:18:22	SIG	M62/2041B1	REDX	M62 J25 - J30	
20/09/15 10:18:22	SIG	M62/2041B2	60R	M62 J25 - J30	
20/09/15 10:18:22	SIG	M62/2041B3	60R	M62 J25 - J30	
20/09/15 10:18:22	SIG	M62/2041B4	60R	M62 J25 - J30	
20/09/15 10:19:54	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 10:19:54	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 10:19:54	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 10:19:54	SIG	M62/2033B2	60R	M62 J25 - J30	
20/09/15 10:19:54	SIG	M62/2033B3	60R	M62 J25 - J30	
20/09/15 10:19:54	SIG	M62/2033B4	60R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2018B1	50R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2018B2	50R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2018B3	50R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2018L1	50R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2025B2	60R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2025B3	60R	M62 J25 - J30	
20/09/15 10:20:09	SIG	M62/2025B4	60R	M62 J25 - J30	
20/09/15 10:20:58	SIG	M62/2012B2	NR	M62 J25 - J30	
20/09/15 10:20:58	SIG	M62/2012B3	NR	M62 J25 - J30	
20/09/15 10:20:58	SIG	M62/2012B4	NR	M62 J25 - J30	
20/09/15 10:22:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:22:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:22:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:22:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2012B1	BLNK	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2018B1	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2018B2	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2018B3	OFF	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2018L1	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2025B2	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2025B3	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2025B4	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2033B2	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2033B3	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2033B4	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2041B2	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2041B3	NR	M62 J25 - J30	
20/09/15 10:34:22	SIG	M62/2041B4	NR	M62 J25 - J30	
20/09/15 10:37:22	SIG	M62/2033B2	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2018L1	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2025B1	BLNK	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2025B1	BLNK	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2025B2	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2025B3	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2025B4	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2033B1	BLNK	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2033B4	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2041B1	BLNK	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2041B1	BLNK	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2041B2	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2041B3	OFF	M62 J25 - J30	
20/09/15 10:37:23	SIG	M62/2041B4	OFF	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2159B1	NR	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2159B2	NR	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2170B1	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2170B2	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2170L1	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2170L2	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 10:50:29	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2170B1	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2170B2	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2170L1	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2170L2	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2177B1	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2177B2	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2177L1	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2177L2	40R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2183B1	50R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2183B2	50R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2183L1	50R	M62 J25 - J30	
20/09/15 10:50:35	SIG	M62/2183L2	50R	M62 J25 - J30	
20/09/15 10:53:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 10:53:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 10:53:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 10:53:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2189B1	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2189B2	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2189B3	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2189B4	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2194B1	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2194B2	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2194B3	60R	M62 J25 - J30	
20/09/15 10:58:22	SIG	M62/2194B4	60R	M62 J25 - J30	
20/09/15 11:05:51	SIG	M62/2189B1	50R	M62 J25 - J30	
20/09/15 11:05:51	SIG	M62/2189B2	50R	M62 J25 - J30	
20/09/15 11:05:51	SIG	M62/2189B3	50R	M62 J25 - J30	
20/09/15 11:05:51	SIG	M62/2189B4	50R	M62 J25 - J30	
20/09/15 11:05:51	SIG	M62/2199M1	50R	M62 J25 - J30	
20/09/15 11:05:51	SIG	M62/2199M2	50R	M62 J25 - J30	
20/09/15 11:05:56	SIG	M62/2189B1	40R	M62 J25 - J30	
20/09/15 11:05:56	SIG	M62/2189B2	40R	M62 J25 - J30	
20/09/15 11:05:56	SIG	M62/2189B3	40R	M62 J25 - J30	
20/09/15 11:05:56	SIG	M62/2189B4	40R	M62 J25 - J30	
20/09/15 11:05:56	SIG	M62/2199M1	40R	M62 J25 - J30	
20/09/15 11:05:56	SIG	M62/2199M2	40R	M62 J25 - J30	
20/09/15 11:06:02	SIG	M62/2189B1	30R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2189B1	20R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2189B2	40R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2189B3	40R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2189B4	40R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2194B1	LDR	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2194B2	50R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2194B3	50R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2194B4	50R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2197B1	50R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2197B2	50R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2197B3	50R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2199M1	40R	M62 J25 - J30	
20/09/15 11:06:07	SIG	M62/2199M2	40R	M62 J25 - J30	
20/09/15 11:06:12	SIG	M62/2189B1	STOP	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2170B1	60R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2170B2	60R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2183B1	60R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2183B2	60R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2183L1	60R	M62 J25 - J30	
20/09/15 11:06:59	SIG	M62/2183L2	60R	M62 J25 - J30	
20/09/15 11:08:00	SIG	M62/2170B1	50R	M62 J25 - J30	
20/09/15 11:08:00	SIG	M62/2170B2	50R	M62 J25 - J30	
20/09/15 11:08:00	SIG	M62/2177B1	40R	M62 J25 - J30	
20/09/15 11:08:00	SIG	M62/2177B2	40R	M62 J25 - J30	
20/09/15 11:08:00	SIG	M62/2177L1	40R	M62 J25 - J30	
20/09/15 11:08:00	SIG	M62/2177L2	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2170B1	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2170B2	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2177B1	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2177B2	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2177L1	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2177L2	40R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2183B1	50R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2183B2	50R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2183L1	50R	M62 J25 - J30	
20/09/15 11:08:06	SIG	M62/2183L2	50R	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2097B1	REDX	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2097B3	NR	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2106B1	REDX	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2106B2	60R	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2106B3	60R	M62 J25 - J30	
20/09/15 11:10:19	SIG	M62/2106B4	60R	M62 J25 - J30	
20/09/15 11:10:24	SIG	M62/2183B1	40R	M62 J25 - J30	
20/09/15 11:10:24	SIG	M62/2183B2	40R	M62 J25 - J30	
20/09/15 11:10:24	SIG	M62/2183L1	40R	M62 J25 - J30	
20/09/15 11:10:24	SIG	M62/2183L2	40R	M62 J25 - J30	
20/09/15 11:10:29	SIG	M62/2183L1	30R	M62 J25 - J30	
20/09/15 11:10:34	SIG	M62/2183B1	40R	M62 J25 - J30	
20/09/15 11:10:34	SIG	M62/2183B2	40R	M62 J25 - J30	
20/09/15 11:10:34	SIG	M62/2183L1	20R	M62 J25 - J30	
20/09/15 11:10:34	SIG	M62/2183L2	40R	M62 J25 - J30	
20/09/15 11:10:39	SIG	M62/2183L1	STOP	M62 J25 - J30	
20/09/15 11:11:22	SIG	M62/2203B1	60R	M62 J25 - J30	
20/09/15 11:11:22	SIG	M62/2203B2	60R	M62 J25 - J30	
20/09/15 11:11:22	SIG	M62/2203B3	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2183B1	50R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2183B2	50R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2183L1	50R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2183L2	50R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2189B1	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2189B2	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2189B3	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2189B4	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2194B1	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2194B2	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2194B3	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2194B4	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2197B1	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2197B2	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2197B3	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2199M1	60R	M62 J25 - J30	
20/09/15 11:13:03	SIG	M62/2199M2	60R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2170B1	60R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2170B2	60R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2183B1	60R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2183B2	60R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2183L1	60R	M62 J25 - J30	
20/09/15 11:14:55	SIG	M62/2183L2	60R	M62 J25 - J30	
20/09/15 11:17:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 11:17:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 11:17:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 11:17:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 11:18:40	SIG	M62/2170L1	50R	M62 J25 - J30	
20/09/15 11:18:40	SIG	M62/2170L2	50R	M62 J25 - J30	
20/09/15 11:26:23	SIG	M62/2203B1	OFF	M62 J25 - J30	
20/09/15 11:26:23	SIG	M62/2203B2	OFF	M62 J25 - J30	
20/09/15 11:26:23	SIG	M62/2203B3	OFF	M62 J25 - J30	
20/09/15 11:27:23	SIG	M62/2197B1	OFF	M62 J25 - J30	
20/09/15 11:27:23	SIG	M62/2197B2	OFF	M62 J25 - J30	
20/09/15 11:27:23	SIG	M62/2197B3	OFF	M62 J25 - J30	
20/09/15 11:27:23	SIG	M62/2199M1	OFF	M62 J25 - J30	
20/09/15 11:27:23	SIG	M62/2199M2	OFF	M62 J25 - J30	
20/09/15 11:27:35	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 11:27:35	SIG	M62/2097B3	NR	M62 J25 - J30	
20/09/15 11:27:35	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 11:27:35	SIG	M62/2106B2	NR	M62 J25 - J30	
20/09/15 11:27:35	SIG	M62/2106B3	NR	M62 J25 - J30	
20/09/15 11:27:35	SIG	M62/2106B4	NR	M62 J25 - J30	
20/09/15 11:30:23	SIG	M62/2159B1	NR	M62 J25 - J30	
20/09/15 11:30:23	SIG	M62/2159B2	NR	M62 J25 - J30	
20/09/15 11:30:23	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 11:30:23	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 11:30:23	SIG	M62/2170L1	OFF	M62 J25 - J30	
20/09/15 11:30:23	SIG	M62/2170L2	OFF	M62 J25 - J30	
20/09/15 11:30:35	SIG	M62/2097B2	OFF	M62 J25 - J30	
20/09/15 11:30:35	SIG	M62/2097B3	OFF	M62 J25 - J30	
20/09/15 11:30:35	SIG	M62/2097B4	OFF	M62 J25 - J30	
20/09/15 11:30:35	SIG	M62/2106B2	OFF	M62 J25 - J30	
20/09/15 11:30:35	SIG	M62/2106B3	OFF	M62 J25 - J30	
20/09/15 11:30:35	SIG	M62/2106B4	OFF	M62 J25 - J30	
20/09/15 11:30:36	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 11:30:36	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 11:30:36	SIG	M62/2106B1	BLNK	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2004A1	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2004A2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2004A3	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2008K1	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2008K2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2012A1	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2012A2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2012A3	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2018A1	HSD	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2018A2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2018A3	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2018A4	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2025A1	REDX	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2025A2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2025A3	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2025A4	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2033A2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2033A3	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2033A4	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2041A1	REDX	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2041A2	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2041A3	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2041A4	60R	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2050A1	REDX	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2050A2	NR	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2050A3	NR	M62 J25 - J30	
20/09/15 11:32:23	SIG	M62/2050A4	NR	M62 J25 - J30	
20/09/15 11:33:23	SIG	M62/2159B1	OFF	M62 J25 - J30	
20/09/15 11:33:23	SIG	M62/2159B2	OFF	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2050A2	60R	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2050A3	60R	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2050A4	60R	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2057A1	NR	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2057A2	NR	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2057A3	NR	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2057J1	NR	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2065A1	REDX	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2065A2	NR	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2065A3	NR	M62 J25 - J30	
20/09/15 11:34:23	SIG	M62/2065A4	NR	M62 J25 - J30	
20/09/15 11:43:53	SIG	M62/2106B2	50R	M62 J25 - J30	
20/09/15 11:43:53	SIG	M62/2106B3	50R	M62 J25 - J30	
20/09/15 11:43:53	SIG	M62/2106B4	50R	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2097B1	REDX	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2097B3	NR	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2106B1	STOP	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2106B2	40R	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2106B3	40R	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2106B4	40R	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2113B1	REDX	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2113B2	50R	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2113B3	50R	M62 J25 - J30	
20/09/15 11:43:59	SIG	M62/2113B4	50R	M62 J25 - J30	
20/09/15 11:44:04	SIG	M62/2106B1	STOP	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2097B2	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2097B3	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2097B4	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2106B1	BLNK	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2106B2	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2106B3	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2106B4	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2113B1	BLNK	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2113B2	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2113B3	OFF	M62 J25 - J30	
20/09/15 11:45:09	SIG	M62/2113B4	OFF	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2012B1	REDX	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2012B2	NR	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2012B3	NR	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2012B4	NR	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2018B1	50R	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2018B2	50R	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2018B3	50R	M62 J25 - J30	
20/09/15 11:51:49	SIG	M62/2018L1	50R	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2012B1	BLNK	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2018B1	OFF	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2018B2	OFF	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2018B3	OFF	M62 J25 - J30	
20/09/15 11:54:24	SIG	M62/2018L1	NR	M62 J25 - J30	
20/09/15 11:57:24	SIG	M62/2018L1	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2004A1	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2004A2	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2004A3	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2008K1	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2008K2	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2012A1	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2012A2	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2012A3	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2018A1	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2018A2	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2018A3	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2018A4	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2025A1	BLNK	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2025A2	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2025A3	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2025A4	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2041A2	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2041A3	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2041A4	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2050A2	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2050A3	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2050A4	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2057A1	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2057A2	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2057A3	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2057J1	NR	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2065A1	BLNK	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2065A2	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2065A3	OFF	M62 J25 - J30	
20/09/15 12:09:24	SIG	M62/2065A4	OFF	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2033A1	BLNK	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2033A2	OFF	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2033A3	OFF	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2033A4	OFF	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2041A1	BLNK	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2041A2	OFF	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2041A3	OFF	M62 J25 - J30	
20/09/15 12:11:15	SIG	M62/2041A4	OFF	M62 J25 - J30	
20/09/15 12:12:24	SIG	M62/2012A1	OFF	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2012A2	OFF	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2012A3	OFF	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2050A1	BLNK	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2050A2	OFF	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2050A3	OFF	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2050A4	OFF	M62 J25 - J30	
20/09/15 12:12:25	SIG	M62/2057J1	OFF	M62 J25 - J30	
20/09/15 12:12:26	SIG	M62/2050A1	BLNK	M62 J25 - J30	
20/09/15 12:13:24	SIG	M606/2003B1	NR	M62 J25 - J30	
20/09/15 12:13:24	SIG	M606/2003B2	NR	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2004A1	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2004A2	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2004A3	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2008K1	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2008K2	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2012A1	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2012A2	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2012A3	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2018A1	HSD	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2018A2	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2018A3	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2018A4	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2025A1	REDX	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2025A2	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2025A3	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2025A4	50R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2033A1	REDX	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2033A2	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2033A3	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2033A4	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2041A1	REDX	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2041A2	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2041A3	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2041A4	60R	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2050A1	REDX	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2050A2	NR	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2050A3	NR	M62 J25 - J30	
20/09/15 12:13:24	SIG	M62/2050A4	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2050A2	60R	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2050A3	60R	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2050A4	60R	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2057A1	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2057A2	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2057A3	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2057J1	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2065A1	REDX	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2065A2	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2065A3	NR	M62 J25 - J30	
20/09/15 12:14:24	SIG	M62/2065A4	NR	M62 J25 - J30	
20/09/15 12:17:24	SIG	M606/2003B1	NR	M62 J25 - J30	
20/09/15 12:17:24	SIG	M606/2003B2	NR	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2008K1	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2008K2	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2012A1	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2012A2	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2012A3	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2018A2	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2018A3	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2018A4	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2025A2	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2025A3	60R	M62 J25 - J30	
20/09/15 12:17:24	SIG	M62/2025A4	60R	M62 J25 - J30	
20/09/15 12:20:24	SIG	M606/2003B1	OFF	M62 J25 - J30	
20/09/15 12:20:24	SIG	M606/2003B2	OFF	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2050A2	NR	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2050A3	NR	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2050A4	NR	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2057A1	OFF	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2057A2	OFF	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2057A3	OFF	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2057J1	NR	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2065A1	BLNK	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2065A2	OFF	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2065A3	OFF	M62 J25 - J30	
20/09/15 12:22:24	SIG	M62/2065A4	OFF	M62 J25 - J30	
20/09/15 12:23:55	SIG	M62/2189B4	OFF	M62 J25 - J30	
20/09/15 12:23:55	SIG	M62/2189B4	???	M62 J25 - J30	
20/09/15 12:24:05	SIG	M62/2189B4	OFF	M62 J25 - J30	
20/09/15 12:24:06	SIG	M62/2189B4	60R	M62 J25 - J30	
20/09/15 12:25:24	SIG	M62/2057J1	OFF	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2050A2	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2050A3	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2050A4	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2057A1	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2057A2	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2057A3	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2057J1	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2065A1	REDX	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2065A2	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2065A3	50R	M62 J25 - J30	
20/09/15 12:25:47	SIG	M62/2065A4	50R	M62 J25 - J30	
20/09/15 12:25:59	SIG	M621/1002A1	50R	M62 J25 - J30	
20/09/15 12:25:59	SIG	M621/1002A2	50R	M62 J25 - J30	
20/09/15 12:27:04	SIG	M621/1010B1	50R	M62 J25 - J30	
20/09/15 12:27:04	SIG	M621/1010B2	50R	M62 J25 - J30	
20/09/15 12:27:05	SIG	M62/2057B1	REDX	M62 J25 - J30	
20/09/15 12:27:05	SIG	M62/2057B2	NR	M62 J25 - J30	
20/09/15 12:27:05	SIG	M62/2057B3	NR	M62 J25 - J30	
20/09/15 12:27:05	SIG	M62/2057B4	NR	M62 J25 - J30	
20/09/15 12:27:05	SIG	M62/2065M1	60R	M62 J25 - J30	
20/09/15 12:27:05	SIG	M621/1002B1	HSD	M62 J25 - J30	
20/09/15 12:27:05	SIG	M621/1002B2	60R	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2050A2	NR	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2050A3	NR	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2050A4	NR	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2057A1	OFF	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2057A2	OFF	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2057A3	OFF	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2057J1	OFF	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2065A1	BLNK	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2065A2	OFF	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2065A3	OFF	M62 J25 - J30	
20/09/15 12:28:32	SIG	M62/2065A4	OFF	M62 J25 - J30	
20/09/15 12:29:01	SIG	M621/1002A1	OFF	M62 J25 - J30	
20/09/15 12:29:01	SIG	M621/1002A2	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M62/2057B1	BLNK	M62 J25 - J30	
20/09/15 12:32:29	SIG	M62/2057B2	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M62/2057B3	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M62/2057B4	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M62/2065M1	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M621/1002B1	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M621/1002B2	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M621/1010B1	OFF	M62 J25 - J30	
20/09/15 12:32:29	SIG	M621/1010B2	OFF	M62 J25 - J30	
20/09/15 12:33:54	SIG	M621/1002A1	50R	M62 J25 - J30	
20/09/15 12:33:54	SIG	M621/1002A2	50R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2050A2	60R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2050A3	60R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2050A4	60R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2057A1	50R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2057A2	50R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2057A3	50R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2057J1	50R	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2065A1	REDX	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2065A2	NR	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2065A3	NR	M62 J25 - J30	
20/09/15 12:34:41	SIG	M62/2065A4	NR	M62 J25 - J30	
20/09/15 12:34:42	SIG	M62/2057A1	60R	M62 J25 - J30	
20/09/15 12:34:42	SIG	M62/2057A2	60R	M62 J25 - J30	
20/09/15 12:34:42	SIG	M62/2057A3	60R	M62 J25 - J30	
20/09/15 12:34:42	SIG	M62/2057J1	60R	M62 J25 - J30	
20/09/15 12:35:54	SIG	M62/2050A1	60R	M62 J25 - J30	
20/09/15 12:36:24	SIG	M62/2004A1	OFF	M62 J25 - J30	
20/09/15 12:36:24	SIG	M62/2004A2	OFF	M62 J25 - J30	
20/09/15 12:36:24	SIG	M62/2004A3	OFF	M62 J25 - J30	
20/09/15 12:36:27	SIG	M62/2041A1	60R	M62 J25 - J30	
20/09/15 12:36:51	SIG	M62/2033A1	60R	M62 J25 - J30	
20/09/15 12:36:55	SIG	M62/2018A1	60R	M62 J25 - J30	
20/09/15 12:36:55	SIG	M62/2025A1	60R	M62 J25 - J30	
20/09/15 12:39:54	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 12:39:55	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 12:40:24	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 12:45:56	SIG	M621/1002A1	OFF	M62 J25 - J30	
20/09/15 12:45:56	SIG	M621/1002A2	OFF	M62 J25 - J30	
20/09/15 13:06:10	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 13:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2177B1	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2177B2	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2177L1	OFF	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2177L2	OFF	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2183B1	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2183B2	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2183L1	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2183L2	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2189B1	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2189B2	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2189B3	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2189B4	NR	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2194B1	OFF	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2194B2	OFF	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2194B3	OFF	M62 J25 - J30	
20/09/15 13:22:25	SIG	M62/2194B4	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2170B1	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2170B2	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2177B1	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2177B2	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2183B1	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2183L1	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2183L2	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2189B1	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2189B2	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2189B3	OFF	M62 J25 - J30	
20/09/15 13:25:26	SIG	M62/2189B4	OFF	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2183B1	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2183B2	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2183L1	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2183L2	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2189B1	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2189B2	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2189B3	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2189B4	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2194B1	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2194B2	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2194B3	60R	M62 J25 - J30	
20/09/15 13:26:25	SIG	M62/2194B4	60R	M62 J25 - J30	
20/09/15 13:29:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 13:29:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 13:29:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2177B1	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2177B2	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2177L1	OFF	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2177L2	OFF	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2183B1	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2183B2	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2183L1	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2183L2	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2189B1	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2189B2	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2189B3	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2189B4	NR	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2194B1	OFF	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2194B2	OFF	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2194B3	OFF	M62 J25 - J30	
20/09/15 13:29:26	SIG	M62/2194B4	OFF	M62 J25 - J30	
20/09/15 13:32:26	SIG	M62/2177B1	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2170B1	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2170B2	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2177B2	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2183B1	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2183L1	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2183L2	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2189B1	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2189B2	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2189B3	OFF	M62 J25 - J30	
20/09/15 13:32:27	SIG	M62/2189B4	OFF	M62 J25 - J30	
20/09/15 13:36:10	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 13:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2106A1	REDX	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2106A2	60R	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2106A3	60R	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2106A4	60R	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2114A1	NR	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2114A2	NR	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2114A3	NR	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2117A1	REDX	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2117A2	NR	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2117A3	NR	M62 J25 - J30	
20/09/15 13:44:31	SIG	M62/2117A4	NR	M62 J25 - J30	
20/09/15 13:47:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
20/09/15 13:47:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
20/09/15 13:47:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
20/09/15 13:47:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
20/09/15 13:57:19	SIG	M62/2114A1	60R	M62 J25 - J30	
20/09/15 13:57:19	SIG	M62/2114A2	60R	M62 J25 - J30	
20/09/15 13:57:19	SIG	M62/2114A3	60R	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2106A2	NR	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2106A3	NR	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2106A4	NR	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2114A1	OFF	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2114A2	OFF	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2114A3	OFF	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2117A1	BLNK	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2117A2	OFF	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2117A3	OFF	M62 J25 - J30	
20/09/15 13:58:33	SIG	M62/2117A4	OFF	M62 J25 - J30	
20/09/15 14:01:33	SIG	M62/2106A1	BLNK	M62 J25 - J30	
20/09/15 14:01:33	SIG	M62/2106A2	OFF	M62 J25 - J30	
20/09/15 14:01:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
20/09/15 14:01:33	SIG	M62/2106A4	OFF	M62 J25 - J30	
20/09/15 14:06:10	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 14:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 14:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 14:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 15:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 15:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 15:18:27	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 15:21:21	SIG	M62/2050A1	50R	M62 J25 - J30	
20/09/15 15:21:21	SIG	M62/2050A2	50R	M62 J25 - J30	
20/09/15 15:21:21	SIG	M62/2050A3	50R	M62 J25 - J30	
20/09/15 15:21:21	SIG	M62/2050A4	50R	M62 J25 - J30	
20/09/15 15:21:26	SIG	M62/2050A1	40R	M62 J25 - J30	
20/09/15 15:21:26	SIG	M62/2050A2	40R	M62 J25 - J30	
20/09/15 15:21:26	SIG	M62/2050A3	40R	M62 J25 - J30	
20/09/15 15:21:26	SIG	M62/2050A4	40R	M62 J25 - J30	
20/09/15 15:21:32	SIG	M62/2050A1	30R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2033A1	LDR	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2033A2	50R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2033A3	50R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2033A4	50R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2041A1	LDR	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2041A2	50R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2041A3	50R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2041A4	50R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2050A1	20R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2050A2	40R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2050A3	40R	M62 J25 - J30	
20/09/15 15:21:37	SIG	M62/2050A4	40R	M62 J25 - J30	
20/09/15 15:21:42	SIG	M62/2050A1	STOP	M62 J25 - J30	
20/09/15 15:36:10	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 15:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2033A1	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2033A2	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2033A3	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2033A4	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2041A1	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2041A2	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2041A3	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2041A4	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2050A1	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2050A2	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2050A3	60R	M62 J25 - J30	
20/09/15 15:41:02	SIG	M62/2050A4	60R	M62 J25 - J30	
20/09/15 15:54:27	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 16:05:03	SIG	M62/2065M1	NR	M62 J25 - J30	
20/09/15 16:05:03	SIG	M62/2069M1	60R	M62 J25 - J30	
20/09/15 16:05:03	SIG	M62/2069M2	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2057B1	REDX	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2057B2	NR	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2057B3	NR	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2057B4	NR	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2065B1	REDX	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2065B2	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2065B3	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2065B4	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M62/2065M1	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M621/1002B1	HSD	M62 J25 - J30	
20/09/15 16:05:04	SIG	M621/1002B2	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M621/1010B1	60R	M62 J25 - J30	
20/09/15 16:05:04	SIG	M621/1010B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2012B1	REDX	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2012B2	NR	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2012B3	NR	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2012B4	NR	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2018B1	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2018B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2018B3	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2018L1	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2025B1	REDX	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2025B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2025B3	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2025B4	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2033B1	REDX	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2033B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2033B3	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2033B4	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2041B1	REDX	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2041B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2041B3	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2041B4	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2050B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2050B3	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2050B4	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2057B2	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2057B3	60R	M62 J25 - J30	
20/09/15 16:05:05	SIG	M62/2057B4	60R	M62 J25 - J30	
20/09/15 16:06:10	SIG	M62/2025A1	???	M62 J25 - J30	
20/09/15 16:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 16:06:35	SIG	M62/2025B1	60R	M62 J25 - J30	
20/09/15 16:06:58	SIG	M62/2033B1	60R	M62 J25 - J30	
20/09/15 16:07:17	SIG	M62/2041B1	60R	M62 J25 - J30	
20/09/15 16:07:38	SIG	M62/2057B1	60R	M62 J25 - J30	
20/09/15 16:07:38	SIG	M621/1002B1	60R	M62 J25 - J30	
20/09/15 16:07:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
20/09/15 16:07:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
20/09/15 16:07:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 16:07:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 16:07:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 16:07:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 16:18:28	SIG	M62/2074B1	REDX	M62 J25 - J30	
20/09/15 16:18:28	SIG	M62/2074B2	60R	M62 J25 - J30	
20/09/15 16:18:28	SIG	M62/2074B3	60R	M62 J25 - J30	
20/09/15 16:18:28	SIG	M62/2074B4	60R	M62 J25 - J30	
20/09/15 16:18:28	SIG	M621/1010B1	60R	M62 J25 - J30	
20/09/15 16:18:28	SIG	M621/1010B2	60R	M62 J25 - J30	
20/09/15 16:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 16:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 16:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 16:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2088B1	REDX	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2088B2	NR	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2088B3	NR	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2088B4	NR	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2097B1	REDX	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2097B2	60R	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2097B3	60R	M62 J25 - J30	
20/09/15 16:55:18	SIG	M62/2097B4	60R	M62 J25 - J30	
20/09/15 17:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 17:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 17:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 17:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 17:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 17:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
20/09/15 17:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 17:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 17:43:30	SIG	M62/2074B1	BLNK	M62 J25 - J30	
20/09/15 17:43:30	SIG	M62/2074B2	OFF	M62 J25 - J30	
20/09/15 17:43:30	SIG	M62/2074B3	OFF	M62 J25 - J30	
20/09/15 17:43:30	SIG	M62/2074B4	OFF	M62 J25 - J30	
20/09/15 17:43:30	SIG	M621/1010B1	OFF	M62 J25 - J30	
20/09/15 17:43:30	SIG	M621/1010B2	OFF	M62 J25 - J30	
20/09/15 17:43:31	SIG	M62/2025A1	HSD	M62 J25 - J30	
20/09/15 17:44:19	SIG	M62/2088B2	NR	M62 J25 - J30	
20/09/15 17:44:19	SIG	M62/2088B3	NR	M62 J25 - J30	
20/09/15 17:44:19	SIG	M62/2088B4	NR	M62 J25 - J30	
20/09/15 17:44:19	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 17:44:19	SIG	M62/2097B3	NR	M62 J25 - J30	
20/09/15 17:44:19	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 17:44:31	SIG	M62/2033A1	HSD	M62 J25 - J30	
20/09/15 17:45:31	SIG	M62/2018A1	HSD	M62 J25 - J30	
20/09/15 17:45:31	SIG	M62/2025A1	REDX	M62 J25 - J30	
20/09/15 17:45:31	SIG	M62/2041A1	HSD	M62 J25 - J30	
20/09/15 17:46:38	SIG	M62/2033A1	REDX	M62 J25 - J30	
20/09/15 17:46:38	SIG	M62/2050A1	HSD	M62 J25 - J30	
20/09/15 17:47:19	SIG	M62/2097B2	OFF	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2088B1	BLNK	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2088B1	BLNK	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2088B2	OFF	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2088B3	OFF	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2088B4	OFF	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2097B3	OFF	M62 J25 - J30	
20/09/15 17:47:20	SIG	M62/2097B4	OFF	M62 J25 - J30	
20/09/15 17:47:30	SIG	M62/2041A1	REDX	M62 J25 - J30	
20/09/15 17:48:30	SIG	M62/2050A1	REDX	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2025A2	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2025A3	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2025A4	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2033A2	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2033A3	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2033A4	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2041A2	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2041A3	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2041A4	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2050A2	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2050A3	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2050A4	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2057A1	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2057A2	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2057A3	NR	M62 J25 - J30	
20/09/15 17:49:31	SIG	M62/2057J1	NR	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2008K1	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2008K2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2012A1	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2012A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2012A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2018A1	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2018A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2018A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2018A4	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2025A1	BLNK	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2025A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2025A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2025A4	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2033A1	BLNK	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2033A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2033A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2033A4	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2041A1	BLNK	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2041A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2041A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2041A4	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2050A1	BLNK	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2050A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2050A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2050A4	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2057A1	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2057A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2057A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2057J1	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2065A1	BLNK	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2065A2	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2065A3	OFF	M62 J25 - J30	
20/09/15 17:50:31	SIG	M62/2065A4	OFF	M62 J25 - J30	
20/09/15 18:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2033B1	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2033B2	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2033B3	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2033B4	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2041B1	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2041B2	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2041B3	50R	M62 J25 - J30	
20/09/15 18:08:21	SIG	M62/2041B4	50R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2033B1	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2033B2	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2033B3	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2033B4	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2041B1	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2041B2	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2041B3	40R	M62 J25 - J30	
20/09/15 18:08:26	SIG	M62/2041B4	40R	M62 J25 - J30	
20/09/15 18:11:28	SIG	M62/2033B3	50R	M62 J25 - J30	
20/09/15 18:11:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:11:34	SIG	M62/2033B3	40R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2033B1	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2033B2	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2033B3	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2033B4	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2041B1	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2041B2	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2041B3	60R	M62 J25 - J30	
20/09/15 18:12:22	SIG	M62/2041B4	60R	M62 J25 - J30	
20/09/15 18:14:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:14:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:14:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:14:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2097A1	REDX	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2097A2	60R	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2097A3	60R	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2097A4	60R	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2106A1	REDX	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2106A2	NR	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2106A3	NR	M62 J25 - J30	
20/09/15 18:25:35	SIG	M62/2106A4	NR	M62 J25 - J30	
20/09/15 18:28:52	SIG	M62/2057B1	HSD	M62 J25 - J30	
20/09/15 18:30:51	SIG	M62/2041B1	HSD	M62 J25 - J30	
20/09/15 18:30:51	SIG	M62/2057B1	REDX	M62 J25 - J30	
20/09/15 18:30:51	SIG	M621/1002B1	HSD	M62 J25 - J30	
20/09/15 18:30:51	SIG	M621/1010B1	60R	M62 J25 - J30	
20/09/15 18:30:51	SIG	M621/1010B2	60R	M62 J25 - J30	
20/09/15 18:31:51	SIG	M62/2033B1	HSD	M62 J25 - J30	
20/09/15 18:32:51	SIG	M62/2025B1	HSD	M62 J25 - J30	
20/09/15 18:32:51	SIG	M62/2041B1	REDX	M62 J25 - J30	
20/09/15 18:33:43	SIG	M62/2033B1	REDX	M62 J25 - J30	
20/09/15 18:34:27	SIG	M62/2025B1	REDX	M62 J25 - J30	
20/09/15 18:34:57	SIG	M62/2065B2	NR	M62 J25 - J30	
20/09/15 18:34:57	SIG	M62/2065B3	NR	M62 J25 - J30	
20/09/15 18:34:57	SIG	M62/2065B4	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2018B1	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2018B2	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2018B3	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2018L1	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2025B2	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2025B3	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2025B4	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2033B2	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2033B3	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2033B4	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2041B2	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2041B3	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2041B4	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2050B2	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2050B3	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2050B4	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2057B2	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2057B3	NR	M62 J25 - J30	
20/09/15 18:34:58	SIG	M62/2057B4	NR	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2025B1	BLNK	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2025B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2025B3	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2025B4	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2033B1	BLNK	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2033B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2033B4	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2041B1	BLNK	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2041B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2041B3	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2041B4	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2050B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2050B3	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2050B4	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2057B1	BLNK	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2057B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2057B3	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2057B4	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2065B1	BLNK	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2065B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2065B3	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2065B4	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2065M1	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2069M1	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M62/2069M2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M621/1002B1	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M621/1002B2	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M621/1010B1	OFF	M62 J25 - J30	
20/09/15 18:35:58	SIG	M621/1010B2	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2012B1	BLNK	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2012B2	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2012B3	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2012B4	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2018B1	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2018B2	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2018B3	OFF	M62 J25 - J30	
20/09/15 18:35:59	SIG	M62/2018L1	OFF	M62 J25 - J30	
20/09/15 19:18:18	SIG	M62/2097A2	NR	M62 J25 - J30	
20/09/15 19:18:18	SIG	M62/2097A3	NR	M62 J25 - J30	
20/09/15 19:18:18	SIG	M62/2097A4	NR	M62 J25 - J30	
20/09/15 19:18:18	SIG	M62/2106A2	NR	M62 J25 - J30	
20/09/15 19:18:18	SIG	M62/2106A3	NR	M62 J25 - J30	
20/09/15 19:18:18	SIG	M62/2106A4	NR	M62 J25 - J30	
20/09/15 19:21:18	SIG	M62/2097A2	OFF	M62 J25 - J30	
20/09/15 19:21:18	SIG	M62/2097A3	OFF	M62 J25 - J30	
20/09/15 19:21:18	SIG	M62/2097A4	OFF	M62 J25 - J30	
20/09/15 19:21:18	SIG	M62/2106A2	OFF	M62 J25 - J30	
20/09/15 19:21:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
20/09/15 19:21:18	SIG	M62/2106A4	OFF	M62 J25 - J30	
20/09/15 19:21:19	SIG	M62/2097A1	BLNK	M62 J25 - J30	
20/09/15 19:21:19	SIG	M62/2106A1	BLNK	M62 J25 - J30	
20/09/15 19:21:19	SIG	M62/2106A1	BLNK	M62 J25 - J30	
20/09/15 20:47:44	SIG	M62/2065B2	50R	M62 J25 - J30	
20/09/15 20:47:44	SIG	M62/2065B3	50R	M62 J25 - J30	
20/09/15 20:47:44	SIG	M62/2065B4	50R	M62 J25 - J30	
20/09/15 20:47:44	SIG	M62/2065M1	50R	M62 J25 - J30	
20/09/15 20:47:44	SIG	M621/1002B2	50R	M62 J25 - J30	
20/09/15 20:47:45	SIG	M62/2074B1	REDX	M62 J25 - J30	
20/09/15 20:47:45	SIG	M62/2074B2	60R	M62 J25 - J30	
20/09/15 20:47:45	SIG	M62/2074B3	60R	M62 J25 - J30	
20/09/15 20:47:45	SIG	M62/2074B4	60R	M62 J25 - J30	
20/09/15 20:47:45	SIG	M621/1010B1	50R	M62 J25 - J30	
20/09/15 20:47:45	SIG	M621/1010B2	50R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2057B1	REDX	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2057B2	NR	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2057B3	NR	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2057B4	NR	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2065B1	REDX	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2065B2	40R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2065B3	40R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2065B4	40R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2065M1	40R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2069M1	50R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M62/2069M2	50R	M62 J25 - J30	
20/09/15 20:47:50	SIG	M621/1002B1	HSD	M62 J25 - J30	
20/09/15 20:47:50	SIG	M621/1002B2	40R	M62 J25 - J30	
20/09/15 20:48:47	SIG	M62/2025A2	50R	M62 J25 - J30	
20/09/15 20:48:47	SIG	M62/2025A3	50R	M62 J25 - J30	
20/09/15 20:48:47	SIG	M62/2025A4	50R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2008K1	60R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2008K2	60R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2012A1	60R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2012A2	60R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2012A3	60R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2018A1	HSD	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2018A2	50R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2018A3	50R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2018A4	50R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2025A1	REDX	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2025A2	40R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2025A3	40R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2025A4	40R	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2033A1	REDX	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2033A2	NR	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2033A3	NR	M62 J25 - J30	
20/09/15 20:48:52	SIG	M62/2033A4	NR	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2004A1	60R	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2004A2	60R	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2004A3	60R	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2033A2	60R	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2033A3	60R	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2033A4	60R	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2041A1	REDX	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2041A2	NR	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2041A3	NR	M62 J25 - J30	
20/09/15 20:49:33	SIG	M62/2041A4	NR	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2170B1	NR	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2170B2	NR	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2170L1	LDR	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2170L2	50R	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2177B1	50R	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2177B2	50R	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2177L1	50R	M62 J25 - J30	
20/09/15 20:49:51	SIG	M62/2177L2	50R	M62 J25 - J30	
20/09/15 20:52:46	SIG	M62/2018A2	60R	M62 J25 - J30	
20/09/15 20:52:46	SIG	M62/2018A3	60R	M62 J25 - J30	
20/09/15 20:52:46	SIG	M62/2018A4	60R	M62 J25 - J30	
20/09/15 20:52:46	SIG	M62/2025A2	60R	M62 J25 - J30	
20/09/15 20:52:46	SIG	M62/2025A3	60R	M62 J25 - J30	
20/09/15 20:52:46	SIG	M62/2025A4	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M62/2065B2	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M62/2065B3	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M62/2065B4	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M62/2065M1	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M62/2069M1	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M62/2069M2	60R	M62 J25 - J30	
20/09/15 20:52:53	SIG	M621/1002B2	60R	M62 J25 - J30	
20/09/15 20:52:54	SIG	M621/1010B1	60R	M62 J25 - J30	
20/09/15 20:52:54	SIG	M621/1010B2	60R	M62 J25 - J30	
20/09/15 21:03:33	SIG	M62/2074B1	BLNK	M62 J25 - J30	
20/09/15 21:03:33	SIG	M62/2074B2	OFF	M62 J25 - J30	
20/09/15 21:03:33	SIG	M62/2074B3	OFF	M62 J25 - J30	
20/09/15 21:03:33	SIG	M62/2074B4	OFF	M62 J25 - J30	
20/09/15 21:03:33	SIG	M621/1010B1	OFF	M62 J25 - J30	
20/09/15 21:03:33	SIG	M621/1010B2	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2004A1	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2004A2	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2004A3	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2057B1	BLNK	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2057B2	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2057B3	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2057B4	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2065B2	NR	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2065B3	NR	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2065B4	NR	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2065M1	NR	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2069M1	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M62/2069M2	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M621/1002B1	OFF	M62 J25 - J30	
20/09/15 21:03:34	SIG	M621/1002B2	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2008K1	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2008K2	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2012A1	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2012A2	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2012A3	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2018A1	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2018A2	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2018A3	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2018A4	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2025A1	BLNK	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2025A2	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2025A3	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2025A4	OFF	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2033A2	NR	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2033A3	NR	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2033A4	NR	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2041A2	NR	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2041A3	NR	M62 J25 - J30	
20/09/15 21:04:33	SIG	M62/2041A4	NR	M62 J25 - J30	
20/09/15 21:06:34	SIG	M62/2065B2	OFF	M62 J25 - J30	
20/09/15 21:06:34	SIG	M62/2065B3	OFF	M62 J25 - J30	
20/09/15 21:06:34	SIG	M62/2065B4	OFF	M62 J25 - J30	
20/09/15 21:06:34	SIG	M62/2065M1	OFF	M62 J25 - J30	
20/09/15 21:06:35	SIG	M62/2065B1	BLNK	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2033A1	BLNK	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2033A2	OFF	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2033A3	OFF	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2033A4	OFF	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2041A1	BLNK	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2041A2	OFF	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2041A3	OFF	M62 J25 - J30	
20/09/15 21:07:34	SIG	M62/2041A4	OFF	M62 J25 - J30	
20/09/15 21:07:35	SIG	M62/2041A1	BLNK	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2170B1	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2170B2	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2170L1	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2170L2	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2177B1	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2177B2	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2177L1	OFF	M62 J25 - J30	
20/09/15 21:11:35	SIG	M62/2177L2	OFF	M62 J25 - J30	
20/09/15 21:52:49	SIG	M62/2088B2	50R	M62 J25 - J30	
20/09/15 21:52:49	SIG	M62/2088B3	50R	M62 J25 - J30	
20/09/15 21:52:49	SIG	M62/2088B4	50R	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2074B1	REDX	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2074B2	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2074B3	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2074B4	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2081B1	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2081B2	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2081B3	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2081L1	NR	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2088B1	REDX	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2088B2	40R	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2088B3	40R	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2088B4	40R	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2097B1	REDX	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2097B2	60R	M62 J25 - J30	
20/09/15 21:52:54	SIG	M62/2097B4	60R	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2074B1	BLNK	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2074B2	OFF	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2074B3	OFF	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2074B4	OFF	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2081B1	OFF	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2081B2	OFF	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2081B3	OFF	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2081L1	NR	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2088B2	NR	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2088B3	NR	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2088B4	NR	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 21:57:15	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 22:00:16	SIG	M62/2081L1	OFF	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2088B1	BLNK	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2088B1	BLNK	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2088B2	OFF	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2088B3	OFF	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2088B4	OFF	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2097B2	OFF	M62 J25 - J30	
20/09/15 22:00:26	SIG	M62/2097B4	OFF	M62 J25 - J30	
20/09/15 22:16:36	SIG	M62/1960K1	50R	M62 J25 - J30	
20/09/15 22:16:36	SIG	M62/1960K2	50R	M62 J25 - J30	
20/09/15 22:16:42	SIG	M62/1960K1	40R	M62 J25 - J30	
20/09/15 22:16:42	SIG	M62/1960K2	40R	M62 J25 - J30	
20/09/15 22:16:47	SIG	M62/1960K1	30R	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1955K1	TI	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1955K2	TI	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1960K1	20R	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1960K2	40R	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1968A1	NR	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1968A2	NR	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1968A3	NR	M62 J25 - J30	
20/09/15 22:16:52	SIG	M62/1968A4	NR	M62 J25 - J30	
20/09/15 22:16:57	SIG	M62/1960K1	STOP	M62 J25 - J30	
20/09/15 22:19:25	SIG	M62/2081B1	50R	M62 J25 - J30	
20/09/15 22:19:25	SIG	M62/2081B2	50R	M62 J25 - J30	
20/09/15 22:19:25	SIG	M62/2081B3	50R	M62 J25 - J30	
20/09/15 22:19:25	SIG	M62/2081L1	50R	M62 J25 - J30	
20/09/15 22:19:30	SIG	M62/2081B1	40R	M62 J25 - J30	
20/09/15 22:19:30	SIG	M62/2081B2	40R	M62 J25 - J30	
20/09/15 22:19:30	SIG	M62/2081B3	40R	M62 J25 - J30	
20/09/15 22:19:30	SIG	M62/2081L1	40R	M62 J25 - J30	
20/09/15 22:19:35	SIG	M62/2081L1	30R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2074B1	REDX	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2074B2	NR	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2074B3	NR	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2074B4	NR	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2081B1	40R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2081B2	40R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2081B3	40R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2081L1	20R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2088B1	REDX	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2088B2	50R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2088B3	50R	M62 J25 - J30	
20/09/15 22:19:41	SIG	M62/2088B4	50R	M62 J25 - J30	
20/09/15 22:19:46	SIG	M62/2081L1	STOP	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2097B1	REDX	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2097B2	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2097B4	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2106B1	REDX	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2106B2	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2106B3	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2106B4	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2113B1	REDX	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2113B2	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2113B3	60R	M62 J25 - J30	
20/09/15 22:34:44	SIG	M62/2113B4	60R	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1955K1	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1955K2	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1960K1	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1960K2	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1968A1	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1968A2	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1968A3	OFF	M62 J25 - J30	
20/09/15 22:35:40	SIG	M62/1968A4	OFF	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2081B1	60R	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2081B2	60R	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2081B3	60R	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2081L1	60R	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2088B2	60R	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2088B3	60R	M62 J25 - J30	
20/09/15 22:48:39	SIG	M62/2088B4	60R	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2074B1	BLNK	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2074B2	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2074B3	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2074B4	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2081B1	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2081B2	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2081B3	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2081L1	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2088B2	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2088B3	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2088B4	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2106B2	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2106B3	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2106B4	NR	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2113B1	BLNK	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2113B2	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2113B3	OFF	M62 J25 - J30	
20/09/15 22:55:45	SIG	M62/2113B4	OFF	M62 J25 - J30	
20/09/15 22:58:45	SIG	M62/2081L1	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2088B2	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2088B3	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2088B4	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2097B2	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2097B4	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2106B2	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2106B3	OFF	M62 J25 - J30	
20/09/15 22:58:55	SIG	M62/2106B4	OFF	M62 J25 - J30	
20/09/15 22:58:56	SIG	M62/2088B1	BLNK	M62 J25 - J30	
20/09/15 22:58:56	SIG	M62/2088B1	BLNK	M62 J25 - J30	
20/09/15 22:58:56	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 22:58:56	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 22:58:56	SIG	M62/2106B1	BLNK	M62 J25 - J30	
20/09/15 22:58:56	SIG	M62/2106B1	BLNK	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2097B1	REDX	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2106B1	REDX	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2106B2	50R	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2106B3	50R	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2106B4	50R	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2113B1	REDX	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2113B2	50R	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2113B3	50R	M62 J25 - J30	
20/09/15 23:31:30	SIG	M62/2113B4	50R	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2097B2	NR	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2097B4	NR	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2106B2	NR	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2106B3	NR	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2106B4	NR	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2113B1	BLNK	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2113B2	OFF	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2113B3	OFF	M62 J25 - J30	
20/09/15 23:32:40	SIG	M62/2113B4	OFF	M62 J25 - J30	
20/09/15 23:35:41	SIG	M62/2106B2	OFF	M62 J25 - J30	
20/09/15 23:35:51	SIG	M62/2097B1	BLNK	M62 J25 - J30	
20/09/15 23:35:51	SIG	M62/2097B2	OFF	M62 J25 - J30	
20/09/15 23:35:51	SIG	M62/2097B4	OFF	M62 J25 - J30	
20/09/15 23:35:51	SIG	M62/2106B1	BLNK	M62 J25 - J30	
20/09/15 23:35:51	SIG	M62/2106B3	OFF	M62 J25 - J30	
20/09/15 23:35:51	SIG	M62/2106B4	OFF	M62 J25 - J30	
20/09/15 23:35:52	SIG	M62/2097B1	BLNK	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2135A1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2135A2	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2135A3	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2135A4	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2144A1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2144A2	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2144J1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2144K1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2151A1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2151A2	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2151J1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2151K1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2155A1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2155A2	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2155J1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2155K1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2157A1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2157A2	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2157J1	NR	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2157J2	NR	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2157K1	50R	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2163A1	NR	M62 J25 - J30	
21/09/15 05:26:32	SIG	M62/2163A2	NR	M62 J25 - J30	
21/09/15 05:28:48	SIG	M62/2157A1	OFF	M62 J25 - J30	
21/09/15 05:28:48	SIG	M62/2157A1	???	M62 J25 - J30	
21/09/15 05:36:10	SIG	M62/2157A1	???	M62 J25 - J30	
21/09/15 05:36:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2135A1	OFF	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2135A2	OFF	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2135A3	OFF	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2135A4	OFF	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2144A1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2144A2	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2144J1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2144K1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2151A1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2151A2	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2151J1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2151K1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2155A1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2155A2	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2155J1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2155K1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2157A1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2157A2	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2157J1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2157J2	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2157K1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2163A1	NR	M62 J25 - J30	
21/09/15 06:04:45	SIG	M62/2163A2	NR	M62 J25 - J30	
21/09/15 06:07:45	SIG	M62/2144J1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2144A1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2144A2	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2144K1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2151A1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2151A2	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2151J1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2151K1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2155A1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2155A2	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2155J1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2155K1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2157A1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2157A2	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2157J1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2157J2	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2157K1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2163A1	OFF	M62 J25 - J30	
21/09/15 06:07:46	SIG	M62/2163A2	OFF	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1974B1	NR	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1974B2	NR	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1974B3	NR	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1974B4	NR	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1981B1	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1981B2	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1981B3	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1981B4	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1987B1	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1987B2	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1987B3	50R	M62 J25 - J30	
21/09/15 06:09:06	SIG	M62/1987B4	50R	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1968B1	NR	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1968B2	NR	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1968B3	NR	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1968L1	NR	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1974B1	50R	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1974B2	50R	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1974B3	50R	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1974B4	50R	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1974M1	50R	M62 J25 - J30	
21/09/15 06:10:10	SIG	M62/1974M2	50R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M606/2003B1	LDR	M62 J25 - J30	
21/09/15 06:16:46	SIG	M606/2003B2	50R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1974B1	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1974B2	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1974B3	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1974B4	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1974M1	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1974M2	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1981B1	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1981B2	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1981B3	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1981B4	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1987B1	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1987B2	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1987B3	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/1987B4	40R	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/2005M1	TI	M62 J25 - J30	
21/09/15 06:16:46	SIG	M62/2005M2	TI	M62 J25 - J30	
21/09/15 06:16:52	SIG	M62/1974B1	30R	M62 J25 - J30	
21/09/15 06:16:52	SIG	M62/1981B1	30R	M62 J25 - J30	
21/09/15 06:16:52	SIG	M62/1987B1	30R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1974B1	20R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1974B2	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1974B3	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1974B4	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1974M1	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1974M2	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1981B1	20R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1981B2	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1981B3	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1981B4	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1987B1	20R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1987B2	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1987B3	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1987B4	40R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1992B1	LDR	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1992B2	50R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1992B3	50R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1992B4	50R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1999B1	REDX	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1999B2	50R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1999B3	50R	M62 J25 - J30	
21/09/15 06:16:57	SIG	M62/1999B4	50R	M62 J25 - J30	
21/09/15 06:17:03	SIG	M62/1974B1	STOP	M62 J25 - J30	
21/09/15 06:17:03	SIG	M62/1981B1	STOP	M62 J25 - J30	
21/09/15 06:17:03	SIG	M62/1987B1	STOP	M62 J25 - J30	
21/09/15 06:18:13	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 06:18:13	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1968B1	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1968B2	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1968B3	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1968L1	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1974B1	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1974B2	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1974B3	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1974B4	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1974M1	OFF	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1974M2	OFF	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1981B1	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1981B2	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1981B3	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1981B4	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1987B1	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1987B2	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1987B3	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1987B4	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1992B1	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1992B2	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1992B3	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1992B4	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1999B2	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1999B3	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/1999B4	NR	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/2005M1	OFF	M62 J25 - J30	
21/09/15 06:18:13	SIG	M62/2005M2	OFF	M62 J25 - J30	
21/09/15 06:21:13	SIG	M62/1999B2	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1968B1	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1968B2	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1968B3	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1968L1	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1974B1	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1974B2	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1974B3	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1974B4	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1981B1	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1981B2	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1981B3	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1981B4	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1987B1	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1987B2	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1987B3	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1987B4	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1992B1	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1992B2	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1992B3	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1992B4	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1999B3	OFF	M62 J25 - J30	
21/09/15 06:21:14	SIG	M62/1999B4	OFF	M62 J25 - J30	
21/09/15 06:21:15	SIG	M62/1999B1	BLNK	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2004A1	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2004A2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2004A3	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2008K1	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2008K2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2012A1	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2012A2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2012A3	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2018A1	HSD	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2018A2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2018A3	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2018A4	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2025A1	REDX	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2025A2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2025A3	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2025A4	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2033A1	REDX	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2033A2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2033A3	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2033A4	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2041A1	REDX	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2041A2	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2041A3	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2041A4	60R	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2050A1	REDX	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2050A2	NR	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2050A3	NR	M62 J25 - J30	
21/09/15 06:37:44	SIG	M62/2050A4	NR	M62 J25 - J30	
21/09/15 06:38:43	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 06:38:43	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 06:38:43	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2033A2	50R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2033A3	50R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2033A4	50R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2050A2	60R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2050A3	60R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2050A4	60R	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2057A1	NR	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2057A2	NR	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2057A3	NR	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2057J1	NR	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2065A1	REDX	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2065A2	NR	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2065A3	NR	M62 J25 - J30	
21/09/15 06:39:44	SIG	M62/2065A4	NR	M62 J25 - J30	
21/09/15 06:40:44	SIG	M62/2041A2	50R	M62 J25 - J30	
21/09/15 06:40:44	SIG	M62/2041A3	50R	M62 J25 - J30	
21/09/15 06:40:44	SIG	M62/2041A4	50R	M62 J25 - J30	
21/09/15 06:41:17	SIG	M62/2057A1	60R	M62 J25 - J30	
21/09/15 06:41:17	SIG	M62/2057A2	60R	M62 J25 - J30	
21/09/15 06:41:17	SIG	M62/2057A3	60R	M62 J25 - J30	
21/09/15 06:41:17	SIG	M62/2057J1	60R	M62 J25 - J30	
21/09/15 06:41:18	SIG	M62/2057A1	60R	M62 J25 - J30	
21/09/15 06:42:28	SIG	M62/2137B2	OFF	M62 J25 - J30	
21/09/15 06:42:35	SIG	M62/2050A1	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 06:42:44	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2004A1	OFF	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2004A2	OFF	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2004A3	OFF	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2008K1	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2008K2	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2012A1	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2012A2	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2012A3	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2018A2	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2018A3	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2018A4	60R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2050A1	50R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2050A2	50R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2050A3	50R	M62 J25 - J30	
21/09/15 06:42:44	SIG	M62/2050A4	50R	M62 J25 - J30	
21/09/15 06:43:03	SIG	M62/2041A1	50R	M62 J25 - J30	
21/09/15 06:43:29	SIG	M62/2033A1	50R	M62 J25 - J30	
21/09/15 06:43:33	SIG	M62/2018A1	60R	M62 J25 - J30	
21/09/15 06:43:33	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2025A1	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2025A2	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2025A3	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2025A4	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2033A1	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2033A2	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2033A3	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2033A4	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2041A1	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2041A2	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2041A3	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2041A4	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2050A1	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2050A2	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2050A3	60R	M62 J25 - J30	
21/09/15 06:43:44	SIG	M62/2050A4	60R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/1999A1	60R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/1999A2	60R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/1999A3	60R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/2004A1	60R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/2004A2	60R	M62 J25 - J30	
21/09/15 06:44:44	SIG	M62/2004A3	60R	M62 J25 - J30	
21/09/15 06:45:44	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 06:45:44	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 06:45:56	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 06:45:59	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 06:46:02	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 06:46:02	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2004A1	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2008K1	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2008K2	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2012A1	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2012A2	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2012A3	40R	M62 J25 - J30	
21/09/15 06:46:02	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 06:49:04	SIG	M62/2065M1	NR	M62 J25 - J30	
21/09/15 06:49:04	SIG	M62/2069M1	60R	M62 J25 - J30	
21/09/15 06:49:04	SIG	M62/2069M2	60R	M62 J25 - J30	
21/09/15 06:49:04	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 06:49:04	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2057B1	REDX	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2065B1	REDX	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2065B2	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2065B3	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2065B4	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 06:49:05	SIG	M621/1002B1	HSD	M62 J25 - J30	
21/09/15 06:49:05	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2012B1	REDX	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2012B2	NR	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2012B3	NR	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2012B4	NR	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2041B1	REDX	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 06:49:06	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 06:49:56	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/1999A1	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/1999A2	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/1999A3	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2004A1	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2004A2	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2004A3	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2008K1	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2008K2	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2012A1	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2012A2	60R	M62 J25 - J30	
21/09/15 06:49:56	SIG	M62/2012A3	60R	M62 J25 - J30	
21/09/15 06:51:07	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 06:51:35	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 06:51:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 06:51:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 06:51:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 06:51:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1979K1	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1979K2	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1981A1	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1981A2	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1981A3	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1981A4	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1987A1	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1987A3	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1987J1	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1992A1	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1992A2	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1992A3	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/1992J1	60R	M62 J25 - J30	
21/09/15 06:51:56	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 06:52:18	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 06:52:18	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 06:52:18	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 06:52:18	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 06:52:18	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 06:52:18	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 06:52:19	SIG	M62/2057B1	60R	M62 J25 - J30	
21/09/15 06:52:19	SIG	M621/1002B1	60R	M62 J25 - J30	
21/09/15 06:52:19	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 06:52:19	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1979K1	40R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1979K2	40R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1981A1	40R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1981A2	40R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1981A3	40R	M62 J25 - J30	
21/09/15 06:52:23	SIG	M62/1981A4	40R	M62 J25 - J30	
21/09/15 06:52:57	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 06:52:57	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1974A1	40R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1974A2	40R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1974A3	40R	M62 J25 - J30	
21/09/15 06:53:56	SIG	M62/1974A4	40R	M62 J25 - J30	
21/09/15 06:54:19	SIG	M62/2065A2	60R	M62 J25 - J30	
21/09/15 06:54:19	SIG	M62/2065A3	60R	M62 J25 - J30	
21/09/15 06:54:19	SIG	M62/2065A4	60R	M62 J25 - J30	
21/09/15 06:54:28	SIG	M62/2073K1	60R	M62 J25 - J30	
21/09/15 06:54:28	SIG	M62/2079A1	REDX	M62 J25 - J30	
21/09/15 06:54:28	SIG	M62/2079A2	NR	M62 J25 - J30	
21/09/15 06:54:28	SIG	M62/2079A3	NR	M62 J25 - J30	
21/09/15 06:54:28	SIG	M62/2079A4	NR	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2079A2	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2079A3	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2079A4	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2088A1	REDX	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2088A2	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2088A3	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2088A4	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2097A1	REDX	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2097A2	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2097A3	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2097A4	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2106A1	REDX	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2106A2	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2106A3	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2106A4	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2114A1	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2114A2	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2114A3	60R	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2117A1	REDX	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2117A2	NR	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2117A3	NR	M62 J25 - J30	
21/09/15 06:54:38	SIG	M62/2117A4	NR	M62 J25 - J30	
21/09/15 06:54:44	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 06:54:44	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 06:54:44	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 06:54:44	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 06:54:44	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 06:55:27	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 06:55:46	SIG	M62/2106A1	60R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2159B1	NR	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2159B2	NR	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 06:56:01	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 06:56:06	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 06:56:13	SIG	M62/2097A1	60R	M62 J25 - J30	
21/09/15 06:56:37	SIG	M62/2088A1	60R	M62 J25 - J30	
21/09/15 06:56:43	SIG	M62/2079A1	60R	M62 J25 - J30	
21/09/15 06:56:44	SIG	M62/1955K1	60R	M62 J25 - J30	
21/09/15 06:56:44	SIG	M62/1955K2	60R	M62 J25 - J30	
21/09/15 06:56:44	SIG	M62/1956A1	60R	M62 J25 - J30	
21/09/15 06:56:44	SIG	M62/1956A2	60R	M62 J25 - J30	
21/09/15 06:56:44	SIG	M62/1956A3	60R	M62 J25 - J30	
21/09/15 06:57:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 06:57:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 06:57:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 06:57:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1974A1	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1974A2	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1974A3	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1974A4	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1979K1	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1979K2	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1981A1	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1981A2	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1981A3	60R	M62 J25 - J30	
21/09/15 06:57:56	SIG	M62/1981A4	60R	M62 J25 - J30	
21/09/15 06:58:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 06:58:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 06:58:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 06:58:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1968A1	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1968A2	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1968A3	60R	M62 J25 - J30	
21/09/15 06:59:27	SIG	M62/1968A4	60R	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2159B1	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2159B2	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2177B1	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2177B2	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2177L1	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2177L2	NR	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2183B1	OFF	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2183L1	OFF	M62 J25 - J30	
21/09/15 07:00:02	SIG	M62/2183L2	OFF	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2189B1	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2189B2	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2189B3	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2189B4	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2194B1	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2194B2	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2194B3	60R	M62 J25 - J30	
21/09/15 07:00:44	SIG	M62/2194B4	60R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2159B1	NR	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2159B2	NR	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 07:01:57	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 07:02:03	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 07:02:29	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 07:02:29	SIG	M62/2113B2	NR	M62 J25 - J30	
21/09/15 07:02:29	SIG	M62/2113B3	NR	M62 J25 - J30	
21/09/15 07:02:29	SIG	M62/2113B4	NR	M62 J25 - J30	
21/09/15 07:02:29	SIG	M62/2120M1	60R	M62 J25 - J30	
21/09/15 07:02:29	SIG	M62/2120M2	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2097B1	REDX	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2097B2	NR	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2097B4	NR	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2106B1	REDX	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2106B2	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2106B3	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2106B4	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2113B2	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2113B3	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2113B4	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2117B1	60R	M62 J25 - J30	
21/09/15 07:02:39	SIG	M62/2117B3	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2074B1	REDX	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2074B2	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2074B3	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2074B4	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2081B1	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2081B2	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2081B3	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2081L1	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2088B1	REDX	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2097B2	60R	M62 J25 - J30	
21/09/15 07:02:59	SIG	M62/2097B4	60R	M62 J25 - J30	
21/09/15 07:04:01	SIG	M62/2088B1	60R	M62 J25 - J30	
21/09/15 07:04:24	SIG	M62/2097B1	60R	M62 J25 - J30	
21/09/15 07:04:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:04:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:04:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:04:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:04:54	SIG	M62/2106B1	60R	M62 J25 - J30	
21/09/15 07:04:58	SIG	M62/2113B1	60R	M62 J25 - J30	
21/09/15 07:05:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 07:05:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 07:05:32	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 07:05:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 07:05:57	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 07:05:57	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 07:05:57	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 07:05:57	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 07:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 07:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 07:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 07:06:28	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 07:06:45	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 07:06:45	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 07:07:12	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 07:07:12	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 07:07:12	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 07:07:12	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 07:07:12	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 07:07:15	SIG	M62/2018A1	40R	M62 J25 - J30	
21/09/15 07:07:15	SIG	M62/2018A2	40R	M62 J25 - J30	
21/09/15 07:07:15	SIG	M62/2018A3	40R	M62 J25 - J30	
21/09/15 07:07:15	SIG	M62/2018A4	40R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1956A1	50R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1956A2	50R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1956A3	50R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1960A1	40R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1960A2	40R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1960A3	40R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 07:07:17	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 07:07:44	SIG	M62/2197B1	60R	M62 J25 - J30	
21/09/15 07:07:44	SIG	M62/2197B2	60R	M62 J25 - J30	
21/09/15 07:07:44	SIG	M62/2197B3	60R	M62 J25 - J30	
21/09/15 07:07:44	SIG	M62/2199M1	60R	M62 J25 - J30	
21/09/15 07:07:44	SIG	M62/2199M2	60R	M62 J25 - J30	
21/09/15 07:08:30	SIG	M62/1955K1	40R	M62 J25 - J30	
21/09/15 07:08:30	SIG	M62/1955K2	40R	M62 J25 - J30	
21/09/15 07:08:30	SIG	M62/1956A1	40R	M62 J25 - J30	
21/09/15 07:08:30	SIG	M62/1956A2	40R	M62 J25 - J30	
21/09/15 07:08:30	SIG	M62/1956A3	40R	M62 J25 - J30	
21/09/15 07:08:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:08:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:08:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:08:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 07:08:44	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 07:08:50	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 07:09:34	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 07:09:34	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 07:10:27	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2189B2	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2189B3	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2189B4	40R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 07:10:33	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2008K1	40R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2008K2	40R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2012A1	40R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2012A2	40R	M62 J25 - J30	
21/09/15 07:10:53	SIG	M62/2012A3	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2004A1	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2008K1	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2008K2	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2012A1	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2012A2	40R	M62 J25 - J30	
21/09/15 07:10:58	SIG	M62/2012A3	40R	M62 J25 - J30	
21/09/15 07:11:14	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 07:11:14	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 07:11:14	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 07:11:14	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1955K1	60R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1955K2	60R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 07:12:31	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 07:12:44	SIG	M62/2203B1	60R	M62 J25 - J30	
21/09/15 07:12:44	SIG	M62/2203B2	60R	M62 J25 - J30	
21/09/15 07:12:44	SIG	M62/2203B3	60R	M62 J25 - J30	
21/09/15 07:12:45	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 07:12:45	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 07:12:45	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 07:12:45	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 07:12:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:12:47	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:12:52	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:13:30	SIG	M62/1956A1	60R	M62 J25 - J30	
21/09/15 07:13:30	SIG	M62/1956A2	60R	M62 J25 - J30	
21/09/15 07:13:30	SIG	M62/1956A3	60R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2194B1	60R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2194B2	60R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2194B3	60R	M62 J25 - J30	
21/09/15 07:14:27	SIG	M62/2194B4	60R	M62 J25 - J30	
21/09/15 07:15:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:15:54	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:15:59	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2189B2	40R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2189B3	40R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2189B4	40R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 07:17:14	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 07:18:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:19:00	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:19:05	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:19:19	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 07:19:19	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 07:19:19	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:19:19	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 07:19:25	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 07:19:37	SIG	M62/2097B3	60R	M62 J25 - J30	
21/09/15 07:19:37	SIG	M62/2097B3	60R	M62 J25 - J30	
21/09/15 07:19:38	SIG	M62/2097B3	60R	M62 J25 - J30	
21/09/15 07:19:43	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 07:19:43	SIG	M62/1987A2	50R	M62 J25 - J30	
21/09/15 07:19:43	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 07:19:43	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 07:20:03	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 07:21:03	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 07:21:03	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 07:21:03	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 07:21:03	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 07:21:09	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 07:21:09	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 07:21:09	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 07:21:09	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 07:22:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:22:06	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:22:11	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2194B1	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2194B2	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2194B3	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2194B4	40R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 07:22:13	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 07:22:17	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:22:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 07:22:18	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 07:22:23	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 07:23:19	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2197B1	40R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2197B2	40R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2197B3	40R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2199M1	40R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2199M2	40R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 07:23:22	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1979K1	60R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1979K2	60R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1981A1	60R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1981A2	60R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1981A3	60R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1981A4	60R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 07:23:44	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 07:24:16	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 07:24:16	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 07:24:16	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:24:16	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 07:24:22	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 07:24:55	SIG	M62/2203B1	40R	M62 J25 - J30	
21/09/15 07:24:55	SIG	M62/2203B2	40R	M62 J25 - J30	
21/09/15 07:24:55	SIG	M62/2203B3	40R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 07:25:02	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 07:25:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:25:11	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:25:16	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1987A2	40R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 07:25:38	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1974A1	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1974A2	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1974A3	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1974A4	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1979K1	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1979K2	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1981A1	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1981A2	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1981A3	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1981A4	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 07:25:43	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2004A1	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2008K1	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2008K2	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2012A1	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2012A2	40R	M62 J25 - J30	
21/09/15 07:25:55	SIG	M62/2012A3	40R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1987A1	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1987A3	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1987J1	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1992A1	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1992A2	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1992A3	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1992J1	60R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 07:26:22	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 07:26:54	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 07:27:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:27:24	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:27:29	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:27:31	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 07:27:31	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 07:27:31	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 07:27:31	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 07:27:36	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 07:27:36	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 07:27:36	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 07:27:36	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 07:27:59	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 07:27:59	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 07:27:59	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 07:27:59	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 07:28:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:28:18	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:28:23	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 07:28:46	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 07:28:56	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 07:28:56	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 07:28:56	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 07:28:56	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 07:29:02	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 07:29:02	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 07:29:02	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 07:29:02	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 07:30:03	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 07:30:03	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 07:30:03	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 07:30:03	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 07:30:03	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 07:30:03	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2203B1	60R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2203B2	60R	M62 J25 - J30	
21/09/15 07:30:05	SIG	M62/2203B3	60R	M62 J25 - J30	
21/09/15 07:30:11	SIG	M62/2041B1	40R	M62 J25 - J30	
21/09/15 07:30:11	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 07:30:11	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 07:30:11	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 07:30:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:30:28	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:30:33	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:30:36	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 07:30:36	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 07:30:36	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 07:30:36	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2197B1	60R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2197B2	60R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2197B3	60R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2199M1	60R	M62 J25 - J30	
21/09/15 07:30:50	SIG	M62/2199M2	60R	M62 J25 - J30	
21/09/15 07:31:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:31:29	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:31:34	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:31:44	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 07:31:44	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 07:31:44	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 07:31:44	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 07:31:44	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 07:31:47	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 07:31:47	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 07:31:47	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 07:31:52	SIG	M62/2203B1	40R	M62 J25 - J30	
21/09/15 07:31:52	SIG	M62/2203B2	40R	M62 J25 - J30	
21/09/15 07:31:52	SIG	M62/2203B3	40R	M62 J25 - J30	
21/09/15 07:32:34	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:32:34	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:32:34	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:32:34	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 07:32:34	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 07:32:44	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 07:32:44	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 07:32:47	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 07:32:47	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 07:32:47	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 07:32:47	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 07:32:56	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 07:32:56	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 07:32:56	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 07:32:56	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 07:33:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:33:31	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:33:37	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 07:33:50	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 07:33:59	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 07:33:59	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 07:33:59	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 07:33:59	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 07:34:09	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 07:34:12	SIG	M606/2003B1	LDR	M62 J25 - J30	
21/09/15 07:34:12	SIG	M606/2003B2	50R	M62 J25 - J30	
21/09/15 07:34:12	SIG	M62/2005M1	TI	M62 J25 - J30	
21/09/15 07:34:12	SIG	M62/2005M2	TI	M62 J25 - J30	
21/09/15 07:34:13	SIG	M62/1992B1	50R	M62 J25 - J30	
21/09/15 07:34:13	SIG	M62/1992B2	50R	M62 J25 - J30	
21/09/15 07:34:13	SIG	M62/1992B3	50R	M62 J25 - J30	
21/09/15 07:34:13	SIG	M62/1992B4	50R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 07:34:15	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 07:34:18	SIG	M62/1992B1	40R	M62 J25 - J30	
21/09/15 07:34:18	SIG	M62/1992B2	40R	M62 J25 - J30	
21/09/15 07:34:18	SIG	M62/1992B3	40R	M62 J25 - J30	
21/09/15 07:34:18	SIG	M62/1992B4	40R	M62 J25 - J30	
21/09/15 07:34:23	SIG	M62/1992B1	30R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1987B1	NR	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1987B2	NR	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1987B3	NR	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1987B4	NR	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1992B1	20R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1992B2	40R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1992B3	40R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1992B4	40R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1999B1	REDX	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1999B2	50R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1999B3	50R	M62 J25 - J30	
21/09/15 07:34:29	SIG	M62/1999B4	50R	M62 J25 - J30	
21/09/15 07:34:34	SIG	M62/1992B1	STOP	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 07:35:03	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 07:35:12	SIG	M62/2057A1	50R	M62 J25 - J30	
21/09/15 07:35:12	SIG	M62/2057A2	50R	M62 J25 - J30	
21/09/15 07:35:12	SIG	M62/2057A3	50R	M62 J25 - J30	
21/09/15 07:35:12	SIG	M62/2057J1	50R	M62 J25 - J30	
21/09/15 07:35:12	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 07:35:12	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2050A1	50R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2050A2	50R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2050A3	50R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2050A4	50R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2057A1	40R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2057A2	40R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2057A3	40R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M62/2057J1	40R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 07:35:18	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 07:35:30	SIG	M62/1979K1	40R	M62 J25 - J30	
21/09/15 07:35:30	SIG	M62/1979K2	40R	M62 J25 - J30	
21/09/15 07:35:30	SIG	M62/1981A1	40R	M62 J25 - J30	
21/09/15 07:35:30	SIG	M62/1981A2	40R	M62 J25 - J30	
21/09/15 07:35:30	SIG	M62/1981A3	40R	M62 J25 - J30	
21/09/15 07:35:30	SIG	M62/1981A4	40R	M62 J25 - J30	
21/09/15 07:35:47	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 07:35:47	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 07:35:47	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 07:35:52	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1987B1	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1987B2	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1987B3	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1987B4	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1992B1	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1992B2	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1992B3	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1992B4	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1999B2	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1999B3	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/1999B4	NR	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/2005M1	OFF	M62 J25 - J30	
21/09/15 07:35:52	SIG	M62/2005M2	OFF	M62 J25 - J30	
21/09/15 07:35:59	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 07:35:59	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:35:59	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 07:35:59	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2189B2	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2189B3	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2189B4	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2194B1	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2194B2	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2194B3	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2194B4	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2197B1	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2197B2	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2197B3	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2199M1	40R	M62 J25 - J30	
21/09/15 07:36:09	SIG	M62/2199M2	40R	M62 J25 - J30	
21/09/15 07:36:10	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 07:36:12	SIG	M62/1974A1	40R	M62 J25 - J30	
21/09/15 07:36:12	SIG	M62/1974A2	40R	M62 J25 - J30	
21/09/15 07:36:12	SIG	M62/1974A3	40R	M62 J25 - J30	
21/09/15 07:36:12	SIG	M62/1974A4	40R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2041A1	50R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2041A2	50R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2041A3	50R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2041A4	50R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2050A1	40R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2050A2	40R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2050A3	40R	M62 J25 - J30	
21/09/15 07:36:32	SIG	M62/2050A4	40R	M62 J25 - J30	
21/09/15 07:36:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:36:35	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 07:36:35	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 07:36:35	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 07:36:35	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 07:36:35	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2033A1	50R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2033A2	50R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2033A3	50R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2033A4	50R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2041A1	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2041A2	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2041A3	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2041A4	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2050A1	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2050A2	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2050A3	40R	M62 J25 - J30	
21/09/15 07:36:37	SIG	M62/2050A4	40R	M62 J25 - J30	
21/09/15 07:36:38	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:36:43	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:37:03	SIG	M62/2203B1	40R	M62 J25 - J30	
21/09/15 07:37:03	SIG	M62/2203B2	40R	M62 J25 - J30	
21/09/15 07:37:03	SIG	M62/2203B3	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 07:37:07	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 07:37:08	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2004A1	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2008K1	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2008K2	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2012A1	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2012A2	40R	M62 J25 - J30	
21/09/15 07:37:44	SIG	M62/2012A3	40R	M62 J25 - J30	
21/09/15 07:37:56	SIG	M62/2033A1	40R	M62 J25 - J30	
21/09/15 07:37:56	SIG	M62/2033A2	40R	M62 J25 - J30	
21/09/15 07:37:56	SIG	M62/2033A3	40R	M62 J25 - J30	
21/09/15 07:37:56	SIG	M62/2033A4	40R	M62 J25 - J30	
21/09/15 07:38:10	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 07:38:10	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 07:38:10	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 07:38:10	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 07:38:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 07:38:38	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:38:43	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1956A1	50R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1956A2	50R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1956A3	50R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1960A1	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1960A2	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1960A3	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 07:38:44	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 07:38:45	SIG	M62/2018A1	60R	M62 J25 - J30	
21/09/15 07:38:45	SIG	M62/2018A2	60R	M62 J25 - J30	
21/09/15 07:38:45	SIG	M62/2018A3	60R	M62 J25 - J30	
21/09/15 07:38:45	SIG	M62/2018A4	60R	M62 J25 - J30	
21/09/15 07:38:45	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 07:38:52	SIG	M62/1999B2	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1987B1	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1987B2	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1987B3	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1987B4	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1992B1	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1992B2	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1992B3	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1992B4	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1999B1	BLNK	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1999B3	OFF	M62 J25 - J30	
21/09/15 07:38:53	SIG	M62/1999B4	OFF	M62 J25 - J30	
21/09/15 07:39:38	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:39:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:39:44	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:39:58	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 07:39:58	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 07:39:58	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 07:39:58	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 07:40:08	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 07:40:30	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 07:40:30	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 07:40:30	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 07:40:30	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2025A2	40R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2025A3	40R	M62 J25 - J30	
21/09/15 07:40:42	SIG	M62/2025A4	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2018A1	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2018A2	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2018A3	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2018A4	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2025A2	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2025A3	40R	M62 J25 - J30	
21/09/15 07:40:48	SIG	M62/2025A4	40R	M62 J25 - J30	
21/09/15 07:41:03	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 07:41:03	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 07:41:03	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 07:41:03	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 07:41:03	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 07:41:16	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 07:41:16	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 07:41:44	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 07:41:55	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 07:41:55	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 07:41:55	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 07:42:03	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 07:42:03	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1955K1	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1955K2	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1956A1	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1956A2	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1956A3	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 07:42:38	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 07:42:42	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:42:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:42:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:42:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:42:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:42:47	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:42:47	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:42:47	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:42:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2004A1	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2008K1	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2008K2	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2012A1	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2012A2	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2012A3	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2018A1	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2018A2	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2018A3	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2018A4	40R	M62 J25 - J30	
21/09/15 07:42:48	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 07:42:50	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 07:43:22	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 07:43:25	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:43:26	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:43:31	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 07:44:18	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 07:44:24	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 07:45:22	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 07:45:22	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 07:45:22	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 07:45:22	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 07:45:27	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 07:45:27	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 07:45:27	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 07:45:27	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 07:45:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:45:46	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:45:51	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:45:52	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 07:45:52	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 07:45:57	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 07:45:57	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1956A1	50R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1956A2	50R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1956A3	50R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1960A1	40R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1960A2	40R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1960A3	40R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 07:46:09	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1955K1	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1955K2	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1956A1	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1956A2	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1956A3	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1960A1	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1960A2	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1960A3	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 07:46:14	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 07:46:25	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 07:46:25	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 07:46:25	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 07:46:29	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:46:29	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 07:46:29	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:46:29	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 07:46:29	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 07:46:30	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:46:35	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:46:58	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:46:58	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:46:58	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:46:58	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 07:46:58	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 07:47:50	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 07:47:50	SIG	M62/2189B2	40R	M62 J25 - J30	
21/09/15 07:47:50	SIG	M62/2189B3	40R	M62 J25 - J30	
21/09/15 07:47:50	SIG	M62/2189B4	40R	M62 J25 - J30	
21/09/15 07:48:53	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 07:48:53	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 07:48:53	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 07:48:53	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 07:48:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:48:57	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:48:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:48:59	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:49:03	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:49:05	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2033A1	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2033A2	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2033A3	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2033A4	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2041A1	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2041A2	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2041A3	60R	M62 J25 - J30	
21/09/15 07:49:10	SIG	M62/2041A4	60R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2033A1	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2033A2	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2033A3	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2033A4	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2041A1	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2041A2	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2041A3	50R	M62 J25 - J30	
21/09/15 07:49:25	SIG	M62/2041A4	50R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2033A1	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2033A2	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2033A3	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2033A4	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2041A1	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2041A2	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2041A3	40R	M62 J25 - J30	
21/09/15 07:49:31	SIG	M62/2041A4	40R	M62 J25 - J30	
21/09/15 07:49:34	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:49:34	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:49:40	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:49:48	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 07:49:48	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 07:50:33	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2057B1	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 07:50:45	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 07:50:56	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 07:50:56	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 07:50:56	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 07:50:56	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 07:51:29	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 07:51:29	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 07:51:29	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 07:51:29	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 07:51:39	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 07:51:39	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 07:51:44	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 07:51:44	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2194B1	60R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2194B2	60R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2194B3	60R	M62 J25 - J30	
21/09/15 07:51:50	SIG	M62/2194B4	60R	M62 J25 - J30	
21/09/15 07:51:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:51:57	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:52:03	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:52:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:52:05	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:52:10	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:52:38	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:52:39	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:52:44	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2189B2	40R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2189B3	40R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2189B4	40R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 07:52:46	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1974A1	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1974A2	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1974A3	40R	M62 J25 - J30	
21/09/15 07:54:02	SIG	M62/1974A4	40R	M62 J25 - J30	
21/09/15 07:54:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:54:58	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:55:03	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:55:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:55:11	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:55:16	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:55:43	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:55:43	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:55:49	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:56:40	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 07:56:40	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 07:57:18	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 07:57:38	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 07:58:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 07:58:01	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 07:58:06	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 07:58:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 07:58:16	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 07:58:22	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 07:58:47	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 07:58:48	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 07:58:53	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 07:59:00	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 07:59:00	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 07:59:40	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 07:59:40	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 07:59:40	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 07:59:40	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 07:59:45	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 07:59:45	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 07:59:45	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 07:59:45	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 08:00:03	SIG	M62/1955K1	40R	M62 J25 - J30	
21/09/15 08:00:03	SIG	M62/1955K2	40R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2197B1	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2197B2	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2197B3	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2199M1	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2199M2	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2203B1	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2203B2	60R	M62 J25 - J30	
21/09/15 08:00:45	SIG	M62/2203B3	60R	M62 J25 - J30	
21/09/15 08:01:00	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 08:01:00	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 08:01:00	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 08:01:00	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 08:01:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:01:05	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:01:06	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 08:01:06	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 08:01:06	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 08:01:06	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 08:01:10	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:01:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:01:28	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:01:29	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 08:01:29	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 08:01:33	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:01:58	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:01:59	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:02:05	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:03:35	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 08:03:35	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 08:03:40	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 08:03:40	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2041A1	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2041A2	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2041A3	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2041A4	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2050A1	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2050A2	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2050A3	50R	M62 J25 - J30	
21/09/15 08:04:03	SIG	M62/2050A4	50R	M62 J25 - J30	
21/09/15 08:04:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:04:09	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:04:14	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:04:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:04:28	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:04:34	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:04:58	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:04:59	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:05:00	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 08:05:00	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 08:05:00	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 08:05:00	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 08:05:04	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:06:15	SIG	M62/2033A1	50R	M62 J25 - J30	
21/09/15 08:06:15	SIG	M62/2033A2	50R	M62 J25 - J30	
21/09/15 08:06:15	SIG	M62/2033A3	50R	M62 J25 - J30	
21/09/15 08:06:15	SIG	M62/2033A4	50R	M62 J25 - J30	
21/09/15 08:06:49	SIG	M62/2050A1	40R	M62 J25 - J30	
21/09/15 08:06:49	SIG	M62/2050A2	40R	M62 J25 - J30	
21/09/15 08:06:49	SIG	M62/2050A3	40R	M62 J25 - J30	
21/09/15 08:06:49	SIG	M62/2050A4	40R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 08:07:00	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 08:07:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:07:12	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:07:18	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1974A1	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1974A2	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1974A3	40R	M62 J25 - J30	
21/09/15 08:07:21	SIG	M62/1974A4	40R	M62 J25 - J30	
21/09/15 08:07:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:07:35	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:07:41	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 08:07:41	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 08:07:41	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 08:07:41	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 08:07:41	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:07:46	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 08:07:46	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 08:07:46	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 08:07:46	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 08:08:01	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:08:02	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:08:07	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:08:30	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:08:30	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 08:08:30	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 08:08:30	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2189B1	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2189B2	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2189B3	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2189B4	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2194B1	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2194B2	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2194B3	60R	M62 J25 - J30	
21/09/15 08:09:44	SIG	M62/2194B4	60R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 08:09:45	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2025A2	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2025A3	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2025A4	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2033A1	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2033A2	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2033A3	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2033A4	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2041A1	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2041A2	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2041A3	40R	M62 J25 - J30	
21/09/15 08:10:08	SIG	M62/2041A4	40R	M62 J25 - J30	
21/09/15 08:10:10	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 08:10:10	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 08:10:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:10:16	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:10:21	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:10:26	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 08:10:26	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 08:10:31	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 08:10:31	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 08:12:12	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 08:12:12	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 08:12:12	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 08:12:12	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 08:12:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:12:45	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:12:50	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:13:10	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:13:10	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:13:16	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:13:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:13:20	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:13:25	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:13:36	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 08:13:36	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 08:13:36	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 08:13:36	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 08:13:42	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 08:13:42	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 08:13:42	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 08:13:42	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2189B1	60R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2189B2	60R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2189B3	60R	M62 J25 - J30	
21/09/15 08:13:45	SIG	M62/2189B4	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2057B1	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 08:14:45	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 08:15:49	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 08:15:49	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 08:16:14	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:16:14	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:16:20	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:16:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:16:24	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 08:16:26	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 08:16:29	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 08:16:33	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:17:42	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:17:45	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 08:17:45	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 08:17:45	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 08:17:45	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 08:17:48	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 08:18:08	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 08:18:17	SIG	M62/2057A1	60R	M62 J25 - J30	
21/09/15 08:18:17	SIG	M62/2057A2	60R	M62 J25 - J30	
21/09/15 08:18:17	SIG	M62/2057A3	60R	M62 J25 - J30	
21/09/15 08:18:17	SIG	M62/2057J1	60R	M62 J25 - J30	
21/09/15 08:18:49	SIG	M62/2041B1	40R	M62 J25 - J30	
21/09/15 08:18:49	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 08:18:49	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 08:18:49	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 08:19:19	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:19:20	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:19:25	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:19:27	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:19:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:19:32	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:19:39	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 08:19:39	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 08:19:39	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 08:19:39	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 08:19:45	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 08:19:45	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 08:19:45	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 08:19:45	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 08:19:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:19:59	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:20:04	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:20:09	SIG	M62/2057A1	50R	M62 J25 - J30	
21/09/15 08:20:09	SIG	M62/2057A2	50R	M62 J25 - J30	
21/09/15 08:20:09	SIG	M62/2057A3	50R	M62 J25 - J30	
21/09/15 08:20:09	SIG	M62/2057J1	50R	M62 J25 - J30	
21/09/15 08:20:14	SIG	M62/2057A1	40R	M62 J25 - J30	
21/09/15 08:20:14	SIG	M62/2057A2	40R	M62 J25 - J30	
21/09/15 08:20:14	SIG	M62/2057A3	40R	M62 J25 - J30	
21/09/15 08:20:14	SIG	M62/2057J1	40R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2189B1	60R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2189B2	60R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2189B3	60R	M62 J25 - J30	
21/09/15 08:21:42	SIG	M62/2189B4	60R	M62 J25 - J30	
21/09/15 08:22:23	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:22:24	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:22:29	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:22:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:22:31	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:22:36	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:22:49	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 08:22:49	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 08:22:49	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 08:22:49	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 08:23:40	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 08:23:44	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 08:23:44	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 08:23:49	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 08:23:49	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 08:24:52	SIG	M62/2041B1	40R	M62 J25 - J30	
21/09/15 08:24:52	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 08:24:52	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 08:24:52	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 08:25:28	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:25:29	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:25:34	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:25:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:25:35	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:25:40	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 08:25:43	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:25:48	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:28:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:28:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:28:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:28:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:28:32	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:28:33	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:28:38	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:28:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:28:39	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:28:44	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2033A1	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2033A2	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2033A3	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2033A4	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2041A1	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2041A2	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2041A3	50R	M62 J25 - J30	
21/09/15 08:29:11	SIG	M62/2041A4	50R	M62 J25 - J30	
21/09/15 08:29:34	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 08:29:34	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 08:29:34	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 08:29:34	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2018A1	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2018A2	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2018A3	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2018A4	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2025A2	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2025A3	40R	M62 J25 - J30	
21/09/15 08:29:48	SIG	M62/2025A4	40R	M62 J25 - J30	
21/09/15 08:29:53	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 08:29:53	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 08:30:06	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 08:30:06	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 08:30:12	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 08:30:12	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 08:31:02	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 08:31:02	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 08:31:02	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 08:31:02	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 08:31:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:31:42	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:31:47	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:31:59	SIG	M62/2041B1	40R	M62 J25 - J30	
21/09/15 08:31:59	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 08:31:59	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 08:31:59	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 08:32:24	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 08:32:24	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 08:32:24	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 08:32:29	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 08:32:39	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:32:40	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:32:45	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 08:33:49	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 08:34:07	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 08:34:07	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 08:34:45	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:34:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:34:51	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2018A1	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2018A2	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2018A3	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2018A4	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2025A2	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2025A3	40R	M62 J25 - J30	
21/09/15 08:35:09	SIG	M62/2025A4	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2033A1	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2033A2	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2033A3	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2033A4	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2041A1	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2041A2	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2041A3	40R	M62 J25 - J30	
21/09/15 08:35:25	SIG	M62/2041A4	40R	M62 J25 - J30	
21/09/15 08:35:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:35:30	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:35:36	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:35:46	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 08:35:46	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 08:35:48	SIG	M62/2057A1	60R	M62 J25 - J30	
21/09/15 08:35:48	SIG	M62/2057A2	60R	M62 J25 - J30	
21/09/15 08:35:48	SIG	M62/2057A3	60R	M62 J25 - J30	
21/09/15 08:35:48	SIG	M62/2057J1	60R	M62 J25 - J30	
21/09/15 08:35:51	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 08:35:51	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 08:35:51	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 08:35:51	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 08:36:00	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 08:36:00	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 08:36:00	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 08:36:00	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 08:37:46	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:37:47	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:37:52	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:37:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:37:58	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 08:38:03	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 08:38:36	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:38:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:38:41	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:38:46	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 08:38:46	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 08:38:46	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 08:38:46	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 08:39:54	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 08:40:18	SIG	M62/2050A1	50R	M62 J25 - J30	
21/09/15 08:40:18	SIG	M62/2050A2	50R	M62 J25 - J30	
21/09/15 08:40:18	SIG	M62/2050A3	50R	M62 J25 - J30	
21/09/15 08:40:18	SIG	M62/2050A4	50R	M62 J25 - J30	
21/09/15 08:40:59	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:40:59	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:41:05	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:41:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:41:43	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:41:48	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:42:40	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 08:42:40	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 08:42:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:42:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:42:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:42:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 08:43:09	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 08:43:09	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 08:43:09	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 08:43:09	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 08:43:36	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 08:43:41	SIG	M62/2041A1	50R	M62 J25 - J30	
21/09/15 08:43:41	SIG	M62/2041A2	50R	M62 J25 - J30	
21/09/15 08:43:41	SIG	M62/2041A3	50R	M62 J25 - J30	
21/09/15 08:43:41	SIG	M62/2041A4	50R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 08:43:42	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 08:43:59	SIG	M62/1956A1	50R	M62 J25 - J30	
21/09/15 08:43:59	SIG	M62/1956A2	50R	M62 J25 - J30	
21/09/15 08:43:59	SIG	M62/1956A3	50R	M62 J25 - J30	
21/09/15 08:43:59	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:43:59	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:44:04	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:44:48	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:44:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:44:54	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 08:45:43	SIG	M62/2057A1	50R	M62 J25 - J30	
21/09/15 08:45:43	SIG	M62/2057A2	50R	M62 J25 - J30	
21/09/15 08:45:43	SIG	M62/2057A3	50R	M62 J25 - J30	
21/09/15 08:45:43	SIG	M62/2057J1	50R	M62 J25 - J30	
21/09/15 08:45:43	SIG	M621/1002A1	50R	M62 J25 - J30	
21/09/15 08:45:43	SIG	M621/1002A2	50R	M62 J25 - J30	
21/09/15 08:45:48	SIG	M62/2057A1	40R	M62 J25 - J30	
21/09/15 08:45:48	SIG	M62/2057A2	40R	M62 J25 - J30	
21/09/15 08:45:48	SIG	M62/2057A3	40R	M62 J25 - J30	
21/09/15 08:45:48	SIG	M62/2057J1	40R	M62 J25 - J30	
21/09/15 08:45:48	SIG	M621/1002A1	40R	M62 J25 - J30	
21/09/15 08:45:48	SIG	M621/1002A2	40R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2189B1	60R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2189B2	60R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2189B3	60R	M62 J25 - J30	
21/09/15 08:46:03	SIG	M62/2189B4	60R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 08:47:00	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 08:47:37	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2018A1	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2018A2	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2018A3	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2018A4	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2025A2	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2025A3	40R	M62 J25 - J30	
21/09/15 08:47:40	SIG	M62/2025A4	40R	M62 J25 - J30	
21/09/15 08:48:49	SIG	M62/1955K1	40R	M62 J25 - J30	
21/09/15 08:48:49	SIG	M62/1955K2	40R	M62 J25 - J30	
21/09/15 08:48:49	SIG	M62/1956A1	40R	M62 J25 - J30	
21/09/15 08:48:49	SIG	M62/1956A2	40R	M62 J25 - J30	
21/09/15 08:48:49	SIG	M62/1956A3	40R	M62 J25 - J30	
21/09/15 08:49:27	SIG	M62/2065A2	50R	M62 J25 - J30	
21/09/15 08:49:27	SIG	M62/2065A3	50R	M62 J25 - J30	
21/09/15 08:49:27	SIG	M62/2065A4	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2073K1	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2079A1	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2079A2	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2079A3	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2079A4	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2088A1	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2088A2	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2088A3	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2088A4	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2097A1	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2097A2	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2097A3	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2097A4	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2106A1	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2106A2	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2106A3	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2106A4	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2114A1	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2114A2	50R	M62 J25 - J30	
21/09/15 08:49:37	SIG	M62/2114A3	50R	M62 J25 - J30	
21/09/15 08:49:43	SIG	M62/2057A1	60R	M62 J25 - J30	
21/09/15 08:49:43	SIG	M62/2057A2	60R	M62 J25 - J30	
21/09/15 08:49:43	SIG	M62/2057A3	60R	M62 J25 - J30	
21/09/15 08:49:43	SIG	M62/2057J1	60R	M62 J25 - J30	
21/09/15 08:49:43	SIG	M621/1002A1	OFF	M62 J25 - J30	
21/09/15 08:49:43	SIG	M621/1002A2	OFF	M62 J25 - J30	
21/09/15 08:49:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:49:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:50:05	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:50:05	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:50:11	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:51:39	SIG	M62/2033A1	50R	M62 J25 - J30	
21/09/15 08:51:39	SIG	M62/2033A2	50R	M62 J25 - J30	
21/09/15 08:51:39	SIG	M62/2033A3	50R	M62 J25 - J30	
21/09/15 08:51:39	SIG	M62/2033A4	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 08:52:26	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 08:52:28	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 08:52:31	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 08:52:38	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 08:52:39	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 08:52:39	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 08:52:40	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 08:52:49	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 08:52:49	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 08:53:10	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:53:10	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:53:15	SIG	M62/2025A1	40R	M62 J25 - J30	
21/09/15 08:53:50	SIG	M62/2025A1	50R	M62 J25 - J30	
21/09/15 08:53:50	SIG	M62/2025A2	50R	M62 J25 - J30	
21/09/15 08:53:50	SIG	M62/2025A3	50R	M62 J25 - J30	
21/09/15 08:53:50	SIG	M62/2025A4	50R	M62 J25 - J30	
21/09/15 08:54:12	SIG	M62/1955K1	40R	M62 J25 - J30	
21/09/15 08:54:12	SIG	M62/1955K2	40R	M62 J25 - J30	
21/09/15 08:55:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:55:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:55:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:55:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 08:55:46	SIG	M62/2050A1	60R	M62 J25 - J30	
21/09/15 08:55:46	SIG	M62/2050A2	60R	M62 J25 - J30	
21/09/15 08:55:46	SIG	M62/2050A3	60R	M62 J25 - J30	
21/09/15 08:55:46	SIG	M62/2050A4	60R	M62 J25 - J30	
21/09/15 08:55:56	SIG	M62/2018A1	50R	M62 J25 - J30	
21/09/15 08:55:56	SIG	M62/2018A2	50R	M62 J25 - J30	
21/09/15 08:55:56	SIG	M62/2018A3	50R	M62 J25 - J30	
21/09/15 08:55:56	SIG	M62/2018A4	50R	M62 J25 - J30	
21/09/15 08:56:14	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 08:56:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 08:58:21	SIG	M62/2008K1	50R	M62 J25 - J30	
21/09/15 08:58:21	SIG	M62/2008K2	50R	M62 J25 - J30	
21/09/15 08:58:21	SIG	M62/2012A1	50R	M62 J25 - J30	
21/09/15 08:58:21	SIG	M62/2012A2	50R	M62 J25 - J30	
21/09/15 08:58:21	SIG	M62/2012A3	50R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 08:58:35	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 09:01:01	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 09:01:01	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 09:01:01	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 09:01:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:01:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:04:02	SIG	M62/2065A2	60R	M62 J25 - J30	
21/09/15 09:04:02	SIG	M62/2065A3	60R	M62 J25 - J30	
21/09/15 09:04:02	SIG	M62/2065A4	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2073K1	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2079A1	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2079A2	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2079A3	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2079A4	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2088A1	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2088A2	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2088A3	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2088A4	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2097A1	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2097A2	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2097A3	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2097A4	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2106A1	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2106A2	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2106A3	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2106A4	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2114A1	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2114A2	60R	M62 J25 - J30	
21/09/15 09:04:11	SIG	M62/2114A3	60R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 09:04:36	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 09:04:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 09:05:03	SIG	M62/1956A1	50R	M62 J25 - J30	
21/09/15 09:05:03	SIG	M62/1956A2	50R	M62 J25 - J30	
21/09/15 09:05:03	SIG	M62/1956A3	50R	M62 J25 - J30	
21/09/15 09:05:45	SIG	M62/2113B1	HSD	M62 J25 - J30	
21/09/15 09:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 09:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 09:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 09:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 09:06:38	SIG	M62/2106B1	HSD	M62 J25 - J30	
21/09/15 09:06:43	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 09:06:43	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 09:06:43	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 09:06:43	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 09:06:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 09:06:49	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 09:06:49	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 09:06:50	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 09:07:46	SIG	M62/2097B1	HSD	M62 J25 - J30	
21/09/15 09:07:46	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 09:07:50	SIG	M62/1960A1	40R	M62 J25 - J30	
21/09/15 09:07:50	SIG	M62/1960A2	40R	M62 J25 - J30	
21/09/15 09:07:50	SIG	M62/1960A3	40R	M62 J25 - J30	
21/09/15 09:07:50	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 09:07:50	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 09:08:54	SIG	M62/2088B1	HSD	M62 J25 - J30	
21/09/15 09:08:54	SIG	M62/2106B1	REDX	M62 J25 - J30	
21/09/15 09:09:46	SIG	M62/2041A1	60R	M62 J25 - J30	
21/09/15 09:09:46	SIG	M62/2041A2	60R	M62 J25 - J30	
21/09/15 09:09:46	SIG	M62/2041A3	60R	M62 J25 - J30	
21/09/15 09:09:46	SIG	M62/2041A4	60R	M62 J25 - J30	
21/09/15 09:10:02	SIG	M62/2097B1	REDX	M62 J25 - J30	
21/09/15 09:10:47	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 09:10:47	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2008K1	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2008K2	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2012A1	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2012A2	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2012A3	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2018A1	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2018A2	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2018A3	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2018A4	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2025A1	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2025A2	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2025A3	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2025A4	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2033A1	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2033A2	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2033A3	60R	M62 J25 - J30	
21/09/15 09:10:47	SIG	M62/2033A4	60R	M62 J25 - J30	
21/09/15 09:10:53	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 09:10:53	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 09:10:53	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 09:10:53	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 09:10:53	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 09:11:10	SIG	M62/2088B1	REDX	M62 J25 - J30	
21/09/15 09:11:17	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 09:11:17	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 09:11:17	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 09:11:17	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 09:11:17	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 09:12:03	SIG	M62/2117B1	NR	M62 J25 - J30	
21/09/15 09:12:03	SIG	M62/2117B3	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2088B2	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2088B3	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2088B4	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2097B2	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2097B4	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2106B2	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2106B3	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2106B4	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2113B2	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2113B3	NR	M62 J25 - J30	
21/09/15 09:12:13	SIG	M62/2113B4	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2074B2	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2074B3	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2074B4	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2081B1	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2081B2	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2081B3	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2081L1	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2120M1	NR	M62 J25 - J30	
21/09/15 09:12:14	SIG	M62/2120M2	NR	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 09:12:16	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2177B1	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2177B2	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2177L1	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2177L2	40R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 09:12:22	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 09:13:03	SIG	M62/2120M1	OFF	M62 J25 - J30	
21/09/15 09:13:03	SIG	M62/2120M2	OFF	M62 J25 - J30	
21/09/15 09:13:04	SIG	M62/2113B1	BLNK	M62 J25 - J30	
21/09/15 09:13:04	SIG	M62/2113B2	OFF	M62 J25 - J30	
21/09/15 09:13:04	SIG	M62/2113B3	OFF	M62 J25 - J30	
21/09/15 09:13:04	SIG	M62/2113B4	OFF	M62 J25 - J30	
21/09/15 09:13:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 09:13:04	SIG	M62/2117B3	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2074B1	BLNK	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2074B2	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2074B3	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2074B4	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2081B1	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2081B2	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2081B3	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2081L1	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2088B1	BLNK	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2088B2	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2088B3	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2088B4	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2097B1	BLNK	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2097B2	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2097B4	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2106B1	BLNK	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2106B2	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2106B3	OFF	M62 J25 - J30	
21/09/15 09:13:14	SIG	M62/2106B4	OFF	M62 J25 - J30	
21/09/15 09:13:41	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 09:13:42	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 09:13:47	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 09:13:47	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 09:14:14	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1979K1	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1979K2	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1981A1	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1981A2	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1981A3	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1981A4	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 09:14:24	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 09:14:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:14:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:14:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:15:16	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 09:15:16	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 09:15:16	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 09:15:16	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 09:15:16	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 09:15:18	SIG	M62/1974A1	40R	M62 J25 - J30	
21/09/15 09:15:18	SIG	M62/1974A2	40R	M62 J25 - J30	
21/09/15 09:15:18	SIG	M62/1974A3	40R	M62 J25 - J30	
21/09/15 09:15:18	SIG	M62/1974A4	40R	M62 J25 - J30	
21/09/15 09:15:46	SIG	M62/2004A1	60R	M62 J25 - J30	
21/09/15 09:15:46	SIG	M62/2004A2	60R	M62 J25 - J30	
21/09/15 09:15:46	SIG	M62/2004A3	60R	M62 J25 - J30	
21/09/15 09:15:49	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 09:15:49	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 09:15:49	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 09:15:49	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 09:15:49	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 09:16:15	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 09:16:15	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 09:16:15	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 09:16:15	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 09:16:16	SIG	M62/2170B1	50R	M62 J25 - J30	
21/09/15 09:16:16	SIG	M62/2170B2	50R	M62 J25 - J30	
21/09/15 09:16:16	SIG	M62/2170L1	50R	M62 J25 - J30	
21/09/15 09:16:16	SIG	M62/2170L2	50R	M62 J25 - J30	
21/09/15 09:16:22	SIG	M62/2170B1	40R	M62 J25 - J30	
21/09/15 09:16:22	SIG	M62/2170B2	40R	M62 J25 - J30	
21/09/15 09:16:22	SIG	M62/2170L1	40R	M62 J25 - J30	
21/09/15 09:16:22	SIG	M62/2170L2	40R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2155A1	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2155A2	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2155J1	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2155K1	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2157A1	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2157A2	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2157J1	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2157J2	50R	M62 J25 - J30	
21/09/15 09:16:45	SIG	M62/2157K1	50R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2151A1	50R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2151A2	50R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2151J1	50R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2151K1	50R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2155A1	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2155A2	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2155J1	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2155K1	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2157A1	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2157A2	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2157J1	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2157J2	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2157K1	40R	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2163A1	NR	M62 J25 - J30	
21/09/15 09:16:50	SIG	M62/2163A2	NR	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/2157A1	50R	M62 J25 - J30	
21/09/15 09:19:27	SIG	M62/2157A1	OFF	M62 J25 - J30	
21/09/15 09:19:33	SIG	M62/2157A1	40R	M62 J25 - J30	
21/09/15 09:19:57	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 09:19:57	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 09:19:57	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 09:19:57	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2151A1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2151A2	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2151J1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2151K1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2155A1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2155A2	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2155J1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2155K1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2157A2	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2157J1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2157J2	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2157K1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2163A1	OFF	M62 J25 - J30	
21/09/15 09:20:45	SIG	M62/2163A2	OFF	M62 J25 - J30	
21/09/15 09:20:47	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 09:20:47	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 09:20:47	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 09:21:18	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 09:21:18	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 09:21:18	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 09:21:18	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 09:21:18	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 09:22:47	SIG	M62/1955K1	60R	M62 J25 - J30	
21/09/15 09:22:47	SIG	M62/1955K2	60R	M62 J25 - J30	
21/09/15 09:22:47	SIG	M62/1956A1	60R	M62 J25 - J30	
21/09/15 09:22:47	SIG	M62/1956A2	60R	M62 J25 - J30	
21/09/15 09:22:47	SIG	M62/1956A3	60R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2177B1	50R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2177B2	50R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2177L1	50R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2177L2	50R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 09:24:42	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 09:24:46	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1999J1	40R	M62 J25 - J30	
21/09/15 09:25:08	SIG	M62/1999J2	40R	M62 J25 - J30	
21/09/15 09:25:47	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 09:25:47	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 09:25:47	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 09:25:47	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 09:25:47	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 09:27:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:27:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 09:29:07	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 09:29:47	SIG	M62/1968A1	60R	M62 J25 - J30	
21/09/15 09:29:47	SIG	M62/1968A2	60R	M62 J25 - J30	
21/09/15 09:29:47	SIG	M62/1968A3	60R	M62 J25 - J30	
21/09/15 09:29:47	SIG	M62/1968A4	60R	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/1974A1	60R	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/1974A2	60R	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/1974A3	60R	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/1974A4	60R	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/2203B1	OFF	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/2203B2	OFF	M62 J25 - J30	
21/09/15 09:31:47	SIG	M62/2203B3	OFF	M62 J25 - J30	
21/09/15 09:32:47	SIG	M62/1979K1	60R	M62 J25 - J30	
21/09/15 09:32:47	SIG	M62/1979K2	60R	M62 J25 - J30	
21/09/15 09:32:47	SIG	M62/1981A1	60R	M62 J25 - J30	
21/09/15 09:32:47	SIG	M62/1981A2	60R	M62 J25 - J30	
21/09/15 09:32:47	SIG	M62/1981A3	60R	M62 J25 - J30	
21/09/15 09:32:47	SIG	M62/1981A4	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1987A1	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1987A3	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1987J1	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1992A1	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1992A2	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1992A3	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1992J1	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1999A1	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1999A2	60R	M62 J25 - J30	
21/09/15 09:34:57	SIG	M62/1999A3	60R	M62 J25 - J30	
21/09/15 09:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 09:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 09:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 09:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 09:55:30	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 09:55:30	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 09:55:30	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 09:55:30	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 09:55:30	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 09:55:30	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 10:00:47	SIG	M62/2197B1	OFF	M62 J25 - J30	
21/09/15 10:00:47	SIG	M62/2197B2	OFF	M62 J25 - J30	
21/09/15 10:00:47	SIG	M62/2197B3	OFF	M62 J25 - J30	
21/09/15 10:00:47	SIG	M62/2199M1	OFF	M62 J25 - J30	
21/09/15 10:00:47	SIG	M62/2199M2	OFF	M62 J25 - J30	
21/09/15 10:03:47	SIG	M62/2159B1	NR	M62 J25 - J30	
21/09/15 10:03:47	SIG	M62/2159B2	NR	M62 J25 - J30	
21/09/15 10:03:47	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 10:03:47	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 10:03:47	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 10:03:47	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 10:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 10:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 10:06:37	SIG	M62/2079A1	HSD	M62 J25 - J30	
21/09/15 10:06:48	SIG	M62/2159B1	OFF	M62 J25 - J30	
21/09/15 10:06:48	SIG	M62/2159B2	OFF	M62 J25 - J30	
21/09/15 10:07:45	SIG	M62/2088A1	HSD	M62 J25 - J30	
21/09/15 10:08:53	SIG	M62/2079A1	REDX	M62 J25 - J30	
21/09/15 10:08:53	SIG	M62/2097A1	HSD	M62 J25 - J30	
21/09/15 10:10:01	SIG	M62/2088A1	REDX	M62 J25 - J30	
21/09/15 10:10:01	SIG	M62/2106A1	HSD	M62 J25 - J30	
21/09/15 10:11:09	SIG	M62/2097A1	REDX	M62 J25 - J30	
21/09/15 10:12:17	SIG	M62/2106A1	REDX	M62 J25 - J30	
21/09/15 10:13:17	SIG	M62/2065A2	NR	M62 J25 - J30	
21/09/15 10:13:17	SIG	M62/2065A3	NR	M62 J25 - J30	
21/09/15 10:13:17	SIG	M62/2065A4	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2073K1	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2079A2	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2079A3	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2079A4	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2088A2	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2088A3	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2088A4	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2097A2	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2097A3	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2097A4	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2106A2	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2106A3	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2106A4	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2114A1	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2114A2	NR	M62 J25 - J30	
21/09/15 10:13:28	SIG	M62/2114A3	NR	M62 J25 - J30	
21/09/15 10:14:35	SIG	M62/2073K1	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2079A1	BLNK	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2079A2	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2079A3	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2079A4	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2088A1	BLNK	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2088A2	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2088A3	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2088A4	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2097A1	BLNK	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2097A2	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2097A3	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2097A4	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2106A1	BLNK	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2106A2	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2106A4	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2114A1	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2114A2	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2114A3	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2117A1	BLNK	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2117A2	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2117A3	OFF	M62 J25 - J30	
21/09/15 10:14:55	SIG	M62/2117A4	OFF	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2177B1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2177B2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2177L1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2177L2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2183B1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2183B2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2183L1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2183L2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2189B1	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2189B2	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2189B3	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2189B4	NR	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2194B1	OFF	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2194B2	OFF	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2194B3	OFF	M62 J25 - J30	
21/09/15 10:16:48	SIG	M62/2194B4	OFF	M62 J25 - J30	
21/09/15 10:19:48	SIG	M62/2189B1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2170B1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2170B2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2170L1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2170L2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2177B1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2177B2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2177L1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2177L2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2183B1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2183L1	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2183L2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2189B2	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2189B3	OFF	M62 J25 - J30	
21/09/15 10:19:49	SIG	M62/2189B4	OFF	M62 J25 - J30	
21/09/15 10:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 10:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 10:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 10:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2170A1	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2170A2	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2170K1	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2170K2	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2177A1	REDX	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2177A2	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2177A3	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2177A4	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2183A1	REDX	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2183A2	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2183A3	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2183A4	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2189A1	REDX	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2189A2	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2189A3	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2189A4	50R	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2197A1	NR	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2197A2	NR	M62 J25 - J30	
21/09/15 10:41:17	SIG	M62/2197A3	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2170A1	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2170A2	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2170K1	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2170K2	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2177A1	BLNK	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2177A2	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2177A3	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2177A4	OFF	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2183A2	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2183A3	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2183A4	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2189A2	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2189A3	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2189A4	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2197A1	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2197A2	NR	M62 J25 - J30	
21/09/15 10:50:43	SIG	M62/2197A3	NR	M62 J25 - J30	
21/09/15 10:53:43	SIG	M62/2183A2	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2183A1	BLNK	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2183A3	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2183A4	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2189A1	BLNK	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2189A2	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2189A3	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2189A4	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2197A1	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2197A2	OFF	M62 J25 - J30	
21/09/15 10:53:44	SIG	M62/2197A3	OFF	M62 J25 - J30	
21/09/15 10:53:45	SIG	M62/2189A1	BLNK	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1955K1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1955K2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1956A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1956A2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1956A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1960A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1960A2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1960A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1960K1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1960K2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1968A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1968A2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1968A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1968A4	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1974A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1974A2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1974A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1974A4	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1979K1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1979K2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1981A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1981A2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1981A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1981A4	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1987A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1987A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1987J1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1992A1	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1992A2	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1992A3	OFF	M62 J25 - J30	
21/09/15 11:03:58	SIG	M62/1992J1	OFF	M62 J25 - J30	
21/09/15 11:06:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 11:06:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 11:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 11:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 11:17:44	SIG	M62/2057B1	HSD	M62 J25 - J30	
21/09/15 11:19:43	SIG	M62/2041B1	HSD	M62 J25 - J30	
21/09/15 11:19:43	SIG	M62/2057B1	REDX	M62 J25 - J30	
21/09/15 11:19:43	SIG	M621/1002B1	HSD	M62 J25 - J30	
21/09/15 11:19:43	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 11:19:43	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 11:20:43	SIG	M62/2033B1	HSD	M62 J25 - J30	
21/09/15 11:21:43	SIG	M62/2025B1	HSD	M62 J25 - J30	
21/09/15 11:21:43	SIG	M62/2041B1	REDX	M62 J25 - J30	
21/09/15 11:22:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 11:23:19	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 11:23:49	SIG	M62/2065B2	NR	M62 J25 - J30	
21/09/15 11:23:49	SIG	M62/2065B3	NR	M62 J25 - J30	
21/09/15 11:23:49	SIG	M62/2065B4	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2018B1	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2018B2	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2018B3	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2018L1	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2025B2	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2025B3	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2025B4	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2033B2	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2033B3	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2033B4	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2041B2	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2041B3	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2041B4	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2050B2	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2050B3	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2050B4	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2057B2	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2057B3	NR	M62 J25 - J30	
21/09/15 11:23:50	SIG	M62/2057B4	NR	M62 J25 - J30	
21/09/15 11:24:49	SIG	M62/2069M1	OFF	M62 J25 - J30	
21/09/15 11:24:49	SIG	M62/2069M2	OFF	M62 J25 - J30	
21/09/15 11:24:49	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 11:24:49	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2041B1	BLNK	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2041B2	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2041B3	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2041B4	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2050B2	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2050B3	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2050B4	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2057B1	BLNK	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2057B2	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2057B3	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2057B4	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2065B1	BLNK	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2065B2	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2065B3	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2065B4	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M62/2065M1	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M621/1002B1	OFF	M62 J25 - J30	
21/09/15 11:24:50	SIG	M621/1002B2	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2012B1	BLNK	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2012B2	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2012B3	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2012B4	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2018B1	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2018B2	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2018B3	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2018L1	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2025B2	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2025B3	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2025B4	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2033B2	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2033B4	OFF	M62 J25 - J30	
21/09/15 11:24:51	SIG	M62/2041B2	OFF	M62 J25 - J30	
21/09/15 11:35:54	SIG	M62/1960B1	50R	M62 J25 - J30	
21/09/15 11:35:54	SIG	M62/1960B2	50R	M62 J25 - J30	
21/09/15 11:35:54	SIG	M62/1960B3	50R	M62 J25 - J30	
21/09/15 11:35:54	SIG	M62/1960L1	50R	M62 J25 - J30	
21/09/15 11:35:54	SIG	M62/1960L2	50R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1960B1	40R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1960B2	40R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1960B3	40R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1960L1	40R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1960L2	40R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1968B1	50R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1968B2	50R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1968B3	50R	M62 J25 - J30	
21/09/15 11:36:00	SIG	M62/1968L1	50R	M62 J25 - J30	
21/09/15 11:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 11:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/1999A1	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/1999A2	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/1999A3	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/1999J1	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/1999J2	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/2004A1	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/2004A2	OFF	M62 J25 - J30	
21/09/15 11:37:49	SIG	M62/2004A3	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1960B1	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1960B2	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1960B3	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1960L1	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1960L2	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1968B1	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1968B2	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1968B3	OFF	M62 J25 - J30	
21/09/15 11:39:54	SIG	M62/1968L1	OFF	M62 J25 - J30	
21/09/15 11:59:49	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 12:00:04	SIG	M62/2065A2	50R	M62 J25 - J30	
21/09/15 12:00:04	SIG	M62/2065A3	50R	M62 J25 - J30	
21/09/15 12:00:04	SIG	M62/2065A4	50R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2057A1	50R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2057A2	50R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2057A3	50R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2057J1	50R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2065A2	40R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2065A3	40R	M62 J25 - J30	
21/09/15 12:00:09	SIG	M62/2065A4	40R	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2057A1	60R	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2057A2	60R	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2057A3	60R	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2057J1	60R	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2065A2	NR	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2065A3	NR	M62 J25 - J30	
21/09/15 12:02:59	SIG	M62/2065A4	NR	M62 J25 - J30	
21/09/15 12:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 12:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 12:08:17	SIG	M62/2074B1	OFF	M62 J25 - J30	
21/09/15 12:08:18	SIG	M62/2074B1	BLNK	M62 J25 - J30	
21/09/15 12:08:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
21/09/15 12:08:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
21/09/15 12:08:22	SIG	M62/2074A1	BLNK	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 12:20:48	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2012B1	REDX	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2012B2	NR	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2012B3	NR	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2012B4	NR	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:20:53	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 12:23:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:23:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:23:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:23:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2041B1	REDX	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 12:24:50	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M62/2057B1	REDX	M62 J25 - J30	
21/09/15 12:25:50	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M621/1002B1	HSD	M62 J25 - J30	
21/09/15 12:25:50	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 12:25:50	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 12:27:26	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 12:27:26	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 12:27:32	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 12:27:32	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:27:32	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 12:27:32	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 12:27:32	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 12:27:32	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 12:27:50	SIG	M62/2065B1	REDX	M62 J25 - J30	
21/09/15 12:27:50	SIG	M62/2065B2	60R	M62 J25 - J30	
21/09/15 12:27:50	SIG	M62/2065B3	60R	M62 J25 - J30	
21/09/15 12:27:50	SIG	M62/2065B4	60R	M62 J25 - J30	
21/09/15 12:28:18	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 12:28:18	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 12:28:18	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 12:30:26	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:30:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:30:32	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:30:53	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 12:30:53	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 12:30:53	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 12:30:59	SIG	M62/2050B2	40R	M62 J25 - J30	
21/09/15 12:30:59	SIG	M62/2050B3	40R	M62 J25 - J30	
21/09/15 12:30:59	SIG	M62/2050B4	40R	M62 J25 - J30	
21/09/15 12:30:59	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 12:30:59	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 12:30:59	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 12:31:50	SIG	M62/2069M1	60R	M62 J25 - J30	
21/09/15 12:31:50	SIG	M62/2069M2	60R	M62 J25 - J30	
21/09/15 12:31:50	SIG	M62/2074B1	REDX	M62 J25 - J30	
21/09/15 12:31:50	SIG	M62/2074B2	60R	M62 J25 - J30	
21/09/15 12:31:50	SIG	M62/2074B3	60R	M62 J25 - J30	
21/09/15 12:31:50	SIG	M62/2074B4	60R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2065B2	50R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2065B3	50R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2065B4	50R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 12:32:36	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 12:33:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:33:30	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:33:35	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M62/2065B2	40R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M62/2065B3	40R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M62/2065B4	40R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M62/2065M1	40R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M62/2069M1	50R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M62/2069M2	50R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M621/1002B2	40R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M621/1010B1	50R	M62 J25 - J30	
21/09/15 12:34:37	SIG	M621/1010B2	50R	M62 J25 - J30	
21/09/15 12:36:10	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 12:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 12:36:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:36:34	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:36:39	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:38:50	SIG	M62/2081B1	60R	M62 J25 - J30	
21/09/15 12:38:50	SIG	M62/2081B2	60R	M62 J25 - J30	
21/09/15 12:38:50	SIG	M62/2081B3	60R	M62 J25 - J30	
21/09/15 12:38:50	SIG	M62/2081L1	60R	M62 J25 - J30	
21/09/15 12:39:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:39:38	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:39:43	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:42:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:42:42	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:42:47	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:45:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:45:45	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M62/2069M1	40R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M62/2069M2	40R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M62/2074B2	50R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M62/2074B3	50R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M62/2074B4	50R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M621/1010B1	40R	M62 J25 - J30	
21/09/15 12:45:51	SIG	M621/1010B2	40R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2074B2	40R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2074B3	40R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2074B4	40R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M621/1010B1	40R	M62 J25 - J30	
21/09/15 12:45:57	SIG	M621/1010B2	40R	M62 J25 - J30	
21/09/15 12:48:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:48:59	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:49:04	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:50:28	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 12:50:28	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 12:50:28	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 12:50:28	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 12:50:28	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 12:50:28	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 12:51:38	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 12:51:38	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 12:51:38	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 12:51:38	SIG	M62/2050B2	40R	M62 J25 - J30	
21/09/15 12:51:38	SIG	M62/2050B3	40R	M62 J25 - J30	
21/09/15 12:51:38	SIG	M62/2050B4	40R	M62 J25 - J30	
21/09/15 12:51:58	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:51:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:52:04	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:52:34	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 12:52:34	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 12:52:34	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 12:52:34	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 12:52:34	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 12:52:34	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 12:54:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:54:58	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:55:04	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:55:37	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 12:55:37	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 12:55:37	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 12:55:37	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 12:55:37	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 12:55:37	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2088B1	REDX	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2097B1	REDX	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2097B2	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2097B4	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2106B1	REDX	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2106B2	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2106B3	60R	M62 J25 - J30	
21/09/15 12:56:00	SIG	M62/2106B4	60R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2081B1	40R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2081B2	40R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2081B3	40R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2081L1	40R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 12:57:20	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 12:58:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:58:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:58:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:58:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 12:58:38	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 12:58:38	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 12:58:38	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 12:58:38	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 12:58:38	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 12:58:43	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 12:58:43	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 12:58:43	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 12:58:43	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 12:58:43	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 12:58:43	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 12:59:51	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 12:59:51	SIG	M62/2113B2	60R	M62 J25 - J30	
21/09/15 12:59:51	SIG	M62/2113B3	60R	M62 J25 - J30	
21/09/15 12:59:51	SIG	M62/2113B4	60R	M62 J25 - J30	
21/09/15 13:01:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:01:05	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:01:10	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 13:01:30	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 13:02:38	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 13:02:38	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 13:02:38	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 13:04:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:04:09	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:04:14	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 13:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 13:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 13:06:20	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 13:06:20	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 13:06:20	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 13:06:41	SIG	M62/2050B2	40R	M62 J25 - J30	
21/09/15 13:06:41	SIG	M62/2050B3	40R	M62 J25 - J30	
21/09/15 13:06:41	SIG	M62/2050B4	40R	M62 J25 - J30	
21/09/15 13:06:41	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 13:06:41	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 13:06:41	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 13:07:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:07:12	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:07:18	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 13:10:12	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 13:10:12	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 13:10:12	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 13:10:12	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 13:10:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:10:16	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:10:21	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2069M1	50R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2069M2	50R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2074B2	50R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2074B3	50R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2074B4	50R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2081B1	60R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2081B2	60R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2081B3	60R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M62/2081L1	60R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M621/1010B1	50R	M62 J25 - J30	
21/09/15 13:10:25	SIG	M621/1010B2	50R	M62 J25 - J30	
21/09/15 13:11:11	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 13:11:11	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 13:11:11	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 13:11:52	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 13:11:52	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:11:52	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 13:13:16	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 13:13:16	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 13:13:16	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 13:13:22	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 13:13:22	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 13:13:22	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 13:13:22	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 13:13:22	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 13:13:22	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 13:14:39	SIG	M62/2069M1	40R	M62 J25 - J30	
21/09/15 13:14:39	SIG	M62/2069M2	40R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2074B2	40R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2074B3	40R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2074B4	40R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M621/1010B1	40R	M62 J25 - J30	
21/09/15 13:14:40	SIG	M621/1010B2	40R	M62 J25 - J30	
21/09/15 13:16:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:16:23	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:16:28	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 13:17:22	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 13:17:22	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 13:17:22	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 13:19:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:19:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:19:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:19:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:20:12	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 13:20:12	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 13:20:12	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 13:20:12	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 13:20:12	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 13:20:12	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 13:21:30	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 13:21:30	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 13:21:30	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 13:26:51	SIG	M62/2018B1	NR	M62 J25 - J30	
21/09/15 13:26:51	SIG	M62/2018B2	NR	M62 J25 - J30	
21/09/15 13:26:51	SIG	M62/2018B3	NR	M62 J25 - J30	
21/09/15 13:26:51	SIG	M62/2018L1	NR	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 13:28:51	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 13:31:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:31:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:31:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:31:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 13:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 13:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 13:41:38	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 13:41:38	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 13:41:38	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 13:45:38	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 13:45:38	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 13:45:38	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2081B1	40R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2081B2	40R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2081B3	40R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2081L1	40R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 13:55:40	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 13:56:24	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 13:56:24	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 13:56:24	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 14:00:02	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 14:01:24	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 14:01:24	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 14:01:24	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 14:02:15	SIG	M62/2004A1	60R	M62 J25 - J30	
21/09/15 14:02:15	SIG	M62/2004A2	60R	M62 J25 - J30	
21/09/15 14:02:15	SIG	M62/2004A3	60R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1974A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 14:02:28	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 14:03:06	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 14:03:06	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 14:03:06	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2012B1	BLNK	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2012B2	OFF	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2012B3	OFF	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2012B4	OFF	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2018B1	OFF	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2018B2	OFF	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2018B3	OFF	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2018L1	NR	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2025B2	NR	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2025B3	NR	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2025B4	NR	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2033B2	NR	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2033B3	NR	M62 J25 - J30	
21/09/15 14:05:52	SIG	M62/2033B4	NR	M62 J25 - J30	
21/09/15 14:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 14:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2081B1	40R	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2081B2	40R	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2081B3	40R	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2081L1	40R	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 14:07:35	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 14:07:38	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 14:07:38	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 14:07:38	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 14:07:52	SIG	M62/2033B2	NR	M62 J25 - J30	
21/09/15 14:07:52	SIG	M62/2033B3	NR	M62 J25 - J30	
21/09/15 14:07:52	SIG	M62/2033B4	NR	M62 J25 - J30	
21/09/15 14:07:52	SIG	M62/2041B2	NR	M62 J25 - J30	
21/09/15 14:07:52	SIG	M62/2041B3	NR	M62 J25 - J30	
21/09/15 14:07:52	SIG	M62/2041B4	NR	M62 J25 - J30	
21/09/15 14:08:02	SIG	M62/2097B2	50R	M62 J25 - J30	
21/09/15 14:08:02	SIG	M62/2097B4	50R	M62 J25 - J30	
21/09/15 14:08:42	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 14:08:42	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 14:08:42	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 14:08:52	SIG	M62/2025B2	OFF	M62 J25 - J30	
21/09/15 14:08:53	SIG	M62/2018L1	OFF	M62 J25 - J30	
21/09/15 14:08:53	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 14:08:53	SIG	M62/2025B3	OFF	M62 J25 - J30	
21/09/15 14:08:53	SIG	M62/2025B4	OFF	M62 J25 - J30	
21/09/15 14:10:25	SIG	M62/2088B2	40R	M62 J25 - J30	
21/09/15 14:10:25	SIG	M62/2088B3	40R	M62 J25 - J30	
21/09/15 14:10:25	SIG	M62/2088B4	40R	M62 J25 - J30	
21/09/15 14:10:52	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 14:10:52	SIG	M62/2033B2	OFF	M62 J25 - J30	
21/09/15 14:10:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:10:52	SIG	M62/2033B4	OFF	M62 J25 - J30	
21/09/15 14:13:57	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 14:13:57	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 14:13:57	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 14:14:26	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 14:14:26	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 14:14:26	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 14:17:52	SIG	M62/1955K1	60R	M62 J25 - J30	
21/09/15 14:17:52	SIG	M62/1955K2	60R	M62 J25 - J30	
21/09/15 14:17:52	SIG	M62/1956A1	60R	M62 J25 - J30	
21/09/15 14:17:52	SIG	M62/1956A2	60R	M62 J25 - J30	
21/09/15 14:17:52	SIG	M62/1956A3	60R	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2033B2	NR	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2033B3	NR	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2033B4	NR	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 14:17:54	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2012B1	REDX	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2012B2	NR	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2012B3	NR	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2012B4	NR	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 14:17:55	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 14:18:01	SIG	M62/2088B2	40R	M62 J25 - J30	
21/09/15 14:18:01	SIG	M62/2088B3	40R	M62 J25 - J30	
21/09/15 14:18:01	SIG	M62/2088B4	40R	M62 J25 - J30	
21/09/15 14:19:20	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 14:19:43	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 14:20:01	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 14:20:20	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 14:20:25	SIG	M62/2057B1	50R	M62 J25 - J30	
21/09/15 14:20:25	SIG	M621/1002B1	40R	M62 J25 - J30	
21/09/15 14:20:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:20:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:20:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:20:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2106B2	50R	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2106B3	50R	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2106B4	50R	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2117B1	60R	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2117B3	60R	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2120M1	60R	M62 J25 - J30	
21/09/15 14:20:52	SIG	M62/2120M2	60R	M62 J25 - J30	
21/09/15 14:23:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:23:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:23:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:23:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:27:25	SIG	M62/2065B2	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M62/2065B3	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M62/2065B4	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M62/2069M1	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M62/2069M2	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M621/1010B1	50R	M62 J25 - J30	
21/09/15 14:27:25	SIG	M621/1010B2	50R	M62 J25 - J30	
21/09/15 14:27:54	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 14:27:54	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 14:27:54	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 14:28:38	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 14:28:38	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 14:28:38	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 14:28:38	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 14:30:42	SIG	M62/2074B2	50R	M62 J25 - J30	
21/09/15 14:30:42	SIG	M62/2074B3	50R	M62 J25 - J30	
21/09/15 14:30:42	SIG	M62/2074B4	50R	M62 J25 - J30	
21/09/15 14:33:52	SIG	M62/2106B2	60R	M62 J25 - J30	
21/09/15 14:33:52	SIG	M62/2106B3	60R	M62 J25 - J30	
21/09/15 14:33:52	SIG	M62/2106B4	60R	M62 J25 - J30	
21/09/15 14:34:52	SIG	M62/2125B1	60R	M62 J25 - J30	
21/09/15 14:34:52	SIG	M62/2125B2	60R	M62 J25 - J30	
21/09/15 14:34:52	SIG	M62/2125B3	60R	M62 J25 - J30	
21/09/15 14:34:52	SIG	M62/2125L1	60R	M62 J25 - J30	
21/09/15 14:34:52	SIG	M62/2125L2	60R	M62 J25 - J30	
21/09/15 14:35:53	SIG	M62/2057B1	60R	M62 J25 - J30	
21/09/15 14:35:53	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 14:35:53	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 14:35:53	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2081B1	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2081B2	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2081B3	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2081L1	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2097B2	60R	M62 J25 - J30	
21/09/15 14:36:02	SIG	M62/2097B4	60R	M62 J25 - J30	
21/09/15 14:36:10	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 14:36:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 14:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 14:36:52	SIG	M62/2069M1	60R	M62 J25 - J30	
21/09/15 14:36:52	SIG	M62/2069M2	60R	M62 J25 - J30	
21/09/15 14:36:52	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 14:36:52	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2065B2	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2065B3	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2065B4	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2074B2	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2074B3	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M62/2074B4	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M621/1002B1	60R	M62 J25 - J30	
21/09/15 14:37:52	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 14:45:12	SIG	M62/2004A1	NR	M62 J25 - J30	
21/09/15 14:45:12	SIG	M62/2004A2	NR	M62 J25 - J30	
21/09/15 14:45:12	SIG	M62/2004A3	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1960A1	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1960A2	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1960A3	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1960K1	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1960K2	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1968A1	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1968A2	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1968A3	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1968A4	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1974A1	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1974A2	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1974A3	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1974A4	60R	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1979K1	OFF	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1979K2	OFF	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1981A1	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1981A2	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1981A3	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1981A4	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1987A1	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1987A3	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1987J1	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1992A1	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1992A2	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1992A3	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1992J1	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1999A1	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1999A2	NR	M62 J25 - J30	
21/09/15 14:45:25	SIG	M62/1999A3	NR	M62 J25 - J30	
21/09/15 14:46:52	SIG	M62/2117B1	NR	M62 J25 - J30	
21/09/15 14:46:52	SIG	M62/2117B3	NR	M62 J25 - J30	
21/09/15 14:46:52	SIG	M62/2120M1	OFF	M62 J25 - J30	
21/09/15 14:46:52	SIG	M62/2120M2	OFF	M62 J25 - J30	
21/09/15 14:46:53	SIG	M62/2125B1	OFF	M62 J25 - J30	
21/09/15 14:46:53	SIG	M62/2125B2	OFF	M62 J25 - J30	
21/09/15 14:46:53	SIG	M62/2125B3	OFF	M62 J25 - J30	
21/09/15 14:46:53	SIG	M62/2125L1	NR	M62 J25 - J30	
21/09/15 14:46:53	SIG	M62/2125L2	NR	M62 J25 - J30	
21/09/15 14:48:12	SIG	M62/2004A1	OFF	M62 J25 - J30	
21/09/15 14:48:12	SIG	M62/2004A2	OFF	M62 J25 - J30	
21/09/15 14:48:12	SIG	M62/2004A3	OFF	M62 J25 - J30	
21/09/15 14:48:25	SIG	M62/1987J1	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1987A1	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1987A3	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1992A1	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1992A2	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1992A3	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1992J1	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1999A1	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1999A2	OFF	M62 J25 - J30	
21/09/15 14:48:36	SIG	M62/1999A3	OFF	M62 J25 - J30	
21/09/15 14:48:53	SIG	M62/2113B1	BLNK	M62 J25 - J30	
21/09/15 14:48:53	SIG	M62/2113B2	OFF	M62 J25 - J30	
21/09/15 14:48:53	SIG	M62/2113B3	OFF	M62 J25 - J30	
21/09/15 14:48:53	SIG	M62/2113B4	OFF	M62 J25 - J30	
21/09/15 14:49:53	SIG	M62/2125L1	OFF	M62 J25 - J30	
21/09/15 14:49:53	SIG	M62/2125L2	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2081B1	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2081B2	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2081B3	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2081L1	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2088B1	BLNK	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2088B2	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2088B3	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2088B4	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2097B1	BLNK	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2097B2	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2097B4	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2106B1	BLNK	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2106B2	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2106B3	OFF	M62 J25 - J30	
21/09/15 14:50:02	SIG	M62/2106B4	OFF	M62 J25 - J30	
21/09/15 14:50:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:50:03	SIG	M62/2117B3	OFF	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2088B1	REDX	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2097B1	REDX	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2097B2	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2097B4	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2106B1	REDX	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2106B2	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2106B3	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2106B4	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2113B2	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2113B3	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2113B4	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2117B3	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2120M1	50R	M62 J25 - J30	
21/09/15 14:56:18	SIG	M62/2120M2	50R	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1955K1	OFF	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1955K2	OFF	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1956A1	OFF	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1956A2	OFF	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1960A1	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1960A2	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1960A3	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1960K1	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1960K2	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1968A1	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1968A2	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1968A3	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1968A4	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1974A1	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1974A2	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1974A3	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1974A4	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1981A1	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1981A2	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1981A3	NR	M62 J25 - J30	
21/09/15 14:56:53	SIG	M62/1981A4	NR	M62 J25 - J30	
21/09/15 14:58:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:58:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:58:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:58:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 14:59:53	SIG	M62/1960A1	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1960A2	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1960A3	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1960K1	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1960K2	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1968A1	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1968A2	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1968A3	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1968A4	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1974A1	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1974A2	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1974A3	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1974A4	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1981A1	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1981A2	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1981A3	OFF	M62 J25 - J30	
21/09/15 14:59:54	SIG	M62/1981A4	OFF	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2125B1	50R	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2125B2	50R	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2125B3	50R	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2125L1	NR	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2125L2	NR	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2132B1	50R	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2132B2	50R	M62 J25 - J30	
21/09/15 15:00:39	SIG	M62/2132B3	50R	M62 J25 - J30	
21/09/15 15:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 15:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 15:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 15:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2125B1	NR	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2125B2	NR	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2125B3	NR	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2125L1	NR	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2125L2	NR	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2132B1	OFF	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2132B2	OFF	M62 J25 - J30	
21/09/15 15:06:49	SIG	M62/2132B3	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2081B1	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2081B2	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2081B3	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2081L1	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2088B2	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2088B3	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2088B4	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2097B2	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2097B4	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2106B2	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2106B3	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2106B4	NR	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2113B1	BLNK	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2113B2	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2113B3	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2113B4	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2117B3	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2120M1	OFF	M62 J25 - J30	
21/09/15 15:06:58	SIG	M62/2120M2	OFF	M62 J25 - J30	
21/09/15 15:09:49	SIG	M62/2125B1	OFF	M62 J25 - J30	
21/09/15 15:09:49	SIG	M62/2125B2	OFF	M62 J25 - J30	
21/09/15 15:09:49	SIG	M62/2125B3	OFF	M62 J25 - J30	
21/09/15 15:09:49	SIG	M62/2125L1	OFF	M62 J25 - J30	
21/09/15 15:09:49	SIG	M62/2125L2	OFF	M62 J25 - J30	
21/09/15 15:09:59	SIG	M62/2106B2	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2081B1	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2081B2	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2081B3	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2081L1	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2088B1	BLNK	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2088B2	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2088B3	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2088B4	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2097B1	BLNK	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2097B2	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2097B4	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2106B1	BLNK	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2106B3	OFF	M62 J25 - J30	
21/09/15 15:10:09	SIG	M62/2106B4	OFF	M62 J25 - J30	
21/09/15 15:20:53	SIG	M62/2074B1	BLNK	M62 J25 - J30	
21/09/15 15:20:53	SIG	M62/2074B2	OFF	M62 J25 - J30	
21/09/15 15:20:53	SIG	M62/2074B3	OFF	M62 J25 - J30	
21/09/15 15:20:53	SIG	M62/2074B4	OFF	M62 J25 - J30	
21/09/15 15:20:53	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 15:20:53	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 15:29:50	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 15:29:50	SIG	M62/2113B2	NR	M62 J25 - J30	
21/09/15 15:29:50	SIG	M62/2113B3	NR	M62 J25 - J30	
21/09/15 15:29:50	SIG	M62/2113B4	NR	M62 J25 - J30	
21/09/15 15:29:50	SIG	M62/2120M1	50R	M62 J25 - J30	
21/09/15 15:29:50	SIG	M62/2120M2	50R	M62 J25 - J30	
21/09/15 15:34:42	SIG	M62/2113B1	BLNK	M62 J25 - J30	
21/09/15 15:34:42	SIG	M62/2113B2	OFF	M62 J25 - J30	
21/09/15 15:34:42	SIG	M62/2113B3	OFF	M62 J25 - J30	
21/09/15 15:34:42	SIG	M62/2113B4	OFF	M62 J25 - J30	
21/09/15 15:34:42	SIG	M62/2120M1	OFF	M62 J25 - J30	
21/09/15 15:34:42	SIG	M62/2120M2	OFF	M62 J25 - J30	
21/09/15 15:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 15:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 15:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 15:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2065A2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2065A3	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2065A4	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2073K1	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2073K2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2074A1	REDX	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2074A2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2074A3	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2074A4	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A1	REDX	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A2	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A3	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A3	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A4	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2079A4	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2088A1	REDX	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2088A2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2088A3	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2088A4	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2097A1	REDX	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2097A2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2097A3	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2097A4	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2106A1	REDX	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2106A2	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2106A3	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2106A4	60R	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2114A1	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2114A2	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2114A3	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2117A1	REDX	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2117A2	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2117A3	NR	M62 J25 - J30	
21/09/15 15:50:25	SIG	M62/2117A4	NR	M62 J25 - J30	
21/09/15 15:50:26	SIG	M62/2114A1	60R	M62 J25 - J30	
21/09/15 15:50:26	SIG	M62/2114A2	60R	M62 J25 - J30	
21/09/15 15:50:26	SIG	M62/2114A3	60R	M62 J25 - J30	
21/09/15 15:52:19	SIG	M62/2106A1	60R	M62 J25 - J30	
21/09/15 15:52:42	SIG	M62/2097A1	60R	M62 J25 - J30	
21/09/15 15:53:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 15:53:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 15:53:03	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 15:53:04	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 15:53:07	SIG	M62/2088A1	60R	M62 J25 - J30	
21/09/15 15:53:11	SIG	M62/2079A1	60R	M62 J25 - J30	
21/09/15 15:59:52	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 15:59:52	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 16:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 16:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 16:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:07:04	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 16:07:04	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 16:07:04	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 16:07:04	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1968A1	40R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1968A2	40R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1968A3	40R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1968A4	40R	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1974A1	NR	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1974A2	NR	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1974A3	NR	M62 J25 - J30	
21/09/15 16:07:10	SIG	M62/1974A4	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1960A1	OFF	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1960A2	OFF	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1960A3	OFF	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1960K1	OFF	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1960K2	OFF	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1968A1	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1968A2	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1968A3	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1968A4	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1974A1	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1974A2	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1974A3	NR	M62 J25 - J30	
21/09/15 16:11:04	SIG	M62/1974A4	NR	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1968A1	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1968A2	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1968A3	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1968A4	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1974A1	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1974A2	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1974A3	OFF	M62 J25 - J30	
21/09/15 16:14:04	SIG	M62/1974A4	OFF	M62 J25 - J30	
21/09/15 16:15:04	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 16:15:04	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 16:16:54	SIG	M62/2081B1	60R	M62 J25 - J30	
21/09/15 16:16:54	SIG	M62/2081B2	60R	M62 J25 - J30	
21/09/15 16:16:54	SIG	M62/2081B3	60R	M62 J25 - J30	
21/09/15 16:16:54	SIG	M62/2081L1	60R	M62 J25 - J30	
21/09/15 16:17:18	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 16:17:18	SIG	M62/2113B2	NR	M62 J25 - J30	
21/09/15 16:17:18	SIG	M62/2113B3	NR	M62 J25 - J30	
21/09/15 16:17:18	SIG	M62/2113B4	NR	M62 J25 - J30	
21/09/15 16:17:18	SIG	M62/2120M1	60R	M62 J25 - J30	
21/09/15 16:17:18	SIG	M62/2120M2	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2088B1	REDX	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2097B1	REDX	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2097B2	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2097B4	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2106B1	REDX	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2106B2	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2106B3	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2106B4	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2113B2	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2113B3	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2113B4	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2117B1	60R	M62 J25 - J30	
21/09/15 16:17:28	SIG	M62/2117B3	60R	M62 J25 - J30	
21/09/15 16:17:40	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 16:17:40	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 16:17:40	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 16:17:41	SIG	M621/1010B1	50R	M62 J25 - J30	
21/09/15 16:17:41	SIG	M621/1010B2	50R	M62 J25 - J30	
21/09/15 16:17:46	SIG	M62/2065M1	40R	M62 J25 - J30	
21/09/15 16:17:46	SIG	M62/2069M1	50R	M62 J25 - J30	
21/09/15 16:17:46	SIG	M62/2069M2	50R	M62 J25 - J30	
21/09/15 16:17:46	SIG	M621/1002B1	40R	M62 J25 - J30	
21/09/15 16:17:46	SIG	M621/1002B2	40R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 16:19:08	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 16:19:14	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 16:19:32	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 16:19:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 16:19:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 16:19:34	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 16:20:58	SIG	M62/2088B1	60R	M62 J25 - J30	
21/09/15 16:21:24	SIG	M62/2097B1	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M62/2069M1	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M62/2069M2	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M621/1002B1	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 16:21:40	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 16:21:46	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 16:21:46	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 16:21:46	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2050B2	40R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2050B3	40R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2050B4	40R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2057B1	50R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 16:21:51	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 16:22:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:22:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:22:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:22:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 16:22:47	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2041B1	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 16:22:52	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 16:24:07	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 16:24:07	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 16:24:07	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 16:24:07	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2183B1	NR	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2183B2	NR	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2183L1	NR	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2183L2	NR	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2189B2	40R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2189B3	40R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2189B4	40R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 16:24:12	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 16:24:24	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 16:24:24	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 16:24:24	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 16:24:24	SIG	M621/1010B1	50R	M62 J25 - J30	
21/09/15 16:24:24	SIG	M621/1010B2	50R	M62 J25 - J30	
21/09/15 16:24:30	SIG	M62/2065M1	40R	M62 J25 - J30	
21/09/15 16:24:30	SIG	M62/2069M1	50R	M62 J25 - J30	
21/09/15 16:24:30	SIG	M62/2069M2	50R	M62 J25 - J30	
21/09/15 16:24:30	SIG	M621/1002B1	40R	M62 J25 - J30	
21/09/15 16:24:30	SIG	M621/1002B2	40R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2197B1	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2197B2	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2197B3	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2199M1	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2199M2	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2203B1	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2203B2	60R	M62 J25 - J30	
21/09/15 16:24:54	SIG	M62/2203B3	60R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2057B1	40R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2065B2	50R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2065B3	50R	M62 J25 - J30	
21/09/15 16:25:16	SIG	M62/2065B4	50R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2057B1	40R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2057B2	40R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2057B3	40R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2057B4	40R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2065B2	40R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2065B3	40R	M62 J25 - J30	
21/09/15 16:25:21	SIG	M62/2065B4	40R	M62 J25 - J30	
21/09/15 16:25:22	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 16:25:27	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 16:26:27	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 16:26:27	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 16:26:27	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 16:26:27	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M62/2069M1	40R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M62/2069M2	40R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M62/2074B2	50R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M62/2074B3	50R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M62/2074B4	50R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M621/1010B1	40R	M62 J25 - J30	
21/09/15 16:26:56	SIG	M621/1010B2	40R	M62 J25 - J30	
21/09/15 16:27:01	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 16:27:01	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 16:27:01	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 16:27:01	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 16:27:01	SIG	M621/1010B1	40R	M62 J25 - J30	
21/09/15 16:27:01	SIG	M621/1010B2	40R	M62 J25 - J30	
21/09/15 16:28:20	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 16:28:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:28:26	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 16:29:07	SIG	M62/2041B1	30R	M62 J25 - J30	
21/09/15 16:29:12	SIG	M62/2041B1	20R	M62 J25 - J30	
21/09/15 16:29:12	SIG	M62/2057B1	LDR	M62 J25 - J30	
21/09/15 16:29:13	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 16:29:13	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 16:29:13	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 16:29:13	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 16:29:18	SIG	M62/2041B1	STOP	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 16:30:04	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 16:30:09	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 16:30:21	SIG	M621/1002B1	LDR	M62 J25 - J30	
21/09/15 16:30:38	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 16:30:38	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 16:30:38	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 16:30:38	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2194B1	40R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2194B2	40R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2194B3	40R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2194B4	40R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 16:31:11	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 16:33:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:33:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2081B1	40R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2081B2	40R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2081B3	40R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2081L1	40R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2088B1	50R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 16:33:27	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 16:33:37	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 16:33:37	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 16:33:37	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 16:33:42	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 16:33:42	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 16:33:42	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 16:33:42	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2197B1	40R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2197B2	40R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2197B3	40R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2199M1	40R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2199M2	40R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 16:34:10	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 16:34:50	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 16:34:50	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 16:34:50	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 16:34:50	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 16:35:13	SIG	M62/2106B1	60R	M62 J25 - J30	
21/09/15 16:35:17	SIG	M62/2088B1	40R	M62 J25 - J30	
21/09/15 16:35:17	SIG	M62/2088B2	40R	M62 J25 - J30	
21/09/15 16:35:17	SIG	M62/2088B3	40R	M62 J25 - J30	
21/09/15 16:35:17	SIG	M62/2088B4	40R	M62 J25 - J30	
21/09/15 16:35:18	SIG	M62/2113B1	60R	M62 J25 - J30	
21/09/15 16:35:42	SIG	M62/2203B1	40R	M62 J25 - J30	
21/09/15 16:35:42	SIG	M62/2203B2	40R	M62 J25 - J30	
21/09/15 16:35:42	SIG	M62/2203B3	40R	M62 J25 - J30	
21/09/15 16:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 16:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 16:36:30	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 16:36:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:36:36	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2177B1	NR	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2177B2	NR	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2177L1	NR	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2177L2	NR	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2183B1	60R	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2183B2	60R	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2183L1	60R	M62 J25 - J30	
21/09/15 16:36:55	SIG	M62/2183L2	60R	M62 J25 - J30	
21/09/15 16:37:13	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 16:37:13	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 16:37:13	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 16:37:37	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 16:38:04	SIG	M62/2097B1	50R	M62 J25 - J30	
21/09/15 16:38:04	SIG	M62/2097B2	50R	M62 J25 - J30	
21/09/15 16:38:04	SIG	M62/2097B4	50R	M62 J25 - J30	
21/09/15 16:39:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 16:39:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 16:39:55	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 16:40:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:40:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:40:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:40:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 16:40:55	SIG	M62/2106B1	50R	M62 J25 - J30	
21/09/15 16:40:55	SIG	M62/2106B2	50R	M62 J25 - J30	
21/09/15 16:40:55	SIG	M62/2106B3	50R	M62 J25 - J30	
21/09/15 16:40:55	SIG	M62/2106B4	50R	M62 J25 - J30	
21/09/15 16:41:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 16:41:44	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 16:41:44	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 16:43:16	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2197B1	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2197B2	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2197B3	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2199M1	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2199M2	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2203B1	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2203B2	40R	M62 J25 - J30	
21/09/15 16:44:15	SIG	M62/2203B3	40R	M62 J25 - J30	
21/09/15 16:44:30	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 16:44:30	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 16:44:30	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 16:44:30	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 16:44:44	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 16:44:44	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 16:45:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 16:46:55	SIG	M62/2159B1	NR	M62 J25 - J30	
21/09/15 16:46:55	SIG	M62/2159B2	NR	M62 J25 - J30	
21/09/15 16:46:55	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 16:46:55	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 16:46:55	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 16:46:55	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 16:47:16	SIG	M62/2203B1	50R	M62 J25 - J30	
21/09/15 16:47:16	SIG	M62/2203B2	50R	M62 J25 - J30	
21/09/15 16:47:16	SIG	M62/2203B3	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2197B1	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2197B2	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2197B3	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2199M1	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2199M2	50R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2203B1	60R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2203B2	60R	M62 J25 - J30	
21/09/15 16:48:15	SIG	M62/2203B3	60R	M62 J25 - J30	
21/09/15 16:49:22	SIG	M62/2097B1	40R	M62 J25 - J30	
21/09/15 16:49:22	SIG	M62/2097B2	40R	M62 J25 - J30	
21/09/15 16:49:22	SIG	M62/2097B4	40R	M62 J25 - J30	
21/09/15 16:50:55	SIG	M62/2189B1	60R	M62 J25 - J30	
21/09/15 16:50:55	SIG	M62/2189B2	60R	M62 J25 - J30	
21/09/15 16:50:55	SIG	M62/2189B3	60R	M62 J25 - J30	
21/09/15 16:50:55	SIG	M62/2189B4	60R	M62 J25 - J30	
21/09/15 16:52:55	SIG	M62/2125B1	60R	M62 J25 - J30	
21/09/15 16:52:55	SIG	M62/2125B2	60R	M62 J25 - J30	
21/09/15 16:52:55	SIG	M62/2125B3	60R	M62 J25 - J30	
21/09/15 16:52:55	SIG	M62/2125L1	60R	M62 J25 - J30	
21/09/15 16:52:55	SIG	M62/2125L2	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2194B1	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2194B2	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2194B3	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2194B4	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2197B1	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2197B2	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2197B3	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2199M1	60R	M62 J25 - J30	
21/09/15 16:53:55	SIG	M62/2199M2	60R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2106B1	40R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2106B2	40R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2106B3	40R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2106B4	40R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2113B1	50R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2113B2	50R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2113B3	50R	M62 J25 - J30	
21/09/15 16:54:49	SIG	M62/2113B4	50R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2113B1	40R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2113B2	40R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2113B3	40R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2113B4	40R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2117B3	50R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2120M1	50R	M62 J25 - J30	
21/09/15 16:59:55	SIG	M62/2120M2	50R	M62 J25 - J30	
21/09/15 17:01:54	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M62/2057B1	50R	M62 J25 - J30	
21/09/15 17:01:59	SIG	M621/1002B1	40R	M62 J25 - J30	
21/09/15 17:02:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:02:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:02:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:02:43	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2170A1	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2170A2	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2170K1	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2170K2	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A1	REDX	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A2	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A2	NR	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A3	NR	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A3	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A4	NR	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2177A4	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2183A1	REDX	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2183A2	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2183A3	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2183A4	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2189A1	REDX	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2189A2	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2189A3	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2189A4	60R	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2197A1	NR	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2197A2	NR	M62 J25 - J30	
21/09/15 17:03:18	SIG	M62/2197A3	NR	M62 J25 - J30	
21/09/15 17:03:55	SIG	M62/2159B1	NR	M62 J25 - J30	
21/09/15 17:03:55	SIG	M62/2159B2	NR	M62 J25 - J30	
21/09/15 17:03:56	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 17:03:56	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 17:03:56	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 17:03:56	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 17:04:40	SIG	M62/2189A1	60R	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2170B1	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2170B2	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2170L1	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2170L2	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2177B1	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2177B2	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2177L1	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2177L2	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2183B1	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2183B2	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2183L1	NR	M62 J25 - J30	
21/09/15 17:04:55	SIG	M62/2183L2	NR	M62 J25 - J30	
21/09/15 17:04:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:04:57	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2117B2	40R	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2117B3	40R	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2120M1	40R	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2120M2	40R	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2125B1	50R	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2125B2	50R	M62 J25 - J30	
21/09/15 17:05:03	SIG	M62/2125B3	50R	M62 J25 - J30	
21/09/15 17:05:08	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:05:08	SIG	M62/2117B3	40R	M62 J25 - J30	
21/09/15 17:05:08	SIG	M62/2120M1	40R	M62 J25 - J30	
21/09/15 17:05:08	SIG	M62/2120M2	40R	M62 J25 - J30	
21/09/15 17:05:24	SIG	M62/2183A1	60R	M62 J25 - J30	
21/09/15 17:05:29	SIG	M62/2177A1	60R	M62 J25 - J30	
21/09/15 17:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 17:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 17:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2159B1	OFF	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2183B1	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2183B2	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2183L1	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2183L2	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2189B1	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2189B2	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2189B3	NR	M62 J25 - J30	
21/09/15 17:06:55	SIG	M62/2189B4	NR	M62 J25 - J30	
21/09/15 17:06:56	SIG	M62/2159B2	OFF	M62 J25 - J30	
21/09/15 17:07:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:07:53	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:07:55	SIG	M62/2177L1	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2170B1	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2170B2	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2170L1	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2170L2	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2177B1	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2177B2	OFF	M62 J25 - J30	
21/09/15 17:07:56	SIG	M62/2177L2	OFF	M62 J25 - J30	
21/09/15 17:07:58	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2189B1	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2189B2	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2189B3	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2189B4	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2194B1	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2194B2	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2194B3	NR	M62 J25 - J30	
21/09/15 17:08:55	SIG	M62/2194B4	NR	M62 J25 - J30	
21/09/15 17:09:01	SIG	M62/2125B1	60R	M62 J25 - J30	
21/09/15 17:09:01	SIG	M62/2125B2	60R	M62 J25 - J30	
21/09/15 17:09:01	SIG	M62/2125B3	60R	M62 J25 - J30	
21/09/15 17:09:02	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:09:02	SIG	M62/2117B3	50R	M62 J25 - J30	
21/09/15 17:09:02	SIG	M62/2120M1	50R	M62 J25 - J30	
21/09/15 17:09:02	SIG	M62/2120M2	50R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2117B3	40R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2120M1	40R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2120M2	40R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2125B1	50R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2125B2	50R	M62 J25 - J30	
21/09/15 17:09:22	SIG	M62/2125B3	50R	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2132B1	60R	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2132B2	60R	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2132B3	60R	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2194B1	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2194B2	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2194B3	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2194B4	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2197B1	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2197B2	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2197B3	NR	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2199M1	OFF	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2199M2	OFF	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2203B1	OFF	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2203B2	OFF	M62 J25 - J30	
21/09/15 17:09:55	SIG	M62/2203B3	OFF	M62 J25 - J30	
21/09/15 17:09:56	SIG	M62/2183B1	OFF	M62 J25 - J30	
21/09/15 17:09:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 17:09:56	SIG	M62/2183L1	OFF	M62 J25 - J30	
21/09/15 17:09:56	SIG	M62/2183L2	OFF	M62 J25 - J30	
21/09/15 17:11:55	SIG	M62/2189B1	OFF	M62 J25 - J30	
21/09/15 17:11:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:11:56	SIG	M62/2189B2	OFF	M62 J25 - J30	
21/09/15 17:11:56	SIG	M62/2189B3	OFF	M62 J25 - J30	
21/09/15 17:11:56	SIG	M62/2189B4	OFF	M62 J25 - J30	
21/09/15 17:11:57	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:12:02	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:12:55	SIG	M62/2197B1	OFF	M62 J25 - J30	
21/09/15 17:12:56	SIG	M62/2194B1	OFF	M62 J25 - J30	
21/09/15 17:12:56	SIG	M62/2194B2	OFF	M62 J25 - J30	
21/09/15 17:12:56	SIG	M62/2194B3	OFF	M62 J25 - J30	
21/09/15 17:12:56	SIG	M62/2194B4	OFF	M62 J25 - J30	
21/09/15 17:12:56	SIG	M62/2197B2	OFF	M62 J25 - J30	
21/09/15 17:12:56	SIG	M62/2197B3	OFF	M62 J25 - J30	
21/09/15 17:15:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:15:03	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:15:08	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:18:07	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:18:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:18:13	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:19:38	SIG	M62/2125B1	40R	M62 J25 - J30	
21/09/15 17:19:38	SIG	M62/2125B2	40R	M62 J25 - J30	
21/09/15 17:19:38	SIG	M62/2125B3	40R	M62 J25 - J30	
21/09/15 17:19:38	SIG	M62/2132B1	50R	M62 J25 - J30	
21/09/15 17:19:38	SIG	M62/2132B2	50R	M62 J25 - J30	
21/09/15 17:19:38	SIG	M62/2132B3	50R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2125B1	40R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2125B2	40R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2125B3	40R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2132B1	40R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2132B2	40R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2132B3	40R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2137B1	50R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2137B2	50R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2137B3	50R	M62 J25 - J30	
21/09/15 17:19:44	SIG	M62/2137B4	50R	M62 J25 - J30	
21/09/15 17:21:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:21:12	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:21:17	SIG	M62/2117B1	40R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2117B1	50R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2117B3	50R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2120M1	50R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2120M2	50R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2125B1	50R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2125B2	50R	M62 J25 - J30	
21/09/15 17:21:34	SIG	M62/2125B3	50R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2137B1	40R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2137B2	40R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2137B3	40R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2137B4	40R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2147B1	60R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2147B2	60R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2147B3	60R	M62 J25 - J30	
21/09/15 17:23:43	SIG	M62/2147B4	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2159B1	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2159B2	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2159M1	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2159M2	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2170B1	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2170B2	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2170L1	60R	M62 J25 - J30	
21/09/15 17:23:55	SIG	M62/2170L2	60R	M62 J25 - J30	
21/09/15 17:24:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:24:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:24:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:24:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:26:58	SIG	M62/2113B1	50R	M62 J25 - J30	
21/09/15 17:26:58	SIG	M62/2113B2	50R	M62 J25 - J30	
21/09/15 17:26:58	SIG	M62/2113B3	50R	M62 J25 - J30	
21/09/15 17:26:58	SIG	M62/2113B4	50R	M62 J25 - J30	
21/09/15 17:27:17	SIG	M62/2106B1	50R	M62 J25 - J30	
21/09/15 17:27:17	SIG	M62/2106B2	50R	M62 J25 - J30	
21/09/15 17:27:17	SIG	M62/2106B3	50R	M62 J25 - J30	
21/09/15 17:27:17	SIG	M62/2106B4	50R	M62 J25 - J30	
21/09/15 17:28:50	SIG	M62/2106B1	40R	M62 J25 - J30	
21/09/15 17:28:50	SIG	M62/2106B2	40R	M62 J25 - J30	
21/09/15 17:28:50	SIG	M62/2106B3	40R	M62 J25 - J30	
21/09/15 17:28:50	SIG	M62/2106B4	40R	M62 J25 - J30	
21/09/15 17:30:14	SIG	M62/2147B1	50R	M62 J25 - J30	
21/09/15 17:30:14	SIG	M62/2147B2	50R	M62 J25 - J30	
21/09/15 17:30:14	SIG	M62/2147B3	50R	M62 J25 - J30	
21/09/15 17:30:14	SIG	M62/2147B4	50R	M62 J25 - J30	
21/09/15 17:30:19	SIG	M62/2147B1	40R	M62 J25 - J30	
21/09/15 17:30:19	SIG	M62/2147B2	40R	M62 J25 - J30	
21/09/15 17:30:19	SIG	M62/2147B3	40R	M62 J25 - J30	
21/09/15 17:30:19	SIG	M62/2147B4	40R	M62 J25 - J30	
21/09/15 17:32:51	SIG	M62/2106B1	50R	M62 J25 - J30	
21/09/15 17:32:51	SIG	M62/2106B2	50R	M62 J25 - J30	
21/09/15 17:32:51	SIG	M62/2106B3	50R	M62 J25 - J30	
21/09/15 17:32:51	SIG	M62/2106B4	50R	M62 J25 - J30	
21/09/15 17:34:47	SIG	M62/2147B1	60R	M62 J25 - J30	
21/09/15 17:34:47	SIG	M62/2147B2	60R	M62 J25 - J30	
21/09/15 17:34:47	SIG	M62/2147B3	60R	M62 J25 - J30	
21/09/15 17:34:47	SIG	M62/2147B4	60R	M62 J25 - J30	
21/09/15 17:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 17:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 17:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:36:50	SIG	M62/2147B1	50R	M62 J25 - J30	
21/09/15 17:36:50	SIG	M62/2147B2	50R	M62 J25 - J30	
21/09/15 17:36:50	SIG	M62/2147B3	50R	M62 J25 - J30	
21/09/15 17:36:50	SIG	M62/2147B4	50R	M62 J25 - J30	
21/09/15 17:36:55	SIG	M62/2147B1	40R	M62 J25 - J30	
21/09/15 17:36:55	SIG	M62/2147B2	40R	M62 J25 - J30	
21/09/15 17:36:55	SIG	M62/2147B3	40R	M62 J25 - J30	
21/09/15 17:36:55	SIG	M62/2147B4	40R	M62 J25 - J30	
21/09/15 17:37:20	SIG	M62/2106B1	40R	M62 J25 - J30	
21/09/15 17:37:20	SIG	M62/2106B2	40R	M62 J25 - J30	
21/09/15 17:37:20	SIG	M62/2106B3	40R	M62 J25 - J30	
21/09/15 17:37:20	SIG	M62/2106B4	40R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2117B1	60R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2117B3	60R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2120M1	60R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2120M2	60R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2125B1	60R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2125B2	60R	M62 J25 - J30	
21/09/15 17:38:56	SIG	M62/2125B3	60R	M62 J25 - J30	
21/09/15 17:40:50	SIG	M62/2147B1	60R	M62 J25 - J30	
21/09/15 17:40:50	SIG	M62/2147B2	60R	M62 J25 - J30	
21/09/15 17:40:50	SIG	M62/2147B3	60R	M62 J25 - J30	
21/09/15 17:40:50	SIG	M62/2147B4	60R	M62 J25 - J30	
21/09/15 17:41:21	SIG	M62/2106B1	50R	M62 J25 - J30	
21/09/15 17:41:21	SIG	M62/2106B2	50R	M62 J25 - J30	
21/09/15 17:41:21	SIG	M62/2106B3	50R	M62 J25 - J30	
21/09/15 17:41:21	SIG	M62/2106B4	50R	M62 J25 - J30	
21/09/15 17:41:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:41:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:41:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:41:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 17:44:20	SIG	M62/2147B1	50R	M62 J25 - J30	
21/09/15 17:44:20	SIG	M62/2147B2	50R	M62 J25 - J30	
21/09/15 17:44:20	SIG	M62/2147B3	50R	M62 J25 - J30	
21/09/15 17:44:20	SIG	M62/2147B4	50R	M62 J25 - J30	
21/09/15 17:44:26	SIG	M62/2147B1	40R	M62 J25 - J30	
21/09/15 17:44:26	SIG	M62/2147B2	40R	M62 J25 - J30	
21/09/15 17:44:26	SIG	M62/2147B3	40R	M62 J25 - J30	
21/09/15 17:44:26	SIG	M62/2147B4	40R	M62 J25 - J30	
21/09/15 17:48:21	SIG	M62/2147B1	60R	M62 J25 - J30	
21/09/15 17:48:21	SIG	M62/2147B2	60R	M62 J25 - J30	
21/09/15 17:48:21	SIG	M62/2147B3	60R	M62 J25 - J30	
21/09/15 17:48:21	SIG	M62/2147B4	60R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 17:48:47	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 17:48:50	SIG	M62/2183B1	50R	M62 J25 - J30	
21/09/15 17:48:50	SIG	M62/2183B2	50R	M62 J25 - J30	
21/09/15 17:48:50	SIG	M62/2183L1	50R	M62 J25 - J30	
21/09/15 17:48:50	SIG	M62/2183L2	50R	M62 J25 - J30	
21/09/15 17:48:50	SIG	M62/2189B1	50R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 17:48:52	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 17:48:55	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 17:48:55	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 17:48:55	SIG	M62/2183L1	40R	M62 J25 - J30	
21/09/15 17:48:55	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 17:48:55	SIG	M62/2189B1	40R	M62 J25 - J30	
21/09/15 17:49:00	SIG	M62/2183L1	30R	M62 J25 - J30	
21/09/15 17:49:00	SIG	M62/2189B1	30R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2177B1	60R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2177B2	60R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2177L1	60R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2177L2	60R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2183B1	40R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2183B2	40R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2183L1	20R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2183L2	40R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2189B1	30R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2189B2	50R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2189B3	50R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2189B4	50R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2194B1	50R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2194B2	50R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2194B3	50R	M62 J25 - J30	
21/09/15 17:49:05	SIG	M62/2194B4	50R	M62 J25 - J30	
21/09/15 17:49:11	SIG	M62/2183L1	STOP	M62 J25 - J30	
21/09/15 17:49:45	SIG	M62/2097B1	50R	M62 J25 - J30	
21/09/15 17:49:45	SIG	M62/2097B2	50R	M62 J25 - J30	
21/09/15 17:49:45	SIG	M62/2097B4	50R	M62 J25 - J30	
21/09/15 17:50:12	SIG	M62/2137B1	50R	M62 J25 - J30	
21/09/15 17:50:12	SIG	M62/2137B2	50R	M62 J25 - J30	
21/09/15 17:50:12	SIG	M62/2137B3	50R	M62 J25 - J30	
21/09/15 17:50:12	SIG	M62/2137B4	50R	M62 J25 - J30	
21/09/15 17:51:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:51:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:51:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:51:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:51:08	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 17:51:08	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 17:51:08	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 17:51:13	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2177B1	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2177B2	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2177L1	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2177L2	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2183B1	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2183L1	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2183L2	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2189B1	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2189B2	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2189B3	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2189B4	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2194B1	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2194B2	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2194B3	OFF	M62 J25 - J30	
21/09/15 17:51:15	SIG	M62/2194B4	OFF	M62 J25 - J30	
21/09/15 17:51:50	SIG	M62/2137B1	40R	M62 J25 - J30	
21/09/15 17:51:50	SIG	M62/2137B2	40R	M62 J25 - J30	
21/09/15 17:51:50	SIG	M62/2137B3	40R	M62 J25 - J30	
21/09/15 17:51:50	SIG	M62/2137B4	40R	M62 J25 - J30	
21/09/15 17:52:47	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 17:52:47	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 17:52:47	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 17:52:47	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 17:52:48	SIG	M62/2088B1	50R	M62 J25 - J30	
21/09/15 17:52:48	SIG	M62/2088B2	50R	M62 J25 - J30	
21/09/15 17:52:48	SIG	M62/2088B3	50R	M62 J25 - J30	
21/09/15 17:52:48	SIG	M62/2088B4	50R	M62 J25 - J30	
21/09/15 17:53:56	SIG	M62/2113B1	60R	M62 J25 - J30	
21/09/15 17:53:56	SIG	M62/2113B2	60R	M62 J25 - J30	
21/09/15 17:53:56	SIG	M62/2113B3	60R	M62 J25 - J30	
21/09/15 17:53:56	SIG	M62/2113B4	60R	M62 J25 - J30	
21/09/15 17:54:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 17:54:07	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 17:54:13	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 17:55:08	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 17:55:50	SIG	M62/2137B1	50R	M62 J25 - J30	
21/09/15 17:55:50	SIG	M62/2137B2	50R	M62 J25 - J30	
21/09/15 17:55:50	SIG	M62/2137B3	50R	M62 J25 - J30	
21/09/15 17:55:50	SIG	M62/2137B4	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 17:57:29	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 17:57:34	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 17:57:38	SIG	M62/2081B1	50R	M62 J25 - J30	
21/09/15 17:57:38	SIG	M62/2081B2	50R	M62 J25 - J30	
21/09/15 17:57:38	SIG	M62/2081B3	50R	M62 J25 - J30	
21/09/15 17:57:38	SIG	M62/2081L1	50R	M62 J25 - J30	
21/09/15 17:57:56	SIG	M62/2137B1	40R	M62 J25 - J30	
21/09/15 17:57:56	SIG	M62/2137B2	40R	M62 J25 - J30	
21/09/15 17:57:56	SIG	M62/2137B3	40R	M62 J25 - J30	
21/09/15 17:57:56	SIG	M62/2137B4	40R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 17:59:55	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 18:00:56	SIG	M62/2106B1	60R	M62 J25 - J30	
21/09/15 18:00:56	SIG	M62/2106B2	60R	M62 J25 - J30	
21/09/15 18:00:56	SIG	M62/2106B3	60R	M62 J25 - J30	
21/09/15 18:00:56	SIG	M62/2106B4	60R	M62 J25 - J30	
21/09/15 18:01:19	SIG	M62/2137B4	OFF	M62 J25 - J30	
21/09/15 18:01:19	SIG	M62/2137B4	50R	M62 J25 - J30	
21/09/15 18:01:25	SIG	M62/2137B4	40R	M62 J25 - J30	
21/09/15 18:01:56	SIG	M62/2137B1	50R	M62 J25 - J30	
21/09/15 18:01:56	SIG	M62/2137B2	50R	M62 J25 - J30	
21/09/15 18:01:56	SIG	M62/2137B3	50R	M62 J25 - J30	
21/09/15 18:01:56	SIG	M62/2137B4	50R	M62 J25 - J30	
21/09/15 18:02:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:02:17	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:02:22	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2132B1	60R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2132B2	60R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2132B3	60R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2137B1	60R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2137B2	60R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2137B3	60R	M62 J25 - J30	
21/09/15 18:03:19	SIG	M62/2137B4	60R	M62 J25 - J30	
21/09/15 18:03:43	SIG	M62/2132B1	50R	M62 J25 - J30	
21/09/15 18:03:43	SIG	M62/2132B2	50R	M62 J25 - J30	
21/09/15 18:03:43	SIG	M62/2132B3	50R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2132B1	40R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2132B2	40R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2132B3	40R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2137B1	50R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2137B2	50R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2137B3	50R	M62 J25 - J30	
21/09/15 18:03:48	SIG	M62/2137B4	50R	M62 J25 - J30	
21/09/15 18:05:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:05:21	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:05:26	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:05:43	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 18:05:43	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 18:05:43	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 18:05:43	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 18:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 18:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
21/09/15 18:06:43	SIG	M62/2189A1	50R	M62 J25 - J30	
21/09/15 18:06:43	SIG	M62/2189A2	50R	M62 J25 - J30	
21/09/15 18:06:43	SIG	M62/2189A3	50R	M62 J25 - J30	
21/09/15 18:06:43	SIG	M62/2189A4	50R	M62 J25 - J30	
21/09/15 18:06:48	SIG	M62/2189A1	40R	M62 J25 - J30	
21/09/15 18:06:48	SIG	M62/2189A2	40R	M62 J25 - J30	
21/09/15 18:06:48	SIG	M62/2189A3	40R	M62 J25 - J30	
21/09/15 18:06:48	SIG	M62/2189A4	40R	M62 J25 - J30	
21/09/15 18:06:51	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 18:06:51	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 18:06:51	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 18:06:51	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 18:06:53	SIG	M62/2189A1	30R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2170A1	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2170A2	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2170K1	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2170K2	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2177A1	LDR	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2177A2	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2177A3	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2177A4	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2183A1	LDR	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2183A2	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2183A3	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2183A4	50R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2189A1	20R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2189A2	40R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2189A3	40R	M62 J25 - J30	
21/09/15 18:06:58	SIG	M62/2189A4	40R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 18:07:00	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 18:07:04	SIG	M62/2189A1	STOP	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2088B1	60R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2088B2	60R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2088B3	60R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2088B4	60R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2097B1	60R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2097B2	60R	M62 J25 - J30	
21/09/15 18:07:06	SIG	M62/2097B4	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2132B1	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2132B2	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2132B3	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2137B1	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2137B2	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2137B3	60R	M62 J25 - J30	
21/09/15 18:07:42	SIG	M62/2137B4	60R	M62 J25 - J30	
21/09/15 18:08:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:08:25	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:08:30	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 18:09:20	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 18:09:31	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2065B2	50R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2065B3	50R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2065B4	50R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2081B1	60R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2081B2	60R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2081B3	60R	M62 J25 - J30	
21/09/15 18:10:14	SIG	M62/2081L1	60R	M62 J25 - J30	
21/09/15 18:11:56	SIG	M62/2125L1	NR	M62 J25 - J30	
21/09/15 18:11:56	SIG	M62/2125L2	NR	M62 J25 - J30	
21/09/15 18:12:28	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 18:12:28	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 18:12:28	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 18:12:28	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 18:12:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:12:30	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:12:35	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 18:13:31	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 18:13:43	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 18:13:43	SIG	M62/2069M1	50R	M62 J25 - J30	
21/09/15 18:13:43	SIG	M62/2069M2	50R	M62 J25 - J30	
21/09/15 18:13:43	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 18:13:43	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 18:13:54	SIG	M621/1010B1	50R	M62 J25 - J30	
21/09/15 18:13:54	SIG	M621/1010B2	50R	M62 J25 - J30	
21/09/15 18:13:56	SIG	M62/2163A1	60R	M62 J25 - J30	
21/09/15 18:13:56	SIG	M62/2163A2	60R	M62 J25 - J30	
21/09/15 18:13:56	SIG	M62/2166K1	60R	M62 J25 - J30	
21/09/15 18:13:56	SIG	M62/2166K2	60R	M62 J25 - J30	
21/09/15 18:16:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:16:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:16:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:16:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:17:44	SIG	M62/2065M1	40R	M62 J25 - J30	
21/09/15 18:17:44	SIG	M621/1002B1	40R	M62 J25 - J30	
21/09/15 18:17:44	SIG	M621/1002B2	40R	M62 J25 - J30	
21/09/15 18:17:55	SIG	M62/2065B2	40R	M62 J25 - J30	
21/09/15 18:17:55	SIG	M62/2065B3	40R	M62 J25 - J30	
21/09/15 18:17:55	SIG	M62/2065B4	40R	M62 J25 - J30	
21/09/15 18:17:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2125B1	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2125B2	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2125B3	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2125L1	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2125L2	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2132B1	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2132B2	NR	M62 J25 - J30	
21/09/15 18:18:56	SIG	M62/2132B3	NR	M62 J25 - J30	
21/09/15 18:20:33	SIG	M62/2079A1	HSD	M62 J25 - J30	
21/09/15 18:20:56	SIG	M62/2170B1	OFF	M62 J25 - J30	
21/09/15 18:20:56	SIG	M62/2170B2	OFF	M62 J25 - J30	
21/09/15 18:20:56	SIG	M62/2170L1	OFF	M62 J25 - J30	
21/09/15 18:20:56	SIG	M62/2170L2	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2132B1	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2132B2	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2132B3	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2137B1	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2137B2	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2137B3	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2137B4	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2147B1	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2147B2	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2147B3	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2147B4	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2159B1	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2159B2	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2159M1	OFF	M62 J25 - J30	
21/09/15 18:20:57	SIG	M62/2159M2	OFF	M62 J25 - J30	
21/09/15 18:21:42	SIG	M62/2088A1	HSD	M62 J25 - J30	
21/09/15 18:21:55	SIG	M62/2065B2	50R	M62 J25 - J30	
21/09/15 18:21:55	SIG	M62/2065B3	50R	M62 J25 - J30	
21/09/15 18:21:55	SIG	M62/2065B4	50R	M62 J25 - J30	
21/09/15 18:21:55	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 18:21:55	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 18:21:55	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 18:21:57	SIG	M62/2125B1	OFF	M62 J25 - J30	
21/09/15 18:21:57	SIG	M62/2125B2	OFF	M62 J25 - J30	
21/09/15 18:21:57	SIG	M62/2125B3	OFF	M62 J25 - J30	
21/09/15 18:21:57	SIG	M62/2125L1	OFF	M62 J25 - J30	
21/09/15 18:21:57	SIG	M62/2125L2	OFF	M62 J25 - J30	
21/09/15 18:22:50	SIG	M62/2079A1	REDX	M62 J25 - J30	
21/09/15 18:22:50	SIG	M62/2097A1	HSD	M62 J25 - J30	
21/09/15 18:23:58	SIG	M62/2106A1	HSD	M62 J25 - J30	
21/09/15 18:23:59	SIG	M62/2088A1	REDX	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2170A1	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2170A2	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2170K1	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2170K2	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2177A1	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2177A2	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2177A3	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2177A4	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2183A1	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2183A2	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2183A3	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2183A4	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2189A1	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2189A2	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2189A3	60R	M62 J25 - J30	
21/09/15 18:24:26	SIG	M62/2189A4	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M62/2057B1	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M62/2069M1	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M62/2069M2	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 18:24:57	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 18:25:06	SIG	M62/2097A1	REDX	M62 J25 - J30	
21/09/15 18:26:14	SIG	M62/2106A1	REDX	M62 J25 - J30	
21/09/15 18:26:57	SIG	M62/2065B2	60R	M62 J25 - J30	
21/09/15 18:26:57	SIG	M62/2065B3	60R	M62 J25 - J30	
21/09/15 18:26:57	SIG	M62/2065B4	60R	M62 J25 - J30	
21/09/15 18:26:57	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 18:26:57	SIG	M621/1002B1	60R	M62 J25 - J30	
21/09/15 18:26:57	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2065A2	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2065A3	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2065A4	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2079A2	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2079A3	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2079A4	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2088A2	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2088A3	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2088A4	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2097A2	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2097A3	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2097A4	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2106A2	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2106A3	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2106A4	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2114A1	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2114A2	NR	M62 J25 - J30	
21/09/15 18:27:15	SIG	M62/2114A3	NR	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2079A1	BLNK	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2079A2	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2079A3	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2079A4	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2088A1	BLNK	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2088A2	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2088A3	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2088A4	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2097A1	BLNK	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2097A2	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2097A3	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2097A4	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2106A1	BLNK	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2106A2	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2106A3	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2106A4	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2114A1	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2114A2	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2114A3	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2117A1	BLNK	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2117A2	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2117A3	OFF	M62 J25 - J30	
21/09/15 18:28:15	SIG	M62/2117A4	OFF	M62 J25 - J30	
21/09/15 18:30:23	SIG	M62/1968B1	50R	M62 J25 - J30	
21/09/15 18:30:23	SIG	M62/1968B2	50R	M62 J25 - J30	
21/09/15 18:30:23	SIG	M62/1968B3	50R	M62 J25 - J30	
21/09/15 18:30:23	SIG	M62/1968L1	50R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1960B1	NR	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1960B2	NR	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1960B3	NR	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1960L1	NR	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1960L2	NR	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1968B1	40R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1968B2	40R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1968B3	40R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1968L1	40R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1974B1	50R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1974B2	50R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1974B3	50R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1974B4	50R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1974M1	50R	M62 J25 - J30	
21/09/15 18:30:29	SIG	M62/1974M2	50R	M62 J25 - J30	
21/09/15 18:31:56	SIG	M62/2166K1	OFF	M62 J25 - J30	
21/09/15 18:31:56	SIG	M62/2166K2	OFF	M62 J25 - J30	
21/09/15 18:31:57	SIG	M62/2163A1	OFF	M62 J25 - J30	
21/09/15 18:31:57	SIG	M62/2163A2	OFF	M62 J25 - J30	
21/09/15 18:32:04	SIG	M62/2177A1	HSD	M62 J25 - J30	
21/09/15 18:32:49	SIG	M62/2183A1	HSD	M62 J25 - J30	
21/09/15 18:33:34	SIG	M62/2189A1	HSD	M62 J25 - J30	
21/09/15 18:33:35	SIG	M62/2177A1	REDX	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1960B1	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1960B2	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1960B3	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1960L1	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1960L2	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1968B1	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1968B2	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1968B3	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1968L1	NR	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1974B1	OFF	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1974B2	OFF	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1974B3	OFF	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1974B4	OFF	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1974M1	OFF	M62 J25 - J30	
21/09/15 18:34:22	SIG	M62/1974M2	OFF	M62 J25 - J30	
21/09/15 18:34:35	SIG	M62/2183A1	REDX	M62 J25 - J30	
21/09/15 18:35:35	SIG	M62/2189A1	REDX	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2170A1	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2170A2	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2170K1	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2170K2	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2177A2	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2177A3	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2177A4	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2183A2	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2183A3	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2183A4	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2189A2	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2189A3	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2189A4	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2197A1	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2197A2	NR	M62 J25 - J30	
21/09/15 18:35:36	SIG	M62/2197A3	NR	M62 J25 - J30	
21/09/15 18:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 18:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
21/09/15 18:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2170A1	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2170A2	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2170K1	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2170K2	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2177A1	BLNK	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2177A2	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2177A3	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2177A4	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2183A1	BLNK	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2183A2	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2183A3	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2183A4	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2189A1	BLNK	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2189A2	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2189A3	OFF	M62 J25 - J30	
21/09/15 18:36:35	SIG	M62/2189A4	OFF	M62 J25 - J30	
21/09/15 18:37:22	SIG	M62/1968L1	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1960B1	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1960B2	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1960B3	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1960L1	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1960L2	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1968B1	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1968B2	OFF	M62 J25 - J30	
21/09/15 18:37:23	SIG	M62/1968B3	OFF	M62 J25 - J30	
21/09/15 18:38:36	SIG	M62/2197A1	OFF	M62 J25 - J30	
21/09/15 18:38:36	SIG	M62/2197A2	OFF	M62 J25 - J30	
21/09/15 18:38:36	SIG	M62/2197A3	OFF	M62 J25 - J30	
21/09/15 18:39:41	SIG	M62/2041B1	50R	M62 J25 - J30	
21/09/15 18:39:41	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 18:39:41	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 18:39:41	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 18:39:46	SIG	M62/2041B1	40R	M62 J25 - J30	
21/09/15 18:39:46	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 18:39:46	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 18:39:46	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 18:39:52	SIG	M62/2041B1	30R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2041B1	20R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2041B2	40R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2041B3	40R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2041B4	40R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2050B2	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2050B3	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2050B4	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2057B1	LDR	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2057B2	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2057B3	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2057B4	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2065B2	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2065B3	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2065B4	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M62/2065M1	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M621/1002B1	50R	M62 J25 - J30	
21/09/15 18:39:57	SIG	M621/1002B2	50R	M62 J25 - J30	
21/09/15 18:40:03	SIG	M62/2041B1	STOP	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2018B1	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2018B2	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2018B3	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2018L1	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2025B1	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2025B2	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2025B3	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2025B4	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2033B1	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2033B2	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:40:59	SIG	M62/2033B4	50R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2018L1	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2025B1	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2033B1	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:41:05	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 18:41:10	SIG	M62/2018L1	30R	M62 J25 - J30	
21/09/15 18:41:10	SIG	M62/2025B1	30R	M62 J25 - J30	
21/09/15 18:41:10	SIG	M62/2033B1	30R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2018B1	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2018B2	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2018B3	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2018L1	20R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2025B1	20R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2033B1	20R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:41:15	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 18:41:21	SIG	M62/2018L1	STOP	M62 J25 - J30	
21/09/15 18:41:21	SIG	M62/2025B1	STOP	M62 J25 - J30	
21/09/15 18:41:21	SIG	M62/2033B1	STOP	M62 J25 - J30	
21/09/15 18:44:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:44:10	SIG	M62/2033B3	50R	M62 J25 - J30	
21/09/15 18:44:15	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2018B1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2018B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2018B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2018L1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2025B1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2025B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2025B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2025B4	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2033B1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2033B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2033B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2033B4	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2041B1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2041B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2041B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2041B4	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2057B1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2065B2	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2065B3	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2065B4	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M621/1002B1	60R	M62 J25 - J30	
21/09/15 18:46:41	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 18:48:36	SIG	M62/2113B1	HSD	M62 J25 - J30	
21/09/15 18:49:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:49:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:49:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:49:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:49:29	SIG	M62/2106B1	HSD	M62 J25 - J30	
21/09/15 18:50:37	SIG	M62/2097B1	HSD	M62 J25 - J30	
21/09/15 18:50:38	SIG	M62/2113B1	REDX	M62 J25 - J30	
21/09/15 18:51:45	SIG	M62/2088B1	HSD	M62 J25 - J30	
21/09/15 18:51:46	SIG	M62/2106B1	REDX	M62 J25 - J30	
21/09/15 18:52:54	SIG	M62/2097B1	REDX	M62 J25 - J30	
21/09/15 18:52:57	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 18:52:57	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 18:54:02	SIG	M62/2088B1	REDX	M62 J25 - J30	
21/09/15 18:54:55	SIG	M62/2117B1	NR	M62 J25 - J30	
21/09/15 18:54:55	SIG	M62/2117B3	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2081B1	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2081B2	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2081B3	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2081L1	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2088B2	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2088B3	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2088B4	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2097B2	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2097B4	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2106B2	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2106B3	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2106B4	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2113B2	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2113B3	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2113B4	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2120M1	NR	M62 J25 - J30	
21/09/15 18:55:05	SIG	M62/2120M2	NR	M62 J25 - J30	
21/09/15 18:55:55	SIG	M62/2120M1	OFF	M62 J25 - J30	
21/09/15 18:55:55	SIG	M62/2120M2	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2097B1	BLNK	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2097B2	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2097B4	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2106B1	BLNK	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2106B2	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2106B3	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2106B4	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2113B1	BLNK	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2113B2	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2113B3	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2113B4	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
21/09/15 18:56:05	SIG	M62/2117B3	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2081B1	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2081B2	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2081B3	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2081L1	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2088B1	BLNK	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2088B2	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2088B3	OFF	M62 J25 - J30	
21/09/15 18:56:06	SIG	M62/2088B4	OFF	M62 J25 - J30	
21/09/15 18:57:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:57:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 18:57:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 19:01:33	SIG	M62/2025A1	HSD	M62 J25 - J30	
21/09/15 19:02:33	SIG	M62/2033A1	HSD	M62 J25 - J30	
21/09/15 19:03:33	SIG	M62/2041A1	HSD	M62 J25 - J30	
21/09/15 19:03:34	SIG	M62/2018A1	HSD	M62 J25 - J30	
21/09/15 19:03:34	SIG	M62/2025A1	REDX	M62 J25 - J30	
21/09/15 19:04:40	SIG	M62/2050A1	HSD	M62 J25 - J30	
21/09/15 19:04:41	SIG	M62/2033A1	REDX	M62 J25 - J30	
21/09/15 19:05:33	SIG	M62/2041A1	REDX	M62 J25 - J30	
21/09/15 19:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 19:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 19:06:32	SIG	M62/2050A1	REDX	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2025A2	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2025A3	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2025A4	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2033A2	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2033A3	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2033A4	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2041A2	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2041A3	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2041A4	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2050A2	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2050A3	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2050A4	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2057A1	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2057A2	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2057A3	NR	M62 J25 - J30	
21/09/15 19:07:33	SIG	M62/2057J1	NR	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2008K1	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2008K2	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2012A1	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2012A2	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2012A3	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2018A1	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2018A2	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2018A3	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2018A4	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2025A1	BLNK	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2025A2	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2025A3	OFF	M62 J25 - J30	
21/09/15 19:08:33	SIG	M62/2025A4	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2033A1	BLNK	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2033A2	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2033A3	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2033A4	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2041A1	BLNK	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2041A2	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2041A3	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2041A4	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2050A1	BLNK	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2050A2	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2050A3	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2050A4	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2057A1	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2057A2	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2057A3	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2057J1	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2065A1	BLNK	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2065A2	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2065A3	OFF	M62 J25 - J30	
21/09/15 19:08:34	SIG	M62/2065A4	OFF	M62 J25 - J30	
21/09/15 19:10:46	SIG	M62/2057B1	HSD	M62 J25 - J30	
21/09/15 19:12:45	SIG	M62/2041B1	HSD	M62 J25 - J30	
21/09/15 19:12:45	SIG	M62/2057B1	REDX	M62 J25 - J30	
21/09/15 19:12:45	SIG	M621/1002B1	HSD	M62 J25 - J30	
21/09/15 19:12:45	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 19:12:45	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 19:13:45	SIG	M62/2033B1	HSD	M62 J25 - J30	
21/09/15 19:14:45	SIG	M62/2025B1	HSD	M62 J25 - J30	
21/09/15 19:14:46	SIG	M62/2041B1	REDX	M62 J25 - J30	
21/09/15 19:15:37	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 19:16:21	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2018B1	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2018B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2018B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2018L1	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2025B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2025B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2025B4	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2033B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2033B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2033B4	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2041B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2041B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2041B4	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2050B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2050B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2050B4	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2057B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2057B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2057B4	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2065B2	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2065B3	NR	M62 J25 - J30	
21/09/15 19:16:52	SIG	M62/2065B4	NR	M62 J25 - J30	
21/09/15 19:17:52	SIG	M62/2069M1	OFF	M62 J25 - J30	
21/09/15 19:17:52	SIG	M62/2069M2	OFF	M62 J25 - J30	
21/09/15 19:17:52	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 19:17:52	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2012B1	BLNK	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2012B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2012B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2012B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2018B1	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2018B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2018B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2018L1	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2025B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2025B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2025B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2033B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2033B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2041B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2041B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2041B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2050B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2050B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2050B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2057B1	BLNK	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2057B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2057B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2057B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2065B1	BLNK	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2065B2	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2065B3	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2065B4	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M62/2065M1	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M621/1002B1	OFF	M62 J25 - J30	
21/09/15 19:17:53	SIG	M621/1002B2	OFF	M62 J25 - J30	
21/09/15 19:24:33	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 19:24:33	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2012B1	REDX	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2012B2	NR	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2012B3	NR	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2012B4	NR	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2025B1	STOP	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 19:52:16	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 19:52:21	SIG	M62/2025B1	STOP	M62 J25 - J30	
21/09/15 19:53:38	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 19:53:38	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2041B1	REDX	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 20:02:58	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 20:05:18	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 20:05:18	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 20:05:23	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 20:05:23	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 20:05:29	SIG	M62/1960K1	30R	M62 J25 - J30	
21/09/15 20:05:34	SIG	M62/1955K1	TI	M62 J25 - J30	
21/09/15 20:05:34	SIG	M62/1955K2	TI	M62 J25 - J30	
21/09/15 20:05:34	SIG	M62/1960K1	20R	M62 J25 - J30	
21/09/15 20:05:34	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 20:05:39	SIG	M62/1960K1	STOP	M62 J25 - J30	
21/09/15 20:05:48	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 20:05:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 20:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 20:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 20:07:41	SIG	M606/2003B1	NR	M62 J25 - J30	
21/09/15 20:07:41	SIG	M606/2003B2	NR	M62 J25 - J30	
21/09/15 20:09:50	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 20:09:50	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M62/2057B1	REDX	M62 J25 - J30	
21/09/15 20:11:58	SIG	M62/2057B2	60R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M62/2057B3	60R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M62/2057B4	60R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M62/2065M1	60R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M621/1002B1	HSD	M62 J25 - J30	
21/09/15 20:11:58	SIG	M621/1002B2	60R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M621/1010B1	60R	M62 J25 - J30	
21/09/15 20:11:58	SIG	M621/1010B2	60R	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2189A1	REDX	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2189A2	60R	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2189A3	60R	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2189A4	60R	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2197A1	LDR	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2197A2	50R	M62 J25 - J30	
21/09/15 20:19:36	SIG	M62/2197A3	50R	M62 J25 - J30	
21/09/15 20:19:58	SIG	M62/2065B1	REDX	M62 J25 - J30	
21/09/15 20:19:58	SIG	M62/2065B2	60R	M62 J25 - J30	
21/09/15 20:19:58	SIG	M62/2065B3	60R	M62 J25 - J30	
21/09/15 20:19:58	SIG	M62/2065B4	60R	M62 J25 - J30	
21/09/15 20:35:47	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 20:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 20:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 20:44:15	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 20:44:15	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 20:44:15	SIG	M62/1987A1	NR	M62 J25 - J30	
21/09/15 20:44:15	SIG	M62/1987A3	NR	M62 J25 - J30	
21/09/15 20:44:15	SIG	M62/1987J1	NR	M62 J25 - J30	
21/09/15 20:44:18	SIG	M62/1979K1	40R	M62 J25 - J30	
21/09/15 20:44:18	SIG	M62/1979K2	40R	M62 J25 - J30	
21/09/15 20:44:18	SIG	M62/1981A1	50R	M62 J25 - J30	
21/09/15 20:44:18	SIG	M62/1981A2	50R	M62 J25 - J30	
21/09/15 20:44:18	SIG	M62/1981A3	50R	M62 J25 - J30	
21/09/15 20:44:18	SIG	M62/1981A4	50R	M62 J25 - J30	
21/09/15 20:44:24	SIG	M62/1981A1	40R	M62 J25 - J30	
21/09/15 20:44:24	SIG	M62/1981A2	40R	M62 J25 - J30	
21/09/15 20:44:24	SIG	M62/1981A3	40R	M62 J25 - J30	
21/09/15 20:44:24	SIG	M62/1981A4	40R	M62 J25 - J30	
21/09/15 20:44:29	SIG	M62/1981A1	30R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1974A1	LDR	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1974A2	50R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1974A3	50R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1974A4	50R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1979K1	40R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1979K2	40R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1981A1	20R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1981A2	40R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1981A3	40R	M62 J25 - J30	
21/09/15 20:44:34	SIG	M62/1981A4	40R	M62 J25 - J30	
21/09/15 20:44:40	SIG	M62/1981A1	STOP	M62 J25 - J30	
21/09/15 20:44:50	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 20:44:50	SIG	M62/1987A2	50R	M62 J25 - J30	
21/09/15 20:44:50	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 20:44:50	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 20:45:10	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 20:45:10	SIG	M62/1987A2	40R	M62 J25 - J30	
21/09/15 20:45:10	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 20:45:10	SIG	M62/1987J1	40R	M62 J25 - J30	
21/09/15 20:45:15	SIG	M62/1987J1	30R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1987A1	40R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1987A3	40R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1987J1	20R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1992A1	50R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1992A2	50R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1992A3	50R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1992J1	50R	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1999A1	NR	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1999A2	NR	M62 J25 - J30	
21/09/15 20:45:20	SIG	M62/1999A3	NR	M62 J25 - J30	
21/09/15 20:45:25	SIG	M62/1987J1	STOP	M62 J25 - J30	
21/09/15 20:46:08	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 20:46:08	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 20:46:08	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 20:46:08	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 20:46:13	SIG	M62/1992J1	30R	M62 J25 - J30	
21/09/15 20:46:18	SIG	M62/1992A1	40R	M62 J25 - J30	
21/09/15 20:46:18	SIG	M62/1992A2	40R	M62 J25 - J30	
21/09/15 20:46:18	SIG	M62/1992A3	40R	M62 J25 - J30	
21/09/15 20:46:18	SIG	M62/1992J1	20R	M62 J25 - J30	
21/09/15 20:46:24	SIG	M62/1992J1	STOP	M62 J25 - J30	
21/09/15 20:49:10	SIG	M62/1999A1	OFF	M62 J25 - J30	
21/09/15 20:49:10	SIG	M62/1999A2	OFF	M62 J25 - J30	
21/09/15 20:49:10	SIG	M62/1999A3	OFF	M62 J25 - J30	
21/09/15 20:49:18	SIG	M606/2003B1	OFF	M62 J25 - J30	
21/09/15 20:49:18	SIG	M606/2003B2	OFF	M62 J25 - J30	
21/09/15 20:49:49	SIG	M62/2033A1	REDX	M62 J25 - J30	
21/09/15 20:49:49	SIG	M62/2033A2	NR	M62 J25 - J30	
21/09/15 20:49:49	SIG	M62/2033A3	NR	M62 J25 - J30	
21/09/15 20:49:49	SIG	M62/2033A4	NR	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1960A1	50R	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1960A2	50R	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1960A3	50R	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1968A1	50R	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1968A2	50R	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1968A3	50R	M62 J25 - J30	
21/09/15 20:54:59	SIG	M62/1968A4	50R	M62 J25 - J30	
21/09/15 21:05:57	SIG	M62/1999J1	OFF	M62 J25 - J30	
21/09/15 21:05:57	SIG	M62/1999J2	OFF	M62 J25 - J30	
21/09/15 21:05:59	SIG	M62/1956A1	50R	M62 J25 - J30	
21/09/15 21:05:59	SIG	M62/1956A2	50R	M62 J25 - J30	
21/09/15 21:05:59	SIG	M62/1956A3	50R	M62 J25 - J30	
21/09/15 21:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 21:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 21:14:33	SIG	M62/1955K1	50R	M62 J25 - J30	
21/09/15 21:14:33	SIG	M62/1955K2	50R	M62 J25 - J30	
21/09/15 21:14:33	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 21:14:33	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 21:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 21:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 21:37:55	SIG	M62/2189A2	NR	M62 J25 - J30	
21/09/15 21:37:55	SIG	M62/2189A3	NR	M62 J25 - J30	
21/09/15 21:37:55	SIG	M62/2189A4	NR	M62 J25 - J30	
21/09/15 21:37:55	SIG	M62/2197A1	OFF	M62 J25 - J30	
21/09/15 21:37:55	SIG	M62/2197A2	OFF	M62 J25 - J30	
21/09/15 21:37:55	SIG	M62/2197A3	OFF	M62 J25 - J30	
21/09/15 21:40:55	SIG	M62/2189A2	OFF	M62 J25 - J30	
21/09/15 21:40:56	SIG	M62/2189A1	BLNK	M62 J25 - J30	
21/09/15 21:40:56	SIG	M62/2189A1	BLNK	M62 J25 - J30	
21/09/15 21:40:56	SIG	M62/2189A3	OFF	M62 J25 - J30	
21/09/15 21:40:56	SIG	M62/2189A4	OFF	M62 J25 - J30	
21/09/15 22:02:00	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 22:02:00	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 22:02:00	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 22:02:00	SIG	M62/1999J1	50R	M62 J25 - J30	
21/09/15 22:02:00	SIG	M62/1999J2	50R	M62 J25 - J30	
21/09/15 22:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 22:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 22:23:01	SIG	M62/1999A1	OFF	M62 J25 - J30	
21/09/15 22:23:01	SIG	M62/1999A2	OFF	M62 J25 - J30	
21/09/15 22:23:01	SIG	M62/1999A3	OFF	M62 J25 - J30	
21/09/15 22:23:01	SIG	M62/1999J1	OFF	M62 J25 - J30	
21/09/15 22:23:01	SIG	M62/1999J2	OFF	M62 J25 - J30	
21/09/15 22:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 22:36:11	SIG	M62/2097B3	OFF	M62 J25 - J30	
21/09/15 22:36:11	SIG	M62/2097B3	OFF	M62 J25 - J30	
21/09/15 22:36:11	SIG	M62/2097B3	OFF	M62 J25 - J30	
21/09/15 22:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 22:43:13	SIG	M62/1999A1	50R	M62 J25 - J30	
21/09/15 22:43:13	SIG	M62/1999A2	50R	M62 J25 - J30	
21/09/15 22:43:13	SIG	M62/1999A3	50R	M62 J25 - J30	
21/09/15 22:43:13	SIG	M62/2004A1	50R	M62 J25 - J30	
21/09/15 22:43:13	SIG	M62/2004A2	50R	M62 J25 - J30	
21/09/15 22:43:13	SIG	M62/2004A3	50R	M62 J25 - J30	
21/09/15 22:43:19	SIG	M62/1999A1	40R	M62 J25 - J30	
21/09/15 22:43:19	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 22:43:19	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 22:43:19	SIG	M62/2004A1	40R	M62 J25 - J30	
21/09/15 22:43:19	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 22:43:19	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 22:43:24	SIG	M62/1999A1	30R	M62 J25 - J30	
21/09/15 22:43:24	SIG	M62/2004A1	30R	M62 J25 - J30	
21/09/15 22:43:29	SIG	M62/2004A1	20R	M62 J25 - J30	
21/09/15 22:43:29	SIG	M62/2004A2	40R	M62 J25 - J30	
21/09/15 22:43:29	SIG	M62/2004A3	40R	M62 J25 - J30	
21/09/15 22:43:30	SIG	M62/1999A1	20R	M62 J25 - J30	
21/09/15 22:43:30	SIG	M62/1999A2	40R	M62 J25 - J30	
21/09/15 22:43:30	SIG	M62/1999A3	40R	M62 J25 - J30	
21/09/15 22:43:35	SIG	M62/1999A1	STOP	M62 J25 - J30	
21/09/15 22:43:35	SIG	M62/2004A1	STOP	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1974A1	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1974A2	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1974A3	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1974A4	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1979K1	50R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1979K2	50R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1981A1	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1981A2	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1981A3	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1981A4	60R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1987A1	50R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1987A3	50R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1987J1	50R	M62 J25 - J30	
21/09/15 22:44:01	SIG	M62/1992J1	40R	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1955K1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1955K2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1956A1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1956A2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1956A3	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1960A1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1960A2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1960A3	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1960K1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1960K2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1968A1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1968A2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1968A3	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1968A4	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1974A1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1974A2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1974A3	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1974A4	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1981A1	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1981A2	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1981A3	OFF	M62 J25 - J30	
21/09/15 22:47:11	SIG	M62/1981A4	OFF	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1974A1	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1974A2	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1974A3	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1974A4	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1981A1	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1981A2	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1981A3	60R	M62 J25 - J30	
21/09/15 22:51:11	SIG	M62/1981A4	60R	M62 J25 - J30	
21/09/15 22:51:59	SIG	M62/2004A1	OFF	M62 J25 - J30	
21/09/15 22:51:59	SIG	M62/2004A2	OFF	M62 J25 - J30	
21/09/15 22:51:59	SIG	M62/2004A3	OFF	M62 J25 - J30	
21/09/15 22:51:59	SIG	M62/2033A2	NR	M62 J25 - J30	
21/09/15 22:51:59	SIG	M62/2033A3	NR	M62 J25 - J30	
21/09/15 22:51:59	SIG	M62/2033A4	NR	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1987A1	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1987A3	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1987J1	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1992A1	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1992A2	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1992A3	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1992J1	60R	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1999A1	OFF	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1999A2	OFF	M62 J25 - J30	
21/09/15 22:52:09	SIG	M62/1999A3	OFF	M62 J25 - J30	
21/09/15 22:55:00	SIG	M62/2033A1	BLNK	M62 J25 - J30	
21/09/15 22:55:00	SIG	M62/2033A2	OFF	M62 J25 - J30	
21/09/15 22:55:00	SIG	M62/2033A3	OFF	M62 J25 - J30	
21/09/15 22:55:00	SIG	M62/2033A4	OFF	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1974A1	OFF	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1974A2	OFF	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1974A3	OFF	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1974A4	OFF	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1981A1	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1981A2	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1981A3	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1981A4	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1987A1	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1987A3	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1987J1	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1992A1	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1992A2	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1992A3	NR	M62 J25 - J30	
21/09/15 22:58:11	SIG	M62/1992J1	NR	M62 J25 - J30	
21/09/15 22:58:31	SIG	M62/1979K1	OFF	M62 J25 - J30	
21/09/15 22:58:31	SIG	M62/1979K2	OFF	M62 J25 - J30	
21/09/15 22:58:31	SIG	M62/1987A1	NR	M62 J25 - J30	
21/09/15 22:58:31	SIG	M62/1987A3	NR	M62 J25 - J30	
21/09/15 22:58:31	SIG	M62/1987J1	NR	M62 J25 - J30	
21/09/15 23:00:01	SIG	M621/1010B1	OFF	M62 J25 - J30	
21/09/15 23:00:01	SIG	M621/1010B2	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2012B1	BLNK	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2012B2	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2012B3	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2012B4	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2025B2	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2025B3	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2025B4	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2033B2	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2033B4	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2041B2	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2041B3	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2041B4	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2050B2	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2050B3	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2050B4	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2057B1	BLNK	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2057B2	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2057B3	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2057B4	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2065B2	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2065B3	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2065B4	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M62/2065M1	NR	M62 J25 - J30	
21/09/15 23:00:02	SIG	M621/1002B1	OFF	M62 J25 - J30	
21/09/15 23:00:02	SIG	M621/1002B2	OFF	M62 J25 - J30	
21/09/15 23:01:11	SIG	M62/1981A1	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1981A2	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1981A3	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1981A4	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1992A2	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1992A3	OFF	M62 J25 - J30	
21/09/15 23:01:12	SIG	M62/1992J1	OFF	M62 J25 - J30	
21/09/15 23:01:31	SIG	M62/1987J1	OFF	M62 J25 - J30	
21/09/15 23:01:42	SIG	M62/1987A1	OFF	M62 J25 - J30	
21/09/15 23:01:42	SIG	M62/1987A3	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2041B2	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2041B3	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2041B4	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2050B2	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2050B3	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2050B4	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2065B2	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2065B3	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2065B4	OFF	M62 J25 - J30	
21/09/15 23:03:02	SIG	M62/2065M1	OFF	M62 J25 - J30	
21/09/15 23:03:03	SIG	M62/2041B1	BLNK	M62 J25 - J30	
21/09/15 23:03:03	SIG	M62/2041B1	BLNK	M62 J25 - J30	
21/09/15 23:03:03	SIG	M62/2065B1	BLNK	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2012B1	REDX	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2012B2	NR	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2012B3	NR	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2012B4	NR	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2025B1	REDX	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2025B2	40R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2025B3	40R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2025B4	40R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2033B1	REDX	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2033B2	40R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2033B3	40R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2033B4	40R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2041B1	REDX	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2041B2	50R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2041B3	50R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2041B4	50R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2050B2	60R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2050B3	60R	M62 J25 - J30	
21/09/15 23:04:02	SIG	M62/2050B4	60R	M62 J25 - J30	
21/09/15 23:06:21	SIG	M62/2033B3	???	M62 J25 - J30	
21/09/15 23:06:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2012B1	BLNK	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2012B2	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2012B3	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2012B4	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2025B1	BLNK	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2025B2	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2025B3	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2025B4	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2033B1	BLNK	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2033B2	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2033B4	OFF	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2041B2	NR	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2041B3	NR	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2041B4	NR	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2050B2	NR	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2050B3	NR	M62 J25 - J30	
21/09/15 23:08:02	SIG	M62/2050B4	NR	M62 J25 - J30	
21/09/15 23:11:02	SIG	M62/2041B2	OFF	M62 J25 - J30	
21/09/15 23:11:02	SIG	M62/2041B3	OFF	M62 J25 - J30	
21/09/15 23:11:02	SIG	M62/2041B4	OFF	M62 J25 - J30	
21/09/15 23:11:02	SIG	M62/2050B2	OFF	M62 J25 - J30	
21/09/15 23:11:02	SIG	M62/2050B3	OFF	M62 J25 - J30	
21/09/15 23:11:02	SIG	M62/2050B4	OFF	M62 J25 - J30	
21/09/15 23:11:03	SIG	M62/2041B1	BLNK	M62 J25 - J30	
21/09/15 23:11:03	SIG	M62/2041B1	BLNK	M62 J25 - J30	
21/09/15 23:12:06	SIG	M62/2147B1	50R	M62 J25 - J30	
21/09/15 23:12:06	SIG	M62/2147B2	50R	M62 J25 - J30	
21/09/15 23:12:06	SIG	M62/2147B3	50R	M62 J25 - J30	
21/09/15 23:12:06	SIG	M62/2147B4	50R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2147B1	40R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2147B2	40R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2147B3	40R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2147B4	40R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2159B1	60R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2159B2	60R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2159M1	60R	M62 J25 - J30	
21/09/15 23:12:11	SIG	M62/2159M2	60R	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2147B1	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2147B2	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2147B3	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2147B4	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2159B1	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2159B2	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2159M1	OFF	M62 J25 - J30	
21/09/15 23:31:33	SIG	M62/2159M2	OFF	M62 J25 - J30	
21/09/15 23:45:02	SIG	M62/1960K1	50R	M62 J25 - J30	
21/09/15 23:45:02	SIG	M62/1960K2	50R	M62 J25 - J30	
21/09/15 23:45:07	SIG	M62/1960K1	40R	M62 J25 - J30	
21/09/15 23:45:07	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 23:45:12	SIG	M62/1960K1	30R	M62 J25 - J30	
21/09/15 23:45:18	SIG	M62/1955K1	TI	M62 J25 - J30	
21/09/15 23:45:18	SIG	M62/1955K2	TI	M62 J25 - J30	
21/09/15 23:45:18	SIG	M62/1960K1	20R	M62 J25 - J30	
21/09/15 23:45:18	SIG	M62/1960K2	40R	M62 J25 - J30	
21/09/15 23:45:23	SIG	M62/1960K1	STOP	M62 J25 - J30	
22/09/15 00:31:18	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1960B1	NR	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1960B2	NR	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1960B3	NR	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1960L1	NR	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1960L2	NR	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1968B1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1968B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1968B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1968L1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1974B1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1974B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1974B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1974B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1974M1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1974M2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1981B1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1981B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1981B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1981B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1987B1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1987B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1987B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1987B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1999B1	REDX	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2004B1	REDX	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2004B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2004B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2004B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 00:31:18	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 00:32:15	SIG	M62/1956A1	50R	M62 J25 - J30	
22/09/15 00:32:15	SIG	M62/1956A2	50R	M62 J25 - J30	
22/09/15 00:32:15	SIG	M62/1956A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 00:32:51	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 00:34:26	SIG	M621/1010B1	NR	M62 J25 - J30	
22/09/15 00:34:26	SIG	M621/1010B2	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1956A1	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1956A2	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1981A1	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1981A2	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1981A3	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1981A4	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1992A1	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1992A2	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1992A3	NR	M62 J25 - J30	
22/09/15 00:41:53	SIG	M62/1992J1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1960B1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1960B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1960B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1960L1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1960L2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1968B1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1968B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1968B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1968L1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1974B1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1974B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1974B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1974B4	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1974M1	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1974M2	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1992B1	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1992B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1992B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1992B4	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1999B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1999B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/1999B4	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2004B2	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2004B3	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2004B4	NR	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2005M1	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2005M2	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2018B1	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2018B2	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 00:42:02	SIG	M62/2018L1	OFF	M62 J25 - J30	
22/09/15 00:44:53	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 00:45:02	SIG	M62/2004B2	OFF	M62 J25 - J30	
22/09/15 00:45:02	SIG	M62/2004B3	OFF	M62 J25 - J30	
22/09/15 00:45:02	SIG	M62/2004B4	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 00:45:03	SIG	M62/2004B1	BLNK	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1960B1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1960B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1960B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1960L1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1960L2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1968B1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1968B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1968B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1968L1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1974B1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1974B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1974B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1974B4	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1981B1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1981B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1981B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1981B4	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1987B1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1987B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1987B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1987B4	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1992B1	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1992B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1992B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1992B4	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1999B1	BLNK	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1999B2	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1999B3	OFF	M62 J25 - J30	
22/09/15 00:45:04	SIG	M62/1999B4	OFF	M62 J25 - J30	
22/09/15 00:54:29	SIG	M62/2144A1	50R	M62 J25 - J30	
22/09/15 00:54:29	SIG	M62/2144A2	50R	M62 J25 - J30	
22/09/15 00:54:29	SIG	M62/2144J1	50R	M62 J25 - J30	
22/09/15 00:54:29	SIG	M62/2144K1	50R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2135A1	50R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2135A2	50R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2135A3	50R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2135A4	50R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2144A1	40R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2144A2	40R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2144J1	40R	M62 J25 - J30	
22/09/15 00:54:35	SIG	M62/2144K1	40R	M62 J25 - J30	
22/09/15 00:55:42	SIG	M62/1955K1	OFF	M62 J25 - J30	
22/09/15 00:55:42	SIG	M62/1955K2	OFF	M62 J25 - J30	
22/09/15 00:55:42	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 00:55:42	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2135A1	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2135A2	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2135A3	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2135A4	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2144A1	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2144A2	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2144J1	OFF	M62 J25 - J30	
22/09/15 01:16:21	SIG	M62/2144K1	OFF	M62 J25 - J30	
22/09/15 01:17:07	SIG	M621/1010B1	NR	M62 J25 - J30	
22/09/15 01:17:07	SIG	M621/1010B2	NR	M62 J25 - J30	
22/09/15 01:20:08	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 01:20:08	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 01:31:36	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 01:31:36	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 01:31:36	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 01:31:42	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 01:31:42	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 01:31:42	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1999A1	LDR	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 01:31:46	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 01:31:47	SIG	M62/2004A1	30R	M62 J25 - J30	
22/09/15 01:31:52	SIG	M62/2004A1	20R	M62 J25 - J30	
22/09/15 01:31:52	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 01:31:52	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 01:31:57	SIG	M62/2004A1	STOP	M62 J25 - J30	
22/09/15 01:33:52	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 01:33:52	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 01:33:52	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2144A1	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2144A2	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2144J1	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2144K1	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2151A1	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2151A2	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2151J1	50R	M62 J25 - J30	
22/09/15 01:44:48	SIG	M62/2151K1	50R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2135A1	50R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2135A2	50R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2135A3	50R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2135A4	50R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2144A1	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2144A2	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2144J1	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2144K1	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2151A1	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2151A2	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2151J1	40R	M62 J25 - J30	
22/09/15 01:44:53	SIG	M62/2151K1	40R	M62 J25 - J30	
22/09/15 02:17:50	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 02:17:50	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 02:17:50	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 02:17:50	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 02:17:55	SIG	M62/2155A1	40R	M62 J25 - J30	
22/09/15 02:17:55	SIG	M62/2155A2	40R	M62 J25 - J30	
22/09/15 02:17:55	SIG	M62/2155J1	40R	M62 J25 - J30	
22/09/15 02:17:55	SIG	M62/2155K1	40R	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2135A1	OFF	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2135A2	OFF	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2135A3	OFF	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2135A4	OFF	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2144A1	50R	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2144A2	50R	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2144J1	50R	M62 J25 - J30	
22/09/15 02:24:26	SIG	M62/2144K1	50R	M62 J25 - J30	
22/09/15 02:33:17	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 02:33:17	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2004A1	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2004A2	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2004A3	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 02:33:17	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1992A1	NR	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1992A2	NR	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1992A3	NR	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1992J1	NR	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 02:33:27	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1987A2	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 02:35:22	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1987A2	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 02:35:42	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 02:35:47	SIG	M62/1981A1	30R	M62 J25 - J30	
22/09/15 02:35:47	SIG	M62/1987J1	30R	M62 J25 - J30	
22/09/15 02:35:47	SIG	M62/1992J1	30R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1974A1	LDR	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1981A1	20R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1987J1	20R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 02:35:52	SIG	M62/1992J1	20R	M62 J25 - J30	
22/09/15 02:35:58	SIG	M62/1981A1	STOP	M62 J25 - J30	
22/09/15 02:35:58	SIG	M62/1987J1	STOP	M62 J25 - J30	
22/09/15 02:35:58	SIG	M62/1992J1	STOP	M62 J25 - J30	
22/09/15 02:36:18	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 02:36:18	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 02:53:25	SIG	M62/2157A1	NR	M62 J25 - J30	
22/09/15 02:53:25	SIG	M62/2157A2	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2144A1	OFF	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2144A2	OFF	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2144J1	OFF	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2144K1	OFF	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2151A1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2151A2	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2151J1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2151K1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2155A1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2155A2	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2155J1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2155K1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2157A1	NR	M62 J25 - J30	
22/09/15 02:54:43	SIG	M62/2157A2	NR	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2151A1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2151A2	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2151J1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2151K1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 02:57:44	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1981A1	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1981A2	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1981A3	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1981A4	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1992A1	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1992A2	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1992A3	NR	M62 J25 - J30	
22/09/15 03:10:50	SIG	M62/1992J1	NR	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 03:13:51	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 03:42:26	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 03:42:26	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2189A1	REDX	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2189A2	60R	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2189A3	60R	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2189A4	60R	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2197A1	LDR	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2197A2	50R	M62 J25 - J30	
22/09/15 03:52:13	SIG	M62/2197A3	50R	M62 J25 - J30	
22/09/15 03:54:34	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 03:54:34	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 03:54:34	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 03:54:34	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 03:54:39	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 04:10:31	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 04:10:31	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2012B2	NR	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2012B3	NR	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2012B4	NR	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2025B1	STOP	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 04:11:30	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 04:11:35	SIG	M62/2025B1	STOP	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 04:17:23	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 04:20:23	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 04:20:24	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 04:20:45	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 04:20:45	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 04:20:45	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 04:20:45	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 04:20:45	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 04:23:46	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 04:23:56	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 04:23:56	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 04:28:09	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 04:28:09	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2025B2	OFF	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2025B3	OFF	M62 J25 - J30	
22/09/15 04:38:54	SIG	M62/2025B4	OFF	M62 J25 - J30	
22/09/15 04:39:08	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 04:44:13	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 04:44:13	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 04:51:46	SIG	M62/2189A2	NR	M62 J25 - J30	
22/09/15 04:51:46	SIG	M62/2189A3	NR	M62 J25 - J30	
22/09/15 04:51:46	SIG	M62/2189A4	NR	M62 J25 - J30	
22/09/15 04:51:46	SIG	M62/2197A1	OFF	M62 J25 - J30	
22/09/15 04:51:46	SIG	M62/2197A2	OFF	M62 J25 - J30	
22/09/15 04:51:46	SIG	M62/2197A3	OFF	M62 J25 - J30	
22/09/15 04:54:46	SIG	M62/2189A2	OFF	M62 J25 - J30	
22/09/15 04:54:46	SIG	M62/2189A3	OFF	M62 J25 - J30	
22/09/15 04:54:46	SIG	M62/2189A4	OFF	M62 J25 - J30	
22/09/15 04:54:47	SIG	M62/2189A1	BLNK	M62 J25 - J30	
22/09/15 06:27:48	SIG	M62/2079A1	REDX	M62 J25 - J30	
22/09/15 06:27:48	SIG	M62/2079A2	NR	M62 J25 - J30	
22/09/15 06:27:48	SIG	M62/2079A3	NR	M62 J25 - J30	
22/09/15 06:27:48	SIG	M62/2079A4	NR	M62 J25 - J30	
22/09/15 06:28:07	SIG	M62/2079A1	BLNK	M62 J25 - J30	
22/09/15 06:28:07	SIG	M62/2079A2	OFF	M62 J25 - J30	
22/09/15 06:28:07	SIG	M62/2079A3	OFF	M62 J25 - J30	
22/09/15 06:28:07	SIG	M62/2079A4	OFF	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 06:34:11	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 06:37:19	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 06:37:39	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 06:37:59	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 06:38:04	SIG	M62/2018A1	60R	M62 J25 - J30	
22/09/15 06:38:04	SIG	M62/2025A1	60R	M62 J25 - J30	
22/09/15 06:40:28	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 06:40:29	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 06:40:30	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 06:40:30	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 06:41:06	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 06:41:06	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 06:44:31	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 06:44:31	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 06:44:31	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 06:44:58	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 06:44:58	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 06:44:58	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 06:49:41	SIG	M62/2033A1	HSD	M62 J25 - J30	
22/09/15 06:50:41	SIG	M62/2041A1	HSD	M62 J25 - J30	
22/09/15 06:51:48	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 06:51:48	SIG	M62/2050A1	HSD	M62 J25 - J30	
22/09/15 06:52:40	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 06:53:40	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 06:54:10	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 06:54:10	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 06:54:10	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 06:54:41	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 06:54:41	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 06:54:41	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 06:54:41	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2159B1	NR	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2159B2	NR	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 06:55:15	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 06:55:21	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 06:57:25	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 06:57:25	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 06:57:25	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 06:57:25	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 06:57:25	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 06:57:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 06:57:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 06:57:39	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 06:57:39	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 06:57:39	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 06:58:10	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2004A1	OFF	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2004A2	OFF	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2004A3	OFF	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 06:58:10	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 06:58:46	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 06:58:46	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 06:58:46	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 06:58:46	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 06:58:51	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 06:59:15	SIG	M62/2159B1	NR	M62 J25 - J30	
22/09/15 06:59:15	SIG	M62/2159B2	NR	M62 J25 - J30	
22/09/15 06:59:15	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 06:59:15	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 06:59:15	SIG	M62/2170L1	OFF	M62 J25 - J30	
22/09/15 06:59:15	SIG	M62/2170L2	OFF	M62 J25 - J30	
22/09/15 06:59:19	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 06:59:38	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 06:59:58	SIG	M62/2033A1	40R	M62 J25 - J30	
22/09/15 07:00:02	SIG	M62/2018A1	60R	M62 J25 - J30	
22/09/15 07:00:02	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2018A1	50R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 07:00:20	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 07:00:25	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 07:00:25	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2018A1	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:00:25	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:00:28	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 07:00:28	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 07:00:28	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 07:00:28	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 07:00:34	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 07:00:50	SIG	M62/2159B1	NR	M62 J25 - J30	
22/09/15 07:00:50	SIG	M62/2159B2	NR	M62 J25 - J30	
22/09/15 07:00:50	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:00:50	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:00:50	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:00:50	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:00:56	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:00:56	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:00:56	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:00:56	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2194B1	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2194B2	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2194B3	60R	M62 J25 - J30	
22/09/15 07:01:10	SIG	M62/2194B4	60R	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2065A2	60R	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2065A3	60R	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2065A4	60R	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2079A1	REDX	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2079A2	NR	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2079A3	NR	M62 J25 - J30	
22/09/15 07:01:15	SIG	M62/2079A4	NR	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2079A2	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2079A3	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2079A4	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2088A1	REDX	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2088A2	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2088A3	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2088A4	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2097A1	REDX	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2097A2	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2097A3	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2097A4	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2106A1	REDX	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2106A2	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2106A3	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2106A4	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2114A1	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2114A2	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2114A3	60R	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2117A1	REDX	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2117A2	NR	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2117A3	NR	M62 J25 - J30	
22/09/15 07:01:16	SIG	M62/2117A4	NR	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2183L1	40R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 07:01:25	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 07:01:39	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 07:01:39	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 07:01:39	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 07:01:39	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:02:01	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2041A1	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 07:02:10	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 07:02:13	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 07:02:13	SIG	M62/2069M1	60R	M62 J25 - J30	
22/09/15 07:02:13	SIG	M62/2069M2	60R	M62 J25 - J30	
22/09/15 07:02:13	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 07:02:13	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2012B2	NR	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2012B3	NR	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2012B4	NR	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2065B1	REDX	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 07:02:14	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 07:02:14	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 07:02:35	SIG	M62/2106A1	60R	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 07:02:47	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 07:02:59	SIG	M62/2097A1	60R	M62 J25 - J30	
22/09/15 07:03:04	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:03:04	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1955K1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1955K2	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1956A1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1956A2	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 07:03:10	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 07:03:19	SIG	M62/2088A1	60R	M62 J25 - J30	
22/09/15 07:03:23	SIG	M62/2079A1	60R	M62 J25 - J30	
22/09/15 07:03:33	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 07:03:47	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 07:03:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 07:03:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 07:03:49	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 07:03:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:03:50	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:03:55	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 07:03:56	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:04:13	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 07:04:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:04:42	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 07:04:42	SIG	M621/1002B1	60R	M62 J25 - J30	
22/09/15 07:04:42	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 07:04:42	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 07:04:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:04:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:04:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:04:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:05:10	SIG	M62/2203B1	60R	M62 J25 - J30	
22/09/15 07:05:10	SIG	M62/2203B2	60R	M62 J25 - J30	
22/09/15 07:05:10	SIG	M62/2203B3	60R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2018A1	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 07:05:18	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 07:05:53	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2050B2	40R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2050B3	40R	M62 J25 - J30	
22/09/15 07:05:59	SIG	M62/2050B4	40R	M62 J25 - J30	
22/09/15 07:06:04	SIG	M62/2041B1	30R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2041B1	20R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2050B2	40R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2050B3	40R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2050B4	40R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2057B1	LDR	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M62/2065M1	50R	M62 J25 - J30	
22/09/15 07:06:09	SIG	M621/1002B1	LDR	M62 J25 - J30	
22/09/15 07:06:09	SIG	M621/1002B2	50R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 07:06:10	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 07:06:10	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 07:06:11	SIG	M62/2041B1	20R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2018A1	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2025A1	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 07:06:12	SIG	M62/2041B1	STOP	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M621/1002B1	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 07:06:24	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 07:06:24	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 07:06:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:06:56	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:07:01	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:07:19	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 07:07:19	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 07:07:19	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:07:19	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/2004A1	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/2004A2	OFF	M62 J25 - J30	
22/09/15 07:08:10	SIG	M62/2004A3	OFF	M62 J25 - J30	
22/09/15 07:08:21	SIG	M62/2018B3	???	M62 J25 - J30	
22/09/15 07:08:21	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 07:08:21	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 07:08:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:08:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:09:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 07:09:10	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 07:09:13	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:09:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 07:09:19	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 07:10:34	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 07:11:33	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 07:11:33	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 07:11:33	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 07:11:33	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 07:11:39	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 07:12:11	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2018A1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2041A1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 07:12:11	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 07:12:59	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:12:59	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:12:59	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:12:59	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2183L1	40R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 07:13:04	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 07:13:30	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:13:30	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:13:30	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:13:30	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:13:35	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:13:35	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:13:35	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:13:35	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:15:10	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 07:15:10	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 07:15:10	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 07:15:10	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 07:15:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:15:12	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:15:17	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:15:22	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:15:22	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:15:28	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:16:58	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:16:58	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 07:16:58	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 07:16:58	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 07:17:28	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 07:17:33	SIG	M62/2113B1	REDX	M62 J25 - J30	
22/09/15 07:17:33	SIG	M62/2113B2	NR	M62 J25 - J30	
22/09/15 07:17:33	SIG	M62/2113B3	NR	M62 J25 - J30	
22/09/15 07:17:33	SIG	M62/2113B4	NR	M62 J25 - J30	
22/09/15 07:17:33	SIG	M62/2120M1	60R	M62 J25 - J30	
22/09/15 07:17:33	SIG	M62/2120M2	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2081B1	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2081B2	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2081B3	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2081L1	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2081L1	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2088B1	REDX	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2088B2	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2088B3	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2088B4	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2097B1	REDX	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2097B2	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2097B4	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2106B1	REDX	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2106B2	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2106B3	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2106B4	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2113B2	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2113B3	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2113B4	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2117B1	60R	M62 J25 - J30	
22/09/15 07:17:43	SIG	M62/2117B3	60R	M62 J25 - J30	
22/09/15 07:18:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:18:17	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:18:23	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:19:27	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:19:28	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 07:19:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 07:19:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 07:19:57	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 07:19:58	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 07:20:28	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:20:28	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:20:28	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 07:20:34	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 07:20:52	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 07:20:52	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 07:20:52	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 07:20:52	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 07:20:58	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 07:21:51	SIG	M62/2088B1	60R	M62 J25 - J30	
22/09/15 07:22:07	SIG	M62/2097B1	60R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2183L1	40R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 07:22:21	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 07:22:22	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:22:22	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:22:22	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:22:22	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:22:27	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:22:27	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:22:27	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:22:27	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:23:25	SIG	M62/2106B1	60R	M62 J25 - J30	
22/09/15 07:23:29	SIG	M62/2113B1	60R	M62 J25 - J30	
22/09/15 07:23:33	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:23:33	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:23:39	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:24:28	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:24:28	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 07:24:28	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 07:24:28	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 07:24:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:24:30	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:24:36	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 07:26:11	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 07:26:29	SIG	M62/2189B4	OFF	M62 J25 - J30	
22/09/15 07:26:30	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:26:31	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:26:37	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:26:38	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:26:38	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 07:27:21	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 07:27:21	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 07:27:21	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:27:21	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2189B1	40R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2189B2	40R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2189B3	40R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2189B4	40R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 07:27:35	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 07:27:36	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:27:41	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:28:18	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 07:28:18	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 07:28:18	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 07:28:18	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:28:23	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2041A1	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 07:29:11	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 07:29:28	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 07:30:31	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 07:30:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:30:49	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:30:54	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:32:04	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 07:32:04	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 07:32:04	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 07:32:04	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 07:32:10	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 07:32:10	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 07:32:10	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 07:32:10	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 07:32:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:32:19	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1979K1	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1979K2	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1981A1	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1981A2	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1981A3	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1981A4	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1992A2	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1992A3	60R	M62 J25 - J30	
22/09/15 07:32:20	SIG	M62/1992J1	60R	M62 J25 - J30	
22/09/15 07:32:24	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 07:33:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:33:50	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:33:55	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2018A1	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 07:34:48	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 07:35:01	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 07:35:01	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 07:35:01	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 07:35:01	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 07:35:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:35:23	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:35:28	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 07:35:55	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 07:35:55	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 07:35:55	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 07:35:55	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 07:36:01	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 07:36:01	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 07:36:01	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 07:36:01	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 07:36:05	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 07:36:05	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 07:36:05	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 07:36:05	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 07:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 07:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:36:19	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 07:36:19	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 07:36:19	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 07:36:20	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 07:36:20	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 07:36:20	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 07:36:24	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:36:24	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:36:24	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:36:24	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:36:29	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:36:29	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:36:29	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:36:29	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:36:54	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:36:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:37:00	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:37:06	SIG	M62/2057A1	50R	M62 J25 - J30	
22/09/15 07:37:06	SIG	M62/2057A2	50R	M62 J25 - J30	
22/09/15 07:37:06	SIG	M62/2057A3	50R	M62 J25 - J30	
22/09/15 07:37:06	SIG	M62/2057J1	50R	M62 J25 - J30	
22/09/15 07:37:06	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 07:37:06	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 07:37:11	SIG	M62/2057A1	40R	M62 J25 - J30	
22/09/15 07:37:11	SIG	M62/2057A2	40R	M62 J25 - J30	
22/09/15 07:37:11	SIG	M62/2057A3	40R	M62 J25 - J30	
22/09/15 07:37:11	SIG	M62/2057J1	40R	M62 J25 - J30	
22/09/15 07:37:11	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 07:37:11	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 07:37:12	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 07:37:12	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 07:37:12	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 07:37:12	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2194B1	40R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2194B2	40R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2194B3	40R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2194B4	40R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2197B1	50R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2197B2	50R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2197B3	50R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2199M1	50R	M62 J25 - J30	
22/09/15 07:37:50	SIG	M62/2199M2	50R	M62 J25 - J30	
22/09/15 07:37:55	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 07:37:55	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 07:37:55	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 07:37:55	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 07:38:00	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 07:38:16	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 07:38:26	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:38:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:38:32	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 07:38:33	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 07:38:47	SIG	M62/2018A1	50R	M62 J25 - J30	
22/09/15 07:38:47	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 07:38:47	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 07:38:47	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2197B1	40R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2197B2	40R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2197B3	40R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2199M1	40R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2199M2	40R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2203B1	50R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2203B2	50R	M62 J25 - J30	
22/09/15 07:39:00	SIG	M62/2203B3	50R	M62 J25 - J30	
22/09/15 07:39:43	SIG	M62/2203B1	40R	M62 J25 - J30	
22/09/15 07:39:43	SIG	M62/2203B2	40R	M62 J25 - J30	
22/09/15 07:39:43	SIG	M62/2203B3	40R	M62 J25 - J30	
22/09/15 07:39:44	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 07:39:44	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 07:39:44	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 07:39:44	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:39:49	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 07:40:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:40:02	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:40:07	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:40:24	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 07:40:24	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 07:40:24	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:40:24	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 07:40:53	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 07:40:57	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 07:40:57	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 07:40:57	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 07:40:57	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 07:40:57	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 07:41:12	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 07:41:12	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 07:41:12	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 07:41:12	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 07:41:22	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 07:41:42	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:41:42	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:41:42	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:41:42	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:41:42	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 07:41:53	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 07:42:03	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 07:42:09	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 07:43:05	SIG	M62/2050A1	40R	M62 J25 - J30	
22/09/15 07:43:05	SIG	M62/2050A2	40R	M62 J25 - J30	
22/09/15 07:43:05	SIG	M62/2050A3	40R	M62 J25 - J30	
22/09/15 07:43:05	SIG	M62/2050A4	40R	M62 J25 - J30	
22/09/15 07:43:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:43:07	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:43:12	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:43:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:43:33	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:43:38	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 07:43:43	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 07:44:14	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 07:44:14	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 07:44:37	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 07:44:37	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 07:44:42	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 07:44:42	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 07:44:52	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 07:45:07	SIG	M62/2041A1	40R	M62 J25 - J30	
22/09/15 07:45:07	SIG	M62/2041A2	40R	M62 J25 - J30	
22/09/15 07:45:07	SIG	M62/2041A3	40R	M62 J25 - J30	
22/09/15 07:45:07	SIG	M62/2041A4	40R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1992A2	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1992A3	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1992J1	60R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 07:45:22	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2194B1	60R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2194B2	60R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2194B3	60R	M62 J25 - J30	
22/09/15 07:45:26	SIG	M62/2194B4	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 07:45:41	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 07:46:02	SIG	M62/2203B1	60R	M62 J25 - J30	
22/09/15 07:46:02	SIG	M62/2203B2	60R	M62 J25 - J30	
22/09/15 07:46:02	SIG	M62/2203B3	60R	M62 J25 - J30	
22/09/15 07:46:14	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:46:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:46:19	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 07:46:25	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 07:47:17	SIG	M62/2033A1	40R	M62 J25 - J30	
22/09/15 07:47:17	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 07:47:17	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 07:47:17	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 07:48:08	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 07:48:08	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 07:48:08	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:48:08	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:48:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:48:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:48:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:48:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2189B1	40R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2189B2	40R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2189B3	40R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2189B4	40R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 07:49:03	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 07:49:20	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:49:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:49:26	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:49:27	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 07:49:27	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 07:49:28	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:49:28	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:49:28	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:49:33	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:49:33	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 07:49:33	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 07:49:33	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 07:49:34	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 07:49:34	SIG	M62/1987A2	50R	M62 J25 - J30	
22/09/15 07:49:34	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 07:49:34	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 07:49:49	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 07:50:02	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 07:50:02	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 07:50:08	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 07:50:08	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 07:50:18	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 07:50:18	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 07:50:18	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 07:50:18	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/2018A1	40R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 07:50:59	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1955K1	50R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1955K2	50R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1956A1	50R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1956A2	50R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1956A3	50R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1960A1	40R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1960A2	40R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1960A3	40R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1960K1	40R	M62 J25 - J30	
22/09/15 07:51:05	SIG	M62/1960K2	40R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2194B1	40R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2194B2	40R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2194B3	40R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2194B4	40R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2197B1	50R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2197B2	50R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2197B3	50R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2199M1	50R	M62 J25 - J30	
22/09/15 07:52:03	SIG	M62/2199M2	50R	M62 J25 - J30	
22/09/15 07:52:05	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 07:52:05	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 07:52:05	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 07:52:05	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 07:52:11	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 07:52:11	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 07:52:11	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 07:52:11	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 07:52:15	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:52:16	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 07:52:18	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 07:52:21	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:52:22	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 07:52:24	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 07:52:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:52:27	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 07:52:28	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 07:52:32	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:52:36	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:52:36	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:52:36	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:52:36	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:52:41	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:52:41	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:52:41	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:52:41	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1979K1	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1979K2	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1981A1	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1981A2	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1981A3	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1981A4	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 07:53:33	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 07:53:44	SIG	M62/1955K1	40R	M62 J25 - J30	
22/09/15 07:53:44	SIG	M62/1955K2	40R	M62 J25 - J30	
22/09/15 07:53:44	SIG	M62/1956A1	40R	M62 J25 - J30	
22/09/15 07:53:44	SIG	M62/1956A2	40R	M62 J25 - J30	
22/09/15 07:53:44	SIG	M62/1956A3	40R	M62 J25 - J30	
22/09/15 07:54:02	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 07:54:02	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 07:54:02	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 07:54:02	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 07:54:02	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 07:54:02	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 07:55:20	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:55:21	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:55:26	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:55:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:55:33	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:55:38	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 07:56:04	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 07:56:36	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 07:56:36	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 07:56:36	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 07:56:36	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 07:57:03	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 07:57:03	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 07:57:03	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:57:03	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 07:57:07	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 07:57:09	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 07:57:09	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 07:57:09	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 07:57:09	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 07:57:12	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 07:57:44	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1955K1	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1955K2	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1956A1	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1956A2	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 07:57:45	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 07:58:13	SIG	M62/2057A1	50R	M62 J25 - J30	
22/09/15 07:58:13	SIG	M62/2057A2	50R	M62 J25 - J30	
22/09/15 07:58:13	SIG	M62/2057A3	50R	M62 J25 - J30	
22/09/15 07:58:13	SIG	M62/2057J1	50R	M62 J25 - J30	
22/09/15 07:58:13	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 07:58:13	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2057A1	40R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2057A2	40R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2057A3	40R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M62/2057J1	40R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 07:58:18	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 07:58:25	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 07:58:25	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 07:58:31	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 07:58:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 07:58:48	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 07:58:54	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 07:58:57	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 07:59:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:59:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:59:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 07:59:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:00:07	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 08:00:07	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 08:00:07	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 08:00:07	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 08:00:15	SIG	M62/2050A1	40R	M62 J25 - J30	
22/09/15 08:00:15	SIG	M62/2050A2	40R	M62 J25 - J30	
22/09/15 08:00:15	SIG	M62/2050A3	40R	M62 J25 - J30	
22/09/15 08:00:15	SIG	M62/2050A4	40R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 08:00:32	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2194B1	40R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2194B2	40R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2194B3	40R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2194B4	40R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2197B1	50R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2197B2	50R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2197B3	50R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2199M1	50R	M62 J25 - J30	
22/09/15 08:00:49	SIG	M62/2199M2	50R	M62 J25 - J30	
22/09/15 08:01:07	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 08:01:07	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 08:01:07	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 08:01:07	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 08:01:29	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:01:30	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:01:35	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:01:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:01:48	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:01:54	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:02:14	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 08:02:14	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 08:02:39	SIG	M62/2025A1	60R	M62 J25 - J30	
22/09/15 08:02:39	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 08:02:39	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 08:02:39	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 08:02:45	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 08:02:59	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 08:03:33	SIG	M62/2018A1	60R	M62 J25 - J30	
22/09/15 08:03:33	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 08:03:33	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 08:03:33	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 08:03:58	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 08:03:58	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 08:03:58	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 08:03:58	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1974A1	40R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1974A2	40R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1974A3	40R	M62 J25 - J30	
22/09/15 08:04:06	SIG	M62/1974A4	40R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 08:04:15	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 08:04:48	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 08:04:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:04:51	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:04:56	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:05:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:05:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:05:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:05:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:05:23	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 08:05:23	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 08:05:23	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 08:05:23	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 08:05:28	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 08:05:28	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 08:05:28	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 08:05:28	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 08:05:35	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:05:36	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 08:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 08:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 08:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 08:06:42	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 08:07:11	SIG	M62/2197B1	50R	M62 J25 - J30	
22/09/15 08:07:11	SIG	M62/2197B2	50R	M62 J25 - J30	
22/09/15 08:07:11	SIG	M62/2197B3	50R	M62 J25 - J30	
22/09/15 08:07:11	SIG	M62/2199M1	50R	M62 J25 - J30	
22/09/15 08:07:11	SIG	M62/2199M2	50R	M62 J25 - J30	
22/09/15 08:07:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:07:57	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:08:02	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2057A1	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2057A2	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2057A3	50R	M62 J25 - J30	
22/09/15 08:08:45	SIG	M62/2057J1	50R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2050A1	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2050A2	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2050A3	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2050A4	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2057A1	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2057A2	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2057A3	40R	M62 J25 - J30	
22/09/15 08:08:51	SIG	M62/2057J1	40R	M62 J25 - J30	
22/09/15 08:10:00	SIG	M62/2194B1	40R	M62 J25 - J30	
22/09/15 08:10:00	SIG	M62/2194B2	40R	M62 J25 - J30	
22/09/15 08:10:00	SIG	M62/2194B3	40R	M62 J25 - J30	
22/09/15 08:10:00	SIG	M62/2194B4	40R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1955K1	50R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1955K2	50R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1956A1	50R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1956A2	50R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1956A3	50R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1960A1	40R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1960A2	40R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1960A3	40R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1960K1	40R	M62 J25 - J30	
22/09/15 08:10:26	SIG	M62/1960K2	40R	M62 J25 - J30	
22/09/15 08:10:55	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 08:10:55	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 08:11:02	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:11:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:11:06	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 08:11:06	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 08:11:07	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:11:11	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 08:11:11	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 08:11:42	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 08:11:42	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 08:11:42	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 08:11:42	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 08:12:21	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 08:12:46	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 08:12:46	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 08:12:46	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 08:12:46	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 08:13:12	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 08:13:12	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 08:13:12	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 08:13:12	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 08:13:14	SIG	M62/2050A1	40R	M62 J25 - J30	
22/09/15 08:13:14	SIG	M62/2050A2	40R	M62 J25 - J30	
22/09/15 08:13:14	SIG	M62/2050A3	40R	M62 J25 - J30	
22/09/15 08:13:14	SIG	M62/2050A4	40R	M62 J25 - J30	
22/09/15 08:14:00	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 08:14:00	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 08:14:00	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 08:14:00	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 08:14:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:14:09	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:14:14	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:14:16	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 08:14:16	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 08:14:16	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 08:14:25	SIG	M62/2041A1	50R	M62 J25 - J30	
22/09/15 08:14:25	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 08:14:25	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 08:14:25	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 08:14:26	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 08:14:26	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 08:14:26	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 08:14:26	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 08:14:26	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2041A1	40R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2041A2	40R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2041A3	40R	M62 J25 - J30	
22/09/15 08:14:30	SIG	M62/2041A4	40R	M62 J25 - J30	
22/09/15 08:14:51	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 08:14:51	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 08:14:51	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 08:14:51	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 08:14:51	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 08:15:21	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 08:15:25	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 08:15:25	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 08:15:25	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 08:15:25	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 08:15:25	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 08:15:26	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 08:15:31	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 08:15:31	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 08:16:36	SIG	M62/1960A1	40R	M62 J25 - J30	
22/09/15 08:16:36	SIG	M62/1960A2	40R	M62 J25 - J30	
22/09/15 08:16:36	SIG	M62/1960A3	40R	M62 J25 - J30	
22/09/15 08:16:36	SIG	M62/1960K1	40R	M62 J25 - J30	
22/09/15 08:16:36	SIG	M62/1960K2	40R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2033A1	40R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 08:16:47	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 08:17:09	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 08:17:09	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 08:17:09	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 08:17:09	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 08:17:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:17:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 08:17:15	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:17:21	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:17:32	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 08:17:32	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 08:17:38	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 08:17:38	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 08:18:26	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2018A1	50R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 08:18:35	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 08:18:44	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 08:18:58	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 08:18:58	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 08:18:58	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 08:18:58	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 08:19:14	SIG	M62/2189B1	40R	M62 J25 - J30	
22/09/15 08:19:14	SIG	M62/2189B2	40R	M62 J25 - J30	
22/09/15 08:19:14	SIG	M62/2189B3	40R	M62 J25 - J30	
22/09/15 08:19:14	SIG	M62/2189B4	40R	M62 J25 - J30	
22/09/15 08:19:16	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 08:19:16	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 08:19:16	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 08:20:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:20:21	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:20:26	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:20:38	SIG	M62/2018A1	40R	M62 J25 - J30	
22/09/15 08:20:38	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 08:20:38	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 08:20:38	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 08:20:39	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 08:20:39	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 08:20:39	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 08:20:39	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 08:20:49	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 08:20:49	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 08:20:49	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 08:20:49	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 08:21:03	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 08:21:03	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 08:21:03	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 08:21:03	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 08:21:05	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:21:06	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:21:11	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:21:33	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 08:21:33	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 08:21:40	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 08:21:40	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 08:21:40	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 08:21:40	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 08:21:46	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 08:21:46	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 08:21:46	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 08:21:46	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 08:21:52	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 08:22:44	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 08:22:44	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 08:22:44	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 08:22:45	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 08:22:45	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 08:22:45	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 08:22:45	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 08:22:45	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 08:23:07	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 08:23:07	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 08:23:07	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 08:23:14	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 08:23:14	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 08:23:14	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 08:23:14	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 08:23:16	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 08:23:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:23:27	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:23:32	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 08:24:04	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:24:05	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:24:10	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:24:28	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 08:24:28	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 08:24:28	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 08:24:28	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 08:25:35	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 08:25:35	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 08:25:35	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 08:25:35	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 08:25:40	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 08:25:40	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 08:25:40	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 08:25:40	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 08:25:50	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 08:25:50	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 08:25:50	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2194B1	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2194B2	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2194B3	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2194B4	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 08:26:12	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 08:26:53	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 08:26:53	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 08:26:53	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 08:26:53	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 08:26:58	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 08:26:58	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 08:26:58	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 08:26:58	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 08:27:07	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:27:08	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:27:14	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 08:27:21	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1955K1	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1955K2	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1956A1	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1956A2	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 08:28:13	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 08:28:16	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:28:16	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 08:28:16	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 08:28:16	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 08:28:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:28:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:28:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:28:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:29:29	SIG	M62/2057A1	50R	M62 J25 - J30	
22/09/15 08:29:29	SIG	M62/2057A2	50R	M62 J25 - J30	
22/09/15 08:29:29	SIG	M62/2057A3	50R	M62 J25 - J30	
22/09/15 08:29:29	SIG	M62/2057J1	50R	M62 J25 - J30	
22/09/15 08:29:29	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 08:29:29	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2057A1	40R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2057A2	40R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2057A3	40R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M62/2057J1	40R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 08:29:34	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 08:29:50	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 08:29:50	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 08:29:50	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2033A1	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 08:30:08	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 08:30:54	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 08:31:00	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 08:31:00	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 08:31:00	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 08:31:12	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 08:31:12	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 08:31:12	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 08:31:12	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 08:32:15	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:32:16	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:32:22	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 08:33:29	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 08:33:29	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 08:33:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:33:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 08:34:08	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 08:34:08	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 08:34:08	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 08:34:08	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 08:34:39	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 08:34:39	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 08:34:47	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 08:34:47	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 08:34:47	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 08:34:47	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 08:34:47	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 08:34:47	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 08:35:19	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:35:20	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:35:26	SIG	M62/2025A1	40R	M62 J25 - J30	
22/09/15 08:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/2025A1	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 08:36:19	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1955K1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1955K2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1956A1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1956A2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1956A3	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1992A2	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1992A3	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1992J1	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2025A1	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 08:37:12	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 08:37:54	SIG	M62/2018A1	60R	M62 J25 - J30	
22/09/15 08:37:54	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 08:37:54	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 08:37:54	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1992A1	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1992A2	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1992A3	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1992J1	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 08:38:17	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 08:38:47	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 08:38:47	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2004A1	NR	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2004A2	NR	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2004A3	NR	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 08:38:47	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 08:38:49	SIG	M62/2057A1	50R	M62 J25 - J30	
22/09/15 08:38:49	SIG	M62/2057A2	50R	M62 J25 - J30	
22/09/15 08:38:49	SIG	M62/2057A3	50R	M62 J25 - J30	
22/09/15 08:38:49	SIG	M62/2057J1	50R	M62 J25 - J30	
22/09/15 08:38:49	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 08:38:49	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2050A1	50R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2050A2	50R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2050A3	50R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2050A4	50R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2057A1	40R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2057A2	40R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2057A3	40R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M62/2057J1	40R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 08:38:54	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 08:39:25	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 08:39:26	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 08:41:12	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 08:41:12	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 08:41:12	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 08:41:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1979K1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1979K2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1981A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1981A2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1981A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1981A4	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1992A2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1992A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1992J1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 08:41:22	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 08:41:42	SIG	M62/2050A1	40R	M62 J25 - J30	
22/09/15 08:41:42	SIG	M62/2050A2	40R	M62 J25 - J30	
22/09/15 08:41:42	SIG	M62/2050A3	40R	M62 J25 - J30	
22/09/15 08:41:42	SIG	M62/2050A4	40R	M62 J25 - J30	
22/09/15 08:41:47	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 08:41:47	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 08:42:48	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 08:42:48	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 08:44:02	SIG	M621/1002A1	50R	M62 J25 - J30	
22/09/15 08:44:02	SIG	M621/1002A2	50R	M62 J25 - J30	
22/09/15 08:44:07	SIG	M621/1002A1	40R	M62 J25 - J30	
22/09/15 08:44:07	SIG	M621/1002A2	40R	M62 J25 - J30	
22/09/15 08:44:12	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 08:44:12	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 08:44:12	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 08:44:17	SIG	M62/2041A1	50R	M62 J25 - J30	
22/09/15 08:44:17	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 08:44:17	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 08:44:17	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2033A1	50R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2041A1	40R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2041A2	40R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2041A3	40R	M62 J25 - J30	
22/09/15 08:44:22	SIG	M62/2041A4	40R	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1981A1	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1981A2	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1981A3	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1981A4	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 08:45:22	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 08:48:13	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 08:48:13	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 08:48:13	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 08:48:13	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 08:48:13	SIG	M621/1002A1	OFF	M62 J25 - J30	
22/09/15 08:48:13	SIG	M621/1002A2	OFF	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 08:48:17	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 08:48:22	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 08:48:32	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 08:50:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 08:50:12	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 08:50:12	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 08:50:12	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 08:53:12	SIG	M62/2159B1	NR	M62 J25 - J30	
22/09/15 08:53:12	SIG	M62/2159B2	NR	M62 J25 - J30	
22/09/15 08:53:12	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 08:53:12	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 08:53:12	SIG	M62/2170L1	OFF	M62 J25 - J30	
22/09/15 08:53:12	SIG	M62/2170L2	OFF	M62 J25 - J30	
22/09/15 08:54:12	SIG	M62/2004A1	OFF	M62 J25 - J30	
22/09/15 08:54:12	SIG	M62/2004A2	OFF	M62 J25 - J30	
22/09/15 08:54:12	SIG	M62/2004A3	OFF	M62 J25 - J30	
22/09/15 08:54:13	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 08:54:13	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 08:54:13	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 08:54:13	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 08:54:13	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 08:56:12	SIG	M62/2159B1	OFF	M62 J25 - J30	
22/09/15 08:56:13	SIG	M62/2159B2	OFF	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2183B1	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2183B2	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2183L1	NR	M62 J25 - J30	
22/09/15 09:00:13	SIG	M62/2183L2	NR	M62 J25 - J30	
22/09/15 09:03:13	SIG	M62/2170B1	OFF	M62 J25 - J30	
22/09/15 09:03:13	SIG	M62/2170B2	OFF	M62 J25 - J30	
22/09/15 09:03:13	SIG	M62/2177B1	OFF	M62 J25 - J30	
22/09/15 09:03:13	SIG	M62/2177B2	OFF	M62 J25 - J30	
22/09/15 09:03:13	SIG	M62/2177L1	OFF	M62 J25 - J30	
22/09/15 09:03:13	SIG	M62/2177L2	OFF	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2183B1	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2183B2	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2183L1	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2183L2	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2189B1	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2189B2	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2189B3	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2189B4	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2194B1	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2194B2	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2194B3	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2194B4	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2197B1	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2197B2	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2197B3	NR	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2199M1	OFF	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2199M2	OFF	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2203B1	OFF	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2203B2	OFF	M62 J25 - J30	
22/09/15 09:05:13	SIG	M62/2203B3	OFF	M62 J25 - J30	
22/09/15 09:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 09:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 09:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 09:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 09:07:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 09:08:13	SIG	M62/2194B1	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2189B1	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2189B2	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2189B3	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2189B4	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2194B2	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2194B3	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2194B4	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2197B1	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2197B2	OFF	M62 J25 - J30	
22/09/15 09:08:14	SIG	M62/2197B3	OFF	M62 J25 - J30	
22/09/15 09:20:14	SIG	M62/2097B3	60R	M62 J25 - J30	
22/09/15 09:20:14	SIG	M62/2097B3	OFF	M62 J25 - J30	
22/09/15 09:20:15	SIG	M62/2097B3	60R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 09:22:10	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 09:22:16	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 09:24:37	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 09:32:39	SIG	M62/2079A1	HSD	M62 J25 - J30	
22/09/15 09:33:47	SIG	M62/2088A1	HSD	M62 J25 - J30	
22/09/15 09:34:55	SIG	M62/2079A1	REDX	M62 J25 - J30	
22/09/15 09:34:55	SIG	M62/2097A1	HSD	M62 J25 - J30	
22/09/15 09:36:03	SIG	M62/2088A1	REDX	M62 J25 - J30	
22/09/15 09:36:03	SIG	M62/2106A1	HSD	M62 J25 - J30	
22/09/15 09:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 09:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 09:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 09:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 09:37:11	SIG	M62/2097A1	REDX	M62 J25 - J30	
22/09/15 09:38:01	SIG	M62/2113B1	HSD	M62 J25 - J30	
22/09/15 09:38:19	SIG	M62/2106A1	REDX	M62 J25 - J30	
22/09/15 09:38:54	SIG	M62/2106B1	HSD	M62 J25 - J30	
22/09/15 09:39:19	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 09:39:19	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 09:39:19	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2079A2	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2079A3	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2079A4	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2088A2	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2088A3	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2088A4	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2097A2	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2097A3	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2097A4	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2106A2	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2106A3	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2106A4	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2114A1	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2114A2	NR	M62 J25 - J30	
22/09/15 09:39:20	SIG	M62/2114A3	NR	M62 J25 - J30	
22/09/15 09:40:02	SIG	M62/2097B1	HSD	M62 J25 - J30	
22/09/15 09:40:03	SIG	M62/2113B1	REDX	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2079A1	BLNK	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2079A2	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2079A3	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2079A4	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2088A1	BLNK	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2088A2	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2088A3	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2088A4	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2097A1	BLNK	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2097A2	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2097A3	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2097A4	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2106A1	BLNK	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2106A2	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2106A4	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2114A1	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2114A2	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2114A3	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2117A1	BLNK	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2117A2	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2117A3	OFF	M62 J25 - J30	
22/09/15 09:40:20	SIG	M62/2117A4	OFF	M62 J25 - J30	
22/09/15 09:41:10	SIG	M62/2088B1	HSD	M62 J25 - J30	
22/09/15 09:41:11	SIG	M62/2106B1	REDX	M62 J25 - J30	
22/09/15 09:42:19	SIG	M62/2097B1	REDX	M62 J25 - J30	
22/09/15 09:43:26	SIG	M62/2088B1	REDX	M62 J25 - J30	
22/09/15 09:44:19	SIG	M62/2117B1	NR	M62 J25 - J30	
22/09/15 09:44:19	SIG	M62/2117B3	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2081B1	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2081B2	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2081B3	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2081L1	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2088B2	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2088B3	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2088B4	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2097B2	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2097B3	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2097B4	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2106B2	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2106B3	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2106B4	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2113B2	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2113B3	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2113B4	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2120M1	NR	M62 J25 - J30	
22/09/15 09:44:20	SIG	M62/2120M2	NR	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2081B1	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2081B2	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2081B3	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2081L1	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2088B1	BLNK	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2088B2	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2088B3	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2088B4	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2097B1	BLNK	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2097B2	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2097B3	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2097B4	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2106B1	BLNK	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2106B2	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2106B3	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2106B4	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2113B1	BLNK	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2113B2	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2113B3	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2113B4	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2117B3	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2120M1	OFF	M62 J25 - J30	
22/09/15 09:45:20	SIG	M62/2120M2	OFF	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 09:58:54	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 09:58:59	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 09:59:02	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 10:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 10:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 10:40:12	SIG	M62/2194B1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/1987A2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2073K1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2073K1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2073K2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2073K2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A3	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A3	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A4	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074A4	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B3	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B3	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B4	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2074B4	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2081B1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2081B1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2081L1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2081L1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2117B2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2117B2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2120M1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2120M1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2137B2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2144A1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2144A2	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2144J1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2144K1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2151J1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2163A1	???	M62 J25 - J30	
22/09/15 10:40:13	SIG	M62/2194B1	???	M62 J25 - J30	
22/09/15 10:40:14	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 10:40:14	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 10:40:14	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 10:40:14	SIG	M62/2050A1	???	M62 J25 - J30	
22/09/15 10:40:14	SIG	M62/2194B1	OFF	M62 J25 - J30	
22/09/15 10:40:15	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 10:40:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 10:40:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 10:40:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 10:40:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 10:40:15	SIG	M62/2050A1	???	M62 J25 - J30	
22/09/15 10:40:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 10:40:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 10:40:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 10:40:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 10:40:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 10:40:16	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 10:40:27	SIG	M62/2081B1	OFF	M62 J25 - J30	
22/09/15 10:40:27	SIG	M62/2081L1	OFF	M62 J25 - J30	
22/09/15 10:40:27	SIG	M62/2120M1	OFF	M62 J25 - J30	
22/09/15 10:40:30	SIG	M62/2144A1	OFF	M62 J25 - J30	
22/09/15 10:40:30	SIG	M62/2144A2	OFF	M62 J25 - J30	
22/09/15 10:40:30	SIG	M62/2144J1	OFF	M62 J25 - J30	
22/09/15 10:40:30	SIG	M62/2144K1	OFF	M62 J25 - J30	
22/09/15 10:40:30	SIG	M62/2151J1	???	M62 J25 - J30	
22/09/15 10:40:30	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 10:54:51	SIG	M62/2057B1	HSD	M62 J25 - J30	
22/09/15 10:56:50	SIG	M62/2041B1	HSD	M62 J25 - J30	
22/09/15 10:56:50	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 10:56:50	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 10:56:51	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 10:56:51	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 10:57:50	SIG	M62/2033B1	HSD	M62 J25 - J30	
22/09/15 10:58:51	SIG	M62/2025B1	HSD	M62 J25 - J30	
22/09/15 10:58:51	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 10:59:43	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 11:00:27	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 11:00:57	SIG	M62/2065B2	NR	M62 J25 - J30	
22/09/15 11:00:57	SIG	M62/2065B3	NR	M62 J25 - J30	
22/09/15 11:00:57	SIG	M62/2065B4	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2018B1	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2018B2	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2018B3	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2018L1	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2025B2	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2025B3	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2025B4	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2033B2	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2033B3	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2033B4	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2041B2	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2041B3	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2041B4	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2057B2	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2057B3	NR	M62 J25 - J30	
22/09/15 11:00:58	SIG	M62/2057B4	NR	M62 J25 - J30	
22/09/15 11:01:57	SIG	M62/2069M1	OFF	M62 J25 - J30	
22/09/15 11:01:57	SIG	M62/2069M2	OFF	M62 J25 - J30	
22/09/15 11:01:57	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 11:01:57	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2025B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2025B3	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2025B4	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2033B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2033B4	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2041B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2041B3	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2041B4	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2050B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2050B3	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2050B4	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2065B1	BLNK	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2065B2	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2065B3	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2065B4	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M62/2065M1	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 11:01:58	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2018B1	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2018B2	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 11:01:59	SIG	M62/2018L1	OFF	M62 J25 - J30	
22/09/15 11:05:35	SIG	M62/2033A1	HSD	M62 J25 - J30	
22/09/15 11:06:11	SIG	M62/2151J1	OFF	M62 J25 - J30	
22/09/15 11:06:34	SIG	M62/2041A1	HSD	M62 J25 - J30	
22/09/15 11:07:41	SIG	M62/2050A1	HSD	M62 J25 - J30	
22/09/15 11:07:42	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 11:08:34	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 11:09:34	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 11:10:34	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 11:10:34	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 11:10:34	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 11:10:34	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 11:10:34	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 11:10:34	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 11:10:35	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2025A1	BLNK	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2025A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2025A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2025A4	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2033A1	BLNK	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2033A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2033A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2033A4	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2041A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2041A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2041A4	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 11:11:35	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1955K1	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1955K2	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1956A1	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1956A2	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1956A3	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 11:12:27	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1955K1	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1955K2	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1956A1	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1956A2	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1956A3	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1960A1	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1960A2	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1960A3	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1960K1	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1960K2	40R	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 11:12:33	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1955K1	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1955K2	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1956A1	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1956A2	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 11:16:27	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1956A1	50R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1956A2	50R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1956A3	50R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 11:17:15	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 11:18:15	SIG	M62/1956A1	60R	M62 J25 - J30	
22/09/15 11:18:15	SIG	M62/1956A2	60R	M62 J25 - J30	
22/09/15 11:18:15	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 11:18:57	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 11:18:57	SIG	M62/1956A3	OFF	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1979K1	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1979K2	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1981A1	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1981A2	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1981A3	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1981A4	60R	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 11:19:29	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 11:19:50	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 11:19:55	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 11:19:55	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1992A2	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1992A3	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1992J1	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 11:19:59	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 11:21:15	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 11:21:15	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 11:22:00	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 11:22:00	SIG	M62/1987A2	50R	M62 J25 - J30	
22/09/15 11:22:00	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 11:22:00	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 11:22:15	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 11:22:15	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 11:22:15	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 11:22:16	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 11:23:07	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 11:24:21	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 11:24:21	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 11:24:21	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 11:25:17	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 11:25:17	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 11:25:17	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 11:25:22	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 11:26:01	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 11:26:01	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 11:26:01	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 11:26:03	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 11:27:15	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 11:27:32	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 11:27:32	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 11:27:32	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 11:27:32	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 11:27:32	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 11:27:32	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 11:27:38	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 11:27:38	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 11:27:38	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 11:27:38	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 11:27:38	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 11:27:38	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1987A2	50R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 11:28:06	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 11:28:29	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 11:28:37	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 11:28:37	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 11:28:37	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 11:28:42	SIG	M62/2041A2	40R	M62 J25 - J30	
22/09/15 11:28:42	SIG	M62/2041A3	40R	M62 J25 - J30	
22/09/15 11:28:42	SIG	M62/2041A4	40R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 11:29:56	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 11:30:18	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1955K1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1955K2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1956A1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1956A2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1956A3	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 11:31:15	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/2004A1	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/2004A2	40R	M62 J25 - J30	
22/09/15 11:31:20	SIG	M62/2004A3	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1974A1	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1974A2	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1974A3	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1974A4	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 11:31:26	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 11:31:40	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 11:31:40	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 11:31:40	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 11:31:40	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 11:31:40	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 11:31:40	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 11:32:37	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 11:33:20	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 11:33:20	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 11:33:20	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 11:34:00	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 11:34:05	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 11:35:15	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1955K1	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1955K2	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1956A1	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1956A2	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1956A3	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 11:35:16	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 11:35:21	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 11:36:10	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 11:36:10	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 11:36:10	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 11:36:10	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 11:36:10	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 11:36:10	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 11:36:52	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 11:36:52	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 11:36:52	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 11:38:02	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 11:38:07	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 11:38:10	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 11:38:10	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 11:38:10	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 11:38:10	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 11:38:10	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 11:38:10	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2144A1	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2144A2	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2144J1	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2144K1	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2151A1	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2151A2	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2151J1	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2151K1	50R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2155A1	40R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2155A2	40R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2155J1	40R	M62 J25 - J30	
22/09/15 11:39:33	SIG	M62/2155K1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2135A1	60R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2135A2	60R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2135A3	60R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2135A4	60R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2144A1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2144A2	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2144J1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2144K1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2151A1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2151A2	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2151J1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2151K1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2155A1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2155A2	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2155J1	40R	M62 J25 - J30	
22/09/15 11:39:39	SIG	M62/2155K1	40R	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2155A1	NR	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2155A2	NR	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2155J1	NR	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2155K1	NR	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 11:39:55	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2117A1	REDX	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2117A2	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2117A3	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2117A4	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2122K1	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2122K2	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2124A1	REDX	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2124A2	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2124A3	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2124A4	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2155A1	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2155A2	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2155J1	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2155K1	60R	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2157A1	NR	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2157A2	NR	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2157J1	NR	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2157J2	NR	M62 J25 - J30	
22/09/15 11:40:15	SIG	M62/2157K1	NR	M62 J25 - J30	
22/09/15 11:40:26	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 11:40:26	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 11:40:27	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 11:40:28	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 11:40:52	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 11:40:52	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 11:40:52	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 11:41:01	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 11:41:01	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 11:41:01	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 11:41:05	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 11:41:05	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 11:41:05	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 11:41:05	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 11:41:05	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 11:41:05	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 11:41:15	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 11:41:15	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 11:41:15	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 11:41:15	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 11:41:15	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 11:41:15	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2157A1	60R	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2157A2	60R	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2157J1	60R	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2157J2	60R	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2157K1	60R	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 11:41:16	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 11:41:45	SIG	M62/1974A1	40R	M62 J25 - J30	
22/09/15 11:41:45	SIG	M62/1974A2	40R	M62 J25 - J30	
22/09/15 11:41:45	SIG	M62/1974A3	40R	M62 J25 - J30	
22/09/15 11:41:45	SIG	M62/1974A4	40R	M62 J25 - J30	
22/09/15 11:42:21	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 11:42:21	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 11:42:21	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 11:42:21	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 11:42:21	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 11:42:21	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 11:43:08	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 11:43:08	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 11:43:08	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 11:43:08	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 11:43:08	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 11:43:08	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 11:43:14	SIG	M62/2041A2	40R	M62 J25 - J30	
22/09/15 11:43:14	SIG	M62/2041A3	40R	M62 J25 - J30	
22/09/15 11:43:14	SIG	M62/2041A4	40R	M62 J25 - J30	
22/09/15 11:43:15	SIG	M62/2166K1	60R	M62 J25 - J30	
22/09/15 11:43:15	SIG	M62/2166K2	60R	M62 J25 - J30	
22/09/15 11:43:15	SIG	M62/2170A1	60R	M62 J25 - J30	
22/09/15 11:43:15	SIG	M62/2170A2	60R	M62 J25 - J30	
22/09/15 11:43:15	SIG	M62/2170K1	60R	M62 J25 - J30	
22/09/15 11:43:15	SIG	M62/2170K2	60R	M62 J25 - J30	
22/09/15 11:43:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:43:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2144A1	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2144A2	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2144J1	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2144K1	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2151A1	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2151A2	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2151J1	60R	M62 J25 - J30	
22/09/15 11:43:32	SIG	M62/2151K1	60R	M62 J25 - J30	
22/09/15 11:43:37	SIG	M62/2183A2	50R	M62 J25 - J30	
22/09/15 11:43:37	SIG	M62/2183A3	50R	M62 J25 - J30	
22/09/15 11:43:37	SIG	M62/2183A4	50R	M62 J25 - J30	
22/09/15 11:43:37	SIG	M62/2189A2	50R	M62 J25 - J30	
22/09/15 11:43:37	SIG	M62/2189A3	50R	M62 J25 - J30	
22/09/15 11:43:37	SIG	M62/2189A4	50R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2177A2	50R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2177A3	50R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2177A4	50R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2183A1	REDX	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2183A2	40R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2183A3	40R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2183A4	40R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2189A1	REDX	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2189A2	40R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2189A3	40R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2189A4	40R	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2197A1	NR	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2197A2	NR	M62 J25 - J30	
22/09/15 11:43:42	SIG	M62/2197A3	NR	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 11:45:56	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 11:46:06	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 11:46:06	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 11:46:06	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 11:47:09	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 11:47:09	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2004B1	REDX	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2004B2	NR	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2004B3	NR	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2004B4	NR	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 11:47:10	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 11:47:10	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 11:47:15	SIG	M62/2065B1	REDX	M62 J25 - J30	
22/09/15 11:47:15	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 11:47:15	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 11:47:15	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 11:47:15	SIG	M62/2069M1	60R	M62 J25 - J30	
22/09/15 11:47:15	SIG	M62/2069M2	60R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 11:47:25	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 11:47:31	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2177A2	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2177A3	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2177A4	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2183A2	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2183A3	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2183A4	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2189A2	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2189A3	60R	M62 J25 - J30	
22/09/15 11:48:38	SIG	M62/2189A4	60R	M62 J25 - J30	
22/09/15 11:48:44	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 11:48:44	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 11:48:44	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 11:48:44	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 11:48:44	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 11:48:44	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 11:49:05	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 11:49:05	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 11:49:05	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 11:49:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 11:49:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 11:49:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 11:49:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 11:49:54	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 11:49:54	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 11:49:54	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2155A1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2155A2	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2155J1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2155K1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2157A1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2157A2	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2157J1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2157J2	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2157K1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 11:49:55	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 11:50:05	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 11:50:05	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 11:50:05	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 11:51:16	SIG	M62/2117A1	BLNK	M62 J25 - J30	
22/09/15 11:51:16	SIG	M62/2117A2	OFF	M62 J25 - J30	
22/09/15 11:51:16	SIG	M62/2117A3	OFF	M62 J25 - J30	
22/09/15 11:51:16	SIG	M62/2117A4	OFF	M62 J25 - J30	
22/09/15 11:51:23	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 11:51:23	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 11:51:23	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 11:51:23	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 11:51:23	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 11:51:23	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/2122K1	OFF	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/2122K2	OFF	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/2124A2	NR	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/2124A3	NR	M62 J25 - J30	
22/09/15 11:52:16	SIG	M62/2124A4	NR	M62 J25 - J30	
22/09/15 11:52:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:52:37	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 11:53:15	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 11:53:20	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2155A1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2155A2	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2155J1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2155K1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2157A1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2157A2	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2157J1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2157J2	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2157K1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 11:53:38	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 11:53:39	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 11:53:44	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 11:53:53	SIG	M62/2041A2	50R	M62 J25 - J30	
22/09/15 11:53:53	SIG	M62/2041A3	50R	M62 J25 - J30	
22/09/15 11:53:53	SIG	M62/2041A4	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 11:54:09	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 11:54:16	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1955K1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1955K2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1956A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1956A2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1956A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 11:54:27	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1999A1	40R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1999A2	40R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1999A3	40R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 11:54:39	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 11:55:16	SIG	M62/2124A1	BLNK	M62 J25 - J30	
22/09/15 11:55:16	SIG	M62/2124A2	OFF	M62 J25 - J30	
22/09/15 11:55:16	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 11:55:16	SIG	M62/2124A4	OFF	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2155A1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2155A2	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2155J1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2155K1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2157A1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2157A2	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2157J1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2157J2	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2157K1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 11:55:19	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 11:56:29	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 11:56:29	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 11:56:29	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 11:56:29	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 11:56:29	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 11:56:29	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 11:57:14	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 11:57:14	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 11:57:14	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 11:57:14	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 11:57:14	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 11:57:14	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 11:57:16	SIG	M62/2189A2	NR	M62 J25 - J30	
22/09/15 11:57:16	SIG	M62/2189A3	NR	M62 J25 - J30	
22/09/15 11:57:16	SIG	M62/2189A4	NR	M62 J25 - J30	
22/09/15 11:57:16	SIG	M62/2197A1	NR	M62 J25 - J30	
22/09/15 11:57:16	SIG	M62/2197A2	NR	M62 J25 - J30	
22/09/15 11:57:16	SIG	M62/2197A3	NR	M62 J25 - J30	
22/09/15 11:57:43	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:57:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 11:58:01	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 11:58:01	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 11:58:01	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 11:58:16	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1979K1	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1979K2	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1981A1	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1981A2	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1981A3	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1981A4	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 11:58:27	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2135A1	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2135A2	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2135A3	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2135A4	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2144A1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2144A2	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2144J1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2144K1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2151A1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2151A2	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2151J1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2151K1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2163A1	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2163A2	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2166K1	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2166K2	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2170K1	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2170K2	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2183A2	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2183A3	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2183A4	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2189A2	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2189A3	NR	M62 J25 - J30	
22/09/15 11:59:16	SIG	M62/2189A4	NR	M62 J25 - J30	
22/09/15 12:00:16	SIG	M62/2197A1	OFF	M62 J25 - J30	
22/09/15 12:00:17	SIG	M62/2197A2	OFF	M62 J25 - J30	
22/09/15 12:00:17	SIG	M62/2197A3	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 12:01:16	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 12:01:35	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 12:01:35	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 12:01:35	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 12:01:35	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 12:01:35	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 12:02:14	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2144J1	OFF	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2183A2	OFF	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2183A3	OFF	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2183A4	OFF	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2189A2	OFF	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2189A3	OFF	M62 J25 - J30	
22/09/15 12:02:16	SIG	M62/2189A4	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2144A1	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2144A2	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2144K1	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2151A1	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2151A2	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2151J1	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2151K1	OFF	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2183A1	BLNK	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2189A1	BLNK	M62 J25 - J30	
22/09/15 12:02:17	SIG	M62/2189A1	BLNK	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2004B2	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2004B3	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2004B4	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2018B1	OFF	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2018B2	OFF	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2018L1	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2025B2	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2025B3	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2025B4	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2033B2	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2033B3	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2033B4	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2041B2	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2041B3	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2041B4	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 12:02:20	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 12:03:05	SIG	M62/2004A1	50R	M62 J25 - J30	
22/09/15 12:03:05	SIG	M62/2004A2	50R	M62 J25 - J30	
22/09/15 12:03:05	SIG	M62/2004A3	50R	M62 J25 - J30	
22/09/15 12:05:20	SIG	M62/2033B2	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2004B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2004B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2004B2	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2004B3	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2004B4	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2018L1	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2025B2	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2025B3	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2025B4	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2033B4	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2041B2	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2041B3	OFF	M62 J25 - J30	
22/09/15 12:05:21	SIG	M62/2041B4	OFF	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1992A2	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1992A3	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1992J1	60R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1999A1	50R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1999A2	50R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1999A3	50R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 12:06:11	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 12:06:29	SIG	M62/2033A2	50R	M62 J25 - J30	
22/09/15 12:06:29	SIG	M62/2033A3	50R	M62 J25 - J30	
22/09/15 12:06:29	SIG	M62/2033A4	50R	M62 J25 - J30	
22/09/15 12:06:34	SIG	M62/2025A2	50R	M62 J25 - J30	
22/09/15 12:06:34	SIG	M62/2025A3	50R	M62 J25 - J30	
22/09/15 12:06:34	SIG	M62/2025A4	50R	M62 J25 - J30	
22/09/15 12:06:34	SIG	M62/2033A2	40R	M62 J25 - J30	
22/09/15 12:06:34	SIG	M62/2033A3	40R	M62 J25 - J30	
22/09/15 12:06:34	SIG	M62/2033A4	40R	M62 J25 - J30	
22/09/15 12:08:22	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 12:08:22	SIG	M62/1992A1	60R	M62 J25 - J30	
22/09/15 12:08:22	SIG	M62/2025A2	40R	M62 J25 - J30	
22/09/15 12:08:22	SIG	M62/2025A3	40R	M62 J25 - J30	
22/09/15 12:08:22	SIG	M62/2025A4	40R	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2106B1	REDX	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2106B2	NR	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2106B3	NR	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2106B4	NR	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2113B1	REDX	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2113B2	60R	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2113B3	60R	M62 J25 - J30	
22/09/15 12:08:26	SIG	M62/2113B4	60R	M62 J25 - J30	
22/09/15 12:08:57	SIG	M62/2018A2	40R	M62 J25 - J30	
22/09/15 12:08:57	SIG	M62/2018A3	40R	M62 J25 - J30	
22/09/15 12:08:57	SIG	M62/2018A4	40R	M62 J25 - J30	
22/09/15 12:10:16	SIG	M62/2008K1	40R	M62 J25 - J30	
22/09/15 12:10:16	SIG	M62/2008K2	40R	M62 J25 - J30	
22/09/15 12:10:16	SIG	M62/2012A1	40R	M62 J25 - J30	
22/09/15 12:10:16	SIG	M62/2012A2	40R	M62 J25 - J30	
22/09/15 12:10:16	SIG	M62/2012A3	40R	M62 J25 - J30	
22/09/15 12:10:16	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 12:10:16	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2065B2	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2065B3	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2065B4	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2069M1	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M62/2069M2	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 12:10:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 12:10:29	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 12:10:29	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 12:10:29	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 12:12:16	SIG	M62/1999A1	60R	M62 J25 - J30	
22/09/15 12:12:16	SIG	M62/1999A2	60R	M62 J25 - J30	
22/09/15 12:12:16	SIG	M62/1999A3	60R	M62 J25 - J30	
22/09/15 12:12:37	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 12:12:37	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 12:12:38	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 12:12:38	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 12:12:38	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 12:12:57	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 12:12:57	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 12:12:57	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 12:13:17	SIG	M62/2065B1	BLNK	M62 J25 - J30	
22/09/15 12:13:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
22/09/15 12:13:17	SIG	M62/2065B3	OFF	M62 J25 - J30	
22/09/15 12:13:17	SIG	M62/2065B4	OFF	M62 J25 - J30	
22/09/15 12:14:16	SIG	M62/2018A2	50R	M62 J25 - J30	
22/09/15 12:14:16	SIG	M62/2018A3	50R	M62 J25 - J30	
22/09/15 12:14:16	SIG	M62/2018A4	50R	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 12:14:42	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 12:14:42	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 12:14:42	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 12:14:42	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 12:14:42	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 12:15:11	SIG	M62/2008K1	50R	M62 J25 - J30	
22/09/15 12:15:11	SIG	M62/2008K2	50R	M62 J25 - J30	
22/09/15 12:15:11	SIG	M62/2012A1	50R	M62 J25 - J30	
22/09/15 12:15:11	SIG	M62/2012A2	50R	M62 J25 - J30	
22/09/15 12:15:11	SIG	M62/2012A3	50R	M62 J25 - J30	
22/09/15 12:15:16	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 12:15:16	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 12:15:16	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 12:15:16	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2004B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2004B2	NR	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2004B3	NR	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2004B4	NR	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2065B1	REDX	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M62/2065M1	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 12:17:15	SIG	M621/1002B2	50R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 12:17:15	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2004B2	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2004B3	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2004B4	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2018B1	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2018B2	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2018L1	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2025B2	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2025B3	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2025B4	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2033B2	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2033B3	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2033B4	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2041B2	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2041B3	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2041B4	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2065B2	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2065B3	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2065B4	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 12:18:07	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 12:18:07	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 12:20:16	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 12:20:16	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2004A1	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2004A2	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2004A3	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 12:20:16	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2004B2	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2004B3	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2004B4	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2018L1	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2025B2	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2025B3	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2025B4	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2033B2	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2033B4	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2041B2	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2041B3	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2041B4	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2050B2	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2050B3	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2050B4	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2065B2	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2065B3	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2065B4	OFF	M62 J25 - J30	
22/09/15 12:21:08	SIG	M62/2065M1	OFF	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2004B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2004B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 12:21:09	SIG	M62/2065B1	BLNK	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2106B2	NR	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2106B3	NR	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2106B4	NR	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2113B1	BLNK	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2113B2	OFF	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2113B3	OFF	M62 J25 - J30	
22/09/15 12:22:14	SIG	M62/2113B4	OFF	M62 J25 - J30	
22/09/15 12:23:16	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 12:23:16	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 12:23:26	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2004A1	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2004A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2004A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2025A1	BLNK	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2025A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2025A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2025A4	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2033A1	BLNK	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2033A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2033A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2033A4	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2041A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2041A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2041A4	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 12:24:16	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 12:24:17	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 12:25:14	SIG	M62/2106B2	OFF	M62 J25 - J30	
22/09/15 12:25:14	SIG	M62/2106B3	OFF	M62 J25 - J30	
22/09/15 12:25:14	SIG	M62/2106B4	OFF	M62 J25 - J30	
22/09/15 12:25:15	SIG	M62/2106B1	BLNK	M62 J25 - J30	
22/09/15 12:26:26	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 12:26:36	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 12:26:36	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 12:28:17	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2025A1	BLNK	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2025A2	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2025A3	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2025A4	OFF	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 12:32:17	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2033A1	BLNK	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2033A2	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2033A3	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2033A4	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2041A2	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2041A3	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2041A4	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 12:35:17	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 12:35:18	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2057B2	NR	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2057B3	NR	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2057B4	NR	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2065B1	REDX	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2069M1	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M62/2069M2	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 12:58:17	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 12:58:17	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 13:00:17	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 13:01:17	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 13:21:17	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 13:21:17	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 13:21:17	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 13:21:17	SIG	M62/2057B2	NR	M62 J25 - J30	
22/09/15 13:21:17	SIG	M62/2057B3	NR	M62 J25 - J30	
22/09/15 13:21:17	SIG	M62/2057B4	NR	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2065B2	NR	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2065B3	NR	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2065B4	NR	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2069M1	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M62/2069M2	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 13:24:17	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 13:24:18	SIG	M62/2050B2	OFF	M62 J25 - J30	
22/09/15 13:24:18	SIG	M62/2050B3	OFF	M62 J25 - J30	
22/09/15 13:24:18	SIG	M62/2050B4	OFF	M62 J25 - J30	
22/09/15 13:27:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
22/09/15 13:27:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
22/09/15 13:27:18	SIG	M62/2065B3	OFF	M62 J25 - J30	
22/09/15 13:27:18	SIG	M62/2065B4	OFF	M62 J25 - J30	
22/09/15 13:27:18	SIG	M62/2065M1	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2025A1	BLNK	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2025A2	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2025A3	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2025A4	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 13:30:18	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2033A1	BLNK	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2033A2	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2033A3	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2033A4	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2041A2	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2041A3	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2041A4	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 13:33:18	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 13:33:19	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 13:33:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 13:34:18	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2025A1	BLNK	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2025A2	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2025A3	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2025A4	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 14:06:18	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 14:07:21	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1987B1	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1987B2	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1987B3	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1987B4	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 14:07:21	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1987B1	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1987B2	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1987B3	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1987B4	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1992B1	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1999B1	REDX	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 14:07:27	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 14:09:18	SIG	M62/2033A2	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2033A1	BLNK	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2033A3	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2033A4	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2041A2	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2041A3	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2041A4	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 14:09:19	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 14:09:20	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 14:09:20	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 14:11:22	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 14:11:22	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1992B1	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1992B2	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1992B3	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1992B4	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1999B2	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1999B3	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/1999B4	NR	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/2005M1	OFF	M62 J25 - J30	
22/09/15 14:11:22	SIG	M62/2005M2	OFF	M62 J25 - J30	
22/09/15 14:14:14	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1987B1	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1987B2	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1987B3	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1987B4	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 14:14:14	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1987B1	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1987B2	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1987B3	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1987B4	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1992B1	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 14:14:20	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 14:18:14	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 14:18:14	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1992B1	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1992B2	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1992B3	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1992B4	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1999B2	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1999B3	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/1999B4	NR	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/2005M1	OFF	M62 J25 - J30	
22/09/15 14:18:14	SIG	M62/2005M2	OFF	M62 J25 - J30	
22/09/15 14:21:15	SIG	M62/1999B2	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1981B1	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1981B2	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1981B3	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1981B4	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1987B1	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1987B2	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1987B3	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1987B4	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1992B1	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1992B2	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1992B3	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1992B4	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1999B1	BLNK	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1999B3	OFF	M62 J25 - J30	
22/09/15 14:21:16	SIG	M62/1999B4	OFF	M62 J25 - J30	
22/09/15 14:33:35	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 14:33:35	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 14:33:40	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 14:37:02	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 14:37:02	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 14:37:03	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 14:37:03	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 14:41:41	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2008K1	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2008K2	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2012A2	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2012A3	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2018A2	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2018A3	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2018A4	60R	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 14:41:43	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2012A1	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2025A2	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2025A3	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2025A4	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2033A2	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2033A3	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2033A4	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2041A2	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2041A3	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2041A4	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2050A2	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2050A3	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2050A4	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2057A1	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2057A2	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2057A3	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2057J1	60R	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2065A1	REDX	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 14:41:44	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 14:42:41	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 14:43:02	SIG	M62/2041A1	60R	M62 J25 - J30	
22/09/15 14:43:21	SIG	M62/2033A1	60R	M62 J25 - J30	
22/09/15 14:43:24	SIG	M62/2018A1	60R	M62 J25 - J30	
22/09/15 14:43:24	SIG	M62/2025A1	60R	M62 J25 - J30	
22/09/15 14:44:41	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 14:44:42	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 14:44:42	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2065B1	REDX	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2069M1	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M62/2069M2	60R	M62 J25 - J30	
22/09/15 14:44:53	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 14:44:53	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2012B2	NR	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2012B3	NR	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2012B4	NR	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 14:44:54	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 14:45:42	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 14:45:43	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 14:46:00	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 14:46:22	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 14:46:41	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 14:47:03	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 14:47:03	SIG	M621/1002B1	60R	M62 J25 - J30	
22/09/15 14:47:04	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 14:47:04	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 14:47:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 14:47:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 14:47:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 14:47:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:01:41	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 15:01:41	SIG	M62/2050A1	OFF	M62 J25 - J30	
22/09/15 15:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 15:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 15:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 15:07:11	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 15:07:16	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 15:09:30	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 15:09:31	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 15:09:36	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 15:12:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 15:12:34	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 15:12:39	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 15:13:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:15:37	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 15:15:38	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 15:15:43	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2155A1	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2155A2	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2155J1	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2155K1	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2157A1	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2157A2	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2157J1	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2157J2	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2157K1	60R	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2163A1	NR	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2163A2	NR	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 15:18:13	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 15:20:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 15:20:45	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 15:20:54	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 15:20:54	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 15:20:54	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 15:20:54	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 15:21:00	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M62/2065M1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M621/1002B1	50R	M62 J25 - J30	
22/09/15 15:21:08	SIG	M621/1002B2	50R	M62 J25 - J30	
22/09/15 15:23:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:23:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:23:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:23:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 15:24:54	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 15:26:20	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 15:26:20	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 15:27:20	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 15:27:54	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 15:27:55	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 15:31:36	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 15:31:36	SIG	M62/2050A1	OFF	M62 J25 - J30	
22/09/15 15:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 15:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 15:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M621/1002B1	60R	M62 J25 - J30	
22/09/15 15:37:13	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 15:39:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:39:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:39:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:39:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:39:57	SIG	M621/1010B1	50R	M62 J25 - J30	
22/09/15 15:39:57	SIG	M621/1010B2	50R	M62 J25 - J30	
22/09/15 15:39:58	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 15:39:58	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 15:39:58	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 15:39:58	SIG	M62/2065M1	50R	M62 J25 - J30	
22/09/15 15:39:58	SIG	M621/1002B1	50R	M62 J25 - J30	
22/09/15 15:39:58	SIG	M621/1002B2	50R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M62/2065B2	40R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M62/2065B3	40R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M62/2065B4	40R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M62/2065M1	40R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M62/2069M1	50R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M62/2069M2	50R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M621/1002B1	40R	M62 J25 - J30	
22/09/15 15:40:03	SIG	M621/1002B2	40R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M62/2069M1	40R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M62/2069M2	40R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M62/2074B2	50R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M62/2074B3	50R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M62/2074B4	50R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M621/1010B1	40R	M62 J25 - J30	
22/09/15 15:41:44	SIG	M621/1010B2	40R	M62 J25 - J30	
22/09/15 15:41:49	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 15:41:49	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 15:41:49	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 15:41:49	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 15:41:49	SIG	M621/1010B1	40R	M62 J25 - J30	
22/09/15 15:41:49	SIG	M621/1010B2	40R	M62 J25 - J30	
22/09/15 15:45:43	SIG	M62/2081B1	60R	M62 J25 - J30	
22/09/15 15:45:43	SIG	M62/2081B2	60R	M62 J25 - J30	
22/09/15 15:45:43	SIG	M62/2081B3	60R	M62 J25 - J30	
22/09/15 15:45:43	SIG	M62/2081L1	60R	M62 J25 - J30	
22/09/15 15:45:43	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 15:45:43	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M62/2069M1	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M62/2069M2	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M621/1002B1	60R	M62 J25 - J30	
22/09/15 15:45:44	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 15:52:58	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 15:52:58	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 15:52:58	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 15:52:58	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 15:53:03	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 15:53:03	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 15:53:03	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 15:53:03	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 15:53:08	SIG	M62/2025B1	30R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2025B1	20R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2033B1	LDR	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2041B1	LDR	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 15:53:13	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 15:53:19	SIG	M62/2025B1	STOP	M62 J25 - J30	
22/09/15 15:55:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:55:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:55:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:55:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 15:59:20	SIG	M62/2081B1	OFF	M62 J25 - J30	
22/09/15 15:59:20	SIG	M62/2081B2	OFF	M62 J25 - J30	
22/09/15 15:59:20	SIG	M62/2081B3	OFF	M62 J25 - J30	
22/09/15 15:59:20	SIG	M62/2081L1	OFF	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 16:05:15	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2050B2	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2050B3	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2050B4	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2057B1	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2057B2	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2057B3	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2057B4	40R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M62/2065M1	50R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M621/1002B1	50R	M62 J25 - J30	
22/09/15 16:05:20	SIG	M621/1002B2	50R	M62 J25 - J30	
22/09/15 16:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 16:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 16:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:06:17	SIG	M62/2065B2	40R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M62/2065B3	40R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M62/2065B4	40R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M62/2065M1	40R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M62/2069M1	50R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M62/2069M2	50R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M621/1002B1	40R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M621/1002B2	40R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M621/1010B1	50R	M62 J25 - J30	
22/09/15 16:06:17	SIG	M621/1010B2	50R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M62/2069M1	40R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M62/2069M2	40R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M62/2074B2	50R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M62/2074B3	50R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M62/2074B4	50R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M621/1010B1	40R	M62 J25 - J30	
22/09/15 16:07:34	SIG	M621/1010B2	40R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M621/1010B1	40R	M62 J25 - J30	
22/09/15 16:07:39	SIG	M621/1010B2	40R	M62 J25 - J30	
22/09/15 16:07:44	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 16:07:44	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 16:07:44	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 16:07:44	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 16:07:49	SIG	M62/2018L1	30R	M62 J25 - J30	
22/09/15 16:07:55	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 16:07:55	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 16:07:55	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 16:07:55	SIG	M62/2018L1	20R	M62 J25 - J30	
22/09/15 16:08:00	SIG	M62/2018L1	STOP	M62 J25 - J30	
22/09/15 16:08:28	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 16:08:28	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 16:08:28	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 16:08:28	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 16:08:28	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 16:08:33	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 16:08:33	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:08:33	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 16:08:33	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 16:08:33	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 16:08:33	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 16:09:23	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 16:10:19	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2050B2	40R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2050B3	40R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2050B4	40R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2057B1	40R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2057B2	40R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2057B3	40R	M62 J25 - J30	
22/09/15 16:10:24	SIG	M62/2057B4	40R	M62 J25 - J30	
22/09/15 16:11:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:11:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:11:16	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:11:26	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 16:11:26	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 16:11:31	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 16:12:39	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 16:12:39	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 16:12:39	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 16:12:39	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2088B1	REDX	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2088B2	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2088B3	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2088B4	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2097B1	REDX	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2097B2	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2097B3	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2097B4	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2106B1	REDX	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2106B2	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2106B3	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2106B4	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B1	REDX	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B2	NR	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B2	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B3	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B3	NR	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B4	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2113B4	NR	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2117B1	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2117B3	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2120M1	60R	M62 J25 - J30	
22/09/15 16:14:12	SIG	M62/2120M2	60R	M62 J25 - J30	
22/09/15 16:14:19	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 16:14:19	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 16:14:19	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 16:14:19	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2081B1	40R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2081B2	40R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2081B3	40R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2081L1	40R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 16:14:35	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 16:15:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:15:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:15:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:15:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:15:21	SIG	M62/2088B1	50R	M62 J25 - J30	
22/09/15 16:15:39	SIG	M62/2097B1	60R	M62 J25 - J30	
22/09/15 16:15:54	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 16:15:54	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 16:15:54	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 16:16:05	SIG	M62/2106B1	60R	M62 J25 - J30	
22/09/15 16:16:09	SIG	M62/2113B1	60R	M62 J25 - J30	
22/09/15 16:16:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:16:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:16:34	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:16:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2065A2	60R	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2065A3	60R	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2065A4	60R	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2079A1	REDX	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2079A2	NR	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2079A3	NR	M62 J25 - J30	
22/09/15 16:18:04	SIG	M62/2079A4	NR	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2079A2	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2079A3	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2079A4	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2088A1	REDX	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2088A2	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2088A3	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2088A4	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2097A1	REDX	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2097A2	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2097A3	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2097A4	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2106A1	REDX	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2106A2	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2106A3	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2106A4	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2114A1	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2114A2	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2114A3	60R	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2117A1	REDX	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2117A2	NR	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2117A3	NR	M62 J25 - J30	
22/09/15 16:18:05	SIG	M62/2117A4	NR	M62 J25 - J30	
22/09/15 16:18:36	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 16:18:36	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 16:18:36	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 16:18:36	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 16:19:48	SIG	M62/2106A1	60R	M62 J25 - J30	
22/09/15 16:19:54	SIG	M62/2088B1	40R	M62 J25 - J30	
22/09/15 16:19:54	SIG	M62/2088B2	40R	M62 J25 - J30	
22/09/15 16:19:54	SIG	M62/2088B3	40R	M62 J25 - J30	
22/09/15 16:19:54	SIG	M62/2088B4	40R	M62 J25 - J30	
22/09/15 16:20:09	SIG	M62/2097A1	60R	M62 J25 - J30	
22/09/15 16:20:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 16:20:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 16:20:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 16:20:18	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 16:20:29	SIG	M62/2088A1	60R	M62 J25 - J30	
22/09/15 16:20:34	SIG	M62/2079A1	60R	M62 J25 - J30	
22/09/15 16:21:21	SIG	M62/2097B1	50R	M62 J25 - J30	
22/09/15 16:21:21	SIG	M62/2097B2	50R	M62 J25 - J30	
22/09/15 16:21:21	SIG	M62/2097B3	50R	M62 J25 - J30	
22/09/15 16:21:21	SIG	M62/2097B4	50R	M62 J25 - J30	
22/09/15 16:23:53	SIG	M62/2097B1	40R	M62 J25 - J30	
22/09/15 16:23:53	SIG	M62/2097B2	40R	M62 J25 - J30	
22/09/15 16:23:53	SIG	M62/2097B3	40R	M62 J25 - J30	
22/09/15 16:23:53	SIG	M62/2097B4	40R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 16:24:29	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2189B1	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2189B2	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2189B3	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2189B4	40R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 16:24:35	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 16:25:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2197B1	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2197B2	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2197B3	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2199M1	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2199M2	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2203B1	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2203B2	50R	M62 J25 - J30	
22/09/15 16:25:39	SIG	M62/2203B3	50R	M62 J25 - J30	
22/09/15 16:26:20	SIG	M62/2159B1	NR	M62 J25 - J30	
22/09/15 16:26:20	SIG	M62/2159B2	NR	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 16:26:21	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 16:27:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 16:27:29	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 16:27:35	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2106B1	50R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2106B2	50R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2106B3	50R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2106B4	50R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2147B1	NR	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2147B2	NR	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2147B3	NR	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2147B4	NR	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2159B1	60R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2159B2	60R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2159M1	60R	M62 J25 - J30	
22/09/15 16:28:21	SIG	M62/2159M2	60R	M62 J25 - J30	
22/09/15 16:28:30	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 16:28:30	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 16:28:30	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 16:29:25	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 16:29:25	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 16:29:25	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 16:29:25	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 16:29:45	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:29:50	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 16:30:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 16:30:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 16:30:58	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 16:31:04	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2125B1	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2125B2	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2125B3	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2125L1	NR	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2125L2	NR	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2132B1	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2132B2	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2132B3	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2137B1	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2137B2	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2137B3	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2137B4	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2147B1	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2147B2	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2147B3	60R	M62 J25 - J30	
22/09/15 16:31:21	SIG	M62/2147B4	60R	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 16:31:36	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2088B1	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2097B1	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2097B2	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2097B3	50R	M62 J25 - J30	
22/09/15 16:32:00	SIG	M62/2097B4	50R	M62 J25 - J30	
22/09/15 16:32:25	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 16:32:25	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 16:32:25	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 16:32:25	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 16:32:25	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 16:32:25	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 16:32:26	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 16:32:31	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 16:33:21	SIG	M62/2125L1	60R	M62 J25 - J30	
22/09/15 16:33:21	SIG	M62/2125L2	60R	M62 J25 - J30	
22/09/15 16:33:43	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 16:33:43	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 16:33:43	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 16:33:43	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 16:34:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:34:33	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:34:38	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:35:04	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 16:35:04	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 16:35:04	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 16:35:04	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 16:35:15	SIG	M62/2088B1	40R	M62 J25 - J30	
22/09/15 16:35:15	SIG	M62/2088B2	40R	M62 J25 - J30	
22/09/15 16:35:15	SIG	M62/2088B3	40R	M62 J25 - J30	
22/09/15 16:35:15	SIG	M62/2088B4	40R	M62 J25 - J30	
22/09/15 16:35:15	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:35:15	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 16:35:21	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 16:35:55	SIG	M62/2170K1	60R	M62 J25 - J30	
22/09/15 16:35:55	SIG	M62/2170K2	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2170A1	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2170A2	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2177A2	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2177A3	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2177A4	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2183A1	REDX	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2183A2	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2183A3	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2183A4	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2189A1	REDX	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2189A2	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2189A3	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2189A4	60R	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2197A1	NR	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2197A2	NR	M62 J25 - J30	
22/09/15 16:35:56	SIG	M62/2197A3	NR	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:36:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 16:36:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 16:36:26	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 16:37:18	SIG	M606/2003B1	LDR	M62 J25 - J30	
22/09/15 16:37:18	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 16:37:18	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 16:37:18	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 16:37:18	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 16:37:18	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 16:37:18	SIG	M62/2005M1	TI	M62 J25 - J30	
22/09/15 16:37:18	SIG	M62/2005M2	TI	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/1992B1	40R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 16:37:23	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/1992B1	30R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 16:37:29	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1992B1	20R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1999B1	REDX	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 16:37:34	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/1992B1	STOP	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 16:37:39	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 16:37:43	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 16:38:07	SIG	M62/2097B1	40R	M62 J25 - J30	
22/09/15 16:38:07	SIG	M62/2097B2	40R	M62 J25 - J30	
22/09/15 16:38:07	SIG	M62/2097B3	40R	M62 J25 - J30	
22/09/15 16:38:07	SIG	M62/2097B4	40R	M62 J25 - J30	
22/09/15 16:39:53	SIG	M62/2189A1	60R	M62 J25 - J30	
22/09/15 16:40:10	SIG	M62/2183A1	60R	M62 J25 - J30	
22/09/15 16:40:13	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 16:40:13	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 16:40:13	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 16:40:13	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 16:40:14	SIG	M62/2177A1	60R	M62 J25 - J30	
22/09/15 16:40:18	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 16:40:18	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 16:40:18	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 16:40:18	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2194B1	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2194B2	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2194B3	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2194B4	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2203B1	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2203B2	60R	M62 J25 - J30	
22/09/15 16:40:25	SIG	M62/2203B3	60R	M62 J25 - J30	
22/09/15 16:40:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:40:40	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 16:40:41	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 16:40:45	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 16:40:46	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2004B1	REDX	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2004B2	60R	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2004B3	60R	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2004B4	60R	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2012B2	60R	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2012B3	60R	M62 J25 - J30	
22/09/15 16:41:21	SIG	M62/2012B4	60R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M606/2003B2	40R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/1999B2	40R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/1999B3	40R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/1999B4	40R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/2004B2	50R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/2004B3	50R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/2004B4	50R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 16:41:46	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M606/2003B2	40R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M62/2004B2	40R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M62/2004B3	40R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M62/2004B4	40R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 16:41:51	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2106B1	40R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2106B2	40R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2106B3	40R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2106B4	40R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2113B1	50R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2113B2	50R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2113B3	50R	M62 J25 - J30	
22/09/15 16:42:49	SIG	M62/2113B4	50R	M62 J25 - J30	
22/09/15 16:43:24	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:43:25	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 16:43:30	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 16:43:36	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 16:43:36	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 16:43:36	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 16:43:36	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 16:43:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:43:43	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:43:48	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2155A1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2155A2	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2155J1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2155K1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2157A1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2157A2	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2157J1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2157J2	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2157K1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 16:44:40	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 16:45:46	SIG	M62/2004B2	50R	M62 J25 - J30	
22/09/15 16:45:46	SIG	M62/2004B3	50R	M62 J25 - J30	
22/09/15 16:45:46	SIG	M62/2004B4	50R	M62 J25 - J30	
22/09/15 16:45:46	SIG	M62/2012B2	60R	M62 J25 - J30	
22/09/15 16:45:46	SIG	M62/2012B3	60R	M62 J25 - J30	
22/09/15 16:45:46	SIG	M62/2012B4	60R	M62 J25 - J30	
22/09/15 16:45:53	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 16:45:53	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 16:45:53	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 16:45:53	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 16:46:31	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 16:46:31	SIG	M62/1992B1	40R	M62 J25 - J30	
22/09/15 16:46:31	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 16:46:31	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 16:46:36	SIG	M606/2003B1	40R	M62 J25 - J30	
22/09/15 16:46:36	SIG	M62/2005M1	40R	M62 J25 - J30	
22/09/15 16:46:36	SIG	M62/2005M2	40R	M62 J25 - J30	
22/09/15 16:46:37	SIG	M62/2004B2	40R	M62 J25 - J30	
22/09/15 16:46:37	SIG	M62/2004B3	40R	M62 J25 - J30	
22/09/15 16:46:37	SIG	M62/2004B4	40R	M62 J25 - J30	
22/09/15 16:46:37	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 16:46:37	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 16:46:37	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 16:46:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:46:47	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:46:52	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:46:54	SIG	M62/1992B1	60R	M62 J25 - J30	
22/09/15 16:46:54	SIG	M62/1992B2	60R	M62 J25 - J30	
22/09/15 16:46:54	SIG	M62/1992B3	60R	M62 J25 - J30	
22/09/15 16:46:54	SIG	M62/1992B4	60R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2106B1	50R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2106B2	50R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2106B3	50R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2106B4	50R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2113B1	60R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2113B2	60R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2113B3	60R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2113B4	60R	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:47:29	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:47:35	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 16:47:35	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 16:47:35	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 16:47:35	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 16:47:53	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 16:47:58	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1987B1	60R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1987B2	60R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1987B3	60R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/1987B4	60R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/2113B1	50R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/2113B2	50R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/2113B3	50R	M62 J25 - J30	
22/09/15 16:49:21	SIG	M62/2113B4	50R	M62 J25 - J30	
22/09/15 16:49:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:49:51	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:49:56	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M606/2003B1	60R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M606/2003B2	60R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M62/1999B2	60R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M62/1999B3	60R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M62/1999B4	60R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M62/2005M1	60R	M62 J25 - J30	
22/09/15 16:50:35	SIG	M62/2005M2	60R	M62 J25 - J30	
22/09/15 16:50:47	SIG	M62/2106B1	40R	M62 J25 - J30	
22/09/15 16:50:47	SIG	M62/2106B2	40R	M62 J25 - J30	
22/09/15 16:50:47	SIG	M62/2106B3	40R	M62 J25 - J30	
22/09/15 16:50:47	SIG	M62/2106B4	40R	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2183B1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2183B2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2183L1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2183L2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2189B1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2189B2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2189B3	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2189B4	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2194B1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2194B2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2194B3	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2194B4	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2197B1	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2197B2	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2197B3	NR	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2199M1	OFF	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2199M2	OFF	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2203B1	OFF	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2203B2	OFF	M62 J25 - J30	
22/09/15 16:51:21	SIG	M62/2203B3	OFF	M62 J25 - J30	
22/09/15 16:51:35	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 16:51:35	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 16:51:35	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 16:51:35	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 16:51:36	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 16:51:36	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 16:51:36	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 16:51:40	SIG	M606/2003B1	40R	M62 J25 - J30	
22/09/15 16:51:40	SIG	M606/2003B2	40R	M62 J25 - J30	
22/09/15 16:51:40	SIG	M62/2005M1	40R	M62 J25 - J30	
22/09/15 16:51:40	SIG	M62/2005M2	40R	M62 J25 - J30	
22/09/15 16:51:41	SIG	M62/1999B2	40R	M62 J25 - J30	
22/09/15 16:51:41	SIG	M62/1999B3	40R	M62 J25 - J30	
22/09/15 16:51:41	SIG	M62/1999B4	40R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 16:52:45	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 16:52:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:52:54	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:52:59	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:53:56	SIG	M62/2137B2	60R	M62 J25 - J30	
22/09/15 16:53:56	SIG	M62/2137B2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2177B1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2177B2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2177L1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2177L2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2189B1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2189B2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2189B3	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2189B4	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2194B1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2194B2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2194B3	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2194B4	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2197B1	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2197B2	OFF	M62 J25 - J30	
22/09/15 16:54:22	SIG	M62/2197B3	OFF	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 16:54:56	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 16:55:01	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 16:55:18	SIG	M62/2137B2	OFF	M62 J25 - J30	
22/09/15 16:55:19	SIG	M62/2137B2	60R	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 16:55:21	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 16:55:35	SIG	M606/2003B1	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M606/2003B2	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/1999B2	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/1999B3	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/1999B4	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2004B2	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2004B3	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2004B4	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2005M1	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2005M2	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2012B2	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2012B3	60R	M62 J25 - J30	
22/09/15 16:55:35	SIG	M62/2012B4	60R	M62 J25 - J30	
22/09/15 16:55:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:55:57	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:56:02	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:56:24	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 16:56:24	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 16:56:24	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 16:56:24	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 16:56:39	SIG	M62/2057B1	40R	M62 J25 - J30	
22/09/15 16:56:39	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 16:56:39	SIG	M62/2057B3	40R	M62 J25 - J30	
22/09/15 16:56:39	SIG	M62/2057B4	40R	M62 J25 - J30	
22/09/15 16:56:42	SIG	M62/2132B1	50R	M62 J25 - J30	
22/09/15 16:56:42	SIG	M62/2132B2	50R	M62 J25 - J30	
22/09/15 16:56:42	SIG	M62/2132B3	50R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2132B1	40R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2132B2	40R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2132B3	40R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2137B1	50R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2137B2	50R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2137B3	50R	M62 J25 - J30	
22/09/15 16:56:48	SIG	M62/2137B4	50R	M62 J25 - J30	
22/09/15 16:56:49	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 16:57:00	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 16:57:30	SIG	M62/2057B2	40R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2113B1	40R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2113B2	40R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2113B3	40R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2113B4	40R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2117B1	50R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2117B3	50R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2120M1	50R	M62 J25 - J30	
22/09/15 16:57:33	SIG	M62/2120M2	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2004B2	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2004B3	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2004B4	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 16:57:53	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M606/2003B1	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M606/2003B2	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2004B2	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2004B3	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2004B4	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2005M1	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2005M2	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 16:57:58	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 16:57:59	SIG	M62/1999B2	40R	M62 J25 - J30	
22/09/15 16:57:59	SIG	M62/1999B3	40R	M62 J25 - J30	
22/09/15 16:57:59	SIG	M62/1999B4	40R	M62 J25 - J30	
22/09/15 16:58:21	SIG	M62/2125B1	50R	M62 J25 - J30	
22/09/15 16:58:21	SIG	M62/2125B2	50R	M62 J25 - J30	
22/09/15 16:58:21	SIG	M62/2125B3	50R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2012B2	50R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2012B3	50R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2012B4	50R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 16:58:55	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 16:59:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 16:59:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 16:59:15	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 16:59:16	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 16:59:16	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 16:59:16	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 16:59:16	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 16:59:21	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 16:59:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:59:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:59:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 16:59:43	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 17:00:07	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2050B2	40R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2050B3	40R	M62 J25 - J30	
22/09/15 17:00:13	SIG	M62/2050B4	40R	M62 J25 - J30	
22/09/15 17:00:48	SIG	M62/2097B1	30R	M62 J25 - J30	
22/09/15 17:00:48	SIG	M62/2097B2	30R	M62 J25 - J30	
22/09/15 17:00:53	SIG	M62/2097B1	20R	M62 J25 - J30	
22/09/15 17:00:53	SIG	M62/2097B2	20R	M62 J25 - J30	
22/09/15 17:00:53	SIG	M62/2106B1	LDR	M62 J25 - J30	
22/09/15 17:00:53	SIG	M62/2106B2	LDR	M62 J25 - J30	
22/09/15 17:00:53	SIG	M62/2113B1	LDR	M62 J25 - J30	
22/09/15 17:00:53	SIG	M62/2113B2	LDR	M62 J25 - J30	
22/09/15 17:00:59	SIG	M62/2097B1	STOP	M62 J25 - J30	
22/09/15 17:00:59	SIG	M62/2097B2	STOP	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 17:01:24	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 17:01:53	SIG	M606/2003B1	60R	M62 J25 - J30	
22/09/15 17:01:53	SIG	M606/2003B2	60R	M62 J25 - J30	
22/09/15 17:01:53	SIG	M62/2005M1	60R	M62 J25 - J30	
22/09/15 17:01:53	SIG	M62/2005M2	60R	M62 J25 - J30	
22/09/15 17:01:54	SIG	M62/1999B2	60R	M62 J25 - J30	
22/09/15 17:01:54	SIG	M62/1999B3	60R	M62 J25 - J30	
22/09/15 17:01:54	SIG	M62/1999B4	60R	M62 J25 - J30	
22/09/15 17:02:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:02:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:02:15	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 17:02:16	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2012B2	40R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2012B3	40R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2012B4	40R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 17:02:21	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 17:02:42	SIG	M62/2004B2	60R	M62 J25 - J30	
22/09/15 17:02:42	SIG	M62/2004B3	60R	M62 J25 - J30	
22/09/15 17:02:42	SIG	M62/2004B4	60R	M62 J25 - J30	
22/09/15 17:02:42	SIG	M62/2012B2	60R	M62 J25 - J30	
22/09/15 17:02:42	SIG	M62/2012B3	60R	M62 J25 - J30	
22/09/15 17:02:42	SIG	M62/2012B4	60R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2117B2	40R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2117B3	40R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2120M1	40R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2120M2	40R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2125B1	40R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2125B2	40R	M62 J25 - J30	
22/09/15 17:02:53	SIG	M62/2125B3	40R	M62 J25 - J30	
22/09/15 17:02:59	SIG	M62/2117B1	40R	M62 J25 - J30	
22/09/15 17:02:59	SIG	M62/2117B3	40R	M62 J25 - J30	
22/09/15 17:02:59	SIG	M62/2120M1	40R	M62 J25 - J30	
22/09/15 17:02:59	SIG	M62/2120M2	40R	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 17:03:16	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 17:03:53	SIG	M62/2125L1	50R	M62 J25 - J30	
22/09/15 17:03:53	SIG	M62/2125L2	50R	M62 J25 - J30	
22/09/15 17:03:58	SIG	M62/2125L1	40R	M62 J25 - J30	
22/09/15 17:03:58	SIG	M62/2125L2	40R	M62 J25 - J30	
22/09/15 17:04:08	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 17:04:08	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 17:04:08	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 17:04:08	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 17:04:55	SIG	M62/2088B1	LDR	M62 J25 - J30	
22/09/15 17:05:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:05:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:05:15	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:05:51	SIG	M62/2117B1	50R	M62 J25 - J30	
22/09/15 17:05:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:05:57	SIG	M62/2117B1	40R	M62 J25 - J30	
22/09/15 17:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 17:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 17:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:06:16	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 17:06:17	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 17:06:28	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 17:06:55	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 17:07:01	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2132B1	50R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2132B2	50R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2132B3	50R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2137B1	60R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2137B2	60R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2137B3	60R	M62 J25 - J30	
22/09/15 17:07:40	SIG	M62/2137B4	60R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2132B1	40R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2132B2	40R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2132B3	40R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2137B1	50R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2137B2	50R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2137B3	50R	M62 J25 - J30	
22/09/15 17:07:48	SIG	M62/2137B4	50R	M62 J25 - J30	
22/09/15 17:08:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:08:12	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:08:18	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:08:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:08:56	SIG	M62/2117B1	50R	M62 J25 - J30	
22/09/15 17:09:01	SIG	M62/2117B1	40R	M62 J25 - J30	
22/09/15 17:09:24	SIG	M62/2097B2	40R	M62 J25 - J30	
22/09/15 17:09:24	SIG	M62/2106B2	50R	M62 J25 - J30	
22/09/15 17:09:24	SIG	M62/2113B2	50R	M62 J25 - J30	
22/09/15 17:09:29	SIG	M62/2097B2	40R	M62 J25 - J30	
22/09/15 17:09:29	SIG	M62/2106B1	STOP	M62 J25 - J30	
22/09/15 17:09:29	SIG	M62/2106B2	40R	M62 J25 - J30	
22/09/15 17:09:29	SIG	M62/2113B2	40R	M62 J25 - J30	
22/09/15 17:09:35	SIG	M62/2106B1	STOP	M62 J25 - J30	
22/09/15 17:09:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:09:59	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 17:10:04	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 17:10:24	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 17:10:27	SIG	M62/2137B1	40R	M62 J25 - J30	
22/09/15 17:10:27	SIG	M62/2137B2	40R	M62 J25 - J30	
22/09/15 17:10:27	SIG	M62/2137B3	40R	M62 J25 - J30	
22/09/15 17:10:27	SIG	M62/2137B4	40R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2106A1	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2106A2	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2106A4	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2114A1	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2114A2	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2114A3	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 17:10:30	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2106A1	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2106A2	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2106A4	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2114A1	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2114A2	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2114A3	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 17:10:36	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 17:10:41	SIG	M62/2106A1	30R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2088A1	LDR	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2088A2	50R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2088A3	50R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2088A4	50R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2097A1	LDR	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2097A2	50R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2097A3	50R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2097A4	50R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2106A1	20R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2106A2	40R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2106A4	40R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2114A1	40R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2114A2	40R	M62 J25 - J30	
22/09/15 17:10:47	SIG	M62/2114A3	40R	M62 J25 - J30	
22/09/15 17:10:52	SIG	M62/2106A1	STOP	M62 J25 - J30	
22/09/15 17:11:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:11:17	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2147B1	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2147B2	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2147B3	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2147B4	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2159B1	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2159B2	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2159M1	50R	M62 J25 - J30	
22/09/15 17:11:22	SIG	M62/2159M2	50R	M62 J25 - J30	
22/09/15 17:11:23	SIG	M62/2106B1	40R	M62 J25 - J30	
22/09/15 17:11:23	SIG	M62/2113B1	50R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2147B1	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2147B2	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2147B3	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2147B4	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2159B1	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2159B2	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2159M1	40R	M62 J25 - J30	
22/09/15 17:11:27	SIG	M62/2159M2	40R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2097B1	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2097B2	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2097B3	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2097B4	50R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2106B1	40R	M62 J25 - J30	
22/09/15 17:11:28	SIG	M62/2113B1	40R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 17:11:36	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 17:12:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:12:01	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 17:12:01	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 17:12:01	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 17:12:01	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 17:12:01	SIG	M62/2117B1	50R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 17:12:06	SIG	M62/2117B1	40R	M62 J25 - J30	
22/09/15 17:12:12	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 17:12:12	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 17:12:12	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 17:12:12	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 17:12:21	SIG	M62/2106B1	50R	M62 J25 - J30	
22/09/15 17:12:21	SIG	M62/2106B2	50R	M62 J25 - J30	
22/09/15 17:12:21	SIG	M62/2106B3	50R	M62 J25 - J30	
22/09/15 17:12:21	SIG	M62/2106B4	50R	M62 J25 - J30	
22/09/15 17:12:37	SIG	M62/2113B1	50R	M62 J25 - J30	
22/09/15 17:12:37	SIG	M62/2113B2	50R	M62 J25 - J30	
22/09/15 17:12:37	SIG	M62/2113B3	50R	M62 J25 - J30	
22/09/15 17:12:37	SIG	M62/2113B4	50R	M62 J25 - J30	
22/09/15 17:12:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:12:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:12:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:12:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:12:56	SIG	M62/2088B1	60R	M62 J25 - J30	
22/09/15 17:12:56	SIG	M62/2088B2	60R	M62 J25 - J30	
22/09/15 17:12:56	SIG	M62/2088B3	60R	M62 J25 - J30	
22/09/15 17:12:56	SIG	M62/2088B4	60R	M62 J25 - J30	
22/09/15 17:12:57	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 17:12:57	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 17:12:57	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 17:12:57	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 17:13:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:13:22	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:13:27	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:13:36	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 17:13:36	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 17:13:36	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 17:13:36	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 17:13:41	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 17:13:41	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 17:13:41	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 17:13:41	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 17:14:14	SIG	M62/2117B1	50R	M62 J25 - J30	
22/09/15 17:14:14	SIG	M62/2117B3	50R	M62 J25 - J30	
22/09/15 17:14:14	SIG	M62/2120M1	50R	M62 J25 - J30	
22/09/15 17:14:14	SIG	M62/2120M2	50R	M62 J25 - J30	
22/09/15 17:14:20	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:14:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:14:26	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2159B1	60R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2159B2	60R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2159M1	60R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2159M2	60R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 17:14:31	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 17:14:33	SIG	M62/2125B1	50R	M62 J25 - J30	
22/09/15 17:14:33	SIG	M62/2125B2	50R	M62 J25 - J30	
22/09/15 17:14:33	SIG	M62/2125B3	50R	M62 J25 - J30	
22/09/15 17:14:33	SIG	M62/2125L1	50R	M62 J25 - J30	
22/09/15 17:14:33	SIG	M62/2125L2	50R	M62 J25 - J30	
22/09/15 17:14:48	SIG	M62/2097A2	40R	M62 J25 - J30	
22/09/15 17:14:48	SIG	M62/2097A3	40R	M62 J25 - J30	
22/09/15 17:14:48	SIG	M62/2097A4	40R	M62 J25 - J30	
22/09/15 17:15:22	SIG	M62/2159B1	50R	M62 J25 - J30	
22/09/15 17:15:22	SIG	M62/2159B2	50R	M62 J25 - J30	
22/09/15 17:15:22	SIG	M62/2159M1	50R	M62 J25 - J30	
22/09/15 17:15:22	SIG	M62/2159M2	50R	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 17:16:01	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 17:16:21	SIG	M62/2159B1	40R	M62 J25 - J30	
22/09/15 17:16:21	SIG	M62/2159B2	40R	M62 J25 - J30	
22/09/15 17:16:21	SIG	M62/2159M1	40R	M62 J25 - J30	
22/09/15 17:16:21	SIG	M62/2159M2	40R	M62 J25 - J30	
22/09/15 17:16:22	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 17:16:22	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 17:16:22	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 17:16:22	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 17:16:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:16:25	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:16:31	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:17:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:17:10	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:17:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:17:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2097B1	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2097B2	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2097B3	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2097B4	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 17:17:22	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 17:17:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:17:24	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:17:29	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:17:36	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 17:17:36	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 17:17:36	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 17:17:36	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2081B1	40R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2081B2	40R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2081B3	40R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2081L1	40R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2088B1	50R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 17:19:00	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 17:19:01	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 17:19:02	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2106B1	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2106B2	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2106B3	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2106B4	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2113B1	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2113B2	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2113B3	60R	M62 J25 - J30	
22/09/15 17:19:22	SIG	M62/2113B4	60R	M62 J25 - J30	
22/09/15 17:19:29	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:19:29	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:19:35	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:20:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:20:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:20:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:20:28	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:20:33	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2097B1	50R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2097B2	50R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2097B3	50R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2097B4	50R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2117B1	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2117B3	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2120M1	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2120M2	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2125B1	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2125B2	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2125B3	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2125L1	60R	M62 J25 - J30	
22/09/15 17:21:22	SIG	M62/2125L2	60R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 17:21:50	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2170B1	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2170B2	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 17:21:55	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 17:22:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:22:33	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:22:39	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2137B1	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2137B2	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2137B3	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2137B4	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2147B1	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2147B2	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2147B3	50R	M62 J25 - J30	
22/09/15 17:23:17	SIG	M62/2147B4	50R	M62 J25 - J30	
22/09/15 17:23:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:23:31	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:23:36	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:24:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:24:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:24:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:24:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:24:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:24:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:24:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:24:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:24:31	SIG	M62/2088B1	40R	M62 J25 - J30	
22/09/15 17:24:31	SIG	M62/2088B2	40R	M62 J25 - J30	
22/09/15 17:24:31	SIG	M62/2088B3	40R	M62 J25 - J30	
22/09/15 17:24:31	SIG	M62/2088B4	40R	M62 J25 - J30	
22/09/15 17:25:36	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:25:37	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:25:42	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 17:25:50	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 17:26:15	SIG	M62/2088A2	40R	M62 J25 - J30	
22/09/15 17:26:15	SIG	M62/2088A3	40R	M62 J25 - J30	
22/09/15 17:26:15	SIG	M62/2088A4	40R	M62 J25 - J30	
22/09/15 17:26:22	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 17:26:22	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 17:26:22	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 17:26:22	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 17:26:28	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 17:26:28	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 17:26:28	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 17:26:28	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 17:26:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:26:36	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:26:40	SIG	M62/2097A2	50R	M62 J25 - J30	
22/09/15 17:26:40	SIG	M62/2097A3	50R	M62 J25 - J30	
22/09/15 17:26:40	SIG	M62/2097A4	50R	M62 J25 - J30	
22/09/15 17:26:41	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2194B1	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2194B2	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2194B3	60R	M62 J25 - J30	
22/09/15 17:27:22	SIG	M62/2194B4	60R	M62 J25 - J30	
22/09/15 17:27:43	SIG	M62/2159B1	50R	M62 J25 - J30	
22/09/15 17:27:43	SIG	M62/2159B2	50R	M62 J25 - J30	
22/09/15 17:27:43	SIG	M62/2159M1	50R	M62 J25 - J30	
22/09/15 17:27:43	SIG	M62/2159M2	50R	M62 J25 - J30	
22/09/15 17:28:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:28:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 17:28:30	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 17:28:31	SIG	M62/2088B1	50R	M62 J25 - J30	
22/09/15 17:28:31	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 17:28:31	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 17:28:31	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 17:28:40	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:28:40	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:28:46	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2137B1	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2137B2	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2137B3	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2137B4	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2147B1	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2147B2	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2147B3	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2147B4	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2159B1	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2159B2	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2159M1	40R	M62 J25 - J30	
22/09/15 17:28:48	SIG	M62/2159M2	40R	M62 J25 - J30	
22/09/15 17:29:33	SIG	M62/2088B1	40R	M62 J25 - J30	
22/09/15 17:29:33	SIG	M62/2088B2	40R	M62 J25 - J30	
22/09/15 17:29:33	SIG	M62/2088B3	40R	M62 J25 - J30	
22/09/15 17:29:33	SIG	M62/2088B4	40R	M62 J25 - J30	
22/09/15 17:29:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:29:39	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:29:45	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2183L1	40R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 17:29:53	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 17:30:07	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 17:30:12	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 17:30:15	SIG	M62/2088A2	50R	M62 J25 - J30	
22/09/15 17:30:15	SIG	M62/2088A3	50R	M62 J25 - J30	
22/09/15 17:30:15	SIG	M62/2088A4	50R	M62 J25 - J30	
22/09/15 17:30:22	SIG	M62/1981B1	OFF	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/1981B2	OFF	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/1981B3	OFF	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/1981B4	OFF	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 17:30:23	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 17:31:22	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 17:31:22	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 17:31:22	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 17:31:22	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 17:31:22	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2117A2	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2117A3	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2117A4	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2122K1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2122K2	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2124A1	REDX	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2124A2	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2124A3	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2124A4	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2135A1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2135A2	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2135A3	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2135A4	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2144A1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2144A2	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2144J1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2144K1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2151A1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2151A2	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2151J1	50R	M62 J25 - J30	
22/09/15 17:31:40	SIG	M62/2151K1	50R	M62 J25 - J30	
22/09/15 17:31:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:31:44	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:31:50	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:31:50	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:31:51	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:31:51	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:31:52	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:32:22	SIG	M62/2106B1	50R	M62 J25 - J30	
22/09/15 17:32:22	SIG	M62/2106B2	50R	M62 J25 - J30	
22/09/15 17:32:22	SIG	M62/2106B3	50R	M62 J25 - J30	
22/09/15 17:32:22	SIG	M62/2106B4	50R	M62 J25 - J30	
22/09/15 17:32:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:32:27	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:32:27	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 17:32:28	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 17:32:32	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 17:32:33	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 17:32:43	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:32:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:32:49	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:33:02	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 17:33:02	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M606/2003B1	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2005M1	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2005M2	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2157J1	NR	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2157J2	NR	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 17:33:40	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1987B1	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1987B2	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1987B3	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1987B4	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 17:33:41	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1987B1	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1987B2	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1987B3	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1987B4	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1992B1	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 17:33:46	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 17:33:52	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2170B1	50R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2170B2	50R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 17:33:55	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 17:34:22	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 17:34:22	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2170A1	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2170A2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2170K1	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2170K2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2177A1	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2177A2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2177A3	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2177A4	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2183A1	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2183A2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2183A3	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2183A4	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2189A1	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2189A2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2189A3	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2189A4	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2197A1	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2197A2	50R	M62 J25 - J30	
22/09/15 17:34:23	SIG	M62/2197A3	50R	M62 J25 - J30	
22/09/15 17:34:47	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:34:48	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:34:53	SIG	M62/2106A3	40R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M606/2003B1	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M606/2003B2	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1992B1	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1992B2	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1992B3	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1992B4	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1999B2	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1999B3	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/1999B4	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/2005M1	60R	M62 J25 - J30	
22/09/15 17:35:16	SIG	M62/2005M2	60R	M62 J25 - J30	
22/09/15 17:35:27	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 17:35:27	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 17:35:27	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 17:35:27	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 17:35:33	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 17:35:33	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 17:35:33	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 17:35:33	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2163A1	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2163A2	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2170A1	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2170A2	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2170K1	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2170K2	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2177A1	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2177A2	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2177A3	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2177A4	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2183A1	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2183A2	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2183A3	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2183A4	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2189A1	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2189A2	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2189A3	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2189A4	60R	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2197A1	NR	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2197A2	NR	M62 J25 - J30	
22/09/15 17:35:39	SIG	M62/2197A3	NR	M62 J25 - J30	
22/09/15 17:35:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:35:47	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:35:52	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:36:03	SIG	M62/2159B1	50R	M62 J25 - J30	
22/09/15 17:36:03	SIG	M62/2159B2	50R	M62 J25 - J30	
22/09/15 17:36:03	SIG	M62/2159M1	50R	M62 J25 - J30	
22/09/15 17:36:03	SIG	M62/2159M2	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2088A1	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2097A1	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2106A1	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2106A2	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2106A4	50R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2114A1	60R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2114A2	60R	M62 J25 - J30	
22/09/15 17:36:09	SIG	M62/2114A3	60R	M62 J25 - J30	
22/09/15 17:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 17:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:36:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 17:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:36:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:36:27	SIG	M62/2088B1	50R	M62 J25 - J30	
22/09/15 17:36:27	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 17:36:27	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 17:36:27	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 17:36:29	SIG	M62/2203B1	60R	M62 J25 - J30	
22/09/15 17:36:29	SIG	M62/2203B2	60R	M62 J25 - J30	
22/09/15 17:36:29	SIG	M62/2203B3	60R	M62 J25 - J30	
22/09/15 17:36:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:36:32	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:36:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:36:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:36:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:36:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:37:59	SIG	M62/1968B1	50R	M62 J25 - J30	
22/09/15 17:37:59	SIG	M62/1968B2	50R	M62 J25 - J30	
22/09/15 17:37:59	SIG	M62/1968B3	50R	M62 J25 - J30	
22/09/15 17:37:59	SIG	M62/1968L1	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1960B1	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1960B2	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1960B3	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1960L1	NR	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1960L2	NR	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1968B1	40R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1968B2	40R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1968B3	40R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1968L1	40R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1974B1	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1974B2	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1974B3	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1974B4	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1974M1	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1974M2	50R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1981B1	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1981B2	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1981B3	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1981B4	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1987B1	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1987B2	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1987B3	60R	M62 J25 - J30	
22/09/15 17:38:04	SIG	M62/1987B4	60R	M62 J25 - J30	
22/09/15 17:38:11	SIG	M62/2159B1	40R	M62 J25 - J30	
22/09/15 17:38:11	SIG	M62/2159B2	40R	M62 J25 - J30	
22/09/15 17:38:11	SIG	M62/2159M1	40R	M62 J25 - J30	
22/09/15 17:38:11	SIG	M62/2159M2	40R	M62 J25 - J30	
22/09/15 17:38:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:38:51	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:38:52	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:38:53	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:38:53	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:38:54	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:38:56	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1974B1	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1974B2	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1974B3	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1974B4	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1974M1	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1974M2	40R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1981B1	50R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1981B2	50R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1981B3	50R	M62 J25 - J30	
22/09/15 17:39:19	SIG	M62/1981B4	50R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2088A1	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2088A2	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2088A3	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2088A4	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2097A1	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2097A2	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2097A3	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2097A4	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2106A1	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2106A2	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2106A3	60R	M62 J25 - J30	
22/09/15 17:39:22	SIG	M62/2106A4	60R	M62 J25 - J30	
22/09/15 17:39:23	SIG	M62/2177B1	60R	M62 J25 - J30	
22/09/15 17:39:23	SIG	M62/2177B2	60R	M62 J25 - J30	
22/09/15 17:39:23	SIG	M62/2177L1	60R	M62 J25 - J30	
22/09/15 17:39:23	SIG	M62/2177L2	60R	M62 J25 - J30	
22/09/15 17:40:45	SIG	M62/2088B1	40R	M62 J25 - J30	
22/09/15 17:40:45	SIG	M62/2088B2	40R	M62 J25 - J30	
22/09/15 17:40:45	SIG	M62/2088B3	40R	M62 J25 - J30	
22/09/15 17:40:45	SIG	M62/2088B4	40R	M62 J25 - J30	
22/09/15 17:40:48	SIG	M62/2203B1	NR	M62 J25 - J30	
22/09/15 17:40:48	SIG	M62/2203B2	NR	M62 J25 - J30	
22/09/15 17:40:48	SIG	M62/2203B3	NR	M62 J25 - J30	
22/09/15 17:41:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:41:55	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:41:56	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:41:57	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:41:57	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:41:58	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:42:01	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:42:12	SIG	M62/2159B1	50R	M62 J25 - J30	
22/09/15 17:42:12	SIG	M62/2159B2	50R	M62 J25 - J30	
22/09/15 17:42:12	SIG	M62/2159M1	50R	M62 J25 - J30	
22/09/15 17:42:12	SIG	M62/2159M2	50R	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1960B1	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1960B2	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1960B3	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1960L1	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1960L2	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1968B1	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1968B2	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1968B3	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1968L1	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1974B1	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1974B2	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1974B3	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1974B4	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1974M1	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1974M2	OFF	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 17:43:20	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 17:43:29	SIG	M62/1968B1	50R	M62 J25 - J30	
22/09/15 17:43:29	SIG	M62/1968B2	50R	M62 J25 - J30	
22/09/15 17:43:29	SIG	M62/1968B3	50R	M62 J25 - J30	
22/09/15 17:43:29	SIG	M62/1968L1	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1960B1	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1960B2	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1960B3	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1960L1	NR	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1960L2	NR	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1968B1	40R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1968B2	40R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1968B3	40R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1968L1	40R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1974B1	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1974B2	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1974B3	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1974B4	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1974M1	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1974M2	50R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1981B1	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1981B2	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1981B3	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1981B4	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1987B1	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1987B2	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1987B3	60R	M62 J25 - J30	
22/09/15 17:43:35	SIG	M62/1987B4	60R	M62 J25 - J30	
22/09/15 17:43:48	SIG	M62/2203B1	OFF	M62 J25 - J30	
22/09/15 17:43:49	SIG	M62/2203B2	OFF	M62 J25 - J30	
22/09/15 17:43:49	SIG	M62/2203B3	OFF	M62 J25 - J30	
22/09/15 17:44:14	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 17:44:14	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 17:44:14	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 17:44:14	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2088B1	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 17:44:45	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 17:44:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:44:59	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:45:04	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:45:25	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 17:45:25	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 17:45:25	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 17:45:25	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 17:46:25	SIG	M62/2081B1	40R	M62 J25 - J30	
22/09/15 17:46:25	SIG	M62/2081B2	40R	M62 J25 - J30	
22/09/15 17:46:25	SIG	M62/2081B3	40R	M62 J25 - J30	
22/09/15 17:46:25	SIG	M62/2081L1	40R	M62 J25 - J30	
22/09/15 17:47:55	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 17:47:55	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 17:47:55	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 17:47:55	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 17:48:00	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 17:48:00	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 17:48:00	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 17:48:00	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 17:48:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:48:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:48:16	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:48:23	SIG	M62/2197B1	OFF	M62 J25 - J30	
22/09/15 17:48:23	SIG	M62/2197B2	OFF	M62 J25 - J30	
22/09/15 17:48:23	SIG	M62/2197B3	OFF	M62 J25 - J30	
22/09/15 17:48:23	SIG	M62/2199M1	OFF	M62 J25 - J30	
22/09/15 17:48:23	SIG	M62/2199M2	OFF	M62 J25 - J30	
22/09/15 17:48:28	SIG	M62/2113B1	HSD	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2137B1	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2137B2	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2137B3	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2137B4	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2147B1	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2147B2	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2147B3	50R	M62 J25 - J30	
22/09/15 17:49:12	SIG	M62/2147B4	50R	M62 J25 - J30	
22/09/15 17:49:21	SIG	M62/2106B1	HSD	M62 J25 - J30	
22/09/15 17:49:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:49:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:49:23	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 17:49:59	SIG	M62/2137B1	40R	M62 J25 - J30	
22/09/15 17:49:59	SIG	M62/2137B2	40R	M62 J25 - J30	
22/09/15 17:49:59	SIG	M62/2137B3	40R	M62 J25 - J30	
22/09/15 17:49:59	SIG	M62/2137B4	40R	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2117A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2117A3	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2117A4	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2122K1	OFF	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2122K2	OFF	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2124A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2124A3	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2124A4	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2135A1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2135A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2135A3	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2135A4	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2144A1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2144A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2144J1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2144K1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2151A1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2151A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2151J1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2151K1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2155A1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2155A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2155J1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2155K1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2157A1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2157A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2157J1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2157J2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2157K1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2163A1	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2163A2	NR	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2170B1	60R	M62 J25 - J30	
22/09/15 17:50:07	SIG	M62/2170B2	60R	M62 J25 - J30	
22/09/15 17:50:08	SIG	M606/2003B1	LDR	M62 J25 - J30	
22/09/15 17:50:08	SIG	M606/2003B2	50R	M62 J25 - J30	
22/09/15 17:50:08	SIG	M62/2005M1	TI	M62 J25 - J30	
22/09/15 17:50:08	SIG	M62/2005M2	TI	M62 J25 - J30	
22/09/15 17:50:09	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 17:50:09	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 17:50:09	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 17:50:09	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 17:50:14	SIG	M62/1992B1	40R	M62 J25 - J30	
22/09/15 17:50:14	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 17:50:14	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 17:50:14	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 17:50:19	SIG	M62/1992B1	30R	M62 J25 - J30	
22/09/15 17:50:21	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 17:50:21	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 17:50:21	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 17:50:21	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 17:50:22	SIG	M62/2106B2	60R	M62 J25 - J30	
22/09/15 17:50:22	SIG	M62/2106B3	60R	M62 J25 - J30	
22/09/15 17:50:22	SIG	M62/2106B4	60R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1992B1	20R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1992B2	40R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1992B3	40R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1992B4	40R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1999B2	50R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1999B3	50R	M62 J25 - J30	
22/09/15 17:50:24	SIG	M62/1999B4	50R	M62 J25 - J30	
22/09/15 17:50:25	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 17:50:25	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 17:50:25	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 17:50:25	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 17:50:29	SIG	M62/2097B1	HSD	M62 J25 - J30	
22/09/15 17:50:29	SIG	M62/2113B1	REDX	M62 J25 - J30	
22/09/15 17:50:30	SIG	M62/1992B1	STOP	M62 J25 - J30	
22/09/15 17:51:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:51:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:51:15	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:51:36	SIG	M62/2088B1	HSD	M62 J25 - J30	
22/09/15 17:51:37	SIG	M62/2106B1	REDX	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2189B1	NR	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2189B2	NR	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2189B3	NR	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2189B4	NR	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2194B1	OFF	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2194B2	OFF	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2194B3	OFF	M62 J25 - J30	
22/09/15 17:52:23	SIG	M62/2194B4	OFF	M62 J25 - J30	
22/09/15 17:52:36	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 17:52:36	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 17:52:36	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 17:52:36	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 17:52:45	SIG	M62/2097B1	REDX	M62 J25 - J30	
22/09/15 17:53:07	SIG	M62/2144J1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2124A2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2124A3	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2124A4	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2135A1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2135A2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2135A3	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2135A4	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2144A1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2144A2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2144K1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2151A1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2151A2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2151J1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2151K1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 17:53:08	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 17:53:09	SIG	M62/2124A1	BLNK	M62 J25 - J30	
22/09/15 17:53:09	SIG	M62/2124A1	BLNK	M62 J25 - J30	
22/09/15 17:53:53	SIG	M62/2088B1	REDX	M62 J25 - J30	
22/09/15 17:53:56	SIG	M606/2003B1	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M606/2003B2	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1992B1	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1992B2	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1992B3	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1992B4	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1999B2	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1999B3	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/1999B4	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/2005M1	60R	M62 J25 - J30	
22/09/15 17:53:56	SIG	M62/2005M2	60R	M62 J25 - J30	
22/09/15 17:54:02	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 17:54:02	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 17:54:02	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 17:54:02	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 17:54:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:54:10	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:54:15	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2088B2	60R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2088B3	60R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2088B4	60R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2097B2	60R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2097B3	60R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2097B4	60R	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2183B1	NR	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2183B2	NR	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2183L1	NR	M62 J25 - J30	
22/09/15 17:54:23	SIG	M62/2183L2	NR	M62 J25 - J30	
22/09/15 17:54:46	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1968B1	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1968B2	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1968B3	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1968L1	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1974B1	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1974B2	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1974B3	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1974B4	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1974M1	60R	M62 J25 - J30	
22/09/15 17:55:06	SIG	M62/1974M2	60R	M62 J25 - J30	
22/09/15 17:55:23	SIG	M62/2189B1	OFF	M62 J25 - J30	
22/09/15 17:55:23	SIG	M62/2189B2	OFF	M62 J25 - J30	
22/09/15 17:55:23	SIG	M62/2189B3	OFF	M62 J25 - J30	
22/09/15 17:55:23	SIG	M62/2189B4	OFF	M62 J25 - J30	
22/09/15 17:55:41	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 17:55:41	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 17:55:41	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 17:55:46	SIG	M62/2088B1	STOP	M62 J25 - J30	
22/09/15 17:55:46	SIG	M62/2088B1	STOP	M62 J25 - J30	
22/09/15 17:55:46	SIG	M62/2088B2	40R	M62 J25 - J30	
22/09/15 17:55:46	SIG	M62/2088B3	40R	M62 J25 - J30	
22/09/15 17:55:46	SIG	M62/2088B4	40R	M62 J25 - J30	
22/09/15 17:55:46	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 17:56:37	SIG	M62/2137B1	50R	M62 J25 - J30	
22/09/15 17:56:37	SIG	M62/2137B2	50R	M62 J25 - J30	
22/09/15 17:56:37	SIG	M62/2137B3	50R	M62 J25 - J30	
22/09/15 17:56:37	SIG	M62/2137B4	50R	M62 J25 - J30	
22/09/15 17:57:13	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 17:57:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 17:57:18	SIG	M62/2079A1	HSD	M62 J25 - J30	
22/09/15 17:57:19	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 17:57:23	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 17:57:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 17:57:23	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 17:57:23	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 17:57:56	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 17:57:56	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 17:57:56	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 17:57:56	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 17:58:12	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 17:58:12	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 17:58:12	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 17:58:12	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 17:58:26	SIG	M62/2088A1	HSD	M62 J25 - J30	
22/09/15 17:58:43	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 17:58:43	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 17:58:43	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 17:58:43	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 17:58:50	SIG	M62/2088B1	REDX	M62 J25 - J30	
22/09/15 17:58:50	SIG	M62/2088B2	60R	M62 J25 - J30	
22/09/15 17:58:50	SIG	M62/2088B3	60R	M62 J25 - J30	
22/09/15 17:58:50	SIG	M62/2088B4	60R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2050B2	40R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2050B3	40R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2050B4	40R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2057B1	40R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2057B2	40R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2057B3	40R	M62 J25 - J30	
22/09/15 17:59:19	SIG	M62/2057B4	40R	M62 J25 - J30	
22/09/15 17:59:23	SIG	M62/2177B1	OFF	M62 J25 - J30	
22/09/15 17:59:23	SIG	M62/2177B2	OFF	M62 J25 - J30	
22/09/15 17:59:23	SIG	M62/2177L1	OFF	M62 J25 - J30	
22/09/15 17:59:23	SIG	M62/2177L2	OFF	M62 J25 - J30	
22/09/15 17:59:30	SIG	M62/1960B1	NR	M62 J25 - J30	
22/09/15 17:59:30	SIG	M62/1960B2	NR	M62 J25 - J30	
22/09/15 17:59:30	SIG	M62/1960B3	NR	M62 J25 - J30	
22/09/15 17:59:31	SIG	M62/1960B1	60R	M62 J25 - J30	
22/09/15 17:59:31	SIG	M62/1960B2	60R	M62 J25 - J30	
22/09/15 17:59:31	SIG	M62/1960B3	60R	M62 J25 - J30	
22/09/15 17:59:34	SIG	M62/2079A1	REDX	M62 J25 - J30	
22/09/15 17:59:34	SIG	M62/2097A1	HSD	M62 J25 - J30	
22/09/15 18:00:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:00:17	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:00:22	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:00:42	SIG	M62/2088A1	REDX	M62 J25 - J30	
22/09/15 18:00:42	SIG	M62/2106A1	HSD	M62 J25 - J30	
22/09/15 18:01:50	SIG	M62/2097A1	REDX	M62 J25 - J30	
22/09/15 18:01:52	SIG	M62/2132B1	60R	M62 J25 - J30	
22/09/15 18:01:52	SIG	M62/2132B2	60R	M62 J25 - J30	
22/09/15 18:01:52	SIG	M62/2132B3	60R	M62 J25 - J30	
22/09/15 18:01:55	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 18:01:55	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 18:01:55	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 18:01:55	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 18:02:01	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 18:02:01	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 18:02:01	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 18:02:01	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2050B2	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2050B3	50R	M62 J25 - J30	
22/09/15 18:02:12	SIG	M62/2050B4	50R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2137B1	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2137B2	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2137B3	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2137B4	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2147B1	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2147B2	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2147B3	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2147B4	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2159B1	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2159B2	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2159M1	60R	M62 J25 - J30	
22/09/15 18:02:23	SIG	M62/2159M2	60R	M62 J25 - J30	
22/09/15 18:02:42	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 18:02:42	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 18:02:42	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 18:02:42	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 18:02:47	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 18:02:47	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 18:02:47	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 18:02:47	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 18:02:58	SIG	M62/2106A1	REDX	M62 J25 - J30	
22/09/15 18:03:09	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 18:03:09	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 18:03:09	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:03:09	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 18:03:18	SIG	M62/2057B1	50R	M62 J25 - J30	
22/09/15 18:03:18	SIG	M62/2057B2	50R	M62 J25 - J30	
22/09/15 18:03:18	SIG	M62/2057B3	50R	M62 J25 - J30	
22/09/15 18:03:18	SIG	M62/2057B4	50R	M62 J25 - J30	
22/09/15 18:03:58	SIG	M62/2065A2	NR	M62 J25 - J30	
22/09/15 18:03:58	SIG	M62/2065A3	NR	M62 J25 - J30	
22/09/15 18:03:58	SIG	M62/2065A4	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2079A2	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2079A3	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2079A4	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2088A2	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2088A3	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2088A4	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2097A2	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2097A3	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2097A4	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2106A2	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2106A3	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2106A4	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2114A1	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2114A2	NR	M62 J25 - J30	
22/09/15 18:03:59	SIG	M62/2114A3	NR	M62 J25 - J30	
22/09/15 18:04:45	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 18:04:45	SIG	M62/2050A1	OFF	M62 J25 - J30	
22/09/15 18:04:59	SIG	M62/2079A1	BLNK	M62 J25 - J30	
22/09/15 18:04:59	SIG	M62/2079A2	OFF	M62 J25 - J30	
22/09/15 18:04:59	SIG	M62/2079A3	OFF	M62 J25 - J30	
22/09/15 18:04:59	SIG	M62/2079A4	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2088A1	BLNK	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2088A2	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2088A3	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2088A4	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2097A1	BLNK	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2097A2	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2097A3	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2097A4	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2106A1	BLNK	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2106A2	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2106A4	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2114A1	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2114A2	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2114A3	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2117A1	BLNK	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2117A2	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2117A3	OFF	M62 J25 - J30	
22/09/15 18:05:00	SIG	M62/2117A4	OFF	M62 J25 - J30	
22/09/15 18:05:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:05:23	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:05:28	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 18:06:11	SIG	M62/2025A1	???	M62 J25 - J30	
22/09/15 18:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 18:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1960B1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1960B2	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1960B3	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1960L1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1960L2	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1968B1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1968B2	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1968B3	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1968L1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1974B1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1974B2	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1974B3	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1974B4	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1974M1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1974M2	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1981B1	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1981B2	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1981B3	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1981B4	OFF	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 18:06:23	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 18:08:00	SIG	M62/2050A1	60R	M62 J25 - J30	
22/09/15 18:08:00	SIG	M62/2050A1	OFF	M62 J25 - J30	
22/09/15 18:08:03	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 18:08:03	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 18:08:03	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 18:08:03	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 18:08:23	SIG	M62/2125L1	NR	M62 J25 - J30	
22/09/15 18:08:23	SIG	M62/2125L2	NR	M62 J25 - J30	
22/09/15 18:08:27	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:08:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:08:33	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:10:22	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 18:10:22	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 18:10:22	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 18:10:22	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 18:10:42	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 18:10:42	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 18:10:42	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:10:42	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2025B1	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 18:11:47	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2025B1	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 18:11:53	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2081B1	60R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2081B2	60R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2081B3	60R	M62 J25 - J30	
22/09/15 18:12:13	SIG	M62/2081L1	60R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2065B2	40R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2065B3	40R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2065B4	40R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 18:12:38	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 18:13:23	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1987B1	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1987B2	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1987B3	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1987B4	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1992B1	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1992B2	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1992B3	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1992B4	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1999B1	BLNK	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1999B2	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1999B3	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/1999B4	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2004B1	BLNK	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2004B2	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2004B3	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2004B4	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2005M1	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2005M2	OFF	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2012B2	NR	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2012B3	NR	M62 J25 - J30	
22/09/15 18:13:23	SIG	M62/2012B4	NR	M62 J25 - J30	
22/09/15 18:13:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:13:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:13:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:13:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2057B1	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 18:14:23	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 18:14:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:14:31	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 18:14:31	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 18:14:31	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2033B1	40R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2033B2	40R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2033B4	40R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 18:14:36	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 18:15:47	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 18:15:47	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 18:15:47	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 18:15:47	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2065B2	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2065B3	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2065B4	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2065M1	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2069M1	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2069M2	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2081B1	60R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2081B2	60R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2081B3	60R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M62/2081L1	60R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M621/1002B1	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M621/1002B2	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M621/1010B1	50R	M62 J25 - J30	
22/09/15 18:16:39	SIG	M621/1010B2	50R	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2117B3	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2120M1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2120M2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2125B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2125B2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2125B3	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2125L1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2125L2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2132B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2132B2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2132B3	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2137B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2137B2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2137B3	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2137B4	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2147B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2147B2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2147B3	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2147B4	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2159B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2159B2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2159M1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2159M2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2170B1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2170B2	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2170L1	OFF	M62 J25 - J30	
22/09/15 18:17:23	SIG	M62/2170L2	OFF	M62 J25 - J30	
22/09/15 18:17:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:17:38	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:17:44	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:18:57	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 18:18:57	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 18:18:57	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 18:18:57	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 18:19:03	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 18:19:03	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 18:19:03	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 18:19:03	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2069M1	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2069M2	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2088B2	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2088B3	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2088B4	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2097B2	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2097B3	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2097B4	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2106B2	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2106B3	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2106B4	NR	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2113B1	BLNK	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2113B2	OFF	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2113B3	OFF	M62 J25 - J30	
22/09/15 18:20:23	SIG	M62/2113B4	OFF	M62 J25 - J30	
22/09/15 18:20:23	SIG	M621/1002B1	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 18:20:23	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 18:20:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:20:42	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:20:47	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:23:23	SIG	M62/2106B2	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2088B1	BLNK	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2088B1	BLNK	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2088B2	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2088B3	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2088B4	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2097B1	BLNK	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2097B1	BLNK	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2097B2	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2097B3	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2097B4	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2106B1	BLNK	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2106B3	OFF	M62 J25 - J30	
22/09/15 18:23:24	SIG	M62/2106B4	OFF	M62 J25 - J30	
22/09/15 18:23:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:23:46	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2041B1	40R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2041B2	40R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2041B3	40R	M62 J25 - J30	
22/09/15 18:23:51	SIG	M62/2041B4	40R	M62 J25 - J30	
22/09/15 18:24:25	SIG	M62/2018B1	50R	M62 J25 - J30	
22/09/15 18:24:25	SIG	M62/2018B2	50R	M62 J25 - J30	
22/09/15 18:24:25	SIG	M62/2018B3	50R	M62 J25 - J30	
22/09/15 18:24:25	SIG	M62/2018L1	50R	M62 J25 - J30	
22/09/15 18:24:30	SIG	M62/2018B1	40R	M62 J25 - J30	
22/09/15 18:24:30	SIG	M62/2018B2	40R	M62 J25 - J30	
22/09/15 18:24:30	SIG	M62/2018B3	40R	M62 J25 - J30	
22/09/15 18:24:30	SIG	M62/2018L1	40R	M62 J25 - J30	
22/09/15 18:26:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:26:49	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:26:55	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:27:51	SIG	M62/2041B1	50R	M62 J25 - J30	
22/09/15 18:27:51	SIG	M62/2041B2	50R	M62 J25 - J30	
22/09/15 18:27:51	SIG	M62/2041B3	50R	M62 J25 - J30	
22/09/15 18:27:51	SIG	M62/2041B4	50R	M62 J25 - J30	
22/09/15 18:29:06	SIG	M62/2018B1	60R	M62 J25 - J30	
22/09/15 18:29:06	SIG	M62/2018B2	60R	M62 J25 - J30	
22/09/15 18:29:06	SIG	M62/2018B3	60R	M62 J25 - J30	
22/09/15 18:29:06	SIG	M62/2018L1	60R	M62 J25 - J30	
22/09/15 18:29:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:29:53	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:29:58	SIG	M62/2033B3	40R	M62 J25 - J30	
22/09/15 18:30:23	SIG	M62/2081B1	OFF	M62 J25 - J30	
22/09/15 18:30:23	SIG	M62/2081B2	OFF	M62 J25 - J30	
22/09/15 18:30:23	SIG	M62/2081B3	OFF	M62 J25 - J30	
22/09/15 18:30:23	SIG	M62/2081L1	OFF	M62 J25 - J30	
22/09/15 18:31:08	SIG	M62/2177A1	HSD	M62 J25 - J30	
22/09/15 18:31:53	SIG	M62/2183A1	HSD	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2033B1	50R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2041B1	60R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 18:32:11	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 18:32:18	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 18:32:18	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:32:18	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 18:32:18	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 18:32:18	SIG	M62/2189B1	50R	M62 J25 - J30	
22/09/15 18:32:24	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 18:32:24	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:32:24	SIG	M62/2183L1	40R	M62 J25 - J30	
22/09/15 18:32:24	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 18:32:24	SIG	M62/2189B1	40R	M62 J25 - J30	
22/09/15 18:32:29	SIG	M62/2183L1	30R	M62 J25 - J30	
22/09/15 18:32:29	SIG	M62/2189B1	30R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2183B1	40R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2183L1	20R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2183L2	40R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2189B1	30R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2189B2	50R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2189B3	50R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2189B4	50R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2194B1	50R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2194B2	50R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2194B3	50R	M62 J25 - J30	
22/09/15 18:32:35	SIG	M62/2194B4	50R	M62 J25 - J30	
22/09/15 18:32:40	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 18:32:40	SIG	M62/2183L1	STOP	M62 J25 - J30	
22/09/15 18:32:40	SIG	M62/2189A1	HSD	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2025B1	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2025B2	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2025B3	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2025B4	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2033B1	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2033B2	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2033B3	60R	M62 J25 - J30	
22/09/15 18:33:24	SIG	M62/2033B4	60R	M62 J25 - J30	
22/09/15 18:33:38	SIG	M62/2183A1	REDX	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2170K1	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2170K2	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2183A2	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2183A3	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2183A4	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2189A1	REDX	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2189A2	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2189A3	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2189A4	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2197A1	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2197A2	NR	M62 J25 - J30	
22/09/15 18:34:38	SIG	M62/2197A3	NR	M62 J25 - J30	
22/09/15 18:35:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:35:17	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:35:22	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:35:38	SIG	M62/2170K1	OFF	M62 J25 - J30	
22/09/15 18:35:38	SIG	M62/2170K2	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2183A1	BLNK	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2183A2	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2183A3	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2183A4	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2189A1	BLNK	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2189A2	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2189A3	OFF	M62 J25 - J30	
22/09/15 18:35:39	SIG	M62/2189A4	OFF	M62 J25 - J30	
22/09/15 18:35:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:36:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:36:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:36:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 18:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
22/09/15 18:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 18:37:39	SIG	M62/2197A1	OFF	M62 J25 - J30	
22/09/15 18:37:39	SIG	M62/2197A2	OFF	M62 J25 - J30	
22/09/15 18:37:39	SIG	M62/2197A3	OFF	M62 J25 - J30	
22/09/15 18:38:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:38:24	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:38:29	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:40:23	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 18:40:23	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 18:40:23	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 18:40:23	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 18:40:23	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 18:41:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:41:31	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:41:36	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:42:23	SIG	M62/2203B1	60R	M62 J25 - J30	
22/09/15 18:42:23	SIG	M62/2203B2	60R	M62 J25 - J30	
22/09/15 18:42:23	SIG	M62/2203B3	60R	M62 J25 - J30	
22/09/15 18:44:04	SIG	M62/2025A1	HSD	M62 J25 - J30	
22/09/15 18:44:36	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:44:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:44:42	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:45:04	SIG	M62/2033A1	HSD	M62 J25 - J30	
22/09/15 18:46:04	SIG	M62/2041A1	HSD	M62 J25 - J30	
22/09/15 18:46:05	SIG	M62/2018A1	HSD	M62 J25 - J30	
22/09/15 18:46:05	SIG	M62/2025A1	REDX	M62 J25 - J30	
22/09/15 18:47:11	SIG	M62/2050A1	HSD	M62 J25 - J30	
22/09/15 18:47:12	SIG	M62/2033A1	REDX	M62 J25 - J30	
22/09/15 18:47:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:47:43	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:47:48	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:48:04	SIG	M62/2041A1	REDX	M62 J25 - J30	
22/09/15 18:49:04	SIG	M62/2050A1	REDX	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2189B1	20R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2189B2	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2189B3	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2189B4	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2194B1	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2194B2	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2194B3	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2194B4	40R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2199M1	50R	M62 J25 - J30	
22/09/15 18:49:53	SIG	M62/2199M2	50R	M62 J25 - J30	
22/09/15 18:49:58	SIG	M62/2194B1	30R	M62 J25 - J30	
22/09/15 18:49:58	SIG	M62/2199M1	40R	M62 J25 - J30	
22/09/15 18:49:58	SIG	M62/2199M2	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2189B1	20R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2189B2	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2189B3	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2189B4	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2194B1	20R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2194B2	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2194B3	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2194B4	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2197B1	50R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2197B2	50R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2197B3	50R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2199M1	40R	M62 J25 - J30	
22/09/15 18:50:03	SIG	M62/2199M2	40R	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2025A2	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2025A3	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2025A4	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2033A2	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2033A3	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2033A4	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2041A2	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2041A3	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2041A4	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2050A2	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2050A3	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2050A4	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2057A1	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2057A2	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2057A3	NR	M62 J25 - J30	
22/09/15 18:50:04	SIG	M62/2057J1	NR	M62 J25 - J30	
22/09/15 18:50:09	SIG	M62/2189B1	STOP	M62 J25 - J30	
22/09/15 18:50:09	SIG	M62/2194B1	STOP	M62 J25 - J30	
22/09/15 18:50:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:50:49	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:50:55	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2008K1	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2008K2	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2012A1	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2012A2	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2012A3	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2018A1	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2018A2	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2018A3	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2018A4	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2025A1	BLNK	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2025A2	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2025A3	OFF	M62 J25 - J30	
22/09/15 18:51:04	SIG	M62/2025A4	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2033A1	BLNK	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2033A2	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2033A3	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2033A4	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2041A1	BLNK	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2041A2	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2041A3	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2041A4	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2050A1	BLNK	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2050A2	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2050A3	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2050A4	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2057A1	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2057A2	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2057A3	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2057J1	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2065A1	BLNK	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2065A2	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2065A3	OFF	M62 J25 - J30	
22/09/15 18:51:05	SIG	M62/2065A4	OFF	M62 J25 - J30	
22/09/15 18:51:17	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 18:51:17	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 18:51:17	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 18:51:17	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 18:51:17	SIG	M62/2183B1	30R	M62 J25 - J30	
22/09/15 18:51:17	SIG	M62/2183L2	30R	M62 J25 - J30	
22/09/15 18:51:23	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 18:51:23	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 18:51:23	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 18:51:23	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 18:51:28	SIG	M62/2177L1	30R	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2177B2	40R	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2177L1	20R	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2183B1	30R	M62 J25 - J30	
22/09/15 18:51:33	SIG	M62/2183L2	30R	M62 J25 - J30	
22/09/15 18:51:38	SIG	M62/2177L1	STOP	M62 J25 - J30	
22/09/15 18:52:23	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 18:52:23	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 18:53:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:53:54	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:54:00	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:57:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 18:57:06	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 18:57:11	SIG	M62/2183B2	40R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2183B1	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2183B2	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2183L1	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2183L2	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2189B1	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2189B2	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2189B3	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2189B4	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2194B1	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2194B2	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2194B3	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2194B4	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2197B1	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2197B2	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2197B3	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2199M1	60R	M62 J25 - J30	
22/09/15 18:57:12	SIG	M62/2199M2	60R	M62 J25 - J30	
22/09/15 18:58:00	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 18:58:00	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 18:58:00	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 18:58:00	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1960A1	50R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1960A2	50R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1960A3	50R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1960K1	50R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1960K2	50R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1968A1	40R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1968A2	40R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1968A3	40R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1968A4	40R	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 18:58:06	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 19:00:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 19:00:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 19:00:12	SIG	M62/2170B1	OFF	M62 J25 - J30	
22/09/15 19:00:13	SIG	M62/2170B2	OFF	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 19:02:00	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 19:02:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 19:05:01	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 19:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 19:06:11	SIG	M62/2183B2	???	M62 J25 - J30	
22/09/15 19:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 19:06:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 19:06:32	SIG	M62/2057B1	HSD	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2177B1	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2177B2	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2177L1	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2177L2	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2183B1	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2183B2	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2183L1	NR	M62 J25 - J30	
22/09/15 19:07:24	SIG	M62/2183L2	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2183B1	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2183B2	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2183L1	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2183L2	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2189B1	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2189B2	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2189B3	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2189B4	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2194B1	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2194B2	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2194B3	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2194B4	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2197B1	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2197B2	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2197B3	NR	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2199M1	OFF	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2199M2	OFF	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2203B1	OFF	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2203B2	OFF	M62 J25 - J30	
22/09/15 19:08:24	SIG	M62/2203B3	OFF	M62 J25 - J30	
22/09/15 19:08:32	SIG	M62/2041B1	HSD	M62 J25 - J30	
22/09/15 19:08:32	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 19:08:32	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 19:08:32	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 19:08:32	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 19:09:32	SIG	M62/2033B1	HSD	M62 J25 - J30	
22/09/15 19:09:46	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 19:09:46	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 19:10:24	SIG	M62/2177L1	OFF	M62 J25 - J30	
22/09/15 19:10:25	SIG	M62/2177B1	OFF	M62 J25 - J30	
22/09/15 19:10:25	SIG	M62/2177B2	OFF	M62 J25 - J30	
22/09/15 19:10:25	SIG	M62/2177L2	OFF	M62 J25 - J30	
22/09/15 19:10:32	SIG	M62/2025B1	HSD	M62 J25 - J30	
22/09/15 19:10:32	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2189B1	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2189B2	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2189B3	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2189B4	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2194B1	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2194B2	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2194B3	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2194B4	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2197B1	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2197B2	OFF	M62 J25 - J30	
22/09/15 19:11:24	SIG	M62/2197B3	OFF	M62 J25 - J30	
22/09/15 19:12:08	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 19:12:38	SIG	M62/2057B2	NR	M62 J25 - J30	
22/09/15 19:12:38	SIG	M62/2057B3	NR	M62 J25 - J30	
22/09/15 19:12:38	SIG	M62/2057B4	NR	M62 J25 - J30	
22/09/15 19:12:38	SIG	M62/2065B2	NR	M62 J25 - J30	
22/09/15 19:12:38	SIG	M62/2065B3	NR	M62 J25 - J30	
22/09/15 19:12:38	SIG	M62/2065B4	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2018B1	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2018B2	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2018B3	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2018L1	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2025B2	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2025B3	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2025B4	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2033B2	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2033B3	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2033B4	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2041B2	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2041B3	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2041B4	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 19:12:39	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 19:13:38	SIG	M62/2069M1	OFF	M62 J25 - J30	
22/09/15 19:13:38	SIG	M62/2069M2	OFF	M62 J25 - J30	
22/09/15 19:13:38	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 19:13:38	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2018B1	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2018B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2018L1	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2025B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2025B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2025B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2033B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2033B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2041B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2041B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2041B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2050B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2050B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2050B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2065B1	BLNK	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2065B2	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2065B3	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2065B4	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M62/2065M1	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 19:13:39	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 19:49:56	SIG	M606/2003B1	NR	M62 J25 - J30	
22/09/15 19:49:56	SIG	M606/2003B2	NR	M62 J25 - J30	
22/09/15 19:50:01	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 19:50:01	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 19:50:01	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2012B1	REDX	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2012B2	NR	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2012B3	NR	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2012B4	NR	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2018B1	NR	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2018B2	NR	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2018B3	NR	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2025B1	STOP	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2025B2	40R	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2025B3	40R	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2025B4	40R	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2033B1	REDX	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2033B2	50R	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2033B3	50R	M62 J25 - J30	
22/09/15 19:50:07	SIG	M62/2033B4	50R	M62 J25 - J30	
22/09/15 19:50:12	SIG	M62/2025B1	STOP	M62 J25 - J30	
22/09/15 19:52:34	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 19:52:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 19:52:56	SIG	M606/2003B1	OFF	M62 J25 - J30	
22/09/15 19:52:56	SIG	M606/2003B2	OFF	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2041B1	REDX	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2041B2	60R	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2041B3	60R	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2041B4	60R	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2050B2	60R	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2050B3	60R	M62 J25 - J30	
22/09/15 19:58:25	SIG	M62/2050B4	60R	M62 J25 - J30	
22/09/15 20:05:55	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:05:55	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 20:05:55	SIG	M62/1999J1	50R	M62 J25 - J30	
22/09/15 20:05:55	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 20:06:00	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:06:00	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 20:06:00	SIG	M62/1999J1	40R	M62 J25 - J30	
22/09/15 20:06:00	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 20:06:05	SIG	M62/1992A1	30R	M62 J25 - J30	
22/09/15 20:06:05	SIG	M62/1992J1	30R	M62 J25 - J30	
22/09/15 20:06:05	SIG	M62/1999J1	30R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1992A1	30R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1992J1	30R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1999J1	20R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/1999J2	40R	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 20:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 20:06:16	SIG	M62/1999J1	STOP	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 20:07:14	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1999J1	LDR	M62 J25 - J30	
22/09/15 20:07:21	SIG	M62/1999J2	50R	M62 J25 - J30	
22/09/15 20:10:23	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 20:10:23	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 20:16:50	SIG	M62/2170L1	50R	M62 J25 - J30	
22/09/15 20:16:50	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 20:16:50	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 20:16:50	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 20:16:50	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 20:16:55	SIG	M62/2170L1	40R	M62 J25 - J30	
22/09/15 20:16:55	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 20:16:55	SIG	M62/2177B1	40R	M62 J25 - J30	
22/09/15 20:16:55	SIG	M62/2177L1	40R	M62 J25 - J30	
22/09/15 20:16:55	SIG	M62/2177L2	40R	M62 J25 - J30	
22/09/15 20:17:00	SIG	M62/2170L1	30R	M62 J25 - J30	
22/09/15 20:17:00	SIG	M62/2177B1	30R	M62 J25 - J30	
22/09/15 20:17:00	SIG	M62/2177L1	30R	M62 J25 - J30	
22/09/15 20:17:00	SIG	M62/2177L2	30R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2170L1	20R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2170L2	40R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2177B1	30R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2177L1	30R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2177L2	30R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2183B1	50R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2183B2	50R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2183L1	50R	M62 J25 - J30	
22/09/15 20:17:06	SIG	M62/2183L2	50R	M62 J25 - J30	
22/09/15 20:17:11	SIG	M62/2170L1	STOP	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2170B1	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2170B2	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2170L1	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2170L2	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2177B1	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2177B2	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2177L1	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2177L2	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2183B1	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2183L1	OFF	M62 J25 - J30	
22/09/15 20:17:19	SIG	M62/2183L2	OFF	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2170L1	LDR	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2170L2	50R	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2177B1	50R	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2177B2	50R	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2177L1	50R	M62 J25 - J30	
22/09/15 20:17:35	SIG	M62/2177L2	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1987A2	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 20:18:03	SIG	M62/1992J1	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1981A1	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1987A2	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1987J1	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:18:18	SIG	M62/1992J1	30R	M62 J25 - J30	
22/09/15 20:18:24	SIG	M62/1981A1	30R	M62 J25 - J30	
22/09/15 20:18:24	SIG	M62/1987J1	30R	M62 J25 - J30	
22/09/15 20:18:24	SIG	M62/1992J1	20R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1968A1	60R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1968A2	60R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1968A3	60R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1968A4	60R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1974A1	LDR	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1979K1	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1979K2	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1981A1	20R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1981A2	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1981A3	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1981A4	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1987A1	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1987A3	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1987J1	20R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1992A2	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1992A3	40R	M62 J25 - J30	
22/09/15 20:18:29	SIG	M62/1992J1	20R	M62 J25 - J30	
22/09/15 20:18:34	SIG	M62/1981A1	STOP	M62 J25 - J30	
22/09/15 20:18:34	SIG	M62/1987J1	STOP	M62 J25 - J30	
22/09/15 20:18:34	SIG	M62/1992J1	STOP	M62 J25 - J30	
22/09/15 20:20:37	SIG	M62/2025B1	REDX	M62 J25 - J30	
22/09/15 20:20:37	SIG	M62/2025B2	50R	M62 J25 - J30	
22/09/15 20:20:37	SIG	M62/2025B3	50R	M62 J25 - J30	
22/09/15 20:20:37	SIG	M62/2025B4	50R	M62 J25 - J30	
22/09/15 20:20:50	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 20:20:51	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:20:56	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M62/2057B1	REDX	M62 J25 - J30	
22/09/15 20:21:25	SIG	M62/2057B2	60R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M62/2057B3	60R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M62/2057B4	60R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M62/2065M1	60R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M621/1002B1	HSD	M62 J25 - J30	
22/09/15 20:21:25	SIG	M621/1002B2	60R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M621/1010B1	60R	M62 J25 - J30	
22/09/15 20:21:25	SIG	M621/1010B2	60R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2106A1	REDX	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2106A2	50R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2106A4	50R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2114A1	50R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2114A2	50R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2114A3	50R	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2117A1	REDX	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2117A2	NR	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2117A3	NR	M62 J25 - J30	
22/09/15 20:22:15	SIG	M62/2117A4	NR	M62 J25 - J30	
22/09/15 20:23:50	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 20:23:51	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:23:56	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:25:15	SIG	M62/2106A3	???	M62 J25 - J30	
22/09/15 20:25:16	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 20:26:57	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:26:57	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 20:27:03	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:27:25	SIG	M62/1960A1	60R	M62 J25 - J30	
22/09/15 20:27:25	SIG	M62/1960A2	60R	M62 J25 - J30	
22/09/15 20:27:25	SIG	M62/1960A3	60R	M62 J25 - J30	
22/09/15 20:27:25	SIG	M62/1960K1	60R	M62 J25 - J30	
22/09/15 20:27:25	SIG	M62/1960K2	60R	M62 J25 - J30	
22/09/15 20:30:03	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:30:03	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 20:30:09	SIG	M62/1992A1	40R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1974A1	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1974A2	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1974A3	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1974A4	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1979K1	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1979K2	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1981A1	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1981A2	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1981A3	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1981A4	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1987A1	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1987A3	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1987J1	60R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 20:33:03	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 20:35:12	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 20:35:13	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 20:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 20:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 20:36:11	SIG	M62/2106A3	???	M62 J25 - J30	
22/09/15 20:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1960A1	OFF	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1960A2	OFF	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1960A3	OFF	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1960K1	OFF	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1960K2	OFF	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1968A1	NR	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1968A2	NR	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1968A3	NR	M62 J25 - J30	
22/09/15 20:42:26	SIG	M62/1968A4	NR	M62 J25 - J30	
22/09/15 20:45:26	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 20:45:26	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 20:45:26	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 20:45:26	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2189A1	REDX	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2189A2	60R	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2189A3	60R	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2189A4	60R	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2197A1	LDR	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2197A2	50R	M62 J25 - J30	
22/09/15 20:50:02	SIG	M62/2197A3	50R	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1981A1	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1981A2	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1981A3	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1981A4	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 20:51:35	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2106A2	NR	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2106A3	NR	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2106A4	NR	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2114A1	OFF	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2114A2	OFF	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2114A3	OFF	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2117A1	BLNK	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2117A2	OFF	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2117A3	OFF	M62 J25 - J30	
22/09/15 20:54:16	SIG	M62/2117A4	OFF	M62 J25 - J30	
22/09/15 20:54:36	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 20:54:51	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 20:54:51	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 20:54:51	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 20:54:51	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 20:54:51	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 20:54:51	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 20:57:17	SIG	M62/2106A1	BLNK	M62 J25 - J30	
22/09/15 20:57:17	SIG	M62/2106A2	OFF	M62 J25 - J30	
22/09/15 20:57:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 20:57:17	SIG	M62/2106A4	OFF	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 21:05:17	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 21:05:18	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 21:05:18	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 21:05:18	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 21:05:18	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 21:05:18	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 21:05:18	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 21:05:23	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 21:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 21:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 21:07:51	SIG	M62/2157A1	???	M62 J25 - J30	
22/09/15 21:07:51	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 21:07:57	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1999J1	OFF	M62 J25 - J30	
22/09/15 21:08:55	SIG	M62/1999J2	OFF	M62 J25 - J30	
22/09/15 21:10:50	SIG	M62/2157A1	???	M62 J25 - J30	
22/09/15 21:10:51	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 21:10:56	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 21:11:55	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 21:11:55	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 21:11:55	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 21:13:50	SIG	M62/2157A1	???	M62 J25 - J30	
22/09/15 21:13:51	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 21:13:56	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 21:16:12	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 21:16:56	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 21:16:56	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 21:16:56	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 21:16:56	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 21:16:56	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 21:16:56	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 21:16:57	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 21:17:02	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 21:19:57	SIG	M62/2157A1	???	M62 J25 - J30	
22/09/15 21:19:57	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 21:20:03	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 21:20:58	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2170B1	NR	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2170B2	NR	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2170L1	OFF	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2170L2	OFF	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2177B1	OFF	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2177B2	OFF	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2177L1	OFF	M62 J25 - J30	
22/09/15 21:27:52	SIG	M62/2177L2	OFF	M62 J25 - J30	
22/09/15 21:30:52	SIG	M62/2170B1	OFF	M62 J25 - J30	
22/09/15 21:30:52	SIG	M62/2170B2	OFF	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1968A1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1968A2	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1968A3	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1968A4	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1974A1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1974A2	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1974A3	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1974A4	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1979K1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1981A1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1981A2	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1981A3	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1981A4	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1987A1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1987A3	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1987J1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1992A1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1992A2	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1992A3	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1992J1	50R	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 21:34:49	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 21:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 21:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1960B1	NR	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1960B2	NR	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1960B3	NR	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1960L1	NR	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1960L2	NR	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1968B1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1968B2	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1968B3	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1968L1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1974B1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1974B2	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1974B3	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1974B4	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1974M1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1974M2	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1981B1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1981B2	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1981B3	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1981B4	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1987B1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1987B2	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1987B3	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1987B4	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1992B1	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1992B2	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1992B3	50R	M62 J25 - J30	
22/09/15 21:36:31	SIG	M62/1992B4	50R	M62 J25 - J30	
22/09/15 21:37:05	SIG	M62/1992A1	???	M62 J25 - J30	
22/09/15 21:37:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 21:37:09	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 21:37:09	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 21:38:16	SIG	M62/1979K2	OFF	M62 J25 - J30	
22/09/15 21:38:17	SIG	M62/1979K2	50R	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1960B1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1960B2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1960B3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1960L1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1960L2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968A1	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968A2	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968A3	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968A4	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968B1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968B2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968B3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1968L1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974A1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974A2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974A3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974A4	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974B1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974B2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974B3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974B4	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974M1	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1974M2	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1979K1	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981A1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981A2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981A3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981A4	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981B1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981B2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981B3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1981B4	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987A1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987A3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987B1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987B2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987B3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987B4	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1987J1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992A1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992A2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992A3	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992B1	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992B2	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992B3	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992B4	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1992J1	OFF	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1999A1	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1999A2	NR	M62 J25 - J30	
22/09/15 21:45:21	SIG	M62/1999A3	NR	M62 J25 - J30	
22/09/15 21:46:53	SIG	M62/2189A2	NR	M62 J25 - J30	
22/09/15 21:46:53	SIG	M62/2189A3	NR	M62 J25 - J30	
22/09/15 21:46:53	SIG	M62/2189A4	NR	M62 J25 - J30	
22/09/15 21:46:53	SIG	M62/2197A1	OFF	M62 J25 - J30	
22/09/15 21:46:53	SIG	M62/2197A2	OFF	M62 J25 - J30	
22/09/15 21:46:53	SIG	M62/2197A3	OFF	M62 J25 - J30	
22/09/15 21:48:21	SIG	M62/1974A1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1960B1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1960B2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1960B3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1960L1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1960L2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1968B1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1968B2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1968B3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1968L1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974A2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974A3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974A4	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974B1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974B2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974B3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1974B4	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981A1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981A2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981A3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981A4	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981B1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981B2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981B3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1981B4	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987A1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987A3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987B1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987B2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987B3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987B4	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1987J1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1992A1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1992A2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1992A3	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1999A1	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1999A2	OFF	M62 J25 - J30	
22/09/15 21:48:31	SIG	M62/1999A3	OFF	M62 J25 - J30	
22/09/15 21:49:54	SIG	M62/2189A1	BLNK	M62 J25 - J30	
22/09/15 21:49:54	SIG	M62/2189A2	OFF	M62 J25 - J30	
22/09/15 21:49:54	SIG	M62/2189A3	OFF	M62 J25 - J30	
22/09/15 21:49:54	SIG	M62/2189A4	OFF	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2065B1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2065B2	60R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2065B3	60R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2065B4	60R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2079A1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2079A2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2079A3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2079A4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2081B1	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2081B2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2081B3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2081L1	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088A1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088A2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088A3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088A4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088B1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088B2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088B3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2088B4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097A1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097A2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097A3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097A4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097B1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097B2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097B3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2097B4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106A1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106A2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106A3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106A4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106B1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106B2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106B3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2106B4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2113B1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2113B2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2113B3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2113B4	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2114A1	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2114A2	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2114A3	50R	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2117A1	REDX	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2117A2	NR	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2117A3	NR	M62 J25 - J30	
22/09/15 22:00:31	SIG	M62/2117A4	NR	M62 J25 - J30	
22/09/15 22:03:14	SIG	M62/2106A3	???	M62 J25 - J30	
22/09/15 22:03:15	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 22:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 22:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 22:06:11	SIG	M62/2106A3	???	M62 J25 - J30	
22/09/15 22:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2065B2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2065B3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2065B4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2079A1	BLNK	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2079A2	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2079A3	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2079A4	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2081B1	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2081B2	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2081B3	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2081L1	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2088A2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2088A3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2088A4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2088B2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2088B3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2088B4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2097A2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2097A3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2097A4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2097B2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2097B3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2097B4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2106A2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2106A3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2106A4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2106B2	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2106B3	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2106B4	NR	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2113B1	BLNK	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2113B2	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2113B3	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2113B4	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2114A1	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2114A2	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2114A3	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2117A1	BLNK	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2117A2	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2117A3	OFF	M62 J25 - J30	
22/09/15 22:06:31	SIG	M62/2117A4	OFF	M62 J25 - J30	
22/09/15 22:09:32	SIG	M62/2065B1	BLNK	M62 J25 - J30	
22/09/15 22:09:32	SIG	M62/2065B2	OFF	M62 J25 - J30	
22/09/15 22:09:32	SIG	M62/2065B3	OFF	M62 J25 - J30	
22/09/15 22:09:32	SIG	M62/2065B4	OFF	M62 J25 - J30	
22/09/15 22:09:32	SIG	M62/2106A2	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2081L1	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088A1	BLNK	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088A2	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088A3	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088A4	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088B1	BLNK	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088B2	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088B3	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2088B4	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097A1	BLNK	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097A2	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097A3	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097A4	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097B1	BLNK	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097B2	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097B3	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2097B4	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106A1	BLNK	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106A4	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106B1	BLNK	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106B2	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106B3	OFF	M62 J25 - J30	
22/09/15 22:09:33	SIG	M62/2106B4	OFF	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2157A2	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2157J1	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2157J2	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2157K1	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2163A1	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2163A2	50R	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2170A1	NR	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2170A2	NR	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2177A1	REDX	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2177A2	NR	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2177A3	NR	M62 J25 - J30	
22/09/15 22:17:33	SIG	M62/2177A4	NR	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2155A1	50R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2155A2	50R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2155J1	50R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2155K1	50R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2157A2	40R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2157J1	40R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2157J2	40R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2157K1	40R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2163A1	40R	M62 J25 - J30	
22/09/15 22:17:38	SIG	M62/2163A2	40R	M62 J25 - J30	
22/09/15 22:20:11	SIG	M62/2157A1	???	M62 J25 - J30	
22/09/15 22:20:12	SIG	M62/2157A1	50R	M62 J25 - J30	
22/09/15 22:20:17	SIG	M62/2157A1	40R	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2155A1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2155A2	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2155J1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2155K1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2157A2	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2157J1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2157J2	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2157K1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2163A1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2163A2	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2170A1	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2170A2	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2177A1	BLNK	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2177A2	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2177A3	OFF	M62 J25 - J30	
22/09/15 22:21:33	SIG	M62/2177A4	OFF	M62 J25 - J30	
22/09/15 22:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 22:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M62/2057B1	BLNK	M62 J25 - J30	
22/09/15 23:00:28	SIG	M62/2057B2	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M62/2057B3	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M62/2057B4	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M62/2065M1	NR	M62 J25 - J30	
22/09/15 23:00:28	SIG	M621/1002B1	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M621/1002B2	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M621/1010B1	OFF	M62 J25 - J30	
22/09/15 23:00:28	SIG	M621/1010B2	OFF	M62 J25 - J30	
22/09/15 23:03:28	SIG	M62/2065M1	OFF	M62 J25 - J30	
22/09/15 23:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 23:06:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 23:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 23:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2012B1	BLNK	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2012B2	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2012B3	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2012B4	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2018B1	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2018B2	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2018B3	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2025B1	BLNK	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2025B2	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2025B3	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2025B4	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2033B1	BLNK	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2033B2	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2033B4	OFF	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2041B2	NR	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2041B3	NR	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2041B4	NR	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2050B2	NR	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2050B3	NR	M62 J25 - J30	
22/09/15 23:45:29	SIG	M62/2050B4	NR	M62 J25 - J30	
22/09/15 23:48:29	SIG	M62/2050B2	OFF	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2041B1	BLNK	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2041B2	OFF	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2041B3	OFF	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2041B4	OFF	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2050B3	OFF	M62 J25 - J30	
22/09/15 23:48:30	SIG	M62/2050B4	OFF	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2157A2	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2157J1	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2157J2	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2157K1	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2163A1	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2163A2	50R	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2170A1	NR	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2170A2	NR	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2177A1	REDX	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2177A2	NR	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2177A3	NR	M62 J25 - J30	
23/09/15 01:00:31	SIG	M62/2177A4	NR	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2155A1	50R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2155A2	50R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2155J1	50R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2155K1	50R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2157A2	40R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2157J1	40R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2157J2	40R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2157K1	40R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2163A1	40R	M62 J25 - J30	
23/09/15 01:00:37	SIG	M62/2163A2	40R	M62 J25 - J30	
23/09/15 01:03:29	SIG	M62/2157A1	???	M62 J25 - J30	
23/09/15 01:03:30	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 01:03:35	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2155A1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2155A2	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2155J1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2155K1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2157A2	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2157J1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2157J2	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2157K1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2163A1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2163A2	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2170A1	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2170A2	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2177A1	BLNK	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2177A2	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2177A3	OFF	M62 J25 - J30	
23/09/15 01:04:30	SIG	M62/2177A4	OFF	M62 J25 - J30	
23/09/15 01:29:29	SIG	M62/2074A3	OFF	M62 J25 - J30	
23/09/15 01:30:09	SIG	M62/2074B1	OFF	M62 J25 - J30	
23/09/15 01:30:09	SIG	M62/2074B1	BLNK	M62 J25 - J30	
23/09/15 01:30:09	SIG	M62/2074B1	BLNK	M62 J25 - J30	
23/09/15 01:30:10	SIG	M62/2073K1	OFF	M62 J25 - J30	
23/09/15 01:30:10	SIG	M62/2073K2	OFF	M62 J25 - J30	
23/09/15 01:30:16	SIG	M62/2074A1	OFF	M62 J25 - J30	
23/09/15 01:30:17	SIG	M62/2074A1	BLNK	M62 J25 - J30	
23/09/15 01:30:17	SIG	M62/2074A1	BLNK	M62 J25 - J30	
23/09/15 01:30:17	SIG	M62/2074A2	OFF	M62 J25 - J30	
23/09/15 01:30:24	SIG	M62/2074A4	OFF	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2170L1	LDR	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 02:01:32	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2170L1	OFF	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2170L2	OFF	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2177B1	OFF	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2177B2	OFF	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2177L1	OFF	M62 J25 - J30	
23/09/15 02:41:10	SIG	M62/2177L2	OFF	M62 J25 - J30	
23/09/15 02:44:11	SIG	M62/2170B1	OFF	M62 J25 - J30	
23/09/15 02:44:11	SIG	M62/2170B2	OFF	M62 J25 - J30	
23/09/15 03:13:40	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 03:13:40	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 03:13:40	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2012B1	REDX	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2012B2	NR	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2012B3	NR	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2012B4	NR	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2018B1	NR	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2018B2	NR	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2018B3	NR	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2025B1	STOP	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2033B1	REDX	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 03:13:45	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 03:13:51	SIG	M62/2025B1	STOP	M62 J25 - J30	
23/09/15 03:14:02	SIG	M62/2041B1	REDX	M62 J25 - J30	
23/09/15 03:14:02	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 03:14:02	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 03:14:02	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2189A1	REDX	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2189A2	60R	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2189A3	60R	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2189A4	60R	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2197A1	LDR	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2197A2	50R	M62 J25 - J30	
23/09/15 03:15:15	SIG	M62/2197A3	50R	M62 J25 - J30	
23/09/15 03:16:16	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 03:16:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1987A1	NR	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1987A3	NR	M62 J25 - J30	
23/09/15 03:27:46	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 03:30:26	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 03:30:26	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 03:30:31	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 03:30:31	SIG	M62/1987J1	40R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1987A1	30R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1987J1	30R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1992J1	LDR	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1999A1	NR	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1999A2	NR	M62 J25 - J30	
23/09/15 03:30:37	SIG	M62/1999A3	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1987A1	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1987A3	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1992A1	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1992A2	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1992A3	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1992J1	OFF	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1999A1	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1999A2	NR	M62 J25 - J30	
23/09/15 03:32:42	SIG	M62/1999A3	NR	M62 J25 - J30	
23/09/15 03:35:43	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 03:35:43	SIG	M62/1992A2	OFF	M62 J25 - J30	
23/09/15 03:35:43	SIG	M62/1992A3	OFF	M62 J25 - J30	
23/09/15 03:35:43	SIG	M62/1999A1	OFF	M62 J25 - J30	
23/09/15 03:35:43	SIG	M62/1999A2	OFF	M62 J25 - J30	
23/09/15 03:35:43	SIG	M62/1999A3	OFF	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1999A1	NR	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1999A2	NR	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1999A3	NR	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1999J1	LDR	M62 J25 - J30	
23/09/15 03:36:06	SIG	M62/1999J2	50R	M62 J25 - J30	
23/09/15 03:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 03:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2012B1	BLNK	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2012B2	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2012B3	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2012B4	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2018B1	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2018B2	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2018B3	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2025B1	BLNK	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2025B2	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2025B3	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2025B4	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2033B1	BLNK	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2033B1	BLNK	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2033B2	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2033B4	OFF	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2041B2	NR	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2041B3	NR	M62 J25 - J30	
23/09/15 03:37:47	SIG	M62/2041B4	NR	M62 J25 - J30	
23/09/15 03:38:53	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 03:38:53	SIG	M62/1992A1	???	M62 J25 - J30	
23/09/15 03:40:47	SIG	M62/2041B2	OFF	M62 J25 - J30	
23/09/15 03:40:47	SIG	M62/2041B3	OFF	M62 J25 - J30	
23/09/15 03:40:47	SIG	M62/2041B4	OFF	M62 J25 - J30	
23/09/15 03:40:48	SIG	M62/2041B1	BLNK	M62 J25 - J30	
23/09/15 03:42:18	SIG	M62/1979K1	40R	M62 J25 - J30	
23/09/15 03:42:18	SIG	M62/1979K2	40R	M62 J25 - J30	
23/09/15 03:42:18	SIG	M62/1981A1	40R	M62 J25 - J30	
23/09/15 03:42:18	SIG	M62/1981A2	40R	M62 J25 - J30	
23/09/15 03:42:18	SIG	M62/1981A3	40R	M62 J25 - J30	
23/09/15 03:42:18	SIG	M62/1981A4	40R	M62 J25 - J30	
23/09/15 03:42:23	SIG	M62/1981A1	30R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1968A1	60R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1968A2	60R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1968A3	60R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1968A4	60R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1974A1	LDR	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1979K1	40R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1979K2	40R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1981A1	20R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1981A2	40R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1981A3	40R	M62 J25 - J30	
23/09/15 03:42:29	SIG	M62/1981A4	40R	M62 J25 - J30	
23/09/15 03:42:34	SIG	M62/1981A1	STOP	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1987A2	40R	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1987J1	40R	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1992A2	40R	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1992A3	40R	M62 J25 - J30	
23/09/15 03:42:56	SIG	M62/1992J1	40R	M62 J25 - J30	
23/09/15 03:43:02	SIG	M62/1987J1	30R	M62 J25 - J30	
23/09/15 03:43:02	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 03:43:02	SIG	M62/1992J1	30R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1987J1	20R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1992A2	40R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1992A3	40R	M62 J25 - J30	
23/09/15 03:43:08	SIG	M62/1992J1	20R	M62 J25 - J30	
23/09/15 03:43:13	SIG	M62/1987J1	STOP	M62 J25 - J30	
23/09/15 03:43:13	SIG	M62/1992J1	STOP	M62 J25 - J30	
23/09/15 03:46:07	SIG	M62/1992A1	???	M62 J25 - J30	
23/09/15 03:46:08	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 03:46:13	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 03:49:20	SIG	M62/1992A1	???	M62 J25 - J30	
23/09/15 03:49:21	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 03:49:26	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 03:52:20	SIG	M62/1992A1	???	M62 J25 - J30	
23/09/15 03:52:21	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 03:52:27	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1979K1	OFF	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1979K2	OFF	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1981A1	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1981A2	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1981A3	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1981A4	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1987A1	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1987A3	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 03:55:28	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 03:56:53	SIG	M62/2189A2	NR	M62 J25 - J30	
23/09/15 03:56:53	SIG	M62/2189A3	NR	M62 J25 - J30	
23/09/15 03:56:53	SIG	M62/2189A4	NR	M62 J25 - J30	
23/09/15 03:56:53	SIG	M62/2197A1	OFF	M62 J25 - J30	
23/09/15 03:56:53	SIG	M62/2197A2	OFF	M62 J25 - J30	
23/09/15 03:56:53	SIG	M62/2197A3	OFF	M62 J25 - J30	
23/09/15 03:57:28	SIG	M62/1992A1	???	M62 J25 - J30	
23/09/15 03:57:29	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 03:58:28	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1981A1	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1981A2	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1981A3	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1981A4	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1987A1	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1987A3	OFF	M62 J25 - J30	
23/09/15 03:58:39	SIG	M62/1987J1	OFF	M62 J25 - J30	
23/09/15 03:59:54	SIG	M62/2189A1	BLNK	M62 J25 - J30	
23/09/15 03:59:54	SIG	M62/2189A2	OFF	M62 J25 - J30	
23/09/15 03:59:54	SIG	M62/2189A3	OFF	M62 J25 - J30	
23/09/15 03:59:54	SIG	M62/2189A4	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1992A2	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1992A3	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1992J1	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1999A1	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1999A2	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1999A3	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1999J1	OFF	M62 J25 - J30	
23/09/15 04:32:43	SIG	M62/1999J2	OFF	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2157A2	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2157J1	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2157J2	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2157K1	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2163A1	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2163A2	50R	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2170A1	NR	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2170A2	NR	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2177A1	REDX	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2177A2	NR	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2177A3	NR	M62 J25 - J30	
23/09/15 05:13:30	SIG	M62/2177A4	NR	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2155A1	50R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2155A2	50R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2155J1	50R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2155K1	50R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2157A2	40R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2157J1	40R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2157J2	40R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2157K1	40R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2163A1	40R	M62 J25 - J30	
23/09/15 05:13:36	SIG	M62/2163A2	40R	M62 J25 - J30	
23/09/15 05:16:29	SIG	M62/2157A1	???	M62 J25 - J30	
23/09/15 05:16:30	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 05:16:35	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 05:19:32	SIG	M62/2157A1	???	M62 J25 - J30	
23/09/15 05:19:33	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 05:19:39	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 05:22:42	SIG	M62/2157A1	???	M62 J25 - J30	
23/09/15 05:22:43	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 05:22:48	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 05:25:42	SIG	M62/2157A1	???	M62 J25 - J30	
23/09/15 05:25:43	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 05:25:48	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 05:28:43	SIG	M62/2157A1	???	M62 J25 - J30	
23/09/15 05:28:44	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 05:28:49	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2155A1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2155A2	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2155J1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2155K1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2157A2	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2157J1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2157J2	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2157K1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2163A1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2163A2	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2170A1	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2170A2	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2177A1	BLNK	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2177A2	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2177A3	OFF	M62 J25 - J30	
23/09/15 05:30:30	SIG	M62/2177A4	OFF	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2018A1	HSD	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2018A2	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2018A3	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2018A4	60R	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2025A1	REDX	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2025A2	NR	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2025A3	NR	M62 J25 - J30	
23/09/15 06:37:59	SIG	M62/2025A4	NR	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2018A1	HSD	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2025A2	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2025A3	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2025A4	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2033A1	REDX	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2033A2	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2033A3	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2033A4	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2041A1	REDX	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2041A2	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2041A3	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2041A4	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2050A1	REDX	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2050A2	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2050A3	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2050A4	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2057A1	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2057A2	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2057A3	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2057J1	60R	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2065A1	REDX	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2065A2	NR	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2065A3	NR	M62 J25 - J30	
23/09/15 06:38:00	SIG	M62/2065A4	NR	M62 J25 - J30	
23/09/15 06:41:18	SIG	M62/2050A1	60R	M62 J25 - J30	
23/09/15 06:41:36	SIG	M62/2004A1	60R	M62 J25 - J30	
23/09/15 06:41:36	SIG	M62/2004A2	60R	M62 J25 - J30	
23/09/15 06:41:36	SIG	M62/2004A3	60R	M62 J25 - J30	
23/09/15 06:41:39	SIG	M62/2041A1	60R	M62 J25 - J30	
23/09/15 06:42:01	SIG	M62/2033A1	60R	M62 J25 - J30	
23/09/15 06:42:05	SIG	M62/2018A1	60R	M62 J25 - J30	
23/09/15 06:42:05	SIG	M62/2025A1	60R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 06:43:36	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 06:43:36	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 06:45:36	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2004A1	OFF	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2004A2	OFF	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2004A3	OFF	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2018A1	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2018A2	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2018A3	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2018A4	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2025A1	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2025A2	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2025A3	60R	M62 J25 - J30	
23/09/15 06:45:36	SIG	M62/2025A4	60R	M62 J25 - J30	
23/09/15 06:46:50	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 06:46:50	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 06:46:50	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 06:46:50	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 06:46:56	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 06:48:23	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 06:48:24	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 06:48:37	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 06:48:37	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 06:49:07	SIG	M62/2065M1	NR	M62 J25 - J30	
23/09/15 06:49:07	SIG	M62/2069M1	60R	M62 J25 - J30	
23/09/15 06:49:07	SIG	M62/2069M2	60R	M62 J25 - J30	
23/09/15 06:49:07	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 06:49:07	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2012B1	REDX	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2012B2	NR	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2012B3	NR	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2012B4	NR	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2025B1	REDX	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2033B1	REDX	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B1	REDX	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B2	NR	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B3	NR	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2041B4	NR	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2050B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2050B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2050B4	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2057B1	REDX	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2057B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2057B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2057B4	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2065B1	REDX	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2065B2	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2065B3	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2065B4	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M62/2065M1	60R	M62 J25 - J30	
23/09/15 06:49:08	SIG	M621/1002B1	HSD	M62 J25 - J30	
23/09/15 06:49:08	SIG	M621/1002B2	60R	M62 J25 - J30	
23/09/15 06:49:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 06:49:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 06:49:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 06:49:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 06:49:57	SIG	M62/2159B1	NR	M62 J25 - J30	
23/09/15 06:49:57	SIG	M62/2159B2	NR	M62 J25 - J30	
23/09/15 06:49:58	SIG	M62/2170B1	50R	M62 J25 - J30	
23/09/15 06:49:58	SIG	M62/2170B2	50R	M62 J25 - J30	
23/09/15 06:49:58	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 06:49:58	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 06:50:03	SIG	M62/2170B1	40R	M62 J25 - J30	
23/09/15 06:50:03	SIG	M62/2170B2	40R	M62 J25 - J30	
23/09/15 06:50:03	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 06:50:03	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 06:51:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 06:51:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 06:51:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 06:51:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 06:52:00	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 06:52:34	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 06:53:04	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 06:53:31	SIG	M62/2057B1	60R	M62 J25 - J30	
23/09/15 06:53:31	SIG	M621/1002B1	60R	M62 J25 - J30	
23/09/15 06:53:31	SIG	M621/1010B1	OFF	M62 J25 - J30	
23/09/15 06:53:31	SIG	M621/1010B2	OFF	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2194B1	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2194B2	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2194B3	60R	M62 J25 - J30	
23/09/15 06:53:36	SIG	M62/2194B4	60R	M62 J25 - J30	
23/09/15 06:56:36	SIG	M62/2197B1	60R	M62 J25 - J30	
23/09/15 06:56:36	SIG	M62/2197B2	60R	M62 J25 - J30	
23/09/15 06:56:36	SIG	M62/2197B3	60R	M62 J25 - J30	
23/09/15 06:56:36	SIG	M62/2199M1	60R	M62 J25 - J30	
23/09/15 06:56:36	SIG	M62/2199M2	60R	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2065A2	60R	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2065A3	60R	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2065A4	60R	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2073K1	60R	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2073K2	60R	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2079A1	REDX	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2079A2	NR	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2079A3	NR	M62 J25 - J30	
23/09/15 06:58:29	SIG	M62/2079A4	NR	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2074A2	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2074A3	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2074A4	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2079A2	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2079A3	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2079A4	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2088A1	REDX	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2088A2	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2088A3	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2088A4	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2097A1	REDX	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2097A2	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2097A3	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2097A4	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2106A1	REDX	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2106A2	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2106A3	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2106A4	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2114A1	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2114A2	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2114A3	60R	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2117A1	REDX	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2117A2	NR	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2117A3	NR	M62 J25 - J30	
23/09/15 06:58:30	SIG	M62/2117A4	NR	M62 J25 - J30	
23/09/15 07:00:36	SIG	M62/2004A1	60R	M62 J25 - J30	
23/09/15 07:00:36	SIG	M62/2004A2	60R	M62 J25 - J30	
23/09/15 07:00:36	SIG	M62/2004A3	60R	M62 J25 - J30	
23/09/15 07:00:36	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 07:00:58	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:00:59	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:01:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:01:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:01:30	SIG	M62/2106A1	60R	M62 J25 - J30	
23/09/15 07:02:00	SIG	M62/2097A1	60R	M62 J25 - J30	
23/09/15 07:02:31	SIG	M62/2088A1	60R	M62 J25 - J30	
23/09/15 07:02:33	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 07:02:33	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 07:02:33	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 07:02:33	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 07:02:35	SIG	M62/2079A1	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2183B1	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2183B2	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2183L1	60R	M62 J25 - J30	
23/09/15 07:03:03	SIG	M62/2183L2	60R	M62 J25 - J30	
23/09/15 07:06:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:06:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 07:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:06:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 07:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:06:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 07:07:22	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2033A1	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2033A2	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2033A3	40R	M62 J25 - J30	
23/09/15 07:07:27	SIG	M62/2033A4	40R	M62 J25 - J30	
23/09/15 07:08:02	SIG	M62/2113B1	REDX	M62 J25 - J30	
23/09/15 07:08:02	SIG	M62/2113B2	NR	M62 J25 - J30	
23/09/15 07:08:02	SIG	M62/2113B3	NR	M62 J25 - J30	
23/09/15 07:08:02	SIG	M62/2113B4	NR	M62 J25 - J30	
23/09/15 07:08:02	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 07:08:02	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2074B1	REDX	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2074B2	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2074B3	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2074B4	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2081B1	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2081B2	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2081B3	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2081L1	NR	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2088B1	REDX	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2088B2	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2088B3	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2088B4	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2097B1	REDX	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2097B2	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2097B4	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2106B1	REDX	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2106B2	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2106B3	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2106B4	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2113B2	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2113B3	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2113B4	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 07:08:12	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2074B2	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2074B3	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2074B4	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2081B1	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2081B2	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2081B3	60R	M62 J25 - J30	
23/09/15 07:08:13	SIG	M62/2081L1	60R	M62 J25 - J30	
23/09/15 07:08:55	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:08:55	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:08:56	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:08:57	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:09:01	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:09:01	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:09:02	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:09:03	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:09:14	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:09:14	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:09:15	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:09:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:09:34	SIG	M62/2088B1	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2117A2	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2117A3	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2117A4	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2122K1	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2122K2	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2124A1	REDX	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2124A2	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2124A3	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2124A4	60R	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2135A1	NR	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2135A2	NR	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2135A3	NR	M62 J25 - J30	
23/09/15 07:09:37	SIG	M62/2135A4	NR	M62 J25 - J30	
23/09/15 07:09:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 07:09:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 07:09:48	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 07:09:49	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 07:09:56	SIG	M62/2097B1	60R	M62 J25 - J30	
23/09/15 07:09:57	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:09:58	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:10:03	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:10:20	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:10:20	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:10:21	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:10:22	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:10:24	SIG	M62/2106B1	60R	M62 J25 - J30	
23/09/15 07:10:27	SIG	M62/2113B1	60R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2106A1	50R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2106A2	50R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2106A3	50R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2106A4	50R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2114A1	50R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2114A2	50R	M62 J25 - J30	
23/09/15 07:10:34	SIG	M62/2114A3	50R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2106A1	40R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2106A2	40R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2106A3	40R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2106A4	40R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2114A1	40R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2114A2	40R	M62 J25 - J30	
23/09/15 07:10:40	SIG	M62/2114A3	40R	M62 J25 - J30	
23/09/15 07:10:48	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:10:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:10:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:10:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2170B1	50R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2170B2	50R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 07:10:55	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2170B1	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2170B2	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 07:11:01	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 07:11:26	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:11:26	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:11:26	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:11:27	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:11:39	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 07:11:39	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 07:11:39	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2004A1	50R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2004A2	50R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2004A3	50R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2008K1	40R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2008K2	40R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2012A1	40R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2012A2	40R	M62 J25 - J30	
23/09/15 07:12:21	SIG	M62/2012A3	40R	M62 J25 - J30	
23/09/15 07:12:33	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:12:33	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:12:34	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:12:34	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:12:37	SIG	M62/1999A1	60R	M62 J25 - J30	
23/09/15 07:12:37	SIG	M62/1999A2	60R	M62 J25 - J30	
23/09/15 07:12:37	SIG	M62/1999A3	60R	M62 J25 - J30	
23/09/15 07:12:37	SIG	M62/1999J1	50R	M62 J25 - J30	
23/09/15 07:12:37	SIG	M62/1999J2	50R	M62 J25 - J30	
23/09/15 07:13:02	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:13:03	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:13:08	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:13:13	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:13:14	SIG	M62/2106A3	50R	M62 J25 - J30	
23/09/15 07:13:19	SIG	M62/2106A3	40R	M62 J25 - J30	
23/09/15 07:13:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:13:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:13:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:13:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:13:28	SIG	M62/1999A1	50R	M62 J25 - J30	
23/09/15 07:13:28	SIG	M62/1999A2	50R	M62 J25 - J30	
23/09/15 07:13:28	SIG	M62/1999A3	50R	M62 J25 - J30	
23/09/15 07:13:28	SIG	M62/2004A1	40R	M62 J25 - J30	
23/09/15 07:13:28	SIG	M62/2004A2	40R	M62 J25 - J30	
23/09/15 07:13:28	SIG	M62/2004A3	40R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2106B1	REDX	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2113B1	LDR	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2117B1	50R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2117B3	50R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2120M1	50R	M62 J25 - J30	
23/09/15 07:14:06	SIG	M62/2120M2	50R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2106A1	60R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2106A2	60R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2106A3	60R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2106A4	60R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2114A1	60R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2114A2	60R	M62 J25 - J30	
23/09/15 07:14:35	SIG	M62/2114A3	60R	M62 J25 - J30	
23/09/15 07:14:55	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 07:14:55	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 07:14:55	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 07:14:55	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 07:15:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:15:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:15:12	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:15:13	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2183B1	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2183B2	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2183L1	60R	M62 J25 - J30	
23/09/15 07:15:40	SIG	M62/2183L2	60R	M62 J25 - J30	
23/09/15 07:16:14	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:16:15	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1999A1	40R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1999A2	40R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1999A3	40R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1999J1	40R	M62 J25 - J30	
23/09/15 07:16:19	SIG	M62/1999J2	40R	M62 J25 - J30	
23/09/15 07:16:20	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:17:04	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:17:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:17:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:17:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:17:19	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:17:20	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:17:20	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:17:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1979K1	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1979K2	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1981A1	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1981A2	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1981A3	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1981A4	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1987A1	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1987A3	60R	M62 J25 - J30	
23/09/15 07:17:47	SIG	M62/1987J1	60R	M62 J25 - J30	
23/09/15 07:18:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:18:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1992A2	40R	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1992A3	40R	M62 J25 - J30	
23/09/15 07:18:46	SIG	M62/1992J1	40R	M62 J25 - J30	
23/09/15 07:19:14	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:19:15	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:19:20	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2170B1	50R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2170B2	50R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 07:20:18	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2170B1	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2170B2	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 07:20:24	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 07:20:30	SIG	M62/1987J1	40R	M62 J25 - J30	
23/09/15 07:20:37	SIG	M62/1974A1	60R	M62 J25 - J30	
23/09/15 07:20:37	SIG	M62/1974A2	60R	M62 J25 - J30	
23/09/15 07:20:37	SIG	M62/1974A3	60R	M62 J25 - J30	
23/09/15 07:20:37	SIG	M62/1974A4	60R	M62 J25 - J30	
23/09/15 07:20:51	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:20:52	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:20:57	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:21:37	SIG	M62/1968A1	60R	M62 J25 - J30	
23/09/15 07:21:37	SIG	M62/1968A2	60R	M62 J25 - J30	
23/09/15 07:21:37	SIG	M62/1968A3	60R	M62 J25 - J30	
23/09/15 07:21:37	SIG	M62/1968A4	60R	M62 J25 - J30	
23/09/15 07:21:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:21:51	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:21:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:21:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:22:17	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:22:18	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:22:23	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:22:34	SIG	M62/1956A1	50R	M62 J25 - J30	
23/09/15 07:22:34	SIG	M62/1956A2	50R	M62 J25 - J30	
23/09/15 07:22:34	SIG	M62/1956A3	50R	M62 J25 - J30	
23/09/15 07:22:37	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:22:38	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:22:38	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1955K1	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1955K2	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1956A1	40R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1956A2	40R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1956A3	40R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960A1	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960A2	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960A3	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960K1	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960K1	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960K2	60R	M62 J25 - J30	
23/09/15 07:22:40	SIG	M62/1960K2	60R	M62 J25 - J30	
23/09/15 07:22:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:22:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:22:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:22:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:23:10	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 07:23:10	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 07:23:10	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1979K1	40R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1979K2	40R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1981A1	40R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1981A2	40R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1981A3	40R	M62 J25 - J30	
23/09/15 07:23:12	SIG	M62/1981A4	40R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2189B2	50R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2189B3	50R	M62 J25 - J30	
23/09/15 07:23:16	SIG	M62/2189B4	50R	M62 J25 - J30	
23/09/15 07:23:54	SIG	M62/2113B1	STOP	M62 J25 - J30	
23/09/15 07:23:54	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 07:23:54	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 07:23:54	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 07:23:59	SIG	M62/2113B1	STOP	M62 J25 - J30	
23/09/15 07:24:05	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:24:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:24:07	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:24:12	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1974A1	40R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1974A2	40R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1974A3	40R	M62 J25 - J30	
23/09/15 07:24:26	SIG	M62/1974A4	40R	M62 J25 - J30	
23/09/15 07:25:22	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:25:23	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:25:28	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:25:37	SIG	M62/2203B1	60R	M62 J25 - J30	
23/09/15 07:25:37	SIG	M62/2203B2	60R	M62 J25 - J30	
23/09/15 07:25:37	SIG	M62/2203B3	60R	M62 J25 - J30	
23/09/15 07:25:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:25:45	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:25:51	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2189B1	40R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2189B2	40R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2189B3	40R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2189B4	40R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2194B1	50R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2194B2	50R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2194B3	50R	M62 J25 - J30	
23/09/15 07:26:19	SIG	M62/2194B4	50R	M62 J25 - J30	
23/09/15 07:26:25	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 07:26:25	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 07:26:25	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 07:26:25	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 07:26:35	SIG	M62/1956A1	60R	M62 J25 - J30	
23/09/15 07:26:35	SIG	M62/1956A2	60R	M62 J25 - J30	
23/09/15 07:26:35	SIG	M62/1956A3	60R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 07:26:42	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 07:27:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:27:07	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:27:12	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2117A2	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2117A3	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2117A4	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2122K1	OFF	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2122K2	OFF	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2124A2	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2124A3	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2124A4	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2135A1	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2135A2	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2135A3	NR	M62 J25 - J30	
23/09/15 07:27:37	SIG	M62/2135A4	NR	M62 J25 - J30	
23/09/15 07:28:27	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:28:28	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:28:33	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2125B1	60R	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2125B2	60R	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2125B3	60R	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2125L1	60R	M62 J25 - J30	
23/09/15 07:28:37	SIG	M62/2125L2	60R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1956A1	50R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1956A2	50R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1956A3	50R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1960A1	40R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1960A2	40R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1960A3	40R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1960K1	40R	M62 J25 - J30	
23/09/15 07:28:43	SIG	M62/1960K2	40R	M62 J25 - J30	
23/09/15 07:28:51	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:28:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:28:57	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:30:11	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:30:12	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:30:17	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:30:32	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 07:30:32	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 07:30:32	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 07:30:32	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 07:30:37	SIG	M62/2124A2	OFF	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2124A1	BLNK	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2124A4	OFF	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2135A1	OFF	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2135A2	OFF	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2135A3	OFF	M62 J25 - J30	
23/09/15 07:30:38	SIG	M62/2135A4	OFF	M62 J25 - J30	
23/09/15 07:31:12	SIG	M62/1955K1	40R	M62 J25 - J30	
23/09/15 07:31:12	SIG	M62/1955K2	40R	M62 J25 - J30	
23/09/15 07:31:12	SIG	M62/1956A1	40R	M62 J25 - J30	
23/09/15 07:31:12	SIG	M62/1956A2	40R	M62 J25 - J30	
23/09/15 07:31:12	SIG	M62/1956A3	40R	M62 J25 - J30	
23/09/15 07:31:32	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:31:32	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:31:38	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:31:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:31:59	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:32:04	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:32:29	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 07:32:29	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 07:32:29	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 07:32:29	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 07:32:34	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:32:39	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2183B1	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2183B2	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2183L1	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2183L2	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2194B1	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2194B2	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2194B3	60R	M62 J25 - J30	
23/09/15 07:33:05	SIG	M62/2194B4	60R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 07:33:15	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 07:33:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:33:20	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 07:33:26	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2189B2	50R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2189B3	50R	M62 J25 - J30	
23/09/15 07:33:32	SIG	M62/2189B4	50R	M62 J25 - J30	
23/09/15 07:33:52	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:33:52	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:33:52	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:33:52	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:34:36	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:34:37	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:34:43	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:35:28	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:35:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:35:34	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:36:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:36:07	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:36:11	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:36:16	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:36:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 07:36:22	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:36:22	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 07:36:22	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:36:22	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 07:36:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:36:27	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:36:28	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:36:33	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:36:33	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 07:36:33	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 07:36:33	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 07:36:33	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 07:36:39	SIG	M62/2106B2	50R	M62 J25 - J30	
23/09/15 07:36:39	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:36:39	SIG	M62/2106B4	50R	M62 J25 - J30	
23/09/15 07:36:45	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:36:45	SIG	M62/2106B2	40R	M62 J25 - J30	
23/09/15 07:36:45	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:36:45	SIG	M62/2106B4	40R	M62 J25 - J30	
23/09/15 07:36:50	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:36:50	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 07:36:50	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 07:36:50	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2183B1	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2183B2	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2183L1	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2183L2	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 07:37:27	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 07:37:51	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:37:52	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:37:53	SIG	M62/2170K1	60R	M62 J25 - J30	
23/09/15 07:37:53	SIG	M62/2170K2	60R	M62 J25 - J30	
23/09/15 07:37:53	SIG	M62/2177A1	REDX	M62 J25 - J30	
23/09/15 07:37:53	SIG	M62/2177A2	NR	M62 J25 - J30	
23/09/15 07:37:53	SIG	M62/2177A3	NR	M62 J25 - J30	
23/09/15 07:37:53	SIG	M62/2177A4	NR	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2170A1	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2170A2	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2177A2	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2177A3	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2177A4	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2183A1	REDX	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2183A2	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2183A3	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2183A4	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2189A1	REDX	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2189A2	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2189A3	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2189A4	60R	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2197A1	NR	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2197A2	NR	M62 J25 - J30	
23/09/15 07:37:54	SIG	M62/2197A3	NR	M62 J25 - J30	
23/09/15 07:37:57	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:38:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:38:33	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:38:38	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 07:39:00	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 07:39:09	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:39:09	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:39:15	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:39:35	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:39:36	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:39:41	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:39:45	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 07:39:45	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:39:56	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 07:39:56	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 07:39:56	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 07:39:56	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 07:40:02	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 07:40:14	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:40:15	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:40:20	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:40:40	SIG	M62/2097B3	60R	M62 J25 - J30	
23/09/15 07:40:40	SIG	M62/2097B3	60R	M62 J25 - J30	
23/09/15 07:40:40	SIG	M62/2097B3	OFF	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 07:40:41	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:40:46	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 07:40:58	SIG	M62/2189A1	60R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2183A1	60R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2189B2	50R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2189B3	50R	M62 J25 - J30	
23/09/15 07:41:16	SIG	M62/2189B4	50R	M62 J25 - J30	
23/09/15 07:41:19	SIG	M62/2177A1	60R	M62 J25 - J30	
23/09/15 07:41:23	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:41:24	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:41:29	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:41:56	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 07:41:56	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 07:41:56	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 07:41:56	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2097B3	OFF	M62 J25 - J30	
23/09/15 07:42:13	SIG	M62/2097B3	60R	M62 J25 - J30	
23/09/15 07:42:26	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:42:27	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:42:32	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2189B1	40R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2189B2	40R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2189B3	40R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2189B4	40R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2194B1	50R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2194B2	50R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2194B3	50R	M62 J25 - J30	
23/09/15 07:42:40	SIG	M62/2194B4	50R	M62 J25 - J30	
23/09/15 07:42:43	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:42:44	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:42:49	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:43:29	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:43:30	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:43:35	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:44:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:44:24	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:44:29	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:44:31	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:44:31	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:44:37	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:44:39	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:44:39	SIG	M62/2113B1	LDR	M62 J25 - J30	
23/09/15 07:44:39	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 07:44:39	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 07:44:39	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 07:44:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:44:41	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:44:47	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:45:05	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:45:17	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 07:45:17	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 07:45:17	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 07:45:17	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 07:45:19	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 07:45:25	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 07:45:33	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:45:34	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:45:39	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:45:51	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:45:51	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:45:57	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:46:46	SIG	M62/2041B1	40R	M62 J25 - J30	
23/09/15 07:46:46	SIG	M62/2041B2	40R	M62 J25 - J30	
23/09/15 07:46:46	SIG	M62/2041B3	40R	M62 J25 - J30	
23/09/15 07:46:46	SIG	M62/2041B4	40R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2194B1	40R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2194B2	40R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2194B3	40R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2194B4	40R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2197B1	50R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2197B2	50R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2197B3	50R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2199M1	50R	M62 J25 - J30	
23/09/15 07:46:48	SIG	M62/2199M2	50R	M62 J25 - J30	
23/09/15 07:46:50	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:46:51	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:46:56	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:47:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 07:47:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:47:29	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:47:35	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:47:37	SIG	M62/2159B1	NR	M62 J25 - J30	
23/09/15 07:47:37	SIG	M62/2159B2	NR	M62 J25 - J30	
23/09/15 07:47:37	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 07:47:37	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 07:47:37	SIG	M62/2170L1	OFF	M62 J25 - J30	
23/09/15 07:47:37	SIG	M62/2170L2	OFF	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2197B1	40R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2197B2	40R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2197B3	40R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2199M1	40R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2199M2	40R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2203B1	50R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2203B2	50R	M62 J25 - J30	
23/09/15 07:47:43	SIG	M62/2203B3	50R	M62 J25 - J30	
23/09/15 07:47:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:47:45	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:47:48	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:47:50	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:47:55	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:47:56	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:47:57	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:47:58	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:48:01	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:48:03	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 07:48:30	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:48:58	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:48:59	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:49:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:49:04	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:49:05	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:49:10	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:49:43	SIG	M62/2203B1	40R	M62 J25 - J30	
23/09/15 07:49:43	SIG	M62/2203B2	40R	M62 J25 - J30	
23/09/15 07:49:43	SIG	M62/2203B3	40R	M62 J25 - J30	
23/09/15 07:50:10	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:50:10	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:50:15	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:50:23	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 07:50:23	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 07:50:23	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 07:50:23	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 07:50:34	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:50:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:50:38	SIG	M62/2159B1	OFF	M62 J25 - J30	
23/09/15 07:50:38	SIG	M62/2159B2	OFF	M62 J25 - J30	
23/09/15 07:50:40	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:50:48	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:50:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:50:54	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:51:13	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:51:13	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:51:19	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:51:44	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 07:51:44	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 07:51:44	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 07:51:44	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 07:52:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:52:05	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:52:10	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:52:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2025A1	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2025A2	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2025A3	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2025A4	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2033A1	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2033A2	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2033A3	60R	M62 J25 - J30	
23/09/15 07:52:38	SIG	M62/2033A4	60R	M62 J25 - J30	
23/09/15 07:52:41	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:53:01	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:53:01	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 07:53:02	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 07:53:08	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:53:08	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 07:53:15	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 07:53:15	SIG	M62/2106B2	60R	M62 J25 - J30	
23/09/15 07:53:15	SIG	M62/2106B3	60R	M62 J25 - J30	
23/09/15 07:53:15	SIG	M62/2106B4	60R	M62 J25 - J30	
23/09/15 07:53:16	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 07:53:16	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 07:53:16	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 07:53:16	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 07:53:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:53:45	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:53:51	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:53:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:53:53	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:53:58	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:55:09	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:55:10	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:55:14	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 07:55:15	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:55:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 07:55:50	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 07:55:50	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 07:55:50	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 07:55:50	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 07:55:56	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 07:55:56	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 07:55:56	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 07:55:56	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 07:56:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:56:45	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:56:50	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:56:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 07:56:56	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 07:57:02	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 07:58:14	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 07:58:14	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 07:58:14	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 07:58:14	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 07:58:16	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 07:58:17	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 07:58:19	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 07:58:19	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 07:58:19	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 07:58:19	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 07:58:22	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M62/2057A1	50R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M62/2057A2	50R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M62/2057A3	50R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M62/2057J1	50R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M62/2177L1	30R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M62/2177L2	30R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M621/1002A1	50R	M62 J25 - J30	
23/09/15 07:58:25	SIG	M621/1002A2	50R	M62 J25 - J30	
23/09/15 07:58:30	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 07:58:30	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 07:58:30	SIG	M62/2177L1	20R	M62 J25 - J30	
23/09/15 07:58:30	SIG	M62/2177L2	20R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2050A1	50R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2050A2	50R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2050A3	50R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2050A4	50R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2057A1	40R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2057A2	40R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2057A3	40R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M62/2057J1	40R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M621/1002A1	40R	M62 J25 - J30	
23/09/15 07:58:31	SIG	M621/1002A2	40R	M62 J25 - J30	
23/09/15 07:58:36	SIG	M62/2177L1	STOP	M62 J25 - J30	
23/09/15 07:58:36	SIG	M62/2177L2	STOP	M62 J25 - J30	
23/09/15 07:58:41	SIG	M62/2183L1	STOP	M62 J25 - J30	
23/09/15 07:58:41	SIG	M62/2183L2	STOP	M62 J25 - J30	
23/09/15 07:58:43	SIG	M62/2183B1	30R	M62 J25 - J30	
23/09/15 07:58:49	SIG	M62/2177B1	30R	M62 J25 - J30	
23/09/15 07:58:49	SIG	M62/2183B1	20R	M62 J25 - J30	
23/09/15 07:58:50	SIG	M62/2050A1	40R	M62 J25 - J30	
23/09/15 07:58:50	SIG	M62/2050A2	40R	M62 J25 - J30	
23/09/15 07:58:50	SIG	M62/2050A3	40R	M62 J25 - J30	
23/09/15 07:58:50	SIG	M62/2050A4	40R	M62 J25 - J30	
23/09/15 07:58:54	SIG	M62/2177B1	20R	M62 J25 - J30	
23/09/15 07:59:00	SIG	M62/2177B1	STOP	M62 J25 - J30	
23/09/15 07:59:00	SIG	M62/2183B1	STOP	M62 J25 - J30	
23/09/15 07:59:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 07:59:50	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 07:59:52	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 07:59:52	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 07:59:52	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 07:59:52	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 07:59:55	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 07:59:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:00:00	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 08:00:05	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 08:01:24	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:01:25	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:01:30	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:01:37	SIG	M62/2041A1	50R	M62 J25 - J30	
23/09/15 08:01:37	SIG	M62/2041A2	50R	M62 J25 - J30	
23/09/15 08:01:37	SIG	M62/2041A3	50R	M62 J25 - J30	
23/09/15 08:01:37	SIG	M62/2041A4	50R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2041A1	40R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2041A2	40R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2041A3	40R	M62 J25 - J30	
23/09/15 08:01:42	SIG	M62/2041A4	40R	M62 J25 - J30	
23/09/15 08:02:02	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 08:02:02	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 08:02:02	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 08:02:02	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 08:02:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:02:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:03:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:03:03	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 08:03:09	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 08:03:46	SIG	M62/2189B1	30R	M62 J25 - J30	
23/09/15 08:03:46	SIG	M62/2194B1	30R	M62 J25 - J30	
23/09/15 08:03:51	SIG	M62/2189B1	20R	M62 J25 - J30	
23/09/15 08:03:51	SIG	M62/2194B1	20R	M62 J25 - J30	
23/09/15 08:03:57	SIG	M62/2194B1	STOP	M62 J25 - J30	
23/09/15 08:04:02	SIG	M62/2189B1	STOP	M62 J25 - J30	
23/09/15 08:04:32	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:04:33	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:04:38	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2033A1	40R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2033A2	40R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2033A3	40R	M62 J25 - J30	
23/09/15 08:04:56	SIG	M62/2033A4	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 08:05:38	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 08:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 08:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 08:06:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 08:06:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 08:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 08:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 08:06:13	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 08:06:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:06:19	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 08:07:39	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:07:39	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 08:07:43	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 08:07:45	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:08:27	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:08:28	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:08:33	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 08:08:37	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 08:08:50	SIG	M621/1002A1	OFF	M62 J25 - J30	
23/09/15 08:08:50	SIG	M621/1002A2	OFF	M62 J25 - J30	
23/09/15 08:09:54	SIG	M621/1002A1	50R	M62 J25 - J30	
23/09/15 08:09:54	SIG	M621/1002A2	50R	M62 J25 - J30	
23/09/15 08:09:59	SIG	M621/1002A1	40R	M62 J25 - J30	
23/09/15 08:09:59	SIG	M621/1002A2	40R	M62 J25 - J30	
23/09/15 08:10:38	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 08:10:47	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:10:48	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:10:53	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:11:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:11:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:11:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:11:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:11:33	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:11:34	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:11:39	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:14:03	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:14:03	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:14:09	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:14:39	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:14:40	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:14:45	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:17:03	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:17:04	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:17:09	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2125B1	OFF	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2125B2	OFF	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2125B3	OFF	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2125L1	NR	M62 J25 - J30	
23/09/15 08:17:38	SIG	M62/2125L2	NR	M62 J25 - J30	
23/09/15 08:17:43	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:17:44	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:17:49	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:20:07	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:20:07	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:20:13	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2157A1	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2157A2	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2157J1	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2157J2	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2157K1	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2163A1	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2163A2	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2166K1	60R	M62 J25 - J30	
23/09/15 08:20:38	SIG	M62/2166K2	60R	M62 J25 - J30	
23/09/15 08:20:39	SIG	M62/2125L1	OFF	M62 J25 - J30	
23/09/15 08:20:39	SIG	M62/2125L2	OFF	M62 J25 - J30	
23/09/15 08:20:48	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:20:48	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:20:54	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:21:03	SIG	M62/2183L1	RED	M62 J25 - J30	
23/09/15 08:21:08	SIG	M62/2183L1	RED	M62 J25 - J30	
23/09/15 08:21:08	SIG	M621/1002A1	OFF	M62 J25 - J30	
23/09/15 08:21:08	SIG	M621/1002A2	OFF	M62 J25 - J30	
23/09/15 08:21:13	SIG	M62/2183L1	RED	M62 J25 - J30	
23/09/15 08:21:18	SIG	M62/2183L1	RED	M62 J25 - J30	
23/09/15 08:21:48	SIG	M621/1002A1	50R	M62 J25 - J30	
23/09/15 08:21:48	SIG	M621/1002A2	50R	M62 J25 - J30	
23/09/15 08:21:53	SIG	M621/1002A1	40R	M62 J25 - J30	
23/09/15 08:21:53	SIG	M621/1002A2	40R	M62 J25 - J30	
23/09/15 08:23:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 08:23:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 08:23:13	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:23:14	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:23:20	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:23:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:23:52	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:23:53	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:23:58	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:26:21	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:26:22	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:26:27	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:26:57	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:26:57	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:27:03	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:29:28	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:29:28	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:29:34	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:30:02	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:30:03	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:30:08	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:31:40	SIG	M621/1002A1	OFF	M62 J25 - J30	
23/09/15 08:31:40	SIG	M621/1002A2	OFF	M62 J25 - J30	
23/09/15 08:32:18	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 08:32:18	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 08:32:34	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:32:35	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:32:40	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 08:32:42	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 08:32:48	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 08:32:51	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 08:32:51	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 08:32:51	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 08:32:51	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 08:33:11	SIG	M62/2033A1	40R	M62 J25 - J30	
23/09/15 08:33:11	SIG	M62/2033A2	40R	M62 J25 - J30	
23/09/15 08:33:11	SIG	M62/2033A3	40R	M62 J25 - J30	
23/09/15 08:33:11	SIG	M62/2033A4	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1960A1	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1960A2	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1960A3	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1960K1	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1960K2	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 08:33:37	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 08:34:57	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 08:34:57	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 08:34:57	SIG	M62/2183B1	30R	M62 J25 - J30	
23/09/15 08:34:57	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:34:57	SIG	M62/2183L2	30R	M62 J25 - J30	
23/09/15 08:35:03	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 08:35:03	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 08:35:03	SIG	M62/2183B1	30R	M62 J25 - J30	
23/09/15 08:35:03	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:35:03	SIG	M62/2183L2	30R	M62 J25 - J30	
23/09/15 08:35:14	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:35:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 08:35:36	SIG	M62/2189B1	LDR	M62 J25 - J30	
23/09/15 08:35:36	SIG	M62/2194B1	40R	M62 J25 - J30	
23/09/15 08:35:40	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:35:41	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:35:46	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:35:54	SIG	M62/1956A1	50R	M62 J25 - J30	
23/09/15 08:35:54	SIG	M62/1956A2	50R	M62 J25 - J30	
23/09/15 08:35:54	SIG	M62/1956A3	50R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 08:35:55	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 08:36:00	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 08:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 08:36:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 08:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 08:36:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 08:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 08:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 08:36:12	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 08:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 08:36:12	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 08:36:17	SIG	M62/2057A1	60R	M62 J25 - J30	
23/09/15 08:36:17	SIG	M62/2057A2	60R	M62 J25 - J30	
23/09/15 08:36:17	SIG	M62/2057A3	60R	M62 J25 - J30	
23/09/15 08:36:17	SIG	M62/2057J1	60R	M62 J25 - J30	
23/09/15 08:37:13	SIG	M62/2050A1	50R	M62 J25 - J30	
23/09/15 08:37:13	SIG	M62/2050A2	50R	M62 J25 - J30	
23/09/15 08:37:13	SIG	M62/2050A3	50R	M62 J25 - J30	
23/09/15 08:37:13	SIG	M62/2050A4	50R	M62 J25 - J30	
23/09/15 08:37:35	SIG	M62/1955K1	40R	M62 J25 - J30	
23/09/15 08:37:35	SIG	M62/1955K2	40R	M62 J25 - J30	
23/09/15 08:37:35	SIG	M62/1956A1	40R	M62 J25 - J30	
23/09/15 08:37:35	SIG	M62/1956A2	40R	M62 J25 - J30	
23/09/15 08:37:35	SIG	M62/1956A3	40R	M62 J25 - J30	
23/09/15 08:37:38	SIG	M62/2166K1	OFF	M62 J25 - J30	
23/09/15 08:37:38	SIG	M62/2166K2	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2157A2	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2157J1	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2157J2	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2157K1	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2163A1	OFF	M62 J25 - J30	
23/09/15 08:37:39	SIG	M62/2163A2	OFF	M62 J25 - J30	
23/09/15 08:37:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:37:56	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:38:01	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2050A1	40R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2050A2	40R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2050A3	40R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2050A4	40R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2057A1	50R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2057A2	50R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2057A3	50R	M62 J25 - J30	
23/09/15 08:38:12	SIG	M62/2057J1	50R	M62 J25 - J30	
23/09/15 08:38:15	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2050A1	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2050A2	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2050A3	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2050A4	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2057A1	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2057A2	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2057A3	40R	M62 J25 - J30	
23/09/15 08:38:18	SIG	M62/2057J1	40R	M62 J25 - J30	
23/09/15 08:38:24	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:38:48	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:38:48	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:38:54	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:39:14	SIG	M62/1999J1	50R	M62 J25 - J30	
23/09/15 08:39:14	SIG	M62/1999J2	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2041A1	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2041A2	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2041A3	50R	M62 J25 - J30	
23/09/15 08:40:01	SIG	M62/2041A4	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1999A1	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1999A2	50R	M62 J25 - J30	
23/09/15 08:40:44	SIG	M62/1999A3	50R	M62 J25 - J30	
23/09/15 08:41:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:41:02	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:41:07	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1992A2	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1992A3	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1992J1	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1999A1	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1999A2	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1999A3	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1999J1	40R	M62 J25 - J30	
23/09/15 08:41:17	SIG	M62/1999J2	40R	M62 J25 - J30	
23/09/15 08:41:19	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:41:19	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:41:25	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:42:12	SIG	M62/2057A1	60R	M62 J25 - J30	
23/09/15 08:42:12	SIG	M62/2057A2	60R	M62 J25 - J30	
23/09/15 08:42:12	SIG	M62/2057A3	60R	M62 J25 - J30	
23/09/15 08:42:12	SIG	M62/2057J1	60R	M62 J25 - J30	
23/09/15 08:42:16	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:42:16	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 08:42:16	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 08:42:16	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 08:42:48	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 08:42:57	SIG	M62/2050A1	50R	M62 J25 - J30	
23/09/15 08:42:57	SIG	M62/2050A2	50R	M62 J25 - J30	
23/09/15 08:42:57	SIG	M62/2050A3	50R	M62 J25 - J30	
23/09/15 08:42:57	SIG	M62/2050A4	50R	M62 J25 - J30	
23/09/15 08:43:14	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 08:43:14	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 08:43:14	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 08:43:14	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1987J1	40R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1992A2	40R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1992A3	40R	M62 J25 - J30	
23/09/15 08:43:31	SIG	M62/1992J1	40R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2197B1	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2197B2	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2197B3	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2199M1	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2199M2	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2203B1	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2203B2	50R	M62 J25 - J30	
23/09/15 08:44:01	SIG	M62/2203B3	50R	M62 J25 - J30	
23/09/15 08:44:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:44:07	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:44:12	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:44:24	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:44:24	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 08:44:27	SIG	M62/2033A1	40R	M62 J25 - J30	
23/09/15 08:44:27	SIG	M62/2033A2	40R	M62 J25 - J30	
23/09/15 08:44:27	SIG	M62/2033A3	40R	M62 J25 - J30	
23/09/15 08:44:27	SIG	M62/2033A4	40R	M62 J25 - J30	
23/09/15 08:45:55	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 08:45:55	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2197B1	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2197B2	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2197B3	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2199M1	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2199M2	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2203B1	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2203B2	40R	M62 J25 - J30	
23/09/15 08:46:01	SIG	M62/2203B3	40R	M62 J25 - J30	
23/09/15 08:46:05	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:46:05	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 08:46:08	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 08:46:11	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2025A2	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2025A3	40R	M62 J25 - J30	
23/09/15 08:46:14	SIG	M62/2025A4	40R	M62 J25 - J30	
23/09/15 08:46:31	SIG	M62/1955K1	40R	M62 J25 - J30	
23/09/15 08:46:31	SIG	M62/1955K2	40R	M62 J25 - J30	
23/09/15 08:47:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:47:13	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:47:18	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:48:29	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:48:29	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:48:35	SIG	M62/2025A1	40R	M62 J25 - J30	
23/09/15 08:49:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:49:12	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:49:18	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:50:09	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 08:50:09	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 08:50:09	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 08:50:09	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 08:50:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:50:19	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:50:24	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2041A1	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2041A2	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2041A3	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2041A4	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2050A1	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2050A2	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2050A3	60R	M62 J25 - J30	
23/09/15 08:50:39	SIG	M62/2050A4	60R	M62 J25 - J30	
23/09/15 08:50:48	SIG	M62/1999J1	50R	M62 J25 - J30	
23/09/15 08:50:48	SIG	M62/1999J2	50R	M62 J25 - J30	
23/09/15 08:51:08	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 08:51:08	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 08:51:08	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 08:51:08	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 08:52:07	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 08:52:07	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 08:52:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:52:19	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:52:25	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:52:26	SIG	M62/1999J1	40R	M62 J25 - J30	
23/09/15 08:52:26	SIG	M62/1999J2	40R	M62 J25 - J30	
23/09/15 08:53:02	SIG	M62/2203B1	50R	M62 J25 - J30	
23/09/15 08:53:02	SIG	M62/2203B2	50R	M62 J25 - J30	
23/09/15 08:53:02	SIG	M62/2203B3	50R	M62 J25 - J30	
23/09/15 08:53:12	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 08:53:12	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 08:53:12	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 08:53:12	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 08:53:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:53:24	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:53:29	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:53:36	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:53:37	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 08:54:01	SIG	M62/2203B1	40R	M62 J25 - J30	
23/09/15 08:54:01	SIG	M62/2203B2	40R	M62 J25 - J30	
23/09/15 08:54:01	SIG	M62/2203B3	40R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/1956A1	50R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/1956A2	50R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/1956A3	50R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2025A1	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2025A2	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2025A3	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2025A4	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2033A1	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2033A2	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2033A3	60R	M62 J25 - J30	
23/09/15 08:54:39	SIG	M62/2033A4	60R	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 08:55:24	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 08:55:30	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:55:37	SIG	M62/1956A1	40R	M62 J25 - J30	
23/09/15 08:55:37	SIG	M62/1956A2	40R	M62 J25 - J30	
23/09/15 08:55:37	SIG	M62/1956A3	40R	M62 J25 - J30	
23/09/15 08:56:11	SIG	M62/1955K1	40R	M62 J25 - J30	
23/09/15 08:56:11	SIG	M62/1955K2	40R	M62 J25 - J30	
23/09/15 08:56:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:56:29	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 08:56:30	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 08:56:35	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 08:57:12	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 08:57:12	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 08:57:12	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 08:57:12	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 08:57:12	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 08:57:12	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 08:57:42	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 08:57:43	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 08:57:49	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 08:57:49	SIG	M62/1992A2	40R	M62 J25 - J30	
23/09/15 08:57:49	SIG	M62/1992A3	40R	M62 J25 - J30	
23/09/15 08:57:49	SIG	M62/1992J1	40R	M62 J25 - J30	
23/09/15 08:58:31	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 08:58:31	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 08:58:31	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 08:58:31	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 08:58:46	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 08:58:46	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 08:58:46	SIG	M62/1987J1	40R	M62 J25 - J30	
23/09/15 08:58:46	SIG	M62/2004A1	50R	M62 J25 - J30	
23/09/15 08:58:46	SIG	M62/2004A2	50R	M62 J25 - J30	
23/09/15 08:58:46	SIG	M62/2004A3	50R	M62 J25 - J30	
23/09/15 08:59:39	SIG	M62/2018A1	60R	M62 J25 - J30	
23/09/15 08:59:39	SIG	M62/2018A2	60R	M62 J25 - J30	
23/09/15 08:59:39	SIG	M62/2018A3	60R	M62 J25 - J30	
23/09/15 08:59:39	SIG	M62/2018A4	60R	M62 J25 - J30	
23/09/15 08:59:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 08:59:43	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 08:59:49	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1974A1	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1974A2	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1974A3	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1974A4	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1979K1	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1979K2	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1981A1	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1981A2	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1981A3	40R	M62 J25 - J30	
23/09/15 09:00:33	SIG	M62/1981A4	40R	M62 J25 - J30	
23/09/15 09:00:37	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:00:38	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 09:00:43	SIG	M62/1992A1	40R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 09:00:56	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 09:01:50	SIG	M62/1999A1	50R	M62 J25 - J30	
23/09/15 09:01:50	SIG	M62/1999A2	50R	M62 J25 - J30	
23/09/15 09:01:50	SIG	M62/1999A3	50R	M62 J25 - J30	
23/09/15 09:01:50	SIG	M62/1999J1	50R	M62 J25 - J30	
23/09/15 09:01:50	SIG	M62/1999J2	50R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1974A1	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1974A2	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1974A3	40R	M62 J25 - J30	
23/09/15 09:02:06	SIG	M62/1974A4	40R	M62 J25 - J30	
23/09/15 09:02:32	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 09:02:32	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 09:02:32	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 09:02:32	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 09:02:37	SIG	M62/2189B1	40R	M62 J25 - J30	
23/09/15 09:02:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:02:43	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 09:02:48	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 09:02:55	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:03:39	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2004A1	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2004A2	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2004A3	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 09:03:39	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 09:03:51	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 09:03:51	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 09:03:51	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 09:04:01	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 09:04:01	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 09:04:01	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 09:04:01	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1960A1	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1960A2	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1960A3	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1960K1	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1960K2	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 09:04:03	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1956A1	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1956A2	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1956A3	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 09:04:23	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 09:04:46	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:04:46	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:04:47	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:04:48	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:06:07	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 09:06:07	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 09:06:07	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 09:06:07	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 09:06:07	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 09:06:07	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 09:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 09:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 09:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 09:06:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 09:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 09:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 09:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 09:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 09:06:12	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 09:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 09:06:14	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 09:06:14	SIG	M62/2189B2	50R	M62 J25 - J30	
23/09/15 09:06:14	SIG	M62/2189B3	50R	M62 J25 - J30	
23/09/15 09:06:14	SIG	M62/2189B4	50R	M62 J25 - J30	
23/09/15 09:06:26	SIG	M62/1960A1	40R	M62 J25 - J30	
23/09/15 09:06:26	SIG	M62/1960A2	40R	M62 J25 - J30	
23/09/15 09:06:26	SIG	M62/1960A3	40R	M62 J25 - J30	
23/09/15 09:06:26	SIG	M62/1960K1	40R	M62 J25 - J30	
23/09/15 09:06:26	SIG	M62/1960K2	40R	M62 J25 - J30	
23/09/15 09:06:29	SIG	M62/2194B1	50R	M62 J25 - J30	
23/09/15 09:06:29	SIG	M62/2194B2	50R	M62 J25 - J30	
23/09/15 09:06:29	SIG	M62/2194B3	50R	M62 J25 - J30	
23/09/15 09:06:29	SIG	M62/2194B4	50R	M62 J25 - J30	
23/09/15 09:06:39	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 09:06:39	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 09:06:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:06:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:06:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:06:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:06:59	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 09:06:59	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 09:06:59	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 09:06:59	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:07:05	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2018A1	40R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2018A2	40R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2018A3	40R	M62 J25 - J30	
23/09/15 09:07:05	SIG	M62/2018A4	40R	M62 J25 - J30	
23/09/15 09:07:45	SIG	M62/1955K1	40R	M62 J25 - J30	
23/09/15 09:07:45	SIG	M62/1955K2	40R	M62 J25 - J30	
23/09/15 09:07:45	SIG	M62/1956A1	40R	M62 J25 - J30	
23/09/15 09:07:45	SIG	M62/1956A2	40R	M62 J25 - J30	
23/09/15 09:07:45	SIG	M62/1956A3	40R	M62 J25 - J30	
23/09/15 09:07:53	SIG	M62/2197B1	50R	M62 J25 - J30	
23/09/15 09:07:53	SIG	M62/2197B2	50R	M62 J25 - J30	
23/09/15 09:07:53	SIG	M62/2197B3	50R	M62 J25 - J30	
23/09/15 09:07:53	SIG	M62/2199M1	50R	M62 J25 - J30	
23/09/15 09:07:53	SIG	M62/2199M2	50R	M62 J25 - J30	
23/09/15 09:08:03	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 09:08:03	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 09:08:03	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 09:08:03	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 09:08:22	SIG	M62/2203B1	50R	M62 J25 - J30	
23/09/15 09:08:22	SIG	M62/2203B2	50R	M62 J25 - J30	
23/09/15 09:08:22	SIG	M62/2203B3	50R	M62 J25 - J30	
23/09/15 09:10:27	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 09:10:27	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 09:10:27	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 09:10:27	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1992A1	60R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1992A2	60R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1992A3	60R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1992J1	60R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1999A1	60R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1999A2	60R	M62 J25 - J30	
23/09/15 09:10:40	SIG	M62/1999A3	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:11:00	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2018A1	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2018A2	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2018A3	60R	M62 J25 - J30	
23/09/15 09:11:00	SIG	M62/2018A4	60R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 09:11:46	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 09:12:40	SIG	M62/2183B1	60R	M62 J25 - J30	
23/09/15 09:12:40	SIG	M62/2183B2	60R	M62 J25 - J30	
23/09/15 09:12:40	SIG	M62/2183L1	60R	M62 J25 - J30	
23/09/15 09:12:40	SIG	M62/2183L2	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1979K1	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1979K2	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1981A1	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1981A2	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1981A3	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1981A4	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1987A1	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1987A3	60R	M62 J25 - J30	
23/09/15 09:12:49	SIG	M62/1987J1	60R	M62 J25 - J30	
23/09/15 09:13:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:13:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:13:05	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:13:05	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:14:00	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 09:14:01	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 09:14:33	SIG	M62/1956A1	50R	M62 J25 - J30	
23/09/15 09:14:33	SIG	M62/1956A2	50R	M62 J25 - J30	
23/09/15 09:14:33	SIG	M62/1956A3	50R	M62 J25 - J30	
23/09/15 09:14:39	SIG	M62/1974A1	60R	M62 J25 - J30	
23/09/15 09:14:39	SIG	M62/1974A2	60R	M62 J25 - J30	
23/09/15 09:14:39	SIG	M62/1974A3	60R	M62 J25 - J30	
23/09/15 09:14:39	SIG	M62/1974A4	60R	M62 J25 - J30	
23/09/15 09:15:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:15:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 09:15:18	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 09:15:18	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 09:15:18	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 09:15:18	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 09:15:18	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:15:23	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2004A1	50R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2004A2	50R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2004A3	50R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2008K1	40R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2008K2	40R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2012A1	40R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2012A2	40R	M62 J25 - J30	
23/09/15 09:15:23	SIG	M62/2012A3	40R	M62 J25 - J30	
23/09/15 09:15:39	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 09:15:39	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 09:15:39	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 09:15:39	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 09:18:39	SIG	M62/2194B1	60R	M62 J25 - J30	
23/09/15 09:18:39	SIG	M62/2194B2	60R	M62 J25 - J30	
23/09/15 09:18:39	SIG	M62/2194B3	60R	M62 J25 - J30	
23/09/15 09:18:39	SIG	M62/2194B4	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:19:18	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2004A1	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2004A2	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2004A3	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 09:19:18	SIG	M62/2177A1	HSD	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2197B1	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2197B2	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2197B3	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2199M1	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2199M2	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2203B1	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2203B2	60R	M62 J25 - J30	
23/09/15 09:19:39	SIG	M62/2203B3	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1955K1	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1955K2	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1956A1	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1956A2	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1956A3	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1960A1	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1960A2	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1960A3	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1960K1	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1960K2	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1968A1	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1968A2	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1968A3	60R	M62 J25 - J30	
23/09/15 09:19:40	SIG	M62/1968A4	60R	M62 J25 - J30	
23/09/15 09:20:04	SIG	M62/2183A1	HSD	M62 J25 - J30	
23/09/15 09:20:49	SIG	M62/2177A1	REDX	M62 J25 - J30	
23/09/15 09:20:49	SIG	M62/2189A1	HSD	M62 J25 - J30	
23/09/15 09:21:32	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 09:21:32	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 09:21:32	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 09:21:32	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 09:21:32	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:21:37	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2004A1	50R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2004A2	50R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2004A3	50R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2008K1	40R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2008K2	40R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2012A1	40R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2012A2	40R	M62 J25 - J30	
23/09/15 09:21:37	SIG	M62/2012A3	40R	M62 J25 - J30	
23/09/15 09:21:49	SIG	M62/2183A1	REDX	M62 J25 - J30	
23/09/15 09:22:48	SIG	M62/2189A1	REDX	M62 J25 - J30	
23/09/15 09:22:49	SIG	M62/2170A1	NR	M62 J25 - J30	
23/09/15 09:22:49	SIG	M62/2170A2	NR	M62 J25 - J30	
23/09/15 09:22:49	SIG	M62/2170K1	NR	M62 J25 - J30	
23/09/15 09:22:49	SIG	M62/2170K2	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2177A2	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2177A3	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2177A4	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2183A2	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2183A3	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2183A4	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2189A2	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2189A3	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2189A4	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2197A1	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2197A2	NR	M62 J25 - J30	
23/09/15 09:22:50	SIG	M62/2197A3	NR	M62 J25 - J30	
23/09/15 09:23:49	SIG	M62/2170K1	OFF	M62 J25 - J30	
23/09/15 09:23:49	SIG	M62/2170K2	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2170A1	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2170A2	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2177A1	BLNK	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2177A2	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2177A3	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2177A4	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2183A1	BLNK	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2183A2	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2183A3	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2183A4	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2189A1	BLNK	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2189A2	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2189A3	OFF	M62 J25 - J30	
23/09/15 09:23:50	SIG	M62/2189A4	OFF	M62 J25 - J30	
23/09/15 09:25:32	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 09:25:32	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2004A1	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2004A2	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2004A3	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 09:25:32	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 09:25:50	SIG	M62/2197A1	OFF	M62 J25 - J30	
23/09/15 09:25:50	SIG	M62/2197A2	OFF	M62 J25 - J30	
23/09/15 09:25:50	SIG	M62/2197A3	OFF	M62 J25 - J30	
23/09/15 09:28:32	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 09:28:32	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 09:29:39	SIG	M62/2159B1	NR	M62 J25 - J30	
23/09/15 09:29:39	SIG	M62/2159B2	NR	M62 J25 - J30	
23/09/15 09:29:40	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 09:29:40	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 09:29:40	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 09:29:40	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 09:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 09:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 09:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 09:36:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 09:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 09:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 09:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 09:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 09:36:12	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 09:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 09:37:26	SIG	M62/2170B1	50R	M62 J25 - J30	
23/09/15 09:37:26	SIG	M62/2170B2	50R	M62 J25 - J30	
23/09/15 09:37:26	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 09:37:26	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2170B1	40R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2170B2	40R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 09:37:31	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 09:41:26	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 09:43:47	SIG	M62/2079A1	HSD	M62 J25 - J30	
23/09/15 09:44:55	SIG	M62/2088A1	HSD	M62 J25 - J30	
23/09/15 09:45:40	SIG	M62/2004A1	OFF	M62 J25 - J30	
23/09/15 09:45:40	SIG	M62/2004A2	OFF	M62 J25 - J30	
23/09/15 09:45:40	SIG	M62/2004A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1955K1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1955K2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1956A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1956A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1956A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1960A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1960A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1960A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1960K1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1960K2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1979K1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1979K2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1981A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1981A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1981A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1981A4	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1987A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1987A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1987J1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1992A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1992A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1992J1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1999A1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1999A2	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1999A3	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1999J1	OFF	M62 J25 - J30	
23/09/15 09:45:49	SIG	M62/1999J2	OFF	M62 J25 - J30	
23/09/15 09:46:03	SIG	M62/2079A1	REDX	M62 J25 - J30	
23/09/15 09:46:03	SIG	M62/2097A1	HSD	M62 J25 - J30	
23/09/15 09:46:40	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 09:47:11	SIG	M62/2088A1	REDX	M62 J25 - J30	
23/09/15 09:47:11	SIG	M62/2106A1	HSD	M62 J25 - J30	
23/09/15 09:48:19	SIG	M62/2097A1	REDX	M62 J25 - J30	
23/09/15 09:49:27	SIG	M62/2106A1	REDX	M62 J25 - J30	
23/09/15 09:50:27	SIG	M62/2065A2	NR	M62 J25 - J30	
23/09/15 09:50:27	SIG	M62/2065A3	NR	M62 J25 - J30	
23/09/15 09:50:27	SIG	M62/2065A4	NR	M62 J25 - J30	
23/09/15 09:50:27	SIG	M62/2074A2	NR	M62 J25 - J30	
23/09/15 09:50:27	SIG	M62/2074A3	NR	M62 J25 - J30	
23/09/15 09:50:27	SIG	M62/2074A4	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2073K1	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2073K2	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2079A2	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2079A3	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2079A4	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2088A2	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2088A3	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2088A4	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2097A2	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2097A3	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2097A4	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2106A2	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2106A3	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2106A4	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2114A1	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2114A2	NR	M62 J25 - J30	
23/09/15 09:50:28	SIG	M62/2114A3	NR	M62 J25 - J30	
23/09/15 09:51:27	SIG	M62/2073K1	OFF	M62 J25 - J30	
23/09/15 09:51:27	SIG	M62/2073K2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2074A1	BLNK	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2074A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2074A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2074A4	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2079A1	BLNK	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2079A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2079A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2079A4	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2088A1	BLNK	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2088A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2088A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2088A4	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2097A1	BLNK	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2097A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2097A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2097A4	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2106A1	BLNK	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2106A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2106A4	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2114A1	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2114A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2114A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2117A1	BLNK	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2117A2	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2117A3	OFF	M62 J25 - J30	
23/09/15 09:51:28	SIG	M62/2117A4	OFF	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2197B1	NR	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2197B2	NR	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2197B3	NR	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2199M1	OFF	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2199M2	OFF	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2203B1	OFF	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2203B2	OFF	M62 J25 - J30	
23/09/15 10:00:40	SIG	M62/2203B3	OFF	M62 J25 - J30	
23/09/15 10:03:40	SIG	M62/2197B1	OFF	M62 J25 - J30	
23/09/15 10:03:41	SIG	M62/2197B2	OFF	M62 J25 - J30	
23/09/15 10:03:41	SIG	M62/2197B3	OFF	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2189B1	NR	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2189B2	NR	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2189B3	NR	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2189B4	NR	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2194B1	OFF	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2194B2	OFF	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2194B3	OFF	M62 J25 - J30	
23/09/15 10:05:40	SIG	M62/2194B4	OFF	M62 J25 - J30	
23/09/15 10:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 10:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 10:06:11	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 10:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 10:06:12	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:08:40	SIG	M62/2189B1	OFF	M62 J25 - J30	
23/09/15 10:08:41	SIG	M62/2189B2	OFF	M62 J25 - J30	
23/09/15 10:08:41	SIG	M62/2189B3	OFF	M62 J25 - J30	
23/09/15 10:08:41	SIG	M62/2189B4	OFF	M62 J25 - J30	
23/09/15 10:10:01	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:10:39	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:10:57	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:11:02	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:11:16	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:11:35	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:11:40	SIG	M62/2183B1	OFF	M62 J25 - J30	
23/09/15 10:11:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 10:11:40	SIG	M62/2183L1	OFF	M62 J25 - J30	
23/09/15 10:11:40	SIG	M62/2183L2	OFF	M62 J25 - J30	
23/09/15 10:14:40	SIG	M62/2159B1	NR	M62 J25 - J30	
23/09/15 10:14:40	SIG	M62/2159B2	NR	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2170L1	OFF	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2170L2	OFF	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2177B1	OFF	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2177B2	OFF	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2177L1	OFF	M62 J25 - J30	
23/09/15 10:14:41	SIG	M62/2177L2	OFF	M62 J25 - J30	
23/09/15 10:16:41	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:16:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:16:42	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:16:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:16:44	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:16:44	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:16:45	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:16:45	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:16:47	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:16:47	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:16:48	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:16:48	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:18	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:18	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:19	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:19	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:25	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:25	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:26	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:26	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:31	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:31	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:32	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:32	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:40	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:40	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:40	SIG	M62/2159B1	OFF	M62 J25 - J30	
23/09/15 10:17:41	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:41	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:41	SIG	M62/2159B2	OFF	M62 J25 - J30	
23/09/15 10:17:41	SIG	M62/2170B1	OFF	M62 J25 - J30	
23/09/15 10:17:41	SIG	M62/2170B2	OFF	M62 J25 - J30	
23/09/15 10:17:50	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:50	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:51	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:51	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:56	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:17:57	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:57	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:57	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:17:57	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:18:08	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:18:08	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:18:08	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:18:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:18:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:18:09	SIG	M62/2106B1	OFF	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2113B1	HSD	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2113B2	60R	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2113B3	60R	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2113B4	60R	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 10:19:57	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 10:20:50	SIG	M62/2106B1	HSD	M62 J25 - J30	
23/09/15 10:21:58	SIG	M62/2097B1	HSD	M62 J25 - J30	
23/09/15 10:21:58	SIG	M62/2113B1	REDX	M62 J25 - J30	
23/09/15 10:22:59	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:23:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:23:00	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:23:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:23:06	SIG	M62/2088B1	HSD	M62 J25 - J30	
23/09/15 10:23:06	SIG	M62/2106B1	REDX	M62 J25 - J30	
23/09/15 10:24:14	SIG	M62/2097B1	REDX	M62 J25 - J30	
23/09/15 10:25:22	SIG	M62/2088B1	REDX	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2074B2	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2074B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2074B4	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2081B1	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2081B2	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2081B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2081L1	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2088B2	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2088B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2088B4	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2097B2	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2097B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2097B4	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2106B2	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2106B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2106B4	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2113B2	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2113B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2113B4	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2117B1	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2117B3	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2120M1	NR	M62 J25 - J30	
23/09/15 10:26:16	SIG	M62/2120M2	NR	M62 J25 - J30	
23/09/15 10:27:15	SIG	M62/2120M1	OFF	M62 J25 - J30	
23/09/15 10:27:15	SIG	M62/2120M2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2074B1	BLNK	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2074B2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2074B3	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2074B4	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2081B1	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2081B2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2081B3	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2081L1	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2088B1	BLNK	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2088B2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2088B3	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2088B4	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2097B1	BLNK	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2097B2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2097B3	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2097B4	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2106B1	BLNK	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2113B1	BLNK	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2113B2	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2113B3	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2113B4	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 10:27:16	SIG	M62/2117B3	OFF	M62 J25 - J30	
23/09/15 10:33:26	SIG	M62/2057B1	HSD	M62 J25 - J30	
23/09/15 10:35:25	SIG	M62/2041B1	HSD	M62 J25 - J30	
23/09/15 10:35:26	SIG	M62/2057B1	REDX	M62 J25 - J30	
23/09/15 10:35:26	SIG	M621/1002B1	HSD	M62 J25 - J30	
23/09/15 10:35:26	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 10:35:26	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 10:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 10:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 10:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 10:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 10:36:25	SIG	M62/2033B1	HSD	M62 J25 - J30	
23/09/15 10:37:26	SIG	M62/2025B1	HSD	M62 J25 - J30	
23/09/15 10:37:26	SIG	M62/2041B1	REDX	M62 J25 - J30	
23/09/15 10:38:18	SIG	M62/2033B1	REDX	M62 J25 - J30	
23/09/15 10:39:02	SIG	M62/2025B1	REDX	M62 J25 - J30	
23/09/15 10:39:32	SIG	M62/2057B2	NR	M62 J25 - J30	
23/09/15 10:39:32	SIG	M62/2057B3	NR	M62 J25 - J30	
23/09/15 10:39:32	SIG	M62/2057B4	NR	M62 J25 - J30	
23/09/15 10:39:32	SIG	M62/2065B2	NR	M62 J25 - J30	
23/09/15 10:39:32	SIG	M62/2065B3	NR	M62 J25 - J30	
23/09/15 10:39:32	SIG	M62/2065B4	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2018B1	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2018B2	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2018B3	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2018L1	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2025B2	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2025B3	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2025B4	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2033B2	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2033B3	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2033B4	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2041B2	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2041B3	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2041B4	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2050B2	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2050B3	NR	M62 J25 - J30	
23/09/15 10:39:33	SIG	M62/2050B4	NR	M62 J25 - J30	
23/09/15 10:40:32	SIG	M62/2069M1	OFF	M62 J25 - J30	
23/09/15 10:40:32	SIG	M62/2069M2	OFF	M62 J25 - J30	
23/09/15 10:40:32	SIG	M621/1010B1	OFF	M62 J25 - J30	
23/09/15 10:40:32	SIG	M621/1010B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2012B1	BLNK	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2012B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2012B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2012B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2018B1	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2018B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2018B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2018L1	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2025B1	BLNK	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2025B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2025B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2025B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2033B1	BLNK	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2033B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2033B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2041B1	BLNK	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2041B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2041B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2041B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2050B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2050B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2050B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2057B1	BLNK	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2057B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2057B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2057B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2065B1	BLNK	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2065B2	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2065B3	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2065B4	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M62/2065M1	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M621/1002B1	OFF	M62 J25 - J30	
23/09/15 10:40:33	SIG	M621/1002B2	OFF	M62 J25 - J30	
23/09/15 10:43:38	SIG	M62/2025A1	HSD	M62 J25 - J30	
23/09/15 10:44:38	SIG	M62/2033A1	HSD	M62 J25 - J30	
23/09/15 10:45:39	SIG	M62/2018A1	HSD	M62 J25 - J30	
23/09/15 10:45:39	SIG	M62/2025A1	REDX	M62 J25 - J30	
23/09/15 10:45:39	SIG	M62/2041A1	HSD	M62 J25 - J30	
23/09/15 10:46:45	SIG	M62/2033A1	REDX	M62 J25 - J30	
23/09/15 10:46:45	SIG	M62/2050A1	HSD	M62 J25 - J30	
23/09/15 10:47:37	SIG	M62/2041A1	REDX	M62 J25 - J30	
23/09/15 10:48:37	SIG	M62/2050A1	REDX	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2025A2	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2025A3	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2025A4	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2033A2	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2033A3	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2033A4	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2041A2	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2041A3	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2041A4	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2050A2	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2050A3	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2050A4	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2057A1	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2057A2	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2057A3	NR	M62 J25 - J30	
23/09/15 10:49:38	SIG	M62/2057J1	NR	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2008K1	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2008K2	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2012A1	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2012A2	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2012A3	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2018A1	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2018A2	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2018A3	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2018A4	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2025A1	BLNK	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2025A2	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2025A3	OFF	M62 J25 - J30	
23/09/15 10:50:38	SIG	M62/2025A4	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2033A1	BLNK	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2033A2	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2033A3	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2033A4	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2041A1	BLNK	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2041A2	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2041A3	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2041A4	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2050A1	BLNK	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2050A2	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2050A3	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2050A4	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2057A1	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2057A2	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2057A3	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2057J1	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2065A1	BLNK	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2065A2	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2065A3	OFF	M62 J25 - J30	
23/09/15 10:50:39	SIG	M62/2065A4	OFF	M62 J25 - J30	
23/09/15 11:31:18	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 11:31:18	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 11:31:18	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 11:31:18	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 11:31:23	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1960A1	OFF	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1960A2	OFF	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1960A3	OFF	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1960K1	OFF	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1960K2	OFF	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1968A1	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1968A2	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1968A3	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1968A4	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 11:35:18	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 11:38:19	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 11:38:20	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 11:49:28	SIG	M62/2117A1	REDX	M62 J25 - J30	
23/09/15 11:49:28	SIG	M62/2117A2	50R	M62 J25 - J30	
23/09/15 11:49:28	SIG	M62/2117A3	50R	M62 J25 - J30	
23/09/15 11:49:28	SIG	M62/2117A4	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2122K1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2122K2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2124A1	REDX	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2124A2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2124A3	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2124A4	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2135A1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2135A2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2135A3	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2135A4	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2144A1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2144A2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2144J1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2144K1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2151A1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2151A2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2151J1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2151K1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2155A1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2155A2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2155J1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2155K1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2157A2	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2157J1	NR	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2157J2	NR	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2157K1	50R	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2163A1	NR	M62 J25 - J30	
23/09/15 11:49:29	SIG	M62/2163A2	NR	M62 J25 - J30	
23/09/15 11:49:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 11:49:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 11:51:17	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2135A1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2135A2	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2135A3	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2135A4	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2144A1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2144A2	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2144J1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2144K1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2151A1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2151A2	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2151J1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2151K1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2155A1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2155A2	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2155J1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2155K1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2157A1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2157A2	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2157J1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2157J2	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2157K1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2163A1	NR	M62 J25 - J30	
23/09/15 11:51:46	SIG	M62/2163A2	NR	M62 J25 - J30	
23/09/15 11:54:46	SIG	M62/2144J1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2144A1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2144A2	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2144K1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2151A1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2151A2	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2151J1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2151K1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2155A1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2155A2	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2155J1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2155K1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2157A2	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2157J1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2157J2	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2157K1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2163A1	OFF	M62 J25 - J30	
23/09/15 11:54:47	SIG	M62/2163A2	OFF	M62 J25 - J30	
23/09/15 11:59:10	SIG	M62/2122K1	TI	M62 J25 - J30	
23/09/15 11:59:10	SIG	M62/2122K2	TI	M62 J25 - J30	
23/09/15 12:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 12:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 12:31:04	SIG	M62/2122K1	50R	M62 J25 - J30	
23/09/15 12:31:04	SIG	M62/2122K2	50R	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2117A1	BLNK	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2117A2	OFF	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2117A3	OFF	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2117A4	OFF	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2122K1	OFF	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2122K2	OFF	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2124A2	NR	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2124A3	NR	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2124A4	NR	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2135A1	NR	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2135A2	NR	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2135A3	NR	M62 J25 - J30	
23/09/15 12:31:16	SIG	M62/2135A4	NR	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2124A2	OFF	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2124A3	OFF	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2124A4	OFF	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2135A1	OFF	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2135A2	OFF	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2135A3	OFF	M62 J25 - J30	
23/09/15 12:34:16	SIG	M62/2135A4	OFF	M62 J25 - J30	
23/09/15 12:34:17	SIG	M62/2124A1	BLNK	M62 J25 - J30	
23/09/15 13:48:35	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 13:48:35	SIG	M62/2157A2	50R	M62 J25 - J30	
23/09/15 13:48:35	SIG	M62/2157J1	50R	M62 J25 - J30	
23/09/15 13:48:35	SIG	M62/2157J2	50R	M62 J25 - J30	
23/09/15 13:48:35	SIG	M62/2157K1	50R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2155A1	50R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2155A2	50R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2155J1	50R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2155K1	50R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2157A2	40R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2157J1	40R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2157J2	40R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2157K1	40R	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2163A1	NR	M62 J25 - J30	
23/09/15 13:48:41	SIG	M62/2163A2	NR	M62 J25 - J30	
23/09/15 13:51:43	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 13:51:44	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 13:51:49	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2155A1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2155A2	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2155J1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2155K1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2157A2	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2157J1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2157J2	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2157K1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2163A1	OFF	M62 J25 - J30	
23/09/15 13:52:36	SIG	M62/2163A2	OFF	M62 J25 - J30	
23/09/15 14:35:45	SIG	M62/2065M1	NR	M62 J25 - J30	
23/09/15 14:35:45	SIG	M62/2069M1	60R	M62 J25 - J30	
23/09/15 14:35:45	SIG	M62/2069M2	60R	M62 J25 - J30	
23/09/15 14:35:45	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 14:35:45	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2012B1	REDX	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2012B2	NR	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2012B3	NR	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2012B4	NR	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2025B1	REDX	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2033B1	REDX	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2041B1	REDX	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2050B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2050B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2050B4	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2057B1	REDX	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2057B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2057B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2057B4	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2065B1	REDX	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2065B2	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2065B3	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2065B4	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M62/2065M1	60R	M62 J25 - J30	
23/09/15 14:35:46	SIG	M621/1002B1	HSD	M62 J25 - J30	
23/09/15 14:35:46	SIG	M621/1002B2	60R	M62 J25 - J30	
23/09/15 14:37:33	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 14:37:58	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 14:38:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 14:38:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 14:38:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 14:38:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 14:38:17	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 14:38:54	SIG	M62/2057B1	60R	M62 J25 - J30	
23/09/15 14:38:54	SIG	M621/1002B1	60R	M62 J25 - J30	
23/09/15 14:38:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
23/09/15 14:38:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2018A1	HSD	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2018A2	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2018A3	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2018A4	60R	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2025A1	REDX	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2025A2	NR	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2025A3	NR	M62 J25 - J30	
23/09/15 14:49:28	SIG	M62/2025A4	NR	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2018A1	HSD	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2025A2	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2025A3	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2025A4	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2033A1	REDX	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2033A2	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2033A3	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2033A4	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2041A1	REDX	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2041A2	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2041A3	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2041A4	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2050A1	REDX	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2050A2	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2050A3	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2050A4	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2057A1	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2057A2	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2057A3	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2057J1	60R	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2065A1	REDX	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2065A2	NR	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2065A3	NR	M62 J25 - J30	
23/09/15 14:49:29	SIG	M62/2065A4	NR	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2106B1	REDX	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2106B2	NR	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2106B3	NR	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2106B4	NR	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2113B1	REDX	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2113B2	60R	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2113B3	60R	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2113B4	60R	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 14:50:15	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 14:50:52	SIG	M62/2050A1	60R	M62 J25 - J30	
23/09/15 14:51:16	SIG	M62/2041A1	60R	M62 J25 - J30	
23/09/15 14:51:38	SIG	M62/2033A1	60R	M62 J25 - J30	
23/09/15 14:51:43	SIG	M62/2018A1	60R	M62 J25 - J30	
23/09/15 14:51:43	SIG	M62/2025A1	60R	M62 J25 - J30	
23/09/15 14:53:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 14:53:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 14:53:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 14:53:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 14:54:01	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 14:54:01	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 14:57:49	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 14:58:01	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 15:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 15:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 15:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 15:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 15:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 15:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2106B2	NR	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2106B3	NR	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2106B4	NR	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2113B1	BLNK	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2113B2	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2113B3	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2113B4	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2117B3	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2120M1	OFF	M62 J25 - J30	
23/09/15 15:20:41	SIG	M62/2120M2	OFF	M62 J25 - J30	
23/09/15 15:23:41	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 15:23:42	SIG	M62/2106B1	BLNK	M62 J25 - J30	
23/09/15 15:23:42	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 15:23:42	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 15:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 15:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 15:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 15:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2065A2	60R	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2065A3	60R	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2065A4	60R	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2073K1	60R	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2073K2	60R	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2079A1	REDX	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2079A2	NR	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2079A3	NR	M62 J25 - J30	
23/09/15 15:57:05	SIG	M62/2079A4	NR	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2074A2	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2074A3	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2074A4	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2079A2	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2079A3	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2079A4	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2088A1	REDX	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2088A2	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2088A3	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2088A4	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2097A1	REDX	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2097A2	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2097A3	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2097A4	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2106A1	REDX	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2106A2	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2106A3	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2106A4	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2114A1	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2114A2	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2114A3	60R	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2117A1	REDX	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2117A2	NR	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2117A3	NR	M62 J25 - J30	
23/09/15 15:57:06	SIG	M62/2117A4	NR	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2155A1	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2155A2	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2155J1	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2155K1	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2157A2	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2157J1	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2157J2	50R	M62 J25 - J30	
23/09/15 15:57:21	SIG	M62/2157K1	50R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2151A1	50R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2151A2	50R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2151J1	50R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2151K1	50R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2155A1	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2155A2	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2155J1	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2155K1	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2157A2	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2157J1	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2157J2	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2157K1	40R	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2163A1	NR	M62 J25 - J30	
23/09/15 15:57:27	SIG	M62/2163A2	NR	M62 J25 - J30	
23/09/15 15:59:59	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 15:59:59	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:00:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:00:01	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:00:18	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 16:00:18	SIG	M62/2157A1	50R	M62 J25 - J30	
23/09/15 16:00:24	SIG	M62/2157A1	40R	M62 J25 - J30	
23/09/15 16:00:40	SIG	M62/2106A1	60R	M62 J25 - J30	
23/09/15 16:01:05	SIG	M62/2097A1	60R	M62 J25 - J30	
23/09/15 16:01:27	SIG	M62/2088A1	60R	M62 J25 - J30	
23/09/15 16:01:31	SIG	M62/2079A1	60R	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2151A1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2151A2	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2151J1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2151K1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2155A1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2155A2	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2155J1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2155K1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2157A1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2157A2	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2157J1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2157J2	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2157K1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2163A1	OFF	M62 J25 - J30	
23/09/15 16:02:50	SIG	M62/2163A2	OFF	M62 J25 - J30	
23/09/15 16:03:46	SIG	M62/2074B1	REDX	M62 J25 - J30	
23/09/15 16:03:46	SIG	M62/2074B2	60R	M62 J25 - J30	
23/09/15 16:03:46	SIG	M62/2074B3	60R	M62 J25 - J30	
23/09/15 16:03:46	SIG	M62/2074B4	60R	M62 J25 - J30	
23/09/15 16:03:46	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 16:03:46	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 16:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 16:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 16:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:06:30	SIG	M62/2113B1	REDX	M62 J25 - J30	
23/09/15 16:06:30	SIG	M62/2113B2	NR	M62 J25 - J30	
23/09/15 16:06:30	SIG	M62/2113B3	NR	M62 J25 - J30	
23/09/15 16:06:30	SIG	M62/2113B4	NR	M62 J25 - J30	
23/09/15 16:06:30	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 16:06:30	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2088B1	REDX	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2088B2	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2088B3	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2088B4	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2097B1	REDX	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2097B2	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2097B4	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2106B1	REDX	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2106B2	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2106B3	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2106B4	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2113B2	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2113B3	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2113B4	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 16:06:41	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2081B1	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2081B2	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2081B3	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2081L1	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2088B2	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2088B3	60R	M62 J25 - J30	
23/09/15 16:06:42	SIG	M62/2088B4	60R	M62 J25 - J30	
23/09/15 16:08:03	SIG	M62/2088B1	60R	M62 J25 - J30	
23/09/15 16:08:29	SIG	M62/2097B1	60R	M62 J25 - J30	
23/09/15 16:09:05	SIG	M62/2106B1	60R	M62 J25 - J30	
23/09/15 16:09:08	SIG	M62/2113B1	60R	M62 J25 - J30	
23/09/15 16:09:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:09:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:09:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:09:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:09:46	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 16:09:46	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 16:09:46	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 16:09:46	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 16:09:51	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 16:11:56	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2041B1	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2041B2	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2041B3	40R	M62 J25 - J30	
23/09/15 16:12:01	SIG	M62/2041B4	40R	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1960A1	OFF	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1960A2	OFF	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1960A3	OFF	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1960K1	OFF	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1960K2	OFF	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1968A1	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1968A2	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1968A3	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1968A4	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 16:13:46	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 16:15:01	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 16:15:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:15:07	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 16:15:56	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 16:16:46	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 16:16:47	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2065B2	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2065B3	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2065B4	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2065M1	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2069M1	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2069M2	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2074B2	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2074B3	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M62/2074B4	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M621/1002B1	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M621/1002B2	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M621/1010B1	50R	M62 J25 - J30	
23/09/15 16:17:19	SIG	M621/1010B2	50R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M62/2065B2	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M62/2065B3	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M62/2065B4	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M62/2065M1	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M62/2069M1	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M62/2069M2	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M621/1002B1	40R	M62 J25 - J30	
23/09/15 16:17:24	SIG	M621/1002B2	40R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2074B2	40R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2074B3	40R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2074B4	40R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2081B1	50R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2081B2	50R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2081B3	50R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M62/2081L1	50R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M621/1010B1	40R	M62 J25 - J30	
23/09/15 16:17:25	SIG	M621/1010B2	40R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2170A1	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2170A2	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2170K1	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2170K2	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A1	REDX	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A2	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A2	NR	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A3	NR	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A3	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A4	NR	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2177A4	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2183A1	REDX	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2183A2	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2183A3	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2183A4	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2189A1	REDX	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2189A2	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2189A3	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2189A4	60R	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2197A1	NR	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2197A2	NR	M62 J25 - J30	
23/09/15 16:17:51	SIG	M62/2197A3	NR	M62 J25 - J30	
23/09/15 16:18:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:18:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:18:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:18:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:18:45	SIG	M62/2189A1	60R	M62 J25 - J30	
23/09/15 16:19:01	SIG	M62/2183A1	60R	M62 J25 - J30	
23/09/15 16:19:04	SIG	M62/2177A1	60R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2081B1	40R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2081B2	40R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2081B3	40R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2081L1	40R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2088B1	50R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2088B2	50R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2088B3	50R	M62 J25 - J30	
23/09/15 16:20:04	SIG	M62/2088B4	50R	M62 J25 - J30	
23/09/15 16:23:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:23:27	SIG	M62/2125B1	50R	M62 J25 - J30	
23/09/15 16:23:27	SIG	M62/2125B2	50R	M62 J25 - J30	
23/09/15 16:23:27	SIG	M62/2125B3	50R	M62 J25 - J30	
23/09/15 16:23:27	SIG	M62/2125L1	50R	M62 J25 - J30	
23/09/15 16:23:27	SIG	M62/2125L2	50R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2125B1	40R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2125B2	40R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2125B3	40R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2125L1	40R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2125L2	40R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2132B1	50R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2132B2	50R	M62 J25 - J30	
23/09/15 16:23:33	SIG	M62/2132B3	50R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2081B1	50R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2081B2	50R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2081B3	50R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2081L1	50R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2088B1	60R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2088B2	60R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2088B3	60R	M62 J25 - J30	
23/09/15 16:24:04	SIG	M62/2088B4	60R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2081B1	40R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2081B2	40R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2081B3	40R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2081L1	40R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2088B1	50R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2088B2	50R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2088B3	50R	M62 J25 - J30	
23/09/15 16:24:31	SIG	M62/2088B4	50R	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2125B1	NR	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2125B2	NR	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2125B3	NR	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2125L1	NR	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2125L2	NR	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2132B1	OFF	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2132B2	OFF	M62 J25 - J30	
23/09/15 16:27:27	SIG	M62/2132B3	OFF	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2125B1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2125B2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2125B3	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2125L1	NR	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2125L2	NR	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2132B1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2132B2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2132B3	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2137B1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2137B2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2137B3	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2137B4	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2147B1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2147B2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2147B3	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2147B4	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2159B1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2159B2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2159M1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2159M2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 16:28:47	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 16:29:10	SIG	M62/2088B1	40R	M62 J25 - J30	
23/09/15 16:29:10	SIG	M62/2088B2	40R	M62 J25 - J30	
23/09/15 16:29:10	SIG	M62/2088B3	40R	M62 J25 - J30	
23/09/15 16:29:10	SIG	M62/2088B4	40R	M62 J25 - J30	
23/09/15 16:30:57	SIG	M62/2097B1	50R	M62 J25 - J30	
23/09/15 16:30:57	SIG	M62/2097B2	50R	M62 J25 - J30	
23/09/15 16:30:57	SIG	M62/2097B4	50R	M62 J25 - J30	
23/09/15 16:33:04	SIG	M62/2097B1	40R	M62 J25 - J30	
23/09/15 16:33:04	SIG	M62/2097B2	40R	M62 J25 - J30	
23/09/15 16:33:04	SIG	M62/2097B4	40R	M62 J25 - J30	
23/09/15 16:33:17	SIG	M62/2159B1	50R	M62 J25 - J30	
23/09/15 16:33:17	SIG	M62/2159B2	50R	M62 J25 - J30	
23/09/15 16:33:17	SIG	M62/2159M1	50R	M62 J25 - J30	
23/09/15 16:33:17	SIG	M62/2159M2	50R	M62 J25 - J30	
23/09/15 16:33:22	SIG	M62/2159B1	40R	M62 J25 - J30	
23/09/15 16:33:22	SIG	M62/2159B2	40R	M62 J25 - J30	
23/09/15 16:33:22	SIG	M62/2159M1	40R	M62 J25 - J30	
23/09/15 16:33:22	SIG	M62/2159M2	40R	M62 J25 - J30	
23/09/15 16:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 16:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 16:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:36:21	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 16:36:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:36:47	SIG	M62/2106B1	50R	M62 J25 - J30	
23/09/15 16:36:47	SIG	M62/2106B2	50R	M62 J25 - J30	
23/09/15 16:36:47	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 16:36:47	SIG	M62/2106B4	50R	M62 J25 - J30	
23/09/15 16:38:47	SIG	M62/2125L1	60R	M62 J25 - J30	
23/09/15 16:38:47	SIG	M62/2125L2	60R	M62 J25 - J30	
23/09/15 16:38:53	SIG	M62/2159B1	60R	M62 J25 - J30	
23/09/15 16:38:53	SIG	M62/2159B2	60R	M62 J25 - J30	
23/09/15 16:38:53	SIG	M62/2159M1	60R	M62 J25 - J30	
23/09/15 16:38:53	SIG	M62/2159M2	60R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2106B1	40R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2106B2	40R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2106B4	40R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 16:40:20	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 16:44:04	SIG	M62/2114A1	50R	M62 J25 - J30	
23/09/15 16:44:04	SIG	M62/2114A2	50R	M62 J25 - J30	
23/09/15 16:44:04	SIG	M62/2114A3	50R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2117B1	50R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2117B3	50R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2120M1	50R	M62 J25 - J30	
23/09/15 16:44:36	SIG	M62/2120M2	50R	M62 J25 - J30	
23/09/15 16:44:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 16:45:18	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 16:45:23	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 16:47:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:47:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:47:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:47:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:47:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:47:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:47:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:47:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 16:48:37	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2117B1	50R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2117B3	50R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2120M1	50R	M62 J25 - J30	
23/09/15 16:48:42	SIG	M62/2120M2	50R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 16:49:18	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 16:51:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:51:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:51:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:51:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:51:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:51:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:51:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:51:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 16:54:05	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 16:55:48	SIG	M62/2117B1	50R	M62 J25 - J30	
23/09/15 16:55:48	SIG	M62/2117B3	50R	M62 J25 - J30	
23/09/15 16:55:48	SIG	M62/2120M1	50R	M62 J25 - J30	
23/09/15 16:55:48	SIG	M62/2120M2	50R	M62 J25 - J30	
23/09/15 16:55:59	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 16:55:59	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 16:55:59	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 16:55:59	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 16:58:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:58:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:58:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:58:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 16:59:59	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 16:59:59	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 16:59:59	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 16:59:59	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 17:04:30	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 17:04:30	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 17:04:30	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 17:04:30	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 17:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 17:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:06:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 17:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 17:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:06:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 17:06:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2170B1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2170B2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2189B2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2189B3	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2189B4	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2194B1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2194B2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2194B3	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2194B4	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2197B1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2197B2	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2197B3	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2199M1	50R	M62 J25 - J30	
23/09/15 17:10:25	SIG	M62/2199M2	50R	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2177B1	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2177B2	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2177L1	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2177L2	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2183B1	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2183B2	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2183L1	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2183L2	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2189B1	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2189B2	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2189B3	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2189B4	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2194B1	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2194B2	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2194B3	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2194B4	NR	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2197B1	OFF	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2197B2	OFF	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2197B3	OFF	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2199M1	OFF	M62 J25 - J30	
23/09/15 17:11:51	SIG	M62/2199M2	OFF	M62 J25 - J30	
23/09/15 17:11:57	SIG	M62/2114A1	60R	M62 J25 - J30	
23/09/15 17:11:57	SIG	M62/2114A2	60R	M62 J25 - J30	
23/09/15 17:11:57	SIG	M62/2114A3	60R	M62 J25 - J30	
23/09/15 17:13:10	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 17:13:10	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 17:13:10	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 17:13:10	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 17:13:10	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 17:13:10	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 17:14:51	SIG	M62/2194B1	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2183B1	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2183L1	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2183L2	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2189B1	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2189B2	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2189B3	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2189B4	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2194B2	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2194B3	OFF	M62 J25 - J30	
23/09/15 17:14:52	SIG	M62/2194B4	OFF	M62 J25 - J30	
23/09/15 17:19:23	SIG	M62/2170B1	50R	M62 J25 - J30	
23/09/15 17:19:23	SIG	M62/2170B2	50R	M62 J25 - J30	
23/09/15 17:19:23	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 17:19:23	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 17:19:23	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 17:19:23	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2170B1	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2170B2	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 17:19:29	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 17:19:57	SIG	M62/2170L1	30R	M62 J25 - J30	
23/09/15 17:19:57	SIG	M62/2170L2	30R	M62 J25 - J30	
23/09/15 17:20:16	SIG	M62/2097B3	40R	M62 J25 - J30	
23/09/15 17:20:16	SIG	M62/2097B3	40R	M62 J25 - J30	
23/09/15 17:20:16	SIG	M62/2097B3	40R	M62 J25 - J30	
23/09/15 17:21:59	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 17:21:59	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 17:21:59	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 17:21:59	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 17:22:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:22:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:22:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:22:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:22:48	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 17:22:48	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 17:22:48	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 17:22:48	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2194B1	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2194B2	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2194B3	60R	M62 J25 - J30	
23/09/15 17:23:48	SIG	M62/2194B4	60R	M62 J25 - J30	
23/09/15 17:25:35	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 17:25:35	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 17:25:35	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2183B1	40R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2183L1	40R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2183L2	40R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2189B1	50R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2189B2	50R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2189B3	50R	M62 J25 - J30	
23/09/15 17:25:41	SIG	M62/2189B4	50R	M62 J25 - J30	
23/09/15 17:26:48	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 17:26:48	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 17:26:48	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 17:26:48	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 17:27:05	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 17:27:05	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 17:27:05	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 17:27:05	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 17:27:48	SIG	M62/2197B1	60R	M62 J25 - J30	
23/09/15 17:27:48	SIG	M62/2197B2	60R	M62 J25 - J30	
23/09/15 17:27:48	SIG	M62/2197B3	60R	M62 J25 - J30	
23/09/15 17:27:48	SIG	M62/2199M1	60R	M62 J25 - J30	
23/09/15 17:27:48	SIG	M62/2199M2	60R	M62 J25 - J30	
23/09/15 17:28:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:28:30	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 17:28:36	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 17:31:06	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 17:31:06	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 17:31:06	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 17:31:06	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 17:31:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:31:35	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 17:31:41	SIG	M62/2183B2	40R	M62 J25 - J30	
23/09/15 17:32:17	SIG	M62/2170B1	60R	M62 J25 - J30	
23/09/15 17:32:17	SIG	M62/2170B2	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2183B1	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2183B2	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2183L1	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2183L2	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 17:32:54	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 17:33:48	SIG	M62/2203B1	60R	M62 J25 - J30	
23/09/15 17:33:48	SIG	M62/2203B2	60R	M62 J25 - J30	
23/09/15 17:33:48	SIG	M62/2203B3	60R	M62 J25 - J30	
23/09/15 17:35:30	SIG	M62/1968B1	50R	M62 J25 - J30	
23/09/15 17:35:30	SIG	M62/1968B2	50R	M62 J25 - J30	
23/09/15 17:35:30	SIG	M62/1968B3	50R	M62 J25 - J30	
23/09/15 17:35:30	SIG	M62/1968L1	50R	M62 J25 - J30	
23/09/15 17:35:34	SIG	M62/2113B1	40R	M62 J25 - J30	
23/09/15 17:35:34	SIG	M62/2113B2	40R	M62 J25 - J30	
23/09/15 17:35:34	SIG	M62/2113B3	40R	M62 J25 - J30	
23/09/15 17:35:34	SIG	M62/2113B4	40R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1960B1	60R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1960B2	60R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1960B3	60R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1960L1	NR	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1960L2	NR	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1968B1	40R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1968B2	40R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1968B3	40R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1968L1	40R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1974B1	50R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1974B2	50R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1974B3	50R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1974B4	50R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1974M1	50R	M62 J25 - J30	
23/09/15 17:35:35	SIG	M62/1974M2	50R	M62 J25 - J30	
23/09/15 17:35:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:35:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:35:56	SIG	M62/2137B4	60R	M62 J25 - J30	
23/09/15 17:35:56	SIG	M62/2137B4	OFF	M62 J25 - J30	
23/09/15 17:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 17:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 17:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 17:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 17:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:36:21	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 17:36:21	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 17:36:21	SIG	M62/2177B1	60R	M62 J25 - J30	
23/09/15 17:36:21	SIG	M62/2177B2	60R	M62 J25 - J30	
23/09/15 17:36:21	SIG	M62/2177L1	60R	M62 J25 - J30	
23/09/15 17:36:21	SIG	M62/2177L2	60R	M62 J25 - J30	
23/09/15 17:39:34	SIG	M62/2125B1	50R	M62 J25 - J30	
23/09/15 17:39:34	SIG	M62/2125B2	50R	M62 J25 - J30	
23/09/15 17:39:34	SIG	M62/2125B3	50R	M62 J25 - J30	
23/09/15 17:39:35	SIG	M62/2117B2	40R	M62 J25 - J30	
23/09/15 17:39:35	SIG	M62/2117B3	40R	M62 J25 - J30	
23/09/15 17:39:35	SIG	M62/2120M1	40R	M62 J25 - J30	
23/09/15 17:39:35	SIG	M62/2120M2	40R	M62 J25 - J30	
23/09/15 17:39:40	SIG	M62/2117B1	40R	M62 J25 - J30	
23/09/15 17:39:40	SIG	M62/2117B3	40R	M62 J25 - J30	
23/09/15 17:39:40	SIG	M62/2120M1	40R	M62 J25 - J30	
23/09/15 17:39:40	SIG	M62/2120M2	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1974B1	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1974B2	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1974B3	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1974B4	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1974M1	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1974M2	40R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1981B1	50R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1981B2	50R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1981B3	50R	M62 J25 - J30	
23/09/15 17:39:42	SIG	M62/1981B4	50R	M62 J25 - J30	
23/09/15 17:41:48	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:41:48	SIG	M62/2203B1	OFF	M62 J25 - J30	
23/09/15 17:41:48	SIG	M62/2203B2	OFF	M62 J25 - J30	
23/09/15 17:41:48	SIG	M62/2203B3	OFF	M62 J25 - J30	
23/09/15 17:41:49	SIG	M62/2117B1	50R	M62 J25 - J30	
23/09/15 17:41:54	SIG	M62/2117B1	40R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M606/2003B1	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M606/2003B2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1987B1	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1987B2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1987B3	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1987B4	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1992B1	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1992B2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1992B3	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1992B4	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1999B1	REDX	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1999B2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1999B3	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/1999B4	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2004B1	REDX	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2004B2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2004B3	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2004B4	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2005M1	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2005M2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2012B2	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2012B3	60R	M62 J25 - J30	
23/09/15 17:42:48	SIG	M62/2012B4	60R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2117B1	50R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2117B3	50R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2120M1	50R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2120M2	50R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2125B1	60R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2125B2	60R	M62 J25 - J30	
23/09/15 17:43:34	SIG	M62/2125B3	60R	M62 J25 - J30	
23/09/15 17:45:29	SIG	M62/2113B1	50R	M62 J25 - J30	
23/09/15 17:45:29	SIG	M62/2113B2	50R	M62 J25 - J30	
23/09/15 17:45:29	SIG	M62/2113B3	50R	M62 J25 - J30	
23/09/15 17:45:29	SIG	M62/2113B4	50R	M62 J25 - J30	
23/09/15 17:45:48	SIG	M62/2197B1	OFF	M62 J25 - J30	
23/09/15 17:45:48	SIG	M62/2197B2	OFF	M62 J25 - J30	
23/09/15 17:45:48	SIG	M62/2197B3	OFF	M62 J25 - J30	
23/09/15 17:45:48	SIG	M62/2199M1	OFF	M62 J25 - J30	
23/09/15 17:45:48	SIG	M62/2199M2	OFF	M62 J25 - J30	
23/09/15 17:45:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:45:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:45:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:45:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2177B1	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2177B2	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2177L1	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2177L2	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2183B1	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2183B2	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2183L1	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2183L2	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2189B1	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2189B2	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2189B3	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2189B4	NR	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2194B1	OFF	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2194B2	OFF	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2194B3	OFF	M62 J25 - J30	
23/09/15 17:46:49	SIG	M62/2194B4	OFF	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 17:48:48	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 17:48:53	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 17:49:49	SIG	M62/2189B1	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2177B1	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2177B2	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2177L1	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2177L2	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2183B1	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2183L1	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2183L2	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2189B2	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2189B3	OFF	M62 J25 - J30	
23/09/15 17:49:50	SIG	M62/2189B4	OFF	M62 J25 - J30	
23/09/15 17:51:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:51:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:51:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:51:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1974B1	50R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1974B2	50R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1974B3	50R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1974B4	50R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1974M1	50R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1974M2	50R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1981B1	60R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1981B2	60R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1981B3	60R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/1981B4	60R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 17:51:11	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 17:51:16	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1968B1	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1968B2	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1968B3	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1968L1	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1974B1	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1974B2	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1974B3	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1974B4	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1974M1	60R	M62 J25 - J30	
23/09/15 17:52:47	SIG	M62/1974M2	60R	M62 J25 - J30	
23/09/15 17:54:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:54:06	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 17:54:11	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 17:54:17	SIG	M62/2106B1	50R	M62 J25 - J30	
23/09/15 17:54:17	SIG	M62/2106B2	50R	M62 J25 - J30	
23/09/15 17:54:17	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 17:54:17	SIG	M62/2106B4	50R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 17:55:11	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 17:55:22	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2137B1	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2137B2	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2137B3	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2137B4	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2147B1	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2147B2	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2147B3	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2147B4	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2159B1	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2159B2	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2159M1	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2159M2	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2170B1	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2170B2	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2170L1	OFF	M62 J25 - J30	
23/09/15 17:57:49	SIG	M62/2170L2	OFF	M62 J25 - J30	
23/09/15 17:58:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:58:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:58:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:58:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 17:58:39	SIG	M62/2106B1	40R	M62 J25 - J30	
23/09/15 17:58:39	SIG	M62/2106B2	40R	M62 J25 - J30	
23/09/15 17:58:39	SIG	M62/2106B3	40R	M62 J25 - J30	
23/09/15 17:58:39	SIG	M62/2106B4	40R	M62 J25 - J30	
23/09/15 18:00:49	SIG	M62/2117B1	60R	M62 J25 - J30	
23/09/15 18:00:49	SIG	M62/2117B3	60R	M62 J25 - J30	
23/09/15 18:00:49	SIG	M62/2120M1	60R	M62 J25 - J30	
23/09/15 18:00:49	SIG	M62/2120M2	60R	M62 J25 - J30	
23/09/15 18:02:40	SIG	M62/2106B1	50R	M62 J25 - J30	
23/09/15 18:02:40	SIG	M62/2106B2	50R	M62 J25 - J30	
23/09/15 18:02:40	SIG	M62/2106B3	50R	M62 J25 - J30	
23/09/15 18:02:40	SIG	M62/2106B4	50R	M62 J25 - J30	
23/09/15 18:02:49	SIG	M62/2132B1	OFF	M62 J25 - J30	
23/09/15 18:02:49	SIG	M62/2132B2	OFF	M62 J25 - J30	
23/09/15 18:02:49	SIG	M62/2132B3	OFF	M62 J25 - J30	
23/09/15 18:03:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:03:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:03:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:03:26	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:05:34	SIG	M62/2097B1	50R	M62 J25 - J30	
23/09/15 18:05:34	SIG	M62/2097B2	50R	M62 J25 - J30	
23/09/15 18:05:34	SIG	M62/2097B3	50R	M62 J25 - J30	
23/09/15 18:05:34	SIG	M62/2097B4	50R	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2065A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2065A3	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2065A4	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2073K1	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2073K2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2074A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2074A3	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2074A4	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2079A1	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2079A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2079A3	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2079A4	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2088A1	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2088A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2088A3	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2088A4	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2097A1	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2097A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2097A3	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2097A4	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2106A1	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2106A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2106A3	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2106A4	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2114A1	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2114A2	50R	M62 J25 - J30	
23/09/15 18:06:23	SIG	M62/2114A3	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 18:06:56	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:07:02	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 18:07:49	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1960B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1960B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1960B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1960L1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1960L2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1968B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1968B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1968B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1968L1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1974B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1974B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1974B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1974B4	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1974M1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1974M2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1981B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1981B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1981B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1981B4	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1987B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1987B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1987B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1987B4	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1992B1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1992B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1992B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1992B4	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1999B1	BLNK	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1999B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1999B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/1999B4	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2004B1	BLNK	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2004B2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2004B3	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2004B4	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2005M1	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2005M2	OFF	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2012B2	NR	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2012B3	NR	M62 J25 - J30	
23/09/15 18:07:49	SIG	M62/2012B4	NR	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 18:08:28	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 18:08:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:08:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:08:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:08:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:08:41	SIG	M62/2088B1	50R	M62 J25 - J30	
23/09/15 18:08:41	SIG	M62/2088B2	50R	M62 J25 - J30	
23/09/15 18:08:41	SIG	M62/2088B3	50R	M62 J25 - J30	
23/09/15 18:08:41	SIG	M62/2088B4	50R	M62 J25 - J30	
23/09/15 18:10:49	SIG	M62/2113B1	60R	M62 J25 - J30	
23/09/15 18:10:49	SIG	M62/2113B2	60R	M62 J25 - J30	
23/09/15 18:10:49	SIG	M62/2113B3	60R	M62 J25 - J30	
23/09/15 18:10:49	SIG	M62/2113B4	60R	M62 J25 - J30	
23/09/15 18:11:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:11:28	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:11:33	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:12:28	SIG	M62/2081B1	50R	M62 J25 - J30	
23/09/15 18:12:28	SIG	M62/2081B2	50R	M62 J25 - J30	
23/09/15 18:12:28	SIG	M62/2081B3	50R	M62 J25 - J30	
23/09/15 18:12:28	SIG	M62/2081L1	50R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 18:12:29	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 18:12:30	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 18:12:30	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 18:12:30	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 18:12:30	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 18:12:47	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 18:15:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:15:34	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:15:39	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:16:48	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 18:16:48	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 18:16:48	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 18:16:48	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 18:16:49	SIG	M62/2106B1	60R	M62 J25 - J30	
23/09/15 18:16:49	SIG	M62/2106B2	60R	M62 J25 - J30	
23/09/15 18:16:49	SIG	M62/2106B3	60R	M62 J25 - J30	
23/09/15 18:16:49	SIG	M62/2106B4	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 18:18:18	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M62/2065B2	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M62/2065B3	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M62/2065B4	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M62/2065M1	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M62/2069M1	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M62/2069M2	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M621/1002B1	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M621/1002B2	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M621/1010B1	50R	M62 J25 - J30	
23/09/15 18:19:25	SIG	M621/1010B2	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 18:19:46	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2088B1	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2088B2	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2088B3	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2088B4	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2097B1	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2097B2	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2097B3	60R	M62 J25 - J30	
23/09/15 18:19:49	SIG	M62/2097B4	60R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:19:51	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 18:20:28	SIG	M62/1960B1	60R	M62 J25 - J30	
23/09/15 18:20:28	SIG	M62/1960B2	60R	M62 J25 - J30	
23/09/15 18:20:28	SIG	M62/1960B3	60R	M62 J25 - J30	
23/09/15 18:20:28	SIG	M62/1960L1	60R	M62 J25 - J30	
23/09/15 18:20:28	SIG	M62/1960L2	60R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 18:21:14	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/1999A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/1999A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/1999A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2004A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2004A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2004A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2008K1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2008K2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2012A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2012A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2012A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2018A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2018A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2018A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2018A4	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2025A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2025A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2025A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2025A4	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2033A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2033A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2033A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2033A4	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2041A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2041A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2041A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2041A4	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2050A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2050A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2050A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2050A4	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2057A1	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2057A2	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2057A3	50R	M62 J25 - J30	
23/09/15 18:21:14	SIG	M62/2057J1	50R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2074B2	50R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2074B3	50R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2074B4	50R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2081B1	60R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2081B2	60R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2081B3	60R	M62 J25 - J30	
23/09/15 18:21:16	SIG	M62/2081L1	60R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 18:21:43	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 18:23:45	SIG	M62/2018B1	60R	M62 J25 - J30	
23/09/15 18:23:45	SIG	M62/2018B2	60R	M62 J25 - J30	
23/09/15 18:23:45	SIG	M62/2018B3	60R	M62 J25 - J30	
23/09/15 18:23:45	SIG	M62/2018L1	60R	M62 J25 - J30	
23/09/15 18:24:17	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 18:24:17	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 18:24:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:24:46	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:24:49	SIG	M62/2125B1	OFF	M62 J25 - J30	
23/09/15 18:24:49	SIG	M62/2125B2	OFF	M62 J25 - J30	
23/09/15 18:24:49	SIG	M62/2125B3	OFF	M62 J25 - J30	
23/09/15 18:24:49	SIG	M62/2125L1	NR	M62 J25 - J30	
23/09/15 18:24:49	SIG	M62/2125L2	NR	M62 J25 - J30	
23/09/15 18:24:51	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M62/2069M1	60R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M62/2069M2	60R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M62/2074B2	60R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M62/2074B3	60R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M62/2074B4	60R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 18:25:49	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 18:26:30	SIG	M62/1999A1	OFF	M62 J25 - J30	
23/09/15 18:26:30	SIG	M62/1999A2	OFF	M62 J25 - J30	
23/09/15 18:26:30	SIG	M62/1999A3	OFF	M62 J25 - J30	
23/09/15 18:26:31	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 18:26:31	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2004A1	NR	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2004A2	NR	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2004A3	NR	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2008K1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2008K2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2012A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2012A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2012A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2018A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2018A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2018A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2018A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2025A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2025A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2025A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2025A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2033A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2033A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2033A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2033A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2041A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2041A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2041A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2041A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2050A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2050A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2050A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2050A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2057A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2057A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2057A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2057J1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2065A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2065A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2065A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2073K1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2073K2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2074A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2074A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2074A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2079A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2079A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2079A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2079A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2088A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2088A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2088A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2088A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2097A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2097A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2097A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2097A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2106A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2106A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2106A3	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2106A4	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2114A1	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2114A2	60R	M62 J25 - J30	
23/09/15 18:26:31	SIG	M62/2114A3	60R	M62 J25 - J30	
23/09/15 18:26:49	SIG	M62/2065B2	60R	M62 J25 - J30	
23/09/15 18:26:49	SIG	M62/2065B3	60R	M62 J25 - J30	
23/09/15 18:26:49	SIG	M62/2065B4	60R	M62 J25 - J30	
23/09/15 18:26:49	SIG	M62/2065M1	60R	M62 J25 - J30	
23/09/15 18:26:49	SIG	M621/1002B1	60R	M62 J25 - J30	
23/09/15 18:26:49	SIG	M621/1002B2	60R	M62 J25 - J30	
23/09/15 18:27:04	SIG	M62/1960B1	50R	M62 J25 - J30	
23/09/15 18:27:04	SIG	M62/1960B2	50R	M62 J25 - J30	
23/09/15 18:27:04	SIG	M62/1960B3	50R	M62 J25 - J30	
23/09/15 18:27:04	SIG	M62/1960L1	50R	M62 J25 - J30	
23/09/15 18:27:04	SIG	M62/1960L2	50R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1960B1	40R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1960B2	40R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1960B3	40R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1960L1	40R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1960L2	40R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1968B1	50R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1968B2	50R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1968B3	50R	M62 J25 - J30	
23/09/15 18:27:09	SIG	M62/1968L1	50R	M62 J25 - J30	
23/09/15 18:27:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:27:49	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:27:49	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:27:50	SIG	M62/2125L1	OFF	M62 J25 - J30	
23/09/15 18:27:50	SIG	M62/2125L2	OFF	M62 J25 - J30	
23/09/15 18:27:55	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:28:59	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:29:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:29:00	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:29:01	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:29:22	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 18:29:22	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 18:29:23	SIG	M62/2177A1	HSD	M62 J25 - J30	
23/09/15 18:29:31	SIG	M62/2004A1	OFF	M62 J25 - J30	
23/09/15 18:29:32	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 18:29:32	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 18:29:32	SIG	M62/2004A2	OFF	M62 J25 - J30	
23/09/15 18:29:32	SIG	M62/2004A3	OFF	M62 J25 - J30	
23/09/15 18:30:08	SIG	M62/2183A1	HSD	M62 J25 - J30	
23/09/15 18:30:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:30:53	SIG	M62/2177A1	REDX	M62 J25 - J30	
23/09/15 18:30:53	SIG	M62/2189A1	HSD	M62 J25 - J30	
23/09/15 18:30:54	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:30:59	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:31:26	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 18:31:26	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 18:31:26	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 18:31:26	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 18:31:52	SIG	M62/2025B1	50R	M62 J25 - J30	
23/09/15 18:31:52	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 18:31:52	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 18:31:52	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 18:31:53	SIG	M62/2183A1	REDX	M62 J25 - J30	
23/09/15 18:31:57	SIG	M62/2025B1	40R	M62 J25 - J30	
23/09/15 18:31:57	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 18:31:57	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 18:31:57	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2033B1	50R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 18:32:07	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2033B1	40R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2033B2	40R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2033B4	40R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2041B1	50R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2041B2	50R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2041B3	50R	M62 J25 - J30	
23/09/15 18:32:45	SIG	M62/2041B4	50R	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2170A1	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2170A2	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2170K1	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2170K2	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2177A2	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2177A3	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2177A4	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2183A2	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2183A3	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2183A4	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2189A1	REDX	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2189A2	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2189A3	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2189A4	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2197A1	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2197A2	NR	M62 J25 - J30	
23/09/15 18:32:53	SIG	M62/2197A3	NR	M62 J25 - J30	
23/09/15 18:33:53	SIG	M62/2170K1	OFF	M62 J25 - J30	
23/09/15 18:33:53	SIG	M62/2170K2	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2170A1	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2170A2	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2177A1	BLNK	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2177A2	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2177A3	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2177A4	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2183A1	BLNK	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2183A2	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2183A3	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2183A4	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2189A1	BLNK	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2189A2	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2189A3	OFF	M62 J25 - J30	
23/09/15 18:33:54	SIG	M62/2189A4	OFF	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1974B1	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1974B2	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1974B3	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1974B4	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1974M1	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1974M2	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1981B1	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1981B2	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1981B3	60R	M62 J25 - J30	
23/09/15 18:34:50	SIG	M62/1981B4	60R	M62 J25 - J30	
23/09/15 18:34:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:34:58	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 18:35:04	SIG	M62/2033B3	40R	M62 J25 - J30	
23/09/15 18:35:54	SIG	M62/2197A1	OFF	M62 J25 - J30	
23/09/15 18:35:54	SIG	M62/2197A2	OFF	M62 J25 - J30	
23/09/15 18:35:54	SIG	M62/2197A3	OFF	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1968B1	40R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1968B2	40R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1968B3	40R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1968L1	40R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1974B1	50R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1974B2	50R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1974B3	50R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1974B4	50R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1974M1	50R	M62 J25 - J30	
23/09/15 18:36:01	SIG	M62/1974M2	50R	M62 J25 - J30	
23/09/15 18:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
23/09/15 18:36:11	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
23/09/15 18:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 18:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:36:12	SIG	M62/2203B1	NR	M62 J25 - J30	
23/09/15 18:36:12	SIG	M62/2203B2	NR	M62 J25 - J30	
23/09/15 18:36:12	SIG	M62/2203B3	NR	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2025B1	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2033B1	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2041B1	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 18:36:44	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 18:37:47	SIG	M62/2113B1	HSD	M62 J25 - J30	
23/09/15 18:38:40	SIG	M62/2106B1	HSD	M62 J25 - J30	
23/09/15 18:39:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:39:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:39:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:39:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:39:48	SIG	M62/2097B1	HSD	M62 J25 - J30	
23/09/15 18:39:48	SIG	M62/2113B1	REDX	M62 J25 - J30	
23/09/15 18:39:50	SIG	M62/1987B1	60R	M62 J25 - J30	
23/09/15 18:39:50	SIG	M62/1987B2	60R	M62 J25 - J30	
23/09/15 18:39:50	SIG	M62/1987B3	60R	M62 J25 - J30	
23/09/15 18:39:50	SIG	M62/1987B4	60R	M62 J25 - J30	
23/09/15 18:40:56	SIG	M62/2088B1	HSD	M62 J25 - J30	
23/09/15 18:40:56	SIG	M62/2106B1	REDX	M62 J25 - J30	
23/09/15 18:42:04	SIG	M62/2097B1	REDX	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1960B1	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1960B2	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1960B3	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1960L1	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1960L2	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1968B1	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1968B2	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1968B3	50R	M62 J25 - J30	
23/09/15 18:43:06	SIG	M62/1968L1	50R	M62 J25 - J30	
23/09/15 18:43:12	SIG	M62/2088B1	REDX	M62 J25 - J30	
23/09/15 18:44:05	SIG	M62/2117B1	NR	M62 J25 - J30	
23/09/15 18:44:05	SIG	M62/2117B3	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2081B1	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2081B2	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2081B3	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2081L1	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2088B2	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2088B3	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2088B4	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2097B2	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2097B3	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2097B4	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2106B2	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2106B3	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2106B4	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2113B2	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2113B3	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2113B4	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2120M1	NR	M62 J25 - J30	
23/09/15 18:44:06	SIG	M62/2120M2	NR	M62 J25 - J30	
23/09/15 18:45:05	SIG	M62/2120M1	OFF	M62 J25 - J30	
23/09/15 18:45:05	SIG	M62/2120M2	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2081B1	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2081B2	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2081B3	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2081L1	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2088B1	BLNK	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2088B2	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2088B3	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2088B4	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2097B1	BLNK	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2097B2	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2097B3	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2097B4	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2106B1	BLNK	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2106B2	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2106B3	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2106B4	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2113B1	BLNK	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2113B2	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2113B3	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2113B4	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
23/09/15 18:45:06	SIG	M62/2117B3	OFF	M62 J25 - J30	
23/09/15 18:46:38	SIG	M62/2025A1	HSD	M62 J25 - J30	
23/09/15 18:47:38	SIG	M62/2033A1	HSD	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1960B1	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1960B2	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1960B3	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1960L1	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1960L2	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1968B1	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1968B2	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1968B3	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1968L1	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1974B1	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1974B2	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1974B3	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1974B4	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1974M1	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/1974M2	60R	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/2074B1	BLNK	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/2074B2	OFF	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/2074B3	OFF	M62 J25 - J30	
23/09/15 18:47:50	SIG	M62/2074B4	OFF	M62 J25 - J30	
23/09/15 18:47:50	SIG	M621/1010B1	OFF	M62 J25 - J30	
23/09/15 18:47:50	SIG	M621/1010B2	OFF	M62 J25 - J30	
23/09/15 18:48:39	SIG	M62/2018A1	HSD	M62 J25 - J30	
23/09/15 18:48:39	SIG	M62/2025A1	REDX	M62 J25 - J30	
23/09/15 18:48:39	SIG	M62/2041A1	HSD	M62 J25 - J30	
23/09/15 18:49:45	SIG	M62/2050A1	HSD	M62 J25 - J30	
23/09/15 18:49:46	SIG	M62/2033A1	REDX	M62 J25 - J30	
23/09/15 18:50:38	SIG	M62/2041A1	REDX	M62 J25 - J30	
23/09/15 18:51:38	SIG	M62/2050A1	REDX	M62 J25 - J30	
23/09/15 18:51:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 18:52:38	SIG	M62/2025A2	NR	M62 J25 - J30	
23/09/15 18:52:38	SIG	M62/2025A3	NR	M62 J25 - J30	
23/09/15 18:52:38	SIG	M62/2025A4	NR	M62 J25 - J30	
23/09/15 18:52:38	SIG	M62/2033A2	NR	M62 J25 - J30	
23/09/15 18:52:38	SIG	M62/2033A3	NR	M62 J25 - J30	
23/09/15 18:52:38	SIG	M62/2033A4	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2041A2	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2041A3	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2041A4	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2050A2	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2050A3	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2050A4	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2057A1	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2057A2	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2057A3	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2057J1	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2065A2	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2065A3	NR	M62 J25 - J30	
23/09/15 18:52:39	SIG	M62/2065A4	NR	M62 J25 - J30	
23/09/15 18:52:50	SIG	M62/1987B1	OFF	M62 J25 - J30	
23/09/15 18:52:50	SIG	M62/1987B2	OFF	M62 J25 - J30	
23/09/15 18:52:50	SIG	M62/1987B3	OFF	M62 J25 - J30	
23/09/15 18:52:50	SIG	M62/1987B4	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2008K1	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2008K2	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2012A1	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2012A2	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2012A3	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2018A1	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2018A2	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2018A3	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2018A4	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2025A1	BLNK	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2025A2	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2025A3	OFF	M62 J25 - J30	
23/09/15 18:53:38	SIG	M62/2025A4	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2033A1	BLNK	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2033A2	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2033A3	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2033A4	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2041A1	BLNK	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2041A2	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2041A3	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2041A4	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2050A1	BLNK	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2050A2	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2050A3	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2050A4	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2057A1	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2057A2	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2057A3	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2057J1	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2065A1	BLNK	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2065A2	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2065A3	OFF	M62 J25 - J30	
23/09/15 18:53:39	SIG	M62/2065A4	OFF	M62 J25 - J30	
23/09/15 18:54:52	SIG	M62/2079A1	HSD	M62 J25 - J30	
23/09/15 18:55:26	SIG	M62/2203B1	NR	M62 J25 - J30	
23/09/15 18:55:26	SIG	M62/2203B2	NR	M62 J25 - J30	
23/09/15 18:55:26	SIG	M62/2203B3	NR	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1960B1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1960B2	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1960B3	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1960L1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1960L2	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1968B1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1968B2	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1968B3	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1968L1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1974B1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1974B2	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1974B3	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1974B4	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1974M1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1974M2	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1981B1	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1981B2	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1981B3	OFF	M62 J25 - J30	
23/09/15 18:55:50	SIG	M62/1981B4	OFF	M62 J25 - J30	
23/09/15 18:56:00	SIG	M62/2088A1	HSD	M62 J25 - J30	
23/09/15 18:57:08	SIG	M62/2079A1	REDX	M62 J25 - J30	
23/09/15 18:57:08	SIG	M62/2097A1	HSD	M62 J25 - J30	
23/09/15 18:58:16	SIG	M62/2088A1	REDX	M62 J25 - J30	
23/09/15 18:58:16	SIG	M62/2106A1	HSD	M62 J25 - J30	
23/09/15 18:58:26	SIG	M62/2203B1	OFF	M62 J25 - J30	
23/09/15 18:58:26	SIG	M62/2203B2	OFF	M62 J25 - J30	
23/09/15 18:58:26	SIG	M62/2203B3	OFF	M62 J25 - J30	
23/09/15 18:59:24	SIG	M62/2097A1	REDX	M62 J25 - J30	
23/09/15 19:00:32	SIG	M62/2106A1	REDX	M62 J25 - J30	
23/09/15 19:01:32	SIG	M62/2074A2	NR	M62 J25 - J30	
23/09/15 19:01:32	SIG	M62/2074A3	NR	M62 J25 - J30	
23/09/15 19:01:32	SIG	M62/2074A4	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2073K1	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2073K2	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2079A2	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2079A3	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2079A4	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2088A2	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2088A3	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2088A4	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2097A2	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2097A3	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2097A4	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2106A2	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2106A3	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2106A4	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2114A1	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2114A2	NR	M62 J25 - J30	
23/09/15 19:01:33	SIG	M62/2114A3	NR	M62 J25 - J30	
23/09/15 19:02:32	SIG	M62/2073K1	OFF	M62 J25 - J30	
23/09/15 19:02:32	SIG	M62/2073K2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2074A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2074A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2074A4	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2079A1	BLNK	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2079A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2079A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2079A4	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2088A1	BLNK	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2088A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2088A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2088A4	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2097A1	BLNK	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2097A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2097A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2097A4	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2106A1	BLNK	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2106A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2106A4	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2114A1	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2114A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2114A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2117A1	BLNK	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2117A2	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2117A3	OFF	M62 J25 - J30	
23/09/15 19:02:33	SIG	M62/2117A4	OFF	M62 J25 - J30	
23/09/15 19:03:11	SIG	M62/2057B1	HSD	M62 J25 - J30	
23/09/15 19:05:10	SIG	M62/2041B1	HSD	M62 J25 - J30	
23/09/15 19:05:10	SIG	M62/2057B1	REDX	M62 J25 - J30	
23/09/15 19:05:10	SIG	M621/1002B1	HSD	M62 J25 - J30	
23/09/15 19:05:10	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 19:05:10	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 19:06:10	SIG	M62/2033B1	HSD	M62 J25 - J30	
23/09/15 19:06:12	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 19:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 19:07:10	SIG	M62/2025B1	HSD	M62 J25 - J30	
23/09/15 19:07:10	SIG	M62/2041B1	REDX	M62 J25 - J30	
23/09/15 19:08:02	SIG	M62/2033B1	REDX	M62 J25 - J30	
23/09/15 19:08:46	SIG	M62/2025B1	REDX	M62 J25 - J30	
23/09/15 19:09:16	SIG	M62/2065B2	NR	M62 J25 - J30	
23/09/15 19:09:16	SIG	M62/2065B3	NR	M62 J25 - J30	
23/09/15 19:09:16	SIG	M62/2065B4	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2018B1	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2018B2	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2018B3	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2018L1	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2025B2	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2025B3	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2025B4	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2033B2	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2033B3	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2033B4	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2041B2	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2041B3	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2041B4	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2050B2	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2050B3	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2050B4	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2057B2	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2057B3	NR	M62 J25 - J30	
23/09/15 19:09:17	SIG	M62/2057B4	NR	M62 J25 - J30	
23/09/15 19:10:16	SIG	M62/2069M1	OFF	M62 J25 - J30	
23/09/15 19:10:16	SIG	M62/2069M2	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2041B1	BLNK	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2041B2	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2041B3	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2041B4	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2050B2	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2050B3	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2050B4	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2057B1	BLNK	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2057B2	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2057B3	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2057B4	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2065B1	BLNK	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2065B2	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2065B3	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2065B4	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M62/2065M1	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M621/1002B1	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M621/1002B2	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M621/1010B1	OFF	M62 J25 - J30	
23/09/15 19:10:17	SIG	M621/1010B2	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2012B1	BLNK	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2012B2	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2012B3	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2012B4	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2018B1	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2018B2	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2018B3	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2018L1	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2025B1	BLNK	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2025B2	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2025B3	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2025B4	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2033B1	BLNK	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2033B2	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 19:10:18	SIG	M62/2033B4	OFF	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2012B1	REDX	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2012B2	NR	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2012B3	NR	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2012B4	NR	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 19:29:23	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 19:29:41	SIG	M62/2025B1	REDX	M62 J25 - J30	
23/09/15 19:29:41	SIG	M62/2025B2	50R	M62 J25 - J30	
23/09/15 19:29:41	SIG	M62/2025B3	50R	M62 J25 - J30	
23/09/15 19:29:41	SIG	M62/2025B4	50R	M62 J25 - J30	
23/09/15 19:33:32	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 19:33:32	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 19:33:32	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 19:33:32	SIG	M62/2018L1	40R	M62 J25 - J30	
23/09/15 19:33:37	SIG	M62/2018L1	30R	M62 J25 - J30	
23/09/15 19:33:42	SIG	M62/2018B1	40R	M62 J25 - J30	
23/09/15 19:33:42	SIG	M62/2018B2	40R	M62 J25 - J30	
23/09/15 19:33:42	SIG	M62/2018B3	40R	M62 J25 - J30	
23/09/15 19:33:42	SIG	M62/2018L1	20R	M62 J25 - J30	
23/09/15 19:33:48	SIG	M62/2018L1	STOP	M62 J25 - J30	
23/09/15 19:35:33	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 19:35:33	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 19:35:33	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 19:35:33	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 19:35:39	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2025B1	STOP	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2025B2	40R	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2025B3	40R	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2025B4	40R	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2033B1	REDX	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2033B2	50R	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2033B3	50R	M62 J25 - J30	
23/09/15 19:36:57	SIG	M62/2033B4	50R	M62 J25 - J30	
23/09/15 19:37:02	SIG	M62/2025B1	STOP	M62 J25 - J30	
23/09/15 19:39:17	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 19:39:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1960A1	OFF	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1960A2	OFF	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1960A3	OFF	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1960K1	OFF	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1960K2	OFF	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1968A1	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1968A2	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1968A3	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1968A4	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 19:39:34	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2041B1	REDX	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2041B2	60R	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2041B3	60R	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2041B4	60R	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2050B2	60R	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2050B3	60R	M62 J25 - J30	
23/09/15 19:41:50	SIG	M62/2050B4	60R	M62 J25 - J30	
23/09/15 19:42:34	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 19:42:35	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 19:57:31	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 19:57:31	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 19:57:48	SIG	M62/2018B1	50R	M62 J25 - J30	
23/09/15 19:57:48	SIG	M62/2018B2	50R	M62 J25 - J30	
23/09/15 19:57:48	SIG	M62/2018B3	50R	M62 J25 - J30	
23/09/15 19:57:48	SIG	M62/2018L1	50R	M62 J25 - J30	
23/09/15 20:00:07	SIG	M62/1999J1	50R	M62 J25 - J30	
23/09/15 20:00:07	SIG	M62/1999J2	50R	M62 J25 - J30	
23/09/15 20:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 20:06:12	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 20:06:51	SIG	M62/2057B1	REDX	M62 J25 - J30	
23/09/15 20:06:51	SIG	M62/2057B2	60R	M62 J25 - J30	
23/09/15 20:06:51	SIG	M62/2057B3	60R	M62 J25 - J30	
23/09/15 20:06:51	SIG	M62/2057B4	60R	M62 J25 - J30	
23/09/15 20:06:51	SIG	M62/2065M1	60R	M62 J25 - J30	
23/09/15 20:06:51	SIG	M621/1002B1	HSD	M62 J25 - J30	
23/09/15 20:06:51	SIG	M621/1002B2	60R	M62 J25 - J30	
23/09/15 20:06:51	SIG	M621/1010B1	60R	M62 J25 - J30	
23/09/15 20:06:51	SIG	M621/1010B2	60R	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2189A1	REDX	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2189A2	60R	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2189A3	60R	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2189A4	60R	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2197A1	LDR	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2197A2	50R	M62 J25 - J30	
23/09/15 20:08:09	SIG	M62/2197A3	50R	M62 J25 - J30	
23/09/15 20:24:22	SIG	M606/2003B1	NR	M62 J25 - J30	
23/09/15 20:24:22	SIG	M606/2003B2	NR	M62 J25 - J30	
23/09/15 20:27:22	SIG	M606/2003B1	OFF	M62 J25 - J30	
23/09/15 20:27:23	SIG	M606/2003B2	OFF	M62 J25 - J30	
23/09/15 20:35:34	SIG	M62/2170L1	50R	M62 J25 - J30	
23/09/15 20:35:34	SIG	M62/2170L2	50R	M62 J25 - J30	
23/09/15 20:35:34	SIG	M62/2177B1	50R	M62 J25 - J30	
23/09/15 20:35:34	SIG	M62/2177L2	50R	M62 J25 - J30	
23/09/15 20:35:39	SIG	M62/2170L1	40R	M62 J25 - J30	
23/09/15 20:35:39	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 20:35:39	SIG	M62/2177B1	40R	M62 J25 - J30	
23/09/15 20:35:39	SIG	M62/2177L2	40R	M62 J25 - J30	
23/09/15 20:35:44	SIG	M62/2170L1	30R	M62 J25 - J30	
23/09/15 20:35:44	SIG	M62/2177B1	30R	M62 J25 - J30	
23/09/15 20:35:44	SIG	M62/2177L2	30R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2170L1	20R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2170L2	40R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2177B1	30R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2177B2	50R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2177L1	LDR	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2177L2	30R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2183B1	50R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2183B2	50R	M62 J25 - J30	
23/09/15 20:35:49	SIG	M62/2183L2	50R	M62 J25 - J30	
23/09/15 20:35:54	SIG	M62/2170L1	STOP	M62 J25 - J30	
23/09/15 20:35:59	SIG	M62/2177L1	50R	M62 J25 - J30	
23/09/15 20:36:04	SIG	M62/2177L1	40R	M62 J25 - J30	
23/09/15 20:36:10	SIG	M62/2177L1	30R	M62 J25 - J30	
23/09/15 20:36:11	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 20:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 20:36:13	SIG	M62/2177B2	40R	M62 J25 - J30	
23/09/15 20:36:18	SIG	M62/2177B2	30R	M62 J25 - J30	
23/09/15 20:36:49	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 20:36:49	SIG	M62/2183L1	50R	M62 J25 - J30	
23/09/15 20:36:49	SIG	M62/2183L1	OFF	M62 J25 - J30	
23/09/15 20:38:10	SIG	M62/2183B2	???	M62 J25 - J30	
23/09/15 20:38:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1987A2	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 20:38:18	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1974A1	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1974A2	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1974A3	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1974A4	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1979K1	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1979K2	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1981A1	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1981A2	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1981A3	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1981A4	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1987A2	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 20:38:33	SIG	M62/1987J1	40R	M62 J25 - J30	
23/09/15 20:38:38	SIG	M62/1974A1	30R	M62 J25 - J30	
23/09/15 20:38:38	SIG	M62/1981A1	30R	M62 J25 - J30	
23/09/15 20:38:38	SIG	M62/1987J1	30R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1960A1	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1960A2	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1960A3	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1960K1	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1960K2	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1968A1	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1968A2	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1968A3	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1968A4	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1974A1	20R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1974A2	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1974A3	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1974A4	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1979K1	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1979K2	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1981A1	20R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1981A2	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1981A3	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1981A4	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1987A1	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1987A3	40R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1987J1	20R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1992A1	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1992A2	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1992A3	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1992J1	50R	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1999A1	NR	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1999A2	NR	M62 J25 - J30	
23/09/15 20:38:44	SIG	M62/1999A3	NR	M62 J25 - J30	
23/09/15 20:38:49	SIG	M62/1974A1	STOP	M62 J25 - J30	
23/09/15 20:38:49	SIG	M62/1981A1	STOP	M62 J25 - J30	
23/09/15 20:38:49	SIG	M62/1987J1	STOP	M62 J25 - J30	
23/09/15 20:38:50	SIG	M62/1960K1	40R	M62 J25 - J30	
23/09/15 20:38:50	SIG	M62/1960K2	40R	M62 J25 - J30	
23/09/15 20:38:50	SIG	M62/1968A1	30R	M62 J25 - J30	
23/09/15 20:38:56	SIG	M62/1955K1	50R	M62 J25 - J30	
23/09/15 20:38:56	SIG	M62/1955K2	50R	M62 J25 - J30	
23/09/15 20:38:56	SIG	M62/1960K1	30R	M62 J25 - J30	
23/09/15 20:38:56	SIG	M62/1960K2	30R	M62 J25 - J30	
23/09/15 20:38:56	SIG	M62/1968A1	20R	M62 J25 - J30	
23/09/15 20:39:01	SIG	M62/1968A1	STOP	M62 J25 - J30	
23/09/15 20:40:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 20:40:04	SIG	M62/1992A1	???	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2189B1	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2189B2	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2189B3	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2189B4	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2194B1	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2194B2	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2194B3	60R	M62 J25 - J30	
23/09/15 20:42:52	SIG	M62/2194B4	60R	M62 J25 - J30	
23/09/15 20:44:52	SIG	M62/1956A1	60R	M62 J25 - J30	
23/09/15 20:44:52	SIG	M62/1956A2	60R	M62 J25 - J30	
23/09/15 20:44:52	SIG	M62/1956A3	60R	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1992A1	OFF	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1992A2	OFF	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1992A3	OFF	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1992J1	NR	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1999A1	NR	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1999A2	NR	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1999A3	NR	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1999J1	OFF	M62 J25 - J30	
23/09/15 20:45:31	SIG	M62/1999J2	OFF	M62 J25 - J30	
23/09/15 20:48:32	SIG	M62/1999A1	OFF	M62 J25 - J30	
23/09/15 20:48:32	SIG	M62/1999A2	OFF	M62 J25 - J30	
23/09/15 20:48:32	SIG	M62/1999A3	OFF	M62 J25 - J30	
23/09/15 20:51:52	SIG	M62/2197B1	60R	M62 J25 - J30	
23/09/15 20:51:52	SIG	M62/2197B2	60R	M62 J25 - J30	
23/09/15 20:51:52	SIG	M62/2197B3	60R	M62 J25 - J30	
23/09/15 20:51:52	SIG	M62/2199M1	60R	M62 J25 - J30	
23/09/15 20:51:52	SIG	M62/2199M2	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1955K1	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1955K2	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1960A1	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1960A2	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1960A3	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1960K1	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1960K2	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1968A1	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1968A2	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1968A3	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1968A4	60R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 20:54:47	SIG	M62/1981A1	40R	M62 J25 - J30	
23/09/15 20:56:52	SIG	M62/2197B1	OFF	M62 J25 - J30	
23/09/15 20:56:52	SIG	M62/2197B2	OFF	M62 J25 - J30	
23/09/15 20:56:52	SIG	M62/2197B3	OFF	M62 J25 - J30	
23/09/15 20:56:52	SIG	M62/2199M1	OFF	M62 J25 - J30	
23/09/15 20:56:52	SIG	M62/2199M2	OFF	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2189B1	NR	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2189B2	NR	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2189B3	NR	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2189B4	NR	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2194B1	OFF	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2194B2	OFF	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2194B3	OFF	M62 J25 - J30	
23/09/15 20:58:53	SIG	M62/2194B4	OFF	M62 J25 - J30	
23/09/15 21:01:53	SIG	M62/2189B1	OFF	M62 J25 - J30	
23/09/15 21:01:53	SIG	M62/2189B2	OFF	M62 J25 - J30	
23/09/15 21:01:53	SIG	M62/2189B3	OFF	M62 J25 - J30	
23/09/15 21:01:53	SIG	M62/2189B4	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2170B1	NR	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2170B2	NR	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2170L1	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2170L2	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2177B1	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2177B2	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2177L1	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2177L2	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2183B1	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2183L1	OFF	M62 J25 - J30	
23/09/15 21:03:10	SIG	M62/2183L2	OFF	M62 J25 - J30	
23/09/15 21:06:10	SIG	M62/2170B1	OFF	M62 J25 - J30	
23/09/15 21:06:11	SIG	M62/2170B2	OFF	M62 J25 - J30	
23/09/15 21:06:12	SIG	M62/2033B3	???	M62 J25 - J30	
23/09/15 21:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2025B1	REDX	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2025B2	60R	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2025B3	60R	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2025B4	60R	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2033B2	60R	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2033B3	60R	M62 J25 - J30	
23/09/15 21:07:33	SIG	M62/2033B4	60R	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2012B1	BLNK	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2012B2	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2012B3	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2012B4	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2018B1	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2018B2	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2018B3	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2018L1	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2025B2	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2025B3	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2025B4	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2033B2	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2033B3	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2033B4	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2041B2	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2041B3	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2041B4	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2050B2	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2050B3	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2050B4	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2057B1	BLNK	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2057B2	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2057B3	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2057B4	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M62/2065M1	NR	M62 J25 - J30	
23/09/15 21:08:52	SIG	M621/1002B1	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M621/1002B2	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M621/1010B1	OFF	M62 J25 - J30	
23/09/15 21:08:52	SIG	M621/1010B2	OFF	M62 J25 - J30	
23/09/15 21:11:52	SIG	M62/2033B2	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2025B1	BLNK	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2025B2	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2025B3	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2025B4	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2033B1	BLNK	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2033B4	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2041B1	BLNK	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2041B2	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2041B3	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2041B4	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2050B2	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2050B3	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2050B4	OFF	M62 J25 - J30	
23/09/15 21:11:53	SIG	M62/2065M1	OFF	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1974A1	60R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1974A2	60R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1974A3	60R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1974A4	60R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1987A1	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1987A3	50R	M62 J25 - J30	
23/09/15 21:14:51	SIG	M62/1987J1	50R	M62 J25 - J30	
23/09/15 21:19:35	SIG	M62/2189A2	NR	M62 J25 - J30	
23/09/15 21:19:35	SIG	M62/2189A3	NR	M62 J25 - J30	
23/09/15 21:19:35	SIG	M62/2189A4	NR	M62 J25 - J30	
23/09/15 21:19:35	SIG	M62/2197A1	OFF	M62 J25 - J30	
23/09/15 21:19:35	SIG	M62/2197A2	OFF	M62 J25 - J30	
23/09/15 21:19:35	SIG	M62/2197A3	OFF	M62 J25 - J30	
23/09/15 21:22:35	SIG	M62/2189A2	OFF	M62 J25 - J30	
23/09/15 21:22:36	SIG	M62/2189A1	BLNK	M62 J25 - J30	
23/09/15 21:22:36	SIG	M62/2189A3	OFF	M62 J25 - J30	
23/09/15 21:22:36	SIG	M62/2189A4	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1955K1	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1955K2	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1956A1	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1956A2	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1956A3	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1987A1	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1987A3	OFF	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 21:33:02	SIG	M62/1992J1	NR	M62 J25 - J30	
23/09/15 21:36:02	SIG	M62/1992J1	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1960A1	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1960A2	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1960A3	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1960K1	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1960K2	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1968A1	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1968A2	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1968A3	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1968A4	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1979K1	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1979K2	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1981A1	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1981A2	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1981A3	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1981A4	OFF	M62 J25 - J30	
23/09/15 21:49:53	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 21:52:53	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 21:52:54	SIG	M62/1987J1	OFF	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968A1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968A2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968A3	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968A4	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968B1	NR	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968B2	NR	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968B3	NR	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1968L1	NR	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974A1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974A2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974A3	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974A4	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974B1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974B2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974B3	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974B4	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974M1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1974M2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1979K1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1979K2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981A1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981A2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981A3	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981A4	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981B1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981B2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981B3	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1981B4	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1987B1	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1987B2	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1987B3	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1987B4	50R	M62 J25 - J30	
23/09/15 23:16:52	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1968B1	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1968B2	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1968B3	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1968L1	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1974B1	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1974B2	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1974B3	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1974B4	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1974M1	OFF	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1974M2	OFF	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1981B1	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1981B2	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1981B3	NR	M62 J25 - J30	
23/09/15 23:39:04	SIG	M62/1981B4	NR	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1968A1	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1968A2	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1968A3	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1968A4	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1974A1	NR	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1974A2	NR	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1974A3	NR	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1974A4	NR	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1979K1	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1979K2	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1981A1	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1981A2	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1981A3	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1981A4	OFF	M62 J25 - J30	
23/09/15 23:39:18	SIG	M62/1987J1	NR	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1981B1	NR	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1981B2	NR	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1981B3	NR	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1981B4	NR	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1987B1	OFF	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1987B2	OFF	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1987B3	OFF	M62 J25 - J30	
23/09/15 23:39:25	SIG	M62/1987B4	OFF	M62 J25 - J30	
23/09/15 23:42:04	SIG	M62/1974B1	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1968B1	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1968B2	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1968B3	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1968L1	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1974B2	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1974B3	OFF	M62 J25 - J30	
23/09/15 23:42:05	SIG	M62/1974B4	OFF	M62 J25 - J30	
23/09/15 23:42:18	SIG	M62/1974A1	OFF	M62 J25 - J30	
23/09/15 23:42:19	SIG	M62/1974A2	OFF	M62 J25 - J30	
23/09/15 23:42:19	SIG	M62/1974A3	OFF	M62 J25 - J30	
23/09/15 23:42:19	SIG	M62/1974A4	OFF	M62 J25 - J30	
23/09/15 23:42:19	SIG	M62/1987J1	OFF	M62 J25 - J30	
23/09/15 23:42:25	SIG	M62/1981B1	OFF	M62 J25 - J30	
23/09/15 23:42:25	SIG	M62/1981B2	OFF	M62 J25 - J30	
23/09/15 23:42:25	SIG	M62/1981B3	OFF	M62 J25 - J30	
23/09/15 23:42:25	SIG	M62/1981B4	OFF	M62 J25 - J30	
24/09/15 01:41:47	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 01:41:47	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 01:56:47	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 01:56:47	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 01:56:47	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2012B1	REDX	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2012B2	NR	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2012B3	NR	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2012B4	NR	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2018B1	NR	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2018B2	NR	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2018B3	NR	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2025B1	STOP	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2033B1	REDX	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 01:56:53	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 01:56:58	SIG	M62/2025B1	STOP	M62 J25 - J30	
24/09/15 01:59:48	SIG	M62/2033B3	???	M62 J25 - J30	
24/09/15 01:59:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 02:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 02:06:12	SIG	M62/2033B3	???	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1987A2	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 02:28:01	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1987A2	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 02:28:22	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 02:28:27	SIG	M62/1987J1	30R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1987J1	20R	M62 J25 - J30	
24/09/15 02:28:32	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 02:28:38	SIG	M62/1987J1	STOP	M62 J25 - J30	
24/09/15 02:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 02:36:12	SIG	M62/2033B3	???	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1987A3	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 02:54:53	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 02:54:56	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1987A2	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 02:55:54	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1987A2	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 02:56:09	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 02:56:15	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 02:56:15	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 02:56:15	SIG	M62/1968A1	30R	M62 J25 - J30	
24/09/15 02:56:15	SIG	M62/1974A1	30R	M62 J25 - J30	
24/09/15 02:56:15	SIG	M62/1981A1	30R	M62 J25 - J30	
24/09/15 02:56:15	SIG	M62/1987J1	30R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1968A1	20R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1974A1	20R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1981A1	20R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1987J1	20R	M62 J25 - J30	
24/09/15 02:56:20	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 02:56:25	SIG	M62/1968A1	STOP	M62 J25 - J30	
24/09/15 02:56:25	SIG	M62/1974A1	STOP	M62 J25 - J30	
24/09/15 02:56:25	SIG	M62/1981A1	STOP	M62 J25 - J30	
24/09/15 02:56:25	SIG	M62/1987J1	STOP	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2012B1	BLNK	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2012B2	OFF	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2012B3	OFF	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2012B4	OFF	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2018B1	OFF	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2018B2	OFF	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2018B3	OFF	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2025B1	REDX	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2025B2	NR	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2025B3	NR	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2025B4	NR	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2033B2	NR	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2033B3	NR	M62 J25 - J30	
24/09/15 02:59:00	SIG	M62/2033B4	NR	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2025B1	BLNK	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2025B2	OFF	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2025B3	OFF	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2025B4	OFF	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2033B1	BLNK	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2033B2	OFF	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 03:02:01	SIG	M62/2033B4	OFF	M62 J25 - J30	
24/09/15 03:02:02	SIG	M62/2025B1	BLNK	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2189A1	REDX	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2189A2	60R	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2189A3	60R	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2189A4	60R	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2197A1	LDR	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2197A2	50R	M62 J25 - J30	
24/09/15 03:05:58	SIG	M62/2197A3	50R	M62 J25 - J30	
24/09/15 03:07:01	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 03:07:01	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 03:10:01	SIG	M606/2003B1	OFF	M62 J25 - J30	
24/09/15 03:10:01	SIG	M606/2003B2	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1955K1	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1955K2	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1960K1	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1960K2	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1987A3	OFF	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1987J1	NR	M62 J25 - J30	
24/09/15 03:11:24	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2170B1	NR	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2170B2	NR	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2170L1	LDR	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 03:13:27	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 03:14:24	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 03:14:25	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 03:14:35	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 03:14:35	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 03:14:35	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 03:14:35	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 03:16:54	SIG	M62/2183B2	???	M62 J25 - J30	
24/09/15 03:16:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2170B1	NR	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2170B2	NR	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2170L1	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2170L2	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2177B1	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2177B2	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2177L1	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2177L2	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2183B1	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2183L1	OFF	M62 J25 - J30	
24/09/15 03:55:23	SIG	M62/2183L2	OFF	M62 J25 - J30	
24/09/15 03:58:23	SIG	M62/2170B1	OFF	M62 J25 - J30	
24/09/15 03:58:23	SIG	M62/2170B2	OFF	M62 J25 - J30	
24/09/15 04:05:00	SIG	M62/2203B1	NR	M62 J25 - J30	
24/09/15 04:05:00	SIG	M62/2203B2	NR	M62 J25 - J30	
24/09/15 04:05:00	SIG	M62/2203B3	NR	M62 J25 - J30	
24/09/15 04:09:00	SIG	M62/2203B1	OFF	M62 J25 - J30	
24/09/15 04:09:00	SIG	M62/2203B2	OFF	M62 J25 - J30	
24/09/15 04:09:00	SIG	M62/2203B3	OFF	M62 J25 - J30	
24/09/15 04:18:41	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 04:18:41	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 04:23:45	SIG	M62/2189A2	NR	M62 J25 - J30	
24/09/15 04:23:45	SIG	M62/2189A3	NR	M62 J25 - J30	
24/09/15 04:23:45	SIG	M62/2189A4	NR	M62 J25 - J30	
24/09/15 04:23:45	SIG	M62/2197A1	OFF	M62 J25 - J30	
24/09/15 04:23:45	SIG	M62/2197A2	OFF	M62 J25 - J30	
24/09/15 04:23:45	SIG	M62/2197A3	OFF	M62 J25 - J30	
24/09/15 04:26:45	SIG	M62/2189A2	OFF	M62 J25 - J30	
24/09/15 04:26:45	SIG	M62/2189A3	OFF	M62 J25 - J30	
24/09/15 04:26:45	SIG	M62/2189A4	OFF	M62 J25 - J30	
24/09/15 04:26:46	SIG	M62/2189A1	BLNK	M62 J25 - J30	
24/09/15 05:00:57	SIG	M62/1999J1	OFF	M62 J25 - J30	
24/09/15 05:00:57	SIG	M62/1999J2	OFF	M62 J25 - J30	
24/09/15 05:45:18	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 05:45:18	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 05:45:18	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 05:45:18	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 05:45:24	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 05:49:18	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 05:52:19	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2025A2	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2025A3	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2025A4	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2033A1	REDX	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2033A2	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2033A3	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2033A4	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2041A1	REDX	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2041A2	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2041A3	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2041A4	60R	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2050A1	REDX	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2050A2	NR	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2050A3	NR	M62 J25 - J30	
24/09/15 06:39:03	SIG	M62/2050A4	NR	M62 J25 - J30	
24/09/15 06:41:03	SIG	M62/2004A1	60R	M62 J25 - J30	
24/09/15 06:41:03	SIG	M62/2004A2	60R	M62 J25 - J30	
24/09/15 06:41:03	SIG	M62/2004A3	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2050A2	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2050A3	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2050A4	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057A1	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057A1	NR	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057A2	NR	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057A2	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057A3	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057A3	NR	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057J1	60R	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2057J1	NR	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2065A1	REDX	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2065A2	NR	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2065A3	NR	M62 J25 - J30	
24/09/15 06:43:12	SIG	M62/2065A4	NR	M62 J25 - J30	
24/09/15 06:44:44	SIG	M62/2050A1	60R	M62 J25 - J30	
24/09/15 06:44:45	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 06:44:45	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 06:44:45	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 06:44:45	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 06:44:48	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 06:44:48	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 06:44:48	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2170B1	NR	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2170B2	NR	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 06:44:51	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 06:44:54	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 06:44:54	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 06:44:54	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 06:44:54	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 06:44:54	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 06:44:54	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 06:45:27	SIG	M62/2041A1	60R	M62 J25 - J30	
24/09/15 06:45:55	SIG	M62/2033A1	60R	M62 J25 - J30	
24/09/15 06:45:59	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 06:45:59	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2008K1	50R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2008K2	50R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2012A1	50R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2012A2	50R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2012A3	50R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 06:46:48	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 06:46:54	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2004A1	50R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2004A2	50R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2004A3	50R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2008K1	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2008K2	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2012A1	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2012A2	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2012A3	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 06:46:54	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 06:47:03	SIG	M62/1999A1	60R	M62 J25 - J30	
24/09/15 06:47:03	SIG	M62/1999A2	60R	M62 J25 - J30	
24/09/15 06:47:03	SIG	M62/1999A3	60R	M62 J25 - J30	
24/09/15 06:47:03	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 06:47:03	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 06:47:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 06:47:30	SIG	M62/2183B2	???	M62 J25 - J30	
24/09/15 06:47:52	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 06:47:52	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 06:47:52	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 06:47:52	SIG	M62/2004A1	40R	M62 J25 - J30	
24/09/15 06:47:52	SIG	M62/2004A2	40R	M62 J25 - J30	
24/09/15 06:47:52	SIG	M62/2004A3	40R	M62 J25 - J30	
24/09/15 06:48:34	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 06:48:35	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 06:48:40	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2018A1	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2025A1	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2025A2	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2025A3	60R	M62 J25 - J30	
24/09/15 06:48:49	SIG	M62/2025A4	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 06:50:03	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 06:50:30	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 06:50:30	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 06:50:30	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 06:50:36	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 06:51:39	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 06:51:39	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 06:51:51	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 06:51:51	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/1999A1	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/1999A2	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/1999A3	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2004A1	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2004A2	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2004A3	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 06:51:51	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 06:52:03	SIG	M62/2197B1	60R	M62 J25 - J30	
24/09/15 06:52:03	SIG	M62/2197B2	60R	M62 J25 - J30	
24/09/15 06:52:03	SIG	M62/2197B3	60R	M62 J25 - J30	
24/09/15 06:52:03	SIG	M62/2199M1	60R	M62 J25 - J30	
24/09/15 06:52:03	SIG	M62/2199M2	60R	M62 J25 - J30	
24/09/15 06:53:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 06:53:42	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 06:53:47	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 06:54:29	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 06:54:31	SIG	M62/2159B1	NR	M62 J25 - J30	
24/09/15 06:54:31	SIG	M62/2159B2	NR	M62 J25 - J30	
24/09/15 06:54:31	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 06:54:31	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 06:54:31	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 06:54:31	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 06:54:36	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 06:54:36	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 06:54:36	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 06:54:36	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 06:54:52	SIG	M606/2003B1	OFF	M62 J25 - J30	
24/09/15 06:54:52	SIG	M606/2003B2	OFF	M62 J25 - J30	
24/09/15 06:55:03	SIG	M62/2203B1	60R	M62 J25 - J30	
24/09/15 06:55:03	SIG	M62/2203B2	60R	M62 J25 - J30	
24/09/15 06:55:03	SIG	M62/2203B3	60R	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2057B1	REDX	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2057B2	NR	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2057B3	NR	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2057B4	NR	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2065M1	NR	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2069M1	60R	M62 J25 - J30	
24/09/15 06:55:26	SIG	M62/2069M2	60R	M62 J25 - J30	
24/09/15 06:55:26	SIG	M621/1002B1	HSD	M62 J25 - J30	
24/09/15 06:55:26	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 06:55:26	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 06:55:26	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2012B1	REDX	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2012B2	NR	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2012B3	NR	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2012B4	NR	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2025B1	REDX	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2033B1	REDX	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2041B1	REDX	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2050B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2050B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2050B4	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2065B1	REDX	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2065B2	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2065B3	60R	M62 J25 - J30	
24/09/15 06:55:27	SIG	M62/2065B4	60R	M62 J25 - J30	
24/09/15 06:56:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 06:56:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 06:56:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 06:56:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 06:56:57	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 06:57:40	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 06:57:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 06:57:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 06:57:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 06:57:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 06:58:04	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 06:58:29	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 06:58:34	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 07:00:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:00:56	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:01:02	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2183B1	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2183B2	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2183L2	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 07:02:30	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 07:05:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:05:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 07:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 07:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 07:10:19	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:10:25	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 07:12:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:12:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:12:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:12:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:14:02	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 07:14:02	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 07:14:02	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 07:14:08	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 07:16:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:16:27	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:16:32	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 07:19:02	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 07:19:08	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2008K1	50R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2008K2	50R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2012A1	50R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2012A2	50R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2012A3	50R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 07:19:08	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 07:19:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:19:32	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:19:37	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:20:03	SIG	M62/1992A1	60R	M62 J25 - J30	
24/09/15 07:20:03	SIG	M62/1992A2	60R	M62 J25 - J30	
24/09/15 07:20:03	SIG	M62/1992A3	60R	M62 J25 - J30	
24/09/15 07:20:03	SIG	M62/1992J1	60R	M62 J25 - J30	
24/09/15 07:20:08	SIG	M62/2057B1	60R	M62 J25 - J30	
24/09/15 07:20:08	SIG	M621/1002B1	60R	M62 J25 - J30	
24/09/15 07:20:08	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 07:20:08	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2004A1	50R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2004A2	50R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2004A3	50R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2008K1	40R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2008K2	40R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2012A1	40R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2012A2	40R	M62 J25 - J30	
24/09/15 07:20:32	SIG	M62/2012A3	40R	M62 J25 - J30	
24/09/15 07:21:02	SIG	M62/2033A1	50R	M62 J25 - J30	
24/09/15 07:21:02	SIG	M62/2033A2	50R	M62 J25 - J30	
24/09/15 07:21:02	SIG	M62/2033A3	50R	M62 J25 - J30	
24/09/15 07:21:02	SIG	M62/2033A4	50R	M62 J25 - J30	
24/09/15 07:21:07	SIG	M62/2033A1	40R	M62 J25 - J30	
24/09/15 07:21:07	SIG	M62/2033A2	40R	M62 J25 - J30	
24/09/15 07:21:07	SIG	M62/2033A3	40R	M62 J25 - J30	
24/09/15 07:21:07	SIG	M62/2033A4	40R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1979K1	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1979K2	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1981A1	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1981A2	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1981A3	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1981A4	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1987A1	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1987A3	60R	M62 J25 - J30	
24/09/15 07:21:13	SIG	M62/1987J1	60R	M62 J25 - J30	
24/09/15 07:21:23	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:21:23	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 07:21:23	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 07:21:23	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 07:21:23	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 07:21:24	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:21:29	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:21:52	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 07:21:52	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 07:21:52	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 07:21:52	SIG	M62/2004A1	40R	M62 J25 - J30	
24/09/15 07:21:52	SIG	M62/2004A2	40R	M62 J25 - J30	
24/09/15 07:21:52	SIG	M62/2004A3	40R	M62 J25 - J30	
24/09/15 07:22:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:22:13	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:22:13	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:22:14	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:22:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 07:22:37	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:22:42	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 07:22:43	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 07:23:03	SIG	M62/1974A1	60R	M62 J25 - J30	
24/09/15 07:23:03	SIG	M62/1974A2	60R	M62 J25 - J30	
24/09/15 07:23:03	SIG	M62/1974A3	60R	M62 J25 - J30	
24/09/15 07:23:03	SIG	M62/1974A4	60R	M62 J25 - J30	
24/09/15 07:23:04	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 07:23:04	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 07:23:04	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 07:23:04	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 07:23:05	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 07:23:10	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 07:24:03	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1999A1	40R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1999A2	40R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1999A3	40R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1999J1	40R	M62 J25 - J30	
24/09/15 07:24:18	SIG	M62/1999J2	40R	M62 J25 - J30	
24/09/15 07:24:28	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:24:29	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:24:34	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 07:24:55	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 07:25:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:25:42	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:25:48	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:26:36	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 07:26:36	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 07:26:36	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 07:26:36	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1987A2	50R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 07:27:06	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 07:27:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:27:22	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:27:27	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:27:32	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:27:33	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:27:38	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:27:46	SIG	M62/2033A1	50R	M62 J25 - J30	
24/09/15 07:27:46	SIG	M62/2033A2	50R	M62 J25 - J30	
24/09/15 07:27:46	SIG	M62/2033A3	50R	M62 J25 - J30	
24/09/15 07:27:46	SIG	M62/2033A4	50R	M62 J25 - J30	
24/09/15 07:28:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:28:48	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:28:53	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:29:31	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:29:32	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:29:37	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:30:02	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:30:02	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 07:30:02	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 07:30:02	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 07:30:16	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 07:30:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:30:25	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:30:31	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 07:31:03	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 07:31:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:31:53	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:31:58	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:32:14	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 07:32:14	SIG	M62/2183L1	OFF	M62 J25 - J30	
24/09/15 07:32:15	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 07:32:20	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 07:32:26	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 07:32:35	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:32:36	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:32:40	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:32:41	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:32:41	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 07:33:27	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 07:33:27	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 07:33:27	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 07:33:27	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 07:33:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:33:29	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:33:34	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1960A1	40R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1960A2	40R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1960A3	40R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 07:34:57	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 07:35:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:35:06	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:35:11	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:35:42	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:35:43	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 07:35:47	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 07:35:48	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:36:11	SIG	M62/1956A1	40R	M62 J25 - J30	
24/09/15 07:36:11	SIG	M62/1956A2	40R	M62 J25 - J30	
24/09/15 07:36:11	SIG	M62/1956A3	40R	M62 J25 - J30	
24/09/15 07:36:11	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 07:36:56	SIG	M62/1955K1	40R	M62 J25 - J30	
24/09/15 07:36:56	SIG	M62/1955K2	40R	M62 J25 - J30	
24/09/15 07:38:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:38:06	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:38:11	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:38:18	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 07:38:18	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 07:38:18	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 07:38:18	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:38:23	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 07:38:51	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:38:51	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:38:56	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 07:39:16	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 07:39:29	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 07:41:03	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 07:41:04	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 07:41:11	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 07:41:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:41:40	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:41:45	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:41:58	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:41:59	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:42:04	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2113B1	REDX	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2113B2	NR	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2113B3	NR	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2113B4	NR	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2120M1	60R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2120M2	60R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 07:42:33	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 07:42:39	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081B1	NR	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081B1	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081B2	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081B2	NR	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081B3	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081B3	NR	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081L1	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2081L1	NR	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2088B1	REDX	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2088B2	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2088B3	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2088B4	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2097B1	REDX	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2097B2	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2097B4	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2106B1	REDX	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2106B2	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2106B3	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2106B4	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2113B2	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2113B3	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2113B4	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2117B1	60R	M62 J25 - J30	
24/09/15 07:42:43	SIG	M62/2117B3	60R	M62 J25 - J30	
24/09/15 07:43:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:43:15	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:43:21	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:43:44	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 07:43:44	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 07:43:44	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 07:43:44	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 07:44:02	SIG	M62/2088B1	60R	M62 J25 - J30	
24/09/15 07:44:25	SIG	M62/2097B1	60R	M62 J25 - J30	
24/09/15 07:44:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:44:43	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:44:48	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 07:44:58	SIG	M62/2106B1	60R	M62 J25 - J30	
24/09/15 07:45:01	SIG	M62/2113B1	60R	M62 J25 - J30	
24/09/15 07:45:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:45:05	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:45:10	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:45:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 07:45:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 07:45:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 07:45:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 07:46:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:46:21	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:46:26	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2033A1	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2033A2	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2033A3	40R	M62 J25 - J30	
24/09/15 07:46:29	SIG	M62/2033A4	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2033A1	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2033A2	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2033A3	40R	M62 J25 - J30	
24/09/15 07:46:34	SIG	M62/2033A4	40R	M62 J25 - J30	
24/09/15 07:47:14	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 07:47:14	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 07:47:14	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 07:47:14	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:47:19	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 07:48:10	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 07:48:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:48:13	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:48:18	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:48:32	SIG	M62/1960A1	40R	M62 J25 - J30	
24/09/15 07:48:32	SIG	M62/1960A2	40R	M62 J25 - J30	
24/09/15 07:48:32	SIG	M62/1960A3	40R	M62 J25 - J30	
24/09/15 07:48:32	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 07:48:32	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 07:48:58	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 07:48:58	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 07:48:58	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 07:48:58	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 07:49:06	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:49:07	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:49:13	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:49:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:49:27	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:49:32	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:49:33	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 07:49:33	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 07:49:33	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 07:49:33	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 07:49:38	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 07:49:38	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 07:49:38	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 07:49:38	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 07:49:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:49:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:49:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:49:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:50:28	SIG	M62/2033A1	50R	M62 J25 - J30	
24/09/15 07:50:28	SIG	M62/2033A2	50R	M62 J25 - J30	
24/09/15 07:50:28	SIG	M62/2033A3	50R	M62 J25 - J30	
24/09/15 07:50:28	SIG	M62/2033A4	50R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 07:50:57	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 07:51:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:51:20	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:51:26	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:51:26	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 07:51:26	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 07:51:26	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 07:51:26	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 07:52:00	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 07:52:00	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 07:52:00	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 07:52:06	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 07:52:20	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:52:20	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:52:26	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:52:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 07:52:33	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:52:38	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 07:52:56	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 07:53:33	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 07:53:33	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 07:53:33	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 07:53:33	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 07:54:24	SIG	M62/1955K1	40R	M62 J25 - J30	
24/09/15 07:54:24	SIG	M62/1955K2	40R	M62 J25 - J30	
24/09/15 07:54:24	SIG	M62/1956A1	40R	M62 J25 - J30	
24/09/15 07:54:24	SIG	M62/1956A2	40R	M62 J25 - J30	
24/09/15 07:54:24	SIG	M62/1956A3	40R	M62 J25 - J30	
24/09/15 07:54:29	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:54:30	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:54:35	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:54:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:54:56	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2183B1	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2183B2	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2183L1	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2183L2	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 07:54:57	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 07:55:01	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 07:55:19	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:55:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 07:55:47	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 07:55:52	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 07:55:59	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 07:56:12	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 07:56:17	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 07:57:32	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 07:57:33	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 07:57:39	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 07:58:06	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 07:58:21	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 07:58:21	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:58:27	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 07:59:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:59:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:59:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:59:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 07:59:47	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 08:00:39	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:00:40	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:00:44	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 08:00:44	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 08:00:44	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 08:00:44	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 08:00:45	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:00:49	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:00:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:00:54	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 08:01:00	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 08:02:04	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 08:02:04	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 08:02:28	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:02:29	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:03:10	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 08:03:10	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 08:03:10	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 08:03:10	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 08:03:46	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:03:47	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:03:52	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:03:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:03:55	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:04:00	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 08:04:03	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 08:04:08	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2050A1	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2050A2	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2050A3	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2050A4	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2057A1	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2057A2	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2057A3	50R	M62 J25 - J30	
24/09/15 08:04:21	SIG	M62/2057J1	50R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2041A1	50R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2041A2	50R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2041A3	50R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2041A4	50R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2050A1	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2050A2	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2050A3	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2050A4	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2057A1	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2057A2	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2057A3	40R	M62 J25 - J30	
24/09/15 08:04:26	SIG	M62/2057J1	40R	M62 J25 - J30	
24/09/15 08:06:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:06:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 08:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 08:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 08:06:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 08:06:33	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 08:06:33	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 08:06:46	SIG	M62/2041A1	40R	M62 J25 - J30	
24/09/15 08:06:46	SIG	M62/2041A2	40R	M62 J25 - J30	
24/09/15 08:06:46	SIG	M62/2041A3	40R	M62 J25 - J30	
24/09/15 08:06:46	SIG	M62/2041A4	40R	M62 J25 - J30	
24/09/15 08:06:53	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:06:54	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:06:59	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:07:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:07:05	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:07:10	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:07:34	SIG	M621/1002A1	50R	M62 J25 - J30	
24/09/15 08:07:34	SIG	M621/1002A2	50R	M62 J25 - J30	
24/09/15 08:07:39	SIG	M621/1002A1	40R	M62 J25 - J30	
24/09/15 08:07:39	SIG	M621/1002A2	40R	M62 J25 - J30	
24/09/15 08:08:03	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 08:08:03	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 08:08:03	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 08:08:03	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 08:08:51	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 08:08:51	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 08:08:51	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 08:08:51	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2004A1	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2004A2	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2004A3	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2008K1	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2008K2	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2012A1	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2012A2	50R	M62 J25 - J30	
24/09/15 08:09:22	SIG	M62/2012A3	50R	M62 J25 - J30	
24/09/15 08:09:43	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 08:09:43	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 08:09:50	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 08:09:50	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 08:09:50	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 08:09:50	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 08:09:55	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 08:09:55	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 08:09:55	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 08:09:55	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 08:10:01	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:10:02	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:10:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:10:07	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 08:10:09	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 08:10:12	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:10:46	SIG	M62/2041A1	50R	M62 J25 - J30	
24/09/15 08:10:46	SIG	M62/2041A2	50R	M62 J25 - J30	
24/09/15 08:10:46	SIG	M62/2041A3	50R	M62 J25 - J30	
24/09/15 08:10:46	SIG	M62/2041A4	50R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2033A1	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2033A2	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2033A3	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2033A4	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2041A1	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2041A2	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2041A3	40R	M62 J25 - J30	
24/09/15 08:10:53	SIG	M62/2041A4	40R	M62 J25 - J30	
24/09/15 08:10:59	SIG	M62/1960A1	40R	M62 J25 - J30	
24/09/15 08:10:59	SIG	M62/1960A2	40R	M62 J25 - J30	
24/09/15 08:10:59	SIG	M62/1960A3	40R	M62 J25 - J30	
24/09/15 08:10:59	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 08:10:59	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 08:11:00	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 08:11:00	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 08:11:00	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/1999A1	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/1999A2	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/1999A3	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/1999J1	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/1999J2	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 08:11:06	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 08:11:35	SIG	M621/1002A1	OFF	M62 J25 - J30	
24/09/15 08:11:35	SIG	M621/1002A2	OFF	M62 J25 - J30	
24/09/15 08:12:10	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 08:12:10	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 08:12:10	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 08:12:10	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 08:12:13	SIG	M62/2057A1	60R	M62 J25 - J30	
24/09/15 08:12:13	SIG	M62/2057A2	60R	M62 J25 - J30	
24/09/15 08:12:13	SIG	M62/2057A3	60R	M62 J25 - J30	
24/09/15 08:12:13	SIG	M62/2057J1	60R	M62 J25 - J30	
24/09/15 08:13:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:13:14	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:13:20	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2041A1	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2041A2	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2041A3	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2041A4	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2050A1	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2050A2	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2050A3	60R	M62 J25 - J30	
24/09/15 08:13:27	SIG	M62/2050A4	60R	M62 J25 - J30	
24/09/15 08:13:44	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:13:45	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/1955K1	40R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/1955K2	40R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/1956A1	40R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/1956A2	40R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/1956A3	40R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 08:13:50	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 08:15:00	SIG	M62/2183B1	60R	M62 J25 - J30	
24/09/15 08:15:00	SIG	M62/2183B2	60R	M62 J25 - J30	
24/09/15 08:15:00	SIG	M62/2183L1	60R	M62 J25 - J30	
24/09/15 08:15:00	SIG	M62/2183L2	60R	M62 J25 - J30	
24/09/15 08:15:07	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 08:15:07	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 08:15:07	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 08:15:07	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 08:15:07	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/1999A1	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/1999A2	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/1999A3	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2004A1	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2004A2	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2004A3	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2008K1	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2008K2	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2012A1	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2012A2	40R	M62 J25 - J30	
24/09/15 08:15:20	SIG	M62/2012A3	40R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 08:16:06	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 08:16:07	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2088A1	REDX	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2088A2	60R	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2088A3	60R	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2088A4	60R	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2097A1	REDX	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2097A2	NR	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2097A3	NR	M62 J25 - J30	
24/09/15 08:16:31	SIG	M62/2097A4	NR	M62 J25 - J30	
24/09/15 08:16:39	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 08:16:39	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:16:39	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 08:16:39	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 08:16:40	SIG	M62/2033A1	50R	M62 J25 - J30	
24/09/15 08:16:40	SIG	M62/2033A2	50R	M62 J25 - J30	
24/09/15 08:16:40	SIG	M62/2033A3	50R	M62 J25 - J30	
24/09/15 08:16:40	SIG	M62/2033A4	50R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 08:16:45	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 08:16:51	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:16:51	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:16:57	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 08:16:58	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 08:17:07	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 08:17:09	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:17:09	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 08:17:09	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 08:17:09	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 08:17:11	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 08:17:12	SIG	M62/1974A1	30R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1974A1	20R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 08:17:17	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 08:17:23	SIG	M62/1974A1	STOP	M62 J25 - J30	
24/09/15 08:17:46	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 08:17:46	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 08:17:46	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 08:17:46	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 08:17:46	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 08:17:46	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 08:18:18	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:18:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:18:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:18:20	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:19:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:19:26	SIG	M62/1999A1	40R	M62 J25 - J30	
24/09/15 08:19:26	SIG	M62/1999A2	40R	M62 J25 - J30	
24/09/15 08:19:26	SIG	M62/1999A3	40R	M62 J25 - J30	
24/09/15 08:19:26	SIG	M62/1999J1	40R	M62 J25 - J30	
24/09/15 08:19:26	SIG	M62/1999J2	40R	M62 J25 - J30	
24/09/15 08:19:26	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:19:31	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2033A1	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2033A2	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2033A3	40R	M62 J25 - J30	
24/09/15 08:19:33	SIG	M62/2033A4	40R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 08:19:57	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 08:20:07	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1987A2	40R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 08:20:16	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 08:20:22	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2025A2	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2025A3	40R	M62 J25 - J30	
24/09/15 08:20:27	SIG	M62/2025A4	40R	M62 J25 - J30	
24/09/15 08:20:35	SIG	M62/1960A1	40R	M62 J25 - J30	
24/09/15 08:20:35	SIG	M62/1960A2	40R	M62 J25 - J30	
24/09/15 08:20:35	SIG	M62/1960A3	40R	M62 J25 - J30	
24/09/15 08:20:35	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 08:20:35	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 08:20:42	SIG	M62/2057B1	50R	M62 J25 - J30	
24/09/15 08:20:42	SIG	M62/2057B2	50R	M62 J25 - J30	
24/09/15 08:20:42	SIG	M62/2057B3	50R	M62 J25 - J30	
24/09/15 08:20:42	SIG	M62/2057B4	50R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2057B1	40R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2057B2	40R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2057B3	40R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2057B4	40R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2065B2	50R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2065B3	50R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2065B4	50R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M62/2065M1	50R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 08:20:47	SIG	M621/1002B2	50R	M62 J25 - J30	
24/09/15 08:21:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 08:21:10	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 08:21:10	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 08:21:10	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 08:21:10	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 08:21:14	SIG	M62/1981A1	30R	M62 J25 - J30	
24/09/15 08:21:20	SIG	M62/1981A1	20R	M62 J25 - J30	
24/09/15 08:21:25	SIG	M62/1981A1	STOP	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 08:22:31	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 08:22:32	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:22:37	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:23:01	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:23:01	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:23:07	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:23:31	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:23:31	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:23:37	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:23:43	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 08:23:43	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 08:23:43	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 08:23:43	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 08:24:27	SIG	M62/2033A1	50R	M62 J25 - J30	
24/09/15 08:24:27	SIG	M62/2033A2	50R	M62 J25 - J30	
24/09/15 08:24:27	SIG	M62/2033A3	50R	M62 J25 - J30	
24/09/15 08:24:27	SIG	M62/2033A4	50R	M62 J25 - J30	
24/09/15 08:24:30	SIG	M62/2088A2	NR	M62 J25 - J30	
24/09/15 08:24:30	SIG	M62/2088A3	NR	M62 J25 - J30	
24/09/15 08:24:30	SIG	M62/2088A4	NR	M62 J25 - J30	
24/09/15 08:24:30	SIG	M62/2097A2	NR	M62 J25 - J30	
24/09/15 08:24:30	SIG	M62/2097A3	NR	M62 J25 - J30	
24/09/15 08:24:30	SIG	M62/2097A4	NR	M62 J25 - J30	
24/09/15 08:24:36	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 08:24:36	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 08:24:36	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 08:24:36	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 08:24:36	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 08:24:41	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 08:24:41	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 08:24:41	SIG	M62/1968A1	30R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2057B1	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2065B2	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2065B3	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2065B4	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M621/1002B1	60R	M62 J25 - J30	
24/09/15 08:24:42	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 08:24:46	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 08:24:46	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 08:24:46	SIG	M62/1968A1	20R	M62 J25 - J30	
24/09/15 08:24:51	SIG	M62/1968A1	STOP	M62 J25 - J30	
24/09/15 08:25:31	SIG	M62/1960A1	40R	M62 J25 - J30	
24/09/15 08:25:31	SIG	M62/1960A2	40R	M62 J25 - J30	
24/09/15 08:25:31	SIG	M62/1960A3	40R	M62 J25 - J30	
24/09/15 08:25:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:25:37	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:25:43	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 08:25:44	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 08:25:49	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 08:26:05	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:26:06	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:26:11	SIG	M62/2025A1	40R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 08:26:32	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 08:26:38	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:26:39	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:26:44	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:26:45	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 08:26:45	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 08:26:56	SIG	M62/2025A1	50R	M62 J25 - J30	
24/09/15 08:26:56	SIG	M62/2025A2	50R	M62 J25 - J30	
24/09/15 08:26:56	SIG	M62/2025A3	50R	M62 J25 - J30	
24/09/15 08:26:56	SIG	M62/2025A4	50R	M62 J25 - J30	
24/09/15 08:27:14	SIG	M62/1955K1	40R	M62 J25 - J30	
24/09/15 08:27:14	SIG	M62/1955K2	40R	M62 J25 - J30	
24/09/15 08:27:14	SIG	M62/1956A1	40R	M62 J25 - J30	
24/09/15 08:27:14	SIG	M62/1956A2	40R	M62 J25 - J30	
24/09/15 08:27:14	SIG	M62/1956A3	40R	M62 J25 - J30	
24/09/15 08:27:30	SIG	M62/2088A2	OFF	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2088A1	BLNK	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2088A3	OFF	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2088A4	OFF	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2097A1	BLNK	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2097A1	BLNK	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2097A2	OFF	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2097A3	OFF	M62 J25 - J30	
24/09/15 08:27:31	SIG	M62/2097A4	OFF	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 08:27:33	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 08:27:37	SIG	M62/1999J1	40R	M62 J25 - J30	
24/09/15 08:27:37	SIG	M62/1999J2	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 08:28:13	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 08:28:31	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 08:28:33	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 08:28:33	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 08:28:33	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 08:28:33	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 08:28:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:28:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:28:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:28:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:29:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:29:20	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:29:43	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 08:29:43	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 08:29:43	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 08:29:43	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2018A1	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2025A1	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2025A2	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2025A3	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2025A4	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2033A1	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2033A2	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2033A3	60R	M62 J25 - J30	
24/09/15 08:30:05	SIG	M62/2033A4	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2183B1	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2183B2	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2183L1	60R	M62 J25 - J30	
24/09/15 08:30:18	SIG	M62/2183L2	60R	M62 J25 - J30	
24/09/15 08:30:44	SIG	M62/2008K1	50R	M62 J25 - J30	
24/09/15 08:30:44	SIG	M62/2008K2	50R	M62 J25 - J30	
24/09/15 08:30:44	SIG	M62/2012A1	50R	M62 J25 - J30	
24/09/15 08:30:44	SIG	M62/2012A2	50R	M62 J25 - J30	
24/09/15 08:30:44	SIG	M62/2012A3	50R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 08:30:50	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 08:31:15	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 08:31:37	SIG	M62/2004A1	50R	M62 J25 - J30	
24/09/15 08:31:37	SIG	M62/2004A2	50R	M62 J25 - J30	
24/09/15 08:31:37	SIG	M62/2004A3	50R	M62 J25 - J30	
24/09/15 08:32:20	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:32:20	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 08:32:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:32:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:32:54	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:32:54	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:32:59	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 08:33:30	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 08:33:45	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 08:33:45	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 08:33:45	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 08:33:45	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 08:33:45	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 08:33:45	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2004A1	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2004A2	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2004A3	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2008K1	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2008K2	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2012A1	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2012A2	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2012A3	40R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2018A1	50R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2018A2	50R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2018A3	50R	M62 J25 - J30	
24/09/15 08:34:37	SIG	M62/2018A4	50R	M62 J25 - J30	
24/09/15 08:34:39	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 08:34:39	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 08:34:39	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 08:34:39	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 08:34:39	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2004A1	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2004A1	50R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2004A2	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2004A2	50R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2004A3	50R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2004A3	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2008K1	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2008K2	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2012A1	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2012A2	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2012A3	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2018A1	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2018A2	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2018A3	40R	M62 J25 - J30	
24/09/15 08:34:43	SIG	M62/2018A4	40R	M62 J25 - J30	
24/09/15 08:34:59	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 08:34:59	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 08:34:59	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 08:34:59	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 08:35:39	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:35:39	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 08:35:39	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 08:35:39	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 08:36:11	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:36:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 08:36:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 08:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 08:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 08:36:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 08:36:31	SIG	M62/2004A1	40R	M62 J25 - J30	
24/09/15 08:36:31	SIG	M62/2004A2	40R	M62 J25 - J30	
24/09/15 08:36:31	SIG	M62/2004A3	40R	M62 J25 - J30	
24/09/15 08:37:00	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 08:37:00	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 08:37:00	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 08:38:05	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 08:38:05	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 08:38:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:38:07	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:38:08	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:38:08	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:38:38	SIG	M62/2018A1	60R	M62 J25 - J30	
24/09/15 08:38:38	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 08:38:38	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 08:38:38	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 08:38:40	SIG	M62/1999A1	40R	M62 J25 - J30	
24/09/15 08:38:40	SIG	M62/1999A2	40R	M62 J25 - J30	
24/09/15 08:38:40	SIG	M62/1999A3	40R	M62 J25 - J30	
24/09/15 08:38:40	SIG	M62/1999J1	40R	M62 J25 - J30	
24/09/15 08:38:40	SIG	M62/1999J2	40R	M62 J25 - J30	
24/09/15 08:39:04	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 08:39:04	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 08:39:04	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 08:39:04	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 08:39:04	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 08:39:04	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 08:40:05	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 08:40:32	SIG	M62/2008K1	50R	M62 J25 - J30	
24/09/15 08:40:32	SIG	M62/2008K2	50R	M62 J25 - J30	
24/09/15 08:40:32	SIG	M62/2012A1	50R	M62 J25 - J30	
24/09/15 08:40:32	SIG	M62/2012A2	50R	M62 J25 - J30	
24/09/15 08:40:32	SIG	M62/2012A3	50R	M62 J25 - J30	
24/09/15 08:41:04	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 08:41:04	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 08:41:04	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 08:41:10	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:41:10	SIG	M62/1992A2	40R	M62 J25 - J30	
24/09/15 08:41:10	SIG	M62/1992A3	40R	M62 J25 - J30	
24/09/15 08:41:10	SIG	M62/1992J1	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 08:41:41	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 08:41:43	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 08:42:40	SIG	M62/2004A1	50R	M62 J25 - J30	
24/09/15 08:42:40	SIG	M62/2004A2	50R	M62 J25 - J30	
24/09/15 08:42:40	SIG	M62/2004A3	50R	M62 J25 - J30	
24/09/15 08:43:26	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:43:27	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:43:32	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:43:49	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 08:43:49	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 08:43:49	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 08:43:49	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 08:43:49	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 08:43:49	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 08:46:05	SIG	M62/2159B1	NR	M62 J25 - J30	
24/09/15 08:46:05	SIG	M62/2159B2	NR	M62 J25 - J30	
24/09/15 08:46:05	SIG	M62/2170B1	NR	M62 J25 - J30	
24/09/15 08:46:05	SIG	M62/2170B2	NR	M62 J25 - J30	
24/09/15 08:46:05	SIG	M62/2170L1	OFF	M62 J25 - J30	
24/09/15 08:46:05	SIG	M62/2170L2	OFF	M62 J25 - J30	
24/09/15 08:46:16	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 08:46:16	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 08:46:16	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 08:46:16	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 08:46:16	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 08:46:22	SIG	M62/1999A1	40R	M62 J25 - J30	
24/09/15 08:46:22	SIG	M62/1999A2	40R	M62 J25 - J30	
24/09/15 08:46:22	SIG	M62/1999A3	40R	M62 J25 - J30	
24/09/15 08:46:22	SIG	M62/1999J1	40R	M62 J25 - J30	
24/09/15 08:46:22	SIG	M62/1999J2	40R	M62 J25 - J30	
24/09/15 08:46:26	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 08:46:26	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 08:46:26	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 08:46:26	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 08:46:27	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:46:28	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:46:33	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:46:51	SIG	M62/2097B3	60R	M62 J25 - J30	
24/09/15 08:46:51	SIG	M62/2097B3	60R	M62 J25 - J30	
24/09/15 08:46:51	SIG	M62/2097B3	OFF	M62 J25 - J30	
24/09/15 08:48:05	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 08:48:05	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 08:48:05	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 08:48:05	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 08:48:05	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 08:48:05	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 08:48:05	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 08:48:57	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 08:49:05	SIG	M62/2159B1	OFF	M62 J25 - J30	
24/09/15 08:49:06	SIG	M62/2159B2	OFF	M62 J25 - J30	
24/09/15 08:49:33	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:49:34	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:49:39	SIG	M62/1992A1	40R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1999A1	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1999A2	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1999A3	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 08:50:22	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 08:51:05	SIG	M606/2003B1	OFF	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2004A1	60R	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2004A2	60R	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2004A3	60R	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2170B1	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2170B2	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2177B1	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2177B2	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2177L1	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2177L2	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2183B1	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2183B2	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2183L1	NR	M62 J25 - J30	
24/09/15 08:51:05	SIG	M62/2183L2	NR	M62 J25 - J30	
24/09/15 08:51:06	SIG	M606/2003B2	OFF	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1960A1	40R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1960A2	40R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1960A3	40R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 08:51:25	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 08:52:07	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 08:52:07	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 08:52:07	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 08:52:42	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:52:42	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:52:43	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:52:44	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 08:54:06	SIG	M62/2177L1	OFF	M62 J25 - J30	
24/09/15 08:54:07	SIG	M62/2170B1	OFF	M62 J25 - J30	
24/09/15 08:54:07	SIG	M62/2170B2	OFF	M62 J25 - J30	
24/09/15 08:54:07	SIG	M62/2177B1	OFF	M62 J25 - J30	
24/09/15 08:54:07	SIG	M62/2177B2	OFF	M62 J25 - J30	
24/09/15 08:54:07	SIG	M62/2177L2	OFF	M62 J25 - J30	
24/09/15 08:54:54	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 08:54:54	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 08:54:54	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 08:54:54	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 08:54:54	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 08:54:54	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 08:54:57	SIG	M62/1955K1	40R	M62 J25 - J30	
24/09/15 08:54:57	SIG	M62/1955K2	40R	M62 J25 - J30	
24/09/15 08:54:57	SIG	M62/1956A1	40R	M62 J25 - J30	
24/09/15 08:54:57	SIG	M62/1956A2	40R	M62 J25 - J30	
24/09/15 08:54:57	SIG	M62/1956A3	40R	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2183B1	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2183B2	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2183L1	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2183L2	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 08:55:05	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2194B1	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2194B2	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2194B3	NR	M62 J25 - J30	
24/09/15 08:56:05	SIG	M62/2194B4	NR	M62 J25 - J30	
24/09/15 08:56:13	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 08:56:13	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 08:56:13	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 08:56:13	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2194B1	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2194B2	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2194B3	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2194B4	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2197B1	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2197B2	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2197B3	NR	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2199M1	OFF	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2199M2	OFF	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2203B1	OFF	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2203B2	OFF	M62 J25 - J30	
24/09/15 08:57:05	SIG	M62/2203B3	OFF	M62 J25 - J30	
24/09/15 08:58:05	SIG	M62/2183L1	OFF	M62 J25 - J30	
24/09/15 08:58:06	SIG	M62/2183B1	OFF	M62 J25 - J30	
24/09/15 08:58:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 08:58:06	SIG	M62/2183L2	OFF	M62 J25 - J30	
24/09/15 08:59:06	SIG	M62/2189B1	OFF	M62 J25 - J30	
24/09/15 08:59:06	SIG	M62/2189B2	OFF	M62 J25 - J30	
24/09/15 08:59:06	SIG	M62/2189B3	OFF	M62 J25 - J30	
24/09/15 08:59:06	SIG	M62/2189B4	OFF	M62 J25 - J30	
24/09/15 09:00:05	SIG	M62/2197B1	OFF	M62 J25 - J30	
24/09/15 09:00:06	SIG	M62/2194B1	OFF	M62 J25 - J30	
24/09/15 09:00:06	SIG	M62/2194B2	OFF	M62 J25 - J30	
24/09/15 09:00:06	SIG	M62/2194B3	OFF	M62 J25 - J30	
24/09/15 09:00:06	SIG	M62/2194B4	OFF	M62 J25 - J30	
24/09/15 09:00:06	SIG	M62/2197B2	OFF	M62 J25 - J30	
24/09/15 09:00:06	SIG	M62/2197B3	OFF	M62 J25 - J30	
24/09/15 09:00:52	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 09:00:52	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 09:00:52	SIG	M62/1956A1	50R	M62 J25 - J30	
24/09/15 09:00:52	SIG	M62/1956A2	50R	M62 J25 - J30	
24/09/15 09:00:52	SIG	M62/1956A3	50R	M62 J25 - J30	
24/09/15 09:01:35	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 09:01:35	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 09:01:35	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 09:01:35	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1974A1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1974A2	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1974A3	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1974A4	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1979K1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1979K2	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1981A1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1981A2	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1981A3	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1981A4	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1987A1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1987A3	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1987J1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1992A1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1992A2	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1992A3	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1992J1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1999A1	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1999A2	60R	M62 J25 - J30	
24/09/15 09:03:15	SIG	M62/1999A3	60R	M62 J25 - J30	
24/09/15 09:05:14	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 09:05:14	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 09:05:15	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 09:05:16	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 09:05:17	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 09:05:17	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 09:05:17	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 09:05:17	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 09:05:17	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 09:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 09:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 09:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 09:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 09:10:06	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 09:17:46	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 09:17:46	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 09:17:46	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 09:17:46	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 09:17:52	SIG	M62/2041B1	40R	M62 J25 - J30	
24/09/15 09:17:52	SIG	M62/2041B2	40R	M62 J25 - J30	
24/09/15 09:17:52	SIG	M62/2041B3	40R	M62 J25 - J30	
24/09/15 09:17:52	SIG	M62/2041B4	40R	M62 J25 - J30	
24/09/15 09:17:57	SIG	M62/2041B1	30R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2041B1	20R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2041B2	40R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2041B3	40R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2041B4	40R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2050B2	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2050B3	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2050B4	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2057B1	LDR	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2057B2	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2057B3	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2057B4	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2065B2	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2065B3	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2065B4	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M62/2065M1	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 09:18:02	SIG	M621/1002B2	50R	M62 J25 - J30	
24/09/15 09:18:08	SIG	M62/2041B1	STOP	M62 J25 - J30	
24/09/15 09:18:12	SIG	M62/2033B1	LDR	M62 J25 - J30	
24/09/15 09:18:12	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 09:18:12	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 09:18:12	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2050B2	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2050B3	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2050B4	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2057B1	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2065B2	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2065B3	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2065B4	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M621/1002B1	60R	M62 J25 - J30	
24/09/15 09:20:12	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 09:22:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:22:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:22:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:22:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:29:48	SIG	M62/2113B1	HSD	M62 J25 - J30	
24/09/15 09:30:41	SIG	M62/2106B1	HSD	M62 J25 - J30	
24/09/15 09:31:49	SIG	M62/2097B1	HSD	M62 J25 - J30	
24/09/15 09:31:50	SIG	M62/2113B1	REDX	M62 J25 - J30	
24/09/15 09:32:09	SIG	M62/2008K1	50R	M62 J25 - J30	
24/09/15 09:32:09	SIG	M62/2008K2	50R	M62 J25 - J30	
24/09/15 09:32:14	SIG	M62/2008K1	40R	M62 J25 - J30	
24/09/15 09:32:14	SIG	M62/2008K2	40R	M62 J25 - J30	
24/09/15 09:32:19	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 09:32:19	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 09:32:19	SIG	M62/2008K1	30R	M62 J25 - J30	
24/09/15 09:32:19	SIG	M62/2008K2	30R	M62 J25 - J30	
24/09/15 09:32:42	SIG	M606/2003B1	LDR	M62 J25 - J30	
24/09/15 09:32:42	SIG	M606/2003B2	50R	M62 J25 - J30	
24/09/15 09:32:42	SIG	M62/1992B1	50R	M62 J25 - J30	
24/09/15 09:32:42	SIG	M62/1992B2	50R	M62 J25 - J30	
24/09/15 09:32:42	SIG	M62/1992B3	50R	M62 J25 - J30	
24/09/15 09:32:42	SIG	M62/1992B4	50R	M62 J25 - J30	
24/09/15 09:32:42	SIG	M62/2005M1	TI	M62 J25 - J30	
24/09/15 09:32:42	SIG	M62/2005M2	TI	M62 J25 - J30	
24/09/15 09:32:48	SIG	M62/1992B1	40R	M62 J25 - J30	
24/09/15 09:32:48	SIG	M62/1992B2	40R	M62 J25 - J30	
24/09/15 09:32:48	SIG	M62/1992B3	40R	M62 J25 - J30	
24/09/15 09:32:48	SIG	M62/1992B4	40R	M62 J25 - J30	
24/09/15 09:32:53	SIG	M62/1992B1	30R	M62 J25 - J30	
24/09/15 09:32:57	SIG	M62/2088B1	HSD	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1987B1	NR	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1987B2	NR	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1987B3	NR	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1987B4	NR	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1992B1	20R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1992B2	40R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1992B3	40R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1992B4	40R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1999B1	REDX	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1999B2	50R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1999B3	50R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/1999B4	50R	M62 J25 - J30	
24/09/15 09:32:58	SIG	M62/2106B1	REDX	M62 J25 - J30	
24/09/15 09:33:04	SIG	M62/1992B1	STOP	M62 J25 - J30	
24/09/15 09:34:05	SIG	M62/2097B1	REDX	M62 J25 - J30	
24/09/15 09:35:13	SIG	M62/2088B1	REDX	M62 J25 - J30	
24/09/15 09:35:27	SIG	M606/2003B1	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M606/2003B2	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1987B1	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1987B2	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1987B3	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1987B4	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1992B1	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1992B2	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1992B3	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1992B4	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1999B2	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1999B3	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/1999B4	NR	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/2005M1	OFF	M62 J25 - J30	
24/09/15 09:35:27	SIG	M62/2005M2	OFF	M62 J25 - J30	
24/09/15 09:36:06	SIG	M62/2117B1	NR	M62 J25 - J30	
24/09/15 09:36:06	SIG	M62/2117B3	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2081B1	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2081B2	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2081B3	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2081L1	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2088B2	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2088B3	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2088B4	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2097B2	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2097B3	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2097B4	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2106B2	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2106B3	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2106B4	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2113B2	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2113B3	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2113B4	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2120M1	NR	M62 J25 - J30	
24/09/15 09:36:07	SIG	M62/2120M2	NR	M62 J25 - J30	
24/09/15 09:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 09:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 09:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2097B1	BLNK	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2097B2	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2097B3	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2097B4	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2106B1	BLNK	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2106B2	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2106B3	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2106B4	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2113B1	BLNK	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2113B2	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2113B3	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2113B4	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2117B3	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2120M1	OFF	M62 J25 - J30	
24/09/15 09:37:07	SIG	M62/2120M2	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2081B1	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2081B2	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2081B3	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2081L1	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2088B1	BLNK	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2088B2	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2088B3	OFF	M62 J25 - J30	
24/09/15 09:37:08	SIG	M62/2088B4	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1987B1	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1987B2	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1987B3	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1987B4	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1992B1	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1992B2	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1992B3	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1992B4	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1999B2	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1999B3	OFF	M62 J25 - J30	
24/09/15 09:38:28	SIG	M62/1999B4	OFF	M62 J25 - J30	
24/09/15 09:38:29	SIG	M62/1999B1	BLNK	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1955K1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1955K2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1956A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1956A2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1956A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1987A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1992A2	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1992A3	OFF	M62 J25 - J30	
24/09/15 09:54:25	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/1999A1	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/1999A2	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/1999A3	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/1999J1	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/1999J2	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/2004A1	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/2004A2	OFF	M62 J25 - J30	
24/09/15 09:56:06	SIG	M62/2004A3	OFF	M62 J25 - J30	
24/09/15 10:00:06	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 10:00:08	SIG	M62/2057B1	HSD	M62 J25 - J30	
24/09/15 10:02:06	SIG	M62/2041B1	HSD	M62 J25 - J30	
24/09/15 10:02:07	SIG	M62/2057B1	REDX	M62 J25 - J30	
24/09/15 10:02:07	SIG	M621/1002B1	HSD	M62 J25 - J30	
24/09/15 10:02:07	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 10:02:07	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 10:03:06	SIG	M62/2033B1	HSD	M62 J25 - J30	
24/09/15 10:04:06	SIG	M62/2025B1	HSD	M62 J25 - J30	
24/09/15 10:04:07	SIG	M62/2041B1	REDX	M62 J25 - J30	
24/09/15 10:04:59	SIG	M62/2033B1	REDX	M62 J25 - J30	
24/09/15 10:05:43	SIG	M62/2025B1	REDX	M62 J25 - J30	
24/09/15 10:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 10:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 10:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 10:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2050B2	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2050B3	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2050B4	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2057B2	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2057B3	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2057B4	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2065B2	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2065B3	NR	M62 J25 - J30	
24/09/15 10:06:13	SIG	M62/2065B4	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2018B1	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2018B2	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2018B3	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2018L1	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2025B2	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2025B3	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2025B4	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2033B2	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2033B3	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2033B4	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2041B2	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2041B3	NR	M62 J25 - J30	
24/09/15 10:06:14	SIG	M62/2041B4	NR	M62 J25 - J30	
24/09/15 10:07:13	SIG	M62/2069M1	OFF	M62 J25 - J30	
24/09/15 10:07:13	SIG	M62/2069M2	OFF	M62 J25 - J30	
24/09/15 10:07:13	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 10:07:13	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2025B1	BLNK	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2025B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2025B3	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2025B4	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2033B1	BLNK	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2033B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2041B1	BLNK	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2041B3	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2041B4	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2050B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2050B3	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2050B4	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2057B1	BLNK	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2057B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2057B3	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2057B4	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2065B1	BLNK	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2065B2	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2065B3	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2065B4	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M62/2065M1	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M621/1002B1	OFF	M62 J25 - J30	
24/09/15 10:07:14	SIG	M621/1002B2	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2012B1	BLNK	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2012B2	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2012B3	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2012B4	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2018B1	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2018B2	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2018B3	OFF	M62 J25 - J30	
24/09/15 10:07:15	SIG	M62/2018L1	OFF	M62 J25 - J30	
24/09/15 10:23:25	SIG	M606/2003B1	OFF	M62 J25 - J30	
24/09/15 10:23:25	SIG	M606/2003B2	OFF	M62 J25 - J30	
24/09/15 10:23:25	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 10:23:25	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 10:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 10:36:12	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 10:46:13	SIG	M62/1960B1	50R	M62 J25 - J30	
24/09/15 10:46:13	SIG	M62/1960B2	50R	M62 J25 - J30	
24/09/15 10:46:13	SIG	M62/1960B3	50R	M62 J25 - J30	
24/09/15 10:53:04	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 10:53:04	SIG	M62/1987A2	50R	M62 J25 - J30	
24/09/15 10:53:04	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 10:53:04	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1992A1	NR	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1992A2	NR	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1992A3	NR	M62 J25 - J30	
24/09/15 10:53:24	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 10:55:04	SIG	M62/1960B1	OFF	M62 J25 - J30	
24/09/15 10:55:04	SIG	M62/1960B2	OFF	M62 J25 - J30	
24/09/15 10:55:04	SIG	M62/1960B3	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1987A1	NR	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1987A3	NR	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1987J1	NR	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1992A1	NR	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1992A2	NR	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1992A3	NR	M62 J25 - J30	
24/09/15 10:57:06	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 11:00:06	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 11:00:21	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 11:00:21	SIG	M62/1987A3	OFF	M62 J25 - J30	
24/09/15 11:00:21	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 11:00:21	SIG	M62/1992A2	OFF	M62 J25 - J30	
24/09/15 11:00:21	SIG	M62/1992A3	OFF	M62 J25 - J30	
24/09/15 11:00:21	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 11:02:34	SIG	M62/2025A1	HSD	M62 J25 - J30	
24/09/15 11:03:34	SIG	M62/2033A1	HSD	M62 J25 - J30	
24/09/15 11:04:34	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 11:04:34	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 11:04:34	SIG	M62/2041A1	HSD	M62 J25 - J30	
24/09/15 11:05:41	SIG	M62/2033A1	REDX	M62 J25 - J30	
24/09/15 11:05:41	SIG	M62/2050A1	HSD	M62 J25 - J30	
24/09/15 11:06:33	SIG	M62/2041A1	REDX	M62 J25 - J30	
24/09/15 11:07:33	SIG	M62/2050A1	REDX	M62 J25 - J30	
24/09/15 11:08:33	SIG	M62/2025A2	NR	M62 J25 - J30	
24/09/15 11:08:33	SIG	M62/2025A3	NR	M62 J25 - J30	
24/09/15 11:08:33	SIG	M62/2025A4	NR	M62 J25 - J30	
24/09/15 11:08:33	SIG	M62/2033A2	NR	M62 J25 - J30	
24/09/15 11:08:33	SIG	M62/2033A3	NR	M62 J25 - J30	
24/09/15 11:08:33	SIG	M62/2033A4	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2041A2	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2041A3	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2041A4	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2050A2	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2050A3	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2050A4	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2057A1	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2057A2	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2057A3	NR	M62 J25 - J30	
24/09/15 11:08:34	SIG	M62/2057J1	NR	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2008K1	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2008K2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2012A1	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2012A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2012A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2018A1	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2018A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2018A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2018A4	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2025A1	BLNK	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2025A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2025A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2025A4	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2033A1	BLNK	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2033A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2033A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2033A4	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2041A1	BLNK	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2041A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2041A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2041A4	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2050A1	BLNK	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2050A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2050A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2050A4	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2057A1	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2057A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2057A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2057J1	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2065A1	BLNK	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2065A2	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2065A3	OFF	M62 J25 - J30	
24/09/15 11:09:34	SIG	M62/2065A4	OFF	M62 J25 - J30	
24/09/15 11:16:20	SIG	M62/2074A1	OFF	M62 J25 - J30	
24/09/15 11:16:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
24/09/15 11:16:24	SIG	M62/2074B1	BLNK	M62 J25 - J30	
24/09/15 11:16:24	SIG	M62/2074B1	OFF	M62 J25 - J30	
24/09/15 11:16:25	SIG	M62/2074B1	BLNK	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2157A2	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2157J1	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2157J2	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2157K1	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2163A1	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2163A2	50R	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2170A1	NR	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2170A2	NR	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2177A1	REDX	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2177A2	NR	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2177A3	NR	M62 J25 - J30	
24/09/15 11:32:43	SIG	M62/2177A4	NR	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2155A1	50R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2155A2	50R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2155J1	50R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2155K1	50R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2157A2	40R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2157J1	40R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2157J2	40R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2157K1	40R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2163A1	40R	M62 J25 - J30	
24/09/15 11:32:49	SIG	M62/2163A2	40R	M62 J25 - J30	
24/09/15 11:35:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 11:35:22	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 11:35:27	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2155A1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2155A2	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2155J1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2155K1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2157A2	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2157J1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2157J2	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2157K1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2163A1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2163A2	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2170A1	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2170A2	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2177A1	BLNK	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2177A2	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2177A3	OFF	M62 J25 - J30	
24/09/15 11:35:51	SIG	M62/2177A4	OFF	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2012B1	REDX	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2012B2	NR	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2012B3	NR	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2012B4	NR	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 11:44:08	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2012B1	BLNK	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2012B2	OFF	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2012B3	OFF	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2012B4	OFF	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2018B1	OFF	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2018B2	OFF	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2018B3	OFF	M62 J25 - J30	
24/09/15 11:58:50	SIG	M62/2018L1	OFF	M62 J25 - J30	
24/09/15 12:08:27	SIG	M606/2003B1	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M606/2003B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1974B1	NR	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1974B2	NR	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1974B3	NR	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1974B4	NR	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1981B1	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1981B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1981B3	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1981B4	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1987B1	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1987B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1987B3	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1987B4	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1992B1	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1992B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1992B3	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1992B4	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1999B1	REDX	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1999B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1999B3	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/1999B4	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2004B1	REDX	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2004B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2004B3	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2004B4	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2005M1	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2005M2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2012B1	REDX	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2012B2	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2012B3	50R	M62 J25 - J30	
24/09/15 12:08:27	SIG	M62/2012B4	50R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/1999A1	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/1999A2	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/1999A3	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/1999J1	50R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/1999J2	50R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2004A1	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2004A2	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2004A3	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2025A2	NR	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2025A3	NR	M62 J25 - J30	
24/09/15 12:11:09	SIG	M62/2025A4	NR	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 12:15:16	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 12:17:48	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:17:49	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M606/2003B1	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M606/2003B2	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1974B1	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1974B2	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1974B3	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1974B4	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1981B1	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1981B2	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1981B3	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1981B4	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1987B1	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1987B2	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1987B3	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1987B4	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1992B1	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1992B2	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1992B3	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1992B4	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1999B2	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1999B3	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/1999B4	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2004B2	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2004B3	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2004B4	NR	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2005M1	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2005M2	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2012B1	BLNK	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2012B2	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2012B3	OFF	M62 J25 - J30	
24/09/15 12:20:13	SIG	M62/2012B4	OFF	M62 J25 - J30	
24/09/15 12:23:13	SIG	M62/1999B2	OFF	M62 J25 - J30	
24/09/15 12:23:13	SIG	M62/2004B2	OFF	M62 J25 - J30	
24/09/15 12:23:13	SIG	M62/2004B3	OFF	M62 J25 - J30	
24/09/15 12:23:13	SIG	M62/2004B4	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1974B1	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1974B2	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1974B3	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1974B4	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1981B1	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1981B2	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1981B3	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1981B4	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1987B1	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1987B2	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1987B3	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1987B4	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1992B1	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1992B2	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1992B3	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1992B4	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1999B1	BLNK	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1999B3	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/1999B4	OFF	M62 J25 - J30	
24/09/15 12:23:14	SIG	M62/2004B1	BLNK	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1981A1	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1981A2	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1981A3	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1981A4	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1987A1	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1987A3	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1987J1	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1992A1	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1992A2	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1992A3	NR	M62 J25 - J30	
24/09/15 12:25:02	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 12:25:09	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1974A1	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1974A2	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1974A3	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1974A4	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1979K1	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1979K2	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1981A1	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1981A2	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1981A3	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1981A4	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1987A1	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1987A3	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1987J1	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1992A1	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1992A2	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1992A3	60R	M62 J25 - J30	
24/09/15 12:26:19	SIG	M62/1992J1	60R	M62 J25 - J30	
24/09/15 12:29:14	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:29:15	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:29:15	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:29:16	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2004A1	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2004A2	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2004A3	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2008K1	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2008K2	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2012A1	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2012A2	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2012A3	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2018A1	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2018A2	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2018A3	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2018A4	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2025A1	BLNK	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2025A2	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2025A3	OFF	M62 J25 - J30	
24/09/15 12:37:10	SIG	M62/2025A4	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1981A1	NR	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1981A2	NR	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1981A3	NR	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1981A4	NR	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1987A3	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1992A2	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1992A3	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1999A1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1999A2	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1999A3	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1999J1	OFF	M62 J25 - J30	
24/09/15 12:37:19	SIG	M62/1999J2	OFF	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1955K1	OFF	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1955K2	OFF	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1956A1	OFF	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1956A2	OFF	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1956A3	OFF	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1960A1	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1960A2	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1960A3	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1960K1	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1960K2	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1981A1	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1981A2	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1981A3	NR	M62 J25 - J30	
24/09/15 12:46:10	SIG	M62/1981A4	NR	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 12:49:10	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1974A1	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1974A2	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1974A3	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1974A4	60R	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1981A1	NR	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1981A2	NR	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1981A3	NR	M62 J25 - J30	
24/09/15 12:50:09	SIG	M62/1981A4	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1955K1	OFF	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1955K2	OFF	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1956A1	OFF	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1956A2	OFF	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1956A3	OFF	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1960A1	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1960A2	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1960A3	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1960K1	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1960K2	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1981A1	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1981A2	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1981A3	NR	M62 J25 - J30	
24/09/15 12:54:09	SIG	M62/1981A4	NR	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 12:57:10	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2025A2	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2025A3	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2025A4	60R	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2033A1	REDX	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2033A2	NR	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2033A3	NR	M62 J25 - J30	
24/09/15 13:31:04	SIG	M62/2033A4	NR	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2008K1	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2008K2	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2012A1	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2012A2	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2012A3	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2018A1	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2018A2	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2018A3	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2018A4	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2025A1	BLNK	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2025A2	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2025A3	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2025A4	OFF	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2033A2	NR	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2033A3	NR	M62 J25 - J30	
24/09/15 13:32:06	SIG	M62/2033A4	NR	M62 J25 - J30	
24/09/15 13:35:06	SIG	M62/2033A2	OFF	M62 J25 - J30	
24/09/15 13:35:06	SIG	M62/2033A3	OFF	M62 J25 - J30	
24/09/15 13:35:06	SIG	M62/2033A4	OFF	M62 J25 - J30	
24/09/15 13:35:07	SIG	M62/2033A1	BLNK	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1981B1	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1981B2	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1981B3	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1981B4	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1987B1	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1987B2	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1987B3	50R	M62 J25 - J30	
24/09/15 14:23:37	SIG	M62/1987B4	50R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1981B1	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1981B2	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1981B3	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1981B4	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1987B1	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1987B2	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1987B3	40R	M62 J25 - J30	
24/09/15 14:23:43	SIG	M62/1987B4	40R	M62 J25 - J30	
24/09/15 14:23:48	SIG	M62/1981B1	30R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1974B1	NR	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1974B2	NR	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1974B3	NR	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1974B4	NR	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1981B1	20R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1981B2	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1981B3	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1981B4	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1987B1	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1987B2	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1987B3	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1987B4	40R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1992B1	50R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1992B2	50R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1992B3	50R	M62 J25 - J30	
24/09/15 14:23:54	SIG	M62/1992B4	50R	M62 J25 - J30	
24/09/15 14:23:59	SIG	M62/1981B1	STOP	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1974B1	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1974B2	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1974B3	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1974B4	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1981B1	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1981B2	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1981B3	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1981B4	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1987B1	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1987B2	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1987B3	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1987B4	NR	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1992B1	OFF	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1992B2	OFF	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1992B3	OFF	M62 J25 - J30	
24/09/15 14:25:05	SIG	M62/1992B4	OFF	M62 J25 - J30	
24/09/15 14:28:05	SIG	M62/1987B1	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1974B1	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1974B2	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1974B3	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1974B4	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1981B1	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1981B2	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1981B3	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1981B4	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1987B2	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1987B3	OFF	M62 J25 - J30	
24/09/15 14:28:06	SIG	M62/1987B4	OFF	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2197B1	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2197B2	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2197B3	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2199M1	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2199M2	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2203B1	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2203B2	50R	M62 J25 - J30	
24/09/15 14:34:11	SIG	M62/2203B3	50R	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2189A1	REDX	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2189A2	50R	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2189A3	50R	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2189A4	50R	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2197A1	50R	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2197A2	50R	M62 J25 - J30	
24/09/15 14:34:58	SIG	M62/2197A3	50R	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189A2	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189A3	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189A4	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2194B1	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2194B2	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2194B3	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2194B4	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2197A1	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2197A2	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2197A3	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2197B1	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2197B2	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2197B3	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2199M1	OFF	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2199M2	OFF	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2203B1	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2203B2	NR	M62 J25 - J30	
24/09/15 14:41:01	SIG	M62/2203B3	NR	M62 J25 - J30	
24/09/15 14:44:01	SIG	M62/2189A2	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189A1	BLNK	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189A3	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189A4	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189B1	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189B2	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189B3	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2189B4	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2194B1	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2194B2	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2194B3	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2194B4	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2197A1	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2197A2	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2197A3	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2197B1	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2197B2	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2197B3	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2203B1	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2203B2	OFF	M62 J25 - J30	
24/09/15 14:44:02	SIG	M62/2203B3	OFF	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2025A2	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2025A3	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2025A4	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2033A1	REDX	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2033A2	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2033A3	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2033A4	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2041A1	REDX	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2041A2	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2041A3	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2041A4	60R	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2050A2	NR	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2050A3	NR	M62 J25 - J30	
24/09/15 14:44:21	SIG	M62/2050A4	NR	M62 J25 - J30	
24/09/15 14:45:12	SIG	M62/2004A1	60R	M62 J25 - J30	
24/09/15 14:45:12	SIG	M62/2004A2	60R	M62 J25 - J30	
24/09/15 14:45:12	SIG	M62/2004A3	60R	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2050A2	60R	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2050A3	60R	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2050A4	60R	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2057A1	NR	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2057A2	NR	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2057A3	NR	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2057J1	NR	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2065A1	REDX	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2065A2	NR	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2065A3	NR	M62 J25 - J30	
24/09/15 14:47:21	SIG	M62/2065A4	NR	M62 J25 - J30	
24/09/15 14:48:09	SIG	M62/2050A1	REDX	M62 J25 - J30	
24/09/15 14:48:09	SIG	M62/2050A1	REDX	M62 J25 - J30	
24/09/15 14:48:09	SIG	M62/2050A1	OFF	M62 J25 - J30	
24/09/15 14:48:34	SIG	M62/2065M1	NR	M62 J25 - J30	
24/09/15 14:48:34	SIG	M62/2069M1	60R	M62 J25 - J30	
24/09/15 14:48:34	SIG	M62/2069M2	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2033B2	NR	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2033B3	NR	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2033B4	NR	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2041B1	REDX	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2050B2	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2050B3	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2050B4	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2065B1	REDX	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2065B2	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2065B3	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2065B4	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
24/09/15 14:48:35	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 14:48:35	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2012B1	REDX	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2012B2	NR	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2012B3	NR	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2012B4	NR	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2025B1	REDX	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 14:48:36	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 14:49:51	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 14:50:18	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 14:50:40	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 14:51:03	SIG	M62/2057B1	60R	M62 J25 - J30	
24/09/15 14:51:03	SIG	M621/1002B1	60R	M62 J25 - J30	
24/09/15 14:51:03	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 14:51:03	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 14:51:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 14:51:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 14:51:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 14:51:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 14:53:27	SIG	M62/2057A1	60R	M62 J25 - J30	
24/09/15 14:53:27	SIG	M62/2057A1	60R	M62 J25 - J30	
24/09/15 14:53:27	SIG	M62/2057A2	60R	M62 J25 - J30	
24/09/15 14:53:27	SIG	M62/2057A3	60R	M62 J25 - J30	
24/09/15 14:53:27	SIG	M62/2057J1	60R	M62 J25 - J30	
24/09/15 14:54:47	SIG	M62/2050A1	60R	M62 J25 - J30	
24/09/15 14:55:09	SIG	M62/2041A1	60R	M62 J25 - J30	
24/09/15 14:55:11	SIG	M62/2004A1	OFF	M62 J25 - J30	
24/09/15 14:55:11	SIG	M62/2004A2	OFF	M62 J25 - J30	
24/09/15 14:55:11	SIG	M62/2004A3	OFF	M62 J25 - J30	
24/09/15 14:56:34	SIG	M62/2033A1	60R	M62 J25 - J30	
24/09/15 14:56:39	SIG	M62/2018A1	60R	M62 J25 - J30	
24/09/15 14:56:39	SIG	M62/2025A1	60R	M62 J25 - J30	
24/09/15 14:59:21	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 14:59:21	SIG	M62/2025A1	???	M62 J25 - J30	
24/09/15 15:01:28	SIG	M62/2050A1	OFF	M62 J25 - J30	
24/09/15 15:01:29	SIG	M62/2050A1	60R	M62 J25 - J30	
24/09/15 15:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 15:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 15:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 15:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 15:06:23	SIG	M62/2050A1	60R	M62 J25 - J30	
24/09/15 15:06:23	SIG	M62/2050A1	OFF	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 15:32:10	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2177B1	NR	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2177B2	NR	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2177L1	NR	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2177L2	NR	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 15:32:16	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 15:33:24	SIG	M62/2183L1	30R	M62 J25 - J30	
24/09/15 15:33:24	SIG	M62/2183L2	30R	M62 J25 - J30	
24/09/15 15:33:24	SIG	M62/2189B1	30R	M62 J25 - J30	
24/09/15 15:33:24	SIG	M62/2189B2	30R	M62 J25 - J30	
24/09/15 15:33:24	SIG	M62/2199M1	50R	M62 J25 - J30	
24/09/15 15:33:24	SIG	M62/2199M2	50R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2183L1	20R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2183L2	20R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2189B1	20R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2189B2	20R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2194B1	LDR	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2194B2	LDR	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2197B1	LDR	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2197B2	50R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2197B3	50R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2199M1	40R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2199M2	40R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2203B1	60R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2203B2	60R	M62 J25 - J30	
24/09/15 15:33:29	SIG	M62/2203B3	60R	M62 J25 - J30	
24/09/15 15:33:35	SIG	M62/2183L1	STOP	M62 J25 - J30	
24/09/15 15:33:35	SIG	M62/2183L2	STOP	M62 J25 - J30	
24/09/15 15:33:35	SIG	M62/2189B1	STOP	M62 J25 - J30	
24/09/15 15:33:35	SIG	M62/2189B2	STOP	M62 J25 - J30	
24/09/15 15:35:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:35:02	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:35:07	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 15:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 15:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 15:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 15:38:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:38:08	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:38:13	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2194B3	40R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2194B4	40R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2197B2	40R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2197B3	40R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2203B1	50R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2203B2	50R	M62 J25 - J30	
24/09/15 15:39:19	SIG	M62/2203B3	50R	M62 J25 - J30	
24/09/15 15:41:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:41:15	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:41:20	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:42:28	SIG	M62/2203B1	40R	M62 J25 - J30	
24/09/15 15:42:28	SIG	M62/2203B2	40R	M62 J25 - J30	
24/09/15 15:42:28	SIG	M62/2203B3	40R	M62 J25 - J30	
24/09/15 15:44:20	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:44:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:44:26	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:46:43	SIG	M62/2189B4	OFF	M62 J25 - J30	
24/09/15 15:46:43	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 15:46:49	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 15:47:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:47:27	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:47:32	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:50:16	SIG	M62/2050A1	OFF	M62 J25 - J30	
24/09/15 15:50:17	SIG	M62/2050A1	60R	M62 J25 - J30	
24/09/15 15:50:32	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:50:33	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:50:38	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:53:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:53:38	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:53:43	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:56:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:56:52	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:56:58	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 15:59:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 15:59:52	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 15:59:57	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:02:13	SIG	M62/2074B1	REDX	M62 J25 - J30	
24/09/15 16:02:13	SIG	M62/2074B2	60R	M62 J25 - J30	
24/09/15 16:02:13	SIG	M62/2074B3	60R	M62 J25 - J30	
24/09/15 16:02:13	SIG	M62/2074B4	60R	M62 J25 - J30	
24/09/15 16:02:13	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 16:02:13	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 16:02:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:02:56	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:03:01	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2081B1	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2081B2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2081B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2081L1	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2088B1	REDX	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2088B2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2088B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2088B4	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2097B1	REDX	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2097B2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2097B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2097B4	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2106B1	REDX	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2106B2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2106B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2106B4	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2113B1	REDX	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2113B2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2113B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2113B4	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2117B1	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2117B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2120M1	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2120M2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2125B1	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2125B2	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2125B3	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2125L1	60R	M62 J25 - J30	
24/09/15 16:03:13	SIG	M62/2125L2	60R	M62 J25 - J30	
24/09/15 16:06:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:06:01	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:06:06	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 16:06:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 16:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:06:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:06:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:06:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:06:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:06:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2155A1	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2155A2	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2155J1	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2155K1	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2157A2	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2157J1	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2157J2	50R	M62 J25 - J30	
24/09/15 16:06:41	SIG	M62/2157K1	50R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2155A1	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2155A2	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2155J1	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2155K1	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2157A2	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2157J1	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2157J2	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2157K1	40R	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2163A1	NR	M62 J25 - J30	
24/09/15 16:06:47	SIG	M62/2163A2	NR	M62 J25 - J30	
24/09/15 16:07:28	SIG	M62/2065A2	60R	M62 J25 - J30	
24/09/15 16:07:28	SIG	M62/2065A3	60R	M62 J25 - J30	
24/09/15 16:07:28	SIG	M62/2065A4	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2073K1	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2073K2	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2074A1	REDX	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2074A2	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2074A4	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2079A1	REDX	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2079A2	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2079A3	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2079A4	60R	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2088A1	REDX	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2088A2	NR	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2088A3	NR	M62 J25 - J30	
24/09/15 16:07:38	SIG	M62/2088A4	NR	M62 J25 - J30	
24/09/15 16:09:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:09:06	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:09:12	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:09:46	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:09:47	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:09:53	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2151A1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2151A2	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2151J1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2151K1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2155A1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2155A2	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2155J1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2155K1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2157A2	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2157J1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2157J2	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2157K1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2163A1	OFF	M62 J25 - J30	
24/09/15 16:10:41	SIG	M62/2163A2	OFF	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 16:10:57	SIG	M62/2197B1	50R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2194B1	40R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2194B2	40R	M62 J25 - J30	
24/09/15 16:11:03	SIG	M62/2197B1	40R	M62 J25 - J30	
24/09/15 16:11:09	SIG	M62/2183L1	30R	M62 J25 - J30	
24/09/15 16:11:09	SIG	M62/2189B1	30R	M62 J25 - J30	
24/09/15 16:11:14	SIG	M62/2183L1	20R	M62 J25 - J30	
24/09/15 16:11:14	SIG	M62/2189B1	20R	M62 J25 - J30	
24/09/15 16:11:14	SIG	M62/2194B1	LDR	M62 J25 - J30	
24/09/15 16:11:20	SIG	M62/2183L1	STOP	M62 J25 - J30	
24/09/15 16:11:20	SIG	M62/2189B1	STOP	M62 J25 - J30	
24/09/15 16:12:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:12:13	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:12:18	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:15:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:15:18	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:15:24	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2170A1	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2170A2	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2170K1	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2170K2	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A1	REDX	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A2	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A2	NR	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A3	NR	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A3	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A4	NR	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2177A4	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2183A1	REDX	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2183A2	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2183A3	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2183A4	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2189A1	REDX	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2189A2	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2189A3	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2189A4	60R	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2197A1	NR	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2197A2	NR	M62 J25 - J30	
24/09/15 16:15:30	SIG	M62/2197A3	NR	M62 J25 - J30	
24/09/15 16:16:35	SIG	M62/2189A1	60R	M62 J25 - J30	
24/09/15 16:16:46	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 16:16:46	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 16:16:46	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 16:16:46	SIG	M62/2197B1	50R	M62 J25 - J30	
24/09/15 16:16:46	SIG	M62/2197B2	50R	M62 J25 - J30	
24/09/15 16:16:46	SIG	M62/2197B3	50R	M62 J25 - J30	
24/09/15 16:16:51	SIG	M62/2183A1	60R	M62 J25 - J30	
24/09/15 16:16:54	SIG	M62/2177A1	60R	M62 J25 - J30	
24/09/15 16:17:21	SIG	M62/2203B1	50R	M62 J25 - J30	
24/09/15 16:17:21	SIG	M62/2203B2	50R	M62 J25 - J30	
24/09/15 16:17:21	SIG	M62/2203B3	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2155A1	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2155A2	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2155J1	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2155K1	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2157A2	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2157J1	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2157J2	50R	M62 J25 - J30	
24/09/15 16:17:24	SIG	M62/2157K1	50R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2194B2	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2194B3	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2194B4	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2197B1	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2197B2	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2197B3	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2203B1	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2203B2	40R	M62 J25 - J30	
24/09/15 16:17:27	SIG	M62/2203B3	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2155A1	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2155A2	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2155J1	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2155K1	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2157A2	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2157J1	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2157J2	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2157K1	40R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2163A1	60R	M62 J25 - J30	
24/09/15 16:17:30	SIG	M62/2163A2	60R	M62 J25 - J30	
24/09/15 16:18:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:18:24	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:18:29	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:19:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:19:59	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:20:04	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:20:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:21:26	SIG	M62/2088B1	60R	M62 J25 - J30	
24/09/15 16:21:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:21:29	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:21:34	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:21:46	SIG	M62/2097B1	60R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 16:21:51	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 16:21:56	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 16:22:12	SIG	M62/2106B1	60R	M62 J25 - J30	
24/09/15 16:22:16	SIG	M62/2113B1	60R	M62 J25 - J30	
24/09/15 16:23:08	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:23:09	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:23:14	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2135A1	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2135A2	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2135A3	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2135A4	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2144A1	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2144A2	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2144J1	60R	M62 J25 - J30	
24/09/15 16:24:13	SIG	M62/2144K1	60R	M62 J25 - J30	
24/09/15 16:24:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:24:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:24:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:24:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:24:34	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:24:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:24:40	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2088A2	60R	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2088A3	60R	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2088A4	60R	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2097A1	REDX	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2097A2	NR	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2097A3	NR	M62 J25 - J30	
24/09/15 16:24:50	SIG	M62/2097A4	NR	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2151A1	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2151A2	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2151J1	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2151K1	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2155A1	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2155A2	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2155J1	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2155K1	60R	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2157A1	NR	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2157A2	NR	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2157J1	NR	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2157J2	NR	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2157K1	NR	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2163A1	OFF	M62 J25 - J30	
24/09/15 16:25:08	SIG	M62/2163A2	OFF	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2079A2	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2079A3	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2079A4	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2088A2	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2088A3	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2088A4	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2097A2	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2097A3	NR	M62 J25 - J30	
24/09/15 16:25:09	SIG	M62/2097A4	NR	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2157A1	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2157A2	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2157J1	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2157J2	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2157K1	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2163A1	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2163A2	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2166K1	60R	M62 J25 - J30	
24/09/15 16:25:13	SIG	M62/2166K2	60R	M62 J25 - J30	
24/09/15 16:25:24	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 16:25:24	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 16:25:24	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 16:25:30	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 16:25:30	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 16:25:30	SIG	M62/2194B1	40R	M62 J25 - J30	
24/09/15 16:25:51	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 16:25:51	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 16:25:51	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 16:25:51	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 16:26:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:26:13	SIG	M62/2125B1	OFF	M62 J25 - J30	
24/09/15 16:26:13	SIG	M62/2125B2	OFF	M62 J25 - J30	
24/09/15 16:26:13	SIG	M62/2125B3	OFF	M62 J25 - J30	
24/09/15 16:26:13	SIG	M62/2125L1	NR	M62 J25 - J30	
24/09/15 16:26:13	SIG	M62/2125L2	NR	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2155A1	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2155A2	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2155J1	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2155K1	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2157A2	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2157J1	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2157J2	50R	M62 J25 - J30	
24/09/15 16:26:28	SIG	M62/2157K1	50R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2155A1	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2155A2	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2155J1	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2155K1	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2157A2	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2157J1	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2157J2	40R	M62 J25 - J30	
24/09/15 16:26:33	SIG	M62/2157K1	40R	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2065A2	NR	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2065A3	NR	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2065A4	NR	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2073K1	OFF	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2073K2	OFF	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2074A2	NR	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2074A4	NR	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2079A1	BLNK	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2079A2	OFF	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2079A3	OFF	M62 J25 - J30	
24/09/15 16:26:46	SIG	M62/2079A4	OFF	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2163A1	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2163A2	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2170A1	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2170A2	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2170K1	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2170K2	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2177A1	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2177A2	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2177A3	50R	M62 J25 - J30	
24/09/15 16:26:51	SIG	M62/2177A4	50R	M62 J25 - J30	
24/09/15 16:26:56	SIG	M62/2163A1	40R	M62 J25 - J30	
24/09/15 16:26:56	SIG	M62/2163A2	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2166K1	50R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2166K2	50R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2170A1	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2170A2	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2170K1	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2170K2	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2177A1	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2177A2	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2177A3	40R	M62 J25 - J30	
24/09/15 16:26:57	SIG	M62/2177A4	40R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 16:27:11	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 16:27:28	SIG	M62/2074A4	OFF	M62 J25 - J30	
24/09/15 16:27:29	SIG	M62/2074A4	NR	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2065A2	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2065A3	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2065A4	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2073K1	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2073K2	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2074A2	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2074A4	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A1	REDX	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A2	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A2	NR	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A3	NR	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A3	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A4	NR	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2079A4	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2088A2	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2088A3	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2088A4	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2097A2	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2097A3	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2097A4	60R	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2106A1	REDX	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2106A2	NR	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2106A3	NR	M62 J25 - J30	
24/09/15 16:27:34	SIG	M62/2106A4	NR	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2106A2	60R	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2106A3	60R	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2106A4	60R	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2114A1	60R	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2114A2	60R	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2114A3	60R	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2117A1	REDX	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2117A2	NR	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2117A3	NR	M62 J25 - J30	
24/09/15 16:27:35	SIG	M62/2117A4	NR	M62 J25 - J30	
24/09/15 16:27:57	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 16:27:57	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 16:27:57	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 16:27:57	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 16:28:25	SIG	M62/2197B1	50R	M62 J25 - J30	
24/09/15 16:28:25	SIG	M62/2197B2	50R	M62 J25 - J30	
24/09/15 16:28:25	SIG	M62/2197B3	50R	M62 J25 - J30	
24/09/15 16:28:25	SIG	M62/2199M1	50R	M62 J25 - J30	
24/09/15 16:28:25	SIG	M62/2199M2	50R	M62 J25 - J30	
24/09/15 16:28:34	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 16:28:34	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 16:28:34	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 16:28:39	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 16:28:50	SIG	M62/2106A1	60R	M62 J25 - J30	
24/09/15 16:29:11	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:29:12	SIG	M62/2097A1	60R	M62 J25 - J30	
24/09/15 16:29:12	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:29:17	SIG	M62/2125L1	OFF	M62 J25 - J30	
24/09/15 16:29:17	SIG	M62/2125L2	OFF	M62 J25 - J30	
24/09/15 16:29:17	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:29:47	SIG	M62/2088A1	60R	M62 J25 - J30	
24/09/15 16:29:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:29:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:29:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:29:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:29:54	SIG	M62/2079A1	60R	M62 J25 - J30	
24/09/15 16:30:32	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 16:30:33	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 16:30:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 16:30:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 16:30:51	SIG	M62/2163A1	60R	M62 J25 - J30	
24/09/15 16:30:51	SIG	M62/2163A2	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2166K1	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2166K2	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2170A1	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2170A2	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2170K1	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2170K2	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2177A1	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2177A2	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2177A3	60R	M62 J25 - J30	
24/09/15 16:30:52	SIG	M62/2177A4	60R	M62 J25 - J30	
24/09/15 16:31:05	SIG	M62/2203B1	50R	M62 J25 - J30	
24/09/15 16:31:05	SIG	M62/2203B2	50R	M62 J25 - J30	
24/09/15 16:31:05	SIG	M62/2203B3	50R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2183B1	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2183B2	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2183L1	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2183L2	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 16:31:14	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 16:31:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:31:22	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 16:31:28	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 16:32:14	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:32:15	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:32:20	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 16:32:33	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 16:33:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:33:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 16:35:19	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:35:19	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:35:25	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:35:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:35:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:35:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:35:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2025A1	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2197B1	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2197B2	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2197B3	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2199M1	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2199M2	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2203B1	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2203B2	60R	M62 J25 - J30	
24/09/15 16:37:13	SIG	M62/2203B3	60R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 16:37:30	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 16:37:36	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2144A1	50R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2144A2	50R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2144J1	50R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2144K1	50R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2151A1	40R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2151A2	40R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2151J1	40R	M62 J25 - J30	
24/09/15 16:38:19	SIG	M62/2151K1	40R	M62 J25 - J30	
24/09/15 16:38:22	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:38:23	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:38:28	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:40:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:40:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:40:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:40:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:41:13	SIG	M62/2117A2	60R	M62 J25 - J30	
24/09/15 16:41:13	SIG	M62/2117A3	60R	M62 J25 - J30	
24/09/15 16:41:13	SIG	M62/2117A4	60R	M62 J25 - J30	
24/09/15 16:41:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2122K1	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2122K2	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2124A1	REDX	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2124A2	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2124A3	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2124A4	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2125B1	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2125B2	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2125B3	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2125L1	60R	M62 J25 - J30	
24/09/15 16:41:14	SIG	M62/2125L2	60R	M62 J25 - J30	
24/09/15 16:41:26	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:41:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:41:29	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 16:41:31	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 16:41:32	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 16:41:32	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:41:33	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 16:41:34	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 16:41:34	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 16:42:58	SIG	M62/2065M1	50R	M62 J25 - J30	
24/09/15 16:42:58	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 16:42:58	SIG	M621/1002B2	50R	M62 J25 - J30	
24/09/15 16:42:58	SIG	M621/1010B1	50R	M62 J25 - J30	
24/09/15 16:42:58	SIG	M621/1010B2	50R	M62 J25 - J30	
24/09/15 16:43:03	SIG	M62/2065M1	40R	M62 J25 - J30	
24/09/15 16:43:03	SIG	M62/2069M1	50R	M62 J25 - J30	
24/09/15 16:43:03	SIG	M62/2069M2	50R	M62 J25 - J30	
24/09/15 16:43:03	SIG	M621/1002B1	40R	M62 J25 - J30	
24/09/15 16:43:03	SIG	M621/1002B2	40R	M62 J25 - J30	
24/09/15 16:43:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:43:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:43:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:43:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:44:13	SIG	M62/2166K1	OFF	M62 J25 - J30	
24/09/15 16:44:13	SIG	M62/2166K2	OFF	M62 J25 - J30	
24/09/15 16:44:29	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:44:30	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:44:35	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:44:38	SIG	M62/2074B2	50R	M62 J25 - J30	
24/09/15 16:44:38	SIG	M62/2074B3	50R	M62 J25 - J30	
24/09/15 16:44:38	SIG	M62/2074B4	50R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2074B2	40R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2074B3	40R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2074B4	40R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2081B1	50R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2081B2	50R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2081B3	50R	M62 J25 - J30	
24/09/15 16:44:43	SIG	M62/2081L1	50R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M62/2069M1	60R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M62/2069M2	60R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M621/1002B1	60R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 16:46:58	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 16:47:31	SIG	M62/2144A1	40R	M62 J25 - J30	
24/09/15 16:47:31	SIG	M62/2144A2	40R	M62 J25 - J30	
24/09/15 16:47:31	SIG	M62/2144J1	40R	M62 J25 - J30	
24/09/15 16:47:31	SIG	M62/2144K1	40R	M62 J25 - J30	
24/09/15 16:47:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:47:33	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:47:39	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:48:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 16:48:14	SIG	M62/2125B1	OFF	M62 J25 - J30	
24/09/15 16:48:14	SIG	M62/2125B2	OFF	M62 J25 - J30	
24/09/15 16:48:14	SIG	M62/2125B3	OFF	M62 J25 - J30	
24/09/15 16:48:14	SIG	M62/2125L1	NR	M62 J25 - J30	
24/09/15 16:48:14	SIG	M62/2125L2	NR	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2074B2	60R	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2074B3	60R	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2074B4	60R	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2081B1	60R	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2081B2	60R	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2081B3	60R	M62 J25 - J30	
24/09/15 16:48:41	SIG	M62/2081L1	60R	M62 J25 - J30	
24/09/15 16:50:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:50:37	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:50:42	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:51:14	SIG	M62/2125L1	OFF	M62 J25 - J30	
24/09/15 16:51:14	SIG	M62/2125L2	OFF	M62 J25 - J30	
24/09/15 16:51:31	SIG	M62/2144A1	50R	M62 J25 - J30	
24/09/15 16:51:31	SIG	M62/2144A2	50R	M62 J25 - J30	
24/09/15 16:51:31	SIG	M62/2144J1	50R	M62 J25 - J30	
24/09/15 16:51:31	SIG	M62/2144K1	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 16:52:58	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 16:52:59	SIG	M62/2144A1	40R	M62 J25 - J30	
24/09/15 16:52:59	SIG	M62/2144A2	40R	M62 J25 - J30	
24/09/15 16:52:59	SIG	M62/2144J1	40R	M62 J25 - J30	
24/09/15 16:52:59	SIG	M62/2144K1	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 16:53:03	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2194B1	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2197B1	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2197B2	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2197B3	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2199M1	50R	M62 J25 - J30	
24/09/15 16:53:32	SIG	M62/2199M2	50R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2194B1	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2194B2	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2194B3	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2194B4	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2197B1	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2197B2	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2197B3	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2199M1	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2199M2	40R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2203B1	50R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2203B2	50R	M62 J25 - J30	
24/09/15 16:53:37	SIG	M62/2203B3	50R	M62 J25 - J30	
24/09/15 16:53:40	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:53:41	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:53:46	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2197B1	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2197B2	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2197B3	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2199M1	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2199M2	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2203B1	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2203B2	60R	M62 J25 - J30	
24/09/15 16:54:15	SIG	M62/2203B3	60R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 16:55:23	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2065B2	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2065B3	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2065B4	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2065M1	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2069M1	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2069M2	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2074B2	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2074B3	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M62/2074B4	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M621/1002B2	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M621/1010B1	50R	M62 J25 - J30	
24/09/15 16:56:14	SIG	M621/1010B2	50R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2065B2	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2065B3	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2065B4	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2065M1	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2069M1	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2069M2	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2074B2	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2074B3	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2074B4	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2081B1	50R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2081B2	50R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2081B3	50R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M62/2081L1	50R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M621/1002B1	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M621/1002B2	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M621/1010B1	40R	M62 J25 - J30	
24/09/15 16:56:19	SIG	M621/1010B2	40R	M62 J25 - J30	
24/09/15 16:56:44	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:56:45	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:56:50	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2144A1	60R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2144A2	60R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2144J1	60R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2144K1	60R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 16:56:59	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 16:57:23	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 16:57:23	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 16:57:23	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 16:57:23	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 16:57:55	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 16:57:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 16:58:01	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 16:59:48	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 16:59:48	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 16:59:54	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2081B1	40R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2081B2	40R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2081B3	40R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2081L1	40R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2088B1	50R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2088B2	50R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2088B3	50R	M62 J25 - J30	
24/09/15 17:00:44	SIG	M62/2088B4	50R	M62 J25 - J30	
24/09/15 17:01:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:01:01	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:01:06	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:01:52	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:01:52	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:01:52	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:01:52	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:01:57	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:01:57	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:01:57	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:01:57	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:02:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:02:52	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:02:57	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2125B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2125B2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2125B3	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2125L1	NR	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2125L2	NR	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2132B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2132B2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2132B3	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2137B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2137B3	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2137B4	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2147B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2147B2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2147B3	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2147B4	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2159B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2159B2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2159M1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2159M2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 17:03:14	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 17:04:04	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:04:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:04:10	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2081B1	50R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2081B2	50R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2081B3	50R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2081L1	50R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2088B1	60R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2088B2	60R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2088B3	60R	M62 J25 - J30	
24/09/15 17:04:44	SIG	M62/2088B4	60R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2081B1	40R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2081B2	40R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2081B3	40R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2081L1	40R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2088B1	50R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2088B2	50R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2088B3	50R	M62 J25 - J30	
24/09/15 17:05:28	SIG	M62/2088B4	50R	M62 J25 - J30	
24/09/15 17:05:52	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:05:52	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:05:52	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:05:52	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 17:05:55	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:05:56	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:06:01	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:06:11	SIG	M62/2050B2	50R	M62 J25 - J30	
24/09/15 17:06:11	SIG	M62/2050B2	50R	M62 J25 - J30	
24/09/15 17:06:11	SIG	M62/2050B3	50R	M62 J25 - J30	
24/09/15 17:06:11	SIG	M62/2050B3	50R	M62 J25 - J30	
24/09/15 17:06:11	SIG	M62/2050B4	50R	M62 J25 - J30	
24/09/15 17:06:11	SIG	M62/2050B4	50R	M62 J25 - J30	
24/09/15 17:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 17:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 17:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 17:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 17:06:17	SIG	M62/2050B2	40R	M62 J25 - J30	
24/09/15 17:06:17	SIG	M62/2050B3	40R	M62 J25 - J30	
24/09/15 17:06:17	SIG	M62/2050B4	40R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2050B2	40R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2050B3	40R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2050B4	40R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2057B1	LDR	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2057B2	50R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2057B3	50R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M62/2057B4	50R	M62 J25 - J30	
24/09/15 17:06:27	SIG	M621/1002B1	LDR	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 17:06:28	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 17:06:46	SIG	M62/2132B1	50R	M62 J25 - J30	
24/09/15 17:06:46	SIG	M62/2132B2	50R	M62 J25 - J30	
24/09/15 17:06:46	SIG	M62/2132B3	50R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 17:06:47	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 17:06:51	SIG	M62/2132B1	40R	M62 J25 - J30	
24/09/15 17:06:51	SIG	M62/2132B2	40R	M62 J25 - J30	
24/09/15 17:06:51	SIG	M62/2132B3	40R	M62 J25 - J30	
24/09/15 17:06:51	SIG	M62/2137B1	50R	M62 J25 - J30	
24/09/15 17:06:51	SIG	M62/2137B3	50R	M62 J25 - J30	
24/09/15 17:06:51	SIG	M62/2137B4	50R	M62 J25 - J30	
24/09/15 17:07:09	SIG	M62/2088B1	40R	M62 J25 - J30	
24/09/15 17:07:09	SIG	M62/2088B2	40R	M62 J25 - J30	
24/09/15 17:07:09	SIG	M62/2088B3	40R	M62 J25 - J30	
24/09/15 17:07:09	SIG	M62/2088B4	40R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 17:07:47	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:07:52	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:08:06	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2050B2	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2050B3	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2050B4	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2057B1	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 17:08:11	SIG	M621/1002B1	40R	M62 J25 - J30	
24/09/15 17:09:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:09:08	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:09:13	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:10:05	SIG	M62/2097B1	50R	M62 J25 - J30	
24/09/15 17:10:05	SIG	M62/2097B2	50R	M62 J25 - J30	
24/09/15 17:10:05	SIG	M62/2097B3	50R	M62 J25 - J30	
24/09/15 17:10:05	SIG	M62/2097B4	50R	M62 J25 - J30	
24/09/15 17:10:11	SIG	M62/2097B1	40R	M62 J25 - J30	
24/09/15 17:10:11	SIG	M62/2097B2	40R	M62 J25 - J30	
24/09/15 17:10:11	SIG	M62/2097B3	40R	M62 J25 - J30	
24/09/15 17:10:11	SIG	M62/2097B4	40R	M62 J25 - J30	
24/09/15 17:10:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:10:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:10:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:10:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:11:47	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:11:47	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:11:47	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:11:47	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 17:12:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:12:08	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:12:13	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 17:12:37	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 17:12:54	SIG	M62/2137B1	40R	M62 J25 - J30	
24/09/15 17:12:54	SIG	M62/2137B3	40R	M62 J25 - J30	
24/09/15 17:12:54	SIG	M62/2137B4	40R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2144A1	50R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2144A2	50R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2144J1	50R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2144K1	50R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2151A1	40R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2151A2	40R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2151J1	40R	M62 J25 - J30	
24/09/15 17:13:50	SIG	M62/2151K1	40R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2088B1	50R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2088B2	50R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2088B3	50R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2088B4	50R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2097B1	60R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2097B2	60R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2097B3	60R	M62 J25 - J30	
24/09/15 17:14:05	SIG	M62/2097B4	60R	M62 J25 - J30	
24/09/15 17:14:44	SIG	M62/2144A1	40R	M62 J25 - J30	
24/09/15 17:14:44	SIG	M62/2144A2	40R	M62 J25 - J30	
24/09/15 17:14:44	SIG	M62/2144J1	40R	M62 J25 - J30	
24/09/15 17:14:44	SIG	M62/2144K1	40R	M62 J25 - J30	
24/09/15 17:15:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:15:08	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:15:13	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:15:14	SIG	M62/2097B1	50R	M62 J25 - J30	
24/09/15 17:15:14	SIG	M62/2097B2	50R	M62 J25 - J30	
24/09/15 17:15:14	SIG	M62/2097B3	50R	M62 J25 - J30	
24/09/15 17:15:14	SIG	M62/2097B4	50R	M62 J25 - J30	
24/09/15 17:15:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:15:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:15:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:15:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:15:29	SIG	M62/2088B1	40R	M62 J25 - J30	
24/09/15 17:15:29	SIG	M62/2088B2	40R	M62 J25 - J30	
24/09/15 17:15:29	SIG	M62/2088B3	40R	M62 J25 - J30	
24/09/15 17:15:29	SIG	M62/2088B4	40R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 17:16:49	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:16:55	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:18:09	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:18:10	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:18:15	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:18:49	SIG	M62/2137B1	50R	M62 J25 - J30	
24/09/15 17:18:49	SIG	M62/2137B2	50R	M62 J25 - J30	
24/09/15 17:18:49	SIG	M62/2137B3	50R	M62 J25 - J30	
24/09/15 17:18:49	SIG	M62/2137B4	50R	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2177B1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2177B2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2177L1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2177L2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2183B1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2183B2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2183L1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2183L2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2194B1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2194B2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2194B3	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2194B4	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2197B1	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2197B2	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2197B3	NR	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2199M1	OFF	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2199M2	OFF	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2203B1	OFF	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2203B2	OFF	M62 J25 - J30	
24/09/15 17:19:15	SIG	M62/2203B3	OFF	M62 J25 - J30	
24/09/15 17:19:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:19:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:19:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:19:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:19:28	SIG	M62/1968B1	50R	M62 J25 - J30	
24/09/15 17:19:28	SIG	M62/1968B2	50R	M62 J25 - J30	
24/09/15 17:19:28	SIG	M62/1968B3	50R	M62 J25 - J30	
24/09/15 17:19:28	SIG	M62/1968L1	50R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1968B1	40R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1968B2	40R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1968B3	40R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1968L1	40R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1974B1	50R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1974B2	50R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1974B3	50R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1974B4	50R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1974M1	50R	M62 J25 - J30	
24/09/15 17:19:34	SIG	M62/1974M2	50R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 17:20:50	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 17:21:13	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:21:14	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:21:19	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:22:15	SIG	M62/2194B1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2177B1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2177B2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2177L1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2177L2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2183B1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2183L1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2183L2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2189B1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2189B2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2189B3	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2189B4	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2194B2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2194B3	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2194B4	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2197B1	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2197B2	OFF	M62 J25 - J30	
24/09/15 17:22:16	SIG	M62/2197B3	OFF	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 17:22:28	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:22:33	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2144A1	60R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2144A2	60R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2144J1	60R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2144K1	60R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 17:23:07	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1968B1	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1968B2	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1968B3	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1968L1	NR	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1974B1	OFF	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1974B2	OFF	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1974B3	OFF	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1974B4	OFF	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1974M1	OFF	M62 J25 - J30	
24/09/15 17:23:28	SIG	M62/1974M2	OFF	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2144A1	50R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2144A2	50R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2144J1	50R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2144K1	50R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2151A1	40R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2151A2	40R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2151J1	40R	M62 J25 - J30	
24/09/15 17:24:13	SIG	M62/2151K1	40R	M62 J25 - J30	
24/09/15 17:24:16	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:24:17	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:24:22	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:25:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:25:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:25:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:25:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:25:38	SIG	M62/2137B1	40R	M62 J25 - J30	
24/09/15 17:25:38	SIG	M62/2137B2	40R	M62 J25 - J30	
24/09/15 17:25:38	SIG	M62/2137B3	40R	M62 J25 - J30	
24/09/15 17:25:38	SIG	M62/2137B4	40R	M62 J25 - J30	
24/09/15 17:26:14	SIG	M62/2106B1	50R	M62 J25 - J30	
24/09/15 17:26:14	SIG	M62/2106B2	50R	M62 J25 - J30	
24/09/15 17:26:14	SIG	M62/2106B3	50R	M62 J25 - J30	
24/09/15 17:26:14	SIG	M62/2106B4	50R	M62 J25 - J30	
24/09/15 17:26:19	SIG	M62/1968B1	50R	M62 J25 - J30	
24/09/15 17:26:19	SIG	M62/1968B2	50R	M62 J25 - J30	
24/09/15 17:26:19	SIG	M62/1968B3	50R	M62 J25 - J30	
24/09/15 17:26:19	SIG	M62/1968L1	50R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1968B1	40R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1968B2	40R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1968B3	40R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1968L1	40R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1974B1	50R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1974B2	50R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1974B3	50R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1974B4	50R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1974M1	50R	M62 J25 - J30	
24/09/15 17:26:24	SIG	M62/1974M2	50R	M62 J25 - J30	
24/09/15 17:26:28	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:26:28	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:26:28	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:26:28	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 17:26:29	SIG	M62/2147B1	50R	M62 J25 - J30	
24/09/15 17:26:29	SIG	M62/2147B2	50R	M62 J25 - J30	
24/09/15 17:26:29	SIG	M62/2147B3	50R	M62 J25 - J30	
24/09/15 17:26:29	SIG	M62/2147B4	50R	M62 J25 - J30	
24/09/15 17:26:35	SIG	M62/2147B1	40R	M62 J25 - J30	
24/09/15 17:26:35	SIG	M62/2147B2	40R	M62 J25 - J30	
24/09/15 17:26:35	SIG	M62/2147B3	40R	M62 J25 - J30	
24/09/15 17:26:35	SIG	M62/2147B4	40R	M62 J25 - J30	
24/09/15 17:26:42	SIG	M62/2097B1	40R	M62 J25 - J30	
24/09/15 17:26:42	SIG	M62/2097B2	40R	M62 J25 - J30	
24/09/15 17:26:42	SIG	M62/2097B3	40R	M62 J25 - J30	
24/09/15 17:26:42	SIG	M62/2097B4	40R	M62 J25 - J30	
24/09/15 17:27:20	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:27:21	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:27:26	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2189B1	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2189B2	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2189B3	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2189B4	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2199M1	50R	M62 J25 - J30	
24/09/15 17:28:07	SIG	M62/2199M2	50R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2183L1	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2189B1	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2199M1	40R	M62 J25 - J30	
24/09/15 17:28:12	SIG	M62/2199M2	40R	M62 J25 - J30	
24/09/15 17:28:18	SIG	M62/2183L1	30R	M62 J25 - J30	
24/09/15 17:28:18	SIG	M62/2189B1	30R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2183B1	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2183B2	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2183L1	20R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2183L2	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2189B1	20R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2189B2	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2189B3	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2189B4	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2194B1	LDR	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2194B2	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2194B3	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2194B4	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2197B1	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2197B2	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2197B3	50R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2199M1	40R	M62 J25 - J30	
24/09/15 17:28:23	SIG	M62/2199M2	40R	M62 J25 - J30	
24/09/15 17:28:28	SIG	M62/2183L1	STOP	M62 J25 - J30	
24/09/15 17:28:28	SIG	M62/2189B1	STOP	M62 J25 - J30	
24/09/15 17:29:23	SIG	M62/2135A3	OFF	M62 J25 - J30	
24/09/15 17:29:24	SIG	M62/2135A3	OFF	M62 J25 - J30	
24/09/15 17:29:24	SIG	M62/2135A3	OFF	M62 J25 - J30	
24/09/15 17:29:25	SIG	M62/2135A3	OFF	M62 J25 - J30	
24/09/15 17:29:35	SIG	M62/2135A3	60R	M62 J25 - J30	
24/09/15 17:29:35	SIG	M62/2135A3	OFF	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2177B1	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2177B2	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2177L1	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2177L2	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2183B1	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2183B2	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2183L1	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2183L2	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2194B1	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2194B2	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2194B3	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2194B4	NR	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2197B1	OFF	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2197B2	OFF	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2197B3	OFF	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2199M1	OFF	M62 J25 - J30	
24/09/15 17:29:48	SIG	M62/2199M2	OFF	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 17:30:05	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1968B1	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1968B2	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1968B3	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1968L1	NR	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1974B1	OFF	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1974B2	OFF	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1974B3	OFF	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1974B4	OFF	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1974M1	OFF	M62 J25 - J30	
24/09/15 17:30:19	SIG	M62/1974M2	OFF	M62 J25 - J30	
24/09/15 17:30:24	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:30:24	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:30:30	SIG	M62/2147B1	60R	M62 J25 - J30	
24/09/15 17:30:30	SIG	M62/2147B2	60R	M62 J25 - J30	
24/09/15 17:30:30	SIG	M62/2147B3	60R	M62 J25 - J30	
24/09/15 17:30:30	SIG	M62/2147B4	60R	M62 J25 - J30	
24/09/15 17:30:30	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:30:31	SIG	M62/1968B1	50R	M62 J25 - J30	
24/09/15 17:30:31	SIG	M62/1968B2	50R	M62 J25 - J30	
24/09/15 17:30:31	SIG	M62/1968B3	50R	M62 J25 - J30	
24/09/15 17:30:31	SIG	M62/1968L1	50R	M62 J25 - J30	
24/09/15 17:30:33	SIG	M62/2147B1	50R	M62 J25 - J30	
24/09/15 17:30:33	SIG	M62/2147B2	50R	M62 J25 - J30	
24/09/15 17:30:33	SIG	M62/2147B3	50R	M62 J25 - J30	
24/09/15 17:30:33	SIG	M62/2147B4	50R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1968B1	40R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1968B2	40R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1968B3	40R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1968L1	40R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1974B1	50R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1974B2	50R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1974B3	50R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1974B4	50R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1974M1	50R	M62 J25 - J30	
24/09/15 17:30:36	SIG	M62/1974M2	50R	M62 J25 - J30	
24/09/15 17:30:38	SIG	M62/2147B1	40R	M62 J25 - J30	
24/09/15 17:30:38	SIG	M62/2147B2	40R	M62 J25 - J30	
24/09/15 17:30:38	SIG	M62/2147B3	40R	M62 J25 - J30	
24/09/15 17:30:38	SIG	M62/2147B4	40R	M62 J25 - J30	
24/09/15 17:31:14	SIG	M62/2125L1	60R	M62 J25 - J30	
24/09/15 17:31:14	SIG	M62/2125L2	60R	M62 J25 - J30	
24/09/15 17:31:15	SIG	M62/2057B1	50R	M62 J25 - J30	
24/09/15 17:31:15	SIG	M62/2057B2	50R	M62 J25 - J30	
24/09/15 17:31:15	SIG	M62/2057B3	50R	M62 J25 - J30	
24/09/15 17:31:15	SIG	M62/2057B4	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2088B1	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2088B2	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2088B3	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2088B4	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2097B1	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2097B2	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2097B3	50R	M62 J25 - J30	
24/09/15 17:31:24	SIG	M62/2097B4	50R	M62 J25 - J30	
24/09/15 17:31:32	SIG	M62/2088B1	40R	M62 J25 - J30	
24/09/15 17:31:32	SIG	M62/2088B2	40R	M62 J25 - J30	
24/09/15 17:31:32	SIG	M62/2088B3	40R	M62 J25 - J30	
24/09/15 17:31:32	SIG	M62/2088B4	40R	M62 J25 - J30	
24/09/15 17:32:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:32:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2177B1	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2177B2	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2177L1	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2177L2	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2183B1	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2183L1	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2183L2	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2189B1	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2189B2	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2189B3	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2189B4	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2194B1	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2194B2	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2194B3	OFF	M62 J25 - J30	
24/09/15 17:32:48	SIG	M62/2194B4	OFF	M62 J25 - J30	
24/09/15 17:33:27	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:33:28	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:33:34	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1974B1	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1974B2	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1974B3	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1974B4	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1974M1	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1974M2	40R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1981B1	50R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1981B2	50R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1981B3	50R	M62 J25 - J30	
24/09/15 17:34:07	SIG	M62/1981B4	50R	M62 J25 - J30	
24/09/15 17:34:14	SIG	M62/1987B1	60R	M62 J25 - J30	
24/09/15 17:34:14	SIG	M62/1987B2	60R	M62 J25 - J30	
24/09/15 17:34:14	SIG	M62/1987B3	60R	M62 J25 - J30	
24/09/15 17:34:14	SIG	M62/1987B4	60R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2159B1	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2159B2	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2159M1	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2159M2	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 17:34:32	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2159B1	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2159B2	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2159M1	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2159M2	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2170B1	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2170B2	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2170L1	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2170L2	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2177B1	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2177B2	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2177L1	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2177L2	40R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2183B1	50R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2183B2	50R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2183L1	50R	M62 J25 - J30	
24/09/15 17:34:37	SIG	M62/2183L2	50R	M62 J25 - J30	
24/09/15 17:35:32	SIG	M62/2088B1	50R	M62 J25 - J30	
24/09/15 17:35:32	SIG	M62/2088B2	50R	M62 J25 - J30	
24/09/15 17:35:32	SIG	M62/2088B3	50R	M62 J25 - J30	
24/09/15 17:35:32	SIG	M62/2088B4	50R	M62 J25 - J30	
24/09/15 17:36:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 17:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 17:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 17:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:36:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 17:36:15	SIG	M606/2003B1	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M606/2003B2	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1992B1	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1992B2	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1992B3	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1992B4	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1999B1	REDX	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1999B2	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1999B3	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/1999B4	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2004B1	REDX	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2004B2	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2004B3	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2004B4	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2005M1	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2005M2	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2012B2	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2012B3	60R	M62 J25 - J30	
24/09/15 17:36:15	SIG	M62/2012B4	60R	M62 J25 - J30	
24/09/15 17:36:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:36:32	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:36:35	SIG	M62/2113B1	HSD	M62 J25 - J30	
24/09/15 17:36:37	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2144A1	60R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2144A2	60R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2144J1	60R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2144K1	60R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 17:36:42	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:36:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:36:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:36:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:36:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2147B1	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2147B2	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2147B3	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2147B4	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2159B1	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2159B2	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2159M1	60R	M62 J25 - J30	
24/09/15 17:37:17	SIG	M62/2159M2	60R	M62 J25 - J30	
24/09/15 17:37:28	SIG	M62/2106B1	HSD	M62 J25 - J30	
24/09/15 17:38:36	SIG	M62/2097B1	HSD	M62 J25 - J30	
24/09/15 17:38:37	SIG	M62/2113B1	REDX	M62 J25 - J30	
24/09/15 17:38:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:38:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:38:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:38:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:39:31	SIG	M62/2177A1	HSD	M62 J25 - J30	
24/09/15 17:39:35	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:39:35	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:39:40	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:39:44	SIG	M62/2088B1	HSD	M62 J25 - J30	
24/09/15 17:39:45	SIG	M62/2106B1	REDX	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2144A1	50R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2144A2	50R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2144J1	50R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2144K1	50R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2151A1	40R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2151A2	40R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2151J1	40R	M62 J25 - J30	
24/09/15 17:39:53	SIG	M62/2151K1	40R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2189B1	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2189B2	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2189B3	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2189B4	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2194B1	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2194B2	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2194B3	60R	M62 J25 - J30	
24/09/15 17:40:15	SIG	M62/2194B4	60R	M62 J25 - J30	
24/09/15 17:40:16	SIG	M62/2183A1	HSD	M62 J25 - J30	
24/09/15 17:40:29	SIG	M62/2081B1	50R	M62 J25 - J30	
24/09/15 17:40:29	SIG	M62/2081B2	50R	M62 J25 - J30	
24/09/15 17:40:29	SIG	M62/2081B3	50R	M62 J25 - J30	
24/09/15 17:40:29	SIG	M62/2081L1	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1974B1	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1974B2	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1974B3	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1974B4	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1974M1	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1974M2	50R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1981B1	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1981B2	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1981B3	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/1981B4	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 17:40:42	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 17:40:53	SIG	M62/2097B1	REDX	M62 J25 - J30	
24/09/15 17:41:01	SIG	M62/2189A1	HSD	M62 J25 - J30	
24/09/15 17:41:02	SIG	M62/2177A1	REDX	M62 J25 - J30	
24/09/15 17:41:11	SIG	M62/2137B1	50R	M62 J25 - J30	
24/09/15 17:41:11	SIG	M62/2137B2	50R	M62 J25 - J30	
24/09/15 17:41:11	SIG	M62/2137B3	50R	M62 J25 - J30	
24/09/15 17:41:11	SIG	M62/2137B4	50R	M62 J25 - J30	
24/09/15 17:41:55	SIG	M62/2137B1	40R	M62 J25 - J30	
24/09/15 17:41:55	SIG	M62/2137B2	40R	M62 J25 - J30	
24/09/15 17:41:55	SIG	M62/2137B3	40R	M62 J25 - J30	
24/09/15 17:41:55	SIG	M62/2137B4	40R	M62 J25 - J30	
24/09/15 17:42:01	SIG	M62/2088B1	REDX	M62 J25 - J30	
24/09/15 17:42:02	SIG	M62/2183A1	REDX	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:42:11	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 17:42:16	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2065A2	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2065A3	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2065A4	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2079A1	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2079A2	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2079A3	50R	M62 J25 - J30	
24/09/15 17:42:27	SIG	M62/2079A4	50R	M62 J25 - J30	
24/09/15 17:42:33	SIG	M62/2079A1	40R	M62 J25 - J30	
24/09/15 17:42:33	SIG	M62/2079A2	40R	M62 J25 - J30	
24/09/15 17:42:33	SIG	M62/2079A3	40R	M62 J25 - J30	
24/09/15 17:42:33	SIG	M62/2079A4	40R	M62 J25 - J30	
24/09/15 17:42:38	SIG	M62/2079A1	30R	M62 J25 - J30	
24/09/15 17:42:39	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:42:40	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2073K1	50R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2073K2	50R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2074A2	50R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2074A4	50R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2079A1	20R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2079A2	40R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2079A3	40R	M62 J25 - J30	
24/09/15 17:42:43	SIG	M62/2079A4	40R	M62 J25 - J30	
24/09/15 17:42:44	SIG	M62/2081B1	40R	M62 J25 - J30	
24/09/15 17:42:44	SIG	M62/2081B2	40R	M62 J25 - J30	
24/09/15 17:42:44	SIG	M62/2081B3	40R	M62 J25 - J30	
24/09/15 17:42:44	SIG	M62/2081L1	40R	M62 J25 - J30	
24/09/15 17:42:45	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1968B1	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1968B2	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1968B3	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1968L1	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1974B1	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1974B2	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1974B3	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1974B4	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1974M1	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/1974M2	60R	M62 J25 - J30	
24/09/15 17:42:49	SIG	M62/2079A1	STOP	M62 J25 - J30	
24/09/15 17:42:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:43:01	SIG	M62/2189A1	REDX	M62 J25 - J30	
24/09/15 17:43:02	SIG	M62/2163A1	NR	M62 J25 - J30	
24/09/15 17:43:02	SIG	M62/2163A2	NR	M62 J25 - J30	
24/09/15 17:43:02	SIG	M62/2170A1	NR	M62 J25 - J30	
24/09/15 17:43:02	SIG	M62/2170A2	NR	M62 J25 - J30	
24/09/15 17:43:02	SIG	M62/2170K1	NR	M62 J25 - J30	
24/09/15 17:43:02	SIG	M62/2170K2	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2177A2	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2177A3	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2177A4	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2183A2	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2183A3	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2183A4	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2189A2	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2189A3	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2189A4	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2197A1	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2197A2	NR	M62 J25 - J30	
24/09/15 17:43:03	SIG	M62/2197A3	NR	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2144A1	60R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2144A2	60R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2144J1	60R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2144K1	60R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2151A1	50R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2151A2	50R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2151J1	50R	M62 J25 - J30	
24/09/15 17:43:53	SIG	M62/2151K1	50R	M62 J25 - J30	
24/09/15 17:43:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2170A1	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2170A2	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2170K1	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2170K2	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2177A1	BLNK	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2177A2	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2177A3	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2177A4	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2183A1	BLNK	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2183A2	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2183A3	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2183A4	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2189A1	BLNK	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2189A2	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2189A3	OFF	M62 J25 - J30	
24/09/15 17:44:02	SIG	M62/2189A4	OFF	M62 J25 - J30	
24/09/15 17:44:27	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:44:27	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:44:27	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:44:27	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:44:32	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:44:32	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:44:32	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:44:32	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:44:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:44:58	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:45:03	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:45:15	SIG	M62/2106B2	60R	M62 J25 - J30	
24/09/15 17:45:15	SIG	M62/2106B3	60R	M62 J25 - J30	
24/09/15 17:45:15	SIG	M62/2106B4	60R	M62 J25 - J30	
24/09/15 17:45:42	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:45:43	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:45:48	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:46:03	SIG	M62/2197A1	OFF	M62 J25 - J30	
24/09/15 17:46:03	SIG	M62/2197A2	OFF	M62 J25 - J30	
24/09/15 17:46:03	SIG	M62/2197A3	OFF	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 17:46:12	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 17:46:15	SIG	M62/2197B1	60R	M62 J25 - J30	
24/09/15 17:46:15	SIG	M62/2197B2	60R	M62 J25 - J30	
24/09/15 17:46:15	SIG	M62/2197B3	60R	M62 J25 - J30	
24/09/15 17:46:15	SIG	M62/2199M1	60R	M62 J25 - J30	
24/09/15 17:46:15	SIG	M62/2199M2	60R	M62 J25 - J30	
24/09/15 17:46:30	SIG	M62/2081B1	50R	M62 J25 - J30	
24/09/15 17:46:30	SIG	M62/2081B2	50R	M62 J25 - J30	
24/09/15 17:46:30	SIG	M62/2081B3	50R	M62 J25 - J30	
24/09/15 17:46:30	SIG	M62/2081L1	50R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2065A2	60R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2065A3	60R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2065A4	60R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2073K1	40R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2073K2	40R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2074A2	40R	M62 J25 - J30	
24/09/15 17:46:48	SIG	M62/2074A4	40R	M62 J25 - J30	
24/09/15 17:46:56	SIG	M62/1968B1	50R	M62 J25 - J30	
24/09/15 17:46:56	SIG	M62/1968B2	50R	M62 J25 - J30	
24/09/15 17:46:56	SIG	M62/1968B3	50R	M62 J25 - J30	
24/09/15 17:46:56	SIG	M62/1968L1	50R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 17:46:57	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1968B1	40R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1968B2	40R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1968B3	40R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1968L1	40R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1974B1	50R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1974B2	50R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1974B3	50R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1974B4	50R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1974M1	50R	M62 J25 - J30	
24/09/15 17:47:02	SIG	M62/1974M2	50R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2170B1	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2170B2	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2183B1	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2183B2	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2183L1	60R	M62 J25 - J30	
24/09/15 17:47:15	SIG	M62/2183L2	60R	M62 J25 - J30	
24/09/15 17:47:28	SIG	M62/2074A4	OFF	M62 J25 - J30	
24/09/15 17:47:29	SIG	M62/2074A4	50R	M62 J25 - J30	
24/09/15 17:47:34	SIG	M62/2074A4	40R	M62 J25 - J30	
24/09/15 17:48:27	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:48:27	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:48:27	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:48:27	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 17:48:46	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:48:47	SIG	M62/2157A1	50R	M62 J25 - J30	
24/09/15 17:48:52	SIG	M62/2157A1	40R	M62 J25 - J30	
24/09/15 17:49:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:49:04	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:49:09	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2151A1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2151A2	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2151J1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2151K1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2155A1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2155A2	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2155J1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2155K1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2157A1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2157A2	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2157J1	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2157J2	60R	M62 J25 - J30	
24/09/15 17:49:22	SIG	M62/2157K1	60R	M62 J25 - J30	
24/09/15 17:50:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:50:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 17:50:47	SIG	M62/2073K1	50R	M62 J25 - J30	
24/09/15 17:50:47	SIG	M62/2073K2	50R	M62 J25 - J30	
24/09/15 17:50:47	SIG	M62/2074A2	50R	M62 J25 - J30	
24/09/15 17:50:47	SIG	M62/2074A4	50R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1968B1	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1968B2	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1968B3	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1968L1	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1974B1	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1974B2	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1974B3	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1974B4	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1974M1	60R	M62 J25 - J30	
24/09/15 17:50:55	SIG	M62/1974M2	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 17:50:57	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 17:51:30	SIG	M62/2074A4	50R	M62 J25 - J30	
24/09/15 17:51:30	SIG	M62/2074A4	OFF	M62 J25 - J30	
24/09/15 17:51:50	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:51:50	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 17:52:34	SIG	M62/2197A1	50R	M62 J25 - J30	
24/09/15 17:52:34	SIG	M62/2197A2	50R	M62 J25 - J30	
24/09/15 17:52:34	SIG	M62/2197A3	50R	M62 J25 - J30	
24/09/15 17:53:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:53:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2088B2	60R	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2088B3	60R	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2088B4	60R	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2097B2	60R	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2097B3	60R	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2097B4	60R	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2197B1	OFF	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2197B2	OFF	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2197B3	OFF	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2199M1	OFF	M62 J25 - J30	
24/09/15 17:54:15	SIG	M62/2199M2	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2117A2	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2117A3	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2117A4	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2122K1	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2122K2	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2124A1	BLNK	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2124A2	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2124A3	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2124A4	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2147B1	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2147B2	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2147B3	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2147B4	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2157A1	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2157A2	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2157J1	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2157J2	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2157K1	NR	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2159B1	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2159B2	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2159M1	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2159M2	50R	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2163A1	OFF	M62 J25 - J30	
24/09/15 17:55:15	SIG	M62/2163A2	OFF	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 17:55:24	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2018B1	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2018B2	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2018B3	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2018L1	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2033B1	50R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:55:30	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2033B1	40R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2033B2	40R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2033B4	40R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2041B1	50R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 17:56:14	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2177B1	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2177B2	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2177L1	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2177L2	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2183B1	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2183B2	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2183L1	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2183L2	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2189B1	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2189B2	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2189B3	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2189B4	NR	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2194B1	OFF	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2194B2	OFF	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2194B3	OFF	M62 J25 - J30	
24/09/15 17:57:16	SIG	M62/2194B4	OFF	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1968B1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1968B2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1968B3	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/1968L1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2135A1	OFF	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2135A2	OFF	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2135A3	OFF	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2135A4	OFF	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2144A1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2144A2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2144J1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2144K1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2151A1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2151A2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2151J1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2151K1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2155A1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2155A2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2155J1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2155K1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2157A1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2157A2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2157J1	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2157J2	NR	M62 J25 - J30	
24/09/15 17:58:15	SIG	M62/2157K1	NR	M62 J25 - J30	
24/09/15 17:58:18	SIG	M62/1968B1	50R	M62 J25 - J30	
24/09/15 17:58:18	SIG	M62/1968B2	50R	M62 J25 - J30	
24/09/15 17:58:18	SIG	M62/1968B3	50R	M62 J25 - J30	
24/09/15 17:58:18	SIG	M62/1968L1	50R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1968B1	40R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1968B2	40R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1968B3	40R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1968L1	40R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1974B1	50R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1974B2	50R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1974B3	50R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1974B4	50R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1974M1	50R	M62 J25 - J30	
24/09/15 17:58:23	SIG	M62/1974M2	50R	M62 J25 - J30	
24/09/15 17:59:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 17:59:21	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 17:59:26	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 17:59:27	SIG	M62/2018B1	60R	M62 J25 - J30	
24/09/15 17:59:27	SIG	M62/2018B2	60R	M62 J25 - J30	
24/09/15 17:59:27	SIG	M62/2018B3	60R	M62 J25 - J30	
24/09/15 17:59:27	SIG	M62/2018L1	60R	M62 J25 - J30	
24/09/15 18:00:13	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 18:00:13	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 18:00:13	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 18:00:13	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 18:00:16	SIG	M62/2189B1	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2177B1	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2177B2	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2177L1	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2177L2	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2183B1	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2183L1	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2183L2	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2189B2	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2189B3	OFF	M62 J25 - J30	
24/09/15 18:00:17	SIG	M62/2189B4	OFF	M62 J25 - J30	
24/09/15 18:00:23	SIG	M62/2025B1	50R	M62 J25 - J30	
24/09/15 18:00:23	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 18:00:23	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 18:00:23	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 18:00:29	SIG	M62/2025B1	40R	M62 J25 - J30	
24/09/15 18:00:29	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 18:00:29	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 18:00:29	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2065B2	50R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2065B3	50R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2065B4	50R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2074B2	50R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2074B3	50R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2074B4	50R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2081B1	60R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2081B2	60R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2081B3	60R	M62 J25 - J30	
24/09/15 18:00:47	SIG	M62/2081L1	60R	M62 J25 - J30	
24/09/15 18:01:08	SIG	M62/2137B1	50R	M62 J25 - J30	
24/09/15 18:01:08	SIG	M62/2137B2	50R	M62 J25 - J30	
24/09/15 18:01:08	SIG	M62/2137B3	50R	M62 J25 - J30	
24/09/15 18:01:08	SIG	M62/2137B4	50R	M62 J25 - J30	
24/09/15 18:01:15	SIG	M62/2144J1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2144A1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2144A2	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2144K1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2151A1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2151A2	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2151J1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2151K1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2155A1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2155A2	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2155J1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2155K1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2157A1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2157A2	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2157J1	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2157J2	OFF	M62 J25 - J30	
24/09/15 18:01:16	SIG	M62/2157K1	OFF	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1960B1	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1960B2	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1960B3	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1960L1	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1960L2	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1968B1	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1968B2	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1968B3	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1968L1	NR	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1974B1	60R	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1974B2	60R	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1974B3	60R	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1974B4	60R	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1974M1	60R	M62 J25 - J30	
24/09/15 18:02:18	SIG	M62/1974M2	60R	M62 J25 - J30	
24/09/15 18:02:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 18:02:21	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 18:02:26	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2065B2	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2065B3	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2065B4	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2074B2	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2074B3	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2074B4	40R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2081B1	50R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2081B2	50R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2081B3	50R	M62 J25 - J30	
24/09/15 18:02:52	SIG	M62/2081L1	50R	M62 J25 - J30	
24/09/15 18:04:04	SIG	M62/2137B1	40R	M62 J25 - J30	
24/09/15 18:04:04	SIG	M62/2137B2	40R	M62 J25 - J30	
24/09/15 18:04:04	SIG	M62/2137B3	40R	M62 J25 - J30	
24/09/15 18:04:04	SIG	M62/2137B4	40R	M62 J25 - J30	
24/09/15 18:05:18	SIG	M62/1960B1	OFF	M62 J25 - J30	
24/09/15 18:05:19	SIG	M62/1960B2	OFF	M62 J25 - J30	
24/09/15 18:05:19	SIG	M62/1960B3	OFF	M62 J25 - J30	
24/09/15 18:05:19	SIG	M62/1960L1	OFF	M62 J25 - J30	
24/09/15 18:05:19	SIG	M62/1960L2	OFF	M62 J25 - J30	
24/09/15 18:05:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 18:05:23	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 18:05:29	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 18:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 18:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 18:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 18:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2065B2	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2065B3	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2065B4	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2065M1	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2069M1	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2069M2	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2074B2	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2074B3	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2074B4	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2081B1	60R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2081B2	60R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2081B3	60R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M62/2081L1	60R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M621/1002B2	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M621/1010B1	50R	M62 J25 - J30	
24/09/15 18:06:52	SIG	M621/1010B2	50R	M62 J25 - J30	
24/09/15 18:07:27	SIG	M62/2088A1	50R	M62 J25 - J30	
24/09/15 18:07:27	SIG	M62/2088A2	50R	M62 J25 - J30	
24/09/15 18:07:27	SIG	M62/2088A3	50R	M62 J25 - J30	
24/09/15 18:07:27	SIG	M62/2088A4	50R	M62 J25 - J30	
24/09/15 18:07:33	SIG	M62/2088A1	40R	M62 J25 - J30	
24/09/15 18:07:33	SIG	M62/2088A2	40R	M62 J25 - J30	
24/09/15 18:07:33	SIG	M62/2088A3	40R	M62 J25 - J30	
24/09/15 18:07:33	SIG	M62/2088A4	40R	M62 J25 - J30	
24/09/15 18:07:38	SIG	M62/2088A1	30R	M62 J25 - J30	
24/09/15 18:07:43	SIG	M62/2088A1	20R	M62 J25 - J30	
24/09/15 18:07:43	SIG	M62/2088A2	40R	M62 J25 - J30	
24/09/15 18:07:43	SIG	M62/2088A3	40R	M62 J25 - J30	
24/09/15 18:07:43	SIG	M62/2088A4	40R	M62 J25 - J30	
24/09/15 18:07:48	SIG	M62/2088A1	STOP	M62 J25 - J30	
24/09/15 18:08:04	SIG	M62/2137B1	50R	M62 J25 - J30	
24/09/15 18:08:04	SIG	M62/2137B2	50R	M62 J25 - J30	
24/09/15 18:08:04	SIG	M62/2137B3	50R	M62 J25 - J30	
24/09/15 18:08:04	SIG	M62/2137B4	50R	M62 J25 - J30	
24/09/15 18:08:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 18:08:28	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 18:08:33	SIG	M62/2033B3	40R	M62 J25 - J30	
24/09/15 18:10:09	SIG	M62/2025B1	60R	M62 J25 - J30	
24/09/15 18:10:09	SIG	M62/2025B2	60R	M62 J25 - J30	
24/09/15 18:10:09	SIG	M62/2025B3	60R	M62 J25 - J30	
24/09/15 18:10:09	SIG	M62/2025B4	60R	M62 J25 - J30	
24/09/15 18:10:15	SIG	M606/2003B1	OFF	M62 J25 - J30	
24/09/15 18:10:15	SIG	M606/2003B2	OFF	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2004B2	NR	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2004B3	NR	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2004B4	NR	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2005M1	OFF	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2005M2	OFF	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2012B2	NR	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2012B3	NR	M62 J25 - J30	
24/09/15 18:10:15	SIG	M62/2012B4	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1968B1	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1968B2	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1968B3	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1968L1	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1974B1	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1974B2	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1974B3	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1974B4	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1974M1	OFF	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1974M2	OFF	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1981B1	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1981B2	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1981B3	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1981B4	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1987B1	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1987B2	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1987B3	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1987B4	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1992B1	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1992B2	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1992B3	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1992B4	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1999B2	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1999B3	NR	M62 J25 - J30	
24/09/15 18:10:16	SIG	M62/1999B4	NR	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2033B1	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2033B2	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2033B3	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2033B4	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2041B1	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 18:10:24	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2073K1	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2073K2	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2074A2	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2074A3	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2074A4	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2079A1	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2079A2	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2079A3	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2079A4	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2088A1	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2088A2	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2088A3	60R	M62 J25 - J30	
24/09/15 18:12:30	SIG	M62/2088A4	60R	M62 J25 - J30	
24/09/15 18:12:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 18:12:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1968B1	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1968B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1968B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1968L1	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1974B1	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1974B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1974B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1974B4	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1981B1	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1981B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1981B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1981B4	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1987B1	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1987B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1987B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1987B4	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1992B1	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1992B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1992B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1992B4	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1999B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1999B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/1999B4	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/2004B1	BLNK	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/2004B2	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/2004B3	OFF	M62 J25 - J30	
24/09/15 18:13:16	SIG	M62/2004B4	OFF	M62 J25 - J30	
24/09/15 18:13:17	SIG	M62/1999B1	BLNK	M62 J25 - J30	
24/09/15 18:14:15	SIG	M62/2069M1	60R	M62 J25 - J30	
24/09/15 18:14:15	SIG	M62/2069M2	60R	M62 J25 - J30	
24/09/15 18:14:15	SIG	M62/2074B2	60R	M62 J25 - J30	
24/09/15 18:14:15	SIG	M62/2074B3	60R	M62 J25 - J30	
24/09/15 18:14:15	SIG	M62/2074B4	60R	M62 J25 - J30	
24/09/15 18:14:15	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 18:14:15	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 18:15:09	SIG	M62/2132B1	60R	M62 J25 - J30	
24/09/15 18:15:09	SIG	M62/2132B2	60R	M62 J25 - J30	
24/09/15 18:15:09	SIG	M62/2132B3	60R	M62 J25 - J30	
24/09/15 18:16:49	SIG	M62/2132B1	50R	M62 J25 - J30	
24/09/15 18:16:49	SIG	M62/2132B2	50R	M62 J25 - J30	
24/09/15 18:16:49	SIG	M62/2132B3	50R	M62 J25 - J30	
24/09/15 18:16:54	SIG	M62/2132B1	40R	M62 J25 - J30	
24/09/15 18:16:54	SIG	M62/2132B2	40R	M62 J25 - J30	
24/09/15 18:16:54	SIG	M62/2132B3	40R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2147B1	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2147B2	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2147B3	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2147B4	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2159B1	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2159B2	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2159M1	60R	M62 J25 - J30	
24/09/15 18:17:15	SIG	M62/2159M2	60R	M62 J25 - J30	
24/09/15 18:18:02	SIG	M621/1010B1	50R	M62 J25 - J30	
24/09/15 18:18:02	SIG	M621/1010B2	50R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M62/2065B2	40R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M62/2065B3	40R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M62/2065B4	40R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M62/2065M1	40R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M62/2069M1	50R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M62/2069M2	50R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M621/1002B1	40R	M62 J25 - J30	
24/09/15 18:18:03	SIG	M621/1002B2	40R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2132B1	60R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2132B2	60R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2132B3	60R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2137B1	60R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2137B2	60R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2137B3	60R	M62 J25 - J30	
24/09/15 18:20:49	SIG	M62/2137B4	60R	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2088B2	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2088B3	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2088B4	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2097B2	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2097B3	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2097B4	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2106B2	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2106B3	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2106B4	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2113B2	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2113B3	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2113B4	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2117B1	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2117B3	NR	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2120M1	OFF	M62 J25 - J30	
24/09/15 18:21:16	SIG	M62/2120M2	OFF	M62 J25 - J30	
24/09/15 18:22:02	SIG	M62/2065B2	50R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M62/2065B3	50R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M62/2065B4	50R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M62/2065M1	50R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M62/2069M1	60R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M62/2069M2	60R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M621/1002B1	50R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M621/1002B2	50R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 18:22:02	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 18:22:29	SIG	M62/2197A1	OFF	M62 J25 - J30	
24/09/15 18:22:29	SIG	M62/2197A2	OFF	M62 J25 - J30	
24/09/15 18:22:29	SIG	M62/2197A3	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2088B2	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2088B3	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2088B4	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2097B2	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2097B3	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2097B4	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2106B2	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2106B3	OFF	M62 J25 - J30	
24/09/15 18:24:16	SIG	M62/2106B4	OFF	M62 J25 - J30	
24/09/15 18:24:17	SIG	M62/2088B1	BLNK	M62 J25 - J30	
24/09/15 18:24:17	SIG	M62/2088B1	BLNK	M62 J25 - J30	
24/09/15 18:24:17	SIG	M62/2097B1	BLNK	M62 J25 - J30	
24/09/15 18:24:17	SIG	M62/2097B1	BLNK	M62 J25 - J30	
24/09/15 18:24:17	SIG	M62/2106B1	BLNK	M62 J25 - J30	
24/09/15 18:26:15	SIG	M62/2057B1	60R	M62 J25 - J30	
24/09/15 18:26:15	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 18:26:15	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 18:26:15	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2113B1	BLNK	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2113B2	OFF	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2113B3	OFF	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2113B4	OFF	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2117B3	OFF	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2125B1	NR	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2125B2	NR	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2125B3	NR	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2125L1	NR	M62 J25 - J30	
24/09/15 18:27:16	SIG	M62/2125L2	NR	M62 J25 - J30	
24/09/15 18:30:15	SIG	M62/2065B2	60R	M62 J25 - J30	
24/09/15 18:30:15	SIG	M62/2065B3	60R	M62 J25 - J30	
24/09/15 18:30:15	SIG	M62/2065B4	60R	M62 J25 - J30	
24/09/15 18:30:15	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 18:30:15	SIG	M621/1002B1	60R	M62 J25 - J30	
24/09/15 18:30:15	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2125B1	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2125B2	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2125B3	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2125L1	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2125L2	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2132B1	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2132B2	NR	M62 J25 - J30	
24/09/15 18:31:16	SIG	M62/2132B3	NR	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2132B1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2132B2	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2132B3	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2137B1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2137B2	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2137B3	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2137B4	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2147B1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2147B2	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2147B3	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2147B4	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2159B1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2159B2	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2159M1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2159M2	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2170B1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2170B2	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2170L1	OFF	M62 J25 - J30	
24/09/15 18:32:16	SIG	M62/2170L2	OFF	M62 J25 - J30	
24/09/15 18:32:35	SIG	M62/2079A1	HSD	M62 J25 - J30	
24/09/15 18:33:43	SIG	M62/2088A1	HSD	M62 J25 - J30	
24/09/15 18:34:16	SIG	M62/2125B1	OFF	M62 J25 - J30	
24/09/15 18:34:16	SIG	M62/2125B2	OFF	M62 J25 - J30	
24/09/15 18:34:16	SIG	M62/2125B3	OFF	M62 J25 - J30	
24/09/15 18:34:16	SIG	M62/2125L1	OFF	M62 J25 - J30	
24/09/15 18:34:16	SIG	M62/2125L2	OFF	M62 J25 - J30	
24/09/15 18:34:51	SIG	M62/2079A1	REDX	M62 J25 - J30	
24/09/15 18:34:51	SIG	M62/2097A1	HSD	M62 J25 - J30	
24/09/15 18:35:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 18:35:59	SIG	M62/2088A1	REDX	M62 J25 - J30	
24/09/15 18:35:59	SIG	M62/2106A1	HSD	M62 J25 - J30	
24/09/15 18:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 18:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 18:37:07	SIG	M62/2097A1	REDX	M62 J25 - J30	
24/09/15 18:38:15	SIG	M62/2106A1	REDX	M62 J25 - J30	
24/09/15 18:38:16	SIG	M62/2081B1	OFF	M62 J25 - J30	
24/09/15 18:38:16	SIG	M62/2081B2	OFF	M62 J25 - J30	
24/09/15 18:38:16	SIG	M62/2081B3	OFF	M62 J25 - J30	
24/09/15 18:38:16	SIG	M62/2081L1	OFF	M62 J25 - J30	
24/09/15 18:39:15	SIG	M62/2065A2	NR	M62 J25 - J30	
24/09/15 18:39:15	SIG	M62/2065A3	NR	M62 J25 - J30	
24/09/15 18:39:15	SIG	M62/2065A4	NR	M62 J25 - J30	
24/09/15 18:39:15	SIG	M62/2074A2	NR	M62 J25 - J30	
24/09/15 18:39:15	SIG	M62/2074A3	NR	M62 J25 - J30	
24/09/15 18:39:15	SIG	M62/2074A4	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2073K1	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2073K2	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2079A2	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2079A3	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2079A4	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2088A2	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2088A3	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2088A4	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2097A2	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2097A3	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2097A4	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2106A2	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2106A3	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2106A4	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2114A1	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2114A2	NR	M62 J25 - J30	
24/09/15 18:39:16	SIG	M62/2114A3	NR	M62 J25 - J30	
24/09/15 18:39:57	SIG	M62/2074A4	OFF	M62 J25 - J30	
24/09/15 18:39:58	SIG	M62/2074A4	NR	M62 J25 - J30	
24/09/15 18:40:15	SIG	M62/2073K1	OFF	M62 J25 - J30	
24/09/15 18:40:15	SIG	M62/2073K2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2074A1	BLNK	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2074A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2074A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2074A4	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2079A1	BLNK	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2079A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2079A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2079A4	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2088A1	BLNK	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2088A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2088A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2088A4	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2097A1	BLNK	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2097A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2097A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2097A4	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2106A1	BLNK	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2106A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2106A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2106A4	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2114A1	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2114A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2114A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2117A1	BLNK	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2117A2	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2117A3	OFF	M62 J25 - J30	
24/09/15 18:40:16	SIG	M62/2117A4	OFF	M62 J25 - J30	
24/09/15 18:44:16	SIG	M62/2074B1	BLNK	M62 J25 - J30	
24/09/15 18:44:16	SIG	M62/2074B2	OFF	M62 J25 - J30	
24/09/15 18:44:16	SIG	M62/2074B3	OFF	M62 J25 - J30	
24/09/15 18:44:16	SIG	M62/2074B4	OFF	M62 J25 - J30	
24/09/15 18:44:16	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 18:44:16	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 18:57:58	SIG	M62/2025A1	HSD	M62 J25 - J30	
24/09/15 18:58:57	SIG	M62/2033A1	HSD	M62 J25 - J30	
24/09/15 18:59:57	SIG	M62/2041A1	HSD	M62 J25 - J30	
24/09/15 18:59:58	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 18:59:58	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 19:01:05	SIG	M62/2033A1	REDX	M62 J25 - J30	
24/09/15 19:01:05	SIG	M62/2050A1	HSD	M62 J25 - J30	
24/09/15 19:01:57	SIG	M62/2041A1	REDX	M62 J25 - J30	
24/09/15 19:02:57	SIG	M62/2050A1	REDX	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2025A2	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2025A3	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2025A4	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2033A2	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2033A3	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2033A4	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2041A2	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2041A3	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2041A4	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2050A2	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2050A3	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2050A4	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2057A1	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2057A2	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2057A3	NR	M62 J25 - J30	
24/09/15 19:03:57	SIG	M62/2057J1	NR	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2008K1	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2008K2	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2012A1	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2012A2	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2012A3	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2018A1	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2018A2	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2018A3	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2018A4	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2025A1	BLNK	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2025A2	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2025A3	OFF	M62 J25 - J30	
24/09/15 19:04:57	SIG	M62/2025A4	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2033A1	BLNK	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2033A2	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2033A3	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2033A4	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2041A1	BLNK	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2041A2	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2041A3	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2041A4	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2050A1	BLNK	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2050A2	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2050A3	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2050A4	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2057A1	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2057A2	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2057A3	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2057J1	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2065A1	BLNK	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2065A2	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2065A3	OFF	M62 J25 - J30	
24/09/15 19:04:58	SIG	M62/2065A4	OFF	M62 J25 - J30	
24/09/15 19:05:13	SIG	M62/2057B1	HSD	M62 J25 - J30	
24/09/15 19:07:12	SIG	M62/2041B1	HSD	M62 J25 - J30	
24/09/15 19:07:12	SIG	M62/2057B1	REDX	M62 J25 - J30	
24/09/15 19:07:12	SIG	M621/1002B1	HSD	M62 J25 - J30	
24/09/15 19:07:12	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 19:07:12	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 19:08:12	SIG	M62/2033B1	HSD	M62 J25 - J30	
24/09/15 19:09:12	SIG	M62/2025B1	HSD	M62 J25 - J30	
24/09/15 19:09:12	SIG	M62/2041B1	REDX	M62 J25 - J30	
24/09/15 19:10:04	SIG	M62/2033B1	REDX	M62 J25 - J30	
24/09/15 19:10:48	SIG	M62/2025B1	REDX	M62 J25 - J30	
24/09/15 19:11:18	SIG	M62/2065B2	NR	M62 J25 - J30	
24/09/15 19:11:18	SIG	M62/2065B3	NR	M62 J25 - J30	
24/09/15 19:11:18	SIG	M62/2065B4	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2018B1	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2018B2	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2018B3	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2018L1	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2025B2	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2025B3	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2025B4	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2033B2	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2033B3	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2033B4	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2041B2	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2041B3	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2041B4	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2050B2	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2050B3	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2050B4	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2057B2	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2057B3	NR	M62 J25 - J30	
24/09/15 19:11:19	SIG	M62/2057B4	NR	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2041B1	BLNK	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2041B2	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2041B3	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2041B4	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2050B2	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2050B3	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2050B4	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2057B1	BLNK	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2057B2	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2057B3	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2057B4	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2065B1	BLNK	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2065B2	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2065B3	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2065B4	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2065M1	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2069M1	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M62/2069M2	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M621/1002B1	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M621/1002B2	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 19:12:19	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2012B1	BLNK	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2012B2	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2012B3	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2012B4	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2018B1	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2018B2	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2018B3	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2018L1	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2025B1	BLNK	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2025B2	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2025B3	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2025B4	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2033B1	BLNK	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2033B2	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 19:12:20	SIG	M62/2033B4	OFF	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2159B1	50R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2159B2	50R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2159M1	50R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2159M2	50R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2170B1	50R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2170B2	LDL	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2177B1	60R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2177B2	60R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2177L1	60R	M62 J25 - J30	
24/09/15 19:13:12	SIG	M62/2177L2	60R	M62 J25 - J30	
24/09/15 19:13:17	SIG	M62/2159B1	40R	M62 J25 - J30	
24/09/15 19:13:17	SIG	M62/2159B2	40R	M62 J25 - J30	
24/09/15 19:13:17	SIG	M62/2159M1	40R	M62 J25 - J30	
24/09/15 19:13:17	SIG	M62/2159M2	40R	M62 J25 - J30	
24/09/15 19:13:22	SIG	M62/2159B2	30R	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2147B1	NR	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2147B2	NR	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2147B3	NR	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2147B4	NR	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2159B1	40R	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2159B2	20R	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2159M1	40R	M62 J25 - J30	
24/09/15 19:13:28	SIG	M62/2159M2	40R	M62 J25 - J30	
24/09/15 19:13:33	SIG	M62/2159B2	STOP	M62 J25 - J30	
24/09/15 19:17:06	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 19:17:06	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 19:21:05	SIG	M62/2170L1	OFF	M62 J25 - J30	
24/09/15 19:21:05	SIG	M62/2170L2	OFF	M62 J25 - J30	
24/09/15 19:22:16	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 19:22:16	SIG	M62/2170L2	50R	M62 J25 - J30	
24/09/15 19:39:13	SIG	M62/2159B1	50R	M62 J25 - J30	
24/09/15 19:39:13	SIG	M62/2159B2	50R	M62 J25 - J30	
24/09/15 19:39:13	SIG	M62/2159M1	50R	M62 J25 - J30	
24/09/15 19:39:13	SIG	M62/2159M2	50R	M62 J25 - J30	
24/09/15 19:39:13	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1987A2	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 20:04:59	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1987A2	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 20:05:15	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2183A1	REDX	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2183A2	60R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2183A3	60R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2183A4	60R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2189A1	REDX	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2189A2	50R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2189A3	50R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2189A4	LDL	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2197A1	50R	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2197A2	LDL	M62 J25 - J30	
24/09/15 20:05:17	SIG	M62/2197A3	LDL	M62 J25 - J30	
24/09/15 20:05:20	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 20:05:20	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 20:05:20	SIG	M62/1968A1	30R	M62 J25 - J30	
24/09/15 20:05:20	SIG	M62/1974A1	30R	M62 J25 - J30	
24/09/15 20:05:20	SIG	M62/1981A1	30R	M62 J25 - J30	
24/09/15 20:05:20	SIG	M62/1987J1	30R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1968A1	20R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1974A1	20R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1981A1	20R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 20:05:25	SIG	M62/1987J1	20R	M62 J25 - J30	
24/09/15 20:05:31	SIG	M62/1968A1	STOP	M62 J25 - J30	
24/09/15 20:05:31	SIG	M62/1974A1	STOP	M62 J25 - J30	
24/09/15 20:05:31	SIG	M62/1981A1	STOP	M62 J25 - J30	
24/09/15 20:05:31	SIG	M62/1987J1	STOP	M62 J25 - J30	
24/09/15 20:08:17	SIG	M62/1999A1	NR	M62 J25 - J30	
24/09/15 20:08:17	SIG	M62/1999A2	NR	M62 J25 - J30	
24/09/15 20:08:17	SIG	M62/1999A3	NR	M62 J25 - J30	
24/09/15 20:12:17	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 20:12:17	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 20:12:17	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 20:13:19	SIG	M62/2177B1	50R	M62 J25 - J30	
24/09/15 20:13:19	SIG	M62/2177B2	50R	M62 J25 - J30	
24/09/15 20:13:19	SIG	M62/2177L1	50R	M62 J25 - J30	
24/09/15 20:13:19	SIG	M62/2177L2	50R	M62 J25 - J30	
24/09/15 20:15:11	SIG	M62/2170L1	LDR	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 20:20:40	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2137B1	NR	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2137B2	NR	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2137B3	NR	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2137B4	NR	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2147B1	60R	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2147B2	60R	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2147B3	60R	M62 J25 - J30	
24/09/15 20:21:18	SIG	M62/2147B4	60R	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/1992A1	50R	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/1992A2	50R	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/1992A3	50R	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/1992J1	50R	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2137B1	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2137B2	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2137B3	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2137B4	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2147B1	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2147B2	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2147B3	NR	M62 J25 - J30	
24/09/15 20:26:18	SIG	M62/2147B4	NR	M62 J25 - J30	
24/09/15 20:26:49	SIG	M62/2159B1	40R	M62 J25 - J30	
24/09/15 20:26:49	SIG	M62/2159B2	40R	M62 J25 - J30	
24/09/15 20:26:49	SIG	M62/2159M1	40R	M62 J25 - J30	
24/09/15 20:26:49	SIG	M62/2159M2	40R	M62 J25 - J30	
24/09/15 20:26:49	SIG	M62/2170B2	LDL	M62 J25 - J30	
24/09/15 20:26:55	SIG	M62/2159B2	30R	M62 J25 - J30	
24/09/15 20:27:00	SIG	M62/2159B1	40R	M62 J25 - J30	
24/09/15 20:27:00	SIG	M62/2159B2	20R	M62 J25 - J30	
24/09/15 20:27:00	SIG	M62/2159M1	40R	M62 J25 - J30	
24/09/15 20:27:00	SIG	M62/2159M2	40R	M62 J25 - J30	
24/09/15 20:27:05	SIG	M62/2159B2	STOP	M62 J25 - J30	
24/09/15 20:28:54	SIG	M62/1992A1	???	M62 J25 - J30	
24/09/15 20:28:55	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 20:29:18	SIG	M62/2137B1	OFF	M62 J25 - J30	
24/09/15 20:29:18	SIG	M62/2137B2	OFF	M62 J25 - J30	
24/09/15 20:29:18	SIG	M62/2137B3	OFF	M62 J25 - J30	
24/09/15 20:29:18	SIG	M62/2137B4	OFF	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1974A1	60R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1974A2	60R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1974A3	60R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1974A4	60R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 20:32:43	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 20:35:00	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 20:35:00	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 20:35:00	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 20:35:00	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 20:36:40	SIG	M62/1955K1	40R	M62 J25 - J30	
24/09/15 20:36:40	SIG	M62/1955K2	40R	M62 J25 - J30	
24/09/15 20:36:45	SIG	M62/1955K1	30R	M62 J25 - J30	
24/09/15 20:36:45	SIG	M62/1955K2	30R	M62 J25 - J30	
24/09/15 20:36:51	SIG	M62/1955K1	20R	M62 J25 - J30	
24/09/15 20:36:51	SIG	M62/1955K2	20R	M62 J25 - J30	
24/09/15 20:36:56	SIG	M62/1955K1	TT	M62 J25 - J30	
24/09/15 20:36:56	SIG	M62/1955K2	TT	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1956A1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1956A2	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1956A3	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1960A1	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1960A2	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1960A3	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1987A3	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1992A2	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1992A3	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1999A1	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1999A2	NR	M62 J25 - J30	
24/09/15 20:41:35	SIG	M62/1999A3	NR	M62 J25 - J30	
24/09/15 20:42:16	SIG	M62/2170L1	50R	M62 J25 - J30	
24/09/15 20:44:35	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1999A1	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1999A2	OFF	M62 J25 - J30	
24/09/15 20:44:36	SIG	M62/1999A3	OFF	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2012B1	REDX	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2012B2	NR	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2012B3	NR	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2012B4	NR	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2033B2	50R	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2033B3	50R	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2033B4	50R	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2041B1	REDX	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2041B2	50R	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2041B3	50R	M62 J25 - J30	
24/09/15 20:49:35	SIG	M62/2041B4	50R	M62 J25 - J30	
24/09/15 20:51:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 20:51:46	SIG	M62/2033B3	???	M62 J25 - J30	
24/09/15 20:53:02	SIG	M62/2170B2	50R	M62 J25 - J30	
24/09/15 20:53:03	SIG	M62/2159B1	50R	M62 J25 - J30	
24/09/15 20:53:03	SIG	M62/2159B2	50R	M62 J25 - J30	
24/09/15 20:53:03	SIG	M62/2159M1	50R	M62 J25 - J30	
24/09/15 20:53:03	SIG	M62/2159M2	50R	M62 J25 - J30	
24/09/15 20:53:32	SIG	M62/2050A2	50R	M62 J25 - J30	
24/09/15 20:53:32	SIG	M62/2050A3	50R	M62 J25 - J30	
24/09/15 20:53:32	SIG	M62/2050A4	50R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2041A1	REDX	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2041A2	60R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2041A3	60R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2041A4	60R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2050A1	STOP	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2050A2	40R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2050A3	40R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2050A4	40R	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2057A1	NR	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2057A2	NR	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2057A3	NR	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2057J1	NR	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2065A1	REDX	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2065A2	NR	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2065A3	NR	M62 J25 - J30	
24/09/15 20:53:37	SIG	M62/2065A4	NR	M62 J25 - J30	
24/09/15 20:53:43	SIG	M62/2050A1	STOP	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2147B1	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2147B2	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2147B3	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2147B4	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2159B1	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2159B2	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2159M1	NR	M62 J25 - J30	
24/09/15 20:56:18	SIG	M62/2159M2	NR	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2170B1	NR	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2170B2	NR	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2170L1	OFF	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2170L2	OFF	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2177B1	OFF	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2177B2	OFF	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2177L1	OFF	M62 J25 - J30	
24/09/15 20:56:19	SIG	M62/2177L2	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2147B1	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2147B2	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2147B3	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2147B4	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2159B1	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2159B2	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2159M1	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2159M2	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2170B1	OFF	M62 J25 - J30	
24/09/15 20:59:19	SIG	M62/2170B2	OFF	M62 J25 - J30	
24/09/15 21:00:03	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 21:00:03	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 21:00:03	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2025B1	STOP	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2025B2	40R	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2025B3	40R	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2025B4	40R	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2041B2	NR	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2041B3	NR	M62 J25 - J30	
24/09/15 21:00:08	SIG	M62/2041B4	NR	M62 J25 - J30	
24/09/15 21:00:13	SIG	M62/2025B1	STOP	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2008K1	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2008K2	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2012A1	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2012A2	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2012A3	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2018A1	HSD	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2018A2	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2018A3	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2018A4	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2025A1	REDX	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2025A2	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2025A3	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2025A4	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2033A1	REDX	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2033A2	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2033A3	60R	M62 J25 - J30	
24/09/15 21:02:19	SIG	M62/2033A4	60R	M62 J25 - J30	
24/09/15 21:03:03	SIG	M62/2041B2	OFF	M62 J25 - J30	
24/09/15 21:03:03	SIG	M62/2041B3	OFF	M62 J25 - J30	
24/09/15 21:03:03	SIG	M62/2041B4	OFF	M62 J25 - J30	
24/09/15 21:03:04	SIG	M62/2041B1	BLNK	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2041B1	REDX	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2041B2	60R	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2041B3	60R	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2041B4	60R	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2050B2	60R	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2050B3	60R	M62 J25 - J30	
24/09/15 21:05:18	SIG	M62/2050B4	60R	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2125B1	NR	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2125B2	NR	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2125B3	NR	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2125L1	50R	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2125L2	50R	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2132B1	50R	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2132B2	50R	M62 J25 - J30	
24/09/15 21:15:20	SIG	M62/2132B3	50R	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2125B1	NR	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2125B2	NR	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2125B3	NR	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2125L1	NR	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2125L2	NR	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2132B1	OFF	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2132B2	OFF	M62 J25 - J30	
24/09/15 21:16:27	SIG	M62/2132B3	OFF	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2125B1	NR	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2125B2	NR	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2125B3	NR	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2125L1	50R	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2125L2	50R	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2132B1	50R	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2132B2	50R	M62 J25 - J30	
24/09/15 21:18:37	SIG	M62/2132B3	50R	M62 J25 - J30	
24/09/15 21:19:07	SIG	M62/2050A1	REDX	M62 J25 - J30	
24/09/15 21:19:07	SIG	M62/2050A2	60R	M62 J25 - J30	
24/09/15 21:19:07	SIG	M62/2050A3	60R	M62 J25 - J30	
24/09/15 21:19:07	SIG	M62/2050A4	60R	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2183A2	NR	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2183A3	NR	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2183A4	NR	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2189A2	NR	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2189A3	NR	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2189A4	NR	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2197A1	OFF	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2197A2	OFF	M62 J25 - J30	
24/09/15 21:19:13	SIG	M62/2197A3	OFF	M62 J25 - J30	
24/09/15 21:22:13	SIG	M62/2183A2	OFF	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2183A1	BLNK	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2183A3	OFF	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2183A4	OFF	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2189A1	BLNK	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2189A2	OFF	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2189A3	OFF	M62 J25 - J30	
24/09/15 21:22:14	SIG	M62/2189A4	OFF	M62 J25 - J30	
24/09/15 21:22:15	SIG	M62/2189A1	BLNK	M62 J25 - J30	
24/09/15 21:30:19	SIG	M62/2018B1	50R	M62 J25 - J30	
24/09/15 21:30:19	SIG	M62/2018B2	50R	M62 J25 - J30	
24/09/15 21:30:19	SIG	M62/2018B3	50R	M62 J25 - J30	
24/09/15 21:30:19	SIG	M62/2018L1	50R	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2008K1	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2008K2	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2012A1	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2012A2	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2012A3	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2018A1	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2018A2	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2018A3	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2018A4	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2025A1	BLNK	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2025A2	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2025A3	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2025A4	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2033A2	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2033A3	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2033A4	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2041A2	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2041A3	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2041A4	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2050A2	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2050A3	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2050A4	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2057A1	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2057A2	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2057A3	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2057J1	NR	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2065A1	BLNK	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2065A2	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2065A3	OFF	M62 J25 - J30	
24/09/15 21:31:19	SIG	M62/2065A4	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2125B1	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2125B2	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2125B3	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2125L1	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2125L2	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2132B1	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2132B2	OFF	M62 J25 - J30	
24/09/15 21:34:07	SIG	M62/2132B3	OFF	M62 J25 - J30	
24/09/15 21:34:19	SIG	M62/2033A2	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2033A1	BLNK	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2033A3	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2033A4	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2041A1	BLNK	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2041A2	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2041A3	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2041A4	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2050A1	BLNK	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2050A2	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2050A3	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2050A4	OFF	M62 J25 - J30	
24/09/15 21:34:20	SIG	M62/2057J1	OFF	M62 J25 - J30	
24/09/15 21:34:21	SIG	M62/2041A1	BLNK	M62 J25 - J30	
24/09/15 21:34:21	SIG	M62/2050A1	BLNK	M62 J25 - J30	
24/09/15 21:43:33	SIG	M62/1955K1	TI	M62 J25 - J30	
24/09/15 21:43:33	SIG	M62/1955K2	TI	M62 J25 - J30	
24/09/15 21:43:47	SIG	M62/2025B1	REDX	M62 J25 - J30	
24/09/15 21:43:47	SIG	M62/2025B2	50R	M62 J25 - J30	
24/09/15 21:43:47	SIG	M62/2025B3	50R	M62 J25 - J30	
24/09/15 21:43:47	SIG	M62/2025B4	50R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M62/2057B1	REDX	M62 J25 - J30	
24/09/15 21:45:19	SIG	M62/2057B2	60R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M62/2057B3	60R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M62/2057B4	60R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M62/2065M1	60R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M621/1002B1	HSD	M62 J25 - J30	
24/09/15 21:45:19	SIG	M621/1002B2	60R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M621/1010B1	60R	M62 J25 - J30	
24/09/15 21:45:19	SIG	M621/1010B2	60R	M62 J25 - J30	
24/09/15 21:49:49	SIG	M62/1955K1	OFF	M62 J25 - J30	
24/09/15 21:49:49	SIG	M62/1955K2	OFF	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1987A2	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 22:34:51	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1987A2	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 22:35:06	SIG	M62/1987J1	40R	M62 J25 - J30	
24/09/15 22:35:11	SIG	M62/1987J1	30R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1974A1	50R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1974A2	50R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1974A3	50R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1974A4	50R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1979K1	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1979K2	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1981A1	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1981A2	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1981A3	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1981A4	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1987A1	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1987A3	40R	M62 J25 - J30	
24/09/15 22:35:16	SIG	M62/1987J1	20R	M62 J25 - J30	
24/09/15 22:35:22	SIG	M62/1987J1	STOP	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 22:48:20	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 22:53:20	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 22:53:20	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 22:53:20	SIG	M62/1956A1	60R	M62 J25 - J30	
24/09/15 22:53:20	SIG	M62/1956A2	60R	M62 J25 - J30	
24/09/15 22:53:20	SIG	M62/1956A3	60R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1960K1	50R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1960K2	50R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1968A1	50R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1968A2	50R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1968A3	50R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1968A4	50R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1974A1	40R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 23:07:52	SIG	M62/1981A1	30R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1960K1	40R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1960K2	40R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1968A1	40R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1974A1	30R	M62 J25 - J30	
24/09/15 23:07:57	SIG	M62/1981A1	20R	M62 J25 - J30	
24/09/15 23:08:02	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 23:08:02	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 23:08:02	SIG	M62/1968A1	30R	M62 J25 - J30	
24/09/15 23:08:02	SIG	M62/1974A1	20R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1955K1	50R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1955K2	50R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1960A1	50R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1960A2	50R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1960A3	50R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1960K1	30R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1960K2	30R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1968A1	20R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1968A2	40R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1968A3	40R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1968A4	40R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1974A1	20R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1974A2	40R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1974A3	40R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1974A4	40R	M62 J25 - J30	
24/09/15 23:08:08	SIG	M62/1981A1	20R	M62 J25 - J30	
24/09/15 23:08:13	SIG	M62/1968A1	STOP	M62 J25 - J30	
24/09/15 23:08:13	SIG	M62/1974A1	STOP	M62 J25 - J30	
24/09/15 23:08:13	SIG	M62/1981A1	STOP	M62 J25 - J30	
24/09/15 23:11:21	SIG	M62/2057B1	BLNK	M62 J25 - J30	
24/09/15 23:11:21	SIG	M62/2057B2	OFF	M62 J25 - J30	
24/09/15 23:11:21	SIG	M62/2057B3	OFF	M62 J25 - J30	
24/09/15 23:11:21	SIG	M62/2057B4	OFF	M62 J25 - J30	
24/09/15 23:11:21	SIG	M62/2065M1	NR	M62 J25 - J30	
24/09/15 23:11:21	SIG	M621/1002B1	OFF	M62 J25 - J30	
24/09/15 23:11:21	SIG	M621/1002B2	OFF	M62 J25 - J30	
24/09/15 23:11:21	SIG	M621/1010B1	OFF	M62 J25 - J30	
24/09/15 23:11:21	SIG	M621/1010B2	OFF	M62 J25 - J30	
24/09/15 23:14:21	SIG	M62/2065M1	OFF	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1955K1	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1955K2	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1960A1	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1960A2	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1960A3	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1960K1	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1960K2	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1968A1	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1968A2	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1968A3	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1968A4	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1974A1	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1974A2	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1974A3	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1974A4	60R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1979K1	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1979K2	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1981A1	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1981A2	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1981A3	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1981A4	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1987A1	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1987A3	50R	M62 J25 - J30	
24/09/15 23:22:38	SIG	M62/1987J1	50R	M62 J25 - J30	
24/09/15 23:23:19	SIG	M62/1992A1	NR	M62 J25 - J30	
24/09/15 23:23:19	SIG	M62/1992A2	NR	M62 J25 - J30	
24/09/15 23:23:19	SIG	M62/1992A3	NR	M62 J25 - J30	
24/09/15 23:23:45	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1987A1	NR	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1987A3	NR	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1987J1	OFF	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1992A1	NR	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1992A2	NR	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1992A3	NR	M62 J25 - J30	
24/09/15 23:30:32	SIG	M62/1992J1	NR	M62 J25 - J30	
24/09/15 23:33:32	SIG	M62/1992J1	OFF	M62 J25 - J30	
24/09/15 23:33:33	SIG	M62/1992A1	OFF	M62 J25 - J30	
24/09/15 23:33:33	SIG	M62/1992A2	OFF	M62 J25 - J30	
24/09/15 23:33:33	SIG	M62/1992A3	OFF	M62 J25 - J30	
24/09/15 23:42:21	SIG	M62/1955K1	OFF	M62 J25 - J30	
24/09/15 23:42:21	SIG	M62/1955K2	OFF	M62 J25 - J30	
24/09/15 23:42:21	SIG	M62/1956A1	OFF	M62 J25 - J30	
24/09/15 23:42:21	SIG	M62/1956A2	OFF	M62 J25 - J30	
24/09/15 23:42:21	SIG	M62/1956A3	OFF	M62 J25 - J30	
24/09/15 23:50:21	SIG	M62/2018B1	OFF	M62 J25 - J30	
24/09/15 23:50:21	SIG	M62/2018B2	OFF	M62 J25 - J30	
24/09/15 23:50:21	SIG	M62/2018B3	OFF	M62 J25 - J30	
24/09/15 23:50:21	SIG	M62/2018L1	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1960A1	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1960A2	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1960A3	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1960K1	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1960K2	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1968A1	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1968A2	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1968A3	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1968A4	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1974A1	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1974A2	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1974A3	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1974A4	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1979K1	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1979K2	OFF	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1981A1	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1981A2	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1981A3	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1981A4	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1987A1	NR	M62 J25 - J30	
24/09/15 23:50:31	SIG	M62/1987A3	NR	M62 J25 - J30	
24/09/15 23:53:31	SIG	M62/1974A1	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1968A1	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1968A2	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1968A3	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1968A4	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1974A2	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1974A3	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1974A4	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1981A1	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1981A2	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1981A3	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1981A4	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1987A1	OFF	M62 J25 - J30	
24/09/15 23:53:42	SIG	M62/1987A3	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2012B1	BLNK	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2012B2	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2012B3	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2012B4	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2025B1	BLNK	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2025B1	BLNK	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2025B2	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2025B3	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2025B4	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2033B1	BLNK	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2033B1	BLNK	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2033B2	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2033B4	OFF	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2041B2	NR	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2041B3	NR	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2041B4	NR	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2050B2	NR	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2050B3	NR	M62 J25 - J30	
25/09/15 00:50:23	SIG	M62/2050B4	NR	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2041B1	BLNK	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2041B2	OFF	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2041B3	OFF	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2041B4	OFF	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2050B2	OFF	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2050B3	OFF	M62 J25 - J30	
25/09/15 00:53:23	SIG	M62/2050B4	OFF	M62 J25 - J30	
25/09/15 00:53:24	SIG	M62/2041B1	BLNK	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2170B1	NR	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2170B2	NR	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2170L1	LDR	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 01:02:43	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2170B1	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2170B2	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2170L1	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2170L2	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2177B1	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2177B2	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2177L1	OFF	M62 J25 - J30	
25/09/15 01:30:29	SIG	M62/2177L2	OFF	M62 J25 - J30	
25/09/15 01:35:15	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 01:35:15	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 01:35:15	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2012B1	REDX	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2012B2	NR	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2012B3	NR	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2012B4	NR	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2025B1	STOP	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2025B2	40R	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2025B3	40R	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2025B4	40R	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2033B1	REDX	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 01:35:21	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 01:35:26	SIG	M62/2025B1	STOP	M62 J25 - J30	
25/09/15 01:37:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 01:37:29	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 02:14:25	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 02:14:25	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2041B1	REDX	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 02:14:30	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 02:17:22	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 02:17:22	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 02:17:28	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2012B1	BLNK	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2012B2	OFF	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2012B3	OFF	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2012B4	OFF	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2025B2	OFF	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2025B3	OFF	M62 J25 - J30	
25/09/15 02:19:37	SIG	M62/2025B4	OFF	M62 J25 - J30	
25/09/15 02:20:24	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 02:20:25	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 02:20:31	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 02:23:28	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 02:23:29	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 02:23:34	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 02:24:08	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 02:24:08	SIG	M62/2025B2	NR	M62 J25 - J30	
25/09/15 02:24:08	SIG	M62/2025B3	NR	M62 J25 - J30	
25/09/15 02:24:08	SIG	M62/2025B4	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2025B2	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2025B3	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2025B4	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2033B2	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2033B3	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2033B4	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2041B2	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2041B3	NR	M62 J25 - J30	
25/09/15 02:24:10	SIG	M62/2041B4	NR	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2025B2	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2025B3	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2025B4	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2033B2	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2033B4	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2041B2	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2041B3	OFF	M62 J25 - J30	
25/09/15 02:27:10	SIG	M62/2041B4	OFF	M62 J25 - J30	
25/09/15 02:27:11	SIG	M62/2025B1	BLNK	M62 J25 - J30	
25/09/15 02:27:11	SIG	M62/2025B1	BLNK	M62 J25 - J30	
25/09/15 02:27:11	SIG	M62/2033B1	BLNK	M62 J25 - J30	
25/09/15 02:27:11	SIG	M62/2041B1	BLNK	M62 J25 - J30	
25/09/15 02:27:11	SIG	M62/2041B1	BLNK	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2041A1	REDX	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2050A1	REDX	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2050A2	NR	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2050A3	NR	M62 J25 - J30	
25/09/15 03:13:57	SIG	M62/2050A4	NR	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1968B1	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1968B2	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1968B3	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1968L1	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1974B1	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1974B2	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1974B3	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1974B4	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1974M1	50R	M62 J25 - J30	
25/09/15 03:31:27	SIG	M62/1974M2	50R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1968B1	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1968B2	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1968B3	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1968L1	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1974B1	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1974B2	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1974B3	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1974B4	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1974M1	40R	M62 J25 - J30	
25/09/15 03:31:32	SIG	M62/1974M2	40R	M62 J25 - J30	
25/09/15 03:31:38	SIG	M62/1968L1	30R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1960B1	NR	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1960B2	NR	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1960B3	NR	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1960L1	NR	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1960L2	NR	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1968B1	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1968B2	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1968B3	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1968L1	20R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1974B1	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1974B2	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1974B3	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1974B4	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1974M1	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1974M2	40R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1981B1	50R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1981B2	50R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1981B3	50R	M62 J25 - J30	
25/09/15 03:31:43	SIG	M62/1981B4	50R	M62 J25 - J30	
25/09/15 03:31:48	SIG	M62/1968L1	STOP	M62 J25 - J30	
25/09/15 03:31:56	SIG	M62/1968B1	30R	M62 J25 - J30	
25/09/15 03:32:02	SIG	M62/1968B1	20R	M62 J25 - J30	
25/09/15 03:32:07	SIG	M62/1968B1	STOP	M62 J25 - J30	
25/09/15 03:35:49	SIG	M62/1968B1	40R	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1960B1	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1960B2	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1960B3	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1960L1	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1960L2	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1968B1	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1968B2	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1968B3	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1968L1	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1974B1	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1974B2	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1974B3	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1974B4	NR	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1974M1	OFF	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1974M2	OFF	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1981B1	OFF	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1981B2	OFF	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1981B3	OFF	M62 J25 - J30	
25/09/15 03:42:13	SIG	M62/1981B4	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1960B1	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1960B2	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1960B3	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1960L1	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1960L2	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1968B1	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1968B2	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1968B3	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1968L1	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1974B1	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1974B2	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1974B3	OFF	M62 J25 - J30	
25/09/15 03:45:14	SIG	M62/1974B4	OFF	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2183A1	REDX	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2183A2	60R	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2183A3	60R	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2183A4	60R	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2189A1	REDX	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2189A2	50R	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2189A3	50R	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2189A4	LDL	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2197A1	50R	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2197A2	LDL	M62 J25 - J30	
25/09/15 03:54:43	SIG	M62/2197A3	LDL	M62 J25 - J30	
25/09/15 04:06:21	SIG	M62/2041A2	NR	M62 J25 - J30	
25/09/15 04:06:21	SIG	M62/2041A3	NR	M62 J25 - J30	
25/09/15 04:06:21	SIG	M62/2041A4	NR	M62 J25 - J30	
25/09/15 04:06:21	SIG	M62/2050A2	NR	M62 J25 - J30	
25/09/15 04:06:21	SIG	M62/2050A3	NR	M62 J25 - J30	
25/09/15 04:06:21	SIG	M62/2050A4	NR	M62 J25 - J30	
25/09/15 04:09:21	SIG	M62/2041A2	OFF	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2041A1	BLNK	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2041A3	OFF	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2041A4	OFF	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2050A1	BLNK	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2050A2	OFF	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2050A3	OFF	M62 J25 - J30	
25/09/15 04:09:22	SIG	M62/2050A4	OFF	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2012A2	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2012A3	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2018A1	HSD	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2025A1	REDX	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2033A1	REDX	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2041A1	REDX	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2041A2	NR	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2041A3	NR	M62 J25 - J30	
25/09/15 04:33:28	SIG	M62/2041A4	NR	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2183A1	BLNK	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2183A2	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2183A3	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2183A4	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2189A1	BLNK	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2189A2	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2189A3	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2189A4	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2197A1	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2197A2	OFF	M62 J25 - J30	
25/09/15 04:47:37	SIG	M62/2197A3	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2008K1	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2008K2	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2012A1	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2012A2	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2012A3	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2018A1	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2018A2	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2018A3	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2018A4	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2025A1	BLNK	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2025A2	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2025A3	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2025A4	OFF	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2033A2	NR	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2033A3	NR	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2033A4	NR	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2041A2	NR	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2041A3	NR	M62 J25 - J30	
25/09/15 04:51:42	SIG	M62/2041A4	NR	M62 J25 - J30	
25/09/15 04:54:42	SIG	M62/2033A2	OFF	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2033A1	BLNK	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2033A3	OFF	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2033A4	OFF	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2041A1	BLNK	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2041A2	OFF	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2041A3	OFF	M62 J25 - J30	
25/09/15 04:54:43	SIG	M62/2041A4	OFF	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2012A2	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2012A3	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2025A1	REDX	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2025A2	NR	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2025A3	NR	M62 J25 - J30	
25/09/15 06:45:11	SIG	M62/2025A4	NR	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2018A1	HSD	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2033A1	REDX	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2041A1	REDX	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2050A1	REDX	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2050A2	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2050A3	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2050A4	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2057A1	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2057A2	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2057A3	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2057J1	60R	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2065A1	REDX	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2065A2	NR	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2065A3	NR	M62 J25 - J30	
25/09/15 06:45:12	SIG	M62/2065A4	NR	M62 J25 - J30	
25/09/15 06:47:10	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 06:47:33	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 06:47:57	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 06:48:01	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 06:48:01	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 06:50:14	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 06:50:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 06:51:29	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2033B2	NR	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2033B3	NR	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2033B4	NR	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2041B1	REDX	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2050B2	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2050B3	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2050B4	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2065B1	REDX	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2065B2	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2065B3	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2065B4	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2065M1	NR	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2065M1	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2069M1	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M62/2069M2	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
25/09/15 06:59:35	SIG	M621/1002B2	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 06:59:35	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2012B1	REDX	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2012B2	NR	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2012B3	NR	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2012B4	NR	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2018B1	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2018B2	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2018B3	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2018L1	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2025B2	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2025B3	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2025B4	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 06:59:36	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 07:01:16	SIG	M62/2025B1	60R	M62 J25 - J30	
25/09/15 07:01:52	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 07:02:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 07:02:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 07:02:12	SIG	M62/2041B1	60R	M62 J25 - J30	
25/09/15 07:02:42	SIG	M62/2057B1	60R	M62 J25 - J30	
25/09/15 07:02:42	SIG	M621/1002B1	60R	M62 J25 - J30	
25/09/15 07:02:42	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 07:02:42	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2159B1	NR	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2159B2	NR	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2170B1	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2170B2	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 07:06:05	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2170B1	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2170B2	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2177B1	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2177B2	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2177L1	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2177L2	40R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 07:06:11	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 07:08:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:08:37	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:08:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:08:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:10:29	SIG	M62/2004A1	60R	M62 J25 - J30	
25/09/15 07:10:29	SIG	M62/2004A2	60R	M62 J25 - J30	
25/09/15 07:10:29	SIG	M62/2004A3	60R	M62 J25 - J30	
25/09/15 07:10:29	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 07:10:45	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 07:10:45	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 07:10:45	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 07:10:51	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 07:11:29	SIG	M62/2194B1	60R	M62 J25 - J30	
25/09/15 07:11:29	SIG	M62/2194B2	60R	M62 J25 - J30	
25/09/15 07:11:29	SIG	M62/2194B3	60R	M62 J25 - J30	
25/09/15 07:11:29	SIG	M62/2194B4	60R	M62 J25 - J30	
25/09/15 07:13:29	SIG	M62/2197B1	60R	M62 J25 - J30	
25/09/15 07:13:29	SIG	M62/2197B2	60R	M62 J25 - J30	
25/09/15 07:13:29	SIG	M62/2197B3	60R	M62 J25 - J30	
25/09/15 07:13:29	SIG	M62/2199M1	60R	M62 J25 - J30	
25/09/15 07:13:29	SIG	M62/2199M2	60R	M62 J25 - J30	
25/09/15 07:13:46	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:13:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:13:52	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:14:48	SIG	M62/2159B1	NR	M62 J25 - J30	
25/09/15 07:14:48	SIG	M62/2159B2	NR	M62 J25 - J30	
25/09/15 07:14:48	SIG	M62/2170B1	NR	M62 J25 - J30	
25/09/15 07:14:48	SIG	M62/2170B2	NR	M62 J25 - J30	
25/09/15 07:14:48	SIG	M62/2170L1	NR	M62 J25 - J30	
25/09/15 07:14:48	SIG	M62/2170L2	NR	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2177B1	60R	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2177B2	60R	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2177L1	60R	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2177L2	60R	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2203B1	60R	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2203B2	60R	M62 J25 - J30	
25/09/15 07:15:29	SIG	M62/2203B3	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2183B1	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2183B2	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2183L1	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2183L2	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 07:15:33	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2159B1	NR	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2159B2	NR	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2170B1	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2170B2	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 07:15:56	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2170B1	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2170B2	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2177B1	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2177B2	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2177L1	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2177L2	40R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 07:16:02	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 07:16:38	SIG	M62/2113B1	REDX	M62 J25 - J30	
25/09/15 07:16:38	SIG	M62/2113B2	NR	M62 J25 - J30	
25/09/15 07:16:38	SIG	M62/2113B3	NR	M62 J25 - J30	
25/09/15 07:16:38	SIG	M62/2113B4	NR	M62 J25 - J30	
25/09/15 07:16:38	SIG	M62/2120M1	60R	M62 J25 - J30	
25/09/15 07:16:38	SIG	M62/2120M2	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2088B1	REDX	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2088B2	NR	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2088B3	NR	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2088B4	NR	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2097B1	REDX	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2097B2	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2097B4	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2106B1	REDX	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2106B2	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2106B3	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2106B4	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2113B2	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2113B3	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2113B4	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2117B1	60R	M62 J25 - J30	
25/09/15 07:16:48	SIG	M62/2117B3	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2074B1	REDX	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2074B2	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2074B3	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2074B4	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2081B1	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2081B2	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2081B3	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2081L1	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2088B2	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2088B3	60R	M62 J25 - J30	
25/09/15 07:16:49	SIG	M62/2088B4	60R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 07:17:27	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 07:18:44	SIG	M62/2088B1	60R	M62 J25 - J30	
25/09/15 07:19:04	SIG	M62/2097B1	60R	M62 J25 - J30	
25/09/15 07:19:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 07:19:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 07:19:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 07:19:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 07:19:44	SIG	M62/2106B1	60R	M62 J25 - J30	
25/09/15 07:19:48	SIG	M62/2113B1	60R	M62 J25 - J30	
25/09/15 07:19:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:20:00	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:20:05	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:20:14	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:20:14	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 07:20:14	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 07:20:14	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2189B1	40R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2189B2	40R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2189B3	40R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2189B4	40R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2194B1	50R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2194B2	50R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2194B3	50R	M62 J25 - J30	
25/09/15 07:20:15	SIG	M62/2194B4	50R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 07:20:19	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 07:21:15	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 07:21:15	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 07:21:46	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 07:22:30	SIG	M62/1999A1	60R	M62 J25 - J30	
25/09/15 07:22:30	SIG	M62/1999A2	60R	M62 J25 - J30	
25/09/15 07:22:30	SIG	M62/1999A3	60R	M62 J25 - J30	
25/09/15 07:22:30	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 07:22:30	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 07:22:59	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:23:00	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:23:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:23:06	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 07:23:06	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:23:11	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2065A2	60R	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2065A3	60R	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2065A4	60R	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2073K1	60R	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2073K2	60R	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2079A1	REDX	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2079A2	NR	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2079A3	NR	M62 J25 - J30	
25/09/15 07:24:11	SIG	M62/2079A4	NR	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2074A2	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2074A3	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2074A4	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2079A2	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2079A3	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2079A4	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2088A1	REDX	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2088A2	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2088A3	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2088A4	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2097A1	REDX	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2097A2	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2097A3	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2097A4	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2106A1	REDX	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2106A2	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2106A3	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2106A4	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2114A1	NR	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2114A1	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2114A2	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2114A2	NR	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2114A3	NR	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2114A3	60R	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2117A1	REDX	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2117A2	NR	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2117A3	NR	M62 J25 - J30	
25/09/15 07:24:12	SIG	M62/2117A4	NR	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2194B1	60R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2194B2	60R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2194B3	60R	M62 J25 - J30	
25/09/15 07:24:15	SIG	M62/2194B4	60R	M62 J25 - J30	
25/09/15 07:25:47	SIG	M62/2106A1	60R	M62 J25 - J30	
25/09/15 07:25:53	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 07:25:53	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 07:25:53	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 07:25:54	SIG	M62/2004A1	40R	M62 J25 - J30	
25/09/15 07:25:54	SIG	M62/2004A2	40R	M62 J25 - J30	
25/09/15 07:25:54	SIG	M62/2004A3	40R	M62 J25 - J30	
25/09/15 07:26:04	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:26:05	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2189B1	40R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2189B2	40R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2189B3	40R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2189B4	40R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2194B1	50R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2194B2	50R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2194B3	50R	M62 J25 - J30	
25/09/15 07:26:08	SIG	M62/2194B4	50R	M62 J25 - J30	
25/09/15 07:26:10	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 07:26:11	SIG	M62/2097A1	60R	M62 J25 - J30	
25/09/15 07:26:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:26:12	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:26:17	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:26:30	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 07:26:30	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 07:26:30	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 07:26:30	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 07:26:54	SIG	M62/2088A1	60R	M62 J25 - J30	
25/09/15 07:26:58	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 07:26:58	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 07:26:58	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 07:26:58	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 07:26:59	SIG	M62/2079A1	60R	M62 J25 - J30	
25/09/15 07:27:07	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 07:27:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 07:27:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 07:27:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 07:27:13	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 07:27:31	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 07:28:30	SIG	M62/1992A1	60R	M62 J25 - J30	
25/09/15 07:28:30	SIG	M62/1992A2	60R	M62 J25 - J30	
25/09/15 07:28:30	SIG	M62/1992A3	60R	M62 J25 - J30	
25/09/15 07:28:30	SIG	M62/1992J1	60R	M62 J25 - J30	
25/09/15 07:29:09	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:29:09	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:29:15	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 07:29:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:29:27	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:29:32	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1999J1	40R	M62 J25 - J30	
25/09/15 07:30:05	SIG	M62/1999J2	40R	M62 J25 - J30	
25/09/15 07:30:58	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 07:30:58	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 07:30:58	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 07:30:58	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1979K1	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1979K2	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1981A1	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1981A2	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1981A3	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1981A4	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1987A1	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1987A3	60R	M62 J25 - J30	
25/09/15 07:31:40	SIG	M62/1987J1	60R	M62 J25 - J30	
25/09/15 07:32:13	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:32:14	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:32:19	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 07:32:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:32:26	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:32:30	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:32:31	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:32:32	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:33:35	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 07:33:35	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 07:33:35	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 07:33:40	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 07:34:25	SIG	M62/1987J1	40R	M62 J25 - J30	
25/09/15 07:34:30	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 07:34:30	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 07:34:30	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 07:34:30	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 07:35:25	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:35:25	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:35:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:35:30	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:35:31	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 07:35:35	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2177B1	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2177B2	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2177L1	60R	M62 J25 - J30	
25/09/15 07:35:58	SIG	M62/2177L2	60R	M62 J25 - J30	
25/09/15 07:36:09	SIG	M62/2183B1	60R	M62 J25 - J30	
25/09/15 07:36:09	SIG	M62/2183B2	60R	M62 J25 - J30	
25/09/15 07:36:09	SIG	M62/2183L1	60R	M62 J25 - J30	
25/09/15 07:36:09	SIG	M62/2183L2	60R	M62 J25 - J30	
25/09/15 07:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 07:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 07:36:16	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2177B1	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2177B2	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2177L1	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2177L2	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 07:36:21	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 07:36:30	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 07:36:30	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 07:36:30	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 07:36:30	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 07:36:32	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 07:36:32	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 07:36:40	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:36:41	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:36:46	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 07:36:57	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 07:37:30	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 07:37:30	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 07:37:30	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 07:37:30	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 07:37:30	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 07:38:25	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:38:25	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:38:25	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 07:38:25	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 07:38:25	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 07:38:26	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 07:38:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:38:37	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:38:42	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:39:50	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 07:39:50	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 07:39:50	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 07:39:50	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 07:39:56	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:39:56	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:40:01	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:41:27	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 07:41:27	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2194B1	60R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2194B2	60R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2194B3	60R	M62 J25 - J30	
25/09/15 07:41:32	SIG	M62/2194B4	60R	M62 J25 - J30	
25/09/15 07:41:43	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:41:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 07:41:45	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 07:41:48	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:41:56	SIG	M62/2183L1	OFF	M62 J25 - J30	
25/09/15 07:41:56	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 07:42:02	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2189B1	40R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2189B2	40R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2189B3	40R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2189B4	40R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2194B1	50R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2194B2	50R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2194B3	50R	M62 J25 - J30	
25/09/15 07:42:24	SIG	M62/2194B4	50R	M62 J25 - J30	
25/09/15 07:42:55	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:42:56	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:43:01	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 07:43:11	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 07:43:47	SIG	M62/2177B1	60R	M62 J25 - J30	
25/09/15 07:43:47	SIG	M62/2177B2	60R	M62 J25 - J30	
25/09/15 07:43:47	SIG	M62/2177L1	60R	M62 J25 - J30	
25/09/15 07:43:47	SIG	M62/2177L2	60R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1974A1	40R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 07:44:45	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 07:44:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:44:49	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:44:54	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:45:30	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 07:45:30	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 07:45:30	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 07:45:30	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 07:45:30	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 07:45:47	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 07:45:47	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 07:45:47	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 07:45:47	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 07:45:53	SIG	M62/2177B1	40R	M62 J25 - J30	
25/09/15 07:45:53	SIG	M62/2177B2	40R	M62 J25 - J30	
25/09/15 07:45:53	SIG	M62/2177L1	40R	M62 J25 - J30	
25/09/15 07:45:53	SIG	M62/2177L2	40R	M62 J25 - J30	
25/09/15 07:46:02	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:46:02	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:46:08	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:46:08	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 07:46:08	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 07:47:20	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 07:47:57	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:47:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 07:47:59	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 07:48:03	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 07:49:14	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 07:49:14	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 07:49:14	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2194B1	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2194B2	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2194B3	60R	M62 J25 - J30	
25/09/15 07:49:22	SIG	M62/2194B4	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2177B1	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2177B2	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2177L1	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2177L2	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2183B1	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2183B2	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2183L1	60R	M62 J25 - J30	
25/09/15 07:49:48	SIG	M62/2183L2	60R	M62 J25 - J30	
25/09/15 07:50:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:50:12	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1955K1	50R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1955K2	50R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1956A1	50R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1956A2	50R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1956A3	50R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1960A1	40R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1960A2	40R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1960A3	40R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1960K1	40R	M62 J25 - J30	
25/09/15 07:51:40	SIG	M62/1960K2	40R	M62 J25 - J30	
25/09/15 07:51:45	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 07:51:45	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 07:51:45	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 07:51:45	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 07:51:45	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 07:51:45	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 07:51:52	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 07:51:52	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 07:51:52	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 07:51:52	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 07:52:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:52:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:52:34	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 07:52:34	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 07:52:34	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 07:52:34	SIG	M62/1999J1	40R	M62 J25 - J30	
25/09/15 07:52:34	SIG	M62/1999J2	40R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2050A1	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2050A2	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2050A3	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2050A4	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2057A1	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2057A2	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2057A3	50R	M62 J25 - J30	
25/09/15 07:53:27	SIG	M62/2057J1	50R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2050A1	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2050A2	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2050A3	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2050A4	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2057A1	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2057A2	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2057A3	40R	M62 J25 - J30	
25/09/15 07:53:33	SIG	M62/2057J1	40R	M62 J25 - J30	
25/09/15 07:53:41	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 07:53:41	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 07:53:41	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 07:53:46	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:53:46	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 07:53:46	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 07:53:46	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 07:53:55	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 07:53:55	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 07:53:55	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 07:53:55	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 07:54:28	SIG	M62/1955K1	40R	M62 J25 - J30	
25/09/15 07:54:28	SIG	M62/1955K2	40R	M62 J25 - J30	
25/09/15 07:54:28	SIG	M62/1956A1	40R	M62 J25 - J30	
25/09/15 07:54:28	SIG	M62/1956A2	40R	M62 J25 - J30	
25/09/15 07:54:28	SIG	M62/1956A3	40R	M62 J25 - J30	
25/09/15 07:56:25	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:56:26	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:56:31	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:56:31	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 07:56:31	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 07:56:31	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 07:56:31	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 07:56:45	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 07:56:45	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 07:56:45	SIG	M62/1987J1	40R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2170B1	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2170B2	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 07:56:53	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2170B1	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2170B2	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2177B1	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2177B2	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2177L1	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2177L2	40R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M621/1002A1	50R	M62 J25 - J30	
25/09/15 07:56:58	SIG	M621/1002A2	50R	M62 J25 - J30	
25/09/15 07:57:04	SIG	M621/1002A1	40R	M62 J25 - J30	
25/09/15 07:57:04	SIG	M621/1002A2	40R	M62 J25 - J30	
25/09/15 07:57:14	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 07:57:14	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 07:57:14	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 07:57:14	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 07:57:31	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 07:58:24	SIG	M62/2050A1	50R	M62 J25 - J30	
25/09/15 07:58:24	SIG	M62/2050A2	50R	M62 J25 - J30	
25/09/15 07:58:24	SIG	M62/2050A3	50R	M62 J25 - J30	
25/09/15 07:58:24	SIG	M62/2050A4	50R	M62 J25 - J30	
25/09/15 07:59:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:59:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:59:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:59:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 07:59:33	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 07:59:34	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 07:59:34	SIG	M62/2050A1	40R	M62 J25 - J30	
25/09/15 07:59:34	SIG	M62/2050A2	40R	M62 J25 - J30	
25/09/15 07:59:34	SIG	M62/2050A3	40R	M62 J25 - J30	
25/09/15 07:59:34	SIG	M62/2050A4	40R	M62 J25 - J30	
25/09/15 07:59:39	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 07:59:55	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1955K1	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1955K2	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1956A1	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1956A2	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1956A3	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 07:59:56	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 08:00:08	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:00:08	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:00:08	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:00:14	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:00:52	SIG	M62/2159B1	NR	M62 J25 - J30	
25/09/15 08:00:52	SIG	M62/2159B2	NR	M62 J25 - J30	
25/09/15 08:00:52	SIG	M62/2170B1	NR	M62 J25 - J30	
25/09/15 08:00:52	SIG	M62/2170B2	NR	M62 J25 - J30	
25/09/15 08:00:52	SIG	M62/2170L1	NR	M62 J25 - J30	
25/09/15 08:00:52	SIG	M62/2170L2	NR	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 08:01:44	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 08:01:56	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 08:01:56	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 08:01:56	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 08:01:56	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 08:01:56	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 08:01:56	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 08:02:08	SIG	M621/1002A1	OFF	M62 J25 - J30	
25/09/15 08:02:08	SIG	M621/1002A2	OFF	M62 J25 - J30	
25/09/15 08:02:28	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:02:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:02:34	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:02:39	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:02:40	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 08:02:45	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 08:02:54	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 08:02:54	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 08:02:54	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 08:02:54	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 08:02:54	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2004A1	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2004A2	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2004A3	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 08:03:02	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 08:03:08	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 08:03:14	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 08:03:27	SIG	M62/1974A1	40R	M62 J25 - J30	
25/09/15 08:03:27	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 08:03:27	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 08:03:27	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 08:03:30	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 08:03:30	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 08:03:30	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 08:03:30	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 08:03:43	SIG	M62/2159B1	NR	M62 J25 - J30	
25/09/15 08:03:43	SIG	M62/2159B2	NR	M62 J25 - J30	
25/09/15 08:03:44	SIG	M62/2170B1	50R	M62 J25 - J30	
25/09/15 08:03:44	SIG	M62/2170B2	50R	M62 J25 - J30	
25/09/15 08:03:44	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 08:03:44	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 08:03:49	SIG	M62/2170B1	40R	M62 J25 - J30	
25/09/15 08:03:49	SIG	M62/2170B2	40R	M62 J25 - J30	
25/09/15 08:03:49	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 08:03:49	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 08:04:04	SIG	M621/1002A1	50R	M62 J25 - J30	
25/09/15 08:04:04	SIG	M621/1002A2	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 08:04:07	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 08:04:09	SIG	M621/1002A1	40R	M62 J25 - J30	
25/09/15 08:04:09	SIG	M621/1002A2	40R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 08:04:31	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 08:05:19	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 08:05:19	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 08:05:19	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:05:38	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 08:05:51	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 08:05:56	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 08:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 08:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 08:06:31	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 08:06:31	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 08:06:54	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:06:55	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 08:07:02	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2189B1	40R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2189B2	40R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2189B3	40R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2189B4	40R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2194B1	50R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2194B2	50R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2194B3	50R	M62 J25 - J30	
25/09/15 08:07:26	SIG	M62/2194B4	50R	M62 J25 - J30	
25/09/15 08:07:27	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 08:07:27	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 08:07:27	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 08:07:27	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 08:07:27	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 08:07:27	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 08:07:30	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 08:07:30	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 08:07:30	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 08:07:30	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 08:07:43	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 08:07:43	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 08:07:43	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 08:07:43	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 08:07:59	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 08:07:59	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 08:07:59	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 08:07:59	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 08:07:59	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 08:08:04	SIG	M621/1002A1	OFF	M62 J25 - J30	
25/09/15 08:08:04	SIG	M621/1002A2	OFF	M62 J25 - J30	
25/09/15 08:08:07	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 08:08:08	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 08:08:14	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 08:08:18	SIG	M62/2170B1	50R	M62 J25 - J30	
25/09/15 08:08:18	SIG	M62/2170B2	50R	M62 J25 - J30	
25/09/15 08:08:18	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 08:08:18	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 08:08:23	SIG	M62/2170B1	40R	M62 J25 - J30	
25/09/15 08:08:23	SIG	M62/2170B2	40R	M62 J25 - J30	
25/09/15 08:08:23	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 08:08:23	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 08:08:30	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 08:08:30	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 08:08:30	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 08:08:30	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 08:08:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:08:38	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:08:44	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:09:18	SIG	M621/1002A1	50R	M62 J25 - J30	
25/09/15 08:09:18	SIG	M621/1002A2	50R	M62 J25 - J30	
25/09/15 08:09:23	SIG	M621/1002A1	40R	M62 J25 - J30	
25/09/15 08:09:23	SIG	M621/1002A2	40R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1979K1	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1979K2	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1981A1	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1981A2	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1981A3	60R	M62 J25 - J30	
25/09/15 08:09:31	SIG	M62/1981A4	60R	M62 J25 - J30	
25/09/15 08:09:41	SIG	M62/2004A1	40R	M62 J25 - J30	
25/09/15 08:09:41	SIG	M62/2004A2	40R	M62 J25 - J30	
25/09/15 08:09:41	SIG	M62/2004A3	40R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1987A1	60R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1987A3	60R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1987J1	60R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1992A1	60R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1992A2	60R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1992A3	60R	M62 J25 - J30	
25/09/15 08:10:40	SIG	M62/1992J1	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 08:10:46	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 08:11:12	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 08:11:12	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 08:11:18	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2194B1	60R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2194B2	60R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2194B3	60R	M62 J25 - J30	
25/09/15 08:11:26	SIG	M62/2194B4	60R	M62 J25 - J30	
25/09/15 08:11:32	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 08:11:32	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 08:11:32	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 08:11:32	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 08:11:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:11:45	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:11:50	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:12:51	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 08:12:51	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 08:12:51	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 08:12:51	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 08:13:00	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 08:13:05	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:13:05	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:13:06	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:13:07	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:13:18	SIG	M621/1002A1	OFF	M62 J25 - J30	
25/09/15 08:13:18	SIG	M621/1002A2	OFF	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:13:32	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:14:25	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 08:14:25	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1999J1	40R	M62 J25 - J30	
25/09/15 08:14:34	SIG	M62/1999J2	40R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2050A2	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2050A3	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2050A4	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2057A1	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2057A2	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2057A3	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2057J1	60R	M62 J25 - J30	
25/09/15 08:15:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:15:53	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:15:58	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:17:13	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:17:13	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:17:28	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 08:17:28	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 08:17:28	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 08:17:28	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 08:17:28	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 08:18:32	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 08:18:32	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 08:18:32	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1992A1	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1992A2	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1992A3	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1992J1	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1999A1	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1999A2	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1999A3	60R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 08:18:33	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 08:18:51	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:19:01	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:21:21	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:21:22	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:21:22	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:21:22	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:21:52	SIG	M62/2050A1	OFF	M62 J25 - J30	
25/09/15 08:21:53	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 08:22:04	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:22:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:22:09	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 08:23:01	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:23:55	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2155A1	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2155A2	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2155J1	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2155K1	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2157A2	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2157J1	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2157J2	50R	M62 J25 - J30	
25/09/15 08:24:28	SIG	M62/2157K1	50R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 08:24:31	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2004A1	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2004A2	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2004A3	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2012A2	60R	M62 J25 - J30	
25/09/15 08:24:31	SIG	M62/2012A3	60R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2151A1	50R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2151A2	50R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2151J1	50R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2151K1	50R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2155A1	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2155A2	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2155J1	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2155K1	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2157A2	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2157J1	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2157J2	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2157K1	40R	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2163A1	NR	M62 J25 - J30	
25/09/15 08:24:33	SIG	M62/2163A2	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1955K1	OFF	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1955K2	OFF	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1956A1	OFF	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1956A2	OFF	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1956A3	OFF	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1960A1	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1960A2	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1960A3	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1960K1	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1960K2	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1968A1	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1968A2	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1968A3	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1968A4	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1974A1	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1974A2	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1974A3	NR	M62 J25 - J30	
25/09/15 08:25:31	SIG	M62/1974A4	NR	M62 J25 - J30	
25/09/15 08:25:34	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 08:25:34	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 08:25:34	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 08:25:34	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 08:26:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:26:13	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:26:18	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:26:50	SIG	M62/2170B1	50R	M62 J25 - J30	
25/09/15 08:26:50	SIG	M62/2170B2	50R	M62 J25 - J30	
25/09/15 08:26:50	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 08:26:50	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 08:26:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:26:53	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 08:26:55	SIG	M62/2170B1	40R	M62 J25 - J30	
25/09/15 08:26:55	SIG	M62/2170B2	40R	M62 J25 - J30	
25/09/15 08:26:55	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 08:26:55	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 08:26:58	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 08:27:31	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 08:27:31	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 08:27:56	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2183B1	40R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2183L1	40R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2183L2	40R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2189B1	50R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2189B2	50R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2189B3	50R	M62 J25 - J30	
25/09/15 08:28:22	SIG	M62/2189B4	50R	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2151A1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2151A2	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2151J1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2151K1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2155A1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2155A2	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2155J1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2155K1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2157A2	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2157J1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2157J2	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2157K1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2163A1	OFF	M62 J25 - J30	
25/09/15 08:28:28	SIG	M62/2163A2	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1968A1	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1968A2	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1968A3	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1968A4	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1974A1	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1974A2	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1974A3	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1974A4	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1979K1	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1979K2	OFF	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1981A1	NR	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1981A2	NR	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1981A3	NR	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1981A4	NR	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1987A1	NR	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1987A3	NR	M62 J25 - J30	
25/09/15 08:28:41	SIG	M62/1987J1	NR	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2155A1	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2155A2	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2155J1	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2155K1	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2157A2	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2157J1	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2157J2	50R	M62 J25 - J30	
25/09/15 08:29:10	SIG	M62/2157K1	50R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2151A1	50R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2151A2	50R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2151J1	50R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2151K1	50R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2155A1	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2155A2	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2155J1	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2155K1	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2157A2	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2157J1	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2157J2	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2157K1	40R	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2163A1	NR	M62 J25 - J30	
25/09/15 08:29:15	SIG	M62/2163A2	NR	M62 J25 - J30	
25/09/15 08:30:31	SIG	M62/1992A1	NR	M62 J25 - J30	
25/09/15 08:30:31	SIG	M62/1992A2	NR	M62 J25 - J30	
25/09/15 08:30:31	SIG	M62/1992A3	NR	M62 J25 - J30	
25/09/15 08:30:31	SIG	M62/1992J1	NR	M62 J25 - J30	
25/09/15 08:31:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:31:24	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:31:30	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:31:41	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 08:31:54	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:31:55	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 08:31:56	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 08:31:56	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 08:31:56	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 08:31:56	SIG	M62/1987A1	OFF	M62 J25 - J30	
25/09/15 08:31:56	SIG	M62/1987A3	OFF	M62 J25 - J30	
25/09/15 08:31:56	SIG	M62/1987J1	OFF	M62 J25 - J30	
25/09/15 08:32:00	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2135A1	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2135A2	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2135A3	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2135A4	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2144A1	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2144A2	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2144J1	60R	M62 J25 - J30	
25/09/15 08:32:31	SIG	M62/2144K1	60R	M62 J25 - J30	
25/09/15 08:33:31	SIG	M62/1992J1	OFF	M62 J25 - J30	
25/09/15 08:33:32	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 08:33:32	SIG	M62/1992A2	OFF	M62 J25 - J30	
25/09/15 08:33:32	SIG	M62/1992A3	OFF	M62 J25 - J30	
25/09/15 08:34:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:34:28	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:34:33	SIG	M62/2183B2	40R	M62 J25 - J30	
25/09/15 08:34:58	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:34:58	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 08:35:04	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2189B1	60R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2189B2	60R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2189B3	60R	M62 J25 - J30	
25/09/15 08:36:01	SIG	M62/2189B4	60R	M62 J25 - J30	
25/09/15 08:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 08:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 08:36:30	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 08:36:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/1999A1	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/1999A2	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/1999A3	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/1999J1	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/1999J2	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/2004A1	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/2004A2	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/2004A3	OFF	M62 J25 - J30	
25/09/15 08:36:31	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2177B1	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2177B2	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2177L1	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2177L2	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2183B1	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2183B2	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2183L1	60R	M62 J25 - J30	
25/09/15 08:37:32	SIG	M62/2183L2	60R	M62 J25 - J30	
25/09/15 08:38:01	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:38:01	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 08:38:07	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 08:39:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:39:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2151A1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2151A2	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2151J1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2151K1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2155A1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2155A2	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2155J1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2155K1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2157A1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2157A2	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2157J1	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2157J2	60R	M62 J25 - J30	
25/09/15 08:40:36	SIG	M62/2157K1	60R	M62 J25 - J30	
25/09/15 08:43:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:43:07	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2157A1	NR	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2157A2	NR	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2157K1	NR	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2163A1	OFF	M62 J25 - J30	
25/09/15 08:46:32	SIG	M62/2163A2	OFF	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2135A1	OFF	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2135A2	OFF	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2135A3	OFF	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2135A4	OFF	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2144A1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2144A2	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2144J1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2144K1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2151A1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2151A2	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2151J1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2151K1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2155A1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2155A2	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2155J1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2155K1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2157A1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2157A2	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 08:48:32	SIG	M62/2157K1	NR	M62 J25 - J30	
25/09/15 08:49:31	SIG	M62/2203B1	OFF	M62 J25 - J30	
25/09/15 08:49:31	SIG	M62/2203B2	OFF	M62 J25 - J30	
25/09/15 08:49:31	SIG	M62/2203B3	OFF	M62 J25 - J30	
25/09/15 08:50:31	SIG	M62/2197B1	OFF	M62 J25 - J30	
25/09/15 08:50:31	SIG	M62/2197B2	OFF	M62 J25 - J30	
25/09/15 08:50:31	SIG	M62/2197B3	OFF	M62 J25 - J30	
25/09/15 08:50:31	SIG	M62/2199M1	OFF	M62 J25 - J30	
25/09/15 08:50:31	SIG	M62/2199M2	OFF	M62 J25 - J30	
25/09/15 08:51:31	SIG	M62/2159B1	NR	M62 J25 - J30	
25/09/15 08:51:31	SIG	M62/2159B2	NR	M62 J25 - J30	
25/09/15 08:51:31	SIG	M62/2170B1	NR	M62 J25 - J30	
25/09/15 08:51:31	SIG	M62/2170B2	NR	M62 J25 - J30	
25/09/15 08:51:31	SIG	M62/2170L1	NR	M62 J25 - J30	
25/09/15 08:51:31	SIG	M62/2170L2	NR	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2144A1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2144A2	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2144J1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2144K1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2151A1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2151A2	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2151J1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2151K1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2155A1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2155A2	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2155J1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2155K1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2157A2	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2157J1	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2157J2	OFF	M62 J25 - J30	
25/09/15 08:51:32	SIG	M62/2157K1	OFF	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2170B1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2170B2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2170L1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2170L2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2177B1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2177B2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2177L1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2177L2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2183B1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2183B2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2183L1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2183L2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2189B1	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2189B2	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2189B3	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2189B4	NR	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2194B1	OFF	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2194B2	OFF	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2194B3	OFF	M62 J25 - J30	
25/09/15 08:53:32	SIG	M62/2194B4	OFF	M62 J25 - J30	
25/09/15 08:54:31	SIG	M62/2159B1	OFF	M62 J25 - J30	
25/09/15 08:54:32	SIG	M62/2159B2	OFF	M62 J25 - J30	
25/09/15 08:56:32	SIG	M62/2189B1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2170B1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2170B2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2170L1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2170L2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2177B1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2177B2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2177L1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2177L2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2183B1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2183L1	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2183L2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2189B2	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2189B3	OFF	M62 J25 - J30	
25/09/15 08:56:33	SIG	M62/2189B4	OFF	M62 J25 - J30	
25/09/15 09:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 09:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 09:06:29	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 09:06:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 09:13:06	SIG	M62/2113B1	HSD	M62 J25 - J30	
25/09/15 09:13:59	SIG	M62/2106B1	HSD	M62 J25 - J30	
25/09/15 09:15:07	SIG	M62/2097B1	HSD	M62 J25 - J30	
25/09/15 09:15:07	SIG	M62/2113B1	REDX	M62 J25 - J30	
25/09/15 09:16:15	SIG	M62/2088B1	HSD	M62 J25 - J30	
25/09/15 09:16:15	SIG	M62/2106B1	REDX	M62 J25 - J30	
25/09/15 09:17:23	SIG	M62/2097B1	REDX	M62 J25 - J30	
25/09/15 09:18:31	SIG	M62/2088B1	REDX	M62 J25 - J30	
25/09/15 09:19:11	SIG	M62/2097B3	60R	M62 J25 - J30	
25/09/15 09:19:11	SIG	M62/2097B3	60R	M62 J25 - J30	
25/09/15 09:19:12	SIG	M62/2097B3	60R	M62 J25 - J30	
25/09/15 09:19:24	SIG	M62/2117B1	NR	M62 J25 - J30	
25/09/15 09:19:24	SIG	M62/2117B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2074B2	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2074B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2074B4	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2081B1	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2081B2	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2081B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2081L1	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2088B2	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2088B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2088B4	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2097B2	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2097B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2097B4	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2106B2	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2106B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2106B4	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2113B2	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2113B3	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2113B4	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2120M1	NR	M62 J25 - J30	
25/09/15 09:19:25	SIG	M62/2120M2	NR	M62 J25 - J30	
25/09/15 09:20:24	SIG	M62/2120M1	OFF	M62 J25 - J30	
25/09/15 09:20:24	SIG	M62/2120M2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2074B1	BLNK	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2074B2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2074B3	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2074B4	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2081B1	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2081B2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2081B3	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2081L1	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2088B1	BLNK	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2088B2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2088B3	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2088B4	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2097B1	BLNK	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2097B2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2097B3	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2097B4	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2106B1	BLNK	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2106B2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2106B3	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2106B4	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2113B1	BLNK	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2113B2	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2113B3	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2113B4	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 09:20:25	SIG	M62/2117B3	OFF	M62 J25 - J30	
25/09/15 09:24:04	SIG	M62/2079A1	HSD	M62 J25 - J30	
25/09/15 09:25:12	SIG	M62/2088A1	HSD	M62 J25 - J30	
25/09/15 09:26:20	SIG	M62/2079A1	REDX	M62 J25 - J30	
25/09/15 09:26:20	SIG	M62/2097A1	HSD	M62 J25 - J30	
25/09/15 09:27:28	SIG	M62/2088A1	REDX	M62 J25 - J30	
25/09/15 09:27:28	SIG	M62/2106A1	HSD	M62 J25 - J30	
25/09/15 09:28:36	SIG	M62/2097A1	REDX	M62 J25 - J30	
25/09/15 09:29:44	SIG	M62/2106A1	REDX	M62 J25 - J30	
25/09/15 09:30:44	SIG	M62/2065A2	NR	M62 J25 - J30	
25/09/15 09:30:44	SIG	M62/2065A3	NR	M62 J25 - J30	
25/09/15 09:30:44	SIG	M62/2065A4	NR	M62 J25 - J30	
25/09/15 09:30:44	SIG	M62/2074A2	NR	M62 J25 - J30	
25/09/15 09:30:44	SIG	M62/2074A3	NR	M62 J25 - J30	
25/09/15 09:30:44	SIG	M62/2074A4	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2073K1	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2073K2	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2079A2	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2079A3	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2079A4	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2088A2	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2088A3	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2088A4	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2097A2	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2097A3	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2097A4	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2106A2	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2106A3	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2106A4	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2114A1	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2114A2	NR	M62 J25 - J30	
25/09/15 09:30:45	SIG	M62/2114A3	NR	M62 J25 - J30	
25/09/15 09:31:26	SIG	M62/2074A4	NR	M62 J25 - J30	
25/09/15 09:31:26	SIG	M62/2074A4	OFF	M62 J25 - J30	
25/09/15 09:31:44	SIG	M62/2073K1	OFF	M62 J25 - J30	
25/09/15 09:31:44	SIG	M62/2073K2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2074A1	BLNK	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2074A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2074A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2074A4	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2079A1	BLNK	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2079A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2079A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2079A4	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2088A1	BLNK	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2088A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2088A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2088A4	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2097A1	BLNK	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2097A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2097A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2097A4	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2106A1	BLNK	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2106A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2106A4	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2114A1	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2114A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2114A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2117A1	BLNK	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2117A2	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2117A3	OFF	M62 J25 - J30	
25/09/15 09:31:45	SIG	M62/2117A4	OFF	M62 J25 - J30	
25/09/15 09:34:35	SIG	M62/2057B1	HSD	M62 J25 - J30	
25/09/15 09:36:34	SIG	M62/2041B1	HSD	M62 J25 - J30	
25/09/15 09:36:35	SIG	M62/2057B1	REDX	M62 J25 - J30	
25/09/15 09:36:35	SIG	M621/1002B1	HSD	M62 J25 - J30	
25/09/15 09:36:35	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 09:36:35	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 09:37:34	SIG	M62/2033B1	HSD	M62 J25 - J30	
25/09/15 09:38:34	SIG	M62/2025B1	HSD	M62 J25 - J30	
25/09/15 09:38:35	SIG	M62/2041B1	REDX	M62 J25 - J30	
25/09/15 09:39:26	SIG	M62/2033B1	REDX	M62 J25 - J30	
25/09/15 09:40:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 09:40:40	SIG	M62/2065B2	NR	M62 J25 - J30	
25/09/15 09:40:40	SIG	M62/2065B3	NR	M62 J25 - J30	
25/09/15 09:40:40	SIG	M62/2065B4	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2018B1	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2018B2	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2018B3	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2018L1	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2025B2	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2025B3	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2025B4	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2033B2	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2033B3	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2033B4	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2041B2	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2041B3	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2041B4	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2050B2	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2050B3	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2050B4	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2057B2	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2057B3	NR	M62 J25 - J30	
25/09/15 09:40:41	SIG	M62/2057B4	NR	M62 J25 - J30	
25/09/15 09:41:41	SIG	M62/2069M1	OFF	M62 J25 - J30	
25/09/15 09:41:41	SIG	M62/2069M2	OFF	M62 J25 - J30	
25/09/15 09:41:41	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 09:41:41	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2012B1	BLNK	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2012B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2012B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2012B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2018B1	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2018B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2018B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2018L1	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2025B1	BLNK	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2025B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2025B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2025B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2033B1	BLNK	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2033B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2033B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2041B1	BLNK	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2041B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2041B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2041B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2050B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2050B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2050B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2057B1	BLNK	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2057B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2057B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2057B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2065B1	BLNK	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2065B2	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2065B3	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2065B4	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M62/2065M1	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M621/1002B1	OFF	M62 J25 - J30	
25/09/15 09:41:42	SIG	M621/1002B2	OFF	M62 J25 - J30	
25/09/15 09:45:32	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 09:46:34	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 09:46:34	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 09:46:34	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 09:46:34	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 09:46:40	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 09:46:40	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 09:46:40	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 09:46:40	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 09:46:45	SIG	M62/2041A1	30R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2025A1	LDR	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2033A1	LDR	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2041A1	20R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 09:46:50	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 09:46:51	SIG	M62/2041A1	20R	M62 J25 - J30	
25/09/15 09:46:51	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 09:46:51	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 09:46:51	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 09:46:56	SIG	M62/2041A1	STOP	M62 J25 - J30	
25/09/15 09:49:52	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 09:49:52	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 09:49:52	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 09:53:52	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 09:53:52	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 09:53:58	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 09:53:58	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 09:53:58	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 09:55:19	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 09:55:19	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 09:55:19	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 09:55:19	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 09:55:32	SIG	M62/2004A1	60R	M62 J25 - J30	
25/09/15 09:55:32	SIG	M62/2004A2	60R	M62 J25 - J30	
25/09/15 09:55:32	SIG	M62/2004A3	60R	M62 J25 - J30	
25/09/15 09:56:51	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 09:56:51	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 09:56:59	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 09:59:56	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 09:59:57	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 10:08:33	SIG	M62/2004A1	OFF	M62 J25 - J30	
25/09/15 10:08:33	SIG	M62/2004A2	OFF	M62 J25 - J30	
25/09/15 10:08:33	SIG	M62/2004A3	OFF	M62 J25 - J30	
25/09/15 10:21:33	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2033B1	REDX	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2033B2	NR	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2033B3	NR	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2033B4	NR	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2041B1	REDX	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2050B2	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2050B3	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2050B4	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2057B1	REDX	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2065B1	REDX	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2065B2	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2065B3	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2065B4	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2065M1	NR	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2065M1	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2069M1	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M62/2069M2	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M621/1002B1	HSD	M62 J25 - J30	
25/09/15 11:31:01	SIG	M621/1002B2	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 11:31:01	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2012B1	REDX	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2012B2	NR	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2012B3	NR	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2012B4	NR	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2018B1	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2018B2	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2018B3	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2018L1	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2025B2	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2025B3	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2025B4	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 11:31:02	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 11:32:23	SIG	M62/2025B1	60R	M62 J25 - J30	
25/09/15 11:32:54	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 11:33:19	SIG	M62/2041B1	60R	M62 J25 - J30	
25/09/15 11:33:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 11:33:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 11:33:58	SIG	M62/2057B1	60R	M62 J25 - J30	
25/09/15 11:33:58	SIG	M621/1002B1	60R	M62 J25 - J30	
25/09/15 11:33:58	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 11:33:58	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 11:54:34	SIG	M62/2117A1	REDX	M62 J25 - J30	
25/09/15 11:54:34	SIG	M62/2117A2	60R	M62 J25 - J30	
25/09/15 11:54:34	SIG	M62/2117A3	60R	M62 J25 - J30	
25/09/15 11:54:34	SIG	M62/2117A4	60R	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2122K1	60R	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2122K2	60R	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2124A1	REDX	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2124A2	60R	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2124A3	60R	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2124A4	60R	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 11:54:35	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 11:54:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:54:45	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:54:46	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:54:47	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:54:56	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:54:57	SIG	M62/2124A3	60R	M62 J25 - J30	
25/09/15 11:55:32	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:55:33	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:55:34	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:55:34	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2114A1	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2114A2	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2114A3	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2135A1	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2135A2	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2135A3	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2135A4	60R	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2144A1	NR	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2144A2	NR	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2144J1	NR	M62 J25 - J30	
25/09/15 11:55:35	SIG	M62/2144K1	NR	M62 J25 - J30	
25/09/15 12:05:35	SIG	M62/2114A1	OFF	M62 J25 - J30	
25/09/15 12:05:35	SIG	M62/2114A2	OFF	M62 J25 - J30	
25/09/15 12:05:35	SIG	M62/2114A3	OFF	M62 J25 - J30	
25/09/15 12:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 12:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2117A1	BLNK	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2117A2	OFF	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2117A3	OFF	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2117A4	OFF	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2122K1	OFF	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2122K2	OFF	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2124A2	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2124A3	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2124A4	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2144A1	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2144A2	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2144J1	NR	M62 J25 - J30	
25/09/15 12:07:35	SIG	M62/2144K1	NR	M62 J25 - J30	
25/09/15 12:10:35	SIG	M62/2124A2	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2124A1	BLNK	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2124A4	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2135A1	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2135A2	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2135A3	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2135A4	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2144A1	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2144A2	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2144J1	OFF	M62 J25 - J30	
25/09/15 12:10:36	SIG	M62/2144K1	OFF	M62 J25 - J30	
25/09/15 12:43:34	SIG	M606/2003B1	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M606/2003B2	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1987B1	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1987B2	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1987B3	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1987B4	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1992B1	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1992B2	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1992B3	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/1992B4	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/2005M1	50R	M62 J25 - J30	
25/09/15 12:43:34	SIG	M62/2005M2	50R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1987B1	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1987B2	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1987B3	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1987B4	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1992B1	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1992B2	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1992B3	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1992B4	40R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1999B1	REDX	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1999B2	50R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1999B3	50R	M62 J25 - J30	
25/09/15 12:43:40	SIG	M62/1999B4	50R	M62 J25 - J30	
25/09/15 12:47:35	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 12:47:35	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1987B1	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1987B2	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1987B3	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1987B4	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1992B1	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1992B2	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1992B3	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1992B4	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1999B2	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1999B3	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/1999B4	NR	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/2005M1	OFF	M62 J25 - J30	
25/09/15 12:47:35	SIG	M62/2005M2	OFF	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2065A2	60R	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2065A3	60R	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2065A4	60R	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2073K1	60R	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2073K2	60R	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2079A1	REDX	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2079A2	NR	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2079A3	NR	M62 J25 - J30	
25/09/15 12:50:16	SIG	M62/2079A4	NR	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2074A1	REDX	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2074A2	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2079A2	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2079A3	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2079A4	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2088A1	REDX	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2088A2	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2088A3	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2088A4	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2097A1	REDX	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2097A2	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2097A3	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2097A4	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2106A1	REDX	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2106A2	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2106A3	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2106A4	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2114A1	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2114A2	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2114A3	60R	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2117A1	REDX	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2117A2	NR	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2117A3	NR	M62 J25 - J30	
25/09/15 12:50:17	SIG	M62/2117A4	NR	M62 J25 - J30	
25/09/15 12:50:35	SIG	M62/1999B2	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1981B1	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1981B2	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1981B3	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1981B4	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1987B1	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1987B2	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1987B3	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1987B4	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1992B1	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1992B2	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1992B3	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1992B4	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1999B1	BLNK	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1999B3	OFF	M62 J25 - J30	
25/09/15 12:50:36	SIG	M62/1999B4	OFF	M62 J25 - J30	
25/09/15 12:51:30	SIG	M62/2106A1	60R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M606/2003B1	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M606/2003B2	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1987B1	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1987B2	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1987B3	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1987B4	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1992B1	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1992B2	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1992B3	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/1992B4	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/2005M1	50R	M62 J25 - J30	
25/09/15 12:51:49	SIG	M62/2005M2	50R	M62 J25 - J30	
25/09/15 12:51:52	SIG	M62/2097A1	60R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1987B1	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1987B2	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1987B3	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1987B4	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1992B1	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1992B2	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1992B3	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1992B4	40R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1999B1	REDX	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1999B2	50R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1999B3	50R	M62 J25 - J30	
25/09/15 12:51:55	SIG	M62/1999B4	50R	M62 J25 - J30	
25/09/15 12:52:20	SIG	M62/2088A1	60R	M62 J25 - J30	
25/09/15 12:52:27	SIG	M62/2079A1	60R	M62 J25 - J30	
25/09/15 12:52:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 12:52:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 12:52:45	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 12:52:45	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 12:55:05	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 12:55:05	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1987B1	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1987B2	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1987B3	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1987B4	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1992B1	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1992B2	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1992B3	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1992B4	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1999B2	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1999B3	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/1999B4	NR	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/2005M1	OFF	M62 J25 - J30	
25/09/15 12:55:05	SIG	M62/2005M2	OFF	M62 J25 - J30	
25/09/15 12:58:05	SIG	M62/1999B2	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1981B1	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1981B2	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1981B3	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1981B4	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1987B1	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1987B2	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1987B3	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1987B4	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1992B1	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1992B2	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1992B3	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1992B4	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1999B1	BLNK	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1999B3	OFF	M62 J25 - J30	
25/09/15 12:58:06	SIG	M62/1999B4	OFF	M62 J25 - J30	
25/09/15 13:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 13:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 13:24:36	SIG	M62/2050A1	OFF	M62 J25 - J30	
25/09/15 13:24:37	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 13:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 13:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 14:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 14:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 14:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 14:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 14:40:08	SIG	M62/2050A1	OFF	M62 J25 - J30	
25/09/15 14:40:09	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 14:48:19	SIG	M62/2113B1	REDX	M62 J25 - J30	
25/09/15 14:48:19	SIG	M62/2113B2	NR	M62 J25 - J30	
25/09/15 14:48:19	SIG	M62/2113B3	NR	M62 J25 - J30	
25/09/15 14:48:19	SIG	M62/2113B4	NR	M62 J25 - J30	
25/09/15 14:48:19	SIG	M62/2120M1	60R	M62 J25 - J30	
25/09/15 14:48:19	SIG	M62/2120M2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B1	REDX	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B2	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B3	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B3	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B4	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2074B4	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081B1	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081B1	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081B2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081B2	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081B3	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081B3	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081L1	NR	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2081L1	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2088B1	REDX	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2088B2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2088B3	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2088B4	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2097B1	REDX	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2097B2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2097B4	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2106B1	REDX	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2106B2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2106B3	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2106B4	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2113B2	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2113B3	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2113B4	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2117B1	60R	M62 J25 - J30	
25/09/15 14:48:29	SIG	M62/2117B3	60R	M62 J25 - J30	
25/09/15 14:49:44	SIG	M62/2088B1	60R	M62 J25 - J30	
25/09/15 14:50:00	SIG	M62/2097B1	60R	M62 J25 - J30	
25/09/15 14:50:27	SIG	M62/2106B1	60R	M62 J25 - J30	
25/09/15 14:50:32	SIG	M62/2113B1	60R	M62 J25 - J30	
25/09/15 14:51:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 14:51:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 14:51:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 14:51:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 14:51:30	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 14:51:30	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 14:51:30	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 14:51:30	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 14:51:42	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 14:51:42	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 14:51:42	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 14:51:42	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 14:53:29	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 14:53:29	SIG	M62/2050A1	OFF	M62 J25 - J30	
25/09/15 14:54:26	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 14:54:27	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 14:56:06	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 14:56:17	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 14:58:36	SIG	M606/2003B1	50R	M62 J25 - J30	
25/09/15 14:58:36	SIG	M606/2003B2	50R	M62 J25 - J30	
25/09/15 14:58:36	SIG	M62/2005M1	50R	M62 J25 - J30	
25/09/15 14:58:36	SIG	M62/2005M2	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1987B1	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1987B2	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1987B3	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1987B4	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1992B1	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1992B2	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1992B3	50R	M62 J25 - J30	
25/09/15 14:58:37	SIG	M62/1992B4	50R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1987B1	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1987B2	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1987B3	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1987B4	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1992B1	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1992B2	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1992B3	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1992B4	40R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1999B1	REDX	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1999B2	50R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1999B3	50R	M62 J25 - J30	
25/09/15 14:58:42	SIG	M62/1999B4	50R	M62 J25 - J30	
25/09/15 15:00:15	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 15:00:15	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 15:00:15	SIG	M62/2005M1	OFF	M62 J25 - J30	
25/09/15 15:00:15	SIG	M62/2005M2	OFF	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1987B1	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1987B2	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1987B3	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1987B4	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1992B1	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1992B2	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1992B3	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1992B4	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1999B2	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1999B3	NR	M62 J25 - J30	
25/09/15 15:00:16	SIG	M62/1999B4	NR	M62 J25 - J30	
25/09/15 15:03:17	SIG	M62/1999B2	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1981B1	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1981B2	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1981B3	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1981B4	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1987B1	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1987B2	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1987B3	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1987B4	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1992B1	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1992B2	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1992B3	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1992B4	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1999B1	BLNK	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1999B3	OFF	M62 J25 - J30	
25/09/15 15:03:18	SIG	M62/1999B4	OFF	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1987B1	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1987B2	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1987B3	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1987B4	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1992B1	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1992B2	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1992B3	50R	M62 J25 - J30	
25/09/15 15:06:10	SIG	M62/1992B4	50R	M62 J25 - J30	
25/09/15 15:06:11	SIG	M606/2003B1	50R	M62 J25 - J30	
25/09/15 15:06:11	SIG	M606/2003B2	50R	M62 J25 - J30	
25/09/15 15:06:11	SIG	M62/2005M1	50R	M62 J25 - J30	
25/09/15 15:06:11	SIG	M62/2005M2	50R	M62 J25 - J30	
25/09/15 15:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 15:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1987B1	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1987B2	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1987B3	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1987B4	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1992B1	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1992B2	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1992B3	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1992B4	40R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1999B1	REDX	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1999B2	50R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1999B3	50R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/1999B4	50R	M62 J25 - J30	
25/09/15 15:06:16	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 15:06:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 15:06:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 15:08:46	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 15:08:58	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 15:08:58	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 15:08:58	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 15:08:58	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 15:09:08	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 15:09:08	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 15:09:08	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 15:09:08	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 15:10:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 15:10:10	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1981B1	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1981B2	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1981B3	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1981B4	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1987B1	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1987B2	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1987B3	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1987B4	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1992B1	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1992B2	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1992B3	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1992B4	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1999B2	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1999B3	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/1999B4	NR	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/2005M1	OFF	M62 J25 - J30	
25/09/15 15:10:10	SIG	M62/2005M2	OFF	M62 J25 - J30	
25/09/15 15:10:38	SIG	M606/2003B1	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M606/2003B2	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1987B1	NR	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1987B2	NR	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1987B3	NR	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1987B4	NR	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1992B1	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1992B2	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1992B3	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1992B4	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1999B2	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1999B3	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/1999B4	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2004B1	REDX	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2004B2	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2004B3	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2004B4	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2005M1	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2005M2	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2012B2	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2012B3	60R	M62 J25 - J30	
25/09/15 15:10:38	SIG	M62/2012B4	60R	M62 J25 - J30	
25/09/15 15:11:52	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 15:11:52	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 15:13:11	SIG	M62/1981B1	OFF	M62 J25 - J30	
25/09/15 15:13:11	SIG	M62/1981B2	OFF	M62 J25 - J30	
25/09/15 15:13:11	SIG	M62/1981B3	OFF	M62 J25 - J30	
25/09/15 15:13:11	SIG	M62/1981B4	OFF	M62 J25 - J30	
25/09/15 15:14:18	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 15:14:18	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 15:14:18	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 15:14:18	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 15:14:31	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 15:14:31	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 15:14:31	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 15:14:31	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 15:17:00	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 15:17:00	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 15:17:23	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 15:17:23	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 15:17:23	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 15:17:23	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 15:17:31	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 15:17:31	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 15:17:31	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 15:17:31	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 15:19:38	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 15:19:38	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 15:20:05	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 15:20:05	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 15:30:22	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 15:30:22	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 15:30:22	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 15:30:22	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1974A1	NR	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1974A2	NR	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1974A3	NR	M62 J25 - J30	
25/09/15 15:30:28	SIG	M62/1974A4	NR	M62 J25 - J30	
25/09/15 15:34:06	SIG	M62/2033B1	50R	M62 J25 - J30	
25/09/15 15:34:06	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 15:34:06	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 15:34:06	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2033B1	40R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2041B1	50R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 15:34:12	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1968A1	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1968A2	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1968A3	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1968A4	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1974A1	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1974A2	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1974A3	NR	M62 J25 - J30	
25/09/15 15:34:23	SIG	M62/1974A4	NR	M62 J25 - J30	
25/09/15 15:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 15:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 15:36:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 15:36:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 15:37:23	SIG	M62/1968A1	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1968A2	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1968A3	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1968A4	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1974A1	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1974A2	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1974A3	OFF	M62 J25 - J30	
25/09/15 15:37:24	SIG	M62/1974A4	OFF	M62 J25 - J30	
25/09/15 15:37:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 15:37:26	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 15:37:31	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2041B1	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 15:38:06	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 15:40:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 15:40:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2074B2	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2074B3	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M62/2074B4	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 15:40:44	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 15:40:49	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2074B2	40R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2074B3	40R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2074B4	40R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2081B1	50R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2081B2	50R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2081B3	50R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M62/2081L1	50R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 15:40:50	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 15:42:39	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 15:42:39	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 15:42:39	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 15:42:39	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2137B1	NR	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2137B3	NR	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2137B4	NR	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2147B1	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2147B2	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2147B3	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2147B4	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2159B1	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2159B2	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2159M1	60R	M62 J25 - J30	
25/09/15 15:42:49	SIG	M62/2159M2	60R	M62 J25 - J30	
25/09/15 15:45:01	SIG	M62/2117A2	50R	M62 J25 - J30	
25/09/15 15:45:01	SIG	M62/2117A3	50R	M62 J25 - J30	
25/09/15 15:45:01	SIG	M62/2117A4	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2122K1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2122K2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2124A1	REDX	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2124A2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2124A4	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2125B1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2125B2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2125B3	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2132B1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2132B2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2132B3	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2135A1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2135A2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2135A3	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2135A4	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2137B1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2137B3	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2137B4	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2144A1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2144A2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2144J1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2144K1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2147B1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2147B2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2147B3	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2147B4	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2151A1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2151A2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2151J1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2151K1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2155A1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2155A2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2155J1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2155K1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2157A2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2157K1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2159B1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2159B2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2159M1	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2159M2	50R	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2163A1	NR	M62 J25 - J30	
25/09/15 15:45:11	SIG	M62/2163A2	NR	M62 J25 - J30	
25/09/15 15:45:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 15:45:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 15:45:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 15:47:09	SIG	M62/2137B2	50R	M62 J25 - J30	
25/09/15 15:47:09	SIG	M62/2137B2	50R	M62 J25 - J30	
25/09/15 15:47:09	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 15:47:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 15:47:28	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 15:47:29	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 15:47:29	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 15:48:40	SIG	M62/2137B2	50R	M62 J25 - J30	
25/09/15 15:48:40	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 15:48:56	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 15:48:56	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 15:48:56	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 15:48:56	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 15:49:05	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 15:49:05	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 15:49:05	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 15:49:05	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 15:49:22	SIG	M62/2033B1	50R	M62 J25 - J30	
25/09/15 15:49:22	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 15:49:22	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 15:49:22	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 15:49:33	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 15:49:33	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 15:49:33	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 15:49:33	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 15:51:55	SIG	M62/2117A2	NR	M62 J25 - J30	
25/09/15 15:51:55	SIG	M62/2117A3	NR	M62 J25 - J30	
25/09/15 15:51:55	SIG	M62/2117A4	NR	M62 J25 - J30	
25/09/15 15:51:56	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 15:51:56	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2122K1	OFF	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2122K2	OFF	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2124A2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2124A3	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2124A4	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2125B1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2125B2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2125B3	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2132B1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2132B2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2132B3	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2137B1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2137B3	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2137B4	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2144A1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2144A2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2144J1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2144K1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2147B1	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2147B2	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2147B3	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2147B4	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2151A1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2151A2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2151J1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2151K1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2155A1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2155A2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2155J1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2155K1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2157A1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2157A2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2157K1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2159B1	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2159B2	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2159M1	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2159M2	60R	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2163A1	NR	M62 J25 - J30	
25/09/15 15:52:03	SIG	M62/2163A2	NR	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2074B2	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2074B3	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2074B4	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2081B1	60R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2081B2	60R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2081B3	60R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M62/2081L1	60R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 15:52:11	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2074B2	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2074B3	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2074B4	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2081B1	50R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2081B2	50R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2081B3	50R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M62/2081L1	50R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 15:52:27	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 15:52:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 15:52:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 15:52:49	SIG	M62/2132B1	NR	M62 J25 - J30	
25/09/15 15:52:49	SIG	M62/2132B2	NR	M62 J25 - J30	
25/09/15 15:52:49	SIG	M62/2132B3	NR	M62 J25 - J30	
25/09/15 15:52:49	SIG	M62/2137B1	60R	M62 J25 - J30	
25/09/15 15:52:49	SIG	M62/2137B3	60R	M62 J25 - J30	
25/09/15 15:52:49	SIG	M62/2137B4	60R	M62 J25 - J30	
25/09/15 15:53:56	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 15:53:57	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 15:53:57	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2132B1	50R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2132B2	50R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2132B3	50R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2137B1	50R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2137B3	50R	M62 J25 - J30	
25/09/15 15:54:17	SIG	M62/2137B4	50R	M62 J25 - J30	
25/09/15 15:54:37	SIG	M62/2132B1	40R	M62 J25 - J30	
25/09/15 15:54:37	SIG	M62/2132B2	40R	M62 J25 - J30	
25/09/15 15:54:37	SIG	M62/2132B3	40R	M62 J25 - J30	
25/09/15 15:54:37	SIG	M62/2137B1	40R	M62 J25 - J30	
25/09/15 15:54:37	SIG	M62/2137B3	40R	M62 J25 - J30	
25/09/15 15:54:37	SIG	M62/2137B4	40R	M62 J25 - J30	
25/09/15 15:54:43	SIG	M62/2137B1	30R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2132B1	40R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2132B2	40R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2132B3	40R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2137B1	20R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2137B3	40R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2137B4	40R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2147B1	LDR	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2147B2	50R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2147B3	50R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2147B4	50R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2159B1	50R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2159B2	50R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2159M1	50R	M62 J25 - J30	
25/09/15 15:54:48	SIG	M62/2159M2	50R	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2124A1	BLNK	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2124A2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2124A4	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2135A1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2135A2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2135A3	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2135A4	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2137B1	STOP	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2144A1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2144A2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2144J1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2144K1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2151A1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2151A2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2151J1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2151K1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2155A1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2155A2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2155J1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2155K1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2157A2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2157J1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2157J2	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2157K1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2163A1	OFF	M62 J25 - J30	
25/09/15 15:55:10	SIG	M62/2163A2	OFF	M62 J25 - J30	
25/09/15 15:55:16	SIG	M62/2124A1	BLNK	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2125B1	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2125B2	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2125B3	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2132B1	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2132B2	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2132B3	NR	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2137B1	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2137B3	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2137B4	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2147B1	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2147B2	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2147B3	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2147B4	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2159B1	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2159B2	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2159M1	60R	M62 J25 - J30	
25/09/15 15:56:02	SIG	M62/2159M2	60R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2081B1	40R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2081B2	40R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2081B3	40R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2081L1	40R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2088B1	50R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2088B2	50R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2088B3	50R	M62 J25 - J30	
25/09/15 15:57:05	SIG	M62/2088B4	50R	M62 J25 - J30	
25/09/15 15:57:38	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 15:57:38	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 15:57:38	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 15:57:58	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 15:57:58	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 15:58:08	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 15:58:08	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 15:59:02	SIG	M62/2125B1	OFF	M62 J25 - J30	
25/09/15 15:59:03	SIG	M62/2125B2	OFF	M62 J25 - J30	
25/09/15 15:59:03	SIG	M62/2125B3	OFF	M62 J25 - J30	
25/09/15 15:59:03	SIG	M62/2125L1	OFF	M62 J25 - J30	
25/09/15 15:59:03	SIG	M62/2125L2	OFF	M62 J25 - J30	
25/09/15 15:59:24	SIG	M62/2088B1	40R	M62 J25 - J30	
25/09/15 15:59:24	SIG	M62/2088B2	40R	M62 J25 - J30	
25/09/15 15:59:24	SIG	M62/2088B3	40R	M62 J25 - J30	
25/09/15 15:59:24	SIG	M62/2088B4	40R	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2132B1	60R	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2132B2	60R	M62 J25 - J30	
25/09/15 15:59:39	SIG	M62/2132B3	60R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2025B1	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2033B1	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 15:59:42	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2025B1	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2025B2	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2025B3	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2025B4	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2033B1	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2041B1	50R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 15:59:47	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 15:59:57	SIG	M62/2074B2	50R	M62 J25 - J30	
25/09/15 15:59:57	SIG	M62/2074B3	50R	M62 J25 - J30	
25/09/15 15:59:57	SIG	M62/2074B4	50R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2074B2	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2074B3	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M62/2074B4	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 16:00:15	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 16:02:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:02:50	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 16:02:55	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2081B1	50R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2081B2	50R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2081B3	50R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2081L1	50R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2088B1	60R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2088B2	60R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2088B3	60R	M62 J25 - J30	
25/09/15 16:03:23	SIG	M62/2088B4	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2025B1	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2025B2	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2025B3	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2025B4	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2041B1	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 16:03:41	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2074B2	50R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2074B3	50R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2074B4	50R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2081B1	60R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2081B2	60R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2081B3	60R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M62/2081L1	60R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 16:04:13	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 16:04:14	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 16:05:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:05:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2074B2	40R	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2074B3	40R	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2074B4	40R	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2081B1	50R	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2081B2	50R	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2081B3	50R	M62 J25 - J30	
25/09/15 16:06:07	SIG	M62/2081L1	50R	M62 J25 - J30	
25/09/15 16:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 16:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:06:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 16:06:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:09:08	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 16:09:08	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2117A2	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2117A3	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2117A4	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2122K1	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2122K2	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2124A2	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 16:11:02	SIG	M62/2124A4	50R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2114A1	50R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2114A2	50R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2114A3	50R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2117A2	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2117A3	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2117A4	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2122K1	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2122K2	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2124A1	REDX	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2124A2	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2124A4	40R	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 16:11:08	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 16:11:18	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:11:18	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 16:11:24	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2170A1	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2170A2	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2170K1	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2170K2	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A1	REDX	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A2	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A2	NR	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A3	NR	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A3	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A4	NR	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2177A4	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2183A1	REDX	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2183A2	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2183A3	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2183A4	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2189A1	REDX	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2189A2	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2189A3	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2189A4	60R	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2197A1	NR	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2197A2	NR	M62 J25 - J30	
25/09/15 16:11:54	SIG	M62/2197A3	NR	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2081B1	40R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2081B2	40R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2081B3	40R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2081L1	40R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2088B1	50R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2088B2	50R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2088B3	50R	M62 J25 - J30	
25/09/15 16:11:57	SIG	M62/2088B4	50R	M62 J25 - J30	
25/09/15 16:13:00	SIG	M62/2189A1	60R	M62 J25 - J30	
25/09/15 16:13:16	SIG	M62/2183A1	60R	M62 J25 - J30	
25/09/15 16:13:20	SIG	M62/2177A1	60R	M62 J25 - J30	
25/09/15 16:13:38	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:13:38	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 16:13:44	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 16:14:56	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 16:15:01	SIG	M62/2114A1	60R	M62 J25 - J30	
25/09/15 16:15:01	SIG	M62/2114A2	60R	M62 J25 - J30	
25/09/15 16:15:01	SIG	M62/2114A3	60R	M62 J25 - J30	
25/09/15 16:15:01	SIG	M62/2117A2	60R	M62 J25 - J30	
25/09/15 16:15:01	SIG	M62/2117A3	60R	M62 J25 - J30	
25/09/15 16:15:01	SIG	M62/2117A4	60R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2122K1	60R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2122K2	60R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2124A2	60R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2124A3	60R	M62 J25 - J30	
25/09/15 16:15:02	SIG	M62/2124A4	60R	M62 J25 - J30	
25/09/15 16:17:22	SIG	M62/2088B1	40R	M62 J25 - J30	
25/09/15 16:17:22	SIG	M62/2088B2	40R	M62 J25 - J30	
25/09/15 16:17:22	SIG	M62/2088B3	40R	M62 J25 - J30	
25/09/15 16:17:22	SIG	M62/2088B4	40R	M62 J25 - J30	
25/09/15 16:17:37	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 16:17:37	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:17:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:17:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:17:44	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:17:44	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:17:49	SIG	M62/2097B1	50R	M62 J25 - J30	
25/09/15 16:17:49	SIG	M62/2097B2	50R	M62 J25 - J30	
25/09/15 16:17:49	SIG	M62/2097B4	50R	M62 J25 - J30	
25/09/15 16:18:39	SIG	M62/2004A1	60R	M62 J25 - J30	
25/09/15 16:18:39	SIG	M62/2004A2	60R	M62 J25 - J30	
25/09/15 16:18:39	SIG	M62/2004A3	60R	M62 J25 - J30	
25/09/15 16:18:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:18:40	SIG	M62/2170B1	OFF	M62 J25 - J30	
25/09/15 16:18:40	SIG	M62/2170B2	OFF	M62 J25 - J30	
25/09/15 16:18:40	SIG	M62/2170L1	OFF	M62 J25 - J30	
25/09/15 16:18:40	SIG	M62/2170L2	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2125B1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2125B2	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2125B3	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2125L1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2125L2	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2132B1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2132B2	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2132B3	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2137B1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2137B3	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2137B4	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2147B1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2147B2	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2147B3	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2147B4	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2159B1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2159B2	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2159M1	OFF	M62 J25 - J30	
25/09/15 16:18:49	SIG	M62/2159M2	OFF	M62 J25 - J30	
25/09/15 16:18:54	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 16:18:54	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 16:18:54	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 16:19:00	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 16:20:49	SIG	M62/2097B1	40R	M62 J25 - J30	
25/09/15 16:20:49	SIG	M62/2097B2	40R	M62 J25 - J30	
25/09/15 16:20:49	SIG	M62/2097B4	40R	M62 J25 - J30	
25/09/15 16:21:12	SIG	M62/2057B1	50R	M62 J25 - J30	
25/09/15 16:21:12	SIG	M62/2057B2	50R	M62 J25 - J30	
25/09/15 16:21:12	SIG	M62/2057B3	50R	M62 J25 - J30	
25/09/15 16:21:12	SIG	M62/2057B4	50R	M62 J25 - J30	
25/09/15 16:21:18	SIG	M62/2057B1	40R	M62 J25 - J30	
25/09/15 16:21:18	SIG	M62/2057B2	40R	M62 J25 - J30	
25/09/15 16:21:18	SIG	M62/2057B3	40R	M62 J25 - J30	
25/09/15 16:21:18	SIG	M62/2057B4	40R	M62 J25 - J30	
25/09/15 16:21:39	SIG	M62/2106B1	50R	M62 J25 - J30	
25/09/15 16:21:39	SIG	M62/2106B2	50R	M62 J25 - J30	
25/09/15 16:21:39	SIG	M62/2106B3	50R	M62 J25 - J30	
25/09/15 16:21:39	SIG	M62/2106B4	50R	M62 J25 - J30	
25/09/15 16:21:43	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:21:44	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:21:49	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 16:22:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 16:22:54	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 16:23:34	SIG	M621/1002A1	50R	M62 J25 - J30	
25/09/15 16:23:34	SIG	M621/1002A2	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 16:24:13	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 16:24:19	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 16:24:40	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 16:24:40	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 16:24:40	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 16:24:40	SIG	M62/2125L1	60R	M62 J25 - J30	
25/09/15 16:24:40	SIG	M62/2125L2	60R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 16:24:45	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 16:25:13	SIG	M62/2057B1	60R	M62 J25 - J30	
25/09/15 16:25:13	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 16:25:13	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 16:25:13	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2106B1	40R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2106B2	40R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2106B3	40R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2106B4	40R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 16:25:21	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 16:26:52	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:26:52	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:26:58	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 16:27:40	SIG	M62/1999A1	60R	M62 J25 - J30	
25/09/15 16:27:40	SIG	M62/1999A2	60R	M62 J25 - J30	
25/09/15 16:27:40	SIG	M62/1999A3	60R	M62 J25 - J30	
25/09/15 16:27:40	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 16:27:40	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 16:28:12	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 16:28:12	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 16:28:12	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 16:28:12	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2012A2	60R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2012A3	60R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 16:28:45	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 16:29:04	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 16:29:17	SIG	M62/2025B1	50R	M62 J25 - J30	
25/09/15 16:29:17	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 16:29:17	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 16:29:17	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2106B1	50R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2106B2	50R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2106B3	50R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2106B4	50R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2113B1	60R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2113B2	60R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2113B3	60R	M62 J25 - J30	
25/09/15 16:29:20	SIG	M62/2113B4	60R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2025B1	40R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2025B2	40R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2025B3	40R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2025B4	40R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2033B1	50R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 16:29:23	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 16:30:43	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 16:30:49	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2106B1	40R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2106B2	40R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2106B3	40R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2106B4	40R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 16:31:08	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 16:31:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:31:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:31:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:31:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2117A2	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2117A3	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2117A4	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2122K1	OFF	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2122K2	OFF	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2124A2	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2124A3	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2124A4	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 16:31:40	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 16:33:01	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:33:02	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:33:07	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2025B1	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2025B2	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2025B3	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2025B4	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 16:33:42	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2124A2	OFF	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2124A4	OFF	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2135A1	OFF	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2135A2	OFF	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2135A3	OFF	M62 J25 - J30	
25/09/15 16:34:40	SIG	M62/2135A4	OFF	M62 J25 - J30	
25/09/15 16:34:41	SIG	M62/2124A1	BLNK	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2012A2	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2012A3	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 16:34:45	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 16:35:59	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 16:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 16:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:36:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 16:36:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:36:31	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 16:36:31	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 16:36:32	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 16:36:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:36:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 16:37:07	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:37:08	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 16:38:48	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 16:38:54	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 16:39:03	SIG	M62/2106B1	50R	M62 J25 - J30	
25/09/15 16:39:03	SIG	M62/2106B2	50R	M62 J25 - J30	
25/09/15 16:39:03	SIG	M62/2106B3	50R	M62 J25 - J30	
25/09/15 16:39:03	SIG	M62/2106B4	50R	M62 J25 - J30	
25/09/15 16:39:06	SIG	M62/2106B1	40R	M62 J25 - J30	
25/09/15 16:39:06	SIG	M62/2106B2	40R	M62 J25 - J30	
25/09/15 16:39:06	SIG	M62/2106B3	40R	M62 J25 - J30	
25/09/15 16:39:06	SIG	M62/2106B4	40R	M62 J25 - J30	
25/09/15 16:39:08	SIG	M621/1002A1	OFF	M62 J25 - J30	
25/09/15 16:39:08	SIG	M621/1002A2	OFF	M62 J25 - J30	
25/09/15 16:41:14	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:41:15	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 16:42:49	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 16:42:49	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 16:42:49	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 16:42:49	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 16:43:40	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 16:43:40	SIG	M62/2117B3	50R	M62 J25 - J30	
25/09/15 16:43:40	SIG	M62/2120M1	50R	M62 J25 - J30	
25/09/15 16:43:40	SIG	M62/2120M2	50R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 16:44:41	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 16:44:56	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 16:44:56	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 16:44:56	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 16:44:56	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 16:46:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:46:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:46:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:46:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:46:40	SIG	M62/1999A1	OFF	M62 J25 - J30	
25/09/15 16:46:40	SIG	M62/1999A2	OFF	M62 J25 - J30	
25/09/15 16:46:40	SIG	M62/1999A3	OFF	M62 J25 - J30	
25/09/15 16:46:40	SIG	M62/1999J1	OFF	M62 J25 - J30	
25/09/15 16:46:40	SIG	M62/1999J2	OFF	M62 J25 - J30	
25/09/15 16:47:12	SIG	M62/2125B1	50R	M62 J25 - J30	
25/09/15 16:47:12	SIG	M62/2125B2	50R	M62 J25 - J30	
25/09/15 16:47:12	SIG	M62/2125B3	50R	M62 J25 - J30	
25/09/15 16:47:13	SIG	M62/2117B2	40R	M62 J25 - J30	
25/09/15 16:47:13	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 16:47:13	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 16:47:13	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 16:47:18	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 16:47:18	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 16:47:18	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 16:47:18	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 16:47:27	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:47:28	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 16:50:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:50:28	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 16:50:34	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 16:50:40	SIG	M62/2132B1	60R	M62 J25 - J30	
25/09/15 16:50:40	SIG	M62/2132B2	60R	M62 J25 - J30	
25/09/15 16:50:40	SIG	M62/2132B3	60R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2106B1	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2106B2	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2106B3	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2106B4	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2117B3	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2120M1	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2120M2	50R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 16:51:13	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 16:51:28	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:51:28	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 16:51:28	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 16:51:28	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 16:51:38	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 16:51:38	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 16:51:38	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 16:51:38	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 16:51:40	SIG	M62/2106B1	40R	M62 J25 - J30	
25/09/15 16:51:40	SIG	M62/2106B2	40R	M62 J25 - J30	
25/09/15 16:51:40	SIG	M62/2106B3	40R	M62 J25 - J30	
25/09/15 16:51:40	SIG	M62/2106B4	40R	M62 J25 - J30	
25/09/15 16:53:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:53:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:53:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:53:30	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 16:54:36	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 16:54:37	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 16:55:12	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 16:55:12	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 16:55:12	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 16:55:12	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 16:57:13	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 16:57:13	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 16:57:13	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 16:57:13	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 16:57:19	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 16:57:53	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2050B2	50R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2050B3	50R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2050B4	50R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2057B1	50R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2057B2	50R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2057B3	50R	M62 J25 - J30	
25/09/15 16:58:47	SIG	M62/2057B4	50R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2050B2	40R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2050B3	40R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2050B4	40R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2057B1	40R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2057B2	40R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2057B3	40R	M62 J25 - J30	
25/09/15 16:58:52	SIG	M62/2057B4	40R	M62 J25 - J30	
25/09/15 16:59:12	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 16:59:12	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 16:59:12	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 16:59:12	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 16:59:32	SIG	M62/2125B1	50R	M62 J25 - J30	
25/09/15 16:59:32	SIG	M62/2125B2	50R	M62 J25 - J30	
25/09/15 16:59:32	SIG	M62/2125B3	50R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2117B2	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 16:59:33	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 16:59:38	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 17:00:41	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 17:01:43	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:01:43	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 17:01:49	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 17:02:48	SIG	M62/2025A1	???	M62 J25 - J30	
25/09/15 17:02:48	SIG	M62/2050B2	60R	M62 J25 - J30	
25/09/15 17:02:48	SIG	M62/2050B3	60R	M62 J25 - J30	
25/09/15 17:02:48	SIG	M62/2050B4	60R	M62 J25 - J30	
25/09/15 17:02:49	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 17:02:54	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2117B3	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2120M1	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2120M2	50R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 17:03:33	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 17:03:39	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 17:03:39	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 17:03:39	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 17:03:39	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 17:03:40	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1987B1	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1987B2	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1987B3	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1987B4	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1992B1	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1992B2	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1992B3	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1992B4	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1999B1	BLNK	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1999B2	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1999B3	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/1999B4	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2004B1	BLNK	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2004B2	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2004B3	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2004B4	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2005M1	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2005M2	OFF	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2012B2	NR	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2012B3	NR	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2012B4	NR	M62 J25 - J30	
25/09/15 17:03:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:04:15	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 17:04:15	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 17:04:15	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 17:04:15	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 17:04:20	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 17:04:20	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 17:04:20	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 17:04:20	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 17:04:33	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 17:04:33	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 17:04:36	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 17:04:36	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 17:04:36	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 17:04:36	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2050A1	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2050A2	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2050A3	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2050A4	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2057A1	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2057A2	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2057A3	50R	M62 J25 - J30	
25/09/15 17:05:08	SIG	M62/2057J1	50R	M62 J25 - J30	
25/09/15 17:05:17	SIG	M62/2025A1	OFF	M62 J25 - J30	
25/09/15 17:05:17	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 17:05:23	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:05:32	SIG	M62/2057B1	60R	M62 J25 - J30	
25/09/15 17:05:32	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 17:05:32	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 17:05:32	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 17:05:36	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 17:05:41	SIG	M62/1999A1	60R	M62 J25 - J30	
25/09/15 17:05:41	SIG	M62/1999A2	60R	M62 J25 - J30	
25/09/15 17:05:41	SIG	M62/1999A3	60R	M62 J25 - J30	
25/09/15 17:05:41	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 17:05:41	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 17:05:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:05:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:05:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:05:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:05:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 17:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:06:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 17:06:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:06:22	SIG	M62/2125B1	50R	M62 J25 - J30	
25/09/15 17:06:22	SIG	M62/2125B2	50R	M62 J25 - J30	
25/09/15 17:06:22	SIG	M62/2125B3	50R	M62 J25 - J30	
25/09/15 17:06:23	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 17:06:23	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 17:06:23	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 17:06:23	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 17:06:31	SIG	M62/2041A1	30R	M62 J25 - J30	
25/09/15 17:06:36	SIG	M62/2025A1	LDR	M62 J25 - J30	
25/09/15 17:06:36	SIG	M62/2033A1	LDR	M62 J25 - J30	
25/09/15 17:06:36	SIG	M62/2041A1	20R	M62 J25 - J30	
25/09/15 17:06:41	SIG	M62/2041A1	STOP	M62 J25 - J30	
25/09/15 17:07:26	SIG	M62/2050A1	40R	M62 J25 - J30	
25/09/15 17:07:26	SIG	M62/2050A2	40R	M62 J25 - J30	
25/09/15 17:07:26	SIG	M62/2050A3	40R	M62 J25 - J30	
25/09/15 17:07:26	SIG	M62/2050A4	40R	M62 J25 - J30	
25/09/15 17:07:32	SIG	M62/2050A1	30R	M62 J25 - J30	
25/09/15 17:07:37	SIG	M62/2050A1	20R	M62 J25 - J30	
25/09/15 17:07:37	SIG	M62/2050A2	40R	M62 J25 - J30	
25/09/15 17:07:37	SIG	M62/2050A3	40R	M62 J25 - J30	
25/09/15 17:07:37	SIG	M62/2050A4	40R	M62 J25 - J30	
25/09/15 17:07:42	SIG	M62/2050A1	STOP	M62 J25 - J30	
25/09/15 17:07:47	SIG	M62/2050A1	STOP	M62 J25 - J30	
25/09/15 17:08:19	SIG	M62/2057A1	60R	M62 J25 - J30	
25/09/15 17:08:19	SIG	M62/2057A2	60R	M62 J25 - J30	
25/09/15 17:08:19	SIG	M62/2057A3	60R	M62 J25 - J30	
25/09/15 17:08:19	SIG	M62/2057J1	60R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 17:08:50	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 17:08:52	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 17:08:52	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 17:08:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:08:55	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 17:09:01	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2117B3	50R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2120M1	50R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2120M2	50R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 17:10:22	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 17:11:09	SIG	M62/2004A1	40R	M62 J25 - J30	
25/09/15 17:11:09	SIG	M62/2004A2	40R	M62 J25 - J30	
25/09/15 17:11:09	SIG	M62/2004A3	40R	M62 J25 - J30	
25/09/15 17:11:10	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 17:11:10	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 17:11:10	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 17:12:51	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 17:12:52	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 17:12:52	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 17:12:55	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 17:12:55	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 17:12:55	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 17:12:55	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 17:13:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:13:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:13:02	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:13:03	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:15:22	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 17:15:22	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 17:15:22	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 17:15:22	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1999J1	40R	M62 J25 - J30	
25/09/15 17:15:30	SIG	M62/1999J2	40R	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2125B1	NR	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2125B2	NR	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2125B3	NR	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2132B1	OFF	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2132B2	OFF	M62 J25 - J30	
25/09/15 17:15:41	SIG	M62/2132B3	OFF	M62 J25 - J30	
25/09/15 17:16:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:16:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:16:51	SIG	M62/2065B2	60R	M62 J25 - J30	
25/09/15 17:16:51	SIG	M62/2065B3	60R	M62 J25 - J30	
25/09/15 17:16:51	SIG	M62/2065B4	60R	M62 J25 - J30	
25/09/15 17:16:51	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 17:16:51	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 17:16:51	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 17:16:51	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 17:17:06	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 17:17:12	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 17:17:12	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 17:17:12	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 17:17:12	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 17:17:12	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2117B2	40R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2125B1	50R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2125B2	50R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2125B3	50R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2125L1	60R	M62 J25 - J30	
25/09/15 17:17:56	SIG	M62/2125L2	60R	M62 J25 - J30	
25/09/15 17:18:01	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 17:18:01	SIG	M62/2117B3	40R	M62 J25 - J30	
25/09/15 17:18:01	SIG	M62/2120M1	40R	M62 J25 - J30	
25/09/15 17:18:01	SIG	M62/2120M2	40R	M62 J25 - J30	
25/09/15 17:18:08	SIG	M62/2057B1	50R	M62 J25 - J30	
25/09/15 17:18:08	SIG	M62/2057B2	50R	M62 J25 - J30	
25/09/15 17:18:08	SIG	M62/2057B3	50R	M62 J25 - J30	
25/09/15 17:18:08	SIG	M62/2057B4	50R	M62 J25 - J30	
25/09/15 17:18:14	SIG	M62/2057B1	40R	M62 J25 - J30	
25/09/15 17:18:14	SIG	M62/2057B2	40R	M62 J25 - J30	
25/09/15 17:18:14	SIG	M62/2057B3	40R	M62 J25 - J30	
25/09/15 17:18:14	SIG	M62/2057B4	40R	M62 J25 - J30	
25/09/15 17:18:21	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 17:18:22	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 17:18:32	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 17:18:32	SIG	M62/1987A2	50R	M62 J25 - J30	
25/09/15 17:18:32	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 17:18:32	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 17:18:47	SIG	M62/1987J1	40R	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1979K1	OFF	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1979K2	OFF	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1987A1	NR	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1987A3	NR	M62 J25 - J30	
25/09/15 17:19:03	SIG	M62/1987J1	NR	M62 J25 - J30	
25/09/15 17:19:37	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 17:19:37	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 17:19:37	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 17:19:41	SIG	M62/2132B1	60R	M62 J25 - J30	
25/09/15 17:19:41	SIG	M62/2132B2	60R	M62 J25 - J30	
25/09/15 17:19:41	SIG	M62/2132B3	60R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 17:19:42	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 17:19:43	SIG	M62/1979K1	60R	M62 J25 - J30	
25/09/15 17:19:43	SIG	M62/1979K2	60R	M62 J25 - J30	
25/09/15 17:19:43	SIG	M62/1981A1	60R	M62 J25 - J30	
25/09/15 17:19:43	SIG	M62/1981A2	60R	M62 J25 - J30	
25/09/15 17:19:43	SIG	M62/1981A3	60R	M62 J25 - J30	
25/09/15 17:19:43	SIG	M62/1981A4	60R	M62 J25 - J30	
25/09/15 17:20:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:20:14	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 17:20:19	SIG	M62/2117B1	40R	M62 J25 - J30	
25/09/15 17:20:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:21:56	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 17:21:56	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 17:21:56	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2117B1	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2117B3	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2120M1	50R	M62 J25 - J30	
25/09/15 17:21:57	SIG	M62/2120M2	50R	M62 J25 - J30	
25/09/15 17:22:08	SIG	M62/2057B1	50R	M62 J25 - J30	
25/09/15 17:22:08	SIG	M62/2057B2	50R	M62 J25 - J30	
25/09/15 17:22:08	SIG	M62/2057B3	50R	M62 J25 - J30	
25/09/15 17:22:08	SIG	M62/2057B4	50R	M62 J25 - J30	
25/09/15 17:22:30	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 17:22:31	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 17:22:36	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 17:23:33	SIG	M62/1987J1	40R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 17:23:41	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 17:24:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:24:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:24:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:24:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:26:13	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 17:26:13	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 17:26:13	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2050A2	60R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2050A3	60R	M62 J25 - J30	
25/09/15 17:26:18	SIG	M62/2050A4	60R	M62 J25 - J30	
25/09/15 17:27:41	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 17:27:41	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 17:27:41	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 17:27:41	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 17:27:42	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 17:27:42	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 17:27:42	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 17:27:42	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 17:27:43	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 17:27:43	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 17:27:43	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 17:27:43	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 17:28:20	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 17:28:20	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 17:28:20	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 17:28:20	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 17:29:23	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 17:29:41	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 17:29:41	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 17:29:41	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 17:29:41	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 17:29:41	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 17:29:46	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 17:29:46	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 17:29:46	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 17:29:46	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 17:30:29	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 17:30:29	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 17:30:29	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 17:30:29	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 17:30:47	SIG	M62/2025B1	50R	M62 J25 - J30	
25/09/15 17:30:47	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 17:30:47	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 17:30:47	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2025B1	40R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2025B2	40R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2025B3	40R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2025B4	40R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2033B1	50R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 17:30:52	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 17:31:40	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 17:33:34	SIG	M62/2018B1	50R	M62 J25 - J30	
25/09/15 17:33:34	SIG	M62/2018B2	50R	M62 J25 - J30	
25/09/15 17:33:34	SIG	M62/2018B3	50R	M62 J25 - J30	
25/09/15 17:33:34	SIG	M62/2018L1	50R	M62 J25 - J30	
25/09/15 17:33:39	SIG	M62/2018B1	40R	M62 J25 - J30	
25/09/15 17:33:39	SIG	M62/2018B2	40R	M62 J25 - J30	
25/09/15 17:33:39	SIG	M62/2018B3	40R	M62 J25 - J30	
25/09/15 17:33:39	SIG	M62/2018L1	40R	M62 J25 - J30	
25/09/15 17:33:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:33:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:33:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:33:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1974A1	40R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 17:34:24	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 17:35:40	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 17:35:40	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 17:35:40	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 17:35:40	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 17:35:59	SIG	M62/2033B1	40R	M62 J25 - J30	
25/09/15 17:35:59	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 17:35:59	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2033B1	40R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2041B1	50R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 17:36:04	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 17:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 17:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:36:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 17:36:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 17:36:41	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 17:36:41	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 17:36:41	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 17:36:41	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 17:36:41	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 17:36:46	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 17:37:34	SIG	M62/2018B1	60R	M62 J25 - J30	
25/09/15 17:37:34	SIG	M62/2018B2	60R	M62 J25 - J30	
25/09/15 17:37:34	SIG	M62/2018B3	60R	M62 J25 - J30	
25/09/15 17:37:34	SIG	M62/2018L1	60R	M62 J25 - J30	
25/09/15 17:38:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:38:51	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 17:38:56	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 17:39:14	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 17:39:14	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 17:39:14	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 17:39:14	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 17:39:59	SIG	M62/2025B1	60R	M62 J25 - J30	
25/09/15 17:39:59	SIG	M62/2025B2	60R	M62 J25 - J30	
25/09/15 17:39:59	SIG	M62/2025B3	60R	M62 J25 - J30	
25/09/15 17:39:59	SIG	M62/2025B4	60R	M62 J25 - J30	
25/09/15 17:40:36	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 17:40:36	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 17:40:36	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 17:40:36	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 17:41:09	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 17:41:19	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 17:41:19	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 17:41:19	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 17:41:20	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 17:41:20	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 17:41:20	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 17:41:20	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 17:41:20	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2033B1	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2041B1	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 17:41:39	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 17:42:12	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 17:42:12	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 17:42:12	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 17:42:12	SIG	M62/2004A1	40R	M62 J25 - J30	
25/09/15 17:42:12	SIG	M62/2004A2	40R	M62 J25 - J30	
25/09/15 17:42:12	SIG	M62/2004A3	40R	M62 J25 - J30	
25/09/15 17:42:25	SIG	M62/1999J1	40R	M62 J25 - J30	
25/09/15 17:42:25	SIG	M62/1999J2	40R	M62 J25 - J30	
25/09/15 17:43:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:43:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 17:44:15	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 17:44:15	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 17:44:15	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 17:44:15	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 17:44:17	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 17:44:17	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 17:44:17	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 17:44:17	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 17:44:48	SIG	M62/2050A1	OFF	M62 J25 - J30	
25/09/15 17:44:49	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1955K1	50R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1955K2	50R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1956A1	50R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1956A2	50R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1956A3	50R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1960A1	40R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1960A2	40R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1960A3	40R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1960K1	40R	M62 J25 - J30	
25/09/15 17:45:39	SIG	M62/1960K2	40R	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2117A2	50R	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2117A3	50R	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2117A4	50R	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2124A1	REDX	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2124A2	NR	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2124A3	NR	M62 J25 - J30	
25/09/15 17:45:41	SIG	M62/2124A4	NR	M62 J25 - J30	
25/09/15 17:45:46	SIG	M62/2114A1	50R	M62 J25 - J30	
25/09/15 17:45:46	SIG	M62/2114A2	50R	M62 J25 - J30	
25/09/15 17:45:46	SIG	M62/2114A3	50R	M62 J25 - J30	
25/09/15 17:45:46	SIG	M62/2117A2	40R	M62 J25 - J30	
25/09/15 17:45:46	SIG	M62/2117A3	40R	M62 J25 - J30	
25/09/15 17:45:46	SIG	M62/2117A4	40R	M62 J25 - J30	
25/09/15 17:46:01	SIG	M62/2122K1	50R	M62 J25 - J30	
25/09/15 17:46:01	SIG	M62/2122K2	50R	M62 J25 - J30	
25/09/15 17:46:01	SIG	M62/2124A2	50R	M62 J25 - J30	
25/09/15 17:46:01	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:46:01	SIG	M62/2124A4	50R	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2122K1	40R	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2122K2	40R	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2124A2	40R	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2124A4	40R	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 17:46:06	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 17:46:12	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 17:46:12	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 17:46:12	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 17:46:12	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 17:46:12	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 17:46:16	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:46:17	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:46:22	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:46:25	SIG	M62/1999J1	50R	M62 J25 - J30	
25/09/15 17:46:25	SIG	M62/1999J2	50R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 17:46:28	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2106A1	50R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2106A2	50R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2106A3	50R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2106A4	50R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2114A1	40R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2114A2	40R	M62 J25 - J30	
25/09/15 17:46:52	SIG	M62/2114A3	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 17:47:09	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2125B1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2125B2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2125B3	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2132B1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2132B2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2132B3	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2135A1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2135A2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2135A3	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2135A4	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2137B1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2137B2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2137B3	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2137B4	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2144A1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2144A2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2144J1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2144K1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2147B1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2147B2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2147B3	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2147B4	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2151A1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2151A2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2151J1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2151K1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2155A1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2155A2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2155J1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2155K1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2157A2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2157K1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2159B1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2159B2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2159M1	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2159M2	50R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2163A1	60R	M62 J25 - J30	
25/09/15 17:47:13	SIG	M62/2163A2	60R	M62 J25 - J30	
25/09/15 17:47:36	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 17:47:36	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 17:47:36	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 17:47:37	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 17:48:18	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 17:48:18	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 17:48:18	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 17:48:18	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 17:48:19	SIG	M62/2106A1	40R	M62 J25 - J30	
25/09/15 17:48:19	SIG	M62/2106A2	40R	M62 J25 - J30	
25/09/15 17:48:19	SIG	M62/2106A3	40R	M62 J25 - J30	
25/09/15 17:48:19	SIG	M62/2106A4	40R	M62 J25 - J30	
25/09/15 17:48:52	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:48:53	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:48:59	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:49:08	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 17:49:08	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 17:49:08	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 17:49:08	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 17:49:09	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:49:09	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:49:14	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:49:25	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:49:26	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:49:26	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:49:31	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:49:31	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 17:49:40	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 17:49:41	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 17:49:41	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 17:49:41	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 17:49:41	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 17:49:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 17:49:42	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:49:47	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:49:53	SIG	M62/1992A1	40R	M62 J25 - J30	
25/09/15 17:49:53	SIG	M62/1992A2	40R	M62 J25 - J30	
25/09/15 17:49:53	SIG	M62/1992A3	40R	M62 J25 - J30	
25/09/15 17:49:53	SIG	M62/1992J1	40R	M62 J25 - J30	
25/09/15 17:49:55	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 17:49:55	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 17:49:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 17:49:57	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:49:57	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 17:49:58	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:50:03	SIG	M62/2124A3	40R	M62 J25 - J30	
25/09/15 17:50:04	SIG	M62/2122K1	50R	M62 J25 - J30	
25/09/15 17:50:04	SIG	M62/2122K2	50R	M62 J25 - J30	
25/09/15 17:50:04	SIG	M62/2124A2	50R	M62 J25 - J30	
25/09/15 17:50:04	SIG	M62/2124A3	50R	M62 J25 - J30	
25/09/15 17:50:04	SIG	M62/2124A4	50R	M62 J25 - J30	
25/09/15 17:50:07	SIG	M62/2177A1	HSD	M62 J25 - J30	
25/09/15 17:50:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:50:15	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:50:15	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:50:16	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:50:27	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 17:50:27	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 17:50:27	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 17:50:27	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2122K1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2122K2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2124A2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2124A3	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2124A4	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2125B1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2125B2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2125B3	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2132B1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2132B2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2132B3	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B3	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B3	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B4	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2137B4	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2144A1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2144A2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2144J1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2144K1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B3	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B3	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B4	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2147B4	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2151A1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2151A2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2151J1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2151K1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2155A1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2155A2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2155J1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2155K1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2157A1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2157A2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2157K1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159B1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159B1	OFF	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159B2	OFF	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159B2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159M1	OFF	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159M1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159M2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2159M2	OFF	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2163A1	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2163A2	NR	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 17:50:41	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2137B1	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2137B3	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2137B4	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2147B1	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2147B2	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2147B3	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2147B4	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2159B1	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2159B2	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2159M1	60R	M62 J25 - J30	
25/09/15 17:50:42	SIG	M62/2159M2	60R	M62 J25 - J30	
25/09/15 17:50:46	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 17:50:52	SIG	M62/2183A1	HSD	M62 J25 - J30	
25/09/15 17:51:01	SIG	M62/2106A3	50R	M62 J25 - J30	
25/09/15 17:51:07	SIG	M62/2106A3	40R	M62 J25 - J30	
25/09/15 17:51:07	SIG	M62/2117A2	60R	M62 J25 - J30	
25/09/15 17:51:07	SIG	M62/2117A3	60R	M62 J25 - J30	
25/09/15 17:51:07	SIG	M62/2117A4	60R	M62 J25 - J30	
25/09/15 17:51:10	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 17:51:10	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 17:51:10	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 17:51:10	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 17:51:37	SIG	M62/2177A1	REDX	M62 J25 - J30	
25/09/15 17:51:37	SIG	M62/2189A1	HSD	M62 J25 - J30	
25/09/15 17:51:44	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 17:51:44	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 17:51:44	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 17:51:44	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/1999A1	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/1999A2	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/1999A3	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2004A1	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2004A2	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2004A3	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2008K1	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2008K2	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2012A1	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2012A2	40R	M62 J25 - J30	
25/09/15 17:52:11	SIG	M62/2012A3	40R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2106A1	60R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2106A2	60R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2106A3	60R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2106A4	60R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2114A1	60R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2114A2	60R	M62 J25 - J30	
25/09/15 17:52:20	SIG	M62/2114A3	60R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2050A1	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2050A2	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2050A3	50R	M62 J25 - J30	
25/09/15 17:52:22	SIG	M62/2050A4	50R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2050A1	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2050A2	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2050A3	40R	M62 J25 - J30	
25/09/15 17:52:27	SIG	M62/2050A4	40R	M62 J25 - J30	
25/09/15 17:52:32	SIG	M62/2041A1	30R	M62 J25 - J30	
25/09/15 17:52:32	SIG	M62/2050A1	30R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2025A1	LDR	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2033A1	LDR	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2041A1	20R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2050A1	20R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2050A2	40R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2050A3	40R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2050A4	40R	M62 J25 - J30	
25/09/15 17:52:37	SIG	M62/2183A1	REDX	M62 J25 - J30	
25/09/15 17:52:43	SIG	M62/2041A1	STOP	M62 J25 - J30	
25/09/15 17:52:43	SIG	M62/2050A1	STOP	M62 J25 - J30	
25/09/15 17:53:00	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:53:00	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:53:01	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:53:02	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 17:53:37	SIG	M62/2189A1	REDX	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2170A1	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2170A2	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2170K1	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2170K2	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2177A2	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2177A3	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2177A4	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2183A2	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2183A3	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2183A4	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2189A2	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2189A3	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2189A4	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2197A1	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2197A2	NR	M62 J25 - J30	
25/09/15 17:53:38	SIG	M62/2197A3	NR	M62 J25 - J30	
25/09/15 17:53:41	SIG	M62/2144J1	OFF	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2144A1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2144A2	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2144J1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2144K1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2151A1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2151A2	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2151J1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2151K1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2155A1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2155A2	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2155J1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2155K1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2157A1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2157A2	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2157J1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2157J2	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2157K1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2163A1	NR	M62 J25 - J30	
25/09/15 17:53:42	SIG	M62/2163A2	NR	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2050A1	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2050A2	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2050A3	60R	M62 J25 - J30	
25/09/15 17:54:02	SIG	M62/2050A4	60R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1999A1	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1999A2	50R	M62 J25 - J30	
25/09/15 17:54:03	SIG	M62/1999A3	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2106A1	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2106A2	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2106A3	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2106A4	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2114A1	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2114A2	50R	M62 J25 - J30	
25/09/15 17:54:31	SIG	M62/2114A3	50R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2106A1	40R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2106A2	40R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2106A3	40R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2106A4	40R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2114A1	40R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2114A2	40R	M62 J25 - J30	
25/09/15 17:54:36	SIG	M62/2114A3	40R	M62 J25 - J30	
25/09/15 17:54:38	SIG	M62/2170K1	OFF	M62 J25 - J30	
25/09/15 17:54:38	SIG	M62/2170K2	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2170A1	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2170A2	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2177A1	BLNK	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2177A2	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2177A3	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2177A4	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2183A1	BLNK	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2183A2	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2183A3	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2183A4	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2189A1	BLNK	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2189A2	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2189A3	OFF	M62 J25 - J30	
25/09/15 17:54:39	SIG	M62/2189A4	OFF	M62 J25 - J30	
25/09/15 17:54:41	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 17:54:41	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 17:54:41	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 17:54:41	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 17:55:34	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 17:55:34	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 17:55:34	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 17:55:34	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 17:55:40	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 17:55:49	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2025A1	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2025A2	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2025A3	40R	M62 J25 - J30	
25/09/15 17:55:54	SIG	M62/2025A4	40R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2004A1	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2004A2	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2004A3	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2012A1	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2012A2	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2012A3	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 17:56:11	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 17:56:39	SIG	M62/2197A1	OFF	M62 J25 - J30	
25/09/15 17:56:39	SIG	M62/2197A2	OFF	M62 J25 - J30	
25/09/15 17:56:39	SIG	M62/2197A3	OFF	M62 J25 - J30	
25/09/15 17:56:42	SIG	M62/2163A1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2144A1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2144A2	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2144J1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2144K1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2151A1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2151A2	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2151J1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2151K1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2155A1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2155A2	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2155J1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2155K1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2157A2	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2157J1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2157J2	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2157K1	OFF	M62 J25 - J30	
25/09/15 17:56:43	SIG	M62/2163A2	OFF	M62 J25 - J30	
25/09/15 17:56:54	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 17:56:55	SIG	M62/2106A3	50R	M62 J25 - J30	
25/09/15 17:57:00	SIG	M62/2106A3	40R	M62 J25 - J30	
25/09/15 17:57:10	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 17:57:10	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 17:57:10	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 17:57:10	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 17:57:13	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 17:57:13	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 17:57:13	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 17:57:13	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 17:57:18	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 17:57:18	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 17:57:18	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 17:57:18	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 17:57:42	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 17:57:42	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 17:57:42	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 17:57:42	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 17:58:27	SIG	M62/2113B1	40R	M62 J25 - J30	
25/09/15 17:58:27	SIG	M62/2113B2	40R	M62 J25 - J30	
25/09/15 17:58:27	SIG	M62/2113B3	40R	M62 J25 - J30	
25/09/15 17:58:27	SIG	M62/2113B4	40R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2106A1	60R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2106A2	60R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2106A3	60R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2106A4	60R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2114A1	60R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2114A2	60R	M62 J25 - J30	
25/09/15 17:58:31	SIG	M62/2114A3	60R	M62 J25 - J30	
25/09/15 17:58:41	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 17:58:41	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 17:58:41	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 17:58:41	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 17:59:26	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 17:59:26	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 18:00:08	SIG	M62/2137B4	OFF	M62 J25 - J30	
25/09/15 18:00:09	SIG	M62/2137B4	60R	M62 J25 - J30	
25/09/15 18:00:42	SIG	M62/1979K1	60R	M62 J25 - J30	
25/09/15 18:00:42	SIG	M62/1979K2	60R	M62 J25 - J30	
25/09/15 18:00:42	SIG	M62/1981A1	60R	M62 J25 - J30	
25/09/15 18:00:42	SIG	M62/1981A2	60R	M62 J25 - J30	
25/09/15 18:00:42	SIG	M62/1981A3	60R	M62 J25 - J30	
25/09/15 18:00:42	SIG	M62/1981A4	60R	M62 J25 - J30	
25/09/15 18:01:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:01:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:01:09	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:01:10	SIG	M62/2018A1	50R	M62 J25 - J30	
25/09/15 18:01:10	SIG	M62/2018A2	50R	M62 J25 - J30	
25/09/15 18:01:10	SIG	M62/2018A3	50R	M62 J25 - J30	
25/09/15 18:01:10	SIG	M62/2018A4	50R	M62 J25 - J30	
25/09/15 18:01:10	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 18:01:13	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1987A1	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1987A3	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1987J1	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1992A1	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1992A2	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1992A3	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1992J1	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1999A1	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1999A2	60R	M62 J25 - J30	
25/09/15 18:01:51	SIG	M62/1999A3	60R	M62 J25 - J30	
25/09/15 18:02:23	SIG	M62/2018A1	40R	M62 J25 - J30	
25/09/15 18:02:23	SIG	M62/2018A2	40R	M62 J25 - J30	
25/09/15 18:02:23	SIG	M62/2018A3	40R	M62 J25 - J30	
25/09/15 18:02:23	SIG	M62/2018A4	40R	M62 J25 - J30	
25/09/15 18:03:42	SIG	M62/2004A1	60R	M62 J25 - J30	
25/09/15 18:03:42	SIG	M62/2004A2	60R	M62 J25 - J30	
25/09/15 18:03:42	SIG	M62/2004A3	60R	M62 J25 - J30	
25/09/15 18:03:54	SIG	M62/2113B1	50R	M62 J25 - J30	
25/09/15 18:03:54	SIG	M62/2113B2	50R	M62 J25 - J30	
25/09/15 18:03:54	SIG	M62/2113B3	50R	M62 J25 - J30	
25/09/15 18:03:54	SIG	M62/2113B4	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2033A1	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2033A2	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2033A3	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2033A4	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2041A1	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2041A2	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2041A3	50R	M62 J25 - J30	
25/09/15 18:04:48	SIG	M62/2041A4	50R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2033A1	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2033A2	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2033A3	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2033A4	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2041A1	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2041A2	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2041A3	40R	M62 J25 - J30	
25/09/15 18:04:54	SIG	M62/2041A4	40R	M62 J25 - J30	
25/09/15 18:05:39	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 18:05:39	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 18:06:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:06:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 18:06:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 18:06:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:06:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2018A1	60R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2018A2	60R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2018A3	60R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2018A4	60R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2025A1	50R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2025A2	50R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2025A3	50R	M62 J25 - J30	
25/09/15 18:06:23	SIG	M62/2025A4	50R	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2137B1	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2137B3	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2137B4	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2147B1	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2147B2	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2147B3	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2147B4	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2159B1	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2159B2	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2159M1	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2159M2	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2170B1	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2170B2	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2170L1	OFF	M62 J25 - J30	
25/09/15 18:07:42	SIG	M62/2170L2	OFF	M62 J25 - J30	
25/09/15 18:08:42	SIG	M62/2132B1	OFF	M62 J25 - J30	
25/09/15 18:08:42	SIG	M62/2132B2	OFF	M62 J25 - J30	
25/09/15 18:08:42	SIG	M62/2132B3	OFF	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2025A1	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2025A2	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2025A3	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2025A4	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2033A1	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2033A2	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2033A3	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2033A4	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2041A1	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2041A2	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2041A3	60R	M62 J25 - J30	
25/09/15 18:08:48	SIG	M62/2041A4	60R	M62 J25 - J30	
25/09/15 18:10:15	SIG	M62/2106B1	50R	M62 J25 - J30	
25/09/15 18:10:15	SIG	M62/2106B2	50R	M62 J25 - J30	
25/09/15 18:10:15	SIG	M62/2106B3	50R	M62 J25 - J30	
25/09/15 18:10:15	SIG	M62/2106B4	50R	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2117A2	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2117A3	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2117A4	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2122K1	OFF	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2122K2	OFF	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2124A2	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2124A3	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2124A4	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2135A1	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2135A2	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2135A3	NR	M62 J25 - J30	
25/09/15 18:10:42	SIG	M62/2135A4	NR	M62 J25 - J30	
25/09/15 18:11:41	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:12:17	SIG	M62/2106B1	40R	M62 J25 - J30	
25/09/15 18:12:17	SIG	M62/2106B2	40R	M62 J25 - J30	
25/09/15 18:12:17	SIG	M62/2106B3	40R	M62 J25 - J30	
25/09/15 18:12:17	SIG	M62/2106B4	40R	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1955K1	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1955K2	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1956A1	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1956A2	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1956A3	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1968A1	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1968A2	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1968A3	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1968A4	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1974A1	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1974A2	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1974A3	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/1974A4	OFF	M62 J25 - J30	
25/09/15 18:13:42	SIG	M62/2124A2	OFF	M62 J25 - J30	
25/09/15 18:13:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
25/09/15 18:13:43	SIG	M62/2124A4	OFF	M62 J25 - J30	
25/09/15 18:13:43	SIG	M62/2135A1	OFF	M62 J25 - J30	
25/09/15 18:13:43	SIG	M62/2135A2	OFF	M62 J25 - J30	
25/09/15 18:13:43	SIG	M62/2135A3	OFF	M62 J25 - J30	
25/09/15 18:13:43	SIG	M62/2135A4	OFF	M62 J25 - J30	
25/09/15 18:13:44	SIG	M62/2124A1	BLNK	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1979K1	OFF	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1979K2	OFF	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1987A1	NR	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1987A3	NR	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1987J1	NR	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1992A1	NR	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1992A2	NR	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1992A3	NR	M62 J25 - J30	
25/09/15 18:14:52	SIG	M62/1992J1	NR	M62 J25 - J30	
25/09/15 18:16:18	SIG	M62/2106B1	50R	M62 J25 - J30	
25/09/15 18:16:18	SIG	M62/2106B2	50R	M62 J25 - J30	
25/09/15 18:16:18	SIG	M62/2106B3	50R	M62 J25 - J30	
25/09/15 18:16:18	SIG	M62/2106B4	50R	M62 J25 - J30	
25/09/15 18:17:14	SIG	M62/2097B1	50R	M62 J25 - J30	
25/09/15 18:17:14	SIG	M62/2097B2	50R	M62 J25 - J30	
25/09/15 18:17:14	SIG	M62/2097B4	50R	M62 J25 - J30	
25/09/15 18:17:25	SIG	M62/2097B1	40R	M62 J25 - J30	
25/09/15 18:17:25	SIG	M62/2097B2	40R	M62 J25 - J30	
25/09/15 18:17:25	SIG	M62/2097B4	40R	M62 J25 - J30	
25/09/15 18:17:52	SIG	M62/1987J1	OFF	M62 J25 - J30	
25/09/15 18:18:02	SIG	M62/1987A1	OFF	M62 J25 - J30	
25/09/15 18:18:02	SIG	M62/1987A3	OFF	M62 J25 - J30	
25/09/15 18:18:02	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 18:18:02	SIG	M62/1992A2	OFF	M62 J25 - J30	
25/09/15 18:18:02	SIG	M62/1992A3	OFF	M62 J25 - J30	
25/09/15 18:18:02	SIG	M62/1992J1	OFF	M62 J25 - J30	
25/09/15 18:20:42	SIG	M62/2117B1	60R	M62 J25 - J30	
25/09/15 18:20:42	SIG	M62/2117B3	60R	M62 J25 - J30	
25/09/15 18:20:42	SIG	M62/2120M1	60R	M62 J25 - J30	
25/09/15 18:20:42	SIG	M62/2120M2	60R	M62 J25 - J30	
25/09/15 18:22:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:22:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:22:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:22:56	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:23:51	SIG	M62/2132B1	50R	M62 J25 - J30	
25/09/15 18:23:51	SIG	M62/2132B2	50R	M62 J25 - J30	
25/09/15 18:23:51	SIG	M62/2132B3	50R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2132B1	40R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2132B2	40R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2132B3	40R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2137B1	50R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2137B2	50R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2137B3	50R	M62 J25 - J30	
25/09/15 18:23:57	SIG	M62/2137B4	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 18:24:06	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 18:24:16	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 18:24:29	SIG	M62/2097B1	50R	M62 J25 - J30	
25/09/15 18:24:29	SIG	M62/2097B2	50R	M62 J25 - J30	
25/09/15 18:24:29	SIG	M62/2097B4	50R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2147B1	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2147B2	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2147B3	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2147B4	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2159B1	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2159B2	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2159M1	60R	M62 J25 - J30	
25/09/15 18:24:42	SIG	M62/2159M2	60R	M62 J25 - J30	
25/09/15 18:24:47	SIG	M62/2097B1	40R	M62 J25 - J30	
25/09/15 18:24:47	SIG	M62/2097B2	40R	M62 J25 - J30	
25/09/15 18:24:47	SIG	M62/2097B4	40R	M62 J25 - J30	
25/09/15 18:27:42	SIG	M62/2170B1	60R	M62 J25 - J30	
25/09/15 18:27:42	SIG	M62/2170B2	60R	M62 J25 - J30	
25/09/15 18:27:42	SIG	M62/2170L1	60R	M62 J25 - J30	
25/09/15 18:27:42	SIG	M62/2170L2	60R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M62/2069M1	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M62/2069M2	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M621/1010B1	50R	M62 J25 - J30	
25/09/15 18:28:31	SIG	M621/1010B2	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2088B1	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2088B2	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2088B3	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2088B4	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2097B1	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2097B2	50R	M62 J25 - J30	
25/09/15 18:28:47	SIG	M62/2097B4	50R	M62 J25 - J30	
25/09/15 18:30:11	SIG	M62/2137B1	40R	M62 J25 - J30	
25/09/15 18:30:11	SIG	M62/2137B2	40R	M62 J25 - J30	
25/09/15 18:30:11	SIG	M62/2137B3	40R	M62 J25 - J30	
25/09/15 18:30:11	SIG	M62/2137B4	40R	M62 J25 - J30	
25/09/15 18:30:45	SIG	M62/2074B2	50R	M62 J25 - J30	
25/09/15 18:30:45	SIG	M62/2074B3	50R	M62 J25 - J30	
25/09/15 18:30:45	SIG	M62/2074B4	50R	M62 J25 - J30	
25/09/15 18:31:05	SIG	M62/2074B2	40R	M62 J25 - J30	
25/09/15 18:31:05	SIG	M62/2074B3	40R	M62 J25 - J30	
25/09/15 18:31:05	SIG	M62/2074B4	40R	M62 J25 - J30	
25/09/15 18:31:26	SIG	M62/2081B1	50R	M62 J25 - J30	
25/09/15 18:31:26	SIG	M62/2081B2	50R	M62 J25 - J30	
25/09/15 18:31:26	SIG	M62/2081B3	50R	M62 J25 - J30	
25/09/15 18:31:26	SIG	M62/2081L1	50R	M62 J25 - J30	
25/09/15 18:32:42	SIG	M62/2113B1	60R	M62 J25 - J30	
25/09/15 18:32:42	SIG	M62/2113B2	60R	M62 J25 - J30	
25/09/15 18:32:42	SIG	M62/2113B3	60R	M62 J25 - J30	
25/09/15 18:32:42	SIG	M62/2113B4	60R	M62 J25 - J30	
25/09/15 18:34:11	SIG	M62/2137B1	50R	M62 J25 - J30	
25/09/15 18:34:11	SIG	M62/2137B2	50R	M62 J25 - J30	
25/09/15 18:34:11	SIG	M62/2137B3	50R	M62 J25 - J30	
25/09/15 18:34:11	SIG	M62/2137B4	50R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2132B1	60R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2132B2	60R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2132B3	60R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2137B1	60R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2137B2	60R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2137B3	60R	M62 J25 - J30	
25/09/15 18:35:07	SIG	M62/2137B4	60R	M62 J25 - J30	
25/09/15 18:35:32	SIG	M621/1010B1	40R	M62 J25 - J30	
25/09/15 18:35:32	SIG	M621/1010B2	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M62/2065B2	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M62/2065B3	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M62/2065B4	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M62/2065M1	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M62/2069M1	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M62/2069M2	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M621/1002B1	40R	M62 J25 - J30	
25/09/15 18:35:33	SIG	M621/1002B2	40R	M62 J25 - J30	
25/09/15 18:35:42	SIG	M62/2057B1	60R	M62 J25 - J30	
25/09/15 18:35:42	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 18:35:42	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 18:35:42	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 18:35:42	SIG	M62/2125L1	NR	M62 J25 - J30	
25/09/15 18:35:42	SIG	M62/2125L2	NR	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2088B1	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2088B2	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2088B3	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2088B4	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2097B1	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2097B2	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2097B4	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2106B1	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2106B2	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2106B3	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2106B4	60R	M62 J25 - J30	
25/09/15 18:35:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:36:12	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:36:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:36:22	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:36:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2157A2	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2157J1	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2157J2	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2157K1	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2163A1	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2163A2	50R	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2170A1	NR	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2170A2	NR	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2177A1	REDX	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2177A2	NR	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2177A3	NR	M62 J25 - J30	
25/09/15 18:38:31	SIG	M62/2177A4	NR	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2155A1	50R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2155A2	50R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2155J1	50R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2155K1	50R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2157A2	40R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2157J1	40R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2157J2	40R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2157K1	40R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2163A1	40R	M62 J25 - J30	
25/09/15 18:38:36	SIG	M62/2163A2	40R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2065B2	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2065B3	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2065B4	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2065M1	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2069M1	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2069M2	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2074B2	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2074B3	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2074B4	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2081B1	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2081B2	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2081B3	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M62/2081L1	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M621/1002B1	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M621/1002B2	60R	M62 J25 - J30	
25/09/15 18:39:32	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 18:39:32	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2057B1	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2057B2	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2057B3	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2057B4	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2065B2	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2065B3	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2065B4	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M62/2065M1	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M621/1002B1	50R	M62 J25 - J30	
25/09/15 18:39:42	SIG	M621/1002B2	50R	M62 J25 - J30	
25/09/15 18:39:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:39:52	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 18:39:52	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 18:40:42	SIG	M62/2057B1	60R	M62 J25 - J30	
25/09/15 18:40:42	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 18:40:42	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 18:40:42	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 18:40:56	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 18:40:57	SIG	M62/2157A1	50R	M62 J25 - J30	
25/09/15 18:41:02	SIG	M62/2157A1	40R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2155A1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2155A2	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2155J1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2155K1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2157A1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2157A2	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2157J1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2157J2	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2157K1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2163A1	60R	M62 J25 - J30	
25/09/15 18:41:03	SIG	M62/2163A2	60R	M62 J25 - J30	
25/09/15 18:41:42	SIG	M62/2065B2	60R	M62 J25 - J30	
25/09/15 18:41:42	SIG	M62/2065B3	60R	M62 J25 - J30	
25/09/15 18:41:42	SIG	M62/2065B4	60R	M62 J25 - J30	
25/09/15 18:41:42	SIG	M62/2065M1	60R	M62 J25 - J30	
25/09/15 18:41:42	SIG	M621/1002B1	60R	M62 J25 - J30	
25/09/15 18:41:42	SIG	M621/1002B2	60R	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2125B1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2125B2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2125B3	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2125L1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2125L2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2132B1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2132B2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2132B3	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2137B1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2137B2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2137B3	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2137B4	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2147B1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2147B2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2147B3	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2147B4	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2159B1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2159B2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2159M1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2159M2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2170B1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2170B2	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2170L1	OFF	M62 J25 - J30	
25/09/15 18:42:42	SIG	M62/2170L2	OFF	M62 J25 - J30	
25/09/15 18:43:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 18:43:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 18:43:52	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 18:43:52	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 18:43:59	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 18:44:00	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 18:44:21	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 18:44:21	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 18:44:21	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 18:44:21	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 18:44:21	SIG	M62/2012A1	60R	M62 J25 - J30	
25/09/15 18:44:21	SIG	M62/2012A2	60R	M62 J25 - J30	
25/09/15 18:44:21	SIG	M62/2012A3	60R	M62 J25 - J30	
25/09/15 18:44:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2155A1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2155A2	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2155J1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2155K1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2157A1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2157A2	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2157J1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2157J2	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2157K1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2163A1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2163A2	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2170A1	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2170A2	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2177A1	BLNK	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2177A2	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2177A3	OFF	M62 J25 - J30	
25/09/15 18:44:43	SIG	M62/2177A4	OFF	M62 J25 - J30	
25/09/15 18:47:21	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 18:47:21	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 18:48:49	SIG	M62/2079A1	HSD	M62 J25 - J30	
25/09/15 18:49:57	SIG	M62/2088A1	HSD	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/1999A1	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/1999A2	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/1999A3	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/1999J1	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/1999J2	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/2004A1	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/2004A2	OFF	M62 J25 - J30	
25/09/15 18:50:42	SIG	M62/2004A3	OFF	M62 J25 - J30	
25/09/15 18:50:51	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 18:50:51	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 18:50:51	SIG	M62/2008K1	50R	M62 J25 - J30	
25/09/15 18:50:51	SIG	M62/2008K2	50R	M62 J25 - J30	
25/09/15 18:51:05	SIG	M62/2079A1	REDX	M62 J25 - J30	
25/09/15 18:51:05	SIG	M62/2097A1	HSD	M62 J25 - J30	
25/09/15 18:52:12	SIG	M62/2106A1	HSD	M62 J25 - J30	
25/09/15 18:52:13	SIG	M62/2088A1	REDX	M62 J25 - J30	
25/09/15 18:53:21	SIG	M62/2097A1	REDX	M62 J25 - J30	
25/09/15 18:53:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 18:54:29	SIG	M62/2106A1	REDX	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2065A2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2065A3	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2065A4	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2073K1	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2073K2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2074A2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2079A2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2079A3	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2079A4	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2088A2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2088A3	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2088A4	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2097A2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2097A3	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2097A4	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2106A2	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2106A3	NR	M62 J25 - J30	
25/09/15 18:55:29	SIG	M62/2106A4	NR	M62 J25 - J30	
25/09/15 18:55:30	SIG	M62/2114A1	NR	M62 J25 - J30	
25/09/15 18:55:30	SIG	M62/2114A2	NR	M62 J25 - J30	
25/09/15 18:55:30	SIG	M62/2114A3	NR	M62 J25 - J30	
25/09/15 18:56:11	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 18:56:11	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 18:56:11	SIG	M62/2008K1	60R	M62 J25 - J30	
25/09/15 18:56:11	SIG	M62/2008K2	60R	M62 J25 - J30	
25/09/15 18:56:29	SIG	M62/2073K1	OFF	M62 J25 - J30	
25/09/15 18:56:29	SIG	M62/2073K2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2074A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2079A1	BLNK	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2079A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2079A3	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2079A4	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2088A1	BLNK	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2088A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2088A3	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2088A4	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2097A1	BLNK	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2097A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2097A3	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2097A4	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2106A1	BLNK	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2106A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2106A3	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2106A4	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2114A1	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2114A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2114A3	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2117A1	BLNK	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2117A2	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2117A3	OFF	M62 J25 - J30	
25/09/15 18:56:30	SIG	M62/2117A4	OFF	M62 J25 - J30	
25/09/15 18:59:07	SIG	M62/2113B1	HSD	M62 J25 - J30	
25/09/15 18:59:11	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 18:59:11	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 19:00:00	SIG	M62/2106B1	HSD	M62 J25 - J30	
25/09/15 19:01:08	SIG	M62/2097B1	HSD	M62 J25 - J30	
25/09/15 19:01:08	SIG	M62/2113B1	REDX	M62 J25 - J30	
25/09/15 19:02:16	SIG	M62/2088B1	HSD	M62 J25 - J30	
25/09/15 19:02:16	SIG	M62/2106B1	REDX	M62 J25 - J30	
25/09/15 19:03:24	SIG	M62/2097B1	REDX	M62 J25 - J30	
25/09/15 19:04:32	SIG	M62/2088B1	REDX	M62 J25 - J30	
25/09/15 19:05:25	SIG	M62/2117B1	NR	M62 J25 - J30	
25/09/15 19:05:25	SIG	M62/2117B3	NR	M62 J25 - J30	
25/09/15 19:05:26	SIG	M62/2106B2	NR	M62 J25 - J30	
25/09/15 19:05:26	SIG	M62/2106B3	NR	M62 J25 - J30	
25/09/15 19:05:26	SIG	M62/2106B4	NR	M62 J25 - J30	
25/09/15 19:05:26	SIG	M62/2113B2	NR	M62 J25 - J30	
25/09/15 19:05:26	SIG	M62/2113B3	NR	M62 J25 - J30	
25/09/15 19:05:26	SIG	M62/2113B4	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2074B2	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2074B3	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2074B4	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2081B1	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2081B2	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2081B3	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2081L1	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2088B2	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2088B3	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2088B4	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2097B2	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2097B4	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2120M1	NR	M62 J25 - J30	
25/09/15 19:05:36	SIG	M62/2120M2	NR	M62 J25 - J30	
25/09/15 19:06:25	SIG	M62/2120M1	OFF	M62 J25 - J30	
25/09/15 19:06:25	SIG	M62/2120M2	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2088B1	BLNK	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2088B2	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2088B3	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2088B4	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2097B1	BLNK	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2097B2	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2097B4	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2106B1	BLNK	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2106B2	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2106B3	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2106B4	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2113B1	BLNK	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2113B2	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2113B3	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2113B4	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
25/09/15 19:06:35	SIG	M62/2117B3	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2074B1	BLNK	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2074B2	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2074B3	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2074B4	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2081B1	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2081B2	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2081B3	OFF	M62 J25 - J30	
25/09/15 19:06:36	SIG	M62/2081L1	OFF	M62 J25 - J30	
25/09/15 19:08:53	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 19:08:53	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 19:25:36	SIG	M62/2057B1	HSD	M62 J25 - J30	
25/09/15 19:26:10	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 19:26:10	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 19:27:35	SIG	M62/2041B1	HSD	M62 J25 - J30	
25/09/15 19:27:35	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 19:27:35	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 19:27:36	SIG	M62/2057B1	REDX	M62 J25 - J30	
25/09/15 19:27:36	SIG	M621/1002B1	HSD	M62 J25 - J30	
25/09/15 19:28:35	SIG	M62/2033B1	HSD	M62 J25 - J30	
25/09/15 19:29:35	SIG	M62/2025B1	HSD	M62 J25 - J30	
25/09/15 19:29:36	SIG	M62/2041B1	REDX	M62 J25 - J30	
25/09/15 19:30:27	SIG	M62/2033B1	REDX	M62 J25 - J30	
25/09/15 19:31:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 19:31:41	SIG	M62/2065B2	NR	M62 J25 - J30	
25/09/15 19:31:41	SIG	M62/2065B3	NR	M62 J25 - J30	
25/09/15 19:31:41	SIG	M62/2065B4	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2018B1	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2018B2	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2018B3	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2018L1	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2025B2	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2025B3	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2025B4	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2033B2	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2033B3	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2033B4	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2041B2	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2041B3	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2041B4	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2050B2	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2050B3	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2050B4	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2057B2	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2057B3	NR	M62 J25 - J30	
25/09/15 19:31:42	SIG	M62/2057B4	NR	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2041B1	BLNK	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2041B2	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2041B3	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2041B4	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2050B2	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2050B3	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2050B4	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2057B1	BLNK	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2057B2	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2057B3	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2057B4	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2065B1	BLNK	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2065B2	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2065B3	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2065B4	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2065M1	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2069M1	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M62/2069M2	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M621/1002B1	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M621/1002B2	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 19:32:42	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2012B1	BLNK	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2012B2	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2012B3	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2012B4	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2018B1	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2018B2	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2018B3	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2018L1	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2025B1	BLNK	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2025B2	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2025B3	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2025B4	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2033B1	BLNK	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2033B2	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2033B4	OFF	M62 J25 - J30	
25/09/15 19:32:43	SIG	M62/2041B2	OFF	M62 J25 - J30	
25/09/15 19:33:17	SIG	M62/2025A1	HSD	M62 J25 - J30	
25/09/15 19:34:17	SIG	M62/2033A1	HSD	M62 J25 - J30	
25/09/15 19:35:17	SIG	M62/2041A1	HSD	M62 J25 - J30	
25/09/15 19:35:18	SIG	M62/2018A1	HSD	M62 J25 - J30	
25/09/15 19:35:18	SIG	M62/2025A1	REDX	M62 J25 - J30	
25/09/15 19:36:24	SIG	M62/2033A1	REDX	M62 J25 - J30	
25/09/15 19:36:24	SIG	M62/2050A1	HSD	M62 J25 - J30	
25/09/15 19:37:16	SIG	M62/2041A1	REDX	M62 J25 - J30	
25/09/15 19:38:16	SIG	M62/2050A1	REDX	M62 J25 - J30	
25/09/15 19:39:16	SIG	M62/2025A2	NR	M62 J25 - J30	
25/09/15 19:39:16	SIG	M62/2025A3	NR	M62 J25 - J30	
25/09/15 19:39:16	SIG	M62/2025A4	NR	M62 J25 - J30	
25/09/15 19:39:16	SIG	M62/2033A2	NR	M62 J25 - J30	
25/09/15 19:39:16	SIG	M62/2033A3	NR	M62 J25 - J30	
25/09/15 19:39:16	SIG	M62/2033A4	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2041A2	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2041A3	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2041A4	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2050A2	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2050A3	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2050A4	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2057A1	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2057A2	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2057A3	NR	M62 J25 - J30	
25/09/15 19:39:17	SIG	M62/2057J1	NR	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2008K1	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2008K2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2012A1	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2012A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2012A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2018A1	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2018A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2018A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2018A4	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2025A1	BLNK	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2025A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2025A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2025A4	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2033A1	BLNK	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2033A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2033A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2033A4	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2041A1	BLNK	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2041A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2041A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2041A4	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2050A1	BLNK	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2050A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2050A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2050A4	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2057A1	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2057A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2057A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2057J1	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2065A1	BLNK	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2065A2	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2065A3	OFF	M62 J25 - J30	
25/09/15 19:40:17	SIG	M62/2065A4	OFF	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2183A1	REDX	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2183A2	60R	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2183A3	60R	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2183A4	60R	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2189A1	REDX	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2189A2	50R	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2189A3	50R	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2189A4	LDL	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2197A1	50R	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2197A2	LDL	M62 J25 - J30	
25/09/15 19:41:27	SIG	M62/2197A3	LDL	M62 J25 - J30	
25/09/15 19:56:10	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 19:56:10	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 19:56:10	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2012B1	REDX	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2012B2	NR	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2012B3	NR	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2012B4	NR	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2018B1	NR	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2018B2	NR	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2018B3	NR	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2025B1	STOP	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2025B2	40R	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2025B3	40R	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2025B4	40R	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2033B1	REDX	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 19:56:15	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 19:56:20	SIG	M62/2025B1	STOP	M62 J25 - J30	
25/09/15 19:57:19	SIG	M62/2018B1	OFF	M62 J25 - J30	
25/09/15 19:57:19	SIG	M62/2018B2	OFF	M62 J25 - J30	
25/09/15 19:57:19	SIG	M62/2018B3	OFF	M62 J25 - J30	
25/09/15 19:58:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 19:58:39	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 19:59:47	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 19:59:47	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2041B1	REDX	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 19:59:52	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 20:02:44	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:02:44	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:02:44	SIG	M62/2050B2	60R	M62 J25 - J30	
25/09/15 20:02:44	SIG	M62/2050B3	60R	M62 J25 - J30	
25/09/15 20:02:44	SIG	M62/2050B4	60R	M62 J25 - J30	
25/09/15 20:02:50	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
25/09/15 20:04:44	SIG	M62/2057B2	60R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M62/2057B3	60R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M62/2057B4	60R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M62/2065M1	60R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
25/09/15 20:04:44	SIG	M621/1002B2	60R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M621/1010B1	60R	M62 J25 - J30	
25/09/15 20:04:44	SIG	M621/1010B2	60R	M62 J25 - J30	
25/09/15 20:05:48	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:05:48	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:05:54	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:08:51	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:08:52	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:08:57	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:11:27	SIG	M62/2170L1	50R	M62 J25 - J30	
25/09/15 20:11:27	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 20:11:27	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 20:11:27	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 20:11:27	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 20:11:32	SIG	M62/2170L1	40R	M62 J25 - J30	
25/09/15 20:11:32	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 20:11:32	SIG	M62/2177B1	40R	M62 J25 - J30	
25/09/15 20:11:32	SIG	M62/2177L1	40R	M62 J25 - J30	
25/09/15 20:11:32	SIG	M62/2177L2	40R	M62 J25 - J30	
25/09/15 20:11:37	SIG	M62/2170L1	30R	M62 J25 - J30	
25/09/15 20:11:37	SIG	M62/2177B1	30R	M62 J25 - J30	
25/09/15 20:11:37	SIG	M62/2177L1	30R	M62 J25 - J30	
25/09/15 20:11:37	SIG	M62/2177L2	30R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2170B1	NR	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2170B2	NR	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2170L1	20R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2170L2	40R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2177B1	30R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2177B2	50R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2177L1	30R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2177L2	30R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2183B1	50R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2183B2	50R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2183L1	50R	M62 J25 - J30	
25/09/15 20:11:43	SIG	M62/2183L2	50R	M62 J25 - J30	
25/09/15 20:11:44	SIG	M62/2065B1	REDX	M62 J25 - J30	
25/09/15 20:11:44	SIG	M62/2065B2	60R	M62 J25 - J30	
25/09/15 20:11:44	SIG	M62/2065B3	60R	M62 J25 - J30	
25/09/15 20:11:44	SIG	M62/2065B4	60R	M62 J25 - J30	
25/09/15 20:11:48	SIG	M62/2170L1	STOP	M62 J25 - J30	
25/09/15 20:11:55	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:11:56	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:12:01	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:13:44	SIG	M62/2018B1	50R	M62 J25 - J30	
25/09/15 20:13:44	SIG	M62/2018B2	50R	M62 J25 - J30	
25/09/15 20:13:44	SIG	M62/2018B3	50R	M62 J25 - J30	
25/09/15 20:13:44	SIG	M62/2018L1	50R	M62 J25 - J30	
25/09/15 20:13:48	SIG	M62/2183B2	???	M62 J25 - J30	
25/09/15 20:13:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2170L1	LDR	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2170L2	50R	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2177B1	50R	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2177L1	50R	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2177L2	50R	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2183B1	OFF	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2183L1	OFF	M62 J25 - J30	
25/09/15 20:14:51	SIG	M62/2183L2	OFF	M62 J25 - J30	
25/09/15 20:14:59	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:15:00	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:15:05	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:15:16	SIG	M62/2197A1	40R	M62 J25 - J30	
25/09/15 20:17:44	SIG	M62/2018B1	OFF	M62 J25 - J30	
25/09/15 20:17:44	SIG	M62/2018B2	OFF	M62 J25 - J30	
25/09/15 20:17:44	SIG	M62/2018B3	OFF	M62 J25 - J30	
25/09/15 20:17:44	SIG	M62/2018L1	OFF	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1987A2	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 20:17:55	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 20:18:03	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:18:03	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:18:09	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1987A2	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 20:18:15	SIG	M62/1987J1	40R	M62 J25 - J30	
25/09/15 20:18:20	SIG	M62/1987J1	30R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 20:18:25	SIG	M62/1987J1	20R	M62 J25 - J30	
25/09/15 20:18:30	SIG	M62/1987J1	STOP	M62 J25 - J30	
25/09/15 20:18:45	SIG	M62/2018B1	50R	M62 J25 - J30	
25/09/15 20:18:45	SIG	M62/2018B2	50R	M62 J25 - J30	
25/09/15 20:18:45	SIG	M62/2018B3	50R	M62 J25 - J30	
25/09/15 20:18:45	SIG	M62/2018L1	50R	M62 J25 - J30	
25/09/15 20:18:50	SIG	M62/2018B1	40R	M62 J25 - J30	
25/09/15 20:18:50	SIG	M62/2018B2	40R	M62 J25 - J30	
25/09/15 20:18:50	SIG	M62/2018B3	40R	M62 J25 - J30	
25/09/15 20:18:50	SIG	M62/2018L1	40R	M62 J25 - J30	
25/09/15 20:19:05	SIG	M62/2018B1	OFF	M62 J25 - J30	
25/09/15 20:19:05	SIG	M62/2018B2	OFF	M62 J25 - J30	
25/09/15 20:19:05	SIG	M62/2018B3	OFF	M62 J25 - J30	
25/09/15 20:19:05	SIG	M62/2018L1	OFF	M62 J25 - J30	
25/09/15 20:19:46	SIG	M62/1999A1	NR	M62 J25 - J30	
25/09/15 20:19:46	SIG	M62/1999A2	NR	M62 J25 - J30	
25/09/15 20:19:46	SIG	M62/1999A3	NR	M62 J25 - J30	
25/09/15 20:21:07	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:21:07	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:21:13	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:21:35	SIG	M62/2018B1	50R	M62 J25 - J30	
25/09/15 20:21:35	SIG	M62/2018B2	50R	M62 J25 - J30	
25/09/15 20:21:35	SIG	M62/2018B3	50R	M62 J25 - J30	
25/09/15 20:21:35	SIG	M62/2018L1	50R	M62 J25 - J30	
25/09/15 20:21:41	SIG	M62/2018B1	40R	M62 J25 - J30	
25/09/15 20:21:41	SIG	M62/2018B2	40R	M62 J25 - J30	
25/09/15 20:21:41	SIG	M62/2018B3	40R	M62 J25 - J30	
25/09/15 20:21:41	SIG	M62/2018L1	40R	M62 J25 - J30	
25/09/15 20:23:55	SIG	M62/2183A2	50R	M62 J25 - J30	
25/09/15 20:23:55	SIG	M62/2183A3	50R	M62 J25 - J30	
25/09/15 20:23:55	SIG	M62/2183A4	50R	M62 J25 - J30	
25/09/15 20:23:55	SIG	M62/2189A2	40R	M62 J25 - J30	
25/09/15 20:23:55	SIG	M62/2189A3	40R	M62 J25 - J30	
25/09/15 20:24:11	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:24:11	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:24:17	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2170A1	60R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2170A2	60R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2170K1	60R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2170K2	60R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2177A1	REDX	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2177A2	60R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2177A3	60R	M62 J25 - J30	
25/09/15 20:24:44	SIG	M62/2177A4	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 20:26:44	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 20:27:15	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:27:15	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:27:20	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1974A1	40R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 20:28:08	SIG	M62/1981A1	30R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1960K1	40R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1960K2	40R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1974A1	30R	M62 J25 - J30	
25/09/15 20:28:14	SIG	M62/1981A1	20R	M62 J25 - J30	
25/09/15 20:28:19	SIG	M62/1960K1	30R	M62 J25 - J30	
25/09/15 20:28:19	SIG	M62/1960K2	30R	M62 J25 - J30	
25/09/15 20:28:19	SIG	M62/1968A1	30R	M62 J25 - J30	
25/09/15 20:28:19	SIG	M62/1974A1	20R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1955K1	50R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1955K2	50R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1960K1	30R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1960K2	30R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1968A1	20R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1974A1	20R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 20:28:25	SIG	M62/1981A1	20R	M62 J25 - J30	
25/09/15 20:28:30	SIG	M62/1968A1	STOP	M62 J25 - J30	
25/09/15 20:28:30	SIG	M62/1974A1	STOP	M62 J25 - J30	
25/09/15 20:28:30	SIG	M62/1981A1	STOP	M62 J25 - J30	
25/09/15 20:29:51	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 20:29:52	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 20:29:52	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:29:52	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 20:29:52	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 20:29:52	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 20:29:52	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 20:30:03	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 20:30:03	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:30:03	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 20:30:03	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 20:30:03	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 20:30:03	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 20:30:44	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 20:30:44	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 20:30:44	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 20:30:44	SIG	M62/2177A2	50R	M62 J25 - J30	
25/09/15 20:30:44	SIG	M62/2177A3	50R	M62 J25 - J30	
25/09/15 20:30:44	SIG	M62/2177A4	50R	M62 J25 - J30	
25/09/15 20:32:26	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:32:27	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:32:32	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:35:26	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:35:27	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:35:32	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:36:55	SIG	M62/2189A2	50R	M62 J25 - J30	
25/09/15 20:36:55	SIG	M62/2189A3	50R	M62 J25 - J30	
25/09/15 20:37:44	SIG	M62/2163A1	60R	M62 J25 - J30	
25/09/15 20:37:44	SIG	M62/2163A2	60R	M62 J25 - J30	
25/09/15 20:37:44	SIG	M62/2166K1	60R	M62 J25 - J30	
25/09/15 20:37:44	SIG	M62/2166K2	60R	M62 J25 - J30	
25/09/15 20:38:29	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:38:30	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:38:35	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:40:42	SIG	M62/2197A2	50R	M62 J25 - J30	
25/09/15 20:40:42	SIG	M62/2197A3	50R	M62 J25 - J30	
25/09/15 20:40:47	SIG	M62/2189A4	50R	M62 J25 - J30	
25/09/15 20:40:47	SIG	M62/2197A2	40R	M62 J25 - J30	
25/09/15 20:40:47	SIG	M62/2197A3	40R	M62 J25 - J30	
25/09/15 20:41:33	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:41:34	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:41:39	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:41:44	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 20:41:44	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 20:41:44	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 20:41:44	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 20:42:45	SIG	M62/2177A2	60R	M62 J25 - J30	
25/09/15 20:42:45	SIG	M62/2177A3	60R	M62 J25 - J30	
25/09/15 20:42:45	SIG	M62/2177A4	60R	M62 J25 - J30	
25/09/15 20:42:45	SIG	M62/2183A2	60R	M62 J25 - J30	
25/09/15 20:42:45	SIG	M62/2183A3	60R	M62 J25 - J30	
25/09/15 20:42:45	SIG	M62/2183A4	60R	M62 J25 - J30	
25/09/15 20:43:21	SIG	M62/2166K1	50R	M62 J25 - J30	
25/09/15 20:43:21	SIG	M62/2166K2	50R	M62 J25 - J30	
25/09/15 20:43:54	SIG	M62/2170K1	50R	M62 J25 - J30	
25/09/15 20:43:54	SIG	M62/2170K2	50R	M62 J25 - J30	
25/09/15 20:43:59	SIG	M62/2170A1	50R	M62 J25 - J30	
25/09/15 20:43:59	SIG	M62/2170A2	50R	M62 J25 - J30	
25/09/15 20:44:37	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:44:38	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:44:43	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:45:44	SIG	M62/2163A1	OFF	M62 J25 - J30	
25/09/15 20:45:44	SIG	M62/2163A2	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2166K1	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2166K2	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2170A1	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2170A2	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2170K1	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2170K2	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2177A1	BLNK	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2177A2	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2177A3	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2177A4	OFF	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2183A2	NR	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2183A3	NR	M62 J25 - J30	
25/09/15 20:45:45	SIG	M62/2183A4	NR	M62 J25 - J30	
25/09/15 20:47:14	SIG	M62/2166K1	50R	M62 J25 - J30	
25/09/15 20:47:14	SIG	M62/2166K2	50R	M62 J25 - J30	
25/09/15 20:47:19	SIG	M62/2166K1	40R	M62 J25 - J30	
25/09/15 20:47:19	SIG	M62/2166K2	40R	M62 J25 - J30	
25/09/15 20:47:24	SIG	M62/2166K1	30R	M62 J25 - J30	
25/09/15 20:47:24	SIG	M62/2166K2	30R	M62 J25 - J30	
25/09/15 20:47:24	SIG	M62/2183A1	BLNK	M62 J25 - J30	
25/09/15 20:47:41	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:47:42	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:47:42	SIG	M62/2183A2	OFF	M62 J25 - J30	
25/09/15 20:47:42	SIG	M62/2183A3	OFF	M62 J25 - J30	
25/09/15 20:47:42	SIG	M62/2183A4	OFF	M62 J25 - J30	
25/09/15 20:47:47	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:48:22	SIG	M62/2197A1	50R	M62 J25 - J30	
25/09/15 20:48:22	SIG	M62/2197A2	50R	M62 J25 - J30	
25/09/15 20:48:22	SIG	M62/2197A3	50R	M62 J25 - J30	
25/09/15 20:48:39	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 20:48:39	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 20:48:39	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 20:48:51	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 20:49:41	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 20:49:41	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:49:41	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 20:49:44	SIG	M62/2197A1	40R	M62 J25 - J30	
25/09/15 20:49:44	SIG	M62/2197A2	40R	M62 J25 - J30	
25/09/15 20:49:44	SIG	M62/2197A3	40R	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1955K1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1955K2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1956A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1956A2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1956A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1968A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1968A2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1968A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1968A4	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1974A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1974A2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1974A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1974A4	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1979K1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1979K2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1987A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1987A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1987J1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1992A2	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1992A3	OFF	M62 J25 - J30	
25/09/15 20:49:54	SIG	M62/1992J1	OFF	M62 J25 - J30	
25/09/15 20:50:06	SIG	M62/1999A1	OFF	M62 J25 - J30	
25/09/15 20:50:06	SIG	M62/1999A2	OFF	M62 J25 - J30	
25/09/15 20:50:06	SIG	M62/1999A3	OFF	M62 J25 - J30	
25/09/15 20:51:20	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 20:51:20	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:51:20	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 20:53:44	SIG	M62/2197A1	50R	M62 J25 - J30	
25/09/15 20:53:44	SIG	M62/2197A2	50R	M62 J25 - J30	
25/09/15 20:53:44	SIG	M62/2197A3	50R	M62 J25 - J30	
25/09/15 20:53:49	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:53:49	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:53:55	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 20:55:20	SIG	M62/2033B2	50R	M62 J25 - J30	
25/09/15 20:55:20	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 20:55:20	SIG	M62/2033B4	50R	M62 J25 - J30	
25/09/15 20:56:45	SIG	M62/2189A1	BLNK	M62 J25 - J30	
25/09/15 20:56:45	SIG	M62/2189A2	OFF	M62 J25 - J30	
25/09/15 20:56:45	SIG	M62/2189A3	OFF	M62 J25 - J30	
25/09/15 20:56:45	SIG	M62/2189A4	OFF	M62 J25 - J30	
25/09/15 20:57:53	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 20:57:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2018B1	50R	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2018B2	50R	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2018B3	50R	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2018L1	50R	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 21:02:15	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 21:02:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 21:02:45	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 21:02:45	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 21:02:45	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 21:07:45	SIG	M62/2065B2	NR	M62 J25 - J30	
25/09/15 21:07:45	SIG	M62/2065B3	NR	M62 J25 - J30	
25/09/15 21:07:45	SIG	M62/2065B4	NR	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2170B1	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2170B2	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2170L1	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2170L2	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2177B1	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2177B2	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2177L1	OFF	M62 J25 - J30	
25/09/15 21:08:04	SIG	M62/2177L2	OFF	M62 J25 - J30	
25/09/15 21:10:29	SIG	M62/2197A1	OFF	M62 J25 - J30	
25/09/15 21:10:29	SIG	M62/2197A2	OFF	M62 J25 - J30	
25/09/15 21:10:29	SIG	M62/2197A3	OFF	M62 J25 - J30	
25/09/15 21:10:45	SIG	M62/2065B2	OFF	M62 J25 - J30	
25/09/15 21:10:45	SIG	M62/2065B3	OFF	M62 J25 - J30	
25/09/15 21:10:45	SIG	M62/2065B4	OFF	M62 J25 - J30	
25/09/15 21:10:46	SIG	M62/2065B1	BLNK	M62 J25 - J30	
25/09/15 21:16:20	SIG	M62/2166K1	OFF	M62 J25 - J30	
25/09/15 21:16:20	SIG	M62/2166K2	OFF	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1992A1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1992A2	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1992A3	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1992J1	50R	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1999A1	NR	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1999A2	NR	M62 J25 - J30	
25/09/15 22:08:39	SIG	M62/1999A3	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1968A1	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1968A2	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1968A3	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1968A4	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1974A1	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1974A2	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1974A3	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1974A4	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1979K1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1979K2	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1987A1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1987A3	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1987J1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1992A1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1992A2	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1992A3	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1992J1	OFF	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1999A1	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1999A2	NR	M62 J25 - J30	
25/09/15 22:09:37	SIG	M62/1999A3	NR	M62 J25 - J30	
25/09/15 22:09:51	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 22:09:51	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 22:09:51	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 22:09:51	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 22:09:51	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 22:09:51	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 22:09:56	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 22:09:56	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 22:09:56	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 22:09:56	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 22:09:56	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 22:09:56	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 22:10:01	SIG	M62/1981A1	30R	M62 J25 - J30	
25/09/15 22:10:01	SIG	M62/1981A4	30R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1968A4	LDL	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1974A1	LDR	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1974A4	LDL	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1981A1	20R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 22:10:07	SIG	M62/1981A4	20R	M62 J25 - J30	
25/09/15 22:10:12	SIG	M62/1981A1	STOP	M62 J25 - J30	
25/09/15 22:10:12	SIG	M62/1981A4	STOP	M62 J25 - J30	
25/09/15 22:12:37	SIG	M62/1999A1	OFF	M62 J25 - J30	
25/09/15 22:12:37	SIG	M62/1999A2	OFF	M62 J25 - J30	
25/09/15 22:12:37	SIG	M62/1999A3	OFF	M62 J25 - J30	
25/09/15 22:19:46	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 22:19:46	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 22:19:46	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 22:19:46	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 22:19:46	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 22:27:18	SIG	M62/1979K1	30R	M62 J25 - J30	
25/09/15 22:27:18	SIG	M62/1979K2	30R	M62 J25 - J30	
25/09/15 22:27:24	SIG	M62/1979K1	20R	M62 J25 - J30	
25/09/15 22:27:24	SIG	M62/1979K2	20R	M62 J25 - J30	
25/09/15 22:29:23	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 22:29:23	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 22:32:36	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 22:32:36	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 22:32:36	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 22:32:36	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 22:32:36	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 22:32:36	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 22:40:43	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 22:40:43	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 22:40:43	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1974A1	40R	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 22:40:49	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1955K1	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1955K2	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1956A1	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1956A2	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1956A3	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 22:41:00	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 22:41:29	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 22:41:29	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 22:42:29	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 22:42:29	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 22:42:29	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 22:42:29	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 22:42:37	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 22:42:37	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 22:42:37	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 22:42:37	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1955K1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1955K2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1956A1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1956A2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1956A3	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1968A1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1968A2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1968A3	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1968A4	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1974A1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1974A2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1974A3	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1974A4	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1979K1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1979K2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1981A1	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1981A2	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1981A3	OFF	M62 J25 - J30	
25/09/15 22:47:47	SIG	M62/1981A4	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M62/2057B1	BLNK	M62 J25 - J30	
25/09/15 22:50:47	SIG	M62/2057B2	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M62/2057B3	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M62/2057B4	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M62/2065M1	NR	M62 J25 - J30	
25/09/15 22:50:47	SIG	M621/1002B1	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M621/1002B2	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M621/1010B1	OFF	M62 J25 - J30	
25/09/15 22:50:47	SIG	M621/1010B2	OFF	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 22:51:47	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 22:53:47	SIG	M62/2065M1	OFF	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1955K1	OFF	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1955K2	OFF	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1956A1	OFF	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1956A2	OFF	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1956A3	OFF	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1960A1	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1960A2	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1960A3	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1960K1	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1960K2	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1968A1	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1968A2	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1968A3	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1968A4	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1974A1	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1974A2	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1974A3	NR	M62 J25 - J30	
25/09/15 22:55:47	SIG	M62/1974A4	NR	M62 J25 - J30	
25/09/15 22:58:47	SIG	M62/1960A1	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1960A2	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1960A3	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1960K1	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1960K2	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1968A1	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1968A2	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1968A3	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1968A4	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1974A1	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1974A2	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1974A3	OFF	M62 J25 - J30	
25/09/15 22:58:48	SIG	M62/1974A4	OFF	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1979K1	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1979K2	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1981A1	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1987A1	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1987A2	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1987A3	50R	M62 J25 - J30	
25/09/15 23:09:01	SIG	M62/1987J1	50R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1987A2	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 23:09:17	SIG	M62/1987J1	40R	M62 J25 - J30	
25/09/15 23:09:22	SIG	M62/1987J1	30R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1979K1	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1979K2	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1981A1	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1987A1	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1987A3	40R	M62 J25 - J30	
25/09/15 23:09:27	SIG	M62/1987J1	20R	M62 J25 - J30	
25/09/15 23:09:32	SIG	M62/1987J1	STOP	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1974A1	60R	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1974A2	60R	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1974A3	60R	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1974A4	60R	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1981A1	LDR	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1981A2	50R	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1981A3	50R	M62 J25 - J30	
25/09/15 23:09:51	SIG	M62/1981A4	50R	M62 J25 - J30	
25/09/15 23:12:35	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 23:12:35	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 23:16:39	SIG	M62/2025B1	STOP	M62 J25 - J30	
25/09/15 23:16:39	SIG	M62/2025B2	40R	M62 J25 - J30	
25/09/15 23:16:39	SIG	M62/2025B3	40R	M62 J25 - J30	
25/09/15 23:16:39	SIG	M62/2025B4	40R	M62 J25 - J30	
25/09/15 23:16:44	SIG	M62/2025B1	STOP	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1960A1	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1960A2	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1960A3	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1960K1	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1960K2	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1968A1	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1968A2	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1968A3	60R	M62 J25 - J30	
25/09/15 23:23:47	SIG	M62/1968A4	60R	M62 J25 - J30	
25/09/15 23:29:23	SIG	M606/2003B1	NR	M62 J25 - J30	
25/09/15 23:29:23	SIG	M606/2003B2	NR	M62 J25 - J30	
25/09/15 23:32:23	SIG	M606/2003B1	OFF	M62 J25 - J30	
25/09/15 23:32:24	SIG	M606/2003B2	OFF	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1968A1	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1968A2	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1968A3	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1968A4	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1974A1	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1974A2	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1974A3	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1974A4	50R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 23:39:18	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1974A1	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 23:39:23	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 23:39:28	SIG	M62/1974A1	30R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1960A1	50R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1960A2	50R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1960A3	50R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1960K1	50R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1960K2	50R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1968A1	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1968A2	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1968A3	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1968A4	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1974A1	20R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1974A2	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1974A3	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1974A4	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1981A1	STOP	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1981A2	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1981A3	40R	M62 J25 - J30	
25/09/15 23:39:34	SIG	M62/1981A4	40R	M62 J25 - J30	
25/09/15 23:39:39	SIG	M62/1974A1	STOP	M62 J25 - J30	
25/09/15 23:39:39	SIG	M62/1981A1	STOP	M62 J25 - J30	
25/09/15 23:40:06	SIG	M62/1999A1	NR	M62 J25 - J30	
25/09/15 23:40:06	SIG	M62/1999A2	NR	M62 J25 - J30	
25/09/15 23:40:06	SIG	M62/1999A3	NR	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/1955K1	60R	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/1955K2	60R	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/1956A1	60R	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/1956A2	60R	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/1956A3	60R	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/2018B1	OFF	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/2018B2	OFF	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/2018B3	OFF	M62 J25 - J30	
25/09/15 23:43:48	SIG	M62/2018L1	OFF	M62 J25 - J30	
25/09/15 23:45:03	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 23:45:03	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 23:45:08	SIG	M62/2033B2	40R	M62 J25 - J30	
25/09/15 23:45:08	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 23:45:08	SIG	M62/2033B4	40R	M62 J25 - J30	
25/09/15 23:45:08	SIG	M62/2041B2	50R	M62 J25 - J30	
25/09/15 23:45:08	SIG	M62/2041B3	50R	M62 J25 - J30	
25/09/15 23:45:08	SIG	M62/2041B4	50R	M62 J25 - J30	
25/09/15 23:45:39	SIG	M62/2025B1	REDX	M62 J25 - J30	
25/09/15 23:45:39	SIG	M62/2025B2	50R	M62 J25 - J30	
25/09/15 23:45:39	SIG	M62/2025B3	50R	M62 J25 - J30	
25/09/15 23:45:39	SIG	M62/2025B4	50R	M62 J25 - J30	
25/09/15 23:46:30	SIG	M62/2018L1	NR	M62 J25 - J30	
25/09/15 23:46:39	SIG	M62/2018B1	NR	M62 J25 - J30	
25/09/15 23:46:39	SIG	M62/2018B2	NR	M62 J25 - J30	
25/09/15 23:46:39	SIG	M62/2018B3	NR	M62 J25 - J30	
25/09/15 23:47:16	SIG	M62/2033B3	???	M62 J25 - J30	
25/09/15 23:47:17	SIG	M62/2033B3	50R	M62 J25 - J30	
25/09/15 23:47:22	SIG	M62/2033B3	40R	M62 J25 - J30	
25/09/15 23:49:03	SIG	M62/2033B2	60R	M62 J25 - J30	
25/09/15 23:49:03	SIG	M62/2033B3	60R	M62 J25 - J30	
25/09/15 23:49:03	SIG	M62/2033B4	60R	M62 J25 - J30	
25/09/15 23:49:03	SIG	M62/2041B2	60R	M62 J25 - J30	
25/09/15 23:49:03	SIG	M62/2041B3	60R	M62 J25 - J30	
25/09/15 23:49:03	SIG	M62/2041B4	60R	M62 J25 - J30	
25/09/15 23:51:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
25/09/15 23:51:27	SIG	M62/2033B3	???	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1960A1	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1960A2	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1960A3	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1960K1	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1960K2	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1968A1	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1968A2	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1968A3	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1968A4	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1974A1	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1974A2	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1974A3	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1974A4	60R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1979K1	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1979K2	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1981A1	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1981A2	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1981A3	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1981A4	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1987A1	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1987A3	50R	M62 J25 - J30	
26/09/15 00:07:14	SIG	M62/1987J1	50R	M62 J25 - J30	
26/09/15 00:07:15	SIG	M62/1999A1	NR	M62 J25 - J30	
26/09/15 00:07:15	SIG	M62/1999A2	NR	M62 J25 - J30	
26/09/15 00:07:15	SIG	M62/1999A3	NR	M62 J25 - J30	
26/09/15 00:08:03	SIG	M62/1992A1	NR	M62 J25 - J30	
26/09/15 00:08:03	SIG	M62/1992A2	NR	M62 J25 - J30	
26/09/15 00:08:03	SIG	M62/1992A3	NR	M62 J25 - J30	
26/09/15 00:08:12	SIG	M62/1992J1	NR	M62 J25 - J30	
26/09/15 00:10:15	SIG	M62/1999A1	OFF	M62 J25 - J30	
26/09/15 00:10:16	SIG	M62/1999A2	OFF	M62 J25 - J30	
26/09/15 00:10:16	SIG	M62/1999A3	OFF	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1987A1	NR	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1987A3	NR	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1987J1	NR	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1992A1	NR	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1992A2	NR	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1992A3	NR	M62 J25 - J30	
26/09/15 00:18:58	SIG	M62/1992J1	NR	M62 J25 - J30	
26/09/15 00:21:59	SIG	M62/1992A1	OFF	M62 J25 - J30	
26/09/15 00:21:59	SIG	M62/1992A2	OFF	M62 J25 - J30	
26/09/15 00:21:59	SIG	M62/1992A3	OFF	M62 J25 - J30	
26/09/15 00:21:59	SIG	M62/1992J1	OFF	M62 J25 - J30	
26/09/15 00:22:09	SIG	M62/2183A2	50R	M62 J25 - J30	
26/09/15 00:22:09	SIG	M62/2183A3	50R	M62 J25 - J30	
26/09/15 00:22:09	SIG	M62/2183A4	50R	M62 J25 - J30	
26/09/15 00:22:09	SIG	M62/2189A2	50R	M62 J25 - J30	
26/09/15 00:22:09	SIG	M62/2189A3	50R	M62 J25 - J30	
26/09/15 00:22:09	SIG	M62/2189A4	50R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2177A1	REDX	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2177A2	50R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2177A3	50R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2177A4	50R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2183A1	REDX	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2183A2	40R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2183A3	40R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2183A4	40R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2189A1	REDX	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2189A2	40R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2189A3	40R	M62 J25 - J30	
26/09/15 00:22:15	SIG	M62/2189A4	40R	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2012B1	BLNK	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2012B2	OFF	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2012B3	OFF	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2012B4	OFF	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2018B1	OFF	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2018B2	OFF	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2018B3	OFF	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2018L1	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2025B2	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2025B3	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2025B4	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2033B2	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2033B3	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2033B4	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2041B2	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2041B3	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2041B4	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 00:23:49	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2177A1	BLNK	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2177A2	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2177A3	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2177A4	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2183A2	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2183A3	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2183A4	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2189A2	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2189A3	OFF	M62 J25 - J30	
26/09/15 00:26:09	SIG	M62/2189A4	OFF	M62 J25 - J30	
26/09/15 00:26:10	SIG	M62/2183A1	BLNK	M62 J25 - J30	
26/09/15 00:26:10	SIG	M62/2183A1	BLNK	M62 J25 - J30	
26/09/15 00:26:10	SIG	M62/2189A1	BLNK	M62 J25 - J30	
26/09/15 00:26:10	SIG	M62/2189A1	BLNK	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2018L1	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2025B2	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2025B3	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2025B4	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2033B2	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2033B4	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2041B2	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2041B3	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2041B4	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2050B2	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2050B3	OFF	M62 J25 - J30	
26/09/15 00:26:49	SIG	M62/2050B4	OFF	M62 J25 - J30	
26/09/15 00:26:50	SIG	M62/2025B1	BLNK	M62 J25 - J30	
26/09/15 00:26:50	SIG	M62/2033B1	BLNK	M62 J25 - J30	
26/09/15 00:26:50	SIG	M62/2041B1	BLNK	M62 J25 - J30	
26/09/15 00:26:50	SIG	M62/2041B1	BLNK	M62 J25 - J30	
26/09/15 00:28:49	SIG	M62/1955K1	OFF	M62 J25 - J30	
26/09/15 00:28:49	SIG	M62/1955K2	OFF	M62 J25 - J30	
26/09/15 00:28:49	SIG	M62/1956A1	OFF	M62 J25 - J30	
26/09/15 00:28:49	SIG	M62/1956A2	OFF	M62 J25 - J30	
26/09/15 00:28:49	SIG	M62/1956A3	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1960A1	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1960A2	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1960A3	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1960K1	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1960K2	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1968A1	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1968A2	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1968A3	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1968A4	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1974A1	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1974A2	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1974A3	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1974A4	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1979K1	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1979K2	OFF	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1981A1	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1981A2	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1981A3	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1981A4	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1987A1	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1987A3	NR	M62 J25 - J30	
26/09/15 00:30:58	SIG	M62/1987J1	NR	M62 J25 - J30	
26/09/15 00:33:59	SIG	M62/1974A1	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1968A1	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1968A2	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1968A3	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1968A4	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1974A2	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1974A3	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1974A4	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1981A1	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1981A2	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1981A3	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1981A4	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1987A1	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1987A3	OFF	M62 J25 - J30	
26/09/15 00:34:09	SIG	M62/1987J1	OFF	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2183A1	REDX	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2183A2	60R	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2183A3	60R	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2183A4	60R	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2189A1	REDX	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2189A2	50R	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2189A3	50R	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2189A4	LDL	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2197A1	50R	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2197A2	LDL	M62 J25 - J30	
26/09/15 02:03:19	SIG	M62/2197A3	LDL	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2183A2	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2183A3	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2183A4	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2189A2	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2189A3	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2189A4	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2197A1	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2197A2	NR	M62 J25 - J30	
26/09/15 03:08:15	SIG	M62/2197A3	NR	M62 J25 - J30	
26/09/15 03:11:15	SIG	M62/2183A2	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2183A1	BLNK	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2183A3	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2183A4	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2189A1	BLNK	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2189A1	BLNK	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2189A2	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2189A3	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2189A4	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2197A1	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2197A2	OFF	M62 J25 - J30	
26/09/15 03:11:16	SIG	M62/2197A3	OFF	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2008K1	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2008K2	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2012A1	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2012A2	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2012A3	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2018A1	HSD	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2018A2	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2018A3	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2018A4	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2025A1	REDX	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2025A2	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2025A3	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2025A4	60R	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2033A1	REDX	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2033A2	NR	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2033A3	NR	M62 J25 - J30	
26/09/15 03:48:15	SIG	M62/2033A4	NR	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 04:00:40	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 04:02:57	SIG	M62/2183B2	???	M62 J25 - J30	
26/09/15 04:02:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 04:18:06	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 04:21:06	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 04:21:07	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 04:21:07	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 04:21:07	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2008K1	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2008K2	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2012A1	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2012A2	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2012A3	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2018A1	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2018A2	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2018A3	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2018A4	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2025A1	BLNK	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2025A2	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2025A3	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2025A4	OFF	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2033A2	NR	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2033A3	NR	M62 J25 - J30	
26/09/15 06:21:28	SIG	M62/2033A4	NR	M62 J25 - J30	
26/09/15 06:21:44	SIG	M62/2033A1	BLNK	M62 J25 - J30	
26/09/15 06:21:44	SIG	M62/2033A2	OFF	M62 J25 - J30	
26/09/15 06:21:44	SIG	M62/2033A3	OFF	M62 J25 - J30	
26/09/15 06:21:44	SIG	M62/2033A4	OFF	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2008K1	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2008K2	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2012A1	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2012A2	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2012A3	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2018A1	HSD	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2018A2	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2018A3	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2018A4	60R	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2025A1	REDX	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2025A2	NR	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2025A3	NR	M62 J25 - J30	
26/09/15 10:30:00	SIG	M62/2025A4	NR	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2012A1	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2018A1	HSD	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2025A2	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2025A3	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2025A4	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2033A1	REDX	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2033A2	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2033A3	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2033A4	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2041A1	REDX	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2041A2	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2041A3	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2041A4	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2050A1	REDX	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2050A2	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2050A3	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2050A4	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2057A1	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2057A2	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2057A3	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2057J1	60R	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2065A1	REDX	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2065A2	NR	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2065A3	NR	M62 J25 - J30	
26/09/15 10:30:01	SIG	M62/2065A4	NR	M62 J25 - J30	
26/09/15 10:31:58	SIG	M62/2050A1	60R	M62 J25 - J30	
26/09/15 10:33:34	SIG	M62/2041A1	60R	M62 J25 - J30	
26/09/15 10:33:58	SIG	M62/2033A1	60R	M62 J25 - J30	
26/09/15 10:34:01	SIG	M62/2018A1	60R	M62 J25 - J30	
26/09/15 10:34:01	SIG	M62/2025A1	60R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M606/2003B1	50R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M606/2003B2	50R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M62/1999B2	50R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M62/1999B3	50R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M62/1999B4	50R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M62/2005M1	50R	M62 J25 - J30	
26/09/15 10:42:12	SIG	M62/2005M2	50R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M606/2003B1	40R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M606/2003B2	40R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M62/2004B1	REDX	M62 J25 - J30	
26/09/15 10:42:17	SIG	M62/2004B2	50R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M62/2004B3	50R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M62/2004B4	50R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M62/2005M1	40R	M62 J25 - J30	
26/09/15 10:42:17	SIG	M62/2005M2	40R	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1992B1	NR	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1992B2	NR	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1992B3	NR	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1992B4	NR	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1999B1	STOP	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1999B2	40R	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1999B3	40R	M62 J25 - J30	
26/09/15 10:42:18	SIG	M62/1999B4	40R	M62 J25 - J30	
26/09/15 10:42:23	SIG	M62/1999B1	STOP	M62 J25 - J30	
26/09/15 10:42:31	SIG	M606/2003B1	30R	M62 J25 - J30	
26/09/15 10:42:36	SIG	M606/2003B1	20R	M62 J25 - J30	
26/09/15 10:42:41	SIG	M606/2003B1	STOP	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/1999B1	REDX	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/1999B2	50R	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/1999B3	50R	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/1999B4	50R	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/2004B2	NR	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/2004B3	NR	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/2004B4	NR	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/2005M1	TI	M62 J25 - J30	
26/09/15 10:44:27	SIG	M62/2005M2	TI	M62 J25 - J30	
26/09/15 10:47:27	SIG	M62/2004B2	OFF	M62 J25 - J30	
26/09/15 10:47:27	SIG	M62/2004B3	OFF	M62 J25 - J30	
26/09/15 10:47:27	SIG	M62/2004B4	OFF	M62 J25 - J30	
26/09/15 10:47:28	SIG	M62/2004B1	BLNK	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/1999B1	STOP	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/1999B2	40R	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/1999B3	40R	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/1999B4	40R	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/2004B1	REDX	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/2004B2	50R	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/2004B3	50R	M62 J25 - J30	
26/09/15 10:52:07	SIG	M62/2004B4	50R	M62 J25 - J30	
26/09/15 10:52:12	SIG	M62/1999B1	STOP	M62 J25 - J30	
26/09/15 10:52:21	SIG	M62/1999B2	LDR	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/1992B1	50R	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/1992B2	50R	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/1992B3	50R	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/1992B4	50R	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/2004B2	LDR	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/2012B1	REDX	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/2012B2	60R	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/2012B3	60R	M62 J25 - J30	
26/09/15 10:55:54	SIG	M62/2012B4	60R	M62 J25 - J30	
26/09/15 10:55:59	SIG	M62/1992B1	40R	M62 J25 - J30	
26/09/15 10:55:59	SIG	M62/1992B2	40R	M62 J25 - J30	
26/09/15 10:55:59	SIG	M62/1992B3	40R	M62 J25 - J30	
26/09/15 10:55:59	SIG	M62/1992B4	40R	M62 J25 - J30	
26/09/15 10:56:05	SIG	M62/1992B1	30R	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1987B1	NR	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1987B2	NR	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1987B3	NR	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1987B4	NR	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1992B1	20R	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1992B2	40R	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1992B3	40R	M62 J25 - J30	
26/09/15 10:56:10	SIG	M62/1992B4	40R	M62 J25 - J30	
26/09/15 10:56:15	SIG	M62/1992B1	STOP	M62 J25 - J30	
26/09/15 10:59:14	SIG	M606/2003B1	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M606/2003B2	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1987B1	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1987B2	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1987B3	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1987B4	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1992B1	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1992B2	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1992B3	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1992B4	NR	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1999B1	REDX	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1999B2	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1999B3	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/1999B4	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/2004B2	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/2004B3	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/2004B4	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/2005M1	60R	M62 J25 - J30	
26/09/15 10:59:14	SIG	M62/2005M2	60R	M62 J25 - J30	
26/09/15 11:02:14	SIG	M62/1987B1	OFF	M62 J25 - J30	
26/09/15 11:02:15	SIG	M62/1987B2	OFF	M62 J25 - J30	
26/09/15 11:02:15	SIG	M62/1987B3	OFF	M62 J25 - J30	
26/09/15 11:02:15	SIG	M62/1987B4	OFF	M62 J25 - J30	
26/09/15 11:07:44	SIG	M62/2065M1	NR	M62 J25 - J30	
26/09/15 11:07:44	SIG	M62/2069M1	60R	M62 J25 - J30	
26/09/15 11:07:44	SIG	M62/2069M2	60R	M62 J25 - J30	
26/09/15 11:07:44	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 11:07:44	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2018B1	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2018B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2018B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2018L1	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2025B1	REDX	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2025B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2025B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2025B4	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2033B1	REDX	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2033B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2033B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2033B4	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2041B1	REDX	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2041B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2041B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2041B4	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2050B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2050B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2050B4	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2057B1	REDX	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2057B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2057B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2057B4	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2065B1	REDX	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2065B2	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2065B3	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2065B4	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M62/2065M1	60R	M62 J25 - J30	
26/09/15 11:07:45	SIG	M621/1002B1	HSD	M62 J25 - J30	
26/09/15 11:07:45	SIG	M621/1002B2	60R	M62 J25 - J30	
26/09/15 11:08:00	SIG	M606/2003B1	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M606/2003B2	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1992B1	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1992B2	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1992B3	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1992B4	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1999B1	BLNK	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1999B2	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1999B3	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/1999B4	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2004B1	BLNK	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2004B2	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2004B3	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2004B4	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2005M1	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2005M2	OFF	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2012B2	NR	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2012B3	NR	M62 J25 - J30	
26/09/15 11:08:00	SIG	M62/2012B4	NR	M62 J25 - J30	
26/09/15 11:09:09	SIG	M62/2025B1	60R	M62 J25 - J30	
26/09/15 11:09:35	SIG	M62/2033B1	60R	M62 J25 - J30	
26/09/15 11:09:54	SIG	M62/2041B1	60R	M62 J25 - J30	
26/09/15 11:10:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 11:10:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 11:10:15	SIG	M62/2057B1	60R	M62 J25 - J30	
26/09/15 11:10:15	SIG	M621/1002B1	60R	M62 J25 - J30	
26/09/15 11:10:15	SIG	M621/1010B1	OFF	M62 J25 - J30	
26/09/15 11:10:15	SIG	M621/1010B2	OFF	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2088B1	REDX	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2088B2	NR	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2088B3	NR	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2088B4	NR	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2097B1	REDX	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2097B2	60R	M62 J25 - J30	
26/09/15 11:20:27	SIG	M62/2097B4	60R	M62 J25 - J30	
26/09/15 11:23:15	SIG	M606/2003B1	LDR	M62 J25 - J30	
26/09/15 11:23:15	SIG	M606/2003B2	50R	M62 J25 - J30	
26/09/15 11:23:15	SIG	M62/1992B1	50R	M62 J25 - J30	
26/09/15 11:23:15	SIG	M62/1992B2	50R	M62 J25 - J30	
26/09/15 11:23:15	SIG	M62/1992B3	50R	M62 J25 - J30	
26/09/15 11:23:15	SIG	M62/1992B4	50R	M62 J25 - J30	
26/09/15 11:23:15	SIG	M62/2005M1	TI	M62 J25 - J30	
26/09/15 11:23:15	SIG	M62/2005M2	TI	M62 J25 - J30	
26/09/15 11:23:21	SIG	M62/1992B1	40R	M62 J25 - J30	
26/09/15 11:23:21	SIG	M62/1992B2	40R	M62 J25 - J30	
26/09/15 11:23:21	SIG	M62/1992B3	40R	M62 J25 - J30	
26/09/15 11:23:21	SIG	M62/1992B4	40R	M62 J25 - J30	
26/09/15 11:23:26	SIG	M62/1992B1	30R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1987B1	NR	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1987B2	NR	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1987B3	NR	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1987B4	NR	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1992B1	20R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1992B2	40R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1992B3	40R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1992B4	40R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1999B1	REDX	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1999B2	50R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1999B3	50R	M62 J25 - J30	
26/09/15 11:23:31	SIG	M62/1999B4	50R	M62 J25 - J30	
26/09/15 11:23:36	SIG	M62/1992B1	STOP	M62 J25 - J30	
26/09/15 11:24:02	SIG	M62/1987B1	50R	M62 J25 - J30	
26/09/15 11:24:02	SIG	M62/1987B2	50R	M62 J25 - J30	
26/09/15 11:24:02	SIG	M62/1987B3	50R	M62 J25 - J30	
26/09/15 11:24:02	SIG	M62/1987B4	50R	M62 J25 - J30	
26/09/15 11:24:07	SIG	M62/1987B1	40R	M62 J25 - J30	
26/09/15 11:24:07	SIG	M62/1987B2	40R	M62 J25 - J30	
26/09/15 11:24:07	SIG	M62/1987B3	40R	M62 J25 - J30	
26/09/15 11:24:07	SIG	M62/1987B4	40R	M62 J25 - J30	
26/09/15 11:24:13	SIG	M62/1987B1	30R	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1981B1	NR	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1981B2	NR	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1981B3	NR	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1981B4	NR	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1987B1	20R	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1987B2	40R	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1987B3	40R	M62 J25 - J30	
26/09/15 11:24:18	SIG	M62/1987B4	40R	M62 J25 - J30	
26/09/15 11:24:23	SIG	M62/1987B1	STOP	M62 J25 - J30	
26/09/15 11:25:38	SIG	M606/2003B1	OFF	M62 J25 - J30	
26/09/15 11:25:38	SIG	M606/2003B2	OFF	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1981B1	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1981B2	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1981B3	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1981B4	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1987B1	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1987B2	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1987B3	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1987B4	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1992B1	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1992B2	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1992B3	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1992B4	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1999B2	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1999B3	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/1999B4	NR	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/2005M1	OFF	M62 J25 - J30	
26/09/15 11:25:38	SIG	M62/2005M2	OFF	M62 J25 - J30	
26/09/15 11:28:38	SIG	M62/1999B2	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1981B1	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1981B2	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1981B3	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1981B4	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1987B1	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1987B2	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1987B3	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1987B4	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1992B1	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1992B2	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1992B3	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1992B4	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1999B1	BLNK	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1999B3	OFF	M62 J25 - J30	
26/09/15 11:28:39	SIG	M62/1999B4	OFF	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2033B1	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2033B2	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2033B3	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2033B4	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2041B1	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2041B2	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2041B3	50R	M62 J25 - J30	
26/09/15 11:32:10	SIG	M62/2041B4	50R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2033B1	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2033B2	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2033B3	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2033B4	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2041B1	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2041B2	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2041B3	40R	M62 J25 - J30	
26/09/15 11:32:16	SIG	M62/2041B4	40R	M62 J25 - J30	
26/09/15 11:34:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 11:34:32	SIG	M62/2033B3	50R	M62 J25 - J30	
26/09/15 11:34:37	SIG	M62/2033B3	40R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 11:35:07	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 11:35:13	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2033B1	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2033B2	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2033B3	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2033B4	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2041B1	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2041B2	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2041B3	60R	M62 J25 - J30	
26/09/15 11:36:11	SIG	M62/2041B4	60R	M62 J25 - J30	
26/09/15 11:37:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 11:37:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 11:37:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 11:37:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 11:38:36	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 11:38:37	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 11:39:07	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 11:39:07	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 11:39:08	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 11:42:08	SIG	M62/2159B1	OFF	M62 J25 - J30	
26/09/15 11:42:08	SIG	M62/2159B2	OFF	M62 J25 - J30	
26/09/15 11:42:08	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 11:42:09	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 11:42:09	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 11:42:09	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 11:42:45	SIG	M62/2088B2	NR	M62 J25 - J30	
26/09/15 11:42:45	SIG	M62/2088B3	NR	M62 J25 - J30	
26/09/15 11:42:45	SIG	M62/2088B4	NR	M62 J25 - J30	
26/09/15 11:42:45	SIG	M62/2097B2	NR	M62 J25 - J30	
26/09/15 11:42:45	SIG	M62/2097B4	NR	M62 J25 - J30	
26/09/15 11:45:45	SIG	M62/2097B2	OFF	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2088B1	BLNK	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2088B1	BLNK	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2088B2	OFF	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2088B3	OFF	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2088B4	OFF	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2097B1	BLNK	M62 J25 - J30	
26/09/15 11:45:55	SIG	M62/2097B4	OFF	M62 J25 - J30	
26/09/15 11:56:19	SIG	M62/2050A1	OFF	M62 J25 - J30	
26/09/15 11:56:20	SIG	M62/2050A1	60R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 12:06:23	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 12:06:28	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 12:08:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:08:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:08:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:08:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2159B1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2159B2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 12:10:23	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 12:11:42	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 12:11:48	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 12:14:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:14:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:14:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:14:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 12:15:42	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2183B1	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2183B2	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2183L1	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2183L2	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2189B1	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2189B2	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2189B3	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2189B4	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2194B1	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2194B2	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2194B3	60R	M62 J25 - J30	
26/09/15 12:17:02	SIG	M62/2194B4	60R	M62 J25 - J30	
26/09/15 12:18:42	SIG	M62/2159B1	OFF	M62 J25 - J30	
26/09/15 12:18:43	SIG	M62/2159B2	OFF	M62 J25 - J30	
26/09/15 12:19:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:19:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2183B1	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2183B2	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2183L1	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2183L2	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2189B1	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2189B2	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2189B3	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2189B4	NR	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2194B1	OFF	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2194B2	OFF	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2194B3	OFF	M62 J25 - J30	
26/09/15 12:29:02	SIG	M62/2194B4	OFF	M62 J25 - J30	
26/09/15 12:32:02	SIG	M62/2189B1	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2189B2	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2189B3	OFF	M62 J25 - J30	
26/09/15 12:32:03	SIG	M62/2189B4	OFF	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 12:47:44	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 12:47:49	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 12:50:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:50:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:50:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:50:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 12:51:44	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 12:54:44	SIG	M62/2159B1	OFF	M62 J25 - J30	
26/09/15 12:54:44	SIG	M62/2159B2	OFF	M62 J25 - J30	
26/09/15 12:54:45	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 12:54:45	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 12:54:45	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 12:54:45	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2157A1	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2157A2	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2157J1	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2157J2	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2157K1	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2163A1	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2163A2	50R	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2170A1	NR	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2170A2	NR	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2177A1	REDX	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2177A2	NR	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2177A3	NR	M62 J25 - J30	
26/09/15 14:16:05	SIG	M62/2177A4	NR	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2155A1	50R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2155A2	50R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2155J1	50R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2155K1	50R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2157A1	40R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2157A2	40R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2157J1	40R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2157J2	40R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2157K1	40R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2163A1	40R	M62 J25 - J30	
26/09/15 14:16:11	SIG	M62/2163A2	40R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M606/2003B1	NR	M62 J25 - J30	
26/09/15 14:17:30	SIG	M606/2003B2	NR	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2004A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2004A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2004A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2008K1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2008K2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2012A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2012A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2012A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2018A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2018A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2018A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2018A4	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2025A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2025A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2025A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2025A4	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2033A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2033A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2033A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2033A4	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2041A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2041A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2041A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2041A4	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2050A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2050A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2050A4	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2057A1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2057A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2057A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2057J1	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2065A2	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2065A3	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2065A4	50R	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 14:17:30	SIG	M62/2074A2	NR	M62 J25 - J30	
26/09/15 14:17:38	SIG	M62/2050A1	50R	M62 J25 - J30	
26/09/15 14:17:38	SIG	M62/2050A1	50R	M62 J25 - J30	
26/09/15 14:17:38	SIG	M62/2050A1	OFF	M62 J25 - J30	
26/09/15 14:18:47	SIG	M62/2157A1	OFF	M62 J25 - J30	
26/09/15 14:18:47	SIG	M62/2157A1	50R	M62 J25 - J30	
26/09/15 14:18:53	SIG	M62/2157A1	40R	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2155A1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2155A2	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2155J1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2155K1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2157A1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2157A2	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2157J1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2157J2	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2157K1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2163A1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2163A2	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2170A1	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2170A2	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2177A1	BLNK	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2177A2	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2177A3	OFF	M62 J25 - J30	
26/09/15 14:20:36	SIG	M62/2177A4	OFF	M62 J25 - J30	
26/09/15 14:40:24	SIG	M606/2003B1	NR	M62 J25 - J30	
26/09/15 14:40:24	SIG	M606/2003B2	NR	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2004A1	OFF	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2004A2	OFF	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2004A3	OFF	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2008K1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2008K2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2012A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2012A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2012A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2018A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2018A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2018A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2018A4	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2025A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2025A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2025A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2025A4	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2033A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2033A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2033A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2033A4	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2041A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2041A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2041A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2041A4	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2050A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2050A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2050A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2050A4	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2057A1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2057A2	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2057A3	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2057J1	60R	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2065A2	NR	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2065A3	NR	M62 J25 - J30	
26/09/15 14:40:24	SIG	M62/2065A4	NR	M62 J25 - J30	
26/09/15 14:40:34	SIG	M62/2074A2	NR	M62 J25 - J30	
26/09/15 14:43:24	SIG	M606/2003B1	OFF	M62 J25 - J30	
26/09/15 14:43:24	SIG	M606/2003B2	OFF	M62 J25 - J30	
26/09/15 14:43:34	SIG	M62/2074A2	OFF	M62 J25 - J30	
26/09/15 14:44:48	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 14:49:04	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 14:49:22	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 14:50:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 14:51:37	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 14:54:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 14:54:35	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 14:56:18	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 14:57:14	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:05:24	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:05:24	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:05:24	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:05:25	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:06:46	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:08:57	SIG	M62/2057B1	HSD	M62 J25 - J30	
26/09/15 15:08:58	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:09:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:09:50	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:10:46	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:10:56	SIG	M62/2041B1	HSD	M62 J25 - J30	
26/09/15 15:10:57	SIG	M62/2057B1	REDX	M62 J25 - J30	
26/09/15 15:10:57	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:10:57	SIG	M621/1002B1	HSD	M62 J25 - J30	
26/09/15 15:10:57	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 15:10:57	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 15:11:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:11:56	SIG	M62/2033B1	HSD	M62 J25 - J30	
26/09/15 15:11:57	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:11:57	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:12:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:12:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:12:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:12:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:12:57	SIG	M62/2025B1	HSD	M62 J25 - J30	
26/09/15 15:12:57	SIG	M62/2041B1	REDX	M62 J25 - J30	
26/09/15 15:12:57	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:12:57	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:13:49	SIG	M62/2033B1	REDX	M62 J25 - J30	
26/09/15 15:13:49	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:13:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:14:33	SIG	M62/2025B1	REDX	M62 J25 - J30	
26/09/15 15:14:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:14:38	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:15:03	SIG	M62/2065B2	NR	M62 J25 - J30	
26/09/15 15:15:03	SIG	M62/2065B3	NR	M62 J25 - J30	
26/09/15 15:15:03	SIG	M62/2065B4	NR	M62 J25 - J30	
26/09/15 15:15:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2018B1	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2018B2	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2018B3	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2018L1	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2025B2	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2025B3	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2025B4	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2033B2	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2033B3	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2033B4	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2041B2	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2041B3	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2041B4	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2057B2	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2057B3	NR	M62 J25 - J30	
26/09/15 15:15:04	SIG	M62/2057B4	NR	M62 J25 - J30	
26/09/15 15:16:03	SIG	M62/2069M1	OFF	M62 J25 - J30	
26/09/15 15:16:03	SIG	M62/2069M2	OFF	M62 J25 - J30	
26/09/15 15:16:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:16:03	SIG	M621/1010B1	OFF	M62 J25 - J30	
26/09/15 15:16:03	SIG	M621/1010B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2012B1	BLNK	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2012B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2012B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2012B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2018B1	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2018B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2018B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2018L1	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2025B1	BLNK	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2025B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2025B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2025B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2033B1	BLNK	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2033B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2033B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2041B1	BLNK	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2041B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2041B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2041B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2050B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2050B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2050B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2057B1	BLNK	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2057B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2057B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2057B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2065B1	BLNK	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2065B2	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2065B3	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2065B4	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M62/2065M1	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M621/1002B1	OFF	M62 J25 - J30	
26/09/15 15:16:04	SIG	M621/1002B2	OFF	M62 J25 - J30	
26/09/15 15:30:39	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:30:44	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:30:48	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:30:48	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:31:01	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:31:01	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:31:15	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:31:15	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:31:15	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:31:16	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:34:22	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:34:42	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2033A1	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2033A2	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2033A3	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2033A4	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2041A1	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2041A2	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2041A3	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2041A4	50R	M62 J25 - J30	
26/09/15 15:47:31	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2033A1	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2033A2	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2033A3	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2033A4	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2041A1	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2041A2	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2041A3	40R	M62 J25 - J30	
26/09/15 15:47:37	SIG	M62/2041A4	40R	M62 J25 - J30	
26/09/15 15:47:42	SIG	M62/2033A1	30R	M62 J25 - J30	
26/09/15 15:47:42	SIG	M62/2041A1	30R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M606/2003B1	NR	M62 J25 - J30	
26/09/15 15:47:47	SIG	M606/2003B2	NR	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2008K1	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2008K2	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2012A1	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2012A2	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2012A3	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2018A1	LDR	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2018A2	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2018A3	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2018A4	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2025A1	LDR	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2025A2	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2025A3	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2025A4	50R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2033A1	20R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2033A2	40R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2033A3	40R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2033A4	40R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2041A1	20R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2041A2	40R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2041A3	40R	M62 J25 - J30	
26/09/15 15:47:47	SIG	M62/2041A4	40R	M62 J25 - J30	
26/09/15 15:47:53	SIG	M62/2033A1	STOP	M62 J25 - J30	
26/09/15 15:47:53	SIG	M62/2041A1	STOP	M62 J25 - J30	
26/09/15 15:48:26	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2057B1	REDX	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2057B2	50R	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2057B3	50R	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2057B4	50R	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2065M1	60R	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:49:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:49:30	SIG	M621/1002B1	HSD	M62 J25 - J30	
26/09/15 15:49:30	SIG	M621/1002B2	60R	M62 J25 - J30	
26/09/15 15:49:30	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 15:49:30	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 15:49:31	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:52:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:52:48	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:53:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:53:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:55:02	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:55:28	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:55:56	SIG	M606/2003B1	NR	M62 J25 - J30	
26/09/15 15:55:56	SIG	M606/2003B2	NR	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2008K1	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2008K2	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2012A1	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2012A2	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2012A3	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2018A1	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2018A2	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2018A3	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2018A4	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2025A1	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2025A2	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2025A3	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2025A4	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2033A1	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2033A2	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2033A3	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2033A4	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2041A1	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2041A2	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2041A3	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2041A4	60R	M62 J25 - J30	
26/09/15 15:55:56	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 15:57:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 15:58:56	SIG	M606/2003B1	OFF	M62 J25 - J30	
26/09/15 15:58:57	SIG	M606/2003B2	OFF	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2057B2	40R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2057B3	40R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2057B4	40R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2065M1	50R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2074B1	REDX	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2074B2	LDR	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2074B3	50R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2074B4	50R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2081B1	60R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2081B2	60R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2081B3	60R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M62/2081L1	60R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M621/1002B2	50R	M62 J25 - J30	
26/09/15 16:00:01	SIG	M621/1010B1	LDR	M62 J25 - J30	
26/09/15 16:00:01	SIG	M621/1010B2	50R	M62 J25 - J30	
26/09/15 16:00:07	SIG	M62/2057B2	30R	M62 J25 - J30	
26/09/15 16:00:07	SIG	M62/2065M1	40R	M62 J25 - J30	
26/09/15 16:00:07	SIG	M621/1002B2	40R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2057B1	STOP	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2057B2	20R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2057B3	40R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2057B4	40R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2065B1	REDX	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2065B2	LDR	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2065B3	50R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2065B4	50R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2065M1	40R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2069M1	50R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M62/2069M2	50R	M62 J25 - J30	
26/09/15 16:00:12	SIG	M621/1002B1	LDR	M62 J25 - J30	
26/09/15 16:00:12	SIG	M621/1002B2	40R	M62 J25 - J30	
26/09/15 16:00:17	SIG	M62/2057B1	STOP	M62 J25 - J30	
26/09/15 16:00:17	SIG	M62/2057B2	STOP	M62 J25 - J30	
26/09/15 16:00:23	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2057B1	BLNK	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2057B2	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2057B3	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2057B4	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2065B2	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2065B3	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2065B4	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2065M1	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2069M1	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2069M2	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2074B1	BLNK	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2074B2	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2074B3	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2074B4	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2081B1	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2081B2	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2081B3	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M62/2081L1	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M621/1002B1	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M621/1002B2	OFF	M62 J25 - J30	
26/09/15 16:01:12	SIG	M621/1010B1	NR	M62 J25 - J30	
26/09/15 16:01:12	SIG	M621/1010B2	NR	M62 J25 - J30	
26/09/15 16:01:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2057B1	REDX	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2057B2	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2057B3	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2057B4	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2065B2	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2065B3	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2065B4	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2065M1	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2069M1	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2069M2	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2074B1	REDX	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2074B2	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2074B3	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M62/2074B4	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M621/1002B1	HSD	M62 J25 - J30	
26/09/15 16:02:06	SIG	M621/1002B2	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 16:02:06	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 16:02:26	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:04:12	SIG	M62/2081L1	OFF	M62 J25 - J30	
26/09/15 16:05:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:05:59	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:06:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:06:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:06:06	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:06:06	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2057B1	BLNK	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2057B2	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2057B3	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2057B4	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2065B2	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2065B3	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2065B4	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2065M1	NR	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2069M1	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2069M2	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2074B1	BLNK	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2074B2	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2074B3	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M62/2074B4	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M621/1002B1	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M621/1002B2	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M621/1010B1	OFF	M62 J25 - J30	
26/09/15 16:10:06	SIG	M621/1010B2	OFF	M62 J25 - J30	
26/09/15 16:10:17	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:12:55	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:13:06	SIG	M62/2065B2	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2050B2	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2050B3	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2050B4	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2065B1	BLNK	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2065B3	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2065B4	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2065M1	OFF	M62 J25 - J30	
26/09/15 16:13:07	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:13:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:13:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:29:40	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:30:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 16:36:54	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 16:37:04	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:07:07	SIG	M62/2065M1	NR	M62 J25 - J30	
26/09/15 17:07:07	SIG	M62/2069M1	60R	M62 J25 - J30	
26/09/15 17:07:07	SIG	M62/2069M2	60R	M62 J25 - J30	
26/09/15 17:07:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:07:07	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 17:07:07	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2012B1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2012B2	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2012B3	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2012B4	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018B1	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018B1	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018B2	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018B3	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018L1	NR	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2018L1	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2025B1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2025B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2025B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2025B4	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2033B1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2033B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2033B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2033B4	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2041B1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2041B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2041B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2041B4	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2050B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2050B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2050B4	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2057B1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2057B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2057B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2057B4	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2065B1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2065B2	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2065B3	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2065B4	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2065M1	60R	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:07:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:07:08	SIG	M621/1002B1	HSD	M62 J25 - J30	
26/09/15 17:07:08	SIG	M621/1002B2	60R	M62 J25 - J30	
26/09/15 17:08:40	SIG	M62/2025B1	60R	M62 J25 - J30	
26/09/15 17:08:41	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:09:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:09:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:09:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:10:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 17:10:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 17:10:29	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:10:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:13:53	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:14:11	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:15:03	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 17:15:03	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 17:15:04	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 17:15:05	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 17:15:09	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1987B1	NR	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1987B2	NR	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1987B3	NR	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1987B4	NR	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1992B1	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1992B2	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1992B3	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1992B4	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1999B1	REDX	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1999B2	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1999B3	50R	M62 J25 - J30	
26/09/15 17:16:20	SIG	M62/1999B4	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M606/2003B1	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M606/2003B2	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2004B1	REDX	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2004B2	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2004B3	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2004B4	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2005M1	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2005M2	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2012B2	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2012B3	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2012B4	50R	M62 J25 - J30	
26/09/15 17:16:21	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:16:38	SIG	M62/2004A1	50R	M62 J25 - J30	
26/09/15 17:16:38	SIG	M62/2004A2	50R	M62 J25 - J30	
26/09/15 17:16:38	SIG	M62/2004A3	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1979K1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1979K2	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1981A1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1981A2	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1981A3	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1981A4	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1987A1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1987A3	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1987J1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1992A1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1992A2	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1992A3	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1992J1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1999A1	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1999A2	50R	M62 J25 - J30	
26/09/15 17:16:48	SIG	M62/1999A3	50R	M62 J25 - J30	
26/09/15 17:17:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:17:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:17:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:17:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:17:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:17:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:17:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:19:40	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 17:19:41	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 17:20:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:21:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:21:07	SIG	M62/2074B1	REDX	M62 J25 - J30	
26/09/15 17:21:07	SIG	M62/2074B2	60R	M62 J25 - J30	
26/09/15 17:21:07	SIG	M62/2074B3	60R	M62 J25 - J30	
26/09/15 17:21:07	SIG	M62/2074B4	60R	M62 J25 - J30	
26/09/15 17:21:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:21:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:21:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 17:21:29	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 17:21:35	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 17:22:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:22:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:22:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:22:24	SIG	M62/2065B2	50R	M62 J25 - J30	
26/09/15 17:22:24	SIG	M62/2065B3	50R	M62 J25 - J30	
26/09/15 17:22:24	SIG	M62/2065B4	50R	M62 J25 - J30	
26/09/15 17:22:24	SIG	M62/2065M1	50R	M62 J25 - J30	
26/09/15 17:22:24	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:22:24	SIG	M621/1002B2	50R	M62 J25 - J30	
26/09/15 17:22:24	SIG	M621/1010B1	50R	M62 J25 - J30	
26/09/15 17:22:24	SIG	M621/1010B2	50R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M62/2065B2	40R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M62/2065B3	40R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M62/2065B4	40R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M62/2065M1	40R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M62/2069M1	50R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M62/2069M2	50R	M62 J25 - J30	
26/09/15 17:22:29	SIG	M621/1002B2	40R	M62 J25 - J30	
26/09/15 17:23:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:23:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:23:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:23:28	SIG	M606/2003B1	OFF	M62 J25 - J30	
26/09/15 17:23:28	SIG	M606/2003B2	OFF	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2004B2	NR	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2004B3	NR	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2004B4	NR	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2005M1	OFF	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2005M2	OFF	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2012B2	NR	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2012B3	NR	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2012B4	NR	M62 J25 - J30	
26/09/15 17:23:28	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1987B1	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1987B2	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1987B3	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1987B4	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1992B1	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1992B2	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1992B3	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1992B4	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1999B2	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1999B3	NR	M62 J25 - J30	
26/09/15 17:23:29	SIG	M62/1999B4	NR	M62 J25 - J30	
26/09/15 17:23:45	SIG	M62/2004A1	NR	M62 J25 - J30	
26/09/15 17:23:45	SIG	M62/2004A2	NR	M62 J25 - J30	
26/09/15 17:23:45	SIG	M62/2004A3	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1979K1	OFF	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1979K2	OFF	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1981A1	OFF	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1981A2	OFF	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1981A3	OFF	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1981A4	OFF	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1987A1	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1987A3	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1987J1	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1992A1	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1992A2	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1992A3	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1992J1	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1999A1	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1999A2	NR	M62 J25 - J30	
26/09/15 17:23:55	SIG	M62/1999A3	NR	M62 J25 - J30	
26/09/15 17:24:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:24:02	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:24:02	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:24:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:24:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:24:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:24:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:25:28	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 17:25:29	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 17:25:52	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 17:25:52	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2170B1	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2170B2	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 17:25:53	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2170B1	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2170B2	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2170L1	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2170L2	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2177B1	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2177B2	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2177L1	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2177L2	40R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2183B1	50R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2183B2	50R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2183L1	50R	M62 J25 - J30	
26/09/15 17:25:58	SIG	M62/2183L2	50R	M62 J25 - J30	
26/09/15 17:26:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:26:03	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:26:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2065B2	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2065B3	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2065B4	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2065M1	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2069M1	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2069M2	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:26:24	SIG	M621/1002B2	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 17:26:24	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 17:26:29	SIG	M62/1999B2	OFF	M62 J25 - J30	
26/09/15 17:26:29	SIG	M62/2004B1	BLNK	M62 J25 - J30	
26/09/15 17:26:29	SIG	M62/2004B2	OFF	M62 J25 - J30	
26/09/15 17:26:29	SIG	M62/2004B3	OFF	M62 J25 - J30	
26/09/15 17:26:29	SIG	M62/2004B4	OFF	M62 J25 - J30	
26/09/15 17:26:29	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1987B1	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1987B2	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1987B3	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1987B4	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1992B1	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1992B2	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1992B3	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1992B4	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1999B1	BLNK	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1999B1	BLNK	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1999B3	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/1999B4	OFF	M62 J25 - J30	
26/09/15 17:26:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:26:45	SIG	M62/2004A1	OFF	M62 J25 - J30	
26/09/15 17:26:46	SIG	M62/2004A2	OFF	M62 J25 - J30	
26/09/15 17:26:46	SIG	M62/2004A3	OFF	M62 J25 - J30	
26/09/15 17:26:55	SIG	M62/1987J1	OFF	M62 J25 - J30	
26/09/15 17:27:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1987A1	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1987A3	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1992A1	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1992A2	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1992A3	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1992J1	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1999A1	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1999A2	OFF	M62 J25 - J30	
26/09/15 17:27:05	SIG	M62/1999A3	OFF	M62 J25 - J30	
26/09/15 17:28:12	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:28:13	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:28:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:28:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 17:29:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2189B1	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2189B2	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2189B3	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2189B4	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2194B1	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2194B2	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2194B3	60R	M62 J25 - J30	
26/09/15 17:29:08	SIG	M62/2194B4	60R	M62 J25 - J30	
26/09/15 17:32:44	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:33:23	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:38:07	SIG	M62/2197B1	60R	M62 J25 - J30	
26/09/15 17:38:07	SIG	M62/2197B2	60R	M62 J25 - J30	
26/09/15 17:38:07	SIG	M62/2197B3	60R	M62 J25 - J30	
26/09/15 17:38:07	SIG	M62/2199M1	60R	M62 J25 - J30	
26/09/15 17:38:07	SIG	M62/2199M2	60R	M62 J25 - J30	
26/09/15 17:38:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:38:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:38:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:38:09	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:39:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:39:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:39:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:39:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:40:35	SIG	M62/2074A1	REDX	M62 J25 - J30	
26/09/15 17:40:46	SIG	M62/2074A1	BLNK	M62 J25 - J30	
26/09/15 17:54:01	SIG	M62/2065B2	50R	M62 J25 - J30	
26/09/15 17:54:01	SIG	M62/2065B3	50R	M62 J25 - J30	
26/09/15 17:54:01	SIG	M62/2065B4	50R	M62 J25 - J30	
26/09/15 17:54:01	SIG	M62/2065M1	50R	M62 J25 - J30	
26/09/15 17:54:01	SIG	M621/1002B2	50R	M62 J25 - J30	
26/09/15 17:54:01	SIG	M621/1010B1	50R	M62 J25 - J30	
26/09/15 17:54:01	SIG	M621/1010B2	50R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M62/2065B2	40R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M62/2065B3	40R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M62/2065B4	40R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M62/2065M1	40R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M62/2069M1	50R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M62/2069M2	50R	M62 J25 - J30	
26/09/15 17:54:06	SIG	M621/1002B2	40R	M62 J25 - J30	
26/09/15 17:57:29	SIG	M62/2069M1	40R	M62 J25 - J30	
26/09/15 17:57:29	SIG	M62/2069M2	40R	M62 J25 - J30	
26/09/15 17:57:30	SIG	M62/2074B2	50R	M62 J25 - J30	
26/09/15 17:57:30	SIG	M62/2074B3	50R	M62 J25 - J30	
26/09/15 17:57:30	SIG	M62/2074B4	50R	M62 J25 - J30	
26/09/15 17:57:30	SIG	M621/1010B1	40R	M62 J25 - J30	
26/09/15 17:57:30	SIG	M621/1010B2	40R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2074B2	40R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2074B3	40R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2074B4	40R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2081B1	50R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2081B2	50R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2081B3	50R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M62/2081L1	50R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M621/1010B1	40R	M62 J25 - J30	
26/09/15 17:57:35	SIG	M621/1010B2	40R	M62 J25 - J30	
26/09/15 18:01:28	SIG	M62/2069M1	50R	M62 J25 - J30	
26/09/15 18:01:28	SIG	M62/2069M2	50R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2074B2	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2074B3	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2074B4	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2081B1	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2081B2	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2081B3	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M62/2081L1	60R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M621/1010B1	50R	M62 J25 - J30	
26/09/15 18:01:29	SIG	M621/1010B2	50R	M62 J25 - J30	
26/09/15 18:04:08	SIG	M62/2057B2	50R	M62 J25 - J30	
26/09/15 18:04:08	SIG	M62/2057B3	50R	M62 J25 - J30	
26/09/15 18:04:08	SIG	M62/2057B4	50R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M62/2069M1	40R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M62/2069M2	40R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M62/2074B2	50R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M62/2074B3	50R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M62/2074B4	50R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M621/1010B1	40R	M62 J25 - J30	
26/09/15 18:10:36	SIG	M621/1010B2	40R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2074B2	40R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2074B3	40R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2074B4	40R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2081B1	50R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2081B2	50R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2081B3	50R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M62/2081L1	50R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M621/1010B1	40R	M62 J25 - J30	
26/09/15 18:10:41	SIG	M621/1010B2	40R	M62 J25 - J30	
26/09/15 18:14:36	SIG	M62/2069M1	50R	M62 J25 - J30	
26/09/15 18:14:36	SIG	M62/2069M2	50R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2074B2	50R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2074B3	50R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2074B4	50R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2081B1	60R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2081B2	60R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2081B3	60R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M62/2081L1	60R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M621/1010B1	50R	M62 J25 - J30	
26/09/15 18:14:37	SIG	M621/1010B2	50R	M62 J25 - J30	
26/09/15 18:16:35	SIG	M62/2069M1	40R	M62 J25 - J30	
26/09/15 18:16:35	SIG	M62/2069M2	40R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2074B2	40R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2074B3	40R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2074B4	40R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2081B1	50R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2081B2	50R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2081B3	50R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M62/2081L1	50R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M621/1010B1	40R	M62 J25 - J30	
26/09/15 18:16:36	SIG	M621/1010B2	40R	M62 J25 - J30	
26/09/15 18:20:38	SIG	M62/2033B1	60R	M62 J25 - J30	
26/09/15 18:20:57	SIG	M62/2041B1	60R	M62 J25 - J30	
26/09/15 18:21:17	SIG	M621/1002B1	50R	M62 J25 - J30	
26/09/15 18:21:22	SIG	M62/2057B1	50R	M62 J25 - J30	
26/09/15 18:21:22	SIG	M621/1002B1	40R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2088B1	REDX	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2088B2	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2088B3	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2088B4	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2097B1	REDX	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2097B2	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2097B4	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2106B1	REDX	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2106B2	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2106B3	60R	M62 J25 - J30	
26/09/15 18:22:18	SIG	M62/2106B4	60R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M62/2065B2	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M62/2065B3	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M62/2065B4	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M62/2065M1	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M62/2069M1	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M62/2069M2	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M621/1002B1	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M621/1002B2	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M621/1010B1	50R	M62 J25 - J30	
26/09/15 18:25:17	SIG	M621/1010B2	50R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2074B2	50R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2074B3	50R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2074B4	50R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2081B1	60R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2081B2	60R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2081B3	60R	M62 J25 - J30	
26/09/15 18:26:24	SIG	M62/2081L1	60R	M62 J25 - J30	
26/09/15 18:33:08	SIG	M62/2057B1	60R	M62 J25 - J30	
26/09/15 18:33:08	SIG	M62/2057B2	60R	M62 J25 - J30	
26/09/15 18:33:08	SIG	M62/2057B3	60R	M62 J25 - J30	
26/09/15 18:33:08	SIG	M62/2057B4	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2065B2	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2065B3	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2065B4	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2065M1	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2069M1	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2069M2	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2074B2	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2074B3	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M62/2074B4	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M621/1002B1	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M621/1002B2	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 18:34:08	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2088B2	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2088B3	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2088B4	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2097B2	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2097B4	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2106B2	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2106B3	NR	M62 J25 - J30	
26/09/15 18:38:18	SIG	M62/2106B4	NR	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2170B1	60R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2170B2	60R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2170L1	50R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2183B1	60R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2183B2	60R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2183L1	60R	M62 J25 - J30	
26/09/15 18:38:19	SIG	M62/2183L2	60R	M62 J25 - J30	
26/09/15 18:40:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 18:40:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 18:41:18	SIG	M62/2097B2	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2088B1	BLNK	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2088B1	BLNK	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2088B2	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2088B3	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2088B4	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2097B1	BLNK	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2097B4	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2106B1	BLNK	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2106B1	BLNK	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2106B2	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2106B3	OFF	M62 J25 - J30	
26/09/15 18:41:33	SIG	M62/2106B4	OFF	M62 J25 - J30	
26/09/15 18:45:09	SIG	M62/2081B1	OFF	M62 J25 - J30	
26/09/15 18:45:09	SIG	M62/2081B2	OFF	M62 J25 - J30	
26/09/15 18:45:09	SIG	M62/2081B3	OFF	M62 J25 - J30	
26/09/15 18:45:09	SIG	M62/2081L1	OFF	M62 J25 - J30	
26/09/15 18:47:09	SIG	M62/2197B1	OFF	M62 J25 - J30	
26/09/15 18:47:09	SIG	M62/2197B2	OFF	M62 J25 - J30	
26/09/15 18:47:09	SIG	M62/2197B3	OFF	M62 J25 - J30	
26/09/15 18:47:09	SIG	M62/2199M1	OFF	M62 J25 - J30	
26/09/15 18:47:09	SIG	M62/2199M2	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2074B1	BLNK	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2074B2	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2074B3	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2074B4	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2159B1	NR	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2159B2	NR	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M621/1010B1	OFF	M62 J25 - J30	
26/09/15 18:48:09	SIG	M621/1010B2	OFF	M62 J25 - J30	
26/09/15 18:51:09	SIG	M62/2159B1	OFF	M62 J25 - J30	
26/09/15 18:51:09	SIG	M62/2159B2	OFF	M62 J25 - J30	
26/09/15 19:01:00	SIG	M62/2183L1	60R	M62 J25 - J30	
26/09/15 19:01:00	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 19:08:14	SIG	M62/1968A1	50R	M62 J25 - J30	
26/09/15 19:08:14	SIG	M62/1968A2	50R	M62 J25 - J30	
26/09/15 19:08:14	SIG	M62/1968A3	50R	M62 J25 - J30	
26/09/15 19:08:14	SIG	M62/1968A4	50R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1960A1	50R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1960A2	50R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1960A3	50R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1960K1	50R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1960K2	50R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1968A1	40R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1968A2	40R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1968A3	40R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1968A4	40R	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1974A1	NR	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1974A2	NR	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1974A3	NR	M62 J25 - J30	
26/09/15 19:08:19	SIG	M62/1974A4	NR	M62 J25 - J30	
26/09/15 19:10:00	SIG	M62/2025A1	HSD	M62 J25 - J30	
26/09/15 19:11:00	SIG	M62/2033A1	HSD	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2177B1	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2177B2	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2183B1	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2183B2	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2183L1	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2183L2	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2189B1	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2189B2	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2189B3	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2189B4	NR	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2194B1	OFF	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2194B2	OFF	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2194B3	OFF	M62 J25 - J30	
26/09/15 19:11:09	SIG	M62/2194B4	OFF	M62 J25 - J30	
26/09/15 19:12:00	SIG	M62/2018A1	HSD	M62 J25 - J30	
26/09/15 19:12:00	SIG	M62/2025A1	REDX	M62 J25 - J30	
26/09/15 19:12:00	SIG	M62/2041A1	HSD	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1960A1	OFF	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1960A2	OFF	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1960A3	OFF	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1960K1	OFF	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1960K2	OFF	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1968A1	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1968A2	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1968A3	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1968A4	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1974A1	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1974A2	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1974A3	NR	M62 J25 - J30	
26/09/15 19:12:14	SIG	M62/1974A4	NR	M62 J25 - J30	
26/09/15 19:13:07	SIG	M62/2050A1	HSD	M62 J25 - J30	
26/09/15 19:13:08	SIG	M62/2033A1	REDX	M62 J25 - J30	
26/09/15 19:13:18	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 19:13:19	SIG	M62/2183L1	NR	M62 J25 - J30	
26/09/15 19:13:59	SIG	M62/2041A1	REDX	M62 J25 - J30	
26/09/15 19:14:09	SIG	M62/2189B1	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2183B1	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2183L2	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2189B2	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2189B3	OFF	M62 J25 - J30	
26/09/15 19:14:10	SIG	M62/2189B4	OFF	M62 J25 - J30	
26/09/15 19:14:59	SIG	M62/2050A1	REDX	M62 J25 - J30	
26/09/15 19:15:14	SIG	M62/1968A1	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1968A2	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1968A3	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1968A4	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1974A1	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1974A2	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1974A3	OFF	M62 J25 - J30	
26/09/15 19:15:15	SIG	M62/1974A4	OFF	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2025A2	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2025A3	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2025A4	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2033A2	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2033A3	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2033A4	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2041A2	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2041A3	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2041A4	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2050A2	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2050A3	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2050A4	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2057A1	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2057A2	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2057A3	NR	M62 J25 - J30	
26/09/15 19:16:00	SIG	M62/2057J1	NR	M62 J25 - J30	
26/09/15 19:16:19	SIG	M62/2183L1	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2008K1	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2008K2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2012A1	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2012A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2012A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2018A1	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2018A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2018A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2018A4	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2025A1	BLNK	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2025A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2025A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2025A4	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2033A1	BLNK	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2033A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2033A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2033A4	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2041A1	BLNK	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2041A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2041A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2041A4	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2050A1	BLNK	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2050A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2050A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2050A4	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2057A1	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2057A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2057A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2057J1	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2065A1	BLNK	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2065A2	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2065A3	OFF	M62 J25 - J30	
26/09/15 19:17:00	SIG	M62/2065A4	OFF	M62 J25 - J30	
26/09/15 19:37:00	SIG	M62/2057B1	HSD	M62 J25 - J30	
26/09/15 19:38:58	SIG	M62/2041B1	HSD	M62 J25 - J30	
26/09/15 19:38:59	SIG	M62/2057B1	REDX	M62 J25 - J30	
26/09/15 19:38:59	SIG	M621/1002B1	HSD	M62 J25 - J30	
26/09/15 19:38:59	SIG	M621/1010B1	60R	M62 J25 - J30	
26/09/15 19:38:59	SIG	M621/1010B2	60R	M62 J25 - J30	
26/09/15 19:39:59	SIG	M62/2033B1	HSD	M62 J25 - J30	
26/09/15 19:40:59	SIG	M62/2025B1	HSD	M62 J25 - J30	
26/09/15 19:40:59	SIG	M62/2041B1	REDX	M62 J25 - J30	
26/09/15 19:41:51	SIG	M62/2033B1	REDX	M62 J25 - J30	
26/09/15 19:42:35	SIG	M62/2025B1	REDX	M62 J25 - J30	
26/09/15 19:43:05	SIG	M62/2065B2	NR	M62 J25 - J30	
26/09/15 19:43:05	SIG	M62/2065B3	NR	M62 J25 - J30	
26/09/15 19:43:05	SIG	M62/2065B4	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2018B1	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2018B2	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2018B3	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2018L1	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2025B2	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2025B3	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2025B4	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2033B2	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2033B3	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2033B4	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2041B2	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2041B3	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2041B4	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2050B2	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2050B3	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2050B4	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2057B2	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2057B3	NR	M62 J25 - J30	
26/09/15 19:43:06	SIG	M62/2057B4	NR	M62 J25 - J30	
26/09/15 19:44:05	SIG	M62/2069M1	OFF	M62 J25 - J30	
26/09/15 19:44:05	SIG	M62/2069M2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2025B1	BLNK	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2025B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2025B3	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2025B4	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2033B1	BLNK	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2033B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2033B4	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2041B1	BLNK	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2041B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2041B3	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2041B4	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2050B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2050B3	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2050B4	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2057B1	BLNK	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2057B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2057B3	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2057B4	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2065B1	BLNK	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2065B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2065B3	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2065B4	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M62/2065M1	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M621/1002B1	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M621/1002B2	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M621/1010B1	OFF	M62 J25 - J30	
26/09/15 19:44:06	SIG	M621/1010B2	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2012B1	BLNK	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2012B2	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2012B3	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2012B4	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2018B1	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2018B2	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2018B3	OFF	M62 J25 - J30	
26/09/15 19:44:07	SIG	M62/2018L1	OFF	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2170B1	NR	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2170B2	NR	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2170L1	LDR	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2170L2	50R	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2177B1	50R	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2177B2	50R	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2177L1	50R	M62 J25 - J30	
26/09/15 20:11:55	SIG	M62/2177L2	50R	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2170B1	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2170B2	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2170L1	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2170L2	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2177B1	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2177B2	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2177L1	OFF	M62 J25 - J30	
26/09/15 20:30:08	SIG	M62/2177L2	OFF	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2012A1	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2012A2	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2012A3	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2018A1	HSD	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2018A2	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2018A3	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2018A4	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2025A1	REDX	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2025A2	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2025A3	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2025A4	60R	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2033A2	NR	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2033A3	NR	M62 J25 - J30	
26/09/15 23:05:23	SIG	M62/2033A4	NR	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2012A1	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2012A2	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2012A3	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2018A1	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2018A2	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2018A3	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2018A4	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2025A1	BLNK	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2025A2	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2025A3	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2025A4	OFF	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2033A2	NR	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2033A3	NR	M62 J25 - J30	
26/09/15 23:23:26	SIG	M62/2033A4	NR	M62 J25 - J30	
26/09/15 23:26:26	SIG	M62/2033A2	OFF	M62 J25 - J30	
26/09/15 23:26:26	SIG	M62/2033A3	OFF	M62 J25 - J30	
26/09/15 23:26:26	SIG	M62/2033A4	OFF	M62 J25 - J30	
26/09/15 23:26:27	SIG	M62/2033A1	BLNK	M62 J25 - J30	
27/09/15 05:49:04	SIG	M606/2003B1	50R	M62 J25 - J30	
27/09/15 05:49:04	SIG	M606/2003B2	50R	M62 J25 - J30	
27/09/15 05:49:04	SIG	M62/1992B1	NR	M62 J25 - J30	
27/09/15 05:49:04	SIG	M62/1992B2	NR	M62 J25 - J30	
27/09/15 05:49:04	SIG	M62/1992B3	NR	M62 J25 - J30	
27/09/15 05:49:04	SIG	M62/1992B4	NR	M62 J25 - J30	
27/09/15 05:49:10	SIG	M606/2003B1	40R	M62 J25 - J30	
27/09/15 05:49:10	SIG	M606/2003B2	40R	M62 J25 - J30	
27/09/15 05:49:15	SIG	M606/2003B1	30R	M62 J25 - J30	
27/09/15 05:49:20	SIG	M606/2003B1	20R	M62 J25 - J30	
27/09/15 05:49:20	SIG	M606/2003B2	40R	M62 J25 - J30	
27/09/15 05:49:20	SIG	M62/2005M1	TI	M62 J25 - J30	
27/09/15 05:49:20	SIG	M62/2005M2	TI	M62 J25 - J30	
27/09/15 05:49:25	SIG	M606/2003B1	STOP	M62 J25 - J30	
27/09/15 07:07:12	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 07:07:12	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 07:07:12	SIG	M62/1992B1	NR	M62 J25 - J30	
27/09/15 07:07:12	SIG	M62/1992B2	NR	M62 J25 - J30	
27/09/15 07:07:12	SIG	M62/1992B3	NR	M62 J25 - J30	
27/09/15 07:07:12	SIG	M62/1992B4	NR	M62 J25 - J30	
27/09/15 07:07:12	SIG	M62/2005M1	OFF	M62 J25 - J30	
27/09/15 07:07:12	SIG	M62/2005M2	OFF	M62 J25 - J30	
27/09/15 07:10:12	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 07:10:12	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 07:10:12	SIG	M62/1992B1	OFF	M62 J25 - J30	
27/09/15 07:10:12	SIG	M62/1992B2	OFF	M62 J25 - J30	
27/09/15 07:10:12	SIG	M62/1992B3	OFF	M62 J25 - J30	
27/09/15 07:10:12	SIG	M62/1992B4	OFF	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2050B2	NR	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2050B3	NR	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2050B4	NR	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057A1	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057A2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057A3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057B1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057B2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057B3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057B4	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2057J1	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065A1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065A2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065A3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065A4	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065B1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065B2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065B3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065B4	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2065M1	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2073K1	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2073K2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074A2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074A3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074A4	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074B1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074B2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074B3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2074B4	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2079A1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2079A2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2079A3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2079A4	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2081B1	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2081B2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2081B3	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2081L1	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2088A1	REDX	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2088A2	NR	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2088A3	NR	M62 J25 - J30	
27/09/15 07:19:10	SIG	M62/2088A4	NR	M62 J25 - J30	
27/09/15 07:19:10	SIG	M621/1002B1	HSD	M62 J25 - J30	
27/09/15 07:19:10	SIG	M621/1002B2	50R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 07:19:10	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2050B2	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2050B3	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2050B4	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057A1	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057A2	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057A3	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057B1	BLNK	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057B2	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057B3	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057B4	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2057J1	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065A1	BLNK	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065A2	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065A3	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065A4	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065B2	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065B3	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065B4	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2065M1	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2073K1	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2073K2	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2074A2	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2074A3	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2074B2	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2074B3	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2074B4	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2079A1	BLNK	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2079A2	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2079A3	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2079A4	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2088A2	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2088A3	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M62/2088A4	NR	M62 J25 - J30	
27/09/15 07:27:08	SIG	M621/1002B1	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M621/1002B2	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M621/1010B1	OFF	M62 J25 - J30	
27/09/15 07:27:08	SIG	M621/1010B2	OFF	M62 J25 - J30	
27/09/15 07:27:47	SIG	M62/2081B1	40R	M62 J25 - J30	
27/09/15 07:27:47	SIG	M62/2081B2	40R	M62 J25 - J30	
27/09/15 07:27:47	SIG	M62/2081B3	40R	M62 J25 - J30	
27/09/15 07:27:47	SIG	M62/2081L1	40R	M62 J25 - J30	
27/09/15 07:27:52	SIG	M62/2081L1	30R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2081B1	40R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2081B2	40R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2081B3	40R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2081L1	20R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2088B1	REDX	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2088B2	50R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2088B3	50R	M62 J25 - J30	
27/09/15 07:27:57	SIG	M62/2088B4	50R	M62 J25 - J30	
27/09/15 07:28:02	SIG	M62/2081L1	STOP	M62 J25 - J30	
27/09/15 07:30:08	SIG	M62/2074A2	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2050B2	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2050B3	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2050B4	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2065B1	BLNK	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2065B2	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2065B3	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2065B4	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2065M1	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2074A3	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2088A1	BLNK	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2088A1	BLNK	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2088A2	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2088A3	OFF	M62 J25 - J30	
27/09/15 07:30:09	SIG	M62/2088A4	OFF	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2081B1	50R	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2081B2	50R	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2081B3	50R	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2081L1	50R	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2088B2	NR	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2088B3	NR	M62 J25 - J30	
27/09/15 07:34:31	SIG	M62/2088B4	NR	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2074B1	BLNK	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2074B2	OFF	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2074B3	OFF	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2074B4	OFF	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2081B1	OFF	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2081B2	OFF	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2081B3	OFF	M62 J25 - J30	
27/09/15 07:34:58	SIG	M62/2081L1	NR	M62 J25 - J30	
27/09/15 07:37:31	SIG	M62/2088B2	OFF	M62 J25 - J30	
27/09/15 07:37:31	SIG	M62/2088B3	OFF	M62 J25 - J30	
27/09/15 07:37:31	SIG	M62/2088B4	OFF	M62 J25 - J30	
27/09/15 07:37:32	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 07:37:58	SIG	M62/2081L1	OFF	M62 J25 - J30	
27/09/15 10:09:58	SIG	M62/1960K1	50R	M62 J25 - J30	
27/09/15 10:09:58	SIG	M62/1960K2	50R	M62 J25 - J30	
27/09/15 10:09:58	SIG	M62/1968A1	50R	M62 J25 - J30	
27/09/15 10:09:58	SIG	M62/1968A2	50R	M62 J25 - J30	
27/09/15 10:09:58	SIG	M62/1968A3	50R	M62 J25 - J30	
27/09/15 10:09:58	SIG	M62/1968A4	50R	M62 J25 - J30	
27/09/15 10:10:04	SIG	M62/1960K1	40R	M62 J25 - J30	
27/09/15 10:10:04	SIG	M62/1960K2	40R	M62 J25 - J30	
27/09/15 10:10:04	SIG	M62/1968A1	40R	M62 J25 - J30	
27/09/15 10:10:04	SIG	M62/1968A2	40R	M62 J25 - J30	
27/09/15 10:10:04	SIG	M62/1968A3	40R	M62 J25 - J30	
27/09/15 10:10:04	SIG	M62/1968A4	40R	M62 J25 - J30	
27/09/15 10:10:09	SIG	M62/1960K1	30R	M62 J25 - J30	
27/09/15 10:10:09	SIG	M62/1960K2	30R	M62 J25 - J30	
27/09/15 10:10:09	SIG	M62/1968A1	30R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1955K1	50R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1955K2	50R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1960A1	50R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1960A2	50R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1960A3	50R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1960K1	30R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1960K2	30R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1968A1	20R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1968A2	40R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1968A3	40R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1968A4	40R	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1974A1	NR	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1974A2	NR	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1974A3	NR	M62 J25 - J30	
27/09/15 10:10:14	SIG	M62/1974A4	NR	M62 J25 - J30	
27/09/15 10:10:20	SIG	M62/1968A1	STOP	M62 J25 - J30	
27/09/15 10:13:18	SIG	M62/1955K1	TI	M62 J25 - J30	
27/09/15 10:13:18	SIG	M62/1955K2	TI	M62 J25 - J30	
27/09/15 10:13:18	SIG	M62/1960K1	20R	M62 J25 - J30	
27/09/15 10:13:24	SIG	M62/1960K1	STOP	M62 J25 - J30	
27/09/15 10:19:25	SIG	M62/1956A1	60R	M62 J25 - J30	
27/09/15 10:19:25	SIG	M62/1956A2	60R	M62 J25 - J30	
27/09/15 10:19:25	SIG	M62/1956A3	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1955K1	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1955K2	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1960A1	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1960A2	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1960A3	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1960K1	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1960K2	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1968A1	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1968A2	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1968A3	60R	M62 J25 - J30	
27/09/15 10:35:36	SIG	M62/1968A4	60R	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1955K1	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1955K2	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1956A1	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1956A2	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1956A3	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1960A1	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1960A2	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1960A3	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1960K1	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1960K2	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1968A1	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1968A2	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1968A3	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1968A4	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1974A1	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1974A2	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1974A3	OFF	M62 J25 - J30	
27/09/15 10:49:26	SIG	M62/1974A4	OFF	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2008K1	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2008K2	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2012A2	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2012A3	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2018A1	HSD	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2018A2	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2018A3	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2018A4	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2025A1	REDX	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2025A2	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2025A3	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2025A4	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2033A1	REDX	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2033A2	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2033A3	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2033A4	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2041A1	REDX	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2041A2	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2041A3	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2041A4	60R	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2050A1	REDX	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2050A2	NR	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2050A3	NR	M62 J25 - J30	
27/09/15 10:59:26	SIG	M62/2050A4	NR	M62 J25 - J30	
27/09/15 10:59:43	SIG	M62/2033A2	50R	M62 J25 - J30	
27/09/15 10:59:43	SIG	M62/2033A3	50R	M62 J25 - J30	
27/09/15 10:59:43	SIG	M62/2033A4	50R	M62 J25 - J30	
27/09/15 10:59:48	SIG	M62/2025A2	50R	M62 J25 - J30	
27/09/15 10:59:48	SIG	M62/2025A3	50R	M62 J25 - J30	
27/09/15 10:59:48	SIG	M62/2025A4	50R	M62 J25 - J30	
27/09/15 10:59:48	SIG	M62/2033A2	40R	M62 J25 - J30	
27/09/15 10:59:48	SIG	M62/2033A3	40R	M62 J25 - J30	
27/09/15 10:59:48	SIG	M62/2033A4	40R	M62 J25 - J30	
27/09/15 11:03:44	SIG	M62/2025A2	60R	M62 J25 - J30	
27/09/15 11:03:44	SIG	M62/2025A3	60R	M62 J25 - J30	
27/09/15 11:03:44	SIG	M62/2025A4	60R	M62 J25 - J30	
27/09/15 11:03:44	SIG	M62/2033A2	60R	M62 J25 - J30	
27/09/15 11:03:44	SIG	M62/2033A3	60R	M62 J25 - J30	
27/09/15 11:03:44	SIG	M62/2033A4	60R	M62 J25 - J30	
27/09/15 11:05:27	SIG	M62/2004A1	60R	M62 J25 - J30	
27/09/15 11:05:27	SIG	M62/2004A2	60R	M62 J25 - J30	
27/09/15 11:05:27	SIG	M62/2004A3	60R	M62 J25 - J30	
27/09/15 11:10:31	SIG	M62/2033A2	50R	M62 J25 - J30	
27/09/15 11:10:31	SIG	M62/2033A3	50R	M62 J25 - J30	
27/09/15 11:10:31	SIG	M62/2033A4	50R	M62 J25 - J30	
27/09/15 11:10:37	SIG	M62/2025A2	50R	M62 J25 - J30	
27/09/15 11:10:37	SIG	M62/2025A3	50R	M62 J25 - J30	
27/09/15 11:10:37	SIG	M62/2025A4	50R	M62 J25 - J30	
27/09/15 11:10:37	SIG	M62/2033A2	40R	M62 J25 - J30	
27/09/15 11:10:37	SIG	M62/2033A3	40R	M62 J25 - J30	
27/09/15 11:10:37	SIG	M62/2033A4	40R	M62 J25 - J30	
27/09/15 11:13:26	SIG	M62/1999A1	60R	M62 J25 - J30	
27/09/15 11:13:26	SIG	M62/1999A2	60R	M62 J25 - J30	
27/09/15 11:13:26	SIG	M62/1999A3	60R	M62 J25 - J30	
27/09/15 11:13:26	SIG	M62/1999J1	50R	M62 J25 - J30	
27/09/15 11:13:26	SIG	M62/1999J2	50R	M62 J25 - J30	
27/09/15 11:13:27	SIG	M62/2018A2	50R	M62 J25 - J30	
27/09/15 11:13:27	SIG	M62/2018A3	50R	M62 J25 - J30	
27/09/15 11:13:27	SIG	M62/2018A4	50R	M62 J25 - J30	
27/09/15 11:13:27	SIG	M62/2025A2	40R	M62 J25 - J30	
27/09/15 11:13:27	SIG	M62/2025A3	40R	M62 J25 - J30	
27/09/15 11:13:27	SIG	M62/2025A4	40R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 11:13:32	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2008K1	50R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2008K2	50R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2012A1	50R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2012A2	50R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2012A3	50R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2018A2	40R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2018A3	40R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2018A4	40R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2025A2	40R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2025A3	40R	M62 J25 - J30	
27/09/15 11:13:32	SIG	M62/2025A4	40R	M62 J25 - J30	
27/09/15 11:14:30	SIG	M62/2033A2	60R	M62 J25 - J30	
27/09/15 11:14:30	SIG	M62/2033A3	60R	M62 J25 - J30	
27/09/15 11:14:30	SIG	M62/2033A4	60R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2004A1	50R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2004A2	50R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2004A3	50R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2008K1	40R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2008K2	40R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2012A1	40R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2012A2	40R	M62 J25 - J30	
27/09/15 11:15:39	SIG	M62/2012A3	40R	M62 J25 - J30	
27/09/15 11:16:08	SIG	M62/2033A2	50R	M62 J25 - J30	
27/09/15 11:16:08	SIG	M62/2033A3	50R	M62 J25 - J30	
27/09/15 11:16:08	SIG	M62/2033A4	50R	M62 J25 - J30	
27/09/15 11:16:14	SIG	M62/2033A2	40R	M62 J25 - J30	
27/09/15 11:16:14	SIG	M62/2033A3	40R	M62 J25 - J30	
27/09/15 11:16:14	SIG	M62/2033A4	40R	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2050A2	60R	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2050A3	60R	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2050A4	60R	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2057A1	NR	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2057A2	NR	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2057A3	NR	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2057J1	NR	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2065A1	REDX	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2065A2	NR	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2065A3	NR	M62 J25 - J30	
27/09/15 11:17:27	SIG	M62/2065A4	NR	M62 J25 - J30	
27/09/15 11:17:28	SIG	M62/2018A2	60R	M62 J25 - J30	
27/09/15 11:17:28	SIG	M62/2018A3	60R	M62 J25 - J30	
27/09/15 11:17:28	SIG	M62/2018A4	60R	M62 J25 - J30	
27/09/15 11:17:28	SIG	M62/2025A2	50R	M62 J25 - J30	
27/09/15 11:17:28	SIG	M62/2025A3	50R	M62 J25 - J30	
27/09/15 11:17:28	SIG	M62/2025A4	50R	M62 J25 - J30	
27/09/15 11:19:27	SIG	M62/2018A2	50R	M62 J25 - J30	
27/09/15 11:19:27	SIG	M62/2018A3	50R	M62 J25 - J30	
27/09/15 11:19:27	SIG	M62/2018A4	50R	M62 J25 - J30	
27/09/15 11:19:30	SIG	M62/2018A2	40R	M62 J25 - J30	
27/09/15 11:19:30	SIG	M62/2018A3	40R	M62 J25 - J30	
27/09/15 11:19:30	SIG	M62/2018A4	40R	M62 J25 - J30	
27/09/15 11:19:30	SIG	M62/2025A2	40R	M62 J25 - J30	
27/09/15 11:19:30	SIG	M62/2025A3	40R	M62 J25 - J30	
27/09/15 11:19:30	SIG	M62/2025A4	40R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 11:19:39	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2004A1	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2004A2	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2004A3	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2008K1	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2008K2	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2012A2	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2012A3	60R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2018A2	50R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2018A3	50R	M62 J25 - J30	
27/09/15 11:19:39	SIG	M62/2018A4	50R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 11:20:02	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2008K1	50R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2008K2	50R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2012A1	50R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2012A2	50R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2012A3	50R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2018A2	40R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2018A3	40R	M62 J25 - J30	
27/09/15 11:20:02	SIG	M62/2018A4	40R	M62 J25 - J30	
27/09/15 11:20:09	SIG	M62/2033A2	50R	M62 J25 - J30	
27/09/15 11:20:09	SIG	M62/2033A3	50R	M62 J25 - J30	
27/09/15 11:20:09	SIG	M62/2033A4	50R	M62 J25 - J30	
27/09/15 11:20:37	SIG	M62/2033A2	40R	M62 J25 - J30	
27/09/15 11:20:37	SIG	M62/2033A3	40R	M62 J25 - J30	
27/09/15 11:20:37	SIG	M62/2033A4	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2004A1	50R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2004A2	50R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2004A3	50R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2008K1	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2008K1	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2008K2	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2012A1	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2012A1	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2012A2	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2012A3	40R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2057A1	60R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2057A2	60R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2057A3	60R	M62 J25 - J30	
27/09/15 11:21:17	SIG	M62/2057J1	60R	M62 J25 - J30	
27/09/15 11:21:27	SIG	M62/2041A2	50R	M62 J25 - J30	
27/09/15 11:21:27	SIG	M62/2041A3	50R	M62 J25 - J30	
27/09/15 11:21:27	SIG	M62/2041A4	50R	M62 J25 - J30	
27/09/15 11:22:13	SIG	M62/2050A1	60R	M62 J25 - J30	
27/09/15 11:22:31	SIG	M62/2041A1	50R	M62 J25 - J30	
27/09/15 11:22:50	SIG	M62/2033A1	40R	M62 J25 - J30	
27/09/15 11:22:54	SIG	M62/2018A1	50R	M62 J25 - J30	
27/09/15 11:22:54	SIG	M62/2025A1	40R	M62 J25 - J30	
27/09/15 11:22:59	SIG	M62/2018A1	40R	M62 J25 - J30	
27/09/15 11:22:59	SIG	M62/2025A1	40R	M62 J25 - J30	
27/09/15 11:23:58	SIG	M62/1999A1	50R	M62 J25 - J30	
27/09/15 11:23:58	SIG	M62/1999A2	50R	M62 J25 - J30	
27/09/15 11:23:58	SIG	M62/1999A3	50R	M62 J25 - J30	
27/09/15 11:23:58	SIG	M62/2004A1	40R	M62 J25 - J30	
27/09/15 11:23:58	SIG	M62/2004A2	40R	M62 J25 - J30	
27/09/15 11:23:58	SIG	M62/2004A3	40R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2025A1	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2025A2	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2025A3	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2025A4	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2033A1	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2033A2	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2033A3	50R	M62 J25 - J30	
27/09/15 11:24:38	SIG	M62/2033A4	50R	M62 J25 - J30	
27/09/15 11:25:17	SIG	M62/2018A1	50R	M62 J25 - J30	
27/09/15 11:25:17	SIG	M62/2018A2	50R	M62 J25 - J30	
27/09/15 11:25:17	SIG	M62/2018A3	50R	M62 J25 - J30	
27/09/15 11:25:17	SIG	M62/2018A4	50R	M62 J25 - J30	
27/09/15 11:27:27	SIG	M62/1992A1	60R	M62 J25 - J30	
27/09/15 11:27:27	SIG	M62/1992A2	60R	M62 J25 - J30	
27/09/15 11:27:27	SIG	M62/1992A3	60R	M62 J25 - J30	
27/09/15 11:27:27	SIG	M62/1992J1	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 11:27:57	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/1999A1	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/1999A2	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/1999A3	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2004A1	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2004A2	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2004A3	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2008K1	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2008K2	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2012A2	60R	M62 J25 - J30	
27/09/15 11:27:57	SIG	M62/2012A3	60R	M62 J25 - J30	
27/09/15 11:30:57	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 11:30:58	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1987B1	NR	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1987B2	NR	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1987B3	NR	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1987B4	NR	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1992B1	50R	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1992B2	50R	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1992B3	50R	M62 J25 - J30	
27/09/15 11:37:25	SIG	M62/1992B4	50R	M62 J25 - J30	
27/09/15 11:37:27	SIG	M62/1992A1	OFF	M62 J25 - J30	
27/09/15 11:37:27	SIG	M62/1992A2	OFF	M62 J25 - J30	
27/09/15 11:37:27	SIG	M62/1992A3	OFF	M62 J25 - J30	
27/09/15 11:37:27	SIG	M62/1992J1	OFF	M62 J25 - J30	
27/09/15 11:38:27	SIG	M62/2018A1	60R	M62 J25 - J30	
27/09/15 11:38:27	SIG	M62/2018A2	60R	M62 J25 - J30	
27/09/15 11:38:27	SIG	M62/2018A3	60R	M62 J25 - J30	
27/09/15 11:38:27	SIG	M62/2018A4	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2025A1	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2025A2	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2025A3	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2025A4	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2033A1	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2033A2	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2033A3	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2033A4	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2041A1	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2041A2	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2041A3	60R	M62 J25 - J30	
27/09/15 11:42:27	SIG	M62/2041A4	60R	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/1999A1	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/1999A2	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/1999A3	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/1999J1	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/1999J2	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/2004A1	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/2004A2	OFF	M62 J25 - J30	
27/09/15 11:51:27	SIG	M62/2004A3	OFF	M62 J25 - J30	
27/09/15 12:04:41	SIG	M606/2003B1	LDR	M62 J25 - J30	
27/09/15 12:04:41	SIG	M606/2003B2	50R	M62 J25 - J30	
27/09/15 12:04:41	SIG	M62/1992B1	40R	M62 J25 - J30	
27/09/15 12:04:41	SIG	M62/1992B2	40R	M62 J25 - J30	
27/09/15 12:04:41	SIG	M62/1992B3	40R	M62 J25 - J30	
27/09/15 12:04:41	SIG	M62/1992B4	40R	M62 J25 - J30	
27/09/15 12:04:41	SIG	M62/2005M1	TI	M62 J25 - J30	
27/09/15 12:04:41	SIG	M62/2005M2	TI	M62 J25 - J30	
27/09/15 12:04:46	SIG	M62/1992B1	30R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1992B1	20R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1992B2	40R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1992B3	40R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1992B4	40R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1999B1	REDX	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1999B2	50R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1999B3	50R	M62 J25 - J30	
27/09/15 12:04:51	SIG	M62/1999B4	50R	M62 J25 - J30	
27/09/15 12:04:57	SIG	M62/1992B1	STOP	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1981B1	NR	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1981B2	NR	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1981B3	NR	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1981B4	NR	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1987B1	LDR	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1987B2	50R	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1987B3	50R	M62 J25 - J30	
27/09/15 12:05:57	SIG	M62/1987B4	50R	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2004B1	REDX	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2004B2	60R	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2004B3	60R	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2004B4	60R	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2012B1	REDX	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2012B2	60R	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2012B3	60R	M62 J25 - J30	
27/09/15 12:07:28	SIG	M62/2012B4	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M606/2003B1	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M606/2003B2	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1981B1	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1981B2	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1981B3	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1981B4	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1987B1	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1987B2	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1987B3	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1987B4	NR	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1992B1	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1992B2	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1992B3	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1992B4	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1999B2	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1999B3	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/1999B4	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/2005M1	60R	M62 J25 - J30	
27/09/15 12:11:39	SIG	M62/2005M2	60R	M62 J25 - J30	
27/09/15 12:14:40	SIG	M62/1981B1	OFF	M62 J25 - J30	
27/09/15 12:14:40	SIG	M62/1981B2	OFF	M62 J25 - J30	
27/09/15 12:14:40	SIG	M62/1981B3	OFF	M62 J25 - J30	
27/09/15 12:14:40	SIG	M62/1981B4	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1987B1	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1987B2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1987B3	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1987B4	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1992B1	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1992B2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1992B3	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1992B4	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1999B1	BLNK	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1999B2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1999B3	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/1999B4	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2004B1	BLNK	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2004B2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2004B3	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2004B4	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2005M1	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2005M2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2012B1	BLNK	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2012B2	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2012B3	OFF	M62 J25 - J30	
27/09/15 12:22:28	SIG	M62/2012B4	OFF	M62 J25 - J30	
27/09/15 12:32:32	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 12:32:32	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 12:33:05	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 12:33:05	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 12:36:05	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 12:36:06	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 13:45:39	SIG	M606/2003B1	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M606/2003B2	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1987B1	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1987B2	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1987B3	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1987B4	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1992B1	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1992B2	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1992B3	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/1992B4	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/2005M1	50R	M62 J25 - J30	
27/09/15 13:45:39	SIG	M62/2005M2	50R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1981B1	NR	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1981B2	NR	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1981B3	NR	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1981B4	NR	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1987B1	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1987B2	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1987B3	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1987B4	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1992B1	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1992B2	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1992B3	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1992B4	40R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1999B1	REDX	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1999B2	50R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1999B3	50R	M62 J25 - J30	
27/09/15 13:45:44	SIG	M62/1999B4	50R	M62 J25 - J30	
27/09/15 13:48:19	SIG	M62/2197A1	50R	M62 J25 - J30	
27/09/15 13:48:19	SIG	M62/2197A2	50R	M62 J25 - J30	
27/09/15 13:48:19	SIG	M62/2197A3	50R	M62 J25 - J30	
27/09/15 13:49:39	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 13:49:39	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1981B1	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1981B2	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1981B3	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1981B4	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1987B1	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1987B2	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1987B3	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1987B4	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1992B1	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1992B2	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1992B3	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1992B4	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1999B2	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1999B3	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/1999B4	NR	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/2005M1	OFF	M62 J25 - J30	
27/09/15 13:49:39	SIG	M62/2005M2	OFF	M62 J25 - J30	
27/09/15 13:52:39	SIG	M62/1999B2	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1981B1	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1981B2	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1981B3	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1981B4	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1987B1	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1987B2	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1987B3	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1987B4	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1992B1	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1992B2	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1992B3	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1992B4	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1999B1	BLNK	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1999B3	OFF	M62 J25 - J30	
27/09/15 13:52:40	SIG	M62/1999B4	OFF	M62 J25 - J30	
27/09/15 13:52:53	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 13:52:54	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 13:57:17	SIG	M62/2197A1	OFF	M62 J25 - J30	
27/09/15 13:57:17	SIG	M62/2197A2	OFF	M62 J25 - J30	
27/09/15 13:57:17	SIG	M62/2197A3	OFF	M62 J25 - J30	
27/09/15 13:59:29	SIG	M606/2003B1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M606/2003B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1992B1	NR	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1992B2	NR	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1992B3	NR	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1992B4	NR	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/1999B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2004B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2005M1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2005M2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2008K1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2008K2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2012B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018A4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018B1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2018L1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025A4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2025B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033A4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2033B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041A4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2041B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050A4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2050B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057A1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2057J1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065A2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065A3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065A4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2065M1	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074A2	NR	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074B1	REDX	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074B3	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M62/2074B4	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M621/1002B1	HSD	M62 J25 - J30	
27/09/15 13:59:29	SIG	M621/1002B2	50R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 13:59:29	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 14:00:17	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 14:00:17	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 14:01:17	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 14:01:17	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 14:01:49	SIG	M62/1999A1	OFF	M62 J25 - J30	
27/09/15 14:01:49	SIG	M62/1999A2	OFF	M62 J25 - J30	
27/09/15 14:01:49	SIG	M62/1999A3	OFF	M62 J25 - J30	
27/09/15 14:01:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 14:01:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2004A1	NR	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2004A2	NR	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2004A3	NR	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2008K1	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2008K2	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2012A2	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2012A3	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2018A1	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2018A2	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2018A3	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2018A4	60R	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 14:01:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 14:02:17	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 14:02:17	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1992B1	NR	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1992B2	NR	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1992B3	NR	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1992B4	NR	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1999B2	NR	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1999B3	NR	M62 J25 - J30	
27/09/15 14:02:20	SIG	M62/1999B4	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 14:02:21	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2004B2	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2004B3	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2004B4	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2005M1	OFF	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2005M2	OFF	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2012B2	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2012B3	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2012B4	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2018B1	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2018B2	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2018B3	NR	M62 J25 - J30	
27/09/15 14:02:21	SIG	M62/2018L1	NR	M62 J25 - J30	
27/09/15 14:03:17	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 14:03:18	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2033A1	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2033A2	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2033A3	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2033A4	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2041A1	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2041A2	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2041A3	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2041A4	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2050A1	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2050A2	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2050A3	40R	M62 J25 - J30	
27/09/15 14:04:16	SIG	M62/2050A4	40R	M62 J25 - J30	
27/09/15 14:04:17	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 14:04:17	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 14:04:22	SIG	M62/2033A1	30R	M62 J25 - J30	
27/09/15 14:04:22	SIG	M62/2041A1	30R	M62 J25 - J30	
27/09/15 14:04:22	SIG	M62/2050A1	30R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 14:04:27	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2008K1	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2008K2	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2012A1	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2012A2	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2012A3	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2018A1	LDR	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2018A2	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2018A3	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2018A4	50R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2025A1	LDR	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2033A1	20R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2033A2	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2033A3	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2033A4	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2041A1	20R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2041A2	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2041A3	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2041A4	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2050A1	20R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2050A2	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2050A3	40R	M62 J25 - J30	
27/09/15 14:04:27	SIG	M62/2050A4	40R	M62 J25 - J30	
27/09/15 14:04:33	SIG	M62/2033A1	STOP	M62 J25 - J30	
27/09/15 14:04:33	SIG	M62/2041A1	STOP	M62 J25 - J30	
27/09/15 14:04:33	SIG	M62/2050A1	STOP	M62 J25 - J30	
27/09/15 14:04:50	SIG	M62/2004A1	OFF	M62 J25 - J30	
27/09/15 14:04:50	SIG	M62/2004A2	OFF	M62 J25 - J30	
27/09/15 14:04:50	SIG	M62/2004A3	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2012B1	BLNK	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2012B2	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2012B3	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2012B4	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2018B1	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2018B2	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2018B3	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2018L1	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2025B2	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2025B3	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2025B4	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2033B2	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2033B3	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2033B4	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2041B2	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2041B3	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2041B4	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2050B2	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2050B3	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2050B4	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2057B1	BLNK	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2057B2	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2057B3	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2057B4	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2065B2	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2065B3	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2065B4	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2065M1	NR	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2074B1	BLNK	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2074B2	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2074B3	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M62/2074B4	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M621/1002B1	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M621/1002B2	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M621/1010B1	OFF	M62 J25 - J30	
27/09/15 14:05:13	SIG	M621/1010B2	OFF	M62 J25 - J30	
27/09/15 14:05:17	SIG	M62/2074A4	NR	M62 J25 - J30	
27/09/15 14:05:17	SIG	M62/2074A4	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1992B1	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1992B2	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1992B3	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1992B4	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1999B1	BLNK	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1999B2	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1999B3	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/1999B4	OFF	M62 J25 - J30	
27/09/15 14:05:21	SIG	M62/2004B2	OFF	M62 J25 - J30	
27/09/15 14:05:22	SIG	M62/2004B1	BLNK	M62 J25 - J30	
27/09/15 14:05:22	SIG	M62/2004B1	BLNK	M62 J25 - J30	
27/09/15 14:05:22	SIG	M62/2004B3	OFF	M62 J25 - J30	
27/09/15 14:05:22	SIG	M62/2004B4	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2018L1	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2025B2	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2025B3	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2025B4	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2033B2	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2041B3	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2041B4	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2050B2	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2050B3	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2050B4	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2065B2	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2065B3	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2065B4	OFF	M62 J25 - J30	
27/09/15 14:08:14	SIG	M62/2065M1	OFF	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2025B1	BLNK	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2025B1	BLNK	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2033B1	BLNK	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2033B1	BLNK	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2041B1	BLNK	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2041B1	BLNK	M62 J25 - J30	
27/09/15 14:08:15	SIG	M62/2065B1	BLNK	M62 J25 - J30	
27/09/15 14:11:57	SIG	M62/2074A2	NR	M62 J25 - J30	
27/09/15 14:11:58	SIG	M606/2003B1	NR	M62 J25 - J30	
27/09/15 14:11:58	SIG	M606/2003B2	NR	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2008K1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2008K2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2012A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2012A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2018A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2018A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2018A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2018A4	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2025A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2025A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2025A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2025A4	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2033A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2033A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2033A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2033A4	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2041A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2041A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2041A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2041A4	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2050A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2050A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2050A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2050A4	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2057A1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2057A2	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2057A3	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2057J1	60R	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2065A2	NR	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2065A3	NR	M62 J25 - J30	
27/09/15 14:11:58	SIG	M62/2065A4	NR	M62 J25 - J30	
27/09/15 14:14:57	SIG	M62/2074A2	OFF	M62 J25 - J30	
27/09/15 14:14:58	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 14:14:58	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 14:14:58	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:14:58	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:14:59	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:16:44	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:17:00	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:22:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:22:12	SIG	M62/2166K1	50R	M62 J25 - J30	
27/09/15 14:22:12	SIG	M62/2166K2	50R	M62 J25 - J30	
27/09/15 14:22:12	SIG	M62/2170K1	50R	M62 J25 - J30	
27/09/15 14:22:12	SIG	M62/2170K2	50R	M62 J25 - J30	
27/09/15 14:22:17	SIG	M62/2166K1	40R	M62 J25 - J30	
27/09/15 14:22:17	SIG	M62/2166K2	40R	M62 J25 - J30	
27/09/15 14:22:17	SIG	M62/2170K1	40R	M62 J25 - J30	
27/09/15 14:22:17	SIG	M62/2170K2	40R	M62 J25 - J30	
27/09/15 14:22:22	SIG	M62/2170K1	30R	M62 J25 - J30	
27/09/15 14:22:27	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2166K1	40R	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2166K2	40R	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2170K1	20R	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2170K2	40R	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2177A1	REDX	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2177A2	NR	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2177A3	NR	M62 J25 - J30	
27/09/15 14:22:28	SIG	M62/2177A4	NR	M62 J25 - J30	
27/09/15 14:22:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:22:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:22:33	SIG	M62/2170K1	STOP	M62 J25 - J30	
27/09/15 14:22:44	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:22:44	SIG	M62/2170K2	30R	M62 J25 - J30	
27/09/15 14:22:44	SIG	M62/2177A2	50R	M62 J25 - J30	
27/09/15 14:22:44	SIG	M62/2177A3	50R	M62 J25 - J30	
27/09/15 14:22:44	SIG	M62/2177A4	50R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2170A1	50R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2170A2	50R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2170K2	30R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2177A1	STOP	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2177A2	40R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2177A3	40R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2177A4	40R	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2183A1	REDX	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2183A2	NR	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2183A3	NR	M62 J25 - J30	
27/09/15 14:22:49	SIG	M62/2183A4	NR	M62 J25 - J30	
27/09/15 14:22:54	SIG	M62/2177A1	STOP	M62 J25 - J30	
27/09/15 14:23:27	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:24:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:24:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:24:31	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:24:31	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:25:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:25:27	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:25:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:25:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:25:44	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:26:52	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:41:22	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2157A1	60R	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2157A2	60R	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2157J1	60R	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2157J2	60R	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2157K1	60R	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2163A1	60R	M62 J25 - J30	
27/09/15 14:41:30	SIG	M62/2163A2	60R	M62 J25 - J30	
27/09/15 14:41:47	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:42:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:42:41	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:43:04	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:43:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:44:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
27/09/15 14:44:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
27/09/15 14:45:30	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:45:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:45:31	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:45:31	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:49:55	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2166K1	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2166K2	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2170A1	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2170A2	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2170K1	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2170K2	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2177A1	REDX	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2177A2	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2177A3	60R	M62 J25 - J30	
27/09/15 14:49:56	SIG	M62/2177A4	60R	M62 J25 - J30	
27/09/15 14:50:26	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2157A2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2157J1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2157J2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2157K1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2163A1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2163A2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2166K1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2166K2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2170A1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2170A2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2170K1	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2170K2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2177A1	BLNK	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2177A2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2177A3	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2177A4	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2183A1	BLNK	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2183A2	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2183A3	OFF	M62 J25 - J30	
27/09/15 14:55:31	SIG	M62/2183A4	OFF	M62 J25 - J30	
27/09/15 15:07:29	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:07:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:09:03	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:09:06	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:09:22	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2074B1	REDX	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2074B2	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2074B3	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2074B4	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2081B1	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2081B2	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2081B3	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2081L1	NR	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2088B1	REDX	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2088B2	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2088B3	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2088B4	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2097B1	REDX	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2097B2	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2097B4	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2106B1	REDX	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2106B2	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2106B3	60R	M62 J25 - J30	
27/09/15 15:10:01	SIG	M62/2106B4	60R	M62 J25 - J30	
27/09/15 15:10:11	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2074B1	BLNK	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2074B2	OFF	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2074B3	OFF	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2074B4	OFF	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2081B1	OFF	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2081B2	OFF	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2081B3	OFF	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2081L1	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2088B2	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2088B3	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2088B4	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2097B2	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2097B4	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2106B2	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2106B3	NR	M62 J25 - J30	
27/09/15 15:10:59	SIG	M62/2106B4	NR	M62 J25 - J30	
27/09/15 15:13:59	SIG	M62/2081L1	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2088B2	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2088B3	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2088B4	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2097B2	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2097B4	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2106B2	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2106B3	OFF	M62 J25 - J30	
27/09/15 15:14:09	SIG	M62/2106B4	OFF	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2097B1	BLNK	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2097B1	BLNK	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2106B1	BLNK	M62 J25 - J30	
27/09/15 15:14:10	SIG	M62/2106B1	BLNK	M62 J25 - J30	
27/09/15 15:14:32	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:19:45	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:19:54	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:28:52	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:29:27	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:29:32	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:29:32	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:31:37	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:31:48	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2057B1	REDX	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2057B2	NR	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2057B3	NR	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2057B4	NR	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2065M1	NR	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2065M1	60R	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2069M1	60R	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2069M2	60R	M62 J25 - J30	
27/09/15 15:35:40	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:35:40	SIG	M621/1002B1	HSD	M62 J25 - J30	
27/09/15 15:35:40	SIG	M621/1002B2	60R	M62 J25 - J30	
27/09/15 15:35:40	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 15:35:40	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2012B1	REDX	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2012B2	NR	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2012B3	NR	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2012B4	NR	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2018B1	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2018B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2018B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2018L1	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2025B1	REDX	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2025B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2025B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2025B4	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2033B1	REDX	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2033B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2033B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2033B4	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2041B1	REDX	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2041B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2041B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2041B4	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2050B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2050B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2050B4	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2057B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2057B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2057B4	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2065B1	REDX	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2065B2	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2065B3	60R	M62 J25 - J30	
27/09/15 15:35:41	SIG	M62/2065B4	60R	M62 J25 - J30	
27/09/15 15:36:47	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:36:53	SIG	M62/2025B1	60R	M62 J25 - J30	
27/09/15 15:36:53	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:36:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:37:24	SIG	M62/2033B1	60R	M62 J25 - J30	
27/09/15 15:37:24	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:37:35	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:37:35	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:37:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 15:37:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 15:37:57	SIG	M62/2041B1	60R	M62 J25 - J30	
27/09/15 15:37:57	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:37:58	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:38:25	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:38:31	SIG	M62/2057B1	60R	M62 J25 - J30	
27/09/15 15:38:31	SIG	M621/1002B1	60R	M62 J25 - J30	
27/09/15 15:38:35	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:38:35	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:38:35	SIG	M621/1010B1	OFF	M62 J25 - J30	
27/09/15 15:38:35	SIG	M621/1010B2	OFF	M62 J25 - J30	
27/09/15 15:39:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:40:18	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:44:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:44:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:44:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:44:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:46:20	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:46:21	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:46:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:46:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:48:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:48:33	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:48:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:48:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:52:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:52:06	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:52:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:52:07	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 15:56:28	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 15:57:12	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:04:20	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:04:20	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:04:20	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:04:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:04:37	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:04:37	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:14:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:14:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:14:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:14:35	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:15:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:15:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:15:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:15:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:17:31	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 16:17:31	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 16:17:32	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 16:17:33	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 16:17:43	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 16:17:43	SIG	M62/2012A1	60R	M62 J25 - J30	
27/09/15 16:19:36	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:19:37	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:19:37	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:20:41	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:21:06	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:21:52	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:23:07	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:23:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:23:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:23:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:27:11	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:27:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 16:27:12	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:27:12	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 16:45:33	SIG	M62/2074B1	REDX	M62 J25 - J30	
27/09/15 16:45:33	SIG	M62/2074B2	60R	M62 J25 - J30	
27/09/15 16:45:33	SIG	M62/2074B3	60R	M62 J25 - J30	
27/09/15 16:45:33	SIG	M62/2074B4	60R	M62 J25 - J30	
27/09/15 16:45:33	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 16:45:33	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 16:48:33	SIG	M62/2081B1	60R	M62 J25 - J30	
27/09/15 16:48:33	SIG	M62/2081B2	60R	M62 J25 - J30	
27/09/15 16:48:33	SIG	M62/2081B3	60R	M62 J25 - J30	
27/09/15 16:48:33	SIG	M62/2081L1	60R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2159B1	NR	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2159B2	NR	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2170B1	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2170B2	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2170L1	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2170L2	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2177B1	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2177B2	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2177L1	50R	M62 J25 - J30	
27/09/15 16:51:06	SIG	M62/2177L2	50R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2170B1	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2170B2	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2170L1	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2170L2	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2177B1	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2177B2	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2177L1	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2177L2	40R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2183B1	50R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2183L1	50R	M62 J25 - J30	
27/09/15 16:51:12	SIG	M62/2183L2	50R	M62 J25 - J30	
27/09/15 16:53:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 16:53:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 16:53:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 16:53:23	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2189B1	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2189B2	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2189B3	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2189B4	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2194B1	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2194B2	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2194B3	60R	M62 J25 - J30	
27/09/15 16:58:33	SIG	M62/2194B4	60R	M62 J25 - J30	
27/09/15 17:02:33	SIG	M62/2197B1	60R	M62 J25 - J30	
27/09/15 17:02:33	SIG	M62/2197B2	60R	M62 J25 - J30	
27/09/15 17:02:33	SIG	M62/2197B3	60R	M62 J25 - J30	
27/09/15 17:02:33	SIG	M62/2199M1	60R	M62 J25 - J30	
27/09/15 17:02:33	SIG	M62/2199M2	60R	M62 J25 - J30	
27/09/15 17:09:27	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:09:27	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:09:27	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2189B1	50R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2189B2	50R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2189B3	50R	M62 J25 - J30	
27/09/15 17:09:32	SIG	M62/2189B4	50R	M62 J25 - J30	
27/09/15 17:11:58	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:11:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:12:04	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:12:33	SIG	M62/2081B1	OFF	M62 J25 - J30	
27/09/15 17:12:33	SIG	M62/2081B2	OFF	M62 J25 - J30	
27/09/15 17:12:33	SIG	M62/2081B3	OFF	M62 J25 - J30	
27/09/15 17:12:33	SIG	M62/2081L1	OFF	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2183B1	50R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2183L1	50R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2183L2	50R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2189B1	60R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2189B2	60R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2189B3	60R	M62 J25 - J30	
27/09/15 17:13:28	SIG	M62/2189B4	60R	M62 J25 - J30	
27/09/15 17:16:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:16:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:16:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:16:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:32:08	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:32:08	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:32:08	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2189B1	50R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2189B2	50R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2189B3	50R	M62 J25 - J30	
27/09/15 17:32:14	SIG	M62/2189B4	50R	M62 J25 - J30	
27/09/15 17:34:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:34:50	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:34:56	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2183B1	50R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2183L1	50R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2183L2	50R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2189B1	60R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2189B2	60R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2189B3	60R	M62 J25 - J30	
27/09/15 17:36:08	SIG	M62/2189B4	60R	M62 J25 - J30	
27/09/15 17:38:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:38:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:38:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:38:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:39:10	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:39:10	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:39:10	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2189B1	50R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2189B2	50R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2189B3	50R	M62 J25 - J30	
27/09/15 17:39:16	SIG	M62/2189B4	50R	M62 J25 - J30	
27/09/15 17:41:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:41:59	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:42:04	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:42:34	SIG	M62/2081B1	60R	M62 J25 - J30	
27/09/15 17:42:34	SIG	M62/2081B2	60R	M62 J25 - J30	
27/09/15 17:42:34	SIG	M62/2081B3	60R	M62 J25 - J30	
27/09/15 17:42:34	SIG	M62/2081L1	60R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2065B2	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2065B3	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2065B4	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2065M1	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2069M1	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2069M2	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2074B2	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2074B3	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M62/2074B4	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M621/1002B1	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M621/1002B2	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M621/1010B1	50R	M62 J25 - J30	
27/09/15 17:42:55	SIG	M621/1010B2	50R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2065B2	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2065B3	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2065B4	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2065M1	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2069M1	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2069M2	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2074B2	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2074B3	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2074B4	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2081B1	50R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2081B2	50R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2081B3	50R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M62/2081L1	50R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M621/1002B1	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M621/1002B2	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M621/1010B1	40R	M62 J25 - J30	
27/09/15 17:43:01	SIG	M621/1010B2	40R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2183B1	50R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2183L1	50R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2183L2	50R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2189B1	60R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2189B2	60R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2189B3	60R	M62 J25 - J30	
27/09/15 17:43:10	SIG	M62/2189B4	60R	M62 J25 - J30	
27/09/15 17:43:34	SIG	M62/2203B1	60R	M62 J25 - J30	
27/09/15 17:43:34	SIG	M62/2203B2	60R	M62 J25 - J30	
27/09/15 17:43:34	SIG	M62/2203B3	60R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2183B1	40R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2183L1	40R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2183L2	40R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2189B1	50R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2189B2	50R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2189B3	50R	M62 J25 - J30	
27/09/15 17:44:57	SIG	M62/2189B4	50R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M62/2065B2	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M62/2065B3	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M62/2065B4	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M62/2065M1	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M62/2069M1	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M62/2069M2	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M621/1002B1	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M621/1002B2	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 17:46:55	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 17:47:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:47:09	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:47:14	SIG	M62/2183B2	40R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2074B2	60R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2074B3	60R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2074B4	60R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2081B1	60R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2081B2	60R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2081B3	60R	M62 J25 - J30	
27/09/15 17:48:34	SIG	M62/2081L1	60R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2183B1	50R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2183B2	50R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2183L1	50R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2183L2	50R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2189B1	60R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2189B2	60R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2189B3	60R	M62 J25 - J30	
27/09/15 17:48:56	SIG	M62/2189B4	60R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2065B2	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2065B3	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2065B4	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2065M1	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2069M1	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2069M2	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2074B2	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2074B3	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M62/2074B4	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M621/1002B1	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M621/1002B2	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M621/1010B1	50R	M62 J25 - J30	
27/09/15 17:50:18	SIG	M621/1010B2	50R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2065B2	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2065B3	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2065B4	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2065M1	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2069M1	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2069M2	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2074B2	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2074B3	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2074B4	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2081B1	50R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2081B2	50R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2081B3	50R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M62/2081L1	50R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M621/1002B1	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M621/1002B2	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M621/1010B1	40R	M62 J25 - J30	
27/09/15 17:50:23	SIG	M621/1010B2	40R	M62 J25 - J30	
27/09/15 17:51:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:51:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:51:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:51:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2065B2	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2065B3	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2065B4	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2065M1	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2069M1	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2069M2	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2074B2	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2074B3	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2074B4	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2081B1	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2081B2	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2081B3	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M62/2081L1	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M621/1002B1	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M621/1002B2	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 17:54:19	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2088B1	REDX	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2088B2	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2088B3	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2088B4	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2097B1	REDX	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2097B2	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2097B3	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2097B4	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2106B1	REDX	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2106B2	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2106B3	60R	M62 J25 - J30	
27/09/15 17:54:34	SIG	M62/2106B4	60R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2065B2	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2065B3	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2065B4	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2065M1	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2069M1	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2069M2	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2074B2	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2074B3	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M62/2074B4	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M621/1002B1	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M621/1002B2	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M621/1010B1	50R	M62 J25 - J30	
27/09/15 17:55:39	SIG	M621/1010B2	50R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2065B2	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2065B3	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2065B4	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2065M1	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2069M1	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2069M2	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2074B2	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2074B3	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2074B4	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2081B1	50R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2081B2	50R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2081B3	50R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M62/2081L1	50R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M621/1002B1	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M621/1002B2	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M621/1010B1	40R	M62 J25 - J30	
27/09/15 17:55:44	SIG	M621/1010B2	40R	M62 J25 - J30	
27/09/15 17:56:41	SIG	M62/2197A1	50R	M62 J25 - J30	
27/09/15 17:56:41	SIG	M62/2197A2	50R	M62 J25 - J30	
27/09/15 17:56:41	SIG	M62/2197A3	50R	M62 J25 - J30	
27/09/15 17:59:19	SIG	M62/2197A1	OFF	M62 J25 - J30	
27/09/15 17:59:19	SIG	M62/2197A2	OFF	M62 J25 - J30	
27/09/15 17:59:19	SIG	M62/2197A3	OFF	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2074B2	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2074B3	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2074B4	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2081B1	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2081B2	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2081B3	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M62/2081L1	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 17:59:39	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M62/2065B2	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M62/2065B3	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M62/2065B4	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M62/2065M1	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M62/2069M1	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M62/2069M2	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M621/1002B1	60R	M62 J25 - J30	
27/09/15 17:59:40	SIG	M621/1002B2	60R	M62 J25 - J30	
27/09/15 18:00:51	SIG	M62/2025A1	HSD	M62 J25 - J30	
27/09/15 18:01:52	SIG	M62/2033A1	HSD	M62 J25 - J30	
27/09/15 18:02:51	SIG	M62/2041A1	HSD	M62 J25 - J30	
27/09/15 18:02:52	SIG	M62/2018A1	HSD	M62 J25 - J30	
27/09/15 18:02:52	SIG	M62/2025A1	REDX	M62 J25 - J30	
27/09/15 18:03:58	SIG	M62/2033A1	REDX	M62 J25 - J30	
27/09/15 18:03:58	SIG	M62/2050A1	HSD	M62 J25 - J30	
27/09/15 18:04:50	SIG	M62/2041A1	REDX	M62 J25 - J30	
27/09/15 18:05:50	SIG	M62/2050A1	REDX	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2025A2	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2025A3	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2025A4	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2033A2	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2033A3	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2033A4	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2041A2	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2041A3	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2041A4	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2050A2	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2050A3	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2050A4	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2057A1	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2057A2	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2057A3	NR	M62 J25 - J30	
27/09/15 18:06:51	SIG	M62/2057J1	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2088B2	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2088B3	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2088B4	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2097B2	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2097B3	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2097B4	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2106B2	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2106B3	NR	M62 J25 - J30	
27/09/15 18:07:34	SIG	M62/2106B4	NR	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2008K1	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2008K2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2012A1	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2012A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2012A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2018A1	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2018A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2018A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2018A4	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2025A1	BLNK	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2025A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2025A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2025A4	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2033A1	BLNK	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2033A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2033A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2033A4	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2041A1	BLNK	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2041A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2041A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2041A4	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2050A1	BLNK	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2050A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2050A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2050A4	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2057A1	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2057A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2057A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2057J1	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2065A1	BLNK	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2065A2	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2065A3	OFF	M62 J25 - J30	
27/09/15 18:07:51	SIG	M62/2065A4	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2088B2	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2088B3	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2088B4	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2097B1	BLNK	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2097B2	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2097B3	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2097B4	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2106B1	BLNK	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2106B2	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2106B3	OFF	M62 J25 - J30	
27/09/15 18:10:35	SIG	M62/2106B4	OFF	M62 J25 - J30	
27/09/15 18:10:36	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 18:10:36	SIG	M62/2106B1	BLNK	M62 J25 - J30	
27/09/15 18:14:30	SIG	M606/2003B1	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M606/2003B2	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1987B1	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1987B2	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1987B3	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1987B4	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1992B1	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1992B2	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1992B3	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/1992B4	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/2005M1	50R	M62 J25 - J30	
27/09/15 18:14:30	SIG	M62/2005M2	50R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1981B1	NR	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1981B2	NR	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1981B3	NR	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1981B4	NR	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1987B1	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1987B2	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1987B3	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1987B4	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1992B1	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1992B2	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1992B3	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1992B4	40R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1999B1	REDX	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1999B2	50R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1999B3	50R	M62 J25 - J30	
27/09/15 18:14:35	SIG	M62/1999B4	50R	M62 J25 - J30	
27/09/15 18:16:41	SIG	M606/2003B1	OFF	M62 J25 - J30	
27/09/15 18:16:41	SIG	M606/2003B2	OFF	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1981B1	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1981B2	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1981B3	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1981B4	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1987B1	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1987B2	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1987B3	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1987B4	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1992B1	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1992B2	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1992B3	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1992B4	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1999B2	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1999B3	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/1999B4	NR	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/2005M1	OFF	M62 J25 - J30	
27/09/15 18:16:41	SIG	M62/2005M2	OFF	M62 J25 - J30	
27/09/15 18:18:34	SIG	M62/2081B1	OFF	M62 J25 - J30	
27/09/15 18:18:34	SIG	M62/2081B2	OFF	M62 J25 - J30	
27/09/15 18:18:34	SIG	M62/2081B3	OFF	M62 J25 - J30	
27/09/15 18:18:34	SIG	M62/2081L1	OFF	M62 J25 - J30	
27/09/15 18:19:41	SIG	M62/1999B2	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1981B1	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1981B2	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1981B3	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1981B4	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1987B1	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1987B2	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1987B3	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1987B4	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1992B1	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1992B2	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1992B3	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1992B4	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1999B1	BLNK	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1999B3	OFF	M62 J25 - J30	
27/09/15 18:19:42	SIG	M62/1999B4	OFF	M62 J25 - J30	
27/09/15 18:39:35	SIG	M62/2203B1	OFF	M62 J25 - J30	
27/09/15 18:39:35	SIG	M62/2203B2	OFF	M62 J25 - J30	
27/09/15 18:39:35	SIG	M62/2203B3	OFF	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2073K1	60R	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2073K2	60R	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2074A2	60R	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2079A1	REDX	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2079A2	60R	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2079A3	60R	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2079A4	60R	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2088A1	REDX	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2088A2	NR	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2088A3	NR	M62 J25 - J30	
27/09/15 18:47:00	SIG	M62/2088A4	NR	M62 J25 - J30	
27/09/15 18:57:35	SIG	M62/2074B1	BLNK	M62 J25 - J30	
27/09/15 18:57:35	SIG	M62/2074B2	OFF	M62 J25 - J30	
27/09/15 18:57:35	SIG	M62/2074B3	OFF	M62 J25 - J30	
27/09/15 18:57:35	SIG	M62/2074B4	OFF	M62 J25 - J30	
27/09/15 18:57:35	SIG	M621/1010B1	OFF	M62 J25 - J30	
27/09/15 18:57:35	SIG	M621/1010B2	OFF	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2073K1	OFF	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2073K2	OFF	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2074A2	NR	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2079A1	BLNK	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2079A2	OFF	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2079A3	OFF	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2079A4	OFF	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2088A2	NR	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2088A3	NR	M62 J25 - J30	
27/09/15 19:10:40	SIG	M62/2088A4	NR	M62 J25 - J30	
27/09/15 19:10:51	SIG	M62/2057B1	HSD	M62 J25 - J30	
27/09/15 19:12:50	SIG	M62/2041B1	HSD	M62 J25 - J30	
27/09/15 19:12:50	SIG	M62/2057B1	REDX	M62 J25 - J30	
27/09/15 19:12:50	SIG	M621/1002B1	HSD	M62 J25 - J30	
27/09/15 19:12:50	SIG	M621/1010B1	60R	M62 J25 - J30	
27/09/15 19:12:50	SIG	M621/1010B2	60R	M62 J25 - J30	
27/09/15 19:13:40	SIG	M62/2074A2	OFF	M62 J25 - J30	
27/09/15 19:13:41	SIG	M62/2088A1	BLNK	M62 J25 - J30	
27/09/15 19:13:41	SIG	M62/2088A2	OFF	M62 J25 - J30	
27/09/15 19:13:41	SIG	M62/2088A3	OFF	M62 J25 - J30	
27/09/15 19:13:41	SIG	M62/2088A4	OFF	M62 J25 - J30	
27/09/15 19:13:42	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 19:13:42	SIG	M62/2088A1	BLNK	M62 J25 - J30	
27/09/15 19:13:50	SIG	M62/2033B1	HSD	M62 J25 - J30	
27/09/15 19:14:19	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 19:14:50	SIG	M62/2025B1	HSD	M62 J25 - J30	
27/09/15 19:14:50	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 19:14:51	SIG	M62/2041B1	REDX	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2170B1	60R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2170B2	60R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2170L1	50R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2170L2	50R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2177B1	50R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2177B2	50R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2177L1	50R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2177L2	50R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2183B1	60R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2183B2	60R	M62 J25 - J30	
27/09/15 19:15:18	SIG	M62/2183L2	60R	M62 J25 - J30	
27/09/15 19:15:19	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 19:15:42	SIG	M62/2033B1	REDX	M62 J25 - J30	
27/09/15 19:15:42	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 19:16:19	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 19:16:26	SIG	M62/2025B1	REDX	M62 J25 - J30	
27/09/15 19:16:26	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 19:16:27	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 19:16:56	SIG	M62/2065B2	NR	M62 J25 - J30	
27/09/15 19:16:56	SIG	M62/2065B3	NR	M62 J25 - J30	
27/09/15 19:16:56	SIG	M62/2065B4	NR	M62 J25 - J30	
27/09/15 19:16:56	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2033B2	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2033B3	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2033B4	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2041B2	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2041B3	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2041B4	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2050B2	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2050B3	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2050B4	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2057B2	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2057B3	NR	M62 J25 - J30	
27/09/15 19:16:57	SIG	M62/2057B4	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2018B1	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2018B2	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2018B3	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2018L1	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2025B2	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2025B3	NR	M62 J25 - J30	
27/09/15 19:16:58	SIG	M62/2025B4	NR	M62 J25 - J30	
27/09/15 19:17:19	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 19:17:47	SIG	M62/2183L1	60R	M62 J25 - J30	
27/09/15 19:17:47	SIG	M62/2183L1	60R	M62 J25 - J30	
27/09/15 19:17:47	SIG	M62/2183L1	OFF	M62 J25 - J30	
27/09/15 19:17:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 19:17:53	SIG	M62/2183B2	???	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2041B1	BLNK	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2041B2	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2041B3	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2041B4	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2050B2	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2050B3	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2050B4	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2057B1	BLNK	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2057B2	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2057B3	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2057B4	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2065B1	BLNK	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2065B2	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2065B3	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2065B4	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2065M1	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2069M1	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M62/2069M2	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M621/1002B1	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M621/1002B2	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M621/1010B1	OFF	M62 J25 - J30	
27/09/15 19:17:57	SIG	M621/1010B2	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2012B1	BLNK	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2012B2	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2012B3	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2012B4	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2018B1	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2018B2	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2018B3	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2018L1	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2025B1	BLNK	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2025B2	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2025B3	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2025B4	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2033B1	BLNK	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2033B2	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2033B4	OFF	M62 J25 - J30	
27/09/15 19:17:58	SIG	M62/2041B2	OFF	M62 J25 - J30	
27/09/15 19:18:57	SIG	M62/2183L1	OFF	M62 J25 - J30	
27/09/15 19:18:58	SIG	M62/2183L1	60R	M62 J25 - J30	
27/09/15 19:21:38	SIG	M62/2183L1	OFF	M62 J25 - J30	
27/09/15 19:21:39	SIG	M62/2183L1	60R	M62 J25 - J30	
27/09/15 19:23:16	SIG	M62/2074A1	REDX	M62 J25 - J30	
27/09/15 19:23:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
27/09/15 19:26:36	SIG	M62/2197B1	OFF	M62 J25 - J30	
27/09/15 19:26:36	SIG	M62/2197B2	OFF	M62 J25 - J30	
27/09/15 19:26:36	SIG	M62/2197B3	OFF	M62 J25 - J30	
27/09/15 19:26:36	SIG	M62/2199M1	OFF	M62 J25 - J30	
27/09/15 19:26:36	SIG	M62/2199M2	OFF	M62 J25 - J30	
27/09/15 19:28:36	SIG	M62/2159B1	NR	M62 J25 - J30	
27/09/15 19:28:36	SIG	M62/2159B2	NR	M62 J25 - J30	
27/09/15 19:28:36	SIG	M62/2170B1	NR	M62 J25 - J30	
27/09/15 19:28:36	SIG	M62/2170B2	NR	M62 J25 - J30	
27/09/15 19:28:36	SIG	M62/2170L1	OFF	M62 J25 - J30	
27/09/15 19:28:36	SIG	M62/2170L2	OFF	M62 J25 - J30	
27/09/15 19:31:36	SIG	M62/2159B1	OFF	M62 J25 - J30	
27/09/15 19:31:36	SIG	M62/2159B2	OFF	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2012B1	REDX	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2012B2	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2012B3	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2012B4	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2018B1	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2018B2	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2018B3	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2018L1	NR	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2025B1	REDX	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2025B2	60R	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2025B3	60R	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2025B4	60R	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2033B1	REDX	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2033B2	60R	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2033B3	60R	M62 J25 - J30	
27/09/15 20:05:42	SIG	M62/2033B4	60R	M62 J25 - J30	
27/09/15 20:08:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 20:08:17	SIG	M62/2033B3	???	M62 J25 - J30	
27/09/15 20:14:11	SIG	M62/2170L1	LDR	M62 J25 - J30	
27/09/15 20:14:11	SIG	M62/2170L2	50R	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2033A1	REDX	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2033A2	60R	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2033A3	60R	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2033A4	60R	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2041A1	REDX	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2041A2	NR	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2041A3	NR	M62 J25 - J30	
27/09/15 20:27:32	SIG	M62/2041A4	NR	M62 J25 - J30	
27/09/15 20:30:21	SIG	M62/2170L1	OFF	M62 J25 - J30	
27/09/15 20:30:21	SIG	M62/2170L2	OFF	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2170B1	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2170B2	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2177B1	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2177B2	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2177L1	OFF	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2177L2	OFF	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2183B1	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2183B2	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2183L1	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2183L2	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2189B1	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2189B2	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2189B3	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2189B4	NR	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2194B1	OFF	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2194B2	OFF	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2194B3	OFF	M62 J25 - J30	
27/09/15 20:35:37	SIG	M62/2194B4	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2012B1	BLNK	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2012B2	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2012B3	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2012B4	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2018B1	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2018B2	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2018B3	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2018L1	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2025B1	BLNK	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2025B2	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2025B3	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2025B4	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2033B1	BLNK	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2033B2	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
27/09/15 20:38:12	SIG	M62/2033B4	OFF	M62 J25 - J30	
27/09/15 20:38:37	SIG	M62/2189B1	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2170B1	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2170B2	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2177B1	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2177B2	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2183B1	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2183B2	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2183L1	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2183L2	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2189B2	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2189B3	OFF	M62 J25 - J30	
27/09/15 20:38:38	SIG	M62/2189B4	OFF	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2033A1	BLNK	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2033A2	OFF	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2033A3	OFF	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2033A4	OFF	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2041A1	BLNK	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2041A2	OFF	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2041A3	OFF	M62 J25 - J30	
27/09/15 21:00:47	SIG	M62/2041A4	OFF	M62 J25 - J30	
27/09/15 21:07:31	SIG	M62/2132B1	50R	M62 J25 - J30	
27/09/15 21:07:31	SIG	M62/2132B2	50R	M62 J25 - J30	
27/09/15 21:07:31	SIG	M62/2132B3	50R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2125B1	NR	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2125B2	NR	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2125B3	NR	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2125L1	NR	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2125L2	NR	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2132B1	40R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2132B2	40R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2132B3	40R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2137B1	50R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2137B2	50R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2137B3	50R	M62 J25 - J30	
27/09/15 21:07:36	SIG	M62/2137B4	50R	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2125B1	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2125B2	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2125B3	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2125L1	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2125L2	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2132B1	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2132B2	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2132B3	NR	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2137B1	OFF	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2137B2	OFF	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2137B3	OFF	M62 J25 - J30	
27/09/15 21:12:35	SIG	M62/2137B4	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2125B1	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2125B2	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2125B3	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2125L1	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2125L2	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2132B1	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2132B2	OFF	M62 J25 - J30	
27/09/15 21:15:36	SIG	M62/2132B3	OFF	M62 J25 - J30	
27/09/15 21:19:02	SIG	M62/2088B2	50R	M62 J25 - J30	
27/09/15 21:19:02	SIG	M62/2088B3	50R	M62 J25 - J30	
27/09/15 21:19:02	SIG	M62/2088B4	50R	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2074B1	REDX	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2074B2	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2074B3	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2074B4	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2081B1	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2081B2	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2081B3	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2081L1	NR	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2088B1	REDX	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2088B2	40R	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2088B3	40R	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2088B4	40R	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2097B1	REDX	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2097B2	60R	M62 J25 - J30	
27/09/15 21:19:08	SIG	M62/2097B4	60R	M62 J25 - J30	
27/09/15 21:21:43	SIG	M62/2132B1	50R	M62 J25 - J30	
27/09/15 21:21:43	SIG	M62/2132B2	50R	M62 J25 - J30	
27/09/15 21:21:43	SIG	M62/2132B3	50R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2125B1	NR	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2125B2	NR	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2125B3	NR	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2125L1	NR	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2125L2	NR	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2132B1	40R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2132B2	40R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2132B3	40R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2137B1	50R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2137B2	50R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2137B3	50R	M62 J25 - J30	
27/09/15 21:21:48	SIG	M62/2137B4	50R	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2074B1	BLNK	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2074B2	OFF	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2074B3	OFF	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2074B4	OFF	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2081B1	OFF	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2081B2	OFF	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2081B3	OFF	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2081L1	NR	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2088B2	NR	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2088B3	NR	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2088B4	NR	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2097B2	NR	M62 J25 - J30	
27/09/15 21:23:02	SIG	M62/2097B4	NR	M62 J25 - J30	
27/09/15 21:26:03	SIG	M62/2081L1	OFF	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2088B1	BLNK	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2088B2	OFF	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2088B3	OFF	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2088B4	OFF	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2097B1	BLNK	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2097B1	BLNK	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2097B2	OFF	M62 J25 - J30	
27/09/15 21:26:13	SIG	M62/2097B4	OFF	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2147B1	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2147B2	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2147B3	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2147B4	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2159B1	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2159B2	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2159M1	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2159M2	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2170B1	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2170B2	60R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2170L1	50R	M62 J25 - J30	
27/09/15 21:29:38	SIG	M62/2170L2	50R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2132B1	60R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2132B2	60R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2132B3	60R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2137B1	60R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2137B2	60R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2137B3	60R	M62 J25 - J30	
27/09/15 21:36:54	SIG	M62/2137B4	60R	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2125B1	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2125B2	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2125B3	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2125L1	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2125L2	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2132B1	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2132B2	NR	M62 J25 - J30	
27/09/15 21:43:38	SIG	M62/2132B3	NR	M62 J25 - J30	
27/09/15 21:46:38	SIG	M62/2125B1	OFF	M62 J25 - J30	
27/09/15 21:46:39	SIG	M62/2125B2	OFF	M62 J25 - J30	
27/09/15 21:46:39	SIG	M62/2125B3	OFF	M62 J25 - J30	
27/09/15 21:46:39	SIG	M62/2125L1	OFF	M62 J25 - J30	
27/09/15 21:46:39	SIG	M62/2125L2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2132B1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2132B2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2132B3	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2137B1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2137B2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2137B3	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2137B4	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2147B1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2147B2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2147B3	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2147B4	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2159B1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2159B2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2159M1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2159M2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2170B1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2170B2	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2170L1	OFF	M62 J25 - J30	
27/09/15 21:48:38	SIG	M62/2170L2	OFF	M62 J25 - J30	
27/09/15 23:04:04	SIG	M62/2170L1	LDR	M62 J25 - J30	
27/09/15 23:04:04	SIG	M62/2170L2	50R	M62 J25 - J30	
27/09/15 23:04:04	SIG	M62/2177B1	50R	M62 J25 - J30	
27/09/15 23:04:04	SIG	M62/2177B2	50R	M62 J25 - J30	
27/09/15 23:04:04	SIG	M62/2177L1	50R	M62 J25 - J30	
27/09/15 23:04:04	SIG	M62/2177L2	50R	M62 J25 - J30	
27/09/15 23:24:53	SIG	M62/2170B1	NR	M62 J25 - J30	
27/09/15 23:24:53	SIG	M62/2170B2	NR	M62 J25 - J30	
27/09/15 23:25:03	SIG	M62/2170L1	OFF	M62 J25 - J30	
27/09/15 23:25:03	SIG	M62/2170L2	OFF	M62 J25 - J30	
27/09/15 23:25:03	SIG	M62/2177B1	OFF	M62 J25 - J30	
27/09/15 23:25:03	SIG	M62/2177B2	OFF	M62 J25 - J30	
27/09/15 23:25:03	SIG	M62/2177L1	OFF	M62 J25 - J30	
27/09/15 23:25:03	SIG	M62/2177L2	OFF	M62 J25 - J30	
27/09/15 23:25:06	SIG	M62/2170B1	OFF	M62 J25 - J30	
27/09/15 23:25:06	SIG	M62/2170B2	OFF	M62 J25 - J30	
28/09/15 06:03:11	SIG	M62/1956A1	NR	M62 J25 - J30	
28/09/15 06:03:11	SIG	M62/1956A2	NR	M62 J25 - J30	
28/09/15 06:03:11	SIG	M62/1956A3	NR	M62 J25 - J30	
28/09/15 06:06:26	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 06:06:26	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2004A1	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2004A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2004A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2012A1	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2012A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2012A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2018A1	HSD	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2018A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2018A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2018A4	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2025A1	REDX	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2025A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2025A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2025A4	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2033A1	REDX	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2033A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2033A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2033A4	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2041A1	REDX	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2041A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2041A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2041A4	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2050A1	REDX	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2050A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2050A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2050A4	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2057A1	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2057A2	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2057A3	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2057J1	50R	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2065A1	REDX	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2065A2	NR	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2065A3	NR	M62 J25 - J30	
28/09/15 06:06:26	SIG	M62/2065A4	NR	M62 J25 - J30	
28/09/15 06:07:00	SIG	M62/1956A1	NR	M62 J25 - J30	
28/09/15 06:07:00	SIG	M62/1956A2	NR	M62 J25 - J30	
28/09/15 06:07:00	SIG	M62/1956A3	NR	M62 J25 - J30	
28/09/15 06:10:00	SIG	M62/1956A1	OFF	M62 J25 - J30	
28/09/15 06:10:00	SIG	M62/1956A2	OFF	M62 J25 - J30	
28/09/15 06:10:00	SIG	M62/1956A3	OFF	M62 J25 - J30	
28/09/15 06:15:47	SIG	M62/1999A1	60R	M62 J25 - J30	
28/09/15 06:15:47	SIG	M62/1999A2	60R	M62 J25 - J30	
28/09/15 06:15:47	SIG	M62/1999A3	60R	M62 J25 - J30	
28/09/15 06:15:47	SIG	M62/1999J1	50R	M62 J25 - J30	
28/09/15 06:15:47	SIG	M62/1999J2	50R	M62 J25 - J30	
28/09/15 06:17:00	SIG	M62/2008K1	40R	M62 J25 - J30	
28/09/15 06:17:00	SIG	M62/2008K2	40R	M62 J25 - J30	
28/09/15 06:17:00	SIG	M62/2012A1	40R	M62 J25 - J30	
28/09/15 06:17:00	SIG	M62/2012A2	40R	M62 J25 - J30	
28/09/15 06:17:00	SIG	M62/2012A3	40R	M62 J25 - J30	
28/09/15 06:18:15	SIG	M62/2004A1	40R	M62 J25 - J30	
28/09/15 06:18:15	SIG	M62/2004A2	40R	M62 J25 - J30	
28/09/15 06:18:15	SIG	M62/2004A3	40R	M62 J25 - J30	
28/09/15 06:18:16	SIG	M62/1999A1	50R	M62 J25 - J30	
28/09/15 06:18:16	SIG	M62/1999A2	50R	M62 J25 - J30	
28/09/15 06:18:16	SIG	M62/1999A3	50R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/1992A1	60R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/1992A2	60R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/1992A3	60R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/1992J1	60R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/1999A3	LDL	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/2012A3	30R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/2018A2	40R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/2018A3	40R	M62 J25 - J30	
28/09/15 06:19:43	SIG	M62/2018A4	40R	M62 J25 - J30	
28/09/15 06:19:48	SIG	M62/2012A3	20R	M62 J25 - J30	
28/09/15 06:19:48	SIG	M62/2018A4	30R	M62 J25 - J30	
28/09/15 06:19:54	SIG	M62/2004A3	LDL	M62 J25 - J30	
28/09/15 06:19:54	SIG	M62/2012A3	20R	M62 J25 - J30	
28/09/15 06:19:54	SIG	M62/2018A2	40R	M62 J25 - J30	
28/09/15 06:19:54	SIG	M62/2018A3	40R	M62 J25 - J30	
28/09/15 06:19:54	SIG	M62/2018A4	20R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2012A3	STOP	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2018A4	STOP	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2025A2	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2025A3	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2025A4	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2033A2	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2033A3	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2033A4	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2041A2	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2041A3	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2041A4	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2050A2	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2050A3	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2050A4	60R	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2057A1	NR	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2057A2	NR	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2057A3	NR	M62 J25 - J30	
28/09/15 06:19:59	SIG	M62/2057J1	NR	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1992A1	50R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1992A2	50R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1992A3	50R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1992J1	50R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1999A1	40R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1999A2	40R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1999J1	40R	M62 J25 - J30	
28/09/15 06:21:56	SIG	M62/1999J2	40R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1987A1	50R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1987A3	50R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1987J1	50R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1992A1	40R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1992A2	40R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1992A3	40R	M62 J25 - J30	
28/09/15 06:24:57	SIG	M62/1992J1	40R	M62 J25 - J30	
28/09/15 06:25:48	SIG	M62/1979K1	60R	M62 J25 - J30	
28/09/15 06:25:48	SIG	M62/1979K2	60R	M62 J25 - J30	
28/09/15 06:25:48	SIG	M62/1981A1	60R	M62 J25 - J30	
28/09/15 06:25:48	SIG	M62/1981A2	60R	M62 J25 - J30	
28/09/15 06:25:48	SIG	M62/1981A3	60R	M62 J25 - J30	
28/09/15 06:25:48	SIG	M62/1981A4	60R	M62 J25 - J30	
28/09/15 06:26:09	SIG	M62/2057A1	60R	M62 J25 - J30	
28/09/15 06:26:09	SIG	M62/2057A1	60R	M62 J25 - J30	
28/09/15 06:26:09	SIG	M62/2057A2	60R	M62 J25 - J30	
28/09/15 06:26:09	SIG	M62/2057A3	60R	M62 J25 - J30	
28/09/15 06:26:09	SIG	M62/2057J1	60R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1987A1	40R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1987A3	40R	M62 J25 - J30	
28/09/15 06:26:43	SIG	M62/1987J1	40R	M62 J25 - J30	
28/09/15 06:27:47	SIG	M62/1974A1	60R	M62 J25 - J30	
28/09/15 06:27:47	SIG	M62/1974A2	60R	M62 J25 - J30	
28/09/15 06:27:47	SIG	M62/1974A3	60R	M62 J25 - J30	
28/09/15 06:27:47	SIG	M62/1974A4	60R	M62 J25 - J30	
28/09/15 06:29:48	SIG	M62/1968A1	60R	M62 J25 - J30	
28/09/15 06:29:48	SIG	M62/1968A2	60R	M62 J25 - J30	
28/09/15 06:29:48	SIG	M62/1968A3	60R	M62 J25 - J30	
28/09/15 06:29:48	SIG	M62/1968A4	60R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1979K2	40R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 06:30:00	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 06:30:47	SIG	M62/1960A1	60R	M62 J25 - J30	
28/09/15 06:30:47	SIG	M62/1960A2	60R	M62 J25 - J30	
28/09/15 06:30:47	SIG	M62/1960A3	60R	M62 J25 - J30	
28/09/15 06:30:47	SIG	M62/1960K1	60R	M62 J25 - J30	
28/09/15 06:30:47	SIG	M62/1960K2	60R	M62 J25 - J30	
28/09/15 06:31:25	SIG	M62/2050A1	60R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1968A1	50R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1968A2	50R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1968A3	50R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1968A4	50R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1974A1	40R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1974A2	40R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1974A3	40R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/1974A4	40R	M62 J25 - J30	
28/09/15 06:31:52	SIG	M62/2041A1	60R	M62 J25 - J30	
28/09/15 06:32:19	SIG	M62/2033A1	60R	M62 J25 - J30	
28/09/15 06:32:23	SIG	M62/2018A1	50R	M62 J25 - J30	
28/09/15 06:32:29	SIG	M62/2018A1	40R	M62 J25 - J30	
28/09/15 06:32:29	SIG	M62/2025A1	60R	M62 J25 - J30	
28/09/15 06:33:48	SIG	M62/1955K1	60R	M62 J25 - J30	
28/09/15 06:33:48	SIG	M62/1955K2	60R	M62 J25 - J30	
28/09/15 06:33:48	SIG	M62/1956A1	60R	M62 J25 - J30	
28/09/15 06:33:48	SIG	M62/1956A2	60R	M62 J25 - J30	
28/09/15 06:33:48	SIG	M62/1956A3	60R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1960A1	50R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1960A2	50R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1960A3	50R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1960K1	50R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1960K2	50R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1968A1	40R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1968A2	40R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1968A3	40R	M62 J25 - J30	
28/09/15 06:34:26	SIG	M62/1968A4	40R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1956A1	50R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1956A2	50R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1956A3	50R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1960A1	40R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1960A2	40R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1960A3	40R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1960K1	40R	M62 J25 - J30	
28/09/15 06:36:43	SIG	M62/1960K2	40R	M62 J25 - J30	
28/09/15 06:37:35	SIG	M62/1999A3	50R	M62 J25 - J30	
28/09/15 06:37:35	SIG	M62/2004A3	50R	M62 J25 - J30	
28/09/15 06:37:35	SIG	M62/2012A3	40R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/1999A3	40R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/2004A3	40R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/2012A3	40R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/2018A1	60R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/2018A2	60R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/2018A3	60R	M62 J25 - J30	
28/09/15 06:37:40	SIG	M62/2018A4	60R	M62 J25 - J30	
28/09/15 06:40:25	SIG	M62/1955K1	40R	M62 J25 - J30	
28/09/15 06:40:25	SIG	M62/1955K2	40R	M62 J25 - J30	
28/09/15 06:40:25	SIG	M62/1956A1	40R	M62 J25 - J30	
28/09/15 06:40:25	SIG	M62/1956A2	40R	M62 J25 - J30	
28/09/15 06:40:25	SIG	M62/1956A3	40R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2159B1	NR	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2159B2	NR	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 06:44:20	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 06:44:26	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 06:46:19	SIG	M62/1999J1	50R	M62 J25 - J30	
28/09/15 06:46:19	SIG	M62/1999J2	50R	M62 J25 - J30	
28/09/15 06:46:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 06:46:48	SIG	M62/2183B2	???	M62 J25 - J30	
28/09/15 06:47:26	SIG	M62/1999J1	40R	M62 J25 - J30	
28/09/15 06:47:26	SIG	M62/1999J2	40R	M62 J25 - J30	
28/09/15 06:48:19	SIG	M62/2159B1	NR	M62 J25 - J30	
28/09/15 06:48:19	SIG	M62/2159B2	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2170B1	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2170B2	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2170L1	OFF	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2170L2	OFF	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2177B1	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2177B2	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2177L1	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2177L2	NR	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2183B1	OFF	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2183L1	OFF	M62 J25 - J30	
28/09/15 06:48:20	SIG	M62/2183L2	OFF	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 06:48:29	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2012B1	REDX	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2025B1	REDX	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2033B2	50R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 06:48:35	SIG	M62/2033B4	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1987A1	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1987A3	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1987J1	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1992A1	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1992A2	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1992A3	50R	M62 J25 - J30	
28/09/15 06:50:01	SIG	M62/1992J1	50R	M62 J25 - J30	
28/09/15 06:51:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 06:51:03	SIG	M62/2033B3	???	M62 J25 - J30	
28/09/15 06:51:20	SIG	M62/2159B1	OFF	M62 J25 - J30	
28/09/15 06:51:20	SIG	M62/2159B2	OFF	M62 J25 - J30	
28/09/15 06:51:20	SIG	M62/2177L1	OFF	M62 J25 - J30	
28/09/15 06:51:21	SIG	M62/2170B1	OFF	M62 J25 - J30	
28/09/15 06:51:21	SIG	M62/2170B2	OFF	M62 J25 - J30	
28/09/15 06:51:21	SIG	M62/2177B1	OFF	M62 J25 - J30	
28/09/15 06:51:21	SIG	M62/2177B2	OFF	M62 J25 - J30	
28/09/15 06:51:21	SIG	M62/2177L2	OFF	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1987A1	40R	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1987A3	40R	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1987J1	40R	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1992A1	40R	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1992A2	40R	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1992A3	40R	M62 J25 - J30	
28/09/15 06:52:18	SIG	M62/1992J1	40R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1987A1	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1987A3	50R	M62 J25 - J30	
28/09/15 06:53:18	SIG	M62/1987J1	50R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1979K2	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1987A1	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1987A3	40R	M62 J25 - J30	
28/09/15 06:53:28	SIG	M62/1987J1	40R	M62 J25 - J30	
28/09/15 06:53:36	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 06:53:36	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 06:53:36	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 06:53:36	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2170B1	NR	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2170B2	NR	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 06:53:41	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 06:53:48	SIG	M62/2033B2	40R	M62 J25 - J30	
28/09/15 06:53:48	SIG	M62/2033B4	40R	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2033B2	40R	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2033B4	40R	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2041B1	REDX	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 06:53:53	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2057B1	REDX	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2057B2	NR	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2057B3	NR	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2057B4	NR	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2065M1	NR	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 06:54:30	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 06:54:30	SIG	M621/1002B1	HSD	M62 J25 - J30	
28/09/15 06:54:30	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 06:54:30	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 06:54:30	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2057B2	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2057B3	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2057B4	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2065B1	REDX	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 06:54:31	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1956A2	OFF	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1956A2	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 06:55:16	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1956A2	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1974A1	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1974A2	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1974A3	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1974A4	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1979K2	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 06:55:22	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 06:55:29	SIG	M62/1955K1	OFF	M62 J25 - J30	
28/09/15 06:55:30	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 06:55:35	SIG	M62/1955K1	40R	M62 J25 - J30	
28/09/15 06:55:39	SIG	M62/1956A3	OFF	M62 J25 - J30	
28/09/15 06:55:40	SIG	M62/1956A3	50R	M62 J25 - J30	
28/09/15 06:55:45	SIG	M62/1956A3	40R	M62 J25 - J30	
28/09/15 06:55:48	SIG	M62/1955K2	OFF	M62 J25 - J30	
28/09/15 06:55:49	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 06:55:50	SIG	M62/1956A1	OFF	M62 J25 - J30	
28/09/15 06:55:54	SIG	M62/1955K2	40R	M62 J25 - J30	
28/09/15 06:55:54	SIG	M62/1956A1	50R	M62 J25 - J30	
28/09/15 06:56:00	SIG	M62/1956A1	40R	M62 J25 - J30	
28/09/15 06:56:01	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 06:56:04	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 06:56:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 06:56:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 06:56:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 06:56:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 06:56:10	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 06:56:15	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 06:56:16	SIG	M62/2041B2	40R	M62 J25 - J30	
28/09/15 06:56:16	SIG	M62/2041B3	40R	M62 J25 - J30	
28/09/15 06:56:16	SIG	M62/2041B4	40R	M62 J25 - J30	
28/09/15 06:56:30	SIG	M62/2033B1	40R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2194B1	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2194B2	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2194B3	60R	M62 J25 - J30	
28/09/15 06:56:48	SIG	M62/2194B4	60R	M62 J25 - J30	
28/09/15 06:56:51	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 06:57:19	SIG	M62/2057B1	60R	M62 J25 - J30	
28/09/15 06:57:19	SIG	M621/1002B1	60R	M62 J25 - J30	
28/09/15 06:57:20	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 06:57:20	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 06:59:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 06:59:14	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 06:59:20	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 06:59:48	SIG	M62/2197B1	60R	M62 J25 - J30	
28/09/15 06:59:48	SIG	M62/2197B2	60R	M62 J25 - J30	
28/09/15 06:59:48	SIG	M62/2197B3	60R	M62 J25 - J30	
28/09/15 06:59:48	SIG	M62/2199M1	60R	M62 J25 - J30	
28/09/15 06:59:48	SIG	M62/2199M2	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 07:00:15	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 07:01:41	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 07:01:41	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 07:01:48	SIG	M62/2159B1	NR	M62 J25 - J30	
28/09/15 07:01:48	SIG	M62/2159B2	NR	M62 J25 - J30	
28/09/15 07:01:48	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 07:01:48	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 07:01:48	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 07:01:48	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 07:02:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:02:18	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:02:23	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 07:02:39	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2183B1	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2183L1	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2183L2	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2189B1	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2189B2	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2189B3	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2189B4	40R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2194B1	50R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2194B2	50R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2194B3	50R	M62 J25 - J30	
28/09/15 07:02:44	SIG	M62/2194B4	50R	M62 J25 - J30	
28/09/15 07:02:56	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 07:02:56	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 07:02:56	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 07:02:56	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 07:03:01	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 07:03:01	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 07:03:01	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 07:03:01	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 07:03:30	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 07:03:30	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 07:03:30	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 07:03:30	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 07:03:35	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 07:03:35	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 07:03:35	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 07:03:35	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M606/2003B1	50R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M62/1956A1	50R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M62/1956A2	50R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M62/1956A3	50R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 07:03:39	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 07:03:40	SIG	M62/1992B1	NR	M62 J25 - J30	
28/09/15 07:03:40	SIG	M62/1992B2	NR	M62 J25 - J30	
28/09/15 07:03:40	SIG	M62/1992B3	NR	M62 J25 - J30	
28/09/15 07:03:40	SIG	M62/1992B4	NR	M62 J25 - J30	
28/09/15 07:04:16	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 07:04:16	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 07:04:16	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 07:04:21	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 07:04:54	SIG	M62/1955K1	40R	M62 J25 - J30	
28/09/15 07:04:54	SIG	M62/1955K2	40R	M62 J25 - J30	
28/09/15 07:04:54	SIG	M62/1956A1	40R	M62 J25 - J30	
28/09/15 07:04:54	SIG	M62/1956A2	40R	M62 J25 - J30	
28/09/15 07:04:54	SIG	M62/1956A3	40R	M62 J25 - J30	
28/09/15 07:05:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:05:22	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:05:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:05:28	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:05:28	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:05:33	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:05:48	SIG	M62/2203B1	60R	M62 J25 - J30	
28/09/15 07:05:48	SIG	M62/2203B2	60R	M62 J25 - J30	
28/09/15 07:05:48	SIG	M62/2203B3	60R	M62 J25 - J30	
28/09/15 07:06:57	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 07:06:57	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 07:06:57	SIG	M62/1992B1	NR	M62 J25 - J30	
28/09/15 07:06:57	SIG	M62/1992B2	NR	M62 J25 - J30	
28/09/15 07:06:57	SIG	M62/1992B3	NR	M62 J25 - J30	
28/09/15 07:06:57	SIG	M62/1992B4	NR	M62 J25 - J30	
28/09/15 07:06:57	SIG	M62/2005M1	OFF	M62 J25 - J30	
28/09/15 07:06:57	SIG	M62/2005M2	OFF	M62 J25 - J30	
28/09/15 07:08:07	SIG	M62/2113B1	REDX	M62 J25 - J30	
28/09/15 07:08:07	SIG	M62/2113B2	NR	M62 J25 - J30	
28/09/15 07:08:07	SIG	M62/2113B3	NR	M62 J25 - J30	
28/09/15 07:08:07	SIG	M62/2113B4	NR	M62 J25 - J30	
28/09/15 07:08:07	SIG	M62/2120M1	60R	M62 J25 - J30	
28/09/15 07:08:07	SIG	M62/2120M2	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2088B1	REDX	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2088B2	NR	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2088B3	NR	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2088B4	NR	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2097B1	REDX	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2097B2	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2097B4	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2106B1	REDX	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2106B2	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2106B3	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2106B4	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2113B2	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2113B3	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2113B4	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2117B1	60R	M62 J25 - J30	
28/09/15 07:08:17	SIG	M62/2117B3	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2074B1	REDX	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2088B2	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2088B3	60R	M62 J25 - J30	
28/09/15 07:08:18	SIG	M62/2088B4	60R	M62 J25 - J30	
28/09/15 07:08:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:08:26	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:08:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:08:29	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:08:31	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:08:34	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:08:48	SIG	M62/2125B1	60R	M62 J25 - J30	
28/09/15 07:08:48	SIG	M62/2125B2	60R	M62 J25 - J30	
28/09/15 07:08:48	SIG	M62/2125B3	60R	M62 J25 - J30	
28/09/15 07:08:48	SIG	M62/2125L1	60R	M62 J25 - J30	
28/09/15 07:08:48	SIG	M62/2125L2	60R	M62 J25 - J30	
28/09/15 07:09:36	SIG	M62/2088B1	60R	M62 J25 - J30	
28/09/15 07:09:57	SIG	M62/1992B1	OFF	M62 J25 - J30	
28/09/15 07:09:58	SIG	M62/1992B2	OFF	M62 J25 - J30	
28/09/15 07:09:58	SIG	M62/1992B3	OFF	M62 J25 - J30	
28/09/15 07:09:58	SIG	M62/1992B4	OFF	M62 J25 - J30	
28/09/15 07:09:58	SIG	M62/2097B1	60R	M62 J25 - J30	
28/09/15 07:09:58	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 07:09:58	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 07:10:11	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 07:10:20	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 07:10:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 07:10:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 07:10:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 07:10:31	SIG	M62/2106B1	60R	M62 J25 - J30	
28/09/15 07:10:35	SIG	M62/2113B1	60R	M62 J25 - J30	
28/09/15 07:11:10	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 07:11:10	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 07:11:10	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 07:11:10	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 07:11:16	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 07:11:16	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 07:11:16	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 07:11:16	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 07:11:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:11:30	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:11:35	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:11:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:11:35	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:11:41	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:11:54	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 07:11:54	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 07:11:54	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 07:11:54	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 07:12:00	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 07:12:00	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 07:12:00	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 07:12:00	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 07:12:01	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2194B1	40R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2194B2	40R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2194B3	40R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2194B4	40R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2197B1	50R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2197B2	50R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2197B3	50R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2199M1	50R	M62 J25 - J30	
28/09/15 07:13:43	SIG	M62/2199M2	50R	M62 J25 - J30	
28/09/15 07:14:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:14:40	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:14:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:14:41	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:14:45	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:14:47	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2197B1	40R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2197B2	40R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2197B3	40R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2199M1	40R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2199M2	40R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2203B1	50R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2203B2	50R	M62 J25 - J30	
28/09/15 07:15:19	SIG	M62/2203B3	50R	M62 J25 - J30	
28/09/15 07:16:13	SIG	M62/2203B1	40R	M62 J25 - J30	
28/09/15 07:16:13	SIG	M62/2203B2	40R	M62 J25 - J30	
28/09/15 07:16:13	SIG	M62/2203B3	40R	M62 J25 - J30	
28/09/15 07:16:55	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 07:16:55	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 07:17:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:17:40	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 07:17:42	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 07:17:45	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:17:47	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:17:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:17:53	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1974A1	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1974A2	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1974A3	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1974A4	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1979K2	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 07:18:05	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 07:18:56	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 07:18:56	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 07:18:56	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 07:18:56	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 07:19:24	SIG	M62/1955K1	40R	M62 J25 - J30	
28/09/15 07:19:24	SIG	M62/1955K2	40R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 07:20:37	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 07:20:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:20:41	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:20:46	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2197B1	50R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2197B2	50R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2197B3	50R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2199M1	50R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2199M2	50R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2203B1	60R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2203B2	60R	M62 J25 - J30	
28/09/15 07:21:42	SIG	M62/2203B3	60R	M62 J25 - J30	
28/09/15 07:22:35	SIG	M62/2194B1	50R	M62 J25 - J30	
28/09/15 07:22:35	SIG	M62/2194B2	50R	M62 J25 - J30	
28/09/15 07:22:35	SIG	M62/2194B3	50R	M62 J25 - J30	
28/09/15 07:22:35	SIG	M62/2194B4	50R	M62 J25 - J30	
28/09/15 07:22:48	SIG	M62/2203B1	50R	M62 J25 - J30	
28/09/15 07:22:48	SIG	M62/2203B2	50R	M62 J25 - J30	
28/09/15 07:22:48	SIG	M62/2203B3	50R	M62 J25 - J30	
28/09/15 07:22:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:22:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:22:57	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 07:22:57	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 07:22:57	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 07:22:57	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 07:23:02	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 07:23:02	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 07:23:02	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 07:23:02	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 07:23:44	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:23:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:23:50	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:25:29	SIG	M62/2194B1	40R	M62 J25 - J30	
28/09/15 07:25:29	SIG	M62/2194B2	40R	M62 J25 - J30	
28/09/15 07:25:29	SIG	M62/2194B3	40R	M62 J25 - J30	
28/09/15 07:25:29	SIG	M62/2194B4	40R	M62 J25 - J30	
28/09/15 07:25:49	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 07:25:49	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:25:49	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 07:25:49	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 07:26:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:26:48	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:26:54	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:27:27	SIG	M62/2183B1	40R	M62 J25 - J30	
28/09/15 07:27:27	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:27:27	SIG	M62/2183L1	40R	M62 J25 - J30	
28/09/15 07:27:27	SIG	M62/2183L2	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2197B1	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2197B2	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2197B3	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2199M1	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2199M2	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2203B1	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2203B2	40R	M62 J25 - J30	
28/09/15 07:27:28	SIG	M62/2203B3	40R	M62 J25 - J30	
28/09/15 07:28:06	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 07:28:06	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 07:28:06	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 07:28:06	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 07:29:52	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:29:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:29:58	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:30:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:30:10	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:30:15	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 07:30:26	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 07:30:26	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 07:30:26	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 07:30:26	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 07:30:31	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 07:30:31	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 07:30:31	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 07:30:31	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2065A2	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2065A3	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2065A4	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2073K1	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2073K2	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2074A1	REDX	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2074A2	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2074A3	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2074A4	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A1	REDX	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A2	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A2	NR	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A3	NR	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A3	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A4	NR	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2079A4	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2088A1	REDX	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2088A2	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2088A3	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2088A4	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2097A1	REDX	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2097A2	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2097A3	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2097A4	60R	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2106A1	REDX	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2106A2	NR	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2106A3	NR	M62 J25 - J30	
28/09/15 07:30:50	SIG	M62/2106A4	NR	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2106A2	60R	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2106A3	60R	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2106A4	60R	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2114A1	60R	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2114A2	60R	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2114A3	60R	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2117A1	REDX	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2117A2	NR	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2117A3	NR	M62 J25 - J30	
28/09/15 07:30:51	SIG	M62/2117A4	NR	M62 J25 - J30	
28/09/15 07:31:27	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 07:31:27	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 07:31:27	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 07:31:27	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 07:32:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:32:56	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:33:02	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:33:25	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 07:33:26	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 07:33:26	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 07:33:27	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2194B1	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2194B2	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2194B3	50R	M62 J25 - J30	
28/09/15 07:33:34	SIG	M62/2194B4	50R	M62 J25 - J30	
28/09/15 07:34:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:34:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:34:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:34:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2197B1	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2197B2	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2197B3	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2199M1	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2199M2	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2203B1	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2203B2	50R	M62 J25 - J30	
28/09/15 07:34:55	SIG	M62/2203B3	50R	M62 J25 - J30	
28/09/15 07:35:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:36:00	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:36:05	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:37:57	SIG	M62/2057A1	50R	M62 J25 - J30	
28/09/15 07:37:57	SIG	M62/2057A2	50R	M62 J25 - J30	
28/09/15 07:37:57	SIG	M62/2057A3	50R	M62 J25 - J30	
28/09/15 07:37:57	SIG	M62/2057J1	50R	M62 J25 - J30	
28/09/15 07:37:57	SIG	M621/1002A1	50R	M62 J25 - J30	
28/09/15 07:37:57	SIG	M621/1002A2	50R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2050A1	50R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2050A2	50R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2050A3	50R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2050A4	50R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2057A1	40R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2057A2	40R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2057A3	40R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M62/2057J1	40R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M621/1002A1	40R	M62 J25 - J30	
28/09/15 07:38:02	SIG	M621/1002A2	40R	M62 J25 - J30	
28/09/15 07:39:03	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:39:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:39:09	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:39:42	SIG	M62/2050A1	40R	M62 J25 - J30	
28/09/15 07:39:42	SIG	M62/2050A2	40R	M62 J25 - J30	
28/09/15 07:39:42	SIG	M62/2050A3	40R	M62 J25 - J30	
28/09/15 07:39:42	SIG	M62/2050A4	40R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2194B1	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2194B2	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2194B3	60R	M62 J25 - J30	
28/09/15 07:41:50	SIG	M62/2194B4	60R	M62 J25 - J30	
28/09/15 07:42:07	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:42:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:42:13	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:42:33	SIG	M62/2041A1	50R	M62 J25 - J30	
28/09/15 07:42:33	SIG	M62/2041A2	50R	M62 J25 - J30	
28/09/15 07:42:33	SIG	M62/2041A3	50R	M62 J25 - J30	
28/09/15 07:42:33	SIG	M62/2041A4	50R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2033A1	50R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2033A2	50R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2033A3	50R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2033A4	50R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2041A1	40R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2041A2	40R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2041A3	40R	M62 J25 - J30	
28/09/15 07:42:39	SIG	M62/2041A4	40R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2132B1	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2132B2	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2132B3	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2137B1	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2137B2	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2137B3	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2137B4	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2147B1	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2147B2	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2147B3	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2147B4	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2159B1	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2159B2	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2159M1	60R	M62 J25 - J30	
28/09/15 07:43:49	SIG	M62/2159M2	60R	M62 J25 - J30	
28/09/15 07:44:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:44:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 07:44:43	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 07:44:43	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 07:44:43	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 07:44:43	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2197B1	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2197B2	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2197B3	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2199M1	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2199M2	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2203B1	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2203B2	60R	M62 J25 - J30	
28/09/15 07:44:49	SIG	M62/2203B3	60R	M62 J25 - J30	
28/09/15 07:45:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:45:11	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:45:16	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:45:19	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 07:45:19	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 07:45:19	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 07:45:19	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2025A1	50R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2025A2	50R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2025A3	50R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2025A4	50R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2033A1	40R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2033A2	40R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2033A3	40R	M62 J25 - J30	
28/09/15 07:45:45	SIG	M62/2033A4	40R	M62 J25 - J30	
28/09/15 07:48:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:48:14	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:48:20	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:49:09	SIG	M62/2041B1	30R	M62 J25 - J30	
28/09/15 07:49:14	SIG	M62/2041B1	20R	M62 J25 - J30	
28/09/15 07:49:14	SIG	M62/2057B1	LDR	M62 J25 - J30	
28/09/15 07:49:19	SIG	M62/2041B1	STOP	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2018A1	50R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2018A2	50R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2018A3	50R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2018A4	50R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2025A1	40R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2025A2	40R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2025A3	40R	M62 J25 - J30	
28/09/15 07:51:15	SIG	M62/2025A4	40R	M62 J25 - J30	
28/09/15 07:51:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:51:19	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 07:51:19	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2018A1	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2018A2	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2018A3	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2018A4	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2025A1	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2025A2	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2025A3	40R	M62 J25 - J30	
28/09/15 07:51:20	SIG	M62/2025A4	40R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M621/1002B1	40R	M62 J25 - J30	
28/09/15 07:51:21	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M621/1002B1	40R	M62 J25 - J30	
28/09/15 07:51:26	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 07:54:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:54:22	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:54:27	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 07:54:46	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 07:54:52	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 07:56:34	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 07:56:34	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 07:56:39	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 07:56:39	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 07:57:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 07:57:26	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 07:57:31	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:00:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:00:30	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:00:35	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2081B1	40R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2081B2	40R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2081B3	40R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2081L1	40R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 08:01:03	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 08:02:44	SIG	M62/2088B1	40R	M62 J25 - J30	
28/09/15 08:02:44	SIG	M62/2088B2	40R	M62 J25 - J30	
28/09/15 08:02:44	SIG	M62/2088B3	40R	M62 J25 - J30	
28/09/15 08:02:44	SIG	M62/2088B4	40R	M62 J25 - J30	
28/09/15 08:03:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:03:40	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:03:46	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:04:52	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2183B1	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2183L1	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2183L2	40R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 08:04:58	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 08:05:10	SIG	M62/2097B1	50R	M62 J25 - J30	
28/09/15 08:05:10	SIG	M62/2097B2	50R	M62 J25 - J30	
28/09/15 08:05:10	SIG	M62/2097B3	50R	M62 J25 - J30	
28/09/15 08:05:10	SIG	M62/2097B4	50R	M62 J25 - J30	
28/09/15 08:05:31	SIG	M62/2097B1	40R	M62 J25 - J30	
28/09/15 08:05:31	SIG	M62/2097B2	40R	M62 J25 - J30	
28/09/15 08:05:31	SIG	M62/2097B4	40R	M62 J25 - J30	
28/09/15 08:06:39	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:06:40	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:06:46	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:07:10	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 08:07:10	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 08:07:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:07:26	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:07:32	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:08:35	SIG	M62/1955K1	40R	M62 J25 - J30	
28/09/15 08:08:35	SIG	M62/1955K2	40R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 08:08:53	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 08:09:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:09:41	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:09:46	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2097B1	50R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2097B2	50R	M62 J25 - J30	
28/09/15 08:10:30	SIG	M62/2097B4	50R	M62 J25 - J30	
28/09/15 08:11:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:11:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:11:56	SIG	M62/2088B1	40R	M62 J25 - J30	
28/09/15 08:11:56	SIG	M62/2088B2	40R	M62 J25 - J30	
28/09/15 08:11:56	SIG	M62/2088B3	40R	M62 J25 - J30	
28/09/15 08:11:56	SIG	M62/2088B4	40R	M62 J25 - J30	
28/09/15 08:12:15	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 08:12:15	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 08:12:15	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 08:12:15	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:12:20	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:12:24	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 08:12:24	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 08:12:24	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:12:24	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:12:30	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 08:12:30	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 08:12:30	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:12:30	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:12:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:12:44	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:12:50	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2183B1	40R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2183L1	40R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2183L2	40R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 08:13:15	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 08:13:50	SIG	M62/2106B1	50R	M62 J25 - J30	
28/09/15 08:13:50	SIG	M62/2106B2	50R	M62 J25 - J30	
28/09/15 08:13:50	SIG	M62/2106B3	50R	M62 J25 - J30	
28/09/15 08:13:50	SIG	M62/2106B4	50R	M62 J25 - J30	
28/09/15 08:15:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:15:36	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:15:41	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:15:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:15:48	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:15:53	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 08:17:59	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 08:18:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:18:41	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:18:46	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:18:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:18:52	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:18:57	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 08:21:30	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 08:21:42	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 08:21:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:21:55	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:22:01	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:23:50	SIG	M62/2106B1	60R	M62 J25 - J30	
28/09/15 08:23:50	SIG	M62/2106B2	60R	M62 J25 - J30	
28/09/15 08:23:50	SIG	M62/2106B3	60R	M62 J25 - J30	
28/09/15 08:23:50	SIG	M62/2106B4	60R	M62 J25 - J30	
28/09/15 08:23:50	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:23:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:24:30	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 08:24:30	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 08:24:30	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 08:24:30	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 08:24:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:24:59	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:25:04	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:25:59	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 08:25:59	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 08:25:59	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 08:25:59	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 08:26:38	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:26:44	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2088B1	60R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2088B2	60R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2088B3	60R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2088B4	60R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2097B1	60R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2097B2	60R	M62 J25 - J30	
28/09/15 08:26:59	SIG	M62/2097B4	60R	M62 J25 - J30	
28/09/15 08:28:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:28:03	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:28:08	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2183B1	40R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2183L1	40R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2183L2	40R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 08:28:57	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2081B1	40R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2081B2	40R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2081B3	40R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2081L1	40R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 08:30:36	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 08:30:37	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 08:30:37	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 08:30:37	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 08:30:37	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 08:31:03	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:31:04	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:31:06	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:31:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:31:07	SIG	M62/2137B4	OFF	M62 J25 - J30	
28/09/15 08:31:08	SIG	M62/2137B4	60R	M62 J25 - J30	
28/09/15 08:31:09	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:31:12	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:33:01	SIG	M62/2088B1	40R	M62 J25 - J30	
28/09/15 08:33:01	SIG	M62/2088B2	40R	M62 J25 - J30	
28/09/15 08:33:01	SIG	M62/2088B3	40R	M62 J25 - J30	
28/09/15 08:33:01	SIG	M62/2088B4	40R	M62 J25 - J30	
28/09/15 08:34:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:34:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:34:09	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:34:10	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:34:15	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:34:16	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:34:31	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 08:34:31	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 08:34:31	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:34:31	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:34:36	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 08:34:36	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 08:34:36	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:34:36	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 08:34:39	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 08:35:00	SIG	M62/2097B1	50R	M62 J25 - J30	
28/09/15 08:35:00	SIG	M62/2097B2	50R	M62 J25 - J30	
28/09/15 08:35:00	SIG	M62/2097B4	50R	M62 J25 - J30	
28/09/15 08:35:42	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 08:35:42	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 08:35:43	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 08:35:43	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2183B1	40R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2183L1	40R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2183L2	40R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 08:36:39	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 08:37:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:37:14	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:37:19	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:38:31	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 08:38:31	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 08:38:31	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 08:38:31	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 08:38:50	SIG	M62/2106B1	50R	M62 J25 - J30	
28/09/15 08:38:50	SIG	M62/2106B2	50R	M62 J25 - J30	
28/09/15 08:38:50	SIG	M62/2106B3	50R	M62 J25 - J30	
28/09/15 08:38:50	SIG	M62/2106B4	50R	M62 J25 - J30	
28/09/15 08:38:54	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 08:38:54	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 08:38:54	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 08:38:54	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 08:39:16	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 08:39:16	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 08:39:16	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:39:16	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:39:21	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 08:39:21	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 08:39:21	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:39:21	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:39:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:39:26	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:39:31	SIG	M62/2183B2	40R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 08:39:38	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 08:40:04	SIG	M621/1002A1	OFF	M62 J25 - J30	
28/09/15 08:40:04	SIG	M621/1002A2	OFF	M62 J25 - J30	
28/09/15 08:40:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:40:18	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 08:40:23	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 08:40:24	SIG	M62/2057A1	60R	M62 J25 - J30	
28/09/15 08:40:24	SIG	M62/2057A2	60R	M62 J25 - J30	
28/09/15 08:40:24	SIG	M62/2057A3	60R	M62 J25 - J30	
28/09/15 08:40:24	SIG	M62/2057J1	60R	M62 J25 - J30	
28/09/15 08:40:27	SIG	M62/2057A1	50R	M62 J25 - J30	
28/09/15 08:40:27	SIG	M62/2057A2	50R	M62 J25 - J30	
28/09/15 08:40:27	SIG	M62/2057A3	50R	M62 J25 - J30	
28/09/15 08:40:27	SIG	M62/2057J1	50R	M62 J25 - J30	
28/09/15 08:40:32	SIG	M62/2057A1	40R	M62 J25 - J30	
28/09/15 08:40:32	SIG	M62/2057A2	40R	M62 J25 - J30	
28/09/15 08:40:32	SIG	M62/2057A3	40R	M62 J25 - J30	
28/09/15 08:40:32	SIG	M62/2057J1	40R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 08:40:38	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2132B1	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2132B2	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2132B3	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2137B1	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2137B2	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2137B3	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2137B4	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2147B1	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2147B2	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2147B3	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2147B4	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2159B1	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2159B2	NR	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2159M1	OFF	M62 J25 - J30	
28/09/15 08:40:50	SIG	M62/2159M2	OFF	M62 J25 - J30	
28/09/15 08:43:15	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 08:43:15	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 08:43:15	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 08:43:15	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 08:43:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:43:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 08:43:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:43:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:43:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:43:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:43:50	SIG	M62/2137B1	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2132B1	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2132B2	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2132B3	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2137B2	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2137B3	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2137B4	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2147B1	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2147B2	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2147B3	OFF	M62 J25 - J30	
28/09/15 08:43:51	SIG	M62/2147B4	OFF	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 08:43:58	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 08:44:50	SIG	M62/2106B1	60R	M62 J25 - J30	
28/09/15 08:44:50	SIG	M62/2106B2	60R	M62 J25 - J30	
28/09/15 08:44:50	SIG	M62/2106B3	60R	M62 J25 - J30	
28/09/15 08:44:50	SIG	M62/2106B4	60R	M62 J25 - J30	
28/09/15 08:44:53	SIG	M621/1002A1	50R	M62 J25 - J30	
28/09/15 08:44:53	SIG	M621/1002A2	50R	M62 J25 - J30	
28/09/15 08:44:58	SIG	M621/1002A1	40R	M62 J25 - J30	
28/09/15 08:44:58	SIG	M621/1002A2	40R	M62 J25 - J30	
28/09/15 08:46:33	SIG	M62/2081B1	40R	M62 J25 - J30	
28/09/15 08:46:33	SIG	M62/2081B2	40R	M62 J25 - J30	
28/09/15 08:46:33	SIG	M62/2081B3	40R	M62 J25 - J30	
28/09/15 08:46:33	SIG	M62/2081L1	40R	M62 J25 - J30	
28/09/15 08:46:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:46:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2170B1	50R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2170B2	50R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2177B1	50R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2177B2	50R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2177L1	50R	M62 J25 - J30	
28/09/15 08:48:17	SIG	M62/2177L2	50R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2170B1	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2170B2	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2170L1	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2170L2	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2177B1	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2177B2	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2177L1	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2177L2	40R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2183B1	50R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2183B2	50R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2183L1	50R	M62 J25 - J30	
28/09/15 08:48:23	SIG	M62/2183L2	50R	M62 J25 - J30	
28/09/15 08:48:52	SIG	M621/1002A1	OFF	M62 J25 - J30	
28/09/15 08:48:52	SIG	M621/1002A2	OFF	M62 J25 - J30	
28/09/15 08:50:33	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 08:50:33	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 08:50:33	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 08:50:33	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 08:50:39	SIG	M621/1002A1	50R	M62 J25 - J30	
28/09/15 08:50:39	SIG	M621/1002A2	50R	M62 J25 - J30	
28/09/15 08:50:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:50:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:50:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:50:43	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:50:45	SIG	M621/1002A1	40R	M62 J25 - J30	
28/09/15 08:50:45	SIG	M621/1002A2	40R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2033A1	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2033A2	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2033A3	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2033A4	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2041A1	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2041A2	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2041A3	50R	M62 J25 - J30	
28/09/15 08:51:58	SIG	M62/2041A4	50R	M62 J25 - J30	
28/09/15 08:52:16	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 08:52:16	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 08:52:16	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 08:52:16	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 08:52:18	SIG	M62/2050A1	50R	M62 J25 - J30	
28/09/15 08:52:18	SIG	M62/2050A2	50R	M62 J25 - J30	
28/09/15 08:52:18	SIG	M62/2050A3	50R	M62 J25 - J30	
28/09/15 08:52:18	SIG	M62/2050A4	50R	M62 J25 - J30	
28/09/15 08:52:27	SIG	M62/2050A1	40R	M62 J25 - J30	
28/09/15 08:52:27	SIG	M62/2050A2	40R	M62 J25 - J30	
28/09/15 08:52:27	SIG	M62/2050A3	40R	M62 J25 - J30	
28/09/15 08:52:27	SIG	M62/2050A4	40R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 08:52:58	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 08:53:07	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 08:53:07	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 08:53:07	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 08:53:07	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 08:53:24	SIG	M62/2025A1	50R	M62 J25 - J30	
28/09/15 08:53:24	SIG	M62/2025A2	50R	M62 J25 - J30	
28/09/15 08:53:24	SIG	M62/2025A3	50R	M62 J25 - J30	
28/09/15 08:53:24	SIG	M62/2025A4	50R	M62 J25 - J30	
28/09/15 08:54:57	SIG	M62/2041A1	40R	M62 J25 - J30	
28/09/15 08:54:57	SIG	M62/2041A2	40R	M62 J25 - J30	
28/09/15 08:54:57	SIG	M62/2041A3	40R	M62 J25 - J30	
28/09/15 08:54:57	SIG	M62/2041A4	40R	M62 J25 - J30	
28/09/15 08:55:18	SIG	M621/1002A1	OFF	M62 J25 - J30	
28/09/15 08:55:18	SIG	M621/1002A2	OFF	M62 J25 - J30	
28/09/15 08:55:39	SIG	M62/2018A1	50R	M62 J25 - J30	
28/09/15 08:55:39	SIG	M62/2018A2	50R	M62 J25 - J30	
28/09/15 08:55:39	SIG	M62/2018A3	50R	M62 J25 - J30	
28/09/15 08:55:39	SIG	M62/2018A4	50R	M62 J25 - J30	
28/09/15 08:55:50	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 08:55:50	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 08:55:50	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 08:55:50	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 08:55:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:55:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 08:55:55	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 08:55:55	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 08:55:55	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 08:55:55	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2088B1	60R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2088B2	60R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2088B3	60R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2088B4	60R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2097B1	60R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2097B2	60R	M62 J25 - J30	
28/09/15 08:56:00	SIG	M62/2097B4	60R	M62 J25 - J30	
28/09/15 08:56:27	SIG	M62/2057A1	60R	M62 J25 - J30	
28/09/15 08:56:27	SIG	M62/2057A2	60R	M62 J25 - J30	
28/09/15 08:56:27	SIG	M62/2057A3	60R	M62 J25 - J30	
28/09/15 08:56:27	SIG	M62/2057J1	60R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2081B1	40R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2081B2	40R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2081B3	40R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2081L1	40R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 08:57:46	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 08:58:41	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 08:58:41	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 08:58:41	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 08:58:41	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 08:58:58	SIG	M62/2050A1	50R	M62 J25 - J30	
28/09/15 08:58:58	SIG	M62/2050A2	50R	M62 J25 - J30	
28/09/15 08:58:58	SIG	M62/2050A3	50R	M62 J25 - J30	
28/09/15 08:58:58	SIG	M62/2050A4	50R	M62 J25 - J30	
28/09/15 08:59:38	SIG	M62/2033A1	40R	M62 J25 - J30	
28/09/15 08:59:38	SIG	M62/2033A2	40R	M62 J25 - J30	
28/09/15 08:59:38	SIG	M62/2033A3	40R	M62 J25 - J30	
28/09/15 08:59:38	SIG	M62/2033A4	40R	M62 J25 - J30	
28/09/15 09:00:06	SIG	M62/2088B1	40R	M62 J25 - J30	
28/09/15 09:00:06	SIG	M62/2088B2	40R	M62 J25 - J30	
28/09/15 09:00:06	SIG	M62/2088B3	40R	M62 J25 - J30	
28/09/15 09:00:06	SIG	M62/2088B4	40R	M62 J25 - J30	
28/09/15 09:00:44	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 09:00:44	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 09:00:44	SIG	M62/2012A1	50R	M62 J25 - J30	
28/09/15 09:00:44	SIG	M62/2012A2	50R	M62 J25 - J30	
28/09/15 09:00:44	SIG	M62/2012A3	50R	M62 J25 - J30	
28/09/15 09:01:42	SIG	M62/2025A1	40R	M62 J25 - J30	
28/09/15 09:01:42	SIG	M62/2025A2	40R	M62 J25 - J30	
28/09/15 09:01:42	SIG	M62/2025A3	40R	M62 J25 - J30	
28/09/15 09:01:42	SIG	M62/2025A4	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2008K1	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2008K2	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2012A1	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2012A2	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2012A3	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2018A1	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2018A2	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2018A3	40R	M62 J25 - J30	
28/09/15 09:01:43	SIG	M62/2018A4	40R	M62 J25 - J30	
28/09/15 09:02:00	SIG	M62/2097B1	50R	M62 J25 - J30	
28/09/15 09:02:00	SIG	M62/2097B2	50R	M62 J25 - J30	
28/09/15 09:02:00	SIG	M62/2097B4	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 09:02:23	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 09:02:32	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 09:02:32	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 09:02:32	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 09:02:32	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 09:03:02	SIG	M62/2097B1	40R	M62 J25 - J30	
28/09/15 09:03:02	SIG	M62/2097B2	40R	M62 J25 - J30	
28/09/15 09:03:02	SIG	M62/2097B4	40R	M62 J25 - J30	
28/09/15 09:03:11	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 09:03:11	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2041A1	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2041A2	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2041A3	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2041A4	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 09:03:44	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 09:04:13	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 09:04:13	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 09:04:13	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 09:04:13	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 09:05:02	SIG	M62/2057A1	50R	M62 J25 - J30	
28/09/15 09:05:02	SIG	M62/2057A2	50R	M62 J25 - J30	
28/09/15 09:05:02	SIG	M62/2057A3	50R	M62 J25 - J30	
28/09/15 09:05:02	SIG	M62/2057J1	50R	M62 J25 - J30	
28/09/15 09:05:02	SIG	M621/1002A1	50R	M62 J25 - J30	
28/09/15 09:05:02	SIG	M621/1002A2	50R	M62 J25 - J30	
28/09/15 09:05:08	SIG	M62/2057A1	40R	M62 J25 - J30	
28/09/15 09:05:08	SIG	M62/2057A2	40R	M62 J25 - J30	
28/09/15 09:05:08	SIG	M62/2057A3	40R	M62 J25 - J30	
28/09/15 09:05:08	SIG	M62/2057J1	40R	M62 J25 - J30	
28/09/15 09:05:08	SIG	M621/1002A1	40R	M62 J25 - J30	
28/09/15 09:05:08	SIG	M621/1002A2	40R	M62 J25 - J30	
28/09/15 09:05:17	SIG	M62/1956A1	50R	M62 J25 - J30	
28/09/15 09:05:17	SIG	M62/1956A2	50R	M62 J25 - J30	
28/09/15 09:05:17	SIG	M62/1956A3	50R	M62 J25 - J30	
28/09/15 09:05:34	SIG	M62/1960A1	50R	M62 J25 - J30	
28/09/15 09:05:34	SIG	M62/1960A2	50R	M62 J25 - J30	
28/09/15 09:05:34	SIG	M62/1960A3	50R	M62 J25 - J30	
28/09/15 09:05:34	SIG	M62/1960K1	50R	M62 J25 - J30	
28/09/15 09:05:34	SIG	M62/1960K2	50R	M62 J25 - J30	
28/09/15 09:05:42	SIG	M62/2033A1	50R	M62 J25 - J30	
28/09/15 09:05:42	SIG	M62/2033A2	50R	M62 J25 - J30	
28/09/15 09:05:42	SIG	M62/2033A3	50R	M62 J25 - J30	
28/09/15 09:05:42	SIG	M62/2033A4	50R	M62 J25 - J30	
28/09/15 09:06:20	SIG	M62/2106B1	50R	M62 J25 - J30	
28/09/15 09:06:20	SIG	M62/2106B2	50R	M62 J25 - J30	
28/09/15 09:06:20	SIG	M62/2106B3	50R	M62 J25 - J30	
28/09/15 09:06:20	SIG	M62/2106B4	50R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2106B1	40R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2106B2	40R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2106B3	40R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2106B4	40R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2113B1	50R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2113B2	50R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2113B3	50R	M62 J25 - J30	
28/09/15 09:06:26	SIG	M62/2113B4	50R	M62 J25 - J30	
28/09/15 09:06:50	SIG	M62/1960A1	40R	M62 J25 - J30	
28/09/15 09:06:50	SIG	M62/1960A2	40R	M62 J25 - J30	
28/09/15 09:06:50	SIG	M62/1960A3	40R	M62 J25 - J30	
28/09/15 09:06:50	SIG	M62/1960K1	40R	M62 J25 - J30	
28/09/15 09:06:50	SIG	M62/1960K2	40R	M62 J25 - J30	
28/09/15 09:06:52	SIG	M62/2088B1	50R	M62 J25 - J30	
28/09/15 09:06:52	SIG	M62/2088B2	50R	M62 J25 - J30	
28/09/15 09:06:52	SIG	M62/2088B3	50R	M62 J25 - J30	
28/09/15 09:06:52	SIG	M62/2088B4	50R	M62 J25 - J30	
28/09/15 09:06:55	SIG	M62/2025A1	50R	M62 J25 - J30	
28/09/15 09:06:55	SIG	M62/2025A2	50R	M62 J25 - J30	
28/09/15 09:06:55	SIG	M62/2025A3	50R	M62 J25 - J30	
28/09/15 09:06:55	SIG	M62/2025A4	50R	M62 J25 - J30	
28/09/15 09:07:14	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 09:07:14	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 09:07:14	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 09:07:14	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1987A1	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1987A3	50R	M62 J25 - J30	
28/09/15 09:08:37	SIG	M62/1987J1	50R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2088B1	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2088B2	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2088B3	60R	M62 J25 - J30	
28/09/15 09:08:50	SIG	M62/2088B4	60R	M62 J25 - J30	
28/09/15 09:09:03	SIG	M62/2057A1	60R	M62 J25 - J30	
28/09/15 09:09:03	SIG	M62/2057A2	60R	M62 J25 - J30	
28/09/15 09:09:03	SIG	M62/2057A3	60R	M62 J25 - J30	
28/09/15 09:09:03	SIG	M62/2057J1	60R	M62 J25 - J30	
28/09/15 09:09:03	SIG	M621/1002A1	OFF	M62 J25 - J30	
28/09/15 09:09:03	SIG	M621/1002A2	OFF	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2012A1	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2012A2	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2012A3	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2018A1	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2018A2	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2018A3	50R	M62 J25 - J30	
28/09/15 09:09:32	SIG	M62/2018A4	50R	M62 J25 - J30	
28/09/15 09:09:33	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 09:09:33	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 09:09:33	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 09:09:33	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 09:09:37	SIG	M62/1955K1	40R	M62 J25 - J30	
28/09/15 09:09:37	SIG	M62/1955K2	40R	M62 J25 - J30	
28/09/15 09:09:37	SIG	M62/1956A1	40R	M62 J25 - J30	
28/09/15 09:09:37	SIG	M62/1956A2	40R	M62 J25 - J30	
28/09/15 09:09:37	SIG	M62/1956A3	40R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M62/2050A1	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M62/2050A2	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M62/2050A3	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M62/2050A4	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 09:09:51	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 09:10:30	SIG	M62/2097B1	60R	M62 J25 - J30	
28/09/15 09:10:30	SIG	M62/2097B2	60R	M62 J25 - J30	
28/09/15 09:10:30	SIG	M62/2097B4	60R	M62 J25 - J30	
28/09/15 09:10:35	SIG	M62/1987A1	40R	M62 J25 - J30	
28/09/15 09:10:35	SIG	M62/1987A3	40R	M62 J25 - J30	
28/09/15 09:10:35	SIG	M62/1987J1	40R	M62 J25 - J30	
28/09/15 09:10:50	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 09:10:50	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 09:10:50	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 09:11:14	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 09:11:14	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 09:11:14	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 09:11:14	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2106B1	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2106B2	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2106B3	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2106B4	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2113B1	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2113B2	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2113B3	60R	M62 J25 - J30	
28/09/15 09:11:26	SIG	M62/2113B4	60R	M62 J25 - J30	
28/09/15 09:11:42	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 09:11:42	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 09:11:42	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 09:11:42	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1974A1	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1974A2	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1974A3	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1974A4	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1979K2	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 09:11:51	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1968A1	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1968A2	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1968A3	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1968A4	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 09:12:05	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 09:12:07	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 09:12:07	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 09:12:07	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 09:12:07	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1968A1	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1968A2	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1968A3	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1968A4	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1974A1	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1974A2	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1974A3	40R	M62 J25 - J30	
28/09/15 09:12:50	SIG	M62/1974A4	40R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2025A1	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2025A2	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2025A3	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2025A4	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2033A1	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2033A2	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2033A3	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2033A4	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2041A1	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2041A2	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2041A3	60R	M62 J25 - J30	
28/09/15 09:12:51	SIG	M62/2041A4	60R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1955K1	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1955K2	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1960A1	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1960A2	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1960A3	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1960K1	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1960K2	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1968A1	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1968A2	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1968A3	50R	M62 J25 - J30	
28/09/15 09:13:41	SIG	M62/1968A4	50R	M62 J25 - J30	
28/09/15 09:14:34	SIG	M62/2004A1	50R	M62 J25 - J30	
28/09/15 09:14:34	SIG	M62/2004A2	50R	M62 J25 - J30	
28/09/15 09:14:34	SIG	M62/2004A3	50R	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2018A1	60R	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2018A2	60R	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2018A3	60R	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2018A4	60R	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2197B1	NR	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2197B2	NR	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2197B3	NR	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2199M1	OFF	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2199M2	OFF	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2203B1	OFF	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2203B2	OFF	M62 J25 - J30	
28/09/15 09:14:51	SIG	M62/2203B3	OFF	M62 J25 - J30	
28/09/15 09:15:23	SIG	M62/1956A1	50R	M62 J25 - J30	
28/09/15 09:15:23	SIG	M62/1956A2	50R	M62 J25 - J30	
28/09/15 09:15:23	SIG	M62/1956A3	50R	M62 J25 - J30	
28/09/15 09:15:46	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 09:15:46	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 09:15:46	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 09:15:46	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 09:15:52	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/1999A1	50R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/1999A2	50R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/1999A3	50R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/1999J1	50R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/1999J2	50R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 09:15:58	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 09:16:07	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 09:16:07	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 09:16:07	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 09:16:07	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 09:17:05	SIG	M62/1992A1	50R	M62 J25 - J30	
28/09/15 09:17:05	SIG	M62/1992A2	50R	M62 J25 - J30	
28/09/15 09:17:05	SIG	M62/1992A3	50R	M62 J25 - J30	
28/09/15 09:17:05	SIG	M62/1992J1	50R	M62 J25 - J30	
28/09/15 09:17:37	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 09:17:37	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 09:17:37	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 09:17:51	SIG	M62/2197B1	OFF	M62 J25 - J30	
28/09/15 09:17:52	SIG	M62/2197B2	OFF	M62 J25 - J30	
28/09/15 09:17:52	SIG	M62/2197B3	OFF	M62 J25 - J30	
28/09/15 09:18:36	SIG	M62/1987A1	50R	M62 J25 - J30	
28/09/15 09:18:36	SIG	M62/1987A3	50R	M62 J25 - J30	
28/09/15 09:18:36	SIG	M62/1987J1	50R	M62 J25 - J30	
28/09/15 09:19:02	SIG	M62/1968A1	40R	M62 J25 - J30	
28/09/15 09:19:02	SIG	M62/1968A2	40R	M62 J25 - J30	
28/09/15 09:19:02	SIG	M62/1968A3	40R	M62 J25 - J30	
28/09/15 09:19:02	SIG	M62/1968A4	40R	M62 J25 - J30	
28/09/15 09:19:50	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 09:19:50	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 09:19:50	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 09:19:50	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 09:20:07	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 09:20:07	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 09:20:07	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 09:20:07	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 09:20:07	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 09:20:07	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2189B1	NR	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2189B2	NR	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2189B3	NR	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2189B4	NR	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2194B1	OFF	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2194B2	OFF	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2194B3	OFF	M62 J25 - J30	
28/09/15 09:20:51	SIG	M62/2194B4	OFF	M62 J25 - J30	
28/09/15 09:21:26	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 09:21:26	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 09:21:26	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 09:21:26	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 09:21:42	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 09:21:42	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 09:21:42	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2159B1	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2159B2	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2170B1	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2170B2	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2170L1	OFF	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2170L2	OFF	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2177B1	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2177B2	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2177L1	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2177L2	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2183B1	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2183B2	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2183L1	NR	M62 J25 - J30	
28/09/15 09:21:51	SIG	M62/2183L2	NR	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1968A1	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1968A2	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1968A3	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1968A4	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 09:23:03	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 09:23:51	SIG	M62/2189B1	OFF	M62 J25 - J30	
28/09/15 09:23:52	SIG	M62/2189B2	OFF	M62 J25 - J30	
28/09/15 09:23:52	SIG	M62/2189B3	OFF	M62 J25 - J30	
28/09/15 09:23:52	SIG	M62/2189B4	OFF	M62 J25 - J30	
28/09/15 09:24:21	SIG	M62/2033B1	50R	M62 J25 - J30	
28/09/15 09:24:21	SIG	M62/2033B2	50R	M62 J25 - J30	
28/09/15 09:24:21	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 09:24:21	SIG	M62/2033B4	50R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2033B1	40R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2033B2	40R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 09:24:24	SIG	M62/2033B4	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2033B1	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2033B2	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 09:24:29	SIG	M62/2033B4	40R	M62 J25 - J30	
28/09/15 09:24:51	SIG	M62/2159B1	OFF	M62 J25 - J30	
28/09/15 09:24:51	SIG	M62/2159B2	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2170B1	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2170B2	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2177B1	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2177B2	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2177L1	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2177L2	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2183B1	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2183L1	OFF	M62 J25 - J30	
28/09/15 09:24:52	SIG	M62/2183L2	OFF	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2041B1	50R	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 09:25:43	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 09:25:51	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 09:25:51	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 09:25:51	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 09:25:51	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 09:25:51	SIG	M621/1002B1	60R	M62 J25 - J30	
28/09/15 09:25:51	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 09:27:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:27:16	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 09:27:21	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1974A1	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1974A2	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1974A3	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1974A4	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1979K1	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1979K2	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1981A1	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1981A2	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1981A3	60R	M62 J25 - J30	
28/09/15 09:27:52	SIG	M62/1981A4	60R	M62 J25 - J30	
28/09/15 09:28:35	SIG	M62/2004A1	40R	M62 J25 - J30	
28/09/15 09:28:35	SIG	M62/2004A2	40R	M62 J25 - J30	
28/09/15 09:28:35	SIG	M62/2004A3	40R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1955K1	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1955K2	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1956A1	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1956A2	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1956A3	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1960A1	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1960A2	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1960A3	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1960K1	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1960K2	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1968A1	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1968A2	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1968A3	60R	M62 J25 - J30	
28/09/15 09:28:51	SIG	M62/1968A4	60R	M62 J25 - J30	
28/09/15 09:29:17	SIG	M62/1999A1	40R	M62 J25 - J30	
28/09/15 09:29:17	SIG	M62/1999A2	40R	M62 J25 - J30	
28/09/15 09:29:17	SIG	M62/1999A3	40R	M62 J25 - J30	
28/09/15 09:29:17	SIG	M62/1999J1	40R	M62 J25 - J30	
28/09/15 09:29:17	SIG	M62/1999J2	40R	M62 J25 - J30	
28/09/15 09:29:40	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 09:29:40	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 09:29:40	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 09:29:40	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 09:30:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:30:20	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 09:30:25	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 09:31:51	SIG	M62/2057B1	60R	M62 J25 - J30	
28/09/15 09:31:51	SIG	M62/2057B2	60R	M62 J25 - J30	
28/09/15 09:31:51	SIG	M62/2057B3	60R	M62 J25 - J30	
28/09/15 09:31:51	SIG	M62/2057B4	60R	M62 J25 - J30	
28/09/15 09:32:16	SIG	M62/2033B1	50R	M62 J25 - J30	
28/09/15 09:32:16	SIG	M62/2033B2	50R	M62 J25 - J30	
28/09/15 09:32:16	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 09:32:16	SIG	M62/2033B4	50R	M62 J25 - J30	
28/09/15 09:33:18	SIG	M62/2004A1	50R	M62 J25 - J30	
28/09/15 09:33:18	SIG	M62/2004A2	50R	M62 J25 - J30	
28/09/15 09:33:18	SIG	M62/2004A3	50R	M62 J25 - J30	
28/09/15 09:34:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:34:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:34:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:34:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:34:43	SIG	M62/1999A1	50R	M62 J25 - J30	
28/09/15 09:34:43	SIG	M62/1999A2	50R	M62 J25 - J30	
28/09/15 09:34:43	SIG	M62/1999A3	50R	M62 J25 - J30	
28/09/15 09:34:43	SIG	M62/1999J1	50R	M62 J25 - J30	
28/09/15 09:34:43	SIG	M62/1999J2	50R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2033B1	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2033B2	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2033B3	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2033B4	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2041B1	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2041B2	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2041B3	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2041B4	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 09:34:51	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 09:36:51	SIG	M62/2125B1	OFF	M62 J25 - J30	
28/09/15 09:36:51	SIG	M62/2125B2	OFF	M62 J25 - J30	
28/09/15 09:36:51	SIG	M62/2125B3	OFF	M62 J25 - J30	
28/09/15 09:36:51	SIG	M62/2125L1	NR	M62 J25 - J30	
28/09/15 09:36:51	SIG	M62/2125L2	NR	M62 J25 - J30	
28/09/15 09:37:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 09:37:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:37:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:39:51	SIG	M62/2125L1	OFF	M62 J25 - J30	
28/09/15 09:39:52	SIG	M62/2125L2	OFF	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2113B1	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2113B2	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2113B3	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2113B4	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2117B1	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2117B2	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2117B3	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2120M1	50R	M62 J25 - J30	
28/09/15 09:41:07	SIG	M62/2120M2	50R	M62 J25 - J30	
28/09/15 09:41:08	SIG	M62/2125B1	50R	M62 J25 - J30	
28/09/15 09:41:08	SIG	M62/2125B2	50R	M62 J25 - J30	
28/09/15 09:41:08	SIG	M62/2125B3	50R	M62 J25 - J30	
28/09/15 09:41:08	SIG	M62/2125L1	60R	M62 J25 - J30	
28/09/15 09:41:08	SIG	M62/2125L2	60R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2113B1	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2113B2	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2113B3	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2113B4	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2117B1	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2117B3	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2120M1	40R	M62 J25 - J30	
28/09/15 09:41:13	SIG	M62/2120M2	40R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1987A1	60R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1987A3	60R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1987J1	60R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1992A1	60R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1992A2	60R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1992A3	60R	M62 J25 - J30	
28/09/15 09:43:07	SIG	M62/1992J1	60R	M62 J25 - J30	
28/09/15 09:43:51	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 09:43:51	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 09:44:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 09:44:18	SIG	M62/2117B1	50R	M62 J25 - J30	
28/09/15 09:44:23	SIG	M62/2117B1	40R	M62 J25 - J30	
28/09/15 09:44:33	SIG	M62/2097B3	60R	M62 J25 - J30	
28/09/15 09:44:33	SIG	M62/2097B3	60R	M62 J25 - J30	
28/09/15 09:44:34	SIG	M62/2097B3	60R	M62 J25 - J30	
28/09/15 09:44:51	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 09:44:51	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 09:44:51	SIG	M62/2008K1	60R	M62 J25 - J30	
28/09/15 09:44:51	SIG	M62/2008K2	60R	M62 J25 - J30	
28/09/15 09:44:51	SIG	M62/2012A1	60R	M62 J25 - J30	
28/09/15 09:44:51	SIG	M62/2012A2	60R	M62 J25 - J30	
28/09/15 09:44:51	SIG	M62/2012A3	60R	M62 J25 - J30	
28/09/15 09:45:06	SIG	M62/2125B1	OFF	M62 J25 - J30	
28/09/15 09:45:06	SIG	M62/2125B2	OFF	M62 J25 - J30	
28/09/15 09:45:06	SIG	M62/2125B3	OFF	M62 J25 - J30	
28/09/15 09:45:06	SIG	M62/2125L1	NR	M62 J25 - J30	
28/09/15 09:45:06	SIG	M62/2125L2	NR	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2113B1	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2113B2	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2113B3	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2113B4	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2117B1	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2117B3	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2120M1	60R	M62 J25 - J30	
28/09/15 09:45:07	SIG	M62/2120M2	60R	M62 J25 - J30	
28/09/15 09:47:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 09:47:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 09:47:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 09:47:25	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 09:47:51	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 09:47:52	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 09:48:07	SIG	M62/2125L1	OFF	M62 J25 - J30	
28/09/15 09:48:07	SIG	M62/2125L2	OFF	M62 J25 - J30	
28/09/15 09:49:51	SIG	M62/1999A1	60R	M62 J25 - J30	
28/09/15 09:49:51	SIG	M62/1999A2	60R	M62 J25 - J30	
28/09/15 09:49:51	SIG	M62/1999A3	60R	M62 J25 - J30	
28/09/15 09:49:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 09:50:51	SIG	M62/2004A1	60R	M62 J25 - J30	
28/09/15 09:50:51	SIG	M62/2004A2	60R	M62 J25 - J30	
28/09/15 09:50:51	SIG	M62/2004A3	60R	M62 J25 - J30	
28/09/15 10:18:07	SIG	M62/2113B1	HSD	M62 J25 - J30	
28/09/15 10:19:00	SIG	M62/2106B1	HSD	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1974A1	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1974A2	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1974A3	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1974A4	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1979K1	OFF	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1979K2	OFF	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1981A1	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1981A2	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1981A3	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1981A4	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1987A1	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1987A3	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1987J1	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1992A1	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1992A2	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1992A3	NR	M62 J25 - J30	
28/09/15 10:19:05	SIG	M62/1992J1	NR	M62 J25 - J30	
28/09/15 10:20:08	SIG	M62/2097B1	HSD	M62 J25 - J30	
28/09/15 10:20:08	SIG	M62/2113B1	REDX	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/1999A1	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/1999A2	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/1999A3	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/1999J1	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/1999J2	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/2004A1	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/2004A2	OFF	M62 J25 - J30	
28/09/15 10:20:52	SIG	M62/2004A3	OFF	M62 J25 - J30	
28/09/15 10:21:16	SIG	M62/2088B1	HSD	M62 J25 - J30	
28/09/15 10:21:17	SIG	M62/2106B1	REDX	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1955K1	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1955K2	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1956A1	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1956A2	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1956A3	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1960A1	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1960A2	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1960A3	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1960K1	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1960K2	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1968A1	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1968A2	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1968A3	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1968A4	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1974A1	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1974A2	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1974A3	OFF	M62 J25 - J30	
28/09/15 10:21:52	SIG	M62/1974A4	OFF	M62 J25 - J30	
28/09/15 10:22:05	SIG	M62/1981A1	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1981A2	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1981A3	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1981A4	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1987A1	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1987A3	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1987J1	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1992A1	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1992A2	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1992A3	OFF	M62 J25 - J30	
28/09/15 10:22:15	SIG	M62/1992J1	OFF	M62 J25 - J30	
28/09/15 10:22:16	SIG	M62/1968A1	50R	M62 J25 - J30	
28/09/15 10:22:16	SIG	M62/1968A2	50R	M62 J25 - J30	
28/09/15 10:22:16	SIG	M62/1968A3	50R	M62 J25 - J30	
28/09/15 10:22:16	SIG	M62/1968A4	50R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1960A1	50R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1960A2	50R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1960A3	50R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1960K1	50R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1960K2	50R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1968A1	40R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1968A2	40R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1968A3	40R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1968A4	40R	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1974A1	NR	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1974A2	NR	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1974A3	NR	M62 J25 - J30	
28/09/15 10:22:21	SIG	M62/1974A4	NR	M62 J25 - J30	
28/09/15 10:22:24	SIG	M62/2097B1	REDX	M62 J25 - J30	
28/09/15 10:23:32	SIG	M62/2088B1	REDX	M62 J25 - J30	
28/09/15 10:24:25	SIG	M62/2117B1	NR	M62 J25 - J30	
28/09/15 10:24:25	SIG	M62/2117B3	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2088B2	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2088B3	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2088B4	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2097B2	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2097B3	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2097B4	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2106B2	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2106B3	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2106B4	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2113B2	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2113B3	NR	M62 J25 - J30	
28/09/15 10:24:26	SIG	M62/2113B4	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2074B2	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2074B3	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2074B4	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2081B1	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2081B2	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2081B3	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2081L1	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2120M1	NR	M62 J25 - J30	
28/09/15 10:24:27	SIG	M62/2120M2	NR	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2106B1	BLNK	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2106B2	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2106B3	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2106B4	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2113B1	BLNK	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2113B2	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2113B3	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2113B4	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2117B3	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2120M1	OFF	M62 J25 - J30	
28/09/15 10:25:26	SIG	M62/2120M2	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2074B1	BLNK	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2074B2	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2074B3	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2074B4	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2081B1	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2081B2	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2081B3	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2081L1	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2088B1	BLNK	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2088B2	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2088B3	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2088B4	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2097B1	BLNK	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2097B2	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2097B3	OFF	M62 J25 - J30	
28/09/15 10:25:27	SIG	M62/2097B4	OFF	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1960A1	OFF	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1960A2	OFF	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1960A3	OFF	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1960K1	OFF	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1960K2	OFF	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1968A1	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1968A2	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1968A3	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1968A4	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1974A1	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1974A2	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1974A3	NR	M62 J25 - J30	
28/09/15 10:26:08	SIG	M62/1974A4	NR	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1955K1	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1955K2	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1956A1	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1956A2	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1956A3	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1960A1	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1960A2	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1960A3	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1960K1	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1960K2	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1968A1	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1968A2	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1968A3	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1968A4	60R	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1974A1	NR	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1974A2	NR	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1974A3	NR	M62 J25 - J30	
28/09/15 10:26:52	SIG	M62/1974A4	NR	M62 J25 - J30	
28/09/15 10:33:15	SIG	M62/1968A1	50R	M62 J25 - J30	
28/09/15 10:33:15	SIG	M62/1968A2	50R	M62 J25 - J30	
28/09/15 10:33:15	SIG	M62/1968A3	50R	M62 J25 - J30	
28/09/15 10:33:15	SIG	M62/1968A4	50R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1960A1	50R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1960A2	50R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1960A3	50R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1960K1	50R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1960K2	50R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1968A1	40R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1968A2	40R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1968A3	40R	M62 J25 - J30	
28/09/15 10:33:21	SIG	M62/1968A4	40R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1960A1	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1960A2	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1960A3	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1960K1	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1960K2	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1968A1	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1968A2	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1968A3	60R	M62 J25 - J30	
28/09/15 10:37:16	SIG	M62/1968A4	60R	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2065A2	NR	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2065A3	NR	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2065A4	NR	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2073K1	OFF	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2073K2	OFF	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2074A1	BLNK	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2074A2	OFF	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2074A3	OFF	M62 J25 - J30	
28/09/15 10:43:19	SIG	M62/2074A4	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2079A1	BLNK	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2079A2	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2079A3	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2079A4	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2088A1	BLNK	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2088A2	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2088A3	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2088A4	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2097A1	BLNK	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2097A2	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2097A3	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2097A4	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2106A1	BLNK	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2106A2	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2106A4	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2114A1	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2114A2	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2114A3	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2117A1	BLNK	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2117A2	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2117A3	OFF	M62 J25 - J30	
28/09/15 10:43:20	SIG	M62/2117A4	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1955K1	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1955K2	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1956A1	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1956A2	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1956A3	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1960A1	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1960A2	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1960A3	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1960K1	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1960K2	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1968A1	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1968A2	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1968A3	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1968A4	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1974A1	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1974A2	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1974A3	OFF	M62 J25 - J30	
28/09/15 10:48:53	SIG	M62/1974A4	OFF	M62 J25 - J30	
28/09/15 11:11:08	SIG	M62/2057B1	HSD	M62 J25 - J30	
28/09/15 11:13:06	SIG	M62/2041B1	HSD	M62 J25 - J30	
28/09/15 11:13:07	SIG	M62/2057B1	REDX	M62 J25 - J30	
28/09/15 11:13:07	SIG	M621/1002B1	HSD	M62 J25 - J30	
28/09/15 11:13:07	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 11:13:07	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 11:14:06	SIG	M62/2033B1	HSD	M62 J25 - J30	
28/09/15 11:15:07	SIG	M62/2025B1	HSD	M62 J25 - J30	
28/09/15 11:15:07	SIG	M62/2041B1	REDX	M62 J25 - J30	
28/09/15 11:15:59	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 11:16:43	SIG	M62/2025B1	REDX	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2050B2	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2050B3	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2050B4	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2057B2	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2057B3	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2057B4	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2065B2	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2065B3	NR	M62 J25 - J30	
28/09/15 11:17:13	SIG	M62/2065B4	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2018B1	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2018B2	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2018B3	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2018L1	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2025B2	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2025B3	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2025B4	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2033B2	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2033B3	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2033B4	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2041B2	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2041B3	NR	M62 J25 - J30	
28/09/15 11:17:14	SIG	M62/2041B4	NR	M62 J25 - J30	
28/09/15 11:18:13	SIG	M62/2069M1	OFF	M62 J25 - J30	
28/09/15 11:18:13	SIG	M62/2069M2	OFF	M62 J25 - J30	
28/09/15 11:18:13	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 11:18:13	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2033B1	BLNK	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2033B2	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2041B1	BLNK	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2041B3	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2041B4	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2050B2	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2050B3	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2050B4	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2057B1	BLNK	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2057B2	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2057B3	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2057B4	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2065B1	BLNK	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2065B2	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2065B3	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2065B4	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M62/2065M1	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M621/1002B1	OFF	M62 J25 - J30	
28/09/15 11:18:14	SIG	M621/1002B2	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2012B1	BLNK	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2012B2	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2012B3	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2012B4	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2018B1	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2018B2	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2018B3	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2018L1	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2025B1	BLNK	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2025B2	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2025B3	OFF	M62 J25 - J30	
28/09/15 11:18:15	SIG	M62/2025B4	OFF	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2033B2	NR	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2033B3	NR	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2033B4	NR	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2041B1	REDX	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2041B2	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2041B3	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2041B4	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2057B1	REDX	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2057B2	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2057B3	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2057B4	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2065B1	REDX	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M621/1002B1	HSD	M62 J25 - J30	
28/09/15 12:08:54	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 12:08:54	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 12:11:16	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 12:11:16	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 12:11:16	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 12:11:16	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 12:11:16	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 12:11:16	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 12:21:10	SIG	M62/2025A1	HSD	M62 J25 - J30	
28/09/15 12:22:10	SIG	M62/2033A1	HSD	M62 J25 - J30	
28/09/15 12:23:10	SIG	M62/2041A1	HSD	M62 J25 - J30	
28/09/15 12:23:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
28/09/15 12:23:11	SIG	M62/2025A1	REDX	M62 J25 - J30	
28/09/15 12:24:17	SIG	M62/2050A1	HSD	M62 J25 - J30	
28/09/15 12:24:18	SIG	M62/2033A1	REDX	M62 J25 - J30	
28/09/15 12:25:10	SIG	M62/2041A1	REDX	M62 J25 - J30	
28/09/15 12:26:09	SIG	M62/2050A1	REDX	M62 J25 - J30	
28/09/15 12:26:54	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 12:26:54	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 12:26:54	SIG	M62/2074B1	REDX	M62 J25 - J30	
28/09/15 12:26:54	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 12:26:54	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 12:26:54	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 12:27:10	SIG	M62/2025A2	NR	M62 J25 - J30	
28/09/15 12:27:10	SIG	M62/2025A3	NR	M62 J25 - J30	
28/09/15 12:27:10	SIG	M62/2025A4	NR	M62 J25 - J30	
28/09/15 12:27:10	SIG	M62/2033A2	NR	M62 J25 - J30	
28/09/15 12:27:10	SIG	M62/2033A3	NR	M62 J25 - J30	
28/09/15 12:27:10	SIG	M62/2033A4	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2041A2	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2041A3	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2041A4	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2050A2	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2050A3	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2050A4	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2057A1	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2057A2	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2057A3	NR	M62 J25 - J30	
28/09/15 12:27:11	SIG	M62/2057J1	NR	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2008K1	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2008K2	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2012A1	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2012A2	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2012A3	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2018A1	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2018A2	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2018A3	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2018A4	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2025A1	BLNK	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2025A2	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2025A3	OFF	M62 J25 - J30	
28/09/15 12:28:10	SIG	M62/2025A4	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2033A1	BLNK	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2033A2	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2033A3	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2033A4	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2041A1	BLNK	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2041A2	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2041A3	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2041A4	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2050A1	BLNK	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2050A2	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2050A3	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2050A4	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2057A1	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2057A2	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2057A3	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2057J1	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2065A1	BLNK	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2065A2	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2065A3	OFF	M62 J25 - J30	
28/09/15 12:28:11	SIG	M62/2065A4	OFF	M62 J25 - J30	
28/09/15 12:28:36	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 12:28:36	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 12:28:36	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 12:28:36	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 12:28:36	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 12:28:36	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 12:28:41	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 12:28:59	SIG	M62/2041B2	60R	M62 J25 - J30	
28/09/15 12:28:59	SIG	M62/2041B3	60R	M62 J25 - J30	
28/09/15 12:28:59	SIG	M62/2041B4	60R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 12:30:39	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 12:32:36	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 12:32:36	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 12:32:36	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 12:33:18	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 12:33:23	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 12:34:39	SIG	M62/2057B2	60R	M62 J25 - J30	
28/09/15 12:34:39	SIG	M62/2057B3	60R	M62 J25 - J30	
28/09/15 12:34:39	SIG	M62/2057B4	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 12:37:18	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 12:37:19	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 12:43:54	SIG	M62/2033B2	NR	M62 J25 - J30	
28/09/15 12:43:54	SIG	M62/2033B3	NR	M62 J25 - J30	
28/09/15 12:43:54	SIG	M62/2033B4	NR	M62 J25 - J30	
28/09/15 12:43:54	SIG	M62/2041B2	NR	M62 J25 - J30	
28/09/15 12:43:54	SIG	M62/2041B3	NR	M62 J25 - J30	
28/09/15 12:43:54	SIG	M62/2041B4	NR	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2033B1	BLNK	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2033B2	OFF	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2033B4	OFF	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2081B1	OFF	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2081B2	OFF	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2081B3	OFF	M62 J25 - J30	
28/09/15 12:46:55	SIG	M62/2081L1	OFF	M62 J25 - J30	
28/09/15 12:49:55	SIG	M62/2041B2	NR	M62 J25 - J30	
28/09/15 12:49:55	SIG	M62/2041B3	NR	M62 J25 - J30	
28/09/15 12:49:55	SIG	M62/2041B4	NR	M62 J25 - J30	
28/09/15 12:49:55	SIG	M62/2050B2	NR	M62 J25 - J30	
28/09/15 12:49:55	SIG	M62/2050B3	NR	M62 J25 - J30	
28/09/15 12:49:55	SIG	M62/2050B4	NR	M62 J25 - J30	
28/09/15 12:52:55	SIG	M62/2050B2	NR	M62 J25 - J30	
28/09/15 12:52:55	SIG	M62/2050B3	NR	M62 J25 - J30	
28/09/15 12:52:55	SIG	M62/2050B4	NR	M62 J25 - J30	
28/09/15 12:52:55	SIG	M62/2057B2	NR	M62 J25 - J30	
28/09/15 12:52:55	SIG	M62/2057B3	NR	M62 J25 - J30	
28/09/15 12:52:55	SIG	M62/2057B4	NR	M62 J25 - J30	
28/09/15 12:52:56	SIG	M62/2041B1	BLNK	M62 J25 - J30	
28/09/15 12:52:56	SIG	M62/2041B2	OFF	M62 J25 - J30	
28/09/15 12:52:56	SIG	M62/2041B3	OFF	M62 J25 - J30	
28/09/15 12:52:56	SIG	M62/2041B4	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2057B1	BLNK	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2057B2	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2057B3	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2057B4	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2065B2	NR	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2065B3	NR	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2065B4	NR	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2065M1	NR	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2069M1	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2069M2	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2074B1	BLNK	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2074B2	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2074B3	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M62/2074B4	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M621/1002B1	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M621/1002B2	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 12:53:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 12:55:55	SIG	M62/2050B2	OFF	M62 J25 - J30	
28/09/15 12:55:56	SIG	M62/2050B3	OFF	M62 J25 - J30	
28/09/15 12:55:56	SIG	M62/2050B4	OFF	M62 J25 - J30	
28/09/15 12:56:55	SIG	M62/2065B2	OFF	M62 J25 - J30	
28/09/15 12:56:56	SIG	M62/2065B3	OFF	M62 J25 - J30	
28/09/15 12:56:56	SIG	M62/2065B4	OFF	M62 J25 - J30	
28/09/15 12:56:56	SIG	M62/2065M1	OFF	M62 J25 - J30	
28/09/15 12:56:57	SIG	M62/2065B1	BLNK	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2012B1	REDX	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2018B1	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2018B2	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2018B3	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2018L1	NR	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2025B1	REDX	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2033B2	60R	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2033B3	60R	M62 J25 - J30	
28/09/15 12:58:36	SIG	M62/2033B4	60R	M62 J25 - J30	
28/09/15 13:01:40	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 13:01:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2012B1	BLNK	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2012B2	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2012B3	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2012B4	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2018B1	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2018B2	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2018B3	OFF	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2018L1	NR	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2025B2	NR	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2025B3	NR	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2025B4	NR	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2033B2	NR	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2033B3	NR	M62 J25 - J30	
28/09/15 13:37:04	SIG	M62/2033B4	NR	M62 J25 - J30	
28/09/15 13:40:04	SIG	M62/2033B2	OFF	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2018L1	OFF	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2025B1	BLNK	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2025B2	OFF	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2025B3	OFF	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2025B4	OFF	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2033B1	BLNK	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 13:40:05	SIG	M62/2033B4	OFF	M62 J25 - J30	
28/09/15 13:45:30	SIG	M606/2003B1	LDR	M62 J25 - J30	
28/09/15 13:45:30	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 13:45:30	SIG	M62/1992B1	50R	M62 J25 - J30	
28/09/15 13:45:30	SIG	M62/1992B2	50R	M62 J25 - J30	
28/09/15 13:45:30	SIG	M62/1992B3	50R	M62 J25 - J30	
28/09/15 13:45:30	SIG	M62/1992B4	50R	M62 J25 - J30	
28/09/15 13:45:30	SIG	M62/2005M1	TI	M62 J25 - J30	
28/09/15 13:45:30	SIG	M62/2005M2	TI	M62 J25 - J30	
28/09/15 13:45:36	SIG	M62/1992B1	40R	M62 J25 - J30	
28/09/15 13:45:36	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 13:45:36	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 13:45:36	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 13:45:41	SIG	M62/1992B1	30R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1987B1	NR	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1987B2	NR	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1987B3	NR	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1987B4	NR	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1992B1	20R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1999B1	REDX	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1999B2	50R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1999B3	50R	M62 J25 - J30	
28/09/15 13:45:46	SIG	M62/1999B4	50R	M62 J25 - J30	
28/09/15 13:45:52	SIG	M62/1992B1	STOP	M62 J25 - J30	
28/09/15 13:47:49	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 13:47:49	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1987B1	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1987B2	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1987B3	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1987B4	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1992B1	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1992B2	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1992B3	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1992B4	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1999B2	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1999B3	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/1999B4	NR	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/2005M1	OFF	M62 J25 - J30	
28/09/15 13:47:49	SIG	M62/2005M2	OFF	M62 J25 - J30	
28/09/15 13:50:49	SIG	M62/1999B2	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1987B1	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1987B2	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1987B3	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1987B4	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1992B1	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1992B2	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1992B3	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1992B4	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1999B1	BLNK	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1999B3	OFF	M62 J25 - J30	
28/09/15 13:50:50	SIG	M62/1999B4	OFF	M62 J25 - J30	
28/09/15 14:33:44	SIG	M62/2065M1	NR	M62 J25 - J30	
28/09/15 14:33:44	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 14:33:44	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 14:33:44	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 14:33:44	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2012B1	REDX	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2025B1	REDX	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B2	NR	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B3	NR	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B4	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2033B4	NR	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2041B1	REDX	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2041B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2041B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2041B4	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2057B1	REDX	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2057B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2057B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2057B4	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2065B1	REDX	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 14:33:45	SIG	M621/1002B1	HSD	M62 J25 - J30	
28/09/15 14:33:45	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 14:35:04	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 14:35:27	SIG	M62/2033B1	60R	M62 J25 - J30	
28/09/15 14:35:47	SIG	M62/2041B1	60R	M62 J25 - J30	
28/09/15 14:36:08	SIG	M62/2057B1	60R	M62 J25 - J30	
28/09/15 14:36:08	SIG	M621/1002B1	60R	M62 J25 - J30	
28/09/15 14:36:09	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 14:36:09	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 14:36:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 14:36:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2177A1	REDX	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2177A2	60R	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2177A3	60R	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2177A4	60R	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2183A1	REDX	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2183A2	NR	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2183A3	NR	M62 J25 - J30	
28/09/15 14:50:36	SIG	M62/2183A4	NR	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2177A1	BLNK	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2177A2	OFF	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2177A3	OFF	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2177A4	OFF	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2183A1	BLNK	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2183A2	OFF	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2183A3	OFF	M62 J25 - J30	
28/09/15 15:03:54	SIG	M62/2183A4	OFF	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2008K1	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2008K2	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2012A1	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2012A2	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2012A3	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2018A1	HSD	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2018A2	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2018A3	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2018A4	60R	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2025A1	REDX	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2025A2	NR	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2025A3	NR	M62 J25 - J30	
28/09/15 15:14:31	SIG	M62/2025A4	NR	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2012A1	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2018A1	HSD	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2025A2	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2025A3	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2025A4	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2033A1	REDX	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2033A2	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2033A3	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2033A4	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2041A1	REDX	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2041A2	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2041A3	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2041A4	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2050A1	REDX	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2050A2	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2050A3	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2050A4	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2057A1	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2057A2	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2057A3	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2057J1	60R	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2065A1	REDX	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2065A2	NR	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2065A3	NR	M62 J25 - J30	
28/09/15 15:14:32	SIG	M62/2065A4	NR	M62 J25 - J30	
28/09/15 15:16:02	SIG	M62/2050A1	60R	M62 J25 - J30	
28/09/15 15:16:42	SIG	M62/2041A1	60R	M62 J25 - J30	
28/09/15 15:17:09	SIG	M62/2033A1	60R	M62 J25 - J30	
28/09/15 15:17:13	SIG	M62/2018A1	60R	M62 J25 - J30	
28/09/15 15:17:13	SIG	M62/2025A1	60R	M62 J25 - J30	
28/09/15 15:22:12	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 15:22:12	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 15:22:12	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 15:22:12	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 15:31:29	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 15:31:29	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 15:31:29	SIG	M62/2008K1	60R	M62 J25 - J30	
28/09/15 15:31:29	SIG	M62/2008K2	60R	M62 J25 - J30	
28/09/15 16:03:42	SIG	M606/2003B1	50R	M62 J25 - J30	
28/09/15 16:03:42	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 16:03:42	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 16:03:42	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1987B1	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1987B2	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1987B3	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1987B4	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1992B1	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1992B2	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1992B3	50R	M62 J25 - J30	
28/09/15 16:03:43	SIG	M62/1992B4	50R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1981B1	NR	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1981B2	NR	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1981B3	NR	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1981B4	NR	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1987B1	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1987B2	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1987B3	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1987B4	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1992B1	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1999B1	REDX	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1999B2	50R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1999B3	50R	M62 J25 - J30	
28/09/15 16:03:48	SIG	M62/1999B4	50R	M62 J25 - J30	
28/09/15 16:06:32	SIG	M62/2073K1	60R	M62 J25 - J30	
28/09/15 16:06:32	SIG	M62/2073K2	60R	M62 J25 - J30	
28/09/15 16:06:32	SIG	M62/2079A1	REDX	M62 J25 - J30	
28/09/15 16:06:32	SIG	M62/2079A2	NR	M62 J25 - J30	
28/09/15 16:06:32	SIG	M62/2079A3	NR	M62 J25 - J30	
28/09/15 16:06:32	SIG	M62/2079A4	NR	M62 J25 - J30	
28/09/15 16:06:33	SIG	M62/2065A2	60R	M62 J25 - J30	
28/09/15 16:06:33	SIG	M62/2065A3	60R	M62 J25 - J30	
28/09/15 16:06:33	SIG	M62/2065A4	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2074A1	REDX	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2074A2	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2079A2	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2079A3	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2079A4	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2088A1	REDX	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2088A2	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2088A3	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2088A4	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2097A1	REDX	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2097A2	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2097A3	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2097A4	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2106A1	REDX	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2106A2	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2106A3	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2106A4	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2114A1	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2114A2	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2114A3	60R	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2117A1	REDX	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2117A2	NR	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2117A3	NR	M62 J25 - J30	
28/09/15 16:06:43	SIG	M62/2117A4	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 16:07:42	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1981B1	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1981B2	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1981B3	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1981B4	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1987B1	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1987B2	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1987B3	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1987B4	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1992B1	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1992B2	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1992B3	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1992B4	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1999B2	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1999B3	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/1999B4	NR	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/2005M1	OFF	M62 J25 - J30	
28/09/15 16:07:42	SIG	M62/2005M2	OFF	M62 J25 - J30	
28/09/15 16:08:04	SIG	M62/2106A1	60R	M62 J25 - J30	
28/09/15 16:08:26	SIG	M62/2097A1	60R	M62 J25 - J30	
28/09/15 16:08:47	SIG	M62/2088A1	60R	M62 J25 - J30	
28/09/15 16:08:51	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 16:08:51	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 16:08:52	SIG	M62/2079A1	60R	M62 J25 - J30	
28/09/15 16:08:52	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 16:08:52	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 16:10:35	SIG	M62/2033A1	50R	M62 J25 - J30	
28/09/15 16:10:35	SIG	M62/2033A2	50R	M62 J25 - J30	
28/09/15 16:10:35	SIG	M62/2033A3	50R	M62 J25 - J30	
28/09/15 16:10:35	SIG	M62/2033A4	50R	M62 J25 - J30	
28/09/15 16:10:40	SIG	M62/2033A1	40R	M62 J25 - J30	
28/09/15 16:10:40	SIG	M62/2033A2	40R	M62 J25 - J30	
28/09/15 16:10:40	SIG	M62/2033A3	40R	M62 J25 - J30	
28/09/15 16:10:40	SIG	M62/2033A4	40R	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1981B1	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1981B2	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1981B3	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1981B4	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1987B1	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1987B2	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1987B3	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1987B4	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1992B1	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1992B2	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1992B3	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1992B4	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1999B1	BLNK	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1999B2	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1999B3	OFF	M62 J25 - J30	
28/09/15 16:10:43	SIG	M62/1999B4	OFF	M62 J25 - J30	
28/09/15 16:10:45	SIG	M62/2033A1	30R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 16:10:51	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2012A1	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2012A2	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2012A3	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2018A1	LDR	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2018A2	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2018A3	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2018A4	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2025A1	LDR	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2025A2	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2025A3	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2025A4	50R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2033A1	20R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2033A2	40R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2033A3	40R	M62 J25 - J30	
28/09/15 16:10:51	SIG	M62/2033A4	40R	M62 J25 - J30	
28/09/15 16:10:56	SIG	M62/2033A1	STOP	M62 J25 - J30	
28/09/15 16:11:55	SIG	M62/2041A1	50R	M62 J25 - J30	
28/09/15 16:11:55	SIG	M62/2041A2	50R	M62 J25 - J30	
28/09/15 16:11:55	SIG	M62/2041A3	50R	M62 J25 - J30	
28/09/15 16:11:55	SIG	M62/2041A4	50R	M62 J25 - J30	
28/09/15 16:12:00	SIG	M62/2041A1	40R	M62 J25 - J30	
28/09/15 16:12:00	SIG	M62/2041A2	40R	M62 J25 - J30	
28/09/15 16:12:00	SIG	M62/2041A3	40R	M62 J25 - J30	
28/09/15 16:12:00	SIG	M62/2041A4	40R	M62 J25 - J30	
28/09/15 16:12:06	SIG	M62/2041A1	30R	M62 J25 - J30	
28/09/15 16:12:11	SIG	M62/2041A1	20R	M62 J25 - J30	
28/09/15 16:12:11	SIG	M62/2041A2	40R	M62 J25 - J30	
28/09/15 16:12:11	SIG	M62/2041A3	40R	M62 J25 - J30	
28/09/15 16:12:11	SIG	M62/2041A4	40R	M62 J25 - J30	
28/09/15 16:12:16	SIG	M62/2041A1	STOP	M62 J25 - J30	
28/09/15 16:12:17	SIG	M62/2050A1	50R	M62 J25 - J30	
28/09/15 16:12:17	SIG	M62/2050A2	50R	M62 J25 - J30	
28/09/15 16:12:17	SIG	M62/2050A3	50R	M62 J25 - J30	
28/09/15 16:12:17	SIG	M62/2050A4	50R	M62 J25 - J30	
28/09/15 16:12:22	SIG	M62/2050A1	40R	M62 J25 - J30	
28/09/15 16:12:22	SIG	M62/2050A2	40R	M62 J25 - J30	
28/09/15 16:12:22	SIG	M62/2050A3	40R	M62 J25 - J30	
28/09/15 16:12:22	SIG	M62/2050A4	40R	M62 J25 - J30	
28/09/15 16:12:27	SIG	M62/2050A1	30R	M62 J25 - J30	
28/09/15 16:12:32	SIG	M62/2050A1	20R	M62 J25 - J30	
28/09/15 16:12:32	SIG	M62/2050A2	40R	M62 J25 - J30	
28/09/15 16:12:32	SIG	M62/2050A3	40R	M62 J25 - J30	
28/09/15 16:12:32	SIG	M62/2050A4	40R	M62 J25 - J30	
28/09/15 16:12:37	SIG	M62/2050A1	STOP	M62 J25 - J30	
28/09/15 16:14:59	SIG	M62/2004A1	60R	M62 J25 - J30	
28/09/15 16:14:59	SIG	M62/2004A2	60R	M62 J25 - J30	
28/09/15 16:14:59	SIG	M62/2004A3	60R	M62 J25 - J30	
28/09/15 16:15:58	SIG	M62/1999A1	60R	M62 J25 - J30	
28/09/15 16:15:58	SIG	M62/1999A2	60R	M62 J25 - J30	
28/09/15 16:15:58	SIG	M62/1999A3	60R	M62 J25 - J30	
28/09/15 16:15:58	SIG	M62/1999J1	50R	M62 J25 - J30	
28/09/15 16:15:58	SIG	M62/1999J2	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1968B1	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1968B2	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1968B3	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1968L1	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1974B1	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1974B2	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1974B3	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1974B4	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1974M1	50R	M62 J25 - J30	
28/09/15 16:17:52	SIG	M62/1974M2	50R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1968B1	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1968B2	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1968B3	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1968L1	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1974B1	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1974B2	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1974B3	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1974B4	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1974M1	40R	M62 J25 - J30	
28/09/15 16:17:58	SIG	M62/1974M2	40R	M62 J25 - J30	
28/09/15 16:18:03	SIG	M62/1968L1	30R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1960B1	NR	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1960B2	NR	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1960B3	NR	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1960L1	NR	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1960L2	NR	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1968B1	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1968B2	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1968B3	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1968L1	20R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1974B1	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1974B2	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1974B3	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1974B4	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1974M1	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1974M2	40R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1981B1	50R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1981B2	50R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1981B3	50R	M62 J25 - J30	
28/09/15 16:18:08	SIG	M62/1981B4	50R	M62 J25 - J30	
28/09/15 16:18:14	SIG	M62/1968L1	STOP	M62 J25 - J30	
28/09/15 16:19:58	SIG	M62/2074B1	REDX	M62 J25 - J30	
28/09/15 16:19:58	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 16:19:58	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 16:19:58	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 16:19:58	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 16:19:58	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1960B1	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1960B2	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1960B3	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1960L1	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1960L2	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1968B1	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1968B2	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1968B3	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1968L1	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1974B1	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1974B2	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1974B3	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1974B4	NR	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1974M1	OFF	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1974M2	OFF	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1981B1	OFF	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1981B2	OFF	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1981B3	OFF	M62 J25 - J30	
28/09/15 16:20:17	SIG	M62/1981B4	OFF	M62 J25 - J30	
28/09/15 16:21:01	SIG	M62/2025A2	40R	M62 J25 - J30	
28/09/15 16:21:01	SIG	M62/2025A3	40R	M62 J25 - J30	
28/09/15 16:21:01	SIG	M62/2025A4	40R	M62 J25 - J30	
28/09/15 16:21:48	SIG	M62/2025A1	50R	M62 J25 - J30	
28/09/15 16:21:48	SIG	M62/2033A1	40R	M62 J25 - J30	
28/09/15 16:21:48	SIG	M62/2041A1	40R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 16:21:53	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2008K1	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2008K2	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2012A1	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2012A2	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2012A3	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2018A1	50R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2025A1	40R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2033A1	40R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2041A1	40R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2050A1	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2050A2	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2050A3	60R	M62 J25 - J30	
28/09/15 16:21:53	SIG	M62/2050A4	60R	M62 J25 - J30	
28/09/15 16:22:16	SIG	M62/2041A1	60R	M62 J25 - J30	
28/09/15 16:22:16	SIG	M62/2041A2	60R	M62 J25 - J30	
28/09/15 16:22:16	SIG	M62/2041A3	60R	M62 J25 - J30	
28/09/15 16:22:16	SIG	M62/2041A4	60R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 16:22:50	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2012A1	50R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2012A2	50R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2012A3	50R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2018A1	40R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2018A2	40R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2018A3	40R	M62 J25 - J30	
28/09/15 16:22:50	SIG	M62/2018A4	40R	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1960B1	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1960B2	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1960B3	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1960L1	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1960L2	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1968B1	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1968B2	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1968B3	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1968L1	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1974B1	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1974B2	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1974B3	OFF	M62 J25 - J30	
28/09/15 16:23:17	SIG	M62/1974B4	OFF	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2004A1	50R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2004A2	50R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2004A3	50R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2008K1	40R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2008K2	40R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2012A1	40R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2012A2	40R	M62 J25 - J30	
28/09/15 16:24:03	SIG	M62/2012A3	40R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 16:24:59	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2033B1	50R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2033B2	50R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:25:04	SIG	M62/2033B4	50R	M62 J25 - J30	
28/09/15 16:25:05	SIG	M62/2033A1	60R	M62 J25 - J30	
28/09/15 16:25:05	SIG	M62/2033A2	60R	M62 J25 - J30	
28/09/15 16:25:05	SIG	M62/2033A3	60R	M62 J25 - J30	
28/09/15 16:25:05	SIG	M62/2033A4	60R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2033B1	40R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2033B2	40R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2033B4	40R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2041B1	50R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 16:26:33	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 16:26:49	SIG	M62/2025A1	60R	M62 J25 - J30	
28/09/15 16:26:49	SIG	M62/2025A2	60R	M62 J25 - J30	
28/09/15 16:26:49	SIG	M62/2025A3	60R	M62 J25 - J30	
28/09/15 16:26:49	SIG	M62/2025A4	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 16:28:03	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2004A1	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2004A2	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2004A3	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2008K1	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2008K2	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2012A1	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2012A2	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2012A3	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2018A1	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2018A2	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2018A3	60R	M62 J25 - J30	
28/09/15 16:28:03	SIG	M62/2018A4	60R	M62 J25 - J30	
28/09/15 16:28:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:28:46	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:28:51	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:28:59	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 16:28:59	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 16:28:59	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 16:28:59	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 16:29:53	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 16:29:53	SIG	M62/2041B2	40R	M62 J25 - J30	
28/09/15 16:29:53	SIG	M62/2041B3	40R	M62 J25 - J30	
28/09/15 16:29:53	SIG	M62/2041B4	40R	M62 J25 - J30	
28/09/15 16:30:34	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 16:30:34	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 16:30:34	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 16:30:34	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 16:31:03	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 16:31:03	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 16:31:14	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 16:31:14	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 16:31:14	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 16:31:14	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 16:31:20	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 16:31:20	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 16:31:20	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 16:31:20	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 16:31:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:31:49	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:31:54	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:33:53	SIG	M62/2041B1	50R	M62 J25 - J30	
28/09/15 16:33:53	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 16:33:53	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 16:33:53	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 16:34:53	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:34:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:34:59	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:36:28	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 16:36:28	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 16:36:28	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 16:36:28	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 16:37:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:37:57	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:38:02	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:39:45	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 16:39:45	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 16:39:45	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 16:39:45	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 16:39:50	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 16:39:50	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 16:39:50	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 16:39:50	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 16:40:28	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M621/1002B1	40R	M62 J25 - J30	
28/09/15 16:40:33	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 16:41:00	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:41:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:41:06	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 16:41:06	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 16:41:06	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 16:41:06	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 16:41:06	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:41:07	SIG	M62/2113B1	REDX	M62 J25 - J30	
28/09/15 16:41:07	SIG	M62/2113B2	NR	M62 J25 - J30	
28/09/15 16:41:07	SIG	M62/2113B3	NR	M62 J25 - J30	
28/09/15 16:41:07	SIG	M62/2113B4	NR	M62 J25 - J30	
28/09/15 16:41:07	SIG	M62/2120M1	60R	M62 J25 - J30	
28/09/15 16:41:07	SIG	M62/2120M2	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2088B1	REDX	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2088B2	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2088B3	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2088B4	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2097B1	REDX	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2097B2	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2097B3	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2097B4	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2106B1	REDX	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2106B2	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2106B3	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2106B4	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2113B2	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2113B3	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2113B4	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2117B1	60R	M62 J25 - J30	
28/09/15 16:41:08	SIG	M62/2117B3	60R	M62 J25 - J30	
28/09/15 16:41:12	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 16:41:12	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 16:41:12	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 16:41:12	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 16:41:18	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 16:41:24	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/1999A1	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/1999A2	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/1999A3	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/1999J1	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/1999J2	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/2004A1	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/2004A2	OFF	M62 J25 - J30	
28/09/15 16:41:59	SIG	M62/2004A3	OFF	M62 J25 - J30	
28/09/15 16:42:34	SIG	M62/2088B1	60R	M62 J25 - J30	
28/09/15 16:42:55	SIG	M62/2097B1	60R	M62 J25 - J30	
28/09/15 16:43:21	SIG	M62/2106B1	60R	M62 J25 - J30	
28/09/15 16:43:26	SIG	M62/2113B1	60R	M62 J25 - J30	
28/09/15 16:44:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:44:04	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:44:09	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:44:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 16:44:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 16:44:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 16:44:16	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 16:45:07	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 16:45:07	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 16:45:07	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 16:45:07	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M621/1002B1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 16:45:19	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 16:46:04	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 16:46:04	SIG	M62/2041B2	40R	M62 J25 - J30	
28/09/15 16:46:04	SIG	M62/2041B3	40R	M62 J25 - J30	
28/09/15 16:46:04	SIG	M62/2041B4	40R	M62 J25 - J30	
28/09/15 16:47:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:47:08	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:47:13	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:48:26	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 16:48:26	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 16:48:26	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 16:48:26	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 16:48:31	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 16:48:31	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 16:48:31	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 16:48:31	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 16:50:11	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:50:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:50:17	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:52:06	SIG	M62/2170K1	60R	M62 J25 - J30	
28/09/15 16:52:06	SIG	M62/2170K2	60R	M62 J25 - J30	
28/09/15 16:52:06	SIG	M62/2177A1	REDX	M62 J25 - J30	
28/09/15 16:52:06	SIG	M62/2177A2	NR	M62 J25 - J30	
28/09/15 16:52:06	SIG	M62/2177A3	NR	M62 J25 - J30	
28/09/15 16:52:06	SIG	M62/2177A4	NR	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2170A1	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2170A2	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2177A2	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2177A3	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2177A4	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2183A1	REDX	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2183A2	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2183A3	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2183A4	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2189A1	REDX	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2189A2	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2189A3	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2189A4	60R	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2197A1	NR	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2197A2	NR	M62 J25 - J30	
28/09/15 16:52:07	SIG	M62/2197A3	NR	M62 J25 - J30	
28/09/15 16:52:58	SIG	M62/2189A1	60R	M62 J25 - J30	
28/09/15 16:53:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:53:15	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:53:15	SIG	M62/2183A1	60R	M62 J25 - J30	
28/09/15 16:53:19	SIG	M62/2177A1	60R	M62 J25 - J30	
28/09/15 16:53:20	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:56:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:56:19	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:56:24	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:56:28	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 16:56:28	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 16:56:28	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 16:56:28	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 16:58:59	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 16:58:59	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 16:58:59	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 16:59:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 16:59:22	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 16:59:27	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 16:59:33	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 16:59:33	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 16:59:33	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 16:59:33	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 16:59:39	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 16:59:39	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 16:59:39	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 16:59:39	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 16:59:59	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 16:59:59	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 16:59:59	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 16:59:59	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 17:01:19	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 17:01:19	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 17:01:19	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 17:02:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:02:26	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:02:31	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:03:33	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:03:33	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:03:33	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:03:33	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 17:03:36	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 17:05:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:05:30	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:05:35	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:05:58	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 17:05:58	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M621/1002B1	40R	M62 J25 - J30	
28/09/15 17:05:59	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 17:06:35	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 17:06:35	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 17:06:35	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 17:06:35	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 17:06:41	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 17:06:41	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 17:06:41	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 17:06:41	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 17:08:39	SIG	M62/1968B1	50R	M62 J25 - J30	
28/09/15 17:08:39	SIG	M62/1968B2	50R	M62 J25 - J30	
28/09/15 17:08:39	SIG	M62/1968B3	50R	M62 J25 - J30	
28/09/15 17:08:39	SIG	M62/1968L1	50R	M62 J25 - J30	
28/09/15 17:08:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:08:42	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1960B1	60R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1960B2	60R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1960B3	60R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1960L1	NR	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1960L2	NR	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1968B1	40R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1968B2	40R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1968B3	40R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1968L1	40R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1974B1	50R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1974B2	50R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1974B3	50R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1974B4	50R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1974M1	50R	M62 J25 - J30	
28/09/15 17:08:45	SIG	M62/1974M2	50R	M62 J25 - J30	
28/09/15 17:08:48	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 17:09:43	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 17:09:49	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 17:10:47	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 17:11:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:11:42	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:11:47	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 17:12:04	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1960B1	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1960B2	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1960B3	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1960L1	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1960L2	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1968B1	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1968B2	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1968B3	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1968L1	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1974B1	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1974B2	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1974B3	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1974B4	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1974M1	OFF	M62 J25 - J30	
28/09/15 17:12:41	SIG	M62/1974M2	OFF	M62 J25 - J30	
28/09/15 17:13:09	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:13:09	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:13:09	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:13:09	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 17:13:43	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 17:14:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:14:42	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:14:47	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:14:48	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 17:14:48	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 17:14:51	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 17:14:51	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 17:14:51	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 17:14:51	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 17:14:51	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 17:14:56	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 17:15:55	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 17:15:55	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 17:15:55	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 17:15:55	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 17:16:01	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 17:16:01	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 17:16:01	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 17:16:01	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 17:16:04	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 17:17:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:17:45	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:17:50	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:19:48	SIG	M62/1968B1	50R	M62 J25 - J30	
28/09/15 17:19:48	SIG	M62/1968B2	50R	M62 J25 - J30	
28/09/15 17:19:48	SIG	M62/1968B3	50R	M62 J25 - J30	
28/09/15 17:19:48	SIG	M62/1968L1	50R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1960B1	60R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1960B2	60R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1960B3	60R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1960L1	NR	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1960L2	NR	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1968B1	40R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1968B2	40R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1968B3	40R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1968L1	40R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1974B1	50R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1974B2	50R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1974B3	50R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1974B4	50R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1974M1	50R	M62 J25 - J30	
28/09/15 17:19:53	SIG	M62/1974M2	50R	M62 J25 - J30	
28/09/15 17:19:54	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:19:54	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:19:54	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:19:54	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:20:48	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:20:48	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:20:54	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 17:22:00	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 17:22:50	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 17:22:50	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 17:22:50	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 17:22:50	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 17:22:55	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 17:22:55	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 17:22:55	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 17:22:55	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1960B1	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1960B2	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1960B3	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1960L1	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1960L2	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1968B1	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1968B2	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1968B3	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1968L1	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1974B1	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1974B2	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1974B3	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1974B4	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1974M1	OFF	M62 J25 - J30	
28/09/15 17:23:48	SIG	M62/1974M2	OFF	M62 J25 - J30	
28/09/15 17:23:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:23:52	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:23:57	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 17:26:00	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 17:26:14	SIG	M62/1968B1	50R	M62 J25 - J30	
28/09/15 17:26:14	SIG	M62/1968B2	50R	M62 J25 - J30	
28/09/15 17:26:14	SIG	M62/1968B3	50R	M62 J25 - J30	
28/09/15 17:26:14	SIG	M62/1968L1	50R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1960B1	60R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1960B2	60R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1960B3	60R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1960L1	NR	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1960L2	NR	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1968B1	40R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1968B2	40R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1968B3	40R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1968L1	40R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1974B1	50R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1974B2	50R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1974B3	50R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1974B4	50R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1974M1	50R	M62 J25 - J30	
28/09/15 17:26:19	SIG	M62/1974M2	50R	M62 J25 - J30	
28/09/15 17:26:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 17:26:36	SIG	M62/2132B1	50R	M62 J25 - J30	
28/09/15 17:26:36	SIG	M62/2132B2	50R	M62 J25 - J30	
28/09/15 17:26:36	SIG	M62/2132B3	50R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2125B1	60R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2125B2	60R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2125B3	60R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2125L1	NR	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2125L2	NR	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2132B1	40R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2132B2	40R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2132B3	40R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2137B1	50R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2137B3	50R	M62 J25 - J30	
28/09/15 17:26:41	SIG	M62/2137B4	50R	M62 J25 - J30	
28/09/15 17:26:51	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:26:51	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:26:51	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:26:51	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:26:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:26:56	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:27:01	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 17:27:12	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 17:27:56	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 17:27:56	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 17:27:56	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M621/1002B1	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 17:28:27	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 17:29:00	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 17:29:00	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 17:29:00	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 17:29:00	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 17:29:05	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 17:29:05	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 17:29:05	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 17:29:05	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 17:29:59	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:29:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:30:04	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 17:30:05	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1960B1	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1960B2	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1960B3	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1960L1	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1960L2	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1968B1	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1968B2	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1968B3	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1968L1	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1974B1	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1974B2	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1974B3	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1974B4	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1974M1	OFF	M62 J25 - J30	
28/09/15 17:30:15	SIG	M62/1974M2	OFF	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2147B1	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2147B2	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2147B3	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2147B4	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2159B1	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2159B2	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2159M1	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2159M2	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2170B1	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2170B2	60R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2170L1	50R	M62 J25 - J30	
28/09/15 17:33:00	SIG	M62/2170L2	50R	M62 J25 - J30	
28/09/15 17:33:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:33:03	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:33:09	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 17:34:48	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 17:35:18	SIG	M62/2163A1	50R	M62 J25 - J30	
28/09/15 17:35:18	SIG	M62/2163A2	50R	M62 J25 - J30	
28/09/15 17:35:18	SIG	M62/2170A1	50R	M62 J25 - J30	
28/09/15 17:35:18	SIG	M62/2170A2	50R	M62 J25 - J30	
28/09/15 17:35:18	SIG	M62/2170K1	50R	M62 J25 - J30	
28/09/15 17:35:18	SIG	M62/2170K2	50R	M62 J25 - J30	
28/09/15 17:35:23	SIG	M62/2166K1	50R	M62 J25 - J30	
28/09/15 17:35:23	SIG	M62/2166K2	50R	M62 J25 - J30	
28/09/15 17:35:23	SIG	M62/2170A1	40R	M62 J25 - J30	
28/09/15 17:35:23	SIG	M62/2170A2	40R	M62 J25 - J30	
28/09/15 17:35:23	SIG	M62/2170K1	40R	M62 J25 - J30	
28/09/15 17:35:23	SIG	M62/2170K2	40R	M62 J25 - J30	
28/09/15 17:36:07	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:36:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:36:13	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:37:27	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:37:27	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:37:27	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:37:27	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 17:37:43	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 17:39:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:39:11	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:39:16	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 17:40:35	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 17:42:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:42:15	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:42:20	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 17:43:15	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 17:44:00	SIG	M62/2157A1	60R	M62 J25 - J30	
28/09/15 17:44:00	SIG	M62/2157A2	60R	M62 J25 - J30	
28/09/15 17:44:00	SIG	M62/2157J1	60R	M62 J25 - J30	
28/09/15 17:44:00	SIG	M62/2157J2	60R	M62 J25 - J30	
28/09/15 17:44:00	SIG	M62/2157K1	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2163A1	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2163A2	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2166K1	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2166K2	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2170A1	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2170A2	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2170K1	60R	M62 J25 - J30	
28/09/15 17:45:02	SIG	M62/2170K2	60R	M62 J25 - J30	
28/09/15 17:45:18	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:45:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:45:24	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:46:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
28/09/15 17:46:34	SIG	M62/2157A1	OFF	M62 J25 - J30	
28/09/15 17:46:59	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 17:46:59	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 17:46:59	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 17:46:59	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 17:47:04	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 17:47:04	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 17:47:04	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 17:47:04	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 17:48:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:48:22	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:48:27	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:51:00	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:51:00	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:51:00	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:51:00	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:51:25	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:51:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:51:31	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 17:51:44	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2157A1	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2157A2	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2157J1	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2157J2	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2157K1	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2163A1	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2163A2	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2166K1	OFF	M62 J25 - J30	
28/09/15 17:52:00	SIG	M62/2166K2	OFF	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2194B1	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2194B2	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2194B3	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2194B4	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2197B1	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2197B2	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2197B3	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2199M1	50R	M62 J25 - J30	
28/09/15 17:52:11	SIG	M62/2199M2	50R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2177B1	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2177B2	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2177L1	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2177L2	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2183B1	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2183B2	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2183L1	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2183L2	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2194B1	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2194B2	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2194B3	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2194B4	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2197B1	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2197B2	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2197B3	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2199M1	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2199M2	40R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2203B1	50R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2203B2	50R	M62 J25 - J30	
28/09/15 17:52:17	SIG	M62/2203B3	50R	M62 J25 - J30	
28/09/15 17:52:32	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 17:52:32	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 17:52:32	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 17:52:32	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 17:52:38	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 17:52:38	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 17:52:38	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 17:52:38	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 17:52:50	SIG	M62/2203B1	40R	M62 J25 - J30	
28/09/15 17:52:50	SIG	M62/2203B2	40R	M62 J25 - J30	
28/09/15 17:52:50	SIG	M62/2203B3	40R	M62 J25 - J30	
28/09/15 17:54:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:54:29	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:54:34	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:54:48	SIG	M62/2189B1	50R	M62 J25 - J30	
28/09/15 17:54:48	SIG	M62/2189B2	50R	M62 J25 - J30	
28/09/15 17:54:48	SIG	M62/2189B3	50R	M62 J25 - J30	
28/09/15 17:54:48	SIG	M62/2189B4	50R	M62 J25 - J30	
28/09/15 17:54:53	SIG	M62/2189B1	40R	M62 J25 - J30	
28/09/15 17:54:53	SIG	M62/2189B2	40R	M62 J25 - J30	
28/09/15 17:54:53	SIG	M62/2189B3	40R	M62 J25 - J30	
28/09/15 17:54:53	SIG	M62/2189B4	40R	M62 J25 - J30	
28/09/15 17:54:56	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 17:54:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 17:55:20	SIG	M62/2189B1	60R	M62 J25 - J30	
28/09/15 17:55:20	SIG	M62/2189B2	60R	M62 J25 - J30	
28/09/15 17:55:20	SIG	M62/2189B3	60R	M62 J25 - J30	
28/09/15 17:55:20	SIG	M62/2189B4	60R	M62 J25 - J30	
28/09/15 17:57:25	SIG	M62/2194B1	60R	M62 J25 - J30	
28/09/15 17:57:25	SIG	M62/2194B2	60R	M62 J25 - J30	
28/09/15 17:57:25	SIG	M62/2194B3	60R	M62 J25 - J30	
28/09/15 17:57:25	SIG	M62/2194B4	60R	M62 J25 - J30	
28/09/15 17:57:42	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 17:57:42	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 17:57:48	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 17:58:15	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 17:58:15	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 17:58:15	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 17:58:15	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 17:58:32	SIG	M62/2041A1	50R	M62 J25 - J30	
28/09/15 17:58:32	SIG	M62/2041A2	50R	M62 J25 - J30	
28/09/15 17:58:32	SIG	M62/2041A3	50R	M62 J25 - J30	
28/09/15 17:58:32	SIG	M62/2041A4	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1987B1	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1987B2	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1987B3	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1987B4	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1992B1	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1992B2	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1992B3	50R	M62 J25 - J30	
28/09/15 17:58:34	SIG	M62/1992B4	50R	M62 J25 - J30	
28/09/15 17:58:38	SIG	M62/2041A1	40R	M62 J25 - J30	
28/09/15 17:58:38	SIG	M62/2041A2	40R	M62 J25 - J30	
28/09/15 17:58:38	SIG	M62/2041A3	40R	M62 J25 - J30	
28/09/15 17:58:38	SIG	M62/2041A4	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1981B1	NR	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1981B2	NR	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1981B3	NR	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1981B4	NR	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1987B1	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1987B2	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1987B3	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1987B4	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1992B1	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1999B1	REDX	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1999B2	50R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1999B3	50R	M62 J25 - J30	
28/09/15 17:58:40	SIG	M62/1999B4	50R	M62 J25 - J30	
28/09/15 17:58:43	SIG	M62/2041A1	30R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M606/2003B1	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2004B1	REDX	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2004B2	60R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2004B3	60R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2004B4	60R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2012B2	60R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2012B3	60R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2012B4	60R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2025A1	LDR	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2025A2	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2025A3	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2025A4	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2033A1	LDR	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2033A2	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2033A3	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2033A4	50R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2041A1	20R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2041A2	40R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2041A3	40R	M62 J25 - J30	
28/09/15 17:58:48	SIG	M62/2041A4	40R	M62 J25 - J30	
28/09/15 17:58:54	SIG	M62/2041A1	STOP	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2132B1	60R	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2132B2	60R	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2132B3	60R	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2137B1	60R	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2137B2	60R	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2137B3	60R	M62 J25 - J30	
28/09/15 17:58:55	SIG	M62/2137B4	60R	M62 J25 - J30	
28/09/15 17:59:22	SIG	M62/2197B1	60R	M62 J25 - J30	
28/09/15 17:59:22	SIG	M62/2197B2	60R	M62 J25 - J30	
28/09/15 17:59:22	SIG	M62/2197B3	60R	M62 J25 - J30	
28/09/15 17:59:22	SIG	M62/2199M1	60R	M62 J25 - J30	
28/09/15 17:59:22	SIG	M62/2199M2	60R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 18:00:19	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1981B1	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1981B2	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1981B3	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1981B4	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1987B1	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1987B2	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1987B3	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1987B4	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1992B1	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1992B2	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1992B3	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1992B4	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1999B2	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1999B3	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/1999B4	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2004B2	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2004B3	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2004B4	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2005M1	OFF	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2005M2	OFF	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 18:00:19	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 18:00:28	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2008K1	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2008K2	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2012A1	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2012A2	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2012A3	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2018A1	LDR	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2018A2	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2018A3	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2018A4	50R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2033A1	STOP	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2033A2	40R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2033A3	40R	M62 J25 - J30	
28/09/15 18:00:28	SIG	M62/2033A4	40R	M62 J25 - J30	
28/09/15 18:00:33	SIG	M62/2033A1	STOP	M62 J25 - J30	
28/09/15 18:00:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:00:42	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:00:47	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M606/2003B1	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1987B1	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1987B2	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1987B3	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1987B4	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1992B1	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1992B2	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1992B3	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/1992B4	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2004B2	60R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2004B3	60R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2004B4	60R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2012B2	60R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2012B3	60R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2012B4	60R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 18:01:35	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 18:01:36	SIG	M62/2203B1	60R	M62 J25 - J30	
28/09/15 18:01:36	SIG	M62/2203B2	60R	M62 J25 - J30	
28/09/15 18:01:36	SIG	M62/2203B3	60R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1981B1	NR	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1981B2	NR	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1981B3	NR	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1981B4	NR	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1987B1	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1987B2	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1987B3	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1987B4	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1992B1	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1999B2	50R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1999B3	50R	M62 J25 - J30	
28/09/15 18:01:40	SIG	M62/1999B4	50R	M62 J25 - J30	
28/09/15 18:01:41	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 18:01:41	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 18:01:41	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 18:01:41	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 18:01:46	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 18:01:46	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 18:01:46	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 18:01:46	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 18:01:47	SIG	M62/2050B2	40R	M62 J25 - J30	
28/09/15 18:01:47	SIG	M62/2050B3	40R	M62 J25 - J30	
28/09/15 18:01:47	SIG	M62/2050B4	40R	M62 J25 - J30	
28/09/15 18:02:05	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 18:02:05	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 18:02:05	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 18:02:35	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1981B1	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1981B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1981B3	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1981B4	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1987B1	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1987B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1987B3	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1987B4	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1992B1	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1992B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1992B3	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1992B4	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1999B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1999B3	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/1999B4	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2004B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2004B3	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2004B4	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2005M1	OFF	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2005M2	OFF	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 18:02:35	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 18:02:53	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 18:02:53	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 18:03:26	SIG	M62/2113B1	HSD	M62 J25 - J30	
28/09/15 18:03:41	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:03:42	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:03:48	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:04:08	SIG	M62/2057B1	40R	M62 J25 - J30	
28/09/15 18:04:08	SIG	M62/2057B2	40R	M62 J25 - J30	
28/09/15 18:04:08	SIG	M62/2057B3	40R	M62 J25 - J30	
28/09/15 18:04:08	SIG	M62/2057B4	40R	M62 J25 - J30	
28/09/15 18:04:19	SIG	M62/2106B1	HSD	M62 J25 - J30	
28/09/15 18:05:28	SIG	M62/2097B1	HSD	M62 J25 - J30	
28/09/15 18:05:28	SIG	M62/2113B1	REDX	M62 J25 - J30	
28/09/15 18:05:35	SIG	M62/1999B2	OFF	M62 J25 - J30	
28/09/15 18:05:35	SIG	M62/2004B2	OFF	M62 J25 - J30	
28/09/15 18:05:35	SIG	M62/2004B3	OFF	M62 J25 - J30	
28/09/15 18:05:35	SIG	M62/2004B4	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1981B1	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1981B2	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1981B3	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1981B4	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1987B1	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1987B2	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1987B3	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1987B4	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1992B1	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1992B2	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1992B3	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1992B4	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1999B3	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/1999B4	OFF	M62 J25 - J30	
28/09/15 18:05:36	SIG	M62/2004B1	BLNK	M62 J25 - J30	
28/09/15 18:05:37	SIG	M62/1999B1	BLNK	M62 J25 - J30	
28/09/15 18:05:41	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 18:05:41	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 18:05:41	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 18:05:41	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 18:06:29	SIG	M62/2065B2	40R	M62 J25 - J30	
28/09/15 18:06:29	SIG	M62/2065B3	40R	M62 J25 - J30	
28/09/15 18:06:29	SIG	M62/2065B4	40R	M62 J25 - J30	
28/09/15 18:06:29	SIG	M62/2065M1	40R	M62 J25 - J30	
28/09/15 18:06:29	SIG	M621/1002B1	40R	M62 J25 - J30	
28/09/15 18:06:29	SIG	M621/1002B2	40R	M62 J25 - J30	
28/09/15 18:06:35	SIG	M62/2088B1	HSD	M62 J25 - J30	
28/09/15 18:06:36	SIG	M62/2106B1	REDX	M62 J25 - J30	
28/09/15 18:06:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:06:44	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:06:49	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:07:00	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 18:07:00	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 18:07:00	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 18:07:43	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 18:07:43	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 18:07:43	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 18:07:43	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 18:07:50	SIG	M62/2097B1	REDX	M62 J25 - J30	
28/09/15 18:08:00	SIG	M62/2004A1	60R	M62 J25 - J30	
28/09/15 18:08:00	SIG	M62/2004A2	60R	M62 J25 - J30	
28/09/15 18:08:00	SIG	M62/2004A3	60R	M62 J25 - J30	
28/09/15 18:08:40	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 18:08:40	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 18:08:40	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 18:08:40	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 18:08:45	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 18:08:45	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 18:08:45	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 18:08:45	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 18:08:52	SIG	M62/2088B1	REDX	M62 J25 - J30	
28/09/15 18:09:00	SIG	M62/2069M1	40R	M62 J25 - J30	
28/09/15 18:09:00	SIG	M62/2069M2	40R	M62 J25 - J30	
28/09/15 18:09:01	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 18:09:01	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 18:09:01	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 18:09:01	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 18:09:01	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2074B2	40R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2074B3	40R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2074B4	40R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2081B1	50R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2081B2	50R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2081B3	50R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M62/2081L1	50R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M621/1010B1	40R	M62 J25 - J30	
28/09/15 18:09:06	SIG	M621/1010B2	40R	M62 J25 - J30	
28/09/15 18:09:47	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:09:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:09:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 18:09:53	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2050B2	50R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2050B3	50R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2050B4	50R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2057B1	50R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2057B2	50R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2057B3	50R	M62 J25 - J30	
28/09/15 18:10:28	SIG	M62/2057B4	50R	M62 J25 - J30	
28/09/15 18:10:45	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 18:10:48	SIG	M62/2041B1	50R	M62 J25 - J30	
28/09/15 18:10:48	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 18:10:48	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 18:10:48	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2170B1	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2170B2	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2170L1	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2170L2	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2177B1	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2177B2	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2177L1	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2177L2	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2183B1	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2183L1	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2183L2	OFF	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2189B1	NR	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2189B2	NR	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2189B3	NR	M62 J25 - J30	
28/09/15 18:11:01	SIG	M62/2189B4	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2113B1	BLNK	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2113B2	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2113B3	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2113B4	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2117B3	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2120M1	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2120M2	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2125B1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2125B2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2125B3	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2125L1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2125L2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2132B1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2132B2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2132B3	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2137B1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2137B2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2137B3	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2137B4	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2147B1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2147B2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2147B3	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2147B4	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2159B1	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2159B2	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2159M1	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2159M2	OFF	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2189B1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2189B2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2189B3	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2189B4	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2194B1	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2194B2	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2194B3	NR	M62 J25 - J30	
28/09/15 18:12:01	SIG	M62/2194B4	NR	M62 J25 - J30	
28/09/15 18:12:44	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 18:12:44	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 18:12:44	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 18:12:44	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 18:12:49	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 18:12:49	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 18:12:49	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 18:12:49	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 18:12:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:12:51	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:12:56	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:13:25	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 18:13:25	SIG	M62/2041B2	40R	M62 J25 - J30	
28/09/15 18:13:25	SIG	M62/2041B3	40R	M62 J25 - J30	
28/09/15 18:13:25	SIG	M62/2041B4	40R	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2137B1	OFF	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2189B1	OFF	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2194B1	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2194B2	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2194B3	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2194B4	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2197B1	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2197B2	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2197B3	NR	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2199M1	OFF	M62 J25 - J30	
28/09/15 18:15:01	SIG	M62/2199M2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2125B1	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2125B2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2125B3	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2125L1	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2125L2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2132B1	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2132B2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2132B3	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2137B2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2137B3	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2137B4	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2147B1	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2147B2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2147B3	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2147B4	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2189B2	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2189B3	OFF	M62 J25 - J30	
28/09/15 18:15:02	SIG	M62/2189B4	OFF	M62 J25 - J30	
28/09/15 18:15:33	SIG	M62/2079A1	HSD	M62 J25 - J30	
28/09/15 18:15:55	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:15:55	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2197B1	NR	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2197B2	NR	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2197B3	NR	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2203B1	OFF	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2203B2	OFF	M62 J25 - J30	
28/09/15 18:16:01	SIG	M62/2203B3	OFF	M62 J25 - J30	
28/09/15 18:16:41	SIG	M62/2088A1	HSD	M62 J25 - J30	
28/09/15 18:16:45	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 18:16:45	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 18:16:45	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 18:16:45	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 18:17:25	SIG	M62/2041B1	50R	M62 J25 - J30	
28/09/15 18:17:25	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 18:17:25	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 18:17:25	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 18:17:36	SIG	M62/2041B1	40R	M62 J25 - J30	
28/09/15 18:17:36	SIG	M62/2041B2	40R	M62 J25 - J30	
28/09/15 18:17:36	SIG	M62/2041B3	40R	M62 J25 - J30	
28/09/15 18:17:36	SIG	M62/2041B4	40R	M62 J25 - J30	
28/09/15 18:17:50	SIG	M62/2079A1	REDX	M62 J25 - J30	
28/09/15 18:17:50	SIG	M62/2097A1	HSD	M62 J25 - J30	
28/09/15 18:18:01	SIG	M62/2194B1	OFF	M62 J25 - J30	
28/09/15 18:18:02	SIG	M62/2194B2	OFF	M62 J25 - J30	
28/09/15 18:18:02	SIG	M62/2194B3	OFF	M62 J25 - J30	
28/09/15 18:18:02	SIG	M62/2194B4	OFF	M62 J25 - J30	
28/09/15 18:18:57	SIG	M62/2088A1	REDX	M62 J25 - J30	
28/09/15 18:18:57	SIG	M62/2106A1	HSD	M62 J25 - J30	
28/09/15 18:18:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:18:59	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:19:01	SIG	M62/2197B1	OFF	M62 J25 - J30	
28/09/15 18:19:01	SIG	M62/2197B2	OFF	M62 J25 - J30	
28/09/15 18:19:01	SIG	M62/2197B3	OFF	M62 J25 - J30	
28/09/15 18:19:04	SIG	M62/2033B3	40R	M62 J25 - J30	
28/09/15 18:20:03	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 18:20:03	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 18:20:03	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 18:20:03	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 18:20:05	SIG	M62/2097A1	REDX	M62 J25 - J30	
28/09/15 18:21:13	SIG	M62/2106A1	REDX	M62 J25 - J30	
28/09/15 18:21:36	SIG	M62/2041B1	50R	M62 J25 - J30	
28/09/15 18:21:36	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 18:21:36	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 18:21:36	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 18:21:54	SIG	M62/2033B1	50R	M62 J25 - J30	
28/09/15 18:21:54	SIG	M62/2033B2	50R	M62 J25 - J30	
28/09/15 18:21:54	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 18:21:54	SIG	M62/2033B4	50R	M62 J25 - J30	
28/09/15 18:22:13	SIG	M62/2065A2	NR	M62 J25 - J30	
28/09/15 18:22:13	SIG	M62/2065A3	NR	M62 J25 - J30	
28/09/15 18:22:13	SIG	M62/2065A4	NR	M62 J25 - J30	
28/09/15 18:22:23	SIG	M62/2074A2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2073K1	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2073K2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2079A2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2079A3	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2079A4	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2088A2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2088A3	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2088A4	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2097A2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2097A3	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2097A4	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2106A2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2106A3	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2106A4	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2114A1	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2114A2	NR	M62 J25 - J30	
28/09/15 18:22:24	SIG	M62/2114A3	NR	M62 J25 - J30	
28/09/15 18:23:13	SIG	M62/2073K1	OFF	M62 J25 - J30	
28/09/15 18:23:13	SIG	M62/2073K2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2074A1	BLNK	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2074A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2079A1	BLNK	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2079A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2079A3	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2079A4	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2088A1	BLNK	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2088A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2088A3	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2088A4	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2097A1	BLNK	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2097A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2097A3	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2097A4	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2106A1	BLNK	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2106A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2106A3	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2106A4	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2114A1	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2114A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2114A3	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2117A1	BLNK	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2117A2	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2117A3	OFF	M62 J25 - J30	
28/09/15 18:23:24	SIG	M62/2117A4	OFF	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 18:23:50	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2025B1	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2025B2	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2025B3	40R	M62 J25 - J30	
28/09/15 18:23:55	SIG	M62/2025B4	40R	M62 J25 - J30	
28/09/15 18:24:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:24:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:24:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:24:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2065B2	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2065B3	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2065B4	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2065M1	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2069M1	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2069M2	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2074B2	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2074B3	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2074B4	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2081B1	60R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2081B2	60R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2081B3	60R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M62/2081L1	60R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M621/1002B1	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M621/1002B2	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M621/1010B1	50R	M62 J25 - J30	
28/09/15 18:25:14	SIG	M621/1010B2	50R	M62 J25 - J30	
28/09/15 18:26:51	SIG	M62/2177A1	HSD	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2057B1	60R	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2057B2	60R	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2057B3	60R	M62 J25 - J30	
28/09/15 18:27:01	SIG	M62/2057B4	60R	M62 J25 - J30	
28/09/15 18:27:36	SIG	M62/2183A1	HSD	M62 J25 - J30	
28/09/15 18:27:50	SIG	M62/2018B1	60R	M62 J25 - J30	
28/09/15 18:27:50	SIG	M62/2018B2	60R	M62 J25 - J30	
28/09/15 18:27:50	SIG	M62/2018B3	60R	M62 J25 - J30	
28/09/15 18:27:50	SIG	M62/2018L1	60R	M62 J25 - J30	
28/09/15 18:28:21	SIG	M62/2177A1	REDX	M62 J25 - J30	
28/09/15 18:28:21	SIG	M62/2189A1	HSD	M62 J25 - J30	
28/09/15 18:28:46	SIG	M62/2025B1	50R	M62 J25 - J30	
28/09/15 18:28:46	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 18:28:46	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 18:28:46	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 18:29:21	SIG	M62/2183A1	REDX	M62 J25 - J30	
28/09/15 18:30:21	SIG	M62/2189A1	REDX	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2170A1	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2170A2	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2170K1	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2170K2	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2177A2	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2177A3	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2177A4	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2183A2	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2183A3	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2183A4	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2189A2	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2189A3	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2189A4	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2197A1	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2197A2	NR	M62 J25 - J30	
28/09/15 18:30:22	SIG	M62/2197A3	NR	M62 J25 - J30	
28/09/15 18:31:21	SIG	M62/2170K1	OFF	M62 J25 - J30	
28/09/15 18:31:21	SIG	M62/2170K2	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2170A1	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2170A2	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2177A1	BLNK	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2177A2	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2177A3	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2177A4	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2183A1	BLNK	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2183A2	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2183A3	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2183A4	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2189A1	BLNK	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2189A2	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2189A3	OFF	M62 J25 - J30	
28/09/15 18:31:22	SIG	M62/2189A4	OFF	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2025B1	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2025B2	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2025B3	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2025B4	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2033B1	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2033B2	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2033B3	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2033B4	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2041B1	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2041B2	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2041B3	60R	M62 J25 - J30	
28/09/15 18:33:02	SIG	M62/2041B4	60R	M62 J25 - J30	
28/09/15 18:33:22	SIG	M62/2197A1	OFF	M62 J25 - J30	
28/09/15 18:33:23	SIG	M62/2197A2	OFF	M62 J25 - J30	
28/09/15 18:33:23	SIG	M62/2197A3	OFF	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2065B2	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2065B3	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2065B4	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2065M1	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2069M1	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2069M2	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2074B2	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2074B3	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M62/2074B4	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M621/1002B1	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M621/1002B2	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 18:35:01	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 18:35:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:35:18	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2088B2	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2088B3	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2088B4	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2097B2	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2097B3	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2097B4	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2106B2	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2106B3	NR	M62 J25 - J30	
28/09/15 18:36:01	SIG	M62/2106B4	NR	M62 J25 - J30	
28/09/15 18:39:01	SIG	M62/2097B2	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2088B1	BLNK	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2088B2	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2088B3	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2088B4	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2097B1	BLNK	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2097B3	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2097B4	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2106B1	BLNK	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2106B2	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2106B3	OFF	M62 J25 - J30	
28/09/15 18:39:02	SIG	M62/2106B4	OFF	M62 J25 - J30	
28/09/15 18:44:01	SIG	M62/2081B1	OFF	M62 J25 - J30	
28/09/15 18:44:01	SIG	M62/2081B2	OFF	M62 J25 - J30	
28/09/15 18:44:01	SIG	M62/2081B3	OFF	M62 J25 - J30	
28/09/15 18:44:01	SIG	M62/2081L1	OFF	M62 J25 - J30	
28/09/15 18:46:12	SIG	M62/2057B1	HSD	M62 J25 - J30	
28/09/15 18:48:01	SIG	M62/2074B1	BLNK	M62 J25 - J30	
28/09/15 18:48:01	SIG	M62/2074B2	OFF	M62 J25 - J30	
28/09/15 18:48:01	SIG	M62/2074B3	OFF	M62 J25 - J30	
28/09/15 18:48:01	SIG	M62/2074B4	OFF	M62 J25 - J30	
28/09/15 18:48:01	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 18:48:01	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 18:48:11	SIG	M62/2041B1	HSD	M62 J25 - J30	
28/09/15 18:48:11	SIG	M62/2057B1	REDX	M62 J25 - J30	
28/09/15 18:48:11	SIG	M621/1002B1	HSD	M62 J25 - J30	
28/09/15 18:48:11	SIG	M621/1010B1	60R	M62 J25 - J30	
28/09/15 18:48:11	SIG	M621/1010B2	60R	M62 J25 - J30	
28/09/15 18:49:11	SIG	M62/2033B1	HSD	M62 J25 - J30	
28/09/15 18:50:01	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:50:11	SIG	M62/2025B1	HSD	M62 J25 - J30	
28/09/15 18:50:12	SIG	M62/2041B1	REDX	M62 J25 - J30	
28/09/15 18:51:03	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 18:51:47	SIG	M62/2025B1	REDX	M62 J25 - J30	
28/09/15 18:52:17	SIG	M62/2065B2	NR	M62 J25 - J30	
28/09/15 18:52:17	SIG	M62/2065B3	NR	M62 J25 - J30	
28/09/15 18:52:17	SIG	M62/2065B4	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2018B1	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2018B2	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2018B3	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2018L1	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2025B2	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2025B3	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2025B4	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2033B2	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2033B3	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2033B4	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2041B2	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2041B3	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2041B4	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2050B2	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2050B3	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2050B4	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2057B2	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2057B3	NR	M62 J25 - J30	
28/09/15 18:52:18	SIG	M62/2057B4	NR	M62 J25 - J30	
28/09/15 18:53:17	SIG	M62/2069M1	OFF	M62 J25 - J30	
28/09/15 18:53:17	SIG	M62/2069M2	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2050B2	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2050B3	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2050B4	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2057B1	BLNK	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2057B2	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2057B3	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2057B4	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2065B1	BLNK	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2065B2	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2065B3	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2065B4	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M62/2065M1	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M621/1002B1	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M621/1002B2	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M621/1010B1	OFF	M62 J25 - J30	
28/09/15 18:53:18	SIG	M621/1010B2	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2012B1	BLNK	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2012B2	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2012B3	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2012B4	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2018B1	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2018B2	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2018B3	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2018L1	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2025B1	BLNK	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2025B2	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2025B3	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2025B4	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2033B1	BLNK	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2033B2	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2033B4	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2041B1	BLNK	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2041B2	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2041B3	OFF	M62 J25 - J30	
28/09/15 18:53:19	SIG	M62/2041B4	OFF	M62 J25 - J30	
28/09/15 19:04:32	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 19:04:32	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2008K1	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2008K2	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2012A1	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2012A2	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2012A3	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2018A1	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2018A2	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2018A3	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2018A4	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2025A1	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2025A2	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2025A3	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2025A4	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2033A1	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2033A2	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2033A3	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2033A4	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2041A1	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2041A2	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2041A3	60R	M62 J25 - J30	
28/09/15 19:04:32	SIG	M62/2041A4	60R	M62 J25 - J30	
28/09/15 19:07:32	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 19:07:33	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 19:08:06	SIG	M62/2025A1	HSD	M62 J25 - J30	
28/09/15 19:09:06	SIG	M62/2033A1	HSD	M62 J25 - J30	
28/09/15 19:10:06	SIG	M62/2018A1	HSD	M62 J25 - J30	
28/09/15 19:10:06	SIG	M62/2025A1	REDX	M62 J25 - J30	
28/09/15 19:10:06	SIG	M62/2041A1	HSD	M62 J25 - J30	
28/09/15 19:11:02	SIG	M62/2004A1	OFF	M62 J25 - J30	
28/09/15 19:11:02	SIG	M62/2004A2	OFF	M62 J25 - J30	
28/09/15 19:11:02	SIG	M62/2004A3	OFF	M62 J25 - J30	
28/09/15 19:11:13	SIG	M62/2033A1	REDX	M62 J25 - J30	
28/09/15 19:11:13	SIG	M62/2050A1	HSD	M62 J25 - J30	
28/09/15 19:12:05	SIG	M62/2041A1	REDX	M62 J25 - J30	
28/09/15 19:13:05	SIG	M62/2050A1	REDX	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2050A2	NR	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2050A3	NR	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2050A4	NR	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2057A1	NR	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2057A2	NR	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2057A3	NR	M62 J25 - J30	
28/09/15 19:14:05	SIG	M62/2057J1	NR	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2057A1	OFF	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2057A2	OFF	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2057A3	OFF	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2057J1	OFF	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2065A1	BLNK	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2065A2	OFF	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2065A3	OFF	M62 J25 - J30	
28/09/15 19:15:06	SIG	M62/2065A4	OFF	M62 J25 - J30	
28/09/15 19:16:38	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 19:16:38	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2008K1	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2008K2	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2012A1	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2012A2	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2012A3	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2018A1	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2018A2	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2018A3	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2018A4	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2025A1	BLNK	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2025A2	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2025A3	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2025A4	OFF	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2033A2	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2033A3	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2033A4	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2041A2	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2041A3	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2041A4	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2050A2	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2050A3	NR	M62 J25 - J30	
28/09/15 19:18:02	SIG	M62/2050A4	NR	M62 J25 - J30	
28/09/15 19:21:02	SIG	M62/2033A2	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2033A1	BLNK	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2033A3	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2033A4	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2041A1	BLNK	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2041A2	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2041A3	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2041A4	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2050A1	BLNK	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2050A2	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2050A3	OFF	M62 J25 - J30	
28/09/15 19:21:03	SIG	M62/2050A4	OFF	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1979K2	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1987A1	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1987A2	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1987A3	50R	M62 J25 - J30	
28/09/15 19:40:28	SIG	M62/1987J1	50R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1979K2	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1987A1	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1987A2	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1987A3	40R	M62 J25 - J30	
28/09/15 19:40:43	SIG	M62/1987J1	40R	M62 J25 - J30	
28/09/15 19:40:48	SIG	M62/1987J1	30R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1974A1	50R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1974A2	50R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1974A3	50R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1974A4	50R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1979K1	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1981A1	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1981A2	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1981A3	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1981A4	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1987A1	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1987A3	40R	M62 J25 - J30	
28/09/15 19:40:53	SIG	M62/1987J1	20R	M62 J25 - J30	
28/09/15 19:40:54	SIG	M62/1992A1	50R	M62 J25 - J30	
28/09/15 19:40:54	SIG	M62/1992A2	50R	M62 J25 - J30	
28/09/15 19:40:54	SIG	M62/1992A3	50R	M62 J25 - J30	
28/09/15 19:40:54	SIG	M62/1992J1	50R	M62 J25 - J30	
28/09/15 19:40:59	SIG	M62/1992A1	40R	M62 J25 - J30	
28/09/15 19:40:59	SIG	M62/1992A2	40R	M62 J25 - J30	
28/09/15 19:40:59	SIG	M62/1992A3	40R	M62 J25 - J30	
28/09/15 19:40:59	SIG	M62/1992J1	40R	M62 J25 - J30	
28/09/15 19:41:04	SIG	M62/1992J1	30R	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1992A1	40R	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1992A2	40R	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1992A3	40R	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1992J1	20R	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1999A1	NR	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1999A2	NR	M62 J25 - J30	
28/09/15 19:41:10	SIG	M62/1999A3	NR	M62 J25 - J30	
28/09/15 19:41:15	SIG	M62/1987J1	STOP	M62 J25 - J30	
28/09/15 19:41:15	SIG	M62/1992J1	STOP	M62 J25 - J30	
28/09/15 19:41:17	SIG	M62/1981A1	30R	M62 J25 - J30	
28/09/15 19:41:22	SIG	M62/1968A1	60R	M62 J25 - J30	
28/09/15 19:41:22	SIG	M62/1968A2	60R	M62 J25 - J30	
28/09/15 19:41:22	SIG	M62/1968A3	60R	M62 J25 - J30	
28/09/15 19:41:22	SIG	M62/1968A4	60R	M62 J25 - J30	
28/09/15 19:41:22	SIG	M62/1974A1	LDR	M62 J25 - J30	
28/09/15 19:41:22	SIG	M62/1981A1	20R	M62 J25 - J30	
28/09/15 19:41:27	SIG	M62/1981A1	STOP	M62 J25 - J30	
28/09/15 19:48:02	SIG	M62/1960A1	60R	M62 J25 - J30	
28/09/15 19:48:02	SIG	M62/1960A2	60R	M62 J25 - J30	
28/09/15 19:48:02	SIG	M62/1960A3	60R	M62 J25 - J30	
28/09/15 19:48:02	SIG	M62/1960K1	60R	M62 J25 - J30	
28/09/15 19:48:02	SIG	M62/1960K2	60R	M62 J25 - J30	
28/09/15 19:51:06	SIG	M606/2003B1	NR	M62 J25 - J30	
28/09/15 19:51:06	SIG	M606/2003B2	NR	M62 J25 - J30	
28/09/15 19:54:06	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 19:54:07	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 19:56:02	SIG	M62/1955K1	60R	M62 J25 - J30	
28/09/15 19:56:02	SIG	M62/1955K2	60R	M62 J25 - J30	
28/09/15 19:56:02	SIG	M62/1956A1	60R	M62 J25 - J30	
28/09/15 19:56:02	SIG	M62/1956A2	60R	M62 J25 - J30	
28/09/15 19:56:02	SIG	M62/1956A3	60R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2012B1	REDX	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2025B1	REDX	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2025B2	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2025B3	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2025B4	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2033B1	REDX	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2033B2	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2033B3	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2033B4	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2041B1	REDX	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2041B2	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2041B3	50R	M62 J25 - J30	
28/09/15 20:04:38	SIG	M62/2041B4	50R	M62 J25 - J30	
28/09/15 20:04:49	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 20:04:49	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 20:04:49	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 20:04:49	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 20:04:54	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 20:04:54	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 20:04:54	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 20:04:54	SIG	M62/2018L1	40R	M62 J25 - J30	
28/09/15 20:05:00	SIG	M62/2018L1	30R	M62 J25 - J30	
28/09/15 20:05:05	SIG	M62/2018B1	40R	M62 J25 - J30	
28/09/15 20:05:05	SIG	M62/2018B2	40R	M62 J25 - J30	
28/09/15 20:05:05	SIG	M62/2018B3	40R	M62 J25 - J30	
28/09/15 20:05:05	SIG	M62/2018L1	20R	M62 J25 - J30	
28/09/15 20:05:10	SIG	M62/2018L1	STOP	M62 J25 - J30	
28/09/15 20:07:10	SIG	M62/2033B3	???	M62 J25 - J30	
28/09/15 20:07:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1974A1	60R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1974A2	60R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1974A3	60R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1974A4	60R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1979K1	50R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1981A1	50R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1981A2	50R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1981A3	50R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1981A4	50R	M62 J25 - J30	
28/09/15 20:14:27	SIG	M62/1987J1	40R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1979K1	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1981A1	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1981A2	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1981A3	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1981A4	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1987A1	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1987A3	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1987J1	60R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1992A1	50R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1992A2	50R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1992A3	50R	M62 J25 - J30	
28/09/15 20:14:57	SIG	M62/1992J1	50R	M62 J25 - J30	
28/09/15 20:18:47	SIG	M62/1999J1	50R	M62 J25 - J30	
28/09/15 20:18:47	SIG	M62/1999J2	LDL	M62 J25 - J30	
28/09/15 20:21:06	SIG	M62/1999J2	50R	M62 J25 - J30	
28/09/15 20:23:03	SIG	M62/1955K1	OFF	M62 J25 - J30	
28/09/15 20:23:03	SIG	M62/1955K2	OFF	M62 J25 - J30	
28/09/15 20:23:03	SIG	M62/1956A1	OFF	M62 J25 - J30	
28/09/15 20:23:03	SIG	M62/1956A2	OFF	M62 J25 - J30	
28/09/15 20:23:03	SIG	M62/1956A3	OFF	M62 J25 - J30	
28/09/15 20:23:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1960A1	OFF	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1960A2	OFF	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1960A3	OFF	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1960K1	OFF	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1960K2	OFF	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1968A1	NR	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1968A2	NR	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1968A3	NR	M62 J25 - J30	
28/09/15 20:24:03	SIG	M62/1968A4	NR	M62 J25 - J30	
28/09/15 20:25:48	SIG	M62/1999J2	LDL	M62 J25 - J30	
28/09/15 20:27:03	SIG	M62/1968A1	OFF	M62 J25 - J30	
28/09/15 20:27:04	SIG	M62/1968A2	OFF	M62 J25 - J30	
28/09/15 20:27:04	SIG	M62/1968A3	OFF	M62 J25 - J30	
28/09/15 20:27:04	SIG	M62/1968A4	OFF	M62 J25 - J30	
28/09/15 20:28:03	SIG	M62/2050B2	60R	M62 J25 - J30	
28/09/15 20:28:03	SIG	M62/2050B3	60R	M62 J25 - J30	
28/09/15 20:28:03	SIG	M62/2050B4	60R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M606/2003B1	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/1999B1	REDX	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/1999B2	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/1999B3	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/1999B4	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2004B1	REDX	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2004B2	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2004B3	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2004B4	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2012B2	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2012B3	50R	M62 J25 - J30	
28/09/15 20:33:06	SIG	M62/2012B4	50R	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1974A1	OFF	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1974A2	OFF	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1974A3	OFF	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1974A4	OFF	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1979K1	OFF	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1979K2	OFF	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1981A1	NR	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1981A2	NR	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1981A3	NR	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1981A4	NR	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1987A1	NR	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1987A3	NR	M62 J25 - J30	
28/09/15 20:34:13	SIG	M62/1987J1	NR	M62 J25 - J30	
28/09/15 20:37:13	SIG	M62/1981A1	OFF	M62 J25 - J30	
28/09/15 20:37:24	SIG	M62/1981A2	OFF	M62 J25 - J30	
28/09/15 20:37:24	SIG	M62/1981A3	OFF	M62 J25 - J30	
28/09/15 20:37:24	SIG	M62/1981A4	OFF	M62 J25 - J30	
28/09/15 20:37:24	SIG	M62/1987A1	OFF	M62 J25 - J30	
28/09/15 20:37:24	SIG	M62/1987A3	OFF	M62 J25 - J30	
28/09/15 20:37:24	SIG	M62/1987J1	OFF	M62 J25 - J30	
28/09/15 20:40:34	SIG	M606/2003B1	LDR	M62 J25 - J30	
28/09/15 20:40:34	SIG	M62/1992B1	50R	M62 J25 - J30	
28/09/15 20:40:34	SIG	M62/1992B2	50R	M62 J25 - J30	
28/09/15 20:40:34	SIG	M62/1992B3	50R	M62 J25 - J30	
28/09/15 20:40:34	SIG	M62/1992B4	50R	M62 J25 - J30	
28/09/15 20:40:34	SIG	M62/2005M1	TI	M62 J25 - J30	
28/09/15 20:40:34	SIG	M62/2005M2	TI	M62 J25 - J30	
28/09/15 20:40:39	SIG	M62/1992B1	40R	M62 J25 - J30	
28/09/15 20:40:39	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 20:40:39	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 20:40:39	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 20:40:45	SIG	M62/1992B1	30R	M62 J25 - J30	
28/09/15 20:40:50	SIG	M62/1992B1	20R	M62 J25 - J30	
28/09/15 20:40:50	SIG	M62/1992B2	40R	M62 J25 - J30	
28/09/15 20:40:50	SIG	M62/1992B3	40R	M62 J25 - J30	
28/09/15 20:40:50	SIG	M62/1992B4	40R	M62 J25 - J30	
28/09/15 20:40:56	SIG	M62/1992B1	STOP	M62 J25 - J30	
28/09/15 20:53:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 20:53:06	SIG	M62/2041B2	60R	M62 J25 - J30	
28/09/15 20:53:06	SIG	M62/2041B3	60R	M62 J25 - J30	
28/09/15 20:53:06	SIG	M62/2041B4	60R	M62 J25 - J30	
28/09/15 20:53:28	SIG	M62/2018B1	50R	M62 J25 - J30	
28/09/15 20:53:28	SIG	M62/2018B2	50R	M62 J25 - J30	
28/09/15 20:53:28	SIG	M62/2018B3	50R	M62 J25 - J30	
28/09/15 20:53:28	SIG	M62/2018L1	50R	M62 J25 - J30	
28/09/15 21:22:47	SIG	M62/2157A1	50R	M62 J25 - J30	
28/09/15 21:22:47	SIG	M62/2157A2	50R	M62 J25 - J30	
28/09/15 21:22:47	SIG	M62/2157K1	50R	M62 J25 - J30	
28/09/15 21:22:47	SIG	M62/2163A1	50R	M62 J25 - J30	
28/09/15 21:22:47	SIG	M62/2163A2	50R	M62 J25 - J30	
28/09/15 21:22:52	SIG	M62/2157A1	40R	M62 J25 - J30	
28/09/15 21:22:52	SIG	M62/2157A2	40R	M62 J25 - J30	
28/09/15 21:22:52	SIG	M62/2157K1	40R	M62 J25 - J30	
28/09/15 21:22:52	SIG	M62/2163A1	40R	M62 J25 - J30	
28/09/15 21:22:52	SIG	M62/2163A2	40R	M62 J25 - J30	
28/09/15 21:22:57	SIG	M62/2157A1	30R	M62 J25 - J30	
28/09/15 21:22:57	SIG	M62/2163A1	30R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2144A1	60R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2144A2	60R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2144J1	60R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2144K1	60R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2151A1	LDR	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2151A2	50R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2151J1	50R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2151K1	50R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2155A1	LDR	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2155A2	50R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2155J1	50R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2155K1	50R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2157A1	20R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2157A2	40R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2157J1	NR	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2157J2	NR	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2157K1	40R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2163A1	20R	M62 J25 - J30	
28/09/15 21:23:03	SIG	M62/2163A2	40R	M62 J25 - J30	
28/09/15 21:23:08	SIG	M62/2157A1	STOP	M62 J25 - J30	
28/09/15 21:23:08	SIG	M62/2163A1	STOP	M62 J25 - J30	
28/09/15 21:24:19	SIG	M62/2144A1	50R	M62 J25 - J30	
28/09/15 21:24:19	SIG	M62/2144A2	50R	M62 J25 - J30	
28/09/15 21:24:19	SIG	M62/2144J1	50R	M62 J25 - J30	
28/09/15 21:24:19	SIG	M62/2144K1	50R	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1992A1	OFF	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1992A2	OFF	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1992A3	OFF	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1992J1	OFF	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1999A1	NR	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1999A2	NR	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1999A3	NR	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1999J1	OFF	M62 J25 - J30	
28/09/15 21:34:38	SIG	M62/1999J2	OFF	M62 J25 - J30	
28/09/15 21:37:38	SIG	M62/1999A1	OFF	M62 J25 - J30	
28/09/15 21:37:39	SIG	M62/1999A2	OFF	M62 J25 - J30	
28/09/15 21:37:39	SIG	M62/1999A3	OFF	M62 J25 - J30	
28/09/15 21:48:12	SIG	M606/2003B2	40R	M62 J25 - J30	
28/09/15 21:48:12	SIG	M62/1999B2	40R	M62 J25 - J30	
28/09/15 21:48:12	SIG	M62/1999B3	40R	M62 J25 - J30	
28/09/15 21:48:12	SIG	M62/1999B4	40R	M62 J25 - J30	
28/09/15 21:52:12	SIG	M606/2003B2	50R	M62 J25 - J30	
28/09/15 21:52:12	SIG	M62/1999B2	50R	M62 J25 - J30	
28/09/15 21:52:12	SIG	M62/1999B3	50R	M62 J25 - J30	
28/09/15 21:52:12	SIG	M62/1999B4	50R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M606/2003B1	50R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/1992B1	OFF	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/1992B2	OFF	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/1992B3	OFF	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/1992B4	OFF	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2004B2	60R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2004B3	60R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2004B4	60R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2012B2	60R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2012B3	60R	M62 J25 - J30	
28/09/15 22:24:38	SIG	M62/2012B4	60R	M62 J25 - J30	
28/09/15 22:29:02	SIG	M62/2005M1	TI	M62 J25 - J30	
28/09/15 22:29:02	SIG	M62/2005M2	TI	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2151A1	NR	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2151A2	NR	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2151J1	NR	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2151K1	NR	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2155A1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2155A2	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2155J1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2155K1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2157A1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2157A2	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2157J1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2157J2	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2157K1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2163A1	OFF	M62 J25 - J30	
28/09/15 22:45:35	SIG	M62/2163A2	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2144A1	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2144A2	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2144J1	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2144K1	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2151A1	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2151A2	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2151J1	OFF	M62 J25 - J30	
28/09/15 22:45:45	SIG	M62/2151K1	OFF	M62 J25 - J30	
28/09/15 22:47:35	SIG	M62/2005M1	50R	M62 J25 - J30	
28/09/15 22:47:35	SIG	M62/2005M2	50R	M62 J25 - J30	
28/09/15 22:53:06	SIG	M606/2003B1	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M606/2003B2	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/1999B1	BLNK	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/1999B2	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/1999B3	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/1999B4	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2004B1	BLNK	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2004B2	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2004B3	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2004B4	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2005M1	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2005M2	OFF	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2012B2	NR	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2012B3	NR	M62 J25 - J30	
28/09/15 22:53:06	SIG	M62/2012B4	NR	M62 J25 - J30	
28/09/15 23:33:06	SIG	M62/2018B1	OFF	M62 J25 - J30	
28/09/15 23:33:06	SIG	M62/2018B2	OFF	M62 J25 - J30	
28/09/15 23:33:06	SIG	M62/2018B3	OFF	M62 J25 - J30	
28/09/15 23:33:06	SIG	M62/2018L1	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2012B1	BLNK	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2012B2	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2012B3	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2012B4	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2025B1	BLNK	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2025B1	BLNK	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2025B2	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2025B3	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2025B4	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2033B1	BLNK	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2033B1	BLNK	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2033B2	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2033B4	OFF	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2041B2	NR	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2041B3	NR	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2041B4	NR	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2050B2	NR	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2050B3	NR	M62 J25 - J30	
28/09/15 23:38:07	SIG	M62/2050B4	NR	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2041B1	BLNK	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2041B2	OFF	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2041B3	OFF	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2041B4	OFF	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2050B2	OFF	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2050B3	OFF	M62 J25 - J30	
28/09/15 23:41:07	SIG	M62/2050B4	OFF	M62 J25 - J30	
28/09/15 23:41:08	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 01:03:54	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 01:03:54	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 01:03:54	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 01:03:54	SIG	M62/2163A1	50R	M62 J25 - J30	
29/09/15 01:03:54	SIG	M62/2163A2	50R	M62 J25 - J30	
29/09/15 01:04:00	SIG	M62/2157A1	40R	M62 J25 - J30	
29/09/15 01:04:00	SIG	M62/2157A2	40R	M62 J25 - J30	
29/09/15 01:04:00	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 01:04:00	SIG	M62/2163A1	40R	M62 J25 - J30	
29/09/15 01:04:00	SIG	M62/2163A2	40R	M62 J25 - J30	
29/09/15 01:04:05	SIG	M62/2157A1	30R	M62 J25 - J30	
29/09/15 01:04:05	SIG	M62/2163A1	30R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2144A1	60R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2144A2	60R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2144J1	60R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2144K1	60R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2151A1	LDR	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2151A2	50R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2151J1	50R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2151K1	50R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2155A1	LDR	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2155A2	50R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2155J1	50R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2155K1	50R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2157A1	20R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2157A2	40R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2163A1	20R	M62 J25 - J30	
29/09/15 01:04:10	SIG	M62/2163A2	40R	M62 J25 - J30	
29/09/15 01:04:15	SIG	M62/2157A1	STOP	M62 J25 - J30	
29/09/15 01:04:15	SIG	M62/2163A1	STOP	M62 J25 - J30	
29/09/15 01:04:27	SIG	M62/2144A1	50R	M62 J25 - J30	
29/09/15 01:04:27	SIG	M62/2144A2	50R	M62 J25 - J30	
29/09/15 01:04:27	SIG	M62/2144J1	50R	M62 J25 - J30	
29/09/15 01:04:27	SIG	M62/2144K1	50R	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2144A1	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2144A2	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2144J1	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2144K1	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2151A1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2151A2	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2151J1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2151K1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2155A1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2155A2	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2155J1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2155K1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2157K1	NR	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 01:47:22	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 01:50:22	SIG	M62/2151J1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2151A1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2151A2	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2151K1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2155A1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2155A2	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2155J1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2155K1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2157J1	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2157J2	OFF	M62 J25 - J30	
29/09/15 01:50:23	SIG	M62/2157K1	OFF	M62 J25 - J30	
29/09/15 02:16:44	SIG	M62/1960B1	50R	M62 J25 - J30	
29/09/15 02:16:44	SIG	M62/1960B2	50R	M62 J25 - J30	
29/09/15 02:16:44	SIG	M62/1960B3	50R	M62 J25 - J30	
29/09/15 02:27:53	SIG	M62/1960B1	OFF	M62 J25 - J30	
29/09/15 02:27:53	SIG	M62/1960B2	OFF	M62 J25 - J30	
29/09/15 02:27:53	SIG	M62/1960B3	OFF	M62 J25 - J30	
29/09/15 02:52:32	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 02:52:32	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 02:52:32	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 02:52:32	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 02:52:32	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 02:52:32	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 02:52:37	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 02:52:37	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 02:52:37	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 02:52:37	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 02:52:37	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 02:52:37	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 02:52:42	SIG	M62/1981A1	30R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1968A1	60R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1968A2	60R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1968A3	60R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1968A4	60R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1974A1	LDR	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1981A1	20R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1987A1	NR	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1987A3	NR	M62 J25 - J30	
29/09/15 02:52:48	SIG	M62/1987J1	NR	M62 J25 - J30	
29/09/15 02:52:53	SIG	M62/1981A1	STOP	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1987A2	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 02:57:18	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1987A2	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 02:57:33	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 02:57:38	SIG	M62/1987J1	30R	M62 J25 - J30	
29/09/15 02:57:38	SIG	M62/1992J1	30R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1987J1	20R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1992J1	20R	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1999A1	NR	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1999A2	NR	M62 J25 - J30	
29/09/15 02:57:44	SIG	M62/1999A3	NR	M62 J25 - J30	
29/09/15 02:57:49	SIG	M62/1987J1	STOP	M62 J25 - J30	
29/09/15 02:57:49	SIG	M62/1992J1	STOP	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1968A1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1968A2	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1968A3	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1968A4	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1974A1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1974A2	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1974A3	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1974A4	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1979K1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1979K2	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1981A1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1981A2	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1981A3	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1981A4	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1987A1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1987A3	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1987J1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1992A1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1992A2	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1992A3	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1992J1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1999A1	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1999A2	OFF	M62 J25 - J30	
29/09/15 03:00:24	SIG	M62/1999A3	OFF	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2012B1	REDX	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2012B2	NR	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2012B3	NR	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2012B4	NR	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 03:04:31	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 03:20:35	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 03:22:44	SIG	M62/2033B3	???	M62 J25 - J30	
29/09/15 03:22:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1999A1	NR	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1999A2	NR	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1999A3	NR	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 03:40:43	SIG	M62/1999J2	LDL	M62 J25 - J30	
29/09/15 03:43:06	SIG	M62/2005M1	TI	M62 J25 - J30	
29/09/15 03:43:06	SIG	M62/2005M2	TI	M62 J25 - J30	
29/09/15 03:43:38	SIG	M606/2003B1	LDR	M62 J25 - J30	
29/09/15 03:43:38	SIG	M606/2003B2	50R	M62 J25 - J30	
29/09/15 03:43:39	SIG	M62/1992B1	50R	M62 J25 - J30	
29/09/15 03:43:39	SIG	M62/1992B2	50R	M62 J25 - J30	
29/09/15 03:43:39	SIG	M62/1992B3	50R	M62 J25 - J30	
29/09/15 03:43:39	SIG	M62/1992B4	50R	M62 J25 - J30	
29/09/15 03:43:44	SIG	M62/1992B1	40R	M62 J25 - J30	
29/09/15 03:43:44	SIG	M62/1992B2	40R	M62 J25 - J30	
29/09/15 03:43:44	SIG	M62/1992B3	40R	M62 J25 - J30	
29/09/15 03:43:44	SIG	M62/1992B4	40R	M62 J25 - J30	
29/09/15 03:43:50	SIG	M62/1992B1	30R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1992B1	20R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1992B2	40R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1992B3	40R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1992B4	40R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1999B1	REDX	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1999B2	50R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1999B3	50R	M62 J25 - J30	
29/09/15 03:43:55	SIG	M62/1999B4	50R	M62 J25 - J30	
29/09/15 03:44:00	SIG	M62/1992B1	STOP	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2012B1	BLNK	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2012B2	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2012B3	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2012B4	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2025B1	BLNK	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2025B1	BLNK	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2025B2	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2025B3	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2025B4	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2033B1	BLNK	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2033B1	BLNK	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2033B2	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2033B4	OFF	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2041B2	NR	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2041B3	NR	M62 J25 - J30	
29/09/15 03:59:14	SIG	M62/2041B4	NR	M62 J25 - J30	
29/09/15 04:02:14	SIG	M62/2041B2	OFF	M62 J25 - J30	
29/09/15 04:02:15	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 04:02:15	SIG	M62/2041B3	OFF	M62 J25 - J30	
29/09/15 04:02:15	SIG	M62/2041B4	OFF	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1992A1	OFF	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1992A2	OFF	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1992A3	OFF	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1992J1	OFF	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1999A1	NR	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1999A2	NR	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1999A3	NR	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1999J1	OFF	M62 J25 - J30	
29/09/15 04:11:04	SIG	M62/1999J2	OFF	M62 J25 - J30	
29/09/15 04:14:04	SIG	M62/1999A1	OFF	M62 J25 - J30	
29/09/15 04:14:05	SIG	M62/1999A2	OFF	M62 J25 - J30	
29/09/15 04:14:05	SIG	M62/1999A3	OFF	M62 J25 - J30	
29/09/15 04:23:47	SIG	M606/2003B2	40R	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/1999B2	40R	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/1999B3	40R	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/1999B4	40R	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/2004B1	REDX	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/2004B2	50R	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/2004B3	50R	M62 J25 - J30	
29/09/15 04:23:47	SIG	M62/2004B4	50R	M62 J25 - J30	
29/09/15 04:27:24	SIG	M606/2003B1	50R	M62 J25 - J30	
29/09/15 04:27:24	SIG	M62/1992B1	OFF	M62 J25 - J30	
29/09/15 04:27:24	SIG	M62/1992B2	OFF	M62 J25 - J30	
29/09/15 04:27:24	SIG	M62/1992B3	OFF	M62 J25 - J30	
29/09/15 04:27:24	SIG	M62/1992B4	OFF	M62 J25 - J30	
29/09/15 04:27:24	SIG	M62/2005M1	50R	M62 J25 - J30	
29/09/15 04:27:24	SIG	M62/2005M2	50R	M62 J25 - J30	
29/09/15 04:27:29	SIG	M606/2003B1	40R	M62 J25 - J30	
29/09/15 04:27:29	SIG	M62/2005M1	40R	M62 J25 - J30	
29/09/15 04:27:29	SIG	M62/2005M2	40R	M62 J25 - J30	
29/09/15 04:28:15	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 04:28:15	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 04:28:15	SIG	M62/2004B2	NR	M62 J25 - J30	
29/09/15 04:28:15	SIG	M62/2004B3	NR	M62 J25 - J30	
29/09/15 04:28:15	SIG	M62/2004B4	NR	M62 J25 - J30	
29/09/15 04:28:15	SIG	M62/2005M1	OFF	M62 J25 - J30	
29/09/15 04:28:15	SIG	M62/2005M2	OFF	M62 J25 - J30	
29/09/15 04:28:16	SIG	M62/1999B1	BLNK	M62 J25 - J30	
29/09/15 04:28:16	SIG	M62/1999B2	OFF	M62 J25 - J30	
29/09/15 04:28:16	SIG	M62/1999B3	OFF	M62 J25 - J30	
29/09/15 04:28:16	SIG	M62/1999B4	OFF	M62 J25 - J30	
29/09/15 04:31:16	SIG	M62/2004B1	BLNK	M62 J25 - J30	
29/09/15 04:31:16	SIG	M62/2004B2	OFF	M62 J25 - J30	
29/09/15 04:31:16	SIG	M62/2004B3	OFF	M62 J25 - J30	
29/09/15 04:31:16	SIG	M62/2004B4	OFF	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2004B1	REDX	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2004B2	50R	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2004B3	50R	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2004B4	50R	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2012B1	REDX	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2012B2	50R	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2012B3	50R	M62 J25 - J30	
29/09/15 04:31:18	SIG	M62/2012B4	50R	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2004B1	BLNK	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2004B2	OFF	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2004B3	OFF	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2004B4	OFF	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2012B1	BLNK	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2012B2	OFF	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2012B3	OFF	M62 J25 - J30	
29/09/15 05:12:18	SIG	M62/2012B4	OFF	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2106B1	REDX	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2106B2	NR	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2106B3	NR	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2106B4	NR	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2113B1	REDX	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2113B2	60R	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2113B3	60R	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2113B4	60R	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2117B1	60R	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2117B3	60R	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2120M1	60R	M62 J25 - J30	
29/09/15 06:19:59	SIG	M62/2120M2	60R	M62 J25 - J30	
29/09/15 06:22:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 06:22:23	SIG	M62/2117B1	???	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2106B2	NR	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2106B3	NR	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2106B4	NR	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2113B1	BLNK	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2113B2	OFF	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2113B3	OFF	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2113B4	OFF	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2117B3	OFF	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2120M1	OFF	M62 J25 - J30	
29/09/15 06:23:33	SIG	M62/2120M2	OFF	M62 J25 - J30	
29/09/15 06:26:33	SIG	M62/2106B2	OFF	M62 J25 - J30	
29/09/15 06:26:33	SIG	M62/2106B3	OFF	M62 J25 - J30	
29/09/15 06:26:33	SIG	M62/2106B4	OFF	M62 J25 - J30	
29/09/15 06:26:34	SIG	M62/2106B1	BLNK	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2159B1	NR	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2159B2	NR	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 06:29:41	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 06:29:47	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 06:32:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 06:32:16	SIG	M62/2183B2	???	M62 J25 - J30	
29/09/15 06:33:41	SIG	M62/2159B1	NR	M62 J25 - J30	
29/09/15 06:33:41	SIG	M62/2159B2	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2170B1	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2170B2	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2170L1	OFF	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2170L2	OFF	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2177B1	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2177B2	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2177L1	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2177L2	NR	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2183B1	OFF	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2183L1	OFF	M62 J25 - J30	
29/09/15 06:33:42	SIG	M62/2183L2	OFF	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2008K1	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2008K2	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2012A1	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2012A2	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2012A3	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2018A1	HSD	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2018A2	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2018A3	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2018A4	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2025A1	REDX	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2025A2	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2025A3	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2025A4	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2033A1	REDX	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2033A2	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2033A3	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2033A4	60R	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2041A1	REDX	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2041A2	NR	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2041A3	NR	M62 J25 - J30	
29/09/15 06:35:14	SIG	M62/2041A4	NR	M62 J25 - J30	
29/09/15 06:36:41	SIG	M62/2159B1	OFF	M62 J25 - J30	
29/09/15 06:36:42	SIG	M62/2159B2	OFF	M62 J25 - J30	
29/09/15 06:36:42	SIG	M62/2177L1	OFF	M62 J25 - J30	
29/09/15 06:36:43	SIG	M62/2170B1	OFF	M62 J25 - J30	
29/09/15 06:36:43	SIG	M62/2170B2	OFF	M62 J25 - J30	
29/09/15 06:36:43	SIG	M62/2177B1	OFF	M62 J25 - J30	
29/09/15 06:36:43	SIG	M62/2177B2	OFF	M62 J25 - J30	
29/09/15 06:36:43	SIG	M62/2177L2	OFF	M62 J25 - J30	
29/09/15 06:38:14	SIG	M62/2004A1	60R	M62 J25 - J30	
29/09/15 06:38:14	SIG	M62/2004A2	60R	M62 J25 - J30	
29/09/15 06:38:14	SIG	M62/2004A3	60R	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2041A2	60R	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2041A3	60R	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2041A4	60R	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2050A1	REDX	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2050A2	NR	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2050A3	NR	M62 J25 - J30	
29/09/15 06:39:14	SIG	M62/2050A4	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2050A2	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2050A3	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2050A4	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057A1	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057A1	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057A2	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057A2	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057A3	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057A3	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057J1	60R	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2057J1	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2065A1	REDX	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2065A2	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2065A3	NR	M62 J25 - J30	
29/09/15 06:42:20	SIG	M62/2065A4	NR	M62 J25 - J30	
29/09/15 06:42:49	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 06:42:49	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 06:42:49	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 06:42:49	SIG	M62/2041A2	50R	M62 J25 - J30	
29/09/15 06:42:49	SIG	M62/2041A3	50R	M62 J25 - J30	
29/09/15 06:42:49	SIG	M62/2041A4	50R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2033A2	40R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2033A3	40R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2033A4	40R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2041A2	40R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2041A3	40R	M62 J25 - J30	
29/09/15 06:42:54	SIG	M62/2041A4	40R	M62 J25 - J30	
29/09/15 06:44:00	SIG	M62/2050A1	60R	M62 J25 - J30	
29/09/15 06:44:09	SIG	M62/2159B1	NR	M62 J25 - J30	
29/09/15 06:44:09	SIG	M62/2159B2	NR	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 06:44:10	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 06:44:14	SIG	M62/2004A1	OFF	M62 J25 - J30	
29/09/15 06:44:14	SIG	M62/2004A2	OFF	M62 J25 - J30	
29/09/15 06:44:14	SIG	M62/2004A3	OFF	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 06:44:15	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 06:44:23	SIG	M62/2041A1	40R	M62 J25 - J30	
29/09/15 06:44:48	SIG	M62/2033A1	40R	M62 J25 - J30	
29/09/15 06:44:52	SIG	M62/2018A1	60R	M62 J25 - J30	
29/09/15 06:44:52	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2018A1	50R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2018A2	50R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2018A3	50R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2018A4	50R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2025A1	40R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2025A2	40R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2025A3	40R	M62 J25 - J30	
29/09/15 06:45:06	SIG	M62/2025A4	40R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M606/2003B1	NR	M62 J25 - J30	
29/09/15 06:45:18	SIG	M606/2003B2	NR	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2018A1	40R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2018A2	40R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2018A3	40R	M62 J25 - J30	
29/09/15 06:45:18	SIG	M62/2018A4	40R	M62 J25 - J30	
29/09/15 06:46:48	SIG	M62/2183B2	???	M62 J25 - J30	
29/09/15 06:46:49	SIG	M62/2041A1	60R	M62 J25 - J30	
29/09/15 06:46:49	SIG	M62/2041A2	60R	M62 J25 - J30	
29/09/15 06:46:49	SIG	M62/2041A3	60R	M62 J25 - J30	
29/09/15 06:46:49	SIG	M62/2041A4	60R	M62 J25 - J30	
29/09/15 06:46:49	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 06:47:14	SIG	M62/2004A1	60R	M62 J25 - J30	
29/09/15 06:47:14	SIG	M62/2004A2	60R	M62 J25 - J30	
29/09/15 06:47:14	SIG	M62/2004A3	60R	M62 J25 - J30	
29/09/15 06:47:15	SIG	M62/1999A1	60R	M62 J25 - J30	
29/09/15 06:47:15	SIG	M62/1999A2	60R	M62 J25 - J30	
29/09/15 06:47:15	SIG	M62/1999A3	60R	M62 J25 - J30	
29/09/15 06:47:15	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 06:47:15	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2189B1	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2189B2	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2189B3	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2189B4	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2194B1	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2194B2	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2194B3	60R	M62 J25 - J30	
29/09/15 06:48:14	SIG	M62/2194B4	60R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 06:48:24	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 06:48:29	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 06:49:11	SIG	M62/2033A1	60R	M62 J25 - J30	
29/09/15 06:49:11	SIG	M62/2033A2	60R	M62 J25 - J30	
29/09/15 06:49:11	SIG	M62/2033A3	60R	M62 J25 - J30	
29/09/15 06:49:11	SIG	M62/2033A4	60R	M62 J25 - J30	
29/09/15 06:49:19	SIG	M62/2025A1	60R	M62 J25 - J30	
29/09/15 06:49:19	SIG	M62/2025A2	60R	M62 J25 - J30	
29/09/15 06:49:19	SIG	M62/2025A3	60R	M62 J25 - J30	
29/09/15 06:49:19	SIG	M62/2025A4	60R	M62 J25 - J30	
29/09/15 06:50:01	SIG	M62/2018A1	60R	M62 J25 - J30	
29/09/15 06:50:01	SIG	M62/2018A2	60R	M62 J25 - J30	
29/09/15 06:50:01	SIG	M62/2018A3	60R	M62 J25 - J30	
29/09/15 06:50:01	SIG	M62/2018A4	60R	M62 J25 - J30	
29/09/15 06:50:14	SIG	M62/2197B1	60R	M62 J25 - J30	
29/09/15 06:50:14	SIG	M62/2197B2	60R	M62 J25 - J30	
29/09/15 06:50:14	SIG	M62/2197B3	60R	M62 J25 - J30	
29/09/15 06:50:14	SIG	M62/2199M1	60R	M62 J25 - J30	
29/09/15 06:50:14	SIG	M62/2199M2	60R	M62 J25 - J30	
29/09/15 06:50:34	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 06:50:34	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 06:50:34	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 06:50:40	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 06:52:14	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 06:52:14	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 06:52:14	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 06:52:14	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 06:52:25	SIG	M606/2003B1	NR	M62 J25 - J30	
29/09/15 06:52:25	SIG	M606/2003B2	NR	M62 J25 - J30	
29/09/15 06:52:25	SIG	M62/2008K1	60R	M62 J25 - J30	
29/09/15 06:52:25	SIG	M62/2008K2	60R	M62 J25 - J30	
29/09/15 06:52:25	SIG	M62/2012A1	60R	M62 J25 - J30	
29/09/15 06:52:25	SIG	M62/2012A2	60R	M62 J25 - J30	
29/09/15 06:52:25	SIG	M62/2012A3	60R	M62 J25 - J30	
29/09/15 06:52:43	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 06:52:43	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 06:52:43	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 06:52:43	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 06:52:53	SIG	M62/2183B2	???	M62 J25 - J30	
29/09/15 06:52:54	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 06:53:00	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 06:53:36	SIG	M62/1999A1	60R	M62 J25 - J30	
29/09/15 06:53:36	SIG	M62/1999A2	60R	M62 J25 - J30	
29/09/15 06:53:36	SIG	M62/1999A3	60R	M62 J25 - J30	
29/09/15 06:53:36	SIG	M62/2004A1	60R	M62 J25 - J30	
29/09/15 06:53:36	SIG	M62/2004A2	60R	M62 J25 - J30	
29/09/15 06:53:36	SIG	M62/2004A3	60R	M62 J25 - J30	
29/09/15 06:54:45	SIG	M62/2065M1	NR	M62 J25 - J30	
29/09/15 06:54:45	SIG	M62/2069M1	60R	M62 J25 - J30	
29/09/15 06:54:45	SIG	M62/2069M2	60R	M62 J25 - J30	
29/09/15 06:54:45	SIG	M621/1010B1	60R	M62 J25 - J30	
29/09/15 06:54:45	SIG	M621/1010B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2012B1	REDX	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2012B2	NR	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2012B3	NR	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2012B4	NR	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2025B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2025B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2025B4	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2033B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2033B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2033B4	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B2	NR	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B3	NR	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2041B4	NR	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2050B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2050B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2050B4	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2057B1	REDX	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2057B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2057B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2057B4	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2065B1	REDX	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2065B2	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2065B3	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2065B4	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M62/2065M1	60R	M62 J25 - J30	
29/09/15 06:54:46	SIG	M621/1002B1	HSD	M62 J25 - J30	
29/09/15 06:54:46	SIG	M621/1002B2	60R	M62 J25 - J30	
29/09/15 06:55:14	SIG	M62/2203B1	60R	M62 J25 - J30	
29/09/15 06:55:14	SIG	M62/2203B2	60R	M62 J25 - J30	
29/09/15 06:55:14	SIG	M62/2203B3	60R	M62 J25 - J30	
29/09/15 06:55:25	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 06:55:25	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2194B1	50R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2194B2	50R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2194B3	50R	M62 J25 - J30	
29/09/15 06:55:28	SIG	M62/2194B4	50R	M62 J25 - J30	
29/09/15 06:55:59	SIG	M62/2183B2	???	M62 J25 - J30	
29/09/15 06:56:00	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 06:56:05	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 06:56:20	SIG	M62/2025B1	60R	M62 J25 - J30	
29/09/15 06:56:44	SIG	M62/2033B1	60R	M62 J25 - J30	
29/09/15 06:56:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 06:57:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 06:57:02	SIG	M62/2041B1	60R	M62 J25 - J30	
29/09/15 06:57:09	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 06:57:09	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 06:57:09	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 06:57:09	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 06:57:14	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 06:57:14	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 06:57:14	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 06:57:14	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 06:57:24	SIG	M62/2057B1	60R	M62 J25 - J30	
29/09/15 06:57:24	SIG	M621/1002B1	60R	M62 J25 - J30	
29/09/15 06:57:24	SIG	M621/1010B1	OFF	M62 J25 - J30	
29/09/15 06:57:24	SIG	M621/1010B2	OFF	M62 J25 - J30	
29/09/15 06:59:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 06:59:06	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 06:59:11	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 07:00:00	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 07:00:05	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 07:00:05	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 07:00:05	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 07:00:05	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:00:05	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:00:06	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 07:00:06	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 07:00:06	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 07:01:09	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 07:01:09	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 07:01:09	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 07:01:09	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 07:02:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:02:12	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:02:17	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1955K1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1955K2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1956A1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1956A2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1956A3	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1960A1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1960A2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1960A3	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1960K1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1960K2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1968A1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1968A2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1968A3	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1968A4	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1974A1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1974A2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1974A3	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1974A4	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1979K1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1979K2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1981A1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1981A2	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1981A3	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1981A4	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1987A1	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1987A3	60R	M62 J25 - J30	
29/09/15 07:02:24	SIG	M62/1987J1	60R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/1999A1	60R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/1999A2	60R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/1999A3	60R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/2004A1	60R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/2004A2	60R	M62 J25 - J30	
29/09/15 07:04:00	SIG	M62/2004A3	60R	M62 J25 - J30	
29/09/15 07:04:17	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 07:04:17	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 07:04:17	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 07:04:17	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 07:04:25	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 07:04:30	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 07:05:17	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:05:17	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:05:23	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:08:24	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:08:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:08:30	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:09:28	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 07:09:28	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 07:09:28	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 07:09:28	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2033A1	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 07:10:17	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2018A1	50R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2018A2	50R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2018A3	50R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2018A4	50R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2025A1	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2025A2	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2025A3	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2025A4	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2033A1	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2033A2	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2033A3	40R	M62 J25 - J30	
29/09/15 07:10:22	SIG	M62/2033A4	40R	M62 J25 - J30	
29/09/15 07:11:30	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:11:31	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:11:36	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M606/2003B1	NR	M62 J25 - J30	
29/09/15 07:12:03	SIG	M606/2003B2	NR	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2018A1	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2018A2	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2018A3	40R	M62 J25 - J30	
29/09/15 07:12:03	SIG	M62/2018A4	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 07:12:09	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 07:14:18	SIG	M62/2033A1	60R	M62 J25 - J30	
29/09/15 07:14:18	SIG	M62/2033A2	60R	M62 J25 - J30	
29/09/15 07:14:18	SIG	M62/2033A3	60R	M62 J25 - J30	
29/09/15 07:14:18	SIG	M62/2033A4	60R	M62 J25 - J30	
29/09/15 07:14:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:14:37	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:14:42	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:15:02	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 07:15:02	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 07:15:02	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 07:15:08	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 07:15:08	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 07:15:08	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2194B1	40R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2194B2	40R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2194B3	40R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2194B4	40R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2197B1	50R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2197B2	50R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2197B3	50R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2199M1	50R	M62 J25 - J30	
29/09/15 07:15:58	SIG	M62/2199M2	50R	M62 J25 - J30	
29/09/15 07:16:04	SIG	M62/2025A1	60R	M62 J25 - J30	
29/09/15 07:16:04	SIG	M62/2025A2	60R	M62 J25 - J30	
29/09/15 07:16:04	SIG	M62/2025A3	60R	M62 J25 - J30	
29/09/15 07:16:04	SIG	M62/2025A4	60R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2197B1	40R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2197B2	40R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2197B3	40R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2199M1	40R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2199M2	40R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2203B1	50R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2203B2	50R	M62 J25 - J30	
29/09/15 07:16:26	SIG	M62/2203B3	50R	M62 J25 - J30	
29/09/15 07:16:35	SIG	M62/2018A1	60R	M62 J25 - J30	
29/09/15 07:16:35	SIG	M62/2018A2	60R	M62 J25 - J30	
29/09/15 07:16:35	SIG	M62/2018A3	60R	M62 J25 - J30	
29/09/15 07:16:35	SIG	M62/2018A4	60R	M62 J25 - J30	
29/09/15 07:17:20	SIG	M62/2203B1	40R	M62 J25 - J30	
29/09/15 07:17:20	SIG	M62/2203B2	40R	M62 J25 - J30	
29/09/15 07:17:20	SIG	M62/2203B3	40R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 07:17:21	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 07:17:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:17:48	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:17:53	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:18:00	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 07:18:00	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 07:18:00	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 07:18:00	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 07:18:00	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 07:18:58	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 07:19:02	SIG	M62/1956A1	60R	M62 J25 - J30	
29/09/15 07:19:02	SIG	M62/1956A2	60R	M62 J25 - J30	
29/09/15 07:19:02	SIG	M62/1956A3	60R	M62 J25 - J30	
29/09/15 07:19:06	SIG	M62/2033A1	50R	M62 J25 - J30	
29/09/15 07:19:06	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 07:19:06	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 07:19:06	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2033A1	40R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2033A2	40R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2033A3	40R	M62 J25 - J30	
29/09/15 07:19:11	SIG	M62/2033A4	40R	M62 J25 - J30	
29/09/15 07:20:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:20:48	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:20:53	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:22:25	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 07:22:25	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 07:22:25	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2025A1	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2025A2	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2025A3	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2025A4	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2033A1	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2033A2	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2033A3	60R	M62 J25 - J30	
29/09/15 07:23:05	SIG	M62/2033A4	60R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2197B1	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2197B2	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2197B3	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2199M1	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2199M2	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2203B1	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2203B2	50R	M62 J25 - J30	
29/09/15 07:23:30	SIG	M62/2203B3	50R	M62 J25 - J30	
29/09/15 07:23:53	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:23:54	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:23:59	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 07:24:04	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 07:24:20	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1968A1	50R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1968A2	50R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1968A3	50R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1968A4	50R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1974A1	40R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1974A2	40R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1974A3	40R	M62 J25 - J30	
29/09/15 07:24:27	SIG	M62/1974A4	40R	M62 J25 - J30	
29/09/15 07:24:40	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 07:24:40	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 07:24:40	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 07:24:40	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 07:24:41	SIG	M62/2194B1	50R	M62 J25 - J30	
29/09/15 07:24:41	SIG	M62/2194B2	50R	M62 J25 - J30	
29/09/15 07:24:41	SIG	M62/2194B3	50R	M62 J25 - J30	
29/09/15 07:24:41	SIG	M62/2194B4	50R	M62 J25 - J30	
29/09/15 07:25:23	SIG	M62/2194B1	40R	M62 J25 - J30	
29/09/15 07:25:23	SIG	M62/2194B2	40R	M62 J25 - J30	
29/09/15 07:25:23	SIG	M62/2194B3	40R	M62 J25 - J30	
29/09/15 07:25:23	SIG	M62/2194B4	40R	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2065A2	60R	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2065A3	60R	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2065A4	60R	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2073K1	60R	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2073K2	60R	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2079A1	REDX	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2079A2	NR	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2079A3	NR	M62 J25 - J30	
29/09/15 07:26:04	SIG	M62/2079A4	NR	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2074A2	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2074A3	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2074A4	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2079A2	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2079A3	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2079A4	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2088A1	REDX	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2088A2	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2088A3	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2088A4	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2097A1	REDX	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2097A2	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2097A3	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2097A4	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2106A1	REDX	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2106A2	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2106A3	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2106A4	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2114A1	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2114A2	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2114A3	60R	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2117A1	REDX	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2117A2	NR	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2117A3	NR	M62 J25 - J30	
29/09/15 07:26:05	SIG	M62/2117A4	NR	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2025B1	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2033B1	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 07:26:20	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2025B1	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2025B2	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2025B3	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2025B4	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2033B1	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2033B2	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2033B4	40R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 07:26:26	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 07:26:41	SIG	M62/2203B1	60R	M62 J25 - J30	
29/09/15 07:26:41	SIG	M62/2203B2	60R	M62 J25 - J30	
29/09/15 07:26:41	SIG	M62/2203B3	60R	M62 J25 - J30	
29/09/15 07:26:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:26:59	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1960A1	50R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1960A2	50R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1960A3	50R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1960K1	50R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1960K2	50R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1968A1	40R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1968A2	40R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1968A3	40R	M62 J25 - J30	
29/09/15 07:27:02	SIG	M62/1968A4	40R	M62 J25 - J30	
29/09/15 07:27:05	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 07:27:09	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 07:27:15	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 07:27:38	SIG	M62/2106A1	60R	M62 J25 - J30	
29/09/15 07:27:58	SIG	M62/2097A1	60R	M62 J25 - J30	
29/09/15 07:28:11	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 07:28:11	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 07:28:21	SIG	M62/2088A1	60R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1960A1	40R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1960A2	40R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1960A3	40R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1960K1	40R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/1960K2	40R	M62 J25 - J30	
29/09/15 07:28:25	SIG	M62/2079A1	60R	M62 J25 - J30	
29/09/15 07:28:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 07:28:34	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 07:28:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 07:28:35	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 07:28:41	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 07:28:42	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 07:28:42	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 07:28:42	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 07:28:42	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:28:42	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:28:44	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 07:28:45	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 07:28:50	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 07:29:04	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 07:29:38	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 07:29:38	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 07:29:38	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 07:29:38	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 07:29:38	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 07:30:03	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 07:30:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:30:06	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:30:11	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2025B1	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2025B2	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2025B3	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2025B4	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2033B1	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2033B2	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2033B3	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2033B4	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2041B1	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 07:30:20	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 07:31:09	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 07:31:09	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 07:31:09	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 07:31:09	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 07:31:13	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 07:31:49	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 07:32:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 07:32:45	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 07:33:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:33:12	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:33:18	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:33:29	SIG	M62/2057A1	50R	M62 J25 - J30	
29/09/15 07:33:29	SIG	M62/2057A2	50R	M62 J25 - J30	
29/09/15 07:33:29	SIG	M62/2057A3	50R	M62 J25 - J30	
29/09/15 07:33:29	SIG	M62/2057J1	50R	M62 J25 - J30	
29/09/15 07:33:29	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 07:33:29	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2050A1	50R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2050A2	50R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2050A3	50R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2050A4	50R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2057A1	40R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2057A2	40R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2057A3	40R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M62/2057J1	40R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 07:33:34	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 07:33:39	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 07:33:39	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 07:34:07	SIG	M62/2194B1	50R	M62 J25 - J30	
29/09/15 07:34:07	SIG	M62/2194B2	50R	M62 J25 - J30	
29/09/15 07:34:07	SIG	M62/2194B3	50R	M62 J25 - J30	
29/09/15 07:34:07	SIG	M62/2194B4	50R	M62 J25 - J30	
29/09/15 07:34:11	SIG	M62/1968A1	50R	M62 J25 - J30	
29/09/15 07:34:11	SIG	M62/1968A2	50R	M62 J25 - J30	
29/09/15 07:34:11	SIG	M62/1968A3	50R	M62 J25 - J30	
29/09/15 07:34:11	SIG	M62/1968A4	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 07:34:24	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 07:34:28	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 07:34:28	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 07:34:28	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 07:34:28	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:34:28	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:34:40	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 07:34:40	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 07:34:40	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 07:34:40	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 07:35:36	SIG	M62/2050A1	40R	M62 J25 - J30	
29/09/15 07:35:36	SIG	M62/2050A2	40R	M62 J25 - J30	
29/09/15 07:35:36	SIG	M62/2050A3	40R	M62 J25 - J30	
29/09/15 07:35:36	SIG	M62/2050A4	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 07:35:59	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 07:36:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:36:17	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:36:22	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1960A1	50R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1960A2	50R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1960A3	50R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1960K1	50R	M62 J25 - J30	
29/09/15 07:37:27	SIG	M62/1960K2	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 07:37:51	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 07:37:55	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 07:37:55	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2033A1	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2041A1	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2041A2	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2041A3	50R	M62 J25 - J30	
29/09/15 07:38:00	SIG	M62/2041A4	50R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2033A1	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2033A2	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2033A3	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2033A4	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2041A1	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2041A2	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2041A3	40R	M62 J25 - J30	
29/09/15 07:38:06	SIG	M62/2041A4	40R	M62 J25 - J30	
29/09/15 07:38:18	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 07:38:18	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 07:38:23	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 07:38:23	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2018A1	50R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2018A2	50R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2018A3	50R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2018A4	50R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2025A1	40R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2025A2	40R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2025A3	40R	M62 J25 - J30	
29/09/15 07:38:39	SIG	M62/2025A4	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2018A1	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2018A2	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2018A3	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2018A4	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2025A1	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2025A2	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2025A3	40R	M62 J25 - J30	
29/09/15 07:38:45	SIG	M62/2025A4	40R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 07:39:25	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 07:39:30	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 07:39:34	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 07:39:34	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 07:39:34	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 07:40:29	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 07:40:29	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 07:40:29	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 07:40:29	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 07:41:23	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 07:41:23	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 07:41:23	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 07:41:23	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 07:41:23	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 07:41:23	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 07:41:43	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 07:41:43	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 07:41:59	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 07:41:59	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 07:42:29	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:42:30	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:42:35	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:42:45	SIG	M62/1974A1	40R	M62 J25 - J30	
29/09/15 07:42:45	SIG	M62/1974A2	40R	M62 J25 - J30	
29/09/15 07:42:45	SIG	M62/1974A3	40R	M62 J25 - J30	
29/09/15 07:42:45	SIG	M62/1974A4	40R	M62 J25 - J30	
29/09/15 07:43:24	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 07:43:24	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 07:43:24	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 07:43:24	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 07:44:29	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 07:44:40	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 07:44:53	SIG	M62/1968A1	40R	M62 J25 - J30	
29/09/15 07:44:53	SIG	M62/1968A2	40R	M62 J25 - J30	
29/09/15 07:44:53	SIG	M62/1968A3	40R	M62 J25 - J30	
29/09/15 07:44:53	SIG	M62/1968A4	40R	M62 J25 - J30	
29/09/15 07:45:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 07:45:28	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 07:45:32	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 07:45:32	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 07:45:50	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 07:45:56	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 07:46:07	SIG	M62/2113B1	REDX	M62 J25 - J30	
29/09/15 07:46:07	SIG	M62/2113B2	NR	M62 J25 - J30	
29/09/15 07:46:07	SIG	M62/2113B3	NR	M62 J25 - J30	
29/09/15 07:46:07	SIG	M62/2113B4	NR	M62 J25 - J30	
29/09/15 07:46:07	SIG	M62/2120M1	60R	M62 J25 - J30	
29/09/15 07:46:07	SIG	M62/2120M2	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2097B1	REDX	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2097B2	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2097B4	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2106B1	REDX	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2106B2	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2106B3	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2106B4	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2113B2	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2113B3	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2113B4	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2117B1	60R	M62 J25 - J30	
29/09/15 07:46:17	SIG	M62/2117B3	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2074B1	REDX	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2074B2	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2074B3	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2074B4	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2081B1	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2081B2	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2081B3	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2081L1	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2088B1	REDX	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2088B2	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2088B3	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2088B4	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2097B2	60R	M62 J25 - J30	
29/09/15 07:46:28	SIG	M62/2097B4	60R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 07:46:54	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 07:47:05	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 07:47:33	SIG	M62/2088B1	60R	M62 J25 - J30	
29/09/15 07:47:52	SIG	M62/2097B1	60R	M62 J25 - J30	
29/09/15 07:47:58	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 07:47:58	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 07:47:58	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 07:47:58	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 07:48:20	SIG	M62/2106B1	60R	M62 J25 - J30	
29/09/15 07:48:24	SIG	M62/2113B1	60R	M62 J25 - J30	
29/09/15 07:48:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 07:48:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 07:48:40	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 07:48:41	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 07:48:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:48:47	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:48:52	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 07:48:53	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 07:49:47	SIG	M62/1968A1	50R	M62 J25 - J30	
29/09/15 07:49:47	SIG	M62/1968A2	50R	M62 J25 - J30	
29/09/15 07:49:47	SIG	M62/1968A3	50R	M62 J25 - J30	
29/09/15 07:49:47	SIG	M62/1968A4	50R	M62 J25 - J30	
29/09/15 07:49:49	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 07:49:49	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 07:49:49	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 07:49:49	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 07:50:37	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 07:50:37	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 07:50:37	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 07:50:37	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 07:50:43	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 07:50:43	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 07:50:43	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 07:50:43	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 07:51:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:51:47	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:51:52	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1974A1	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1974A2	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1974A3	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1974A4	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 07:52:00	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 07:52:24	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 07:52:24	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 07:52:29	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 07:52:29	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 07:52:54	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 07:53:05	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 07:53:05	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:53:05	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 07:53:05	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 07:53:34	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 07:53:34	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 07:53:34	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 07:53:34	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 07:53:40	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 07:53:40	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 07:53:40	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 07:53:40	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 07:54:16	SIG	M62/1955K1	60R	M62 J25 - J30	
29/09/15 07:54:16	SIG	M62/1955K2	60R	M62 J25 - J30	
29/09/15 07:54:16	SIG	M62/1956A1	60R	M62 J25 - J30	
29/09/15 07:54:16	SIG	M62/1956A2	60R	M62 J25 - J30	
29/09/15 07:54:16	SIG	M62/1956A3	60R	M62 J25 - J30	
29/09/15 07:55:13	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 07:55:13	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 07:55:13	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 07:55:13	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 07:55:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:55:55	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:55:59	SIG	M62/1968A1	40R	M62 J25 - J30	
29/09/15 07:55:59	SIG	M62/1968A2	40R	M62 J25 - J30	
29/09/15 07:55:59	SIG	M62/1968A3	40R	M62 J25 - J30	
29/09/15 07:55:59	SIG	M62/1968A4	40R	M62 J25 - J30	
29/09/15 07:56:00	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 07:56:25	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 07:56:25	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 07:56:30	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 07:56:30	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 07:56:35	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 07:56:35	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 07:59:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 07:59:01	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 07:59:06	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:00:16	SIG	M62/2203B1	50R	M62 J25 - J30	
29/09/15 08:00:16	SIG	M62/2203B2	50R	M62 J25 - J30	
29/09/15 08:00:16	SIG	M62/2203B3	50R	M62 J25 - J30	
29/09/15 08:01:57	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 08:01:57	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 08:02:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1960A1	40R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1960A2	40R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1960A3	40R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1960K1	40R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/1960K2	40R	M62 J25 - J30	
29/09/15 08:02:07	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:02:13	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:02:16	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 08:02:16	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 08:02:16	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 08:02:16	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 08:02:22	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 08:02:22	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 08:02:25	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 08:02:25	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:02:25	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 08:02:25	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 08:02:27	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 08:02:27	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 08:03:19	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2018A1	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2018A2	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2018A3	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2018A4	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 08:03:59	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2018A1	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2018A2	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2018A3	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2018A4	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2025A1	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2025A2	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2025A3	40R	M62 J25 - J30	
29/09/15 08:04:08	SIG	M62/2025A4	40R	M62 J25 - J30	
29/09/15 08:04:19	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 08:04:19	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 08:04:19	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 08:04:19	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 08:04:19	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 08:06:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:06:15	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:06:21	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:09:16	SIG	M62/2203B1	60R	M62 J25 - J30	
29/09/15 08:09:16	SIG	M62/2203B2	60R	M62 J25 - J30	
29/09/15 08:09:16	SIG	M62/2203B3	60R	M62 J25 - J30	
29/09/15 08:09:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:09:21	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:09:26	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 08:09:36	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 08:09:40	SIG	M62/2057A1	60R	M62 J25 - J30	
29/09/15 08:09:40	SIG	M62/2057A2	60R	M62 J25 - J30	
29/09/15 08:09:40	SIG	M62/2057A3	60R	M62 J25 - J30	
29/09/15 08:09:40	SIG	M62/2057J1	60R	M62 J25 - J30	
29/09/15 08:09:40	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 08:09:40	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 08:10:24	SIG	M62/2057A1	50R	M62 J25 - J30	
29/09/15 08:10:24	SIG	M62/2057A2	50R	M62 J25 - J30	
29/09/15 08:10:24	SIG	M62/2057A3	50R	M62 J25 - J30	
29/09/15 08:10:24	SIG	M62/2057J1	50R	M62 J25 - J30	
29/09/15 08:10:29	SIG	M62/2057A1	40R	M62 J25 - J30	
29/09/15 08:10:29	SIG	M62/2057A2	40R	M62 J25 - J30	
29/09/15 08:10:29	SIG	M62/2057A3	40R	M62 J25 - J30	
29/09/15 08:10:29	SIG	M62/2057J1	40R	M62 J25 - J30	
29/09/15 08:11:10	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 08:11:10	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:11:10	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 08:11:10	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:12:38	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:12:44	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:14:23	SIG	M62/2057A1	60R	M62 J25 - J30	
29/09/15 08:14:23	SIG	M62/2057A2	60R	M62 J25 - J30	
29/09/15 08:14:23	SIG	M62/2057A3	60R	M62 J25 - J30	
29/09/15 08:14:23	SIG	M62/2057J1	60R	M62 J25 - J30	
29/09/15 08:15:26	SIG	M62/2057A1	50R	M62 J25 - J30	
29/09/15 08:15:26	SIG	M62/2057A2	50R	M62 J25 - J30	
29/09/15 08:15:26	SIG	M62/2057A3	50R	M62 J25 - J30	
29/09/15 08:15:26	SIG	M62/2057J1	50R	M62 J25 - J30	
29/09/15 08:15:32	SIG	M62/2057A1	40R	M62 J25 - J30	
29/09/15 08:15:32	SIG	M62/2057A2	40R	M62 J25 - J30	
29/09/15 08:15:32	SIG	M62/2057A3	40R	M62 J25 - J30	
29/09/15 08:15:32	SIG	M62/2057J1	40R	M62 J25 - J30	
29/09/15 08:15:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:15:33	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:15:39	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:16:31	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 08:16:31	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 08:16:36	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 08:16:36	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 08:16:39	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 08:16:50	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:16:50	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:16:50	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:16:50	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:17:26	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 08:17:26	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 08:17:26	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 08:17:26	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 08:17:31	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 08:17:31	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 08:17:31	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 08:17:31	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2033A1	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2041A1	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2041A2	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2041A3	50R	M62 J25 - J30	
29/09/15 08:17:59	SIG	M62/2041A4	50R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2033A1	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2033A2	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2033A3	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2033A4	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2041A1	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2041A2	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2041A3	40R	M62 J25 - J30	
29/09/15 08:18:06	SIG	M62/2041A4	40R	M62 J25 - J30	
29/09/15 08:18:57	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 08:18:57	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 08:19:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:19:46	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:19:47	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 08:19:47	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 08:19:47	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 08:19:52	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:19:54	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 08:19:54	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 08:19:54	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 08:19:54	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 08:19:54	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 08:20:59	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 08:20:59	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 08:22:15	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 08:22:15	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 08:22:21	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 08:22:21	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 08:22:29	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 08:22:29	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 08:22:29	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 08:22:29	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2033A1	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 08:22:35	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 08:22:47	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:22:47	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:22:53	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2025A1	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2025A2	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2025A3	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2025A4	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2033A1	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2033A2	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2033A3	40R	M62 J25 - J30	
29/09/15 08:22:54	SIG	M62/2033A4	40R	M62 J25 - J30	
29/09/15 08:23:25	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 08:23:25	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:23:25	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 08:23:25	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 08:23:53	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 08:23:53	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 08:23:53	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 08:23:53	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 08:23:53	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 08:23:55	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 08:23:55	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 08:23:55	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 08:23:55	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 08:23:59	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 08:23:59	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 08:23:59	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 08:23:59	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 08:23:59	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:24:00	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:24:05	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:25:36	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 08:25:36	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 08:25:36	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 08:25:36	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 08:26:44	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 08:26:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:26:56	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:27:01	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:27:07	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 08:27:07	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 08:27:46	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 08:28:00	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 08:28:00	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 08:28:00	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 08:28:00	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 08:29:17	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 08:29:17	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 08:29:17	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 08:29:17	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 08:29:22	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 08:29:22	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 08:29:22	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 08:29:22	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 08:29:36	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 08:29:36	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 08:29:36	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 08:29:36	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 08:30:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:30:02	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:30:07	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 08:31:59	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 08:32:30	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 08:32:30	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 08:32:36	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 08:32:36	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 08:33:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:33:09	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:33:14	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 08:33:14	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 08:33:14	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 08:33:15	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 08:33:15	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 08:33:15	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 08:33:15	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 08:33:15	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 08:33:15	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 08:33:17	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 08:33:50	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 08:35:09	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 08:35:15	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 08:36:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:36:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:36:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:36:16	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:36:17	SIG	M62/2197B1	60R	M62 J25 - J30	
29/09/15 08:36:17	SIG	M62/2197B2	60R	M62 J25 - J30	
29/09/15 08:36:17	SIG	M62/2197B3	60R	M62 J25 - J30	
29/09/15 08:36:17	SIG	M62/2199M1	60R	M62 J25 - J30	
29/09/15 08:36:17	SIG	M62/2199M2	60R	M62 J25 - J30	
29/09/15 08:36:35	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 08:36:35	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 08:36:56	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:36:56	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:36:56	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:37:02	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 08:37:02	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:37:02	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 08:37:02	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 08:37:11	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 08:37:17	SIG	M62/2194B1	60R	M62 J25 - J30	
29/09/15 08:37:17	SIG	M62/2194B2	60R	M62 J25 - J30	
29/09/15 08:37:17	SIG	M62/2194B3	60R	M62 J25 - J30	
29/09/15 08:37:17	SIG	M62/2194B4	60R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1974A1	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1974A2	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1974A3	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1974A4	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 08:38:00	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 08:38:55	SIG	M621/1002A1	50R	M62 J25 - J30	
29/09/15 08:38:55	SIG	M621/1002A2	50R	M62 J25 - J30	
29/09/15 08:39:00	SIG	M621/1002A1	40R	M62 J25 - J30	
29/09/15 08:39:00	SIG	M621/1002A2	40R	M62 J25 - J30	
29/09/15 08:39:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:39:21	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:39:27	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1968A1	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1968A2	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1968A3	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1968A4	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 08:39:44	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1968A1	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1968A2	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1968A3	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1968A4	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1974A1	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1974A2	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1974A3	40R	M62 J25 - J30	
29/09/15 08:40:07	SIG	M62/1974A4	40R	M62 J25 - J30	
29/09/15 08:40:39	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 08:40:39	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 08:40:39	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 08:40:39	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2189B3	40R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2189B4	40R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2194B1	50R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2194B2	50R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2194B3	50R	M62 J25 - J30	
29/09/15 08:41:27	SIG	M62/2194B4	50R	M62 J25 - J30	
29/09/15 08:42:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:42:27	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 08:42:32	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 08:42:34	SIG	M62/2177B1	60R	M62 J25 - J30	
29/09/15 08:42:34	SIG	M62/2177B2	60R	M62 J25 - J30	
29/09/15 08:42:34	SIG	M62/2177L1	60R	M62 J25 - J30	
29/09/15 08:42:34	SIG	M62/2177L2	60R	M62 J25 - J30	
29/09/15 08:43:18	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 08:43:18	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 08:43:37	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1960A1	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1960A2	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1960A3	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1960K1	50R	M62 J25 - J30	
29/09/15 08:43:41	SIG	M62/1960K2	50R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 08:44:21	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1960A1	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1960A2	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1960A3	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1960K1	40R	M62 J25 - J30	
29/09/15 08:44:22	SIG	M62/1960K2	40R	M62 J25 - J30	
29/09/15 08:44:44	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 08:44:44	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 08:44:44	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2183B1	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2183B2	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2183L1	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2183L2	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2189B1	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2189B2	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2189B3	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2189B4	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2194B1	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2194B2	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2194B3	60R	M62 J25 - J30	
29/09/15 08:45:28	SIG	M62/2194B4	60R	M62 J25 - J30	
29/09/15 08:46:31	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 08:46:31	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 08:46:31	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 08:46:31	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 08:46:31	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 08:46:54	SIG	M621/1002A1	OFF	M62 J25 - J30	
29/09/15 08:46:54	SIG	M621/1002A2	OFF	M62 J25 - J30	
29/09/15 08:47:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:47:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 08:48:57	SIG	M62/2057A1	60R	M62 J25 - J30	
29/09/15 08:48:57	SIG	M62/2057A2	60R	M62 J25 - J30	
29/09/15 08:48:57	SIG	M62/2057A3	60R	M62 J25 - J30	
29/09/15 08:48:57	SIG	M62/2057J1	60R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2018A1	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2018A2	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2018A3	50R	M62 J25 - J30	
29/09/15 08:49:24	SIG	M62/2018A4	50R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2018A1	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2018A2	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2018A3	40R	M62 J25 - J30	
29/09/15 08:49:34	SIG	M62/2018A4	40R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 08:50:23	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2004A1	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2004A2	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2004A3	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2008K1	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2008K2	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2012A1	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2012A2	40R	M62 J25 - J30	
29/09/15 08:50:28	SIG	M62/2012A3	40R	M62 J25 - J30	
29/09/15 08:51:35	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 08:51:35	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 08:52:10	SIG	M62/2050A1	50R	M62 J25 - J30	
29/09/15 08:52:10	SIG	M62/2050A2	50R	M62 J25 - J30	
29/09/15 08:52:10	SIG	M62/2050A3	50R	M62 J25 - J30	
29/09/15 08:52:10	SIG	M62/2050A4	50R	M62 J25 - J30	
29/09/15 08:52:42	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 08:52:42	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 08:53:52	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 08:54:06	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 08:54:06	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 08:54:24	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 08:54:28	SIG	M62/2041A1	50R	M62 J25 - J30	
29/09/15 08:54:28	SIG	M62/2041A2	50R	M62 J25 - J30	
29/09/15 08:54:28	SIG	M62/2041A3	50R	M62 J25 - J30	
29/09/15 08:54:28	SIG	M62/2041A4	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 08:56:41	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 08:56:43	SIG	M62/2033A1	50R	M62 J25 - J30	
29/09/15 08:56:43	SIG	M62/2033A2	50R	M62 J25 - J30	
29/09/15 08:56:43	SIG	M62/2033A3	50R	M62 J25 - J30	
29/09/15 08:56:43	SIG	M62/2033A4	50R	M62 J25 - J30	
29/09/15 08:57:47	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 08:57:47	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 08:57:47	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 08:57:47	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 08:57:47	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 08:57:47	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 08:58:17	SIG	M62/2159B1	NR	M62 J25 - J30	
29/09/15 08:58:17	SIG	M62/2159B2	NR	M62 J25 - J30	
29/09/15 08:58:17	SIG	M62/2170B1	NR	M62 J25 - J30	
29/09/15 08:58:17	SIG	M62/2170B2	NR	M62 J25 - J30	
29/09/15 08:58:17	SIG	M62/2170L1	OFF	M62 J25 - J30	
29/09/15 08:58:17	SIG	M62/2170L2	OFF	M62 J25 - J30	
29/09/15 08:58:24	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 08:58:24	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 08:58:24	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 08:58:24	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 08:58:24	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 08:58:46	SIG	M62/2025A1	50R	M62 J25 - J30	
29/09/15 08:58:46	SIG	M62/2025A2	50R	M62 J25 - J30	
29/09/15 08:58:46	SIG	M62/2025A3	50R	M62 J25 - J30	
29/09/15 08:58:46	SIG	M62/2025A4	50R	M62 J25 - J30	
29/09/15 08:58:50	SIG	M62/1999A1	40R	M62 J25 - J30	
29/09/15 08:58:50	SIG	M62/1999A2	40R	M62 J25 - J30	
29/09/15 08:58:50	SIG	M62/1999A3	40R	M62 J25 - J30	
29/09/15 08:58:50	SIG	M62/1999J1	40R	M62 J25 - J30	
29/09/15 08:58:50	SIG	M62/1999J2	40R	M62 J25 - J30	
29/09/15 08:59:20	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 08:59:20	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 08:59:20	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 08:59:20	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 09:00:12	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 09:00:17	SIG	M62/2203B1	OFF	M62 J25 - J30	
29/09/15 09:00:17	SIG	M62/2203B2	OFF	M62 J25 - J30	
29/09/15 09:00:17	SIG	M62/2203B3	OFF	M62 J25 - J30	
29/09/15 09:00:47	SIG	M62/2018A1	50R	M62 J25 - J30	
29/09/15 09:00:47	SIG	M62/2018A2	50R	M62 J25 - J30	
29/09/15 09:00:47	SIG	M62/2018A3	50R	M62 J25 - J30	
29/09/15 09:00:47	SIG	M62/2018A4	50R	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2159B1	OFF	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2159B2	OFF	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2197B1	OFF	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2197B2	OFF	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2197B3	OFF	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2199M1	OFF	M62 J25 - J30	
29/09/15 09:01:17	SIG	M62/2199M2	OFF	M62 J25 - J30	
29/09/15 09:01:55	SIG	M62/1968A1	50R	M62 J25 - J30	
29/09/15 09:01:55	SIG	M62/1968A2	50R	M62 J25 - J30	
29/09/15 09:01:55	SIG	M62/1968A3	50R	M62 J25 - J30	
29/09/15 09:01:55	SIG	M62/1968A4	50R	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2170B1	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2170B2	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2177B1	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2177B2	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2177L1	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2177L2	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2183B1	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2183B2	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2183L1	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2183L2	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2189B1	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2189B2	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2189B3	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2189B4	NR	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2194B1	OFF	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2194B2	OFF	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2194B3	OFF	M62 J25 - J30	
29/09/15 09:02:17	SIG	M62/2194B4	OFF	M62 J25 - J30	
29/09/15 09:02:59	SIG	M62/2008K1	50R	M62 J25 - J30	
29/09/15 09:02:59	SIG	M62/2008K2	50R	M62 J25 - J30	
29/09/15 09:02:59	SIG	M62/2012A1	50R	M62 J25 - J30	
29/09/15 09:02:59	SIG	M62/2012A2	50R	M62 J25 - J30	
29/09/15 09:02:59	SIG	M62/2012A3	50R	M62 J25 - J30	
29/09/15 09:03:03	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 09:03:03	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 09:03:03	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 09:03:03	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 09:03:03	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 09:03:03	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 09:03:17	SIG	M62/2050A1	60R	M62 J25 - J30	
29/09/15 09:03:17	SIG	M62/2050A2	60R	M62 J25 - J30	
29/09/15 09:03:17	SIG	M62/2050A3	60R	M62 J25 - J30	
29/09/15 09:03:17	SIG	M62/2050A4	60R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1960A1	50R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1960A2	50R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1960A3	50R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1960K1	50R	M62 J25 - J30	
29/09/15 09:04:33	SIG	M62/1960K2	50R	M62 J25 - J30	
29/09/15 09:05:17	SIG	M62/2189B1	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2170B1	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2170B2	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2177B1	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2177B2	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2177L1	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2177L2	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2183B1	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2183L1	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2183L2	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2189B2	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2189B3	OFF	M62 J25 - J30	
29/09/15 09:05:18	SIG	M62/2189B4	OFF	M62 J25 - J30	
29/09/15 09:05:22	SIG	M62/1974A1	40R	M62 J25 - J30	
29/09/15 09:05:22	SIG	M62/1974A2	40R	M62 J25 - J30	
29/09/15 09:05:22	SIG	M62/1974A3	40R	M62 J25 - J30	
29/09/15 09:05:22	SIG	M62/1974A4	40R	M62 J25 - J30	
29/09/15 09:05:28	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 09:05:28	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 09:05:28	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1999A1	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1999A2	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1999A3	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/1999J2	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/2004A1	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/2004A2	50R	M62 J25 - J30	
29/09/15 09:07:09	SIG	M62/2004A3	50R	M62 J25 - J30	
29/09/15 09:07:33	SIG	M62/1968A1	40R	M62 J25 - J30	
29/09/15 09:07:33	SIG	M62/1968A2	40R	M62 J25 - J30	
29/09/15 09:07:33	SIG	M62/1968A3	40R	M62 J25 - J30	
29/09/15 09:07:33	SIG	M62/1968A4	40R	M62 J25 - J30	
29/09/15 09:08:47	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 09:08:47	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 09:08:47	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2018A1	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2018A2	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2018A3	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2018A4	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2025A1	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2025A2	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2025A3	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2025A4	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2033A1	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2033A2	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2033A3	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2033A4	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2041A1	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2041A2	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2041A3	60R	M62 J25 - J30	
29/09/15 09:09:17	SIG	M62/2041A4	60R	M62 J25 - J30	
29/09/15 09:09:41	SIG	M62/1960A1	40R	M62 J25 - J30	
29/09/15 09:09:41	SIG	M62/1960A2	40R	M62 J25 - J30	
29/09/15 09:09:41	SIG	M62/1960A3	40R	M62 J25 - J30	
29/09/15 09:09:41	SIG	M62/1960K1	40R	M62 J25 - J30	
29/09/15 09:09:41	SIG	M62/1960K2	40R	M62 J25 - J30	
29/09/15 09:11:35	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 09:11:35	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 09:11:35	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 09:11:35	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 09:11:35	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 09:11:35	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 09:11:52	SIG	M62/1955K1	40R	M62 J25 - J30	
29/09/15 09:11:52	SIG	M62/1955K2	40R	M62 J25 - J30	
29/09/15 09:11:52	SIG	M62/1956A1	40R	M62 J25 - J30	
29/09/15 09:11:52	SIG	M62/1956A2	40R	M62 J25 - J30	
29/09/15 09:11:52	SIG	M62/1956A3	40R	M62 J25 - J30	
29/09/15 09:12:01	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 09:12:01	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 09:12:01	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 09:12:01	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 09:12:17	SIG	M606/2003B1	NR	M62 J25 - J30	
29/09/15 09:12:17	SIG	M606/2003B2	NR	M62 J25 - J30	
29/09/15 09:12:17	SIG	M62/2008K1	60R	M62 J25 - J30	
29/09/15 09:12:17	SIG	M62/2008K2	60R	M62 J25 - J30	
29/09/15 09:12:17	SIG	M62/2012A1	60R	M62 J25 - J30	
29/09/15 09:12:17	SIG	M62/2012A2	60R	M62 J25 - J30	
29/09/15 09:12:17	SIG	M62/2012A3	60R	M62 J25 - J30	
29/09/15 09:15:08	SIG	M62/1968A1	50R	M62 J25 - J30	
29/09/15 09:15:08	SIG	M62/1968A2	50R	M62 J25 - J30	
29/09/15 09:15:08	SIG	M62/1968A3	50R	M62 J25 - J30	
29/09/15 09:15:08	SIG	M62/1968A4	50R	M62 J25 - J30	
29/09/15 09:15:17	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 09:15:18	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 09:16:05	SIG	M62/1955K1	50R	M62 J25 - J30	
29/09/15 09:16:05	SIG	M62/1955K2	50R	M62 J25 - J30	
29/09/15 09:16:05	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 09:16:05	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 09:16:05	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 09:18:17	SIG	M62/2004A1	60R	M62 J25 - J30	
29/09/15 09:18:17	SIG	M62/2004A2	60R	M62 J25 - J30	
29/09/15 09:18:17	SIG	M62/2004A3	60R	M62 J25 - J30	
29/09/15 09:19:16	SIG	M62/1960A1	50R	M62 J25 - J30	
29/09/15 09:19:16	SIG	M62/1960A2	50R	M62 J25 - J30	
29/09/15 09:19:16	SIG	M62/1960A3	50R	M62 J25 - J30	
29/09/15 09:19:16	SIG	M62/1960K1	50R	M62 J25 - J30	
29/09/15 09:19:16	SIG	M62/1960K2	50R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1979K1	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1979K2	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1981A1	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1981A2	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1981A3	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1981A4	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1987A1	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1987A3	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1987J1	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1999A1	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1999A2	60R	M62 J25 - J30	
29/09/15 09:19:34	SIG	M62/1999A3	60R	M62 J25 - J30	
29/09/15 09:20:17	SIG	M62/1974A1	60R	M62 J25 - J30	
29/09/15 09:20:17	SIG	M62/1974A2	60R	M62 J25 - J30	
29/09/15 09:20:17	SIG	M62/1974A3	60R	M62 J25 - J30	
29/09/15 09:20:17	SIG	M62/1974A4	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1955K1	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1955K2	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1956A1	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1956A2	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1956A3	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1960A1	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1960A2	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1960A3	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1960K1	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1960K2	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1968A1	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1968A2	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1968A3	60R	M62 J25 - J30	
29/09/15 09:22:18	SIG	M62/1968A4	60R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 09:27:50	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2183L1	40R	M62 J25 - J30	
29/09/15 09:27:55	SIG	M62/2183L2	40R	M62 J25 - J30	
29/09/15 09:28:01	SIG	M62/2177L1	30R	M62 J25 - J30	
29/09/15 09:28:01	SIG	M62/2183B1	30R	M62 J25 - J30	
29/09/15 09:28:01	SIG	M62/2183L1	30R	M62 J25 - J30	
29/09/15 09:28:01	SIG	M62/2183L2	30R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2170B1	NR	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2170B2	NR	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2177L1	20R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2183B1	30R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2183L1	30R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2183L2	30R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2189B1	50R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2189B2	50R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2189B3	50R	M62 J25 - J30	
29/09/15 09:28:06	SIG	M62/2189B4	50R	M62 J25 - J30	
29/09/15 09:28:11	SIG	M62/2177L1	STOP	M62 J25 - J30	
29/09/15 09:28:42	SIG	M62/2189B1	40R	M62 J25 - J30	
29/09/15 09:28:42	SIG	M62/2189B2	40R	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2183L1	LDR	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2183L2	LDR	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2189B1	30R	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2189B2	30R	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2194B1	50R	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2194B2	50R	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2194B3	50R	M62 J25 - J30	
29/09/15 09:28:48	SIG	M62/2194B4	50R	M62 J25 - J30	
29/09/15 09:29:50	SIG	M62/2177L2	30R	M62 J25 - J30	
29/09/15 09:29:50	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 09:29:50	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 09:29:55	SIG	M62/2177L2	20R	M62 J25 - J30	
29/09/15 09:29:55	SIG	M62/2183B1	40R	M62 J25 - J30	
29/09/15 09:29:55	SIG	M62/2183B2	40R	M62 J25 - J30	
29/09/15 09:30:00	SIG	M62/2177L2	STOP	M62 J25 - J30	
29/09/15 09:30:02	SIG	M62/2113B1	HSD	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2170B1	NR	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2170B2	NR	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2177B1	NR	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2177B2	NR	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2177L1	NR	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2177L2	NR	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 09:30:09	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2177B1	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2177B2	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2177L1	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2177L2	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2183B1	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2183B2	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2183L1	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2183L2	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2189B1	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2189B2	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2189B3	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2189B4	NR	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2194B1	OFF	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2194B2	OFF	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2194B3	OFF	M62 J25 - J30	
29/09/15 09:30:18	SIG	M62/2194B4	OFF	M62 J25 - J30	
29/09/15 09:30:55	SIG	M62/2106B1	HSD	M62 J25 - J30	
29/09/15 09:32:03	SIG	M62/2097B1	HSD	M62 J25 - J30	
29/09/15 09:32:03	SIG	M62/2113B1	REDX	M62 J25 - J30	
29/09/15 09:33:10	SIG	M62/2170B1	OFF	M62 J25 - J30	
29/09/15 09:33:10	SIG	M62/2170B2	OFF	M62 J25 - J30	
29/09/15 09:33:11	SIG	M62/2088B1	HSD	M62 J25 - J30	
29/09/15 09:33:11	SIG	M62/2106B1	REDX	M62 J25 - J30	
29/09/15 09:33:18	SIG	M62/2189B1	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2177B1	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2177B2	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2177L1	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2177L2	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2183B1	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2183L1	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2183L2	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2189B2	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2189B3	OFF	M62 J25 - J30	
29/09/15 09:33:19	SIG	M62/2189B4	OFF	M62 J25 - J30	
29/09/15 09:34:19	SIG	M62/2097B1	REDX	M62 J25 - J30	
29/09/15 09:35:27	SIG	M62/2088B1	REDX	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2155A1	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2155A2	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2155J1	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2155K1	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2157J1	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2157J2	50R	M62 J25 - J30	
29/09/15 09:35:52	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2151A1	50R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2151A2	50R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2151J1	50R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2151K1	50R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2155A1	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2155A2	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2155J1	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2155K1	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2157A1	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2157A2	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2157J1	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2157J2	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2163A1	NR	M62 J25 - J30	
29/09/15 09:35:58	SIG	M62/2163A2	NR	M62 J25 - J30	
29/09/15 09:36:20	SIG	M62/2117B1	NR	M62 J25 - J30	
29/09/15 09:36:20	SIG	M62/2117B3	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2088B2	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2088B3	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2088B4	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2097B2	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2097B4	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2106B2	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2106B3	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2106B4	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2113B2	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2113B3	NR	M62 J25 - J30	
29/09/15 09:36:30	SIG	M62/2113B4	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2074B2	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2074B3	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2074B4	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2081B1	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2081B2	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2081B3	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2081L1	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2120M1	NR	M62 J25 - J30	
29/09/15 09:36:31	SIG	M62/2120M2	NR	M62 J25 - J30	
29/09/15 09:37:20	SIG	M62/2120M1	OFF	M62 J25 - J30	
29/09/15 09:37:20	SIG	M62/2120M2	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2106B1	BLNK	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2106B2	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2106B3	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2106B4	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2113B1	BLNK	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2113B2	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2113B3	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2113B4	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 09:37:21	SIG	M62/2117B3	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2074B1	BLNK	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2074B2	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2074B3	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2074B4	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2081B1	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2081B2	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2081B3	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2081L1	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2088B1	BLNK	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2088B2	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2088B3	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2088B4	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2097B1	BLNK	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2097B2	OFF	M62 J25 - J30	
29/09/15 09:37:31	SIG	M62/2097B4	OFF	M62 J25 - J30	
29/09/15 09:38:12	SIG	M62/2079A1	HSD	M62 J25 - J30	
29/09/15 09:38:52	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 09:38:52	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 09:38:58	SIG	M62/2157A1	40R	M62 J25 - J30	
29/09/15 09:39:20	SIG	M62/2088A1	HSD	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2151A1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2151A2	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2151J1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2151K1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2155A1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2155A2	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2155J1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2155K1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2157J1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2157J2	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2157K1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 09:39:53	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 09:40:28	SIG	M62/2079A1	REDX	M62 J25 - J30	
29/09/15 09:40:28	SIG	M62/2097A1	HSD	M62 J25 - J30	
29/09/15 09:41:36	SIG	M62/2088A1	REDX	M62 J25 - J30	
29/09/15 09:41:36	SIG	M62/2106A1	HSD	M62 J25 - J30	
29/09/15 09:42:44	SIG	M62/2097A1	REDX	M62 J25 - J30	
29/09/15 09:43:52	SIG	M62/2106A1	REDX	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2065A2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2065A3	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2065A4	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2073K1	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2073K2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2074A2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2074A3	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2074A4	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2079A2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2079A3	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2079A4	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2088A2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2088A3	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2088A4	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2097A2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2097A3	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2097A4	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2106A2	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2106A3	NR	M62 J25 - J30	
29/09/15 09:44:52	SIG	M62/2106A4	NR	M62 J25 - J30	
29/09/15 09:44:53	SIG	M62/2114A1	NR	M62 J25 - J30	
29/09/15 09:44:53	SIG	M62/2114A2	NR	M62 J25 - J30	
29/09/15 09:44:53	SIG	M62/2114A3	NR	M62 J25 - J30	
29/09/15 09:45:52	SIG	M62/2073K1	OFF	M62 J25 - J30	
29/09/15 09:45:52	SIG	M62/2073K2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2074A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2074A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2074A4	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2079A1	BLNK	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2079A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2079A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2079A4	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2088A1	BLNK	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2088A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2088A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2088A4	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2097A1	BLNK	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2097A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2097A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2097A4	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2106A1	BLNK	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2106A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2106A4	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2114A1	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2114A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2114A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2117A1	BLNK	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2117A2	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2117A3	OFF	M62 J25 - J30	
29/09/15 09:45:53	SIG	M62/2117A4	OFF	M62 J25 - J30	
29/09/15 09:47:24	SIG	M62/2057B1	HSD	M62 J25 - J30	
29/09/15 09:49:23	SIG	M62/2041B1	HSD	M62 J25 - J30	
29/09/15 09:49:23	SIG	M621/1010B1	60R	M62 J25 - J30	
29/09/15 09:49:23	SIG	M621/1010B2	60R	M62 J25 - J30	
29/09/15 09:49:24	SIG	M62/2057B1	REDX	M62 J25 - J30	
29/09/15 09:49:24	SIG	M621/1002B1	HSD	M62 J25 - J30	
29/09/15 09:50:23	SIG	M62/2033B1	HSD	M62 J25 - J30	
29/09/15 09:51:23	SIG	M62/2025B1	HSD	M62 J25 - J30	
29/09/15 09:51:24	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 09:52:15	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 09:52:59	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 09:53:29	SIG	M62/2065B2	NR	M62 J25 - J30	
29/09/15 09:53:29	SIG	M62/2065B3	NR	M62 J25 - J30	
29/09/15 09:53:29	SIG	M62/2065B4	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2018B1	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2018B2	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2018B3	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2018L1	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2025B2	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2025B3	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2025B4	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2033B2	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2033B3	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2033B4	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2041B2	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2041B3	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2041B4	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2050B2	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2050B3	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2050B4	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2057B2	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2057B3	NR	M62 J25 - J30	
29/09/15 09:53:30	SIG	M62/2057B4	NR	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2057B1	BLNK	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2057B2	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2057B3	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2057B4	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2065B1	BLNK	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2065B2	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2065B3	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2065B4	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2065M1	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2069M1	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M62/2069M2	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M621/1002B1	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M621/1002B2	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M621/1010B1	OFF	M62 J25 - J30	
29/09/15 09:54:30	SIG	M621/1010B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2012B1	BLNK	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2012B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2012B3	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2012B4	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2018B1	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2018B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2018B3	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2018L1	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2025B1	BLNK	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2025B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2025B3	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2025B4	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2033B1	BLNK	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2033B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2033B4	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2041B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2041B3	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2041B4	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2050B2	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2050B3	OFF	M62 J25 - J30	
29/09/15 09:54:31	SIG	M62/2050B4	OFF	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/1999A1	NR	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/1999A2	NR	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/1999A3	NR	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/1999J1	OFF	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/1999J2	OFF	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/2004A1	NR	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/2004A2	NR	M62 J25 - J30	
29/09/15 09:59:18	SIG	M62/2004A3	NR	M62 J25 - J30	
29/09/15 10:02:18	SIG	M62/2004A1	OFF	M62 J25 - J30	
29/09/15 10:02:19	SIG	M62/2004A2	OFF	M62 J25 - J30	
29/09/15 10:02:19	SIG	M62/2004A3	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1955K1	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1955K2	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1956A1	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1956A2	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1956A3	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1960A1	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1960A2	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1960A3	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1960K1	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1960K2	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1968A1	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1968A2	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1968A3	OFF	M62 J25 - J30	
29/09/15 10:04:18	SIG	M62/1968A4	OFF	M62 J25 - J30	
29/09/15 10:36:16	SIG	M62/2025A1	HSD	M62 J25 - J30	
29/09/15 10:37:16	SIG	M62/2033A1	HSD	M62 J25 - J30	
29/09/15 10:38:15	SIG	M62/2041A1	HSD	M62 J25 - J30	
29/09/15 10:38:16	SIG	M62/2018A1	HSD	M62 J25 - J30	
29/09/15 10:38:16	SIG	M62/2025A1	REDX	M62 J25 - J30	
29/09/15 10:39:23	SIG	M62/2033A1	REDX	M62 J25 - J30	
29/09/15 10:39:23	SIG	M62/2050A1	HSD	M62 J25 - J30	
29/09/15 10:40:15	SIG	M62/2041A1	REDX	M62 J25 - J30	
29/09/15 10:41:15	SIG	M62/2050A1	REDX	M62 J25 - J30	
29/09/15 10:42:15	SIG	M62/2025A2	NR	M62 J25 - J30	
29/09/15 10:42:15	SIG	M62/2025A3	NR	M62 J25 - J30	
29/09/15 10:42:15	SIG	M62/2025A4	NR	M62 J25 - J30	
29/09/15 10:42:15	SIG	M62/2033A2	NR	M62 J25 - J30	
29/09/15 10:42:15	SIG	M62/2033A3	NR	M62 J25 - J30	
29/09/15 10:42:15	SIG	M62/2033A4	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2041A2	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2041A3	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2041A4	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2050A2	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2050A3	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2050A4	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2057A1	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2057A2	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2057A3	NR	M62 J25 - J30	
29/09/15 10:42:16	SIG	M62/2057J1	NR	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2008K1	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2008K2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2012A1	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2012A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2012A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2018A1	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2018A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2018A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2018A4	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2025A1	BLNK	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2025A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2025A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2025A4	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2033A1	BLNK	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2033A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2033A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2033A4	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2041A1	BLNK	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2041A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2041A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2041A4	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2050A1	BLNK	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2050A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2050A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2050A4	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2057A1	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2057A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2057A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2057J1	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2065A1	BLNK	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2065A2	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2065A3	OFF	M62 J25 - J30	
29/09/15 10:43:16	SIG	M62/2065A4	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1974A1	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1974A2	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1974A3	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1974A4	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1979K1	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1979K2	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1981A1	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1981A2	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1981A3	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1981A4	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1987A1	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1987A3	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1987J1	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1992A1	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1992A2	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1992A3	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1992J1	OFF	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1999A1	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1999A2	NR	M62 J25 - J30	
29/09/15 11:00:29	SIG	M62/1999A3	NR	M62 J25 - J30	
29/09/15 11:03:29	SIG	M62/1987J1	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1981A1	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1981A2	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1981A3	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1981A4	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1987A1	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1987A3	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1999A1	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1999A2	OFF	M62 J25 - J30	
29/09/15 11:03:39	SIG	M62/1999A3	OFF	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2033B2	NR	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2033B3	NR	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2033B4	NR	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2050B2	60R	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2050B3	60R	M62 J25 - J30	
29/09/15 12:02:22	SIG	M62/2050B4	60R	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2033B2	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2033B3	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2033B4	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2041B2	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2041B3	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2041B4	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2050B2	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2050B3	NR	M62 J25 - J30	
29/09/15 12:16:03	SIG	M62/2050B4	NR	M62 J25 - J30	
29/09/15 12:19:03	SIG	M62/2050B2	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2033B1	BLNK	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2033B2	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2033B4	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2041B2	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2041B3	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2041B4	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2050B3	OFF	M62 J25 - J30	
29/09/15 12:19:04	SIG	M62/2050B4	OFF	M62 J25 - J30	
29/09/15 14:40:32	SIG	M62/1960B1	50R	M62 J25 - J30	
29/09/15 14:40:32	SIG	M62/1960B2	50R	M62 J25 - J30	
29/09/15 14:40:32	SIG	M62/1960B3	50R	M62 J25 - J30	
29/09/15 14:43:23	SIG	M62/1960B1	OFF	M62 J25 - J30	
29/09/15 14:43:23	SIG	M62/1960B2	OFF	M62 J25 - J30	
29/09/15 14:43:23	SIG	M62/1960B3	OFF	M62 J25 - J30	
29/09/15 15:03:09	SIG	M62/2065M1	NR	M62 J25 - J30	
29/09/15 15:03:09	SIG	M62/2069M1	60R	M62 J25 - J30	
29/09/15 15:03:09	SIG	M62/2069M2	60R	M62 J25 - J30	
29/09/15 15:03:09	SIG	M621/1010B1	60R	M62 J25 - J30	
29/09/15 15:03:09	SIG	M621/1010B2	60R	M62 J25 - J30	
29/09/15 15:03:10	SIG	M62/2057B1	REDX	M62 J25 - J30	
29/09/15 15:03:10	SIG	M62/2057B2	NR	M62 J25 - J30	
29/09/15 15:03:10	SIG	M62/2057B3	NR	M62 J25 - J30	
29/09/15 15:03:10	SIG	M62/2057B4	NR	M62 J25 - J30	
29/09/15 15:03:10	SIG	M62/2065M1	60R	M62 J25 - J30	
29/09/15 15:03:10	SIG	M621/1002B1	HSD	M62 J25 - J30	
29/09/15 15:03:10	SIG	M621/1002B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2012B1	REDX	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2012B2	NR	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2012B3	NR	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2012B4	NR	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2025B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2025B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2025B4	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2033B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2033B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2033B4	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2050B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2050B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2050B4	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2057B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2057B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2057B4	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2065B1	REDX	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2065B2	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2065B3	60R	M62 J25 - J30	
29/09/15 15:03:11	SIG	M62/2065B4	60R	M62 J25 - J30	
29/09/15 15:04:36	SIG	M62/2025B1	60R	M62 J25 - J30	
29/09/15 15:05:05	SIG	M62/2033B1	60R	M62 J25 - J30	
29/09/15 15:05:27	SIG	M62/2041B1	60R	M62 J25 - J30	
29/09/15 15:05:56	SIG	M62/2057B1	60R	M62 J25 - J30	
29/09/15 15:05:56	SIG	M621/1002B1	60R	M62 J25 - J30	
29/09/15 15:05:56	SIG	M621/1010B1	OFF	M62 J25 - J30	
29/09/15 15:05:56	SIG	M621/1010B2	OFF	M62 J25 - J30	
29/09/15 15:06:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 15:06:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2008K1	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2008K2	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2012A1	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2012A2	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2012A3	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2018A1	HSD	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2018A2	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2018A3	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2018A4	60R	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2025A1	REDX	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2025A2	NR	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2025A3	NR	M62 J25 - J30	
29/09/15 15:39:12	SIG	M62/2025A4	NR	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2012A1	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2018A1	HSD	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2025A2	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2025A3	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2025A4	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2033A1	REDX	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2033A2	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2033A3	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2033A4	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2041A1	REDX	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2041A2	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2041A3	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2041A4	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2050A1	REDX	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2050A2	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2050A3	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2050A4	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2057A1	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2057A2	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2057A3	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2057J1	60R	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2065A1	REDX	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2065A2	NR	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2065A3	NR	M62 J25 - J30	
29/09/15 15:39:13	SIG	M62/2065A4	NR	M62 J25 - J30	
29/09/15 15:40:30	SIG	M62/2050A1	60R	M62 J25 - J30	
29/09/15 15:41:11	SIG	M62/2041A1	60R	M62 J25 - J30	
29/09/15 15:41:45	SIG	M62/2033A1	60R	M62 J25 - J30	
29/09/15 15:41:51	SIG	M62/2018A1	60R	M62 J25 - J30	
29/09/15 15:41:51	SIG	M62/2025A1	60R	M62 J25 - J30	
29/09/15 16:14:25	SIG	M62/2074B1	REDX	M62 J25 - J30	
29/09/15 16:14:25	SIG	M62/2074B2	60R	M62 J25 - J30	
29/09/15 16:14:25	SIG	M62/2074B3	60R	M62 J25 - J30	
29/09/15 16:14:25	SIG	M62/2074B4	60R	M62 J25 - J30	
29/09/15 16:14:25	SIG	M621/1010B1	60R	M62 J25 - J30	
29/09/15 16:14:25	SIG	M621/1010B2	60R	M62 J25 - J30	
29/09/15 16:19:25	SIG	M62/2081B1	60R	M62 J25 - J30	
29/09/15 16:19:25	SIG	M62/2081B2	60R	M62 J25 - J30	
29/09/15 16:19:25	SIG	M62/2081B3	60R	M62 J25 - J30	
29/09/15 16:19:25	SIG	M62/2081L1	60R	M62 J25 - J30	
29/09/15 16:25:09	SIG	M62/2025B1	50R	M62 J25 - J30	
29/09/15 16:25:09	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 16:25:09	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 16:25:09	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2025B1	40R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2025B2	40R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2025B3	40R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2025B4	40R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2033B1	50R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:25:14	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 16:25:58	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 16:25:58	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 16:25:58	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 16:25:58	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2033B1	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2033B2	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2033B4	40R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 16:26:04	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2065B2	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2065B3	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2065B4	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2065M1	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2069M1	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2069M2	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2074B2	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2074B3	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M62/2074B4	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M621/1002B1	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M621/1002B2	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M621/1010B1	50R	M62 J25 - J30	
29/09/15 16:28:14	SIG	M621/1010B2	50R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2065B2	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2065B3	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2065B4	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2065M1	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2069M1	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2069M2	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2074B2	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2074B3	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2074B4	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2081B1	50R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2081B2	50R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2081B3	50R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M62/2081L1	50R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M621/1002B1	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M621/1002B2	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M621/1010B1	40R	M62 J25 - J30	
29/09/15 16:28:19	SIG	M621/1010B2	40R	M62 J25 - J30	
29/09/15 16:28:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:28:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:28:52	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:29:59	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 16:29:59	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 16:29:59	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 16:29:59	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2170A1	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2170A2	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2170K1	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2170K2	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A1	REDX	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A2	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A2	NR	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A3	NR	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A3	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A4	NR	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2177A4	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2183A1	REDX	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2183A2	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2183A3	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2183A4	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2189A1	REDX	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2189A2	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2189A3	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2189A4	60R	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2197A1	NR	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2197A2	NR	M62 J25 - J30	
29/09/15 16:30:51	SIG	M62/2197A3	NR	M62 J25 - J30	
29/09/15 16:31:49	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:31:49	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:31:55	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:31:59	SIG	M62/2189A1	60R	M62 J25 - J30	
29/09/15 16:32:17	SIG	M62/2183A1	60R	M62 J25 - J30	
29/09/15 16:32:22	SIG	M62/2177A1	60R	M62 J25 - J30	
29/09/15 16:34:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:34:53	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:34:58	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2025B1	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2025B2	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2025B3	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2025B4	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2033B1	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2033B2	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2033B3	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2033B4	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2041B1	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 16:35:00	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 16:35:52	SIG	M62/2065A2	60R	M62 J25 - J30	
29/09/15 16:35:52	SIG	M62/2065A3	60R	M62 J25 - J30	
29/09/15 16:35:52	SIG	M62/2065A4	60R	M62 J25 - J30	
29/09/15 16:35:53	SIG	M62/2073K1	60R	M62 J25 - J30	
29/09/15 16:35:53	SIG	M62/2073K2	60R	M62 J25 - J30	
29/09/15 16:35:53	SIG	M62/2079A1	REDX	M62 J25 - J30	
29/09/15 16:35:53	SIG	M62/2079A2	NR	M62 J25 - J30	
29/09/15 16:35:53	SIG	M62/2079A3	NR	M62 J25 - J30	
29/09/15 16:35:53	SIG	M62/2079A4	NR	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2074A2	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2079A2	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2079A3	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2079A4	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2088A1	REDX	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2088A2	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2088A3	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2088A4	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2097A1	REDX	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2097A2	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2097A3	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2097A4	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2106A1	REDX	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2106A2	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2106A3	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2106A4	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2114A1	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2114A2	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2114A3	60R	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2117A1	REDX	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2117A2	NR	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2117A3	NR	M62 J25 - J30	
29/09/15 16:36:12	SIG	M62/2117A4	NR	M62 J25 - J30	
29/09/15 16:37:44	SIG	M62/2106A1	60R	M62 J25 - J30	
29/09/15 16:37:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:37:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:38:10	SIG	M62/2097A1	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2088B1	REDX	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2088B2	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2088B3	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2088B4	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2097B1	REDX	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2097B2	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2097B4	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2106B1	REDX	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2106B2	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2106B3	60R	M62 J25 - J30	
29/09/15 16:38:36	SIG	M62/2106B4	60R	M62 J25 - J30	
29/09/15 16:38:37	SIG	M62/2088A1	60R	M62 J25 - J30	
29/09/15 16:38:41	SIG	M62/2079A1	60R	M62 J25 - J30	
29/09/15 16:38:43	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 16:38:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 16:38:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 16:38:45	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B1	REDX	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B2	NR	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B2	60R	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B3	NR	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B3	60R	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B4	NR	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2113B4	60R	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2117B1	60R	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2117B3	60R	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2120M1	60R	M62 J25 - J30	
29/09/15 16:40:39	SIG	M62/2120M2	60R	M62 J25 - J30	
29/09/15 16:42:11	SIG	M62/2088B1	60R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2025B1	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 16:42:33	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2025B1	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2025B2	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2025B3	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2025B4	40R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2033B1	50R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 16:42:39	SIG	M62/2097B1	60R	M62 J25 - J30	
29/09/15 16:43:09	SIG	M62/2106B1	60R	M62 J25 - J30	
29/09/15 16:43:13	SIG	M62/2113B1	60R	M62 J25 - J30	
29/09/15 16:43:13	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 16:43:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 16:43:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 16:43:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 16:43:15	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2033B1	40R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2033B2	40R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2033B4	40R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 16:44:20	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2183A1	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2183A2	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2183A3	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2183A4	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2189A1	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2189A2	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2189A3	50R	M62 J25 - J30	
29/09/15 16:45:23	SIG	M62/2189A4	50R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2177A1	50R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2177A2	50R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2177A3	50R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2177A4	50R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2183A1	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2183A2	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2183A3	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2183A4	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2189A1	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2189A2	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2189A3	40R	M62 J25 - J30	
29/09/15 16:45:29	SIG	M62/2189A4	40R	M62 J25 - J30	
29/09/15 16:47:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:47:08	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:47:13	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:47:15	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 16:47:15	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 16:47:15	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 16:47:15	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 16:47:25	SIG	M62/2163A1	60R	M62 J25 - J30	
29/09/15 16:47:25	SIG	M62/2163A2	60R	M62 J25 - J30	
29/09/15 16:47:25	SIG	M62/2166K1	60R	M62 J25 - J30	
29/09/15 16:47:25	SIG	M62/2166K2	60R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2033B1	50R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2041B1	60R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 16:48:48	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2177A1	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2177A2	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2177A3	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2177A4	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2183A1	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2183A2	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2183A3	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2183A4	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2189A1	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2189A2	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2189A3	60R	M62 J25 - J30	
29/09/15 16:49:24	SIG	M62/2189A4	60R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2033B1	40R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2033B2	40R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2033B4	40R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 16:49:50	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 16:50:13	SIG	M62/1968B1	50R	M62 J25 - J30	
29/09/15 16:50:13	SIG	M62/1968B2	50R	M62 J25 - J30	
29/09/15 16:50:13	SIG	M62/1968B3	50R	M62 J25 - J30	
29/09/15 16:50:13	SIG	M62/1968L1	50R	M62 J25 - J30	
29/09/15 16:50:15	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 16:50:15	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 16:50:15	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 16:50:15	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1960B1	60R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1960B2	60R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1960B3	60R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1960L1	NR	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1960L2	NR	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1968B1	40R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1968B2	40R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1968B3	40R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1968L1	40R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1974B1	50R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1974B2	50R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1974B3	50R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1974B4	50R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1974M1	50R	M62 J25 - J30	
29/09/15 16:50:18	SIG	M62/1974M2	50R	M62 J25 - J30	
29/09/15 16:50:21	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 16:50:21	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 16:50:21	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 16:50:21	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 16:52:14	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:52:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:52:20	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1974B1	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1974B2	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1974B3	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1974B4	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1974M1	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1974M2	40R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 16:54:30	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 16:55:17	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:55:18	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:55:23	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:55:38	SIG	M62/2041B1	40R	M62 J25 - J30	
29/09/15 16:55:38	SIG	M62/2041B2	40R	M62 J25 - J30	
29/09/15 16:55:38	SIG	M62/2041B3	40R	M62 J25 - J30	
29/09/15 16:55:38	SIG	M62/2041B4	40R	M62 J25 - J30	
29/09/15 16:56:05	SIG	M62/2065B2	50R	M62 J25 - J30	
29/09/15 16:56:05	SIG	M62/2065B3	50R	M62 J25 - J30	
29/09/15 16:56:05	SIG	M62/2065B4	50R	M62 J25 - J30	
29/09/15 16:56:05	SIG	M62/2069M1	50R	M62 J25 - J30	
29/09/15 16:56:05	SIG	M62/2069M2	50R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2074B2	50R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2074B3	50R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2074B4	50R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2081B1	60R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2081B2	60R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2081B3	60R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M62/2081L1	60R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M621/1010B1	50R	M62 J25 - J30	
29/09/15 16:56:12	SIG	M621/1010B2	50R	M62 J25 - J30	
29/09/15 16:56:27	SIG	M62/2065M1	50R	M62 J25 - J30	
29/09/15 16:56:27	SIG	M621/1002B1	50R	M62 J25 - J30	
29/09/15 16:56:27	SIG	M621/1002B2	50R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M62/2065M1	40R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M62/2069M1	40R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M62/2069M2	40R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M621/1002B1	40R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M621/1002B2	40R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M621/1010B1	40R	M62 J25 - J30	
29/09/15 16:56:48	SIG	M621/1010B2	40R	M62 J25 - J30	
29/09/15 16:58:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 16:58:21	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 16:58:26	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2065B2	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2065B3	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2065B4	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2074B2	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2074B3	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2074B4	40R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2081B1	50R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2081B2	50R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2081B3	50R	M62 J25 - J30	
29/09/15 16:59:16	SIG	M62/2081L1	50R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1987B1	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1987B2	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1987B3	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1987B4	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1992B1	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1992B2	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1992B3	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1992B4	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1999B1	REDX	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1999B2	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1999B3	60R	M62 J25 - J30	
29/09/15 16:59:25	SIG	M62/1999B4	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M606/2003B1	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M606/2003B2	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2004B1	REDX	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2004B2	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2004B3	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2004B4	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2005M1	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2005M2	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2012B2	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2012B3	60R	M62 J25 - J30	
29/09/15 16:59:26	SIG	M62/2012B4	60R	M62 J25 - J30	
29/09/15 17:00:34	SIG	M62/1960B1	NR	M62 J25 - J30	
29/09/15 17:00:34	SIG	M62/1960B2	NR	M62 J25 - J30	
29/09/15 17:00:34	SIG	M62/1960B3	NR	M62 J25 - J30	
29/09/15 17:01:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:01:25	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:01:25	SIG	M62/2166K1	OFF	M62 J25 - J30	
29/09/15 17:01:25	SIG	M62/2166K2	OFF	M62 J25 - J30	
29/09/15 17:01:26	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 17:01:26	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 17:01:30	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:01:31	SIG	M62/1960B1	60R	M62 J25 - J30	
29/09/15 17:01:31	SIG	M62/1960B2	60R	M62 J25 - J30	
29/09/15 17:01:31	SIG	M62/1960B3	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1968B1	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1968B2	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1968B3	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1968L1	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1974B1	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1974B2	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1974B3	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1974B4	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1974M1	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1974M2	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1981B1	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1981B2	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1981B3	60R	M62 J25 - J30	
29/09/15 17:01:44	SIG	M62/1981B4	60R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2065B2	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2065B3	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2065B4	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2065M1	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2069M1	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2069M2	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2074B2	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2074B3	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2074B4	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2081B1	60R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2081B2	60R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2081B3	60R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M62/2081L1	60R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M621/1002B1	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M621/1002B2	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M621/1010B1	50R	M62 J25 - J30	
29/09/15 17:04:10	SIG	M621/1010B2	50R	M62 J25 - J30	
29/09/15 17:04:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:04:28	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:04:34	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:04:37	SIG	M62/2065B2	40R	M62 J25 - J30	
29/09/15 17:04:37	SIG	M62/2065B3	40R	M62 J25 - J30	
29/09/15 17:04:37	SIG	M62/2065B4	40R	M62 J25 - J30	
29/09/15 17:04:37	SIG	M62/2065M1	40R	M62 J25 - J30	
29/09/15 17:04:37	SIG	M621/1002B1	40R	M62 J25 - J30	
29/09/15 17:04:37	SIG	M621/1002B2	40R	M62 J25 - J30	
29/09/15 17:04:51	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:04:51	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:04:51	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2069M1	40R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2069M2	40R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2074B2	40R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2074B3	40R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2074B4	40R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2081B1	50R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2081B2	50R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2081B3	50R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M62/2081L1	50R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M621/1010B1	40R	M62 J25 - J30	
29/09/15 17:06:40	SIG	M621/1010B2	40R	M62 J25 - J30	
29/09/15 17:07:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:07:32	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:07:37	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:07:38	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 17:07:38	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 17:07:38	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 17:07:38	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 17:07:41	SIG	M62/2197A1	50R	M62 J25 - J30	
29/09/15 17:07:41	SIG	M62/2197A2	50R	M62 J25 - J30	
29/09/15 17:07:41	SIG	M62/2197A3	50R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2189A1	50R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2189A2	50R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2189A3	50R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2189A4	50R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2197A1	40R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2197A2	40R	M62 J25 - J30	
29/09/15 17:07:46	SIG	M62/2197A3	40R	M62 J25 - J30	
29/09/15 17:08:51	SIG	M62/2041B1	40R	M62 J25 - J30	
29/09/15 17:08:51	SIG	M62/2041B2	40R	M62 J25 - J30	
29/09/15 17:08:51	SIG	M62/2041B3	40R	M62 J25 - J30	
29/09/15 17:08:51	SIG	M62/2041B4	40R	M62 J25 - J30	
29/09/15 17:10:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:10:36	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2074B2	50R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2074B3	50R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2074B4	50R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2081B1	60R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2081B2	60R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2081B3	60R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M62/2081L1	60R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M621/1010B1	50R	M62 J25 - J30	
29/09/15 17:10:41	SIG	M621/1010B2	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M62/2065B2	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M62/2065B3	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M62/2065B4	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M62/2065M1	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M62/2069M1	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M62/2069M2	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M621/1002B1	50R	M62 J25 - J30	
29/09/15 17:10:42	SIG	M621/1002B2	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2050B2	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2050B3	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2050B4	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2057B1	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2057B2	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2057B3	50R	M62 J25 - J30	
29/09/15 17:12:52	SIG	M62/2057B4	50R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2050B2	40R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2050B3	40R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2050B4	40R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2057B1	40R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2057B2	40R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2057B3	40R	M62 J25 - J30	
29/09/15 17:12:57	SIG	M62/2057B4	40R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2183A1	50R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2183A2	50R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2183A3	50R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2183A4	50R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2189A1	40R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2189A2	40R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2189A3	40R	M62 J25 - J30	
29/09/15 17:13:19	SIG	M62/2189A4	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2177A1	50R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2177A2	50R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2177A3	50R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2177A4	50R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2183A1	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2183A2	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2183A3	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2183A4	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2189A1	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2189A2	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2189A3	40R	M62 J25 - J30	
29/09/15 17:13:25	SIG	M62/2189A4	40R	M62 J25 - J30	
29/09/15 17:13:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:13:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:13:53	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:14:26	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1960B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1960B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1960B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1960L1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1960L2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1968B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1968B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1968B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1968L1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1974B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1974B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1974B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1974B4	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1974M1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1974M2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1981B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1981B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1981B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1981B4	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1987B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1987B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1987B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1987B4	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1992B1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1992B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1992B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1992B4	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1999B1	BLNK	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1999B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1999B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/1999B4	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2004B1	BLNK	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2004B2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2004B3	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2004B4	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2005M1	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2005M2	OFF	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2012B2	NR	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2012B3	NR	M62 J25 - J30	
29/09/15 17:14:26	SIG	M62/2012B4	NR	M62 J25 - J30	
29/09/15 17:14:47	SIG	M62/2065B2	40R	M62 J25 - J30	
29/09/15 17:14:47	SIG	M62/2065B3	40R	M62 J25 - J30	
29/09/15 17:14:47	SIG	M62/2065B4	40R	M62 J25 - J30	
29/09/15 17:14:47	SIG	M62/2065M1	40R	M62 J25 - J30	
29/09/15 17:14:47	SIG	M621/1002B1	40R	M62 J25 - J30	
29/09/15 17:14:47	SIG	M621/1002B2	40R	M62 J25 - J30	
29/09/15 17:15:09	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:15:09	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:15:09	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:15:26	SIG	M62/2163A1	60R	M62 J25 - J30	
29/09/15 17:15:26	SIG	M62/2163A2	60R	M62 J25 - J30	
29/09/15 17:15:26	SIG	M62/2166K1	60R	M62 J25 - J30	
29/09/15 17:15:26	SIG	M62/2166K2	60R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2170A1	50R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2170A2	50R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2170K1	50R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2170K2	50R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2177A1	40R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2177A2	40R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2177A3	40R	M62 J25 - J30	
29/09/15 17:16:23	SIG	M62/2177A4	40R	M62 J25 - J30	
29/09/15 17:16:34	SIG	M62/2197A1	50R	M62 J25 - J30	
29/09/15 17:16:34	SIG	M62/2197A2	50R	M62 J25 - J30	
29/09/15 17:16:34	SIG	M62/2197A3	50R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2069M1	40R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2069M2	40R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2074B2	40R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2074B3	40R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2074B4	40R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2081B1	50R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2081B2	50R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2081B3	50R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M62/2081L1	50R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M621/1010B1	40R	M62 J25 - J30	
29/09/15 17:16:38	SIG	M621/1010B2	40R	M62 J25 - J30	
29/09/15 17:16:40	SIG	M62/2197A1	40R	M62 J25 - J30	
29/09/15 17:16:40	SIG	M62/2197A2	40R	M62 J25 - J30	
29/09/15 17:16:40	SIG	M62/2197A3	40R	M62 J25 - J30	
29/09/15 17:16:46	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:16:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:16:52	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:17:26	SIG	M62/2157A1	60R	M62 J25 - J30	
29/09/15 17:17:26	SIG	M62/2157A2	60R	M62 J25 - J30	
29/09/15 17:17:26	SIG	M62/2157J1	60R	M62 J25 - J30	
29/09/15 17:17:26	SIG	M62/2157J2	60R	M62 J25 - J30	
29/09/15 17:17:26	SIG	M62/2157K1	60R	M62 J25 - J30	
29/09/15 17:17:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 17:17:51	SIG	M62/2132B1	50R	M62 J25 - J30	
29/09/15 17:17:51	SIG	M62/2132B2	50R	M62 J25 - J30	
29/09/15 17:17:51	SIG	M62/2132B3	50R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2125B1	60R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2125B2	60R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2125B3	60R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2125L1	NR	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2125L2	NR	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2132B1	40R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2132B2	40R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2132B3	40R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2137B1	50R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2137B2	50R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2137B3	50R	M62 J25 - J30	
29/09/15 17:17:57	SIG	M62/2137B4	50R	M62 J25 - J30	
29/09/15 17:18:24	SIG	M62/2163A1	50R	M62 J25 - J30	
29/09/15 17:18:24	SIG	M62/2163A2	50R	M62 J25 - J30	
29/09/15 17:18:25	SIG	M62/2166K1	50R	M62 J25 - J30	
29/09/15 17:18:25	SIG	M62/2166K2	50R	M62 J25 - J30	
29/09/15 17:18:25	SIG	M62/2170A1	40R	M62 J25 - J30	
29/09/15 17:18:25	SIG	M62/2170A2	40R	M62 J25 - J30	
29/09/15 17:18:25	SIG	M62/2170K1	40R	M62 J25 - J30	
29/09/15 17:18:25	SIG	M62/2170K2	40R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2050B2	50R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2050B3	50R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2050B4	50R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2057B1	50R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2057B2	50R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2057B3	50R	M62 J25 - J30	
29/09/15 17:18:49	SIG	M62/2057B4	50R	M62 J25 - J30	
29/09/15 17:19:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:19:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:19:49	SIG	M62/1968B1	50R	M62 J25 - J30	
29/09/15 17:19:49	SIG	M62/1968B2	50R	M62 J25 - J30	
29/09/15 17:19:49	SIG	M62/1968B3	50R	M62 J25 - J30	
29/09/15 17:19:49	SIG	M62/1968L1	50R	M62 J25 - J30	
29/09/15 17:19:53	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1960B1	60R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1960B2	60R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1960B3	60R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1960L1	NR	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1960L2	NR	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1968B1	40R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1968B2	40R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1968B3	40R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1968L1	40R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1974B1	50R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1974B2	50R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1974B3	50R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1974B4	50R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1974M1	50R	M62 J25 - J30	
29/09/15 17:19:54	SIG	M62/1974M2	50R	M62 J25 - J30	
29/09/15 17:20:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:20:17	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2183A1	60R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2183A2	60R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2183A3	60R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2183A4	60R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2189A1	50R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2189A2	50R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2189A3	50R	M62 J25 - J30	
29/09/15 17:20:23	SIG	M62/2189A4	50R	M62 J25 - J30	
29/09/15 17:20:38	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 17:20:38	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 17:20:38	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 17:20:38	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2163A1	40R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2163A2	40R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2166K1	40R	M62 J25 - J30	
29/09/15 17:21:13	SIG	M62/2166K2	40R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2189A1	60R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2189A2	60R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2189A3	60R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2189A4	60R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:21:14	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:21:28	SIG	M62/2041B1	40R	M62 J25 - J30	
29/09/15 17:21:28	SIG	M62/2041B2	40R	M62 J25 - J30	
29/09/15 17:21:28	SIG	M62/2041B3	40R	M62 J25 - J30	
29/09/15 17:21:28	SIG	M62/2041B4	40R	M62 J25 - J30	
29/09/15 17:21:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2125B1	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2125B2	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2125B3	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2125L1	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2125L2	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2132B1	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2132B2	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2132B3	NR	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2137B1	OFF	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2137B2	OFF	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2137B3	OFF	M62 J25 - J30	
29/09/15 17:21:52	SIG	M62/2137B4	OFF	M62 J25 - J30	
29/09/15 17:22:24	SIG	M62/2177A1	60R	M62 J25 - J30	
29/09/15 17:22:24	SIG	M62/2177A2	60R	M62 J25 - J30	
29/09/15 17:22:24	SIG	M62/2177A3	60R	M62 J25 - J30	
29/09/15 17:22:24	SIG	M62/2177A4	60R	M62 J25 - J30	
29/09/15 17:22:26	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 17:22:26	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 17:22:26	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 17:22:26	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 17:22:44	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 17:22:44	SIG	M62/2132B1	50R	M62 J25 - J30	
29/09/15 17:22:44	SIG	M62/2132B2	50R	M62 J25 - J30	
29/09/15 17:22:44	SIG	M62/2132B3	50R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2125B1	60R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2125B2	60R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2125B3	60R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2125L1	NR	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2125L2	NR	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2132B1	40R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2132B2	40R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2132B3	40R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2137B1	50R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2137B2	50R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2137B3	50R	M62 J25 - J30	
29/09/15 17:22:49	SIG	M62/2137B4	50R	M62 J25 - J30	
29/09/15 17:22:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:22:51	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:22:56	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:23:08	SIG	M62/2197A1	50R	M62 J25 - J30	
29/09/15 17:23:08	SIG	M62/2197A2	50R	M62 J25 - J30	
29/09/15 17:23:08	SIG	M62/2197A3	50R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2189A1	50R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2189A2	50R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2189A3	50R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2189A4	50R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2197A1	40R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2197A2	40R	M62 J25 - J30	
29/09/15 17:23:13	SIG	M62/2197A3	40R	M62 J25 - J30	
29/09/15 17:23:20	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:23:20	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:23:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:23:21	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2157A1	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2157A2	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2157K1	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2163A1	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2163A2	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2166K1	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2166K2	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2170A1	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2170A2	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2170K1	60R	M62 J25 - J30	
29/09/15 17:25:11	SIG	M62/2170K2	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2147B1	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2147B2	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2147B3	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2147B4	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2159B1	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2159B2	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2159M1	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2159M2	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 17:25:26	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 17:25:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:25:55	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:26:00	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2183A1	50R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2183A2	50R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2183A3	50R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2183A4	50R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2189A1	40R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2189A2	40R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2189A3	40R	M62 J25 - J30	
29/09/15 17:26:59	SIG	M62/2189A4	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2050B2	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2050B3	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2050B4	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2057B1	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2057B2	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2057B3	40R	M62 J25 - J30	
29/09/15 17:27:15	SIG	M62/2057B4	40R	M62 J25 - J30	
29/09/15 17:27:21	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:27:21	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:27:21	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:27:25	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:27:26	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:27:52	SIG	M62/2197A1	50R	M62 J25 - J30	
29/09/15 17:27:52	SIG	M62/2197A2	50R	M62 J25 - J30	
29/09/15 17:27:52	SIG	M62/2197A3	50R	M62 J25 - J30	
29/09/15 17:27:57	SIG	M62/2197A1	40R	M62 J25 - J30	
29/09/15 17:27:57	SIG	M62/2197A2	40R	M62 J25 - J30	
29/09/15 17:27:57	SIG	M62/2197A3	40R	M62 J25 - J30	
29/09/15 17:28:21	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 17:28:21	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 17:28:21	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 17:28:21	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 17:28:27	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 17:28:27	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 17:28:27	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 17:28:27	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2177A1	50R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2177A2	50R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2177A3	50R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2177A4	50R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2183A1	40R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2183A2	40R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2183A3	40R	M62 J25 - J30	
29/09/15 17:28:41	SIG	M62/2183A4	40R	M62 J25 - J30	
29/09/15 17:28:58	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:28:59	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:29:04	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1981B1	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1981B2	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1981B3	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1981B4	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1987B1	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1987B2	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1987B3	60R	M62 J25 - J30	
29/09/15 17:29:26	SIG	M62/1987B4	60R	M62 J25 - J30	
29/09/15 17:31:53	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:31:53	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:31:53	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:32:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:32:03	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:32:08	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:32:23	SIG	M62/2163A1	50R	M62 J25 - J30	
29/09/15 17:32:23	SIG	M62/2163A2	50R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2170A1	50R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2170A2	50R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2170K1	50R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2170K2	50R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2177A1	40R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2177A2	40R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2177A3	40R	M62 J25 - J30	
29/09/15 17:32:24	SIG	M62/2177A4	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2166K1	50R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2166K2	50R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2170A1	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2170A2	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2170K1	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2170K2	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2177A1	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2177A2	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2177A3	40R	M62 J25 - J30	
29/09/15 17:32:29	SIG	M62/2177A4	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1974B1	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1974B2	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1974B3	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1974B4	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1974M1	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1974M2	40R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 17:33:09	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 17:33:34	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 17:33:34	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 17:33:34	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 17:33:34	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2050B2	50R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2050B3	50R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2050B4	50R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2057B1	50R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2057B2	50R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2057B3	50R	M62 J25 - J30	
29/09/15 17:33:36	SIG	M62/2057B4	50R	M62 J25 - J30	
29/09/15 17:35:05	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:35:06	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:35:11	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M606/2003B1	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M606/2003B2	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1992B1	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1992B2	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1992B3	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1992B4	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1999B1	REDX	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1999B2	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1999B3	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/1999B4	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2004B1	REDX	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2004B2	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2004B3	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2004B4	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2005M1	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2005M2	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2012B2	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2012B3	60R	M62 J25 - J30	
29/09/15 17:35:26	SIG	M62/2012B4	60R	M62 J25 - J30	
29/09/15 17:36:01	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 17:36:01	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 17:36:01	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 17:36:01	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 17:36:07	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 17:36:07	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 17:36:07	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 17:36:07	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2183A1	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2183A2	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2183A3	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2183A4	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2189A1	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2189A2	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2189A3	60R	M62 J25 - J30	
29/09/15 17:36:09	SIG	M62/2189A4	60R	M62 J25 - J30	
29/09/15 17:36:13	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:36:14	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2163A1	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2163A2	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2166K1	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2166K2	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2170A1	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2170A2	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2170K1	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2170K2	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2177A1	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2177A2	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2177A3	60R	M62 J25 - J30	
29/09/15 17:36:24	SIG	M62/2177A4	60R	M62 J25 - J30	
29/09/15 17:38:09	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:38:10	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:38:15	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:38:59	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 17:38:59	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 17:38:59	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 17:38:59	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2170B1	50R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2170B2	50R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2177B1	50R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2177B2	50R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2177L1	50R	M62 J25 - J30	
29/09/15 17:39:09	SIG	M62/2177L2	50R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2170B1	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2170B2	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2170L1	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2170L2	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2177B1	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2177B2	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2177L1	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2177L2	40R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2183B1	50R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2183B2	50R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2183L1	50R	M62 J25 - J30	
29/09/15 17:39:14	SIG	M62/2183L2	50R	M62 J25 - J30	
29/09/15 17:40:00	SIG	M62/2041B1	40R	M62 J25 - J30	
29/09/15 17:40:00	SIG	M62/2041B2	40R	M62 J25 - J30	
29/09/15 17:40:00	SIG	M62/2041B3	40R	M62 J25 - J30	
29/09/15 17:40:00	SIG	M62/2041B4	40R	M62 J25 - J30	
29/09/15 17:41:12	SIG	M62/2137B1	40R	M62 J25 - J30	
29/09/15 17:41:12	SIG	M62/2137B2	40R	M62 J25 - J30	
29/09/15 17:41:12	SIG	M62/2137B3	40R	M62 J25 - J30	
29/09/15 17:41:12	SIG	M62/2137B4	40R	M62 J25 - J30	
29/09/15 17:41:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:41:14	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:41:19	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:41:32	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 17:41:32	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 17:41:32	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 17:41:32	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 17:41:53	SIG	M62/2197A1	50R	M62 J25 - J30	
29/09/15 17:41:53	SIG	M62/2197A2	50R	M62 J25 - J30	
29/09/15 17:41:53	SIG	M62/2197A3	50R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2189A1	50R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2189A2	50R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2189A3	50R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2189A4	50R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2197A1	40R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2197A2	40R	M62 J25 - J30	
29/09/15 17:41:59	SIG	M62/2197A3	40R	M62 J25 - J30	
29/09/15 17:42:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 17:42:00	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 17:42:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 17:42:01	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 17:43:09	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 17:43:09	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 17:43:09	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 17:43:09	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2170B1	60R	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2170B2	60R	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2170L1	50R	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2170L2	50R	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2177B1	NR	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2177B2	NR	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2177L1	NR	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2177L2	NR	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2183B1	OFF	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2183B2	OFF	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2183L1	OFF	M62 J25 - J30	
29/09/15 17:43:11	SIG	M62/2183L2	OFF	M62 J25 - J30	
29/09/15 17:43:14	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 17:43:14	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 17:43:14	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 17:43:14	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 17:44:16	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:44:17	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:44:22	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2050B2	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2050B3	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2050B4	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2057B1	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2057B2	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2057B3	40R	M62 J25 - J30	
29/09/15 17:44:39	SIG	M62/2057B4	40R	M62 J25 - J30	
29/09/15 17:45:12	SIG	M62/2137B1	50R	M62 J25 - J30	
29/09/15 17:45:12	SIG	M62/2137B2	50R	M62 J25 - J30	
29/09/15 17:45:12	SIG	M62/2137B3	50R	M62 J25 - J30	
29/09/15 17:45:12	SIG	M62/2137B4	50R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2189A1	60R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2189A2	60R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2189A3	60R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2189A4	60R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:45:53	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:46:12	SIG	M62/2177B1	OFF	M62 J25 - J30	
29/09/15 17:46:12	SIG	M62/2177B2	OFF	M62 J25 - J30	
29/09/15 17:46:12	SIG	M62/2177L1	OFF	M62 J25 - J30	
29/09/15 17:46:12	SIG	M62/2177L2	OFF	M62 J25 - J30	
29/09/15 17:47:20	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:47:21	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:47:27	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:47:27	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 17:47:27	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 17:47:27	SIG	M62/2157J1	OFF	M62 J25 - J30	
29/09/15 17:47:27	SIG	M62/2157J2	OFF	M62 J25 - J30	
29/09/15 17:47:27	SIG	M62/2157K1	OFF	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1974B1	50R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1974B2	50R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1974B3	50R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1974B4	50R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1974M1	50R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1974M2	50R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1981B1	60R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1981B2	60R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1981B3	60R	M62 J25 - J30	
29/09/15 17:48:19	SIG	M62/1981B4	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1968B1	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1968B2	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1968B3	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1968L1	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1974B1	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1974B2	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1974B3	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1974B4	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1974M1	60R	M62 J25 - J30	
29/09/15 17:48:49	SIG	M62/1974M2	60R	M62 J25 - J30	
29/09/15 17:49:53	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 17:49:53	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 17:49:53	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 17:49:53	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 17:50:24	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:50:25	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:50:26	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 17:50:26	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 17:50:26	SIG	M62/2166K1	OFF	M62 J25 - J30	
29/09/15 17:50:26	SIG	M62/2166K2	OFF	M62 J25 - J30	
29/09/15 17:50:30	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:50:32	SIG	M62/2197A1	50R	M62 J25 - J30	
29/09/15 17:50:32	SIG	M62/2197A2	50R	M62 J25 - J30	
29/09/15 17:50:32	SIG	M62/2197A3	50R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2189A1	50R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2189A2	50R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2189A3	50R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2189A4	50R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2197A1	40R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2197A2	40R	M62 J25 - J30	
29/09/15 17:50:38	SIG	M62/2197A3	40R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2132B1	60R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2132B2	60R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2132B3	60R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2137B1	60R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2137B2	60R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2137B3	60R	M62 J25 - J30	
29/09/15 17:50:57	SIG	M62/2137B4	60R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2050B2	50R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2050B3	50R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2050B4	50R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2057B1	50R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2057B2	50R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2057B3	50R	M62 J25 - J30	
29/09/15 17:52:42	SIG	M62/2057B4	50R	M62 J25 - J30	
29/09/15 17:52:48	SIG	M62/2132B1	50R	M62 J25 - J30	
29/09/15 17:52:48	SIG	M62/2132B2	50R	M62 J25 - J30	
29/09/15 17:52:48	SIG	M62/2132B3	50R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2132B1	40R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2132B2	40R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2132B3	40R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2137B1	50R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2137B2	50R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2137B3	50R	M62 J25 - J30	
29/09/15 17:52:53	SIG	M62/2137B4	50R	M62 J25 - J30	
29/09/15 17:53:03	SIG	M62/1968B1	50R	M62 J25 - J30	
29/09/15 17:53:03	SIG	M62/1968B2	50R	M62 J25 - J30	
29/09/15 17:53:03	SIG	M62/1968B3	50R	M62 J25 - J30	
29/09/15 17:53:03	SIG	M62/1968L1	50R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1968B1	40R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1968B2	40R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1968B3	40R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1968L1	40R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1974B1	50R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1974B2	50R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1974B3	50R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1974B4	50R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1974M1	50R	M62 J25 - J30	
29/09/15 17:53:08	SIG	M62/1974M2	50R	M62 J25 - J30	
29/09/15 17:53:28	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:53:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:53:34	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:54:11	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 17:54:11	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 17:54:11	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 17:54:11	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 17:54:16	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 17:54:16	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 17:54:16	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 17:54:16	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2189A1	60R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2189A2	60R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2189A3	60R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2189A4	60R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2197A1	60R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2197A2	60R	M62 J25 - J30	
29/09/15 17:54:33	SIG	M62/2197A3	60R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1974B1	40R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1974B2	40R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1974B3	40R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1974B4	40R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1974M1	40R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1974M2	40R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 17:54:48	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 17:56:31	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:56:32	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:56:37	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2132B1	60R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2132B2	60R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2132B3	60R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2137B1	60R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2137B2	60R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2137B3	60R	M62 J25 - J30	
29/09/15 17:57:04	SIG	M62/2137B4	60R	M62 J25 - J30	
29/09/15 17:57:33	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 17:57:33	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 17:57:33	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 17:57:33	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 17:58:09	SIG	M62/2041B1	40R	M62 J25 - J30	
29/09/15 17:58:09	SIG	M62/2041B2	40R	M62 J25 - J30	
29/09/15 17:58:09	SIG	M62/2041B3	40R	M62 J25 - J30	
29/09/15 17:58:09	SIG	M62/2041B4	40R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1968B1	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1968B2	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1968B3	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1968L1	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1974B1	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1974B2	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1974B3	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1974B4	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1974M1	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1974M2	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1981B1	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1981B2	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1981B3	60R	M62 J25 - J30	
29/09/15 17:58:49	SIG	M62/1981B4	60R	M62 J25 - J30	
29/09/15 17:58:50	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 17:58:50	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 17:58:50	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 17:58:50	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 17:59:35	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 17:59:36	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 17:59:41	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:00:27	SIG	M62/2197A1	NR	M62 J25 - J30	
29/09/15 18:00:27	SIG	M62/2197A2	NR	M62 J25 - J30	
29/09/15 18:00:27	SIG	M62/2197A3	NR	M62 J25 - J30	
29/09/15 18:02:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:02:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:02:53	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2050B2	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2050B3	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2050B4	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2057B1	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2057B2	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2057B3	40R	M62 J25 - J30	
29/09/15 18:05:39	SIG	M62/2057B4	40R	M62 J25 - J30	
29/09/15 18:05:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:05:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:05:53	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2125B1	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2125B2	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2125B3	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2125L1	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2125L2	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2132B1	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2132B2	NR	M62 J25 - J30	
29/09/15 18:08:27	SIG	M62/2132B3	NR	M62 J25 - J30	
29/09/15 18:08:47	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:08:47	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:08:53	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:09:27	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1960B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1960B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1960B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1960L1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1960L2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1968B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1968B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1968B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1968L1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1974B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1974B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1974B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1974B4	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1974M1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1974M2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1981B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1981B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1981B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1981B4	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1987B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1987B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1987B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1987B4	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1992B1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1992B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1992B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1992B4	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1999B1	BLNK	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1999B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1999B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/1999B4	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2004B1	BLNK	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2004B2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2004B3	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2004B4	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2005M1	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2005M2	OFF	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2012B2	NR	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2012B3	NR	M62 J25 - J30	
29/09/15 18:09:27	SIG	M62/2012B4	NR	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2050B2	50R	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2050B3	50R	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2050B4	50R	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2057B1	50R	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2057B2	50R	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2057B3	50R	M62 J25 - J30	
29/09/15 18:09:39	SIG	M62/2057B4	50R	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2132B1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2132B2	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2132B3	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2137B1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2137B2	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2137B3	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2137B4	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2147B1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2147B2	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2147B3	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2147B4	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2159B1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2159B2	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2159M1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2159M2	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2170B1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2170B2	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2170L1	OFF	M62 J25 - J30	
29/09/15 18:10:27	SIG	M62/2170L2	OFF	M62 J25 - J30	
29/09/15 18:10:28	SIG	M62/2041B1	50R	M62 J25 - J30	
29/09/15 18:10:28	SIG	M62/2041B2	50R	M62 J25 - J30	
29/09/15 18:10:28	SIG	M62/2041B3	50R	M62 J25 - J30	
29/09/15 18:10:28	SIG	M62/2041B4	50R	M62 J25 - J30	
29/09/15 18:11:27	SIG	M62/2125B1	OFF	M62 J25 - J30	
29/09/15 18:11:27	SIG	M62/2125B2	OFF	M62 J25 - J30	
29/09/15 18:11:27	SIG	M62/2125B3	OFF	M62 J25 - J30	
29/09/15 18:11:27	SIG	M62/2125L1	OFF	M62 J25 - J30	
29/09/15 18:11:27	SIG	M62/2125L2	OFF	M62 J25 - J30	
29/09/15 18:11:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:11:50	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:11:56	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:12:48	SIG	M62/2025B1	50R	M62 J25 - J30	
29/09/15 18:12:48	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 18:12:48	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 18:12:48	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 18:14:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:14:54	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:14:59	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:16:29	SIG	M62/2033B1	50R	M62 J25 - J30	
29/09/15 18:16:29	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 18:16:29	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:16:29	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 18:16:34	SIG	M62/2025B1	40R	M62 J25 - J30	
29/09/15 18:16:34	SIG	M62/2025B2	40R	M62 J25 - J30	
29/09/15 18:16:34	SIG	M62/2025B3	40R	M62 J25 - J30	
29/09/15 18:16:34	SIG	M62/2025B4	40R	M62 J25 - J30	
29/09/15 18:17:48	SIG	M62/2033B1	40R	M62 J25 - J30	
29/09/15 18:17:48	SIG	M62/2033B2	40R	M62 J25 - J30	
29/09/15 18:17:48	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:17:48	SIG	M62/2033B4	40R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2122K1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2122K2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2124A1	REDX	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2124A2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2124A3	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2124A4	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2125B1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2125B2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2125B3	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2125L1	NR	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2125L2	NR	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2132B1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2132B2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2132B3	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2135A1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2135A2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2135A3	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2135A4	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2137B1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2137B2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2137B3	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2137B4	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2144A1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2144A2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2144J1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2144K1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2147B1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2147B2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2147B3	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2147B4	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2151A1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2151A2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2151J1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2151K1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2155A1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2155A2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2155J1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2155K1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2159B1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2159B2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2159M1	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2159M2	50R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2163A1	60R	M62 J25 - J30	
29/09/15 18:19:09	SIG	M62/2163A2	60R	M62 J25 - J30	
29/09/15 18:19:10	SIG	M62/2117A2	50R	M62 J25 - J30	
29/09/15 18:19:10	SIG	M62/2117A3	50R	M62 J25 - J30	
29/09/15 18:19:10	SIG	M62/2117A4	50R	M62 J25 - J30	
29/09/15 18:19:18	SIG	M62/2124A3	OFF	M62 J25 - J30	
29/09/15 18:19:19	SIG	M62/2124A3	OFF	M62 J25 - J30	
29/09/15 18:19:19	SIG	M62/2124A3	OFF	M62 J25 - J30	
29/09/15 18:19:20	SIG	M62/2124A3	OFF	M62 J25 - J30	
29/09/15 18:19:30	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 18:19:30	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 18:19:30	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 18:19:30	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 18:19:36	SIG	M62/2018B1	40R	M62 J25 - J30	
29/09/15 18:19:36	SIG	M62/2018B2	40R	M62 J25 - J30	
29/09/15 18:19:36	SIG	M62/2018B3	40R	M62 J25 - J30	
29/09/15 18:19:36	SIG	M62/2018L1	40R	M62 J25 - J30	
29/09/15 18:19:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:20:00	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:20:06	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2065B2	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2065B3	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2065B4	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2065M1	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2069M1	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2069M2	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2074B2	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2074B3	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2074B4	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2081B1	60R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2081B2	60R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2081B3	60R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M62/2081L1	60R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M621/1002B1	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M621/1002B2	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M621/1010B1	50R	M62 J25 - J30	
29/09/15 18:20:35	SIG	M621/1010B2	50R	M62 J25 - J30	
29/09/15 18:21:02	SIG	M62/2050A1	OFF	M62 J25 - J30	
29/09/15 18:21:03	SIG	M62/2050A1	60R	M62 J25 - J30	
29/09/15 18:21:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 18:21:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 18:21:32	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 18:21:33	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 18:23:03	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:23:04	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:23:09	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:23:30	SIG	M62/2018B1	60R	M62 J25 - J30	
29/09/15 18:23:30	SIG	M62/2018B2	60R	M62 J25 - J30	
29/09/15 18:23:30	SIG	M62/2018B3	60R	M62 J25 - J30	
29/09/15 18:23:30	SIG	M62/2018L1	60R	M62 J25 - J30	
29/09/15 18:26:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:26:08	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:26:13	SIG	M62/2033B3	40R	M62 J25 - J30	
29/09/15 18:27:20	SIG	M62/2033B1	50R	M62 J25 - J30	
29/09/15 18:27:20	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 18:27:20	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 18:27:20	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2057B1	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2057B2	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2057B3	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2057B4	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2065B2	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2065B3	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2065B4	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2065M1	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2069M1	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2069M2	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2074B2	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2074B3	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M62/2074B4	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M621/1002B1	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M621/1002B2	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M621/1010B1	60R	M62 J25 - J30	
29/09/15 18:27:27	SIG	M621/1010B2	60R	M62 J25 - J30	
29/09/15 18:28:09	SIG	M62/2113B1	HSD	M62 J25 - J30	
29/09/15 18:29:02	SIG	M62/2106B1	HSD	M62 J25 - J30	
29/09/15 18:29:27	SIG	M62/2050B2	60R	M62 J25 - J30	
29/09/15 18:29:27	SIG	M62/2050B3	60R	M62 J25 - J30	
29/09/15 18:29:27	SIG	M62/2050B4	60R	M62 J25 - J30	
29/09/15 18:30:10	SIG	M62/2097B1	HSD	M62 J25 - J30	
29/09/15 18:30:11	SIG	M62/2113B1	REDX	M62 J25 - J30	
29/09/15 18:30:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:30:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:30:13	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:30:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:31:15	SIG	M62/2025B1	50R	M62 J25 - J30	
29/09/15 18:31:15	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 18:31:15	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 18:31:15	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 18:31:18	SIG	M62/2088B1	HSD	M62 J25 - J30	
29/09/15 18:31:19	SIG	M62/2106B1	REDX	M62 J25 - J30	
29/09/15 18:31:41	SIG	M62/2177A1	HSD	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2117A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2117A3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2117A4	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2122K1	OFF	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2122K2	OFF	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2124A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2124A3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2124A4	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2125B1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2125B2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2125B3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2125L1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2125L2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2132B1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2132B2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2132B3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2135A1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2135A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2135A3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2135A4	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2137B1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2137B2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2137B3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2137B4	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2144A1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2144A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2144J1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2144K1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2147B1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2147B2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2147B3	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2147B4	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2151A1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2151A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2151J1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2151K1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2155A1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2155A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2155J1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2155K1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2157A1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2157A2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2157K1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2159B1	OFF	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2159B2	OFF	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2159M1	OFF	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2159M2	OFF	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2163A1	NR	M62 J25 - J30	
29/09/15 18:32:04	SIG	M62/2163A2	NR	M62 J25 - J30	
29/09/15 18:32:26	SIG	M62/2183A1	HSD	M62 J25 - J30	
29/09/15 18:32:27	SIG	M62/2097B1	REDX	M62 J25 - J30	
29/09/15 18:33:11	SIG	M62/2177A1	REDX	M62 J25 - J30	
29/09/15 18:33:11	SIG	M62/2189A1	HSD	M62 J25 - J30	
29/09/15 18:33:35	SIG	M62/2088B1	REDX	M62 J25 - J30	
29/09/15 18:34:11	SIG	M62/2183A1	REDX	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2025B1	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2025B2	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2025B3	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2025B4	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2033B1	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2033B2	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2033B3	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2033B4	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2041B1	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 18:34:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2088B2	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2088B3	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2088B4	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2097B2	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2097B4	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2106B2	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2106B3	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2106B4	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2113B2	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2113B3	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2113B4	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2117B1	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2117B3	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2120M1	NR	M62 J25 - J30	
29/09/15 18:34:38	SIG	M62/2120M2	NR	M62 J25 - J30	
29/09/15 18:35:04	SIG	M62/2124A2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2124A3	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2124A4	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2125B1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2125B2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2125B3	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2125L1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2125L2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2132B1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2132B2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2132B3	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2135A1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2135A2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2135A3	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2135A4	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2137B1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2137B2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2137B3	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2137B4	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2144A1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2144A2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2144J1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2144K1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2147B1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2147B2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2147B3	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2147B4	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2151A1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2151A2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2151J1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2151K1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2155A1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2155A2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2155J1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2155K1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2157J1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2157J2	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2157K1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 18:35:05	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 18:35:06	SIG	M62/2124A1	BLNK	M62 J25 - J30	
29/09/15 18:35:11	SIG	M62/2189A1	REDX	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2170A1	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2170A2	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2170K1	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2170K2	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2177A2	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2177A3	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2177A4	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2183A2	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2183A3	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2183A4	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2189A2	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2189A3	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2189A4	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2197A1	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2197A2	NR	M62 J25 - J30	
29/09/15 18:35:12	SIG	M62/2197A3	NR	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2106B1	BLNK	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2106B2	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2106B3	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2106B4	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2113B1	BLNK	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2113B2	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2113B3	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2113B4	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2117B3	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2120M1	OFF	M62 J25 - J30	
29/09/15 18:35:28	SIG	M62/2120M2	OFF	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2088B1	BLNK	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2088B2	OFF	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2088B3	OFF	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2088B4	OFF	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2097B1	BLNK	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2097B2	OFF	M62 J25 - J30	
29/09/15 18:35:38	SIG	M62/2097B4	OFF	M62 J25 - J30	
29/09/15 18:36:11	SIG	M62/2170K1	OFF	M62 J25 - J30	
29/09/15 18:36:11	SIG	M62/2170K2	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2170A1	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2170A2	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2177A1	BLNK	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2177A2	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2177A3	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2177A4	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2183A1	BLNK	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2183A2	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2183A3	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2183A4	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2189A1	BLNK	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2189A2	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2189A3	OFF	M62 J25 - J30	
29/09/15 18:36:12	SIG	M62/2189A4	OFF	M62 J25 - J30	
29/09/15 18:37:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:37:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:38:12	SIG	M62/2197A1	OFF	M62 J25 - J30	
29/09/15 18:38:13	SIG	M62/2197A2	OFF	M62 J25 - J30	
29/09/15 18:38:13	SIG	M62/2197A3	OFF	M62 J25 - J30	
29/09/15 18:38:27	SIG	M62/2081B1	OFF	M62 J25 - J30	
29/09/15 18:38:27	SIG	M62/2081B2	OFF	M62 J25 - J30	
29/09/15 18:38:27	SIG	M62/2081B3	OFF	M62 J25 - J30	
29/09/15 18:38:27	SIG	M62/2081L1	OFF	M62 J25 - J30	
29/09/15 18:38:49	SIG	M62/2079A1	HSD	M62 J25 - J30	
29/09/15 18:39:57	SIG	M62/2088A1	HSD	M62 J25 - J30	
29/09/15 18:41:05	SIG	M62/2079A1	REDX	M62 J25 - J30	
29/09/15 18:41:05	SIG	M62/2097A1	HSD	M62 J25 - J30	
29/09/15 18:41:27	SIG	M62/2074B1	BLNK	M62 J25 - J30	
29/09/15 18:41:27	SIG	M62/2074B2	OFF	M62 J25 - J30	
29/09/15 18:41:27	SIG	M62/2074B3	OFF	M62 J25 - J30	
29/09/15 18:41:27	SIG	M62/2074B4	OFF	M62 J25 - J30	
29/09/15 18:41:27	SIG	M621/1010B1	OFF	M62 J25 - J30	
29/09/15 18:41:27	SIG	M621/1010B2	OFF	M62 J25 - J30	
29/09/15 18:42:13	SIG	M62/2088A1	REDX	M62 J25 - J30	
29/09/15 18:42:13	SIG	M62/2106A1	HSD	M62 J25 - J30	
29/09/15 18:43:21	SIG	M62/2097A1	REDX	M62 J25 - J30	
29/09/15 18:44:29	SIG	M62/2106A1	REDX	M62 J25 - J30	
29/09/15 18:45:29	SIG	M62/2065A2	NR	M62 J25 - J30	
29/09/15 18:45:29	SIG	M62/2065A3	NR	M62 J25 - J30	
29/09/15 18:45:29	SIG	M62/2065A4	NR	M62 J25 - J30	
29/09/15 18:45:29	SIG	M62/2074A2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2073K1	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2073K2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2079A2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2079A3	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2079A4	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2088A2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2088A3	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2088A4	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2097A2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2097A3	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2097A4	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2106A2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2106A3	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2106A4	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2114A1	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2114A2	NR	M62 J25 - J30	
29/09/15 18:45:30	SIG	M62/2114A3	NR	M62 J25 - J30	
29/09/15 18:46:29	SIG	M62/2073K1	OFF	M62 J25 - J30	
29/09/15 18:46:29	SIG	M62/2073K2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2074A1	BLNK	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2074A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2079A1	BLNK	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2079A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2079A3	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2079A4	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2088A1	BLNK	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2088A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2088A3	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2088A4	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2097A1	BLNK	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2097A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2097A3	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2097A4	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2106A1	BLNK	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2106A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2106A3	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2106A4	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2114A1	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2114A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2114A3	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2117A1	BLNK	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2117A2	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2117A3	OFF	M62 J25 - J30	
29/09/15 18:46:30	SIG	M62/2117A4	OFF	M62 J25 - J30	
29/09/15 18:48:52	SIG	M62/1974B1	50R	M62 J25 - J30	
29/09/15 18:48:52	SIG	M62/1974M1	50R	M62 J25 - J30	
29/09/15 18:48:52	SIG	M62/1974M2	50R	M62 J25 - J30	
29/09/15 18:48:57	SIG	M62/1974B1	40R	M62 J25 - J30	
29/09/15 18:48:57	SIG	M62/1974M1	40R	M62 J25 - J30	
29/09/15 18:48:57	SIG	M62/1974M2	40R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1960B1	NR	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1960B2	NR	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1960B3	NR	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1960L1	NR	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1960L2	NR	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1968B1	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1968B2	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1968B3	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1968L1	LDR	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1974B1	30R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1974B2	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1974B3	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1974B4	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1974M1	30R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1974M2	30R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 18:49:03	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 18:49:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1960B1	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1960B2	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1960B3	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1960L1	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1960L2	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1968B1	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1968B2	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1968B3	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1968L1	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1974B1	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1974B2	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1974B3	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1974B4	NR	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1974M1	OFF	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1974M2	OFF	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1981B1	OFF	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1981B2	OFF	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1981B3	OFF	M62 J25 - J30	
29/09/15 18:50:00	SIG	M62/1981B4	OFF	M62 J25 - J30	
29/09/15 18:51:45	SIG	M62/2025A1	HSD	M62 J25 - J30	
29/09/15 18:52:45	SIG	M62/2033A1	HSD	M62 J25 - J30	
29/09/15 18:53:00	SIG	M62/1974B1	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1960B1	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1960B2	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1960B3	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1960L1	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1960L2	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1968B1	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1968B2	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1968B3	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1968L1	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1974B2	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1974B3	OFF	M62 J25 - J30	
29/09/15 18:53:01	SIG	M62/1974B4	OFF	M62 J25 - J30	
29/09/15 18:53:45	SIG	M62/2041A1	HSD	M62 J25 - J30	
29/09/15 18:53:46	SIG	M62/2018A1	HSD	M62 J25 - J30	
29/09/15 18:53:46	SIG	M62/2025A1	REDX	M62 J25 - J30	
29/09/15 18:54:52	SIG	M62/2050A1	HSD	M62 J25 - J30	
29/09/15 18:54:53	SIG	M62/2033A1	REDX	M62 J25 - J30	
29/09/15 18:55:45	SIG	M62/2041A1	REDX	M62 J25 - J30	
29/09/15 18:56:45	SIG	M62/2050A1	REDX	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2025A2	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2025A3	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2025A4	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2033A2	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2033A3	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2033A4	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2041A2	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2041A3	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2041A4	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2050A2	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2050A3	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2050A4	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2057A1	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2057A2	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2057A3	NR	M62 J25 - J30	
29/09/15 18:57:45	SIG	M62/2057J1	NR	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2008K1	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2008K2	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2012A1	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2012A2	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2012A3	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2018A1	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2018A2	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2018A3	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2018A4	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2025A1	BLNK	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2025A2	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2025A3	OFF	M62 J25 - J30	
29/09/15 18:58:45	SIG	M62/2025A4	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2033A1	BLNK	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2033A2	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2033A3	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2033A4	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2041A1	BLNK	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2041A2	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2041A3	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2041A4	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2050A1	BLNK	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2050A2	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2050A3	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2050A4	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2057A1	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2057A2	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2057A3	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2057J1	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2065A1	BLNK	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2065A2	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2065A3	OFF	M62 J25 - J30	
29/09/15 18:58:46	SIG	M62/2065A4	OFF	M62 J25 - J30	
29/09/15 19:00:14	SIG	M62/2057B1	HSD	M62 J25 - J30	
29/09/15 19:02:14	SIG	M62/2041B1	HSD	M62 J25 - J30	
29/09/15 19:02:14	SIG	M62/2057B1	REDX	M62 J25 - J30	
29/09/15 19:02:14	SIG	M621/1002B1	HSD	M62 J25 - J30	
29/09/15 19:02:14	SIG	M621/1010B1	60R	M62 J25 - J30	
29/09/15 19:02:14	SIG	M621/1010B2	60R	M62 J25 - J30	
29/09/15 19:03:14	SIG	M62/2033B1	HSD	M62 J25 - J30	
29/09/15 19:04:14	SIG	M62/2025B1	HSD	M62 J25 - J30	
29/09/15 19:04:14	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 19:05:06	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 19:05:50	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2025B2	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2025B3	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2025B4	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2033B2	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2033B3	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2033B4	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2041B2	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2041B3	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2041B4	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2050B2	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2050B3	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2050B4	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2057B2	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2057B3	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2057B4	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2065B2	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2065B3	NR	M62 J25 - J30	
29/09/15 19:06:20	SIG	M62/2065B4	NR	M62 J25 - J30	
29/09/15 19:06:21	SIG	M62/2018B1	NR	M62 J25 - J30	
29/09/15 19:06:21	SIG	M62/2018B2	NR	M62 J25 - J30	
29/09/15 19:06:21	SIG	M62/2018B3	NR	M62 J25 - J30	
29/09/15 19:06:21	SIG	M62/2018L1	NR	M62 J25 - J30	
29/09/15 19:07:20	SIG	M62/2069M1	OFF	M62 J25 - J30	
29/09/15 19:07:20	SIG	M62/2069M2	OFF	M62 J25 - J30	
29/09/15 19:07:20	SIG	M621/1010B1	OFF	M62 J25 - J30	
29/09/15 19:07:20	SIG	M621/1010B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2012B1	BLNK	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2012B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2012B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2012B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2018B1	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2018B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2018B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2018L1	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2025B1	BLNK	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2025B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2025B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2025B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2033B1	BLNK	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2033B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2033B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2041B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2041B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2041B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2050B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2050B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2050B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2057B1	BLNK	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2057B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2057B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2057B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2065B1	BLNK	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2065B2	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2065B3	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2065B4	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M62/2065M1	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M621/1002B1	OFF	M62 J25 - J30	
29/09/15 19:07:21	SIG	M621/1002B2	OFF	M62 J25 - J30	
29/09/15 19:18:56	SIG	M606/2003B1	NR	M62 J25 - J30	
29/09/15 19:18:56	SIG	M606/2003B2	NR	M62 J25 - J30	
29/09/15 19:35:59	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 19:35:59	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1979K1	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1979K2	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1981A1	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1981A2	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1981A3	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1981A4	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1987A1	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1987A2	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1987A3	50R	M62 J25 - J30	
29/09/15 19:40:24	SIG	M62/1987J1	50R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1987A2	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 19:40:40	SIG	M62/1987J1	40R	M62 J25 - J30	
29/09/15 19:40:45	SIG	M62/1987J1	30R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1974A1	50R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1974A2	50R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1974A3	50R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1974A4	50R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1979K1	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1979K2	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1981A1	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1981A2	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1981A3	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1981A4	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1987A1	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1987A3	40R	M62 J25 - J30	
29/09/15 19:40:50	SIG	M62/1987J1	20R	M62 J25 - J30	
29/09/15 19:40:51	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 19:40:51	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 19:40:51	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 19:40:51	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 19:40:56	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 19:40:56	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 19:40:56	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 19:40:56	SIG	M62/1992J1	40R	M62 J25 - J30	
29/09/15 19:41:01	SIG	M62/1992J1	30R	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1992A1	40R	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1992A2	40R	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1992A3	40R	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1992J1	20R	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1999A1	NR	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1999A2	NR	M62 J25 - J30	
29/09/15 19:41:07	SIG	M62/1999A3	NR	M62 J25 - J30	
29/09/15 19:41:12	SIG	M62/1987J1	STOP	M62 J25 - J30	
29/09/15 19:41:12	SIG	M62/1992J1	STOP	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1960A1	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1960A2	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1960A3	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1960K1	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1960K2	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1968A1	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1968A2	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1968A3	60R	M62 J25 - J30	
29/09/15 19:50:29	SIG	M62/1968A4	60R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M606/2003B2	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1987B1	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1987B2	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1987B3	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1987B4	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1992B1	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1992B2	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1992B3	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1992B4	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1999B2	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1999B3	50R	M62 J25 - J30	
29/09/15 19:55:58	SIG	M62/1999B4	50R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M606/2003B1	LDR	M62 J25 - J30	
29/09/15 19:56:04	SIG	M606/2003B2	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1981B1	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1981B2	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1981B3	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1981B4	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1987B1	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1987B2	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1987B3	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1987B4	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1992B1	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1992B2	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1992B3	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1992B4	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1999B2	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1999B3	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/1999B4	40R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/2004B1	REDX	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/2004B2	50R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/2004B3	50R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/2004B4	50R	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/2005M1	TI	M62 J25 - J30	
29/09/15 19:56:04	SIG	M62/2005M2	TI	M62 J25 - J30	
29/09/15 19:56:09	SIG	M62/1981B1	30R	M62 J25 - J30	
29/09/15 19:56:09	SIG	M62/1987B1	30R	M62 J25 - J30	
29/09/15 19:56:09	SIG	M62/1992B1	30R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1981B1	20R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1981B2	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1981B3	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1981B4	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1987B1	20R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1987B2	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1987B3	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1987B4	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1992B1	20R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1992B2	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1992B3	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1992B4	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1999B1	STOP	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1999B2	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1999B3	40R	M62 J25 - J30	
29/09/15 19:56:14	SIG	M62/1999B4	40R	M62 J25 - J30	
29/09/15 19:56:19	SIG	M62/1999B1	STOP	M62 J25 - J30	
29/09/15 19:56:25	SIG	M62/1981B1	STOP	M62 J25 - J30	
29/09/15 19:56:25	SIG	M62/1987B1	STOP	M62 J25 - J30	
29/09/15 19:56:30	SIG	M62/1992B1	STOP	M62 J25 - J30	
29/09/15 19:57:29	SIG	M62/1955K1	60R	M62 J25 - J30	
29/09/15 19:57:29	SIG	M62/1955K2	60R	M62 J25 - J30	
29/09/15 19:57:29	SIG	M62/1956A1	60R	M62 J25 - J30	
29/09/15 19:57:29	SIG	M62/1956A2	60R	M62 J25 - J30	
29/09/15 19:57:29	SIG	M62/1956A3	60R	M62 J25 - J30	
29/09/15 20:04:29	SIG	M62/2012B1	REDX	M62 J25 - J30	
29/09/15 20:04:29	SIG	M62/2012B2	60R	M62 J25 - J30	
29/09/15 20:04:29	SIG	M62/2012B3	60R	M62 J25 - J30	
29/09/15 20:04:29	SIG	M62/2012B4	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1974A1	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1974A2	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1974A3	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1974A4	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1979K1	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1979K2	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1981A1	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1981A2	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1981A3	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1981A4	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1987A1	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1987A3	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1987J1	60R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1992A1	50R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1992A2	50R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1992A3	50R	M62 J25 - J30	
29/09/15 20:05:53	SIG	M62/1992J1	50R	M62 J25 - J30	
29/09/15 20:06:14	SIG	M62/1999J1	50R	M62 J25 - J30	
29/09/15 20:06:14	SIG	M62/1999J2	LDL	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1955K1	OFF	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1955K2	OFF	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1956A1	OFF	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1956A2	OFF	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1956A3	OFF	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1960A1	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1960A2	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1960A3	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1960K1	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1960K2	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1968A1	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1968A2	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1968A3	NR	M62 J25 - J30	
29/09/15 20:13:29	SIG	M62/1968A4	NR	M62 J25 - J30	
29/09/15 20:13:55	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 20:13:55	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 20:13:55	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 20:13:55	SIG	M62/2163A1	50R	M62 J25 - J30	
29/09/15 20:13:55	SIG	M62/2163A2	50R	M62 J25 - J30	
29/09/15 20:14:00	SIG	M62/2157A1	40R	M62 J25 - J30	
29/09/15 20:14:00	SIG	M62/2157A2	40R	M62 J25 - J30	
29/09/15 20:14:00	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 20:14:00	SIG	M62/2163A1	40R	M62 J25 - J30	
29/09/15 20:14:00	SIG	M62/2163A2	40R	M62 J25 - J30	
29/09/15 20:14:06	SIG	M62/2157A2	30R	M62 J25 - J30	
29/09/15 20:14:06	SIG	M62/2163A2	30R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2144A1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2144A2	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2144J1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2144K1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2151A1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2151A2	LDL	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2151J1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2151K1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2155A1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2155A2	LDL	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2155J1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2155K1	50R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2157A1	40R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2157A2	20R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2163A1	40R	M62 J25 - J30	
29/09/15 20:14:11	SIG	M62/2163A2	20R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M606/2003B1	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M606/2003B2	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1987B1	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1987B2	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1987B3	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1987B4	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1992B1	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1992B2	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1992B3	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1992B4	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1999B1	REDX	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1999B2	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1999B3	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/1999B4	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/2004B2	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/2004B3	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/2004B4	60R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/2005M1	50R	M62 J25 - J30	
29/09/15 20:14:13	SIG	M62/2005M2	50R	M62 J25 - J30	
29/09/15 20:14:16	SIG	M62/2157A2	STOP	M62 J25 - J30	
29/09/15 20:14:16	SIG	M62/2163A2	STOP	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2151A1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2151A2	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2151J1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2151K1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2155A1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2155A2	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2155J1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2155K1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2157K1	NR	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 20:14:39	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1981B1	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1981B2	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1981B3	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1981B4	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1987B1	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1987B2	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1987B3	40R	M62 J25 - J30	
29/09/15 20:14:45	SIG	M62/1987B4	40R	M62 J25 - J30	
29/09/15 20:14:50	SIG	M62/1981B1	30R	M62 J25 - J30	
29/09/15 20:14:53	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 20:14:53	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 20:14:53	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 20:14:53	SIG	M62/2163A1	50R	M62 J25 - J30	
29/09/15 20:14:53	SIG	M62/2163A2	50R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1981B1	20R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1981B2	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1981B3	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1981B4	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1987B1	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1987B2	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1987B3	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1987B4	40R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1992B1	50R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1992B2	50R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1992B3	50R	M62 J25 - J30	
29/09/15 20:14:55	SIG	M62/1992B4	50R	M62 J25 - J30	
29/09/15 20:14:58	SIG	M62/2157A1	40R	M62 J25 - J30	
29/09/15 20:14:58	SIG	M62/2157A2	40R	M62 J25 - J30	
29/09/15 20:14:58	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 20:14:58	SIG	M62/2163A1	40R	M62 J25 - J30	
29/09/15 20:14:58	SIG	M62/2163A2	40R	M62 J25 - J30	
29/09/15 20:15:01	SIG	M62/1981B1	STOP	M62 J25 - J30	
29/09/15 20:15:03	SIG	M62/2157A1	30R	M62 J25 - J30	
29/09/15 20:15:03	SIG	M62/2163A1	30R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2151A1	LDR	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2151A2	50R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2151J1	50R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2151K1	50R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2155A1	LDR	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2155A2	50R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2155J1	50R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2155K1	50R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2157A1	20R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2157A2	40R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2157K1	40R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2163A1	20R	M62 J25 - J30	
29/09/15 20:15:09	SIG	M62/2163A2	40R	M62 J25 - J30	
29/09/15 20:15:14	SIG	M62/2157A1	STOP	M62 J25 - J30	
29/09/15 20:15:14	SIG	M62/2163A1	STOP	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1960A1	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1960A2	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1960A3	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1960K1	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1960K2	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1968A1	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1968A2	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1968A3	OFF	M62 J25 - J30	
29/09/15 20:16:30	SIG	M62/1968A4	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1974A1	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1974A2	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1974A3	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1974A4	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1979K1	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1979K2	OFF	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1981A1	NR	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1981A2	NR	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1981A3	NR	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1981A4	NR	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1987A1	NR	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1987A3	NR	M62 J25 - J30	
29/09/15 20:20:39	SIG	M62/1987J1	NR	M62 J25 - J30	
29/09/15 20:23:39	SIG	M62/1981A1	OFF	M62 J25 - J30	
29/09/15 20:23:50	SIG	M62/1981A2	OFF	M62 J25 - J30	
29/09/15 20:23:50	SIG	M62/1981A3	OFF	M62 J25 - J30	
29/09/15 20:23:50	SIG	M62/1981A4	OFF	M62 J25 - J30	
29/09/15 20:23:50	SIG	M62/1987A1	OFF	M62 J25 - J30	
29/09/15 20:23:50	SIG	M62/1987A3	OFF	M62 J25 - J30	
29/09/15 20:23:50	SIG	M62/1987J1	OFF	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2033B1	REDX	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2033B2	50R	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2033B3	50R	M62 J25 - J30	
29/09/15 20:24:14	SIG	M62/2033B4	50R	M62 J25 - J30	
29/09/15 20:24:29	SIG	M62/2157J1	60R	M62 J25 - J30	
29/09/15 20:24:29	SIG	M62/2157J2	60R	M62 J25 - J30	
29/09/15 20:26:03	SIG	M62/2025B1	STOP	M62 J25 - J30	
29/09/15 20:26:03	SIG	M62/2025B2	40R	M62 J25 - J30	
29/09/15 20:26:03	SIG	M62/2025B3	40R	M62 J25 - J30	
29/09/15 20:26:03	SIG	M62/2025B4	40R	M62 J25 - J30	
29/09/15 20:26:08	SIG	M62/2025B1	STOP	M62 J25 - J30	
29/09/15 20:26:32	SIG	M62/2033B3	???	M62 J25 - J30	
29/09/15 20:26:33	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2018B1	50R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2018B2	50R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2018B3	50R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2018L1	50R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2041B1	REDX	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2041B2	60R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2041B3	60R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2041B4	60R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2050B2	60R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2050B3	60R	M62 J25 - J30	
29/09/15 20:33:29	SIG	M62/2050B4	60R	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1992A1	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1992A2	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1992A3	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1992J1	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1999A1	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1999A2	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1999A3	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1999J1	OFF	M62 J25 - J30	
29/09/15 20:42:18	SIG	M62/1999J2	OFF	M62 J25 - J30	
29/09/15 20:50:30	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 20:50:30	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 20:55:04	SIG	M62/2025B1	REDX	M62 J25 - J30	
29/09/15 20:55:04	SIG	M62/2025B2	50R	M62 J25 - J30	
29/09/15 20:55:04	SIG	M62/2025B3	50R	M62 J25 - J30	
29/09/15 20:55:04	SIG	M62/2025B4	50R	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2018B1	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2018B2	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2018B3	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2018L1	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2025B1	BLNK	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2025B2	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2025B3	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2025B4	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2033B1	BLNK	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2033B2	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2033B4	OFF	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2041B2	NR	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2041B3	NR	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2041B4	NR	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2050B2	NR	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2050B3	NR	M62 J25 - J30	
29/09/15 20:55:30	SIG	M62/2050B4	NR	M62 J25 - J30	
29/09/15 20:58:30	SIG	M62/2050B2	OFF	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2041B1	BLNK	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2041B2	OFF	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2041B3	OFF	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2041B4	OFF	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2050B3	OFF	M62 J25 - J30	
29/09/15 20:58:31	SIG	M62/2050B4	OFF	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1981B1	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1981B2	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1981B3	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1981B4	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1987B1	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1987B2	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1987B3	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1987B4	50R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1992B1	60R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1992B2	60R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1992B3	60R	M62 J25 - J30	
29/09/15 21:00:32	SIG	M62/1992B4	60R	M62 J25 - J30	
29/09/15 21:01:30	SIG	M606/2003B1	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M606/2003B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1981B1	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1981B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1981B3	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1981B4	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1987B1	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1987B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1987B3	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1987B4	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1992B1	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1992B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1992B3	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1992B4	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1999B1	BLNK	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1999B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1999B3	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/1999B4	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2004B1	BLNK	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2004B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2004B3	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2004B4	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2005M1	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2005M2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2012B1	BLNK	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2012B2	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2012B3	OFF	M62 J25 - J30	
29/09/15 21:01:30	SIG	M62/2012B4	OFF	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2151A1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2151A2	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2151J1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2151K1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2155A1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2155A2	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2155J1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2155K1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2157J1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2157J2	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2157K1	NR	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2163A1	OFF	M62 J25 - J30	
29/09/15 21:05:52	SIG	M62/2163A2	OFF	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2151A1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2151A2	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2151J1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2151K1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2155A1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2155A2	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2155J1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2155K1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2157A1	50R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2157A2	50R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2157J1	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2157J2	60R	M62 J25 - J30	
29/09/15 21:07:30	SIG	M62/2157K1	50R	M62 J25 - J30	
29/09/15 21:09:51	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 21:09:51	SIG	M62/2157A1	???	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2151A1	NR	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2151A2	NR	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2151J1	NR	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2151K1	NR	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2155A1	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2155A2	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2155J1	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2155K1	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2157A2	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2157J1	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2157J2	OFF	M62 J25 - J30	
29/09/15 21:15:31	SIG	M62/2157K1	OFF	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2144A1	OFF	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2144A2	OFF	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2144J1	OFF	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2144K1	OFF	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2151A1	NR	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2151A2	NR	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2151J1	NR	M62 J25 - J30	
29/09/15 21:44:26	SIG	M62/2151K1	NR	M62 J25 - J30	
29/09/15 21:47:26	SIG	M62/2151J1	OFF	M62 J25 - J30	
29/09/15 21:47:27	SIG	M62/2151A1	OFF	M62 J25 - J30	
29/09/15 21:47:27	SIG	M62/2151A2	OFF	M62 J25 - J30	
29/09/15 21:47:27	SIG	M62/2151K1	OFF	M62 J25 - J30	
29/09/15 23:47:10	SIG	M62/1956A1	50R	M62 J25 - J30	
29/09/15 23:47:10	SIG	M62/1956A2	50R	M62 J25 - J30	
29/09/15 23:47:10	SIG	M62/1956A3	50R	M62 J25 - J30	
29/09/15 23:47:10	SIG	M62/1960A1	NR	M62 J25 - J30	
29/09/15 23:47:10	SIG	M62/1960A2	NR	M62 J25 - J30	
29/09/15 23:47:10	SIG	M62/1960A3	NR	M62 J25 - J30	
30/09/15 00:06:02	SIG	M62/1956A1	OFF	M62 J25 - J30	
30/09/15 00:06:02	SIG	M62/1956A2	OFF	M62 J25 - J30	
30/09/15 00:06:02	SIG	M62/1956A3	OFF	M62 J25 - J30	
30/09/15 00:06:02	SIG	M62/1960A1	OFF	M62 J25 - J30	
30/09/15 00:06:02	SIG	M62/1960A2	OFF	M62 J25 - J30	
30/09/15 00:06:02	SIG	M62/1960A3	OFF	M62 J25 - J30	
30/09/15 00:16:08	SIG	M62/2157A1	50R	M62 J25 - J30	
30/09/15 00:16:08	SIG	M62/2157A2	50R	M62 J25 - J30	
30/09/15 00:16:08	SIG	M62/2157K1	50R	M62 J25 - J30	
30/09/15 00:16:08	SIG	M62/2163A1	50R	M62 J25 - J30	
30/09/15 00:16:08	SIG	M62/2163A2	50R	M62 J25 - J30	
30/09/15 00:16:13	SIG	M62/2157A1	40R	M62 J25 - J30	
30/09/15 00:16:13	SIG	M62/2157A2	40R	M62 J25 - J30	
30/09/15 00:16:13	SIG	M62/2157K1	40R	M62 J25 - J30	
30/09/15 00:16:13	SIG	M62/2163A1	40R	M62 J25 - J30	
30/09/15 00:16:13	SIG	M62/2163A2	40R	M62 J25 - J30	
30/09/15 00:16:19	SIG	M62/2157A1	30R	M62 J25 - J30	
30/09/15 00:16:19	SIG	M62/2163A1	30R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2144A1	60R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2144A2	60R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2144J1	60R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2144K1	60R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2151A1	LDR	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2151A2	50R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2151J1	50R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2151K1	50R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2155A1	LDR	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2155A2	50R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2155J1	50R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2155K1	50R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2157A1	20R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2157A2	40R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2157J1	NR	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2157J2	NR	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2157K1	40R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2163A1	20R	M62 J25 - J30	
30/09/15 00:16:24	SIG	M62/2163A2	40R	M62 J25 - J30	
30/09/15 00:16:29	SIG	M62/2157A1	STOP	M62 J25 - J30	
30/09/15 00:16:29	SIG	M62/2163A1	STOP	M62 J25 - J30	
30/09/15 00:51:58	SIG	M62/2177A1	REDX	M62 J25 - J30	
30/09/15 00:51:58	SIG	M62/2177A2	NR	M62 J25 - J30	
30/09/15 00:51:58	SIG	M62/2177A3	NR	M62 J25 - J30	
30/09/15 00:51:58	SIG	M62/2177A4	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2144A1	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2144A2	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2144J1	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2144K1	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2151A1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2151A2	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2151J1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2151K1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2155A1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2155A2	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2155J1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2155K1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2157A2	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2157J1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2157J2	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2157K1	NR	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2177A1	BLNK	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2177A2	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2177A3	OFF	M62 J25 - J30	
30/09/15 00:57:08	SIG	M62/2177A4	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2151A1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2151A2	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2151J1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2151K1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2155A1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2155A2	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2155J1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2155K1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2157J1	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2157J2	OFF	M62 J25 - J30	
30/09/15 01:00:08	SIG	M62/2157K1	OFF	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1981B1	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1981B2	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1981B3	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1981B4	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1987B1	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1987B2	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1987B3	50R	M62 J25 - J30	
30/09/15 02:40:05	SIG	M62/1987B4	50R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1981B1	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1981B2	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1981B3	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1981B4	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 02:40:10	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 02:40:15	SIG	M62/1981B1	30R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1981B1	20R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1981B2	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1981B3	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1981B4	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 02:40:21	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 02:40:26	SIG	M62/1981B1	STOP	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2012B1	REDX	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2025B1	REDX	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2033B1	REDX	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2041B1	REDX	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 02:43:21	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 02:43:42	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 02:43:42	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 02:43:42	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 02:43:42	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 02:43:48	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 02:43:48	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 02:43:48	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 02:43:48	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 02:43:53	SIG	M62/2018L1	30R	M62 J25 - J30	
30/09/15 02:43:58	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 02:43:58	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 02:43:58	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 02:43:58	SIG	M62/2018L1	20R	M62 J25 - J30	
30/09/15 02:44:04	SIG	M62/2018L1	STOP	M62 J25 - J30	
30/09/15 02:46:01	SIG	M62/2033B3	???	M62 J25 - J30	
30/09/15 02:46:02	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1979K1	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1979K2	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1981A1	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1981A2	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1981A3	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1981A4	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1987A1	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1987A2	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1987A3	50R	M62 J25 - J30	
30/09/15 02:49:25	SIG	M62/1987J1	50R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1979K1	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1979K2	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1981A1	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1981A2	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1981A3	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1981A4	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1987A1	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1987A2	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1987A3	40R	M62 J25 - J30	
30/09/15 02:49:40	SIG	M62/1987J1	40R	M62 J25 - J30	
30/09/15 02:49:45	SIG	M62/1987J1	30R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1974A1	50R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1974A2	50R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1974A3	50R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1974A4	50R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1979K1	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1979K2	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1981A1	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1981A2	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1981A3	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1981A4	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1987A1	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1987A3	40R	M62 J25 - J30	
30/09/15 02:49:50	SIG	M62/1987J1	20R	M62 J25 - J30	
30/09/15 02:49:51	SIG	M62/1992A1	50R	M62 J25 - J30	
30/09/15 02:49:51	SIG	M62/1992A2	50R	M62 J25 - J30	
30/09/15 02:49:51	SIG	M62/1992A3	50R	M62 J25 - J30	
30/09/15 02:49:51	SIG	M62/1992J1	50R	M62 J25 - J30	
30/09/15 02:49:56	SIG	M62/1992A1	40R	M62 J25 - J30	
30/09/15 02:49:56	SIG	M62/1992A2	40R	M62 J25 - J30	
30/09/15 02:49:56	SIG	M62/1992A3	40R	M62 J25 - J30	
30/09/15 02:49:56	SIG	M62/1992J1	40R	M62 J25 - J30	
30/09/15 02:50:01	SIG	M62/1992J1	30R	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1992A1	40R	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1992A2	40R	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1992A3	40R	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1992J1	20R	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1999A1	NR	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1999A2	NR	M62 J25 - J30	
30/09/15 02:50:07	SIG	M62/1999A3	NR	M62 J25 - J30	
30/09/15 02:50:12	SIG	M62/1987J1	STOP	M62 J25 - J30	
30/09/15 02:50:12	SIG	M62/1992J1	STOP	M62 J25 - J30	
30/09/15 02:50:56	SIG	M62/1999J1	LDR	M62 J25 - J30	
30/09/15 02:50:56	SIG	M62/1999J2	50R	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1974A1	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1974A2	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1974A3	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1974A4	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1979K1	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1979K2	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1981A1	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1981A2	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1981A3	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1981A4	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1987A1	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1987A3	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1987J1	OFF	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1992A1	50R	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1992A2	50R	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1992A3	50R	M62 J25 - J30	
30/09/15 02:58:07	SIG	M62/1992J1	50R	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1992A1	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1992A2	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1992A3	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1992J1	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1999A1	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1999A2	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1999A3	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1999J1	OFF	M62 J25 - J30	
30/09/15 02:58:10	SIG	M62/1999J2	OFF	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1992A1	50R	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1992A2	50R	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1992A3	50R	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1992J1	50R	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1999A1	NR	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1999A2	NR	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1999A3	NR	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1999J1	50R	M62 J25 - J30	
30/09/15 03:03:06	SIG	M62/1999J2	LDL	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 03:13:09	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 03:14:09	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 03:14:09	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1992B1	NR	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1992B2	NR	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1992B3	NR	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1992B4	NR	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1999B1	REDX	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 03:14:09	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M606/2003B1	LDR	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1981B1	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1981B2	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1981B3	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1981B4	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1987B1	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1987B2	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1987B3	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1987B4	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/2005M1	TI	M62 J25 - J30	
30/09/15 03:14:29	SIG	M62/2005M2	TI	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1981B1	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1981B2	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1981B3	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1981B4	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1992B1	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 03:14:35	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 03:14:40	SIG	M62/1981B1	30R	M62 J25 - J30	
30/09/15 03:14:40	SIG	M62/1987B1	30R	M62 J25 - J30	
30/09/15 03:14:40	SIG	M62/1992B1	30R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1981B1	20R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1981B2	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1981B3	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1981B4	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1987B1	20R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1992B1	20R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 03:14:46	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 03:14:51	SIG	M62/1992B1	STOP	M62 J25 - J30	
30/09/15 03:14:56	SIG	M62/1981B1	STOP	M62 J25 - J30	
30/09/15 03:15:01	SIG	M62/1987B1	STOP	M62 J25 - J30	
30/09/15 03:16:10	SIG	M62/1974B1	NR	M62 J25 - J30	
30/09/15 03:16:10	SIG	M62/1974B2	NR	M62 J25 - J30	
30/09/15 03:16:10	SIG	M62/1974B3	NR	M62 J25 - J30	
30/09/15 03:16:10	SIG	M62/1974B4	NR	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2012B1	BLNK	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2012B2	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2012B3	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2012B4	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2018B1	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2018B2	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2018B3	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2018L1	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2025B2	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2025B3	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2025B4	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2033B2	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2033B4	OFF	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2041B2	NR	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2041B3	NR	M62 J25 - J30	
30/09/15 03:29:27	SIG	M62/2041B4	NR	M62 J25 - J30	
30/09/15 03:29:28	SIG	M62/2025B1	BLNK	M62 J25 - J30	
30/09/15 03:29:28	SIG	M62/2025B1	BLNK	M62 J25 - J30	
30/09/15 03:29:28	SIG	M62/2033B1	BLNK	M62 J25 - J30	
30/09/15 03:29:28	SIG	M62/2033B1	BLNK	M62 J25 - J30	
30/09/15 03:32:27	SIG	M62/2041B2	OFF	M62 J25 - J30	
30/09/15 03:32:28	SIG	M62/2041B1	BLNK	M62 J25 - J30	
30/09/15 03:32:28	SIG	M62/2041B3	OFF	M62 J25 - J30	
30/09/15 03:32:28	SIG	M62/2041B4	OFF	M62 J25 - J30	
30/09/15 03:32:32	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1981B1	40R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1999B1	BLNK	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1999B2	OFF	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1999B3	OFF	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/1999B4	OFF	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 03:32:32	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 03:33:11	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 03:33:11	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1974B1	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1974B2	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1974B3	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1974B4	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1987B1	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1987B2	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1987B3	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1987B4	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1992B1	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1992B2	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1992B3	NR	M62 J25 - J30	
30/09/15 03:33:11	SIG	M62/1992B4	NR	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1974B1	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1974B2	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1974B3	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1974B4	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 03:36:12	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1992A1	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1992A2	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1992A3	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1992J1	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1999A1	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1999A2	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1999A3	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1999J1	OFF	M62 J25 - J30	
30/09/15 04:02:24	SIG	M62/1999J2	OFF	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2008K1	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2008K2	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2012A1	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2012A2	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2012A3	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2018A1	HSD	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2018A2	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2018A3	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2018A4	60R	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2025A1	REDX	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2025A2	NR	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2025A3	NR	M62 J25 - J30	
30/09/15 06:33:56	SIG	M62/2025A4	NR	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2012A1	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2018A1	HSD	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2025A2	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2025A3	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2025A4	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2033A1	REDX	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2033A2	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2033A3	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2033A4	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2041A1	REDX	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2041A2	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2041A3	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2041A4	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2050A1	REDX	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2050A2	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2050A3	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2050A4	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2057A1	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2057A2	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2057A3	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2057J1	60R	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2065A1	REDX	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2065A2	NR	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2065A3	NR	M62 J25 - J30	
30/09/15 06:33:57	SIG	M62/2065A4	NR	M62 J25 - J30	
30/09/15 06:35:02	SIG	M62/2050A1	60R	M62 J25 - J30	
30/09/15 06:35:22	SIG	M62/2041A1	60R	M62 J25 - J30	
30/09/15 06:35:43	SIG	M62/2033A1	60R	M62 J25 - J30	
30/09/15 06:35:47	SIG	M62/2018A1	60R	M62 J25 - J30	
30/09/15 06:35:47	SIG	M62/2025A1	60R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2159B1	NR	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2159B2	NR	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 06:42:47	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 06:42:53	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 06:45:45	SIG	M62/2183B2	???	M62 J25 - J30	
30/09/15 06:45:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2189B1	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2189B2	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2189B3	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2189B4	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 06:47:41	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 06:48:41	SIG	M62/2197B1	60R	M62 J25 - J30	
30/09/15 06:48:41	SIG	M62/2197B2	60R	M62 J25 - J30	
30/09/15 06:48:41	SIG	M62/2197B3	60R	M62 J25 - J30	
30/09/15 06:48:41	SIG	M62/2199M1	60R	M62 J25 - J30	
30/09/15 06:48:41	SIG	M62/2199M2	60R	M62 J25 - J30	
30/09/15 06:49:08	SIG	M62/2183B1	40R	M62 J25 - J30	
30/09/15 06:49:08	SIG	M62/2183L1	40R	M62 J25 - J30	
30/09/15 06:49:08	SIG	M62/2183L2	40R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2183B1	40R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2183L1	40R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2183L2	40R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 06:49:14	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2189B1	40R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2189B2	40R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2189B3	40R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2189B4	40R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 06:50:35	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 06:51:06	SIG	M62/2065M1	NR	M62 J25 - J30	
30/09/15 06:51:06	SIG	M62/2069M1	60R	M62 J25 - J30	
30/09/15 06:51:06	SIG	M62/2069M2	60R	M62 J25 - J30	
30/09/15 06:51:06	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 06:51:06	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2025B1	REDX	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2025B2	NR	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2025B3	NR	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2025B4	NR	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2033B1	REDX	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2041B1	REDX	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2050B2	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2050B3	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2050B4	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2057B1	REDX	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2057B2	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2057B3	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2057B4	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2065B1	REDX	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2065B2	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2065B3	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2065B4	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M62/2065M1	60R	M62 J25 - J30	
30/09/15 06:51:07	SIG	M621/1002B1	HSD	M62 J25 - J30	
30/09/15 06:51:07	SIG	M621/1002B2	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2012B1	REDX	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 06:51:08	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 06:51:57	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 06:51:57	SIG	M62/2183B2	???	M62 J25 - J30	
30/09/15 06:52:03	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 06:52:15	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 06:52:42	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 06:53:03	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 06:53:24	SIG	M62/2057B1	60R	M62 J25 - J30	
30/09/15 06:53:24	SIG	M621/1002B1	60R	M62 J25 - J30	
30/09/15 06:53:24	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 06:53:24	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 06:53:41	SIG	M62/2203B1	60R	M62 J25 - J30	
30/09/15 06:53:41	SIG	M62/2203B2	60R	M62 J25 - J30	
30/09/15 06:53:41	SIG	M62/2203B3	60R	M62 J25 - J30	
30/09/15 06:53:57	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 06:53:57	SIG	M62/2033B3	???	M62 J25 - J30	
30/09/15 06:55:08	SIG	M62/2183B2	???	M62 J25 - J30	
30/09/15 06:55:09	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 06:55:14	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 06:55:22	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 06:55:22	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 06:55:22	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 06:55:22	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1955K1	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1955K2	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1956A1	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1956A2	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1956A3	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1960A1	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1960A2	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1960A3	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1960K1	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1960K2	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1968A1	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1968A2	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1968A3	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1968A4	60R	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1974A1	NR	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1974A2	NR	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1974A3	NR	M62 J25 - J30	
30/09/15 06:55:41	SIG	M62/1974A4	NR	M62 J25 - J30	
30/09/15 06:58:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 06:58:09	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 06:58:14	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/1999A1	60R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/1999A2	60R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/1999A3	60R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/1999J1	50R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/1999J2	50R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/2004A1	60R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/2004A2	60R	M62 J25 - J30	
30/09/15 07:00:41	SIG	M62/2004A3	60R	M62 J25 - J30	
30/09/15 07:01:14	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:01:15	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:01:21	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:04:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:04:22	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:04:27	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2194B1	40R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2194B2	40R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2194B3	40R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2194B4	40R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2197B1	50R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2197B2	50R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2197B3	50R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2199M1	50R	M62 J25 - J30	
30/09/15 07:07:22	SIG	M62/2199M2	50R	M62 J25 - J30	
30/09/15 07:07:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:07:26	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:07:32	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2197B1	40R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2197B2	40R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2197B3	40R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2199M1	40R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2199M2	40R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 07:08:26	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 07:08:39	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 07:08:39	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 07:08:39	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 07:08:39	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 07:08:45	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 07:08:45	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 07:08:45	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 07:08:45	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 07:09:41	SIG	M62/2203B1	40R	M62 J25 - J30	
30/09/15 07:09:41	SIG	M62/2203B2	40R	M62 J25 - J30	
30/09/15 07:09:41	SIG	M62/2203B3	40R	M62 J25 - J30	
30/09/15 07:10:33	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:10:34	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:10:39	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M606/2003B1	NR	M62 J25 - J30	
30/09/15 07:10:41	SIG	M606/2003B2	NR	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2008K1	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2008K2	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2012A1	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2012A2	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2012A3	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2018A1	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2018A2	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2018A3	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2018A4	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2025A1	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2025A2	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2025A3	50R	M62 J25 - J30	
30/09/15 07:10:41	SIG	M62/2025A4	50R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1974A1	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1974A2	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1974A3	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1974A4	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1979K1	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1979K2	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1981A1	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1981A2	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1981A3	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1981A4	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1987A1	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1987A3	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1987J1	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1992A1	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1992A2	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1992A3	60R	M62 J25 - J30	
30/09/15 07:10:51	SIG	M62/1992J1	60R	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2097B1	REDX	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2097B2	NR	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2097B4	NR	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2106B1	REDX	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2106B2	60R	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2106B3	60R	M62 J25 - J30	
30/09/15 07:12:17	SIG	M62/2106B4	60R	M62 J25 - J30	
30/09/15 07:12:39	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 07:12:39	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 07:12:39	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 07:12:39	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 07:13:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:13:40	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:13:45	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:15:32	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 07:15:32	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 07:15:32	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 07:15:32	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 07:16:41	SIG	M62/2033A1	50R	M62 J25 - J30	
30/09/15 07:16:41	SIG	M62/2033A2	50R	M62 J25 - J30	
30/09/15 07:16:41	SIG	M62/2033A3	50R	M62 J25 - J30	
30/09/15 07:16:41	SIG	M62/2033A4	50R	M62 J25 - J30	
30/09/15 07:16:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:16:46	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:16:51	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 07:16:54	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 07:17:00	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 07:18:38	SIG	M62/2033A1	40R	M62 J25 - J30	
30/09/15 07:18:38	SIG	M62/2033A2	40R	M62 J25 - J30	
30/09/15 07:18:38	SIG	M62/2033A3	40R	M62 J25 - J30	
30/09/15 07:18:38	SIG	M62/2033A4	40R	M62 J25 - J30	
30/09/15 07:19:10	SIG	M62/2057A1	50R	M62 J25 - J30	
30/09/15 07:19:10	SIG	M62/2057A2	50R	M62 J25 - J30	
30/09/15 07:19:10	SIG	M62/2057A3	50R	M62 J25 - J30	
30/09/15 07:19:10	SIG	M62/2057J1	50R	M62 J25 - J30	
30/09/15 07:19:10	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 07:19:10	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2050A1	50R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2050A2	50R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2050A3	50R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2050A4	50R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2057A1	40R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2057A2	40R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2057A3	40R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M62/2057J1	40R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 07:19:15	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 07:19:26	SIG	M62/2025A1	40R	M62 J25 - J30	
30/09/15 07:19:26	SIG	M62/2025A2	40R	M62 J25 - J30	
30/09/15 07:19:26	SIG	M62/2025A3	40R	M62 J25 - J30	
30/09/15 07:19:26	SIG	M62/2025A4	40R	M62 J25 - J30	
30/09/15 07:19:51	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:19:52	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:19:57	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2041A1	50R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2041A2	50R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2041A3	50R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2041A4	50R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2050A1	40R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2050A2	40R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2050A3	40R	M62 J25 - J30	
30/09/15 07:20:24	SIG	M62/2050A4	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2041A1	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2041A2	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2041A3	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2041A4	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2050A1	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2050A2	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2050A3	40R	M62 J25 - J30	
30/09/15 07:20:30	SIG	M62/2050A4	40R	M62 J25 - J30	
30/09/15 07:20:47	SIG	M62/2018A1	40R	M62 J25 - J30	
30/09/15 07:20:47	SIG	M62/2018A2	40R	M62 J25 - J30	
30/09/15 07:20:47	SIG	M62/2018A3	40R	M62 J25 - J30	
30/09/15 07:20:47	SIG	M62/2018A4	40R	M62 J25 - J30	
30/09/15 07:20:55	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 07:20:55	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 07:20:55	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 07:20:55	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2004A1	50R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2004A2	50R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2004A3	50R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2008K1	40R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2008K2	40R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2012A1	40R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2012A2	40R	M62 J25 - J30	
30/09/15 07:21:51	SIG	M62/2012A3	40R	M62 J25 - J30	
30/09/15 07:22:57	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:22:57	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:23:03	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:23:25	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 07:23:25	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 07:23:25	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 07:23:25	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2033A1	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2033A2	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2033A3	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2033A4	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2041A1	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2041A2	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2041A3	60R	M62 J25 - J30	
30/09/15 07:23:27	SIG	M62/2041A4	60R	M62 J25 - J30	
30/09/15 07:23:29	SIG	M62/1999A1	50R	M62 J25 - J30	
30/09/15 07:23:29	SIG	M62/1999A2	50R	M62 J25 - J30	
30/09/15 07:23:29	SIG	M62/1999A3	50R	M62 J25 - J30	
30/09/15 07:23:29	SIG	M62/2004A1	40R	M62 J25 - J30	
30/09/15 07:23:29	SIG	M62/2004A2	40R	M62 J25 - J30	
30/09/15 07:23:29	SIG	M62/2004A3	40R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2033A1	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2033A2	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2033A3	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2033A4	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2041A1	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2041A2	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2041A3	50R	M62 J25 - J30	
30/09/15 07:24:02	SIG	M62/2041A4	50R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2033A1	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2033A2	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2033A3	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2033A4	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2041A1	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2041A2	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2041A3	40R	M62 J25 - J30	
30/09/15 07:24:07	SIG	M62/2041A4	40R	M62 J25 - J30	
30/09/15 07:24:08	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 07:24:08	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 07:24:08	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 07:24:08	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 07:24:13	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 07:24:13	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 07:24:13	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 07:24:13	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2197B1	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2197B2	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2197B3	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2199M1	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2199M2	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 07:24:40	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1992A1	50R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1992A2	50R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1992A3	50R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1992J1	50R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1999A1	40R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1999A2	40R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1999A3	40R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1999J1	40R	M62 J25 - J30	
30/09/15 07:24:47	SIG	M62/1999J2	40R	M62 J25 - J30	
30/09/15 07:25:04	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 07:25:04	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 07:25:04	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 07:25:04	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 07:25:12	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 07:25:12	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 07:25:12	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 07:25:12	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2018A1	60R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2018A2	60R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2018A3	60R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2018A4	60R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2025A1	50R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2025A2	50R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2025A3	50R	M62 J25 - J30	
30/09/15 07:25:52	SIG	M62/2025A4	50R	M62 J25 - J30	
30/09/15 07:26:08	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:26:08	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:26:14	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:26:41	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 07:26:41	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 07:26:41	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 07:26:41	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 07:26:41	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2113B2	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2113B3	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2113B4	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2117B1	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2117B3	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2120M1	60R	M62 J25 - J30	
30/09/15 07:26:51	SIG	M62/2120M2	60R	M62 J25 - J30	
30/09/15 07:27:04	SIG	M62/2189B1	40R	M62 J25 - J30	
30/09/15 07:27:04	SIG	M62/2189B2	40R	M62 J25 - J30	
30/09/15 07:27:04	SIG	M62/2189B3	40R	M62 J25 - J30	
30/09/15 07:27:04	SIG	M62/2189B4	40R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1987A1	50R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1987A3	50R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1987J1	50R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1992A1	40R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1992A2	40R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1992A3	40R	M62 J25 - J30	
30/09/15 07:27:24	SIG	M62/1992J1	40R	M62 J25 - J30	
30/09/15 07:28:09	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 07:28:09	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 07:28:09	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 07:28:09	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 07:28:43	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 07:28:43	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 07:28:43	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 07:28:43	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2018A1	50R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2018A2	50R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2018A3	50R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2018A4	50R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2025A1	40R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2025A2	40R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2025A3	40R	M62 J25 - J30	
30/09/15 07:28:48	SIG	M62/2025A4	40R	M62 J25 - J30	
30/09/15 07:28:49	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 07:28:49	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 07:28:49	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 07:28:49	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 07:28:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:28:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:28:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:28:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2018A1	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2018A2	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2018A3	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2018A4	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2025A1	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2025A2	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2025A3	40R	M62 J25 - J30	
30/09/15 07:28:53	SIG	M62/2025A4	40R	M62 J25 - J30	
30/09/15 07:29:09	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:29:10	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1979K1	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1979K2	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1981A1	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1981A2	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1981A3	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1981A4	50R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1987A1	40R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1987A3	40R	M62 J25 - J30	
30/09/15 07:29:12	SIG	M62/1987J1	40R	M62 J25 - J30	
30/09/15 07:29:15	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:29:35	SIG	M62/2194B1	40R	M62 J25 - J30	
30/09/15 07:29:35	SIG	M62/2194B2	40R	M62 J25 - J30	
30/09/15 07:29:35	SIG	M62/2194B3	40R	M62 J25 - J30	
30/09/15 07:29:35	SIG	M62/2194B4	40R	M62 J25 - J30	
30/09/15 07:30:23	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 07:30:23	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 07:31:10	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 07:31:10	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 07:31:15	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 07:31:15	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1974A1	50R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1974A2	50R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1974A3	50R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1974A4	50R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1979K1	40R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1979K2	40R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1981A1	40R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1981A2	40R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1981A3	40R	M62 J25 - J30	
30/09/15 07:31:17	SIG	M62/1981A4	40R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 07:31:42	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:31:48	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 07:32:15	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:32:16	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:32:21	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2033B1	40R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2033B2	40R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2033B4	40R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2041B1	50R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 07:32:53	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2197B1	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2197B2	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2197B3	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2199M1	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2199M2	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2203B1	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2203B2	40R	M62 J25 - J30	
30/09/15 07:32:55	SIG	M62/2203B3	40R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1968A1	50R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1968A2	50R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1968A3	50R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1968A4	50R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1974A1	40R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1974A2	40R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1974A3	40R	M62 J25 - J30	
30/09/15 07:33:00	SIG	M62/1974A4	40R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2197B1	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2197B2	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2197B3	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2199M1	50R	M62 J25 - J30	
30/09/15 07:33:35	SIG	M62/2199M2	50R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 07:33:41	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1960A1	50R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1960A2	50R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1960A3	50R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1960K1	50R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1960K2	50R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1968A1	40R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1968A2	40R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1968A3	40R	M62 J25 - J30	
30/09/15 07:35:06	SIG	M62/1968A4	40R	M62 J25 - J30	
30/09/15 07:35:43	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 07:35:43	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 07:35:43	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 07:35:43	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 07:35:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:35:51	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:35:56	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:36:24	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:36:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:36:25	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:36:26	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1960A1	40R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1960A2	40R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1960A3	40R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1960K1	40R	M62 J25 - J30	
30/09/15 07:36:34	SIG	M62/1960K2	40R	M62 J25 - J30	
30/09/15 07:36:52	SIG	M62/2041B1	40R	M62 J25 - J30	
30/09/15 07:36:52	SIG	M62/2041B2	40R	M62 J25 - J30	
30/09/15 07:36:52	SIG	M62/2041B3	40R	M62 J25 - J30	
30/09/15 07:36:52	SIG	M62/2041B4	40R	M62 J25 - J30	
30/09/15 07:36:57	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 07:36:57	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 07:36:57	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 07:36:58	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 07:36:58	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 07:36:58	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 07:36:58	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 07:37:13	SIG	M62/1956A1	40R	M62 J25 - J30	
30/09/15 07:37:13	SIG	M62/1956A2	40R	M62 J25 - J30	
30/09/15 07:37:13	SIG	M62/1956A3	40R	M62 J25 - J30	
30/09/15 07:37:24	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 07:37:24	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 07:37:24	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 07:37:24	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 07:38:30	SIG	M62/2203B1	40R	M62 J25 - J30	
30/09/15 07:38:30	SIG	M62/2203B2	40R	M62 J25 - J30	
30/09/15 07:38:30	SIG	M62/2203B3	40R	M62 J25 - J30	
30/09/15 07:38:35	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 07:38:35	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 07:38:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:38:55	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:39:00	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:39:01	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 07:39:01	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 07:40:31	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 07:40:31	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 07:40:36	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 07:40:36	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2074B1	REDX	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2074B2	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2074B3	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2074B4	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2081B1	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2081B2	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2081B3	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2081L1	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2088B1	REDX	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2088B2	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2088B3	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2088B4	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2097B2	60R	M62 J25 - J30	
30/09/15 07:40:51	SIG	M62/2097B4	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 07:40:52	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 07:42:30	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 07:42:30	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 07:42:30	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 07:42:41	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 07:42:41	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 07:42:41	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 07:42:41	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 07:42:41	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 07:42:41	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2106B2	40R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2106B3	40R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2106B4	40R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2113B2	40R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2113B3	40R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2113B4	40R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 07:42:46	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 07:42:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:43:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:43:41	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 07:43:41	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 07:43:41	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 07:43:41	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2189B1	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2189B2	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2189B3	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2189B4	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 07:43:42	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:43:47	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2033B1	40R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2033B2	40R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2033B4	40R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2041B1	50R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 07:44:49	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 07:44:51	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 07:46:10	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 07:46:10	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 07:46:10	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 07:46:10	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 07:46:10	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2137B2	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2147B1	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2147B2	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2147B3	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2147B4	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2159B1	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2159B2	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2159M1	60R	M62 J25 - J30	
30/09/15 07:46:15	SIG	M62/2159M2	60R	M62 J25 - J30	
30/09/15 07:46:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:46:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 07:46:54	SIG	M62/2106B2	60R	M62 J25 - J30	
30/09/15 07:46:54	SIG	M62/2106B3	60R	M62 J25 - J30	
30/09/15 07:46:54	SIG	M62/2106B4	60R	M62 J25 - J30	
30/09/15 07:47:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:47:04	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:47:10	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:47:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:47:23	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 07:47:28	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 07:48:42	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 07:48:42	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 07:48:42	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 07:48:51	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 07:48:51	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 07:48:51	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 07:50:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 07:50:09	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 07:50:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:50:28	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 07:50:33	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 07:50:51	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:50:57	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 07:51:00	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 07:51:04	SIG	M62/2113B2	40R	M62 J25 - J30	
30/09/15 07:51:04	SIG	M62/2113B3	40R	M62 J25 - J30	
30/09/15 07:51:04	SIG	M62/2113B4	40R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 07:51:29	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2033B1	40R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2033B2	40R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2033B4	40R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2041B1	50R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 07:52:48	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 07:53:15	SIG	M62/2106B2	40R	M62 J25 - J30	
30/09/15 07:53:15	SIG	M62/2106B3	40R	M62 J25 - J30	
30/09/15 07:53:15	SIG	M62/2106B4	40R	M62 J25 - J30	
30/09/15 07:53:34	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 07:53:34	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 07:53:34	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 07:53:34	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 07:53:34	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 07:53:40	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 07:54:35	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 07:54:35	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:54:41	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2197B1	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2197B2	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2197B3	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2199M1	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2199M2	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2203B1	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2203B2	60R	M62 J25 - J30	
30/09/15 07:54:42	SIG	M62/2203B3	60R	M62 J25 - J30	
30/09/15 07:55:14	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:55:15	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:55:20	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 07:57:25	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 07:57:34	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 07:57:34	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 07:57:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 07:57:40	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 07:57:45	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 07:58:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 07:58:20	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 07:58:25	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 07:58:44	SIG	M62/2057A1	60R	M62 J25 - J30	
30/09/15 07:58:44	SIG	M62/2057A2	60R	M62 J25 - J30	
30/09/15 07:58:44	SIG	M62/2057A3	60R	M62 J25 - J30	
30/09/15 07:58:44	SIG	M62/2057J1	60R	M62 J25 - J30	
30/09/15 07:59:00	SIG	M62/2057A1	50R	M62 J25 - J30	
30/09/15 07:59:00	SIG	M62/2057A2	50R	M62 J25 - J30	
30/09/15 07:59:00	SIG	M62/2057A3	50R	M62 J25 - J30	
30/09/15 07:59:00	SIG	M62/2057J1	50R	M62 J25 - J30	
30/09/15 07:59:06	SIG	M62/2057A1	40R	M62 J25 - J30	
30/09/15 07:59:06	SIG	M62/2057A2	40R	M62 J25 - J30	
30/09/15 07:59:06	SIG	M62/2057A3	40R	M62 J25 - J30	
30/09/15 07:59:06	SIG	M62/2057J1	40R	M62 J25 - J30	
30/09/15 07:59:06	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 07:59:06	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 07:59:11	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 07:59:11	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 08:00:14	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 08:00:14	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 08:00:45	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:00:45	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:00:51	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:01:08	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 08:01:08	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 08:01:22	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:01:23	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2137B2	60R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 08:01:26	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 08:01:28	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:01:28	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 08:01:28	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 08:01:28	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 08:02:17	SIG	M62/2041B1	40R	M62 J25 - J30	
30/09/15 08:02:17	SIG	M62/2041B2	40R	M62 J25 - J30	
30/09/15 08:02:17	SIG	M62/2041B3	40R	M62 J25 - J30	
30/09/15 08:02:17	SIG	M62/2041B4	40R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 08:02:18	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2183B1	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2183L1	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2183L2	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2189B1	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2189B2	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2189B3	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2189B4	40R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 08:02:23	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 08:02:54	SIG	M62/2106B2	40R	M62 J25 - J30	
30/09/15 08:02:54	SIG	M62/2106B3	40R	M62 J25 - J30	
30/09/15 08:02:54	SIG	M62/2106B4	40R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1974A1	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1974A2	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1974A3	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1974A4	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1979K1	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1979K2	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1981A1	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1981A2	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1981A3	50R	M62 J25 - J30	
30/09/15 08:03:20	SIG	M62/1981A4	50R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1974A1	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1974A2	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1974A3	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1974A4	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1979K1	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1979K2	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1981A1	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1981A2	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1981A3	40R	M62 J25 - J30	
30/09/15 08:03:47	SIG	M62/1981A4	40R	M62 J25 - J30	
30/09/15 08:03:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:03:51	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:03:56	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:04:27	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:04:27	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:04:33	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 08:04:37	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 08:04:42	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 08:05:27	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:05:28	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:05:33	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 08:06:17	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 08:06:18	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 08:06:18	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2189B1	40R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2189B2	40R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2189B3	40R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2189B4	40R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 08:06:52	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 08:06:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:06:55	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:07:01	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:07:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:07:31	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:07:36	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:08:34	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:08:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:08:35	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 08:08:35	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 08:08:40	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:08:59	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 08:08:59	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 08:09:00	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 08:09:00	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 08:09:00	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 08:09:00	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 08:09:04	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 08:09:04	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1960A1	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1960A2	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1960A3	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1960K1	50R	M62 J25 - J30	
30/09/15 08:09:08	SIG	M62/1960K2	50R	M62 J25 - J30	
30/09/15 08:10:01	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:10:02	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:10:07	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1956A1	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1956A2	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1956A3	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1960A1	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1960A2	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1960A3	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1960K1	40R	M62 J25 - J30	
30/09/15 08:10:10	SIG	M62/1960K2	40R	M62 J25 - J30	
30/09/15 08:10:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:10:35	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:10:39	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 08:10:39	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 08:10:39	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 08:10:40	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 08:10:52	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2189B1	40R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2189B2	40R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2189B3	40R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2189B4	40R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 08:11:25	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 08:11:41	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:11:42	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:11:47	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:12:16	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 08:12:16	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 08:12:16	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 08:12:16	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 08:12:59	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 08:12:59	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 08:13:06	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 08:13:06	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 08:13:06	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 08:13:06	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 08:13:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:13:07	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:13:13	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:13:38	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:13:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:13:40	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 08:13:40	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 08:13:40	SIG	M62/1956A1	40R	M62 J25 - J30	
30/09/15 08:13:40	SIG	M62/1956A2	40R	M62 J25 - J30	
30/09/15 08:13:40	SIG	M62/1956A3	40R	M62 J25 - J30	
30/09/15 08:13:44	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:14:48	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:14:49	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:14:54	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:15:27	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 08:15:27	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 08:15:27	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 08:15:27	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 08:15:32	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 08:15:32	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 08:15:32	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 08:15:32	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 08:16:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:16:23	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:16:28	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:16:30	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 08:16:30	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 08:16:35	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 08:16:35	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 08:16:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:16:50	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:16:56	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 08:17:05	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 08:17:06	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:17:06	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 08:17:06	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 08:17:06	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2189B1	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2189B2	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2189B3	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2189B4	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 08:17:18	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 08:18:21	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 08:18:21	SIG	M62/2137B4	OFF	M62 J25 - J30	
30/09/15 08:19:27	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 08:19:27	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 08:19:27	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 08:19:27	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 08:19:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:19:51	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:19:56	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:20:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:20:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:20:13	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 08:20:13	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:20:13	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 08:20:13	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2183B1	40R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2183L1	40R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2183L2	40R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 08:20:18	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 08:20:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:20:22	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:20:25	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 08:20:25	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 08:20:25	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 08:20:25	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 08:20:27	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:20:30	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 08:20:30	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 08:20:30	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 08:20:30	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 08:20:30	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 08:20:30	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 08:20:35	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 08:20:35	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 08:20:35	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 08:20:35	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 08:20:40	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 08:20:40	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 08:20:40	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 08:20:40	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 08:21:05	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 08:21:05	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 08:21:10	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 08:21:10	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 08:22:27	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:22:27	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 08:22:27	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 08:22:27	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2189B1	40R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2189B2	40R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2189B3	40R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2189B4	40R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 08:22:40	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 08:22:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:22:51	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:22:56	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:23:06	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:23:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:23:12	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 08:24:18	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 08:24:19	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:24:19	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 08:24:19	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 08:24:19	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 08:24:35	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 08:24:35	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 08:24:35	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 08:24:35	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 08:24:52	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 08:24:52	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 08:24:52	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 08:24:52	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 08:24:58	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 08:24:58	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 08:24:58	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 08:24:58	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 08:25:06	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 08:25:06	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 08:25:48	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 08:25:48	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 08:25:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:25:53	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 08:25:53	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 08:25:54	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:25:59	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:26:10	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:26:11	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 08:26:11	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 08:26:11	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 08:26:11	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 08:26:12	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:26:18	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:26:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:26:30	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:26:35	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2194B1	40R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2194B2	40R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2194B3	40R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2194B4	40R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2197B1	50R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2197B2	50R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2197B3	50R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2199M1	50R	M62 J25 - J30	
30/09/15 08:27:47	SIG	M62/2199M2	50R	M62 J25 - J30	
30/09/15 08:28:38	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 08:28:38	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 08:28:38	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 08:28:38	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 08:28:43	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2183B1	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2183L1	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2183L2	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2197B1	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2197B2	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2197B3	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2199M1	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2199M2	40R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 08:28:49	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 08:28:53	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 08:28:53	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 08:28:53	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 08:28:53	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 08:28:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:28:57	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:29:02	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 08:29:19	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 08:30:05	SIG	M62/2203B1	40R	M62 J25 - J30	
30/09/15 08:30:05	SIG	M62/2203B2	40R	M62 J25 - J30	
30/09/15 08:30:05	SIG	M62/2203B3	40R	M62 J25 - J30	
30/09/15 08:30:17	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 08:30:17	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 08:30:17	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 08:30:41	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 08:30:41	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 08:31:11	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 08:31:11	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 08:31:22	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:31:23	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:31:28	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2050A1	50R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2050A2	50R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2050A3	50R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2050A4	50R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2057A1	60R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2057A2	60R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2057A3	60R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M62/2057J1	60R	M62 J25 - J30	
30/09/15 08:31:31	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 08:31:31	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 08:31:35	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 08:31:35	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 08:31:35	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 08:31:37	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:31:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:31:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:31:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:31:49	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 08:31:49	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 08:31:49	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 08:31:49	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 08:31:55	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 08:31:55	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 08:31:55	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 08:31:55	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2050A1	40R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2050A2	40R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2050A3	40R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2050A4	40R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2057A1	50R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2057A2	50R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2057A3	50R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M62/2057J1	50R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 08:31:56	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 08:32:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2050A1	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2050A2	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2050A3	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2050A4	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2057A1	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2057A2	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2057A3	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M62/2057J1	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M621/1002A1	40R	M62 J25 - J30	
30/09/15 08:32:01	SIG	M621/1002A2	40R	M62 J25 - J30	
30/09/15 08:32:02	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:32:07	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:32:43	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 08:32:43	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 08:32:43	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 08:32:43	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 08:32:43	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 08:32:48	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 08:34:05	SIG	M62/2197B1	60R	M62 J25 - J30	
30/09/15 08:34:05	SIG	M62/2197B2	60R	M62 J25 - J30	
30/09/15 08:34:05	SIG	M62/2197B3	60R	M62 J25 - J30	
30/09/15 08:34:05	SIG	M62/2199M1	60R	M62 J25 - J30	
30/09/15 08:34:05	SIG	M62/2199M2	60R	M62 J25 - J30	
30/09/15 08:34:28	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:34:28	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:34:33	SIG	M62/2183B2	40R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2189B1	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2189B2	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2189B3	60R	M62 J25 - J30	
30/09/15 08:35:02	SIG	M62/2189B4	60R	M62 J25 - J30	
30/09/15 08:35:04	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:35:04	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 08:35:08	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 08:35:10	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 08:35:14	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 08:35:18	SIG	M62/2203B1	60R	M62 J25 - J30	
30/09/15 08:35:18	SIG	M62/2203B2	60R	M62 J25 - J30	
30/09/15 08:35:18	SIG	M62/2203B3	60R	M62 J25 - J30	
30/09/15 08:35:50	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 08:35:50	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 08:35:50	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 08:35:50	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2050A1	50R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2050A2	50R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2050A3	50R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2050A4	50R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2057A1	60R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2057A2	60R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2057A3	60R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M62/2057J1	60R	M62 J25 - J30	
30/09/15 08:35:53	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 08:35:53	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2106B2	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2106B3	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2106B4	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2113B2	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2113B3	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2113B4	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2117B1	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2117B3	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2120M1	60R	M62 J25 - J30	
30/09/15 08:36:43	SIG	M62/2120M2	60R	M62 J25 - J30	
30/09/15 08:37:30	SIG	M62/2025A1	30R	M62 J25 - J30	
30/09/15 08:37:34	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:37:35	SIG	M62/2018A1	LDR	M62 J25 - J30	
30/09/15 08:37:35	SIG	M62/2025A1	20R	M62 J25 - J30	
30/09/15 08:37:35	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:37:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:37:36	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:37:40	SIG	M62/2025A1	STOP	M62 J25 - J30	
30/09/15 08:38:08	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:38:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:38:14	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:38:26	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 08:38:26	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 08:38:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:38:51	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:38:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:38:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:39:20	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 08:39:20	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 08:39:20	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 08:39:20	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 08:39:33	SIG	M62/2041A1	50R	M62 J25 - J30	
30/09/15 08:39:33	SIG	M62/2041A2	50R	M62 J25 - J30	
30/09/15 08:39:33	SIG	M62/2041A3	50R	M62 J25 - J30	
30/09/15 08:39:33	SIG	M62/2041A4	50R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 08:39:55	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 08:40:20	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 08:40:20	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 08:40:20	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 08:40:20	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 08:40:25	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 08:40:25	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 08:40:25	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 08:40:25	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 08:40:56	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 08:40:56	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 08:40:56	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 08:41:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:41:12	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:41:17	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:42:03	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 08:42:03	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 08:42:03	SIG	M62/1956A1	40R	M62 J25 - J30	
30/09/15 08:42:03	SIG	M62/1956A2	40R	M62 J25 - J30	
30/09/15 08:42:03	SIG	M62/1956A3	40R	M62 J25 - J30	
30/09/15 08:42:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:42:46	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:44:01	SIG	M62/2033A1	50R	M62 J25 - J30	
30/09/15 08:44:01	SIG	M62/2033A2	50R	M62 J25 - J30	
30/09/15 08:44:01	SIG	M62/2033A3	50R	M62 J25 - J30	
30/09/15 08:44:01	SIG	M62/2033A4	50R	M62 J25 - J30	
30/09/15 08:44:15	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:44:16	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:44:21	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2050A1	60R	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2050A2	60R	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2050A3	60R	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2050A4	60R	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2132B1	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2132B2	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2132B3	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2137B1	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2137B2	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2137B3	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2137B4	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2147B1	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2147B2	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2147B3	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2147B4	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2159B1	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2159B2	NR	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2159M1	OFF	M62 J25 - J30	
30/09/15 08:44:43	SIG	M62/2159M2	OFF	M62 J25 - J30	
30/09/15 08:44:56	SIG	M62/2018A2	50R	M62 J25 - J30	
30/09/15 08:44:56	SIG	M62/2018A3	50R	M62 J25 - J30	
30/09/15 08:44:56	SIG	M62/2018A4	50R	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2074B1	BLNK	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2074B2	OFF	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2074B3	OFF	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2074B4	OFF	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2081B1	OFF	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2081B2	OFF	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2081B3	OFF	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2081L1	NR	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2088B2	NR	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2088B3	NR	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2088B4	NR	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2097B2	NR	M62 J25 - J30	
30/09/15 08:45:53	SIG	M62/2097B4	NR	M62 J25 - J30	
30/09/15 08:45:57	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 08:45:57	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 08:45:57	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 08:45:57	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 08:47:19	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:47:20	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:47:25	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2033A1	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2033A2	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2033A3	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2033A4	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2041A1	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2041A2	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2041A3	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2041A4	60R	M62 J25 - J30	
30/09/15 08:47:43	SIG	M62/2137B1	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2132B1	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2132B2	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2132B3	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2137B2	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2137B3	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2137B4	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2147B1	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2147B2	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2147B3	OFF	M62 J25 - J30	
30/09/15 08:47:44	SIG	M62/2147B4	OFF	M62 J25 - J30	
30/09/15 08:48:53	SIG	M62/2081L1	OFF	M62 J25 - J30	
30/09/15 08:48:53	SIG	M62/2088B2	OFF	M62 J25 - J30	
30/09/15 08:48:53	SIG	M62/2088B3	OFF	M62 J25 - J30	
30/09/15 08:48:53	SIG	M62/2088B4	OFF	M62 J25 - J30	
30/09/15 08:48:54	SIG	M62/2088B1	BLNK	M62 J25 - J30	
30/09/15 08:48:54	SIG	M62/2088B1	BLNK	M62 J25 - J30	
30/09/15 08:50:23	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:50:23	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:50:29	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:50:43	SIG	M62/2125B1	OFF	M62 J25 - J30	
30/09/15 08:50:43	SIG	M62/2125B2	OFF	M62 J25 - J30	
30/09/15 08:50:43	SIG	M62/2125B3	OFF	M62 J25 - J30	
30/09/15 08:50:43	SIG	M62/2125L1	NR	M62 J25 - J30	
30/09/15 08:50:43	SIG	M62/2125L2	NR	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2097B2	NR	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2097B4	NR	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2106B2	NR	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2106B3	NR	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2106B4	NR	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2113B1	BLNK	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2113B2	OFF	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2113B3	OFF	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2113B4	OFF	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2117B3	OFF	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2120M1	OFF	M62 J25 - J30	
30/09/15 08:50:53	SIG	M62/2120M2	OFF	M62 J25 - J30	
30/09/15 08:52:04	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 08:52:04	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 08:52:43	SIG	M62/2159B1	NR	M62 J25 - J30	
30/09/15 08:52:43	SIG	M62/2159B2	NR	M62 J25 - J30	
30/09/15 08:52:44	SIG	M62/2170B1	NR	M62 J25 - J30	
30/09/15 08:52:44	SIG	M62/2170B2	NR	M62 J25 - J30	
30/09/15 08:52:44	SIG	M62/2170L1	OFF	M62 J25 - J30	
30/09/15 08:52:44	SIG	M62/2170L2	OFF	M62 J25 - J30	
30/09/15 08:53:26	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:53:27	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:53:32	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:53:43	SIG	M62/2125L1	OFF	M62 J25 - J30	
30/09/15 08:53:43	SIG	M62/2125L2	OFF	M62 J25 - J30	
30/09/15 08:53:49	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 08:53:49	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 08:53:49	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 08:53:53	SIG	M62/2106B2	OFF	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2097B1	BLNK	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2097B1	BLNK	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2097B2	OFF	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2097B4	OFF	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2106B1	BLNK	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2106B3	OFF	M62 J25 - J30	
30/09/15 08:54:09	SIG	M62/2106B4	OFF	M62 J25 - J30	
30/09/15 08:54:31	SIG	M62/1956A3	OFF	M62 J25 - J30	
30/09/15 08:54:31	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2197B1	NR	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2197B2	NR	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2197B3	NR	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2199M1	OFF	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2199M2	OFF	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2203B1	OFF	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2203B2	OFF	M62 J25 - J30	
30/09/15 08:54:43	SIG	M62/2203B3	OFF	M62 J25 - J30	
30/09/15 08:55:34	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 08:55:34	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 08:55:34	SIG	M62/1956A1	40R	M62 J25 - J30	
30/09/15 08:55:34	SIG	M62/1956A2	40R	M62 J25 - J30	
30/09/15 08:55:34	SIG	M62/1956A3	40R	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2159B1	OFF	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2170B1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2170B2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2177B1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2177B2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2177L1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2177L2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2183B1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2183B2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2183L1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2183L2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2189B1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2189B2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2189B3	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2189B4	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2194B1	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2194B2	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2194B3	NR	M62 J25 - J30	
30/09/15 08:55:43	SIG	M62/2194B4	NR	M62 J25 - J30	
30/09/15 08:55:44	SIG	M62/2159B2	OFF	M62 J25 - J30	
30/09/15 08:56:16	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 08:56:16	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 08:56:16	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 08:56:16	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 08:56:21	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 08:56:21	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 08:56:21	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 08:56:21	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 08:56:30	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:56:31	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:56:36	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 08:57:43	SIG	M62/2197B1	OFF	M62 J25 - J30	
30/09/15 08:57:44	SIG	M62/2197B2	OFF	M62 J25 - J30	
30/09/15 08:57:44	SIG	M62/2197B3	OFF	M62 J25 - J30	
30/09/15 08:58:04	SIG	M62/2041B1	50R	M62 J25 - J30	
30/09/15 08:58:04	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 08:58:04	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 08:58:04	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 08:58:25	SIG	M62/2041B1	40R	M62 J25 - J30	
30/09/15 08:58:25	SIG	M62/2041B2	40R	M62 J25 - J30	
30/09/15 08:58:25	SIG	M62/2041B3	40R	M62 J25 - J30	
30/09/15 08:58:25	SIG	M62/2041B4	40R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2117A1	REDX	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2117A2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2117A3	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2117A4	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2122K1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2122K2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2124A1	REDX	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2124A2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2124A3	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2124A4	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2135A1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2135A2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2135A3	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2135A4	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2144A1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2144A2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2144J1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2144K1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2151A1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2151A2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2151J1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2151K1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2155A1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2155A2	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2155J1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2155K1	50R	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2157A1	NR	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2157A2	NR	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2157J1	NR	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2157J2	NR	M62 J25 - J30	
30/09/15 08:58:35	SIG	M62/2157K1	NR	M62 J25 - J30	
30/09/15 08:58:43	SIG	M62/2194B1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2170B1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2170B2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2177B1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2177B2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2177L1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2177L2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2183B1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2183L1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2183L2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2189B1	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2189B2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2189B3	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2189B4	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2194B2	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2194B3	OFF	M62 J25 - J30	
30/09/15 08:58:44	SIG	M62/2194B4	OFF	M62 J25 - J30	
30/09/15 08:58:50	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 08:58:51	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 08:58:52	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 08:58:52	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2113B2	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2113B3	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2113B4	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2117B1	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2117B3	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2125L1	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2125L2	NR	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2147B1	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2147B2	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2147B3	50R	M62 J25 - J30	
30/09/15 08:59:00	SIG	M62/2147B4	50R	M62 J25 - J30	
30/09/15 08:59:34	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 08:59:34	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 08:59:40	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 09:00:16	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 09:00:16	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 09:00:16	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 09:00:16	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 09:00:32	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 09:00:32	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 09:00:32	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 09:00:32	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 09:01:03	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 09:01:03	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 09:02:04	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 09:02:04	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 09:02:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 09:02:39	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 09:02:44	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 09:03:08	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 09:04:28	SIG	M62/2018A2	40R	M62 J25 - J30	
30/09/15 09:04:28	SIG	M62/2018A3	40R	M62 J25 - J30	
30/09/15 09:04:28	SIG	M62/2018A4	40R	M62 J25 - J30	
30/09/15 09:05:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 09:05:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 09:06:04	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 09:06:04	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 09:06:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:06:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:06:30	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 09:06:30	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 09:07:20	SIG	M62/2018A1	50R	M62 J25 - J30	
30/09/15 09:07:25	SIG	M62/2018A1	40R	M62 J25 - J30	
30/09/15 09:07:25	SIG	M62/2025A1	60R	M62 J25 - J30	
30/09/15 09:07:25	SIG	M62/2025A2	60R	M62 J25 - J30	
30/09/15 09:07:25	SIG	M62/2025A3	60R	M62 J25 - J30	
30/09/15 09:07:25	SIG	M62/2025A4	60R	M62 J25 - J30	
30/09/15 09:09:05	SIG	M62/2018A1	50R	M62 J25 - J30	
30/09/15 09:09:05	SIG	M62/2018A2	50R	M62 J25 - J30	
30/09/15 09:09:05	SIG	M62/2018A3	50R	M62 J25 - J30	
30/09/15 09:09:05	SIG	M62/2018A4	50R	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2122K1	OFF	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2122K2	OFF	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2124A2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2124A3	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2124A4	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2125B1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2125B2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2125B3	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2125L1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2125L2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2132B1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2132B2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2132B3	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2135A1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2135A2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2135A3	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2135A4	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2137B1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2137B2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2137B3	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2137B4	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2144A1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2144A2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2144J1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2144K1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2147B1	OFF	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2147B2	OFF	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2147B3	OFF	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2147B4	OFF	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2151A1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2151A2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2151J1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2151K1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2155A1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2155A2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2155J1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2155K1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2157A1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2157A2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2157J1	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2157J2	NR	M62 J25 - J30	
30/09/15 09:09:54	SIG	M62/2157K1	NR	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2113B1	BLNK	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2113B2	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2113B3	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2113B4	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2117A1	BLNK	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2117A2	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2117A3	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2117A4	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 09:09:55	SIG	M62/2117B3	OFF	M62 J25 - J30	
30/09/15 09:10:29	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 09:10:29	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 09:11:27	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 09:11:27	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 09:12:54	SIG	M62/2124A2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2124A1	BLNK	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2124A4	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2125B1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2125B2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2125B3	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2125L1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2125L2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2132B1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2132B2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2132B3	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2135A1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2135A2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2135A4	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2137B1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2137B2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2137B3	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2137B4	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2144A1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2144A2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2144J1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2144K1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2151A1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2151A2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2151J1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2151K1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2155A1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2155A2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2155J1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2155K1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2157A2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2157J1	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2157J2	OFF	M62 J25 - J30	
30/09/15 09:12:55	SIG	M62/2157K1	OFF	M62 J25 - J30	
30/09/15 09:13:11	SIG	M62/2008K1	50R	M62 J25 - J30	
30/09/15 09:13:11	SIG	M62/2008K2	50R	M62 J25 - J30	
30/09/15 09:13:11	SIG	M62/2012A1	50R	M62 J25 - J30	
30/09/15 09:13:11	SIG	M62/2012A2	50R	M62 J25 - J30	
30/09/15 09:13:11	SIG	M62/2012A3	50R	M62 J25 - J30	
30/09/15 09:14:18	SIG	M62/2004A1	50R	M62 J25 - J30	
30/09/15 09:14:18	SIG	M62/2004A2	50R	M62 J25 - J30	
30/09/15 09:14:18	SIG	M62/2004A3	50R	M62 J25 - J30	
30/09/15 09:15:28	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 09:15:28	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 09:15:49	SIG	M62/2106A2	50R	M62 J25 - J30	
30/09/15 09:15:49	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:15:49	SIG	M62/2106A4	50R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2097A1	REDX	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2097A2	60R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2097A3	60R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2097A4	60R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2106A1	STOP	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2106A2	40R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2106A4	40R	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2114A1	NR	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2114A2	NR	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2114A3	NR	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2117A1	REDX	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2117A2	NR	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2117A3	NR	M62 J25 - J30	
30/09/15 09:15:54	SIG	M62/2117A4	NR	M62 J25 - J30	
30/09/15 09:16:00	SIG	M62/2106A1	STOP	M62 J25 - J30	
30/09/15 09:17:43	SIG	M62/2018A1	60R	M62 J25 - J30	
30/09/15 09:17:43	SIG	M62/2018A2	60R	M62 J25 - J30	
30/09/15 09:17:43	SIG	M62/2018A3	60R	M62 J25 - J30	
30/09/15 09:17:43	SIG	M62/2018A4	60R	M62 J25 - J30	
30/09/15 09:18:43	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 09:18:44	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:18:45	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:18:51	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:19:07	SIG	M62/1999A1	50R	M62 J25 - J30	
30/09/15 09:19:07	SIG	M62/1999A2	50R	M62 J25 - J30	
30/09/15 09:19:07	SIG	M62/1999A3	50R	M62 J25 - J30	
30/09/15 09:19:07	SIG	M62/1999J1	50R	M62 J25 - J30	
30/09/15 09:19:07	SIG	M62/1999J2	50R	M62 J25 - J30	
30/09/15 09:19:32	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 09:19:32	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 09:19:40	SIG	M62/1992A1	50R	M62 J25 - J30	
30/09/15 09:19:40	SIG	M62/1992A2	50R	M62 J25 - J30	
30/09/15 09:19:40	SIG	M62/1992A3	50R	M62 J25 - J30	
30/09/15 09:19:40	SIG	M62/1992J1	50R	M62 J25 - J30	
30/09/15 09:21:48	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:21:49	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:21:55	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M606/2003B1	NR	M62 J25 - J30	
30/09/15 09:22:44	SIG	M606/2003B2	NR	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2004A1	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2004A2	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2004A3	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2008K1	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2008K2	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2012A1	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2012A2	60R	M62 J25 - J30	
30/09/15 09:22:44	SIG	M62/2012A3	60R	M62 J25 - J30	
30/09/15 09:23:42	SIG	M62/1987A1	50R	M62 J25 - J30	
30/09/15 09:23:42	SIG	M62/1987A3	50R	M62 J25 - J30	
30/09/15 09:23:42	SIG	M62/1987J1	50R	M62 J25 - J30	
30/09/15 09:23:43	SIG	M62/2065A2	60R	M62 J25 - J30	
30/09/15 09:23:43	SIG	M62/2065A3	60R	M62 J25 - J30	
30/09/15 09:23:43	SIG	M62/2065A4	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2073K1	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2073K2	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2074A2	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2074A3	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2074A4	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2079A1	REDX	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2079A2	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2079A3	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2079A4	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2088A1	REDX	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2088A2	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2088A3	60R	M62 J25 - J30	
30/09/15 09:23:44	SIG	M62/2088A4	60R	M62 J25 - J30	
30/09/15 09:25:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:25:03	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:25:08	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1974A1	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1974A2	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1974A3	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1974A4	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1979K1	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1979K2	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1981A1	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1981A2	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1981A3	50R	M62 J25 - J30	
30/09/15 09:25:10	SIG	M62/1981A4	50R	M62 J25 - J30	
30/09/15 09:25:44	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 09:25:44	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 09:26:40	SIG	M62/1968A1	50R	M62 J25 - J30	
30/09/15 09:26:40	SIG	M62/1968A2	50R	M62 J25 - J30	
30/09/15 09:26:40	SIG	M62/1968A3	50R	M62 J25 - J30	
30/09/15 09:26:40	SIG	M62/1968A4	50R	M62 J25 - J30	
30/09/15 09:28:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:28:03	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:28:08	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:28:43	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 09:28:43	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 09:29:05	SIG	M62/1960A1	50R	M62 J25 - J30	
30/09/15 09:29:05	SIG	M62/1960A2	50R	M62 J25 - J30	
30/09/15 09:29:05	SIG	M62/1960A3	50R	M62 J25 - J30	
30/09/15 09:29:05	SIG	M62/1960K1	50R	M62 J25 - J30	
30/09/15 09:29:05	SIG	M62/1960K2	50R	M62 J25 - J30	
30/09/15 09:30:39	SIG	M62/1960A1	40R	M62 J25 - J30	
30/09/15 09:30:39	SIG	M62/1960A2	40R	M62 J25 - J30	
30/09/15 09:30:39	SIG	M62/1960A3	40R	M62 J25 - J30	
30/09/15 09:30:39	SIG	M62/1960K1	40R	M62 J25 - J30	
30/09/15 09:30:39	SIG	M62/1960K2	40R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1979K1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1979K2	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1981A1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1981A2	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1981A3	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1981A4	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1987A1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1987A3	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1987J1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1992A1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1992A2	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1992A3	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1992J1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1999A1	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1999A2	60R	M62 J25 - J30	
30/09/15 09:30:59	SIG	M62/1999A3	60R	M62 J25 - J30	
30/09/15 09:31:02	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:31:03	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:31:08	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:31:53	SIG	M62/1955K1	40R	M62 J25 - J30	
30/09/15 09:31:53	SIG	M62/1955K2	40R	M62 J25 - J30	
30/09/15 09:32:44	SIG	M62/1974A1	60R	M62 J25 - J30	
30/09/15 09:32:44	SIG	M62/1974A2	60R	M62 J25 - J30	
30/09/15 09:32:44	SIG	M62/1974A3	60R	M62 J25 - J30	
30/09/15 09:32:44	SIG	M62/1974A4	60R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2113B2	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2113B3	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2113B4	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2114A1	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2114A2	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2114A3	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2117A2	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2117A3	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2117A4	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2117B1	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2117B3	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2122K1	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2122K2	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2124A1	REDX	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2124A2	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2124A3	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2124A4	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2125L1	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2125L2	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2135A1	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2135A2	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2135A3	NR	M62 J25 - J30	
30/09/15 09:34:00	SIG	M62/2135A4	NR	M62 J25 - J30	
30/09/15 09:34:05	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:34:05	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:34:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:34:10	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:34:11	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:34:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:34:11	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1960A1	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1960A2	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1960A3	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1960K1	50R	M62 J25 - J30	
30/09/15 09:35:52	SIG	M62/1960K2	50R	M62 J25 - J30	
30/09/15 09:36:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:36:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:37:08	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:37:09	SIG	M62/2106A3	50R	M62 J25 - J30	
30/09/15 09:37:14	SIG	M62/2106A3	40R	M62 J25 - J30	
30/09/15 09:37:44	SIG	M62/1968A1	60R	M62 J25 - J30	
30/09/15 09:37:44	SIG	M62/1968A2	60R	M62 J25 - J30	
30/09/15 09:37:44	SIG	M62/1968A3	60R	M62 J25 - J30	
30/09/15 09:37:44	SIG	M62/1968A4	60R	M62 J25 - J30	
30/09/15 09:40:02	SIG	M62/2106A1	REDX	M62 J25 - J30	
30/09/15 09:40:02	SIG	M62/2106A2	60R	M62 J25 - J30	
30/09/15 09:40:02	SIG	M62/2106A3	60R	M62 J25 - J30	
30/09/15 09:40:02	SIG	M62/2106A4	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1955K1	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1955K2	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1956A1	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1956A2	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1956A3	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1960A1	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1960A2	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1960A3	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1960K1	60R	M62 J25 - J30	
30/09/15 09:40:44	SIG	M62/1960K2	60R	M62 J25 - J30	
30/09/15 09:42:16	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:42:16	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:42:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:42:17	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2113B1	BLNK	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2113B2	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2113B3	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2113B4	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2114A1	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2114A2	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2114A3	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2117A2	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2117A3	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2117A4	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2117B3	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2122K1	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2122K2	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2124A2	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2124A3	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2124A4	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2125B1	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2125B2	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2125B3	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2125L1	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2125L2	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2132B1	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2132B2	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2132B3	OFF	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2135A1	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2135A2	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2135A3	NR	M62 J25 - J30	
30/09/15 09:45:28	SIG	M62/2135A4	NR	M62 J25 - J30	
30/09/15 09:48:28	SIG	M62/2124A2	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2124A1	BLNK	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2124A4	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2125B1	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2125B2	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2125B3	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2125L1	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2125L2	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2135A1	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2135A2	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 09:48:29	SIG	M62/2135A4	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2065A2	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2065A3	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2065A4	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2073K1	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2073K2	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2074A2	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2074A3	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2074A4	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2079A1	BLNK	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2079A2	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2079A3	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2079A4	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2088A2	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2088A3	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2088A4	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2097A2	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2097A3	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2097A4	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2106A2	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2106A3	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2106A4	NR	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2114A1	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2114A2	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2114A3	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2117A1	BLNK	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2117A2	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2117A3	OFF	M62 J25 - J30	
30/09/15 09:51:44	SIG	M62/2117A4	OFF	M62 J25 - J30	
30/09/15 09:52:33	SIG	M62/2074A4	OFF	M62 J25 - J30	
30/09/15 09:52:34	SIG	M62/2074A4	NR	M62 J25 - J30	
30/09/15 09:52:44	SIG	M62/2004A1	OFF	M62 J25 - J30	
30/09/15 09:52:44	SIG	M62/2004A2	OFF	M62 J25 - J30	
30/09/15 09:52:44	SIG	M62/2004A3	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1979K1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1979K2	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1981A1	NR	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1981A2	NR	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1981A3	NR	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1981A4	NR	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1987A1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1987A3	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1987J1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1992A1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1992A2	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1992A3	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1992J1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1999A1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1999A2	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1999A3	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1999J1	OFF	M62 J25 - J30	
30/09/15 09:52:57	SIG	M62/1999J2	OFF	M62 J25 - J30	
30/09/15 09:53:23	SIG	M62/2074A4	OFF	M62 J25 - J30	
30/09/15 09:53:24	SIG	M62/2074A4	NR	M62 J25 - J30	
30/09/15 09:54:23	SIG	M62/2074A4	OFF	M62 J25 - J30	
30/09/15 09:54:24	SIG	M62/2074A4	NR	M62 J25 - J30	
30/09/15 09:54:44	SIG	M62/2004A1	60R	M62 J25 - J30	
30/09/15 09:54:44	SIG	M62/2004A2	60R	M62 J25 - J30	
30/09/15 09:54:44	SIG	M62/2004A3	60R	M62 J25 - J30	
30/09/15 09:54:44	SIG	M62/2106A2	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2074A2	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2074A3	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2088A1	BLNK	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2088A2	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2088A3	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2088A4	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2097A1	BLNK	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2097A2	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2097A3	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2097A4	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2106A1	BLNK	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 09:54:45	SIG	M62/2106A4	OFF	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1974A1	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1974A2	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1974A3	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1974A4	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1981A1	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1981A2	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1981A3	NR	M62 J25 - J30	
30/09/15 09:55:45	SIG	M62/1981A4	NR	M62 J25 - J30	
30/09/15 09:57:24	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 09:57:24	SIG	M62/2074A4	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1955K1	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1955K2	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1956A1	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1956A2	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1956A3	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1960A1	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1960A2	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1960A3	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1960K1	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1960K2	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1968A1	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1968A2	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1968A3	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1968A4	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1974A1	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1974A2	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1974A3	OFF	M62 J25 - J30	
30/09/15 09:57:45	SIG	M62/1974A4	OFF	M62 J25 - J30	
30/09/15 09:58:45	SIG	M62/1981A1	OFF	M62 J25 - J30	
30/09/15 09:58:45	SIG	M62/1981A2	OFF	M62 J25 - J30	
30/09/15 09:58:45	SIG	M62/1981A3	OFF	M62 J25 - J30	
30/09/15 09:58:45	SIG	M62/1981A4	OFF	M62 J25 - J30	
30/09/15 10:13:44	SIG	M62/2057B1	HSD	M62 J25 - J30	
30/09/15 10:15:43	SIG	M62/2041B1	HSD	M62 J25 - J30	
30/09/15 10:15:43	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 10:15:43	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 10:15:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
30/09/15 10:15:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
30/09/15 10:16:43	SIG	M62/2033B1	HSD	M62 J25 - J30	
30/09/15 10:17:43	SIG	M62/2025B1	HSD	M62 J25 - J30	
30/09/15 10:17:44	SIG	M62/2041B1	REDX	M62 J25 - J30	
30/09/15 10:18:36	SIG	M62/2033B1	REDX	M62 J25 - J30	
30/09/15 10:19:20	SIG	M62/2025B1	REDX	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2018B1	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2018B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2018B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2018L1	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2025B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2025B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2025B4	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2033B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2033B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2033B4	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2041B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2041B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2041B4	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2050B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2050B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2050B4	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2057B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2057B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2057B4	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2065B2	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2065B3	NR	M62 J25 - J30	
30/09/15 10:19:50	SIG	M62/2065B4	NR	M62 J25 - J30	
30/09/15 10:20:50	SIG	M62/2069M1	OFF	M62 J25 - J30	
30/09/15 10:20:50	SIG	M62/2069M2	OFF	M62 J25 - J30	
30/09/15 10:20:50	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 10:20:50	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2012B1	BLNK	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2012B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2012B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2012B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2018B1	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2018B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2018B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2018L1	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2025B1	BLNK	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2025B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2025B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2025B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2033B1	BLNK	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2033B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2033B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2041B1	BLNK	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2041B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2041B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2041B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2050B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2050B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2050B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2057B1	BLNK	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2057B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2057B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2057B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2065B1	BLNK	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2065B2	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2065B3	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2065B4	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M62/2065M1	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M621/1002B1	OFF	M62 J25 - J30	
30/09/15 10:20:51	SIG	M621/1002B2	OFF	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2088A1	REDX	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2088A2	50R	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2088A3	50R	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2088A4	50R	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2097A1	REDX	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2097A2	NR	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2097A3	NR	M62 J25 - J30	
30/09/15 10:24:08	SIG	M62/2097A4	NR	M62 J25 - J30	
30/09/15 10:24:33	SIG	M62/2088A2	60R	M62 J25 - J30	
30/09/15 10:24:33	SIG	M62/2088A3	60R	M62 J25 - J30	
30/09/15 10:24:33	SIG	M62/2088A4	60R	M62 J25 - J30	
30/09/15 10:27:04	SIG	M62/2088A2	NR	M62 J25 - J30	
30/09/15 10:27:04	SIG	M62/2088A3	NR	M62 J25 - J30	
30/09/15 10:27:04	SIG	M62/2088A4	NR	M62 J25 - J30	
30/09/15 10:27:04	SIG	M62/2097A2	NR	M62 J25 - J30	
30/09/15 10:27:04	SIG	M62/2097A3	NR	M62 J25 - J30	
30/09/15 10:27:04	SIG	M62/2097A4	NR	M62 J25 - J30	
30/09/15 10:30:04	SIG	M62/2088A2	OFF	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2088A1	BLNK	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2088A3	OFF	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2088A4	OFF	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2097A1	BLNK	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2097A1	BLNK	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2097A2	OFF	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2097A3	OFF	M62 J25 - J30	
30/09/15 10:30:05	SIG	M62/2097A4	OFF	M62 J25 - J30	
30/09/15 10:37:45	SIG	M62/2004A1	OFF	M62 J25 - J30	
30/09/15 10:37:45	SIG	M62/2004A2	OFF	M62 J25 - J30	
30/09/15 10:37:45	SIG	M62/2004A3	OFF	M62 J25 - J30	
30/09/15 10:53:38	SIG	M62/2025A1	HSD	M62 J25 - J30	
30/09/15 10:54:38	SIG	M62/2033A1	HSD	M62 J25 - J30	
30/09/15 10:55:38	SIG	M62/2041A1	HSD	M62 J25 - J30	
30/09/15 10:55:39	SIG	M62/2018A1	HSD	M62 J25 - J30	
30/09/15 10:55:39	SIG	M62/2025A1	REDX	M62 J25 - J30	
30/09/15 10:56:45	SIG	M62/2050A1	HSD	M62 J25 - J30	
30/09/15 10:56:46	SIG	M62/2033A1	REDX	M62 J25 - J30	
30/09/15 10:57:37	SIG	M62/2041A1	REDX	M62 J25 - J30	
30/09/15 10:58:37	SIG	M62/2050A1	REDX	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2025A2	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2025A3	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2025A4	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2033A2	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2033A3	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2033A4	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2041A2	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2041A3	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2041A4	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2050A2	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2050A3	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2050A4	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2057A1	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2057A2	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2057A3	NR	M62 J25 - J30	
30/09/15 10:59:38	SIG	M62/2057J1	NR	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2008K1	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2008K2	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2012A1	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2012A2	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2012A3	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2018A1	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2018A2	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2018A3	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2018A4	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2025A1	BLNK	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2025A2	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2025A3	OFF	M62 J25 - J30	
30/09/15 11:00:38	SIG	M62/2025A4	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2033A1	BLNK	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2033A2	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2033A3	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2033A4	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2041A1	BLNK	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2041A2	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2041A3	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2041A4	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2050A1	BLNK	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2050A2	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2050A3	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2050A4	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2057A1	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2057A2	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2057A3	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2057J1	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2065A1	BLNK	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2065A2	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2065A3	OFF	M62 J25 - J30	
30/09/15 11:00:39	SIG	M62/2065A4	OFF	M62 J25 - J30	
30/09/15 11:24:17	SIG	M62/2057A1	50R	M62 J25 - J30	
30/09/15 11:24:17	SIG	M62/2057A2	50R	M62 J25 - J30	
30/09/15 11:24:17	SIG	M62/2057A3	50R	M62 J25 - J30	
30/09/15 11:24:17	SIG	M62/2057J1	50R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2050A1	REDX	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2050A2	50R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2050A3	50R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2050A4	50R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2057A1	40R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2057A2	40R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2057A3	40R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2057J1	40R	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2065A1	REDX	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2065A2	NR	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2065A3	NR	M62 J25 - J30	
30/09/15 11:24:22	SIG	M62/2065A4	NR	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2050A2	NR	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2050A3	NR	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2050A4	NR	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2057A1	OFF	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2057A2	OFF	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2057A3	OFF	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2057J1	NR	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2065A1	BLNK	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2065A2	OFF	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2065A3	OFF	M62 J25 - J30	
30/09/15 11:28:18	SIG	M62/2065A4	OFF	M62 J25 - J30	
30/09/15 11:31:18	SIG	M62/2057J1	OFF	M62 J25 - J30	
30/09/15 11:31:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
30/09/15 11:31:19	SIG	M62/2050A1	BLNK	M62 J25 - J30	
30/09/15 11:31:19	SIG	M62/2050A2	OFF	M62 J25 - J30	
30/09/15 11:31:19	SIG	M62/2050A3	OFF	M62 J25 - J30	
30/09/15 11:31:19	SIG	M62/2050A4	OFF	M62 J25 - J30	
30/09/15 13:22:49	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1987B1	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1987B2	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1987B3	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1987B4	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 13:22:49	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1992B1	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1999B1	REDX	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 13:22:54	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 13:24:55	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 13:24:55	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1987B1	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1987B2	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1987B3	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1987B4	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1992B1	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1992B2	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1992B3	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1992B4	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1999B2	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1999B3	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/1999B4	NR	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 13:24:55	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1999B1	BLNK	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1999B2	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1999B3	OFF	M62 J25 - J30	
30/09/15 13:27:56	SIG	M62/1999B4	OFF	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2122K1	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2122K2	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2124A1	REDX	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2124A2	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2124A3	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2124A4	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2135A1	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2135A2	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2135A3	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2135A4	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2144A1	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2144A2	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2144J1	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2144K1	50R	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2151A1	NR	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2151A2	NR	M62 J25 - J30	
30/09/15 14:46:08	SIG	M62/2151K1	NR	M62 J25 - J30	
30/09/15 14:46:18	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 14:46:19	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 14:46:20	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 14:46:20	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 14:58:14	SIG	M62/2163A1	50R	M62 J25 - J30	
30/09/15 14:58:14	SIG	M62/2163A2	50R	M62 J25 - J30	
30/09/15 14:58:14	SIG	M62/2170A1	50R	M62 J25 - J30	
30/09/15 14:58:14	SIG	M62/2170A2	50R	M62 J25 - J30	
30/09/15 14:58:14	SIG	M62/2170K1	50R	M62 J25 - J30	
30/09/15 14:58:14	SIG	M62/2170K2	50R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2166K1	50R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2166K2	50R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2170A1	40R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2170A2	40R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2170K1	40R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2170K2	40R	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2177A1	REDX	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2177A2	NR	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2177A3	NR	M62 J25 - J30	
30/09/15 14:58:20	SIG	M62/2177A4	NR	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2166K1	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2166K2	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2170A1	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2170A2	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2170K1	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2170K2	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2177A1	BLNK	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2177A2	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2177A3	OFF	M62 J25 - J30	
30/09/15 15:05:07	SIG	M62/2177A4	OFF	M62 J25 - J30	
30/09/15 15:05:28	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:05:29	SIG	M62/2135A3	50R	M62 J25 - J30	
30/09/15 15:06:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 15:06:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2050B2	NR	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2050B3	NR	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2050B4	NR	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2057B1	REDX	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2057B2	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2057B3	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2057B4	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2065B1	REDX	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2065B2	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2065B3	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2065B4	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2065M1	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2069M1	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2069M2	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2074B1	REDX	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2074B2	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2074B3	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M62/2074B4	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M621/1002B1	HSD	M62 J25 - J30	
30/09/15 15:07:50	SIG	M621/1002B2	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 15:07:50	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2033B1	REDX	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2033B2	NR	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2033B3	NR	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2033B4	NR	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2041B1	REDX	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2050B2	60R	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2050B3	60R	M62 J25 - J30	
30/09/15 15:08:50	SIG	M62/2050B4	60R	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2025B1	REDX	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2025B2	NR	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2025B3	NR	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2025B4	NR	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 15:08:57	SIG	M62/2151J1	NR	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2012B1	REDX	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 15:08:58	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 15:10:36	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 15:11:03	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 15:11:26	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 15:11:50	SIG	M62/2074B1	BLNK	M62 J25 - J30	
30/09/15 15:11:50	SIG	M62/2074B2	OFF	M62 J25 - J30	
30/09/15 15:11:50	SIG	M62/2074B3	OFF	M62 J25 - J30	
30/09/15 15:11:50	SIG	M62/2074B4	OFF	M62 J25 - J30	
30/09/15 15:11:52	SIG	M62/2057B1	60R	M62 J25 - J30	
30/09/15 15:11:52	SIG	M621/1002B1	60R	M62 J25 - J30	
30/09/15 15:11:52	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 15:11:52	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 15:11:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 15:11:59	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 15:12:50	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 15:13:52	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:13:52	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:13:53	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:13:53	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:14:03	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:14:04	SIG	M62/2135A3	50R	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2073K1	50R	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2073K2	50R	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2074A2	50R	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2079A1	REDX	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2079A2	NR	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2079A3	NR	M62 J25 - J30	
30/09/15 15:18:05	SIG	M62/2079A4	NR	M62 J25 - J30	
30/09/15 15:19:18	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:19:18	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:19:19	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:19:20	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2008K1	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2008K2	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2012A1	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2012A2	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2012A3	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2018A1	HSD	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2018A2	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2018A3	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2018A4	60R	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2025A1	REDX	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2025A2	NR	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2025A3	NR	M62 J25 - J30	
30/09/15 15:30:50	SIG	M62/2025A4	NR	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2012A1	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2018A1	HSD	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2025A2	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2025A3	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2025A4	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2033A1	REDX	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2033A2	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2033A3	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2033A4	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2041A1	REDX	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2041A2	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2041A3	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2041A4	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2050A1	REDX	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2050A2	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2050A3	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2050A4	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2057A1	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2057A2	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2057A3	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2057J1	60R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2065A1	REDX	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2065A2	50R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2065A3	50R	M62 J25 - J30	
30/09/15 15:30:51	SIG	M62/2065A4	50R	M62 J25 - J30	
30/09/15 15:32:17	SIG	M62/2050A1	60R	M62 J25 - J30	
30/09/15 15:32:52	SIG	M62/2041A1	60R	M62 J25 - J30	
30/09/15 15:33:21	SIG	M62/2033A1	60R	M62 J25 - J30	
30/09/15 15:33:25	SIG	M62/2018A1	60R	M62 J25 - J30	
30/09/15 15:33:25	SIG	M62/2025A1	60R	M62 J25 - J30	
30/09/15 15:36:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 15:36:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 15:36:14	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:36:14	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 15:44:35	SIG	M62/2065A2	NR	M62 J25 - J30	
30/09/15 15:44:35	SIG	M62/2065A3	NR	M62 J25 - J30	
30/09/15 15:44:35	SIG	M62/2065A4	NR	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2073K1	OFF	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2073K2	OFF	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2074A2	NR	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2079A1	BLNK	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2079A2	OFF	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2079A3	OFF	M62 J25 - J30	
30/09/15 15:44:44	SIG	M62/2079A4	OFF	M62 J25 - J30	
30/09/15 15:47:45	SIG	M62/2074A2	OFF	M62 J25 - J30	
30/09/15 15:48:11	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 15:48:11	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 15:48:12	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 15:49:51	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 15:49:51	SIG	M62/2074B1	REDX	M62 J25 - J30	
30/09/15 15:49:51	SIG	M62/2074B2	60R	M62 J25 - J30	
30/09/15 15:49:51	SIG	M62/2074B3	60R	M62 J25 - J30	
30/09/15 15:49:51	SIG	M62/2074B4	60R	M62 J25 - J30	
30/09/15 15:49:51	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 15:49:51	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 15:50:36	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2113B2	NR	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2113B3	NR	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2113B4	NR	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2120M1	60R	M62 J25 - J30	
30/09/15 15:55:38	SIG	M62/2120M2	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2081B1	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2081B2	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2081B3	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2081L1	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2088B1	REDX	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2088B2	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2088B3	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2088B4	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2097B1	REDX	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2097B2	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2097B4	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2106B1	REDX	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2106B2	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2106B3	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2106B4	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2113B2	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2113B3	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2113B4	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2117B1	60R	M62 J25 - J30	
30/09/15 15:55:57	SIG	M62/2117B3	60R	M62 J25 - J30	
30/09/15 15:57:16	SIG	M62/2088B1	60R	M62 J25 - J30	
30/09/15 15:57:42	SIG	M62/2097B1	60R	M62 J25 - J30	
30/09/15 15:58:08	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 15:58:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 15:58:10	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 15:58:10	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 15:58:11	SIG	M62/2106B1	60R	M62 J25 - J30	
30/09/15 15:58:15	SIG	M62/2113B1	60R	M62 J25 - J30	
30/09/15 16:01:23	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:02:10	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:02:10	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:06:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:06:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:06:13	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:06:13	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:06:33	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:06:34	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:06:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:06:34	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:06:52	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:06:53	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:07:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:07:12	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:07:13	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:07:13	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:10:04	SIG	M62/2065M1	50R	M62 J25 - J30	
30/09/15 16:10:04	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:10:04	SIG	M621/1002B1	50R	M62 J25 - J30	
30/09/15 16:10:04	SIG	M621/1002B2	50R	M62 J25 - J30	
30/09/15 16:10:04	SIG	M621/1010B1	50R	M62 J25 - J30	
30/09/15 16:10:04	SIG	M621/1010B2	50R	M62 J25 - J30	
30/09/15 16:10:10	SIG	M62/2065M1	40R	M62 J25 - J30	
30/09/15 16:10:10	SIG	M62/2069M1	50R	M62 J25 - J30	
30/09/15 16:10:10	SIG	M62/2069M2	50R	M62 J25 - J30	
30/09/15 16:10:10	SIG	M621/1002B1	40R	M62 J25 - J30	
30/09/15 16:10:10	SIG	M621/1002B2	40R	M62 J25 - J30	
30/09/15 16:10:12	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:11:07	SIG	M62/2074B2	50R	M62 J25 - J30	
30/09/15 16:11:07	SIG	M62/2074B3	50R	M62 J25 - J30	
30/09/15 16:11:07	SIG	M62/2074B4	50R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2074B2	40R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2074B3	40R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2074B4	40R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2081B1	50R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2081B2	50R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2081B3	50R	M62 J25 - J30	
30/09/15 16:11:12	SIG	M62/2081L1	50R	M62 J25 - J30	
30/09/15 16:11:18	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:12:36	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:12:36	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:12:37	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:12:38	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:14:04	SIG	M62/2065M1	60R	M62 J25 - J30	
30/09/15 16:14:04	SIG	M62/2069M1	60R	M62 J25 - J30	
30/09/15 16:14:04	SIG	M62/2069M2	60R	M62 J25 - J30	
30/09/15 16:14:04	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:14:04	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:14:04	SIG	M621/1002B1	60R	M62 J25 - J30	
30/09/15 16:14:04	SIG	M621/1002B2	60R	M62 J25 - J30	
30/09/15 16:14:04	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 16:14:04	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 16:14:05	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:14:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:14:21	SIG	M62/2065M1	50R	M62 J25 - J30	
30/09/15 16:14:21	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:14:21	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:14:21	SIG	M621/1002B1	50R	M62 J25 - J30	
30/09/15 16:14:21	SIG	M621/1002B2	50R	M62 J25 - J30	
30/09/15 16:14:21	SIG	M621/1010B1	50R	M62 J25 - J30	
30/09/15 16:14:21	SIG	M621/1010B2	50R	M62 J25 - J30	
30/09/15 16:14:22	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:14:22	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:14:26	SIG	M62/2065M1	40R	M62 J25 - J30	
30/09/15 16:14:26	SIG	M62/2069M1	50R	M62 J25 - J30	
30/09/15 16:14:26	SIG	M62/2069M2	50R	M62 J25 - J30	
30/09/15 16:14:26	SIG	M621/1002B1	40R	M62 J25 - J30	
30/09/15 16:14:26	SIG	M621/1002B2	40R	M62 J25 - J30	
30/09/15 16:18:01	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:18:02	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:18:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:18:02	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:18:08	SIG	M62/2069M1	40R	M62 J25 - J30	
30/09/15 16:18:08	SIG	M62/2069M2	40R	M62 J25 - J30	
30/09/15 16:18:08	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:18:08	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:18:08	SIG	M621/1010B1	40R	M62 J25 - J30	
30/09/15 16:18:08	SIG	M621/1010B2	40R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2081B1	40R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2081B2	40R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2081B3	40R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2081L1	40R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2088B1	50R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2088B2	50R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2088B3	50R	M62 J25 - J30	
30/09/15 16:18:17	SIG	M62/2088B4	50R	M62 J25 - J30	
30/09/15 16:18:18	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:18:18	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:18:51	SIG	M62/2065B2	50R	M62 J25 - J30	
30/09/15 16:18:51	SIG	M62/2065B3	50R	M62 J25 - J30	
30/09/15 16:18:51	SIG	M62/2065B4	50R	M62 J25 - J30	
30/09/15 16:18:51	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:18:51	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:19:04	SIG	M62/2065B2	40R	M62 J25 - J30	
30/09/15 16:19:04	SIG	M62/2065B3	40R	M62 J25 - J30	
30/09/15 16:19:04	SIG	M62/2065B4	40R	M62 J25 - J30	
30/09/15 16:19:05	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:19:05	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:19:48	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:19:48	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:19:48	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:19:49	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:21:35	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:21:35	SIG	M62/2088B1	40R	M62 J25 - J30	
30/09/15 16:21:35	SIG	M62/2088B2	40R	M62 J25 - J30	
30/09/15 16:21:35	SIG	M62/2088B3	40R	M62 J25 - J30	
30/09/15 16:21:35	SIG	M62/2088B4	40R	M62 J25 - J30	
30/09/15 16:21:41	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:21:51	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:21:52	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:22:51	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:23:23	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:23:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:23:51	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:23:51	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:24:36	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:24:37	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:24:37	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:24:37	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 16:24:49	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2033B1	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2033B2	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2033B4	40R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2041B1	50R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 16:24:54	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 16:25:56	SIG	M62/2097B1	50R	M62 J25 - J30	
30/09/15 16:25:56	SIG	M62/2097B2	50R	M62 J25 - J30	
30/09/15 16:25:56	SIG	M62/2097B3	50R	M62 J25 - J30	
30/09/15 16:25:56	SIG	M62/2097B4	50R	M62 J25 - J30	
30/09/15 16:26:11	SIG	M62/2097B1	40R	M62 J25 - J30	
30/09/15 16:26:11	SIG	M62/2097B2	40R	M62 J25 - J30	
30/09/15 16:26:11	SIG	M62/2097B4	40R	M62 J25 - J30	
30/09/15 16:26:16	SIG	M62/2065A2	60R	M62 J25 - J30	
30/09/15 16:26:16	SIG	M62/2065A3	60R	M62 J25 - J30	
30/09/15 16:26:16	SIG	M62/2065A4	60R	M62 J25 - J30	
30/09/15 16:26:21	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2073K1	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2073K2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2074A2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2079A1	REDX	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2079A2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2079A3	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2079A4	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2088A1	REDX	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2088A2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2088A3	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2088A4	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2097A1	REDX	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2097A2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2097A3	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2097A4	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2106A1	REDX	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2106A2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2106A3	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2106A4	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2114A1	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2114A2	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2114A3	60R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2117A1	REDX	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2117A2	50R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2117A3	50R	M62 J25 - J30	
30/09/15 16:26:41	SIG	M62/2117A4	50R	M62 J25 - J30	
30/09/15 16:27:27	SIG	M62/2041B1	40R	M62 J25 - J30	
30/09/15 16:27:27	SIG	M62/2041B2	40R	M62 J25 - J30	
30/09/15 16:27:27	SIG	M62/2041B3	40R	M62 J25 - J30	
30/09/15 16:27:27	SIG	M62/2041B4	40R	M62 J25 - J30	
30/09/15 16:27:28	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:27:29	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 16:27:34	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 16:28:50	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 16:28:51	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 16:28:51	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 16:28:52	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 16:29:22	SIG	M62/2106B1	50R	M62 J25 - J30	
30/09/15 16:29:22	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 16:29:22	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 16:29:22	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2106B1	40R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2106B2	40R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2106B3	40R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2106B4	40R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2113B1	50R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 16:29:27	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 16:29:51	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 16:29:51	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 16:29:51	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 16:29:51	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 16:29:51	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 16:30:27	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 16:30:27	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 16:30:27	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 16:30:27	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 16:30:29	SIG	M62/2106A1	60R	M62 J25 - J30	
30/09/15 16:30:32	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:30:33	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 16:30:38	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 16:30:53	SIG	M62/2097A1	60R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 16:30:56	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 16:31:02	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 16:31:27	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 16:32:51	SIG	M62/2117A2	60R	M62 J25 - J30	
30/09/15 16:32:51	SIG	M62/2117A3	60R	M62 J25 - J30	
30/09/15 16:32:51	SIG	M62/2117A4	60R	M62 J25 - J30	
30/09/15 16:32:51	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:32:51	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:33:01	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:02	SIG	M62/2124A3	50R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2033B1	40R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2033B2	40R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2033B4	40R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2041B1	50R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 16:33:06	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 16:33:12	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:25	SIG	M62/2124A3	50R	M62 J25 - J30	
30/09/15 16:33:25	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:35	SIG	M62/2097B3	40R	M62 J25 - J30	
30/09/15 16:33:35	SIG	M62/2097B3	40R	M62 J25 - J30	
30/09/15 16:33:35	SIG	M62/2097B3	40R	M62 J25 - J30	
30/09/15 16:33:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:41	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:42	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:33:43	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:34:55	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 16:34:55	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 16:34:55	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 16:34:55	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 16:35:38	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:35:39	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2113B1	40R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2113B2	40R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2113B3	40R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2113B4	40R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 16:35:42	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 16:35:44	SIG	M62/2033B3	40R	M62 J25 - J30	
30/09/15 16:36:13	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:36:13	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:36:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:36:14	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:36:51	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2041B1	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 16:37:08	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 16:37:44	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 16:39:51	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:39:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:40:12	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:40:13	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:40:18	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:40:52	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 16:40:52	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 16:40:52	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2122K1	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2122K2	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2124A2	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2124A3	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2124A4	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2135A1	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2135A2	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2135A3	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2135A4	60R	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2144A1	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2144A2	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2144J1	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2144K1	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2151A1	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2151A2	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2151J1	NR	M62 J25 - J30	
30/09/15 16:43:08	SIG	M62/2151K1	NR	M62 J25 - J30	
30/09/15 16:43:17	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:43:18	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:43:18	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:43:18	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:43:19	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:43:19	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:43:23	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 16:44:39	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 16:45:02	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 16:45:26	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:45:27	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:45:28	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:45:28	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2183A1	REDX	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2183A2	50R	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2183A3	50R	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2183A4	50R	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2189A1	REDX	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2189A2	50R	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2189A3	50R	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2189A4	50R	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2197A1	NR	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2197A2	NR	M62 J25 - J30	
30/09/15 16:45:50	SIG	M62/2197A3	NR	M62 J25 - J30	
30/09/15 16:46:08	SIG	M62/2151J1	OFF	M62 J25 - J30	
30/09/15 16:46:09	SIG	M62/2151A1	OFF	M62 J25 - J30	
30/09/15 16:46:09	SIG	M62/2151A2	OFF	M62 J25 - J30	
30/09/15 16:46:09	SIG	M62/2151K1	OFF	M62 J25 - J30	
30/09/15 16:46:50	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 16:46:50	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 16:46:50	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 16:46:50	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 16:46:50	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 16:46:55	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 16:47:23	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:47:41	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:47:46	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:48:52	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 16:48:52	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 16:48:52	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 16:48:52	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 16:48:52	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 16:48:52	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2147B1	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2147B2	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2147B3	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2147B4	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2159B1	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2159B2	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2159M1	60R	M62 J25 - J30	
30/09/15 16:49:52	SIG	M62/2159M2	60R	M62 J25 - J30	
30/09/15 16:50:27	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:50:32	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:50:38	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2163A1	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2163A2	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2166K1	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2166K2	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2170A1	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2170A2	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2170K1	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2170K2	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2177A1	REDX	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2177A2	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2177A3	60R	M62 J25 - J30	
30/09/15 16:50:52	SIG	M62/2177A4	60R	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2183A2	60R	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2183A3	60R	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2183A4	60R	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2189A2	NR	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2189A3	NR	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2189A4	NR	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2197A1	NR	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2197A2	NR	M62 J25 - J30	
30/09/15 16:51:38	SIG	M62/2197A3	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2117A2	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2117A3	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2117A4	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2122K1	OFF	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2122K2	OFF	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2124A2	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2124A3	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2124A4	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2135A1	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2135A2	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2135A3	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2135A4	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2144A1	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2144A2	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2144J1	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2144K1	NR	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2157A1	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2157A2	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2157J1	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2157J2	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2157K1	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 16:51:52	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 16:52:41	SIG	M62/2197A1	50R	M62 J25 - J30	
30/09/15 16:52:41	SIG	M62/2197A2	50R	M62 J25 - J30	
30/09/15 16:52:41	SIG	M62/2197A3	50R	M62 J25 - J30	
30/09/15 16:52:46	SIG	M62/2189A2	50R	M62 J25 - J30	
30/09/15 16:52:46	SIG	M62/2189A3	50R	M62 J25 - J30	
30/09/15 16:52:46	SIG	M62/2189A4	50R	M62 J25 - J30	
30/09/15 16:52:46	SIG	M62/2197A1	40R	M62 J25 - J30	
30/09/15 16:52:46	SIG	M62/2197A2	40R	M62 J25 - J30	
30/09/15 16:52:46	SIG	M62/2197A3	40R	M62 J25 - J30	
30/09/15 16:52:51	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 16:52:51	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 16:53:09	SIG	M62/2088A1	60R	M62 J25 - J30	
30/09/15 16:53:14	SIG	M62/2079A1	60R	M62 J25 - J30	
30/09/15 16:53:32	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:53:33	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:53:37	SIG	M62/2163A1	50R	M62 J25 - J30	
30/09/15 16:53:37	SIG	M62/2163A2	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2170A1	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2170A2	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2170K1	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2170K2	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2177A2	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2177A3	50R	M62 J25 - J30	
30/09/15 16:53:38	SIG	M62/2177A4	50R	M62 J25 - J30	
30/09/15 16:53:39	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2166K1	50R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2166K2	50R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2170A1	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2170A2	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2170K1	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2170K2	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2177A2	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2177A3	40R	M62 J25 - J30	
30/09/15 16:53:43	SIG	M62/2177A4	40R	M62 J25 - J30	
30/09/15 16:53:57	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 16:53:57	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 16:54:58	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2147B1	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2147B2	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2147B3	50R	M62 J25 - J30	
30/09/15 16:55:08	SIG	M62/2147B4	50R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2124A1	BLNK	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2124A2	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2124A3	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2124A4	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2135A1	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2135A2	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2135A3	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2135A4	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2137B1	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2137B3	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2137B4	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2144A1	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2144A2	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2144J1	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2144K1	OFF	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2147B1	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2147B2	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2147B3	40R	M62 J25 - J30	
30/09/15 16:55:14	SIG	M62/2147B4	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 16:55:20	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 16:55:26	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 16:56:37	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:56:42	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2183A2	50R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2183A3	50R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2183A4	50R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2189A2	40R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2189A3	40R	M62 J25 - J30	
30/09/15 16:56:47	SIG	M62/2189A4	40R	M62 J25 - J30	
30/09/15 16:56:53	SIG	M62/2183A2	40R	M62 J25 - J30	
30/09/15 16:56:53	SIG	M62/2183A3	40R	M62 J25 - J30	
30/09/15 16:56:53	SIG	M62/2183A4	40R	M62 J25 - J30	
30/09/15 16:56:53	SIG	M62/2189A2	40R	M62 J25 - J30	
30/09/15 16:56:53	SIG	M62/2189A3	40R	M62 J25 - J30	
30/09/15 16:56:53	SIG	M62/2189A4	40R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2163A1	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2163A2	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2166K1	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2166K2	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2170A1	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2170A2	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2170K1	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2170K2	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2177A2	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2177A3	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2177A4	60R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2183A2	50R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2183A3	50R	M62 J25 - J30	
30/09/15 16:57:36	SIG	M62/2183A4	50R	M62 J25 - J30	
30/09/15 16:57:59	SIG	M62/2159B1	50R	M62 J25 - J30	
30/09/15 16:57:59	SIG	M62/2159B2	50R	M62 J25 - J30	
30/09/15 16:57:59	SIG	M62/2159M1	50R	M62 J25 - J30	
30/09/15 16:57:59	SIG	M62/2159M2	50R	M62 J25 - J30	
30/09/15 16:58:05	SIG	M62/2159B1	40R	M62 J25 - J30	
30/09/15 16:58:05	SIG	M62/2159B2	40R	M62 J25 - J30	
30/09/15 16:58:05	SIG	M62/2159M1	40R	M62 J25 - J30	
30/09/15 16:58:05	SIG	M62/2159M2	40R	M62 J25 - J30	
30/09/15 16:58:06	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:58:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:58:07	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:58:08	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 16:58:35	SIG	M62/2177A2	50R	M62 J25 - J30	
30/09/15 16:58:35	SIG	M62/2177A3	50R	M62 J25 - J30	
30/09/15 16:58:35	SIG	M62/2177A4	50R	M62 J25 - J30	
30/09/15 16:58:35	SIG	M62/2183A2	40R	M62 J25 - J30	
30/09/15 16:58:35	SIG	M62/2183A3	40R	M62 J25 - J30	
30/09/15 16:58:35	SIG	M62/2183A4	40R	M62 J25 - J30	
30/09/15 16:59:06	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 16:59:06	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 16:59:06	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 16:59:06	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 16:59:06	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 16:59:06	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 16:59:19	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 16:59:35	SIG	M62/2197A1	60R	M62 J25 - J30	
30/09/15 16:59:35	SIG	M62/2197A2	60R	M62 J25 - J30	
30/09/15 16:59:35	SIG	M62/2197A3	60R	M62 J25 - J30	
30/09/15 16:59:42	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 16:59:43	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 16:59:48	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 17:00:15	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 17:00:21	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 17:00:21	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 17:00:21	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 17:00:21	SIG	M62/2137B1	40R	M62 J25 - J30	
30/09/15 17:00:21	SIG	M62/2137B3	40R	M62 J25 - J30	
30/09/15 17:00:21	SIG	M62/2137B4	40R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2170A1	50R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2170A2	50R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2170K1	50R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2170K2	50R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2177A2	40R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2177A3	40R	M62 J25 - J30	
30/09/15 17:00:23	SIG	M62/2177A4	40R	M62 J25 - J30	
30/09/15 17:01:46	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2147B1	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2147B2	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2147B3	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2147B4	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2159B1	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2159B2	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2159M1	60R	M62 J25 - J30	
30/09/15 17:02:00	SIG	M62/2159M2	60R	M62 J25 - J30	
30/09/15 17:02:11	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:02:12	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:02:36	SIG	M62/2147B1	50R	M62 J25 - J30	
30/09/15 17:02:36	SIG	M62/2147B2	50R	M62 J25 - J30	
30/09/15 17:02:36	SIG	M62/2147B3	50R	M62 J25 - J30	
30/09/15 17:02:36	SIG	M62/2147B4	50R	M62 J25 - J30	
30/09/15 17:02:42	SIG	M62/2147B1	40R	M62 J25 - J30	
30/09/15 17:02:42	SIG	M62/2147B2	40R	M62 J25 - J30	
30/09/15 17:02:42	SIG	M62/2147B3	40R	M62 J25 - J30	
30/09/15 17:02:42	SIG	M62/2147B4	40R	M62 J25 - J30	
30/09/15 17:02:47	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:02:48	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:02:52	SIG	M62/2197A1	NR	M62 J25 - J30	
30/09/15 17:02:52	SIG	M62/2197A2	NR	M62 J25 - J30	
30/09/15 17:02:52	SIG	M62/2197A3	NR	M62 J25 - J30	
30/09/15 17:02:53	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:03:16	SIG	M62/2189A2	60R	M62 J25 - J30	
30/09/15 17:03:16	SIG	M62/2189A3	60R	M62 J25 - J30	
30/09/15 17:03:16	SIG	M62/2189A4	60R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 17:03:35	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 17:03:49	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2170A1	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2170A2	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2170K1	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2170K2	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2177A2	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2177A3	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2177A4	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2183A2	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2183A3	60R	M62 J25 - J30	
30/09/15 17:04:24	SIG	M62/2183A4	60R	M62 J25 - J30	
30/09/15 17:04:58	SIG	M62/2159B1	50R	M62 J25 - J30	
30/09/15 17:04:58	SIG	M62/2159B2	50R	M62 J25 - J30	
30/09/15 17:04:58	SIG	M62/2159M1	50R	M62 J25 - J30	
30/09/15 17:04:58	SIG	M62/2159M2	50R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2159B1	40R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2159B2	40R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2159M1	40R	M62 J25 - J30	
30/09/15 17:05:04	SIG	M62/2159M2	40R	M62 J25 - J30	
30/09/15 17:05:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:05:52	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:05:53	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:05:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:06:05	SIG	M62/2113B1	50R	M62 J25 - J30	
30/09/15 17:06:05	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 17:06:05	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 17:06:05	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 17:06:13	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 17:06:30	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 17:07:01	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 17:07:01	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 17:07:01	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 17:07:01	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 17:07:01	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 17:07:01	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 17:07:08	SIG	M62/2113B1	40R	M62 J25 - J30	
30/09/15 17:07:08	SIG	M62/2113B2	40R	M62 J25 - J30	
30/09/15 17:07:08	SIG	M62/2113B3	40R	M62 J25 - J30	
30/09/15 17:07:08	SIG	M62/2113B4	40R	M62 J25 - J30	
30/09/15 17:07:38	SIG	M62/2189A1	60R	M62 J25 - J30	
30/09/15 17:07:56	SIG	M62/2183A1	60R	M62 J25 - J30	
30/09/15 17:08:01	SIG	M62/2177A1	60R	M62 J25 - J30	
30/09/15 17:08:15	SIG	M62/2117B2	40R	M62 J25 - J30	
30/09/15 17:08:15	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 17:08:15	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 17:08:15	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 17:08:21	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:08:21	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 17:08:21	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 17:08:21	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 17:09:16	SIG	M62/2147B1	60R	M62 J25 - J30	
30/09/15 17:09:16	SIG	M62/2147B2	60R	M62 J25 - J30	
30/09/15 17:09:16	SIG	M62/2147B3	60R	M62 J25 - J30	
30/09/15 17:09:16	SIG	M62/2147B4	60R	M62 J25 - J30	
30/09/15 17:09:52	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 17:09:52	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 17:09:52	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 17:09:52	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 17:09:52	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 17:09:52	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 17:11:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:11:07	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:11:11	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 17:11:11	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 17:11:11	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 17:11:11	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 17:11:13	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 17:11:17	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 17:13:56	SIG	M62/2147B1	50R	M62 J25 - J30	
30/09/15 17:13:56	SIG	M62/2147B2	50R	M62 J25 - J30	
30/09/15 17:13:56	SIG	M62/2147B3	50R	M62 J25 - J30	
30/09/15 17:13:56	SIG	M62/2147B4	50R	M62 J25 - J30	
30/09/15 17:14:01	SIG	M62/2147B1	40R	M62 J25 - J30	
30/09/15 17:14:01	SIG	M62/2147B2	40R	M62 J25 - J30	
30/09/15 17:14:01	SIG	M62/2147B3	40R	M62 J25 - J30	
30/09/15 17:14:01	SIG	M62/2147B4	40R	M62 J25 - J30	
30/09/15 17:14:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:14:07	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:14:12	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:14:27	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 17:14:27	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 17:14:27	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 17:14:27	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 17:14:27	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2125L1	40R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2125L2	40R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 17:14:32	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 17:15:12	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 17:16:21	SIG	M621/1002A1	50R	M62 J25 - J30	
30/09/15 17:16:21	SIG	M621/1002A2	50R	M62 J25 - J30	
30/09/15 17:17:09	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:17:10	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:17:15	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 17:17:18	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 17:17:24	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 17:17:32	SIG	M62/2197A1	50R	M62 J25 - J30	
30/09/15 17:17:32	SIG	M62/2197A2	50R	M62 J25 - J30	
30/09/15 17:17:32	SIG	M62/2197A3	50R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2189A1	50R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2189A2	50R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2189A3	50R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2189A4	50R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2197A1	40R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2197A2	40R	M62 J25 - J30	
30/09/15 17:17:37	SIG	M62/2197A3	40R	M62 J25 - J30	
30/09/15 17:17:53	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 17:17:53	SIG	M62/2157A2	OFF	M62 J25 - J30	
30/09/15 17:17:53	SIG	M62/2157J1	OFF	M62 J25 - J30	
30/09/15 17:17:53	SIG	M62/2157J2	OFF	M62 J25 - J30	
30/09/15 17:17:53	SIG	M62/2157K1	OFF	M62 J25 - J30	
30/09/15 17:17:56	SIG	M62/2147B1	60R	M62 J25 - J30	
30/09/15 17:17:56	SIG	M62/2147B2	60R	M62 J25 - J30	
30/09/15 17:17:56	SIG	M62/2147B3	60R	M62 J25 - J30	
30/09/15 17:17:56	SIG	M62/2147B4	60R	M62 J25 - J30	
30/09/15 17:18:14	SIG	M62/2159B1	60R	M62 J25 - J30	
30/09/15 17:18:14	SIG	M62/2159B2	60R	M62 J25 - J30	
30/09/15 17:18:14	SIG	M62/2159M1	60R	M62 J25 - J30	
30/09/15 17:18:14	SIG	M62/2159M2	60R	M62 J25 - J30	
30/09/15 17:18:46	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 17:18:46	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 17:18:46	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 17:18:46	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 17:18:46	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 17:18:46	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 17:18:52	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 17:18:52	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 17:18:52	SIG	M62/2166K1	OFF	M62 J25 - J30	
30/09/15 17:18:52	SIG	M62/2166K2	OFF	M62 J25 - J30	
30/09/15 17:20:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:20:05	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:20:06	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:20:07	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:20:14	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:20:15	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:20:20	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2183A1	50R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2183A2	50R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2183A3	50R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2183A4	50R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2189A1	40R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2189A2	40R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2189A3	40R	M62 J25 - J30	
30/09/15 17:20:34	SIG	M62/2189A4	40R	M62 J25 - J30	
30/09/15 17:20:39	SIG	M62/2137B1	40R	M62 J25 - J30	
30/09/15 17:20:39	SIG	M62/2137B3	40R	M62 J25 - J30	
30/09/15 17:20:39	SIG	M62/2137B4	40R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2147B1	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2147B2	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2147B3	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2147B4	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2159B1	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2159B2	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2159M1	50R	M62 J25 - J30	
30/09/15 17:21:25	SIG	M62/2159M2	50R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2147B1	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2147B2	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2147B3	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2147B4	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2159B1	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2159B2	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2159M1	40R	M62 J25 - J30	
30/09/15 17:21:31	SIG	M62/2159M2	40R	M62 J25 - J30	
30/09/15 17:21:33	SIG	M62/2197A1	60R	M62 J25 - J30	
30/09/15 17:21:33	SIG	M62/2197A2	60R	M62 J25 - J30	
30/09/15 17:21:33	SIG	M62/2197A3	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2189B1	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2189B2	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2189B3	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2189B4	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2194B1	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2194B2	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2194B3	60R	M62 J25 - J30	
30/09/15 17:21:52	SIG	M62/2194B4	60R	M62 J25 - J30	
30/09/15 17:23:19	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:23:20	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2159B1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2159B2	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2159M1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2159M2	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 17:23:21	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 17:23:26	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2159B1	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2159B2	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2159M1	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2159M2	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2170B1	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2170B2	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2177B1	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2177B2	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2177L1	50R	M62 J25 - J30	
30/09/15 17:24:19	SIG	M62/2177L2	50R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2159B1	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2159B2	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2159M1	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2159M2	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2170B1	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2170B2	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2170L1	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2170L2	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2177B1	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2177B2	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2177L1	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2177L2	40R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 17:24:24	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2183A1	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2183A2	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2183A3	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2183A4	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2189A1	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2189A2	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2189A3	60R	M62 J25 - J30	
30/09/15 17:24:33	SIG	M62/2189A4	60R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2183A1	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2183A2	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2183A3	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2183A4	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2189A1	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2189A2	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2189A3	50R	M62 J25 - J30	
30/09/15 17:25:30	SIG	M62/2189A4	50R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2177A1	50R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2177A2	50R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2177A3	50R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2177A4	50R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2183A1	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2183A2	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2183A3	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2183A4	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2189A1	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2189A2	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2189A3	40R	M62 J25 - J30	
30/09/15 17:25:36	SIG	M62/2189A4	40R	M62 J25 - J30	
30/09/15 17:25:47	SIG	M62/2197A1	50R	M62 J25 - J30	
30/09/15 17:25:47	SIG	M62/2197A2	50R	M62 J25 - J30	
30/09/15 17:25:47	SIG	M62/2197A3	50R	M62 J25 - J30	
30/09/15 17:25:52	SIG	M62/2197A1	40R	M62 J25 - J30	
30/09/15 17:25:52	SIG	M62/2197A2	40R	M62 J25 - J30	
30/09/15 17:25:52	SIG	M62/2197A3	40R	M62 J25 - J30	
30/09/15 17:26:24	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:26:25	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:26:30	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:26:52	SIG	M62/2163A1	60R	M62 J25 - J30	
30/09/15 17:26:52	SIG	M62/2163A2	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2166K1	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2166K2	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2197B1	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2197B2	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2197B3	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2199M1	60R	M62 J25 - J30	
30/09/15 17:26:53	SIG	M62/2199M2	60R	M62 J25 - J30	
30/09/15 17:27:19	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:27:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:27:20	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:27:21	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2025B1	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 17:28:16	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2018B1	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2018B2	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2018B3	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2018L1	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2025B1	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2033B1	50R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 17:28:21	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 17:29:29	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2177A1	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2177A2	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2177A3	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2177A4	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2183A1	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2183A2	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2183A3	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2183A4	60R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2189A1	50R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2189A2	50R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2189A3	50R	M62 J25 - J30	
30/09/15 17:29:30	SIG	M62/2189A4	50R	M62 J25 - J30	
30/09/15 17:29:35	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2189A1	60R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2189A2	60R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2189A3	60R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2189A4	60R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2197A1	60R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2197A2	60R	M62 J25 - J30	
30/09/15 17:29:47	SIG	M62/2197A3	60R	M62 J25 - J30	
30/09/15 17:30:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:30:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:30:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:30:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2197A1	50R	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2197A2	50R	M62 J25 - J30	
30/09/15 17:32:15	SIG	M62/2197A3	50R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2189A1	50R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2189A2	50R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2189A3	50R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2189A4	50R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2197A1	40R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2197A2	40R	M62 J25 - J30	
30/09/15 17:32:21	SIG	M62/2197A3	40R	M62 J25 - J30	
30/09/15 17:32:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:32:34	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:32:39	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2025B1	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2025B2	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2025B3	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2025B4	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2033B1	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2033B2	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2033B3	60R	M62 J25 - J30	
30/09/15 17:33:25	SIG	M62/2033B4	60R	M62 J25 - J30	
30/09/15 17:33:27	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 17:35:13	SIG	M62/1968B1	50R	M62 J25 - J30	
30/09/15 17:35:13	SIG	M62/1968B2	50R	M62 J25 - J30	
30/09/15 17:35:13	SIG	M62/1968B3	50R	M62 J25 - J30	
30/09/15 17:35:13	SIG	M62/1968L1	50R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1960B1	60R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1960B2	60R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1960B3	60R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1960L1	NR	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1960L2	NR	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1968B1	40R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1968B2	40R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1968B3	40R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1968L1	40R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1974B1	50R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1974B2	50R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1974B3	50R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1974B4	50R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1974M1	50R	M62 J25 - J30	
30/09/15 17:35:18	SIG	M62/1974M2	50R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2170B1	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2170B2	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2170L1	50R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2170L2	50R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2177B1	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2177B2	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2177L1	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2177L2	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2183B1	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2183B2	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2183L1	60R	M62 J25 - J30	
30/09/15 17:35:36	SIG	M62/2183L2	60R	M62 J25 - J30	
30/09/15 17:35:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:35:38	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:35:44	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:35:53	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:35:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2189A1	60R	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2189A2	60R	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2189A3	60R	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2189A4	60R	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2197A1	60R	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2197A2	60R	M62 J25 - J30	
30/09/15 17:36:15	SIG	M62/2197A3	60R	M62 J25 - J30	
30/09/15 17:37:10	SIG	M62/2125L1	50R	M62 J25 - J30	
30/09/15 17:37:10	SIG	M62/2125L2	50R	M62 J25 - J30	
30/09/15 17:37:18	SIG	M621/1002A1	OFF	M62 J25 - J30	
30/09/15 17:37:18	SIG	M621/1002A2	OFF	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 17:37:36	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 17:38:39	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:38:40	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:39:44	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:39:45	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:39:45	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:39:46	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2117B2	40R	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 17:40:15	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 17:40:20	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:40:20	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 17:40:20	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 17:40:20	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 17:40:53	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 17:40:53	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 17:40:53	SIG	M62/2166K1	OFF	M62 J25 - J30	
30/09/15 17:40:53	SIG	M62/2166K2	OFF	M62 J25 - J30	
30/09/15 17:41:53	SIG	M62/2125L1	60R	M62 J25 - J30	
30/09/15 17:41:53	SIG	M62/2125L2	60R	M62 J25 - J30	
30/09/15 17:42:50	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:42:51	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:42:56	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M606/2003B1	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M606/2003B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1981B1	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1981B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1981B3	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1981B4	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1987B1	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1987B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1987B3	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1987B4	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1992B1	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1992B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1992B3	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1992B4	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1999B1	REDX	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1999B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1999B3	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/1999B4	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2004B1	REDX	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2004B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2004B3	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2004B4	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2005M1	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2005M2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2012B2	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2012B3	60R	M62 J25 - J30	
30/09/15 17:43:53	SIG	M62/2012B4	60R	M62 J25 - J30	
30/09/15 17:44:53	SIG	M62/2197B1	OFF	M62 J25 - J30	
30/09/15 17:44:53	SIG	M62/2197B2	OFF	M62 J25 - J30	
30/09/15 17:44:53	SIG	M62/2197B3	OFF	M62 J25 - J30	
30/09/15 17:44:53	SIG	M62/2199M1	OFF	M62 J25 - J30	
30/09/15 17:44:53	SIG	M62/2199M2	OFF	M62 J25 - J30	
30/09/15 17:45:55	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:45:56	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:46:02	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1968B1	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1968B2	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1968B3	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1968L1	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1974B1	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1974B2	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1974B3	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1974B4	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1974M1	60R	M62 J25 - J30	
30/09/15 17:46:09	SIG	M62/1974M2	60R	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2183B1	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2183B2	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2183L1	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2183L2	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2189B1	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2189B2	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2189B3	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2189B4	NR	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2194B1	OFF	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2194B2	OFF	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2194B3	OFF	M62 J25 - J30	
30/09/15 17:47:53	SIG	M62/2194B4	OFF	M62 J25 - J30	
30/09/15 17:49:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:49:06	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:49:11	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 17:49:17	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 17:49:53	SIG	M62/2197A1	NR	M62 J25 - J30	
30/09/15 17:49:53	SIG	M62/2197A2	NR	M62 J25 - J30	
30/09/15 17:49:53	SIG	M62/2197A3	NR	M62 J25 - J30	
30/09/15 17:50:53	SIG	M62/2189B1	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2183B1	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2183L1	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2183L2	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2189B2	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2189B3	OFF	M62 J25 - J30	
30/09/15 17:50:54	SIG	M62/2189B4	OFF	M62 J25 - J30	
30/09/15 17:52:04	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 17:52:05	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:52:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:52:06	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:52:07	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 17:53:53	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 17:53:53	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1992B1	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1992B2	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1992B3	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1992B4	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1999B2	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1999B3	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/1999B4	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2004B2	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2004B3	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2004B4	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 17:53:53	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1960B1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1960B2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1960B3	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1960L1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1960L2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1968B1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1968B2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1968B3	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1968L1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1974B1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1974B2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1974B3	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1974B4	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1974M1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1974M2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 17:55:53	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 17:56:18	SIG	M62/2159B1	50R	M62 J25 - J30	
30/09/15 17:56:18	SIG	M62/2159B2	50R	M62 J25 - J30	
30/09/15 17:56:18	SIG	M62/2159M1	50R	M62 J25 - J30	
30/09/15 17:56:18	SIG	M62/2159M2	50R	M62 J25 - J30	
30/09/15 17:56:53	SIG	M62/1999B2	OFF	M62 J25 - J30	
30/09/15 17:56:53	SIG	M62/2004B2	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1999B1	BLNK	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1999B3	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/1999B4	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/2004B1	BLNK	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/2004B3	OFF	M62 J25 - J30	
30/09/15 17:56:54	SIG	M62/2004B4	OFF	M62 J25 - J30	
30/09/15 17:57:16	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2004B1	REDX	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2004B2	60R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2004B3	60R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2004B4	60R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2012B2	60R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2012B3	60R	M62 J25 - J30	
30/09/15 17:57:16	SIG	M62/2012B4	60R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1987B1	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1987B2	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1987B3	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1987B4	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 17:57:17	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1992B1	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1999B1	REDX	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 17:57:22	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 17:58:39	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1999B2	NR	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1999B3	NR	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/1999B4	NR	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2004B1	BLNK	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2004B2	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2004B3	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2004B4	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 17:58:39	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2117B2	40R	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2125B1	40R	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2125B2	40R	M62 J25 - J30	
30/09/15 17:59:22	SIG	M62/2125B3	40R	M62 J25 - J30	
30/09/15 17:59:28	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 17:59:28	SIG	M62/2117B3	40R	M62 J25 - J30	
30/09/15 17:59:28	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 17:59:28	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1987B1	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1987B2	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1987B3	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1987B4	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2004B1	REDX	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2004B2	60R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2004B3	60R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2004B4	60R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2012B2	60R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2012B3	60R	M62 J25 - J30	
30/09/15 17:59:41	SIG	M62/2012B4	60R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1987B1	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1987B2	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1987B3	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1987B4	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1992B1	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 17:59:46	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 18:00:23	SIG	M62/2137B2	50R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M606/2003B1	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M606/2003B2	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1987B1	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1987B2	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1987B3	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1987B4	NR	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1992B1	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1992B2	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1992B3	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1992B4	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1999B2	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1999B3	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/1999B4	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/2005M1	60R	M62 J25 - J30	
30/09/15 18:01:16	SIG	M62/2005M2	60R	M62 J25 - J30	
30/09/15 18:02:22	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:02:22	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 18:02:28	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2147B1	50R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2147B2	50R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2147B3	50R	M62 J25 - J30	
30/09/15 18:03:41	SIG	M62/2147B4	50R	M62 J25 - J30	
30/09/15 18:04:16	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 18:04:16	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 18:04:16	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 18:04:16	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 18:05:28	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:05:30	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 18:05:35	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 18:08:23	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 18:08:23	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 18:08:23	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 18:08:23	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 18:08:23	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 18:08:23	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 18:08:33	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 18:08:33	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:08:38	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 18:08:38	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 18:08:38	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 18:08:39	SIG	M62/2117B1	50R	M62 J25 - J30	
30/09/15 18:08:39	SIG	M62/2117B1	40R	M62 J25 - J30	
30/09/15 18:08:39	SIG	M62/2117B3	50R	M62 J25 - J30	
30/09/15 18:08:39	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 18:08:39	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 18:11:36	SIG	M606/2003B1	LDR	M62 J25 - J30	
30/09/15 18:11:36	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 18:11:36	SIG	M62/1992B1	50R	M62 J25 - J30	
30/09/15 18:11:36	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 18:11:36	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 18:11:36	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 18:11:36	SIG	M62/2005M1	TI	M62 J25 - J30	
30/09/15 18:11:36	SIG	M62/2005M2	TI	M62 J25 - J30	
30/09/15 18:11:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:11:38	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:11:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:11:39	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:11:42	SIG	M62/1992B1	40R	M62 J25 - J30	
30/09/15 18:11:42	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 18:11:42	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 18:11:42	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 18:11:47	SIG	M62/1992B1	30R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1992B1	20R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1992B2	40R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1992B3	40R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1992B4	40R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 18:11:52	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 18:11:58	SIG	M62/1992B1	STOP	M62 J25 - J30	
30/09/15 18:12:03	SIG	M62/1960B1	50R	M62 J25 - J30	
30/09/15 18:12:03	SIG	M62/1960B2	50R	M62 J25 - J30	
30/09/15 18:12:03	SIG	M62/1960B3	50R	M62 J25 - J30	
30/09/15 18:12:09	SIG	M62/2113B1	50R	M62 J25 - J30	
30/09/15 18:12:09	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 18:12:09	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 18:12:09	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 18:14:33	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 18:14:33	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 18:14:33	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 18:15:09	SIG	M62/2113B1	40R	M62 J25 - J30	
30/09/15 18:15:09	SIG	M62/2113B2	40R	M62 J25 - J30	
30/09/15 18:15:09	SIG	M62/2113B3	40R	M62 J25 - J30	
30/09/15 18:15:09	SIG	M62/2113B4	40R	M62 J25 - J30	
30/09/15 18:15:53	SIG	M62/2159B1	60R	M62 J25 - J30	
30/09/15 18:15:53	SIG	M62/2159B2	60R	M62 J25 - J30	
30/09/15 18:15:53	SIG	M62/2159M1	60R	M62 J25 - J30	
30/09/15 18:15:53	SIG	M62/2159M2	60R	M62 J25 - J30	
30/09/15 18:16:31	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 18:16:31	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 18:16:31	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 18:17:54	SIG	M62/2177B1	OFF	M62 J25 - J30	
30/09/15 18:17:54	SIG	M62/2177B2	OFF	M62 J25 - J30	
30/09/15 18:17:54	SIG	M62/2177L1	OFF	M62 J25 - J30	
30/09/15 18:17:54	SIG	M62/2177L2	OFF	M62 J25 - J30	
30/09/15 18:18:31	SIG	M62/2079A1	HSD	M62 J25 - J30	
30/09/15 18:18:53	SIG	M62/2147B1	60R	M62 J25 - J30	
30/09/15 18:18:53	SIG	M62/2147B2	60R	M62 J25 - J30	
30/09/15 18:18:53	SIG	M62/2147B3	60R	M62 J25 - J30	
30/09/15 18:18:53	SIG	M62/2147B4	60R	M62 J25 - J30	
30/09/15 18:19:24	SIG	M62/2113B1	50R	M62 J25 - J30	
30/09/15 18:19:24	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 18:19:24	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 18:19:24	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 18:19:39	SIG	M62/2088A1	HSD	M62 J25 - J30	
30/09/15 18:20:47	SIG	M62/2079A1	REDX	M62 J25 - J30	
30/09/15 18:20:47	SIG	M62/2097A1	HSD	M62 J25 - J30	
30/09/15 18:21:20	SIG	M62/1960L1	60R	M62 J25 - J30	
30/09/15 18:21:20	SIG	M62/1960L2	60R	M62 J25 - J30	
30/09/15 18:21:55	SIG	M62/2088A1	REDX	M62 J25 - J30	
30/09/15 18:21:55	SIG	M62/2106A1	HSD	M62 J25 - J30	
30/09/15 18:23:03	SIG	M62/2097A1	REDX	M62 J25 - J30	
30/09/15 18:23:49	SIG	M62/2113B1	40R	M62 J25 - J30	
30/09/15 18:23:49	SIG	M62/2113B2	40R	M62 J25 - J30	
30/09/15 18:23:49	SIG	M62/2113B3	40R	M62 J25 - J30	
30/09/15 18:23:49	SIG	M62/2113B4	40R	M62 J25 - J30	
30/09/15 18:24:11	SIG	M62/2106A1	REDX	M62 J25 - J30	
30/09/15 18:25:11	SIG	M62/2065A2	NR	M62 J25 - J30	
30/09/15 18:25:11	SIG	M62/2065A3	NR	M62 J25 - J30	
30/09/15 18:25:11	SIG	M62/2065A4	NR	M62 J25 - J30	
30/09/15 18:25:20	SIG	M62/1960L1	OFF	M62 J25 - J30	
30/09/15 18:25:20	SIG	M62/1960L2	OFF	M62 J25 - J30	
30/09/15 18:25:29	SIG	M62/2074A2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2073K1	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2073K2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2079A2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2079A3	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2079A4	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2088A2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2088A3	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2088A4	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2097A2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2097A3	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2097A4	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2106A2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2106A3	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2106A4	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2114A1	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2114A2	NR	M62 J25 - J30	
30/09/15 18:25:39	SIG	M62/2114A3	NR	M62 J25 - J30	
30/09/15 18:25:50	SIG	M606/2003B2	40R	M62 J25 - J30	
30/09/15 18:25:50	SIG	M62/1999B2	40R	M62 J25 - J30	
30/09/15 18:25:50	SIG	M62/1999B3	40R	M62 J25 - J30	
30/09/15 18:25:50	SIG	M62/1999B4	40R	M62 J25 - J30	
30/09/15 18:25:50	SIG	M62/2004B2	50R	M62 J25 - J30	
30/09/15 18:25:50	SIG	M62/2004B3	50R	M62 J25 - J30	
30/09/15 18:25:50	SIG	M62/2004B4	50R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M606/2003B2	40R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M62/2004B2	40R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M62/2004B3	40R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M62/2004B4	40R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M62/2012B2	50R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M62/2012B3	50R	M62 J25 - J30	
30/09/15 18:25:56	SIG	M62/2012B4	50R	M62 J25 - J30	
30/09/15 18:26:11	SIG	M62/2073K1	OFF	M62 J25 - J30	
30/09/15 18:26:11	SIG	M62/2073K2	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2074A2	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2079A1	BLNK	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2079A2	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2079A3	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2079A4	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2088A1	BLNK	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2088A2	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2088A3	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2088A4	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2097A1	BLNK	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2097A2	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2097A3	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2097A4	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2106A1	BLNK	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2106A2	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2106A3	OFF	M62 J25 - J30	
30/09/15 18:26:29	SIG	M62/2106A4	OFF	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2114A1	OFF	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2114A2	OFF	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2114A3	OFF	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2117A1	BLNK	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2117A2	OFF	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2117A3	OFF	M62 J25 - J30	
30/09/15 18:26:39	SIG	M62/2117A4	OFF	M62 J25 - J30	
30/09/15 18:27:49	SIG	M62/2113B1	50R	M62 J25 - J30	
30/09/15 18:27:49	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 18:27:49	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 18:27:49	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 18:28:52	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 18:29:51	SIG	M62/2004B2	50R	M62 J25 - J30	
30/09/15 18:29:51	SIG	M62/2004B3	50R	M62 J25 - J30	
30/09/15 18:29:51	SIG	M62/2004B4	50R	M62 J25 - J30	
30/09/15 18:29:51	SIG	M62/2012B2	60R	M62 J25 - J30	
30/09/15 18:29:51	SIG	M62/2012B3	60R	M62 J25 - J30	
30/09/15 18:29:51	SIG	M62/2012B4	60R	M62 J25 - J30	
30/09/15 18:30:21	SIG	M62/2004B2	40R	M62 J25 - J30	
30/09/15 18:30:21	SIG	M62/2004B3	40R	M62 J25 - J30	
30/09/15 18:30:21	SIG	M62/2004B4	40R	M62 J25 - J30	
30/09/15 18:30:21	SIG	M62/2012B2	50R	M62 J25 - J30	
30/09/15 18:30:21	SIG	M62/2012B3	50R	M62 J25 - J30	
30/09/15 18:30:21	SIG	M62/2012B4	50R	M62 J25 - J30	
30/09/15 18:30:49	SIG	M62/2132B1	50R	M62 J25 - J30	
30/09/15 18:30:49	SIG	M62/2132B2	50R	M62 J25 - J30	
30/09/15 18:30:49	SIG	M62/2132B3	50R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2125B1	50R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2125B2	50R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2125B3	50R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2132B1	40R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2132B2	40R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2132B3	40R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2137B1	50R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2137B3	50R	M62 J25 - J30	
30/09/15 18:30:54	SIG	M62/2137B4	50R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2125B1	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2125B2	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2125B3	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2132B1	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2132B2	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2132B3	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2137B1	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2137B3	60R	M62 J25 - J30	
30/09/15 18:34:39	SIG	M62/2137B4	60R	M62 J25 - J30	
30/09/15 18:34:47	SIG	M62/2177A1	HSD	M62 J25 - J30	
30/09/15 18:35:32	SIG	M62/2183A1	HSD	M62 J25 - J30	
30/09/15 18:35:58	SIG	M62/2106B1	50R	M62 J25 - J30	
30/09/15 18:35:58	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 18:35:58	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 18:35:58	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 18:36:17	SIG	M62/2189A1	HSD	M62 J25 - J30	
30/09/15 18:36:18	SIG	M62/2177A1	REDX	M62 J25 - J30	
30/09/15 18:37:17	SIG	M62/2183A1	REDX	M62 J25 - J30	
30/09/15 18:38:17	SIG	M62/2189A1	REDX	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2012B2	40R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2012B3	40R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2012B4	40R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2018B1	50R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2018B2	50R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2018B3	50R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2018L1	50R	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2170A1	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2170A2	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2170K1	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2170K2	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2177A2	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2177A3	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2177A4	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2183A2	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2183A3	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2183A4	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2189A2	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2189A3	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2189A4	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2197A1	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2197A2	NR	M62 J25 - J30	
30/09/15 18:38:18	SIG	M62/2197A3	NR	M62 J25 - J30	
30/09/15 18:39:17	SIG	M62/2170K1	OFF	M62 J25 - J30	
30/09/15 18:39:17	SIG	M62/2170K2	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2170A1	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2170A2	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2177A1	BLNK	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2177A2	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2177A3	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2177A4	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2183A1	BLNK	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2183A2	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2183A3	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2183A4	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2189A1	BLNK	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2189A2	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2189A3	OFF	M62 J25 - J30	
30/09/15 18:39:18	SIG	M62/2189A4	OFF	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1987B1	60R	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1987B2	60R	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1987B3	60R	M62 J25 - J30	
30/09/15 18:39:54	SIG	M62/1987B4	60R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M62/1992B1	60R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M62/1992B2	60R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M62/1992B3	60R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M62/1992B4	60R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 18:39:56	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 18:40:01	SIG	M606/2003B1	40R	M62 J25 - J30	
30/09/15 18:40:01	SIG	M62/2005M1	40R	M62 J25 - J30	
30/09/15 18:40:01	SIG	M62/2005M2	40R	M62 J25 - J30	
30/09/15 18:41:18	SIG	M62/2197A1	OFF	M62 J25 - J30	
30/09/15 18:41:18	SIG	M62/2197A2	OFF	M62 J25 - J30	
30/09/15 18:41:18	SIG	M62/2197A3	OFF	M62 J25 - J30	
30/09/15 18:41:32	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 18:41:32	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 18:41:32	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 18:41:32	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 18:41:32	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 18:41:32	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 18:41:32	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2004B2	50R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2004B3	50R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2004B4	50R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2012B2	60R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2012B3	60R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2012B4	60R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2018B1	60R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2018B2	60R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2018B3	60R	M62 J25 - J30	
30/09/15 18:42:19	SIG	M62/2018L1	60R	M62 J25 - J30	
30/09/15 18:42:52	SIG	M62/1960B1	OFF	M62 J25 - J30	
30/09/15 18:42:52	SIG	M62/1960B2	OFF	M62 J25 - J30	
30/09/15 18:42:52	SIG	M62/1960B3	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2117B1	60R	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2117B3	60R	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2120M1	60R	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2120M2	60R	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2137B1	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2137B3	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2137B4	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2147B1	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2147B2	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2147B3	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2147B4	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2159B1	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2159B2	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2159M1	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2159M2	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2170B1	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2170B2	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2170L1	OFF	M62 J25 - J30	
30/09/15 18:43:54	SIG	M62/2170L2	OFF	M62 J25 - J30	
30/09/15 18:44:52	SIG	M62/2097B1	50R	M62 J25 - J30	
30/09/15 18:44:52	SIG	M62/2097B2	50R	M62 J25 - J30	
30/09/15 18:44:52	SIG	M62/2097B4	50R	M62 J25 - J30	
30/09/15 18:45:54	SIG	M62/2132B1	OFF	M62 J25 - J30	
30/09/15 18:45:54	SIG	M62/2132B2	OFF	M62 J25 - J30	
30/09/15 18:45:54	SIG	M62/2132B3	OFF	M62 J25 - J30	
30/09/15 18:46:36	SIG	M62/2117B1	???	M62 J25 - J30	
30/09/15 18:46:37	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 18:46:53	SIG	M62/2088B1	50R	M62 J25 - J30	
30/09/15 18:46:53	SIG	M62/2088B2	50R	M62 J25 - J30	
30/09/15 18:46:53	SIG	M62/2088B3	50R	M62 J25 - J30	
30/09/15 18:46:53	SIG	M62/2088B4	50R	M62 J25 - J30	
30/09/15 18:48:27	SIG	M62/2081B1	50R	M62 J25 - J30	
30/09/15 18:48:27	SIG	M62/2081B2	50R	M62 J25 - J30	
30/09/15 18:48:27	SIG	M62/2081B3	50R	M62 J25 - J30	
30/09/15 18:48:27	SIG	M62/2081L1	50R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M606/2003B1	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M606/2003B2	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/1999B2	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/1999B3	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/1999B4	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/2004B2	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/2004B3	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/2004B4	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/2005M1	60R	M62 J25 - J30	
30/09/15 18:48:54	SIG	M62/2005M2	60R	M62 J25 - J30	
30/09/15 18:49:54	SIG	M62/2113B1	60R	M62 J25 - J30	
30/09/15 18:49:54	SIG	M62/2113B2	60R	M62 J25 - J30	
30/09/15 18:49:54	SIG	M62/2113B3	60R	M62 J25 - J30	
30/09/15 18:49:54	SIG	M62/2113B4	60R	M62 J25 - J30	
30/09/15 18:53:54	SIG	M62/2106B1	60R	M62 J25 - J30	
30/09/15 18:53:54	SIG	M62/2106B2	60R	M62 J25 - J30	
30/09/15 18:53:54	SIG	M62/2106B3	60R	M62 J25 - J30	
30/09/15 18:53:54	SIG	M62/2106B4	60R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M62/2065B2	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M62/2065B3	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M62/2065B4	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M62/2065M1	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M62/2069M1	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M62/2069M2	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M621/1002B1	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M621/1002B2	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M621/1010B1	50R	M62 J25 - J30	
30/09/15 18:54:51	SIG	M621/1010B2	50R	M62 J25 - J30	
30/09/15 18:54:53	SIG	M62/2074B2	50R	M62 J25 - J30	
30/09/15 18:54:53	SIG	M62/2074B3	50R	M62 J25 - J30	
30/09/15 18:54:53	SIG	M62/2074B4	50R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2081B1	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2081B2	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2081B3	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2081L1	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2088B1	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2088B2	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2088B3	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2088B4	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2097B1	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2097B2	60R	M62 J25 - J30	
30/09/15 18:58:04	SIG	M62/2097B4	60R	M62 J25 - J30	
30/09/15 18:58:52	SIG	M62/2113B1	HSD	M62 J25 - J30	
30/09/15 18:59:45	SIG	M62/2106B1	HSD	M62 J25 - J30	
30/09/15 19:00:53	SIG	M62/2097B1	HSD	M62 J25 - J30	
30/09/15 19:00:53	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2065B2	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2065B3	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2065B4	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2065M1	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2069M1	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2069M2	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2074B2	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2074B3	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M62/2074B4	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M621/1002B1	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M621/1002B2	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 19:01:54	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 19:02:01	SIG	M62/2088B1	HSD	M62 J25 - J30	
30/09/15 19:02:01	SIG	M62/2106B1	REDX	M62 J25 - J30	
30/09/15 19:03:09	SIG	M62/2097B1	REDX	M62 J25 - J30	
30/09/15 19:03:54	SIG	M62/2125B1	OFF	M62 J25 - J30	
30/09/15 19:03:54	SIG	M62/2125B2	OFF	M62 J25 - J30	
30/09/15 19:03:54	SIG	M62/2125B3	OFF	M62 J25 - J30	
30/09/15 19:03:54	SIG	M62/2125L1	NR	M62 J25 - J30	
30/09/15 19:03:54	SIG	M62/2125L2	NR	M62 J25 - J30	
30/09/15 19:04:17	SIG	M62/2088B1	REDX	M62 J25 - J30	
30/09/15 19:04:54	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 19:05:10	SIG	M62/2117B1	NR	M62 J25 - J30	
30/09/15 19:05:10	SIG	M62/2117B3	NR	M62 J25 - J30	
30/09/15 19:05:11	SIG	M62/2113B2	NR	M62 J25 - J30	
30/09/15 19:05:11	SIG	M62/2113B3	NR	M62 J25 - J30	
30/09/15 19:05:11	SIG	M62/2113B4	NR	M62 J25 - J30	
30/09/15 19:05:11	SIG	M62/2120M1	NR	M62 J25 - J30	
30/09/15 19:05:11	SIG	M62/2120M2	NR	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2113B1	BLNK	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2113B2	OFF	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2113B3	OFF	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2113B4	OFF	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2117B3	OFF	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2120M1	OFF	M62 J25 - J30	
30/09/15 19:06:11	SIG	M62/2120M2	OFF	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1981B1	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1981B2	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1981B3	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1981B4	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1987B1	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1987B2	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1987B3	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/1987B4	NR	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/2125L1	OFF	M62 J25 - J30	
30/09/15 19:06:55	SIG	M62/2125L2	OFF	M62 J25 - J30	
30/09/15 19:07:54	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2088B2	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2088B3	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2088B4	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2097B2	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2097B4	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2106B2	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2106B3	NR	M62 J25 - J30	
30/09/15 19:09:04	SIG	M62/2106B4	NR	M62 J25 - J30	
30/09/15 19:09:11	SIG	M62/2025A1	HSD	M62 J25 - J30	
30/09/15 19:09:54	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2004B1	BLNK	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2004B2	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2004B3	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2004B4	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 19:09:54	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1999B1	BLNK	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1999B2	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1999B3	OFF	M62 J25 - J30	
30/09/15 19:09:55	SIG	M62/1999B4	OFF	M62 J25 - J30	
30/09/15 19:10:11	SIG	M62/2033A1	HSD	M62 J25 - J30	
30/09/15 19:10:54	SIG	M62/2081B1	OFF	M62 J25 - J30	
30/09/15 19:10:54	SIG	M62/2081B2	OFF	M62 J25 - J30	
30/09/15 19:10:54	SIG	M62/2081B3	OFF	M62 J25 - J30	
30/09/15 19:10:54	SIG	M62/2081L1	OFF	M62 J25 - J30	
30/09/15 19:11:11	SIG	M62/2018A1	HSD	M62 J25 - J30	
30/09/15 19:11:11	SIG	M62/2025A1	REDX	M62 J25 - J30	
30/09/15 19:11:11	SIG	M62/2041A1	HSD	M62 J25 - J30	
30/09/15 19:12:04	SIG	M62/2097B2	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2088B2	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2088B3	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2088B4	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2097B4	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2106B2	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2106B3	OFF	M62 J25 - J30	
30/09/15 19:12:14	SIG	M62/2106B4	OFF	M62 J25 - J30	
30/09/15 19:12:15	SIG	M62/2088B1	BLNK	M62 J25 - J30	
30/09/15 19:12:15	SIG	M62/2097B1	BLNK	M62 J25 - J30	
30/09/15 19:12:15	SIG	M62/2106B1	BLNK	M62 J25 - J30	
30/09/15 19:12:18	SIG	M62/2033A1	REDX	M62 J25 - J30	
30/09/15 19:12:18	SIG	M62/2050A1	HSD	M62 J25 - J30	
30/09/15 19:12:55	SIG	M62/2074B1	BLNK	M62 J25 - J30	
30/09/15 19:12:55	SIG	M62/2074B2	OFF	M62 J25 - J30	
30/09/15 19:12:55	SIG	M62/2074B3	OFF	M62 J25 - J30	
30/09/15 19:12:55	SIG	M62/2074B4	OFF	M62 J25 - J30	
30/09/15 19:12:55	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 19:12:55	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 19:13:10	SIG	M62/2041A1	REDX	M62 J25 - J30	
30/09/15 19:13:23	SIG	M606/2003B1	NR	M62 J25 - J30	
30/09/15 19:13:23	SIG	M606/2003B2	NR	M62 J25 - J30	
30/09/15 19:14:10	SIG	M62/2050A1	REDX	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2025A2	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2025A3	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2025A4	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2033A2	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2033A3	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2033A4	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2041A2	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2041A3	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2041A4	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2050A2	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2050A3	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2050A4	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2057A1	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2057A2	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2057A3	NR	M62 J25 - J30	
30/09/15 19:15:11	SIG	M62/2057J1	NR	M62 J25 - J30	
30/09/15 19:15:48	SIG	M62/1974B1	50R	M62 J25 - J30	
30/09/15 19:15:48	SIG	M62/1974B2	50R	M62 J25 - J30	
30/09/15 19:15:48	SIG	M62/1974B3	50R	M62 J25 - J30	
30/09/15 19:15:48	SIG	M62/1974B4	50R	M62 J25 - J30	
30/09/15 19:15:48	SIG	M62/1974M1	50R	M62 J25 - J30	
30/09/15 19:15:48	SIG	M62/1974M2	50R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1968B1	NR	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1968B2	NR	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1968B3	NR	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1968L1	NR	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1974B1	40R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1974B2	40R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1974B3	40R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1974B4	40R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1974M1	40R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1974M2	40R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1981B1	50R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1981B2	50R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1981B3	50R	M62 J25 - J30	
30/09/15 19:15:54	SIG	M62/1981B4	50R	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2008K1	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2008K2	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2012A1	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2012A2	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2012A3	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2018A1	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2018A2	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2018A3	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2018A4	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2025A1	BLNK	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2025A2	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2025A3	OFF	M62 J25 - J30	
30/09/15 19:16:11	SIG	M62/2025A4	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2033A1	BLNK	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2033A2	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2033A3	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2033A4	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2041A1	BLNK	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2041A2	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2041A3	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2041A4	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2050A1	BLNK	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2050A2	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2050A3	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2050A4	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2057A1	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2057A2	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2057A3	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2057J1	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2065A1	BLNK	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2065A2	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2065A3	OFF	M62 J25 - J30	
30/09/15 19:16:12	SIG	M62/2065A4	OFF	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1968B1	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1968B2	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1968B3	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1968L1	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1974B1	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1974B2	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1974B3	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1974B4	NR	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1974M1	OFF	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1974M2	OFF	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1981B1	OFF	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1981B2	OFF	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1981B3	OFF	M62 J25 - J30	
30/09/15 19:19:48	SIG	M62/1981B4	OFF	M62 J25 - J30	
30/09/15 19:22:48	SIG	M62/1974B1	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1968B1	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1968B2	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1968B3	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1968L1	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1974B2	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1974B3	OFF	M62 J25 - J30	
30/09/15 19:22:49	SIG	M62/1974B4	OFF	M62 J25 - J30	
30/09/15 19:24:45	SIG	M62/2057B1	HSD	M62 J25 - J30	
30/09/15 19:26:44	SIG	M62/2041B1	HSD	M62 J25 - J30	
30/09/15 19:26:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
30/09/15 19:26:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
30/09/15 19:26:44	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 19:26:44	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 19:27:44	SIG	M62/2033B1	HSD	M62 J25 - J30	
30/09/15 19:28:44	SIG	M62/2025B1	HSD	M62 J25 - J30	
30/09/15 19:28:44	SIG	M62/2041B1	REDX	M62 J25 - J30	
30/09/15 19:29:36	SIG	M62/2033B1	REDX	M62 J25 - J30	
30/09/15 19:30:20	SIG	M62/2025B1	REDX	M62 J25 - J30	
30/09/15 19:30:50	SIG	M62/2065B2	NR	M62 J25 - J30	
30/09/15 19:30:50	SIG	M62/2065B3	NR	M62 J25 - J30	
30/09/15 19:30:50	SIG	M62/2065B4	NR	M62 J25 - J30	
30/09/15 19:30:51	SIG	M62/2057B2	NR	M62 J25 - J30	
30/09/15 19:30:51	SIG	M62/2057B3	NR	M62 J25 - J30	
30/09/15 19:30:51	SIG	M62/2057B4	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2018B1	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2018B2	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2018B3	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2018L1	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2025B2	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2025B3	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2025B4	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2033B2	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2033B3	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2033B4	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2041B2	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2041B3	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2041B4	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2050B2	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2050B3	NR	M62 J25 - J30	
30/09/15 19:30:52	SIG	M62/2050B4	NR	M62 J25 - J30	
30/09/15 19:31:50	SIG	M62/2069M1	OFF	M62 J25 - J30	
30/09/15 19:31:50	SIG	M62/2069M2	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2041B1	BLNK	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2041B2	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2041B3	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2041B4	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2050B2	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2050B3	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2050B4	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2057B1	BLNK	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2057B2	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2057B3	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2057B4	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2065B1	BLNK	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2065B2	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2065B3	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2065B4	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M62/2065M1	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M621/1002B1	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M621/1002B2	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 19:31:51	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2012B1	BLNK	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2012B2	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2012B3	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2012B4	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2018B1	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2018B2	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2018B3	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2018L1	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2025B1	BLNK	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2025B2	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2025B3	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2025B4	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2033B1	BLNK	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2033B2	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 19:31:52	SIG	M62/2033B4	OFF	M62 J25 - J30	
30/09/15 19:38:06	SIG	M606/2003B1	NR	M62 J25 - J30	
30/09/15 19:38:06	SIG	M606/2003B2	NR	M62 J25 - J30	
30/09/15 19:38:33	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1987B1	NR	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1987B2	NR	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1987B3	NR	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1987B4	NR	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1992B1	LDR	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1992B2	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1992B3	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1992B4	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1999B1	REDX	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1999B2	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1999B3	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/1999B4	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 19:38:33	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 19:39:45	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 19:39:45	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1987B1	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1987B2	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1987B3	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1987B4	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1992B1	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1992B2	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1992B3	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1992B4	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1999B2	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1999B3	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/1999B4	NR	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 19:39:45	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1987B1	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1987B2	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1987B3	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1987B4	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1999B1	BLNK	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1999B2	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1999B3	OFF	M62 J25 - J30	
30/09/15 19:42:46	SIG	M62/1999B4	OFF	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2050B2	NR	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2050B3	NR	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2050B4	NR	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2057B1	REDX	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2057B2	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2057B3	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2057B4	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2065B1	REDX	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2065B2	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2065B3	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2065B4	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2065M1	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2074B1	REDX	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2074B2	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2074B3	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2074B4	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2081B1	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2081B2	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2081B3	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M62/2081L1	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M621/1002B1	HSD	M62 J25 - J30	
30/09/15 19:42:51	SIG	M621/1002B2	50R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 19:42:51	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2050A1	REDX	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2050A2	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2050A3	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2050A4	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2057A1	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2057A2	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2057A3	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2057J1	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2065A1	REDX	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2065A2	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2065A3	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2065A4	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2073K1	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2073K2	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2074A1	REDX	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2074A2	50R	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2079A1	REDX	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2079A2	NR	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2079A3	NR	M62 J25 - J30	
30/09/15 19:43:16	SIG	M62/2079A4	NR	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1979K1	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1979K2	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1981A1	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1981A2	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1981A3	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1981A4	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1987A1	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1987A2	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1987A3	50R	M62 J25 - J30	
30/09/15 19:50:40	SIG	M62/1987J1	50R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1979K1	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1979K2	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1981A1	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1981A2	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1981A3	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1981A4	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1987A1	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1987A2	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1987A3	40R	M62 J25 - J30	
30/09/15 19:50:55	SIG	M62/1987J1	40R	M62 J25 - J30	
30/09/15 19:51:00	SIG	M62/1981A1	30R	M62 J25 - J30	
30/09/15 19:51:00	SIG	M62/1987J1	30R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1968A1	60R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1968A2	60R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1968A3	60R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1968A4	60R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1974A1	LDR	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1974A2	50R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1974A3	50R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1974A4	50R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1979K1	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1979K2	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1981A1	20R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1981A2	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1981A3	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1981A4	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1987A1	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1987A3	40R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1987J1	20R	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1992A1	NR	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1992A2	NR	M62 J25 - J30	
30/09/15 19:51:06	SIG	M62/1992A3	NR	M62 J25 - J30	
30/09/15 19:51:11	SIG	M62/1981A1	STOP	M62 J25 - J30	
30/09/15 19:51:11	SIG	M62/1987J1	STOP	M62 J25 - J30	
30/09/15 19:52:55	SIG	M62/1987A1	NR	M62 J25 - J30	
30/09/15 19:52:55	SIG	M62/1987A3	NR	M62 J25 - J30	
30/09/15 19:52:55	SIG	M62/1987J1	NR	M62 J25 - J30	
30/09/15 19:52:55	SIG	M62/1992A1	NR	M62 J25 - J30	
30/09/15 19:52:55	SIG	M62/1992A2	NR	M62 J25 - J30	
30/09/15 19:52:55	SIG	M62/1992A3	NR	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1987A1	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1987A3	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1987J1	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1992A1	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1992A2	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1992A3	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1992J1	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1999A1	NR	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1999A2	NR	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1999A3	NR	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1999J1	50R	M62 J25 - J30	
30/09/15 19:53:18	SIG	M62/1999J2	LDL	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1968A1	OFF	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1968A2	OFF	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1968A3	OFF	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1968A4	OFF	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1974A1	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1974A2	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1974A3	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1974A4	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1979K1	OFF	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1979K2	OFF	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1981A1	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1981A2	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1981A3	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1981A4	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1987A1	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1987A3	NR	M62 J25 - J30	
30/09/15 19:53:35	SIG	M62/1987J1	NR	M62 J25 - J30	
30/09/15 19:54:21	SIG	M62/2157A1	50R	M62 J25 - J30	
30/09/15 19:54:21	SIG	M62/2157A2	50R	M62 J25 - J30	
30/09/15 19:54:21	SIG	M62/2157K1	50R	M62 J25 - J30	
30/09/15 19:54:21	SIG	M62/2163A1	50R	M62 J25 - J30	
30/09/15 19:54:21	SIG	M62/2163A2	50R	M62 J25 - J30	
30/09/15 19:54:26	SIG	M62/2157A1	40R	M62 J25 - J30	
30/09/15 19:54:26	SIG	M62/2157A2	40R	M62 J25 - J30	
30/09/15 19:54:26	SIG	M62/2157K1	40R	M62 J25 - J30	
30/09/15 19:54:26	SIG	M62/2163A1	40R	M62 J25 - J30	
30/09/15 19:54:26	SIG	M62/2163A2	40R	M62 J25 - J30	
30/09/15 19:54:31	SIG	M62/2157A1	30R	M62 J25 - J30	
30/09/15 19:54:31	SIG	M62/2163A1	30R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2144A1	60R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2144A2	60R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2144J1	60R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2144K1	60R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2151A1	LDR	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2151A2	50R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2151J1	50R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2151K1	50R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2155A1	LDR	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2155A2	50R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2155J1	50R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2155K1	50R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2157A1	20R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2157A2	40R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2157J1	NR	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2157J2	NR	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2157K1	40R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2163A1	20R	M62 J25 - J30	
30/09/15 19:54:37	SIG	M62/2163A2	40R	M62 J25 - J30	
30/09/15 19:54:42	SIG	M62/2157A1	STOP	M62 J25 - J30	
30/09/15 19:54:42	SIG	M62/2163A1	STOP	M62 J25 - J30	
30/09/15 19:56:35	SIG	M62/1974A1	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1974A2	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1974A3	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1974A4	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1981A1	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1981A2	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1981A3	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1981A4	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1987A1	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1987A3	OFF	M62 J25 - J30	
30/09/15 19:56:45	SIG	M62/1987J1	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2050B2	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2050B3	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2050B4	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2057B1	BLNK	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2057B2	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2057B3	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2057B4	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2065B2	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2065B3	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2065B4	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2065M1	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2074B1	BLNK	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2074B2	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2074B3	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2074B4	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2081B1	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2081B2	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2081B3	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M62/2081L1	NR	M62 J25 - J30	
30/09/15 19:59:10	SIG	M621/1002B1	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M621/1002B2	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 19:59:10	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2073K1	OFF	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2073K2	OFF	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2074A2	NR	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2074A3	NR	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2074A4	NR	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2079A1	BLNK	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2079A2	OFF	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2079A3	OFF	M62 J25 - J30	
30/09/15 19:59:25	SIG	M62/2079A4	OFF	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2050A2	NR	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2050A3	NR	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2050A4	NR	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2057A1	OFF	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2057A2	OFF	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2057A3	OFF	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2057J1	NR	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2065A1	BLNK	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2065A2	OFF	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2065A3	OFF	M62 J25 - J30	
30/09/15 19:59:26	SIG	M62/2065A4	OFF	M62 J25 - J30	
30/09/15 20:02:10	SIG	M62/2065B2	OFF	M62 J25 - J30	
30/09/15 20:02:10	SIG	M62/2081L1	OFF	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2050B2	OFF	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2050B3	OFF	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2050B4	OFF	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2065B1	BLNK	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2065B3	OFF	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2065B4	OFF	M62 J25 - J30	
30/09/15 20:02:11	SIG	M62/2065M1	OFF	M62 J25 - J30	
30/09/15 20:02:25	SIG	M62/2074A2	OFF	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2050A1	BLNK	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2050A2	OFF	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2050A3	OFF	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2050A4	OFF	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2057J1	OFF	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2074A1	BLNK	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2074A3	OFF	M62 J25 - J30	
30/09/15 20:02:26	SIG	M62/2074A4	OFF	M62 J25 - J30	
30/09/15 20:02:55	SIG	M62/2157J1	60R	M62 J25 - J30	
30/09/15 20:02:55	SIG	M62/2157J2	60R	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2106B1	REDX	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2106B2	NR	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2106B3	NR	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2106B4	NR	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2113B2	60R	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2113B3	60R	M62 J25 - J30	
30/09/15 20:08:37	SIG	M62/2113B4	60R	M62 J25 - J30	
30/09/15 20:12:59	SIG	M62/2120M1	50R	M62 J25 - J30	
30/09/15 20:12:59	SIG	M62/2120M2	50R	M62 J25 - J30	
30/09/15 20:13:05	SIG	M62/2120M1	40R	M62 J25 - J30	
30/09/15 20:13:05	SIG	M62/2120M2	40R	M62 J25 - J30	
30/09/15 20:14:26	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 20:14:26	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 20:14:26	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2012B1	REDX	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2012B2	NR	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2012B3	NR	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2012B4	NR	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2025B1	STOP	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2025B2	40R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2025B3	40R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2025B4	40R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2033B1	REDX	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2033B2	50R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2033B3	50R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2033B4	50R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2041B1	REDX	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2041B2	50R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2041B3	50R	M62 J25 - J30	
30/09/15 20:14:31	SIG	M62/2041B4	50R	M62 J25 - J30	
30/09/15 20:14:36	SIG	M62/2025B1	STOP	M62 J25 - J30	
30/09/15 20:17:09	SIG	M62/2033B3	???	M62 J25 - J30	
30/09/15 20:17:10	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 20:19:55	SIG	M62/2120M1	OFF	M62 J25 - J30	
30/09/15 20:19:55	SIG	M62/2120M2	OFF	M62 J25 - J30	
30/09/15 20:21:56	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 20:21:56	SIG	M62/2050B2	60R	M62 J25 - J30	
30/09/15 20:21:56	SIG	M62/2050B3	60R	M62 J25 - J30	
30/09/15 20:21:56	SIG	M62/2050B4	60R	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2106B2	NR	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2106B3	NR	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2106B4	NR	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2113B1	BLNK	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2113B2	OFF	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2113B3	OFF	M62 J25 - J30	
30/09/15 20:22:46	SIG	M62/2113B4	OFF	M62 J25 - J30	
30/09/15 20:23:21	SIG	M62/1960K1	50R	M62 J25 - J30	
30/09/15 20:23:21	SIG	M62/1960K2	50R	M62 J25 - J30	
30/09/15 20:23:26	SIG	M62/1960K1	40R	M62 J25 - J30	
30/09/15 20:23:26	SIG	M62/1960K2	40R	M62 J25 - J30	
30/09/15 20:23:31	SIG	M62/1960K1	30R	M62 J25 - J30	
30/09/15 20:23:36	SIG	M62/1955K1	TI	M62 J25 - J30	
30/09/15 20:23:36	SIG	M62/1955K2	TI	M62 J25 - J30	
30/09/15 20:23:36	SIG	M62/1960K1	20R	M62 J25 - J30	
30/09/15 20:23:36	SIG	M62/1960K2	40R	M62 J25 - J30	
30/09/15 20:23:42	SIG	M62/1956A1	50R	M62 J25 - J30	
30/09/15 20:23:42	SIG	M62/1956A2	50R	M62 J25 - J30	
30/09/15 20:23:42	SIG	M62/1956A3	50R	M62 J25 - J30	
30/09/15 20:23:42	SIG	M62/1960K1	STOP	M62 J25 - J30	
30/09/15 20:23:46	SIG	M606/2003B1	NR	M62 J25 - J30	
30/09/15 20:23:46	SIG	M606/2003B2	NR	M62 J25 - J30	
30/09/15 20:24:18	SIG	M62/1981A1	NR	M62 J25 - J30	
30/09/15 20:24:18	SIG	M62/1981A2	NR	M62 J25 - J30	
30/09/15 20:24:18	SIG	M62/1981A3	NR	M62 J25 - J30	
30/09/15 20:24:18	SIG	M62/1981A4	NR	M62 J25 - J30	
30/09/15 20:25:47	SIG	M62/2106B1	BLNK	M62 J25 - J30	
30/09/15 20:25:47	SIG	M62/2106B2	OFF	M62 J25 - J30	
30/09/15 20:25:47	SIG	M62/2106B3	OFF	M62 J25 - J30	
30/09/15 20:25:47	SIG	M62/2106B4	OFF	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1992A1	OFF	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1992A2	OFF	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1992A3	OFF	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1992J1	OFF	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1999A1	NR	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1999A2	NR	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1999A3	NR	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1999J1	OFF	M62 J25 - J30	
30/09/15 20:32:30	SIG	M62/1999J2	OFF	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2151A1	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2151A2	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2151J1	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2151K1	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2155A1	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2155A2	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2155J1	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2155K1	60R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2157A1	50R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2157A2	50R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2157K1	50R	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 20:34:46	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 20:35:30	SIG	M62/1999A1	OFF	M62 J25 - J30	
30/09/15 20:35:31	SIG	M62/1999A2	OFF	M62 J25 - J30	
30/09/15 20:35:31	SIG	M62/1999A3	OFF	M62 J25 - J30	
30/09/15 20:36:09	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 20:36:09	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2025B1	REDX	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2025B2	50R	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2025B3	50R	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2025B4	50R	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2041B2	60R	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2041B3	60R	M62 J25 - J30	
30/09/15 20:36:25	SIG	M62/2041B4	60R	M62 J25 - J30	
30/09/15 20:37:19	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 20:37:19	SIG	M62/2157A1	???	M62 J25 - J30	
30/09/15 20:43:56	SIG	M62/1960A1	50R	M62 J25 - J30	
30/09/15 20:43:56	SIG	M62/1960A2	50R	M62 J25 - J30	
30/09/15 20:43:56	SIG	M62/1960A3	50R	M62 J25 - J30	
30/09/15 20:44:27	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 20:44:27	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 20:44:27	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 20:44:32	SIG	M62/2203B1	40R	M62 J25 - J30	
30/09/15 20:44:32	SIG	M62/2203B2	40R	M62 J25 - J30	
30/09/15 20:44:32	SIG	M62/2203B3	40R	M62 J25 - J30	
30/09/15 20:44:37	SIG	M62/2203B1	30R	M62 J25 - J30	
30/09/15 20:44:42	SIG	M62/2203B1	20R	M62 J25 - J30	
30/09/15 20:44:42	SIG	M62/2203B2	40R	M62 J25 - J30	
30/09/15 20:44:42	SIG	M62/2203B3	40R	M62 J25 - J30	
30/09/15 20:44:48	SIG	M62/2203B1	STOP	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2144A1	OFF	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2144A2	OFF	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2144J1	OFF	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2144K1	OFF	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2151A1	NR	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2151A2	NR	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2151J1	NR	M62 J25 - J30	
30/09/15 20:45:57	SIG	M62/2151K1	NR	M62 J25 - J30	
30/09/15 20:46:28	SIG	M62/2177B1	NR	M62 J25 - J30	
30/09/15 20:46:28	SIG	M62/2177B2	NR	M62 J25 - J30	
30/09/15 20:46:28	SIG	M62/2177L1	NR	M62 J25 - J30	
30/09/15 20:46:28	SIG	M62/2177L2	NR	M62 J25 - J30	
30/09/15 20:48:57	SIG	M62/2151J1	OFF	M62 J25 - J30	
30/09/15 20:48:58	SIG	M62/2151A1	OFF	M62 J25 - J30	
30/09/15 20:48:58	SIG	M62/2151A2	OFF	M62 J25 - J30	
30/09/15 20:48:58	SIG	M62/2151K1	OFF	M62 J25 - J30	
30/09/15 20:57:31	SIG	M606/2003B1	50R	M62 J25 - J30	
30/09/15 20:57:31	SIG	M606/2003B2	50R	M62 J25 - J30	
30/09/15 20:57:31	SIG	M62/2005M1	50R	M62 J25 - J30	
30/09/15 20:57:31	SIG	M62/2005M2	50R	M62 J25 - J30	
30/09/15 20:57:32	SIG	M62/1992B1	NR	M62 J25 - J30	
30/09/15 20:57:32	SIG	M62/1992B2	NR	M62 J25 - J30	
30/09/15 20:57:32	SIG	M62/1992B3	NR	M62 J25 - J30	
30/09/15 20:57:32	SIG	M62/1992B4	NR	M62 J25 - J30	
30/09/15 20:57:37	SIG	M606/2003B1	40R	M62 J25 - J30	
30/09/15 20:57:37	SIG	M606/2003B2	40R	M62 J25 - J30	
30/09/15 20:57:37	SIG	M62/2005M1	40R	M62 J25 - J30	
30/09/15 20:57:37	SIG	M62/2005M2	40R	M62 J25 - J30	
30/09/15 21:06:14	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 21:06:14	SIG	M62/2157A1	???	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2155A1	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2155A2	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2155J1	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2155K1	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2157A2	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2157J1	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2157J2	OFF	M62 J25 - J30	
30/09/15 21:07:57	SIG	M62/2157K1	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M606/2003B1	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M606/2003B2	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M62/1992B1	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M62/1992B2	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M62/1992B3	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M62/1992B4	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M62/2005M1	OFF	M62 J25 - J30	
30/09/15 21:19:43	SIG	M62/2005M2	OFF	M62 J25 - J30	
30/09/15 21:33:20	SIG	M62/1955K1	50R	M62 J25 - J30	
30/09/15 21:33:20	SIG	M62/1955K2	50R	M62 J25 - J30	
30/09/15 21:33:20	SIG	M62/1960K1	50R	M62 J25 - J30	
30/09/15 21:33:20	SIG	M62/1960K2	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2197B1	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2197B2	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2197B3	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2199M1	50R	M62 J25 - J30	
30/09/15 22:00:58	SIG	M62/2199M2	50R	M62 J25 - J30	
30/09/15 22:01:29	SIG	M62/2203B1	50R	M62 J25 - J30	
30/09/15 22:01:29	SIG	M62/2203B2	50R	M62 J25 - J30	
30/09/15 22:01:29	SIG	M62/2203B3	50R	M62 J25 - J30	
30/09/15 22:02:58	SIG	M62/2203B1	OFF	M62 J25 - J30	
30/09/15 22:02:58	SIG	M62/2203B2	OFF	M62 J25 - J30	
30/09/15 22:02:58	SIG	M62/2203B3	OFF	M62 J25 - J30	
30/09/15 22:03:44	SIG	M62/2183B2	???	M62 J25 - J30	
30/09/15 22:03:45	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2177B1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2177B2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2177L1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2177L2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2183B1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2183L1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2183L2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2189B1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2189B2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2189B3	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2189B4	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2194B1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2194B2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2194B3	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2194B4	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2197B1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2197B2	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2197B3	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2199M1	OFF	M62 J25 - J30	
30/09/15 22:04:58	SIG	M62/2199M2	OFF	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2177B1	NR	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2177B2	NR	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2177L1	NR	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2177L2	NR	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2183B1	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2183B2	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2183L2	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2189B1	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2189B2	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2189B3	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2189B4	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2194B1	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2194B2	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2194B3	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2194B4	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2197B1	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2197B2	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2197B3	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2199M1	50R	M62 J25 - J30	
30/09/15 22:08:58	SIG	M62/2199M2	50R	M62 J25 - J30	
30/09/15 22:11:54	SIG	M62/2183B2	???	M62 J25 - J30	
30/09/15 22:11:55	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 22:29:42	SIG	M62/2183L1	OFF	M62 J25 - J30	
30/09/15 22:29:43	SIG	M62/2183L1	50R	M62 J25 - J30	
30/09/15 22:42:06	SIG	M62/2157A1	50R	M62 J25 - J30	
30/09/15 22:42:06	SIG	M62/2157A2	50R	M62 J25 - J30	
30/09/15 22:42:06	SIG	M62/2157K1	50R	M62 J25 - J30	
30/09/15 22:42:06	SIG	M62/2163A1	50R	M62 J25 - J30	
30/09/15 22:42:06	SIG	M62/2163A2	50R	M62 J25 - J30	
30/09/15 22:42:12	SIG	M62/2157A1	40R	M62 J25 - J30	
30/09/15 22:42:12	SIG	M62/2157A2	40R	M62 J25 - J30	
30/09/15 22:42:12	SIG	M62/2157K1	40R	M62 J25 - J30	
30/09/15 22:42:12	SIG	M62/2163A1	40R	M62 J25 - J30	
30/09/15 22:42:12	SIG	M62/2163A2	40R	M62 J25 - J30	
30/09/15 22:42:17	SIG	M62/2157A1	30R	M62 J25 - J30	
30/09/15 22:42:17	SIG	M62/2163A1	30R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2144A1	60R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2144A2	60R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2144J1	60R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2144K1	60R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2151A1	LDR	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2151A2	50R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2151J1	50R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2151K1	50R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2155A1	LDR	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2155A2	50R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2155J1	50R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2155K1	50R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2157A1	20R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2157A2	40R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2157J1	NR	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2157J2	NR	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2157K1	40R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2163A1	20R	M62 J25 - J30	
30/09/15 22:42:22	SIG	M62/2163A2	40R	M62 J25 - J30	
30/09/15 22:42:27	SIG	M62/2157A1	STOP	M62 J25 - J30	
30/09/15 22:42:27	SIG	M62/2163A1	STOP	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2177B1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2177B2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2177L1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2177L2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2183B1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2183B2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2183L1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2183L2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2189B1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2189B2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2189B3	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2189B4	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2194B1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2194B2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2194B3	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2194B4	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2197B1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2197B2	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2197B3	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2199M1	OFF	M62 J25 - J30	
30/09/15 22:44:59	SIG	M62/2199M2	OFF	M62 J25 - J30	
30/09/15 22:53:58	SIG	M62/2157J1	60R	M62 J25 - J30	
30/09/15 22:53:58	SIG	M62/2157J2	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2151A1	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2151A2	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2151J1	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2151K1	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2155A1	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2155A2	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2155J1	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2155K1	60R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2157A1	50R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2157A2	50R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2157K1	50R	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 23:12:30	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 23:13:20	SIG	M62/2163A1	NR	M62 J25 - J30	
30/09/15 23:13:20	SIG	M62/2163A2	NR	M62 J25 - J30	
30/09/15 23:15:31	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 23:15:31	SIG	M62/2157A1	???	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2144A1	OFF	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2144A2	OFF	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2144J1	OFF	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2144K1	OFF	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2151A1	NR	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2151A2	NR	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2151J1	NR	M62 J25 - J30	
30/09/15 23:18:59	SIG	M62/2151K1	NR	M62 J25 - J30	
30/09/15 23:19:36	SIG	M62/2097B3	OFF	M62 J25 - J30	
30/09/15 23:19:36	SIG	M62/2097B3	OFF	M62 J25 - J30	
30/09/15 23:19:37	SIG	M62/2097B3	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2155A1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2155A2	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2155J1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2155K1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2157A1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2157A2	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2157J1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2157J2	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2157K1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2163A1	OFF	M62 J25 - J30	
30/09/15 23:20:59	SIG	M62/2163A2	OFF	M62 J25 - J30	
30/09/15 23:21:59	SIG	M62/2151J1	OFF	M62 J25 - J30	
30/09/15 23:22:00	SIG	M62/2151A1	OFF	M62 J25 - J30	
30/09/15 23:22:00	SIG	M62/2151A2	OFF	M62 J25 - J30	
30/09/15 23:22:00	SIG	M62/2151K1	OFF	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2050B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2050B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2050B4	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2057B1	REDX	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2057B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2057B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2057B4	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2065B1	REDX	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2065B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2065B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2065B4	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2065M1	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2074B1	REDX	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2074B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2074B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2074B4	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2081B1	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2081B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2081B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2081L1	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2088B1	REDX	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2088B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2088B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2088B4	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2097B1	REDX	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2097B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2097B3	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M62/2097B4	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M621/1002B1	HSD	M62 J25 - J30	
30/09/15 23:24:44	SIG	M621/1002B2	50R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M621/1010B1	60R	M62 J25 - J30	
30/09/15 23:24:44	SIG	M621/1010B2	60R	M62 J25 - J30	
30/09/15 23:32:55	SIG	M62/2097B2	40R	M62 J25 - J30	
30/09/15 23:32:55	SIG	M62/2097B3	40R	M62 J25 - J30	
30/09/15 23:32:55	SIG	M62/2097B4	40R	M62 J25 - J30	
30/09/15 23:33:01	SIG	M62/2097B4	30R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2097B2	40R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2097B3	40R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2097B4	20R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2106B1	REDX	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2106B2	50R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2106B3	50R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2106B4	LDL	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2113B1	REDX	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2113B2	50R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2113B3	50R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2113B4	LDL	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2117B1	60R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2117B3	60R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2120M1	60R	M62 J25 - J30	
30/09/15 23:33:06	SIG	M62/2120M2	60R	M62 J25 - J30	
30/09/15 23:33:12	SIG	M62/2097B4	STOP	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2050B2	60R	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2050B3	60R	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2050B4	60R	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2057B1	BLNK	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2057B2	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2057B3	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2057B4	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2065B2	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2065B3	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2065B4	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2065M1	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2074B1	BLNK	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2074B2	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2074B3	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2074B4	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2081B1	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2081B2	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2081B3	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2081L1	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2088B2	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2088B3	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M62/2088B4	NR	M62 J25 - J30	
30/09/15 23:33:40	SIG	M621/1002B1	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M621/1002B2	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M621/1010B1	OFF	M62 J25 - J30	
30/09/15 23:33:40	SIG	M621/1010B2	OFF	M62 J25 - J30	
30/09/15 23:33:55	SIG	M62/2106B2	40R	M62 J25 - J30	
30/09/15 23:33:55	SIG	M62/2106B3	40R	M62 J25 - J30	
30/09/15 23:35:13	SIG	M62/2097B4	40R	M62 J25 - J30	
30/09/15 23:35:13	SIG	M62/2106B4	50R	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2097B4	40R	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2106B4	40R	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2113B4	50R	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2117B1	OFF	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2117B3	OFF	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2120M1	OFF	M62 J25 - J30	
30/09/15 23:35:18	SIG	M62/2120M2	OFF	M62 J25 - J30	
30/09/15 23:36:40	SIG	M62/2065B2	OFF	M62 J25 - J30	
30/09/15 23:36:40	SIG	M62/2081L1	OFF	M62 J25 - J30	
30/09/15 23:36:41	SIG	M62/2065B1	BLNK	M62 J25 - J30	
30/09/15 23:36:41	SIG	M62/2065B3	OFF	M62 J25 - J30	
30/09/15 23:36:41	SIG	M62/2065B4	OFF	M62 J25 - J30	
30/09/15 23:36:41	SIG	M62/2065M1	OFF	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2088B2	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2088B3	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2088B4	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2097B2	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2097B3	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2097B4	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2106B2	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2106B3	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2106B4	NR	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2113B1	BLNK	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2113B2	OFF	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2113B3	OFF	M62 J25 - J30	
30/09/15 23:37:56	SIG	M62/2113B4	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2088B1	BLNK	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2088B2	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2088B3	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2088B4	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2097B1	BLNK	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2097B2	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2097B3	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2097B4	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2106B1	BLNK	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2106B2	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2106B3	OFF	M62 J25 - J30	
30/09/15 23:40:56	SIG	M62/2106B4	OFF	M62 J25 - J30	
30/09/15 23:40:57	SIG	M62/2088B1	BLNK	M62 J25 - J30	
30/09/15 23:40:57	SIG	M62/2097B1	BLNK	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2012B1	BLNK	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2012B2	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2012B3	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2012B4	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2025B1	BLNK	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2025B2	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2025B3	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2025B4	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2033B1	BLNK	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2033B1	BLNK	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2033B2	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2033B3	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2033B4	OFF	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2041B2	NR	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2041B3	NR	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2041B4	NR	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2050B2	NR	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2050B3	NR	M62 J25 - J30	
30/09/15 23:45:00	SIG	M62/2050B4	NR	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2041B1	BLNK	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2041B2	OFF	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2041B3	OFF	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2041B4	OFF	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2050B2	OFF	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2050B3	OFF	M62 J25 - J30	
30/09/15 23:48:00	SIG	M62/2050B4	OFF	M62 J25 - J30	
30/09/15 23:48:01	SIG	M62/2041B1	BLNK	M62 J25 - J30	